RecordWell Data

October 12, 2026 Public Works, Sewer & Water Packet

City of Verona · Dane County · meeting of Oct 12, 2026 · Agenda packets

Open the original document More from City of Verona

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City of Verona 111 Lincoln Street Verona, WI 53593 (608) 845-6495 veronawi.gov PUBLIC WORKS, SEWER & WATER COMMITTEE- DATE: Monday October 12, 2026 TIME: 5:30 PM LOCATION: VERONA CITY HALL ROOM D122 111 LINCOLN STREET VERONA, WI 53593 1. Call to Order: 2. Roll: 3. Public Comment: 4. Approval of the Minutes: 5. Discussion and Possible Action: Project 2024-105 Mark Drive Reconstruction Ph 2. Pay request #4 Northwestern Stone LLC. 6. Discussion and Possible Action: Project 2022-107 Military Ridge State Trail Bridges-Paving. Pay request #1. Janke General Contractors. 7. Discussion and Possible Action: Request to reconsider recommendation to Council Action April 27, 2026, Related to South Main Street. 8. Staff Report: 9. Adjourn: Beth Tucker Long - Chairperson POSTED: October 8, 2026 POSTED: Verona City Hall Verona Public Library Miller’s Market All agendas are posted on the City website at: veronawi.gov WRITTEN COMMENTS: You can send comments to the Public Works, Sewer & Water Committee on any matter, either on or not on the agenda, by emailing bmanning@veronawi.gov or in writing to Public Works, Sewer & Water Committee, 410 Investment Court, Verona, WI, 53593. Notice: If you need an interpreter, materials in alternative formats, or other accommodation to access the meeting, please contact the City Clerk at (608) 845-6495 at least 48-hours preceding the meeting. Every reasonable effort will be made to accommodate your request. Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works, Sewer & Water Committee to gather information about a subject over which they have decision-making responsibility. The City Council and any other standing committees will not take formal action at this meeting. City of Verona 111 Lincoln Street Verona, WI 53593 (608) 845-6495 veronawi.gov PUBLIC WORKS, SEWER & WATER COMMITTEE- DATE: Monday September 28, 2026 TIME: 5:30 PM LOCATION: VERONA CITY HALL ROOM D122 111 LINCOLN STREET VERONA, WI 53593 1. Call to Order: Meeting called to order at 5:30 pm by Alder Beth Tucker Long. 2. Roll: Beth Tucker Long, Alejandro Hernandez, Chris Weiss, also present, Rick Eilertson -AE COM, Bryan Manning- Public Works Director, Mike Trotter- Assistant Public Work Director. 3. Public Comment: None. 4. Approval of the Minutes: Moved by Alder Weiss and seconded by Alder Hernandez to approve the minutes of the September 14th meeting. Motion passed 3-0. 5. Discussion and Possible Action: Project 2024-105 Mark Drive Reconstruction Phase 2, Pay request #3 Northwestern Stone LLC. Moved by Alder Weiss and seconded by Alder Hernandez to approve Project 2024-105 Mark Drive Reconstruction Phase 2 Pay request #3 Northwestern Stone for a sum not to exceed $ 380,435.10. Motion passed 3-0. 6. Discussion and Possible Action: Project 2026-105 N Marietta St and N Shuman St Reconstruction - Plympton/Shuman Intersection design alternatives. Staff presented design alternatives and discussed options. No action taken. 