101 Alpine Pkwy. Oregon, WI 53575 | Phone: (608) 835-3118 | Fax: (608) 835-6503
oregonwi.gov | Find us on Facebook!
Pursuant to Wis. Stat. § 19.84, notice is hereby given to the public by the Chair of the Park Board, that the
following meeting will be held:
Meeting: Park Board Date: Tuesday, August 18, 2026
Location: Village Hall; 101 Alpine Pkwy. Time: 5:00 PM
Note: Any person who has a qualifying disability as defined by the Americans with Disabilities Act that requires
the meeting or materials at the meeting to be in an accessible location or format must contact the Village Clerk
at (608) 835 -3118, 101 Alpine Pkwy. , Oregon, Wisconsin, at least twenty -four (24) hours prior to the
commencement of the meeting so that any necessary arrangements can be made to accommodate each
request.
_________________________________________________________________________________ __________
Notice is hereby given that a majority of the Village Board of the Village of Oregon may be present at the Pa rk
Board meeting to gather information about subjects over which they have decision-making responsibility. This
constitutes a meeting of the Village Board of the Village of Oregon pursuant to state exrel. Badke V. Greendale
Village Board., 173 Wis 2d 553, 494 N.W. 2d 408 (1993) and must be noticed as such although the Village Board
will not take any formal action at this meeting.
Page 1 of 2
AGENDA
1) Call to Order.
2) Roll Call.
3) Approval of Minutes, if correct, and correction of mistakes, if any.
a) June 9, 2026
4) Public Appearances.
a) Community Input. This part of the agenda allows members of the public to provide
information to the Park Board, including items both on and off the agenda. Under the Open
Meetings Law, this agenda item allows the Board to receive information, and to ask
questions of a presenter to facilitate a better understanding of the information. Board
members may discuss procedural matters relating to the information, such as whether the
information should be directed to staff or placed on a future Board agenda. However,
Board members may not expand their discussion beyond such procedural matters. Fifteen
(15) minutes will be provided for this item with a three (3) minut e maximum per speaker;
otherwise, the agenda will proceed as posted. (This note may not be read at Board
meetings.)
5) Reports from Village Staff.
a) Director of Public Works Report.
Page 2 of 2
b) Director of Community Development Report. Update on Bike and Pedestrian Study
Request for Proposals.
c) Recreation and Programming Coordinator Report. Update on Future Events.
6) Unfinished Business (Items are for discussion and / or potential action).
a) Draft 2027 – 2036 Parks & Trails Capital Improvement Plan Review
7) New Business (Items are for discussion and / or potential action).
a) Proposed Rotary Club Lerner Park Bench and Bike Rack Installation and Rotary Trail
Message Board Installation Projects (staff recommendation: motion to recommend to the
Village Board approval as presented).
8) Items for Future Meetings and Assignments.
a) Announcements, comments, communications, upcoming meetings and events, and
miscellaneous business. Park Board members may provide brief statements, but no discussion or
action of the body shall occur.
b) Upcoming Meeting Dates: September 15 (please note this is the 3rd Tuesday of the month)
and October 13.
9) Adjournment.
Board Members: Mark Miller (Chair), Andy Hoernemann (Vice Chair), Jamie Frisch, Judy Knutson, Matt
Leas (Village Board Representative) , Nicolas Ruotti (Full-Member Student Representative) , and Alissa
Rozner.
101 Alpine Pkwy. Oregon, WI 53575 | Phone: (608) 835-3118 | Fax: (608) 835-6503
oregonwi.gov | Find us on Facebook!
Pursuant to Wis. Stat. § 19.84, notice is hereby given to the public by the Chair of the Park Board, that the
following meeting will be held:
Meeting: Park Board Date: Tuesday, August 18, 2026
Location: Village Hall; 101 Alpine Pkwy. Time: 5:00 PM
Note: Any person who has a qualifying disability as defined by the Americans with Disabilities Act that requires
the meeting or materials at the meeting to be in an accessible location or format must contact the Village Clerk
at (608) 835 -3118, 101 Alpine Pkwy. , Oregon, Wisconsin, at least twenty -four (24) hours prior to the
commencement of the meeting so that any necessary arrangements can be made to accommodate each
request.
_________________________________________________________________________________ __________
Notice is hereby given that a majority of the Village Board of the Village of Oregon may be present at the Pa rk
Board meeting to gather information about subjects over which they have decision-making responsibility. This
constitutes a meeting of the Village Board of the Village of Oregon pursuant to state exrel. Badke V. Greendale
Village Board., 173 Wis 2d 553, 494 N.W. 2d 408 (1993) and must be noticed as such although the Village Board
will not take any formal action at this meeting.
Page 1 of 2
AGENDA
1) Call to Order.
2) Roll Call.
3) Approval of Minutes, if correct, and correction of mistakes, if any.
a) June 9, 2026
4) Public Appearances.
a) Community Input. This part of the agenda allows members of the public to provide
information to the Park Board, including items both on and off the agenda. Under the Open
Meetings Law, this agenda item allows the Board to receive information, and to ask
questions of a presenter to facilitate a better understanding of the information. Board
members may discuss procedural matters relating to the information, such as whether the
information should be directed to staff or placed on a future Board agenda. However,
Board members may not expand their discussion beyond such procedural matters. Fifteen
(15) minutes will be provided for this item with a three (3) minut e maximum per speaker;
otherwise, the agenda will proceed as posted. (This note may not be read at Board
meetings.)
