1
AGENDA
CITY OF MONONA
COMMUNITY DEVELOPMENT AUTHORITY
Monona City Hall – Conference Room
5211 Schluter Road, Monona, WI
Tuesday September 22, 2026
6:30 pm
1. Call to Order
2. Roll Call
3. Approval of CDA Meeting Minutes of July 28, 2026.
4. Appearances
5. Public Hearing (None)
6. Old Business
A. None
7. New Business
A. Consideration and possible action on 1106 Birch Haven Circle Renew Monona
Loan Program Request – Shawn Marie Klett.
B. Informational Presentation and Discussion for Proposed Redevelopment and Tax
Increment Finance Request for Broadway Senior – Phase III of the Northpointe
East Broadway GDP at approximately 1212 E. Broadway (Northpointe
Development Corp.)
8. Update on Existing and Proposed Developments
A. Staff Report on Development Projects and Applications.
B. CDA Questions and Requests for Information Concerning Development Projects.
9. Upcoming CDA Meetings – The next regular meeting is scheduled for October 27,
2026.
10. Adjournment
Note: Upon reasonable notice, the City of Monona will accommodate the needs of disabled individuals through
auxiliary aids or services. For additional information or to request this service, contact Christina Kahl at
(608) 222-2525 (not a TDD telephone number), FAX (608) 222-9225, or through the City Police
Department TDD telephone number 441-0399. The public is notified that any final action taken at a
previous meeting may be reconsidered pursuant to the City of Monona ordinances. A suspension of the
rules may allow for final action to be taken on an item of New Business. It is possible that members of and a
possible quorum of members of other governmental bodies of the municipality may be in attendance at
the above stated meeting to gather information or speak about a subject, over which they have decision-
making responsibility. Any governmental body at the above stated meeting will take no action other than the
governmental body specifically referred to above in this notice.
Community Development Authority Minutes - DRAFT
July 28, 2026
1
Minutes
Community Development Authority
July 28, 2026
Chair Stolper called the Community Development Authority (CDA) meeting to order at 6:36 pm.
Present: Chair Tom Stolper, Alder Doug Wood, Ms. Jennifer Henderson, Mr. Andrew
Homburg, Mr. Dave Lombardo and Mr. Scott Kelly.
Excused: Alder Brian Holmquist
Also Present: City Administrator Neil Stechschulte, City Attorney Bill Cole, Katrina Becker.
(Becker Associates), Milo Pinkerton (MSP Real Estate), Brian Woolsey (MSP
Real Estate), Tom Denaway (MSP Real Estate), Bert Slinde (Slinde Realty
Investments), Jeff Slinde (Slinde Realty Investments), and Mike Slinde (Slinde
Realty Investments).
MINUTES
A motion by Alder Wood, seconded by Mr. Lombardo, to approve the open and closed session
minutes of July 7, 2026 and July 17, 2026 meeting carried with no corrections.
APPEARANCES
There were no appearances.
PUBLIC HEARING (NONE)
OLD BUSINESS
A. Continued Review, Discussion, and Possible Action (if necessary) of Development
Proposal and Tax Increment Finance Request for 112-208 Owen Road (Slinde Realty and
MSP Companies).
The MSP Companies/Slinde Realty Investments provided an overview of their current
proposal to the CDA. The presentation included:
• Two phases: Phase has 143 units, Phase 2 has 116 units.
• Pay-Go TIF reimbursement at $4.6 million (principal), 5.0% interest rate.
• Developer assumption included a 20-Year reimbursement period, 70/30 sharing
ratio, 1.5% market value inflation, and $215,000 per unit assessment.
• Extraordinary costs identified included structured parking, site
clearing/excavation, stormwater, site utilities, top floor step back, demolition, and
fire rated structural upgrades at $5,742,456 (excluding land).
• Current gap identified as $6,124,613.
Community Development Authority Minutes - DRAFT
July 28, 2026
2
B. Convene in Closed Session (if necessary) Pursuant to Wisconsin State Statute Section
19.85(1)(e) Deliberating or negotiating the purchasing of public properties, the investing
of public funds, or conducting other specified public business, whenever competitive or
bargaining reasons require a closed session (112-208 Owen Road - Development
Agreement Consideration).
Attorney Cole shared that in accordance with the court decision in Oitzinger v. City of
Marinette the reason for the Closed Session was to discuss the Development Agreement
and to provide direction to the negotiating team.
Motion by Mr. Lombardo, second by Alder Wood, to convene in closed session. On a roll
call vote, all members voted aye to convene in closed session at 7:17 pm.
C. Reconvene in Open Session Under Wisconsin State Statute 19.85(2) (if necessary).
Motion by Alder Wood, second by Mr. Homburg, to reconvene into open session. Motion
carried. The CDA reconvened into open session at 8:23 pm.
D. Discussion and Possible Action on Items Arising from Closed Session (
Gisholt Drive and
W. Broadway) (if necessary).
No action was taken.
NEW BUSINESS
A. None
REPORTS OF STAFF AND CDA MEMBERS
No report.
UPCOMING CDA MEETINGS
The next regular meeting is scheduled for August 25, 2026.
ADJOURNMENT
A motion was made by Alder Wood, seconded by Mr. Lombardo to adjourn. The motion carried.
(8:27 pm)
Minutes taken by City Administrator Neil Stechschulte.
1
RENEW MONONA LOAN PROGRAM STAFF REPORT
CITY OF MONONA CASE NO. 2026-4
Project: Request for Renew Monona Loan Funds
Project Address: 1106 Birch Haven Circle
Applicant: Shawn Marie Klett
Proposal Summary:
Shawn Marie Klett (the “Applicant”) owns the property at 1106 Birch Haven Circle (the “Property”),
and has submitted a Renew Monona Loan application requesting $75,000.00 from the Major Home
Rehab category (the “Application”) to conduct the following improvements to the existing residence
(the “Project”):
Complete the construction of a new single-family home on the Property. Current condition
includes a foundation which was completed before the previous project was paused.
Per the Application, the proposed total cost of improvements is $525,000.00 with the loan request of
$75,000.00. The Applicant provided cost estimates for the work, which are included as Attachment 4
in the meeting packet.
Staff Review of Eligibility Criteria:
Criteria Criteria Met Notes
1 Property is owner-occupied Yes The Applicant purchased the
Property in 2021.
2 Assessed Property Value Yes Total Assessed Value (TAV) of
$331,500.00 as of 01/01/2025.
3 Assessed Property Value less than or
equal to 120% of Median Assessed Value
Yes TAV of $331,500.00 is less
than the 120% of the median
assessed value of residential
properties of $563,400.00 as of
01/01/2025. Foundation only.
4 Applicant to maintain at residence for at
least 2 Years after Project
Yes The Applicant indicated that
they will remain at the
residence for at least 2 years
after the improvements are
completed.
5 Proposed Improvements are to Primary
Structure
Yes The proposed improvements
are to the main structure.
