Page 1 of 4 Town Board
Agenda posted at Greenville Town Hall, Greenville Post Office, Town Website ( www.townofgreenville.com ) and em ailed to Rachel Rausch. This is a
public m eeting. As such, a quorum of the Town Board, Plan Com m ission, Park Com m ission, Board of Appeals, or other Town com m ittee m ay be
in attendance. However, the only business to be conducted is for the Town Board.
TOWN BOARD
MEETING AGENDA
DATE:
TIME:
LOCATION:
Monday, April 22, 2019
Immediately Following Sanitary District #2
Greenville Town Hall, W6860 Parkview Drive, Greenville, WI 54942
OPENING:
1. CALL TO ORDER/ROLL CALL
2. PLEDGE OF ALLEGIANCE
PRESENTATIONS & PUBLIC FORUM:
3. PUBLIC HEARINGS:
4. PRESENTATIONS:
4.a. Spring 2019 Road Conditions Report
19.04.22 Roadway Conditions.pdf
5. PUBLIC COMMENT FORUM:
Members of the public are welcome to address the Town Board. Individuals wishing to speak on an
item (whether on the agenda or not) must sign in prior to the start of the meeting and may speak
during the Public Comment Forum segment of the meeting. This segment is placed early in the
agenda so the public may make their comments prior to any discussion or action by the Town Board.
Individual comments are limited to no more than three minutes each. The Public Input section is
limited to a total of 15 minutes. Once the public input segment ends there will be no additional
discussion from the audience. The Town Board may suspend this rule if deemed necessary.
1
Page 2 of 4 Town Board
Agenda posted at Greenville Town Hall, Greenville Post Office, Town Website ( www.townofgreenville.com ) and em ailed to Rachel Rausch. This is a
public m eeting. As such, a quorum of the Town Board, Plan Com m ission, Park Com m ission, Board of Appeals, or other Town com m ittee m ay be
in attendance. However, the only business to be conducted is for the Town Board .
Note regarding non-agenda Town related matters: Pursuant to WI Statutes 19.83(2) and 19.84(2),
the public may present matters; however, they cannot be discussed or acted upon until specific
notice of the subject matter of the proposed action can be given.
TOWN BOARD BUSINESS AGENDA:
Notice is hereby given that the Greenville Town Board may take action on any item listed within this
agenda.
6. CONSENT AGENDA
Items on the Consent Agenda are routine in nature and require one motion to approve all items
listed. Prior to voting on the Consent Agenda, items on the Consent Agenda may be removed at the
request of any Supervisor and considered immediately following the motion to approve the other
items on the Consent Agenda.
6.a. Six-month Class “B” Beer License Application of Greenville Youth Sports, Ryan Paschke,
Agent, Community Park.
Approve
6.b. Temporary Class "B" Beer License for Fox Cities Gargoyles Rugby Club, John Walt, Person In
Charge, Greenville Lions Park, May 11 and September 7, 2019 from 7:00 a.m. to 7:00 p.m.
6.c. Approval of Special Event Applications:
-- St. Mary's Oktoberfest
-- Fox Valley Humane Association Bark in the Park
-- Immanuel Lutheran I-Run
-- HASD Color Run
PRF Agenda Item - Special Event Applications.pdf
6.d. Free Facility Use Policy - Addition of Fox Valley Humane Association
PRF Agenda Item - Free Facility Use Policy.pdf
7. PLAN COMMISSION RECOMMENDATIONS AND DEVELOPMENT PROJECTS FOR
DISCUSSION & POSSIBLE ACTION:
7.a. Consider/Discuss/Act on Resolution 19-19 Special Exception for Automotive Sales and Repair
for Greenville Auto & RV parcels 110014207, 110014208, 110014210, 110014211
7a _Res 19-19 Greenville Auto.pdf
2
Page 3 of 4 Town Board
Agenda posted at Greenville Town Hall, Greenville Post Office, Town Website ( www.townofgreenville.com ) and em ailed to Rachel Rausch. This is a
public m eeting. As such, a quorum of the Town Board, Plan Com m ission, Park Com m ission, Board of Appeals, or other Town com m ittee m ay be
in attendance. However, the only business to be conducted is for the Town Board .
7.b. Consider/Discuss/Act on Resolution 32-19 Rezoning Parcel 110086203 from General
Commercial to Industrial
7b_Resolution 32-19 Rezoning Parcel 110086203 GC to Ind.pdf
7.c. Consider/Discuss/Act on Resolution 34-19 Special Exception for a Gas Regulator for WE
Energies
7c_Res 34-19 WE Energies Gas Regulator.pdf
7.d. Consider/Discuss/Act on Ordinance 03-19 Chapter 204 Article II Town Functional Road
Classification System
7d_Ord 03-19 Roads.pdf
7.e. Consider/Discuss/Act on Resolution 27-19 Jennerjohn Field of Dreams Development Agreement
for Phase 1
7e&f_Res 27-19 & 28-19 Jennerjohn DAs.pdf
7.f. Consider/Discuss/Act on Resolution 28-19 Jennerjohn Field of Dreams Development Agreement
for Phase 2
7e&f_Res 27-19 & 28-19 Jennerjohn DAs.pdf
8. UNFINISHED BUSINESS FOR DISCUSSION & POSSIBLE ACTION:
9. NEW BUSINESS FOR DISCUSSION & POSSIBLE ACTION:
9.a. Acquisition of Right of Way from Town of Greenville for CTH CB & Atlantis Roundabout
19.04.22 CTH CB and Atlantis Roundabout Right of Way.pdf
9.b. Agreement for Professional Services with Ehlers to prepare Tax Incremental Finance District
Annual Report.
TID Reporting Engagement Letter.pdf
Ehlers TID Reporting Summary_2019.pdf
9.c. Relocation of Telecommunication Utilities with ATT&T for Greenville Fire and Safety Building.
ATT ACTUAL COST INVOICE ATTACHED CR 200200 PROJECT A01KKWK.pdf
9.d. Professional Services Agreement with Moss & Associates for Appraisal and Acquisition of
Public Right-of-Way for Tax Incremental Finance District #1.
Moss & Associates Proposal For Appraisal and Acquisition Services to Town of Greenville
Design Drive Extension.pdf
3
Page 4 of 4 Town Board
Agenda posted at Greenville Town Hall, Greenville Post Office, Town Website ( www.townofgreenville.com ) and em ailed to Rachel Rausch. This is a
public m eeting. As such, a quorum of the Town Board, Plan Com m ission, Park Com m ission, Board of Appeals, or other Town com m ittee m ay be
in attendance. However, the only business to be conducted is for the Town Board .
9.e. Fox Cities Regional Partnership Funding Request
Pledge Letter 20180401.pdf
9.f. Proclamation RU4-15 Supporting the Reconstruction of the State Highway 15 Bypass Project
Proclamation RU4 - 15 - Keeping Highway 15 Bypass Project on Schedule.pdf
9.g. Operator's License Application Fee
TB - Fox Valley Area Operator License Fees and Schedule.docx
TB - Comparison Evidence and Proposal.docx
9.h. CTH CA "Town of Greenville" sign
CLOSED SESSION:
a. Motion to go into Closed Session:
i. Pursuant to Wis. Stat. sec. 19.85(1)(e) to deliberate or negotiate the purchase of public
property, investment of public funds, or conducting other specified public business when
competitive or bargaining reasons require a closed session, more specifically for acquisition of
property for a yard waste compost facility.
b. Reconvene to Open Session: Possible Town Board Action on Items Discussed in Closed
Session.
CLOSING:
10. ANNOUNCEMENTS & FUTURE MEETING DATES:
11. ADJOURNMENT
4
Pa ge 1 of 5
MEETING: Town Board AGENDA ITEM #: __________
DATE: April 22 2019 ACTION TYPE: Informational
“To
wn of Greenville”
AGENDA MEMORANDUM
To: Honorable Town Chairperson and Town Supervisors
From: Brian Rickert, Public Works Director
Date: 4/ 10/2019
RE: Roadway Conditions Update
ACTION TYPE: This item is for informational use only.
BACKGROUND & SUMMARY: The winter of 2018 – 2019 had a very negative impact on the roads
throughout Town. Multiple sections of roadway were in good condition until the spring thaw of 2019
came about. A perfect example of this would be approximately a 100’ section of Manley Road mid-block
between Spring Road and Hillview Road. This section of roadway was in good condition but deteriorated
very quickly due to having only 2” of asphalt and limited to no road base material. There was locations
that the clay beneath the roadway was actually pumping through the pavement. Also in this location,
there are no ditches to allow for drainage of the road base, this leaves the base supersaturated.
Th
ere was also four large locations in the Farms at South Creek South Subdivision where the final
asphalt surface was approximately only 1” thick and was placed on 2” to 3” of compacted reclaimed
(pulverized) asphalt. This project was originally scoped to be a pulverize and pave for a construction to
occur in 2020. After seeing the sub-grade condition, the roadway will most likely require a complete
reconstruct. During this reconstruct, we will have the ability to remove the clay that is not stable and
install a quality roadbed that provides structure for the pavement.
It
has become very apparent that many of the developments or roadway projects had limited to no
quality control or verification. With the addition of an Engineering Technician and with support from
Cedar this summer, we will have a better handle on the installation of the infrastructure. This will be a
new process for developers because they will get charged for the inspection costs but it is needed. We
have been seeing premature failure of infrastructure due to lack of quality.
STAFF RECOMMENDATION: Staff would like Town Board to be aware of the work and expense that is
occurring due to inadequate construction practices and poor quality control.
POLICY/PLAN REFERENCE(S):
N/A
5
TB - 4a
Town of Greenville Page 2 of 5
FISCAL IMPACT:
Is there a fiscal impact? Yes, ~$20,000
Is it currently budgeted or planned? NO
Amount budgeted: $0
Account #: 100-5331-340
Attachments:
1. 2 Photos from Manley Road
2. 3 Photos from South Creek Drive
6
Town of Greenville Page 3 of 5
Manley Road Southbound (between Hillview Road and Spring Road)
7
Town of Greenville Page 4 of 5
South Creek Drive (School Road to Termini)
8
Town of Greenville Page 5 of 5
9
Page 1 of 1
MEETING: Town Board AGENDA ITEM #: __________
DATE: April 22, 2019 ACTION TYPE: Approval/Denial
“Town of Greenville”
AGENDA MEMORANDUM
To: Honorable Town Chairperson and Town Supervisors
From: Tony Nowak, Director of Parks, Recreation and Forestry
Date: April 17, 2019
RE: Special Event Applications
ACTION TYPE: This item is for possible Town Board Approval/Denial.
BACKGROUND & SUMMARY: Staff have reviewed the following special event applications and are
recommending Town Board approval:
1. St. Mary’s Oktoberfest – This event held by St. Mary’s Church has been held at Lions Park in
previous years. We have not had any issues with the event.
2. Fox Valley Humane Association Bark in the Park – This event has been held in the past without
issue. They are requesting waiving of the fee.
3. Immanuel Lutheran I-run – This event has been held in the past without issue.
4. HASD Color Run – This is the second year of this event. We did not have any issues with this
event last year.
STAFF RECOMMENDATION: Staff recommends the Town Board approve the Special Event Applications
as proposed. If the Board is in agreement, the following motion may be made: “Motion to approve the
Special Event Applications for St. Mary’s Oktoberfest and Greenville Stars Baseball Tournament.”
POLICY/PLAN REFERENCE(S): Special Event Policy, Free Facility Use Policy
FISCAL IMPACT: N/A
###
Attachments:
1. Special Event Application – St. Mary’s Oktoberfest
2. Special Event Application – FVHA Bark in the Park
3. Special Event Application – Immanuel Lutheran I-run
4. Special Event Application – HASD Color Run
10
TB - 6c
11
12
TN
BR
GR
13
14
15
16
17
18
SECTION 4- LEGAL NOTICE
By signing below, I certify that I am at least·] 8 years of age, that I have read and understand the Special Event Policy, and that 1
agree to the terms and conditions contained in the Special Evellf Policy. My signature further confinns (i) that I understand the filing
of this application does not ensure the issuance of a Special Event Permit, (ii) that the Special Event Application Fee is non
refundable pursuant to the terms of the Special Event Policy, (iii) I will be responsible for ensuring the event and event participants
comply with all applicable Town ordinances, traffic rules, park rules, state health laws,fire codes and liquor licensing regulations
and any other applicable laws, rules and regulations including the Special Event Policy, (iv) that fees for park facilities, food sales
permits, tent and fireworks permits, etc., are in addition to the Special Event Permit Fee, (v) that I shall reimburse the Town.for costs
incurred due to extraordinary damage to Town property during the Special Event, (vi) that I am authorized to apply for this Special
Event Permit on behalf of the organization holding the event (if applicable), and (vii) that the information contained in this
Application is true to the best of my knowledge. I understand that intentionally providing false or misleading information in this
Application may lead to civil or criminal penalties.
Hold harmless indemnification and defense.
For good and valuable consideration the applicant and/or the organization agrees to indemnify, defend and hold harmless the Town
of Greenville and its officers, officials, employees and agents from and against any and all liability, loss, damage, expenses, costs,
including attorney fees arising out of the activities pe,formed as described herein, caused in whole or in part by any negligent act or
omission of the applicant/organization, anyone directly or indirectly employed by any of them or anyone whose acts any of them may
be liable, except where caused by the sole negligence or willful misconduct of the Town.
Signature of Applicant
Received
Completed Application
Map
Copy of Insurance
Copy of EM Plan
Department Aoorove
Administration
Clerk
Community & Economic
Development
Emergency Management
Fire/EMS
Parks & Recreat1.on
Public Works
Sheriff
Board Anorove
Town Board
Date Permit Issued:
OFFICE USE ONLY
Date
Aoolication Fee
Event Fee
Deposit
Total
Deny By Reason
Deny Date Reason
'-1/1 ;}-j/ Cj
Date 1 1
Received
$25.00
Date
WH
4/12/19
4/12/19
JG
TN
BR
GR
19
20
21
22
TN
BR
GR
23
24
25
26
27
JG
JL
TN
BR
GR
No Fees
4/10/19
4/10/19
XWH
28
29
Page 1 of 1
MEETING: Town Board AGENDA ITEM #: __________
DATE: April 22, 2019 ACTION TYPE: Approval/Denial
“Town of Greenville”
AGENDA MEMORANDUM
To: Honorable Town Chairperson and Town Supervisors
From: Tony Nowak, Director of Parks, Recreation and Forestry
Date: April 17, 2019
RE: Free Facility Use Policy – addition of Fox Valley Humane Association
ACTION TYPE: This item is for possible Town Board Approval/Denial.
BACKGROUND & SUMMARY: The Fox Valley Humane Association has made a formal request to have
their fees waived for this year’s Bark in the Park event to be held at Lions Park. In response to this
request, the Park Commission is recommending adding the Fox Valley Humane Association to the list of
organizations that receive free park facility use, per the Free Facility Use Policy.
STAFF RECOMMENDATION: The Park Commission is recommending the addition of Fox Valley Humane
Association to the Free Facility Use Policy. If the Board is in agreement, the following motion may be
made: “Motion to add Fox Valley Humane Association to the Free Facility Use Policy.”
POLICY/PLAN REFERENCE(S): Free Facility Use Policy
FISCAL IMPACT: N/A
###
Attachments:
1. Free Facility Use Policy
2. Letter from Fox Valley Humane Association
30
TB - 6d
Greenville Parks, Recreation and Forestry Department
W6895-B Parkview Drive • PO Box 60 • Greenville, WI 54942
Phone: (920) 757-7276 • Fax: (920) 757-6342
www.townofgreenville.com
FREE FACILITY USE POLICY
It is recognized that there are several non-profit organizations in Greenville that provide many benefits to the
community through their programs and events. They also routinely give back to the community through their
support of the Greenville Park, Recreation and Forestry Department’s programs and properties. Therefore, the
following groups and organizations are exempt from any fees associated with their use park facilities.
Greenville Lions Club
Greenville Lioness Club
Greenville Civic Club
Greenville Youth Sports
Greenville Fire Department
Greenville Women’s Club
Outagamie County Sheriff’s Department
Hortonville Area School District
Any official Greenville board, commission or committee
Any other group or organization, whether for profit or non-profit, shall be charged the normal rate for their use
of park facilities. Any organization wishing to have the fee waived or reduced shall submit a written request to
the Parks, Recreation and Forestry Department no less than 45 days prior to the event. The Park Commission
will review the request at their next scheduled meeting and will make a recommendation to the Town Board for
final approval. Requests will be reviewed on a case by case basis.
31
32
P age 1 of 3
MEETING: Planning Commission/Town Board AGENDA ITEM #:
DATE: April 22, 2019 ACTION TYPE:
7a
Approval/Denial
“T
own of Greenville”
AGENDA MEMORANDUM
To: Honorable Chairperson and Commission and Board Members
From: Michael J. D. Brown, Community & Economic Development Director
Date: April 15, 2019
RE: Site Plan and Special Exception for Automotive Use for Greenville Auto
ACTION TYPE: This item is for possible Planning Commission and Town Board Approval/Denial.
BACKGROUND & SUMMARY: John Korth, property owner and applicant, has submitted an application
for a site plan and special exception to develop a used car sales facility and automotive shop; self-
storage units are also proposed and are a permitted use. The property is located on Hwy 15 on parcels
110014207, 110014208, 110014210, 110014211, is approximately 11.3 acres is zoned General
Commercial and is currently being used for agricultural purposes and lies within the Gateway District. A
CSM was approved in February 2019 to combine all four parcels as well as rezoning a portion from Two
Family Residential to General Commercial.
T
he Planning Commission tabled the requests at its March 25, 2019 meeting as it felt the applicant
didn’t meet the Gateway District standards related to the design of the building. The applicant has since
revised the building to provide for an all masonry façade facing Hwy 15, as required by the ordinance, as
well as included additional detail and articulation to the façade. Foundation landscaping has been
provided to provide for additional articulation of the façade.
SURROUNDING ZONING AND LAND USES:
Existing Zoning Existing Land Use
North Agriculture Residential
South Agriculture Residential
East General Commercial Commercial
West Two Family and Ag Residential
ITEMS FOR DISCUSSION:
1. S
pecial Exception: A Special Exception for a car dealership and automotive shop has been
requested:
a. S
ection 320-209A(1-10) Standards for granting a special exception. Special Exceptions
may be granted by the Planning Commission, and approved by the Town Board, when
all of the following conditions prevail:
33
Page 2 of 3
i. The establishment, maintenance, or operation of the special exception will not be
detrimental to, or endanger the public health, safety, morals, comfort or general
welfare of the community.
ii. The special exception will not be injurious to the uses of other property in the
immediate vicinity for the purposes already permitted, nor substantially diminish and
impair property values within the neighborhood in which it is to be located.
iii. The proposed use will not create a look of clutter, garishness, glare or creates an
obnoxious noise level, or would generate any other incompatibility with surrounding
neighborhood.
iv. The impact of the use is furthering the purposes of this chapter or the purposes of the
zoning district in which the use is proposed or the adopted Comprehensive Plan of the
Town.
v. The establishment of the special exception will not impede the normal and orderly
development and improvement of the surrounding property.
vi. Adequate facilities, access roads, drainage and/or necessary services will be provided.
vii. Adequate measures have been or will be taken to provide ingress and egress so
designed as to minimize traffic congestion in the public streets.
viii. If the special exception invo lves a public use or a use providing public utility service,
that such use or service shall meet a demonstrable public need and provide a public
benefit.
ix. Lot area, lot width and setbacks meet or exceed minimum requirements and are
adequate for the proposed use. When there is an existing nonconforming structure, this
provision may be waived by the Town Board.
x. Generally, a buffer shall exist as determined by the Planning Commission between the
structure or land use to be occupied by the special exception and any adjoining property
line.
2. The applicant will be required to obtain necessary permits from the WI Department of
Transportation for access off of Hwy 15 prior to issuance of construction permits; however,
there is an existing permitted access off of Hillview Road. If access is not permitted by the State,
the Hillview Road access will be required to be widened to accommodate two way traffic.
3. The applicant will be required to obtain necessary permits from the WI Department of Natural
Resources prior to the Town issuing construction permits.
4. The plans have been reviewed by staff and its engineering consultant and find them to be in
general compliance with ordinance requirements other than the items mentioned above.
STAFF RECOMMENDATION: Staff recommends the Commission approve the site plan and special
exception.
If the Commission is in agreement, the following motions may be made:
1. Site Plan “Motion to approve Resolution 18-19.”
2. Special Exception “Motion to recommend approval of Resolution 19-19 to the Town Board.”
34
P age 3 of 3
###
Attachments:
1. Aerial
2. Resolution 19-19
35
This map provides data containing geographic information about
the Town of Greenville. The data was obtained from multiple
sources and agencies. The Town of Greenville provides this
information with the understanding that it is not guaranteed to be
current, correct or complete and assumes no responsibility for the
accuracy of this map or its use or misuse. The map is intended for
use as a general reference only.
Town of Greenville
Zoning
GENERAL AGRICULTURE
SINGLE FAMILY RESIDENTIAL
TWO FAMILY RESIDENTIAL
MULTI-FAMILY RESIDENTIAL
GENERAL COMMERCIAL DISTRICT
PLANNED COMMERCIAL
NEIGHBORHOOD COMMERCIAL DISTRICT
BUSINESS PARK
INDUSTRIAL
AIRPORT DISTRICT
Parcel Boundary
.
Scale is approximate and is not based
upon legally recorded or surveyed data.
HILLWOOD COURT
HILLVIEW ROAD HILLVIEW ROAD
NORTH ROAD
GREENVILLE
DRIVE
NORTH ROAD
0 300 600150
Feet
STATE RD 15
HILLWO OD CO URT
HILLVIEW ROAD
HILLVIE W ROA D
NOR TH ROAD
BENNETT CIRCLE
CANADIAN NATIONAL RAILROAD
GREENVILLE
DRIVE
GREENVILLE DRIVE
NO RTH ROA D
Zoning Map: NOT TO SCALE
Project Location
2019_Greenville Auto Site Plan and Special Exception
36
Page 1 of 2
Resolution #19-19
RESOLUTION OF THE TOWN BOARD OF THE TOWN OF GREENVILLE
APPROVING A SPECIAL EXCEPTION FOR GREENVILLE AUTO FOR AUTOMTIVE
SALES AND REPAIR
LOCATED ON HWY 15 AT PARCELS 110014207, 110014208, 110014210, 110014211
WHEREAS, an Automotive Sale and Repair Shop has been applied for as a special exception
for Greenville Auto located at on Hwy 15 on parcels 110014207, 110014208, 110014210, 110014211
as shown on the attached Exhibit A; and
WHEREAS, the Planning Commission has found that the condit ions in which to grant a
special exception in Section 320- 209A(1-10) of the Zoning Ordinance have been met and have
recommended approval to the Town Board; and
WHEREAS, the approval and continued use of the special exception shall be conditioned on
the following
1. All vehicles shall be parked on paved surfaces; parking on gravel or grass is prohibited; and
2. No permits shall be issued until all local, county, state and federal regulations are met; and
3. If access is denied off of Hwy 15 the Hillview Road access shall be widened in order to
provide two way traffic all the way back to the parking lot are a prior to issuance of
construction permits; and
4. Cyclone/chainlink fencing shall be prohibited for the storage and refuse areas.
WHEREAS, per Section 320- 209B(2) of the Zoning Ordinance, the special exception shall
expire if the use is discontinued for a period of eight months. If a building permit is required, and has
not been obtained within 12 months of the issuance of the special exception permit, the applicant must
request in writing and the Planning Commission may approve an extension if it finds there is no
significant change to warrant a new special exception permit application. If the special exception does
not require a building permit and has not started within 12 months of issuance of the special exception
permit the permit is considered null and void and an application for a special exception permit shall be
required. If the conditions set forth above are not met within the specified timeframes the special
exception permit shall expire and be null and void. The special exception shall run with the land and is
transferable with the sale of the property; and
WHEREAS, this resolution shall act as the special exception permit and be enforceable by the
Town;
NOW, THEREFORE, BE IT RESOLVED that the Town Board of the Town of Greenville
hereby finds that the conditions in which to grant a special exception in Section 320-209A(1-10) of the
Zoning Ordinance have been met and approves the special exception permit.
This resolution was adopted by the Town of Greenville Town Board on the 22nd day of April,
2019:
37
Page 2 of 2
TOWN BOARD OF THE
TOWN OF GREENVILLE, WISCONSIN
By: _____________________________
Jack Anderson, Town Chair
ATTEST:
___________________________________
Wendy Helgeson, Clerk
Motion to Approve Resolution No. #19-19 made by:
Votes:
Title Name Aye Nay Other
Supervisor Culbertson
Supervisor Peters
Supervisor Ryan
Supervisor Strobel
Chairperson Anderson
Posted:
38
Exhibit A - Res 19-19
39
N 57°57'36" W50.00'
N 57°57'36" W 643.80'
N 57°56'55" W 274.21'
N 15°50'18" E 318.74'
N 89°48'18" E 889.43'
S 89°48'18" W 300.00'
50.00'
N 32°02'24" E
45.00'
S 32°03'05" W
N 57°57'36" W 441.43'
N 32°15'57" E 204.31'
S 55°09'42" E 267.41'
S 00°07'22" W 700.00'
Proposed
Pond
Provide boulders or
alternative barrier
Wetland Disturbance
per exemption/permitting
ProposedBuilding
24'
Proposed Asphalt
24'
W
(12) 10'X18' Stalls
Proposed Asphalt
Proposed
Well
128'
Proposed Asphalt
Proposed
Handicap
Sign/Post
5 Stalls
60'
PROPOSED STORAGE
BUILDING "D"
PROPOSED STORAGE
BUILDING "B"
PROPOSED STORAGE
BUILDING "C"
Employee Parking
(13) 10' X 18' Stalls
RECYLING /
TRASH8'-0" HIGH CYCLONEFENCE W/ PLASTIC SLATSFENCED IN AREA
APPROX. LOCATIONOF SEPTIC TANK
(13) 10' X 18' Stalls
(9) 10' X 18' Stalls
(11) 10' X 18' Stalls
30'
SIGNSUBMITTAL
BY OWNER
GATE
PROPOSED STORAGE
BUILDING "A"
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
253'
116'
40'
50'
144'
50'
25'
50'
200'
Proposed Asphalt
Proposed Asphalt
40'
40'
24'
50'
30'
25'
10'
10'
10'
(11) 10' X 18' Stalls
(9) 10' X 18' Stalls
10'
10'
10'
10'
10'
20'
20'
31'
24'
28.55'
13.4'
24.5'
24'
14'
R25'
59'
59'
59'
124'
56.27'
62.01'
151.82'
10'
10'
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
Sanitary Sewer
Storm Sewer
Overhead Electric Lines Utility Pole
Guy Wire
Deciduous Tree
LEGEND
Treeline
Index Contour
Ex Spot Elevation
Culvert
Intermediate Contour
Utility Guy Wire Benchmark
Asphalt Pavement
Concrete Pavement
Gravel
Proposed Building
Proposed Asphalt
Proposed Concrete
Proposed Gravel
Page
Author:
Date:
1.0
JRD
Last Saved by:
tim
Filename:
5392engr.dwg
Greenville Auto
Town of Greenville, Outagamie County, WI
For: John Korth
SITE
PLAN
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
60 0 60 120 180
04/1/2019
SHEET INDEX:
Sheet Page
Site Plan 1.0
Topographic Survey 1.1
Drainage and Grading Plan 1.2
Erosion & Sediment Control Plan 1.3
Utility Plan 1.4
Construction Details 2.1
Stormwater Pond Details 2.2
Project Information
Owner:
Greenville Auto & RV
N2121 Greenville Drive
Hortonville, WI 54944
Phone (920) 470-9907
Site:
Parcel ID # 110014207, 110014208, 110014210, 110014211
Zoning: GC General Commercial District
Site is not within airport zoning or buffers
Areas:
Pavement: 97,371 square feet
Building: 41,722 square feet
Green Space: 420,812 square feet
Total: 522,355 square feet
Total Impervious: 139,093 square feet (26.6%)
Setbacks:
Front: Town Road=37'
County or State Road=55'
Rear: 25'
Side: 20'
Notes:
- Total Parking Stalls: 82 + 1 Handicap
- Storage of hazardous materials (oil, antifreeze, etc) shall be
located within proposed building.
Additional sign to indicate
a "Van Accessible"
Handicap Space
5' Min.
HANDICAP PARKING SIGN DETAIL
12"
6"1"
18"
Exhibit A - Res 19-19
40
Sanitary Sewer
Storm Sewer
Overhead Electric Lines Utility Pole
Guy Wire
Deciduous Tree
LEGEND
Treeline
Index Contour
Ex Spot Elevation
Culvert
Intermediate Contour
Utility Guy Wire Benchmark
Asphalt Pavement
Concrete Pavement
Gravel
N 57°57'36" W50.00'
N 57°57'36" W 643.80'
N 57°56'55" W 274.21'
N 15°50'18" E 318.74'
N 89°48'18" E 889.43'
S 89°48'18" W 300.00'
50.00'
N 32°02'24" E
45.00'
S 32°03'05" W
N 57°57'36" W 441.43'
N 32°15'57" E 204.31'
S 55°09'42" E 267.41'
S 00°07'22" W 700.00'
INV=892.16'
INV=893.12'
Page
Author:
Date:
1.1
AMP
Last Saved by:
tim
Filename:
5392Topo.dwg
GREENVILLE AUTO
Town of Greenville, Outagamie County, WI
For: John Korth
TOPOGRAPHIC
SURVEY
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
NOTES
Existing utilities shown are indicated in accordance with available records and field
measurements. The contractor shall be responsible for obtaining exact locations &
elevations of all utilities, including sewer & water from the the property owners of the
respective utilities. All utility the property owners shall be notified by the contractor 72
hours prior to excavation. Contact Digger's Hotline (1-800-242-8511) for exact utility
locations.
This is not a boundary survey.
03/29/2019
60 0 60 120 180
Exhibit A - Res 19-19
41
Proposed Storm Sewer
Proposed Contour
Proposed Swale
Proposed Storm Manhole
Proposed Curb Inlet
Prop. Catch Basin / Yard Drain
Proposed Endwall
608.73 TW
Proposed Rip Rap
Prop. Finished Floor Elev.
Prop. Drainage Direction
Prop. Flowline Spot Elev.
Prop. Top of Walk Elev.
