Packet
City of Verona · Dane County · meeting of Aug 3, 2026 · Agenda packets
Open the original document More from City of Verona
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF VERONA
111 Lincoln Street
Verona, WI 53593
(608) 845-6495
veronawi.gov
PLAN COMMISSION
DATE: MONDAY, AUGUST 3, 2026 TIME: 6:30 PM
LOCATION: COUNCIL CHAMBERS
CITY HALL
111 LINCOLN STREET
VERONA, WI 53593
Call To Order
Roll Call
Public Comment
Minutes
Approval of minutes from July 6, 2026 Plan Commission meeting.
2026-07- 06 PLAN COMMISSION MINUTES.PDF
1162 Laser Street, Suites 104 - 108
Public Hearing– Conditional use permit review for a fitness and entertainment facility greater than 10,000 square feet and less than 49,999 square feet located at 1162 Laser Street.
a. Discussion & Possible Action – Conditional use permit for a fitness and entertainment facility greater than 10,000 square feet and less than 49,999 square feet located at 1162 Laser Street.
5. 1162 LASER STREET - CUP.PDF
Zoning Text Amendment
Public Hearing – Zoning text amendment to amend Section 13 -1-105(d): Institutional Uses to allow place of worship in additional zoning districts.
a. Discussion & Possible Action – Zoning text amendment to amend Section 13 -1-105(d): Institutional Uses to allow place of worship in additional zoning districts.
6. PI ZONING DISTRICT.PDF
Ardent Glen Subdivision
Discussion & Possible Action – Final plat review to create 80 lots and 5 outlots located in the Ardent Glen Subdivision west of Shady Oak Lane.
7. ARDENT GLEN - FINAL PLAT.PDF
2000 Range Trail
Discussion & Possible Action – Certified survey map review to create two (2) lots located at 2000 Range Trail in the Town of Verona.
8. 2000 RANGE TRAIL - CSM.PDF
201 South Main Street
Discussion & Possible Action – Initial review for approximately 5,000 square foot addition located at 201 South Main Street.
9. 201 S MAIN ST - INITIAL.PDF
Reports And Comments From The Planning Department
Reports and comments from the Planning Department
a. Update on development projects.
b. Next meeting:
i. Tuesday, September 8, 2026 at 6:30 p.m.
Adjournment
Luke Diaz - Chairperson
POSTED: July 29, 2026
POSTED: Verona City Hall
Verona Public Library
Miller ’s Market
All agendas are posted on the City website at: veronawi.gov
WRITTEN COMMENTS: You can send comments to the Plan Commission on any matter, either on or not on the agenda, by emailing lsivertsen@veronawi.gov or in writing to Plan Commission, 111 Lincoln Street, Verona, WI, 53593.
Notice: If you need an interpreter, materials in alternative formats, or other accommodation to access the meeting, please contact the City Clerk at (608) 845 -6495 at least 48 -hours preceding the meeting. Every reasonable effort will be made to accommodate your request.
Notice is hereby given that a majority of the City Council may be present at the meeting of the Plan Commission to gather information about a subject over which they have decision - making responsibility. This constitutes a meeting of the City Council pursuant to the State ex rel. Badke v. Greendale Village Board, 173Wis. 2d 553, 494 N.W. 2d 408 (1993) and must be noticed as such,
although the City Council will not take any formal action at this meeting.
1.
2.
3.
4.
Documents:
5.
Documents:
6.
Documents:
7.
Documents:
8.
Documents:
9.
Documents:
10.
11.
CITY OF VERONA
PLAN COMMISSION
MINUTES
July 6, 2026
Council Chambers
1. Call to Order: Mayor Diaz called the meeting to order at 6:30 p.m.
2. Roll Call: Tyler Wood, William Taylor, Luke Diaz, Lachlann Swanson, and Mike
Hankard were present. Tyler Powers and Linnea Matulat were absent and excused.
Also present: Director of Planning and Development Lucas Sivertsen, Community
Development Specialist Katherine Holt, and City Engineer Carla Fischer.
3. Public Comment
• Dale Beske, 6422 Shady Bend Rd., spoke regarding the proposed Subzero
development. He would like screening from the development to the
neighborhood. He also had concerns about back-up beepers, diesel fumes,
operating twenty-four (24) hours a day, and trucks choosing to use Shady
Bend Road instead of Liberty Business Park or the proposed north-south
roadway.
4. Approval of minutes from June 1, 2026 Plan Commission meeting.
Motion by Swanson, seconded by Wood to approve the minutes from the June 1,
2026 Plan Commission meeting. Motion carried 5-0.
5. Public Hearing – Review the City of Verona Comprehensive Plan as an amendment
to the City of Verona 2009 – 2039 Comprehensive Plan. The proposed amendment
will repeal and re-enact the City’s Comprehensive Plan by providing details for
planned future land uses, utilities, parks, street networks, community facilities, and
other details for lands generally bounded by north of County Highway PD, Epic
Systems Corporation property to the west, Sunset Drive to the south, and Fitchrona
Road to the east.
Nick Kalogeresis, MKSK, and Kyle Terry, 1861 Group, gave a presentation of the draft
Comprehensive Plan. The public engagement and participation were very
successful. The Downtown Subarea is a major focus with more commercial,
residential, and mixed-use buildings. The housing strategy focuses on a wide range
of housing types: single-family, multi-family, townhomes, senior housing, etc.
Motion by Diaz, seconded by Swanson to open the public hearing at 7:04 p.m.
Motion carried 5-0.
Erik Olsen, attorney representing the Endres family, stated they are concerned that
County Highway M is considered as an arterial and not a neighborhood. They would
like to develop that land into a vibrant community similar to Hilldale in Madison.
Bob Cravens, 312 Monte Cristo, stated that the Comprehensive Plan needed
measurable goals and accountability. He suggested a public dashboard to track the
accomplishments of the plan. He asked if the City could force certain rental level or
a percent of affordable housing in a development.
Beth Foss, 384 Breckenridge Rd., spoke in support of walkability and bikeability of
the City and referenced the 2016 Bike Study. She explained the difficulties of a
fourteen-year-old riding a bike to Miller’s as it is illegal to ride of the sidewalk. She
suggested housing to incentivize condos similar to the ones on Railroad Street. Foss
asked if the City needs to keep growing.
Kelly Gilboy, representing the Fisher family, stated they are excited about the plan
and look forward to working with the City.
David Lonsdorf, 1717 Beach Rd., stated that the Ice Age Trail is not depicted on the
maps associated with the Comprehensive Plan. There are also inaccuracies in areas
of the Town of Verona. He supports a new boundary agreement and would like to be
involved in the negotiations.
Beth Tucker Long, Chair of Comprehensive Plan Task Force, thanked the Task Force,
MKSK, and staff for their work.
Donna Spencer, 405 Lincoln St., stated her biggest concern is safety for bikers and
pedestrians due to lack of sidewalks and higher roadway speeds on roads with no
sidewalks.
Diane Mandell, 664 Grace St., spoke about the importance of keeping Verona a
small-town feel. She asked about the intent of the Comprehensive Plan and if the
plan is for long-term residents or stakeholders. She is supportive of small
businesses.
Jen Finta, 408 Lone Pine Way, spoke regarding the importance of affordable housing
and the importance of bike traffic safety.
Justin Borella, 406 Church Ave., stated that the City should focus more on bike lanes
and bus improvements rather than car traffic on Verona Ave. He stated he prefers
more dense vertical developments to help with walkability.
Phil Nawrocki, 501 Mark Dr., was concerned about future development in the
Downtown Subarea. He wants to make sure there is proper phasing of apartment
buildings and single-family homes as well as stepping back buildings from the
single-family homes to take into consideration noise and lighting.
Shasha Spak-Greenfield, 559 East View Rd., spoke regarding affordable housing and
housing availability. She also echoed the comments about bicycle traffic safety and
protections of the Ice Age Trail.
Christal Martinez, 205 N Jefferson St., appreciates the diversity of housing types in
the Comprehensive Plan. She is concerned about senior housing, pedestrian
accessibility and community resources. She explained that the City needs to
support all ages and multiple ages in the same family home.
Matt Mueller, 7226 Pine Row, stated that this area is the only one designated as
residential and retail across from the new SSM clinic. A company purchased this
area recently to put in a gravel pit. He requests the City work with the Town of Verona
to plan for this area and has concerns about the amount of truck traffic and hours of
operation if the gravel pit is approved.
Adam Greenfield, 559 E View Rd., stated that it is important to differentiate Verona
on the map.
Keith Dickinson, owner of land near SSM, is no longer in a contract with a buyer of
his land because of the proposed gravel pit. He was surprised to find out that there
is currently no boundary agreement between the City and the Town.
Brandi Mueller, 7226 Pine Row, spoke in support of affordable housing. She also
spoke against the proposed gravel pit and explained that she feels as though her
property is caught between two parents (City and Town) arguing. She is seeking
advice on how to find more information about the gravel pit.
Motion by Diaz, seconded by Swanson to close the public hearing at 7:58 p.m.
Motion carried 5-0.
a. Discussion & Possible Action – Draft Comprehensive Plan review
Diaz stated that the City sent an offer to the Town for a new boundary
agreement and the offer was rejected. He stated that the Town Chair Mark
Geller has declined to meet with him regarding the boundary agreement. He is
supportive of the Ice Age Trail and agrees that the information needs to be
corrected in the Comprehensive Plan. Diaz supports condo units, but projects
have not been brought to the City as sometimes these are not financially
feasible. The City has approve 700 single-family homes in recent years.
Wood asked if there are plans for an updated bike study. Holt stated that the
majority of the improvements that were recommended in the previous bike
study have been completed or are in progress. After that is finished, they can
begin looking at recommendations in the Comprehensive Plan to create a
priority list to implement or include in an updated bicycle study.
Swanson stated that the end goal is to keep Verona small-town feel, and to
make it affordable for people that work here to live here.
Taylor supports the emphasis on mixed-use development in the
Comprehensive Plan which will make the City more walkable. He discussed
that people need a destination to walk to, which is why mixed-use
developments make sense.
Diaz addressed the proposed gravel pit. He explained that the review of the
gravel pit is in the hands of the Town Board and Dane County, which residents
can contact to find out more information.
The Plan Commission recessed at 8:24 p.m.
The Plan Commission reconvened at 8:33 p.m.
6. Public Hearing – A conditional use permit for an apartment/condominium complex
land use, and a conditional use permit to exceed the maximum height requirement
of thirty-five (35)-feet in the Urban Residential zoning district, for a 200-unit
apartment and clubhouse complex located south of Morningside Boulevard and
west of proposed Grassland Terrace known as the Midthun property.
Motion by Diaz, seconded by Swanson to open the public hearing at 8:34 p.m.
Motion carried 5-0.
Bob Cravens, 312 Monte Cristo, stated the City needs to apply the Comprehensive
Plan to this project. He suggested requiring some of the units to be affordable.
Motion by Diaz, seconded by Wood to close the public hearing at 8:36 p.m. Motion
carried 5-0.
a. Discussion & Possible Action – Site plan review to construct a 200-unit
apartment and clubhouse complex located south of Morningside Boulevard
and west of proposed Grassland Terrace.
Swanson stated that the City is not able to require that some units be
affordable as stated in public comment.
Diaz asked about the landscaping plan. Sivertsen stated that the applicant
exceeds the landscaping requirements in the zoning ordinance, especially
along the western edge. Diaz is skeptical that this project will happen
because of the delays with the Whispering Coves development as the force
main needs to be installed.
Hankard is in support of zero-entry units similar to the Lincoln Street
apartments. He also suggested a path or connection to the property to the
south. Sivertsen explained the connection was discussed but the applicant
did not include it because of the differences in grade to the properties.
Wood liked the solar panels and is not a fan of the design of project.
Motion by Swanson, seconded by Wood to approve the site plan to allow for
the construction of 200-unit apartment complex located south of
Morningside Boulevard and west of proposed grassland Terrace with the
following conditions: the approval shall become effective upon the applicant
acquiring the property; the approval shall become effective upon execution
of a development agreement to include design, construction, and operation
of a force main as required by the Whispering Coves stormwater
management plan approve by the City; solar panels as shown on the site
plan shall be installed to meet the lot coverage requirement; within 365 days
of the date in which the Plan Commission votes to approve the Site Plan, the
Applicant will either start construction or request an extension from the Plan
Commission as described in section 13-1-220 of the Zoning Ordinance.
