September 28, 2026 - Public Works, Sewer & Water Committee Packet
City of Verona · Dane County · meeting of Sep 28, 2026 · Agenda packets
Open the original document More from City of Verona
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Verona
111 Lincoln Street
Verona, WI 53593
(608) 845-6495
veronawi.gov
PUBLIC WORKS, SEWER & WATER COMMITTEE-
DATE: Monday September 28, 2026 TIME: 5:30 PM
LOCATION: VERONA CITY HALL
ROOM D122
111 LINCOLN STREET
VERONA, WI 53593
1. Call to Order:
2. Roll:
3. Public Comment:
4. Approval of the Minutes:
5. Discussion and Possible Action: Project 2024-105 Mark Drive Reconstruction Phase 2,
Pay request #3 Northwestern Stone LLC.
6. Discussion and Possible Action: Project 2026-105 N Marietta St and N Shuman St
Reconstruction - Plympton/Shuman Intersection design alternatives.
7. Staff Report:
8. Adjourn:
Beth Tucker Long - Chairperson
POSTED: September 24, 2026
POSTED: Verona City Hall
Verona Public Library
Miller’s Market
All agendas are posted on the City website at: veronawi.gov
WRITTEN COMMENTS: You can send comments to the Public Works, Sewer & Water Committee on any matter, either on or not on the
agenda, by emailing bmanning@veronawi.gov or in writing to Public Works, Sewer & Water Committee, 410 Investment Court, Verona, WI,
53593.
Notice: If you need an interpreter, materials in alternative formats, or other accommodation to access the meeting, please contact the City
Clerk at (608) 845-6495 at least 48-hours preceding the meeting. Every reasonable effort will be made to accommodate your request.
Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works, Sewer & Water Committee to
gather information about a subject over which they have decision-making responsibility. The City Council and any other standing
committees will not take formal action at this meeting.
City of Verona
111 Lincoln Street
Verona, WI 53593
(608) 845-6495
veronawi.gov
PUBLIC WORKS, SEWER & WATER COMMITTEE-
DATE: Monday, September 14, 2026 TIME: 5:30 PM
LOCATION: VERONA CITY HALL
ROOM D122
111 LINCOLN STREET
VERONA, WI 53593
1. Call to Order: Meeting called to order at 5:30 pm by Alder Beth Tucker Long.
2. Roll: Beth Tucker Long, Alejandro Hernandez (remote), Chris Weiss, also present, Rick Eilertson -AE
COM, Bryan Manning- Public Works Director, Mike Trotter- Assistant Public Work Director.
3. Public Comment: None.
4. Approval of the Minutes: Moved by Alder Weiss and seconded by Alder Tucker Long to approve the
minutes of the August 24th meeting. Motion passed 3-0.
5. Discussion and Possible Action: Project 2024-105 Mark Drive Reconstruction Phase 1 Change
Order #2 Moved by Alder Weiss and seconded Alder Hernandez to approve Project 2024-105 Mark
Drive Reconstruction Phase 1 Change Order #2 James Peterson and Sons Inc. for a sum not to exceed
$8,639.62. Motion passed 3-0.
6. Discussion and Possible Action: Verona Stormwater Utility Credit Application Moved by Alder
Tucker Long and seconded by Alder Weiss to adopt and implement the City of Verona Stormwater
Utility Credit Application Form. Motion passed 3-0.
Moved by Alder Tucker Long and seconded by Alder Weiss to amend Item 6 to recommend approval of
the Verona Stormwater Utility Credit Application to the Common Council. Motion passed 3-0.
7. Discussion and Possible Action: Verona Sugar River Pledge Form Moved by Alder Tucker Long and
seconded by Alder Weiss to recommend adoption to the common council, the City of Verona Sugar
River Supporter Program and Application Form with change to site drop off address location. Motion
passed 3-0.
8. Staff Report:
9. Adjourn: Moved by Alder Weiss and seconded by Alder Hernandez to Adjourn at 6:07 pm.
Motion Passed 3-0.
Beth Tucker Long - Chairperson
POSTED: September 10, 2026
POSTED: Verona City Hall
Verona Public Library
Miller’s Market
All agendas are posted on the City website at: veronawi.gov
WRITTEN COMMENTS: You can send comments to the Public Works, Sewer & Water Committee on any matter, either on or not on the
agenda, by emailing bmanning@veronawi.gov or in writing to Public Works, Sewer & Water Committee, 410 Investment Court, Verona, WI,
53593.