608.73
Existing Grade
Proposed Culvert
608
FF=000.0
N 57°57'36" W50.00'
N 57°57'36" W 643.80'
N 57°56'55" W 274.21'
N 15°50'18" E 318.74'
N 89°48'18" E 889.43'
S 89°48'18" W 300.00'
50.00'
N 32°02'24" E
45.00'
S 32°03'05" W
N 57°57'36" W 441.43'
N 32°15'57" E 204.31'
S 55°09'42" E 267.41'
S 00°07'22" W 700.00'
INV=892.16'
INV=893.12'
892
890
890
Proposed
Pond
3:1
3:1
891.10
891.40
892.00
890.80
891.00
891.00
892.00
891.00
890.96
891.47
892.50892.00
892.63892.10
891.58
892.20
893.45
893.37
894.40
891.63
891.40
892.50
892.50
892.50
889.79
888.65
891.70
890.64
889.00
890.50
890.86
891.40
892
885 886
887
892 891
890
889
888
892
893
892
892
892
891.40
892.50
891.40
888 889
889888887886
885
884 879
881
886 889
889
885
886
888
890
892.20
891.85
891.59
892.00
891.99
892.50
890.44
891.59
R-10.1
R-20.1
R-30.1
R-11.1
R-21.1
R-31.1
R-12.1
R-23.1
892.50
892.50
2.5:1
892.50
892.50
891.00
892.50
892.48
892.50
892.50
892.50
892.50
892.50
891.24
892.26
FF=892.5
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
892.25
890.81
892.25
890.85
891.26
892.26
892.00
890.47
891.60
891.60
891.80
892.00
892.07
892.20
892
891
892
893
890
891
891
892
892
892
891
892
891
886
887
891
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
892.23
891.65
892.30
892.30
892.20
891.58
892.04
892.20
892.00
891.84
892.12
891.70
R-22.1
891.84
891.07
891.82
891.95
891.96
891.96
892.15
892.15891.95
892.35
892.35
892.12
892.12
892.12
892.13
892.13
Sanitary Sewer
Storm Sewer
Overhead Electric Lines Utility Pole
Guy Wire
Deciduous Tree
LEGEND
Treeline
Index Contour
Ex Spot Elevation
Culvert
Intermediate Contour
Utility Guy Wire Benchmark
Asphalt Pavement
Concrete Pavement
Gravel
Page
Author:
Date:
1.2
JRD
Last Saved by:
tim
Filename:
5392engr.dwg
Greenville Auto
Town of Greenville, Outagamie County, WI
For: John Korth
DRAINAGE & GRADING
PLAN
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
NOTES:
1. Existing utilities shown are indicated in accordance with available records and field
measurements. The contractor shall be responsible for obtaining exact locations &
elevations of all utilities, including sewer and water from the owners of the respective
utilities. All utility owners shall be notified by the contractor 72 hours prior to
excavation. Contact Digger's Hotline (1-800-242-8511) for exact utility locations.
2. The Contractor shall verify all staking and field layout against the plan and field
conditions prior to constructing the work and immediately notify the Engineer of any
discrepancies.
3. The contractor shall minimize the area disturbed by construction as the project is
constructed. Disturbed areas shall be seeded as soon as final grade is established.
Contractor shall replace topsoil and then seed, fertilize and mulch all lawn areas
within 1 week of topsoil placement.
4. Contractor shall remove all excess materials from the site. Earthwork contractors
shall verify topsoil depth.
5. Taper curb head per the curb and gutter termini detail adjacent to all buildings and
sidewalks.
04/1/201960 0 60 120 180
Exhibit A - Res 19-19
42
Proposed Silt Fence
Proposed Storm Sewer
Proposed Tracking Pad
Proposed Swale
Proposed Contour
Proposed Inlet Protection
Proposed Erosion Mat
Proposed Culvert
Prop. Drainage Direction
Proposed Storm Manhole
Proposed Curb Inlet
Prop. Catch Basin / Yard Drain
Proposed Endwall
Proposed Rip Rap
608
A Type of Inlet ProtectionProposed Ditch Check
N 57°57'36" W50.00'
N 57°57'36" W 643.80'
N 57°56'55" W 274.21'
N 15°50'18" E 318.74'
N 89°48'18" E 889.43'
S 89°48'18" W 300.00'
50.00'
N 32°02'24" E
45.00'
S 32°03'05" W
N 57°57'36" W 441.43'
N 32°15'57" E 204.31'
S 55°09'42" E 267.41'
S 00°07'22" W 700.00'
INV=892.16'
INV=893.12'
Topsoil Stockpile
892
890
890
Proposed
Pond
Total Disturbed
Area = 240,500 s.f.
Perimeter Silt Fence
Perimeter Silt Fence
Track out control
Track out control
892
885 886
887
892 891
890
889
888
892
893
892
892
892
888 889
889888887886
885
884 879
881
886 889
889
885
886
888
890
Provide Urban Type B matting
& Seed on all Pond Embankments
Provide Urban Type B matting
& Seed on all 3:1 embankments
Install Gravel Drive
Install Gravel Drive
Provide Urban Type B matting &
Seed on Driveway embankment
Provide Class I Type B matting
& Seed within Swale
Install 9"Ø sediment logs upslope
of outlets once installed, break silt fence
Soil Loss:
Initial Site Construction:
300' at 1.8%
Soil Loss:
Final Site Construction:
80' at 5%FF=892.5
Proposed Asphalt
(12) 10'X18' Stalls
Proposed Asphalt
Proposed Asphalt
5 Stalls
Employee Parking
(13) 10' X 18' Stalls
(13) 10' X 18' Stalls
(9) 10' X 18' Stalls
(11) 10' X 18' Stalls
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
Proposed Asphalt
(11) 10' X 18' Stalls
(9) 10' X 18' Stalls
Provide 12 tons light riprap over fabric
10'w x 16' x 12" depth
Provide 26 tons light riprap over fabric
10'w x 34' x 12" depth
892
891
892
893
890
891
891
892
892
892
891
892
891
886
887
891
Provide 8 tons light riprap over fabric
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
Curb (typ)
Sanitary Sewer
Storm Sewer
Overhead Electric Lines Utility Pole
Guy Wire
Deciduous Tree
LEGEND
Treeline
Index Contour
Ex Spot Elevation
Culvert
Intermediate Contour
Utility Guy Wire Benchmark
Asphalt Pavement
Concrete Pavement
Gravel
Page
Author:
Date:
1.3
JRD
Last Saved by:
tim
Filename:
5392engr.dwg
Greenville Auto
Town of Greenville, Outagamie County, WI
For: John Korth
EROSION & SEDIMENT
CONTROL PLAN
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
60 0 60 120 180
04/1/2019
Planned Sediment and Erosion Control Practices
All erosion control practices shall be in place prior to disturbing the site. All sediment and erosion control devices and methods shall be in
accordance with DNR Technical Standards and the WisDOT Erosion Control product acceptability lists (PAL). It is the responsibility of the
Contractor to minimize the area disturbed and the duration of the disturbance. Erosion & sediment control measures shall be maintained on
a continuing basis until the site is permanently stabilized. All applicable controls must be in place at the end of each work day with all off-site
sediments being cleaned daily or as necessary as no sediment flushing is allowed.
1) Diverting Flow
a) Permanent Diversion - Intended to divert runoff around disturbed areas to a location where the water can be discharged without
adversely impacting the receiving area or channel. Permanent diversions will be used to route runoff to the storm water pond.
2) Overland Flow
a) Silt Fence - Intended to provide a temporary barrier to the transportation of sediment offsite. Silt fence also reduces the velocity of
sheet flow; thereby reducing the erosion potential of flowing water. Silt fencing is not to be used in areas of channelized flow and
sediment deposits shall be removed when a 6 inch depth is reached. The silt fence shall be repaired or replaced as necessary to
maintain a barrier. All Silt Fence shall be installed and maintained in accordance with DNR Technical Standard 1056
. It will
be placed at the following locations:
i) along the site boundary where runoff will leave the site.
ii) and at the toe of soil piles if the pile will remain in place for more than seven (7) days.
b) Mulching and Erosion Mat - Intended to reduce the amount of erosion caused by raindrop impact, high overland and concentrated
flow velocities and assist the establishment of both temporary and permanent vegetation. All Erosion Mat shall be installed and
maintained in accordance with DNR Technical Standards 1052 and 1053 and all Mulching with DNR Technical Standard
1058. In addition to mulching, Erosion Mat is required per plan and if field conditions warrant.
c) Seeding - Intended to provide a reduction of overland flow velocities and stabilize disturbed areas. Seeding will be used on all
disturbed areas within seven days of the completion of the activity that will disturb the area. All seeding shall be in accordance
with DNR Technical Standard 1059. Seed mixture 40 (per WisDOT Specifications, Section 630) shall be applied at 5 pounds per
1000 square feet for permanent seeding prior to September 15 th. If required, temporary seeding shall consist of Oats, Rye, Winter
Wheat, and/or Annual Ryegrass applied at rates and during the season specified by the Technical Standard but no later than
November 1st. Sod placement may occur at any time sod is available and the sod and soil are not frozen.
3) Permanent Channel Stabilization
a) Armored Waterway - Intended to establish a non-erosive lining in the channel to prevent erosion. This can be accomplished using
riprap. All areas immediately downstream storm discharges will be stabilized using riprap per plan.
b) Vegetated Waterway - Intended to establish permanent vegetation to reduce the velocity of concentrated runoff thereby protecting
the waterway from erosion. The type of erosion mat used will depend upon the velocity of the runoff in the channel and are
specified in accordance with DOT Erosion Control Product Acceptability Lists (PAL). Vegetated waterways will be used in the
following areas:
i) drainage swales as indicated on the plans;
4) Inlet Protection Barriers - Intended to prevent the sedimentation of storm water conveyance structures. All Inlet Protection Barriers
shall be installed and maintained in accordance with DNR Technical Standard 1060. As required, inlet protection barriers will be
used at all storm sewer inlets as indicated on the plans. All storm sewer inlet protection shall be Type A. Upon installation of aggregate
sub-base the storm catch basins shall be modified to Type B.
5) Tracking Out Control - Intended to reduce the amount of sediment transported onto public roads. The Tracking Pad shall be installed
and maintained in accordance with DNR Technical Standard 1057. A stone tracking pad will be constructed at the site entrance as
indicated on the plan.
6) Dust Control - Intended to reduce surface to air transport of dust during construction. Dust control shall be implemented with use of
methods provided in DNR Technical Standard 1068. These methods include the use of polymers, seeding, and mulch.
7) Dewatering BMP - Intended to reduce the amount of sediment conveyed due to dewatering practices. Dewatering practices require
compliance with DNR Technical Standard 1061. The use of geotextile bags is required to prevent sedimentation with a stabile
discharge to the storm water pond or upland area (if pumping is required for stormwater pond construction). The bags shall meet the
requirements of Technical Standard 1061. Upon completion of the dewatering operation, all materials must be disposed of properly in
accordance with all state and local requirements.
8) Waste Material - All onsite waste and construction materials shall be handled and disposed of properly. No pavement material, runoff
from concrete washout, or other waste material is allowed to enter the storm sewer system or receiving waters.
Sequence of Construction
1) Obtain plan approval and other applicable permits
2) Install & maintain all sediment control measures: May 2019
3) Strip topsoil in the area of the stormwater pond and stockpile required reuse onsite. Construct stormwater pond: May 2019
4) Site Work Construction (grade and gravel): May-July 2019
5) Stabilize lawn and ditch areas no later than one week after final grade is established, the entire site shall be stabilized by the end
of July with vegetation established prior to the end of 2019 growing season. Install temporary stabilization in areas receiving additional
landscaping after building construction.
6) Construct Buildings: June - August 2019
7) Paving: September 2019
Maintenance Plan
The contractor is responsible for inspection and maintenance of sediment and erosion control measures until the project is completed. The
inspections shall be made every seven days or within 24-hours of a rainfall event of 0.50-inch or greater. Any practices that are damaged or
not working properly shall be repaired by the end of the day. Accumulated sediment shall be removed when it has reached a height of
one-half the height of the structure. In addition, the following measures shall be taken:
1) All seeded areas will be re-seeded and mulched as necessary according to the specifications in the planned practices to maintain a
vigorous, dense vegetated cover.
2) Remove silt fence and temporary structures only after final stabilization and vegetative cover is established.
3) Avoid the use of fertilizers and pesticides in or adjacent to channels or ditches.
4) Construction and waste materials shall be properly disposed.
Weekly inspection reports shall be maintained by the contractor. These reports shall document inspections and maintenance performed. The
date and time of the inspections, the inspector's name, and the status of construction and any maintenance performed. Refer to the DNR
website for a template; http://dnr.wi.gov/runoff/stormwater/constrforms.htm#forms. Upon request, the inspection reports shall be made
available to the owner, the engineer, the Wisconsin Department of Natural Resources, or the Town of Greenville.
Exhibit A - Res 19-19
43
Proposed Sanitary Sewer
Proposed Sanitary ManholeProposed Storm Sewer
Proposed Water Main
Proposed Contour
Proposed Swale
Proposed Storm Manhole
Proposed Curb Inlet
Prop. Catch Basin / Yard Drain
Proposed Endwall
Proposed Culvert
608
N 57°57'36" W50.00'
N 57°57'36" W 643.80'
N 57°56'55" W 274.21'
N 15°50'18" E 318.74'
N 89°48'18" E 889.43'
S 89°48'18" W 300.00'
50.00'
N 32°02'24" E
45.00'
S 32°03'05" W
N 57°57'36" W 441.43'
N 32°15'57" E 204.31'
S 55°09'42" E 267.41'
S 00°07'22" W 700.00'
INV=892.16'
INV=893.12'
R-10.1
R-20.1
R-30.1
R-11.1
R-21.1
R-31.1
R-12.1
R-23.1
FF=892.5
R-22.1
Sanitary Sewer
Storm Sewer
Overhead Electric Lines Utility Pole
Guy Wire
Deciduous Tree
LEGEND
Treeline
Index Contour
Ex Spot Elevation
Culvert
Intermediate Contour
Utility Guy Wire Benchmark
Asphalt Pavement
Concrete Pavement
Gravel
Page
Author:
Date:
1.4
JRD
Last Saved by:
tim
Filename:
5392engr.dwg
Greenville Auto
Town of Greenville, Outagamie County, WI
For: John Korth
UTILITY PLAN
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
60 0 60 120 180
04/1/2019
Sewer shall be constructed in accordance with the State of Wisconsin
Standard Specifications for Sewer and Water Construction.
Contractor shall locate all buried facilities prior to excavating. This plan
may not correctly or completely show all buried utilities.
The Contractor shall verify all staking and field layout against the plan
and field conditions prior to constructing the work and immediately
notify the Engineer of any discrepancies.
The Contractor shall comply with all conditions of the Erosion Control
Plan and the Storm Water discharge Permit. All Erosion Control shall
be done in accordance with the Plan and Wisconsin DNR Technical
Standards.
The Contractor shall be responsible for coordination of continuation of
the services into the building to properly coincide with the interior
plumbing plans, and compliance with all plumbing permits.
The Contractor is responsible for compliance with Department of
Safety & Professional Services, Chapter SPS 382, for lateral
construction and cleanout locations.
The contractor shall coordinate with provider for electric, gas, and
telecommunication service connection and relocations.
Pipe lengths are measured to center of structure. Endwalls are
included in pipe length.
Storm Sewer Pipe shall be PVC SDR(35), Reinforced Concrete Class
III, or HDPE, AASHTO M 294, Type S with soil tight joints, with
minimum of 18 gauge, insulated (brown), single-conductor copper
tracer wire, or equivalent, per SPS 382.36 (7)(d)10.a.
Proposed 44' 15" CMP
INV. 890.86 W
INV. 890.50 E
Downspout discharge
to 6" storm sewer with
1.0% slope to main (typ.)
Exhibit A - Res 19-19
44
Page
Author:
Date:
2.1
JRD
Last Saved by:
tim
Filename:
5392engr.dwg
Greenville Auto
Town of Greenville, Outagamie County, WI
For: John Korth
CONSTRUCTION
DETAILS
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
04/1/2019
Elevation shown
on plans
See plan for size
and location
Varies
Total Depth
Pipe Depth
Concrete bench
Casting as specified
Precast base 36" I.D.
3 1/2"
3 1/2"
Storm Catch Basin
8" Monolithic base
Storm
Structure
STORM SEWER UNDERDRAIN
Recompacted Native Soil Backfill
Undisturbed Native Soil
Minimum 6" of WisDOT Course Aggregate #2
Aggregate Base Course
(Required thickness as per detail)
Pavement
(Required thickness as per detail)
4" Perforated plastic tubing with a
fabric "filter sock" and end cap.
Minimum length should be 10'.
Provide a minimum 1%
downward slope towards the
stub drains in all directions
3"
6"
6"
12"
2" - 5"
3B
3A
1
2
4
5
1. Prepare soil before installing Rolled Erosion Control Products (RECP's), including any necessary application of lime, fertilizer,
and seed.
Note: When using cell-o-seed do not seed prepared area. Cell-o-seed must be installed with paper side down.
2. Begin at the top of the slope by anchoring the RECP's in a 6" (15 cm) deep x 6" (15 cm) wide trench with approximately 12"
(30 cm) of RECP's extended beyond the up-slope portion of the trench. Anchor the RECP's with a row of staples/stakes
approximately 12" (30 cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to
compacted soil and fold remaining 12" (30 cm) portion of RECP's back over seed and compacted soil. Secure RECP's over
compacted soil with a row of staples/stakes spaced approximately 12" (30 cm) apart across the width of the RECP's.
3. Roll the RECP's (A.) down or (B.) horizontally across the slope. RECP's will unroll with appropriate side against the soil
surface. All RECP's must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the
staple pattern guide. When using the Dot system, staples/stakes should be placed through each of the colored Dots
corresponding to the appropriate staple pattern.
4. The edges of parallel RECP's must be stapled with approximately 2" - 5" (5 cm - 12.5 cm) overlap depending on RECP's type.
5. Consecutive RECP's spliced down the slope must be placed end over end (shingle style) with an approximate 3" (7.5 cm)
overlap. Staple through overlapped area, approximately 12" (30 cm) apart across entire RECP's width.
Note: * In loose soil conditions, the use of staple or stake lengths greater than 6" (30 cm) may be necessary to properly secure
the RECP's.
6. Detail provided by North American Green (www.nagreen.com)
7. Turf Reinforcement Mats (TRM's) shall be installed in accordance with the above specifications for all RECP's. Anchoring size
and pattern is to be installed per manufacturer specifications for clay soils having 4:1 slope. All TRM's shall be topsoil filled,
seeded, and covered with a Class 2, Type B erosion mat in accordance with all manufacturer specifications.
EROSION/TURF REINFORCEMENT MAT SLOPE INSTALLATION
1. Prepare soil before installing Rolled Erosion Control Products (RECP's), including any necessary application of lime, fertilizer,
and seed.
Note: When using cell-o-seed do not seed prepared area. Cell-o-seed must be installed with paper side down.
2. Begin at the top of the channel by anchoring the RECP's in a 6" (15 cm) deep x 6" (15 cm) wide trench with approximately 12"
(30 cm) of RECP's extended beyond the up-slope portion of the trench. Anchor the RECP's with a row of staples/stakes
approximately 12" (30 cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to
compacted soil and fold remaining 12" (30 cm) portion of RECP's back over seed and compacted soil. Secure RECP's over
compacted soil with a row of staples/stakes spaced approximately 12" (30 cm) across the width of the RECP's.
3. Roll center RECP's in direction of water flow in bottom of channel. RECP's will unroll with appropriate side against the soil
surface. All RECP's must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the
staple pattern guide. When using the DOT system, staples/stakes should be placed through each of the colored dots
corresponding to the appropriate staple pattern.
4. Place consecutive RECP's end over end (shingle style) with a 4" - 6" (10 cm - 15 cm) overlap. Use a double row of staples
staggered 4" (10 cm) apart and 4" (10 cm) on center to secure RECP's.
5. Full length edge of RECP's at top of side slopes must be anchored with a row of staples/stakes approximately 12" (30 cm)
apart in a 6" (15 cm) deep x 6" (15 cm) wide trench. Backfill and compact the trench after stapling.
6. Adjacent RECP's must be overlapped approximately 2" - 5" (5cm - 12.5 cm) (depending on RECP's type) and stapled.
7. In high flow channel applications a staple check slot is recommended at 30 to 40 foot (9 M - 12 M) intervals. Use a double row
of staples staggered 4" (10 cm) apart and 4" (10 cm) on center over entire width of the channel.
8. The terminal end of the RECP's must be anchored with a row of staples.stakes approximately 12" (30 cm) apart in a 6" (15
cm) deep x 6" (15 cm) wide trench. Backfill and compact the trench after stapling.
Note:
* In loose soil conditions, the use of staple or stake lengths greater than 6" (15 cm) may be necessary to properly anchor the
RECP's.
9. Detail provided by North American Green (www.nagreen.com)
Note:
* Horizontal staple spacing should be altered if
necessary to allow staples to secure the critical
points along the channel surface.
** In loose soil conditions, the use of staple or
stake lengths greater than 6" (15 cm) may be
necessary to properly anchor the RECP's.
Critical Points
A. Overlaps and seams
B. Projected Water line
C. Channel Bottom/side slope vertices
C
B
A
6"
4" - 6"
2" - 5"
6" 6"
12"
6"
4"
4" (10 cm)
EROSION MAT CHANNEL INSTALLATION
1
2
3
4
5
6
7
8
SECTION B-B
B
PLAN VIEW
SECTION A-A
A
L
B
A
d
OUTLET PROTECTION
Notes:
1. Excavate below channel outlet and widen channel outlet to the required
riprap thickness for each apron. Foundation to be set to zero grade and
smoothed.
2. Place geotextile fabric on bottom and sides of prepared foundation.
Fabric shall extend under endwall in accordance with DOT specifications.
(DOT Section 628.2 & 628.3)
3. Exercise care in placement of riprap to avoid damage to filter fabric.
4. Use riprap conforming to Wisconsin DOT specifications. (DOT Section
606.2 & 606.3)
5. Use DOT Type R geotextile fabric for light riprap. Use Type HR for
medium and heavy riprap. (DOT Section 606.2, 606.3, 628.2 & 628.3)
6. Use 12" dimension for pipes less than 12" in diameter.
L 10' 12' 18' 20' 20' 25' 28' 33'
12" 15" 18" 21" 24" 30" 36"D
D
1'
W 11' 13' 20' 22' 24' 28' 32' 38'
d 12"
42"
37'
42'
48"
40'
45'
54"
45'
50'
60"
cu yds 2.6 3.6 7.8 14.3 15.6 22.6 38.4 53.2 65.8 76.3 95.0
12" 12" 18" 18" 18" 24" 24" 24" 24" 24"
Riprap Light Light Light Med. Med. Med. Heavy Heavy Heavy Heavy Heavy
Geotextile Fabric
W
d 12"
2' Min
Backfill trench with
excavated soil
Geotextile fabric only
(DOT Section
628.2 & 628.3)
Wood posts
4' min. length
2' min. bury
Silt fence notes:
1. Detail of construction not shown on this drawings shall conform to criteria set by authorities having
jurisdiction and by DNR Technical Standard 1056.
2. When possible, the silt fence should be constructed in an arc or horseshoe shape with the ends
pointing upslope to maximize both strength and effectiveness.
3. Attach the fabric to the posts with wire staples or wooden lath and nails.
4. 8'-0" post spacing allowed if a woven geotextile fabric is used.
5. Trench shall be a minimum of 4" wide and 6" deep to bury and anchor the geotextile fabric. Fold
material to fit trench and backfill and compact trench with excavated soil.
6. Geotextile fabric shall be reinforced with an industrial polypropylene netting with a maximum mesh
spacing of 3/4" or equal. A heavy-duty nylon top support chord or equivalent is required.
7. Steel posts shall be studded "tee" or "u" type with a minimum weight of 128 lbs/lineal foot (without
anchor). Fin anchors shall be a minimum size of 4" diameter or 1 1/2" x 3 1/2", except wood posts
for geotextile fabric reinforced with netting shall be a minimum size of 1 1/8" x 1 1/8" oak or
hickory.
Flow direction
3' Max
Fold
3" max
Support cord
Geotextile
fabric
Flow
SILT FENCE INSTALLATION
TRENCH DETAIL
Geotextile fabric
(DOT Section
628.2 & 628.3)
Flow
Excess
fabric
2' min bury
Wood
post
Curlex sediment logs
or equivalent Steel rebar or hardwood stake
Rebar or stake to only
penetrate netting,
not Curlex material
Channel
bottom
Nominal diameter
as specified
16" Minimum
Flow
45° to 60°
Rebar or stake to only
penetrate netting,
not Curlex material
Curlex sediment logs
or equivalent
Steel rebar or
hardwood stake
16" minimum
STAKE DETAILS
(NO TRENCH)
STAKE DETAIL
(FRONT VIEW)
NOTE:
Stake installation shall meet manufacturer's requirements in
regard to spacing, material, size, and bury depth.
SEDIMENT LOG DETAIL
Slope var.Slope var.
Bottom elevation of end log shall be equal
to or greater than top of lowest middle log.
FRONT ELEVATION
Compacted subgrade
12" Stone base course
4" - base aggregate dense 1¼"
8" - base aggregate dense 3"
Varies
8"
2.00% Slope
5" Thick concrete slab
with 6x6-w 1.4 x 1.4 wwf
Concrete curb with #5 horizontal
cont. top & bottom and #5 vertical
@ 16" O.C.
3 12" Asphalt pavement (LT 58-28 S)
1 3 4" finish course
1 3 4" binder course
SIDEWALK / PAVEMENT SECTION
Grade
as shown on plan
12"
7" - 3 4" crusher run
5"
12"
Roof Drain
Wye fitting
Plug
Building
Wall
ROOF DRAIN CONNECTION
TO STORM SEWER
6" STANDARD CURB
18"
6"
6"
R 2"
Adjacent asphalt & sub baseCast in place concrete
12"/Ft. Batter, face of curb
(above adjacent pavement)
Construction joint
Taper curb
6' Normal
CURB AND GUTTER TERMINI
Exhibit A - Res 19-19
45
Proposed
Pond
892
885 886
887
892
888 889
889
888
887886
885
884
879
881
886 889
889
885
886
888
890
Proposed Storm Sewer
Proposed Contour
Proposed Swale
Proposed Storm Manhole
Proposed Curb Inlet
Prop. Catch Basin / Yard Drain
Proposed Endwall
608.73 TW
Proposed Rip Rap
Prop. Finished Floor Elev.
Prop. Drainage Direction
Prop. Flowline Spot Elev.
Prop. Top of Walk Elev.
608.73
Existing Grade
Proposed Culvert
608
FF=000.0
Sanitary Sewer
Storm Sewer
Overhead Electric Lines Utility Pole
Guy Wire
Deciduous Tree
LEGEND
Treeline
Index Contour
Ex Spot Elevation
Culvert
Intermediate Contour
Utility Guy Wire Benchmark
Asphalt Pavement
Concrete Pavement
Gravel
Page
Author:
Date:
2.2
JRD
Last Saved by:
tim
Filename:
5392engr.dwg
Greenville Auto
Town of Greenville, Outagamie County, WI
For: John Korth
STORMWATER
POND DETAIL
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
20 0 20 40 60
04/1/2019
888.00
889.00
Varies 6'-10' per plan
Wisconsin DOT Light Riprap
placed over Type R Geotextile Fabric
(DOT Section 606.2, 606.3, 628.2 & 628.3)
12"
3:1
3:1
889.00
888.00
4:14:1
10'
889.00
Varies 6'-10' per plan
3:1
10:1
3:1
2:1
879.00
Normal Water Surface 885.00
884.20
Match
existing
EMERGENCY SPILLWAY SECTION
EMERGENCY SPILLWAY DETAIL
TYPICAL EMBANKMENT SECTION
Min. 2' clay or
synthetic liner
Keyway
(Min 8' wide &
2' deep. Side
slopes to be
1:1 or flatter.)
886.50
885.00
4
0.50
885.00
15
Elevation
Crest
Invert
Size, in
Intake orifice
Slope (%)
Invert
Size, in
Outlet
SOUTH POND STAND PIPE DETAIL
36"
Crest
Outlet
Intake
Orifice with Grate
Neenah foundry R-6118 Type G
grate with R-1799-P frame
or equivalent manufactured grate
Elevation
Base
882.00
Cast-in-place
concrete base
Install anti-seep collar to the
outlet pipe with a water-tight
connection. Collar shall
project a minimum of 2'
away from the pipe in all
directions. Collar shall not
be installed within 2' of a
pipe joint.
Pond Notes:
1. The base of the embankment shall be stripped of all vegetation, stumps,
topsoil and other matter. Stripping shall be to a minimum of 6 inches.
2. Embankments shall be constructed with non-organic soils and compacted to
90% standard proctor according to the procedures outlined in ASTM D-698.
No tree stumps, or other organic material shall be buried in the
embankment. The constructed embankment height shall be increased a
minimum of 5% to account for settling.
3. All pipes extending through the embankment shall be bedded and backfilled
with embankment or equivalent soils. The bedding and backfill shall be
compacted in lifts and to the same standard as the original embankment.
Excavation through a completed embankment shall have a side slope of 1:1
or flatter.
4. Topsoil shall be spread on all disturbed areas, except for elevations below
the safety shelf, as work is completed. The minimum depth of topsoil shall
be 4 inches.
5. All areas disturbed by pond construction shall be seeded as work is
completed. Pond side slopes above permanent pool shall be temporarily
seeded with annual rye or oats immediately after pond is "roughed in." This
will require topsoil application. Slopes steeper than 10:1 but less than 4:1
will require properly anchored mulch in accordance with Section 627.1 of
the DOT Standard Specifications for Highway and Structure Construction.
DOT Class I, Type B erosion mat will be required on slopes steeper than 4:1
(Section 628.2 & 628.3).
6. Riprap at all inflow points shall extend a minimum of 18 vertical inches
below the permanent pool. (Section 606.2 & 606.3)
7. Any rock encountered shall be excavated to a depth two feet deeper than
the proposed pond grade.
8. The pond shall be constructed with a Type B Liner with the following WDNR
specifications (Wet Detention Pond Technical Standard 1001). Liners
include; Clay, High Density Polyethylene (HDPE), Polyethylene Pond Liner
(PPL) or any liner satisfying Type A Liner criteria.
Clay liners specifications are as follows:
· 50% fines (200 sieve) or more.
· Hydraulic conductivity of 1 x 10-6 cm/sec or less.
· Average liquid limit of 16 or greater, with no value less than 14.
· Average PI of 7 or more, with no values less than 5.
· Clay compaction and documentation as specified in NRCS Wisconsin
Construction Specification 204, Earthfill for Waste Storage Facilities.
· Minimum thickness of 2 feet.
· If in-situ soils meet the above requirements of the specification for a Type
B Clay Liner, including a minimum saturated hydraulic conductivity of 1 x
10-6 cm/sec to a depth of 4 feet below the pond bottom, the in-situ soils
then satisfy the pond liner requirements.
HDPE liner specifications are as follows:
· Minimum thickness of 40 mils.
· Design according to the criteria in Table 3 of NRCS 313, Waste Storage
Facility Technical Standard.
· Install according to NRCS Wisconsin Construction Specification 202,
Polyethylene Geomembrane Lining.
PPL liner Specifications are as follows:
· Minimum thickness of 30 mils.
· Design according to the criteria in Table 3 of NRCS 313, Waste Storage
Facility Technical Standard.
· Install according to NRCS Wisconsin Construction Specification 202,
Polyethylene Geomembrane Lining.
9. All liners must extend above the permanent pool up to the elevation of the
2-year, 24-hour rainfall event.
884.75
885.00 NWS
12"
Light Riprap over Type R fabric
5' x 5' x 12" thick
Stand Pipe
Orifice
Intake
Orifice
12"
INTAKE GRATE DETAIL
38" Smooth Bars
(Epoxy black painted) @
3" O.C. Each Way, Welded
Bend to match with 3"
clearance from structure.
3" Provide 1" x 4 3
4 " Stainless
Steel (304) pipe strap and
anchors.