6 Proposed improvements are eligible uses
of Program Loan Funds
For discussion The applicant applied for the
Major Home Rehab program,
which includes the “addition of
or significant improvement to
living space”. Please note that
program materials state that
“tear-downs” are not eligible
uses of program funds. The
CDA may choose to consider
the existing nature of the
foundation and the unusual
circumstances that exist in this
case. The requested loan
2
amount is the maximum loan
amount for the program.
7 Proposed improvements will increase the
assessed value of the home.
Yes The proposed single-family
home will increase assessed
value.
8 Proposed improvements will improve the
attractiveness of the home and the
neighborhood to potential future home
buyers.
Yes The completion of the
construction with a functional
family home will enhance the
Property, and appeal to future
home buyers.
9 Applicant is in good financial standing and
gives the City of Monona permission to
contact their mortgage provider to
confirm.
Yes The applicant has a primary
mortgage with Summit Credit
Union. The Applicant gave
Staff permission to contact
their lender.
Financing the Project:
The Applicant has indicated that they plan to use a combination of funds from their retirement
account and their divorce settlement to finance their portion of the Project ($450,000.00+), assuming
that the City approves the full 50% loan amount. Assuming the requested loan amount is approved,
work is scheduled to begin shortly after approval. If the loan were not to be approved, it would cause
financial hardship to the Applicant who would need to apply for a higher interest loan for this portion
or possibly delay the Project.
Recommendation:
Staff recommends CDA review and discussion of the application materials, eligibility requirements,
and to make a recommendation on what, if any, loan amount should be provided for this Project.
Performance Criteria Staff Comments
A
Proposed improvements are well chosen,
are an appropriate use of loan funds, and
fulfill an obvious need for the housing
structure.
The proposal aligns with the Renew Monona loan
program description to rejuvenate existing and
aging housing stock to make it more attractive to
buyers.
B
Improvements are long-lasting and will
enhance the quality of the home for years
to come.
The project scope is well thought out, and will be
constructed to a high quality. The Project will
complete the construction of a new single-family
home providing an updated residence on the
Property.
C
Proposed improvements will increase the
energy efficiency of the home.
The Project includes two zone duct system,
enhanced insulation levels in exterior walls,
energy efficient windows and doors and plans to
use energy efficient lighting throughout the
house.
D
The home where proposed improvements
will occur is in an area in need of
improvements or is in an identified
preference area. This may include
accessibility improvements or additions
allowing the applicant to age in place.
The former structure was demolished, with the
proposed Project to include an upgraded new
single-family home in approximately the same
location.
3
Attachments:
Attachment 1 – The Applicant’s Renew Monona Application Form
Attachment 2 – Map of 1106 Birch Haven Circle (from Dane County GIS)
Attachment 3 – Parcel Records for 1106 Birch Haven Circle. (from Dane County Property
Information)
Attachment 4 – Submitted Project Estimates from OZ Builders.
Attachment 1
Attachment 1
Attachment 1
Attachment 1
Attachment 1
Birch Haven Cir
Birch Haven
Cir
Bi rch Ha ven Ci r
Nis
his
hin
Trl
NE
Birch Ha ven
Pa rk
Nish
ishin
Trl N
E
1106 Birch Haven Circle
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap
contributors, and the GIS User Community
Parcels
9/14/2026, 4:43:57 PM
0 100 20050 ft
0 30 6015 m
1:1,080
Attachment 2
Attachment 3
OZ Builders
4284 Hawk Trail
DeForest WI, 53532
Nick (920) 210-2721
Jeff (262) 385-1039
July 30, 2026
Shawn Klett
304 Panther Trail
Monona, WI 53716
Shawn,
OZ Builders appreciates the chance to bid on your work. Our goal is to serve you in a helpful and
beneficial manner; we provide this through open, honest communication and quality workmanship.
Attached is the total estimated cost of building your new home per the submitted plans. Please give us
a call and set up a time to review the specifications and go over the contract if you have any questions.
If you do not have any questions and would like to accept this document, please sign, and date the last
page.
Sincerely yours,
Nick Zander and Jeff Olbinski, Owners
OZ Builders
Attachment
Attachment 4
Proposal
OZ Builders (“Contractor”), whose address being 4284 Hawk Trail, DeForest, WI 53532 submits the
following proposal to Shawn Klett (“Owner”), whose address 304 Panther Trail, Monona, WI 53716. In
consideration of the contract price and subject to the following conditions and terms, Contractor
proposes to perform the work required by the contract documents on the building site located at 1106
Birch Haven Circle, Monona, WI 53716.
We hereby submit estimates and specifications for the following:
Project
Permits
All building permits to be pulled by Contractor ($5,000 allowance)
Electrical
See Larson Electric estimate
o Includes $2,000 for additional requests and upgrades
Plumbing
See RHD Plumbing estimate
o Includes lower level rough in option, re-circulating line option, additional sump pump and
$2,000 fixture upgrade allowance
Septic
City sewer lateral connection included.
Well
City water lateral connection included.
Well pump system
NA
HVAC
See Four Seasons Heating and Cooling estimate
o Includes air conditioning, dual zones, Wi-Fi thermostats, air cleaner and $2,500 gas
piping allowance
Insulation
See Rockweiler Insulation estimate
o Includes sound batting for all bedrooms, bathrooms and laundry room perimeters, sound
batting for first floor ceiling, spray foam in basement and first floor box sills
Attachment 4
Roofing
50 Year Owens Corning Duration shingles – Boley Remodeling - $6,600
Step, chimney and sewer vent flashing where necessary
Drip cap
Seamless gutters, down spouts and extensions – Boley Remodeling - $2,000
Exterior:
See Rick’s Siding estimate
o LP Smart Side – Color TBD
Flooring/Tiled Shower/Tiled Backsplash:
See Floor 360 estimate
Trim Carpentry
Trim carpentry by OZ Builders
o Installation of cabinetry and hardware. Cabinet shelving placement by Owners
o Installation of countertops (excluding stone – by suppliers)
o Installation of bathroom mirrors, towel holders, TP holders, etc.
o Installation of interior doors, door handles, door stops, base, casing, jams, railings, hand
rails, exterior trim, mantle, closet shelving
o Installation of decking and railings
o Trim materials – See Bliffert summary
Concrete
Helical piers, footings, pads, foundation walls and basement floor are already poured.
o $20,000 allowance
o Tear down and pour last remaining section of foundation wall
o Remove interior foundation walls, grind flat
o Front stoop, sidewalk, 4” garage floor and driveway
Excavation
Most of the excavation and partial backfill has been completed. $4,500 allowance included
Rough Framing
All rough framing materials provided per plan – See Bliffert summary and Bliffert doors
Windows provided by Owner, installation by Contractor
Framing to be complete by Primetime Construction – See Primetime Construction estimate.
