Packet
City of Stoughton · Dane County · meeting of Sep 15, 2026 · Agenda packets
Open the original document More from City of Stoughton
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
OFFICIAL NOTICE AND AGENDA
Notice is hereby given that the Parks and Recreation Committee of the City of Stoughton,
Wisconsin, will hold a regular or special meeting as indicated on the date and at the time and
location given below.
Date and Time: Tuesday, September 15th, 2026 at 6:00pm
In-person: Stoughton Public Works Conference Room (2439 County Road A, Stoughton, WI)
Video Call Link: https://shorturl.at/TTHwC
Live streamed: The meeting can also be live streamed on the City of Stoughton Government
Channel at https://www.cityofstoughton.com/336/GOV -TV-Livestream and on Spectrum or TDS
Channel 980. The WSTO-TV app is also available on Roku TV, Apple TV and Fire TV as well as on
Android and iOS devices.
P & R Members: Regina Hirsch, Phil Caravello, Patrick Butler, Sandra Black, Nicole Dewitt, Mike
Vienneau, Tim Swadley
Call To Order
Roll Call And Verification Of Quorum
Certification Of Compliance With Open Meetings Law
August Minutes
PARKS RECREATION MINUTES AUGUST 18 2026.PDF
Member Communications
Superintendent Report - September
SUPERINTENDENT REPORT - SEPTEMBER 2026.PDF
Old Business
COMP Plan 2016
HTTPS://WWW.CITYOFSTOUGHTON.COM/225/COMPREHENSIVE-PLAN
Utilities And Community Facilities Chapter
8. STOUGHTON COMP PLAN DRAFT UTILITIES CH.PDF
New Business
Future Agenda Items
Teigen Farms Park Master Plan
East Side Park Concepts
RDA Site Park
Eastwood Estates Park
Skate Park
Scooters and E-Bikes
1.
2.
3.
4.
Documents:
5.
6.
Documents:
7.
7.I.
7.II.
Documents:
8.
9.
OFFICIAL NOTICE AND AGENDA
Notice is hereby given that the Parks and Recreation Committee of the City of Stoughton,
Wisconsin, will hold a regular or special meeting as indicated on the date and at the time and
location given below.
Date and Time: Tuesday, September 15th, 2026 at 6:00pm
In-person: Stoughton Public Works Conference Room (2439 County Road A, Stoughton, WI)
Video Call Link: https://shorturl.at/TTHwC
Live streamed: The meeting can also be live streamed on the City of Stoughton Government
Channel at https://www.cityofstoughton.com/336/GOV -TV-Livestream and on Spectrum or TDS
Channel 980. The WSTO-TV app is also available on Roku TV, Apple TV and Fire TV as well as on
Android and iOS devices.
P & R Members: Regina Hirsch, Phil Caravello, Patrick Butler, Sandra Black, Nicole Dewitt, Mike
Vienneau, Tim Swadley
Call To Order
Roll Call And Verification Of Quorum
Certification Of Compliance With Open Meetings Law
August Minutes
PARKS RECREATION MINUTES AUGUST 18 2026.PDF
Member Communications
Superintendent Report - September
SUPERINTENDENT REPORT - SEPTEMBER 2026.PDF
Old Business
COMP Plan 2016
HTTPS://WWW.CITYOFSTOUGHTON.COM/225/COMPREHENSIVE-PLAN
Utilities And Community Facilities Chapter
8. STOUGHTON COMP PLAN DRAFT UTILITIES CH.PDF
New Business
Future Agenda Items
Teigen Farms Park Master Plan
East Side Park Concepts
RDA Site Park
Eastwood Estates Park
Skate Park
Scooters and E-Bikes
1.
2.
3.
4.
Documents:
5.
6.
Documents:
7.
7.I.
7.II.
Documents:
8.
9.
City of Stoughton
Parks & Recreation Committee Meeting Minutes
Date: August 18, 2026
Location: Stoughton Public Works Conference Room and online
1. Call to Order
Chair Regina Hirsch called the meeting to order at 6:03 p.m.
2. Roll Call and Verification of Quorum
Present: Regina Hirsch, Phil Caravello, Sandra Black, Nicole
Dewitt, Mike Vienneau, Tim Swadley
Absent: Patrick Butler
Staff: Tony King, Parks & Recreation Superintendent
A quorum was present.
3. Certification of Compliance with Open Meetings Law
The meeting was properly noticed in accordance with Wisconsin
Open Meetings Law.
4. Approval of Minutes
July Meeting Minutes
Motion by Caravello, seconded by Dewitt, to approve the July Parks
& Recreation Committee meeting minutes.
Motion carried, 5-0.
August 4 Special Meeting Minutes
Motion by Dewitt, seconded by Vienneau, to approve the August 4
Special Meeting minutes.
Motion carried, 5-0.
Edit
5. Member Communications
Swadley provided an update on the recent Coffee Break Festival.
He noted that the event had a good turnout and that the Chamber
was pleased with the event layout. The festival also sold out of
coffee mugs.
6. Superintendent Report
Superintendent King provided updates on the following:
River Park Project: King discussed the recent meeting with
the Wisconsin Department of Natural Resources (DNR), the
contractor, and project engineers regarding permitting and the
means and methods associated with the project. The August
Superintendent Report noted that the River Park contract had
been signed and that coordination with the contractor and DNR
regarding dewatering was required.
Stoughton Trailers Community Park: King discussed the
agreement with STI and comments received as part of the
review process. STI continues to review the agreement.
Dog Waste: The Committee discussed issues with improper
disposal of dog waste in City parks. King noted that a letter had
been distributed to the neighborhood near Greg Standard
Legacy Park regarding proper dog waste disposal.
Budget Report: King reviewed the monthly budget report and
clarified which specific budget line items correspond to various
recreation programs.
7. Old Business
Comprehensive Plan – Chapter 4: Natural Resources
The Committee reviewed Chapter 4 – Natural Resources of the
City's Comprehensive Plan.
Committee members discussed potential additions and revisions to
several goals. The proposed changes and comments will be
forwarded to Katrina Becker.
Caravello recommended reviewing the City's previous
Comprehensive Plan as a reference during the review process. The
Committee also discussed revising certain terminology, including
language related to dam removal versus dam modification.
The Committee agreed to continue its Comprehensive Plan review
at the September meeting, with Chapter 7 – Transportation and
Chapter 8 – Utilities & Community Facilities to be reviewed at
that time.
8. New Business
Dane County Food Scrap/Compost Program
King reviewed the proposed Dane County Food Scrap Stop
program. The Committee discussed potential locations for a
collection site. King will continue discussions with Dane County to
determine an appropriate location based on the County's
operational needs and recommendations.
The Committee expressed support for moving forward with the
compost program.
The Dane County program includes County-coordinated
registration, outreach, hauling, carts, and locks, with participating
municipalities responsible for certain site maintenance
responsibilities.
9. Future Agenda Items
The Committee discussed the following future agenda items:
Scooters and E-Bikes – Hirsch and Caravello
Adult Outdoor Workout/Fitness Area – Hirsch
Future of Troll Beach – King
10. Adjournment
Motion by Caravello, seconded by Black, to adjourn.
Motion carried, 5-0.
The meeting adjourned at 8:09 p.m.
Sources
September Superintendent Report
PARKS UPDATE
River Park Project
• The temporary drawdown is planned for October 19 through March 15 to support Phase 1 construction.
• Freshwater mussel relocation was completed in mid-August.
• The City , R.G. Huston, the project engineers and the DNR continue coordinating the drawdown
application and the means and methods for dewatering and dredging.
• All permits have been turned in and are under review
Stoughton Trailers Community Park
• MSA's east-west trail design has been sent to STI. Construction planned for early 2027
• The development agreement remains under review with STI.
Greg Standard Legacy Park
• Construction continues on the shelter and restroom building.
• Turf establishment is planned for this fall, with use of the school district's slit seeder if available.
Tee Naasak Park
• Planning continues for the access road and angled parking layout.
• Soil piles are being retained for future park grading and topsoil needs.
Parks Operations
• Seasonal mowing, facility maintenance and project support continue while staffing remains limited by an
employee injury.