8' Wide Safety Shelf Liner 886.50
10' Top
Embankment
Width
(Elev. 889.00)
3:1
8' Safety Shelf
3:1
3:1
6' Top
Embankment
Width
(Elev. 889.00)
South Pond Standpipe
Provide 2 tons light riprap around
intake grate per detail
10' Spillway
Provide 30' 15" Storm
Sewer @ 0.5%
Inv. 884.85 (Endwall)
8' Safety Shelf
2:1
2:1
3:1
3:1
Provide 24 tons light
riprap per detail
Provide 3.6 tons light
riprap per detail
Provide 26 tons light
riprap per detail
Provide 7.8 tons light
riprap per detail
Provide 2.6 tons light
riprap per detail
100-year Water Surface 887.70
Exhibit A - Res 19-19
46
Exhibit A - Res 19-19
47
Exhibit A - Res 19-19
48
Exhibit A - Res 19-19
49
GREENVILLE AUTO AND RV
LITHONIA RSX1 WALL MOUNT
Designer
Date
1 29 19
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Schedule
Symbol Label Quantity Manufacturer Catalog Number
G
21 Lithonia Lighting RSX1 LED P4 40K R4
MVOLT WBA STD FINISH
J
6 GE LIGHTING
SOLUTIONS
LRXR 6 10 8 40 MD -
FRAME6R
K
46 Lithonia Lighting TWR1 LED P3 40K
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
LOT (STORAGE UNITS) 1.5 fc 11.3 fc 0.1 fc 113.0:1 15.0:1
PARKING LOT 6.6 fc 41.1 fc 0.1 fc 411.0:1 66.0:1
0.3
0.6
0.5
0.8
0.8
0.7
1.7
2.7
2.8
1.7
0.8
0.7
1.9
5.1
8.2
8.8
5.8
3.1
1.4
0.8
1.5
3.6
9.1
17.7
19.7
13.1
10.3
6.7
2.8
0.8
1.1
3.4
6.4
9.8
29.3
19.2
14.8
9.4
4.1
1.1
0.6
0.7
1.7
4.6
9.1
15.8
35.9
27.5
17.9
10.7
4.6
1.6
0.6
1.0
3.8
7.8
12.0
34.4
34.3
16.0
7.5
2.8
1.0
0.4
0.4
1.5
5.1
13.1
31.2
2.7
1.1
0.2
0.4
1.3
4.5
11.3
21.2
34.2
2.6
0.5
0.3
0.7
2.5
6.3
11.4
18.5
31.5
35.8
24.0
1.2
0.2
0.7
1.7
5.6
11.1
16.7
25.0
20.2
3.9
0.4
0.5
1.3
4.3
8.6
13.9
16.4
22.1
27.1
11.5
1.0
0.2
0.8
2.0
5.2
7.9
8.3
5.9
11.4
2.3
0.3
0.5
0.8
2.2
3.0
2.2
2.3
3.8
3.2
0.4
0.2
0.5
0.9
0.8
0.5
0.6
0.6
0.2
0.3
0.3
0.2
1.0
0.3
2.1
0.5
0.2
0.1 0.1
0.1
0.1
0.1
0.1 0.1
0.1 0.1
0.1
0.1 0.1
0.1
41.1
0.8
4.9
1.8
0.7
0.5
3.1
1.5
1.9
0.7
6.7
1.4
0.8
0.7
1.8
3.2
1.9
0.6
0.4
0.4
0.3
4.8
1.3
1.3
0.5
0.4
0.4
2.3
0.7
0.6
0.9
7.4
3.0
6.4
1.0
0.6
0.4
0.4
0.7
1.1
1.5
0.7
0.4
0.3
7.4
1.5
1.4
1.2
2.5
2.6
1.0
1.5
0.6
0.3
0.2
1.1
3.4
6.5
1.4
0.8
0.3
0.2
6.9
1.9
1.4
1.4
2.0
7.6
3.2
0.8
0.3
0.3
0.7
1.4
1.9
2.4
2.0
0.6
0.5
0.3
0.2
3.2
2.1
2.6
1.5
2.1
1.9
5.7
2.0
0.8
0.3
0.2
0.5
1.6
6.1
1.4
1.3
0.8
0.4
0.3
7.7
1.7
1.6
1.5
2.6
4.1
0.9
0.3
0.2
0.4
1.4
2.7
6.5
1.5
0.7
0.6
0.4
0.3
2.3
5.8
2.0
1.6
1.4
2.0
8.9
0.9
0.4
0.2
1.5
2.5
1.9
2.1
0.7
0.6
1.6
3.0
1.8
2.2
1.2
2.3
1.7
1.1
0.3
0.2
9.8
6.6
1.4
1.2
1.4
3.3
2.3
5.4
6.7
1.1
1.1
0.8
0.6
0.4
0.4
2.4
5.9
1.8
1.4
1.5
3.9
9.1
0.7
1.1
0.6
0.4
0.3
2.7
1.9
2.4
2.1
1.9
2.2
1.3
0.6
0.3
6.7
6.7
1.7
1.5
1.8
4.6
2.9
1.6
0.5
2.3
4.2
2.1
1.7
1.6
4.1
10.6
1.5
0.6
0.3
3.2
1.7
2.1
2.1
2.3
2.1
1.0
0.3
4.4
6.0
1.7
1.3
1.7
4.6
3.5
0.4
0.3
0.2
9.7
2.0
2.8
2.0
1.5
1.2
0.8
0.5
10.0
4.1
1.3
0.7
0.5
0.4
0.3
1.4
0.7
0.4
0.3
1.8
0.6
0.3
1.3
0.5
0.3
1.8
0.6
0.3
0.6
0.3
0.2
0.2
0.2
0.3
0.5
0.2
0.5
1.5
0.2
0.3
0.9
2.7
0.2
0.8
2.7
0.3
0.7
0.3
0.6
1.5
0.2
0.4
0.5
2.6
3.6
0.2
0.3
0.2
1.1
0.9
2.1
0.3
0.4
1.0
2.5
1.8
0.2
0.4
0.7
1.0
3.3
6.2
0.2
0.3
0.5
1.4
1.3
2.0
0.2
0.3
0.4
0.6
1.0
3.6
2.1
0.2
0.2
0.3
0.5
0.9
1.1
3.8
0.2
0.3
0.4
0.5
1.6
1.6
1.9
0.2
0.2
0.3
0.5
0.6
1.1
4.7
2.7
2.0
0.2
0.2
0.3
0.6
1.2
1.2
4.0
0.4
0.2
0.2
0.3
0.4
0.6
1.6
2.1
1.2
0.7
0.2
0.2
0.3
0.5
0.6
0.5
0.4
0.3
0.2
0.2
0.3
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1 0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
11.3
G
G
G
G
GG
G
G
G
G
G
GG
G
G
G
G
GG
G
GJJJ JJJ
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
Plan View
Exhibit A - Res 19-19
50
Exhibit A - Res 19-19
51
Exhibit A - Res 19-19
52
Exhibit A - Res 19-19
53
Exhibit A - Res 19-19
54
Exhibit A - Res 19-19
55
Exhibit A - Res 19-19
56
Exhibit A - Res 19-19
57
Exhibit A - Res 19-19
58
Exhibit A - Res 19-19
59
Exhibit A - Res 19-19
60
Exhibit A - Res 19-19
61
Exhibit A - Res 19-19
62
P age 1 of 1
MEETING: Planning Commission/Town Board AGENDA ITEM #:
DATE: April 22, 2019 ACTION TYPE:
7b__________
Approval/Denial
“T
own of Greenville”
AGENDA MEMORANDUM
To: Honorable Chairperson and Board and Commission Members
From: Michael J. D. Brown, Community & Economic Development Director
Date: April 15 2019
RE: Rezoning Parcel 110086203 from General Commercial to Industrial
ACTION TYPE: This item is for possible Town Planning Commission/Board Approval/Denial.
BACKGROUND & SUMMARY: Staff has been working diligently with the Catherin A. Schlimm RLT, the
owners of Parcel 110086203, on the development of approximately 30 arces of their 54 acre property
into a future manufacturing facility. The property is located south of County Highway GV and east of
County Highway CB. In order to facilitate development of the site, the property owners are looking to
rezone the property from General Commercial to Industrial to meet the needs of the future
development opportunity. This property is within the Town’s Tax Increment Finance District and is
poised for development with the future extension of Design Drive between County Highway CB and
Mayflower Road as well as construction of a regional stormwater management facility. While the
developer has asked to remain anonymous at this time, staff has reviewed its proposed uses and they
are best suited with Industrial zoning.
ITEMS FOR DISCUSSION:
1. C
onsistency with the Comprehensive Plan: The future land use map indicates this area as
industrial and therefore is consistent with the comprehensive plan. The surrounding properties
are a mix of Industrial and General Commercial; market conditions are better suited for more
in
dustrial/office uses in this area.
STAFF RECOMMENDATION: Staff recommends approval the rezoning request. If the Commission is in
agreement, the following motion may be made:
“
Motion to recommend approval of Resolution 32-19 to the Town Board.”
###
Attachments:
1. Aerial
2. Resolution 32-19
64
This map provides data containing geographic information about
the Town of Greenville. The data was obtained from multiple
sources and agencies. The Town of Greenville provides this
information with the understanding that it is not guaranteed to be
current, correct or complete and assumes no responsibility for the
accuracy of this map or its use or misuse. The map is intended for
use as a general reference only.
Town of Greenville
Zoning
GENERAL AGRICULTURE
SINGLE FAMILY RESIDENTIAL
TWO FAMILY RESIDENTIAL
MULTI-FAMILY RESIDENTIAL
GENERAL COMMERCIAL DISTRICT
PLANNED COMMERCIAL
NEIGHBORHOOD COMMERCIAL DISTRICT
BUSINESS PARK
INDUSTRIAL
AIRPORT DISTRICT
Parcel Boundary
.
Scale is approximate and is not based
upon legally recorded or surveyed data.
WALLY WAY
M
AYFLOW
ER DRIVE
M
AYFLOW
ER DRIVE
COUNTY RD CB COUNTY RD GV
STATE RD 15
LEVI DRIVE
DESIGN DRIVE
QUALITY DRIVE
GREENVILLE DRIVE
0 400 800200
Feet
HE
RO
N
R
IDG
E
C
O
U
RT
DE
ER
HA
VE
N C
OU
R
T
WALLY WAY
MAYFLOW
ER DRIVE
M
AYFLO
W
ER
DR
IV
E
WISCONSIN AVENUE
SCH RO TH LANE
M
AYFLO
W
ER
DR
IV
E
SCH OO L R OA D
WISCONSIN AVENUE
LILAC LA NE
SCH OO L R OA D
GRE
ENW
O
O
D RO
AD
GRE ENV ILLE D RIVE
DESIG N D RIVE
RED WING DRIVE
NEU BERT RO AD
DAWN C OU RT
STAR DU
ST DR
IVE
COUNTY RD CB
STATE RD 15
STATE RD 96
COUNTY RD CB
COUNTY RD GV
STATE RD 15
C
RAFTS
ME
N
DR
IVE
CR
AFTSM
EN
DR
IVE
QUA LIT Y CO URT QUA LIT Y D RIVE
SPEC IA LTY D RIVE
C R AF TSM E N
CO U RT
VA
NDE
R M
AAZE
N DR
IVE
TA LO N D RIVE
TH
RU
SH
D
RIVE
Q UAIL RU N D RIVE
RED
W
ING
DRIVE
GR
EENW
OO
D
C
OU
RT
GRE ENWO O D CO UR T
EVEN
IN
G S
TA
R DR
IVE
LILAC LANE
LILAC LANE
SUM M ER WIN D LANE
EVEN
IN
G S
TA
R DR
IVE
M OO N
SHA DOW
DR IVE
M
O
ON
DU
ST
C
OU
RT
LE
VI DRIV
E
LE VI DRIV E
TECH
NICA
L D
RIVE
TECH NICA L D RIVE TECH NICA L D RIVE
DESIG N D RIVE
DESIG N D RIVE
TECH
NICA
L D
RIVE
TECH
NICA
L D
RIVE
SPEC IA LTY D RIVE
TO
W
ER
VIEW
D
RIVE
TO
W
ER
VIEW
D
RIVE
QUALIT Y DRIVE
QUA
LIT
Y DRIV
E
GREENVILLE DRIVE
MO ON
SH ADOW
DR IVE NEU BERT R OAD
COUNTY RD CB
Zoning Map: NOT TO SCALE
Project Location
Rezone Parcel 110086203 from General Commercial to Industrial
65
1
Resolution #32-19
RESOLUTION OF THE TOWN BOARD OF THE TOWN OF GREENVILLE
APPROVING A REZONING OF PARCEL 110086203 FROM GENERAL COMMERCIAL TO
INDUSTRIAL.
WHEREAS, a rezoning request has been applied for to rezone parcel 110086203 from General
Commercial to Industrial as shown on Exhibit A; and
W
HEREAS, the Planning Commission has found the request to be consistent with the Town of
Greenville’s Comprehensive Plan and recommended approval to the Town Board; and
N
OW, THEREFORE, BE IT RESOLVED that the Town Board of the Town of Greenville
hereby finds that the request is consistent with the Town of Greenville’s Comprehensive Plan and
therefore approves the rezoning request.
T
his resolution was adopted by the Town of Greenville Town Board on the 22 nd day of April,
2019:
T
OWN BOARD OF THE
TOWN OF GREENVILLE, WISCONSIN
B
y: _____________________________
Jack Anderson, Town Chair
ATTEST:
___________________________________
Wendy Helgeson, Clerk
M
otion to Approve Resolution No. #32-19 made by:
V
otes:
Title Name Aye Nay Other
Supervisor Culbertson
Supervisor Peters
Supervisor Ryan
Supervisor Strobel
Chairperson Anderson
P
osted:
66
This map provides data containing geographic information about
the Town of Greenville. The data was obtained from multiple
sources and agencies. The Town of Greenville provides this
information with the understanding that it is not guaranteed to be
current, correct or complete and assumes no responsibility for the
accuracy of this map or its use or misuse. The map is intended for
use as a general reference only.
Town of Greenville
Zoning
GENERAL AGRICULTURE
SINGLE FAMILY RESIDENTIAL
TWO FAMILY RESIDENTIAL
MULTI-FAMILY RESIDENTIAL
GENERAL COMMERCIAL DISTRICT
PLANNED COMMERCIAL
NEIGHBORHOOD COMMERCIAL DISTRICT
BUSINESS PARK
INDUSTRIAL
AIRPORT DISTRICT
Parcel Boundary
.
Scale is approximate and is not based
upon legally recorded or surveyed data.
WALLY WAY
MAYFLOWER DRIVE
MAYFLOWER DRIVE
COUNTY RD CB
COUNTY RD GV
STATE RD 15
LEVI DRIVE
DESIGN DRIVE
QUALITY DRIVE
GREENVILLE DRIVE
0 400 800200
Feet
H E R O N R I D G E C O U R T
D E E R H A V E N C O U R T
WALL Y WAY
MAYFLOWER DRIV E
MAYFLOWER DRIV E
W ISCONSIN AVE NUE
SCH RO TH LANE
MAYFLOWER DRIV E
SCH OO L R OA D
W ISCONSIN AVE NUE
L ILAC L A NE
SCH OO L R OA D
GRE ENWO O D RO AD
GRE ENV I LLE D RIVE
DESIG N D RIVE
RED WING DRIVE
NEU BERT RO AD
DAWN C OU RT
STAR DU ST DR IVE
COUNTY RD CB
STATE RD 15
STATE RD 96
COUNTY RD CB
COUNTY RD GV
STATE RD 15
C
RAFTS
ME
N
DR
IVE
CR
AFTSM
EN
DR
IVE
QUA LI T Y CO URT QUA LI T Y D RIVE
SPEC I A L TY D RIVE
C R AF TSM E N
CO U RT
V A NDE R M AAZE N DR IVE
T A L O N D RIVE
TH
RU
SH
D
RIVE
Q UAIL RU N D RIVE
RED WING DRIVE
GR
EENW
OO
D
C
OU
RT
GRE ENWO O D CO UR T
EVEN I N G S T A R DR IVE
L ILAC LANE
L ILAC LANE
SUM M ER WIN D LANE
EVEN I N G S T A R DR IVE
M OO N
SHA DOW
DR IVE
M
O
ON
DU
ST
C
OU
RT
L E VI DRIV E
L E VI DRIV E
TECH NICA L D RIVE
TECH NICA L D RIVE TECH NICA L D RIVE
DESIG N D RIVE
DESIG N D RIVE
TECH NICA L D RIVE
TECH NICA L D RIVE
SPEC I A L TY D RIVE
T O WER VIEW D RIVE
T O WER VIEW D RIVE
QUA LI T Y DRIV E
QUA LI T Y DRIV E
G RE ENVIL LE DRIVE
MO ON
SH ADOW
DR IVE NEU BERT R OAD
COUNTY RD CB
Zoning Map: NOT TO SCALE
Project Location
Rezone Parcel 110086203 from General Commercial to Industrial
Exhibit A - Res 32-19
67
P age 1 of 2
MEETING: Planning Commission/Town Board AGENDA ITEM #:
DATE: A pril 22, 2019 ACTION TYPE:
7c
Approval/Denial
“T
own of Greenville”
AGENDA MEMORANDUM
To: Honorable Chairperson and Board and Commission Members
From: Michael J. D. Brown, Community & Economic Development Director
Date: A pril 15, 2019
RE: WE Energies Gas Regulation Station Site Plan and Special Exception
ACTION TYPE: This item is for possible Town Planning Commission/Board Approval/Denial.
BACKGROUND & SUMMARY: At the December 17, 2018 Planning Commission meeting WE Energies
presented a concept plan for a gas regulator located at the southeast corner of parcel 110085604 over
an easement they are purchasing from the property owner. We Energies was concerned with the
landscaping and Gateway District aesthetic requirements. The Planning Commission indicated the
proposed landscaping and brick building would be acceptable as well as the gravel parking area. As
such, WE Energies has submitted an application for a site plan and special exception for a gas regulator.
This project requires a special exception use as the property is zoned General Commercial and there is
no principle permitted use or structure on the property.
SURROUNDING ZONING AND LAND USES:
Existing Zoning Existing Land Use
North Business Park Agriculture
South General Commercial Residential
East Grand Chute Agriculture
West General Commercial Agriculture
ITEMS FOR DISCUSSION:
1. S
pecial Exception: A Special Exception for a Gas Regulator has been requested:
a. S
ection 320-209A(1-10) Standards for granting a special exception. Special Exceptions
may be granted by the Planning Commission, and approved by the Town Board, when
all of the following conditions prevail:
i. The establishment, maintenance, or operation of the sp ecial exception will not be
detrimental to, or endanger the public health, safety, morals, comfort or gene ral
welfare of the community.
69
Page 2 of 2
ii. The special exception will not be injurious to the uses of other property in the
immediate vicinity for the purposes already permitted, nor substantially diminish and
impair property values within the neighborhood in which it is to be located.
iii. The proposed use will not create a look of clutter, garishness, glare or creates an
obnoxious noise level, or would generate any o ther incompatibility with surrounding
neighborhood.
iv. The impact of the use is furthering the purposes of this chapter or the purposes of the
zoning district in which the use is proposed or the adopted Comprehensive Plan of the
Town.
v. The establishment of the special exception will not impede the normal and orderly
development and improvement of the surrounding property.
vi. Adequate facilities, access roads, drainage and/or necessary services will be provided.
vii. Adequate measures have been or will be taken to p rovide ingress and egress so
designed as to minimize traffic congestion in the public streets.
viii. If the special exception involves a public use or a use providing public utility service,
that such use or service shall meet a demonstrable public need and pro vide a public
benefit.
ix. Lot area, lot width and setbacks meet or exceed minimum requirements and are
adequate for the proposed use. When there is an existing nonconforming structure, this
provision may be waived by the Town Board.
x. Generally, a buffer shall exist as determined by the Planning Commission between the
structure or land use to be occupied by the special exception and any adjoining property
line.
2. Site Plan: Staff has reviewed the site plan and it is in general compliance with Town ordinances
and the discussions the Planning Commission previously had with WE Energies.
RECOMMENDATION: Staff recommends approval of the site plan and special exception requests. If the
Commission is in agreement it may make the following motions:
“Motion to approve Resolution 33-19”
“Motion to recommend approval of Resolution 34-19 to the Town Board”
###
Attachments:
1. Aerial Map
2. Resolution 33-19
3. Resolution 34-19
70
This map provides data containing geographic information about
the Town of Greenville. The data was obtained from multiple
sources and agencies. The Town of Greenville provides this
information with the understanding that it is not guaranteed to be
current, correct or complete and assumes no responsibility for the
accuracy of this map or its use or misuse. The map is intended for
use as a general reference only.
Zoning
GENERAL AGRICULTURE
SINGLE FAMILY RESIDENTIAL
TWO FAMILY RESIDENTIAL
MULTI-FAMILY RESIDENTIAL
GENERAL COMMERCIAL DISTRICT
PLANNED COMMERCIAL
NEIGHBORHOOD COMMERCIAL DISTRICT
BUSINESS PARK
INDUSTRIAL
AIRPORT DISTRICT
Parcel Boundary
.
Scale is approximate and is not based
upon legally recorded or surveyed data.
MAYFLOWER DRIVE
MAYFLOWER DRIVE
STATE RD 15
GREENVILLE DRIVE
0 200 400100
Feet
WALLY WAY
MAYFLOW ER DR IVE
MAYFLOW ER DR IVE
NEUB E RT ROA D
COU NTY R D C B
COU NTY R D GV
STATE RD 15
LEV I DRIVE
DES IGN DRIV E
QUA LIT Y DRIVE
GREENVILLE D RIVE
MOON
SHADOW
DRIVE NEUB E RT ROA D
COU NTY R D CB
Zoning Map: NOT TO SCALE
Project Location
Town of Greenville
WE Energies Gas Regulator
Gas Regulator
Location
71
Page 1 of 2
Resolution #34-19
RESOLUTION OF THE TOWN BOARD OF THE TOWN OF GREENVILLE
APPROVING A SPECIAL EXCEPTION FOR A GAS REGULATOR FOR WE ENERGIES,
LOCATED AT PARCEL 110085604
WHEREAS, a gas regu lator has been applied for as a special exception for WE Energies
located on parcel 110085604 as shown on the attached Exhibit A; and
WHEREAS, the Planning Commission has found that the conditions in which to gra nt a
special exception in Section 320- 209A(1-10) of the Zoning Ordinance have been met and have
recommended approval to the Town Board; and
WHEREAS, the approval and continued use of the special exception shall be conditioned on
the following
1. No conditions set.
WHEREAS, per Section 320- 209B(2) of the Zoning Ordinance, the special exception shall
expire if the use is discontinued for a period of eight months. If a building permit is required, and has
not been obtained within 12 months of the issuance of the special exception permit, the applicant must
request in writing and the Planning Commission may approve an extension if it finds there is no
significant change to warrant a new special exception permit application. If the special exception does
not require a building permit and has not started within 12 months of issuance of the special exception
permit the permit is considered null and void and an application for a special exception permit shall be
required. If the conditions set forth above are not met within the specified timeframes the special
exception permit shall expire and be null and void. The special exception shall run with the land and is
transferable with the sale of the property; and
WHEREAS, this resolution shall act as the special exception permit and be enforceable by the
Town;
NOW, THEREFORE, BE IT RESOLVED that the Town Board of the Town of Greenville
hereby finds that the conditions in which to grant a special exception in Section 320-209A(1-10) of the
Zoning Ordinance have been met and approves the special exception permit.
This resolution was adopted by the Town of Greenville Town Board on the 22nd day of April,
2019:
TOWN BOARD OF THE
TOWN OF GREENVILLE, WISCONSIN
By: _____________________________
Jack Anderson, Town Chair
72
Page 2 of 2
ATTEST:
___________________________________
Wendy Helgeson, Clerk
M
otion to Approve Resolution No. #34-19 made by:
V
otes:
Title Name Aye Nay Other
Supervisor Culbertson
Supervisor Peters
Supervisor Ryan
Supervisor Strobel
Chairperson Anderson
P
osted:
73
W
26'
10'
10'
10'
10'
10' 10'
Gate
Proposed NG Pipe
Proposed NG Pipe
Proposed Building
10'
75'
150'
150'
35'
300'
219'
10'
40'
Proposed Stone Section
Proposed
Asphalt15'
Proposed Stone Section
NG Pipe Connection
to existing main
20'
308.16'
LEGEND
Proposed Contour608 Proposed Building
Proposed GravelProposed Gas Line
Proposed Fence Proposed Asphalt
Page
Author:
Date:
1.0
----
Last Saved by:
tim
Filename:
5640engr.dwg
Gas Regulator Station, Mayflower Drive
Town of Greenville, Outagamie County, WI
For: We Energies
SITE PLAN
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
20 0 20 40 60
04/1/2019
SHEET INDEX:
Sheet Page
Site Plan 1.0
Topographic Survey 1.1
Drainage and Grading Plan 1.2
Erosion & Sediment Control Plan 1.3
NO SCALE
LOCATION MAP
NE 1/4 SEC 24, T 21 N, R 16 E,
TOWN OF GREENVILLE
OUTAGAMIE COUNTY, WI
1924
STH 15
Mayflower Road
Project
Location
13 18
24 19
13
24
24
County Road CB
Greenville Drive
Project Information
Owner:
We Energies
333 West Everett
Milwaukee, WI 53201
Phone (414) 221-2850
Site:
Parcel ID # 110085604
Zoning: General Commercial District
Airport: Zone 2b
Easement Areas:
Open Gradation: 10,090 square feet
Building: 260 square feet
Green Space: 6,900 square feet
Total: 17,250 square feet
Setbacks:
Front Town Road: 37'
Rear: 20'
Side: 20'
Maximum Height: 20'
Distance to north property line
Exhibit A - Res 34-19
74
Utility Pole
Guy Wire
Wetlands
LEGEND
Treeline
Index Contour
Ex Spot ElevationCulvert
Intermediate Contour
Well
Asphalt Pavement
Benchmark
Permanent Regulator Exclusive Easement
Utility & Access Easement
W
N89° 29' 18"W 428.03'
S00° 30' 42"W 64.71'
S13° 13' 30"E 63.14'
150.00'150.00'
N00° 30' 42"E 75.00'
S89° 29' 18"E 150.00'
35.00'
40.00'
S89° 29' 18"E 150.00'
24.71'
40.00'
S00° 30' 42"W 75.00'
128.03'
Page
Author:
Date:
C1.1
----
Last Saved by:
jim
Filename:
5640Topo.dwg
Gas Regulator Station, Mayflower Drive
Town of Greenville,Outagamie County, WI
For: We Energies
TOPOGRAPHIC
SURVEY
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
NOTES
This topographic survey was performed during winter conditions. Utility and ground
features shown on this map are indicated based on what was observed at the time.
Utility markings and existing features may have been covered by snow and/or ice and
may not be shown on this map.
Existing utilities shown are indicated in accordance with available records and field
measurements. The contractor shall be responsible for obtaining exact locations &
elevations of all utilities, including sewer & water from the the property owners of the
respective utilities. All utility the property owners shall be notified by the contractor 72
hours prior to excavation. Contact Digger's Hotline (1-800-242-8511) for exact utility
locations.
This is not a boundary survey.
03/4/2019
20 0 20 40 60
NO SCALE
LOCATION MAP
NE 1/4 SEC 24, T 21 N, R 16 E,
TOWN OF GREENVILLE
OUTAGAMIE COUNTY, WI
1924
STH 15
Mayflower Road
Project
Location
13 18
24 19
13
24
24
County Road CB
Greenville Drive
Bearings are referenced to the East line of the
Northeast 1/4, Section 24, T21N, R16E,
assumed to bear N00°30'42"E, base on the
Outagamie County Coordinate System.
Exhibit A - Res 34-19
75
W
Gate
Proposed NG Pipe
Proposed NG Pipe
Proposed Building
FF=751.5
848.50849.35
850.59
850.46
Proposed Stone Section
Proposed
AsphaltProposed Stone Section
Replace culvert
at existing field entrance
with 32' 28"x20" CMPA
with endwalls
Inv 847.40 N
Inv 847.50 S
Match existing grade
(849.65 +/-) to maintain
drainage path from south
Match existing
grade, field verify
All green space within
easement shall be seeded
with no-mow seed mixture
NG Pipe Connection
to existing main
848.50
852.2
852.2 849.75
849.50
850.59
850.46
849.35 140' x 4' wide swale at 0.60% slope
850.50
850.50
850
851
852
849
851 850
850
All green space within
easement shall be seeded
with no-mow seed mixture
Emergency
Overland
Overflow path
849.20 849.20
848.95 848.95849
LEGEND
Proposed Contour
608.73 Proposed Grade
608
Existing GradeProposed Culvert
Proposed Building
Proposed Gravel
Prop. Finished Floor Elev.FF=000.0
Proposed Gas Line
Proposed Fence
Page
Author:
Date:
1.2
----
Last Saved by:
tim
Filename:
5640engr.dwg
Gas Regulator Station, Mayflower Drive
Town of Greenville, Outagamie County, WI
For: We Energies
DRAINAGE & GRADING
PLAN
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
NOTES:
1. Existing utilities shown are indicated in accordance with available records and field
measurements. The contractor shall be responsible for obtaining exact locations &
elevations of all utilities, including sewer and water from the owners of the respective
utilities. All utility owners shall be notified by the contractor 72 hours prior to
excavation. Contact Digger's Hotline (1-800-242-8511) for exact utility locations.
2. The Contractor shall verify all staking and field layout against the plan and field
conditions prior to constructing the work and immediately notify the Engineer of any
discrepancies.
3. The contractor shall minimize the area disturbed by construction as the project is
constructed. Disturbed areas shall be seeded as soon as final grade is established.
Contractor shall replace topsoil and then seed, fertilize and mulch all lawn areas
within 1 week of topsoil placement.
4. Contractor shall remove all excess materials from the site. Earthwork contractors
shall verify topsoil depth.
5. Updated survey and title search have not been authorized and the boundary and
easements shown may be inaccurate or incomplete.
20 0 20 40 60
04/1/2019
Stabilize with DOT Class I, Type B
(DOT Section 628.2 & 628.3)
or approved equal erosion control blanket
15' Min
TYPICAL DRAINAGE SWALE SECTION
4:1 Max
4' wide bottom, grade on drainage plan
Property line
Match
existing
grade
4:1 Max
NOTE:
Mat should extend to top of bank or 18" vertically, whichever is less.
Compacted subgrade
12" Stone base course
4" - base aggregate dense 1¼"
8" - base aggregate dense 3"
12"
ASPHALT PAVEMENT SECTION
Topsoil
1:1 Min.
4" Asphalt pavement
1 3 4" finish course
2 14" binder course
Edge of pavement
as shown on plan
Compacted subgrade
12" Stone base course
Open Graded Aggregate per Section 310
State of Wisconsin Standard Specification
For Highway and Structure Construction,
latest edition.
STONE SECTION
Topsoil or Landscaping
1:1 Min.