Failure to satisfy this condition will result in revocation of the Site Plan
approval. Motion carried 5-0.
b. Discussion & Possible Action – Conditional use permit for an
apartment/condominium complex land use located south of Morningside
Boulevard and west of proposed Grassland Terrace.
Motion by Swanson, seconded by Wood to recommend that the Common
Council approve a conditional use permit for an apartment/condominium
complex located south of Morningside Boulevard and west of proposed
Grassland Terrace with the following conditions: the approval shall become
effective upon the execution of a development agreement; within 365 days of
the date in which the Common Council votes to approve the conditional use
permit, the Applicant with either start construction or request an extension
as described in section 13-1-217 of the zoning ordinance (failure to satisfy
this condition will result in revocation of the conditional use permit). Motion
carried 5-0.
c. Discussion & Possible Action – Conditional use permit to exceed the
maximum height requirement of thirty-five (35)-feet in the Urban Residential
zoning district located south of Morningside Boulevard and west of proposed
Grassland Terrace.
Motion by Swanson, seconded by Wood to recommend the Common
Council approve a conditional use permit to exceed the maximum height
requirement of 35 feet to approximately 47 feet in the Urban Residential
zoning district located south of Morningside Boulevard and west of proposed
Grassland Terrace with the following conditions: the approval shall become
effective upon execution of a development agreement and Within 365 days
of the date in which the Common Council votes to approve the conditional
use permit, the Applicant will either start construction or request an
extension as described in section 13-1-217 of the zoning ordinance (failure to
satisfy this condition will result in revocation of the conditional use
approval). Motion carried 5-0.
7. Discussion & Possible Action – Initial review for an 800,000 square foot distribution
facility located south of Whalen Road and east of Ambition Street, Clarity Street,
and Laser Street in Liberty Business Park.
Sivertsen stated there will be 200 parking stalls and three shifts. The land will be
divided to accommodate future development to the north and south.
Taylor is abstaining from this discussion.
Wood prefers design option 4. He doesn’t like the parking lots being completely
uncovered. Wood has concerns regarding the distribution trucks driving in the
existing neighborhood as well as truck noise at night.
Diaz suggested the parking lots are covered in solar panels. There was a discussion
regarding the proposed north-south roadway and environmental corridors. He likes
options 3 and 4 as the lighter colors may be more energy efficient.
Hankard is supportive of the development. He would like the building to be
screened and break up some of the larger lengths of the building. Hankard asked
the applicant if the materials coming to the property are from their own facilities or
are materials from others that come to the facility. The applicant replied that the
deliveries will be a mix of their trucks and others. Hankard explained that the non-
beeping back-up options for trucks can be done on their trucks but would be
difficult to require trucks that bring materials and owned by others.
Swanson suggested moving the building further to the east. He prefers darker design
patterns and façades, which is design option 4.
8. Reports and comments from the Planning Department
a. Update on development projects.
9. Adjournment: Motion by Wood, seconded by Hankard to adjourn at 9:26 p.m.
Motion carried 5-0.
Respectfully Submitted,
Holly Licht, City Clerk
1162 Laser St., Suites 104-108
Planning Report
City of Verona
Plan Commission 8-3-2026
Conditional Use Permit
Property Location: 1162 Laser Street, Suites 104 - 108
Property Owner: Verona Flex Properties, LLC
807 Liberty Drive
Verona, WI 53593
Applicant: Madtown Pickleball Club, LLC
3509 Strawberry Loop
Middleton, WI 53562
Existing Zoning: Suburban Industrial (SI)
Existing Land Use: Multi-tenant building as a flexible industrial building
Proposed Land Use: Flexible industrial building with indoor pickleball
Figure 1 – Location Map
Summary: The Applicant is requesting a conditional use permit to allow for an indoor
fitness facility over 10,000 square feet in a portion of the existing building
at 1162 Laser Street in Liberty Business Park
CTH M
CTH PB
Liberty Dr.
Whalen Rd.
USH 18/151
1162 Laser Street, Suites 104 – 108
Conditional Use Permit
2
Site and Operations:
Applicant has submitted a request to utilize approximately 11,922 square feet of a
26,400 square foot flexible industrial building for five (5) pickleball courts (“Application”)
located at 1162 Laser Street in the Liberty Business Park (“Property”) as depicted in
Figure 1. The Property is zoned Suburban Industrial (SI). The Applicant is expecting to
operate daily from 5:30 a.m. to 11:30 p.m., which may be adjusted over time. There will
be two (2) to four (4) employees that will visit the Property for cleaning, management,
and operational oversight. Per the Applicant’s narrative, “During typical operations,
occupancy is expected to range between 10 and 20 patrons. During periods of peak
activity, occupancy is anticipated to be approximately 30 to 40 patrons, including players
and individuals waiting between reservations. The waiting area primarily supports normal
facility operations by providing seating for players before and after scheduled
reservations”.
The Property currently contains two (2) businesses. Suite 102 consists of Play Zone/Play
Café and uses approximately 3,360 square feet. The second occupant is located in
Suites 110 – 112 by Perlisten Audio and uses approximately 11,280 square feet.
Background:
In April of 2024, the Plan Commission reviewed and approved a site plan for a 26,400
square foot flexible industrial building with the following conditions that were met:
a. Prior to the issuance of building permits, the Applicant shall enter into a
development agreement with the City for the future public improvements for Laser
Street.
b. The Applicant shall replace the proposed EIFS with concrete stucco.
c. The Applicant shall replace the proposed metal on the rear of the building with a
material used on the other three elevations.
Southeast Neighborhood Plan:
The Property is located in the Southeast Neighborhood Plan (“Plan”), which was adopted
in 2010. The Property is shown on the land use map as non-residential and is discussed
on page 15 of the Plan.
“Non-Residential Land Uses:
Non-residential land-uses within the ‘Southeast Neighborhood’ will be
located closest to the intersection of two county trunk highways with access
to a limited-access U.S. highway. As explained within the City’s
comprehensive plan—the City plans to take logical advantage of the
locational benefits provided by the interchange between County Highway’s
‘M’ and ‘PB’ and U.S. Highway 18-151 for non-residential land-uses in this
area. The City has already created a tax increment finance district in this
area (Tax Increment District No. 6) as part of the community’s effort to
promote non-residential development in this area.
1162 Laser Street, Suites 104 – 108
Conditional Use Permit
3
Planned non-residential land-uses in this area include a mix of commercial
uses closest to the intersection of ‘M’ and ‘PB’ and office, business-park,
research, educational, light-industrial, and corporate campus uses further
from this intersection. The City has taken great efforts to limit the amount of
land that will be utilized for retail development in this area and has allowed
only about 80 acres (closest to the intersection of CTH ‘M’ and ‘PB’…) to
be zoned for retail development. The City has taken great efforts to limit the
amount of retail zoning in this area to reinforce the City’s goal to continue
to concentrate the bulk of retail land-uses within our downtown area and
along Verona Avenue—as explained in greater detail within Chapter 8—
Land Use—of our comprehensive plan. The City of Verona plans to keep
the downtown area the retail and service center of the community. While
the downtown is the priority area for future retail development—the City
also plans to take logical advantage of the intersection of two County Trunk
Highways—‘M’ and ‘PB’—within the Southeast Neighborhood to
accommodate some retail development outside of the downtown. This
limited amount of retail development will also enhance the City’s effort to
promote employment and job-creation opportunities within the Southeast
Neighborhood by creating the amenities and services that are necessary in
close proximity to a major employment center.
See the ‘Southeast Commercial’ and the ‘Southeast Business Park’ Sub-
Area Plans below for additional information about planned non-residential
development within the ‘Southeast Neighborhood’.”
The Applicant is proposing an indoor pickleball court, which is located inside a flexible
industrial building. The land use matches the Plan’s desire for non-residential land use in
this area. The Zoning Ordinance supports the Plan’s need to maintain commercial
development in the center of the City as retail and restaurants are not allowed in the
industrial zoning districts. Tax Incremental District (TID) 6 is no longer active and was
able to promote development in this area as intended by the Plan.
“Southeast Business Park Sub-Area (North and South of CTH ‘M’)
• The City plans to utilize this area for creating jobs and employment
opportunities for Verona residents with office, corporate headquarter,
light manufacturing, warehousing, educational, and similar business
park-type developments;” (Plan, p. 20).
The proposed use is generally consistent with the Southeast Neighborhood Plan as it is
non-residential land use.
Draft Comprehensive Plan:
The Comprehensive Plan is underway and is being finalized. The Comprehensive Plan
designated this Property as mix – industrial or commercial land use.
“Mix – Industrial or Commercial
1162 Laser Street, Suites 104 – 108
Conditional Use Permit
4
The Industrial and Commercial district supports a mix of employment-
oriented land uses, including light industrial, office, and commercial
activities. This district seeks to promote uses that can coexist with flexible
development framework, designed to accommodate both standalone
enterprises and multi-tenant developments that support Verona’s
economic base” (p. 66).
“Businesses to Attract Residents & Visitors. Creating a designation
where people want to live, shop, and spend time relies on a local economy
that attracts both residents and visitors. Supporting a vibrant mix of
business throughout the city – including retail, dining, services, and
entertainment – will help position Verona as a top destination. Targeting
efforts into key areas that will attract new businesses and support existing
businesses will help connect residents, visitors, and the local economy” (p.
100).
The Applicant proposes an entertainment facility to be used for members only pickleball.
The proposal supports the Comprehensive Plan as it is commercial activity in a multi-
tenant building.
Planning Review:
The existing building continues to meet all of the setback requirements for the SI zoning
district as well as the height requirements. The building design and landscaping will not
change.
Parking:
Access to the site will continue from Laser Street. Table 1 contains the minimum
required parking spaces per the amended parking ordinance as well as for each tenant.
The parking standards for an indoor fitness facility were recently amended to require 1/3
People at Maximum Capacity; or 1/each player + 1/employee; + 1/3 people per class;
+1/3 people per tournament for a minimum parking requirement. The pickleball facility
will have five (5) indoor courts allowing twenty (20) players to play. To support the
business, there will be four (4) employees. On a daily basis, there would be
approximately twenty-four (24) people in the building with others arriving or leaving. Peak
periods are anticipated to have approximately thirty (30) to forty (40) people waiting
between reservations. The existing parking lot has seventy-four (74) parking stalls, which
include two (2) electric vehicle charging stalls and handicapped stalls. Bicycle parking is
also provided along the front of the building.
Business Minimum Required Parking Spaces
Play Zone/Play Café (Suite 102) 23 spaces
Vacant (Suites 104 - 108) 24 spaces (normal operation)
40 spaces (peak operation)
60 spaces (tournaments)
Perilisten Audio (Suites 110 - 114) 8 spaces
1162 Laser Street, Suites 104 – 108
Conditional Use Permit
5
Business Minimum Required Parking Spaces
Total Required Parking Spaces 55 spaces (normal operations)
71 spaces (peak operation)
91 spaces (tournaments)
Total Provided Parking Spaces 74 spaces
There are enough parking spaces for the normal operations of a pickleball facility to meet
the recently amended parking ordinance with some additional parking stalls to help with
overflow from these businesses. During peak operations, there will not be any additional
parking stalls for each business to use as all will be taken if the peak demand is during
business hours for the other businesses. If the facility has a pickleball tournament, the
business would be short of approximately seventeen (17) parking stalls. When the site
plan was before the Plan Commission in April of 2024, the Plan Commission had
concerns about parking and the tenant mix; however, this building was part of a phased
development with this being the first phase and the second phase was for an office
building. If the second phase is built as an office building, Staff recommends a shared
parking agreement for people to utilize their parking lot solely for tournaments as this is
the best option to reduce on-street parking. If the development is not an office building,
Staff is supportive of people using on-street parking solely for infrequent tournaments as
these would be special cases instead of the norm. Staff anticipate more traffic (trucks) on
Laser Street in the future due to potential industrial development occurring to the east,
which could hinder on-street parking due to truck turning radius.
Conditional Use Permit Findings:
The Applicant is requesting a conditional use permit approval for indoor commercial
entertainment land use, which is a conditional use in the Suburban Industrial district. The
Zoning Ordinance requires all conditional uses to fulfill general standards and specific
standards for all conditional use permit requests (Sec. 13-1-363).
a. How is the proposed conditional use (in its spec ific location) in harmony with
the purposes, goals, objectives, policies and standards of the City of Verona
Comprehensive Plan, this Chapter, and any other plan, program, or Chapter
adopted, or under consideration pursuant to official notice by the City?