5) Reports from Village Staff.
a) Director of Public Works Report.
Page 2 of 2
b) Director of Community Development Report. Update on Bike and Pedestrian Study
Request for Proposals.
c) Recreation and Programming Coordinator Report. Update on Future Events.
6) Unfinished Business (Items are for discussion and / or potential action).
a) Draft 2027 – 2036 Parks & Trails Capital Improvement Plan Review
7) New Business (Items are for discussion and / or potential action).
a) Proposed Rotary Club Lerner Park Bench and Bike Rack Installation and Rotary Trail
Message Board Installation Projects (staff recommendation: motion to recommend to the
Village Board approval as presented).
8) Items for Future Meetings and Assignments.
a) Announcements, comments, communications, upcoming meetings and events, and
miscellaneous business. Park Board members may provide brief statements, but no discussion or
action of the body shall occur.
b) Upcoming Meeting Dates: September 15 (please note this is the 3rd Tuesday of the month)
and October 13.
9) Adjournment.
Board Members: Mark Miller (Chair), Andy Hoernemann (Vice Chair), Jamie Frisch, Judy Knutson, Matt
Leas (Village Board Representative) , Nicolas Ruotti (Full-Member Student Representative) , and Alissa
Rozner.
h
101 Alpine Parkway, WI 53575 | Phone: (608) 835-3118 | Fax: (608) 835-6503
vil.oregon.wi.us | Find us on Facebook!
Pursuant to Wis. Stat. § 19.84, notice is hereby given to the public by the Chair of the Village of Oregon Park
Board, that the following meeting will be held:
Meeting: Village of Oregon Park Board Date: Tuesday, June 9, 2026
Location: Village Hall; 101 Alpine Parkway Time: 5:00 PM
f
Note: Any person who has a qualifying disability as defined by the Americans with Disabilities Act that requires
the meeting or materials at the meeting to be in an accessible location or format must contact the Village Clerk
at (608) 835 -3118, 1 01 Alpine Parkway , Oregon, Wisconsin, at least twenty -four (24) hours prior to the
commencement of the meeting so that any necessary arrangements can be made to accommodate each
request.
_______________________________________________________________________________________________________
Notice is hereby given that a majority of the Village Board of the Village of Oregon may be present at the Park
Board meeting to gather information about subjects over which they have decision -making responsibility. This
constitutes a meeting of the Villa ge Board of the Village of Oregon pursuant to state exrel . Badke V. Greendale
Village Board., 173 Wis 2d 553, 494 N.W. 2d 408 (1993) and must be noticed as such although the Village Board
will not take any formal action at this meeting.
To be approved 07/14/2026 Page 1 of 5
MEETING MINUTES
1) Call to Order
The Park Board meeting was called to order by Chair Mark Miller at 5:00 p.m. on Tuesday, June 9,
2026.
2) Roll Call
Present: Matt Leas, Andy Hoernemann, Judy Knutson, Mark Miller, and Jamie Frisch.
Absent: Nico Ruotti
Also Present: Director of Community Development Elise Cruz, Director of Public Works Lauren Striegl,
Village Engineer Rich Koceja, Recreation and Programming Coordinator Liane Rhodes, Human Resources
Coordinator/Deputy Clerk Peggy Haag, and many members of the public.
3) Approval of Minutes
a) May 12, 2026
Hoernemann moved, seconded by Leas, to approve the minutes from May 12, 2026 with the
amendment as shown below. Motion carried 6-0.
4) Public Appearances
a) Public Comment. This part of the agenda allows members of the public to provide information
to the Village Board, including items both on and off the agenda. Under the Open Meetings
Law, this agenda item allows the Board to receive information, and to ask questions from a
presenter to facilitate a better understanding of the information. Board members may discuss
procedural matters relating to the information, such as whether the information should be
directed to staff, referred to a committee, or placed on a future Park Board agenda. However,
3(a)
To be approved 07/14/2026 Page 2 of 5
Board members may not expand their discussion beyond such procedural matters. Fifteen (15)
minutes will be provided for this item with a three (3) minute maximum per speaker;
otherwise, the agenda will proceed as posted. (This note may not be read at Board meetings.)
There were no public comments.
5) Reports of Village Officers
a) Director of Public Works Report
1. Update on Green View Preserve Park Improvement
Striegl reported that improvements at the Green View Preserve parks have been
completed. The parks have not yet been formally accepted by the Village, but acceptance
is expected within the next month. Public Works has been mowing the park at the
southern part of the subdivision to become familiar with maintenance needs, while
Veridian continues to maintain the remaining areas. Upon Village acceptance, Public
Works will assume full maintenance responsibilities for all park areas.
2. Update on Summer Park Enhancements
Koceja reported that erosion control work at Gary Disch Park is scheduled to begin this
week. A safety fence will be installed on Friday, and soil borings are expected to begin the
following week.
b) Director of Community Development Report
1. Bike and Pedestrian Study RFP Update
Cruz reported that seven proposals were received in response to the Request for Proposals
(RFP) for the Bike and Pedestrian Plan. Following interviews with three firms, staff
selected MSA Professional Services, citing the Village's positive experience working with
the firm on previous projects.