Exhibit A - Res 34-19
76
W
Gate
Proposed NG Pipe
Proposed NG Pipe
Proposed Building
Perimeter Silt Fence
Tracking Pad
Proposed Stone Section
Proposed
AsphaltProposed Stone Section
Class III Sediment Log
Replace culvert
at existing field entrance
with 32' 28"x20" CMPA
with endwalls
Inv 847.40 N
Inv 847.50 S
NG Pipe Connection
to existing main
Stabilize swale with Class 1, Type B matting
per swale detail sheet 1.2.
850
851
852
849
851 850
850
849
Proposed Sediment barrier
LEGEND
Proposed Tracking Pad
Proposed Contour
Prop. Drainage Direction
608.73 Proposed Grade
608
Existing GradeProposed Culvert
Proposed Building
Proposed Gravel
Prop. Finished Floor Elev.FF=000.0
Proposed Gas Line
Proposed Fence
Page
Author:
Date:
1.3
----
Last Saved by:
tim
Filename:
5640engr.dwg
Gas Regulator Station, Mayflower Drive
Town of Greenville, Outagamie County, WI
For: We Energies
EROSION & SEDIMENT
CONTROL PLAN
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
20 0 20 40 60
04/1/2019
2' Min
Backfill trench with
excavated soil
Geotextile fabric only
(DOT Section
628.2 & 628.3)
Wood posts
4' min. length
2' min. bury
Silt fence notes:
1. Detail of construction not shown on this drawings shall conform to criteria set by authorities having
jurisdiction and by DNR Technical Standard 1056.
2. When possible, the silt fence should be constructed in an arc or horseshoe shape with the ends
pointing upslope to maximize both strength and effectiveness.
3. Attach the fabric to the posts with wire staples or wooden lath and nails.
4. 8'-0" post spacing allowed if a woven geotextile fabric is used.
5. Trench shall be a minimum of 4" wide and 6" deep to bury and anchor the geotextile fabric. Fold
material to fit trench and backfill and compact trench with excavated soil.
6. Geotextile fabric shall be reinforced with an industrial polypropylene netting with a maximum mesh
spacing of 3/4" or equal. A heavy-duty nylon top support chord or equivalent is required.
7. Steel posts shall be studded "tee" or "u" type with a minimum weight of 128 lbs/lineal foot (without
anchor). Fin anchors shall be a minimum size of 4" diameter or 1 1/2" x 3 1/2", except wood posts
for geotextile fabric reinforced with netting shall be a minimum size of 1 1/8" x 1 1/8" oak or
hickory.
Flow direction
3' Max
Fold
3" max
Support cord
Geotextile
fabric
Flow
SILT FENCE INSTALLATION
TRENCH DETAIL
Geotextile fabric
(DOT Section
628.2 & 628.3)
Flow
Excess
fabric
2' min bury
Wood
post
Note 1 Use hard, durable, angular stone or recycled concrete meeting the
gradation in Table 1. Where this gradation is not available, meet the
gradation in Wisconsin Department of Transportation (DOT) 2018 Standard
Specification, Section 312, Select Crushed Material.
Note 2 Slope the stone tracking pad in a manner to direct runoff to an
approved treatment practice.
Note 3 Select fabric type based on soil conditions and vehicles loading.
Note 4 Install tracking pad across full width of the access point, or restrict
existing traffic to a dedicated egress lane at least 12 feet wide across the
top of the pad.
Note 5 If a 50’ pad length is not possible due to site geometry, install the
maximum length practicable and supplement with additional practices as
needed.
TABLE 1: GRADATION FOR STONE TRACKING PADS
Sieve Size Percent by weight passing
3" 100
2-1/2" 90-100
1-1/2" 25-60
3/4" 0-20
3/8" 0-5
TRACKING PAD DETAIL
Aggregate1
Full width of the
egress point4 Geotextile Fabric Liner 3
50' Min5
12" Min2
Site Description
The site is an easement for a natural gas regulator station. The site has access from an existing field access on
Mayflower Drive. The balance of the property (outside the easement) is agricultural land within the Mud Creek
watershed having outlet to the Mayflower Drive cross culvert north of the easement location.
Soils
Soils are silt loam to silty clam loam being Hortonville Silt Loam and Symco Silt Loam.
Planned Sediment and Erosion Control Practices
All erosion control practices shall be in place prior to disturbing the site. All sediment and erosion control
devices and methods shall be in accordance with DNR Technical Standards and the WisDOT Erosion Control
product acceptability lists (PAL). It is the responsibility of the Contractor to minimize the area disturbed and the
duration of the disturbance. Erosion & sediment control measures shall be maintained on a continuing basis
until the site is permanently stabilized. All applicable controls must be in place at the end of each work day with
all off-site sediments being cleaned daily or as necessary as no sediment flushing is allowed.
1) Diverting Flow
a) Permanent Diversion - Intended to divert runoff around disturbed areas to a location where the water
can be discharged without adversely impacting the receiving area or channel. Permanent diversions
will be used to route runoff from the swale to the Mayflower Drive road ditch.
2) Overland Flow
a) Silt Fence - Intended to provide a temporary barrier to the transportation of sediment offsite. Silt fence
also reduces the velocity of sheet flow; thereby reducing the erosion potential of flowing water. Silt
fencing is not to be used in areas of channelized flow and sediment deposits shall be removed when
a 6 inch depth is reached. The silt fence shall be repaired or replaced as necessary to maintain a
barrier. All Silt Fence shall be installed and maintained in accordance with DNR Technical
Standard 1056. It will be placed at the following locations:
i) along the site boundary where runoff will leave the site.
b) Mulching and Erosion Mat - Intended to reduce the amount of erosion caused by raindrop impact,
high overland and concentrated flow velocities and assist the establishment of both temporary and
permanent vegetation. All Erosion Mat shall be installed and maintained in accordance with
DNR Technical Standards 1052 and 1053 and all Mulching with DNR Technical Standard 1058 .
In addition to mulching, Erosion Mat is required per plan and if field conditions warrant.
c) Seeding - Intended to provide a reduction of overland flow velocities and stabilize disturbed areas.
Seeding will be used on all disturbed areas within seven days of the completion of the activity that will
disturb the area. All seeding shall be in accordance with DNR Technical Standard 1059 . A no
mow seed mixture shall be applied for permanent seeding prior to September 15 th. If required,
temporary seeding shall consist of Oats, Rye, Winter Wheat, and/or Annual Ryegrass applied at rates
and during the season specified by the Technical Standard but no later than November 1 st. Sod
placement may occur at any time sod is available and the sod and soil are not frozen.
3) Permanent Channel Stabilization
a) Vegetated Waterway - Intended to establish permanent vegetation to reduce the velocity of
concentrated runoff thereby protecting the waterway from erosion. The type of erosion mat used will
depend upon the velocity of the runoff in the channel and are specified in accordance with DOT
Erosion Control Product Acceptability Lists (PAL). Vegetated waterways will be used in the following
areas:
i) drainage swale as indicated on the plans;
4) Tracking Out Control - Intended to reduce the amount of sediment transported onto public roads. The
Tracking Pad shall be installed and maintained in accordance with DNR Technical Standard 1057. A
stone tracking pad will be constructed at the site entrance as indicated on the plan.
5) Dust Control - Intended to reduce surface to air transport of dust during construction. Dust control shall be
implemented with use of methods provided in DNR Technical Standard 1068. These methods include
the use of polymers, seeding, and mulch.
6) Dewatering BMP - Intended to reduce the amount of sediment conveyed due to dewatering practices.
Dewatering practices require compliance with DNR Technical Standard 1061. The use of geotextile
bags is required to prevent sedimentation with a stabile discharge to the storm water pond or upland area (if
pumping is required for stormwater pond construction). The bags shall meet the requirements of Technical
Standard 1061. Upon completion of the dewatering operation, all materials must be disposed of properly in
accordance with all state and local requirements. Dewatering is not anticipated.
7) Waste Material - All onsite waste and construction materials shall be handled and disposed of properly. No
pavement material, runoff from concrete washout, or other waste material is allowed to enter the drainage
system or receiving waters.
Sequence of Construction
1) Obtain plan approval and other applicable permits
2) Install & maintain all sediment control measures: May 2019
3) Strip topsoil in the area of the station and driveway: May 2019
4) Site Work Construction (utilities, grade, gravel, building): May-June 2019
5) Stabilize lawn and ditch areas no later than one week after final grade is established, the entire site
shall be stabilized by the end of June with vegetation established prior to the end of 2019 growing season.
6) Apron paving: July 2019
Maintenance Plan
The contractor is responsible for inspection and maintenance of sediment and erosion control measures until
the project is completed. The inspections shall be made every seven days or within 24-hours of a rainfall event
of 0.50-inch or greater. Any practices that are damaged or not working properly shall be repaired by the end of
the day. Accumulated sediment shall be removed when it has reached a height of one-half the height of the
structure. In addition, the following measures shall be taken:
1) All seeded areas will be re-seeded and mulched as necessary according to the specifications in the planned
practices to maintain a vigorous, dense vegetated cover.
2) Remove silt fence and temporary structures only after final stabilization and vegetative cover is
established.
3) Avoid the use of fertilizers and pesticides in or adjacent to channels or ditches.
4) Construction and waste materials shall be properly disposed.
Weekly inspection reports shall be maintained by the contractor. These reports shall document inspections and
maintenance performed. The date and time of the inspections, the inspector's name, and the status of
construction and any maintenance performed. Refer to the DNR website for a template;
http://dnr.wi.gov/runoff/stormwater/constrforms.htm#forms. Upon request, the inspection reports shall be made
available to the owner, the engineer, or the Town of Greenville.
Responsible Parties
Best Management Practices (BMPs) Construction and Maintenance:
To be Determined (TBD)
BMP Inspection and Compliance Enforcement
Town of Greenville
Curlex sediment logs
or equivalent Steel rebar or hardwood stake
Rebar or stake to only
penetrate netting,
not Curlex material
Channel
bottom
Nominal diameter
as specified
16" Minimum
Flow
45° to 60°
Rebar or stake to only
penetrate netting,
not Curlex material
Curlex sediment logs
or equivalent
Steel rebar or
hardwood stake
16" minimum
STAKE DETAILS
(NO TRENCH)
STAKE DETAIL
(FRONT VIEW)
NOTE:
Stake installation shall meet manufacturer's requirements in
regard to spacing, material, size, and bury depth.
SEDIMENT LOG DETAIL
Slope var.Slope var.
Bottom elevation of end log shall be equal
to or greater than top of lowest middle log.
FRONT ELEVATION
Exhibit A - Res 34-19
77
Exhibit A - Res 34-19
78
1" = 50'
Scale:
3/4/2019Date:
Revision #: 1 Chad Wolfrath
WE ENERGIES GREENVILLE
Landscape Plan: Landscape Design by:
Shrub, Deciduous
Dogwood, Variegated 9 Cornus alba 5 Gal.
Viburnum, Dwarf 14 Viburnum 'Compactum' 5 Gal.
Tree, Deciduous
Maple, Armstrong 5 Acre rubric 'Armstrong' 11/2"
Pear, Callery, Chanticleer 4 Pyrus calleryana 'Chanticleer' 11/2"
Tree, Evergreen
Spruce, Black Hills 8 Picea glauca 'Densata' 5-6'
Legend
Common Name Qty Botanical Name Size
Hardwood mulch
No underlayment
No edging
areas not covered with Hardwood Mulch
to be restored with a no mow seed mix and covered with
straw blankets to eliminate erosion.
planting diagram
form saucer with
3" continuous rim
soil backfill w/ mix
tamp to remove
air pockets
hardwood mulch 3" depth
not to scale
not to scale
mayflower Drive
15' wide asphalt area
15' wide no mow seed area
10' wide no mow seed area
Exhibit A - Res 34-19
79
Luminaire Schedule
SymbolQtyLabelDescription
1OA1045HY50WNFRVLYHZ0000H001 mounted @ 11'
Isoline Legend
Illuminance (Fc)
ColorValue
0.1
0.2
0.5
1
2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 1.5 3.67.79.8 6.2 2.6 1.1 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.7 1.5 3.2 5.6 6.6 4.8 2.5 1.2 0.6 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.7 1.2 2.1 3.1 3.4 2.8 1.8 1.0 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.5 0.9 1.3 1.7 1.8 1.5 1.1 0.7 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.4 0.6 0.8 0.9 1.0 0.9 0.7 0.5 0.4 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.6 0.6 0.5 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Exhibit A - Res 34-19
80
Page 1 of 1
MEETING: Planning Commission & Town Board AGENDA ITEM #: 7d
DATE: April 22, 2019 ACTION TYPE: Discussion
“Town o
f Greenville”
AGENDA MEMORANDUM
To: Honorable Chairperson and Board and Commission Members
From: Michael J. D. Brown, Community & Economic Development Director
Date: April 15, 2019
RE: Ordinance 03-19 Town Functional Road Classification System
ACTION TYPE: This item is for possible Town Planning Commission/Board Approval/Denial.
BACKGROUND & SUMMARY: As part of the update to the Subdivision Ordinance staff has been working
on it was identified that th ere were c onflicts between the Subdivision Ordinance and the Town
Functional Road Classification System. As a result, Community Development, Public Works and GIS has
updated Chapter 204 Article II Town Functional Road Classification System to reflect appropriate road
classifications. Collector roads have been broken out into major and minor classifications and the
extension of Design Drive between County Highway CB and Mayflower has been designated as an
Officially Mapped Road, being a Tax Increment Finance District project. The Roads going into the Sports
Complex off of State Highway 96 as well as the east/west connectors have been added as Officially
M
apped Roads as this is a requirement of the State Department of Transportation in order to receive an
access permit to the Sports Complex and Well #5 currently being developed.
RECOMMENDATION: Staff recommends approval of Ordinance 03-19 Town Functional Road
Classification System. If the Planning Commission is in agreement the following motion can be made.
“Reco
mmend approval of Ordinance 03-19 to the Town Board”
###
Attachments:
1. Ordinance 03-19
82
TO
WN OF GREENVILLE
ORDINANCE NO. 03-19
TOWN FUNCTIONAL ROAD CLASSIFICATION SYSTEM
T
he Town Board of the Town of Greenville, Outagamie County does hereby ordain as follows:
S
ections §204-10 through §204-13 of the Town of Greenville Code is hereby repealed and recreated
as follows:
§
204-10 Functional road classification.
There is hereby established a Functional Road Classification System consisting of arterial roads, major
collector roads, minor collector roads, and local roads in the Town of Greenville as defined and
designated below.
§ 204-11 Arterial roads.
The primary function of arterial roads is the movement of through traffic from one area of the community
to another or the movement of through traffic between important economic activity centers, more
specifically to carry traffic from Major and Minor Collector roads to it.
A. Existing roads designated as arterial roads. The following existing roads are designated as arterial
roads in addition to any extensions or new alignments of these roads:
1. WIS 15
2. WIS 76
3. WIS 96
4. COUNTY BB
5. COUNTY CA
6. COUNTY CB
7. COUNTY GV
8. COUNTY JJ
§ 204-12 Collector roads.
The primary function of collector roads is to collect and distribute traffic between arterial roads and local
roads. Collector roads shall have a right-of-way of not less than 80 feet.
A. Major Collector Roads. The primary function of major collector roads is to carry traffic from minor
collector roads to the major systems of arterial roads. The following existing roads are designated as
major collector roads in addition to any extensions or new alignments of these roads as shown on the
official map:
1. Greendale Road
2. Hillview Road
3. Island Road
4. Julius Drive
83
5. Manley Road
6. Mayflower Drive
7. North Road
8. School Road
9. Spring Road
10. West Spencer Road
B. Minor Collector Roads. The primary function of minor collector roads is to carry traffic from Local
roads to the major system of Major Collector and Arterial roads, it may include the principal
entrance roads to residential, commercial and industrial developments. The following existing roads
are designated as minor collector roads in addition to any extensions or new alignments of these
roads as shown on the official map:
1. Design Drive
2. Everglade Road
3. Greenwood Road
4. Lily of the Valley Road (south of WIS 15)
5. Moon Shadow Drive
6. Neubert Road
7. Parkview Drive
C. Local Roads. The primary function of local roads is to carry traffic from abutting properties
within a subdivision to Minor Collector streets; local streets should avoid connecting directly to major
collectors or arterials when possible. Those roads not classified as an arterial or collector shall be
considered local roads with a minimum right-of-way width of not less than 66 feet.
§ 204-13 Official Town of Greenville Functional Classification System Map.
There is hereby established an Official Town of Greenville Functional Classification System Map
depicting the designation and location of existing and proposed arterial roads, existing and proposed
collector roads and existing and proposed local roads. The Official Town of Greenville Functional
Classification System Map as shown in Figure 1 shall be part of this chapter and constitute a part of the
Official Map of the Town of Greenville.
A. Amendments. Amendments to the Official Town of Greenville Functional Classification System
Map shall be approved by the Town Board in accordance with the amendment provisions in Article
I, General Provisions, of this chapter. Amendments shall be promptly portrayed on the map.
B. Detail maps. The Town Board may from time to time establish more detailed maps showing
locations, distance and other information for proposed arterial, collector and local roads in Article
IV, Detail Maps, of this chapter. In the event of any conflict or variance between locations and
distance on the Official Town of Greenville Functional Classification System Map as shown in
Figure 1 and detailed maps in Article IV of this chapter, the detailed maps shall prevail and
constitute the proper location and distance.
84
If this conflicts with any section within the Town of Greenville Municipal Code, this ordinance shall
prevail.
This Ordinance shall take effect upon passage and publication.
Adopted this 22nd day of April, 2019.
TOWN OF GREENVILLE:
Jack Anderson
Town Chairperson
Attest:
Wendy Helgeson
Town Clerk
85
Julius Dr
School Rd
Municipal Dr
North Rd
Wisconsin Av
Greenville Dr
Spring Rd
Manley Rd
N Mayflower Dr
Winnegamie Dr
Island Rd
Hillview Rd
Everglade Rd
W Spencer Rd
Rickey La
Greenwood Rd
Lilac La
Levi Dr
Design Dr
Greendale Rd
Parkview Dr
Quality Dr
Winnegamie Drive
Joan St
River Dr
Glennview Dr
Spring Valley Dr
Greenridge Dr
Glen Valley Dr
College Av
Holy Hill Dr
Medina Dr
Neubert Rd
Communication Dr
S Mayflower Dr
Terrace Dr
Ares Dr
Spencer Rd
Aerotech Dr
Cedar Dr
Fairwinds Dr
Sunnyvale La
Maple Terrace Rd
Westhaven Dr
Ellen La
Craftsmen Dr
Rocky Mountain Dr
Ridgeway Dr
Tower View Dr
Specialty Dr
Sunrise Tr
Churchill Rd
Redwing Dr
Summer View Dr
Endeavour Dr
Technical Dr
Buman Way
Star Dust Dr
Westgreen Dr
Discovery Dr
Windward Dr
Puls Farm Pl
Swanee Cir
Long Ct
Moon Shadow Dr
Thrush DrBrush Run
Hickory Nut Tr
Meadow Park Dr
Cedar La
Spring Ct
Sunset Dr
Pebble Ridge Rd
Elpaso Dr
Charleen La
Lundeen Dr
Fox Springs Dr
Prairie Ct
Bennett Cir
Two Mile Rd
South Creek Dr
Fawn Ridge Dr
Challenger Dr
Hyacinth La
Heavenly Dr
Shagbark Way
Peaceful Ct
Angel Hill Dr
Emerald La
Priscilla La
Lily Of The Valley Dr
Horizon Dr
Colonial Dr
Evening Star Dr
Sunfield Dr
Sally St
Foxwood Dr
N Spring Dr
Savannah Dr
Prairie View Dr
Hickory Meadows La
Boonesborough Dr
Fox Hollow La
Crandon Ct
Pilgrim St
Linda Lou Dr Meadowview Dr
Harvest Dr
Prescott Dr
Rimrock La
Fairlane Dr
Quarry View Dr
Pasture Pkwy
Pathfinder Dr
Milly St
Rawley Point Dr
Dover Ct
Columbia Dr
Parkview Drive
Airport Park Dr
Bobwhite Dr
Buttercup Ct
Rockdale La
Hummock Dr
Moonlight Dr
Jackie Ct
Highgreen Dr
Waterlefe Drive
Cleary Ct
Midnight Way
Vast Domain Dr
Plymouth St
Hillwood Ct
Timothy La
Forest Glen Dr
Ridgeside Dr
Clover La
Englewood Dr
Learning Way
Atlantis Dr
Brookview Dr
Arnies La
Schroth La
Red Hawk Dr
Donna Dr
Hillcrest Ct
Lynchburg Dr
Lakeview Ct
Orchid Way
Reimer Dr
West Meadows La
Merrimac Dr
Bluebluff Way
South Park Dr
Rock Island Dr
Sherwood Point Dr
West Lake Ct
Stone Bluff LaWesthaven Ct
Marlys Ct
Dairy La
Velma La Gemini La
Glenford Way
Violet Ct
Cornhusk Dr
Greenwood Ct
Keimar Ct
Winds End La
Joeys Pl
Autumn Ct
Anderson La
Trillium Ct
Comet La
Christy La
Wally Way
Molly Marie Ct
Bettys Rodeo Dr
Cheryl Ct
Hot Springs Ct
Ponderosa Dr
Vander Maazen DrMaple Leaf Ct
Blustery Dr
Windyhill Rd
Deer Haven Ct
Jeremy Ct
Winnegamie Drive
Ellen La
Winnegamie Drive
Greendale Rd
Greenville Dr
Winnegamie Drive
Parkview Dr
Winnegamie Drive
College Av
Hillview Rd
Greendale Rd
Revised November 24, 2009
Revised March 10, 2010
Revised April 10, 2013
Revised July 18, 2017
Revised December 4, 2017
Revised March 5, 2019
Source: Outagamie County, 2010
This map provides data containing geographic information about
the Town of Greenville. The data was obtained from multiple
sources and agencies. The Town of Greenville provides this
information with the understanding that it is not guaranteed to be
current, correct or complete and assumes no responsibility for the
accuracy of this map or its use or misuse. The map is intended for
use as a general reference only.
Prepared March 21, 2019 By:
Town of Greenville - GIS Department
W6860 Parkview Dr.
P.O. Box 60
Greenville, WI 54942
(920)757-7276 Phone
(920)757-6342 Fax
Website: www.townofgreenville.com
Email: gis@townofgreenville.com
Town of Greenville
Officially Mapped Road Local
Arterial
Major Collector
Minor Collector
Street Section #
AEROTECH DR 25
AIRPORT PARK DR
ALEXANDRA WAY
25
23
ANDERSON LN
ANGEL HILL DR
31
3
APPLETREE CT
ARES DR (pvt)
14
35
ARNIES LN 11, 14
ATLANTIS DR (pvt) 25
AUTUMN CT 9
BAILEY'S HARBOR CT 12
BAILEY'S HARBOR RD 12
BARNWOOD CT 21
BARRY CT 14
BENJAMIN DR 3
BENNETT CIR 4, 9
BETTY'S RODEO DR 22
BIRMINGHAM ST 12
BLUE HERON LA 3
BLUEBLUFF WAY 3
BLUSTERY DR 14, 23
BOBWHITE DR 23
BON BON CT 10
BONAVENTURE TER
BOONESBOROUGH DR
23
12
BRACKENWOOD LA (pvt) 15
BRANDON CT 13
BROOKHILL DR 10
BROOKVIEW DR 30
BRUSH RUN 21
BUCKY'S WAY 23
BUMAN WAY 16
BUTTERCUP CT 10
C.T.H. BB
C.T.H. CA
35, 36
25
C.T.H. CB 24,25, 36
C.T.H. GV 24
C.T.H. JJ 1,2, 3, 4, 5, 6
CAPE COD AVE 36
CEDAR DR 14
CEDAR GROVE CT 14
CEDAR LA 14
CELEBRATION DR 7
CHALLENGER DR (pvt) 25, 36
CHAPEL HILL DR 3
CHARLEEN LA 23
CHATHAM CT
CHERYL CT
23
23
CHESAPEAKE CT 12
CHRISTY LA 10
CHURCHILL CT 22
CHURCHILL RD 22
CLEARY CT 22
CLOVER LA 10
COBBLESTONE CT 23
COLONIAL DR 36
COLUMBIA DR (pvt) 36
COMET LA 13
COMMUNICATION CT 25
COMMUNICATION DR 25
CONTRACTOR DR 36
CORNHUSK DR 3
COZY CREEK 14
CRAFTSMEN CT 23
CRAFTSMEN DR 23
CRANDON CT
CRESTFIELD WAY
21
15
DAIRY LA (pvt) 22
DANIEL CT 14
DAWN CT 13
DEER HAVEN CT 13
DESIGN DR 23, 24
DIAMOND CT 14
DISCOVERY DR (pvt) 25
DONNA DR 11
DOVER CT 10
ELLEN LA 14
ELPASO DR 12
EMERALD CT 14
EMERALD LA 14
ENDEAVOR DR (pvt) 26
ENGLEWOOD DR 3
ENTERPRISE DR (pvt) 25
EVENING STAR DR 13
EVERGLADE RD 10, 11, 12
FAIRLANE DR 14
FAIRWINDS DR 14
FAITH CT (pvt)
FALLON LN
FAMILY CIR
23
23
23
FAWN RIDGE CT 14
FAWN RIDGE DR 14
FLAGSTONE CT 23
FOREST GLEN CT 15
FOREST GLEN DR 15
FORSYTH PKWY
FOX HOLLOW LA
23
10
FOX SPRINGS DR 21
FOXWOOD DR 33
GEMINI LN 15
GEMSTONE CT 23
GENE CT 21
GLEN ROSE LA 3
GLEN VALLEY DR 3
GLENFORD WAY 3
Street Section #
GLENNVIEW DR 23
GOLDEN AUTUMN PL 23
GOLDFINCH CT 11
GOLDFINCH DR 11
GOOSE CREEK CIR 12
GREEN WILLOW CT 14
GREEN WILLOW LA 14
GREENBUSH CT 14
GREENDALE RD 6, 7, 18, 30
GREENRIDGE DR 14, 15
GREENVILLE CENTER DR 36
GREENVILLE DR 9,10,13,14,15,24
GREENWOOD CT 14
GREENWOOD RD 11, 12, 13, 14
HARPERS DR 12
HARVEST DR 16
HAWKFIELD (pvt) 15
HEAVENLY DR 3
HERON RIDGE CT 13
HICKORY MEADOWS LA 34
HICKORY NUT TR
HIGH POINT LN
34
15
HIGHGREEN CT 14
HIGHGREEN DR 14
HILLANDALE DR 3
HILLCREST CT 8
HILLVIEW RD 3,4,5,6,7 8,9,10
HILLWOOD CT 9
HOLY HILL DR 3
HORIZON DR 33
HOT SPRINGS CT 12
HUMMOCK DR 2
HYACINTH CT 10
HYACINTH LA 10
ISLAND RD 29, 31, 32
IVY LA 10
JACKIE CT 17
JEREMY CT 10
JOAN ST 2
JOEY'S PL 23
JULIUS DR 9,10,15,16,21,
22,27,28,33,34
KAS DR 11,14
KEIFER CT 14
KEIMER CT 14
KIMBERLY CT 14
KNOLLWOOD CT 14
LAKEVIEW CT 21
LAKEVIEW LA 21
LAWLER CT 8
LEARNING WAY
LEVI DR
2
23, 24
LILAC LA 13, 14
LILY OF THE VALLEY CT 10
LILY OF THE VALLEY DR 10
LINDA LOU DR 16
LONG CT 25
LUNDEEN DR 8
LYNCHBURG DR 12
MANLEY RD 5,6,7,8,17,18, 19, 20
MAPLE TERRACE RD 10, 11
MAPLE LEAF CT 21
MARCY CT 14
MARLYS CT 8
MARRIHILL CT 2
MAYFLOWER RD 1,12,13,24,25, 36
MEADOW PARK DR 15
MEADOWVIEW DR 11, 14
MEDINA DR 11, 14
MERRIMAC DR 14
MICHAEL CT 14
MIDNIGHT CT 15
MIDNIGHT WAY 15
MILLY ST 2
MISTY SPRING CT 9
MOLLY MARIE CT 21
MOON DUST CT 13
MOONLIGHT DR 15
MOON SHADOW DR 13
MORNING GLORY LA 10
MUNICIPAL DR 2,3,10,11,14, 15,22, 23,26,
27,34,35
NATURE TR DR 34
NEUBERT RD 13
NORTH RD 4,5,8,9,16,17,
20,21,28,29
NORTH SPRING DR 9
NORTHMONT DR 3
OAKWOOD AVE
OLDE QUARRY LN
33
20
OLIVE CT 14
ORCHID WAY 10
PARKVIEW CT 10
PARKVIEW DR 10, 11, 12, 13
PASTURE PKWY (pvt) 22
PATHFINDER DR (pvt) 35, 36
PEACEFUL CT 20
PEBBLE RIDGE RD 23
PILGRIM ST 36
PINE VIEW CT 30
PLYMOUTH ST 36
PONDEROSA DR 10
PORTSIDE CT 11
Street Section #
PRAIRIE CT 15
PRAIRIE VIEW DR
PRESCOTT DR
15
23
PRISCILLA LA 36
PULS FARM PL 3
QUAIL RUN DR 23
QUALITY CT 23
QUALITY DR
QUARRY RIM RD
23, 24
20
QUARRY VIEW DR 20
RAWLEY POINT DR 12
RED HAWK DR 33
RED WING DR 23
REIMER CT 10
REIMER DR 10
REIS RD 3
RHINESTONE CT 14
RICKEY LA
RIDGELINE TR
13, 14
15
RIDGESIDE DR 33
RIDGETOP DR 33
RIDGEWAY DR 11, 14
RIMROCK LA 15
RIVENDALE CT (pvt) 15
RIVER DR 20
ROBERT CT 21
ROCHELLE CT 10
ROCK ISLAND DR 12
ROCKDALE LA 15
ROCKY MOUNTAIN DR 12
SALLY CT 2
SALLY ST 2
SAVANNAH DR 12
SCHOOL RD 13 - 24
SCHROEDER FARM DR 11, 14
SCHROTH LA 24
SHADYBROOK LA 10
SHAGBARK WAY 34
SHENANDOAH CT 12
SHERWOOD POINT CT 12
SHERWOOD POINT DR 12
SKYLINE DR 14
SMOKEY CT 12
SNOWDROP CT 10
SOUTH CREEK DR 21
SOUTH PARK DR 36
SOUTHPORT DR 12
SPECIALTY DR 23, 24
SPENCER RD 25, 36
SPRING CT 9
SPRING RD 7,8,9,10,15,16,17,18
SPRING GREEN PL 23
SPRING VALLEY DR 21
SQUIRREL RUN 34
ST. HELEN DR 3
ST. MARY'S DR 2
STAR DUST DR 13
STATE RD 15 4, 5, 6
STATE RD 76 34, 35
STONE BLUFF LA 15
SUMMER WIND DR 13
SUMMERBREEZE LN 23
SUMMER VIEW DR 16
SUNFIELD DR 10
SUNNYVALE LA 14, 15
SUNRISE TR 34
SUNSET DR 34
SWANEE CIR 12
TALLAHASSEE CT 12
TALON DR 23
TECHNICAL DR 24
TERRACE DR 9
THORNTON DR 3
THRUSH DR 23
TIMOTHY LA 3
TOPAZ CT 14
TOWER VIEW DR 24
TRILLIUM CT 9
TUCKAWAY CT 14
TWO MILE RD 36
VANDER MAAZEN DR 23
VANESSA LA 3
VAST DOMAIN DR 7
VELMA LA 16
VIOLET CT 9
VISTA CT 2
W SPENCER RD 26,27, 28, 33, 34, 35
WALLY WAY 24
WATERLEFE DR 11, 14
WEATHERHILL CT 2
WESTHAVEN CT 16
WESTHAVEN DR 15, 16
WEST LAKE CT 21
WEST MEADOWS LA 21
WESTGREEN CT 14
WESTGREEN DR 14
WIECKERT CT 15
WILDWOOD DR 14
WINDS END LA 16
WINDWARD DR 14
WINDY WAY 33
WINDYHILL RD 14, 23
WINNEGAMIE DR 31,32,33,34,35, 36
WISCONSIN AVE 19 - 30
WOODLAND DR 14
Figure 1
86
P age 1 of 1
MEETING: Planning Commission/Town Board AGENDA ITEM #: 7e&f
DATE: A pril 22, 2019 ACTION TYPE: Approval/Denial
“T
own of Greenville”
AGENDA MEMORANDUM
To: Honorable Chairperson and Board Members
From: Michael J. D. Brown, Community & Economic Development Director
Date: A pril 15, 2019
RE: Jennerjohn Field of Dreams Development Agreements - AMENDMENTS
ACTION TYPE: This item is for possible Town Board Approval/Denial.
