Jeffrey Bodoh
Project Engineer
City of Kaukauna
PROJECT 3-26
2026 ALLEY PAVING PROJECT
P u b l i c I n f o r m a t i o n M e e t i n g
June 22, 2026
Dixon Street / Seventh Street Alley
- Between Quinney Avenue and East Terminus
Seventh Street / Eighth Street Alley
- Between Crooks Avenue and Metoxen Avenue
PROJECT AREAS
C I T Y O F
K A U K A U N A
Fourth Street/ Fifth Street Alley
- Between Miner Street and Main Avenue
PROJECT AREAS
C I T Y O F
K A U K A U N A
Thirteenth Street/ Fourteenth Street Alley
- Between Hendricks Avenue and Main Avenue
PROJECT AREAS
C I T Y O F
K A U K A U N A
C I T Y O F
K A U K A U N A
PROJECT OVERVIEW
• Remove Existing Pavement and Base
• Install new storm sewer and catch basins in alleys
• Remove Sub-Grade Material As-Needed
• Install and Grade Granular Base
• Install Asphalt Pavement
• Replace Concrete Apron/Walk Where Needed
• Add Gravel Shouldering
• Turf Restoration
• The alleys in this year’s Alley Paving
Project have not been reconstructed
since the 1960s. These alleys are
rutted, have quite a few potholes and
cracks.
CONSTRUCTION – WHY IS IT NEEDED
C I T Y O F
K A U K A U N A
• The Contractor will be installing new
storm sewer and catch basins. They
will be connecting to existing storm
sewer pipes that are connected to
storm inlets at the ends of the alley.
• This work will take place prior to
excavation and stone placement
CONSTRUCTION – STORM SEWER
C I T Y O F
K A U K A U N A
• The contractors tentative schedule has them
starting the storm sewer replacement, excavation
and stone placement on July 28th on the alley.
• They will first replace the section of storm sewer.
• The contractor will then excavate the alley.
Excavations are 1 foot beyond the proposed edge
of pavement and dug down 16 inched below the
proposed top of the alley.
• A geotextile fabric is laid at the bottom of the
excavation. Stone will be placed on top of the
fabric.
• The stone is graded and compacted.
• Shortly after the stone is graded and compacted,
the paving contractor will pave the alley with
asphalt. The alley will have two mats of asphalt –
a binder mat and a final mat.
CONSTRUCTION – EXCAVATION AND STONE PLACEMENT
C I T Y O F
K A U K A U N A
• Shortly after the stone is graded and compacted,
the paving contractor will pave the alley with
asphalt.
• The alley will have two mats of asphalt – a binder
mat, a course grade asphalt, and a surface mat
which is a fine grade asphalt.
• The contractor will roll and compact the asphalt to
provide a hardened surface that can be driven on.
• Typically, it takes about 24 hours for the asphalt to
fully cool and harden enough to drive on.
CONSTRUCTION – ASPHALT PAVING
C I T Y O F
K A U K A U N A
• Shortly after the asphalt paving is done, the
contractor installs gravel shouldering on both
sides of the new asphalt pavement. This
shouldering is typically one foot wide and protects
the edge of the asphalt.
• After the gravel shouldering is done, the
contractor will do the landscape restoration.
CONSTRUCTION – SHOULDERING AND LANDSCAPE RESTORATION
C I T Y O F
K A U K A U N A
• RESIDENTIAL ASSESSMENTS
– 8.03(2) ASSESSMENTS
(h) The cost per foot for such assessments shall be
set based on current bid prices and include
reasonable engineering fees.
– Ordinance changing special assessment for alley
paving adopted in 2019. Ordinance now states
property owners are responsible for 2/3 of the project
costs and the City is responsible for 1/3.
11
ASSESSMENT RATES
C I T Y O F
K A U K A U N A
C I T Y O F
K A U K A U N A
ASSESSMENT RATES
Special Assessment Rates for Asphalt Alley Reconstruction
2026 Asphalt Alley Reconstruction
• Alley Between E. Dixon Street and E. 7th Street – Quinney Avenue to 250’ east of Metoxen Avenue
• Alley Between E. 7th Street and E. 8th Street – Crooks Avenue to Metoxen Avenue
• Alley Between W. 4th Street and W. 5th Street – Miner Street to Main Avenue
• Alley Between W. 13th Street and W. 14th Street – Hendricks Avenue to Main Avenue
$32.09/ Frontage Foot
(14 feet wide)
Comparison to 2025:
- 2025 Assessment Rate was $38.32 / Frontage Foot (14 feet wide)
- 2025 Average Assessment was $ 2,435.98
Proposed 2026 Average Assessment is $1,932.60
8.03(2) ASSESSMENTS
(i) All special assessments under this section
8.03(2) shall be paid over a period of 10 years or
less. ……. If the City borrowed the money for the
project, the interest rate shall be at the same
interest rate paid by the City plus 1%.
Estimated Interest Rate: 5.3% (4.3% +1%)
13
ASSESSMENT PAYMENTS
C I T Y O F
K A U K A U N A
C I T Y O F
K A U K A U N A
ASSESSMENT PAYMENTS
Special Assessment Timeline
October 2026 • Project is completed.
• Engineering Department measures “as-built” quantities.
November 2026 • Final Special Assessment totals forwarded to Finance Department.
• Special Assessment Invoices sent out to property owners.
• 30 days to pay in full to avoid finance charges.
December 2026 • Any unpaid special assessments appear on property tax bill.
• 1/10th of total assessment plus interest due.
Following Decembers • 1/10th of assessments plus interest due.
REPAIRS AND LIFE EXPECTANCY
The City estimates that hot mix asphalt alleys
should last 15 years. If any surface repairs are
necessary during the life expectancy the repairs
shall be made at the City’s general expense, and
not by special assessment against abutting
property owners.
15
ASSESSMENT POLICIES
C I T Y O F
K A U K A U N A
PUBLIC INFORMATION
MEETING
• QUESTIONS/COMMENTS FROM PUBLIC
• STAFF AVAILABLE AFTER THE PUBLIC
INFORMATION MEETING FOR INDIVIDUAL
DISCUSSIONS
• YOU CAN CONTACT JEFF BODOH AT
(920) 766-6305 EXT 3 OR AT
JBODOH@KAUKAUNA.GOV WITH QUESTIONS
17
PUBLIC INFORMATION MEETING
C I T Y O F
K A U K A U N A
THANK YOU