Cruz noted that the project is primarily funded through the Wisconsin Department of
Transportation (WisDOT), requiring completion of state administrative processes before
work can begin. Staff anticipates providing additional project information to the Park
Board at its first meeting in July, with a project kickoff meeting expected in mid- to late
July. Cruz invited interested Park Board members to participate on the project's steering
committee.
c) Recreation and Programming Coordinator Report
1. Future Events
Rhodes reminded members of the Kids' Bike Parade scheduled for July 4. The parade will
begin at Jaycee Community Park and conclude at Kiser Park, where participants can enjoy
popsicles, music, and hose spraying provided in partnership with the Oregon Area Fire &
EMS Department.
Rhodes also announced the upcoming Sounds of Summer concert series. Free concerts
will be held beginning July 14 and continuing through August 25, with festivities starting
at 5:30 p.m., warm-up acts at 6:00 p.m., and headlining performances at 6:30 p.m.
To be approved 07/14/2026 Page 3 of 5
6) Unfinished Business (Items are for Discussion and/or potential action)
a) Presentation by Garret Perry from JT Engineering of Bethel Greenacre Park Master Plan
Garrett Perry of JT Engineering presented the draft Bethel Greenacre Park Master Plan. He
reviewed the public engagement process, which included more than 12 hours of interviews
with stakeholders, impacted neighbors, Village staff, public safety representatives, and senior
residents, as well as research into the site's history and existing conditions.
Perry summarized two conceptual design alternatives that were developed through the
planning process. Concept A, which received stronger public support, emphasizes natural
features, pollinator habitat, meandering pathways, and informal gathering spaces. Concept B
follows a more traditional park layout. Both concepts incorporate stormwater management
features such as park amenities and educational opportunities.
Perry and Christoph Ibele of INTOTO Studio reviewed the preferred concept, which includes
a pavilion, restrooms, drinking fountains, plaza areas, natural play features, a futsal/multi-use
court, outdoor classroom space, and landscaping designed to support ecological function while
remaining maintainable. The design team worked with Village staff throughout the process to
address maintenance considerations and to maintain the project within the established $1.5
million budget, including contingency.
Board members discussed several aspects of the plan, including stormwater education
opportunities, long-term maintenance needs, connectivity to other areas of the Village,
preservation and replacement of existing trees, and potential cost reductions. Perry noted that
stormwater features would be intentionally integrated into the park design to provide both
functional and educational benefits. He also stated that future connections across the railroad
corridor could be explored, although no specific solution has been identified.
Striegl explained that the master plan is intended to serve as a guiding vision for future park
development and that additional budget and Capital Improvement Plan discussions will occur
in the coming months. Staff noted that approval of the master plan would allow the project to
advance into the detailed design phase, where individual elements could be refined and
potentially phased based on available funding.
Frisch moved, seconded by Hoernemann, to recommend that the Village Board approve
the Bethel Greenacre Park Master Plan. Motion carried, 3-2, with Leas and Knutson
voting no due to the cost. They like the vision but not the cost.
b) Discussion and possible action regarding Martin Family request for field naming
Ellen Smith addressed the Park Board regarding her family's request to name the field
immediately west of the courts at Jaycee Community Park the Howard Martin Memorial
Field. Smith referenced the statement included in the Board packet and asked the Board to
reconsider the request following the adoption of the Park Naming Policy.
Hoernemann reiterated the position he expressed during the Board's December discussion,
stating that while he appreciated the family's request, he does not support naming parks or
park facilities after individuals.
Leas moved, seconded by Knutson, to recommend that the Village Board approve the
naming of the soccer field to the west of the courts, Howard Martin Memorial Field, in
memory of Howard Martin. Motion carried 4-1 with Hoernemann voting no.
To be approved 07/14/2026 Page 4 of 5
c) Park Facilities Reservation Policy
Public Works Director Striegl requested feedback and direction from the Park Board regarding
the Park Facilities Reservation Policy for consideration by the Village Board.
Striegl presented the following guidance from Village Attorney Larry Konopacki:
1. Provide feedback on whether the Park Board would prefer to honor the FOOP / Oregon
School District request for “Community Play,” as presented at the May 2026 meeting, free
of charge.
2. Provide feedback on any other preferred priorities and outcomes with respect to the fee
schedule.
3. Recommend that the Village Board consider and, if they so choose, act to update the
existing Policy.
Attorney Konopacki had also advised that the Park Board, as an advisory body, should
formally recommend that the Village Board review the policy and consider revisions. Staff
also noted ambiguity in the current fee structure regarding classifications such as community
organizations, athletic organizations, and governmental entities, as well as the role of
501(c)(3) status.
Board discussion focused on the need for clearer definitions in the fee schedule and for the
consistent application of facility use fees. Members discussed how organizations should be
categorized, including the Oregon School District, community organizations, athletic
organizations, and nonprofit entities. Discussion also included how requests for pickleball
community play should be addressed within the fee structure.
Leas moved, seconded by Hoernemann, to recommend to the Village Board that
Appendix F of the fee schedule be revised to more clearly define groups and
organizations and their related fees for use of Village facilities. Motion carried 5-0.
Further discussion focused on how the Oregon School District should be incorporated into the
fee schedule, including whether it should be treated differently from other school districts or
governmental entities and whether reduced or no fees should apply to certain uses.
Barone, a member of the Friends of Oregon Pickleball (FOOP), stated that community play
has operated since 2017 and is intended to be inclusive of all ages and skill levels. He said
community play helps manage court usage and reduce conflicts when courts are heavily
utilized. Barone described a recent situation during an unofficial community play period in
which approximately 30 people were using the courts when a separate group arrived and
began occupying the courts. Barone stated that he spoke with members of the group and
encouraged them to rotate court usage with the regular community play participants so that
others could continue to play. He indicated that community play has historically provided
rules and guidance for court rotation and expressed concern that, without a reservation process
for community play, conflicts over court access could increase.