• Looking to hire two LTE ’s for Parks.
RECREATION UPDATE
Fall Programs
• NFL Flag Football is underway
• Men ’s 3v3 Basketball is underway
• Miniball Soccer is underway
• Youth Basketball registration is open
Staffing
• Jeremy no longer works for the City . Staff are covering the Recreation Supervisor duties while hiring for
the position takes place.
Troll Beach
Revenue for 2026 was $35,000
Wages paid were $54,000
Maintenance/Repairs $8,000
Operating at a $27,000 deficit
YOUTH CENTER UPDATE
• Summer programming has concluded, and staff are transitioning to the school-year schedule and
activities.
• Staff took kids to Mt. Olympus, Dave and Busters, Badgers Basketball, and purchased an additional PS5
with games
FORESTRY UPDATE
• Tree trimming and seasonal watering of terrace trees continue.
• The forestry intern has returned to school for the academic year.
DRAFT
106 | Stoughton Comp Plan_Draft
DRAFT
Chapter 8: Utilities and Community
Facilities
In This Chapter
INTRODUCTION - - - - - - - - - - - - - - - - - - - - - 108
KEY TAKEAWAYS - - - - - - - - - - - - - - - - - - - - 108
GOALS, STRATEGIES, AND ACTIONS - - - - - - - - - - - - 109
SURVEY RESULTS - - - - - - - - - - - - - - - - - - - - 112
COMMUNITY SERVICES - - - - - - - - - - - - - - - - - 117
UTILITIES AND COMMUNITY FACILITIES TIMETABLE - - - - - 139
DRAFT DRAFT
PLANSt/o_ught/o_n
| 107
DRAFTDRAFT
108 | Stoughton Comp Plan_Draft
INTRODUCTION
Utilities and community facilities form the backbone of Stoughton’s quality of life, supporting residents, businesses, institutions, and future growth.
Reliable water, wastewater, electric, stormwater, telecommunications, and other utility systems are essential to public health, safety, and economic
development. Likewise, community facilities - including schools, parks, trails, public safety services, the library, senior center, youth center, and
healthcare facilities—help create a vibrant, connected, and resilient community.
As Stoughton continues to grow and evolve over the next 20 years, thoughtful planning and investment in infrastructure, public services, and community
amenities will be critical to maintaining the high quality of life valued by residents. This chapter evaluates existing utility systems and community
facilities, identifies future needs and opportunities, and establishes goals, strategies, and actions to guide decision -making through the planning
horizon.
KEY TAKEAWAYS
◊ Stoughton benefits from reliable and well -maintained water, wastewater, electric, and stormwater systems that have adequate capacity to support
existing residents, businesses, and anticipated growth over the next 20 years.
◊ High -quality community facilities and services – including parks, trails, schools, the library, senior center, youth center, and public safety services –
are central to Stoughton’s strong quality of life and community identity.
◊ Residents identified parks, trails, outdoor recreation opportunities, and family -oriented amenities as some of the community’s highest priorities,
with strong interest in expanded recreational facilities, improved trail connections, and greater access to the Yahara River.
◊ As the community grows, maintaining service levels will require continued investment in staffing, facilities, and equipment, particularly for EMS,
public works, library services, and public safety operations.
◊ Stoughton’s long -term success depends on attracting and retaining residents of all ages by providing excellent schools, youth programming, senior
services, childcare options, and community gathering spaces.
◊ Sustainability, resilience, and energy innovation are increasingly important considerations in public infrastructure and facility planning. Stoughton
has demonstrated leadership in renewable energy, sustainability initiatives, and environmental stewardship that should continue into the future.
◊ Strong partnerships and coordination among the City, Stoughton Utilities, the Stoughton Area School District, Dane County, neighboring communities,
healthcare providers, and community organizations will remain essential for efficiently delivering services and meeting future community needs.
DRAFTDRAFT
Utilities & Community Facilities | 109
GOALS, STRATEGIES, AND ACTIONS
Goal 1: Provide reliable and efficient utilities and public infrastructure that support existing residents, future growth,
and long-term community resilience.
Strategies:
1. Prioritize proactive maintenance and strategic upgrades to water, sewer, electric, and stormwater systems to provide future developments and
redevelopments with reliable and durable infrastructure.
2. Ensure utility systems have adequate capacity to accommodate planned growth while avoiding unnecessary overbuilding.
3. Coordinate utility and community facility systems planning with land use, transportation, natural resources, housing, economic development,
and recreation planning.
4. Encourage compact development, infill redevelopment, and other growth that efficiently utilizes existing infrastructure and public investments,
and plan for the orderly extension of utilities and facilities in future growth areas.
Actions:
◊ Maintain and regularly update utility
master plans, service area plans,
and related infrastructure studies,
and follow the recommendations
of these plans and studies
when making utility and growth
decisions.
◊ Continue to update and implement
the city’s 5 -year Capital
Improvement Plan (CIP) annually.
◊ Avoid extending public utilities over
large acreages of undeveloped land
for the purpose of serving scattered
parcels of existing development.
◊ Continue to require that all new
development in the city make
provisions for handling stormwater.
◊ Complete regular maintenance of
utilities and community facilities in
accordance with best practices and
requirements.
◊ Combine utility and community
facility projects with other projects
– like roads, parks, and broadband
– wherever practical.
◊ Continue to require that all new
development and redevelopment
in the city make provisions for
handling stormwater and soil
erosion, including stormwater
management and erosion control
fees.
DRAFTDRAFT
110 | Stoughton Comp Plan_Draft
Goal 2: Provide high-quality community facilities and public services, such as the library, parks, trails, senior center, and youth center,
that enhance quality of life, promote public health and safety, and serve residents of all ages and abilities.
Strategies:
1. Modernize public facilities and municipal operations to improve accessibility and sustainability.
2. Continue to invest resources to ensure a high level of public safety, including fire, police, and emergency medical services (EMS) throughout the
city.
3. Provide effective, transparent, and inclusive service and governance to City residents.
4. Ensure all residents have convenient access to parks, open spaces, trails, and recreation opportunities.
DRAFTDRAFT
Utilities & Community Facilities | 111
◊ Ensure adequate staff capacity
to continue providing high -
quality services as the city grows,
particularly for EMS, public works,
and the library.
◊ Close gaps in the community trail
network and improve connections
between neighborhoods, schools,
parks, downtown, and regional trail
systems.
◊ Evaluate renewable energy, energy
efficiency, and sustainable building
practices for municipal and utility
facility projects.
◊ Incorporate universal design and
accessibility principles into park
and recreation improvements.
◊ Utilize diverse methods to
communicate programs, policies,
initiatives, and other information
to the public and stakeholders in a
clear, timely, and equitable manner.
◊ Update and implement the city’s
Comprehensive Outdoor Recreation
Plan every five years.
◊ Continue to require parkland
dedication or fees -in -lieu -of, and
park and trail improvement fees for
new development.
◊ Implement the Stoughton
Sustainability Plan
recommendations and periodically
update the plan.
◊ Implement the recommendations
of Stoughton’s Comprehensive
Outdoor Recreation Plan and
continue to update the plan every
five years.
◊ Support continued investment in the
Library, Senior Center, and Youth
Center.
◊ Pursue opportunities for shared
facilities and services with other
governmental units and the School
District.
◊ Assess the space needs of city
administration and public safety
departments and explore the
feasibility of and potential
locations for new facilities as the
city grows.
◊ Explore the potential of a multi -
use community center; evaluate
potential sites and funding sources
for a new or expanded facility that
could serve as a conference space,
event center, and recreation hub.
Actions:
DRAFTDRAFT
112 | Stoughton Comp Plan_Draft
Graph 32. Public Services Satisfaction: How satisfied are you with the
quality of public services (parks, water, emergency services, etc.)?
SURVEY RESULTS
City Services and Governance
The majority of survey respondents (59%) indicated that the city is doing
well or great at delivering essential services efficiently and at an affordable
cost. 10% say there is some work to do.
Graph 31. Services: Stoughton delivers essentials services, such
as water, waste management, and public safety, efficiently and at
an affordable cost to meet the needs of its residents.
69% of survey respondents are satisfied with the quality of public services
in Stoughton.