Notice: If you need an interpreter, materials in alternative formats, or other accommodation to access the meeting, please contact the City
Clerk at (608) 845-6495 at least 48-hours preceding the meeting. Every reasonable effort will be made to accommodate your request.
Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works, Sewer & Water Committee to
gather information about a subject over which they have decision-making responsibility. The City Council and any other standing
committees will not take formal action at this meeting.
Meeting Date: Monday September 28, 2026
PW/S&W Committee Memo
Page 1 / 1
Public Works/Sewer & Water Committee
Listed below is an explanation of the items on the Public Works/Sewer & Water Committee
agenda.
Item (5) Discussion and Possible Action: Project 2024-105 Mark Drive Reconstruction
Phase 2, Pay request #3 Northwestern Stone LLC.
Memo:
This pay application is for work that was performed installing storm sewer, sanitary, and
water main with hydrants and services. The work and pay application were inspected,
verified, and reviewed by staff.
Recommended Motion:
Move to approve Project 2024-105 Mark Drive Reconstruction Phase 2 Pay request #3
Northwestern Stone for a sum not to exceed $ 380,435.10.
Item (6) Discussion and Possible Action: Project 2026-105 N Marietta St and N Shuman
St Reconstruction - Plympton/Shuman Intersection design alternatives.
Memo: The attached exhibit shows existing topography in light gray, proposed linework in
black, and alternative curb-flange radii in color for discussion. The intersection is currently
configured as a three-way stop.
Recommended Motion:
Staff Report
Streets
Curb/gutter and inlet repair, Mowing, Street sign work, Street painting, Asphalt repair
Utility
Utility Locates, Meter installs, Flow tests, Sewer cleaning, Manhole rehab, Water main break
(Edward and Todd)
Water Samples, Well maintenance / cleaning
GUYPOSTGUYGUYA/C
G GG G G G
G G G
SAN
SAN
SAN
SAN
SAN
SS
SS
SS
WSANSANSANSAN
SSG G
G GOH
OH
OH
OHOHOHOHOHOH
W
W
W
W W W
W W W W
OH
OH
OH
OH
OH
OH WVWVWVSANSANGUYGVT
E
E
E
E
E
IP58953
IP58954
IP58955
IP58959
IP58960
IP58961 14
115
305+00 PLYM306+00 PLYM 307+00 PLYM
EP: 307+00.00 PLYM
202+00 SHU
203+00 SHU
204+00 SHU
PI: 202+67.57 SHU
PI: 203+36.55 SHU
EX RADIUS = ~50 FEET30-FT ALT.20-FT ALT. 1 (red)no taper
20-FT ALT. 2 (teal) w/ taper
15-FT PROPOSED
15-FT PROPOSED
1 SHUMAN AND PLYMPTONINTERSECTION ALTERNATIVESCITY OF VERONA
2026-1059/25/2026(INSERT)(INSERT)
G:\Verona\26058-000 N Marietta St and N Shuman St\Civil 3D\SheetsPlan\other\Intersection alts.dwg8/28/2026 10:20:14 AM
N MARIETTA ANDN SHUMANRECONSTRUCTION
1 IN:20 FT
© PROPERTY OF KLENGINEERING, INC. NOT TOBE USED FOR ANY OTHERPROJECT WITHOUT WRITTENAUTHORIZATION OFKL ENGINEERING.
MADISON | GREEN BAY | MENOMONIE | GERMANTOWN5400 KING JAMES WAY, SUITE 200MADISON, WI 53719608-663-1218, klengineering.com[A] Better Experience
ISSUE DATE:DESIGNED BY:CHECKED BY:PROJECT NO.
PROJECT:
DATE:DESCRIPTIONNO.ISSUANCES / REVISIONS:
PLOT DATE:FILE:
PLOT SCALE:(INSERT)(INSERT)
STOPR1-130"X30"
STOPR1-130"X30"
STOPR1-130"X30"
PLYMPTON STREET
NORTH SHUMAN STREET
Source: City of Verona website. First collected Oct 16, 2026.