Leas moved, seconded by Hoernemann, to recommend the Village Board look at how the
Oregon School District is defined and charged for use fees. Motion carried 5-0.
Staff noted the motions and discussion would be used to prepare information for Village
Board review. Staff summarized the Park Board's direction as seeking clarification of
organizational classifications within the fee schedule, including athletic organizations,
community organizations, 501(c)(3) entities, and the Oregon School District, and requesting
Village Board feedback regarding potential fee treatment for Oregon School District-
To be approved 07/14/2026 Page 5 of 5
sponsored activities before drafting specific policy language. Staff indicated that the status quo
could continue, provided that the Friends of Oregon Pickleball or the Oregon School District
paid the fees required under the current fee schedule. Otherwise, the courts would not be
reserved for Community Play.
7) New Business (Items are for discussion and/or potential action)
a) Upcoming Meeting Dates: July 14 and August 18
8) Items for Future Meetings and Assignments.
Hoernemann suggested exploring a park passport program to encourage residents to visit local parks.
He referenced Liane Rhodes' flyer discussed at the previous meeting and suggested a web-based or
mobile-friendly platform where participants could submit photos, similar to the snowflake scavenger
hunt. He noted that such a program could help residents discover different parks and their amenities
and could include incentives such as drawings or small rewards. Hoernemann also expressed interest
in developing an interactive map showing park locations and amenities.
Knutson shared that DeForest has a park passport program and noted that it has moved away from
offering gifts, instead providing a surprise feature at each park.
9) Announcements, comments, communications, upcoming meetings and events, and miscellaneous
business. Park Board members may provide brief statements, but no discussion or action of the body
shall occur.
Knutson thanked Public Works for adding new sand to the sandbox at Meadow View Park.
10) Adjournment
Hoernemann moved, seconded by Knutson, to adjourn the Park Board Meeting at 6:36 p.m. on
Tuesday, June 9, 2026. Motion carried 5-0.
Submitted by:
Peggy Haag
HR Coordinator / Deputy Clerk
The Village of Oregon is developing its first-ever Bicycle and Pedestrian Plan to
evaluate existing walking and biking conditions, and make recommendations
for new infrastructure and policies in the Village. We are seeking feedback at
upcoming community events!
You can find project information and more ways to get involved at
www.oregonwi.gov/bikepedplan
• Oregon National Night Out
Tuesday 8/4 5-8PM at Kiser Park
• Sounds of Summer Concert Series
Tuesday 8/25 5:30-8PM at Waterman Triangle Park
• OSD Ready Set Go Conferences
Multiple schools and dates in late August
• Community Open House
Wednesday 9/16 6-8PM at Oregon Public Library
&
BICYCLE
PEDESTRIAN
PLAN
Find us at:
The Village of Oregon is developing its first-ever Bicycle and Pedestrian Plan to
evaluate existing walking and biking conditions, and make recommendations
for new infrastructure and policies in the Village. We are seeking feedback at
upcoming community events!
You can find project information and more ways to get involved at
www.oregonwi.gov/bikepedplan
• Oregon National Night Out
Tuesday 8/4 5-8PM at Kiser Park
• Sounds of Summer Concert Series
Tuesday 8/25 5:30-8PM at Waterman Triangle Park
• OSD Ready Set Go Conferences
Multiple schools and dates in late August
• Community Open House
Wednesday 9/16 6-8PM at Oregon Public Library
&
BICYCLE
PEDESTRIAN
PLAN
Find us at:
Village Hall 101 Alpine Parkway Oregon, Wisconsin 53575-3812
Telephone: (608) 835-6285 Fax: (608) 835-6503
lstriegl@oregonwi.gov
MEMO
TO: Public Works & Utilities Committee
FROM: Lauren Striegl, Director of Public Works
DATE: August 18, 2026
RE: Draft 2027 – 2036 Parks & Trails Capital Improvement Plan Review
UPDATE August 18, 2026: attached is the draft 2027 – 2036 Parks & Trails Capital Improvement Plan
(CIP) for the Village of Oregon. The 2027 – 2036 Parks & Trails CIP is based on the 2026 – 2035 Parks
& Trails CIP, as described in the memorandum text below (originally from May 12, 2026). The draft
2027 – 2036 Parks & Trails CIP was presented to the Village Board on August 3, 2026 as part of the
overall 2027 – 2036 Village-wide CIP, and will be discussed further at future August and September 2026
Village Board meetings.
In addition to the adjustments described below under “Potential Proposed Adjustments to the 2027– 2036
Parks CIP,” the primary change (relative to the 2026 – 2035 Parks & Trails CIP) included in the 2027 –
2036 CIP is a restructuring of the improvements proposed under the “West Side Conservation Parks
Improvements” project series. The 2026 – 2035 Parks & Trails CIP separated work over the 10-year
planning period by type, including restoration, pathway construction, restroom facility construction, etc.
The 2027 – 2036 Parks & Trails CIP has been adjusted such that projects are grouped by area – Keller
Alpine Park, West Side Park, Lerner / DiMaggio Park, etc. Specific proposed project components are
included in the Project Worksheet, attached to this memorandum. This change was made to better
estimate project costs, maximize resident benefit, and increase efficiencies in project planning and
construction.