7. Staff Report: 8. Adjourn: Moved by Alder Weiss and seconded by Alder Hernandez to Adjourn at 6:06 pm. Motion Passed 3-0. Beth Tucker Long - Chairperson POSTED: September 24, 2026 POSTED: Verona City Hall Verona Public Library Miller’s Market All agendas are posted on the City website at: veronawi.gov WRITTEN COMMENTS: You can send comments to the Public Works, Sewer & Water Committee on any matter, either on or not on the agenda, by emailing bmanning@veronawi.gov or in writing to Public Works, Sewer & Water Committee, 410 Investment Court, Verona, WI, 53593. Notice: If you need an interpreter, materials in alternative formats, or other accommodation to access the meeting, please contact the City Clerk at (608) 845-6495 at least 48-hours preceding the meeting. Every reasonable effort will be made to accommodate your request. Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works, Sewer & Water Committee to gather information about a subject over which they have decision-making responsibility. The City Council and any other standing committees will not take formal action at this meeting. Meeting Date: Monday October 12, 2026 PW/S&W Committee Memo Page 1 / 1 Public Works/Sewer & Water Committee Listed below is an explanation of the items on the Public Works/Sewer & Water Committee agenda. Item (5) Discussion and Possible Action: Project 2024-105 Mark Drive Reconstruction Phase 2. Pay request #4 Northwestern Stone LLC. Memo: This pay application covers installation of storm sewer, sanitary sewer, and water main infrastructure, including hydrants and services. Staff inspected and verified the work and reviewed the pay application. Recommended Motion: Move to approve Project 2024-105 Mark Drive Reconstruction Phase 2 Pay request #4 Northwestern Stone for a sum not to exceed $ 394,048.68. Item (6) Discussion and Possible Action: Project 2022-107 Military Ridge State Trail Bridges-Paving. Pay request #1. Janke General Contractors. Memo: This pay application covers completed work and purchased materials. Staff inspected and verified the work and reviewed the application. Recommended Motion: Move to approve Project 2022-107 Military Ridge State Trail Bridges-Paving. Pay request #1. Janke General Contractors for a sum not to exceed $161,463.47. Item (7) Discussion and Possible Action: Request to reconsider recommendation to Council Action April 27, 2026, Related to South Main Street. Memo: (See attached TSC Appeal) Recommended Motion: Recommend request to reconsider recommendation to Council Action April 27, 2026, Related to South Main Street. Staff Report Streets Started speed hump install on Aspen, Curb & gutter/inlet repair, Asphalt patching, Street Sweeping, Started Fall leaf collection, Manhole repair. Utility Cleaning Sewers, Curb stop Repair, Water Samples, Working on Well 6 Heat Pump Well 5, Generator Start Up at Locust Lift Station, Fog Program, Fire Flow Testing, Manhole repairs. REQUEST AND CERTIFICATE FOR PAYMENT PROJECT: Military Ridge State Trail - Pedestrian Structures REQUEST NO.: 1 REQUEST DATE: 10/5/2026 OWNER: City of Verona CONTRACTOR: Janke General Contractors ENGINEER: Joe Jirsa City of Verona - Public Works 1224 Mount View Lane City of Verona - Public Works 410 Investment Court Verona, WI 53593 Athens, WI 54411 410 Investment Court Verona, WI 53593 CHANGE ORDER SUMMARY Request is made for payment, as shown below, in connection Previously Approved Change Orders: Additions Deductions with the contract. Continuation Sheet is attached. The present status of the contract is as follows: ORIGINAL CONTRACT SUM:……………………………………………..….. $ 1,607,360.37 NET CHANGE BY CHANGE ORDERS:…………………………………………..$ - CONTRACT SUM TO DATE:………………………………………………………$ 1,607,360.37 Current Change Order Additions Deductions TOTAL COMPLETED TO DATE:…………………..