The location of the proposed use is in harmony with the goals and policies of the City in
the specific location proposed.
b. Does the proposed conditional use, in its proposed location and as depicted
on the required site plan [see Subsection (c)(4), above], result in a substantial
or undue adverse impact on nearby property, the character of the
neighborhood, environmental factors, traffic factors, parking, public
improvements, public property or rights -of-way, or other matters affecting the
public health, safety, or general welfare, either as they now exist or as they
may in the future be developed as a result of the implementation of the
provisions of this Chapter, the Comprehensive Plan, or any other plan,
program, map, or Chapter adopted or under consideration pursuant to official
1162 Laser Street, Suites 104 – 108
Conditional Use Permit
6
notice by the City or other governmental agency having jurisdiction to guide
development?
The proposed use has sufficient parking available on the Property for daily operation;
however, there is insufficient parking if there is a tournament based on the amended
Zoning Ordinance. The Applicant would be short by seventeen (17) parking stalls,
which could be accommodated through a shared parking agreement with the
neighboring properties or on- street parking as this is not the norm. Another creative
way to have a couple of additional parking stalls is to create additional parking
spaces for employees in the loading dock area for this business and potentially the
other businesses if they are supportive of this idea for tournaments only. There are
no adverse impacts on adjoining properties or the environment for normal business
operations.
c. Does the proposed conditional use maintain the desired consistency of land
uses, land use intensities, and land use impacts as related to the environs of
the subject property?
The proposed conditional use maintains the desired consistency of land uses, land use
intensities, and land use as the area is designated as industrial land uses.
d. Is the proposed conditional use located in an area that will be adequately
served by, and will not impose an undue burden on, any of the improvements,
facilities, utilities or services provided by public agencies serving the subject
property?
The Applicant will utilize an existing building and existing utilities. This use will not
impose an undue burden on these facilities or services.
e. Do the potential public benefits of the proposed conditional use outweigh any
and all potential adverse impacts of the proposed conditional use (as
identified in Subsections (d)(2)a—e above), after taking into consideration the
Applicant's proposal and any requirements recommended by the Applicant to
ameliorate such impacts?
The benefits of the proposed use outweigh any adverse impacts in the neighborhood.
Specific Fitness Facility and Entertainment Use Standards:
The Plan Commission as part of their review shall take into account the following per
Section 13-1-127 in the Zoning Ordinance:
(b): Fitness Facility/Entertainment Facility Indoor, 10,000 – 49,999 square feet
(1) Façades greater than one hundred (100) feet in length, measured horizontally,
shall incorporate surface articulation every twenty-five (25) feet.
(2) Ground floor facades that face public streets shall have arcades, clear glass
display windows, entry areas, awnings, or other such features along no less
than sixty (60) percent of their horizontal length.
1162 Laser Street, Suites 104 – 108
Conditional Use Permit
7
(3) Curb cuts and site vehicular access shall be minimized in frequency and width
and shall not dominate the site plan or property and street frontage.
(4) Service areas, dumpsters, utilities, and the required screening thereof shall be
designed and located to minimize visibility from public rights-of-way.
(5) Pedestrian access shall be provided to the building entries and parking areas
connecting to the sidewalk at the street frontage.
(6) Exterior building materials shall be time- and weather-tested materials and
techniques such as but not limited to masonry, stone veneer systems, stucco,
precast panels with inlaid or stamped brick texture.
(7) If a facility has courts or fields, the parking requirements will be based on the
total number of players on each court or field plus employees and additional
parking for classes if offered as well as for spectators.
(8) A drop-off area must be designed on the site.
(9) A joint parking agreement for all tenants must be provided to the City and
recorded with Dane County Register of Deeds.
Typically, the Plan Commission reviews the specific use standards to drive the overall
design of the building for a particular land use. In this instance, the building was already
built without any known tenants at that time. The builder has met items 3 through 6 as
part of the site plan review. Items 1 and 8 are not met for fitness land use as the building
was reviewed and designed for industrial land use, which does not have this building
design standard. The Applicant does not need to redesign the exterior of the existing
building to meet these requirements. The Applicant should consider a drop-off area if
there will be classes offered to large amounts of children. Item 2 is met as the Applicant
is using three (3) tenant spaces for their business, which has windows and awning. Staff
reminds the Applicant to maintain item 2 as clear glass display windows for the building.
Item 7 is met for the peak occupancy without tournaments. If additional parking is
provided or a joint parking agreement is executed which provides additional parking the
Applicant would be allowed a tournament with twenty (20) spectators.
Recommendation:
Staff recommends the Plan Commission recommend that the Common Council approve
the conditional use permit to allow an indoor fitness facility greater than 10,000 square
feet and less than 49,999 square feet for pickleball located at 1162 Laser Street, Suites
104 – 108 with the following conditions:
1. The tenants of 1162 Laser Street shall enter into a shared parking agreement.
Prepared by: Katherine Holt
Community Development Specialist
Submitted by: Lucas Sivertsen, AICP
Director of Planning and Development
MADTOWN PICKLEBALL CLUB
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
July 2, 2026
City of Verona
Planning & Development Department
111 Lincoln Street
Verona, WI 53593
RE: 1162 Laser Street #104-108 Conditional Use Permit
Madtown Pickleball Club, LLC.
City staff and Commission members,
On behalf of Madtown Pickleball Club, we are requesting a Conditional Use Permit be granted
for an 11,922 square foot pickleball facility to be located within the existing multi-tenant building
located at 1162 Laser Street. The existing 26,400 square foot building is within the Suburban
Industrial (SI) Zoning district. The proposed pickleball facility is classified as a Fitness Facility
and Entertainment use, greater than 10,000 square feet as a conditional use.
Madtown Pickleball is a privately operated indoor pickleball facility offering year-round court
rentals, memberships, recurring group reservations, open play, clinics, and instructional
programming. The facility is designed to accommodate players of all skill levels and primarily
serves residents of Verona, Madison, and the surrounding Dane County area.
Operations follow a hybrid participation model in which customers may reserve courts either as
members or as pay-as-you-go guests. Membership is not required to use the facility. Walk-in
participation is limited, as court use is primarily reservation-based. Reservations are scheduled
in advance, resulting in predictable customer arrivals and departures throughout the day rather
than large event-based gatherings. The business is intended to provide a convenient, safe, and
professionally managed recreational facility for individuals, families, and organized groups.
Hours of Operation
The facility is expected to operate daily from 5:30 a.m. to 11:30 p.m. Hours may be adjusted
modestly over time based on customer demand and operational experience.
Security and Facility Access
Customer access is managed through a technology-enabled, primarily self-service operating
model. Building access is managed through secure electronic access that is integrated with the
facility’s reservation system. Building access is limited to customers with active reservations
during designated operating hours. Each reservation requires customer identification and
acceptance of an electronic liability waiver prior to facility access.
The building will utilize controlled electronic access, security cameras throughout the facility,
and remote monitoring of building systems, including security, lighting, and HVAC controls.
Emergency contact information will be prominently displayed within the facility, and ownership
will remain available by telephone during operating hours. Emergency responders will retain
appropriate building access in accordance with applicable codes and local regulations.
MADTOWN PICKLEBALL CLUB
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
Employees
The business is expected to operate with approximately 2–4 employees , primarily in
management, customer service, facility maintenance, and programming roles. Employees will
not be continuously present during operating hours; however, staff will routinely visit the facility
for customer support, maintenance, cleaning, programming, and general operational oversight.
Occupancy
The building includes five indoor pickleball courts along with a small lobby and waiting area.
During typical operations, occupancy is expected to range between 10 and 20 patrons . During
periods of peak activity, occupancy is anticipated to be approximately 30 to 40 patrons ,
including players and individuals waiting between reservations. The waiting area primarily
supports normal facility operations by providing seating for players before and after scheduled
reservations. We have reviewed the floor plan with Building Inspection and agree that a reduced
occupancy is justified.
Parking
There are currently 74 off-street parking stalls on the property, including two accessible stalls.
Per the zoning ordinance, parking needs per event type are:
General Play: 20 players + 4 employees = 24 stalls
Class/instruction: 16 players + 1 employee = 17 st alls
Tournament: 40 players + 20 spectators = 60 stalls
The result is an average need of 24 stalls. If a larger event were to take place such as a
tournament, parking would need 60 stalls.
Overall, Madtown Pickleball is intended to provide a safe, professionally managed indoor
recreational facility that meets the growing demand for year-round pickleball. This operating
model promotes predictable customer activity through scheduled reservations, controlled
building access, and modern facility management practices.
Respectfully,
Anthony Suy
Lee Schwartz
Madtown Pickleball Club, LLC.
Attachments:
1162 Laser Street_PCApplication.pdf
1162 Laser Street_CUPDrawings.pdf
AA
A3.0
AA
A3.0
BB
A3.0
BB
A3.0
1 2
A
3
C
4 85 6 7
27' - 11" 32' - 10" 32' - 10" 32' - 10" 32' - 10" 32' - 10" 27' - 11"
FIRE RISER &
PLUMBING
220' - 0"
5M 5R
BELOW
MIDDLE
5E
ABOVE
5R
5N
BELOW
ABOVE
5R 5R 5R 5R 5R 5R 5R
5R5S
BELOW
MIDDLE
5E
ABOVE
5M5R
BELOW
MIDDLE
5E
ABOVE
5R 5S
BELOW
MIDDLE
5E
ABOVE
5S
5E
5M 5S
5E
5R
5S 5S
5E
5R 5R 5R
5S
5E
5S
5E
5S
5E
5M 5M 5M
120' - 0"
4' - 10" 3' - 4" 6' - 8" 12' - 0" 2' - 4" 12' - 0" 9' - 4" 3' - 4" 8' - 8" 3' - 4" 14' - 8" 12' - 0" 2' - 4" 12' - 0" 6' - 8" 3' - 4" 12' - 8" 3' - 4" 13' - 4" 12' - 0" 2' - 4" 12' - 0" 4' - 0" 3' - 4" 25' - 4" 2' - 0" 3' - 4" 9' - 6"
6" 28' - 10" 9' - 4" 10' - 8" 9' - 4" 10' - 8" 9' - 4" 10' - 8" 9' - 4" 21' - 10" 6"
7' - 6" 12' - 0" 2' - 0" 6' - 0" 5' - 4" 12' - 0" 2' - 0" 6' - 0" 9' - 4" 9' - 4" 5' - 4" 12' - 0" 12' - 8" 17' - 0" 24' - 8" 5' - 4" 9' - 4" 9' - 4" 6' - 0" 2' - 0" 12' - 0" 5' - 4" 6' - 0" 2' - 0" 12' - 0" 7' - 6"
6" 28' - 10" 9' - 4" 11' - 4" 9' - 4" 22' - 0" 9' - 4" 12' - 0" 9' - 4" 8' - 6" 6"
BELOW
MIDDLE
ABOVE
BELOW
MIDDLE
BELOW
MIDDLE
ABOVE
BELOW
MIDDLE
ABOVE
BELOW
MIDDLE
ABOVE
BELOW
MIDDLE
ABOVE
BELOW
MIDDLE
ABOVE
BELOW
MIDDLE
BELOW
MIDDLE
BELOW
MIDDLE
BELOW
MIDDLE
5S 5R
BELOW
MIDDLE
5E
ABOVE
5M5R
BELOW
MIDDLE
5E
ABOVE
BELOW
MIDDLE
ABOVE
BELOW
MIDDLE
ABOVE
5R
5S
5E
5R
5S
5S
S1 S3 S1 S2 S3 S4 S3 S2 S1 S3
S0
S0
S0
9C
S
9C
S
S3S1S3
A2.01
A2.0
2
A2.0
3
A2.0 4
D
A3.0
C
A3.0
A
A3.0
101A
108
101B 101C 102B 103B102C 103C 104C 104B 105B 105C 106C 106B 107B107C
107A106A105A104A103A102A
5E5E ABOVE ABOVE 5EABOVE 5E ABOVE 5E ABOVE
B
FUTURE TLT FUTURE TLT FUTURE TLT
FUTURE OFFICE FUTURE OFFICE FUTURE OFFICE
FUTURE TLT FUTURE TLT
FUTURE OFFICE FUTURE OFFICE
FUTURE TLT
DASHED WALLS INDICATE
POTENTIAL FUTURE TENANT
DIVIDING WALLS AND
BUILDOUTS FOR PLANNING
PURPOSES ONLY. TYP
E
A3.0
F
A3.0
B
A3.0
EV CHARGING
STATION
LOCATION;
SEE CIVIL
A6.1
120' - 0"
1
1
1
1
S0
S0
1' - 2" 10"
1' - 10"1' - 10"1' - 10"1' - 10"
S0
S0
1
1
1
1
1
S0
FLOOR PLAN GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
PROVIDE VERTICAL CONTROL JOINTS (CJ'S) WHERE STRUCTURAL
SYSTEMS CHANGE, LOCATIONS THAT ARE PRONE TO CRACKING
AND AS REQUIRED BY MANUFACTURES INSTALLATION
RECOMMENDATIONS.