Comments on city services emphasized strong appreciation for core
services - particularly the library - alongside widespread concern that
staffing levels, hours, and facilities have not kept pace with community
needs. Many respondents called for improved EMS capacity and upgrades
to police facilities and operations. Public Works staff expressed that “as the
community continues to grow, our biggest challenge is adding adequate
staff… to maintain parks, roadways and stormwater infrastructure.”
While noted as a beloved and key community resource, comments also
consistently highlight the desire for increased library staffing and space.
DRAFTDRAFT
Utilities & Community Facilities | 113
“Essential city services are understaffed. The Library in particular
needs more staff. ”
“We need a full time EMS. Response times to calls are terrible. ”
“The library is amazing but clearly understaffed. ”
Graph 33. Stoughton fosters transparency, actively involves residents in decision
making, and keeps the community informed about its projects and initiatives.
Representative Quotes
36% of survey respondents said the city has a lot or some work to do in fostering transparency,
actively involving residents in decision -making, and keeping the community informed about its
projects and initiatives.
DRAFTDRAFT
114 | Stoughton Comp Plan_Draft
Parks and Recreation
Parks and outdoor recreational spaces were ranked as the most important of community facilities by survey respondents, while indoor recreational
facilities were ranked as the second most important.
DRAFTDRAFT
Utilities & Community Facilities | 115
Residents link strong schools and family/youth -friendly activities to
enrollment, talent retention, and long -term community health. Many
responses indicated a desire to attract more young families to Stoughton
and interest in more activities and “third spaces” for kids and adults
(places other than home or work where people can gather).
“We need to focus on attracting young families and the way to do that
is with great schools!”
“We need more free or low cost things to do, especially for families. ”
“We need more activities and facilities for youth. Teens need places to
go that aren’t sports based. ”
“Supporting young families is key if we want to stop declining school
enrollment. ”
Comments emphasized the need for improved parks, expanded trail
connections, and better access to the riverfront, with many residents
viewing these amenities as central to quality of life and community
health. There was especially strong and repeated support for a public
aquatic center, often framed as a priority amenity for families, in
addition to closing trail gaps and building truly inclusive play spaces.
“Please prioritize a city swimming pool… Families leave town to use
neighboring pools. ”
“Finish trails and connect to Lower Yahara and Madison. ”
“Being a grandparent, parks are very important—we need inclusive
parks for all ages and abilities. ”
“We really need more fun recreational activities that are friendly for
all ages like a pool or mini golf. ”
Representative Quotes
Representative Quotes
DRAFTDRAFT
116 | Stoughton Comp Plan_Draft
Urban Service Area
An Urban Service Area (USA) includes those areas planned for urban
development where a full range of urban services will be provided
within the planning period. Urban services include public sanitary sewer
systems, public water supply and distribution systems, fire and police
protection, solid waste collection, urban drainage facilities, streets
with curbs and gutters, streetlights, neighborhood facilities such as
schools and parks, and urban transportation systems. USAs represent
an essential element in community planning and growth management
and are used to locate future development in specific areas planned for
urban growth. In Dane County, all USAs are established and amended
by the Capital Area Regional Planning Commission (CARPC) working
on behalf of the Wisconsin Department of Natural Resources (DNR).
Amendments to original USAs expand services as communities grow.
As of October 2025, Stoughton’s USA contains 4,075 acres in total. This
acreage includes areas within environmental corridors, existing ROW,
and existing development; this calculation does not represent acreage
that is currently available for future development. The Stoughton USA
includes the majority of the municipal boundary area of the City of
Stoughton and small portions of the Town of Dunkirk, Town of Pleasant
Springs, Town of Rutland, and Town of Dunn. There are a few parcels on
the western, northeastern, and southeastern areas of the city that are
not included in the Stoughton USA. Stoughton’s USA is relatively close
to the edge of existing development thereby limiting the potential for
“leap -frog” development (when new development “skips over” nearby
undeveloped land and instead gets built farther out, leaving gaps of
empty land between existing development and the new area).
Lake Kegonsa Limited Service Area
Around Lake Kegonsa, a Limited Service Area (LSA) has been established
to provide sanitary sewer service for residential development in
close proximity to the lake. Limited -Service Areas are not intended to
provide a full range of urban services or accommodate intensive urban
development and thus are generally not considered as logical for
substantial expansion – particularly for residential, institutional, office,
or commercial development.
Source: Natally Fisher - RE/MAX Preferred / RedFin.com
DRAFTDRAFT
Utilities & Community Facilities | 117
COMMUNITY SERVICES
Municipal Utilities
Drinking water, wastewater, and electric utilities are provided to City of
Stoughton residents by Stoughton Utilities (SU), a locally -owned not -for -
profit municipal utility with a service territory covering approximately 24
miles.
At the time of this plan writing, SU operations are directed from the
Utilities Administration Building located at 600 S. Fourth Street, however,
Stoughton Utilities has outgrown this space and is in the process of
designing a new utility operations facility to be potentially located on
Williams Drive between Business Park Circle and CTH B. The construction
of a new facility will provide the utility with the necessary space to
accommodate future demands as the city grows. It will also enable the
City to explore more effective uses for the current administration building
located along the riverfront.
The city and utility continue to collaborate on the replacement of
infrastructure throughout the city. To meet all divisions’ needs, Stoughton
Utilities has an aggressive water and sewer main replacement schedule in
the coming years.
Water Supply and Distribution
Drinking water supply is provided to the City of
Stoughton by Stoughton Utilities. The surrounding
townships are served by private wells. City ordinance
requires that all properties used for human habitation
with access to Stoughton Utilities water mains be
connected to Stoughton Utilities water and sewer service.
Stoughton Utilities currently pumps groundwater from four wells
located throughout the city. In addition to these wells, current water
infrastructure includes two elevated storage tanks and one reservoir
for a combined 1.3 million gallons of water storage. SU also maintains
75 miles of water mains (58% of which were installed within the last 35
years), 5,447 water meters, and 716 fire hydrants throughout the city.
Hydrants are flushed twice a year and valves are operated annually,
exceeding the state maintenance requirements.
The City’s water supply comes from four groundwater wells, each capable
of pumping 43 -45 million gallons per month. Wells are rehabilitated
on a 6–8 -year cycle, which is more frequent than the 10 -year interval
recommended by the Wisconsin DNR.
Table 5. Active Well Facilities in the City of Stoughton
Location Year Constructed Depth Pumping Capacity
Well 4 – North Van Buren Street 1963 969 feet 1,220 gpm
Well 5 – West South Street 1978 1,113 feet 950 gpm
Well 6 – East Academy Street 1985 1,137 feet 1,050 gpm
Well 7 – Roby Road 1997 1,040 feet 1,080 gpm
Table 6. Active Water Storage Facilities in the City of Stoughton
Location Year Constructed Storage Capacity
Tower 2 – Furseth Road 1977 300,000 gallons
Reservoir 2 – West South Street 1989 400,000 gallons
Tower 3 – Racetrack Road 2010 600,000 gallons
DRAFTDRAFT
118 | Stoughton Comp Plan_Draft
Stoughton Utilities submits water use data to the Public Service Commission (PSC), which was used to estimate water use by customer sector. Figure x
illustrates the percentage of total pumpage by sector for 2024 and Figure x illustrates the total water sales by customer sector for the last 10 years. In
general, water use has been fairly consistent over the past 10 years except for in the industrial category which has decreased moderately, largely due to
enhanced efficiency practices. In 2024, the total pumpage was approximately 462 million gallons, while only 403 million gallons was accounted for. This
nets approximately 8% of pumped water unaccounted for, which is the difference between the water pumped into the system and water SU can actually
measure, bill, or otherwise account for. Often called “non -revenue water” or system losses, it includes pipe leaks or watermain breaks (usually the
largest component), metering inaccuracies, unauthorized or unmetered use, or authorized but unbilled uses (firefighting, flushing hydrants and mains,
street cleaning). System losses under 10% is considered low and an indication of an efficient, well -managed system.