Staff is seeking any feedback or guidance from the Park Board on their preferred priorities for the 2027–
2036 CIP. Park Board feedback may be used by staff to adjust the CIP, or directed to the Village Board as
a formal recommendation from the Park Board as appropriate.
In early May 2026, Village staff began the annual 10-Year Capital Improvement Planning effort for the
2027 – 2036 period. Prior to beginning this effort in earnest, Village of Oregon Public Works and
Community Development staff are seeking Park Board guidance on preferred priorities for the Village’s
parks and trails over the 10-year planning horizon.
Approved 2026 – 2035 Capital Improvement Plan (CIP)
The Board-approved 2026 – 2035 CIP is attached to this memorandum for review. With the exception of
the Park Street Connector Trail (Perry to Janesville) – TID 4 project (Parks – Trails), all projects and
equipment programmed for 2026 in Parks (Parks, Equipment, and Trails) are currently on schedule to be
purchased or completed in 2026 as planned.
Final funding amounts (borrowing and funds on hand) for 2026 projects and equipment were approved in
March and April 2026.
Page | 2
When developing the annual 10-year CIP, staff generally starts with the previous year’s CIP as a base.
Project estimates are updated based on the previous year’s actual construction costs and inflation
predictions, and scheduling is adjusted where necessary to accommodate current priorities. Between
September 2025 and today, staff has noted several likely changes and additions to the 2027 – 2036 CIP
(relative to the 2025 – 2036 CIP). Those changes are briefly described below. Note that this list only
includes needs already identified, and is not inclusive of all modifications that may be presented at the
June Park Board meeting.
Potential Proposed Adjustments to the 2027 – 2036 Parks CIP
New Project – Parks Facilities Access Control. This project would include the installation of
electronic access control equipment at all publicly-accessible Village parks buildings, including
the restroom facilities at Kiser Fireman’s Park, JayceeCommunity Park, and the Highlands of
Netherwood Park. Currently, Village staff must lock and unlock these facilities manually, which
takes significant staff time. In contrast, an electronic access control system could be programmed
to automatically lock and unlock these facilities at certain times. An electronic access control
system will increase efficiency for Village staff, and provide better security for Village
infrastructure. Note that the concession stand and sports equipment storage shed at Jaycee
Community Park are having this system installed in 2026 with the Public Works Garage Access
Control project.
Kiser Fireman’s Park Master Plan. This project is programmed for 2032 in the 2026 – 2035 CIP.
In the 2027 – 2036 CIP, staff will propose bringing this project forward to 2027. Downtown
Oregon is currently undergoing or planning for several transformational projects, including the
Senior Center reconstruction and the reuse of the old Village Hall building. These projects have
highlighted a need to plan for complementary infrastructure in the “greater” downtown area,
which includes Kiser Fireman’s Park. In addition, several of Kiser Fireman’s Park’s facilities,
including the skate park, the tennis courts, and parts of the softball fields, have reached the end of
their useful lives and require significant capital investment to be safely usable. Staff feels that the
combination of these two factors make a Master Plan for Kiser Fireman’s Park an urgent need to
support smart long-term growth in the Village’s downtown and parks system.
Park Street Connector Trail (Perry to Janesville) – TID 4 project. As discussed above, this project
was postponed from 2026. It will be included in the 2027 – 2036 CIP, but staff has not yet
identified a proposed schedule.
Staff is seeking any feedback or guidance from the Park Board on their preferred priorities for the 2027 –
2036 CIP. Over the month of May, staff will update the CIP based on new information and feedback
provided, and will provide a draft 2027 – 2036 Parks CIP for review at the June Park Board meeting.
Proposed Budget ($)
2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Parks Projects
Bergamont Park Improvements - - - - - 20,000 177,000 - - -
Bethel Greenacre - Playground, Restroom, Play Field and Prairie
Conversion 1,620,000 - - - - - - - - -
West Side Conservation Parks Improvements 232,000 1,109,000 137,000 1,683,000 41,000 472,000 76,000 773,000 46,000 417,000
Elving Kjellstrom Memorial Park - Water Fountain - - - 13,000 - - - - - -
Gasner Memorial Park - Playground Upgrades and Water Main
Replacement - 30,000 383,000 - - - - - - -
General Park Expenditures 35,000 37,000 38,000 39,000 40,000 41,000 42,000 44,000 45,000 46,000
Hawthorne Estates Park Improvements - - - - - 26,000 333,000 - - -
High Meadows Park and Scott St Tot Lot Improvements - - - - 30,000 421,000 - - - -
Jaycee Community Park Field and Court Lighting - - - - - - - - 25,000 1,774,000
Jaycee Community Park Bridge Decking 40,000 - - - - - - - - -
Kiser Fireman's Park Master Plan 70,000 - - - - - - - - -
Liberty Park Improvements - 20,000 135,000 - - - - - - -
Meadow View Park - - 95,000 - - - - - - -
Merri-Hill Park Improvements - - - - 85,000 - - - - -