VERIFY SIZE AND LOCATIONS OF ALL MECHANICAL OPENINGS.
GENERAL CONTRACTOR TO PAINT AND SEAL LOUVER PERIMETER,
TYPICAL.
GENERAL CONTRACTOR TO PROVIDE CONCRETE EQUIPMENT
PADS/CURBS AS REQUIRED FOR MECHANICAL/ELECTRICAL
EQUIPMENT. VERIFY SIZE/PROFILE/LOCATION WITH
PLUMBING/MECHANICAL/ELECTRICAL.
GENERAL CONTRACTOR TO INSTALL FOAM FILLER AT ALL MASONRY
WALL CONTROL/EXPANSION JOINTS AND SEAL BOTH SIDES (WALL
REINFORCING TO DISCONTINUE AT JOINTS).
GENERAL CONTRACTOR TO PROVIDE WOOD BLOCKING BETWEEN
WOOD/METAL STUDS AS REQUIRED FOR
CASEWORK/HANDRAIL/TOILET ACCESSORIES ETC. MOUNTING.
REFER TO EXTERIOR ELEVATIONS FOR EXTERIOR WALL CONTROL
JOINTS.
VERIFY ALL ACTUAL CHASE DIMENSIONS WITH HVAC CONTRACTOR.
ADA CLEARANCE CIRCLES AND BOXES SHOWN ON PLAN ARE FOR
INFORMATION PURPOSES ONLY.
DIMENSIONS ARE FROM FACE OF STUD TO FACE OF STUD UNLESS
NOTED OTHERWISE.
Autodesk Docs://Dimension IV Internal Projects 2023/24015 - Coris - Flex Building.rvt1/9/2025 12:22:13 AM
N
0' 2' 4' 8'
1/8" = 1'-0"1 FIRST FLOOR PLAN
ROOF PLAN GENERAL NOTES
A.
B.
C.
ROOFING TO BE STANDING SEAM METAL ROOF BY PEMB SUPPLIER -
REFER TO ROOF TYPE R50.
ROOF PLUMBING VENT PIPE PENETRATIONS NOT SHOWN.
COORDINATE QUANTITY AND LOCATIONS WITH PLUMBING
CONTRACTOR.
COORDINATE DOWNSPOUT CONNECTIONS TO SEWER W/ CIVIL
PLANS. PROVIDE SPLASH BLOCKS @ DOWNSPOUTS THAT SPILL
ONTO GRADE.
AA
A3.0
AA
A3.0
BB
A3.0
BB
A3.0
1 2
A
3
C
4 85 6 7
1/2" / 12"
COMPRESSION
FITTING SNOW
SLIDE GUARDS
COMPRESSION
FITTING SNOW
SLIDE GUARDS
COMPRESSION
FITTING SNOW
SLIDE GUARDS
COMPRESSION
FITTING SNOW
SLIDE GUARDS
22' - 0"14' - 0" 17' - 2"
14' - 0"14' - 0"
220' - 0"
120' - 0"
FUTURE RTU
N.I.C
FUTURE RTU
N.I.C
FUTURE RTU
N.I.C
FUTURE RTU
N.I.C
FUTURE RTU
N.I.C
FUTURE RTU
N.I.C
FUTURE RTU
N.I.C
14' - 0" 14' - 0" 14' - 0"
27' - 11" 32' - 10" 32' - 10" 32' - 10" 32' - 10" 32' - 10" 27' - 11"
D
A3.0
C
A3.0
A
A3.0
B
17' - 2"
E
A3.0
4' - 0"
4' - 6"
4' - 0"
4' - 6"
4' - 6"
4' - 6"
4' - 6"
4' - 5 3/4"
4' - 5 3/4"
F
A3.0
B
A3.0
3
A6.0
3
A6.0
3
A6.0
3
A6.0
3
A6.0
1
A6.0
1
A6.0
3
A6.0
3
A6.0
Autodesk Docs://Dimension IV Internal Projects 2023/24015 - Coris - Flex Building.rvt9/4/2024 11:06:53 AM
1/8" = 1'-0"1 ROOF PLAN
N
0' 2' 4' 8'
ALUM
STOREFRONT
MA
MAS
BRICK
REVEAL
BRK-1
EIFS
CPG
CST
SFC-1
CPG
EIFS
MP-1
CST
SFC-1
C
A3.0
6' - 8"
4"
12' - 8"
4"
6' - 0"
6' - 0"4"16' - 0"4"6' - 8"
3' - 4"3' - 4"3' - 4"3' - 4"2' - 8"7' - 2"
CJ CJ CJ CJ
CST
CST
CST
BRK-1
CST
SFC-1
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
ALUM STOREFRONT
CJ
CST
ALUM STOREFRONT
CJ
CST
ALUM STOREFRONT
CJ
CST
FIRST FLOOR
100' - 0"
MAS
MA
BRK-1
BRICK
REVEAL
CPG
EIFS
EIFS AT
BACKSIDE OF
PARAPET GTR
ROOFING
BEYOND
DS
CST
SFC-1
INSULATED
METAL
DOOR
INSULATED
METAL OVERHEAD
DOOR
INSULATED
METAL OVERHEAD
DOOR
DS
SFC-1
DS
CST INSULATED
METAL
DOOR
INSULATED
METAL
DOOR
INSULATED
METAL OVERHEAD
DOOR
INSULATED
METAL OVERHEAD
DOOR
DS
SFC-1
DS
CST INSULATED
METAL
DOOR
INSULATED
METAL
DOOR
INSULATED
METAL OVERHEAD
DOOR
INSULATED
METAL OVERHEAD
DOOR
DS
SFC-1
DS
CST INSULATED
METAL
DOOR
INSULATED
METAL
DOOR
INSULATED
METAL OVERHEAD
DOOR
MP-2
EIFS AT
BACKSIDE OF
PARAPET GTR
ROOFING
BEYOND
MP-2
EIFS AT
BACKSIDE OF
PARAPET GTR
ROOFING
BEYOND
MP-2
BRK-1
BRICK
REVEAL
CPG
EIFS
DS
CST
SFC-1
E
A3.0
B
A3.0
SNOW SLIDE
GUARDS, TYP
FIRST FLOOR
100' - 0"
CPG
EIFS
BRICK
REVEAL
BRK-1
CST
SFC-1
MA-1
MAS
MAS
ALUM
STOREFRONT
ALUM
STOREFRONT
MAS
MA-1
MAS
MAS
ALUM
STOREFRONT
ALUM
STOREFRONT
MAS
CPG
MP-1
BRK-1
EIFS
CPG
SFC-1
CST
BRK-1
EIFS
CPG
SFC-1
CST
MAS
MP-1
MA-2
MAS
SFC-1
ALUM
STOREFRONT
ALUM
STOREFRONT
MP-1
CPG
BRICK
REVEAL
BRK-1
EIFS
CPG
MA-1CPG
MA-2
MP-1
BRK-1
EIFS
CPG
BRICK
REVEAL
MP-1
CPG
CPG
EIFS
BRICK
REVEAL
BRK-1
CST
SFC-1
SFC-1
CST
SFC-1
CST
MAS
CJ
SFC-1
ALUM
STOREFRONT
ALUM
STOREFRONT
ALUM
STOREFRONT
MA-1
D
A3.0
EIFS
EIFS
EIFS
EIFS
EIFS
3' - 8"3' - 4"3' - 4"3' - 4"2' - 8"7' - 0"
7' - 3"16' - 4"7' - 0"
6' - 0"16' - 4"7' - 0"
6' - 4"16' - 0"7' - 0"
6' - 10"12' - 8"7' - 0"
E
A3.0
CJ
CJ
CJ
CJ CJ CJ CJ CJ
CJ
CJ CJ
CJ CJ
CST CST CST CST CST CST
6' - 10"12' - 8"7' - 0"
FIRST FLOOR
100' - 0"
CPG
EIFS
BRK-1
BRICK
REVEAL
MA
MAS
CST
SFC-1
EIFS
MP-1
CPG
CST
SFC-1
ALUM
STOREFRONT
ALUM
STOREFRONT
MASMAS
MAMA
MAS
MAS
TINT AT WEST
WINDOWS ONLY
(GLT-12F)
TINT AT WEST
WINDOWS ONLY
(GLT-12F)
F
A3.0
CJ
CJCJ
CJCJ
CJCJ
CJ
CSTCST
CST
ALUM
STOREFRONT
TINT AT WEST
WINDOWS ONLY
(GLT-12F)
ALUM
STOREFRONT
TINT AT WEST
WINDOWS ONLY
(GLT-12F)
ELEVATION LEGEND & NOTES
MASONRY COLOR MORTAR
BRK-1 BRICK VENEER RED LIGHT BUFF
SFC-1 8X16 SPLIT FACE CMU NATURAL / TAN LIGHT BUFF
CST CAST STONE IMITATION LIMESTONE
CJ CONTROL JOINT
METAL SIDING COLOR
MP-1 METAL PANEL HORIZONTAL TEXAS SILVER METALLIC
MP-2 METAL PANEL VERTICAL TEXAS SILVER METALLIC
EXTERIOR INSULATION FINISH SYSTEM COLOR
EIFS - SAND TEXTURE BEIGE - SWISS MOCHA
PRE-FINISHED METAL COLOR
DS DOWNSPOUT TEXAS SILVER METALLIC
GTR GUTTER TEXAS SILVER METALLIC
FSA FASCIA TERRA COTTA
CPG COPING TERRA COTTA
CANOPY ACCESSORIES COLOR
MA-1 METAL AWNING TERRA COTTA
MA-2 SUNSHADE METAL AWNING SILVER METALLIC
MAS METAL AWNING STRUCTURAL POST SILVER METALLIC
STOREFRONT COLOR
ANODIZED ALUMINUM CLEAR ANODIZED
Autodesk Docs://Dimension IV Internal Projects 2023/24015 - Coris - Flex Building.rvt1/9/2025 12:22:16 AM
1/8" = 1'-0"1 EAST ELEVATION
1/8" = 1'-0"2 NORTH ELEVATION
1/8" = 1'-0"3 SOUTH ELEVATION
1/8" = 1'-0"4 WEST ELEVATION
1
1
FIRST FLOOR
100' - 0"
BB
A3.0
BB
A3.0
12348 567
A3.0
C
A3.0
C
r50
f30
5S
5E
5R 5R
5S
5E
FUTURE TENANT 7 FUTURE TENANT 6 FUTURE TENANT 5 FUTURE TENANT 4 FUTURE TENANT 3 FUTURE TENANT 2 FUTURE TENANT 1 FIRE RISER &
PLUMBING
9C
S
29' - 4"
29' - 4"
FIRST FLOOR
100' - 0"
AA
A3.0
AA
A3.0
AC
1/2"
12"
B
22' - 10"
25' - 4"
A3.0
AA3.0
D
FUTURE TENANT 2
29' - 4"
f30
r50
5M
5E
5N
6' - 6"
C
10' - 8" 12' - 8" 6' - 0"
5M
5E
29' - 4"
r50
1/2"
12"
f30
A8.0
6
A8.0
3
A6.0
3
A8.0
1
4' - 6"
A8.0
10 SIM.
8
6' - 0"16' - 4"7' - 0"
5S
5E
5R
29' - 4"
f30
r50
A8.0
2
A8.0
1
A8.0
3
A8.0
23
A8.0
20
4"3' - 4"3' - 4"3' - 4"3' - 4"2' - 8"4"
1' - 3"
3/4" CORBEL
TYP.