BACKGROUND & SUMMARY: DJW Investments, LLC, applicant, has requested an amendment to the
development agreements that were approved by Resolutions 09-19 Phase 1 and 10-19 Phase 2 for the
Jennerjohn Field of Dreams subdivision due to revised cost estimates which has modified the letter of
credit amount, but more importantly, per the applicant’s request at the February 25, 2019 Town Board
meeting, an additional $3,965 of engineering fees be paid for by the Town. This fee is from cost
estimates from the original design of the stormwater facility in 2016. The Town’s costs for engineering
fees would increase from $10,391.00 to $14,356.00.
P
er the Town Board’s request, all development agreements have been signed by the developers and the
Letter of Credits have been submitted. The developer has closed on the property and has started
construction of the public improvements.
STAFF RECOMMENDATION: Staff recommends approval of the agreements.
###
Attachments:
1. Resolution 27-19
2. Resolution 28-19
88
1
Resolution #27-19
RESOLUTION OF THE TOWN BOARD OF THE TOWN OF GREENVILLE
APPROVING AN AMENDED DEVELOPMENT AGREEMENT FOR JENNERJOHN FIELD
OF DREAMS PHASE 1 LOCATED AT PARCEL # 110084131 & 110084200
WHEREAS, the Owner/Subdivider has now submitted a Final P lat for approval which require
that all public improvements be completed and accepted by the Town, at the sole expense of the
Owner/Subdivider, before and as a condition of Final Plat approval or, in the alternative, at the request
of the Owner/Subdivider, and in the sole discretion of the Town, the Owner/Subdivider enter into an
agreement with the Town to complete all required public improvements within a reasonable time and
to provide the Town with a financial guarantee to ensure such public improvements are timely
completed at the Owner/Subdivider’s sole expense as a condition of Final Plat approval; and
W
HEREAS, the Town of Greenville Town Board and DJW Investments have agreed to enter
into an amended development agreement for Jennerjohn Field of Dreams Phase 1 which shall repeal
and replace the development agreement approved by Resolution 09-19 , attached as Exhibit A , in
accordance with Town ordinances;
N
OW, THEREFORE, BE IT RESOLVED that the Town Board of the Town of Greenville
hereby approves the at tached development agreement for Jennerjohn Field of Dreams Phase 1 as
shown as Exhibit A.
N
OW, THEREFORE, BE IT FURTHER RESOLVED the Town Chair is authorized to sign
the agreement only after the Owner/Subdivider has signed the agreement and the developme nt
agreements that were approved by Resolutions 28- 19 and 29-19 have been signed by the
Owner/Subdivider of the respective development agreements.
This resolution was adopted by the Town of Greenville Town Board on the 22nd day of April,
2019:
T
OWN BOARD OF THE
TOWN OF GREENVILLE, WISCONSIN
B
y: _____________________________
Jack Anderson, Town Chair
ATTEST:
___________________________________
Wendy Helgeson, Clerk
M
otion to Approve Resolution No. #27-19 made by:
Votes:
Title Name Aye Nay Other
Supervisor Culbertson
Supervisor Peters
Supervisor Strobel
Supervisor Woods
Chairperson Anderson
Posted: 89
1
TOWN OF GREENVILLE
Document No. DEVELOPMENT AGREEMENT
THIS D EVELOPMENT AGREEMENT,
made by and between the Town of Greenville ,
Outagamie County, Wisconsin, a body politic and
municipality(“Town”) and DJW Investments, LLC
(“Owner/Subdivider”):
WH
EREAS, the Owner/Subdivider has
proposed to develop property located in the Town of
Greenville, Outagamie County, Wisconsin,
described in Exhibit 1 attached hereto; and
WH
EREAS, the Owner/Subdivider has
submitted a Preliminary Plat entitled Jennerjohn
Field of Dreams requiring public improvements that
was approved by the Town on July 11, 2016; and
WHEREAS, t he Owner/Subdivider has
submitted engineering reports, construction plans
and specifications for all required public
improvements pursuant to Chapter 270, Code of the
Town of Greenville that were approved by the Town
on November 26, 2018 by Resolution 52-18, and
WH
EREAS, the Owner/ Subdivider has now submitted a Final Plat for approval which
require that all public improvements be completed and accepted by the Town, at the sole expense of
the Owner/Subdivider, before and as a condition of Final Plat approval or, in the alternative, at the
request of the Owner/Subdivider, and in the sole discretion of the Town, the Owner/Subdivider enter
into an agreement with the Town to complete all required public improvements within a reasonable
time and to provide the Town with a financial guarantee to ensure such public improvements are
timely completed at the Owner/Subdivider’s sole expense as a condition of Final Plat approval; and
WH
EREAS, the Owner/Subdivider has provided the Town with the estimated costs of all
required public improvements as shown in Exhibit 2 attached and has agreed to the form and terms
of a financial guarantee.
NO
W THEREFORE, IN CONSIDERATION OF FINAL PLAT APPROVAL, IT IS
AGREED AS FOLLOWS:
1. The
Owner/Subdivider shall construct and complete all required public improvements at its
sole expense and be accepted by the Town by resolution within two years of the date of the
original approval of this agreement, which was approved by Resolution 01-19 on January 14,
2019.
2. Th
e Owner/Subdivider shall construct all required public improvements in compliance with all
Town requirements and in accordance with all approved reports, plans and specifications on
Return to:
Richard J. Carlson
331 E Washington St
Appleton, WI 54911
Tax Parcel NumberTax Parcel No.
Exhibit A - Resolution 27-19
90
2
file with the Town which are hereby deemed to be incorporated into this Agreement and part of
this Agreement.
3. The Owner/Subdivider shall provide a financial guarantee in the form of an irrevocable letter
of credit or escrow account in the amount of 120 percent of the estimated costs for Phase 1 as
set forth in Exhibit 3 and Exhibit 4 for a term of two years in the amount of $991,773.31 for
the benefit of the Town and in the name of the Town. The letter of credit/escrow account shall
be irrevocable and require only that the Town present the l etter of credit or escrow account
agreement with a sight draft and written notice signed by the Town Chair and attested by the
Town Clerk to draw funds. The form of the letter of credit or escrow account and the issuer or
holder shall be approved by the Town. The letter of credit shall be submitted within 5 business
days of approval of this agreement.
4. No financial guarantee shall be allowed to expire prior to substantial completion of all required
public improvements. The Owner/Subdivider shall provide written notice to the Town at least
45 days prior to the expiration of the financial guarantee if substantial completion can not be
achieved prior to expiration. The Town may require renewal or extension of the financial
guarantee.
5. The Owner/Subdivider a cknowledges that it has requested a financial guarantee as a
discretionary alternative to a Town req uirement of completing all required public
improvements as a condition of Final Plat approval and waives any right that it may have to a
different form or different terms of a financial guarantee.
6. The Owner/Subdivider acknowledges that the actual cost of constructi ng required public
improvements may exceed estimated costs for any particular public improvement or all public
improvements in the aggregate and acknowledges its obligation to pay all actual costs.
7. Notwithstanding paragraphs 1 through 6 above, the Owner/Subdivider shall deposit 120
percent of the estimated cost of final pavement for all streets in a separate designated escrow
account in the amount of $71,000.00 in the name of the Town for subsequent final pavement to
be installed by the Town with the account proceeds, upon the sale of 50 percent of the lots, five
years from the date of the Final Plat approval or by order of the Town, whichever comes first.
8. The Owner/Subdivider shall install all public improvements except for the final layer of asphalt
prior to acceptance of the public improvements. The Town Board shall accept all public
improvements by resolution at the recommendation of the Public Works Director.
9. Building permits may be issued once all of the following have been completed:
a. The final plat has been recorded.
b. Public improvements are substantially completed and accepted by the Town
Board by resolution.
c. The escrow required in paragraph 7 has been submitted.
10. Regional Pond Allocation Cost:
Exhibit A - Resolution 27-19
91
3
a. The Town agrees to pay the Owner/Subdivider a not to exceed amount of $154,150.00
towards the actual cost to construct the regional pond and associated infrastructure
specific to the pond; this is approximately 49.5% of the Construction Subtotal. Exhibit 5
indicates the proposed drainage basins map; the Town’s cost share is for the South and
East portions on the map.
b. T
he Town agrees to pay the Owner/Subdivider a not to exceed amount of $62,711.00;
100% of the Construction Subtotal as shown on page 2 of Exhibit 2 Note 3: Town of
Greenville Storm Water Pond Direct Cost Table towards the actual cost to construct
associated infrastructure outside of the areas as shown on Exhibit 3 as these areas would
not be required of the Owner/Subdivider if it were not developed as a regional pond.
c. T
he Town agrees to pay the Owner/Subdivider Construction Engineering Fees (CEF) of a
not to exceed amount of $14,356.00. The Town shall reimburse the Owner/Subdivider
within 30 days of receiving the letter of credit.
d. T
he Owner/Subdivider may submit for and the Town may agree to pay for unforeseen
construction costs for costs identified in paragraph 10a&b only through a formal change
order request at a cost share of 49.5% of the total change order request. The
Owner/Subdivider shall submit a change order request in writing and provide
documentation to substantiate the request. The Town Public Works Director is
authorized to approve change order requests that are equal to or less than $4,999.99; the
Town shall provide a written response of approval or disapproval within 3 business days.
Change order requests equal to or greater than $5,000 shall be approved by the Town
Board; change order requests shall be submitted at least 10 business days prior to the next
regularly scheduled Town Board meeting in order for the request to be presented for
consideration. The cost thresholds are consistent with the Town’s Purchasing Policy.
e. U
pon acceptance of the pond and associated infrastructure by the Town Board, the
Owner/Subdivider shall submit an itemized invoice for the work performed. Town staff shall
review and provide a recommendation to the Town Board within 15 business days of receipt
of the itemized invoice (s). The Town Board shall take action on the request at its next
regularly scheduled meeting after the 15 day review period. The Town shall reimburse the
Owner/Subdivider within 10 business days of the reimbursement request approval.
11. T
he Owner/Subdivider shall pay in full all Town review fees in connection with or relating to
the final plat, reports, plans and specifications as a condition of final plat approval.
12. T
he Owner/Subdivider shall timely pay all Town inspection fees and expenses in connection
with and relating to the construction of required public improvements.
13. T
he Owner/Subdivider shall comply with all regulatory requirements of the Code of the Town
of Greenville and all applicable regulatory requirements of the State of Wisconsin and
Outagamie County.
14. T
he Owner/Subdivider shall provide the Town with record drawings of sanitary sewer, water
main and storm sewer improvements showing the location of all appurtenances and features of
Exhibit A - Resolution 27-19 92
4
the systems.
15. The Owner/Subdivider shall guarantee all public improvements against defects due to faulty
materials or workmanship which appear within a period of 14 months after substantial
completion and accepted by the Town by Resolution. The Owner/Subdivider shall pay the full
cost of necessary replacement or repair of defects and provide the Town with financial security
to ensure timely replacement or repair in an amount of 10 percent of the estimated total costs of
all completed improvements.
16. The Owner/Subdivider shall, to the maximum extent practicable, preserve existing landscape
features such as trees, grassed areas and the like located outside of actual construction zones
needed for public improvements.
17. The Owner/Subdivider shall timely remove and properly dispose of brush and rubbish piles
and timely remedy washouts and sedimentation accumulations arising from construction
activities.
18. The Owner/Subdivider acknowledges and agrees that nothing in this agreement shall be
deemed a waiver or limi tation of any Town immunity, power or authority conferred by law
including but not limited to special assessments and special charges.
19. The Owner/Subdivider acknowledges and agrees that nothing in this agreement waives any
other requirement, obligation or fee of any Town ordinance or resolution.
20. This Agreement shall be interpreted consistent with the rules and requirements of Chapter 270,
Code of the Town of Greenville.
21. This Agreement shall be binding on the Owner/Subdivider, its successors or assigns and shall
constitute a covenant running with the land. This Agreement shall also constitute restrictions
for public benefit pursuant to Section 236.293 Wis. Stats.
22. The Town may deny issuance of a building permit until compliance with the provisions of this
Agreement and Chapter 270, Code of the Town of Greenville are met.
23. This Agreement may only be modified or amended in writing by the parties.
Exhibit A - Resolution 27-19
93
5
S
UBDIVIDER TOWN OF GREENVILLE
D
JW Investments, LLC Jack Anderson, Town Chair
David Winkel, Sole Member
Personally came before me this ___ ATTEST:
day of ____________, 2____, the above
t
o me known to be the person(s) who Wendy Helgeson, Town Clerk
executed the foregoing instrument and
acknowledged the same.
Personally came before me this ___
day of ____________, 2____, the above
N
otary Public, State of Wisconsin
My commission expires:__________________
t o me known to be the person(s) who
executed the foregoing instrument and
acknowledged the same
N
otary Public, State of Wisconsin
My commission expires:__________________
D
rafted by:
Richard J. Carlson
331 E. Washington St.
Appleton WI 54911
Exhibit A - Resolution 27-19
94
S 24°18'58" E81.59'
L4
Proposed Trail Location
Proposed TrailLocation
56
20,000 SF
55
20,000 SF
54
20,000 SF
Alexandra Way
Fallon Lane
Melony Court
Alana Lane
49.87'
18.63'
72.77'
125.00'125.00'
125.00'
S 89°38'08" E
160.00'
125.00'
S 89°38'08" E
160.00'
S 89°38'08" E
160.00'
31.53'
C32
N 36°07'28" E
106.51'
128.72'
L6
S 53°52'32" E 160.00'
S 53°52'32" E 216.00'
S 00°21'52" W 1233.13'
S 00°20'58" W 232.42'
N 00°24'32" E 232.04'
S 88°59'31" W 800.02'
L8
L7
S 36°07'28" W
62.62'
N 65°01'30" E 290.06'
N 00°33'41" W 168.22'
329.71'
30' Building
Setback
30' Building Setback
30' Building Setback30' Bui
ldi
ng Setback
30' Building Setback
30' Building Setback
30' Building Setback
Drainage Easement
Drainage Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Utility
Easement
N 36°07'28" E 239.03'
N 88°03'16" E
150.00'
L5
N 88°03'16" E 302.17'
57.84'
27
14,612 SF
29
24,709 SF
S 89°38'08" E
184.10'
150.00'
Drainage Easement
22
14,612 SF
23
16,087 SF
24
18,195 SF
25
14,612 SF
26
14,612 SF
28
14,577 SF
91.32'
S 89°38'08" E
162.36'
91.32'
152.17'
N 00°24'18" E
126.86'
S 89°38'08" E
160.00'
91.32'
91.32' 29.64'
S 89°38'08" E
160.00' 118.06'
S 89°38'08" E
160.00'
91.33'
S 89°38'08" E
160.00'
91.33'
40.46'
S 66°21'44" E
167.10'
C322.49'
S 53°52'32" E160.00'
53.18'
C2
53
37,855 SF
C29 C30 C31
53.08'
18.42' 45.74'
4.26'
C7 C6 C5
40.25' 50.31' 91.33' 117.02'
N 00°21'52" E 431.45'
97.27'
S 88°59'31" W 303.71'
11,760 SF
0.2700 ac
OL 4
43
28,481 SF
13,823 SF
0.3173 ac
OL 3
32
17,611 SF
36
15,716 SF
30
16,590 SF
35
15,200 SF
31
15,200 SF
34
17,614 SF
33
16,010 SF
52
20,000 SF
51
20,000 SF
41
31,549 SF
42
36,708 SF
37
19,848 SF
38
26,059 SF
40
16,406 SF
39
18,987 SF
45
34,977 SF
44
24,030 SF
C895.00'160.10'
110.00'
100.00'
86.88'
N 00°21'52" E 160.10'
S 00°21'52" W 160.10'
110.00'
100.00'
110.00'
160.00'
160.00'
C9
160.60' 95.00' 95.00'
101.45'95.00'
N 89°38'08" W
160.00'
48.39'
C27
24.41'
S 89°38'08" E
170.98'
123.17'
N 89°38'08" W
160.00'
125.00'
125.00'
N 89°38'08" W
160.00'
125.00'
125.00'
25.00'
172.12'
166.36'
137.35'
140.00'
N 01°00'29" W 236.28'
C22
103.65'145.00'
N 01°00'29" W 215.81'
C21105.33'
N 03°41'54" W
96.17'
C18
C20
170.11'
84.11'
N 76°23'44" E 269.66'
C17
84.11'
C16
C15
N 00°28'48" E
95.78'
61.26'
S 24°18'58" E 190.17'
C13
S 24°18'58" E 212.38'
C12
26.42'
S 89°38'08" E 150.00'
C11
L1 N 47°27'17" E
154.34'
L2
188.06' 171.92'
S 00°21'51" W 359.98'
C26
C24
C25
48
31,088 SF
46
45,142 SF
50
20,000 SF
49
20,000 SF
47
22,273 SF
N 06°21'26" E 233.61'
S 08°12'47" E 179.73'
17.70'
S 62°19'33" E 167.41'
30' Building Setback
12' Utility Easement
37' Building Setback
50' DOT Highway Setback
55' Municipal Building Setback
55' Municipal Building Setback
50' DOT Highway Setback
20' Drainage & Utility Easement
37' Building Setback
50' DOT Highway Setback
55' Municipal Building Setback
Watermain Easement
Storm Sewer
Easement
Drainage Easement
N 53°16'55" E 184.95'
L3
S 36°07'28" W
106.51' 91.33'
N 88°03'16" E 312.18'
152.05'
160.13'
144.51'
C1S 00°21'52" W 354.30'C4
N 12°16'06" W 68.42'
S 00°21'52" W 308.18'
S 89°38'08" E 296.88'
N 00°21'52" E 350.60'
S 00°21'52" W 354.30'
395.64'
S 89°38'08" E 320.00'
160.00'
160.00'
S 89°38'08" E 320.00'
66.00'
C10
C14
C19
C23
S 89°38'08" E 261.35'
S 00°21'52" W 323.39'
C28L9
44.01'
35'
33' 33'
CL
Dedicated to the Public
CL
33'33' Dedicated to the Public
CL
33' 33'Dedicated to the Public
224.49'66.00'
20' 20'
N 00°21'52" E 235.10'
( S88°59'37"W )
( S00°04'29"E )
50'
50'
50'50'
50'
50'
20'
55' Municipal Building Setback
50' DOT Highway Setback
N00°21'52"E 196.45'
20'
10'
20'
10'
Dedicated to the Public
Dedicated to the Public
20' Drainage Easement
LINE TABLE
Line
L1
L2
L3
L4
L5
L6
L7
L8
L9
Bearing
N 00°21'52" E
S 89°38'08" E
S 87°34'16" E
N 00°21'52" E
N 06°43'28" E
S 36°07'28" W
N 89°04'56" W
S 89°00'28" W
N 12°16'06" W
Length
66.83'
36.96'
66.04'
45.04'
90.56'
38.00'
10.97'
55.05'
68.42'
Delineated Wetlands with 20'
Conservation Easement
No access to right of way
LEGEND
114" x 18" Steel Rebar @ 4.30lbs/LF SET
All other corners
34" x 18" Steel Rebar @ 1.50lbs/LF SET
114" Rebar Found
34" Rebar Found
Lot areas in square feet
Recorded As
SF
( )
1" Iron Pipe Found
File: 4350Final2.dwg
Date: 11/14/2018
Drafted By: jim
Sheet: 1 of 2
Revision Date: Nov 14, 2018
FO
RW
ARD
There are no objections to this plat with respect to
Secs. 236.15, 236.16, 236.20 and 236.21(1) and (2),
Wis. Stats. as provided by s. 236.12, Wis. Stats.
Certified __________________, 20_____
Department of Administration
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
80080160240
Part of the the Southwest 1/4 of the Southwest 1/4 and part of Lot 4, CSM 4036 being part of the Northwest 1/4 of the Southwest 1/4
and part of the Northeast 1/4 of the Southwest 1/4, all being part of Section 23, Township 21 North, Range 16 East,
Town of Greenville, Outagamie County, Wisconsin.
Jennerjohn Field of Dreams 2
NO SCALE
LOCATION MAP
SW 1/4 SEC 23, T 21 N, R 16 E,
TOWN OF GREENVILLE
OUTAGAMIE COUNTY, WI
23 24
26 25 Hwy 96/Wisconsin Ave
14 13
23 24
15 14
22 23
22 23
27 26 Hwy 76/Municipal Dr
School Rd
Project
Location
Notes
1. All linear measurements have been made to the nearest one hundredth of a
foot.
2. No Access area extends 50' each way of the block corner unless otherwise
noted on the plat.
4. All angular measurements have been made to the nearest 20 seconds and
computed to the nearest half seconds.
5. No Improvements or structures are allowed between the right of way line and
the highway setback line. It is expressly intended that this restriction is for
the benefit of the public as provided in section 236.293, Wisconsin Statues,
and shall be enforceable by the Wisconsin Department of Transportation or
its assigns. Contact the Wisconsin Department of Transportation for more
information. The Phone number may be obtained by contacting the County
Highway Department.
6. Lots containing wetlands may require wetland permits to prior to construction
of a building.
7. Outlot 3 & 4 are dedicated to the public for trail purposes per this document.
8. The trail shown noted on the map will be owned by the Town. The
construction and maintenance of the trail will be specified in the developers
agreement.
9. A Wetland Delineation was completed on December 4, 2015 by Davel
Engineering & Environmental, Inc. and received WDNR concurrence.
10. Lots 29, 45, 46 & 53 contain wetlands. There will be a 20' Conservation
Easement around all delineated wetlands unless the easement is otherwise
dimensioned on the plat.
11. Surface water flows into an area listed as Generalized Unique Geologic
Features.
Bearings are referenced to the
W/L of the of the Southwest 1/4 of Section 23
assumed to bear S00°26'16"W based on the
Outagamie County coordinate system
James R. Sehloff, PLS-2692Date
jim@davel.pro
Exhibit 1
Proposed Lots 7 & 8 and all of Proposed Alana Lane Right-Of-Way is Excluded from the Project Legal Description
95
CURVE TABLE
Curve
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20
C21
C22
C23
C24
C25
C26
C27
C28
C29
C30
C31
C32
Radius
133.00'
133.00'
133.00'
167.00'
167.00'
167.00'
233.00'
167.00'
533.00'
533.00'
533.00'
533.00'
533.00'
60.00'
60.00'
60.00'
60.00'
60.00'
467.00'
467.00'
467.00'
467.00'
60.00'
60.00'
60.00'
60.00'
233.00'
167.00'
167.00'
167.00'
233.00'
67.00'
Chord Direction
S 18°14'40" W
S 29°52'52" W
S 12°00'04" W
N 10°28'25" E
N 05°59'47" E
N 16°06'20" E
N 04°09'26" E
S 05°57'07" E
N 89°07'16" E
S 67°51'20" W
S 76°09'57" W
S 66°28'47" W
S 58°10'09" W
S 37°43'04" E
S 87°16'33" W
S 26°02'23" W
S 53°39'05" E
N 40°59'58" E
N 72°51'31" E
N 63°22'32" E
N 77°59'42" E
N 87°28'41" E
S 63°47'22" W
N 52°45'20" W
S 54°43'50" W
S 08°43'28" E
N 05°57'07" W
N 04°09'26" E
N 08°15'55" W
N 08°09'36" E
N 10°28'25" E
N 18°14'40" E
Chord Length
81.67'
28.93'
53.65'
58.62'
32.78'
26.07'
131.77'
36.75'
23.13'
237.68'
84.99'
95.01'
59.45'
66.08'
44.16'
76.56'
77.21'
85.30'
280.95'
130.35'
107.30'
47.03'
113.52'
85.53'
54.58'
71.21'
51.27'
94.44'
23.32'
71.85'
81.79'
41.14'
Arc Length
83.01'
28.99'
54.02'
58.93'
32.83'
26.10'
133.59'
36.82'
23.13'
239.70'
85.08'
95.14'
59.48'
307.01'
45.22'
83.03'
83.87'
94.88'
285.37'
130.78'
107.54'
47.05'
228.11'
95.21'
56.67'
76.23'
51.37'
95.75'
23.33'
72.42'
82.22'
41.82'
Central Angle
35°45'37"
12°29'12"
23°16'25"
20°13'06"
11°15'50"
8°57'16"
32°51'03"
12°37'59"
2°29'11"
25°46'00"
9°08'45"
10°13'36"
6°23'38"
293°10'15"
43°11'02"
79°17'18"
80°05'38"
90°36'18"
35°00'42"
16°02'44"
13°11'37"
5°46'22"
217°49'30"
90°54'55"
54°06'46"
72°47'50"
12°37'57"
32°51'03"
8°00'21"
24°50'43"
20°13'06"
35°45'37"
Tangent Bearing-in
S 36°07'28" W
S 36°07'28" W
S 23°38'16" W
N 20°34'58" E
N 11°37'42" E
N 20°34'58" E
N 12°16'06" W
N 12°16'06" W
N 87°52'41" E
S 80°44'20" W
S 80°44'20" W
S 71°35'35" W
S 61°21'58" W
N 71°07'56" W
N 71°07'56" W
S 65°41'02" W
S 13°36'16" E
N 86°18'06" E
N 55°21'10" E
N 55°21'10" E
N 71°23'53" E
N 84°35'30" E
S 45°07'23" E
S 81°47'13" W
S 27°40'27" W
S 45°07'23" E
N 00°21'51" E
N 12°16'06" W
N 12°16'06" W
N 04°15'45" W
N 20°34'58" E
S 00°21'52" W
Tangent Bearing-out
S 00°21'51" W
S 23°38'16" W
S 00°21'51" W
N 00°21'52" E
N 00°21'52" E
N 11°37'42" E
N 20°34'58" E
N 00°21'52" E
S 89°38'08" E
S 54°58'20" W
S 71°35'35" W
S 61°21'58" W
S 54°58'20" W
N 04°18'11" W
S 65°41'02" W
S 13°36'16" E
N 86°18'06" E
N 04°18'11" W
S 89°38'08" E
N 71°23'53" E
N 84°35'30" E
S 89°38'08" E
N 07°17'52" W
N 07°17'52" W
S 81°47'13" W
S 27°40'27" W
N 12°16'06" W
N 20°34'58" E
N 04°15'45" W
N 20°34'58" E
N 00°21'52" E
S 36°07'28" W
File: 4350Final2.dwg
Date: 11/14/2018
Drafted By: jim
Sheet: 2 of 2
Revision Date: Nov 14, 2018
FO
RW
ARD
There are no objections to this plat with respect to
Secs. 236.15, 236.16, 236.20 and 236.21(1) and (2),
Wis. Stats. as provided by s. 236.12, Wis. Stats.
Certified __________________, 20_____
Department of Administration
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
Part of the the Southwest 1/4 of the Southwest 1/4 and part of Lot 4, CSM 4036 being part of the Northwest 1/4 of the Southwest
1/4 and part of the Northeast 1/4 of the Southwest 1/4, all being part of Section 23, Township 21 North, Range 16 East,
Town of Greenville, Outagamie County, Wisconsin.
Jennerjohn Field of Dreams 2
Town of Greenville Approval Certificate
Resolved, that the plat of Jennerjohn Field of Dreams 2 in the Town of Greenville, Outagamie County, DJW Investments, LLC; owners, is hereby
approved by the Town Board of the Town of Greenville.
ChairmanDate
I hereby certify that the foregoing is a copy of a resolution adopted by the Town Board of the Town of Greenville.
ClerkDate
Field Tile Statement:
Any agricultural drain tile which is disturbed, cut or broken as part of the development of the plat (CSM) or excavation for home construction must
be repaired and/or relocated to allow for the drain tile to continue to drain as originally designed. The cost of repair and/or replacement of the
drain tile must be born by the party damaging the drain tile .
Right to Farm Statement:
The lots created on this map are adjacent to properties that, as of the date of this document, are being used for agricultural purposes. Some
individuals believe that the activities associated with the agricultural use constitute a nuisance or conflict with the quiet enjoyment of their
property. This statement is intended to provide third parties with notice that agricultural activities may exist on the adjacent properties.
Grading Statement:
All grading and final grades for the construction of any public or private improvement shall conform to the surface water drainage plan as approved
by the Town of Greenville Planning Commission.
Street Lighting Statement
Lots within this plat shall be subject to assessments on an annual basis for the operation and maintenance of street lights and the purchase of any
lot constitutes a waiver of objection and agreement to pay said annual assessments which shall be placed upon the annual tax bill as a special
assessment.
Benchmark Note:
Benchmarks will be established on the tag bolts of the fire hydrants after utility construction has been completed.
Drainage Easement Statement:
The Town of Greenville shall have an unqualified right to enter upon any drainage easement for inspection and to maintain and repair all drainage
ways and drainage improvements. Lots shall be equally assessed for maintenance and repair of all drainage way and drainage improvements.
Conservancy Assessments Note:
Lots within this plat shall be subject to assessments on an annual basis for operation and maintenance of conservancy and detention pond area
and the purchase of any lot constitutes a waiver of objection and agreement to pay said annual assessments which shall be placed upon the
annual tax bill as a special assessment
Drainage Easement Restrictions:
The following uses and structures are prohibited within all drainage easements and outlots in the subdivision plat: filling, grading and excavating
except for construction of drainage ways and drainage facilities; the cultivation of crops, fruits or vegetables; the dumping or depositing of ashes,
waste, compost or materials of any kind; the storage of vehicles, equipment, materials or personal property of any kind; and constructing, erecting or
moving any building or structure, including fences, within the drainage easement.
Pedestrian Trail Note:
A pedestrian trail will be located in Outlot 3, Outlot 4 and the road right of way. For exact location please refer to the engineering plans.
Geotechnical Note:
Lot 29 is in an area mapped as “severe” soil rating for construction of homes. Foundations for these homes shall be designed by and
construction of the foundations shall be overseen by a licensed engineer.
Access Restriction Statement:
As owner I hereby restrict all lots and blocks in that no owner, possessor, user, nor licensee, nor other person shall have any right of direct vehicular
ingress or egress with STH 96, as shown on the plat, it being expressly intended that this restriction shall constitute a restriction for the benefit of the
public according to s.236.293, Stats., and shall be enforceable by the Wisconsin Department of Transportation.