North Main St (249/267) Park - 40,000 250,000 - - - - - - -
Norm Champion Park Playground Upgrade - - - - - - 31,000 400,000 - -
Rustic Vinyards Park Improvements - - - 20,000 167,000 - - - - -
Stone Ridge Park Improvements - - - - - - - 38,000 487,000 -
Thomson Park Playground Upgrade - - 32,000 411,000 - - - - - -
Waterman Triangle Park - - - - - 58,000 756,000 - - -
Windcrest Park Playground Upgrades - - - - - - - 35,000 457,000 -
Baseball/Softball Infield Restoration 10,000 15,000 20,000 5,500 5,500 6,000 6,000 6,500 7,000 7,500
Planned ($)
2027-2036 Capital Improvement Plan Worksheet - Parks and Trails
Project / Purchase
Proposed Budget ($)
2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Planned ($)
2027-2036 Capital Improvement Plan Worksheet - Parks and Trails
Project / Purchase
Playground Solid Surface Maintenance 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000
Pickleball Court Resurfacing - - 95,000 - - - - - - -
Field Overseeding 17,000 17,500 18,000 18,600 19,100 19,700 20,300 20,900 21,500 22,200
Field Treatment Expenses 11,200 11,500 11,900 12,200 12,600 13,000 13,400 13,800 14,200 14,600
Park Signage 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
Park Security 98,000 - 13,000 - 14,000 14,000 - - - -
Park Equipment
Field Grooming & Maintenance Machine & Appurtenances - - - - - - - - 54,000 -
Field Grooming Machine Trailer 5,000 - - - - - - - - -
Athletic Complex Mower - - - - - - - - - 91,000
Aerator - - - - - - - - - 72,000
Workman Vehicle w/ Sprayer Attachment 62,000 - - - - - - - - -
Pull-Behind Finish Mower - 80,000 - - - - - - - -
Toro Mower #1 - - - - - - - - - 195,000
Toro Mower #2 - - - 164,000 - - - - - -
John Deere 4720 Tractor (Vehicle No. 81 - 2013) - 90,000 - - - - - - - -
2002 JD Tractor & Wing Mower - - - 88,000 - - - - - -
JD F-1585 Mower #1 - - 64,000 - - - - 75,000 - -
Ventrac 4520 Wide 60,000 - - - - 70,000 - - - -
61" SCAG Parks Mower #2 - - - 24,000 - - - - 27,000 -
61" SCAG Parks Mower #1 - - - - 19,000 - - - - 22,000
Forestry Head/Drum Mulcher - - - - - - - - - 61,000
Playing Field Tools & Maintenance 11,000 12,000 13,000 14,000 15,000 16,000 17,000 18,000 19,000 20,000
Proposed Budget ($)
2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Planned ($)
2027-2036 Capital Improvement Plan Worksheet - Parks and Trails
Project / Purchase
Trail Projects
Trail Maintenance & Repairs 225,000 - - 225,000 - - 225,000 - - 225,000
Total 2,531,200 1,497,000 1,339,900 2,752,300 483,200 1,211,700 1,731,700 1,459,200 1,237,700 3,002,300
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2032 New Debt (GO) $20,000
2033 New Debt (GO) $177,000
Other:
Other:
Other:
Other:
Other:
Total $197,000
Design
Construction (inc. const admin)
Comments
Capital Project / Purchase Worksheet
Bergamont Park Improvements
Description of Project / Purchase
Installation of small shelter and additional multi-use field.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2026 New Debt (GO) $125,000
2027 New Debt (GO) $1,620,000
Other:
Other:
Other:
Other:
Total $1,745,000
Comments
Capital Project / Purchase Worksheet
Bethel Greenacre - Playground, Restroom, Play Field and Prairie
Conversion
Description of Project / Purchase
Bethel Greenacre Park on Burr Oak Street has a single small shelter that is nearing the end of its useful life.
Project layout and components are based on the 2026 Bethel Greenacre Master Plan, and include a restroom
facility/pavilion, sequence of play elements, futsal court, mowed walking path, and conversion of low-lying
stormwater detention areas to native prairie.
Sources of Funding
Architectural/engineering services
Construction (inc. const admin)
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $232,000
2028 New Debt (GO) $1,109,000
2029 New Debt (GO) $115,000
2029 TID 5 Expense $22,000
2030 New Debt (GO) $1,402,000
2030 TID 5 Expense $281,000
2031 New Debt (GO) $41,000
2032 New Debt (GO) $472,000
2033 New Debt (GO) $44,000
2033 TID 5 Expense $32,000
2034 New Debt (GO) $456,000
2034 TID 5 Expense $317,000
Phase 4 design (boardwalks only)
Comments
Capital Project / Purchase Worksheet
West Side Conservation Parks Improvements
Description of Project / Purchase
The west side of the Village contains serveral park and open space areas that are more natural and nature based.
This includes Lerner Park, Keller Alpine Park, DiMaggio Park, and Dega Park. Included in this area is the former
Florida Avenue area and also the West Side Park area bordering North Alpine Parkway. In 2024-2025, a Master
Plan was completed for these parks. The projects listed below combine the implementation framework
developed in the Master Plan with observed usage patterns to address all areas of the parks complex.
Phase 0: Conservation Parks Master Plan addendum with ecological assessment and restoration plan (2027)
Phase 1: Keller Alpine Park Improvements (design 2027, construction 2028). Includes mesic and wet mesic
prairie restoration, shelter/restroom facility, educational infrastructure (including small plaza and birding tower).
Phase 2: Dega, Florida Ave and DiMaggio Parks Improvements (design 2029, construction 2030). Includes mesic
and wet mesic prairie restoration, marsh restoration, shelter/restroom facility, educational infrastructure
(including small plaza and birding tower), small parking lot, boardwalks to Lerner Park, and stormwater
management infrastructure.