FIRST FLOOR
100' - 0"
A
7' - 0" 15' - 10"
5N
5R
22' - 10"
1/2"
12"
A8.0
1
A8.0
5
r50
1' - 0" 1' - 0"
C
5M
5E
r50
6' - 10"9' - 0"10' - 8"
26' - 6"
A8.0
4
1/2"
12"
A6.0
1
11' - 0"
1
5M
5E
5R
7' - 0" 13' - 0" 6' - 0"
26' - 0"
r50
A8.0
20
A8.0
17
A8.0
2
A8.0
1
A8.0
4
A
5R
5N
A8.0
2
A8.0
1
A8.0
19
15' - 10"7' - 0"
22' - 10"
r50
1/2"
12"
Autodesk Docs://Dimension IV Internal Projects 2023/24015 - Coris - Flex Building.rvt9/4/2024 11:07:00 AM
1/8" = 1'-0"AA BUILDING SECTION
1/8" = 1'-0"BB BUILDING SECTION
0' 2' 4' 8'
0' 2' 4' 8'
3/8" = 1'-0"D WALL SECTION D
3/8" = 1'-0"C WALL SECTION C
3/8" = 1'-0"A SECTION A
3/8" = 1'-0"E WALL SECTION E
3/8" = 1'-0"F WALL SECTION F - TYPICAL
3/8" = 1'-0"B SECTION B
1A
S 1
WALL TYPE DESIGNATION
WALL FIRE RATING (IF
INDICATED)
THIS WALL WOULD
HAVE A 1 HOUR
RATING
SOUND INSULATION
(IF INDICATED)
WALL DETAIL NOTES
1. TO ACHIEVE STC RATING, ADD FIBERGLASS BATT INSULATION TO THE
ENTIRE WIDTH OF STUD CAVITY, TYP.
1A
WALL TYPE DESIGNATION
WALL HAS NO FIRE
RATINGWALL IS NOT A
SOUND WALL
WALL TYPE GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
ASSEMBLY FIRE RATING REPRESENTS MAXIMUM ALLOWABLE
RATING PER UL CLASSIFICATION. REFER TO CODE COMPLIANCE
AND FLOOR PLANS FOR REQUIRED FIRE RATING AT SPECIFIC
LOCATIONS.
CONTINUE ALL PARTITION FRAMING AND GYPSUM BOARD TO
UNDERSIDE OF RATED ROOF ASSEMBLY OR FLOOR DECK ABOVE,
UNLESS INDICATED OTHERWISE.
SOUND WALLS (INDICATED BY "STC" - SOUND TRANSFER
COEFFICIENT): CAULK ALL UNFINISHED JOINTS BETWEEN GYPSUM
BOARD PANELS AND BETWEEN GYPSUM BOARD PANELS AND
FLOOR AND SIDE WALL MATERIALS WITH ONE BEAD OF SEALANT
PER LAYER OF GYPSUM BOARD. ACOUSTICALLY SEAL ALL
PENETRATIONS INCLUDING ELECTRICAL, MECHANICAL AND PIPING.
LIMIT NECESSARY WALL PENETRATIONS TO ONE PER STUD CAVITY.
AT RESILIENT CHANNELS, USE RECOMMENDED SCREW LENGTH IN
ORDER TO MEET PRESCRIBED SOUND RATING.
PENETRATIONS IN SOUND WALLS AND SMOKE AND FIRE RATED
WALLS AND CONNECTIONS AT WALLS TO OTHER WORK SHALL
MAINTAIN STC AND/OR FIRE RATING, SHALL BE IN ACCORDANCE
WITH MANUFACTURERS RECOMMENDED DETAILS, AND SHALL
COMPLY WITH APPLICABLE TESTING AGENCY REQUIREMENTS.
WHERE WALLS AND/OR FURRING MEET, MAINTAIN A FLUSH
SURFACE ON THE SIDE WHERE WALL SURFACE IS STRAIGHT OR
CONTINUOUS, UNLESS INDICATED OTHERWISE.
FIRE RATINGS SHOWN ARE THE RATINGS AVAILABLE PER NOTED
TESTING AGENCY AND/OR IBC REQUIREMENTS. REFER TO FLOOR
PLANS AND WALL TYPE SUBSCRIPTS FOR LOCATIONS OF FIRE
RATED WALLS.
REFER TO ROOM SCHEDULE FOR ADDITIONAL WALL FINISHES.
PROVIDE FIRE RATED WOOD BLOCKING IN PARTITION TYPES AS
REQUIRED BY SPECIFICATIONS AND ACCESSORIES INDICATED ON
DRAWINGS.
REFER TO EXTERIOR ELEVATIONS FOR LOCATIONS OR VARIATIONS
TO EXTERIOR VENEER MATERIALS.
WALL HEIGHTS LEGEND
UNDERSIDE
OF FLOOR
OR ROOF
DECKING
CEILING
HEIGHT
FLOOR
GRADE
1A
S 1
NO SUBSCRIPT
EXTEND TOTAL
PARTITION TO
STRUCTURE
1A
S 1
6"
SUBSCRIPT (6")
EXTEND TOTAL
PARTITION TO 6"
ABOVE CEILING
6"
1A
S 1
SUBSCRIPT (C)
EXTEND TOTAL
PARTITION TO
CEILING
C
1A
S 1
SUBSCRIPT (X'-X")
PARTIAL HEIGHT
PARTITION
HEIGHT AS
NOTED, SEE
ABOVE DETAIL
FOR OTHER
REQUIREMENTS
3'-6"
X
AX/XX
REFER TO SUBSCRIPT FOR HEIGHT
SUB GRADE
DRAINAGE FILL
F30
VAPOR BARRIER
CONCRETE FLOOR SLAB
SEE STRUCTURAL
FLOOR ASSEMBLY
SLAB-ON-GRADE
* CONCRETE WALL
SEE STRUCTURAL
FOR REINFORCING
(R-10) RIGID
INSULATION
3 HOUR FIRE RATING
PER IBC TABLE 721.1(2)
EXTERIOR
3D
* 3A = 6"
3B = 8"
3C = 10"
3D = 12"
*
3C3B
3A
4 HOUR FIRE RATING
PER IBC TABLE 721.1(2)
8" 5/8"
1 3/4"
3 5/8"
5R
SPLIT FACE CMU
VENEER
MASONRY ANCHOR AT 24"
O.C. VERTICALLY AND 32"
O.C. HORIZONTALLY, TYP.
8" METAL STUD
@ 16" O.C.
STEEL
COLUMN/BENT
BEYOND; BY
PEMB SUPPLIER
SIMPLE SAVER INSULATION
SYSTEM AND LINER OR
EQUAL 0.052 U-VALUE
CMU VENEER AT
METAL STUD WALL
SIMPLE SAVER
LINER
5N
STEEL COLUMN/BENT
BEYOND; BY PEMB
SUPPLIER
VERTICAL METAL SIDING
AT PEMB WALL (GIRTS)
EXTERIOR VERTICAL
METAL PANEL; BY PEMB
SUPPLIER
SIMPLE SAVER
INSULATION SYSTEM OR
EQUAL 0.052 U-VALUE
8" GIRT WITH
THERMAL BREAK TAPE
INSULATION HANGER
SIMPLE SAVER LINER
WEATHER RESISTANT
BARRIER
8" 5/8"
1 3/4"
3 5/8"
5S
BRICK VENEER
MASONRY ANCHOR AT 24"
O.C. VERTICALLY AND 32"
O.C. HORIZONTALLY, TYP.
8" METAL STUD
@ 16" O.C.
STEEL
COLUMN/BENT
BEYOND; BY
PEMB SUPPLIER
SIMPLE SAVER INSULATION
SYSTEM AND LINER OR
EQUAL 0.052 U-VALUE
BRICK VENEER AT
METAL STUD WALL
SIMPLE SAVER
LINER
WEATHER RESISTANT
BARRIER
5E
5/8" EXTERIOR
GYPSUM SHEATHING
8" METAL STUD
@ 16" O.C.
STEEL
COLUMN/BENT
BEYOND; BY
PEMB SUPPLIER
SIMPLE SAVER INSULATION
SYSTEM AND LINER OR
EQUAL 0.052 U-VALUE
EIFS; 2" TYP.
EIFS AT METAL
STUD WALL
SIMPLE SAVER
LINER
WEATHER RESISTANT
BARRIER
5M
STEEL COLUMN/BENT
BEYOND; BY PEMB
SUPPLIER
HORIZONTAL METAL SIDING
AT METAL STUD WALL
EXTERIOR HORIZONTAL
METAL PANEL
SIMPLE SAVER
INSULATION SYSTEM OR
EQUAL 0.052 U-VALUE
SIMPLE SAVER LINERAIR CAVITY
5/8" EXTERIOR
GYPSUM SHEATHING
8"
5/8"
2"8"
5/8"1' - 2"
WEATHER RESISTANT
BARRIER
5/8" EXTERIOR
GYPSUM SHEATHING
8" METAL STUD
@ 16" O.C.
5/8" EXTERIOR
GYPSUM SHEATHING
8"
1' - 2"
AIR CAVITY
(2) LAYER 5/8"
GYPSUM BOARD
5/8"
5/8" 6" 5/8"
5/8"
8 1/2"
NOT USED - PLANNED
FOR FUTURE TENANT
DEMISING WALLS
UL# U419
1 HOUR
STC: 54-56
9D
6" SOUND ATTEN.
BLANKET IF INDICATED
(2) LAYER 5/8"
GYPSUM BOARD
6" LIGHT GAUGE
METAL STUDS
AT 16" O.C.
5/8" GYPSUM
BOARD
5/8" 6" 5/8"
UL# U419
STC: 50
9C
6" SOUND ATTEN.
BLANKET IF INDICATED
(1) LAYER 5/8"
GYPSUM BOARD
6" LIGHT GAUGE
METAL STUDS
AT 16" O.C.
7 1/4"
RATING: N/A
U-VALUE: 0.029r50
METAL ROOF PANELS;
PROFILE TO MATCH
EXISTING
3" FIBER GLASS
INSULATION
THERMAL BLOCKING
METAL PURLIN, SEE
STRUCTURAL
8" FIBER GLASS
INSULATION
STRAPPING
SIMPLE SAVER
SYSTEM
U-0.029
METAL FRAMING, SEE
STRUCTURAL
VAPOR BARRIER
(SIMPLE SAVER LINER)
PEMB ROOF
-SEE PLAN FOR
WALL TYPE
54"
DOUBLE 2X BLOCKING
COORDINATE
W/ SUNSHADE
MANUFACTURER
ATTACHMENT
BRACKET BY SUNSHADE
MANUFACTURER
FASTENER W/
CRUSH TUBE
DOUBLE 2X BLOCKING
COORDINATE
W/ SUNSHADE
MANUFACTURER
FASTENER W/
CRUSH TUBE
ATTACHMENT
BRACKET BY SUNSHADE
MANUFACTURER
TYP.
3/16
40.00°
FINISHED DECK
TS 2 1/2x2 1/2x3/16
TUBE TO TUBE
STUDS TO TUBE3/16
TYP.
3/16
TS 6x4x5/16"
PROVIDE AT
EACH
VERTICAL
SUPPORT OF
AWNING
TS 4x 4 x 3/16 @ ENDS
TS 4x 2 1/2 x 3/16 @
16" O.C.
1/2" GUSSET PLATE
CENTERED ON TS 6x4
W/ 2-1/2" THRU BOLTS
TYP.
3/16
3/8" GUSSET PLATE
3/8" CAP PLATE ON
ENDS OF TS 2 1/2X2 1/2
3/8" CAP PLATE ON
ENDS OF TS 2 1/2x2 1/2
BENT PLATE
7x4" LLV
BETWEEN
TS 6x4
MASONRY
BEYOND
3" 2 1/2"
8"
3 1/8"
PROVIDE FLASHING
BEHIND METAL SIDING
2' - 0"
127.77°
40.00°
3"
2"
7' - 0"
2' - 0"
17' - 1 5/16"
4' - 4 1/4"10' - 9 1/8"
3' - 1 1/2"
6"
FACE OF MASONRY
A6.0
2
Autodesk Docs://Dimension IV Internal Projects 2023/24015 - Coris - Flex Building.rvt9/4/2024 11:07:02 AM
1 1/2" = 1'-0"3H TYPE 3 HORIZONTAL ASSEMBLIES - CONCRETE
1 1/2" = 1'-0"3V TYPE 3 VERTICAL ASSEMBLIES - CONCRETE
1 1/2" = 1'-0"5V TYPE 5 VERTICAL ASSEMBLIES - COLD FORMED STEEL
1 1/2" = 1'-0"9V TYPE 9 VERTICAL ASSEMBLIES - LIGHT GAUGE STEEL
1 1/2" = 1'-0"5H TYPE 5 HORIZONTAL ASSEMBLIES - METAL
3/4" = 1'-0"1 SUNSHADE METAL AWNING DETAIL
4" 8"2"0'
4" 8"2"0'
4" 8"2"0'
4" 8"2"0'4" 8"2"0'6"3"0' 1'
3/4" = 1'-0"2 AWNING DETAIL
6"3"0' 1'
1/2" = 1'-0"3 AWNING DIAGRAM
6"0' 1' 2'
Memorandum
To: Plan Commission
From: Katherine Holt, Community Development Specialist
Date: August 3, 2026
Re: Public Institutional Zoning Text Amendment
As Staff has reviewed various types of land uses discussed in the draft
Comprehensive Plan, City Staff found that existing places of worship are not allowed
in the zoning district where they are currently located. For example, the downtown is
zoned Central Commercial (CC) and currently prohibits places of worship. This
means that the existing places of worship cannot make improvements to the building
outside of their existing building footprint. Staff propose to add places of worship to
four (4) zoning districts noted in red text that currently have places of worship in
those zoning districts.