Source: Stoughton Utilities, 2025
Source: Stoughton Utilities, 2025
DRAFTDRAFT
Utilities & Community Facilities | 119
The 10 largest water users in the City of Stoughton are summarized in Table 7 with
the largest water user being Uniroyal Global, served by two separate meters. These
10 users make up just over a quarter of the city’s total water use.
Source: Stoughton Utilities, 2025
Table 8 summarizes the projected water use for the city based on
projected population.
Stoughton has adequate water supply to provide water service to
the city throughout the planning period, including for all population
projections and fire protection needs. If additional water supply
is needed in the future, SU’s most cost -effective option would be
to drill additional wells. General areas for new well locations were
determined in the 2015 Water System Study – see Map ___.
Existing water sources and water storage facilities are expected
to be sufficient to supply the city through the planning period.
No significant water supply facilities or capital improvements are
recommended outside of regular well and distribution system
maintenance. There are no plans or anticipated need for additional
well capacity in the next 20 years. More details are provided in
Stoughton Utilities’ Water Supply Service Area Plan (2025).
Table 7. Stoughton Top 10 Water Users, 2024: Largest Water Users in City of Stoughton
Table 8. City of Stoughton Water Use Forecast
DRAFTDRAFT
120 | Stoughton Comp Plan_Draft
Wastewater Collection and Treatment
Stoughton Utilities maintains a wastewater collection and treatment
system that safely transports and treats sewage from homes and
businesses. First built in the 1940s, the City of Stoughton Wastewater
Treatment Plant (WWTP) has undergone several expansions and upgrades
to replace aging equipment, accommodate an increasing population,
and remain compliant with discharge permit requirements. Wastewater
collection and treatment consists of one treatment plant, three inverted
siphons, six lift stations, over 69 miles of sanitary sewer mains, and over
1,600 manholes. All operations, including remote locations, are monitored
and controlled by a supervisory control and data acquisition (SCADA)
system.
The collection system includes 65 miles of sanitary sewer mains and utility
holes, with 58% of the system installed within the last 35 years. Each year,
about one -third of the system is cleaned and 10% is viewed to ensure
proper function and maintenance.
Where gravity flow is not possible, wastewater is moved through lift
stations. Stoughton Utilities operates several lift stations, including
Eastwood, Nordic Ridge, Barberry, Stonecrest, and Vennevoll. The 8th
Street Lift Station is currently in need of replacement or an alternative
solution.
All collected wastewater is conveyed to the Stoughton Wastewater
Treatment Plant, located at 700 Mandt Parkway, for processing. The facility
was constructed in 1977 and has received numerous upgrades as necessary.
It is a conventional activated sludge plant that provides advanced
secondary treatment, including biological phosphorus removal. While not
originally designed for nitrification of ammonia, significant nitrification
occurs in the aeration tanks when operating conditions are favorable. The
treated wastewater is discharged into the Yahara River and the anaerobic
sludge, which settles out during the treatment process, is thickened and
stored for land injection on area farmland.
Stoughton’s wastewater treatment plant averages a Biochemical Oxygen
Demand (BOD) load of about 2,500 pounds per day and an annual average
influent flow (the rate at which wastewater enters a treatment system)
of about 1.12 million gallons per day (mgd). The plant is designed for
an average flow of 1.65 mgd, a BOD load of 2,655 lbs/day, and a total
suspended solids (TSS) load of 3,230 lbs/day. The treatment plant is
expected to have adequate capacity for the city’s projected population of
16,759 in 2050.
Efficient expansion areas are well -distributed around the City, with
particularly large areas to the east and northeast. With the exception of
most of the Southwest Planned Neighborhood and some additional small
areas at the edges of the City, and infill and redevelopment/rehabilitation
areas, most new development in the City will require service via lift
stations and force mains to overcome low ridge lines to the southwest and
southeast, flat topography to the northeast and east, and closed drainage
basin rims to the west and northwest. Map x depicts the general pattern of
sanitary sewer interceptor lines and lift stations needed to serve the areas
designated for development on Map x.
DRAFTDRAFT
Utilities & Community Facilities | 121
Electric
Stoughton Utilities supplies electricity to approximately ____ customers in Stoughton and the surrounding townships, covering about
55 square miles. It purchases bulk electric power from WPPI Energy, a nonprofit regional power company that supplies electricity to 51
locally -owned municipal utilities. Stoughton Utilities has a long -range power contract with WPPI through 2055.
SU has eight distribution transformers installed across its four substations, providing capacity to service a total system load of 92
megawatts (MW). Over the past five years, the average monthly demand across the distribution system has been 24.8 MW with a system peak of 38.1
MW, indicating existing capacity to serve future development. The system delivers power safely through a network of underground and overhead lines,
protection devices, and transformers.
Currently, about 44% of the system is underground and 56% is overhead, with 217 miles of primary distribution lines maintained.
The four substations step down high voltage electricity from the transmission system (69 kilovolts (kV)) to the local distribution level (12.47 kV) for use
in homes and businesses. Each substation is regularly inspected, with monthly checks by utility staff and comprehensive third -party testing every four
years. The East Substation, located at 1200 East South Street, was built in 2003, expanded in 2005, and had new breakers installed in 2023. The West
Substation, at 3221 McComb Road, was built in 2018. The North Substation, located at 302 CTH B, was built in 1989 and expanded in 1994. The South
Substation, at 1069 Taylor Lane, was built in 1997 and expanded in 2000.
DRAFTDRAFT
122 | Stoughton Comp Plan_Draft
Stoughton – Recognized for Sustainable Practices
The City of Stoughton and Stoughton Utilities have both been recognized for their commitment to sustainability. In 2024, Stoughton was designated as a
Green Tier Legacy Community by the Wisconsin Department of Natural Resources (DNR) after the adoption of the city’s Sustainability Plan. The Green
Tier Legacy Communities program is for local governments, businesses, and organizations looking to work with the DNR to expand and enhance their
sustainability practices. In 2019, the City was recognized by Focus on Energy for the energy efficiency measures incorporated into the new public works
building, amounting to $38,115 in financial incentives for the project and saving the city over $44,000 annually in energy costs.
Figure 34. Representatives from City of Stoughton, Stoughton Utilities, and Focus
on Energy at the grand opening of Stoughton’s Public Works facility in 2019.
Stoughton Utilities has been nationally recognized for its leadership in
renewable energy participation. In 2023, the U.S. Department of Energy’s
National Renewable Energy Laboratory (NREL) ranked Stoughton eighth
in the nation for customer participation in green power programs, with
a 5.15% participation rate. This marks the ninth time in over a decade
that Stoughton has earned a top ten ranking. Much of this success is
attributed to the Choose Renewable program, which allows customers
to voluntarily add a small monthly charge to their utility bill to support
renewable energy sources such as solar, wind, and biogas. This consistent
recognition highlights the community’s strong commitment to sustainability
and reducing carbon emissions, while reinforcing Stoughton’s position as a
leader in renewable energy at the national level.
Dane County leads Wisconsin in electric vehicle (EV) adoption, with 25%
of the state’s EVs and only 10% of its population. To support this growing
demand and ensure equitable access to EV benefits, the Charge Up Dane
County initiative is a $13.2 million effort aimed at expanding EV charging
infrastructure across the county. The initiative focuses on making EVs a
practical option for all residents by improving access to charging stations.
As part of this work, the City of Stoughton has already installed two EV
chargers at City Hall and has partnered with Dane County to apply for two
additional grants targeting new charger installations at the South Municipal
Lot on Division Street and Mandt Park.
DRAFTDRAFT
Utilities & Community Facilities | 123
Solar Energy
Solar energy systems convert sunlight into usable energy and are allowed
throughout the City of Stoughton. Rooftop, building -mounted, and
free -standing systems are permitted in all zoning districts as accessory
structures, provided they meet standard requirements for height,
setbacks, and location. Free -standing systems must follow the same rules
as other accessory structures, while rooftop systems must comply with
the limits for primary buildings. All solar installations must also follow
applicable Wisconsin state statutes.
Stoughton Utilities supports the integration of distributed solar energy
within the community through its Distributed Generation Interconnections
Program. Net -metered solar arrays are already in place within the
City, and the Utilities Department provides a dedicated webpage with
resources to help customers navigate the process. The site offers a step -
by -step guide for determining the most appropriate solar option for a
project, along with information on available tax credits and incentives.
