November 18, 2025 (Plan Commission Meeting)
1
PLAN COMMISSION MEETING
TUESDAY, NOVEMBER 18, 2025
5:30 PM, ALLOUEZ VILLAGE HALL
CALL TO ORDER/ROLL CALL
Lefebvre called the meeting to order at 5:30 p.m.
Present: Brunmeier, Lefebvre, Marsch, Ostrenga-Ruffell, Robillard, Van Remortel
Excused: Capichano-Simmons
Also Present: Fuller, March
MODIFY/ADOPT AGENDA
Marsch / Van Remortel moved to adopt the agenda as presented. Motion carried.
MODIFY / ADOPT MINUTES
A. Minutes dated July 15, 2025
Ostrenga-Ruffell / Van Remortel moved to approve the minutes dated July 15, 2025, as presented and
placed on file. Motion carried.
B. Minutes dated September 29, 2025
Van Remortel / Ostrenga-Ruffell moved to approve the minutes dated September 29, 2025, as presented
and placed on file. Motion carried.
ANNOUNCEMENTS
• None
PUBLIC APPEARANCES
• None
PRESENTATION BY COMMUNITY ADVOCATE, MEGAN DARLING – RIVERSIDE DRIVE
CORRIDOR: SAFE ACCESS TO THE FOX RIVER TRAIL
Megan Darling, 221 Arbor Lane
• Participated in the Green Bay Transportation Academy that provides students with the fundamentals of
local transportation information, planning, and provides the skills to advocate for themselves and their
communities.
• The Riverside Drive Corridor is four-lane state arterial road separating neighborhoods from the Fox
River Trail. There are two safe crossings over a three-mile area.
• Since the opening of the trail in 2001 it has become of the most popular and heavily used trails in the
State of Wisconsin.
November 18, 2025 (Plan Commission Meeting)
2
• With it being one of the most popular trails there is not a safe connection between neighborhoods and
the trail. Riverside Drive is designed to encourage speeding even though the speed limit is 35mph.
• Community is needing safe access to trail, continuous sidewalks, and have the Village be more walking
and biking friendly.
• Offered different suggestions in order to accommodate and accomplish.
Discussion:
• A meeting with WisDOT would be the best place to start.
• Any sidewalks or changes to Riverside would come out of the Village budget due to the State Hwy
holding up better than they thought.
• State controlled roadways are very difficult to lower the speed limit.
• What can Allouez do to make changes to Riverside Drive? Walkways can be added, but the DOT would
need to give final approval.
• Around 98.5% of Allouez residents live east of Riverside Drive. Only 1.5% of the Allouez population
does not have to cross Riverside Drive to utilize the trail.
• A three-lane configuration on Riverside Drive is possible, and it only takes some paint and convincing
WisDOT that it is the smart move. This can improve road crossing conditions including adding a
pedestrian island.
• Brown County Planning and Land Services did a study in 2004 of potential crossings on Riverside
Drive. The railroad trestle bridge was identified as a potentially low-cost solution if that railroad ever
goes away.
• Some of the other issues are once you get people safely across Riverside Drive, how do you get them
onto the trail without going onto private property?
• WisDOT did design an intersection at Allouez Avenue, but the Village would have to pay for it.
• A DNR controlled tunnel currently goes under the road near Lazarre on Riverside Drive in Heritage Hill
Park. It would present a challenge because the DNR utilizes it to get to the other half of their park on the
other side of the road.
• The Village obtained a grant to install a trail and controlled crossing on the north side of STH172 a few
years ago.
• Possibly changing the designation of the road from a state trunk highway to a state connecting highway.
The difference would be local control, to maintain a state connecting highway the Village would receive
funds to plow the road, annual maintenance, and that is calculated on a cost per mile basis. Would also
allow the Village input on the road conversations.
• In 2019, a St. Norbert’s student reached out to the Village and wanted to conduct a survey on the Fox
River Trail. Staff provided the Plan Commission with a presentation at the time with the results of the
survey which were about the best practices and best locations for crossings.
DISCUSSION RE: CONTINUING EDUCATION TOPICS FOR PLANNING
• To be moved to the next meeting due to time constraints.
REPORT RE: COMMUNITY DEVELOPMENT AUTHORITY FORMATION
• To be moved to the next meeting due to time constraints.
November 18, 2025 (Plan Commission Meeting)
3
REPORT RE: ANNUAL TAX INCREMENTAL DISTRICT REPORT
• The Joint Review Board met and approved the report by resolution.
• The TID is scheduled to close in 2039. It can close earlier if we are at a breakeven point with no
infrastructure projects in mind. It could close in 2028. A lot of the projects could be funded using TID
funds. Projected revenues through the closure of the TID are around $29 million. Current expected
expenditure is $14 million.
ADJOURNMENT
Ostrenga-Ruffell / Van Remortel moved to adjourn at 6:30 p.m. Motion carried.