Wetland Setback Note:
At the time of applying for a building permit, on lots containing wetland, the wetland setback and the house must be located in the field so that the
building inspector can verify that the house is not located within the Wetland setback.
This Final Plat is contained wholly within the property described in the following recorded instruments:
the property owner of record:Recording Information:Parcel Number(s):
DJW Investments LLC Doc No. ___________Part of 110-0841-31
All of 110-842-00
Surveyor's Certificate
I, James R. Sehloff, Professional land surveyor, hereby certify: That in full compliance with the provisions of Chapter 236 of the Wisconsin
Statutes and the subdivision regulations of the Town of Greenville and Outagamie County, and under the direction of DJW Investments, LLC,
owners of said land, I have surveyed divided and mapped Jennerjohn Field of Dreams; that such plat correctly represents all exterior
boundaries and the subdivision of the land surveyed; and that this land is part of the the Southwest 1/4 of the Southwest 1/4 and part of Lot
4, CSM 4036 being part of the Northwest 1/4 of the Southwest 1/4 and part of the Northeast 1/4 of the Southwest 1/4, all being part of
Section 23, Township 21 North, Range 16 East, Town of Greenville, Outagamie County, Wisconsin all being part of Section 23, Township 21
North, Range 16 East, Town of Greenville, Outagamie County, Wisconsin containing 943,392 Sq Ft (21.6573 Ac) of land described as
follows:
Commencing at the Southwest 1/4 corner of Section 23; thence along the West line of said Section 23, N00°26'16"E, 292.98 feet; thence
S88°59'31"E, 153.89 feet to the Southeast corner of Outlot 2 of Jennerjohn Field of Dreams said point also being the point of beginning;
thence, along said Outlot 2, N00°33'41"W, 168.22 feet; thence, continuing along said Outlot 2, N65°01'30"E 290.06 feet; thence, continuing
along said Outlot 2, N00°28'48"E 95.78 feet; thence, continuing along said Outlot 2, N53°16'55"E 184.95 feet; thence, continuing along said
Outlot 2, N00°21'52"E 66.83 feet; thence, continuing along said Outlot 2, N47°27'17"E 154.34 feet; thence, continuing along said Outlot 2,
S89°38'08"E 36.96 feet to the West right of way line of Fallon Lane; thence, S87°34'16"E 66.04 feet to the East right of way line of said
Fallon Lane; thence, along said East right of way line, N00°21'52"E 45.04 feet to the South line of Lot 12 of said Jennerjohn Field of Dreams;
thence, along said South line N88°03'16'E 150.00 feet to the Southeast corner of said Lot 12; thence along the East line of said Lot 12
N00°24'18"E 126.86 feet to the Northeast corner of said lot 12; thence, along the East line of Lot 13 of said Jennerjohn Field of Dreams,
N06°43'28"E 90.56 feet to the Northeast corner of said Lot 13; thence, along the East line of Lots 14-18 of said Jennerjohn Field of Dreams,
N00°21'52"E 431.45 feet to the Northeast corner of said Lot 18; thence, along the East line of Lots 19-21 of Jennerjohn Field of Dreams,
N36°07'28"E 239.03 feet to the Northeast corner of said Lot 21; thence, along the South line of Lot 12 Towering Pines West S53°52'32"E
160.00 feet to the West right of way line of Alexandra Way; thence, along said West right of way line, S36°07'28"W 38.00 feet to the
Southwest corner of said Alexandra Way; thence along the South line of said Alexandra Way and the South line of Lot 54 Towering Pines 2,
S53°52'32"E 216.00 feet to Southeast Corner of said Lot 54; thence, along the East line of Lot 53 of said Towering Pines 2, S36°07'28'W
62.62 feet to a point on the North/South 1/4 line of said Southwest 1/4; thence, along said 1/4 Line, S00°21'52"W 1233.13 feet; thence
S88°59'31"W 303.71 feet; thence S00°20'58"W 232.42 feet to the Northerly right of way line of STH 96/Wisconsin Ave; thence, along said
North right of way line, N89°04'56"W 10.97 feet; thence, continuing along said North right of way line, S89°00'28"W 55.05 feet; thence
N00°24'32"E 232.04 feet; thence, S88°59'31"W 800.02 feet to the point of beginning, subject to all easements and restrictions of record.
Given under my hand this
day of , 20.
James R. Sehloff, Wisconsin Professional Land Surveyor No. S-2692
Utility Easement Provisions
An easement for electric, natural gas, and communications service is hereby granted by
DJW Investments, LLC, Grantor, to:
Wisconsin Electric Power Company and Wisconsin Gas, LLC, Wisconsin corporations doing business as We Energies, Grantee,
SBC, Grantee,
and
Time Warner Cable, Grantee
their respective successors and assigns, to construct, install, operate, repair, maintain and replace from time to time, facilities used in
connection with overhead and underground transmission and distribution of electricity and electric energy, natural gas, telephone and cable
TV facilities for such purposes as the same is now or may hereafter be used, all in, over, under, across, along and upon the property shown
within those areas on the plat designated as ”Utility Easement Areas” and the property designated on the plat for streets and alleys, whether
public or private, together with the right to install service connections upon, across within and beneath the surface of each lot to serve
improvements, theron, or on adjacent lots; also the right to trim or cut down trees, brush and roots as may be reasonably required incident to
the rights herein given, and the right to enter upon the subdivided property for all such purposes. The Grantees agree to restore or cause to
have restored, the property, as nearly as is reasonably possible, to the condition existing prior to such entry by the Grantees or their agents.
This
restoration, however, does not apply to the initial installation of said underground and/or above ground electric facilities, natural gas facilities,
or telephone and cable TV facilities or to any trees, brush or roots which may be removed at any time pursuant to the rights herein granted.
Structures shall not be placed over Grantees' facilities or in, upon or over the property within the lines marked “Utility Easement Areas”
without the prior written consent of Grantees. After installation of any such facilities, the grade of the subdivided property shall not be altered
by more than four inches without written consent of grantees.
The grant of easement shall be binding upon and inure to the benefit of the heirs, successors and assigns of all parties hereto.
DJW Investments, LLC
David J. Winkel Date
Managing Member
Owner's Certificate
DJW Investments, LLC, a partnership duly organized and existing under and by virtue of the laws of the State of Wisconsin, as owner, does
hereby certify that said partnership caused the land described on this plat to be surveyed, divided, mapped and dedicated as represented on
this plat.
DJW Investments, LLC, does further certify this plat is required by s.236.10 or s.236.12 to be submitted to the following for approval or
objection:
Outagamie County Planning and Zoning Committee
Town of Greeville
Department of Administration
Department of Transportation
IN WITNESS WHEREOF, the said DJW Investments, LLC, has caused these presents to
be signed by its authorized representatives, located at, _________________, Wisconsin
this _______day of ______________________, 20______.
In the Presence of: DJW Investments, LLC
David J. Winkel Date
Managing Member
State of Wisconsin )
)ss
__________ __ County )
Personally came before me this ___________day of ___________________, 20____,
the above named, officers of said corporation, and acknowledged that they executed the foregoing instrument as such officers
as the deed of said corporation, by its authority.
My commission expires:.
Notary Public, Wisconsin
Treasurer's Certificate
We, being the duly elected, qualified and acting Treasurer's of the Town of Greenville and Outagamie County, do hereby certify that in
accordance with the records in our office, there are no unredeemed tax sales and unpaid taxes, or special assessments on and of the land
included in this plat.
Town TreasurerDate
County TreasurerDate
County Planning Agency Approval Certificate
Resolved, that the plat of Jennerjohn Field of Dreams in the Town of Greenville, Outagamie County, Jennerjohn Family Limited
Partnership owners, is hereby approved by Outagamie County.
County Zoning AdministratorDate
Exhibit 1
Proposed Lots 7 & 8 and all of Proposed Alana Lane Right-Of-Way is Excluded from the Project Legal Description
96
Jennerjohn Field of Dreams
Utility & Street Construction
Town of Greenville
Preliminary Opinion of Probable Cost
McM No. W0986-9-18-00645.02.01
Item Description Quantity Unit Unit Cost Total Cost Quantity Cost Quantity Cost
1 8-inch sanitary sewer 3,855 L.F. $25.00 $96,375.00 403 $10,075.00
2 48-inch sanitary sewer manhole 177.0 V.F. $220.00 $38,940.00 15.98 $3,515.60
3 4-inch SCH40 PVC sanitary sewer lateral 2,430 L.F. $20.00 $48,600.00
Subtotal = 183,915.00$ - $ 13,590.60$
4 8-inch water main 4,700 L.F. $26.00 $122,200.00 685 $17,810.00
5 6-inch water main 100 L.F. $30.00 $3,000.00 24 $720.00
6 8-inch resilient wedge gate valve 14 EACH $1,500.00 $21,000.00 2 $3,000.00
7 6-inch resilient wedge gate valve 11 EACH $1,000.00 $11,000.00 2 $2,000.00
8 Hydrant 11 EACH $3,500.00 $38,500.00 2 $7,000.00
9 1 1/4-inch SDR 9 PE water lateral 2580 L.F. $15.00 $38,700.00
10 1 1/4-inch corporation, curb stop & stop box 54 EACH $350.00 $18,900.00
Subtotal = 253,300.00$ - $ 30,530.00$
11 29-inch x 45-inch HERCP storm sewer 35 L.F. 100.00$ $3,500.00 35 $3,500.00
12 42-inch storm sewer 292 L.F. 90.00$ $26,280.00 132 $11,880.00
13 36-inch storm sewer 149 L.F. 75.00$ $11,175.00
14 24-inch storm sewer 561 L.F. 45.00$ $25,245.00
15 21-inch storm sewer 175 L.F. 45.00$ $7,875.00
16 18-inch storm sewer 1,436
L.F. 40.00$ $57,440.00 344 $13,760.00
17 15-inch storm sewer 591 L.F. 35.00$ $20,685.00 36 $1,260.00
18 12-inch storm sewer 438 L.F. 30.00$ $13,140.00 124 $3,720.00
19 10-inch storm sewer 783 L.F. 28.00$ $21,924.00
20 96-inch diameter storm sewer manhole 6.4 V.F. 650.00$ $4,160.00
21 60-inch diameter storm sewer manhole 16.7 V.F. 350.00$ $5,845.00
22 48-inch diameter storm sewer manhole 57.4 V.F. 250.00$ $14,350.00 14.28 $3,570.00
23 48-inch diameter storm sewer inlet-manhole 31.7 V.F. 250.00$ $7,925.00 7.24 $1,810.00
24 36-inch diameter storm sewer manhole 8.8 V.F. 225.00$ $1,971.00 4.00 $900.00
25 24-inch diameter storm sewer manhole 30.5 V.F. 200.00$ $6,100.00
26 Inlet 16 EACH 1,500.00$ $24,000.00 1 $1,500.00
27 4-inch SCH 40 PVC storm sewer lateral 2,430 L.F. 15.00$ $36,450.00
28 29-inch x 45-inch HERCP flared end section 1 EACH 1,200.00$ $1,200.00 1 $1,200.00
29 42-inch RCP flared end section 6 EACH 1,000.00$ $6,000.00 4 $4,000.00
30 24-inch RCP flared end section 5 EACH 650.00$ $3,250.00
31 12-inch RCP flared end section 1 EACH 550.00$ $550.00 1 $550.00
Subtotal = 299,065.00$ 25,750.00$ 21,900.00$
32 Strip & stockpile topsoil 32,900 S.Y. $1.50 $49,350.00 7,076 $10,613.33
33 Common excavation (roadway) 8,650 C.Y. $6.50 $56,225.00 1,725 $11,210.33
34 Type SAS fabric 17,100 S.Y. $2.00 $34,200.00 3,449 $6,898.67
35 6-inch base aggregate dense 1 1/4-inch 5,710 TONS $11.00 $62,810.00 1,150 $12,647.56
36 6-inch base aggregate dense 3-inch 4,510 TONS $11.00 $49,610.00
37 9-inch base aggregate dense 3-inch 1,800 TONS $11.00 $19,800.00 1,725 $18,971.33
38 30-inch mountable concrete curb & gutter 8,620 L.F. $12.00 $103,440.00 1,592 $19,104.00
39 1 3/4-inch HMA pavement, 3 LT 58-28S 1,140 TONS $60.00 $68,400.00
40 2 1/4-inch HMA pavement, 3 LT 58-28S 400 TONS $60.00 $24,000.00 400 $24,000.00
41 1 3/4-inch HMA pavement, 4 LT 58-28S 1,450 TONS $60.00 $87,000.00 297 $17,830.40
42 Lawn restoration 17,700 S.Y. $5.00 $88,500.00 3,803 $19,015.56
43 Common excavation (trail) 778 C.Y. $8.00 $6,224.00
44 6-inch base aggregate dense (trail) 1,244 TONS $15.00 $18,660.00
45 2-inch HMA pavement (trail) 380 TONS $80.00 $30,400.00
46 Lawn restoration (trail) 3,111 S.Y. $5.00 $15,555.00
47 Drainage easement grading (grading, topsoil, seed, fertilize & mulch) 2,200 L.F. $7.00 $15,400.00
48 Erosion Control (silt fence, hay bales, ditch checks) 1 L.S. $10,000.00 $10,000.00
49 Detention pond excavation 20,800 C.Y. $6.50 $135,200.00 20,800 $135,200.00
50 Removal of excess detention pond excavated material off-site 10,000 C.Y. $5.10 $51,000.00
51 Detention pond outlet structure 1 L.S. $5,000.00 $5,000.00 1 $5,000.00
52 Detention pond restoration (4.655-acres) 1 L.S. $50,000.00 $50,000.00 1 $50,000.00
53 Detention pond bird deterrent grid 1 L.S. $70,000.00 $70,000.00 1 $70,000.00
54 Medium Rip-rap 770 C.Y. $40.00 $30,800.00 636 $25,457.78
55 STH 76 Intersection improvements 1 L.S. $60,500.00 $60,500.00 1 $60,500.00
56 Fiber Optic & Utility Relocation at STH 76 & Alana Lane 1 L.S. $30,000.00 $30,000.00 1 $30,000.00
Subtotal = $1,172,074.00 $285,657.78 $230,791.18
Utility Total = 736,280.00$ 25,750.00$ 66,020.60$
Note: 1. Item 55 unit price from Bid Tabulation (Davel Engineering) Street Total = 1,172,074.00$ 285,657.78$ 230,791.18$
Construction Subtotal = 1,908,354.00$ 311,407.78$ 296,811.78$
Construction Engineering Fees = 66,792.39$ 10,899.27$ 10,388.41$
15% Contingency = 286,253.10$ 46,711.17$ 44,521.77$
Total = 2,261,399.49$ 369,018.22$ 351,721.96$
4. Unit cost for Item 50 is assuming disposal within 4 miles of site.
Alana Lane
2. There is storm sewer along Fallon Ln that is oversized to provide
service to Lot 7; the oversizing cost should be allocated to Lot 7.
3. There is storm sewer along outlots 3 & 4 where a portion of the cost
should be allocated to the Town of Greenville.
Street Construction:
Storm Sewer:
Water main:
Sanitary Sewer:
Storm Water Pond
February 19, 2019
[W:\PROJECTS\W0986\91800645\Dept\Muni\OPC\Jennerjohn Field of Dreams OPC]
Exhibit 2
97
Jennerjohn Field of Dreams
Utility & Street Construction
Town of Greenville
Preliminary Opinion of Probable Cost
McM No. W0986-9-18-00645.02.01
Item Description Quantity Unit Unit Cost Total Cost
11 29-inch x 45-inch HERCP storm sewer 35 L.F. 100.00$ 3,500.00$
12 42-inch storm sewer 132 L.F. 90.00$ 11,880.00$
18 12-inch storm sewer 124 L.F. 30.00$ 3,720.00$
24 36-inch diameter storm sewer manhole 4.0 V.F. 225.00$ 900.00$
28 29-inch x 45-inch HERCP flared end section 1 EACH 1,200.00$ 1,200.00$
29 42-inch RCP flared end section 4 EACH 1,000.00$ 4,000.00$
31 12-inch RCP flared end section 1 EACH 550.00$ 550.00$
49 Detention pond excavation 20,800 C.Y. $6.50 135,200.00$
51 Detention pond outlet structure 1 L.S. $5,000.00 5,000.00$
52 Detention pond restoration (4.655-acres) 1 L.S. $50,000.00 50,000.00$
53 Detention pond bird deterrent grid 1 L.S. $70,000.00 70,000.00$
54 Medium Rip-rap 636 C.Y. $40.00 25,457.78$
Construction Subtotal = 311,407.78$
Construction Engineering Fees = 10,899.27$
15% Contingency = 46,711.17$
Total = 369,018.22$
Note 3: Town of Greenville Storm Water Pond Direct Costs
Item Description Quantity Unit Unit Cost Total Cost
14 24-inch storm sewer (R-81.1 to pond) 222 L.F. 45.00$ 9,990.00$
24 36-inch diameter storm sewer manhole (R-81.1) 4.8 V.F. 225.00$ 1,071.00$
30 24-inch RCP flared end section 1 EACH 650.00$ 650.00$
50 Removal of excess detention pond excavated material off-site 10,000 C.Y. $5.10 51,000.00$
Construction Subtotal = 62,711.00$
Construction Engineering Fees = 2,194.89$
15% Contingency = 9,406.65$
Total = 74,312.54$
Note 2: Storm Sewer Oversizing Costs to service Lots 7 & 8
Item Description Quantity Unit Unit Cost Total Cost
Storm Sewer Oversizing 18-inch to 15-inch (R-52.2 to R-60.1) 42 L.F. 5.00$ 210.00$
Storm Sewer Oversizing 24-inch to 18-inch (R-60.1 to R-51.1) 164 L.F. 5.00$ 820.00$
Storm Sewer Oversizing 36-inch to 18-inch (R-51.1 to R-50.3) 149 L.F. 35.00$ 5,215.00$
Storm Sewer Manhole Oversizing 60-inch to 48-inch (R-51.1) 7.89 V.F. 100.00$ 789.00$
Construction Subtotal = 7,034.00$
15% Contingency = 1,055.10$
Total = 8,089.10$
Total Construction Cost = 2,261,399.49$
Storm Water Pond Credit (Drainage Area Based) = 216,882.89$
Alana Lane Credit = 351,721.96$
Town of Greenville Direct Storm Sewer Costs = 74,312.54$
Storm Sewer Oversizing Costs to service Lots 7 & 8 = 8,089.10$
Total Field of Dreams Cost = 1,610,393.00$
Jennerjohn Field of Dreams Summary of Costs
Summary of Storm Water Pond Costs
February 19, 2019
[W:\PROJECTS\W0986\91800645\Dept\Muni\OPC\Jennerjohn Field of Dreams OPC]
Exhibit 2
98
Item Description Cost
1 Construction Cost Subtotal 1,908,354.00$
4 Less Town's pond costs ($271,407 x .495) rounded (154,150.00)$
5 Less Town's street storm sewer construction subtotal costs (62,711.00)$
6 Total Field of Dreams construction costs 1,691,493.00$
8 Less Alana Lane (Phase III) Construction Subtotal (296,811.78)$
9 54 Lot/street/utility costs 1,394,681.22$
10 Per lot cost ($1,394,681.22/54 lots) 25,827.43$
11 Phase 1: 32 lots x $25,827.43 826,477.76$
12 Phase 1 LOC 120% of $826,477.76 991,773.31$
13 Phase 2: 22 lots x $25,827.43 568,203.46$
14 Phase 2 LOC 120% of $568,203.46 681,844.15$
15 Phase 3: Alana Lane 296,811.78$
16 Phase 3 LOC 120% of $296,811.78 356,174.14$
Total Total Cost of Phases I, II & III (Equals Line 6) 1,691,493.00$
Exhibit 3: Phasing Costs
99
T
TC
C
56
20,000 SF
55
20,000 SF
54
20,000 SF
12
19,473 SF
13
13,949 SF
20
14,240 SF
8
151,285 SF
21
14,240 SF
30' Building
Setback
30' Building
Setback
30' Building Setback
30' Building Setback
30' Building Setback
30' Building Setback
30' Building Setback
30' Building Setback
Drainage Easement
Drainage Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Util
ity Easement
12' Utility
Easement
27
14,612 SF
29
24,709 SF
17
17,961 SF
19
13,859 SF
14
14,613 SF
15
16,103 SF
18
16,278 SF
3
21,230 SF
4
24,949 SF
5
17,719 SF
Drainage Easement
35'
20'
22
14,612 SF
23
16,087 SF
24
18,195 SF
25
14,612 SF
26
14,612 SF
28
14,577 SF 53
37,855 SF
Drainage Easement
16
17,084 SF
1
18,050 SF
2
15,200 SF
10
17,010 SF
11
23,587 SF
7
196,185 SF
11,760 SF
0.2700 ac
OL 4
43
28,481 SF
13,823 SF
0.3173 ac
OL 3
32
17,611 SF
36
15,716 SF
30
16,590 SF
35
15,200 SF
31
15,200 SF
34
17,614 SF
33
16,010 SF
52
20,000 SF
51
20,000 SF
41
31,549 SF
42
36,708 SF
37
19,848 SF
38
26,059 SF
40
16,406 SF
39
18,987 SF
45
34,977 SF
44
24,030 SF 48
31,088 SF
46
45,237 SF
50
20,000 SF
49
20,000 SF
47
22,232 SF
30' Building Setback
12' Utility Easement
37' Building Setback
50' DOT Highway Setback
55' Municipal Building Setback
55' Municipal Building Setback
50' DOT Highway Setback
202,765 SF
4.6548 ac
OL 2
6
22,841 SF
9
20,007 SF
56,398 SF
1.2947 ac
OL 1
20' Drainage &Utility Easement
37' Building Setback
50' DOT Highway Setback
55' Municipal Building Setback
Watermain Easement
Storm Sewer
Easement
Drainage Easement
Drainage Easement
20'
10' Asphalt Trail
10' Asphalt Trail
4' High Landscape Berm
4' High Landscape Berm
10' Asphalt Trail
4' High Landscape Berm
S-111
S-201
S-90S-93
S-94S-95
S-91
S-100
S-202
R-52.3
R-33.2
R-33.3
R-31.2
R-31.3
R-33.1
R-30.1
R-30.3
R-52.2
R-51.3
R-51.2
R-60.1
R-50.2
R-34.1
R-52.5
R-53.1
R-71.1
R-70.3
R-50.1
R-40.1
Proposed
Stormwater
Pond
R-41.1
R-85.1
S-110
S-92
R-32.1
R-42.1
R-51.1
R-30.2
R-50.3
R-72.1
R-80.1
R-81.1
R-70.2
S-200
S-96
S-101
R-54.1
R-77.1
R-78.1
R-72.2
R-73.1
R-76.3
R-76.2
R-76.1
R-70.1
10' Asphalt Trail
10' Asphalt Trail
R-52.4
R-60.2
R-84.3
R-84.2
PHASE
3
PHASE
2
PHASE
1
PHASE
1
PHASE
1
PHASE
2
Underground Cable TV
Underground Fiber Optic
Sanitary Sewer
Storm Sewer
Water Main
Fence - Steel
Overhead Electric Lines
Underground Electric
Underground Gas Line
Underground Telephone
Fence - Wood
Fence - Barbed Wire E
E
A
T
T
W
Sanitary MH / Tank / Base
Clean Out / Curb Stop / Pull Box
Storm Manhole
Hydrant
Catch Basin / Yard Drain
Inlet
Utility Pole
Light Pole / Signal
Guy Wire / Pump
Utility Meter
Utility Valve
Telephone Pedestal
Telephone Manhole
Air Conditioner
Electric Transformer
Electric Pedestal
Sign
Tower / Silo
Satellite Dish
Post / Guard Post
Flag Pole
Marsh
Soil Boring
Water MH / Well
Deciduous Tree
Bush / Hedge
Coniferous Tree
Large Rock
Stump
Wetlands
LEGEND
Treeline
Railroad Tracks
Index Contour
Ex Spot Elevation
Railroad Signal
Culvert
Intermediate Contour
Utility Guy Wire
G
C
Gas Regulator
CATV Pedestal
Benchmark
Asphalt Pavement
Concrete Pavement
Proposed Sanitary Sewer
Proposed Sanitary ManholeProposed Storm Sewer
Proposed Water Main
Proposed Contour
Proposed Swale
Proposed Storm Manhole
Proposed Curb Inlet
Prop. Catch Basin / Yard Drain
Proposed Endwall
Proposed Reducer
Proposed Plug
Proposed Hydrant
Proposed Valve
Proposed Curb Stop
Proposed Water MH
Proposed Tee
Proposed Cross
Proposed 90° Bend
Proposed 45° Bend
Proposed 22.5° Bend
W
Proposed Culvert
608
Page
1.1
Jennerjohn Field of Dreams
Town of Greenville, Outagamie County, WI
For: Jennerjohn Field of Dreams LLC
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
Sewer and Water shall be constructed in accordance with the State of
Wisconsin Standard Specifications for Sewer and Water Construction, and all
Special Provisions of the Town of Greenville.
Streets shall be constructed in accordance with the State of Wisconsin
Standard Specifications for Highway and Structures Construction, and all
Special Provisions of the Town of Greenville.
Contractor shall locate all buried facilities prior to excavating. This plan may
not correctly or completely show all buried utilities.
The Contractor shall verify all staking and field layout against the plan and field
conditions prior to constructing the work and immediately notify the Engineer
of any discrepancies.
The Contractor shall comply with all conditions of the Erosion Control Plan and
the Storm Water discharge Permit. All Erosion Control shall be done in
accordance with the Plan and Wisconsin DNR Technical Standards.
The contractor shall coordinate with provider for electric, gas, and
telecommunication service connection and relocations.
Pipe lengths are measured to center of structure. Endwalls are included in
pipe length.
Any agricultural drain tile encountered during construction of the subdivision
shall be reconnected and remain operational if serving offsite property.
Any construction within the 20' sanitary force main easement requires
contacting Dan Klansky (Town of Greenville) 920-841-8550
Project Number: 4350
November 14, 2018
100 0 100 200 300
NO SCALE
LOCATION MAP
SW 1/4 SEC 23, T 21 N, R 16 E,
TOWN OF GREENVILLE
OUTAGAMIE COUNTY, WI
23 24
26 25Hwy 96/Wisconsin Ave
14 13
23 24
15 14
22 23
22 23
27 26 Hwy 76/Municipal Dr
School Rd
Project
Location
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Alana Lane
Melony Court
Fallon Lane
Alexandra WayAlexandra Way
Fallon Lane
Watermain connection to existing watermain
within the north right of way of S.T.H. 96
SHEET INDEX:
Sheet Page
Sewer & Water Cover Sheet 1.1
Drainage and Grading Plan 1.2
Erosion & Sediment Control Plan 1.3
Landscape Plan 1.4
Construction Details 2.1
Sewer & Water Details 2.2
Erosion & Sediment Control Details 2.3
S.T.H. 76 Intersection Detail 2.4
Pavement Markings & Traffic Control Plan 2.5
Stormwater Pond Details 2.6
Plan & Profile: Alana Lane - Sta 0+00 to 8+94.61 3.1
Plan & Profile: Fallon Lane - Sta 0+00 to 10+00 3.2
Plan & Profile: Fallon Lane - Sta 10+00 to 16+50 3.3
Plan & Profile: Melony Court / Alexandra Way - Sta 12+50 to 20+00 3.4
Plan & Profile: Alexandra Way - Sta 20+00 to 27+00 3.5
Plan & Profile: Alexandra Way - Sta 27+00 to 31+70.41 3.6
Plan & Profile: Hwy 96 Watermain Loop - Sta 0+00 to 5+00 3.7
Plan & Profile: Outlot 3 Sanitary - Sta 0+00 to 5+00 3.8
Cross Sections: S.T.H. 76 4.1
Cross Sections: S.T.H. 76 4.2
Cross Sections: Alana Lane 4.3
SEWER & WATER
COVER SHEET
Field tile to be reconnected in a hydraulically efficient fashion if broken during
construction. Any agricultural drain tile which is disturbed, cut or broken as part
of the development of the property or excavation for construction must be
repaired and/or relocated to allow for the drain tile to continue to drain as
originally designed.
Construction phase 1 shall include storm sewer installation from Melony Court,
north within Fallon Lane to the pond storm sewer outfall R-50.1. Construction
phase 2 shall include a temporary trail connection across Alana Lane with
sewer and water construction to include S-202, R-54.1, adjacent hydrant.
Well located on Lot 8 shall be properly abandoned.
Exhibit 4
100
MDR
MFR
POND
SUBR
LDR
LDR
CSTRIP
MDR - MEDIUM DENSITY RESIDENTIAL
MFR - MULTI FAMILY RESIDENTIAL
SUBR - SUBURBAN RESIDENTIAL
CSTRIP - STRIP COMMERCIAL
POND - POND GRASS & WATER
LDR
LDR
MDR
LDR - LOW DENSITY RESIDENTIALJENNERJOHN FOD
MULTI-FAMILY
EAST
SOUTH
Exhibit 5
101
1
Resolution #28-19
RESOLUTION OF THE TOWN BOARD OF THE TOWN OF GREENVILLE
APPROVING AN AMENDED DEVELOPMENT AGREEMENT FOR JENNERJOHN FIELD
OF DREAMS PHASE 2 LOCATED AT PARCEL # 110084131 & 110084200
WHEREAS, the Owner/Subdivider has now submitted a Final P lat for approval which require
that all public improvements be completed and accepted by the Town, at the sole expense of the
Owner/Subdivider, before and as a condition of Final Plat approval or, in the alternative, at the request
of the Owner/Subdivider, and in the sole discretion of the Town, the Owner/Subdivider enter into an
agreement with the Town to complete all required public improvements within a reasonable time and
to provide the Town with a financial guarantee to ensure such public improvements are timely
completed at the Owner/Subdivider’s sole expense as a condition of Final Plat approval; and
WH
EREAS, the Town of Greenville Town Board and DJW Investments have agreed to enter
into an amended development agreement for Jennerjohn Field of Dreams Phase 2 which shall repeal
and replace the development agr eement approved by Resolution 10-19 , attached as Exhibit A , in
accordance with Town ordinances;
NO
W, THEREFORE, BE IT RESOLVED that the Town Board of the Town of Greenville
hereby approves the at tached development agreement for Jennerjohn Field of Dreams Phase 2 as
shown as Exhibit A.
NO
W, THEREFORE, BE IT FURTHER RESOLVED the Town Chair is authorized to sign
the agreement only after the Owner/Subdivider has signed the agreement and the developme nt
agreements that were approved by Resolutions 27- 19 and 29- 19 have been signed by the
Owner/Subdivider of the respective development agreements.