Drywall
See Hare Plastering and Drywall estimate
Cabinetry & Countertops
See Coyle Carpet One estimate – Final selections TBD
Attachment 4
Allowances/Miscellaneous
Landscaping $8,000
Gas fireplace $7,000
Mantle, fireplace stone or tile $2,500
Exterior stone and install $2,500
Surveying and house staking $0
Building permits and zoning $5,000
Light fixtures $3,500
Garage doors, openers, keyless entry $3,000
Front yard post lamp $0
Shower door $700
Painting supplies $1,500
Natural gas hookup $300
Electric hookup $0
Temp Power $475
Dumpster service $2,600
Porta potty service $900
Erosion control $300
Appliances $7,000
Mailbox $0
Bathroom mirrors and hangers $750
Total Contract Price: $531,341
Pricing
All prices are estimates. Owner to pay actual cost as shown by receipts provided by Contractor All pricing
estimates will try to be honored but due to market fluctuations, material increases and unknowns pricing
is subject to change.
Allowances
Owner agrees to pay for the allowance items and agrees that the amounts shown for the allowance
items are estimated allowances. Allowances are subject to adjustment upon completion of the
particular work involved. If the cost of any allowance items exceeds its allowance, Owner shall promptly
pay the difference to the Contractor. If the cost of the allowance items is less than the total allowance,
Owner shall receive a credit for the difference.
Change Orders
Except as specifically provided herein, the contract price and the contract documents may be changed
only by written change order. The extra cost or credit to Owner from a change order shall be
determined by mutual agreement. Slight deviations from the contract documents shall not require
authorizations by written change order.
Attachment 4
Obligations of Contractor
Contractor shall:
1. Provide and pay for all labor, materials and equipment, tools, construction equipment and
transportation and other facilities necessary for the completion of the work.
2. Pay all sales and use taxes and shall obtain, at Owners expense, the building permit, and
inspections necessary for the completion of the work.
3. Comply with all laws, ordinances, regulations, and lawful orders of any state or local agency or
authority which shall be applicable to the performance of the work.
Building Site
Owner warrants that they have a good and marketable title to the building site. Owner agrees to furnish
the contractor a copy of all restrictions, right of way, covenants and easements affecting the building
site.
Lien Notice
As required by the Wisconsin Construction Lien Law, contractor hereby notifies owner that persons or
companies furnishing labor or materials for the construction on owner’s land may have lien rights on
owner’s land and building if not paid. Those entitled to lien rights, in addition to the above-signed, are
those who contract directly with the owner or give the owners notice within 60 days after they first
furnish labor or materials for the construction. Accordingly, owner probably will receive notices from
those who furnish labor or material for the construction and should give a copy of each notice to their
mortgage lender, if any. Builder agrees to cooperate with the owner and their lender to see that all
potential lien claimants are duly paid. Commencement of work on this contract constitutes acceptance.
All work to be completed in a workmanlike manner according to standard practices. Any alteration from
the above specification involving extra cost will only be made upon written orders and will become extra
charges over and above the estimate. All agreements as to materials and fixtures, deliveries and
installation contingent upon strikes, accidents, or delays beyond our control. Owner to carry liability
and casualty insurance.
Supervision of Work
Owner agrees not to interfere with the direction and supervision of the work. Owner, upon reasonable
notice, may inspect the work. Such an inspection, however, shall not unreasonably interfere with the
performance of the work.
Utilities
Owner agrees to supply and pay for all water, heat, utilities, and services necessary for the performance
of the work.
Draws/Payments
Payment/Draw requests will be made on a as needed basis (typically monthly) by the Contractor. Timely
sign-off by the Owners is requested.
Attachment 4
Insurance
Contractor shall keep in effect a contractor’s liability insurance policy covering the building site.
Owner shall purchase and keep in effect a comprehensive general liability insurance policy covering the
building site and providing coverage against loss of use of property due to fire or other casualties.
Owner shall purchase and keep in effect property insurance with extended coverage upon both existing
structures located on the building site and the work to the full insurable value thereof. This insurance
shall include the interest of the owner, contractor, and any subcontractors in the work and shall insure
against the perils of fire and extended coverage shall include “all risk” insurance for physical loss or
damage because of theft, vandalism, and malicious mischief.
Contractor shall not be liable to Owner, and Owner waives any and all claims, actions, causes of action,
or demands Owner now has or may hereafter have against Contractor, for losses, damages or injuries
cause by adverse weather conditions, acts of God, accident, fire or other casualty, riot, civil commotion,
theft, vandalism, war, acts or omissions of Owner, or from any cause beyond the reasonable control of
Contractor.
Owner’s Right to Cancel
Owner may cancel this agreement by mailing a written notice to Contractor at the address set forth
above before midnight of the third business day after Owner signed this agreement. If Owner wishes,
Owner may use this page as that notice by writing “I hereby cancel” and adding Owner’s name and
address. A duplicate of this page is provided by Contractor for Owner’s records.
Acceptance of Proposal
Upon acceptance, this proposal shall constitute an agreement between Contactor and Owner for the
performance of work for the total contracted price and subject to the foregoing terms and conditions.
Customer Signature Date
OZ Builders Signature Date 7/30/26
08/26/2026
Attachment 4
Cost Specifications
5,000$ Building permit allowance - Includes Monona impact fees, permits, applications, review and
sanitary fees
NA Driveway permit
NA Drafting/Design - OZ Builders
-$ Survey - Paulson & Associates
2,600$ Disposal - Royal Container Service - 4 dumpsters at $650 each
900$ Porta potty - Strander's Sanitary
300$ Alliant Energy gas hookup allowance (65' free afterwards (6.7+.9 per foot)
475$ Alliant Energy electric hookup and temp service allowance (100' free $5.80 per foot)
300$ Silt fence - Flores Contractors - Zoning dependent
4,500$ Excavating - Fuller Excavating - Includes fill/stone allowance
20,000$ Concrete - Rutland Concrete, Includes partial wall, stoop, garage, driveway, and sidewalk
4,695$ Zander Solutions - Includes sealed sump basket, radon system with fan, finish water proofing
and apply insulcrete
65,000$ Rough framing, roof trusses, exterior doors, clad garage door frame, exposed lower level
perimeter framing - Bliffert Lumber
19,000$ Interior doors, hardware, trim and shelving - Bliffert Lumber
32,953$ Drywall - Hare Plastering and Drywall. Drywall and finish all finished spaces, includes
painting ceilings and closets flat white. Hang and fire tape garage ceiling and common walls.
34,005$ HVAC - Four Seasons Heating and Cooling - HVAC system including air conditioning, dual
zoning, Wi-Fi thermostats, air cleaner and gas piping allowance.
27,130$ Plumbing - RHD Plumbing - Includes lower level bath rough, re-circulating line, one additional
sump pump and $2,000 of upgrades
39,000$ Rough framing labor - Primetime Construction, includes $2,200 to frame deck
51,713$ LP Smart Siding materials and labor - Rick's Siding
24,000$ Finish carpentry labor - OZ Builders
35,925$ Electric - Larson Electric. Includes $2,000 of upgrades
3,500$ Light fixture allowance
14,185$
Insulation - Rockweiler Insulation - R-50 attic insulation. Includes sound batting for all
bedrooms, bathrooms and laundry room perimeters, sound batting for first floor ceiling, spray
foam in basement and first floor box sills, Includes R-19 basement perimeter walls.
