August 5 2025 Village Board Minutes
Village of Allouez · Brown County · meeting of Aug 5, 2025 · Minutes
Open the original document More from Village of Allouez
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Allouez Village Board Meeting (August 5, 2025)
ALLOUEZ VILLAGE BOARD MEETING
TUESDAY, AUGUST 5, 2025 AT 6:30 P.M.
ALLOUEZ VILLAGE HALL, 1900 LIBAL STREET
CALL TO ORDER / ROLL CALL
In the absence of President Rafter, Trustee Atwood nominated Trustee Matthew Harris for chair.
Atwood/Marsch moved to nominate and elect Harris as Chair. Motion carried.
Trustee Harris called the meeting to order at 6:34 p.m.
Present: Atwood, Genrich, Harris, Marsch, Sampson
Excused: Leiterman, Rafter
Staff Present: Trevor Fuller, Sean Gehin, Josh Ritchie
MODIFY / ADOPT AGENDA
Atwood/Marsch moved to modify the agenda removing item #5. Motion carried.
ANNOUNCEMENTS
a. Music in the Park at Green Isle on August 14th from 5:00 pm – 8:00pm
b. Movie in the Park on August 15th at Voyageur Park beginning at dusk
c. Picklefall Pickleball Tournament on October 4th
d. Hiring of Josh Wood, Equipment Operator, Street Department
o S. Gehin – pleased to announce the hiring of Josh Wood who recently moved to Green Bay
from the state of Washington. Josh has over 20 years of experience of operating trucks and
front-end loaders. His 1st day was Monday, July 28th, and very excited to have him as part of
the team.
PUBLIC COMMENT
Becky Nyberg, 214 Simonet Street
- Responsible for organizing Good Neighbor Week in the Village of Allouez. The City of Green
Bay had the program established and with it being such a great program, began one in the
Village with collaboration from the City of Green Bay.
- Due to demand of need, the Village of Allouez set-up their own week for Good Neighbor
Week taking place the week of August 25th. This is a different week than the City of Green
Bay in order to have helpers from both communities assist each other.
- Currently looking for volunteers and personally invited the Board Members to come and
help.
- Five homes have been selected to receive the help, which is all outside work from staining a
deck, weeding, and any other yard work that is needed. Lunch will be provided by either the
home owner or the Neighbor Week program.
CONSENT AGENDA
Sampson/Atwood moved to:
a. Approval of Village Board minutes dated 7/1/25
b. Accept and Place on File minutes from:
i. Plan Commission dated 3/18/25 & 4/15/2025
ii. Public Works dated 6/3/25
b. Approval of accounts payable dated 6/27/25, 7/3/25, 7/11/25, 7/18/25, 7/25/25
Motion carried.
Allouez Village Board Meeting (August 5, 2025)
CHLORINE LEAK INCIDENT REPORT
S. Gehin
- On May 5, 2025, at 10:49 a.m. a chlorine gas leak began in the chlorine room of the AZ-2
Water Connection Station located at 141 Vande Hei Road. One Water Department operator
was present in the room at the time of the leak. Once the operator evacuated the chlorine
room 911 was contacted. Green Bay Metro Fire Department HazMat team was deployed to
the scene to contain the situation.
Josh Ritchie, Water Department Foreman
- The residual chlorine of the incoming water (from CBCWA) dropped below 0.65mg/L
around 1:00 a.m. on May 5, 2025. This prompted the chlorine booster pumps to activate.
- A water department operator arrived at the AZ-2 connection station at 7:15 a.m. to perform
the daily rounds at the station. Upon arrival it was noticed that the chlorine booster pumps
were running, but no chlorine was being added.
- Upon investigation, the operator noticed that the manually operated valves on chlorine gas
tanks were in the closed position.
- The operator manually turned the operating valve on chlorine tank 2 a quarter turn to the
“on” position.
- The system began to pump chlorine as normal.
- The pre-chlorine level reached 0.75mg/L at 8:05 a.m. and automatically turned off the
chlorine booster system.
- The operator returned to AZ-2 connection station to investigate a slight chlorine smell
around 10:30 a.m. The operator began investigating the leak using a bottle of ammonia. The
leak was detected at the connection point between the Regal Automatic Switchover Gas
Chlorinator and the Chlorine Gas Cylinder Valve.
- The operator turned to grab a wrench that was located on the windowsill behind him and at
this time the chlorinator disconnected from the cylinder valve and began leaking chlorine
gas.
- The operator immediately left the room and called the water utility foreman.
Chlorine Leak Timeline:
• 10:49 a.m. - The operator calls the water utility foreman to inform of chlorine leak. The
foreman sends another operator to the site and prepares to alert emergency response.
• 10:55 a.m. - Water Utility Forman calls 911
• 11:10 a.m. - Emergency response team begins to arrive onsite and begins setting a
perimeter of the area.
• 11:30 a.m. – Green Bay Metro HazMat team contains the leak and begins monitoring
ambient air.
• 12:10 p.m. – The operator is transported via ambulance (non-emergency) to Aurora
BayCare Medical Center for further evaluation.
• 2:00 p.m. – The operator is released from Aurora BayCare Medical Center with no injury.