Phase 3: West Side Park Improvements (design 2031, construction 2032). Includes mesic and wet mesic prairie
restoration, educational infrastructure (including small plaza), paved path to Library trail.
Phase 4: Lerner Conservation Park Improvements (design 2033, construction 2034). Includes mesic and wet
mesic prairie restoration, marsh restoration, educational infrastructure (including small plaza and birding tower),
and boardwalks.
Phase 5: Library Trailhead (design 2035, construction 2036). Includes mesic and wet mesic prairie restoration,
educational infrastructure (including small plaza).
Sources of Funding
Phase 4 design (no boardwalks)
Phase 4 construction (no boardwalks)
Phase 0, Phase 1 design
Phase 2 construction (no boardwalks)
Phase 3 design
Phase 2 design (no boardwalks)
Phase 1 construction
Phase 3 construction
Phase 2 construction (boardwalks only)
Phase 4 construction (boardwalks only)
Phase 2 design (boardwalks only)
2035 New Debt (GO) $46,000
2036 New Debt (GO) $417,000
Total $4,986,000
Phase 5 design
Phase 5 construction
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2030 New Debt (GO) $13,000
Other:
Other:
Other:
Other:
Other:
Total $13,000
Comments
Capital Project / Purchase Worksheet
Elving Kjellstrom Memorial Park - Water Fountain
Description of Project / Purchase
ADA-accessible water fountain.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2028 New Debt (GO) $30,000
2028 New Debt (Water) $24,000
2029 New Debt (GO) $383,000
2029 New Debt (Water) $344,000
Other:
Other:
Other:
Total $781,000
Park design
Park construction
Water main construction
Water main design
Comments
Capital Project / Purchase Worksheet
Gasner Memorial Park - Playground Upgrades and Water Main
Replacement
Description of Project / Purchase
New playground and solid surfacing. Also includes replacement of existing 10" primary pressure water main from
northern edge of Gasner Memorial Park to South Standpipe (including connection to Well No. 4) with 12" water
main.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $35,000
Other:
Other:
Other:
Other:
Other:
Total $35,000
Comments
Capital Project / Purchase Worksheet
General Park Capital Expenditures
Description of Project / Purchase
This amount is borrowed and allocated annually to provide for ongoing improvements, maintenance, repairs,
etc. at any of the Village of Oregon Parks. This includes wood chips, replacement swings and equipment,
machinery, restoration materials, etc. Also includes portable park fixtures such as benches, picnic tables, trash
cans, and grills. Annual budget, increase for inflation.
Trash cans: $1.0K - $1.5K per can
Picnic table: $1.5K - $1.6K per picnic table
Sources of Funding
Annual, increase for inflation
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2032 New Debt (GO) $26,000
2033 New Debt (GO) $333,000
Other:
Other:
Other:
Other:
Total $359,000
Design
Construction (inc. const admin)
Comments
Capital Project / Purchase Worksheet
Hawthorne Estates Park Improvements
Description of Project / Purchase
New playground and solid surfacing.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2031 New Debt (GO) $30,000
2032 New Debt (GO) $421,000
Other:
Other:
Other:
Other:
Total $451,000
Comments
Capital Project / Purchase Worksheet
High Meadows Park and Scott St Tot Lot Improvements
Description of Project / Purchase
Addition of paved asphalt path around perimeter of High Meadows including to Scott St Tot Lot. New sandbox,
small play equipment, picnic tables and benches at Scott St Tot Lot.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2035 New Debt (GO) $25,000
2036 New Debt (GO) $1,774,000
Other: Park Impact Fees
Other:
Other:
Other:
Total $1,799,000
Comments
Capital Project / Purchase Worksheet
Jaycee Community Park Field and Court Lighting
Description of Project / Purchase
Lighting of 4 ball diamonds, 2 multiuse playing fields, and pickleball courts. All underground and light pole bases
were installed as part of Phase 2. This project involves an electical contractor pulling wires and installation of
Musco Lighting Poles and Lights.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $40,000
Other:
Other:
Other:
Other:
Other:
Total $40,000
Comments
Capital Project / Purchase Worksheet
Jaycee Community Park Bridge Decking
Description of Project / Purchase
Replacement of decking on Jaycee Community Park pedestrian bridges. These are worn, and present a slipping
hazard in wet conditions. Public Works has previously used grippy tape and matting to increase traction, but
these have a short useful lifespan and increase maintenance needs.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $70,000
Other:
Other:
Other:
Other:
Total $70,000
Comments
Capital Project / Purchase Worksheet
Kiser Fireman's Park Master Plan
Description of Project / Purchase
Kiser Fireman's Park includes a picnic shelter, two small softball diamonds, and a rudimentary skate park. The
park includes both low area, which commonly floods, and higher ground, which does not. The skate park, which
is located on high ground, is not often used and is at the end of its useful life.