This resolution was adopted by the Town of Greenville Town Board on the 22nd day of April,
2019:
TOW
N BOARD OF THE
TOWN OF GREENVILLE, WISCONSIN
By:
_____________________________
Jack Anderson, Town Chair
ATTEST:
___________________________________
W
endy Helgeson, Clerk
Mot
ion to Approve Resolution No. #28-19 made by:
Votes:
Title Name Aye Nay Other
Supervisor Culbertson
Supervisor Peters
Supervisor Strobel
Supervisor Woods
Chairperson Anderson
Posted: 102
1
TOWN OF GREENVILLE
Document No. DEVELOPMENT AGREEMENT
THIS D EVELOPMENT AGREEMENT,
made by and between the Town of Greenville ,
Outagamie County, Wisconsin, a body politic and
municipality(“Town”) and DJW Investments, LLC
(“Owner/Subdivider”):
WH
EREAS, the Owner/Subdivider has
proposed to develop property located in the Town of
Greenville, Outagamie County, Wisconsin,
described in Exhibit 1 attached hereto; and
WH
EREAS, the Owner/Subdivider has
submitted a Preliminary Plat entitled Jennerjohn
Field of Dreams requiring public improvements that
was approved by the Town on July 11, 2016; and
WHEREAS, t he Owner/Subdivider has
submitted engineering reports, construction plans
and specifications for all required public
improvements pursuant to Chapter 270, Code of the
Town of Greenville that were approved by the Town
on November 26, 2018 by Resolution 52-18, and
WH
EREAS, the Owner/ Subdivider has now submitted a Final Plat for approval which
require that all public improvements be completed and accepted by the Town, at the sole expense of
the Owner/Subdivider, before and as a condition of Final Plat approval or, in the alternative, at the
request of the Owner/Subdivider, and in the sole discretion of the Town, the Owner/Subdivider enter
into an agreement with the Town to complete all required public improvements within a reasonable
time and to provide the Town with a financial guarantee to ensure such public improvements are
timely completed at the Owner/Subdivider’s sole expense as a condition of Final Plat approval; and
WH
EREAS, the Owner/Subdivider has provided the Town with the estimated costs of all
required public improvements as shown in Exhibit 2 attached and has agreed to the form and terms
of a financial guarantee.
NO
W THEREFORE, IN CONSIDERATION OF FINAL PLAT APPROVAL, IT IS
AGREED AS FOLLOWS:
1. The
Owner/Subdivider shall construct and complete all required public improvements at its
sole expense and be accepted by the Town by resolution within two years of the date of
approval of the original agreement, which was approved by Resolution 02-19 on January 14,
2019.
2. Th
e Owner/Subdivider shall construct all required public improvements in compliance with all
Town requirements and in accordance with all approved reports, plans and specifications on
Return to:
Richard J. Carlson
331 E Washington St
Appleton, WI 54911
Tax Parcel NumberTax Parcel No.
Exhibit A - Resolution 28-19
103
2
file with the Town which are hereby deemed to be incorporated into this Agreement and part of
this Agreement.
3. T
he Owner/Subdivider shall provide a financial guarantee in the form of an irrevocable letter
of credit or escrow account in the amount of 120 percent of the estimated costs for Phase 2 as
set forth in Exhibit 3 and Exhibit 4 for a term of two years in the amount of $681,844.15 for
the benefit of the Town and in the name of the Town. The letter of credit/escrow account shall
be irrevocable and require only that the Town present the letter of credit or escrow account
agreement with a sight draft and written notice signed by the Town Chair and attested by the
Town Clerk to draw funds. The form of the letter of credit or escrow account and the issuer or
holder shall be approved by the Town. The letter of credit shall be submitted prior to recording
of the final plat and start of construction.
4. N
o financial guarantee shall be allowed to expire prior to substantial completion of all required
public improvements. The Owner/Subdivider shall provide written notice to the Town at least
45 days prior to the expiration of the financial guarantee if substantial completion can not be
achieved prior to expiration. The Town may require renewal or extension of the financial
guarantee.
5. T
he Owner/Subdivide r acknowledges that it has requested a financial guarantee as a
discretionary alternative to a Town req uirement of completing all required public
improvements as a condition of Final Plat approval and waives any right that it may have to a
different form or different terms of a financial guarantee.
6. T
he Owner/Subdivider acknowledges that the actual cost of constructi ng required public
improvements may exceed estimated costs for any particular public improvement or all public
improvements in the aggregate and acknowledges its obligation to pay all actual costs.
7. N
otwithstanding paragraphs 1 through 6 above, the Owner/Subdivider shall deposit 120
percent of the estimated cost of final pavement for all streets in a separate designated escrow
account in the amount of $37,000.00 in the name of the Town for subsequent final pavement to
be installed by the Town with the account proceeds, upon the sale of 50 percent of the lots, five
years from the date of the Final Plat approval or by order of the Town, whichever comes first.
8. T
he Owner/Subdivider shall install all public improvements except for the final layer of asphalt
prior to acceptance of the public improvements. The Town Board shall accept all public
improvements by resolution at the recommendation of the Public Works Director.
9. B
uilding permits may be issued once all of the following have been completed:
a. Th
e final plat has been recorded.
b. P ublic improvements are substantially completed and accepted by the Town
Board by resolution.
c. The escrow required in paragraph 7 has been submitted.
10. T
he Owner/Subdivider shall pay in full all Town review fees in connection with or relating to
the final plat, reports, plans and specifications as a condition of final plat approval.
Exhibit A - Resolution 28-19 104
3
11. The Owner/Subdivider shall timely pay all Town inspection fees and expenses in connection
with and relating to the construction of required public improvements.
12. The Owner/Subdivider shall comply with all regulatory requirements of the Code of the Town
of Greenville and all applicable regul atory requirements of the State of Wisconsin and
Outagamie County.
13. The Owner/Subdivider shall provide the Town with record drawings of sanitary sewer, water
main and storm sewer improvements showing the location of all appurtenances and features of
the systems.
14. The Owner/Subdivider shall guarantee all public improvements against defects due to faulty
materials or workmanship which appear within a period of 14 months after substantial
completion and accepted by the Town by Resolution. The Owner/Subdivider shall pay the full
cost of necessary replacement or repair of defects and provide the Town with financial security
to ensure timely replacement or repair in an amount of 10 percent of the estimated total costs of
all completed improvements.
15. The Owner/Subdivider shall, to the maximum extent practicable, preserve existing landscape
features such as trees, grassed areas and the like located outside of actual construction zones
needed for public improvements.
16. The Owner/Subdivider shall timely remove and properly dispose of brush and rubbish piles
and timely remedy washouts and sedimentation accumulations arising from construction
activities.
17. The Owner/Subdivider acknowledges and agrees that nothing in this agreement shall be
deemed a waiver or limi tation of any Town immunity, power or authority conferred by law
including but not limited to special assessments and special charges.
18. The Owner/Subdivider acknowledges and agrees that nothing in this agreement waives any
other requirement, obligation or fee of any Town ordinance or resolution.
19. This Agreement shall be interpreted consistent with the rules and requirements of Chapter 270,
Code of the Town of Greenville.
20. This Agreement shall be binding on the Owner/Subdivider, its successors or assigns and shall
constitute a covenant running with the land. This Agreement shall also constitute restrictions
for public benefit pursuant to Section 236.293 Wis. Stats.
21. The Town may deny issuance of a building permit until compliance with the provisions of this
Agreement and Chapter 270, Code of the Town of Greenville are met.
22. This Agreement may only be modified or amended in writing by the parties.
Exhibit A - Resolution 28-19
105
4
SUBDIVIDER TOWN OF GREENVILLE
DJW Investments, LLC Jack Anderson, Town Chair
David Winkel, Sole Member
Personally came before me this ___ ATTEST:
day of ____________, 2____, the above
to me known to be the person(s) who Wendy Helgeson, Town Clerk
executed the foregoing instrument and
acknowledged the same.
Personally came before me this ___
day of ____________, 2____, the above
Notary Public, State of Wisconsin
My commission expires:__________________
to me known to be the person(s) who
executed the foregoing instrument and
acknowledged the same
Notary Public, State of Wisconsin
My commission expires:__________________
Drafted by:
Richard J. Carlson
331 E. Washington St.
Appleton WI 54911
Exhibit A - Resolution 28-19
106
Exhibit 1
Proposed Lots 7 & 8 and all of Proposed Alana Lane Right-Of-Way is Excluded from the Project Legal Description
107
Exhibit 1
Proposed Lots 7 & 8 and all of Proposed Alana Lane Right-Of-Way is Excluded from the Project Legal Description
108
Jennerjohn Field of Dreams
Utility & Street Construction
Town of Greenville
Preliminary Opinion of Probable Cost
McM No. W0986-9-18-00645.02.01
Item Description Quantity Unit Unit Cost Total Cost Quantity Cost Quantity Cost
1 8-inch sanitary sewer 3,855 L.F. $25.00 $96,375.00 403 $10,075.00
2 48-inch sanitary sewer manhole 177.0 V.F. $220.00 $38,940.00 15.98 $3,515.60
3 4-inch SCH40 PVC sanitary sewer lateral 2,430 L.F. $20.00 $48,600.00
Subtotal = 183,915.00$ - $ 13,590.60$
4 8-inch water main 4,700 L.F. $26.00 $122,200.00 685 $17,810.00
5 6-inch water main 100 L.F. $30.00 $3,000.00 24 $720.00
6 8-inch resilient wedge gate valve 14 EACH $1,500.00 $21,000.00 2 $3,000.00
7 6-inch resilient wedge gate valve 11 EACH $1,000.00 $11,000.00 2 $2,000.00
8 Hydrant 11 EACH $3,500.00 $38,500.00 2 $7,000.00
9 1 1/4-inch SDR 9 PE water lateral 2580 L.F. $15.00 $38,700.00
10 1 1/4-inch corporation, curb stop & stop box 54 EACH $350.00 $18,900.00
Subtotal = 253,300.00$ - $ 30,530.00$
11 29-inch x 45-inch HERCP storm sewer 35 L.F. 100.00$ $3,500.00 35 $3,500.00
12 42-inch storm sewer 292 L.F. 90.00$ $26,280.00 132 $11,880.00
13 36-inch storm sewer 149 L.F. 75.00$ $11,175.00
14 24-inch storm sewer 561 L.F. 45.00$ $25,245.00
15 21-inch storm sewer 175 L.F. 45.00$ $7,875.00
16 18-inch storm sewer 1,436
L.F. 40.00$ $57,440.00 344 $13,760.00
17 15-inch storm sewer 591 L.F. 35.00$ $20,685.00 36 $1,260.00
18 12-inch storm sewer 438 L.F. 30.00$ $13,140.00 124 $3,720.00
19 10-inch storm sewer 783 L.F. 28.00$ $21,924.00
20 96-inch diameter storm sewer manhole 6.4 V.F. 650.00$ $4,160.00
21 60-inch diameter storm sewer manhole 16.7 V.F. 350.00$ $5,845.00
22 48-inch diameter storm sewer manhole 57.4 V.F. 250.00$ $14,350.00 14.28 $3,570.00
23 48-inch diameter storm sewer inlet-manhole 31.7 V.F. 250.00$ $7,925.00 7.24 $1,810.00
24 36-inch diameter storm sewer manhole 8.8 V.F. 225.00$ $1,971.00 4.00 $900.00
25 24-inch diameter storm sewer manhole 30.5 V.F. 200.00$ $6,100.00
26 Inlet 16 EACH 1,500.00$ $24,000.00 1 $1,500.00
27 4-inch SCH 40 PVC storm sewer lateral 2,430 L.F. 15.00$ $36,450.00
28 29-inch x 45-inch HERCP flared end section 1 EACH 1,200.00$ $1,200.00 1 $1,200.00
29 42-inch RCP flared end section 6 EACH 1,000.00$ $6,000.00 4 $4,000.00
30 24-inch RCP flared end section 5 EACH 650.00$ $3,250.00
31 12-inch RCP flared end section 1 EACH 550.00$ $550.00 1 $550.00
Subtotal = 299,065.00$ 25,750.00$ 21,900.00$
32 Strip & stockpile topsoil 32,900 S.Y. $1.50 $49,350.00 7,076 $10,613.33
33 Common excavation (roadway) 8,650 C.Y. $6.50 $56,225.00 1,725 $11,210.33
34 Type SAS fabric 17,100 S.Y. $2.00 $34,200.00 3,449 $6,898.67
35 6-inch base aggregate dense 1 1/4-inch 5,710 TONS $11.00 $62,810.00 1,150 $12,647.56
36 6-inch base aggregate dense 3-inch 4,510 TONS $11.00 $49,610.00
37 9-inch base aggregate dense 3-inch 1,800 TONS $11.00 $19,800.00 1,725 $18,971.33
38 30-inch mountable concrete curb & gutter 8,620 L.F. $12.00 $103,440.00 1,592 $19,104.00
39 1 3/4-inch HMA pavement, 3 LT 58-28S 1,140 TONS $60.00 $68,400.00
40 2 1/4-inch HMA pavement, 3 LT 58-28S 400 TONS $60.00 $24,000.00 400 $24,000.00
41 1 3/4-inch HMA pavement, 4 LT 58-28S 1,450 TONS $60.00 $87,000.00 297 $17,830.40
42 Lawn restoration 17,700 S.Y. $5.00 $88,500.00 3,803 $19,015.56
43 Common excavation (trail) 778 C.Y. $8.00 $6,224.00
44 6-inch base aggregate dense (trail) 1,244 TONS $15.00 $18,660.00
45 2-inch HMA pavement (trail) 380 TONS $80.00 $30,400.00
46 Lawn restoration (trail) 3,111 S.Y. $5.00 $15,555.00
47 Drainage easement grading (grading, topsoil, seed, fertilize & mulch) 2,200 L.F. $7.00 $15,400.00
48 Erosion Control (silt fence, hay bales, ditch checks) 1 L.S. $10,000.00 $10,000.00
49 Detention pond excavation 20,800 C.Y. $6.50 $135,200.00 20,800 $135,200.00
50 Removal of excess detention pond excavated material off-site 10,000 C.Y. $5.10 $51,000.00
51 Detention pond outlet structure 1 L.S. $5,000.00 $5,000.00 1 $5,000.00
52 Detention pond restoration (4.655-acres) 1 L.S. $50,000.00 $50,000.00 1 $50,000.00
53 Detention pond bird deterrent grid 1 L.S. $70,000.00 $70,000.00 1 $70,000.00
54 Medium Rip-rap 770 C.Y. $40.00 $30,800.00 636 $25,457.78
55 STH 76 Intersection improvements 1 L.S. $60,500.00 $60,500.00 1 $60,500.00
56 Fiber Optic & Utility Relocation at STH 76 & Alana Lane 1 L.S. $30,000.00 $30,000.00 1 $30,000.00
Subtotal = $1,172,074.00 $285,657.78 $230,791.18
Utility Total = 736,280.00$ 25,750.00$ 66,020.60$
Note: 1. Item 55 unit price from Bid Tabulation (Davel Engineering) Street Total = 1,172,074.00$ 285,657.78$ 230,791.18$
Construction Subtotal = 1,908,354.00$ 311,407.78$ 296,811.78$
Construction Engineering Fees = 66,792.39$ 10,899.27$ 10,388.41$
15% Contingency = 286,253.10$ 46,711.17$ 44,521.77$
Total = 2,261,399.49$ 369,018.22$ 351,721.96$
4. Unit cost for Item 50 is assuming disposal within 4 miles of site.
Alana Lane
2. There is storm sewer along Fallon Ln that is oversized to provide
service to Lot 7; the oversizing cost should be allocated to Lot 7.
3. There is storm sewer along outlots 3 & 4 where a portion of the cost
should be allocated to the Town of Greenville.
Street Construction:
Storm Sewer:
Water main:
Sanitary Sewer:
Storm Water Pond
February 19, 2019
[W:\PROJECTS\W0986\91800645\Dept\Muni\OPC\Jennerjohn Field of Dreams OPC]
Exhibit 2
109
Jennerjohn Field of Dreams
Utility & Street Construction
Town of Greenville
Preliminary Opinion of Probable Cost
McM No. W0986-9-18-00645.02.01
Item Description Quantity Unit Unit Cost Total Cost
11 29-inch x 45-inch HERCP storm sewer 35 L.F. 100.00$ 3,500.00$
12 42-inch storm sewer 132 L.F. 90.00$ 11,880.00$
18 12-inch storm sewer 124 L.F. 30.00$ 3,720.00$
24 36-inch diameter storm sewer manhole 4.0 V.F. 225.00$ 900.00$
28 29-inch x 45-inch HERCP flared end section 1 EACH 1,200.00$ 1,200.00$
29 42-inch RCP flared end section 4 EACH 1,000.00$ 4,000.00$
31 12-inch RCP flared end section 1 EACH 550.00$ 550.00$
49 Detention pond excavation 20,800 C.Y. $6.50 135,200.00$
51 Detention pond outlet structure 1 L.S. $5,000.00 5,000.00$
52 Detention pond restoration (4.655-acres) 1 L.S. $50,000.00 50,000.00$
53 Detention pond bird deterrent grid 1 L.S. $70,000.00 70,000.00$
54 Medium Rip-rap 636 C.Y. $40.00 25,457.78$
Construction Subtotal = 311,407.78$
Construction Engineering Fees = 10,899.27$
15% Contingency = 46,711.17$
Total = 369,018.22$
Note 3: Town of Greenville Storm Water Pond Direct Costs
Item Description Quantity Unit Unit Cost Total Cost
14 24-inch storm sewer (R-81.1 to pond) 222 L.F. 45.00$ 9,990.00$
24 36-inch diameter storm sewer manhole (R-81.1) 4.8 V.F. 225.00$ 1,071.00$
30 24-inch RCP flared end section 1 EACH 650.00$ 650.00$
50 Removal of excess detention pond excavated material off-site 10,000 C.Y. $5.10 51,000.00$
Construction Subtotal = 62,711.00$
Construction Engineering Fees = 2,194.89$
15% Contingency = 9,406.65$
Total = 74,312.54$
Note 2: Storm Sewer Oversizing Costs to service Lots 7 & 8
Item Description Quantity Unit Unit Cost Total Cost
Storm Sewer Oversizing 18-inch to 15-inch (R-52.2 to R-60.1) 42 L.F. 5.00$ 210.00$
Storm Sewer Oversizing 24-inch to 18-inch (R-60.1 to R-51.1) 164 L.F. 5.00$ 820.00$
Storm Sewer Oversizing 36-inch to 18-inch (R-51.1 to R-50.3) 149 L.F. 35.00$ 5,215.00$
Storm Sewer Manhole Oversizing 60-inch to 48-inch (R-51.1) 7.89 V.F. 100.00$ 789.00$
Construction Subtotal = 7,034.00$
15% Contingency = 1,055.10$
Total = 8,089.10$
Total Construction Cost = 2,261,399.49$
Storm Water Pond Credit (Drainage Area Based) = 216,882.89$
Alana Lane Credit = 351,721.96$
Town of Greenville Direct Storm Sewer Costs = 74,312.54$
Storm Sewer Oversizing Costs to service Lots 7 & 8 = 8,089.10$
Total Field of Dreams Cost = 1,610,393.00$
Jennerjohn Field of Dreams Summary of Costs
Summary of Storm Water Pond Costs
February 19, 2019
[W:\PROJECTS\W0986\91800645\Dept\Muni\OPC\Jennerjohn Field of Dreams OPC]
Exhibit 2
110
Item Description Cost
1 Construction Cost Subtotal 1,908,354.00$
4 Less Town's pond costs ($271,407 x .495) rounded (154,150.00)$
5 Less Town's street storm sewer construction subtotal costs (62,711.00)$
6 Total Field of Dreams construction costs 1,691,493.00$
8 Less Alana Lane (Phase III) Construction Subtotal (296,811.78)$
9 54 Lot/street/utility costs 1,394,681.22$
10 Per lot cost ($1,394,681.22/54 lots) 25,827.43$
11 Phase 1: 32 lots x $25,827.43 826,477.76$
12 Phase 1 LOC 120% of $826,477.76 991,773.31$
13 Phase 2: 22 lots x $25,827.43 568,203.46$
14 Phase 2 LOC 120% of $568,203.46 681,844.15$
15 Phase 3: Alana Lane 296,811.78$
16 Phase 3 LOC 120% of $296,811.78 356,174.14$
Total Total Cost of Phases I, II & III (Equals Line 6) 1,691,493.00$
Exhibit 3: Phasing Costs
111
T
TC
C
56
20,000 SF
55
20,000 SF
54
20,000 SF
12
19,473 SF
13
13,949 SF
20
14,240 SF
8
151,285 SF
21
14,240 SF
30' Building
Setback
30' Building
Setback
30' Building Setback
30' Building Setback
30' Building Setback
30' Building Setback
30' Building Setback
30' Building Setback
Drainage Easement
Drainage Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Utility Easement
12' Util
ity Easement
12' Utility
Easement
27
14,612 SF
29
24,709 SF
17
17,961 SF
19
13,859 SF
14
14,613 SF
15
16,103 SF
18
16,278 SF
3
21,230 SF
4
24,949 SF
5
17,719 SF
Drainage Easement
35'
20'
22
14,612 SF
23
16,087 SF
24
18,195 SF
25
14,612 SF
26
14,612 SF
28
14,577 SF 53
37,855 SF
Drainage Easement
16
17,084 SF
1
18,050 SF
2
15,200 SF
10
17,010 SF
11
23,587 SF
7
196,185 SF
11,760 SF
0.2700 ac
OL 4
43
28,481 SF
13,823 SF
0.3173 ac
OL 3
32
17,611 SF
36
15,716 SF
30
16,590 SF
35
15,200 SF
31
15,200 SF
34
17,614 SF
33
16,010 SF
52
20,000 SF
51
20,000 SF
41
31,549 SF
42
36,708 SF
37
19,848 SF
38
26,059 SF
40
16,406 SF
39
18,987 SF
45
34,977 SF
44
24,030 SF 48
31,088 SF
46
45,237 SF
50
20,000 SF
49
20,000 SF
47
22,232 SF
30' Building Setback
12' Utility Easement
37' Building Setback
50' DOT Highway Setback
55' Municipal Building Setback
55' Municipal Building Setback
50' DOT Highway Setback
202,765 SF
4.6548 ac
OL 2
6
22,841 SF
9
20,007 SF
56,398 SF
1.2947 ac
OL 1
20' Drainage &Utility Easement
37' Building Setback
50' DOT Highway Setback
55' Municipal Building Setback
Watermain Easement
Storm Sewer
Easement
Drainage Easement
Drainage Easement
20'
10' Asphalt Trail
10' Asphalt Trail
4' High Landscape Berm
4' High Landscape Berm
10' Asphalt Trail
4' High Landscape Berm
S-111
S-201
S-90S-93
S-94S-95
S-91
S-100
S-202
R-52.3
R-33.2
R-33.3
R-31.2
R-31.3
R-33.1
R-30.1
R-30.3
R-52.2
R-51.3
R-51.2
R-60.1
R-50.2
R-34.1
R-52.5
R-53.1
R-71.1
R-70.3
R-50.1
R-40.1
Proposed
Stormwater
Pond
R-41.1
R-85.1
S-110
S-92
R-32.1
R-42.1
R-51.1
R-30.2
R-50.3
R-72.1
R-80.1
R-81.1
R-70.2
S-200
S-96
S-101
R-54.1
R-77.1
R-78.1
R-72.2
R-73.1
R-76.3
R-76.2
R-76.1
R-70.1
10' Asphalt Trail
10' Asphalt Trail
R-52.4
R-60.2
R-84.3
R-84.2
PHASE
3
PHASE
2
PHASE
1
PHASE
1
PHASE
1
PHASE
2
Underground Cable TV
Underground Fiber Optic
Sanitary Sewer
Storm Sewer
Water Main
Fence - Steel
Overhead Electric Lines
Underground Electric
Underground Gas Line
Underground Telephone
Fence - Wood
Fence - Barbed Wire E
E
A
T
T
W
Sanitary MH / Tank / Base
Clean Out / Curb Stop / Pull Box
Storm Manhole
Hydrant
Catch Basin / Yard Drain
Inlet
Utility Pole
Light Pole / Signal
Guy Wire / Pump
Utility Meter
Utility Valve
Telephone Pedestal
Telephone Manhole
Air Conditioner
Electric Transformer
Electric Pedestal
Sign
Tower / Silo
Satellite Dish
Post / Guard Post
Flag Pole
Marsh
Soil Boring
Water MH / Well
Deciduous Tree
Bush / Hedge
Coniferous Tree
Large Rock
Stump
Wetlands
LEGEND
Treeline
Railroad Tracks
Index Contour
Ex Spot Elevation
Railroad Signal
Culvert
Intermediate Contour
Utility Guy Wire
G
C
Gas Regulator
CATV Pedestal
Benchmark
Asphalt Pavement
Concrete Pavement
Proposed Sanitary Sewer
Proposed Sanitary ManholeProposed Storm Sewer
Proposed Water Main
Proposed Contour
Proposed Swale
Proposed Storm Manhole
Proposed Curb Inlet
Prop. Catch Basin / Yard Drain
Proposed Endwall
Proposed Reducer
Proposed Plug
Proposed Hydrant
Proposed Valve
Proposed Curb Stop
Proposed Water MH
Proposed Tee
Proposed Cross
Proposed 90° Bend
Proposed 45° Bend
Proposed 22.5° Bend
W
Proposed Culvert
608
Page
1.1
Jennerjohn Field of Dreams
Town of Greenville, Outagamie County, WI
For: Jennerjohn Field of Dreams LLC
DAVEL ENGINEERING &
ENVIRONMENTAL, INC.
CIVIL ENGINEERING CONSULTANTS
1811 Racine Street Menasha, WI 54952
Ph: 920-991-1866 Fax: 920-830-9595
www.davel.pro
Sewer and Water shall be constructed in accordance with the State of
Wisconsin Standard Specifications for Sewer and Water Construction, and all
Special Provisions of the Town of Greenville.
Streets shall be constructed in accordance with the State of Wisconsin
Standard Specifications for Highway and Structures Construction, and all
Special Provisions of the Town of Greenville.
Contractor shall locate all buried facilities prior to excavating. This plan may
not correctly or completely show all buried utilities.
The Contractor shall verify all staking and field layout against the plan and field
conditions prior to constructing the work and immediately notify the Engineer
of any discrepancies.
The Contractor shall comply with all conditions of the Erosion Control Plan and
the Storm Water discharge Permit. All Erosion Control shall be done in
accordance with the Plan and Wisconsin DNR Technical Standards.
The contractor shall coordinate with provider for electric, gas, and
telecommunication service connection and relocations.
Pipe lengths are measured to center of structure. Endwalls are included in
pipe length.
Any agricultural drain tile encountered during construction of the subdivision
shall be reconnected and remain operational if serving offsite property.
Any construction within the 20' sanitary force main easement requires
contacting Dan Klansky (Town of Greenville) 920-841-8550
Project Number: 4350
November 14, 2018
100 0 100 200 300
NO SCALE
LOCATION MAP
SW 1/4 SEC 23, T 21 N, R 16 E,
TOWN OF GREENVILLE
OUTAGAMIE COUNTY, WI
23 24
26 25Hwy 96/Wisconsin Ave
14 13
23 24
15 14
22 23
22 23
27 26 Hwy 76/Municipal Dr
School Rd
Project
Location
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Wetland
Alana Lane
Melony Court
Fallon Lane
Alexandra WayAlexandra Way
Fallon Lane
Watermain connection to existing watermain
within the north right of way of S.T.H. 96
SHEET INDEX:
Sheet Page
Sewer & Water Cover Sheet 1.1
Drainage and Grading Plan 1.2
Erosion & Sediment Control Plan 1.3
Landscape Plan 1.4
Construction Details 2.1
Sewer & Water Details 2.2
Erosion & Sediment Control Details 2.3
S.T.H. 76 Intersection Detail 2.4
Pavement Markings & Traffic Control Plan 2.5
Stormwater Pond Details 2.6
Plan & Profile: Alana Lane - Sta 0+00 to 8+94.61 3.1
Plan & Profile: Fallon Lane - Sta 0+00 to 10+00 3.2
Plan & Profile: Fallon Lane - Sta 10+00 to 16+50 3.3
Plan & Profile: Melony Court / Alexandra Way - Sta 12+50 to 20+00 3.4
Plan & Profile: Alexandra Way - Sta 20+00 to 27+00 3.5
Plan & Profile: Alexandra Way - Sta 27+00 to 31+70.41 3.6
Plan & Profile: Hwy 96 Watermain Loop - Sta 0+00 to 5+00 3.7
Plan & Profile: Outlot 3 Sanitary - Sta 0+00 to 5+00 3.8
Cross Sections: S.T.H. 76 4.1
Cross Sections: S.T.H. 76 4.2
Cross Sections: Alana Lane 4.3
SEWER & WATER
COVER SHEET
Field tile to be reconnected in a hydraulically efficient fashion if broken during
construction. Any agricultural drain tile which is disturbed, cut or broken as part
of the development of the property or excavation for construction must be
repaired and/or relocated to allow for the drain tile to continue to drain as
originally designed.
Construction phase 1 shall include storm sewer installation from Melony Court,
north within Fallon Lane to the pond storm sewer outfall R-50.1. Construction
phase 2 shall include a temporary trail connection across Alana Lane with
sewer and water construction to include S-202, R-54.1, adjacent hydrant.
Well located on Lot 8 shall be properly abandoned.
Exhibit 4
112
Pa ge 1 of 2
MEETING: Town Board AGENDA ITEM #: __________
DATE: April 22 2019 ACTION TYPE: Approval/Denial
“To
wn of Greenville”
AGENDA MEMORANDUM
To: Honorable Town Chairperson and Town Supervisors
From: Brian Rickert, Public Works Director
Date: 4/11 /2019
RE: CTH CB and Atlantis Roundabout Land Acquisition
ACTION TYPE: This item is for possible Town Board Approval/Denial
BACKGROUND & SUMMARY: In November of 2018, the Town was approached by OMNNI and
Associates about the construction of a Roundabout at CTH CB and Atlantis intersection. The roundabout
is scheduled to be constructed beginning in August of 2019. This project was brought to light after the
budget was approved for 2018, the Town did not budget for the upcoming work. Work items will include
the installation of a water and electrical service for maintenance of the landscaping, relocation of the
water service to Plexus, relocation of water valves, vertical adjustments of water valves and sanitary
manholes.
The a
ttached documents are for Right of Way and Easement adjustments that need to be made to allow
for the construction and sloping of the Roundabout. Currently the Town has a Permanent Limited
Easement for the Trail that is located on the east side of CTH CB. Due to the size of the Roundabout the
trail will need to be relocated and the permanent limited easement will become Right of way.
STAFF RECOMMENDATION: Staff recommends the Board approve the signatures for the Conveyance of
Rights in Land and the Temporary Construction Easement. If the Board is in agreement, the following
motion may be made: “Motion to sign the Temporary Construction Easement and Conveyance of Land
allowing for the construction of the Roundabout at CTH CB and Atlantis.”
POLICY/PLAN REFERENCE(S):
Town Purchasing Policy – Adopted August 2017
FISCAL IMPACT:
Is there a fiscal impact? Yes, $1.00
Is it currently budgeted or planned? No
Amount budgeted: $0
Account #: General Fund
139
TB - 9a
Town of Greenville Page 2 of 2
Attachments:
1. Conveyance of Rights in Land
2. Parcel 91 Legal Description
3. Temporary Construction Easement
4. Transportation Project Plat (2 Pages)
140
141
142
143
144
145
MEETING: Town Board AGENDA ITEM #: 9.b
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 1 of 2
"Town of Greenville"
AGENDA MEMORANDUM
-
To: Honorable Town Chairperson and Town Supervisors
From: Joel Gregozeski
Date: April 22, 2019
RE: Agreement for Professional Services with Ehlers to prepare Tax Incremental Finance District
Annual Report.