6,600$
Roofing - Boley Remodeling - Owens Corning 50 year dimensions shingles
2,000$ Seamless gutters - Boley Remodeling
1,000$ Decorative stone on front of house (Allowance) - United Brick and Fireplace or Madison
Block and Stone
1,500$ Decorative stone install (Allowance)
8,000$ Landscaping allowance - Lakeside Landscaping
16,400$ Cabinets - Coyle Carpet One - Includes laundry room cubbies
10,900$ Quartz, laminate, and cultured marble tops - Coyle Carpet One
14,254$ Flooring - Carpet, LVP, LVT - Floor 360
1,200$ Tile backsplash - Floor 360 (Allowance)
5,856$ Tile shower - Floor 360
700$ Shower door allowance
3,000$ Garage door allowance- Seltzner Door Service - 18x8 recessed panel door with openers, 2
remotes and keyless entry
4,800$ Putty nail holes, caulking of trim
7,000$ Appliance allowance
750$ Bathroom mirrors & hardware allowance
-$ Mailbox allowance n/a
7,000$ Fireplace allowance
2,500$ Mantle & fireplace stone and install allowance
1,500$ Painting
3,200$ Decking/railing labor
-$ Septic - n/a
-$ Well - n/a
-$ Well pump & pressure tank - n/a
10,000$ Buffer, cleaning, various supplies and unknowns
493,341$ Subtotal
38,000$ General Contractor Fee
531,341$ Total Contract
Attachment 4
September 13, 2026
Douglas Plowman
City Planner
City of Monona
5211 Schluter Road
Monona, WI 53716
RE: Discussion of potential TIF assistance for The Encore
Northpointe Development II Corporation is requesting the opportunity to introduce and discuss
the potential to apply for TIF assistance for The Encore Senior affordable housing development
located at 1212 E Broadway in the City of Monona, Wisconsin.
Northpointe is proposing to construct a fifty-six-unit multifamily affordable housing
development for seniors located on the south side of the former Whitehorse property. The
GDP for the project was approved by the city late last year and an application for PIP approval
has been submitted. Those plans included a residential development consisting of one four-
story building. This would be the third residential housing project on the site following the
Broadway Lofts and Broadway Senior projects. Broadway Lofts, which included 12 townhomes
and 63 apartments for a total of 75 units, was supported with TIF assistance. Broadway Senior,
which is currently under construction and includes a 55-unit Senior Affordable Housing
development as well as a 2400 sq/ft retail commercial building to be built along Broadway, did
not request TIF assistance. Broadway Senior is expected to be competed in June of 2027.
Northpointe is targeting a March 2027 construction start with completion in April of 2028. In
general, affordable housing projects restrict the rents to an affordable level for those who earn
30-80% of the county’s median income. These rents are well below attainable market rents,
which causes financial gaps in the project. Gaps can also be attributed to cost increases as well
as negative pressures coming from increased interest rates and depressed pricing for
Affordable Housing Tax Credits. In addition, this project will have challenges due to the site’s
poor soils and necessity for geopiers. We are requesting the CDA to consider providing
feedback on the potential for TIF assistance to this project to fill a portion of the gap. We
anticipate that The Encore, Broadway Senior, and the future commercial building along
Broadway will generate $9-9.5 million in assessment. Broadway Lofts was guaranteed by
Northpointe to provide $7.5 million in assessment; however, the total assessment has been
more than $9.5 million over the past two years providing additional increment to the district.
It is our belief that this project will have a high impact on the community, give the residents
access to economic opportunity, and will act as a catalyst in the community. We greatly
appreciate your opportunity to introduce the project and plan to submit a full financial analysis
regarding the project for discussion at an upcoming CDA Meeting.
Sincerely,
Sean O’Brien
Principal
Northpointe Development Corporation
www.northpointedev.com
July 24, 2026
Plan Commission
City of Monona
5211 Schluter Road
Monona, WI 53716
Re: Narrative – Planned Development
Precise Implementation Plan Approval
Plan Commission Recommendation Date: September 7, 2026
The Encore -Broadway Phase 3
1212 E. Broadway, Monona, WI
KBA Project #2531
The following is submitted together with the plans and application for Plan Commission consideration.
Organizational Structure:
Architect:
Knothe & Bruce Architects, LLC
8401 Greenway Blvd., Ste 900
Middleton, WI 53562
(608) 836-3690
Contact: Kevin Burow
Developer:
Northpointe Development II Corporation
230 Ohio St.
Oshkosh, WI 53593
(608) 334-5665
Contact: Sean O’Brien
Developer:
Selassie Development
5970 Schroeder Road, Unit G
Madison, WI 53711
(608) 669-0994
Contact: Sam Haile
Engineer:
Vierbicher Associates, Inc.
999 Fourier Dr.
Madison, WI 53717
(608) 826-0532
Contact: Justin Zampardi
Landscape Design:
Vierbicher
999 Fourier Dr.
Madison, WI 53717
(608) 826-0532
Contact: Justin Zampardi
Project Description:
The Encore will be a newly constructed fifty-six-unit Senior LIHTC multifamily development located on
the south side of Monona, Wisconsin. The development will consist of the new construction of a single
four-story elevatored building containing 41, one bedroom/one-bathroom units, 15, two-bedroom/one-
bathroom units for a total of 56 units. The Developer proposes setting aside all the units for residents
earning 30, 50, or 80 percent or less of the Dane County AMI using the LIHTC Program targeting
Seniors 55+.
This project will be the third phase of affordable housing that Northpointe has developed in the area as
the first phase, Broadway Lofts, was completed in November of 2024 and phase 2, Broadway Senior will
be completed in 2027. We believe that a multi-family project located adjacent to our first two phases
will complement each other without over saturating the market. The residents will have access to the
B-Cycle Station and E-Bikes installed by the first phase. The site is located next door to medical clinics
and near grocery and other retail and very well located in the county’s urban core area which allows
residents access to most places in Dane County in less than 20 minutes. The site is located near a
future bus stop planned by Monona and has easy access to the Beltline, Interstate 90/94, and the Dutch
Mills Park n’ Ride.
The project will be built to a newly prescribed enhanced WHEDA sustainability standard of LEED Net
Zero. We are planning to have an approximate 40 KW PV Solar System on the roof of the building to
eliminate up to 90% of the building’s common area electrical usage. The project will have high quality
materials including LVT flooring and solid surface countertops.
The proposal meets a significant number of priorities identified by the city of Monona; however, we
should note that this site has significant limitations in terms of buildable area. There are wetlands that
run in parallel with the creek to the west, south and east which is why the building is located where you
see it on the plans. We have received approval from CARPC to encroach into the Environmental
Corridor.
Changes made to the project since after feedback received during our GDP approval:
We appreciate the feedback from Plan Commission and made the following changes to the project. We
increased the size of the outdoor patio to add to our outdoor amenities on the site and adjusted the 4th
floor plan to provide an outdoor deck.
Project Timeline:
We received WHEDA credits this spring and are planning to proceed with construction documents and
be ready to start construction in March of 2027. We anticipate that it would take approximately 12
months to complete the planned building as the site already has the private drive and utilities
constructed, meaning resident occupancy in March of 2028. We do plan to explore the potential
availability of TIF or other sources through the state.