Most residential solar installations do not require a formal commissioning
process; however, larger systems including residential arrays over 20 kW,
multi -phase systems, and non -residential projects may require utility
commissioning, inspection, and anti -islanding testing to ensure safe
operation.
Table 9. City of Stoughton Historical Residential and Commercial Solar Permits
Figure 35. Greenspire Apartments received the 2025
Project of the Year from RENEW Wisconsin and from the
Wisconsin Council for Rural and Affordable Housing
Did you know Stoughton is
going solar?
The Public Works Facility, Fire Station, and Senior
Center already have solar panels, and more
municipal buildings are joining in! Solar panels
are planned for the Library in 2026, City Hall
in 2027, and the Public Safety Building in 2028.
Stoughton is shining bright with clean energy!
DRAFTDRAFT
124 | Stoughton Comp Plan_Draft
Stormwater Management
Stormwater refers to rain or melted snow that flows across the ground’s
surface. In developed areas, where roofs, roads, and parking lots prevent
water from soaking into the soil, this runoff travels quickly across these
hard surfaces. Along the way, it can pick up pollutants such as oil,
gasoline, paint, trash, and fertilizers, which are then carried into local
storm sewers and ultimately to rivers, lakes, and other waterways.
The city maintains a storm sewer system that is separate from its sanitary
sewer system and drains into the Yahara River. The storm sewer system
includes a series of greenways and detention basins throughout the city,
such as in the Glen Oaks Additions on the north side, Industrial Park
South, and the Village and Hills -Olson Additions on the west side. The
city’s Streets Department maintains this storm sewer system. With the
continuing evolution of stormwater management “best practices” and
standards for quantity, quality and infiltration emerging over the last ten
years, the city will need to devote continued attention to this key issue.
Stoughton has implemented a stormwater management utility fee to help
address the costs associated with improved stormwater management
practices as the amount of impervious surface in the city increases.
Stormwater Utility Credit Policy: In 2012, the City of Stoughton created a
Stormwater Utility to fund maintenance and improvements to its drainage
system, which includes streets, storm sewers, inlets, manholes, greenways,
and detention basins. Fees are based on the amount of impervious surface
on each property, as these areas generate more runoff and increase
system costs. To recognize properties that reduce runoff through effective
stormwater practices, the city also established a credit system allowing
eligible property owners to apply for reduced fees.
Pollution Prevention Plan 2017: In 2017, the City of Stoughton adopted a
Stormwater Pollution Prevention Plan (SWPPP) for its Public Works and
Parks Department facility to meet Wisconsin DNR permit requirements
and outline daily operations and maintenance practices that prevent
stormwater pollution.
Stoughton is one of nine communities partnering with Dane County on the
Adopt -A -Storm Drain program. The goal of the program is to build a network
of volunteers committed to cleaning the area on and around local storm
drains and report back results. Keeping storm drains clean and clear can
prevent localized flooding and protect our waters. Click here to adopt
your storm drain today
DRAFTDRAFT
Utilities & Community Facilities | 125
Natural Gas
Alliant Energy provides the City of Stoughton with natural gas service
for homes, businesses, and public facilities. The company operates a
local office at 1521 Progress Way, Stoughton, WI 53589, offering in -person
customer service alongside an online portal for account management,
billing, outage reporting, and energy safety resources.
Solid Waste Disposal and Recycling
John’s Disposal, based in Whitewater, provides garbage and recycling
collection for the City of Stoughton. Half of the city is collected on
Tuesdays and the other half on Fridays with recycling collected every other
week. Stoughton residents can schedule curbside collection of electronic
waste (E -waste) as part of their bulky item collection service with John’s
Disposal. Each household may schedule two electronic collections per year,
with one item per pickup. Each E -waste collection replaces that month’s
bulky collection.
The City of Stoughton provides several convenient options for residents
to properly dispose of and recycle various materials. The Public Works
Facility accepts electronics during business hours, with a $15 fee applied
to TVs, monitors, laptops, and iPads, while residents are encouraged to
use the curbside program included in annual trash and recycling fees.
Packing materials such as peanuts, foam bags, and air bags can be dropped
off for recycling at the UPS Store in Stoughton, and many community
members also reuse or share boxes and materials through local groups. The
Stoughton Lions and Rotary Clubs maintain a plastic bag recycling program
with convenient drop -off locations at the Library, Senior Center, Pick n’
Save, Stoughton Lumber, Jung’s Garden Center, and the Stoughton Wellness
and Athletic Center (SWAC). For light bulb recycling, the city partners
with Logistics Recycling to ensure safe disposal, offering residents the
opportunity to recycle their first six bulbs free of charge at the Public Works
Facility located at 2439 County Road A.
Yard Waste
Stoughton maintains a shared facility use and maintenance
agreement for the Town of Dunkirk -owned brush and yard
waste disposal site located at 1101 Collins Road. For a
cost of $25/year (residents) and $30/year (non -residents),
households can purchase permits to dispose of brush, logs,
and yard waste at the site, and take finished yard waste compost, mulch,
and logs for free. Public Works also maintains a spring and fall curbside leaf
and brush collection schedule for City residents.
Law Enforcement
The Stoughton Police Department serves as the City’s 24 -hour municipal law
enforcement agency, providing comprehensive police services to residents
and businesses. Services include after -hours support to Stoughton Utilities,
community outreach, vehicle registration, fingerprinting, and offering
Salvation Army vouchers to those in need of emergency lodging, gas, and
food. The department is organized into administrative, patrol, investigation,
and dispatch/civilian service divisions, and is staffed by 24 sworn officers,
seven dispatchers, one community service officer, and one K9 unit. The
Department is located in the city’s Public Safety Building at 321 S. Fourth
Street.
In addition to traditional patrol duties, the department maintains a team
of five trained bike officers who provide high -visibility patrols during
community events such as Syttende Mai, as well as throughout the summer
when staffing allows. These officers are also assigned to patrol local trails,
neighborhoods, and the downtown area.
DRAFTDRAFT
126 | Stoughton Comp Plan_Draft
Fire and Emergency Medical Services (EMS)
Stoughton Fire Department
The Stoughton Fire Department, located at 401 East Main Street, is a
combination fire and rescue department consisting of three full -time staff
and 39 professional volunteers. With coverage responsibilities for the
City of Stoughton and portions of the Towns of Dunn, Dunkirk, Pleasant
Springs, and Rutland, the Stoughton Fire Department responds to fires,
vehicle accidents, storms, tornadoes, gas explosions, water rescue,
industrial and farm accidents, and assists EMS and Police agencies when
requested. The Fire Department’s call volume runs around 400 calls per
year.
The Stoughton Fire Department also operates a training/conference room
that is available for use by other city departments or community groups.
Stoughton EMS
Stoughton Area EMS is a municipal pre -hospital emergency medical
service providing 911 response for the City of Stoughton and surrounding
areas. Owned by the City and located at 516 S. Fourth Street, the service
covers a population of approximately 18,746 residents, including 100% of
the City of Stoughton and Town of Dunkirk, 33.3% of the Town of Dunn,
59.5% of the Town of Pleasant Springs, and 30% of the Town of Rutland. In
addition to its jurisdictional area, Stoughton Area EMS provides support
through Dane County Mutual Aid Agreements and the Mutual Aid Box
Alarm System (MABAS 115). The department operates with a full -time EMS
Director, a full -time EMS Operations Support Specialist, and 42 stipend
volunteers, including 40 licensed Advanced and Basic EMTs and a limited
number of driver -only members.
Three ambulances Rescue 88, Rescue 87, and Rescue 86 make up the
fleet, with Rescue 88 staffed 24/7 and the other two available for backup
as needed. Annual call volumes have steadily increased, with 1,530 calls
in 2019, 1,733 in 2020, and 1,757 in 2021. Beyond emergency response,
Stoughton EMS contributes to public safety and community health by
offering CPR/AED classes through certified American Heart Association
instructors, collaborating with the Stoughton Police and Fire Departments
during emergencies and special events, and working closely with the
Stoughton Wellness Coalition, Stoughton School District, and Stoughton
Hospital.