……………………………..$ 169,961.55 RETAINAGE %:....... 5.00% RETAINAGE:….................................. $ 8,498.08 Net Change by Change Orders: $ - $ - The undersigned CONTRACTOR certifies that (1) all previous progress payments received from OWNER on account of work completed under the contract referred to above have been applied to discharge in full, all obligations of CONTRACTOR incurred in connection with the work covered by prior applications for payment numbered _1_ through _1_ inclusive (none); and (2) title to all materials and equipment incorporated in said work or otherwise listed in or covered by this application for payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests, and encumbrances (except such as covered by Bond acceptable to OWNER). TOTAL EARNED LESS RETAINAGE:……………….………………………….. $ 161,463.47 LESS PREVIOUS CERTIFICATES FOR PAYMENT:……………................ CURRENT PAYMENT DUE:………………………………………………………….$ 161,463.47 Submitted by Contractor: Date: I herby certify that I have reviewed the work and that to the best of my knowledge and belief, the quantities shown in this estimate are correct. This application is in conformance with the Contract Documents, therefore, I recommend payment of Recommended by Engineer: Date: Approved by Owner: Date: Military Ridge State Trail - Pedestrian Structures - PAR 01 -10.5.26.xlsx Mike Rausch 10/5/2026 CONTINUATION SHEET REQUEST AND CERTIFICATE FOR PAYMENT -CONTRACTOR'S SIGNED CERTIFICATE IS ATTACHED Item No. (A) Description of Work (B) Unit of Measure Scheduled Quantity (C) Unit Price (D) Item Total (C * D) Work Completed Total Completed To Date (E + F) Percent Complete Previous Requests (E) This Request (F) Quantity Amount Quantity Amount Quantity Amount 1 Clearing STA 5 $ 2,525.00 $ 12,625.00 $ - 3.00 $ 7,575.00 3.00 $ 7,575.00 60.00% 2 Grubbing STA 5 $ 2,170.00 $ 10,850.00 $ - 2.00 $ 4,340.00 2.00 $ 4,340.00 40.00% 3 Removing Structure (structure) (01. NR-13-32) EACH 1 $ 42,956.00 $ 42,956.00 $ - $ - 0.00 $ - 0.00% 4 Removing Structure (structure) (02. NR-13-33) EACH 1 $ 34,000.00 $ 34,000.00 $ - 0.90 $ 30,600.00 0.90 $ 30,600.00 90.00% 5 Removing Structure (structure) (03. NR-13-34) EACH 1 $ 31,372.00 $ 31,372.00 $ - $ - 0.00 $ - 0.00% 6 Removing Concrete Pavement SY 462 $ 56.50 $ 26,103.00 $ - $ - 0.00 $ - 0.00% 7 Removing Storm Sewer (size) (01. 8-INCH) LF 15 $ 38.20 $ 573.00 $ - $ - 0.00 $ - 0.00% 8 Removing Storm Sewer (size) (02. 15-INCH) LF 16 $ 43.15 $ 690.40 $ - $ - 0.00 $ - 0.00% 9 Removing Storm Sewer (size) (03. 36-INCH) LF 24 $ 65.45 $ 1,570.80 $ - 24.00 $ 1,570.80 24.00 $ 1,570.80 100.00% 10 Removing Storm Sewer (size) (04. 42-INCH) LF 22 $ 71.45 $ 1,571.90 $ - $ - 0.00 $ - 0.00% 11 Excavation for Structures Bridges (structure) (01. NR-13-32) EACH 1 $ 11,985.00 $ 11,985.00 $ - $ - 0.00 $ - 0.00% 12 Excavation for Structures Bridges (structure) (02. NR-13-34) EACH 1 $ 11,200.00 $ 11,200.00 $ - $ - 0.00 $ - 0.00% 13 Excavation for Structures Culverts (structure) (01. NR-13-33) EACH 1 $ 51,255.00 $ 51,255.00 $ - 0.90 $ 46,129.50 0.90 $ 46,129.50 90.00% 14 Backfill Structure Type A TON 322 $ 34.00 $ 10,948.00 $ - $ - 0.00 $ - 0.00% 15 Backfill Structure Type B TON 340 $ 34.00 $ 11,560.00 $ - $ - 0.00 $ - 0.00% 16 Base Aggregate Dense 1 1/4-Inch TON 183 $ 31.35 $ 5,737.05 $ - $ - 0.00 $ - 0.00% 17 Base Aggregate Dense 3-Inch TON 207 $ 30.80 $ 6,375.60 $ - $ - 0.00 $ - 0.00% 18 Breaker Run TON 125 $ 37.00 $ 4,625.00 $ - $ - 0.00 $ - 0.00% 19 Concrete Pavement 6-Inch SY 41 $ 159.00 $ 6,519.00 $ - $ - 0.00 $ - 0.00% 20 Concrete Pavement Approach Slab SY 64 $ 278.00 $ 17,792.00 $ - $ - 0.00 $ - 0.00% 21 Drilled Tie Bars EACH 2 $ 90.50 $ 181.00 $ - $ - 0.00 $ - 0.00% 22 Concrete Masonry Bridges CY 74 $ 1,647.00 $ 121,878.00 $ - $ - 0.00 $ - 0.00% 23 Protective Surface Treatment SY 309 $ 4.50 $ 1,390.50 $ - $ - 0.00 $ - 0.00% 24 Concrete Masonry Culverts CY 15 $ 1,585.00 $ 23,775.00 $ - $ - 0.00 $ - 0.00% 25 Precast Concrete Box Culvert (ft X ft) (01. 