Sec. 13-1-105 – Use Matrix.
Table 13-1-105(d): Institutional Uses
Use
Additional
Regulation RA NR MR UR SC CC NO SO SI UI PI
Cemetery P
College / University P P P P P
Government Uses, Indoor P P P P P P P P P P P
Government Uses, Outdoor C C C C C C C C C C C
Outdoor Public Recreation,
Active 13-1-123(a) P P P P P P P P P P
Outdoor Public Recreation,
Passive P P P P P P P P P P P
Place of Worship P P P P P P P P P
Public Service and Utilities 13-1-123(b) P P P P P P P P P P P
School, Elementary and Middle P P P P P
School, High P P P P P
Vocational / Employment
Training P P P
Zoning Text Amendment Findings
2
A determination is required to ensure that a Zoning Text Amendment is in harmony
with the recommendations of the City of Verona’s Comprehensive Master Plan by
answering the following questions posed in Section 13-1-215 of the Zoning
Ordinance.
a. How does the proposed text amendment further the purposes of this title
and the general article in which the amendment is proposed to be located
as outlined in section 13-1-5?
The proposed text amendment allows places of worship in the Suburban
Commercial (SC), Central Commercial (CC), Neighborhood Office (NO), and
Suburban Office (SO) zoning districts, which are already built in some of these
zoning districts.
b. How does the proposed text amendment further the purposes of the
specific section in which the amendment is proposed to be located?
The proposed text amendment allows places of worship in the SC, CC, NO, and SO
zoning districts, which are already built in some of these zoning districts. This will
allow places of worship to construct additions or have modifications made to the
buildings by right.
c. Which of the following factors has arisen that are not properly addressed
in the current zoning text:
1. The provisions of this chapter should be brought into conformity with
the Comprehensive Plan (if a factor related to the proposed
amendment, note pertinent portions of the Comprehensive Plan);
2. A change has occurred in the land market, or other factors have
arisen which require a new form of development, a new type of land
use, or a new procedure to meet said change(s);
3. New methods of development or providing infrastructure make it
necessary to alter this chapter to meet these new factors;
4. If the proposed text amendment is concerned with the provisions of
articles C and/or D: How does the proposed amendment maintain the
desired overall consistency of land uses, land use intensities, and
land use impacts within the pertinent zoning districts?
Allowing this type of land use in the SC, CC, NO, and SO zoning districts may allow
places of worship on a piece of property in these zoning districts to make
improvements to the structure on the property. In 2021, the Zoning Ordinance was
overhauled, and the revision did not include places of worship in the proposed
zoning districts causing the existing places of worship to be grandfathered, which
3
means that these uses could not have any work done outside of the existing
footprint.
Recommendation:
Staff recommends the Plan Commission recommend the Common Council approve
the zoning text amendment for Section 13-1-105(d) – Use Matrix to allow places of
worship.
Ardent Glen – Second Addition
Planning Report
City of Verona
Plan Commission 8-3-2026
Final Plat
Property Location: 3040 Shady Oak Lane
Property Owner: VH Ardent Glen, LLC
6801 South Towne Drive
Madison, WI 53713
Applicant: D’Onofrio, Kottke, & Associates, Inc.
7530 Westward Way
Madison, WI 53717
Existing Land Use: Vacant
Proposed Land Use: Single-family and mixed residential development
Existing Zoning: Mixed Residential (MR), Public Institutional (PI), and
Planned Development Overlay
Proposed Zoning: Same
Figure 1 – Location Map
Summary: The Applicant is proposing to create 80 single-family and twin home lots
and five (5) outlots north of CTH PD and west of Shady Oak Lane.
CTH PD
Northern
Lights Rd.
Final Plat
Ardent Glen – Second Addition
2
Site Description:
VH Ardent Glen LLC (“Applicant”) is requesting a final plat to develop approximately 80
lots and five (5) outlots to be located north of Paradise Way and west of Shady Oak
Lane (“Property”). This is another plat for Ardent Glen Subdivision called Ardent Glen
Second Addition. Additional plats for Ardent Glen subdivision would go before the Plan
Commission and Common Council at a later date.
Background:
• May 2021 – An initial plan to develop approximately 142-acres of land with
seventy-four (74) carriage lane accessed single-family homes, 218 street
accessed single-family homes, sixteen (16) twin homes, and ninety-two (92) twin
homes.
• November 2021 - Annexed 147.988-acres of land into the City of Verona.
• September 29, 2022 - WDNR approved the proposed urban service area
amendment for the Ardent Glen development, and other lands.
• December of 2022 – Approved the following plans with conditions to be effective
upon the execution of a development agreement.
o Preliminary and final planned development for the Ardent Glen subdivision
with the following exemptions and condition:
The minimum lot area is 2,550 square feet;
The minimum lot width is thirty-one (31) feet for alleys;
The minimum corner setback is ten (10) feet instead of twenty (20)
feet for all products;
The minimum rear setback is two (2) feet instead of twenty (20) feet
for alley accessed products;
The minimum pavement setback is two (2) feet instead of five (5)
feet for all products;
The maximum lot coverage is eighty (80) percent for alley accessed
homes and seventy (70) percent for alley accessed single family
and street accessed haven homes; and
o Zoning map amendment to rezone lots 1-406 to Mixed Residential (MR)
and outlots 1-25 to Public Institutional (PI).
o Preliminary plat to create 406-lots and 25-outlots with the following
conditions:
The final plat shall have private alleys labeled as fire lanes.
While not explicitly called out in the staff report for exemptions, the following
exemptions were also understood to be allowed and were included in their
Application packet.
o Garage setback:
Street facing garages are twenty-two (22) feet (minimum front yard
setback);
Final Plat
Ardent Glen – Second Addition
3
Side entry garages are twenty (20) feet (minimum front yard
setback);
Ten (10) foot minimum side yard setback (non-garage door side
yard);
Street facing garages must be setback a minimum of two (2) feet
from the front façade of the house.
o Garage setback:
Terraces, steps, uncovered and covered front porches, decks,
stoops, or similar appurtenances to residential buildings which do
not extend above the flood level of the adjacent building entrance
may encroach a maximum of six (6) feet into the front yard setback.
At grade patios may encroach up to the paved side yard setback
allowance.
Decks may encroach up to ten (10) feet into rear yard setback.
Corner lot porches, and bay windows may not encroach the vision
triangle.
Garden walls or fences shall be no more than four (4) feet in height
and will require approval by the Architectural Control Committee.
Walls and fences located within the vision triangles shall not
exceed thirty (30) inches in height.
• May 2023 - Phase 1 final plat created 102 single-family and twin home parcels
and 12 outlots with the following conditions:
o The final plat shall have private alleys labeled as fire lanes.
o The final plat shall become effective upon approval of the floodplain
modifications by the State and federal agencies.
• November 2023 - Administratively created two (2) new outlots owned by the
Homeowners Association.
• November 2023 – Final plat was recorded and included the two (2)
administratively approved outlots.
• April 2025 – First Addition to Ardent Glen final plat created fifty-four (54) single-
family and twin home lots and six (6) outlots.
• February 2026 – Preliminary and final planned development amendment and a
preliminary plat modified 406 lots to create 425-lots and 25-oulots with the
following conditions:
o Minimum lot area for the MR zone of 6,000 square feet to 2,550 square
feet.
o Minimum lot width from fifty (50)-feet to thirty-one (31)-feet for lots where
garages are accessed from an alley.
o Minimum corner side yard setback from twenty (20)-feet to ten (10)-feet.
o Minimum rear yard setback twenty (20)-feet to two (2)-feet for lots where
garages are accessed from an alley.
o Minimum paved surface setback from five (5) feet to two (2) feet.
Final Plat
Ardent Glen – Second Addition
4
o Maximum lot coverage from fifty (50%) percent to eighty (80%) percent.
o Minimum street right-of-way garage setback from twenty-five (25) feet to
twenty (20) feet.
o Minimum street right-of-way garage setback from twenty-five (25) feet to
ten (10) feet for garages accessed from alley.
o Minimum front yard patio, steps, uncovered and covered porches, decks,
stoops, or similar appurtenances which do not extend above the floor level
of the adjacent building entrance from twenty (20) feet to fourteen (14)
feet.
o Minimum side yard patio setback from five (5) feet to two (2) feet.
o Minimum rear yard deck setback from twenty (20) feet to ten (10) feet for
lots without alley access.
o The preliminary and final planned development shall become effective
upon the execution of a development agreement.
o The preliminary and final planned development shall be subject to the
City’s adopted stormwater management requirements.
Planning Review:
Lots:
The Applicant is proposing eighty (80)
single-family and twin home parcels with a
Mixed Residential (MR) zoning district
designation and five (5) outlots with a
Public Institutional (PI) zoning district
designation. The smallest lot will be 3,084
square feet while the largest lot will be
7,834 square feet.
Connectivity:
The Applicant is proposing to extend Eagle
Eye Street. The Applicant will begin
construction of Spring Garden Street that
will create an east-west connection
towards Shady Oak Lane in the future.
Other roadways and alleys will be
constructed as part of this plat. Staff have
no concerns with the road configuration.
Outlots:
The Applicant is proposing one (1) outlot
for parkland and one (1) outlot to be used
for future development as part of a future
phased final plat. Any park design would
require approval from the Park Board as
well as park fees. The remaining three (3)
outlots contain private alleys and private open space. The private alleys will allow
Figure 2 - Outline of Second Addition plat for the Ardent Glen Subdivision
Final Plat
Ardent Glen – Second Addition
5
access to garages from the rear of the home. These private alleys are labeled as fire
lanes as this allows the City to tow vehicles if the vehicles are parked in the alley.
Recommendation:
Staff recommend the Plan Commission recommend that the Common Council approve
the Final Plat for the Second Addition to Ardent Glen to create eighty (80) single-family
and twin home parcels and five (5) outlots.
Prepared by: Katherine Holt
Community Development Specialist
Submitted by: Lucas Sivertsen, AICP
Director of Planning and Development
OL25190191192204196193203195210202194209201208200207199206198205197211 232231230229235236234233
166
161
164163162
159160
158157
179180178
187188181189182183184185186
169167168171170172173174175176177
165
237228227226224223222220219218217216215214213212221225
OL23
OL 22OL 21
OL 24EAGLE EYE STREETWINNERS WAY
SPRING GARDEN STREET
SHEET 1 OF 3
FORWARD
There are no objections to this plat with respect to Secs. 236.15, 236.16, 236.20 and 236.21(1) and (2),Wis. Stats. as provided by s. 236.12, Wis. Stats.Certified __________________, 20_____Department of AdministrationSECOND ADDITION TO ARDENT GLENOUTLOT 3, CERTIFIED SURVEY MAP NO. 17063 AND OUTLOT 17 AND LOTS 147-152, FIRST ADDITION TO ARDENT GLEN,LOCATED IN THE SOUTHEAST 1/4 OF THE SOUTHEAST 1/4 AND THE SOUTHWEST 1/4 OF THE SOUTHEAST 1/4 OF SECTION 5,TOWNSHIP 6 NORTH , RANGE 8 EAST, CITY OF VERONA, DANE COUNTY, WISCONSIN
OL25236237 OL25
OL25
SHEET 2 OF 3
FORWARD
There are no objections to this plat with respect to Secs. 236.15, 236.16, 236.20 and 236.21(1) and (2),Wis. Stats. as provided by s. 236.12, Wis. Stats.Certified __________________, 20_____Department of AdministrationSECOND ADDITION TO ARDENT GLENOUTLOT 3, CERTIFIED SURVEY MAP NO. 17063 AND OUTLOT 17 AND LOTS 147-152, FIRST ADDITION TO ARDENT GLEN,LOCATED IN THE SOUTHEAST 1/4 OF THE SOUTHEAST 1/4 AND THE SOUTHWEST 1/4 OF THE SOUTHEAST 1/4 OF SECTION 5,TOWNSHIP 6 NORTH , RANGE 8 EAST, CITY OF VERONA, DANE COUNTY, WISCONSIN
SHEET 3 OF 3
FORWARD
There are no objections to this plat with respect to Secs. 236.15, 236.16, 236.20 and 236.21(1) and (2),Wis. Stats. as provided by s. 236.12, Wis. Stats.Certified __________________, 20_____Department of Administration
SECOND ADDITION TO ARDENT GLENOUTLOT 3, CERTIFIED SURVEY MAP NO. 17063 AND OUTLOT 17 AND LOTS 147-152, FIRST ADDITION TO ARDENT GLEN,LOCATED IN THE SOUTHEAST 1/4 OF THE SOUTHEAST 1/4 AND THE SOUTHWEST 1/4 OF THE SOUTHEAST 1/4 OF SECTION 5,TOWNSHIP 6 NORTH , RANGE 8 EAST, CITY OF VERONA, DANE COUNTY, WISCONSIN
2000 Range Trail
Planning Report
City of Verona
Plan Commission 8-3-2026
Certified Survey Map
Property Location: 2000 Range Trail, Town of Verona
Property Owner: Margaret Jacobs Trust
2000 Range Trail
Verona, WI 53593
Applicant: Michael Jensen
1288 Enterprise Drive
Verona, WI 53593
Existing Zoning: Rural Residential (RR-16) – Town of Verona
Existing Land Use: Single-family home
Proposed Land Use: Same
Figure 1 – Location Map
Summary: The Applicant has submitted a certified survey map (CSM) to split one (1)
lot into two (2) lots located at 2000 Range Trail.