DRAFTDRAFT
Utilities & Community Facilities | 127
Evaluating New Facilities
and Shared Services
As the city continues to grow, it will be prudent to continually assess the
current capacities of existing facilities, such as the City Administration
building, the Fire Department, Police Department, and EMS, and evaluate
each department’s current and future space needs. This proactive
approach can lead to siting and acquiring the most effective locations,
and properly budgeting for them, if and when the need arises for new
buildings. Additionally, many communities in the region are beginning
to explore what shared public safety services might look like, as rising
costs and staffing concerns hinder the quality and efficiency of services
provided by individual municipalities.
City Administration Building
After 118 years in the historic City Hall building shared with the Stoughton
Opera House, city administration offices relocated to the former McFarland
State Bank building at 207 S. Forrest Street in April 2019. The move
consolidated all city services and offices to one floor, and freed up space
in the Opera House for expanded amenities and programming. City Hall
houses the Mayor’s office, Clerk’s office, finance department, and planning
department.
DRAFTDRAFT
128 | Stoughton Comp Plan_Draft
Schools and Education
Map x shows the boundary of the Stoughton Area School District
(SASD). SASD serves approximately 114 square miles of Dane County
and a small portion of Rock County, including the City of Stoughton,
and parts of the towns of Albion, Christiana, Cottage Grove, Deerfield,
Dunkirk, Dunn, Pleasant Springs, Rutland, Porter, and Union. This
public school district operates five schools, all located in the City of
Stoughton, in addition to virtual learning options and a 4K program.
Fox Prairie, Kegonsa, and Sandhill Elementary Schools serve grades K -5,
while River Bluff Middle School serves grades 6 -8 and Stoughton High
School includes grades 9 -12.
SASD school enrollment has gradually declined over the past
decade, shifting from 3,117 students in 2016–2017 to an estimated
2,735 students in 2024–2025. While the overall trend shows a modest
decrease, year -to -year fluctuations such as slight increases between
2021–2022 and 2023–2024 are common and can be influenced by
several factors, including birth rates, housing turnover, and local
economic conditions. Changes in household and family size also
play a direct role in future student enrollment: as more households
are composed of singles, couples without children, or older adults,
fewer school -aged children enter the district even when the number
of housing units increases. Conversely, new family -oriented housing
or shifts in migration patterns can temporarily boost enrollment.
Understanding these dynamics helps the City and School District plan
for long -term facility needs, staffing, and community services. Figure
x below shows the historical enrollment numbers from 2016 to 2025.
In 2020, the Stoughton Area School District commissioned a study entitled
Gaining and Maintaining Young Adults and Young Families in
Stoughton, Wisconsin. The study identified inclusion and equity issues,
increasingly unaffordable housing and limited housing options, and limited
career pathways and social opportunities, among other factors, as key
barriers to attracting the young families needed to sustain our community.
Source: WISEdash Public Portal Wisconsin Department of Public Instruction accessed November 19, 2025
Other schools in the planning area include St. Ann Catholic Elementary and
Middle School (serving students from 4K through 8th grade).
DRAFTDRAFT
Utilities & Community Facilities | 129
Library
Residents of Stoughton and the surrounding area are served by the
Stoughton Public Library, a designated Local Landmark located at 304 S.
Fourth Street. The library offers more than 75,000 print and audiovisual
materials, access to 175,000 eBooks, public computers, high -speed wireless
internet, and a variety of programs for all ages, from Storytime and teen
activities to concerts, craft groups, and book discussions.
Stoughton’s library service began in 1882 in a small reading room
operated by the Women’s Christian Temperance Union and moved through
several locations before finding a permanent home in 1908 as a Carnegie
Library, designed by Louis Claude and Edward Starck. Over the decades,
it has remained a hub for learning, culture, and community connection,
with expansions and renovations, including a major update in 2015,
ensuring that the historic building continues to meet the needs of future
generations.
The Stoughton Public Library’s 2023–2026 Strategic Plan outlines priorities
to meet the needs of a growing and diversifying community. Building on
prior plans and informed by community surveys, focus groups, and staff
input, it emphasizes diversity, equity, inclusion, and collaboration with
the Stoughton Area School District to enhance literacy and educational
opportunities.
The Stoughton Public Library will monitor community growth and
development to ensure its services and facilities meet evolving needs. The
Library Board of Trustees will regularly review the Strategic Plan, report on
progress, and keep community stakeholders informed through meetings,
reports, and various communication channels. This ongoing process will
help the library adapt to change and remain a vital resource for residents.
Key goals include increasing access to diverse information resources,
offering in -person and virtual programming, enhancing the library’s
physical space, ensuring financial stability, and investing in staff retention
and growth. Initiatives address expanding digital services, improving
facilities, increasing program budgets, securing sustainable funding, and
conducting space and diversity audits.
Community input during the comprehensive planning process emphasized
the importance of Stoughton’s public library as the heart of the community
and expressed a desire for expanded library space, staff, and services.
Senior Center
The Stoughton Area Senior Center, located along the Yahara
River in downtown Stoughton at 248 W. Main Street, is
a key community resource committed to enriching the
lives of older adults and their families through a diverse
array of programs, services, and volunteer opportunities.
Accredited by the Wisconsin Association of Senior Centers (WASC), the
Stoughton Area Senior Center supports wellness, social connection,
and independence through case management, congregate meals, home
delivered meals, equipment loans, classes, recreational programs, and
essential publications. In 2023, the Center expanded its facility to add two
new multi -purpose program spaces.
The Senior Center provides services to almost 700 individuals each year in
the City of Stoughton and Towns of Albion, Dunn, Dunkirk, Pleasant Springs,
and Rutland. The continued aging of the Baby Boomer generation and
desirability of Stoughton as a place to live for seniors will likely increase
the demand for senior center services, facilities, and programming during
the planning period.
DRAFTDRAFT
130 | Stoughton Comp Plan_Draft
Youth Center
Located at 567 East Main Street, just a few blocks from River Bluff Middle
School, the Stoughton Area Youth Center offers a safe, supportive
environment and engaging programming for local youth in grades 5
through 8. Centered around its mission to support youth in academics,
career exploration, and leadership development while encouraging respect
for self, others, and space, SAYC staff emphasize positive behavior through
role modeling, structured routines, and reflective learning.
The community has expressed a desire for additional youth programs that
serve children and teens across a wider range of ages beyond grades 5–8.
As Stoughton’s population continues to grow, expanding youth services
will be essential to meet demand and ensure that families have access
to diverse, high -quality opportunities. Strengthening and broadening
programming will also help the city remain competitive with neighboring
municipalities, where expanded youth facilities and services are often a
key factor in attracting and retaining young families.
Health and Medical Facilities
Local healthcare facilities in Stoughton include Stoughton Health, an
independent, nonprofit healthcare system founded in 1904 whose main
facility, Stoughton Hospital (located at 900 Ridge Street), provides 24/7
emergency care, general surgery and outpatient procedures, cardiology
and heart care, orthopedics and sports medicine, medical imaging,
and rehabilitation and physical therapy. Stoughton Health also has a
community wellness center with associated programs and education, in
addition to urgent care clinics in nearby communities.
Stoughton’s Neighborhood Free Health Clinic, located at 1520 Vernon St.,
provides free care for uninsured or underinsured adults in the community,
including primary care, chronic disease management, and blood pressure
and diabetes care.
Other healthcare facilities in Stoughton:
◊ UW Health Stoughton Clinic – 1001 Nygaard St.
• Part of the University of Wisconsin health system providing internal
medicine, pediatric and adolescent care, and lab and x -ray services.
◊ UnityPoint Health – Meriter Stoughton Clinic – 100 Silverado Dr.
• Provides primary care for all ages and includes lab and diagnostic
services and care coordination with the larger Meriter hospital in
Madison.
DRAFTDRAFT
Utilities & Community Facilities | 131
Childcare Facilities
There are a diverse mix of childcare options in Stoughton that support
early childhood development and meet the needs of working families.
These facilities include licensed childcare centers, family -based
providers, preschools, and publicly supported early education programs.
Collectively, they form an important component of the community’s
social infrastructure and contribute to workforce participation and family
stability.