Written Justification:
Northpointe Development and Selassie are proposing to develop The Encore. As stated in the
Comprehensive Plan, the amount of undeveloped land is extremely low in Monona, and the city should
support creative and diverse housing types as well as a variety of housing types. We believe that the
team’s proposal is creative and will create a neighborhood feel with our variety of housing types and
amenities vs a single oversized apartment building.
This project will also bring much needed new affordable housing to the city. According to the 2016
Comp Plan, over 80% of the city’s housing stock is over 30 years old. Since 2016 there have been
several new multifamily developments, all of which have been market rate developments. Those
projects charge between $1,800-$2,000 monthly for a 1 bedroom, $2,000-$2,200 monthly for a 2
bedroom. Also, demand for housing near the beltline has been significant.
As stated in the 2016 comp plan, “Housing is considered to be “affordable” if households spend no
more than 30% of their income on housing costs. The definition of income comes from the Census
definition of “money income,” and is “pre-tax, post-transfer” income. Housing costs for renting
households are “gross rent” which is rent paid plus utilities (where not included in rent). Utilities are
electricity, gas, water, and sewer. Housing costs for owning households include mortgage payments, real
estate taxes, home insurance, and utilities. Households that pay more than thirty percent of their
income for housing are considered rent cost burdened. An examination of housing cost burden in
Monona (Table 2.9) shows 71.4% owners and 53.7% renters in Monona pay less than 30% of their
income and are considered affordable. Therefore, 28.6% of owner-occupied households are cost-
burdened while about 46.3% of rental households are cost-burdened.” As almost half of the renter
households are rent-burdened, and increasing according to data compiled by Baker Tilly, this project will
provide a significant boost to housing affordability in the city.
Lastly, we also understand that even though the CDD allows residential as a use, the 2016
Comprehensive Plan identifies the future use of the site as commercial and that there have been
concerns with housing being placed on this site in the past. Since the 2016 Comprehensive Plan, the
sites have been divided, and Broadway Lofts have shown that there is a market for housing in this area.
Broadway Lofts created a pocket neighborhood that utilized the natural setting and green space to make
a truly desirable place to live. It also drives up the taxable basis of the property for the benefit of the
city.
Standards:
The project is being proposed as a PD to allow for this residential development.
This project will not substantially impair or diminish the use, value, and enjoyment of other properties
within this neighborhood. Quite the opposite. This project will enhance the character of the
neighborhood and bring additional opportunities for housing.
The site has been designed to facilitate safe pedestrian and vehicular traffic flow. Accessible routes will
be provided to residential and commercial spaces.
The project will comply with the City Erosion Control and Stormwater Management requirements.
Infiltration areas will be provided as required.
Each unit has a private patio or deck. Other amenities include a community room, exercise room,
storage areas, outdoor residential patio space, grill area. There will be bike racks underneath the
building, and we will install at least one electric car charging station in the underground parking.
Requested Exemptions:
Potentially on parking, but the housing units are mostly one-bedrooms. Seniors will have a lessor need
for parking, generally 1:1. Since the GDP review, parking on the street has been removed and replaced
in kind in the surface lot, so our proposed parking ratio is 1.45 which would allow extra parking for
visitors.
Site Development Data:
Densities - Lot 2
Lot Area – Lot 2 87,419 S.F. / 2.01 acres
Dwelling Units – Lot 2 56 D.U.
Lot Area / D.U. – Lot 2 1,561 S.F. / D.U.
Density 28.0 units / acre
Building Height: 4 Stories = +/- 51’-4” Apartment
Residential Area – Lot 2:
Apartments
First Floor 15,095 S.F.
Second Floor 15,095 S.F.
Third Floor 15,095 S.F.
Fourth Floor 15,095 S.F.
Total = 60,380 S.F.
Dwelling Unit Mix – Lot 2:
One Bedroom 41
Two Bedroom 15
Total = 56 D.U.
Vehicle Parking - Lot 2:
Underground 35
Surface Parking Lot 46
Total = 81 vehicle stalls
Thank you for your time and consideration of our proposal.
Sincerely,
Kevin Burow, AIA, NCARB, LEED AP
Managing Member
Robert Feller, AIA, NCARB, LEED AP
SHEET INDEX
AC100 BASEMENT PLAN
AC101 FIRST FLOOR PLAN
AC102 SECOND FLOOR PLAN
AC103 THIRD FLOOR PLAN
AC104 FOURTH FLOOR PLAN
AC105 ROOF PLAN
AC201 EXTERIOR ELEVATIONS
AC202 EXTERIOR ELEVATIONS
AC203 COLORED EXTERIOR ELEVATIONS
AC204 COLORED EXTERIOR ELEVATIONS
PROJECT NUMBER:
THE ENCORE BROADWAY
PHASE 3
PIP SUBMITTAL - 2026/07/24
1212 EAST BROADWAY, MONONA, WI
2531
G000 COVER SHEET
CA101a COLORED SITE PLAN
CA101 ARCHITECTURAL SITE PLAN
CA102 SITE LIGHTING PLAN
CA103 LOT COVERAGE
ARCHITECTURE SITE
GENERAL
C001 TITLE SHEET
C100 CIVIL SITE PLAN
C100 OVERALL EXISTING CONDITIONS
C101 EXISTING CONDITIONS
C200 SITE PLAN
C300 OVERALL GRADING & EROSION
CONTROL
C301 GRADING PLAN - WEST
C302 GRADING PLAN - EAST
C400 UTILITY PLAN
C500 CONSTRUCTION DETAILS
C501 CONSTRUCTION DETAILS
C502 CONSTRUCTION DETAILS
C503 CONSTRUCTION DETAILS
C504 CONSTRUCTION DETAILS
C505 CONSTRUCTION DETAILS
CIVIL
CONTEXT IMAGES
L100 LANDSCAPE PLAN
L200 LANDSCAPE NOTES
LANDSCAPE
2025.12.29 - GDP SUBMITTA
2026.07.24 - PIP SUBMITTAL
1
EV
INSTALLED
2
EV
INSTALLED
3
EV READY
4
EV READY
5
EV READY
6
EV READY
7
EV READY
8 9 10 11 12 14 15
16 17 18 19 20 21 22 23 24 25 26 27 28
29
30
31
32
33
34
35
3'-2"
13
4'-0"
23'-0"
18'-0" TYP. 24'-0" 18'-0" TYP.
6'-5 3/8"
4'-7 3/8"
6'-7 5/8" 6'-8 1/4"
3'-7 3/8"
4'-7 3/8"
6'-7 5/8" 6'-8 1/4"
3'-7 3/8"
4'-7 3/8"
6'-0 3/8" 6'-0 3/8" 6'-0 3/8" 6'-0 3/8" 6'-0 3/8" 6'-0 3/8"
4'-7 3/8"
6'-0 3/8" 6'-0 3/8" 6'-0 3/8"
6'-1" 6'-0 3/8" 6'-0 1/8" 6'-0 1/8"
4'-7 3/8"
3'-7 3/8"
6'-8 1/4" 6'-7 5/8"
3'-7 3/8"
6'-5 3/8"
3'-11 3/8"
4'-7 3/8"
6'-5 5/8" 6'-5 3/8" 6'-5 3/8"
3'-7 3/8"
18'-0" TYP. 24'-0" 18'-0" TYP.