8 FT x 4 FT) LF 128 $ 1,100.00 $ 140,800.00 $ - 32.00 $ 35,200.00 32.00 $ 35,200.00 25.00% 26 Bar Steel Reinforcement HS Structures LB 5290 $ 2.00 $ 10,580.00 $ - $ - 0.00 $ - 0.00% 27 Bar Steel Reinforcement HS Coated Structures LB 6870 $ 2.00 $ 13,740.00 $ - $ - 0.00 $ - 0.00% 28 Prefabricated Steel Truss Pedestrian Bridge LRFD (structure) (01. NR-13-32) EACH 1 $ 127,700.00 $ 127,700.00 $ - $ - 0.00 $ - 0.00% 29 Prefabricated Steel Truss Pedestrian Bridge LRFD (structure) (02. NR-13-34) EACH 1 $ 97,545.00 $ 97,545.00 $ - $ - 0.00 $ - 0.00% 30 Rubberized Membrane Waterproofing SY 31 $ 34.00 $ 1,054.00 $ - $ - 0.00 $ - 0.00% 31 Concrete Collars for Pipe EACH 4 $ 1,310.00 $ 5,240.00 $ - $ - 0.00 $ - 0.00% 32 Piling Steel HP 10-Inch X 42 Lb LF 850 $ 82.25 $ 69,912.50 $ - $ - 0.00 $ - 0.00% 33 Riprap Medium CY 208 $ 106.00 $ 22,048.00 $ - $ - 0.00 $ - 0.00% 34 Riprap Heavy CY 305 $ 106.00 $ 32,330.00 $ - $ - 0.00 $ - 0.00% 35 Relaid Storm Sewer 36-Inch LF 24 $ 84.00 $ 2,016.00 $ - $ - 0.00 $ - 0.00% 36 Pipe Underdrain Wrapped 6-Inch LF 184 $ 14.60 $ 2,686.40 $ - $ - 0.00 $ - 0.00% 37 Maintenance and Repair of Haul Roads (project) (01. 2022-107) EACH 1 $ 903.00 $ 903.00 $ - $ - 0.00 $ - 0.00% 38 Mobilization EACH 1 $ 165,000.00 $ 165,000.00 $ - 0.20 $ 33,000.00 0.20 $ 33,000.00 20.00% 39 Water MGAL 6 $ 18.75 $ 112.50 $ - $ - 0.00 $ - 0.00% 40 Topsoil SY 3155 $ 11.25 $ 35,493.75 $ - $ - 0.00 $ - 0.00% 41 Mulching SY 631 $ 0.70 $ 441.70 $ - $ - 0.00 $ - 0.00% 42 Silt Fence LF 2102 $ 2.25 $ 4,729.50 $ - 100.00 $ 225.00 100.00 $ 225.00 4.76% 43 Silt Fence Maintenance LF 2102 $ 0.01 $ 21.02 $ - $ - 0.00 $ - 0.00% 44 Mobilizations Erosion Control EACH 12 $ 250.00 $ 3,000.00 $ - 1.00 $ 250.00 1.00 $ 250.00 8.33% 45 Mobilizations Emergency Erosion Control EACH 9 $ 250.00 $ 2,250.00 $ - $ - 0.00 $ - 0.00% 46 Erosion Mat Urban Class I Type B SY 2968 $ 1.85 $ 5,490.80 $ - $ - 0.00 $ - 0.00% 47 Erosion Mat Class II Type A SY 188 $ 2.45 $ 460.60 $ - $ - 0.00 $ - 0.00% 48 Turbidity Barriers SY 74 $ 40.00 $ 2,960.00 $ - $ - 0.00 $ - 0.00% 49 Inlet Protection Type C EACH 2 $ 75.00 $ 150.00 $ - $ - 0.00 $ - 0.00% 50 Culvert Pipe Checks EACH 50 $ 20.00 $ 1,000.00 $ - $ - 0.00 $ - 0.00% 51 Tracking Pads EACH 5 $ 1,900.00 $ 9,500.00 $ - $ - 0.00 $ - 0.00% 52 Rock Bags EACH 75 $ 15.00 $ 1,125.00 $ - 16.00 $ 240.00 16.00 $ 240.00 21.33% 53 Fertilizer Type B CWT 1 $ 100.00 $ 100.00 $ - $ - 0.00 $ - 0.00% 54 Seeding Mixture No. 20 LB 128 $ 13.00 $ 1,664.00 $ - $ - 0.00 $ - 0.00% 55 Seeding Mixture No. 40 LB 18 $ 22.00 $ 396.00 $ - $ - 0.00 $ - 0.00% 56 Seeding Temporary LB 88 $ 3.00 $ 264.00 $ - $ - 0.00 $ - 0.00% 57 Seed Water MGAL 65 $ 30.00 $ 1,950.00 $ - $ - 0.00 $ - 0.00% 58 Signs Type II Reflective F SF 4 $ 25.00 $ 100.00 $ - $ - 0.00 $ - 0.00% 59 Moving Signs Type II EACH 7 $ 100.00 $ 700.00 $ - $ - 0.00 $ - 0.00% 60 Removing Signs Type II EACH 20 $ 35.00 $ 700.00 $ - $ - 0.00 $ - 0.00% 61 Moving Small Sign Supports EACH 7 $ 100.00 $ 700.00 $ - $ - 0.00 $ - 0.00% 