Stoughton has an estimated 19 licensed childcare providers with a
combined capacity of approximately 930 children. These include about 13
center -based programs and 6 family home providers, reflecting a mix of
larger institutional settings and smaller, home -based care environments.
Childcare services in the community generally fall into the following
categories:
• Childcare centers serving infants through school -age children
• Family/home -based daycare providers offering smaller, more
flexible care settings
• Preschool and 4K programs focused on school readiness
• Head Start and subsidized programs serving low -income families
• Before - and after -school care programs for school -age children
Like many communities across Wisconsin and the United
States, Stoughton’s childcare system operates within
a broader childcare crisis characterized by staffing
shortages, rising costs, and limited availability, which
constrain providers’ capacity and make it difficult for
families to access affordable care. Additionally, recent
reductions in childcare subsidies and the expiration of pandemic -era
stabilization funding are expected to have significant impacts on childcare
availability and affordability in Wisconsin and nationwide, with analyses
indicating that up to 25% of childcare providers in the state may close or
significantly reduce services without continued funding, while many others
are expected to reduce capacity, operating hours, or significantly increase
tuition, further burdening working families.
Continued attention to capacity, affordability, quality, and the need for
sustained public investment will be essential to ensure that childcare
remains accessible and aligned with future population growth and
workforce demands in Stoughton.
DRAFTDRAFT
132 | Stoughton Comp Plan_Draft
Telecommunications and Media
Telecommunications
Reliable telecommunications and media services are essential to supporting Stoughton’s residents, businesses, and institutions. The community is
served by a mix of private telecommunications providers offering broadband internet, mobile wireless service, and traditional telephone connectivity.
High -speed internet access is widely available in most developed areas, with ongoing upgrades to fiber and hybrid fiber -coaxial systems improving
reliability and download speeds. Cellular coverage is generally strong throughout the city, though gaps in signal strength may occur in outlying or low -
lying areas.
Telecommunication towers are a key component of Stoughton’s communications infrastructure, supporting wireless voice, data, and broadcast services
throughout the community. These facilities include traditional freestanding towers (such as monopoles and lattice towers), antennas mounted on
utility poles or water towers, and smaller -scale equipment installed on buildings or existing structures.
Within the Stoughton area, there is a relatively dense network of cellular infrastructure. Publicly available data indicates there are dozens of registered
tower and antenna locations—potentially more than 50 sites when including all cellular, radio, and broadcast facilities—serving the community
and surrounding areas. These sites are used by major national carriers such as AT&T, Verizon, and T -Mobile, along with regional and infrastructure
providers that lease space on towers to multiple carriers.
DRAFTDRAFT
Utilities & Community Facilities | 133
Media
Media access in Stoughton includes regional television and radio broadcasting, digital media platforms, and local information
channels. The City benefits from proximity to the Madison media market, providing residents with a wide range of news,
entertainment, and public information. Local communication is further supported through municipal channels such as the City’s
website, social media, newsletters, and community access television, which play an important role in public engagement and
emergency communications.
WSTO TV is Stoughton’s local public, educational, and government (PEG) access channel and serves as the community’s primary public broadcast
outlet. Operated by the City of Stoughton’s Information Technology and Media Services Department, WSTO functions as both a television station and
community media center, providing residents with access to locally produced programming and government information. Established in 1969, WSTO is
currently the oldest continually operating community cable channel in the United States, covering a wide range of programming including coverage of
Stoughton City Council, Planning Commission, and Municipal Court, Stoughton Area School District events, local events and parades, and more.
As technology continues to evolve, Stoughton will prioritize maintaining and upgrading telecommunications infrastructure to meet increasing demand,
support smart -city applications, and enhance community resilience. Ensuring reliable, affordable, and widespread access to telecommunications
services will remain a key component of the City’s Utilities and Community Facilities planning efforts.
Figure 36. Chamber of Commerce Executive Director Sarah Ebert and guest announce
the annual Syttende Mai Parade, produced and broadcasted by WSTO
DRAFTDRAFT
134 | Stoughton Comp Plan_Draft
Parks and Recreation
Stoughton’s Park system includes 25 parks covering more than 280 acres, offering a variety of spaces such as mini parks, neighborhood parks, community
parks, special use areas, conservancy lands, and natural areas. The city updates its Comprehensive Outdoor Recreation Plan (CORP) every five years
to guide park planning and maintain an up -to -date inventory. The 2024-2028 CORP shows that the majority of Stoughton residents are able to access
parkland within a roughly 10 -minute walk of their residence (a standard for assessing how equitably parkland is distributed geographically throughout a
community). The two most notable exceptions are found at the western edge of the city near Jackson St. and a small area on the eastern edge of the city
(east of County Rd N). The future Tee Nasaak Park will serve residents located along Jackson St that currently do not have walkable access to a city owned
park. Any platting of new subdivisions requires setting aside a portion of land for parkland or paying a fee in -lieu of. All new residential developments are
evaluated to ensure their residents’ parks and recreation needs are met.
Using a level of service standard of 10.5 acres per 1,000 residents, Stoughton currently maintains a surplus of 148.4 acres of parkland that is expected to
remain through 2040 even with projected population growth. In 2050, with an anticipated population of 16,759, the demand for parkland would be 176
acres. If the city’s current amount of parkland remained at 286.7 acres, there would still be a surplus of 110.7 acres in 2050.
Planned Parks in Development:
◊ Standard Legacy Park (2026)
• The second proposed neighborhood park within the 51 West Subdivision
• Will be located on former farmland west of 51 on a five -acre lot
• Incorporates both active and passive recreation opportunities, including an accessible
playground, basketball and pickleball courts, multi -use paved paths, and three multi -
purpose athletic fields.
DRAFTDRAFT
Utilities & Community Facilities | 135
◊ Racetrack Park Expansion (2028 -2031)
• Master Plan for the expansion was approved in 2021
• Plans include the addition of two baseball parks, a second concession stand, and a park
shelter.
• Other improvements will be the expansion of the south parking lot, covered dugouts,
improved seating with wheelchair -accessible spaces, additional restrooms, a loop trail, new
lighting, replacement of the current concession stand, and additional parking lot expansion.
◊ Tee Naasak Park
• Proposed neighborhood park within the Kettle Park West Subdivision
• Will be located on a ten -acre site on the western side of Stoughton, just north of Highway
138.
• Will include a playground area, multi -sport court, open green space, a bike pump track, a
bike skills area, a woodland bike path, a sledding hill, a paved multi -use path, mown prairie
walking paths, and a parking lot.
◊ Yahara River Park
• Intended to repurpose the Yahara River Dam site into the first free, public river recreation
park in Wisconsin.
• Proposed elements include a series of five drop pools for tubers and kayakers, a natural
“surf wave” feature for kayakers, open green space for fishing and picnicking on the site of
the current millpond, and a riverside pedestrian trail.
• Currently, there are limited opportunities for river access in the project area; there are no
launch points for watercraft, no pedestrian trails, and the existing site conditions do not
encourage visitors to spend much time near the river. With the construction of this park, the
city seeks to transform this site into an active, thriving, regional recreation destination for
paddlers, anglers, bikers, and pedestrians.
Figure 37. Photo space
for Racetrack Park
Figure 38. Photo space
for Tee Naasak Park
DRAFTDRAFT
136 | Stoughton Comp Plan_Draft
◊ Teigen Farm Park
• Proposed neighborhood park within the Magnolia Springs Subdivision
• Will be located on former farmland, west of South 4th Street on a four -acre site
• Will include walking trails around a delineated wetland area, a multi -use trail, an open -air
shelter, a natural play area, open green space, stormwater management pond, and native
prairie plantings.
◊ Stoughton Trailers Community Park (Master Plan approved May 2026)
• The park will include open green space and outdoor amphitheater seating, shelters, walking
paths and seating areas, three U15 -18 soccer fields, four U12 -14 soccer fields, a multi -use
pavilion with restroom and concessions, eight pickleball courts, a basketball court, a kayak
launch, a “destination playground,” a challenge course, and a possible future park path and
aquatic center.