9'-0" TYP.
8'-0" 8'-0"
18'-0"
9'-0" TYP. 9'-0" TYP.
PARKING GARAGE EXHAUST
& AREA WELL (VERIFY SIZES
WITH HVAC DESIGNER)
PARKING GARAGE FRESH
AIR INTAKE & AREA
WELL (VERIFY SIZES
WITH HVAC DESIGNER)
UNIT HEATER
EXHAUST AREA WELL
(VERIFY SIZING)
UNIT HEATER
EXHAUST AREA WELL
(VERIFY SIZING)
24'-0"
24'-0"
23'-1 1/2"
RESIDENTIAL PARKING GARAGE
35 PARKING STALLS - 2 EV INSTALLED & 5 EV READY
6 FLOOR MOUNTED BIKE STALLS
STAIR A
STAIR B
ELEV.
MECHANICAL
TRASH
MAINTENANCE
16'-4" 28'-0" 16'-4"
25'-4 1/2" 9"
A202 2
A202
1
A201
1
A201 2
6 FLOOR MOUNTED
BIKE STALLS
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
BASEMENT PLAN
AC100
2531
0' 4' 8' 16'
1/8" = 1 ' - 0"
1/8" = 1'-0" AC100
1 00 - BASEMENT
LEGEND
1 Bed
2 Bed
Amenity - Active
Amenity - Leasure
Circulation
Parking
Storage
Utility
PIP SUBMITTAL - 2026/07/24
528 SF
EXERCISE
831 SF
STYLE G1
ONE BEDROOM
#117
1180 SF
STYLE F1
TWO BEDROOM
#116
668 SF
COMMUNITY ROOM
733 SF
STYLE D
ONE BEDROOM
#112
745 SF
STYLE C
ONE BEDROOM
#110
732 SF
STYLE D
ONE BEDROOM
#108
1167 SF
STYLE E
TWO BEDROOM
#102
1191 SF
STYLE B1
TWO BEDROOM
#101
745 SF
STYLE C TYPE A /
WHEDA / ROLL-IN
ONE BEDROOM
#103
1130 SF
STYLE A1 - 'TYPE A'
TWO BEDROOM
#105
749 SF
STYLE C WHEDA /
ROLL-IN
ONE BEDROOM
#107
732 SF
STYLE D
ONE BEDROOM
#109
744 SF
STYLE C
ONE BEDROOM
#111
RESTROOM
OFFICE
JAN.
PARCEL
COMMUNITY SERVICE
VESTIBULE
STAIR A STAIR B
MECH.
10 STORAGE LOCKERS
ELEV.
LOBBY
MAIL
A202 2
A202
1
A201
1
A201 2
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
FIRST FLOOR PLAN
AC101
2531
1/8" = 1'-0" AC101
1 01 - FIRST FLOOR
0' 4' 8' 16'
1/8" = 1 ' - 0"
LEGEND
1 Bed
2 Bed
Amenity - Active
Amenity - Leasure
Circulation
Parking
Storage
Utility
PIP SUBMITTAL - 2026/07/24
733 SF
STYLE D
ONE BEDROOM
#213
749 SF
STYLE C
ONE BEDROOM
#215
744 SF
STYLE C
ONE BEDROOM
#214
866 SF
STYLE G
TWO BEDROOM
#217
1215 SF
STYLE F
TWO BEDROOM
#216
733 SF
STYLE D
ONE BEDROOM
#212
745 SF
STYLE C
ONE BEDROOM
#210
732 SF
STYLE D
ONE BEDROOM
#208
1167 SF
STYLE E
TWO BEDROOM
#202
1225 SF
STYLE B
TWO BEDROOM
#201
745 SF
STYLE C WHEDA
ONE BEDROOM
#203
1165 SF
STYLE A WHEDA
TWO BEDROOM
#205
749 SF
STYLE C
ONE BEDROOM
#207
732 SF
STYLE D
ONE BEDROOM
#209
744 SF
STYLE C
ONE BEDROOM
#211
STAIR A STAIR B
MECH.
10 STORAGE LOCKERS
ELEV.
A202 2
A202
1
A201
1
A201 2
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
SECOND FLOOR
PLAN
AC102
2531
1/8" = 1'-0" AC102
1 02 - SECOND FLOOR
0' 4' 8' 16'
1/8" = 1 ' - 0"
LEGEND
1 Bed
2 Bed
Amenity - Active
Amenity - Leasure
Circulation
Parking
Storage
Utility
PIP SUBMITTAL - 2026/07/24
733 SF
STYLE D
ONE BEDROOM
#313
749 SF
STYLE C
ONE BEDROOM
#315
744 SF
STYLE C
ONE BEDROOM
#314
866 SF
STYLE G
ONE BEDROOM
#317
1215 SF
STYLE F
TWO BEDROOM
#316
733 SF
STYLE D
ONE BEDROOM
#312
745 SF
STYLE C
ONE BEDROOM
#310
732 SF
STYLE D
ONE BEDROOM
#308
1167 SF
STYLE E
TWO BEDROOM
#302
1225 SF
STYLE B
TWO BEDROOM
#301
745 SF
STYLE C
ONE BEDROOM
#303
1165 SF
STYLE A
TWO BEDROOM
#305
749 SF
STYLE C WHEDA
ONE BEDROOM
#307
732 SF
STYLE D
ONE BEDROOM
#309
744 SF
STYLE C
ONE BEDROOM
#311
STAIR A STAIR B
MECH.
10 STORAGE LOCKERS
ELEV.
A202 2
A202
1
A201
1
A201 2
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
THIRD FLOOR PLAN
AC103
2531
1/8" = 1'-0" AC103
1 03 - THIRD FLOOR
0' 4' 8' 16'
1/8" = 1 ' - 0"
LEGEND
1 Bed
2 Bed
Amenity - Active
Amenity - Leasure
Circulation
Parking
Storage
Utility
PIP SUBMITTAL - 2026/07/24
733 SF
STYLE D
ONE BEDROOM
#413
749 SF
STYLE C
ONE BEDROOM
#415
744 SF
STYLE C
ONE BEDROOM
#414
866 SF
STYLE G1
ONE BEDROOM
#417
1215 SF
STYLE F1
TWO BEDROOM
#416
733 SF
STYLE D
ONE BEDROOM
#412
745 SF
STYLE C
ONE BEDROOM
#410
732 SF
STYLE D
ONE BEDROOM
#408
1167 SF
STYLE E
TWO BEDROOM
#402
745 SF
STYLE C
ONE BEDROOM
#403
1165 SF
STYLE A
TWO BEDROOM
#405
749 SF
STYLE C
ONE BEDROOM
#407
732 SF
STYLE D
ONE BEDROOM
#409
744 SF
STYLE C
ONE BEDROOM
#411
STAIR A STAIR B
MECH.
8 STORAGE LOCKERS
ELEV.