Locust Dr.
Range Trl.
CTH PB
Certified Survey Map
2000 Range Trail
2
CSM Review:
The Applicant is proposing a certified survey map (CSM) to split one (1) lot into two (2)
lots located at 2000 Range Trail (“Property”) in the Town of Verona. The lot division was
recently reviewed by the Joint Planning Committee, which was a committee created by
the City and Town Boundary Agreement. The request was denied, in part because it
was inconsistent with the standards of review outlined in the Boundary Agreement.
Since that review, the Boundary Agreement has expired and now the City will review it
as part of the extraterritorial jurisdictional review. Extraterritorial platting authority is a
state statute that provides Cities and Village’s the authority to review land divisions that
are within a mile and a half (1 ½ mile) radius around those municipalities. While the land
is within the Town of Verona, the Property is within the City’s extraterritorial platting
jurisdiction.
The Property is a total of 23.2 acres and zoned Rural Residential (RR-16) in the Town
of Verona, which allows one (1) single family home per sixteen (16) acres. The Property
is subject to Dane County Zoning regulations. While the City has extraterritorial plat
authority it does not have extraterritorial zoning authority. The Applicant is requesting a
zoning map amendment through Dane County to change the zoning from RR-16 to RR-
8, which would allow one (1) single family home per eight (8) acres.
Lot 1 will consist of approximately 9.54 acres with a new driveway accessing Range
Trail. The access is required from Range Trail per a deed restriction.
Lot 2 will consist of approximately 13.65 acres with an existing single-family home and
existing driveway. This lot also contains steep, wooded slopes due to the terminal
moraine.
The northern property line of Lot 1 abuts the Woods at Cathedral Point. The 2009 City
of Verona Comprehensive Plan was silent regarding land use for this area of the City
and Town of Verona. The draft City of Verona Comprehensive Plan shows this area as
Housing A (low density), which could consist of single-households, duplexes, triplexes,
and townhomes. The Woods at Cathedral Point was developed to allow water, sewer,
and roadways to be extended to the south to this Property if, or when, it develops.
However, the Property is not annexing into the City and would continue to follow the
Town of Verona development requirements including well and septic.
Since a CSM is being reviewed, the City can request land be dedicated towards right-of-
way. The City recommends the Applicant, as part of this CSM, dedicate additional right-
of-way than what is currently shown on the CSM to match the City’s right-of-way on
Range Trail for a total cross-section of seventy-two (72) feet or thirty-six (36) feet on
one (1) side of the road instead of the shown thirty-three (33) feet. This will allow Range
Trail to have the option of future roadway improvements to include roadway width,
sidewalk, or bicycle lanes if these are ever needed or if the land across from this
Property annexes to the City.
Certified Survey Map
2000 Range Trail
3
Recommendation:
Staff recommend the Plan Commission recommend that the Common Council approve
the certified survey map to create two (2) lots from the existing one (1) lot located at
2000 Range Trail with the following condition:
1. The certified survey map shall be modified for additional right-of-way dedication
for roadway improvements to Range Trail if ever needed.
Prepared by: Katherine Holt
Community Development Specialist
Submitted by: Lucas Sivertsen, AICP
Director of Planning and Development
Appendix A
2000 Range Trail – Town of Verona, Dane County, Wisconsin
Supporting Documentation for City of Verona CSM Application
Land Resources
Question C
• Does the CSM contain an area of soil instability—greater than 20% slope and/or organic
soils, peats, or mucks at or near the surface?
Yes. Portions of the subject property contain slopes greater than 20%, primarily within the
approximately 13.65-acre wooded terminal moraine area located in the southern and
central portions of the property. The attached Elevation Map – 2000 Range Trail identifies
multiple areas categorized as “20 and greater” slope. The attached USDA NRCS Soil Map
further confirms the presence of steep slope conditions associated with Elkmound sandy
loam soils ranging from 12% to 30% slopes.
The steep slope areas correspond closely with the wooded terminal moraine terrain and are
associated with constrained topographic conditions that limit both development intensity
and agricultural productivity. These areas are largely separate from the proposed 9.54-acre
parcel intended for limited residential use.
The proposed residential parcel is located primarily within the flatter agricultural field area
adjacent to Range Trail and avoids the majority of the steep slope terrain. The presence of
steep slopes further supports the appropriateness of low-intensity development and
preservation of environmentally constrained areas consistent with the City of Verona
planning framework.
No mapped organic soils, peats, or mucks at or near the surface were identified within the
reviewed soil mapping documentation.
Question D
• Does the CSM contain prime agricultural land (Class 1, 2, or 3 soils)?
Portions of the subject property, particularly within the flatter agricultural field area,
contain productive agricultural soils commonly associated with Class 1–3 capability soils.
The attached USDA NRCS Soil Map identifies several silt loam soil types within the
agricultural portion of the property, including Gale silt loam, Basco silt loam, and Troxel silt
loam.
However, a substantial portion of the property consists of steep wooded terminal moraine
terrain containing Elkmound sandy loam soils with slopes ranging from 12% to 30%, which
significantly limit agricultural productivity and development potential.
The soil mapping confirms that the property is not uniformly prime agricultural land and
instead contains a combination of flatter agricultural soils in the northern/western field
area and steep, environmentally constrained moraine terrain in the southern and central
portions of the property.
The proposed land division reflects these existing physical conditions by locating the
proposed residential parcel within the historically agricultural portion of the property while
preserving the constrained moraine area.
Question F
• Does the CSM contain unique physical features or wildlife habitat?
Yes. The subject property contains several unique physical and environmental features,
including wooded terminal moraine terrain, steep slopes, mature tree cover, natural
drainage features, and undeveloped open space areas that provide existing wildlife habitat
and environmental value.
The approximately 13.65-acre southern and central portion of the property consists largely
of wooded terminal moraine landscape characterized by steep topography and
environmentally sensitive terrain.
Importantly, the proposed CSM is designed to minimize impacts to these environmental
features by locating the proposed residential parcel primarily within the flatter agricultural
portion of the property, avoiding the majority of steep slope and wooded moraine areas,
preserving substantial open space and existing tree cover, and maintaining the existing low-
intensity land use pattern.
Human and Scientific Interest
Question A
• Does the CSM contain an area or buildings of archaeological, geological, or historical
interest?
Yes. The subject property contains geological features of significance associated with the
terminal moraine landscape present within this portion of Dane County and the greater
Verona area. The approximately 13.65-acre southern and central portion of the property
consists of steep wooded moraine terrain characterized by rolling topography, elevation
changes, and environmentally sensitive landforms that are representative of glacial
geological features.
At this time, no formally identified archaeological sites, historically designated structures,
or documented historic landmarks are known to exist within the proposed CSM area based
upon currently reviewed materials.
Question D
• Does the CSM contain old growth trees or significant woodland features?
Yes. The approximately 13.65-acre parcel contains numerous mature and old growth trees
within the wooded terminal moraine portion of the property.
The proposed 9.54-acre parcel, which is intended for limited residential use, is located
primarily within the existing agricultural field area and does not contain old growth trees or
significant woodland disturbance areas.
Importantly, the proposed CSM itself will not result in the removal of old growth trees.
City Planning
Question A
• Is the development consistent with the City Master Plan and other adopted planning
documents?
Yes. The proposed CSM is consistent with the City of Verona Comprehensive Plan and
related adopted planning documents because it represents a low-intensity form of urban
development that responds appropriately to the physical characteristics, environmental
constraints, and existing infrastructure conditions present on the property.
The proposed CSM is also consistent with the Town of Verona Comprehensive Plan and
related adopted Town planning policies. The Town of Verona formally reviewed and
approved the proposed Certified Survey Map, confirming that the land division complies
with applicable Town land use policies, zoning objectives, and rural residential
development standards.
The proposed CSM therefore represents a site-responsive, environmentally sensitive, and
low-intensity development pattern that is consistent with both the City of Verona
Comprehensive Plan and other adopted planning documents while preserving long-term
planning flexibility for future urban growth patterns.
Yes. The approximately 13.65-acre parcel contains numerous mature woodland including red oak,
white oak, and black oak trees.
E Whispering Pines Way
Range
Trl
Early
Tw
ilightW
ay
Range
Trl
E Whispering Pines Way
M
erry
Blossom
Ln
ArcGIS Web Map
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap
contributors, and the GIS User Community
Parcels
2 foot Intervals
10 foot Intervals
2 foot Intervals
Steep Slopes
Greater than 6 to less than 12
12 to less than 20
20 and greater
5/14/2026, 10:32:31 AM
0 340 680170 ft
0 100 20050 m
1:3,674
Soil Map—Dane County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/14/2026
Page 1 of 3
4759640 4759720 4759800 4759880 4759960 4760040 4760120
4759640 4759720 4759800 4759880 4759960 4760040
294070 294150 294230 294310 294390 294470 294550 294630 294710 294790
294070 294150 294230 294310 294390 294470 294550 294630 294710 294790
42° 57' 57'' N
89° 31' 30'' W
42° 57' 57'' N
89° 30' 57'' W
42° 57' 41'' N
89° 31' 30'' W
42° 57' 41'' N
89° 30' 57'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 150 300 600 900
Feet
0 50 100 200 300
Meters
Map Scale: 1:3,400 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Dane County, Wisconsin
Survey Area Data: Version 24, Sep 10, 2025
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 13, 2020—Jul
31, 2020
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—Dane County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/14/2026
Page 2 of 3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
214B2 Gale silt loam, 2 to 6 percent
slopes, moderately eroded
4.1 13.4%
214C2 Gale silt loam, 6 to 12 percent
slopes, moderately eroded
7.4 24.0%
234B2 Basco silt loam, 2 to 6 percent
slopes, eroded
1.0 3.3%
246C2 Elkmound sandy loam, 6 to 12
percent slopes, eroded
3.9 12.6%
246D2 Elkmound sandy loam, 12 to
20 percent slopes, eroded
7.4 24.0%
246E2 Elkmound sandy loam, 20 to
30 percent slopes, eroded
4.5 14.6%
7197A Troxel silt loam, 0 to 3 percent
slopes
2.5 8.2%
Totals for Area of Interest 31.1 100.0%
Soil Map—Dane County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/14/2026
Page 3 of 3
201 South Main Street
Initial Review
Planning Report
City of Verona
Plan Commission 8-3-2026
Property Location: 201 South Main Street
Property Owner: Memorial Baptist Church
201 South Main Street
Verona, WI 53593
Applicant: Same
Existing Zoning: Central Commercial (CC)
Existing Land Use: Place of Worship
Proposed Land Use: Place of Worship
Figure 1 – Location Map
Summary: The Applicant is requesting an initial review to construct approximately
4,700 square foot addition located at 201 South Main Street. The
project requires site plan approval.