◊ “To Be Named” Park at the RDA Riverfront Development Site
• Currently in the early stages of planning
DRAFTDRAFT
Utilities & Community Facilities | 137
Planned Trails in Development:
◊ South Loop Trail: off -road gravel path between Isham St. and the Magnolia Springs Subdivision (completed as of 2026)
◊ Jefferson Street Pedestrian Bridge replacement (planned for 2026)
◊ Highway 51 Underpass: construction of a pedestrian underpass on 51 at Rutland -Dunn Townline Road has begun (2026)
◊ North Loop Trail: off -road paved path along Lincoln Ave to the STI Development/Stoughton Trailers Community Park (engineering planned for 2027
with construction in 2028)
◊ Ridge St. to Cooper’s Causeway: off -road paved path connecting Ridge St. to Cooper’s Causeway (no timeline)
This Comprehensive Plan calls for the provision of neighborhood park facilities in carefully considered locations within each of the Future Neighborhood
areas. Map __ depicts the six locations recommended in the CORP for future parks. These include the following locations:
◊ The northwest corner of the city - west of USH 51, just south of the CTH B intersection and north of Rutland -Dunn Townline Road.
◊ Ehle property on the northeast side
◊ Racetrack Park expansion (planned for 2028)
◊ At the Jefferson Street pedestrian bridge on the east side of the river near Water Street
◊ Along the river between Water Street and Fourth Street (Uniroyal property)
◊ At the old powerhouse on the river at Fourth Street (RDA property)
Additionally, Map x depicts recommended general locations for other parks based on the Future Neighborhood areas defined in this Plan. Refinement
of these general location recommendations should be considered during the next update of the CORP . Such decisions will be finalized during the actual
subdivision platting process.
Trails are an important part of the system, with the Yahara River Trail serving as the City’s longest trail, spanning three miles along both sides of the
river and connected by on -street bike routes. Plans are in place to extend the trail to create a complete recreational loop and eventually link with a
county trail system that will connect Stoughton to Lake Kegonsa State Park, Fish Camp County Park, McFarland, and the Capital City Trail in Madison.
Additional trail opportunities include the Virgin Lake Trail on the west side of the city, which runs 0.8 miles between Jackson Street and Heggestad Park.
Viking County Park, the only Dane County -owned park in Stoughton, offers a dog park, multi -use trails, fishing areas, and a reservable shelter. Map x
depicts existing and future trails.
DRAFTDRAFT
138 | Stoughton Comp Plan_Draft
Parkland Dedication and Impact Fees
Impact fees are one -time charges imposed on new development to offset the cost of expanding public facilities and infrastructure necessitated by that
development. These fees are typically paid at the time of permit issuance and are non -refundable.
The City of Stoughton’s impact fees play a crucial role in supporting public amenities, especially parks and trails. By charging developers based on unit
type, the city ensures that the costs of growth are shared fairly and that community spaces grow in tandem with population increases. The purpose
of park -related impact fees is to ensure that as the City of Stoughton grows, residents continue to have adequate access to parks and trails, and that
existing recreational facilities are not overburdened by new development. These fees provide the city with the resources needed to plan for future
park expansions and recreational services without placing the financial burden solely on existing taxpayers. Additionally, the system offers flexibility to
developers by allowing them to either dedicate land for park use or pay a fee in lieu of dedication, helping maintain the city’s long -term commitment to
preserving and enhancing green space.
The city’s fee schedule can be found online at https://www.cityofstoughton.com/259/Licenses-Permits-Forms-Applications.
Cemeteries
The City of Stoughton owns and maintains two cemeteries: Riverside Cemetery and Wheeler Prairie Cemetery. Riverside Cemetery, located along the
Yahara River at the intersection of Milwaukee Street and South Page Street, serves as a centrally located and historic resting place within the community.
Wheeler Prairie Cemetery, situated about seven miles southeast of Stoughton in the Town of Dunkirk, offers a serene rural setting. The city is responsible
for both the upkeep of these cemeteries and the management of burial records, which have been fully digitized to allow efficient searches and improved
record keeping.
DRAFTDRAFT
Utilities & Community Facilities | 139
UTILITIES AND COMMUNITY FACILITIES TIMETABLE
Table 10. Timetable to Expand, Rehabilitate, or Create New Community Utilities or Facilities
City Utilities and Community
Facilities
Timeframe Initiatives
Water Supply Ongoing Ongoing distribution system upgrades; aligning water main replacements with USH
51 reconstruction from 2025-2029.
2045 (sooner if needed) Update Water Supply Service Area Plan.
Every 3-5 years Conduct Operational Study.
2050 Potential fifth production well and potential fourth storage facility.
Sanitary Sewer Service Ongoing Ongoing collection system upgrades; aligning sewer main replacements with USH 51
reconstruction from 2025-2029.
Every 3-5 years Conduct Operational Study.
2041 Wastewater Treatment Facility participation in Yahara WINS Adaptive Management
Program; Potential activated sludge modifications.
Electric Service Ongoing Ongoing distribution system upgrades.
Every 3-5 years Conduct Operational Study.
New/upgraded substations?
Stormwater Management Ongoing Participate in the Yahara WINS Adaptive Management Program.
Collect stormwater management utility fees and offer credits for improved practices.
Participate in Dane County’s Adopt-A-Storm-Drain program.
Participate in the Madison Area Municipal Stormwater Partnership.
Update Stormwater Pollution Prevention Plan.
Update Total Maximum Daily Loads (TMDL) for Total Phosphorus and Total
Suspended Solids Compliance Plan.
Senior Center There are no planned upgrades or expansions for the Senior Center at this time.
Youth Center There are no planned upgrades or expansions for the Youth Center at this time.
Public Library 2027 Planned Space Needs Study.
DRAFTDRAFT
140 | Stoughton Comp Plan_Draft
City Administration Ongoing Consider a Space Needs Study as City population approaches 15,000 – a typical
tipping point for expanded staff and meeting needs.
2027 Upgrades to current building including solar panels, roof replacement, new HVAC
system, and other renovations.
Utilities Administration 2027-2028 Construction planned for a new Stoughton Utilities administration building.
Public Safety Ongoing Evaluate space needs, feasibility, and potential location of new, shared public safety
building.
2028 Upgrades to current building including roof replacement and solar panels.
Fire & EMS Departments Ongoing Evaluate space needs, feasibility, and potential location of new, shared public safety
building.
DRAFTDRAFT
Utilities & Community Facilities | 141
Parks & Recreation 2026-2040 • Standard Legacy Park - complete second neighborhood park in 51 West Subdivision.
• Tee Naasak Park – develop neighborhood park within the Kettle Park West
subdivision.
• Expand Racetrack Park.
• Develop Yahara River Park.
• Teigen Farm Park – develop neighborhood park within the Magnolia Springs
Subdivision.
• Develop Stoughton Trailers Community Park.
• Develop “To Be Named” Park at the RDA Riverfront Development Site.
• Assess the feasibility of and potentially develop an aquatic center as part of
Stoughton Trailers Community Park.
• Replace the Jefferson Street Pedestrian Bridge.
• Complete construction of a pedestrian underpass on USH 51 at Rutland-Dunn
Towline Road.
• Complete North Loop Trail connecting Lincoln Ave to Stoughton Trailers Community
Park.
• Complete Ridge St. to Cooper’s Causeway off-road path.
• Complete the Yahara River Trail connection.
Ongoing Complete maintenance and upgrades to existing park and trail facilities. Implement
the recommendations of the CORP .
Update the CORP in 2029, 2034, 2039, 2044, and 2049.
Cemeteries Consider additional long-term site as part of a needs study in conjunction with area
congregations and surrounding towns.
Schools Highly dependent on pace and quantity of housing types and student yield factors.
The City will continue to work with the school district as new development occurs.
Recycling and Trash Services Ongoing Continue to contract with a private waste disposal company for collection service.
Sustainability Ongoing Implement the City’s Sustainability Plan and update as needed.
Other 2030 Building repairs for the RDA-owned old Powerhouse on the river.
DRAFTDRAFT
142 | Stoughton Comp Plan_Draft
Figure 39. Space for full -page map
DRAFTDRAFT
Utilities & Community Facilities | 143
Source: City of Stoughton website. First collected Oct 16, 2026.