Post Incident Investigation, May 6, 2025:
• It was discovered that two lead seals were present at the connection point of the chlorinator
and the chlorine cylinder valve. It is believed that this caused an insufficient connection
between the regulator and the chlorine cylinder ultimately causing the chlorine leak.
o Every time the chlorinator is removed from a chlorine gas cylinder valve, the lead
seal should be removed and replaced.
Allouez Village Board Meeting (August 5, 2025)
o Chlorine Cylinder installation instructions are posted on the wall in the Chlorine
Room.
o Instructions for the removal and replacement of the lead seals is also posted on the
chlorinator next to the connection point.
• Accident was reported to both the WDNR and EPA.
• Last tank exchange was January of 2024.
Dave Dellemann, Green Bay Fire Department
- One of the HazMat Technicians on scene.
- Appreciative that there was a representative from the Village of Allouez on the scene when
they arrived. This enabled them to get notification that there was not anyone in the
building, which helps with the process.
- The Battalion Chief arrived. Winds were south so the houses facing the building were put
under “shelter at place”. Knocked on doors, residents that were home were instructed to
turn off central air/HVAC to stop anything from migrating into the home.
- Engine arrived for decontamination purposes. To stop the leak, the tank had to be shut off.
- The employee that was exposed was transported to a medical facility.
Tony Piontek, Green Bay Fire Department Battalion Chief
- Wanted to give the Village of Allouez employees recommendation for the actions prior,
during, and after the event. They did exactly what they were supposed to do, which enabled
the Fire Department to be able to do their job in a timely and informative manner.
WATER SERVICE LINE INVENTORY AND LEAD SERVICE LINE REPLACEMENT UPDATE
S. Gehin and Josh Ritchie, Water Department Foreman
- Water Service History: Lead historically was used for water services but was phased out in
the 1930’s and 1940’s. In 1984, lead solder used in interior plumbing was phased out. As of
1991 LCR requires lead monitoring/testing. In 2021 LCR requires inventory of water
services and in 2024 LCR requires ID & replacement of all lead.
- The Lead-Copper Rule Revision became an EPA requirement in December 2021, with the
DNR enforcing it in Wisconsin. Municipal requirements are to inventory all water services –
public and private including material, size, age, address, and method of verification. The
inventory was submitted to the DNR by October 16, 2024.
- The Village has a plan to identify all unknown services by 2030 with identifying
approximately 500 homes/businesses a year. Cross Connection Control Inspections are
completing about 300 homes per year with the remaining 200 being done by Water Utility
Appointments. Currently working north to south (oldest to newest).
- Known lead services are 65 locations with 49 being utility services and 18 are private
services. Known galvanized services are a total of 35 with 8 galvanized downstream of lead.
Allouez Village Board Meeting (August 5, 2025)
2025 CONSTRUCTION PROJECT UPDATE
S. Gehin
Reconstruction Projects:
- Park Drive: Road excavation has been completed with Private Side Sanitary Sewer Lateral
installation and concrete work (curb and driveway aprons) to follow. Project is on schedule.
- St. Francis Drive: Storm sewer main installation to continue. Temporary water to be
installed between Crescent Drive and Webster Avenue later in the week. Watermain
installation between Crescent and Webster to follow. Project is on schedule.
- Crescent Drive: Road excavation has been completed with Private Side Sanitary Sewer
Lateral installation and concrete work (curb and driveway aprons) to follow. Project is on
schedule.
- Greene Avenue: Watermain installation to continue between Regina and Greenwald. Storm
sewer main installation to begin mid-week. Project is slightly behind schedule due to extra
work added. Work will be completed by the middle to end of October.
- Regina Street: Project to begin after contractor completes work between East River Drive
and Greenwald.
- Webster Avenue Crossing: Beginning on August 4th, the Village of Allouez, in partnership
with the Brown County Highway Department, will be closing the outside north and
southbound lanes at Webster Avenue (CTH X) and Greene Avenue intersection. The closure
is necessary to make improvements to the existing pedestrian crossing including new ADA
curb ramps, rapid flashing beacons, pavement markings and signage.
Sanitary Sewer Lining Project: all the work has been completed
East River Drive Watermain Relay:
- Work has been completed. Road restoration to be completed under separate contract in
August.
Allouez Village Board Meeting (August 5, 2025)
Street Resurfacing Project:
- E. Ledgeview Street: Concrete work has been completed with pavement removal to begin
week of August 4th.
- Gwynn Street: Concrete work is currently in progress. Minor utility work and pavement
removal to follow.
- Normandy Lane: Concrete removal and replacement to begin this week with minor utility
work to follow.
- East River Drive: Concrete removal and replacement to begin soon with minor utility work
to follow.
- Braebourne Court: Concrete work has been completed with pavement removal to begin
week of August 4th.
- W. Mission Street: Concrete work has been completed with pavement removal to begin
week of August 4th.
FUTURE AGENDA ITEMS
- None
ADJOURNMENT
Sampson/Genrich moved to adjourn at 7:22 p.m. Motion carried.
Minutes submitted by Kim Siudzinski, Deputy Clerk
Source: Village of Allouez website. First collected Oct 15, 2026.