62 Field Office Type B EACH 1 $ 5,390.00 $ 5,390.00 $ - $ - 0.00 $ - 0.00% 63 Traffic Control Drums DAY 5780 $ 0.28 $ 1,618.40 $ - $ - 0.00 $ - 0.00% 64 Traffic Control Barricades Type III DAY 4040 $ 0.40 $ 1,616.00 $ - $ - 0.00 $ - 0.00% 65 Traffic Control Warning Lights Type A DAY 5600 $ 0.15 $ 840.00 $ - $ - 0.00 $ - 0.00% 66 Traffic Control Signs DAY 18620 $ 0.35 $ 6,517.00 $ - $ - 0.00 $ - 0.00% 67 Traffic Control Covering Signs Type II EACH 4 $ 25.00 $ 100.00 $ - $ - 0.00 $ - 0.00% Military Ridge State Trail - Pedestrian Structures - PAR 01 -10.5.26.xlsx 68 Temporary Marking Crosswalk Removable Tape 6-Inch LF 102 $ 1.55 $ 158.10 $ - $ - 0.00 $ - 0.00% 69 Traffic Control EACH 1 $ 6,000.00 $ 6,000.00 $ - 0.25 $ 1,500.00 0.25 $ 1,500.00 25.00% 70 Temporary Pedestrian Curb Ramp DAY 120 $ 17.00 $ 2,040.00 $ - $ - 0.00 $ - 0.00% 71 Temporary Pedestrian Detectable Warning Field SF 128 $ 2.00 $ 256.00 $ - $ - 0.00 $ - 0.00% 72 Temporary Pedestrian Barricade LF 262 $ 5.05 $ 1,323.10 $ - $ - 0.00 $ - 0.00% 73 Temporary Audible Message Devices DAY 1840 $ 3.25 $ 5,980.00 $ - $ - 0.00 $ - 0.00% 74 Geotextile Type C SY 250 $ 3.30 $ 825.00 $ - $ - 0.00 $ - 0.00% 75 Geotextile Type DF Schedule A SY 124 $ 2.65 $ 328.60 $ - $ - 0.00 $ - 0.00% 76 Geotextile Type HR SY 1027 $ 3.45 $ 3,543.15 $ - $ - 0.00 $ - 0.00% 77 Construction Staking Subgrade LF 540 $ 2.00 $ 1,080.00 $ - $ - 0.00 $ - 0.00% 78 Construction Staking Base LF 540 $ 3.50 $ 1,890.00 $ - $ - 0.00 $ - 0.00% 79 Construction Staking Structure Layout (structure) (01. NR-13-032) EACH 1 $ 4,500.00 $ 4,500.00 $ - $ - 0.00 $ - 0.00% 80 Construction Staking Structure Layout (structure) (02. NR-13-033) EACH 1 $ 5,500.00 $ 5,500.00 $ - 0.50 $ 2,750.00 0.50 $ 2,750.00 50.00% 81 Construction Staking Structure Layout (structure) (03. NR-13-034) EACH 1 $ 4,000.00 $ 4,000.00 $ - $ - 0.00 $ - 0.00% 82 Construction Staking Supplemental Control (project) (01. 2022-107) EACH 1 $ 8,000.00 $ 8,000.00 $ - $ - 0.00 $ - 0.00% 83 Construction Staking Slope Stakes LF 540 $ 4.00 $ 2,160.00 $ - $ - 0.00 $ - 0.00% 84 Crack and Damage Survey EACH 1 $ 10,000.00 $ 10,000.00 $ - $ - 0.00 $ - 0.00% 85 Special (01. Unstable Trench Bottom and Crushed Stone Stabilization (Sanitary Sewer)) CY 14 $ 155.00 $ 2,170.00 $ - $ - 0.00 $ - 0.00% 86 Special (01. Trail Reconstruction for Site Access NR-13-032) EACH 1 $ 6,957.00 $ 6,957.00 $ - $ - 0.00 $ - 0.00% 87 Special (02. Trail Reconstruction for Site Access NR-13-033) EACH 1 $ 6,625.00 $ 6,625.00 $ - $ - 0.00 $ - 0.00% 88 Special (03. Trail Reconstruction for Site Access NR-13-034) EACH 1 $ 6,325.00 $ 6,325.00 $ - $ - 0.00 $ - 0.00% 89 Special (04. Salvage and Reinstall Rectangular Rapid Flashing Beacon Units) EACH 1 $ 2,890.00 $ 2,890.00 $ - $ - 0.00 $ - 0.00% 90 Special (05. Connection to Existing Manhole) EACH 2 $ 1,760.00 $ 3,520.00 $ - $ - 0.00 $ - 0.00% 91 Special (06. Relaid Apron Endwall) EACH 1 $ 1,415.00 $ 1,415.00 $ - $ - 0.00 $ - 0.00% 92 Special (07. Temporary Water Diversion (STA 163+97.15)) EACH 1 $ 26,325.00 $ 26,325.00 $ - 0.25 $ 6,581.25 0.25 $ 6,581.25 25.00% 93 Special (08. Grading and Shaping Trail NR-13-032) EACH 1 $ 13,410.00 $ 13,410.00 $ - $ - 0.00 $ - 0.00% 94 Special (09. Grading and Shaping Trail NR-13-033) EACH 1 $ 51,705.00 $ 51,705.00 $ - $ - 0.00 $ - 0.00% 95 Special (10. Grading and Shaping Trail NR-13-034) EACH 1 $ 2,055.00 $ 2,055.00 $ - $ - 0.00 $ - 0.00% 96 Special (11. Construction Staking Concrete Pad) EACH 1 $ 2,000.00 $ 2,000.00 $ - $ - 0.00 $ - 0.00% 97 Special (02. Fence Timber 4.5-FT) LF 288 $ 84.00 $ 24,192.00 $ - $ - 0.00 $ - 0.00% 98 Special (03. Decorative Fence 4.5-FT) LF 65 $ 568.00 $ 36,920.00 $ - $ - 0.00 $ - 0.00% 99 Special (04. Replacement Sanitary Sewer 12-Inch) LF 123 $ 130.00 $ 15,990.00 $ - $ - 0.00 $ - 0.00% 100 Special (01. Dewatering) LS 1 $ 7,236.00 $ 7,236.00 $ - $ - 0.00 $ - 0.00% 102 Special (01. Insulation) SF 431 $ 5.00 $ 2,155.00 $ - $ - 0.00 $ - 0.00% 103 Special (01. Trench Backfill (Sanitary Sewer)) TF 123 $ 32.00 $ 3,936.00 $ - $ - 0.00 $ - 0.00% 104 Special (01. Excavation, Hauling, and Disposal of Creosote Contaminated Soil TON 364 $ 148.00 $ 53,872.00 $ - $ - 0.00 $ - 0.00% ALT 1 Bid Alternative 1 Piling Steel HP 10-Inch X 42 Lb LF 600 $ 86.00 $ 51,600.00 $ - $ - 0.00 $ - 0.00% $ - $ - $ - 0.00 $ - Original Contract Total: $ 1,607,360.37 $ - $ 169,961.55 $ 169,961.55 Change Orders REQUEST AND CERTIFICATE FOR PAYMENT -CONTRACTOR'S SIGNED CERTIFICATE IS ATTACHED Item No. (A) Description of Work (B) Unit of Measure Scheduled Quantity (C) Unit Price (D) Item Total (C * D) Work Completed Total Completed To Date (E + F) Percent Complete Previous Requests (E) This Request (F) Quantity Amount Quantity Amount Quantity Amount $ - $ - $ - 0.00 $ - $ - $ - $ - 0.00 $ - $ - $ - $ - 0.00 $ - $ - $ - $ - 0.00 $ - $ - $ - $ - 0.00 $ - $ - $ - $ - 0.00 $ - $ - $ - $ - 0.00 $ - $ - $ - $ - 0.00 $ - $ - $ - $ - 0.00 $ - Subtotal - Change Orders: $ - $ - $ - $ - Project Total With Change Order: $ 1,607,360.37 $ - $ 169,961.55 $ 169,961.55 Military Ridge State Trail - Pedestrian Structures - PAR 01 -10.5.26.xlsx CITY OF VERONA 111 Lincoln Street Verona, WI 53590-1520 Jamie J. Aulik, City Administrator Phone: (608) 848-9942 Email: jaulik@veronawi.gov MEMORANDUM To: Public Works, Water and Sewer Committee and Verona Common Council From: Jamie J. Aulik, City Administrator Bryan Manning, Public Works Director Date: October 7, 2026 Re: Request to Reconsider April 27, 2026 Council Action Related to South Main Street Background The Common Council previously considered an appeal of the Traffic Safety Committee’s (the Traffic Safety Committee or TSC is a multi-discipline technical committee comprised of AECOM Traffic Engineers, Public Works Director, Assistant, and Construction Engineers, Planning, Police, and Administration) decision regarding pedestrian and bicycle safety on the eastern side of South Main Street between the Badger Mill Creek bridge and Melody Lane. The original request was brought forward because this segment of South Main Street does not have a sidewalk or designated pedestrian/bicycle facility on the east side of the roadway. The roadway also includes a hill and curve between Locust Street and Melody Lane, creating limited sight distance. These conditions are particularly concerning for residents, including children, who may walk or bicycle to school, Fireman’s Park, and other destinations. The TSC previously considered the request and denied it. The TSC’s decision was based primarily on the fact that the proposed improvements would require capital expenditures that were not included in the current budget and that infrastructure investments of this nature should generally be evaluated through the City’s normal capital planning and budget prioritization process. The matter was subsequently appealed to the Public Works, Sewer and Water Committee on April 27, 2026. At their meeting, they contemplated investigating a striped bike lane with