-
ACTION TYPE:
This item is for possible Town Board Approval/Denial.
BACKGROUND & SUMMARY:
Wis. Stat. §66.1105(6m)(c) requires that any political subdivision with a tax incremental district (TID) file an
annual report with all overlapping taxing jurisdictions and the Wisconsin Department of Revenue (DOR).
Additionally, a meeting of the Joint Review Board must be convened to review the annual report and to review
the performance and status of each of the political subdivision’s TIDs. Political subdivisions must file their
annual report (DOR Form PE-300) electronically through the DOR’s website not later than July 1 annually.
The Joint Review Board must meet each year to review the annual report and the performance and status of
each district governed by the Board. A single meeting can be held for purposes of reviewing all active TIDs
within the political subdivision if all are overlapped by the same taxing jurisdictions. A Class 1 notice of the
meeting must be published at least five days before the meeting.
Staff is recommending to work with our advisor Ehlers to assist us in complying with its annual TID reporting
and JRB meeting requirement under Wisconsin Statutes. Ehlers has provided the attached engagement letter
and scope of services.
STAFF RECOMMENDATION:
POLICY/PLAN REFERENCE(S):
Town Purchasing Policy - Adopted August 2017
146
MEETING: Town Board AGENDA ITEM #: 9.b
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 2 of 2
FISCAL IMPACT:
Is there a fiscal impact? Yes, ($1,500).
Is it currently budgeted or planned? Yes, FY2019
Amount budgeted: $1,500
###
A ttachments:
TID Reporting Engagement Letter.pdf
Ehlers TID Reporting Summary_2019.pdf
147
Letter of Engagement (“Letter”) to Retain Ehlers to Provide Assistance with Annual Tax
Incremental District Reporting
As a governmental entity (“Client”) with one or more active Tax Incremental Districts (“TIDs”) you are required
to prepare and file an annual report with the Wisconsin Department of Revenue not later than July 1. Following
filing, the Joint Review Board (“JRB”) must meet to review the annual report, and to review the performance and
status of each district governed by the JRB.
Client has requested that Ehlers as sist Client in complying with its annual TID reporting and JRB meeting
requirement under Wisconsin Statutes 66.1105(6m)(c)(intro) and 66.1105(4m)(f)1. Ehlers proposes and agrees
to provide the following scope of services and for the following fees:
Scope of Service & Fee Compensation
Annual Report Submission
Annual reports must be filed electroni cally by Client not later than July 1 through the Department of Revenue’s
website with copies provided to each overlapping taxing entity. The information needed to complete the report
will be found within Client’s financial statements and supporting accounting records.
Scope: If requested, Ehlers will provide input to Client and Client’s auditor with respect to required
report entries.
Fee: No charge for routine questions or review of report entries.
Additional assistance may be subject to hourly charges. Client will be advised prior to incurring
fees for this scope item if charges become necessary.
Preparation of Supplemental Information for JRB
Given that the DOR annual report format provides limited information for a single fiscal year, Ehlers recommends
preparation of supplemental information that will assist Client in more fully presenting the TID’s current financial
position, key activities, and anticipated future performance.
Scope: 1. Request from Client information necessary for preparation of summary page and updated
TID cash flow.
2.
Prepare supplemental information package to include:
a. Cover and su
mmary page.
b. Current m
ap of TID boundaries.
c. Updated cash flow projection.
d. Copy of Annual Report.
148
Fee: $1,500 flat fee per TID.
Flat fee applicable if Ehlers has available an existing cash flow model to update. If a cash flow
model must be created, the additional time require d for that task may be billed hourly. Client
will be advised prior to incurring hourly fees for this scope item if charges become necessary.
In the event Ehlers has already prepared an upda ted cash flow for the current year as part of
other work for which it has been compensated, the fee charged may be reduced.
JRB Meeting Coordination
Following submission of the annual report with the Depart ment of Revenue, the JRB mu st meet to review the
annual report, and to review the performance and status of each district governed by the JRB.
Scope: 1. Obtain from Client preferred meeting dates and times and contact overlapping taxing
jurisdictions to confirm availability and attendance.
2. Prepare required Class 1 meeting notice and tr ansmit to Client’s Official Newspaper for
publication.
3. Prepare, and via electronic mail, provide Client and overlapping taxing jurisdictions with:
a. Cover letter with meeting details and requirements.
b. Agenda.
c. Supplemental information package.
d. Joint Review Board resolution.
Fee: $500 flat fee per meeting.
It is recommended that Client hold a single meeting for review of all active TIDs. (Separate
meetings may be required in cer tain cases where more than one county, school district or
technical college are involved).
JRB Meeting Attendance
Scope: Attend Joint Review Board meeting to review cash flow projections and answer questions.
Meeting attendance may be in person, or by conference call, as agreed to by Client. Ehlers can
provide a call-in number for meetings to be he ld telephonically. If ph one participation in
meetings is permitted by Client’s ordinance or policy, this may also be used to facilitate
attendance by taxing jurisdiction representatives.
Fee: $500 Flat Fee per meeting. In addition, travel time to and from the meeting will be billed
hourly, not to exceed $1,000.
It is recommended that Client hold a single meeting for review of all active TIDs. (Separate
meetings may be required in cer tain cases where more than one county, school district or
technical college are involved).
149
Fee Example
A Client with three active TIDs for which all services are requested would be charged $4,500 for preparation of
the supplemental reports ($1,500 pe r TID), $500 for JRB meeting coor dination and $5000 for JRB meeting
attendance for a total of $5,500. This assumes a single JRB meeting is held and excludes hourly charges for travel.
Hourly Charges
For any service requested by Client related to the Project that exceeds the Scope of Service defined in this Letter,
Client will be charged on an hourly basis. Hourly charges will also apply as identified in the Scope of Services &
Fee Compensation section of this Letter. Ehlers will bill Client at our then current hourly rates dependent upon
the task/staff required to meet Client request. Prior to char ging Client hourly fees, Ehlers will first advise Client
of the anticipated charges and receive authorization to proceed. (Does not apply to hourly fees charged for travel
if in person JRB meeting attendance is requested).
Payment for Services
Ehlers will invoice Client upon completion of the work. The invoice is due and payable upon receipt by Client.
Future Fee Changes
Prior to any fee adjustments, Client will be notified in writing of the revised fees and their effective date.
TID Eligible Expense
Fees charged by Ehlers for the services outlined in this Letter are a TID eligible expense.
Client Responsibility
For each TID that Ehlers is assisting with, Client agrees to:
Provide Ehlers with the following information:
o A copy of the TID Annual Report as filed with th e Department of Revenue. (Client must also
provide a copy directly to each overlapping taxing jurisdiction).
o A copy of the prior year’s audited financial statements if available.
o A copy of the prior year’s DOR Form PC-202 (Tax Increment Collection Worksheet).
o A current TID boundary map.
o Copies of documents related to TID debt or other TID liabilities which Client may have incurred,
and which Ehlers does not have on file.
Complete and return a questionnaire which we will provide you inquiring as to other information we may
need to prepare an updated cash flow.
Post the Annual JRB meeting agenda and provide notification as required by statute. (Ehlers will prepare
and coordinate publication of the Class I Notice if this service is elected).
Take and prepare minutes at the Annual JRB meeting.
150
Provide any technology required for telephonic meeting par ticipation by Ehlers or other parties if such
participation is allowed by Client.
Pay the following costs, which are not include within our Scope of Services:
o Services rendered by Client’s engineers, planners, surveyors, appraisers, assessors, attorneys,
auditors and others that may be called on by Client to assist with preparing the a nnual report or
related supplemental information.
o Publication charge for the Notice of Joint Review Board meeting.
Acceptance
Client hereby accepts this Letter and engages Ehlers to provide the services accepted below. This Letter shall be
effective as of the date of its accepta nce by Client and shall remain in eff ect for a period of one (1) year. This
Letter shall thereafter renew automatically for successive one (1) year periods.
Notwithstanding the foregoing, this Letter may be terminat ed by either party upon sixty (60) days prior written
notice. Client may change their scope of service elections or modify the list of TIDs for which services are being
provided prior to commencement of each annual reporting cycle.
Scope of Service Election of Services
Preparation of Supplemental Information for JRB ☐ Accept This Service
☐ Decline This Service
JRB Meeting Coordination ☐ Accept This Service
☐ Decline This Service
JRB Meeting Attendance ☐ Accept This Service
☐ Decline This Service
☐ Provide these services for all active TIDs.
OR
☐ Provide these services for the following TIDs only:
By: Title:
N a m e : D a t e :
151
Annual TIF Reporting Requirements
W
is. Stat. §66.1105(6m)(c) requires that any political subdivision with a tax incremental district
(TID) file an annual report with all overlapping taxing jurisdictions and the Wisconsin
Department of Revenue (DOR). Additionally, a meeting of the Joint Review Board must be
convened to review the annual report and to review the performance and status of each of the
political subdivision’s TIDs.
Required Report
Political subdivisions must file their annual report (DOR Form PE-300) electronically through
the DOR’s website not later than July 1 annually. A separate report must be filed for each active
TID.
The PE-300 form contains mandatory field entries and consists largely of the information found
on the Statement of Revenues, Expenditures and Changes in Fund Balance in a typical audited
financial statement. Municipalities must also report their estimated future revenues and future
costs. In addition to filing the online form, a copy of the submitted report must also be
transmitted by the political subdivision to each overlapping taxing entity.
The reporting requirement applies to all types of political subdivisions and to all types of TIDs,
to include environmental TIDs, industry-specific Town TIDs created under Wis. Stat. § 60.23
and Town TIDs created under Wis. Stat. § 60.85.
Estimated and Amended Reports
If a governmental unit is not prepared to file its annual report by the July 1st deadline, an
estimated report may be filed. There is a penalty for a late filing beginning 60 days after the
report is past due. The penalty is $100 per district per day, with a maximum penalty of $6,000
per District. Amendments to filed reports can be made up until November 1.
Joint Review Board Meeting Requirement
The Joint Review Board must meet each year to review the annual report and the performance
and status of each district governed by the Board. A single meeting can be held for purposes of
reviewing all active TIDs within the political subdivision if all are overlapped by the same taxing
jurisdictions. A Class 1 notice of the meeting must be published at least five days before the
meeting.
152
While the law requires that the meeting be held on July 1, or when the annual report becomes
available, DOR has issued guidance indicating that there is no specific requirement as to how
soon the Joint Review Board meeting must occur following availability of the annual report. As
such, meetings should be scheduled based on the availability of Joint Review Board
representatives noting that county and technical college district representatives will be asked to
attend multiple meetings throughout their jurisdictions in the same general timeframe. While
each local government’s requirements may vary as to the permissibility of phone participation in
meetings, neither statute or DOR rules require Joint Review Board members to participate in
person which makes teleconference an option that can be considered to facilitate maximum
attendance.
As the purpose of the meeting is to review the annual report, no action by the Joint Review
Board is required other than to convene the meeting. As a best practice, Ehlers recommends that
the Joint Review Board be asked to approve a resolution acknowledging filing of the annual
report and compliance with the annual meeting requirement.
To make the annual meeting a more useful exercise, Ehlers recommends preparation of updated
forward looking cash flow projections for your TIDs and provision of other supplemental
information that helps to more fully explain the current position of each TID. While the PE-300
form is the only required information to be reported each year, it does not address the future
performance of the district or identify its projected year of closure. Since a TID is a partnership
with the other taxing jurisdictions, this information is helpful to alert taxing jurisdictions to a
potential TID closure or explain remaining initiatives to be accomplished within the TID.
How Can Ehlers Help?
Ehlers has developed a scope of services for governmental units that may require or prefer
assistance in complying with some or all these requirements. Contact an Ehlers’ Municipal
Advisor to discuss these services so that you can determine what assistance you may need.
153
MEETING: Town Board AGENDA ITEM #: 9.c
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 1 of 2
"Town of Greenville"
AGENDA MEMORANDUM
-
To: Honorable Town Chairperson and Town Supervisors
From: Joel Gregozeski
Date: April 22, 2019
RE: Relocation of Telecommunication Utilities with ATT&T for Greenville Fire and Safety Building.
-
ACTION TYPE:
This item is for possible Town Board Approval/Denial.
BACKGROUND & SUMMARY:
ATT&T has an overhead coaxial cable utility line along the western side of STH 76 running three-quarters of
the length of the Town owned property where the new Fire & Safety Building is being constructed. This
overhead utility line is in conflict with the driveway location of the existing emergency vehicles at STH 76.
Staff has secured a proposal to direct bury the cable lines that will be in conflict with the driveways.
STAFF RECOMMENDATION:
POLICY/PLAN REFERENCE(S):
Town Purchasing Policy – Adopted August 2017.
FISCAL IMPACT:
Is there a fiscal impact? Yes, ($22,895).
Is it currently budgeted or planned? Yes, FY2019
Amount budgeted: 400-5722-820-1908 Fire & Safety Building Construction
###
A ttachments:
ATT ACTUAL COST INVOICE ATTACHED CR 200200 PROJECT A01KKWK.pdf
154
MEETING: Town Board AGENDA ITEM #: 9.c
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 2 of 2
155
Estimate of Cost and Authority to Work
Special Construction Charge and InvoiceAT&T WISCONSIN
ACTUAL COST BASIS
CDSR0030-12.0
TV326H 04/16/2019
Page 1 of 2
Billing Party's Name :
(920) 969-7654Phone :
W6860 PARKVIEW DRIVEBilling Address :
GREENVILLE, WI 54942
JOEL GREGOZESKIContact Name :
(920) 969-7654Phone :
Billing Information
Engineering Labor
Construction Labor
Material Cost
Contractor Cost
Expenses Amount
APQ: JOELG@TOWNOFGREENVILLE.COM, ON SITE KRIS.OCONNOC@MIRON-CONSTRUCTION.COM
Misc. Tax $0.00
$ 8,824.80
$ 13,939.41
$ 9,406.19
$ 3,390.79
A01KKWKProject Number 150756Customer ID :
04/16/2019Date :200200Customer Request Number
Total Estimated Costs $ 35,561.19
TOWN OF GREENVILLE
:
:
OSPE Representative:
Title:
TRISTRAM VILLIERS
CUSTOMER CONTRACTS SPECIALIST
Phone #: (262) 970-8420
Work Description &
Engineering Remarks :
156
Estimate of Cost and Authority to Work
Special Construction Charge and InvoiceAT&T WISCONSIN
ACTUAL COST BASIS
CDSR0030-12.0
TV326H 04/16/2019
Page 2 of 2
A01KKWKProject Number 150756Customer ID :
04/16/2019Date :200200Customer Request Number
Applicant understands that pursuant to the tariffs on file with the FCC and with the State of Wisconsin and/or in order to induce AT&T to relinquish or
modify its property right, it is my responsibility to pay these costs incurred by Wisconsin Bell, Inc., d/b/a SBC Wisconsin, a Wisconsin corporation to
complete the work requested.
DESCRIPTION OF CUSTOM WORK:
ESTIMATED COST FOR CUSTOM WORK:
APQ: JOELG@TOWNOFGREENVILLE.COM, ON SITE KRIS.OCONNOC@MIRON-CONSTRUCTION.COM
$ 35,561.19
Applicant shall pay for the work on an "Actual Cost" basis. Upon completion of the work, AT&T will compute the actual cost of the work. Any
difference between the amount of advance payment and the actual cost will be either paid by the Applicant to AT&T or refunded to Applicant by AT&T
as the case may be. Applicant understands that this amount is only an estimate of approximate costs, and that the actual cost incurred by AT&T and
for which the Applicant is responsible may be different.
Charges are calculated in accordance with AT&T's ordinary accounting practices under the Uniform System of Accounts for Class A telephone
companies and include allocated costs for labor, engineering, materials, transportation, motor vehicles, tool and supply expenses and corporate
overhead loadings.
If Applicant cancels the work prior to completion, Applicant shall pay AT&T for all costs AT&T has incurred before being notified in writing to cease
work.
Applicant has asked AT&T to perform the above-described custom work for which Applicant shall pay AT&T the contract price of Thirty-Five
Thousand Five Hundred Sixty-One Dollars And Nineteen Cents/ $35,561.19 in advance of the start of any AT&T work.
The estimated amount of Thirty-Five Thousand Five Hundred Sixty-One Dollars And Nineteen Cents/ $35,561.19 is valid for only thirty (30)
days and is therefore subject to change/cancellation after May 16, 2019 if AT&T has not received an executed copy of the Application and
advance payment by that date.
:
:
ACCEPTED FOR APPLICANT: SEND PAYMENT PAYABLE TO:
BY:
Printed Name:
Title:
Date Signed:
AT&T Midwest - CWO Center
220 Wisconsin Avenue - Floor 2,
Waukesha, WI 53186
157
MEETING: Town Board AGENDA ITEM #: 9.d
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 1 of 2
"Town of Greenville"
AGENDA MEMORANDUM
-
To: Honorable Town Chairperson and Town Supervisors
From: Joel Gregozeski
Date: April 22, 2019
RE: Professional Services Agreement with Moss & Associates for Appraisal and Acquisition of
Public Right-of-Way for Tax Incremental Finance District #1.
-
ACTION TYPE:
This item is for possible Town Board Approval/Denial.
BACKGROUND & SUMMARY:
The Town of Greenville has been planning for the extension of Design Drive between CTH CB and Mayflower
Road to support development in the Tax Incremental Finance District #1. In order to begin acquiring the
appropriate land and right-of-way for public infrastructure, the Town must perform an appraisal of property to
determine the value of land for negotiating purposes. Town staff has met with each affected land owner; each
agreed to allow the Town to perform the appraisal.
Staff has requested a proposal from Moss & Associates to begin the process of appraising and negotiating the
acquisition of right-of-way and land for public infrastructure. Moss & Associates will meet with owners,
deliver offers, mail documents to Register of Deeds for recording, prepare Jurisdictional Offers if necessary,
prepare Award of Damages if necessary.
Town of Greenville will be responsible for providing right of way plats and construction plans, making
payments to owners and paying for recording fees.
STAFF RECOMMENDATION:
POLICY/PLAN REFERENCE(S):
Town Purchasing Policy - Adopted August 2017
FISCAL IMPACT:
158
MEETING: Town Board AGENDA ITEM #: 9.d
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 2 of 2
Varies based on nominal acquisition of ROW/PLEs/TLEs for construction of Design Drive and regional
stormwater pond.
###
A ttachments:
Moss & Associates Proposal For Appraisal and Acquisition Services to Town of Greenville Design Drive Extension.pdf
159
Proposal Town of Greenville
Design Drive Extension
NEGOTIATION:
Acquisition of parcels as Nominal (No appraisal acquired) $450/parcel
Acquisition of parcels requiring appraisal $600/parcel
Right of Way Certification $750
Moss & Associates will meet with owners, deliver offers, mail documents to Register of Deeds for
recording, prepare Jurisdictional Offers if necessary, prepare Award of Damages if necessary.
Town of Greenville will be responsible for providing right of way plats and construction plans, making
payments to owners and paying for recording fees.
APPRAISALS:
Short Form Appraisals: $1,850
Full narrative Appraisals: $2,750
Testimony prep time: $150.00 per hour
Court Testimony: $150.00 per hour
160
MEETING: Town Board AGENDA ITEM #: 9.e
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 1 of 2
"Town of Greenville"
AGENDA MEMORANDUM
-
To: Honorable Town Chairperson and Town Supervisors
From: Joel Gregozeski
Date: April 22, 2019
RE: Fox Cities Regional Partnership Funding Request
-
ACTION TYPE:
This item is for possible Town Board Approval/Denial.
BACKGROUND & SUMMARY:
The Fox Cities Regional Partnership has submitted its annual funding request to provide economic
development services to Greenville. In the past Greenville has provided a minimal amount for its services
which has been approximately $2,500. The Partnership has requested $5,000 from Greenville for 2019.
Greenville did not budget for the request for 2019 and if Town Board would approve the request a funding
source would need to be identified.
STAFF RECOMMENDATION:
POLICY/PLAN REFERENCE(S):
Town Purchasing Policy - Adopted August 2017
FISCAL IMPACT:
Is there a fiscal impact? Yes, $5,000
Is it currently budgeted or planned? No
Amount budgeted: $0
Account #: n/a
###
161
MEETING: Town Board AGENDA ITEM #: 9.e
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 2 of 2
A ttachments:
Pledge Letter 20180401.pdf
162
163
Town of Greenville
FINDINGS FROM DISCOVERY MEETING:
1. The Town’s Primary focus is on business retention.
2. The Town is platting residential neighborhoods and continues to show solid residential growth potential.
3. The Town may benefit from attraction efforts to support the increased residential growth in the community
4. The Town has “certain” issues with development around ATW.
5. The Town may have issues moving forward with WDNR regarding isolated wetland designations.
6. The Town is working through the process of incorporation.
Fox Cities Chamber recommends Prestige level at $5,000:
ACCESS BENEFITS
• Access to an economic development team that helps employers locate to and expand within the Fox Cities.
o Attraction efforts that support the residential growth and increase the town tax base.
o Target market for hotel development and Foreign Direct Investment in and around ATW
o Market opportunity for the TIDs as business expansion areas.
• Exclusive access to key information on legislation and public policies affecting business.
o Potential changes to TIF law and the impacts on Pay-Go TIFs
o Administrative rule vigilance especially related to wetland delineation
o Dark Store legislation monitoring
• Access to a Chamber staff advocating on your behalf for local, state and federal pro -business issues.
o Registered lobbyist on staff
• Access to participate in workforce development initiatives.
• Discounts available to Fox Cities Chamber members through our Member Advantage program (including
exclusive access to the FCC…).
• Use of the Chamber’s conference rooms and meeting spaces (Subject to usage policies – the Fox Cities Chamber
does not endorse the sale of products).
• All employees in one business location hold membership status.
• Access to complimentary e-newsletters for all registered employees.
• Complimentary subscription for your organization to The Business News (est. value $26/annually).
• Complimentary subscription to Fox Cities Chamber BUSiNESS magazine.
• Access to free certificates of origin. (4 annually).
• Access to notary services (no limit).
MARKETING BENEFITS
• Name recognition at Business Breakfast Bytes, Lunch n Learns, Public Policy, task forces/committees.
164
• Opportunity to submit editorials in Fox Cities Chamber BUSiNESS magazine. (Subject to availability and
approval.)
• Enhanced online directory listing for up to UNLIMITED businesses/locations under the same ownership.
• Opportunity for inclusion in social media and website postings.
• Opportunity to show membership through Chamber window decal and digital logo placement on website/social
media.
• Chamber-assisted ribbon cutting ceremony for milestone events (one event annually).
• Company recognition/ability to display business materials in Chamber lobby.
• Access to affordable advertising rates in digital communications and Chamber BUSiNESS magazine.
• Access to online job board postings on Chamber website.
ENGAGEMENT BENEFITS
• Access to multiple networking opportunities.
• Opportunity for involvement in Chamber committees.
• Access to participate in young professional initiatives through our PULSE Young Professionals Network.
EDUCATIONAL BENEFITS
• Access to monthly Business Breakfast Bytes educational sessions.
• Discounted member pricing for Leadership Fox Cities program (Subject to standard application
process/acceptance).
• Discounted member rates for select workshops and seminars in partnership with Fox Valley Technical College.
• Access to obtain one active member list in Excel format per membership year.
• Complimentary Member 411 advertising: 3 ads per membership year ($150 value) .
• One written “Member Spotlight” feature per membership year (Subject to availability and space permitting) or the
opportunity to upgrade “Member Spotlight” feature as a 60-second video feature (one per membership year) (est.
value = about $500).
• Ability to post Member-to-Member Deals on Chamber website.
• Ability for licensed brokers to sell applicable offering from FCC.
• Access to discounted rate for Executive Roundtables program (Subject to standard application process).
• Access to complimentary event tickets = 2 tickets to each of the following:
o Pinnacle Awards Gala
o Business Awards Luncheon
o Future 15 Young Professionals Awards
o Invitation to exclusive annual premier leaders’ event
o Economic Outlook Lunch
o Guests must register within 30 days of each event (est. Value = $630)
165
MEETING: Town Board AGENDA ITEM #: 9.f
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial.
Page 1 of 1
"Town of Greenville"
AGENDA MEMORANDUM
-
To: Honorable Town Chairperson and Town Supervisors
From: Joel Gregozeski
Date: April 22, 2019
RE: Proclamation RU4-15 Supporting the Reconstruction of the State Highway 15 Bypass
Project
-
ACTION TYPE:
This item is for possible Town Board Approval/Denial.
BACKGROUND & SUMMARY:
On April 15, 2019 the Village of Hortonville hosted a news conference for the purposes of displaying public
support toward the Governor's biennial budget proposal and the inclusion of the STH 15 bypass project. The
Village drafted the attached proclamation seeking support from all municipalities impacted by the project.
Chairperson Anderson, Public Works Director Rickert and I attended the conference and indicated we'd bring
this proclamation to the full Town Board for consideration.
STAFF RECOMMENDATION:
POLICY/PLAN REFERENCE(S):
N/A
FISCAL IMPACT:
N/A
###
A ttachments:
Proclamation RU4 - 15 - Keeping Highway 15 Bypass Project on Schedule.pdf
166
Proclamation RU4-15
A PROCLAMATION IN FAVOR OF KEEPING THE
HIGHWAY 15 BYPASS PROJECT ON SCHEDULE
WHEREAS, WIS 15 is a busy commuter route and that commuter traffic
flows through Cities, Towns, and Villages of the Fox West Region; and
WHEREAS, WIS 15 has insufficiencies in roadway structure and design
that, along with the heavy load of commuter traffic, creates an increased
number of safety issues; and
WHEREAS, multiple accidents through-out the region has caused an
alarming amount of injuries and fatalities to occur; and
WHEREAS, the Highway 15 Bypass project will address these safety
issues and enhance vehicle travel through the region; and
WHEREAS, the Wisconsin Department of Transportation (WisDOT) has
completed their studies and preliminary engineering and has purchased
many properties along the proposed route in preparation for the start of the
Highway 15 Bypass construction; and
WHEREAS, delay of the Highway 15 Bypass project once again will
continue to have a negative effect on safety, planning, and economic
development for the cities, towns, and villages affected; and
WHEREAS, This project is non-partisan in manner, and that Governor
Tony Evers the 46th Governor of the Great State of Wisconsin has declared
this project as major in nature in the 2019 – 2021 biennium budget; and
WHEREAS, the Wisconsin Department of Transportation (WisDOT) has
supported the Governor and has named this project STH 76 – New London
on its Major Projects Expenditure Schedule dated February 2019; and
WHEREAS, the officials present in this room representing multiple
Counties of Wisconsin, law enforcement agencies, Emergency Medical
contractors, local Villages, Cities, Townships, as well as planning
consortiums and transportation companies, all want to see this project
remain on schedule and come to fruition for the benefit of its users;
NOW THEREFORE BE IT RESOLVED that this assembly of officials
support the WIS 15 Expansion Project as proposed by WisDOT and
supports the beginning of construction on schedule in 2021.
BE IT FURTHER RESOLVED that a copy of this proclamation shall be
forwarded to Governor Evers, Representatives in the State Legislature as
well as the Wisconsin Department of Transportation WisDOT Officials.
167
IN WITNESS WHEREOF, The following officials have come together as
an act of unification to declare their support for Project ID# 1146-75-00
commonly known as the STH 15 Reconstruction Project.
Signed this date 4-15-2019:
Name Title Signature
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________
_____________________ ______________________ _____________________ 168
169
MEETING: Town Board AGENDA ITEM #: 9.g
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial
Page 1 of 2
"Town of Greenville"
AGENDA MEMORANDUM
-
To: Honorable Town Chairperson and Town Supervisors
From: Wendy Helgeson
Date: April 22, 2019
RE: Operator's License Application Fee
-
ACTION TYPE:
This item is for possible Town Board Approval/Denial
BACKGROUND & SUMMARY:
In an attempt to streamline and facilitate a restructuring of our Operator Licensing, a report related to license
fees and schedules is included and the following information provided to the Town Board:
1. Attachment including current fees and scheduling
2. Attachment of proposed license fees and scheduling
STAFF RECOMMENDATION:
POLICY/PLAN REFERENCE(S):
1. The Town of Greenville Fee Schedule as per Resolution #79-18 – Resolution Amending Fees and
Licenses Schedule
FISCAL IMPACT:
Is there a fiscal impact? Yes, $35.00 per first time applicant; $25.00 per renewal applicant
Is it currently planned? No, FY19-20 starting July 1, 2019 (state licensing period)
###
170
MEETING: Town Board AGENDA ITEM #: 9.g
DATE: April 22, 2019 ACTION TYPE: This item is for possible Town
Board Approval/Denial
Page 2 of 2
A ttachments:
TB - Fox Valley Area Operator License Fees and Schedule.docx
TB - Comparison Evidence and Proposal.docx
171
Fox Valley Area Operator License Fees and Schedule
1. Communities of the Fox Valley and surrounding areas regulate their pricing based on approved
local Resolutions.
2.
The option of one or two year licensing is up to each community.
3.
Operator license terms begin on July 1st and terminate on June 30th pursuant to State Statute
Sections 125.32(2) and 125.68(2).
4.
Provisional License are available to Operators who would like to work prior to the background
check
completion and Board approval, and is valid for 60 days. If a Provisional License is desired
it may only be purch
ased at the time of applying for an Operator’s License.
Name 1 year 2 year Application Fee Provisional
Sparta N/A 60 15 15
Appleton 60 N/A 7 15
Kaukauna 50 N/A N/A 15
Grand Chute 85.00 New or
70.00 Renewal N/A N/A 15
Neenah 60 N/A N/A 15
Little Chute 32 50 N/A 15
Greenville 25 N/A N/A 5
172
Comparison Evidence and Proposal
Total Fees
Name New Renewal Timeframe
Sparta 90 75 Renewed Every Other Year
Appleton 82 67 Renewed Every Year
Kaukauna 65 50 Renewed Every Year
Grand Chute 100 70 Renewed Every Year
Neenah 75 60 Renewed Every Year
47/1 year 32/1 year
Little Chute or 65/2 year or 50/2 year Operator Choice
Greenville 30 25 Renewed Every Year
Currently, communities in the Fox Valley and surrounding areas average $69.00 for new
Operator License applicants and $59.00 for Operator License renewals. These amounts are significantly
higher than the current cost in Greenville of $30.00 for new applicants and $25.00 for renewal
applicants. With increased costs and wages along with an enhanced approval process, raising the
licensing cost would ensure an alignment to our cost of providing such license. The Clerk’s office ensures
all paperwork is completed; copies are made of the applicant’s photo ID and license to serve,
background checks performed, and in questionable cases, forwarded on to police for further review.
Information is then sent to the Town Board for approval or denial, and licenses are then processed and
distributed through the mail. Although the increase may seem significant, it is still very much in line with
current costs of other nearby communities and less than the yearly average of those communities.
The recommendation to consider is to increase the Provisional Operator License cost to $15.00,
and increase the yearly Operator License cost to $50.00. There would only ever be a onetime charge for
the Provisional Operator License at the initial point of purchase of the Operator License (first time
applicants).
173