PUBLIC WORKS COMMITTEE MINUTES
Tuesday, October 7th, 2025 at 5:30 p.m.
Allouez Village Hall, 1900 Libal Street
CALL TO ORDER/ ROLL CALL
Chairperson Genrich called the meeting to order at 5:30 p.m.
Present: Collison, Genrich, Lefebvre, Leiterman
Excused: Beyler
Also present: Sean Gehin, Jim March
MODIFY/ADOPT AGENDA
Genrich/Collison moved to adopt the agenda as presented. Motion carried.
APPROVAL OF SEPTEMBER 2ND, 2025 MINUTES
Lefebvre/Genrich moved to approve the September 2, 2025 minutes. Motion carried.
ANNOUNCEMENTS
a. Fall Clean-up, October 20th thru November 21st
PUBLIC APPEARANCES
- None
LEBRUN STREET EXTENSION
S. Gehin:
- The City of De Pere is requesting to either extend LeBrun Street or construct a private
driveway east of McCastlen Street to serve a proposed 5.5-acre multi-family residential
development. The proposed development is located east of Manitowish Place in the City
of De Pere.
- Village and City staff have met multiple times to determine how best to serve the
proposed development while minimizing impacts to those abutting the LeBrun Street
right-of-way.
- The following roadway access options were reviewed and discussed:
o Extension of LeBrun Street from McCastlen Street west 500’ to a proposed Cul-
De-Sac (Centered in R/W) – Construction of 24-ft wide roadway centered in the
vacant street right-of-way. This option includes the engineering and grading of
an 8-ft trail along the north side of the roadway for consideration in the future.
o Extension of LeBrun Street from McCastlen Steet west 500’ to a proposed Cul-
De-Sac (Offset in R/W) – This option would shift the roadway south limiting the
need of Village right-of-way to 5.5 feet. This option would also include the
engineering and grading of an 8-ft trail along the north side of the roadway for
consideration in the future. Preferred Option.
o Construction of a Private Driveway in the City right-of-way
o Extension of LeBrun Street from McCastlen Street to East River Drive – Option
was eliminated due to the number of residential homes in close proximity to the
LeBrun Street right-of-way.
- The preferred option works to create a greater buffer from the street to the homes
located to the north, ensures the proper maintenance of the roadway pavement in the
future, and furthers the collaboration between the Village and the City.
Scott Thoresen, City of De Pere, Public Works Director
- Discussed the proposed multi-family residential development (approximately 60 units)
& gave an overview of the proposed plan for utilities.
- Preferred option includes construction of a 24’ foot roadway, flange to flange which
includes curb and gutter/asphalt & pavement. Due to the narrow roadway, no parking
will be allowed on the street.
- If Allouez would like to see a private driveway, the City of De Pere would look at
vacating the right-of-way & Allouez would be on their own for future trail or sidewalk.
- Current proposal would allow for joint/share between the City and Village.
- If proposal is agreed upon, intergovernmental agreement will need to be drafted for
maintenance purposes.
- No plan to hold public informational meeting(s) (due to no changes to zoning)
- Grant funding available to assist in pedestrian trail/sidewalk
Lefebvre/Genrich moved to suspend the rules. Motion carried.
Cora Haltaufderheid, 3962 Presque Isle Court
- Built home in Allouez around 35 years ago and is disappointed neighbors did not hear
about this topic sooner. There was an agreement established in 2013 to have a walking
path on Lebrun Street.
- If there is no street parking on proposed driveway, the cul de sacs nearby will become
parking lots. Believes LeBrun Street was closed originally due to the number of car
accidents.
Joyce Lefebvre, 824 Ontonagon Court
- Height of proposed units/Fire Department access
- Where is cul du sac ending on the Allouez side?
Laurie Larson, 3963 Presque Isle Court
- What is the timeline of this project?
- Believes her property value will drop if LeBrun Street is extended.
Lefebvre/Genrich moved to pick up the rules. Motion carried.
Discussion:
- Proposed sewer and water plan
- Property is already zoned for multi-family use
- Lighting/landscaping requirements
- Difference in road width: 36 feet wide (Le Brun west of McCastlen St.), proposal (East of
McCastlen) is 24 feet wide (too narrow for street parking)
- Parking/Sidewalk/Trail Maintenance
- Why doesn’t LeBrun St. go all the way through to E. River Drive?
Lefebvre/Leiterman moved to recommend to the Village Board approval of the preferred
option layout (Extension of LeBrun Street from McCastlen Steet west 500’ to a proposed Cul-
De-Sac (Offset in R/W) – option would shift the roadway south limiting the need of Village
right-of-way to 5.5 feet. This option would also include the engineering and grading of an 8-ft
trail along the north side of the roadway for consideration in the future.) pending City of De
Pere and Village of Allouez work out the details and recommend having the developer create
a plan to block the street lighting, the traffic noise, and landscaping. Motion carried.
LIBAL STREET ENGINEERING SERVICES AGREEMENT
- The Village of Allouez has received a Surface Transportation Block Grant (STBG) for the
resurfacing of Libal Street from LeBrun Street to Hoffman Road.
- Estimated construction cost is $1,424,100 with federal funding of $1,139,280 (80%) and
local share of $284,820.
- A selection committee reviewed and ranked the proposals in order of preference based
on qualification criteria, not by price.
- raSmith Inc’s proposal scored the highest among the 5 proposals received. The
qualification-based selection of raSmith Inc was approved by the Public Works
Committee and Village Board on September 2nd.
- Proposal for professional fees from raSmith was received in the amount of $309,269.84,
after further review of the contract, Gehin since worked with the firm to lower the cost
to $285,615.89.
- Agreement does not include real estate acquisition services or purchase of.
Collison/Lefebvre moved to approve the Libal Street Engineering Services Agreement with
raSmith, Inc. in the amount of $285,615.89. Motion carried.
Leiterman/Collison moved to table items #7 (2026 Public Works Department Budget, #9
(Report- Water Distribution System- Water Usage) and #10 (2025 Construction Project
Update) to the next Public Works Committee meeting due to time constraints. Motion
carried.
ADJOURNMENT
Genrich /Lefebvre moved to adjourn at 6:27 p.m. Motion carried.
Minutes submitted by Carrie Zittlow, Clerk/Treasurer