COMMUNITY ROOM
RESTROOM
A202 2
A202
1
A201
1
A201 2
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
FOURTH FLOOR
PLAN
AC104
2531
1/8" = 1'-0" AC104
1 04 - FOURTH FLOOR
0' 4' 8' 16'
1/8" = 1 ' - 0"
LEGEND
1 Bed
2 Bed
Amenity - Active
Amenity - Leasure
Circulation
Parking
Storage
Utility
PIP SUBMITTAL - 2026/07/24
PIP SUBMITTAL - 2026/07/24
E
RD RD RD RD
RD
OD
OD OD OD
OD
1/4" : 1' -0"
1/4" : 1' -0"
PITCH TOP CHORD 1/4" / 1'-0" PITCH TOP CHORD 1/4" / 1'-0"
PITCH TOP CHORD 1/4" / 1'-0"
PITCH TOP CHORD 1/4" / 1'-0"
PITCH TOP CHORD 1/4" / 1'-0"
PITCH TOP CHORD
ELEV. SHAFT BELOW
NO MECHANICAL EQUIPMENT
ALLOWED OUTSIDE DASHED LINE
10'-0" MIN. FROM ROOF EDGE
10'-0"
2" ABOVE ROOF
DRAIN MAX. TYP.
10'-2"
CORRIDOR
WALLS BELOW
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
ROOF PLAN
AC105
2531
1/8" = 1'-0" AC105
1 CITY - 05 - ROOF PLAN
0' 4' 8' 16'
1/8" = 1 ' - 0"
PIP SUBMITTAL - 2026/07/24
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
FOURTH FLOOR
133' -5 5/8"
02 01 03
05 06 06
07 08 01
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
BASEMENT
89' -6"
FOURTH FLOOR
133' -5 5/8"
05 06 06
01 02 03
04
01 02 03 08 08 07 07
ELECTRIC
METERS
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
EXTERIOR
ELEVATIONS
AC201
2531
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 COMPOSITE ALTERNATING LAP SIDING - 7"-4"-7" JAMES HARDIE LIGHT MIST
02 COMPOSITE BOARD & BATTEN JAMES HARDIE IRON GRAY
03 COMPOSITE PANEL JAMES HARDIE BOOTHBAY BLUE
04 COMPOSITE PANEL JAMES HARDIE ARCTIC WHITE
05 BRICK VENEER INTERSTATE BRICK SAWGRASS
06 CAST STONE BANDS & SILLS EDWARDS BUFF
07 RAILINGS & HANDRAILS SUPERIOR BLACK
08 COMPOSITE WINDOW ANDERSEN WHITE
0' 4' 8' 16'
1/8" = 1 ' - 0"
– BALCONY FASCIA TRIM JAMES HARDIE IRON GRAY
– COMPOSITE TRIM @ ENTRY CANOPY JAMES HARDIE ARCTIC WH ITE
– COMPOSITE TRIM @ COMPOSITE PANEL JAMES HARDIE BOOTHB AY BLUE
– COMPOSITE OPENING TRIM @ LAP SIDING JAMES HARDIE LIG HT MIST
– COMPOSITE OPENING TRIM @ BOARD & BATTEN JAMES HARDI E IRON GRAY
– COMPOSITE WINDOW TRIM @ LAP SIDING JAMES HARDIE LIGH T MIST
– COMPOSITE WINDOW TRIM @ BAORD & BATTEN JAMES HARDIE IRON GRAY
– COMPOSITE SOFFIT PANELS JAMES HARDIE MATCH ADJACENT MATERIAL
– MORTAR @ BRICK VENEER & CAST STONE ELEMENTS MORTAR TECHNOLOGIES TBD
– PREFINISHED METAL FLASHING @ MASONRY & CAST STONE C MG / ULTRA-CLAD SIERRA TAN
– PREFINISHED METAL FLASHING - U.O.N. CMG / ULTRA-CLA D MATCH ADJACENT MATERIAL
– COMPOSITE BALCONY DECK BOARDS TREX COMPOSITE DECKIN G PEBBLE GRAY
– ALUMINIUM STOREFONT KAWNEER (OR SIM) WHITE
– INSULATED METAL MAN DOOR & OVERHEAD DOOR @
BASEMENT
TBD MATCH BRICK VENEER
1/8" = 1'-0" AC201
2 ELEVATION - WEST
1/8" = 1'-0" AC201
1 ELEVATION - NORTH
PIP SUBMITTAL - 2026/07/24
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
FOURTH FLOOR
133' -5 5/8"
01 04 02 03
05 06 06
07 02 03 08
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
FOURTH FLOOR
133' -5 5/8"
01 02 03 04 03 02 03
05 06 06
08
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
EXTERIOR
ELEVATIONS
AC202
2531
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 COMPOSITE ALTERNATING LAP SIDING - 7"-4"-7" JAMES HARDIE LIGHT MIST
02 COMPOSITE BOARD & BATTEN JAMES HARDIE IRON GRAY
03 COMPOSITE PANEL JAMES HARDIE BOOTHBAY BLUE
04 COMPOSITE PANEL JAMES HARDIE ARCTIC WHITE
05 BRICK VENEER INTERSTATE BRICK SAWGRASS
06 CAST STONE BANDS & SILLS EDWARDS BUFF
07 RAILINGS & HANDRAILS SUPERIOR BLACK
08 COMPOSITE WINDOW ANDERSEN WHITE
0' 4' 8' 16'
1/8" = 1 ' - 0"
– BALCONY FASCIA TRIM JAMES HARDIE IRON GRAY
– COMPOSITE TRIM @ ENTRY CANOPY JAMES HARDIE ARCTIC WH ITE
– COMPOSITE TRIM @ COMPOSITE PANEL JAMES HARDIE BOOTHB AY BLUE
– COMPOSITE OPENING TRIM @ LAP SIDING JAMES HARDIE LIG HT MIST
– COMPOSITE OPENING TRIM @ BOARD & BATTEN JAMES HARDI E IRON GRAY
– COMPOSITE WINDOW TRIM @ LAP SIDING JAMES HARDIE LIGH T MIST
– COMPOSITE WINDOW TRIM @ BAORD & BATTEN JAMES HARDIE IRON GRAY
– COMPOSITE SOFFIT PANELS JAMES HARDIE MATCH ADJACENT MATERIAL
– MORTAR @ BRICK VENEER & CAST STONE ELEMENTS MORTAR TECHNOLOGIES TBD
– PREFINISHED METAL FLASHING @ MASONRY & CAST STONE C MG / ULTRA-CLAD SIERRA TAN
– PREFINISHED METAL FLASHING - U.O.N. CMG / ULTRA-CLA D MATCH ADJACENT MATERIAL
– COMPOSITE BALCONY DECK BOARDS TREX COMPOSITE DECKIN G PEBBLE GRAY
– ALUMINIUM STOREFONT KAWNEER (OR SIM) WHITE
– INSULATED METAL MAN DOOR & OVERHEAD DOOR @
BASEMENT
TBD MATCH BRICK VENEER
1/8" = 1'-0" AC202
1 ELEVATION - SOUTH
1/8" = 1'-0" AC202
2 ELEVATION - EAST