South Franklin Street
South Shuman Street
South Main Street
East Park Lane
2
201 South Main Street
Initial Review
Background:
The Applicant is requesting an initial review (“Application”) to construct an
approximately 4,700 square foot addition to the existing building located at 201 South
Main Street (“Property”), which is depicted in Figure 1 in yellow. The proposed building
addition would allow for additional classrooms, a new entry, and support space. The
parking lot will be reconfigured to allow for a drop-off/pick-up area. The Property is
zoned Central Commercial (CC) and is currently a place of worship. Land uses
surrounding the Property include residences and businesses. The proposed addition
requires a site plan review.
Downtown Mobility and Design:
The Property is located in the Downtown Mobility and Design Plan (“Plan”), which
was adopted in 2016. The following are excerpts from the Plan and the proposed
additional conforms to the recommendations of the Plan.
“Architectural & Historical Character
The architectural character of downtown
Verona is eclectic, comprised of structures
and styles from the past 100+ years. While
there are no registered historic structures in
the study area, there are several (pictured
below) that were noted in the statewide
Architectural and Historic Inventory (AHI)
compiled in the 1970s. None of these
buildings are recognized as architecturally
or historically significant, but they are part of
the eclectic character of the downtown area.
The planning process revealed limited
interest to ensure protection of these
structures. Buildings noted most frequently as desirable were 101 N.
Main St. and 102 W. Railroad St.” (Chapter 3, PDF p. 9).
The Plan also discusses façade improvements along South Main Street. It is understood
in the Plan that this Property would not redevelop in the long-term. The Plan
recommended a minimum building setback of five (5) feet and a maximum of fifteen (15)
feet from the front property line. Staff discussed moving the addition to the front of the
Property and closer to the property line on South Main Street, which would not work for
the function of the proposed addition. If future improvements are made to the building,
Staff recommend bringing the building or improvements closer to South Main Street
creating a more defined Downtown corridor.
The Plan also shows this Property as part of the Downtown Mixed Use district. It is
described as “Suitable for a variety of uses in a traditional downtown format, including
high percentage lot coverage and limited off-street parking. To be rezoned to Central
Commercial” (Chapter 4, PDF p. 2). The Plan recommended this Property be rezoned to
CC, which was done. A place of worship is typically found in downtown areas throughout
the country. The Zoning Ordinance supports a high percentage of lot coverage by
Figure 2 - Photo from the Architecture & Historic Character
3
201 South Main Street
Initial Review
allowing the entire lot to be built out.
Proposed Comprehensive Plan:
The City has published a public hearing draft Comprehensive Plan for review. As part of
that document, this Property is shown as downtown mixed use land use as depicted in
Figure 3. The following are excerpts from the draft Plan.
“Downtown Verona Mixed-
Use Core encourages a mix
of commercial and
residential uses in both
existing buildings and in
new development,
promoting Verona’s
traditional Downtown
Verona as a mixed-use
center of activity. Existing
buildings and storefronts
along Verona Ave. and Main
St. should be maintained
and rehabilitated to support
retail and small business
activity. Over the long term,
new commercial and mixed-
use development may occur
on select opportunity sites,
designed to reinforce
Downtown Verona’s
traditional pedestrian-
oriented design character
and scale” (p. 47).
The Property fronts South
Main Street. The Applicant is
proposing an addition in the
rear of the building, which
would be an expansion of the
existing building. This addition
is supported by the above text
by maintaining and in this case
expanding the existing building.
• “Connected Street Grid and Sidewalk Network. A lack of through-streets in
the Downtown Verona limits walkability and development potential. As
parcels transition and develop, it is essential to establish roadway links and
an expanded sidewalk network to create a well-connected and accessible
Downtown Verona for both car travelers and pedestrians” (p. 70).
Staff is in discussions with the Applicant regarding adding a sidewalk along East Railroad
Figure 3 - draft Comprehensive Plan
4
201 South Main Street
Initial Review
Street in an effort to provide sidewalk access from South Franklin Street to South Main
Street. There will be a sidewalk gap between this Property and South Main Street, but this
connection is the first step to creating an overall sidewalk connection between these two
(2) roads.
Planning Review:
Bulk Requirements:
The proposed building addition will be located in the rear of the existing building away
from South Main Street. The CC zoning district has a maximum building setback of
fifteen (15) feet from South Main Street, East Park Lane, and East Railroad Street. The
rear yard setback is ten (10) feet from South Franklin Street. The proposed addition will
conform to the setback requirements and Staff does not have any concerns at this time.
Access, Parking, and Connectivity:
Access to the Property will continue from South Main Street, East Railroad Street, and
East Park Lane. The access from East Railroad Street will be shifted from the current
location towards South Franklin Street. The parking lot will be reconfigured for a one
(1)-way movement from South Main Street towards East Railroad Street. Access from
East Railroad Street into the parking lot will only allow access to the addition area,
which will be two (2) way traffic in this portion of the parking lot. As this Property is
zoned CC, there are no minimum or maximum parking requirements for non-
residential land uses, and the lot coverage allows for the entire lot to be covered. Staff
is working with the Applicant to squeeze in a sidewalk along the frontage of their
Property on East Railroad Street. While Staff understands the sidewalk will not
connect to South Main Street, Staff is hopeful this is the first incremental step towards
better connectivity.
Zoning Text Amendment
Staff is proposing a zoning text amendment at the August 2026 Plan Commission
meeting to allow places of worship to occur in the CC, Suburban Commercial (SC),
Neighborhood Office (NO), and Suburban Office (SO) zoning districts. Currently, the
existing places of worship are grandfathered in these areas and cannot make any
exterior improvements outside of the existing footprint. If the zoning text amendment is
approved, the Applicant has the opportunity to add 4,700 square feet to the existing
building.
Recommendation:
Staff recommends the Plan Commission review the submitted materials and provide
feedback to the Applicant.
Prepared by: Katherine Holt
Community Development Specialist
Submitted by: Lucas Sivertsen, AICP
Director of Planning and Development
P:\20260200 - Memorial Baptist Church Addition\Desi gn\Agency\Verona\Plan Commission Concept Review\Wor king\Memorial Baptist Church Addition
- Letter of Intent.docx
901 Deming Way 608.664.3500 Ph
Suite 102 608.664.3535 Fx
Madison, WI 53717 iconicacreates.com
07-02-26
City of Verona – Plan Commission Via: Email
111 Lincoln Street
Verona, WI 53593-1520
Re: Memorial Baptist Church Addition – Concept Review
Dear Zoning Administrator:
Memorial Baptist Church, located at 201 S. Main Street in Verona, is planning a building
addition to their existing facility. The addition will be approximately 4,700 SF and will
accommodate a new entry/drop-off area, 3 new classrooms, along with support spaces.
The exterior will be designed to be a cohesive continuation of the existing facility by
matching existing materials and details. The site will also be reconfigured to allow for
additional parking along with a drop of lane for visitors.
The existing facility is used as a place of worship, which includes the main sanctuary,
fellowship / gym area, kitchen, classroom, along with support spaces. The new addition will
include 3 additional classrooms, 2 single use accessible restrooms, and a unfinished second
floor space set aside for future needs. The classrooms will be used during weekends and
Wednesday night youth groups.
At this time, we are requesting conceptual review from Plan Commission at the August 3
rd
meeting.
Sincerely,
Jeremy Frommelt
Director of Design
7-2-26
Planning and Development
111 Lincoln Street
Verona, WI 53593-1520
Phone: (608) 845-848-9941
Fax: (608) 845-8613
www.veronawi.gov
Official Plan Commission submittal includes:
To begin review process:
1. 1 digital file of the completed application form with property owner’s signature;
2. Submittal fee, check payable to the City of Verona. Additional charges may be billed to
the applicant as the City Engineer’s review time is charged back to the applicant. An
initial review is free; and
3. Email, link, or flash drive with below plans in digital format; and
4. 1 digital copy of the stormwater management plans.
After Staff’s review and comments are sent to the applicant, the following
items need to be submitted by the requested Staff deadline.
1. 1 digital file at 8 ½” x 11” of a written description describing details of your project
submitted after Staff’s review and comments sent to applicant.
2. 1 digital file at 11” x 17” of the following plans, which are submitted after Staff’s review
and comments to applicant:
• Site Plan – Showing existing and proposed buildings & parking.
• Landscaping Plan – Showing existing and proposed plantings noting natives to
Wisconsin. Any trees that are planted due to removal of other trees must be marked
on the plans as replacement trees.
• Lighting Plan – Showing light locations, light levels and fixture details.
• Grading, Drainage, Erosion Control Plans – With contours & flow arrows.
• Utility Plans – Showing the location of existing and proposed utility lines.
• Floor Plans – Showing the size and use of the existing & proposed buildings.
• Elevation drawings – Scaled drawings identifying materials and heights.
• Stormwater calculations – Engineering calculations.
• Project detail sheets – Any details may be included in separate sheets such as
dumpster enclosures, fencing, charging stations, bicycle racks, or signage.
3. See Development Checklist for more information.
EXISTING BUILDING
7
S. MAIN ST.
S. FRANKLIN ST.
RAILROAD
ST.
E. PARK LN.
2
7
5
4
6 6
4
COVERED
DROP-OFF
5 EXISTING ELECTRICAL
TRANSFORMER
**46 TOTAL PARKING STALLS
4,716 SF BUILDING ADDITION
PHASE II
PHASE I
DUMPSTER
ENCLOSURE
BIKE PARKING
NEW 5'-0" WIDE
SIDEWALK
901 DEMING WAY // MADISON, WI 53717
Ph: 608.664.3500
Copyright © 2024 by Iconica (All Rights Reserved)
https://iconicacreates.com/
7/1/2026 12:28:09 PM
07/02/26
PRELIMINARY SITE PLAN MEMORIAL BAPTIST CHURCH ADDITION
201 S. MAIN ST.
VERONA, WI 53593 Z100
N
TRUE
NORTH
15' 30' 60' 0
2" 0
1" = 30'-0"
DN
KITCHEN
STORAGE
JANITOR
MEN
WOMEN
VESTIBULE
RAMP
STAIR
NARTHEX
SECRETARY
CLASSROOM
PASTOR
HALL
CHANCEL
CHOIR
SANCTUARY
ENTRY
COATS
NARTHEX
CORRIDOR
STAIR
RESTROOM
VESTIBULE
CLASSROOM CLASSROOM CLASSROOM
RECEPTION
FELLOWSHIP / GYM
STORAGE
96' - 6" 100' - 0"
96' - 6"
LULA
100' - 0"
DN
UP
DN
DN
DN
Z301
2
Z301
1
Z302
1
Z302
2
FUTURE SPACE
DN
Z301
2
Z301
1
Z302
1
32'-6"
42'-6"
EXTENT OF 2ND FLOOR SPACE
ALLOWED PER MAX TRAVEL
DISTANCE WITH ONE EXIT
901 DEMING WAY // MADISON, WI 53717
Ph: 608.664.3500
Copyright © 2024 by Iconica (All Rights Reserved)
https://iconicacreates.com/
6/29/2026 1:30:53 PM
07/02/26
PRELIMINARY FLOOR PLAN MEMORIAL BAPTIST CHURCH ADDITION
201 S. MAIN ST.
VERONA, WI 53593 Z201 N
TRUE
NORTH
5.3' 10.7' 21.3' 0
2" 0
3/32" = 1'-0"
901 DEMING WAY // MADISON, WI 53717
Ph: 608.664.3500
Copyright © 2024 by Iconica (All Rights Reserved)
https://iconicacreates.com/
6/26/2026 3:29:47 PM
07/02/26
PRELIMINARY EXTERIOR ELEVATIONSMEMORIAL BAPTIST CHURCH ADDITION
201 S. MAIN ST.
VERONA, WI 53593 Z301
4' 8' 16'0
2"0
1/8" = 1'-0"
SCALE: 1/8" = 1'-0"Z301
EAST ELEVATION2
SCALE: 1/8" = 1'-0"Z301
SOUTH ELEVATION1
901 DEMING WAY // MADISON, WI 53717
Ph: 608.664.3500
Copyright © 2024 by Iconica (All Rights Reserved)
https://iconicacreates.com/
6/26/2026 3:29:56 PM
07/02/26
PRELIMINARY EXTERIOR ELEVATIONSMEMORIAL BAPTIST CHURCH ADDITION
201 S. MAIN ST.
VERONA, WI 53593 Z302
4' 8' 16'0
2"0
1/8" = 1'-0"
SCALE: 1/8" = 1'-0"Z302
NORTH ELEVATION2
SCALE: 1/8" = 1'-0"Z302
NORTHEAST ELEVATION1
Source: City of Verona website. First collected Oct 16, 2026.