temporary delineator posts. The Common Council later voted to overturn the TSC decision and directed that a painted bike lane be installed on the east side of South Main Street between the Badger Mill Creek Bridge and Melody Lane. Staff’s Current Concern To be clear, Staff does not believe the current configuration of this area is an adequate long- term solution and the TSC members remain concerned about pedestrian and bicycle safety in this area. However, after further consideration of the proposed configuration, Staff do not believe that placing pedestrians and bicyclists within the existing roadway, separated from moving vehicles primarily by paint and temporary delineator posts, is a sufficiently safe solution for this particular location. Staff’s concern is that the proposed interim solution may create a false sense of security while placing pedestrians and bicyclists immediately adjacent to moving traffic in a location with known visibility limitations. Delineator posts provide visual separation, but they are not a substantial physical barrier between a pedestrian and a motor vehicle. In this location, staff does not believe that distinction should be minimized. The physical characteristics of South Main Street are also important. This is an older roadway that was not designed around today’s expectations for pedestrian and bicycle facilities. The relevant portion of the roadway includes a curve and hill that limit visibility. Rather than providing a separated sidewalk, trail, or other dedicated facility, the proposed approach would essentially repurpose a portion of the existing roadway and place pedestrians and bicyclists immediately adjacent to moving traffic. There is also a practical concern with the proposed use of temporary delineators. Delineators are considered break away barriers meaning that a vehicle can drive through and over them instead of bouncing back such as a guard rail or a sidewalk curb. The temporary delineators' posts would need to be removed for winter operations. Consequently, the proposed solution would not actually provide consistent protection throughout the year. The City would effectively be establishing a pedestrian facility that changes substantially depending upon the season. The Existing Roadway Is the Problem Staff recognize the frustration with the current configuration and understand the desire to provide an immediate solution. The City should not dismiss the legitimate concern simply because the roadway was constructed many years ago under different standards and expectations. At the same time, we should be careful not to confuse doing something with doing something safe. The absence of a sidewalk or dedicated pedestrian facility is a deficiency in the existing roadway. That deficiency does not necessarily mean that converting a portion of the roadway into a pedestrian facility is the appropriate interim solution. In our view, the better approach is to acknowledge that this portion of South Main Street presents a difficult infrastructure problem, note it, and in the longer term, when major road maintenance occurs on that section of South Main Street pursue a solution that provides pedestrians with meaningful separation from moving traffic. Staff Recommendation Staff recommend that the Common Council reconsider its April 27, 2026 action and not proceed with installation of the proposed painted bike lane/delineator configuration.

Source: City of Verona website. First collected Oct 16, 2026.