PIP SUBMITTAL - 2026/07/24
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
FOURTH FLOOR
133' -5 5/8"
02 01 03
05 06 06
07 08 01
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
BASEMENT
89' -6"
FOURTH FLOOR
133' -5 5/8"
05 06 06
01 02 03
04
01 02 03 08 08 07 07
ELECTRIC
METERS
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
COLORED EXTERIOR
ELEVATIONS
AC203
2531
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 COMPOSITE ALTERNATING LAP SIDING - 7"-4"-7" JAMES HARDIE LIGHT MIST
02 COMPOSITE BOARD & BATTEN JAMES HARDIE IRON GRAY
03 COMPOSITE PANEL JAMES HARDIE BOOTHBAY BLUE
04 COMPOSITE PANEL JAMES HARDIE ARCTIC WHITE
05 BRICK VENEER INTERSTATE BRICK SAWGRASS
06 CAST STONE BANDS & SILLS EDWARDS BUFF
07 RAILINGS & HANDRAILS SUPERIOR BLACK
08 COMPOSITE WINDOW ANDERSEN WHITE
0' 4' 8' 16'
1/8" = 1 ' - 0"
– BALCONY FASCIA TRIM JAMES HARDIE IRON GRAY
– COMPOSITE TRIM @ ENTRY CANOPY JAMES HARDIE ARCTIC WH ITE
– COMPOSITE TRIM @ COMPOSITE PANEL JAMES HARDIE BOOTHB AY BLUE
– COMPOSITE OPENING TRIM @ LAP SIDING JAMES HARDIE LIG HT MIST
– COMPOSITE OPENING TRIM @ BOARD & BATTEN JAMES HARDI E IRON GRAY
– COMPOSITE WINDOW TRIM @ LAP SIDING JAMES HARDIE LIGH T MIST
– COMPOSITE WINDOW TRIM @ BAORD & BATTEN JAMES HARDIE IRON GRAY
– COMPOSITE SOFFIT PANELS JAMES HARDIE MATCH ADJACENT MATERIAL
– MORTAR @ BRICK VENEER & CAST STONE ELEMENTS MORTAR TECHNOLOGIES TBD
– PREFINISHED METAL FLASHING @ MASONRY & CAST STONE C MG / ULTRA-CLAD SIERRA TAN
– PREFINISHED METAL FLASHING - U.O.N. CMG / ULTRA-CLA D MATCH ADJACENT MATERIAL
– COMPOSITE BALCONY DECK BOARDS TREX COMPOSITE DECKIN G PEBBLE GRAY
– ALUMINIUM STOREFONT KAWNEER (OR SIM) WHITE
– INSULATED METAL MAN DOOR & OVERHEAD DOOR @
BASEMENT
TBD MATCH BRICK VENEER
1/8" = 1'-0" AC203
2 COLORED ELEVATION - WEST
1/8" = 1'-0" AC203
1 COLORED ELEVATION - NORTH
PIP SUBMITTAL - 2026/07/24
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
FOURTH FLOOR
133' -5 5/8"
01 04 02 03
05 06 06
07 02 03 08
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
FOURTH FLOOR
133' -5 5/8"
01 02 03 04 03 02 03
05 06 06
08
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
THE ENCORE BROADWAY
PHASE 3
1212 EAST BROADWAY,
MONONA, WI
COLORED EXTERIOR
ELEVATIONS
AC204
2531
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 COMPOSITE ALTERNATING LAP SIDING - 7"-4"-7" JAMES HARDIE LIGHT MIST
02 COMPOSITE BOARD & BATTEN JAMES HARDIE IRON GRAY
03 COMPOSITE PANEL JAMES HARDIE BOOTHBAY BLUE
04 COMPOSITE PANEL JAMES HARDIE ARCTIC WHITE
05 BRICK VENEER INTERSTATE BRICK SAWGRASS
06 CAST STONE BANDS & SILLS EDWARDS BUFF
07 RAILINGS & HANDRAILS SUPERIOR BLACK
08 COMPOSITE WINDOW ANDERSEN WHITE
0' 4' 8' 16'
1/8" = 1 ' - 0"
– BALCONY FASCIA TRIM JAMES HARDIE IRON GRAY
– COMPOSITE TRIM @ ENTRY CANOPY JAMES HARDIE ARCTIC WH ITE
– COMPOSITE TRIM @ COMPOSITE PANEL JAMES HARDIE BOOTHB AY BLUE
– COMPOSITE OPENING TRIM @ LAP SIDING JAMES HARDIE LIG HT MIST
– COMPOSITE OPENING TRIM @ BOARD & BATTEN JAMES HARDI E IRON GRAY
– COMPOSITE WINDOW TRIM @ LAP SIDING JAMES HARDIE LIGH T MIST
– COMPOSITE WINDOW TRIM @ BAORD & BATTEN JAMES HARDIE IRON GRAY
– COMPOSITE SOFFIT PANELS JAMES HARDIE MATCH ADJACENT MATERIAL
– MORTAR @ BRICK VENEER & CAST STONE ELEMENTS MORTAR TECHNOLOGIES TBD
– PREFINISHED METAL FLASHING @ MASONRY & CAST STONE C MG / ULTRA-CLAD SIERRA TAN
– PREFINISHED METAL FLASHING - U.O.N. CMG / ULTRA-CLA D MATCH ADJACENT MATERIAL
– COMPOSITE BALCONY DECK BOARDS TREX COMPOSITE DECKIN G PEBBLE GRAY
– ALUMINIUM STOREFONT KAWNEER (OR SIM) WHITE
– INSULATED METAL MAN DOOR & OVERHEAD DOOR @
BASEMENT
TBD MATCH BRICK VENEER
1/8" = 1'-0" AC204
1 COLORED ELEVATION - SOUTH
1/8" = 1'-0" AC204
2 COLORED ELEVATION - EAST
PIP SUBMITTAL - 2026/07/24
© Knothe & Bruce Architects, LLC
2531 PIP SUBMITTAL
1212 EAST BROADWAY, MONONA, WI
THE ENCORE BROADWAY PHASE 3
CONCEPT IMAGE
2026/07/24
© Knothe & Bruce Architects, LLC
2531 PIP SUBMITTAL
1212 EAST BROADWAY, MONONA, WI
THE ENCORE BROADWAY PHASE 3
CONCEPT IMAGE
2026/07/24
© Knothe & Bruce Architects, LLC
2531 PIP SUBMITTAL
1212 EAST BROADWAY, MONONA, WI
THE ENCORE BROADWAY PHASE 3
CONCEPT IMAGE
2026/07/24
© Knothe & Bruce Architects, LLC
2531 PIP SUBMITTAL
1212 EAST BROADWAY, MONONA, WI
THE ENCORE BROADWAY PHASE 3
CONCEPT IMAGE
2026/07/24
© Knothe & Bruce Architects, LLC
2531 PIP SUBMITTAL
1212 EAST BROADWAY, MONONA, WI
THE ENCORE BROADWAY PHASE 3
CONCEPT IMAGE
2026/07/24
Source: City of Monona website. First collected Oct 16, 2026.