Many other Kiser facilities are also in need of repair or replacement, including softball lighting, dugouts and
fencing. Coupled with significant downtown development in the coming years, master planning for Kiser Park is
necessary to support sustainable downtown development.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2028 New Debt (GO) $20,000
2029 New Debt (GO) $135,000
Other:
Other:
Other:
Other:
Total $155,000
Design
Construction
Comments
Capital Project / Purchase Worksheet
Liberty Park Improvements
Description of Project / Purchase
Replace sandbox, add solid surfacing to whole park. Tie to other playground projects for lower design costs.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2029 New Debt (GO) $95,000
Other:
Other:
Other:
Other:
Other:
Total $95,000
Comments
Capital Project / Purchase Worksheet
Meadow View Park
Description of Project / Purchase
Replace sandbox.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2031 New Debt (GO) $85,000
Other:
Other:
Other:
Other:
Other:
Other:
Total $85,000
Comments
Capital Project / Purchase Worksheet
Merri-Hill Park Improvements
Description of Project / Purchase
Extend and connect north-south and east-west path connections with paved asphalt path.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2028 New Debt (GO) $40,000
2029 New Debt (GO) $250,000
Other:
Other:
Other:
Other:
Other:
Total $290,000
Comments
Capital Project / Purchase Worksheet
North Main St (249/267) Park
Description of Project / Purchase
Design and construction of ~0.7 acre park at 249/267 N Main St. location
Sources of Funding
Design
Construction
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2033 New Debt (GO) $31,000
2034 New Debt (GO) $400,000
Other:
Other:
Other:
Other:
Total $431,000
Comments
Capital Project / Purchase Worksheet
Norm Champion Park Playground Upgrade
Description of Project / Purchase
New playground and solid surfacing.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2030 New Debt (GO) $20,000
2031 New Debt (GO) $167,000
Other:
Other:
Other:
Other:
Total $187,000
Comments
Capital Project / Purchase Worksheet
Rustic Vinyards Park Improvements
Description of Project / Purchase
Improvement of ball diamond infield and dugouts and installation of paved asphalt path around perimeter of
park.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2034 New Debt (GO) $38,000
2035 New Debt (GO) $487,000
Other:
Other:
Other:
Other:
Total $525,000
Comments
Capital Project / Purchase Worksheet
Stone Ridge Park Improvements
Description of Project / Purchase
Replacement of playground equipment and solid surfacing. Addition of one playing field.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2029 New Debt (GO) $32,000
2030 New Debt (GO) $411,000
Other:
Other:
Other:
Other:
Total $443,000
Comments
Capital Project / Purchase Worksheet
Thomson Park Upgrades
Description of Project / Purchase
The playground equipment and playground area at Thomson Park are aged and in need of upgrade or
replacement. Improvements could include new playground equipment including adaptive play equipment for all
abilities. We would like to include a paved path from the street and also solid surfacing in the playground area
that is adaptive to those in wheelchairs or other needs.
Sources of Funding
Engineering
Construction/installation
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2032 New Debt (GO) $58,000
2033 New Debt (GO) $756,000
Other:
Other:
Other:
Other:
Total $814,000
Comments
Capital Project / Purchase Worksheet
Waterman Triangle Park Upgrades
Description of Project / Purchase
Based on recommendations from Downtown Master Plan. Would include small restroom building, water feature,
rehabilitation of band shelter, landscaping, benches.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2034 New Debt (GO) $35,000
2035 New Debt (GO) $457,000
Other:
Other:
Other:
Other:
Total $492,000
Comments
Capital Project / Purchase Worksheet
Windcrest Park Playground Upgrades
Description of Project / Purchase
New playground and solid surfacing.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $10,000
2028 New Debt (GO) $15,000
2029 New Debt (GO) $20,000
2030 New Debt (GO) $6,000
Other:
Other:
Total $51,000
Comments
Capital Project / Purchase Worksheet
Baseball/Softball Infield Restoration
Description of Project / PurchaseInfield mix at Jaycee and Kiser Park fields requires upgrades. To be spaced over several years.
2026: Reinforce Jaycee home bases, pitching mounds, 1st-3rd base sliding areas for all fields. Cost per bag is
$300. Assume $1,000/field for three fields, $1,500/field for two larger fields, - $7,000 total for Jaycee, plus
additional for contingency.
2027: Amend entire infield for two fields at Kiser. Assume two trucks at $5,000/truck (based on 2025 numbers,
with inflation).
2028: Amend entire infield for three fields (two small and Statz) at Jaycee. Assume three trucks of material at
$5,000/truck.
2029: Amend entire infield for two larger fields at Jaycee. Assume four trucks of material at $5,000/truck.
2030 and later: Include one truck of material (infield mix or topdressing) per year for all fields.
Sources of Funding
Adjust for inflation in out years
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $25,000
Other:
Other:
Other:
Other:
Other:
Total $25,000
Comments
Capital Project / Purchase Worksheet
Playground Solid Surface Maintenance
Description of Project / Purchase
Solid surfaces for playground require regular maintenance. Wear and tear and cleats can cause cracks, peeling,
and delaminating. Routine repairs will extend the life of these assets.
Sources of Funding
Annual
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2026 New Debt (GO) $30,000
Other:
Other:
Other:
Other:
Other:
Total $30,000
Comments
Capital Project / Purchase Worksheet
Pickleball Patio and Sidewalk
Description of Project / Purchase
This project includes the construction of a patio adjacent to the Jaycee Park pickleball courts, and a sidewalk
leading from the parking lot to the courts.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2029 New Debt (GO) $95,000
Other:
Other:
Other:
Other:
Other:
Total $95,000
Comments
Capital Project / Purchase Worksheet
Pickleball Court Resurfacing
Description of Project / Purchase
Pickleball and tennis courts require resurfacing (asphalt and painting) every 6-8 years depending on wear and
tear.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $17,000
Other:
Other:
Other:
Other:
Total $17,000
Comments
Capital Project / Purchase Worksheet
Field Overseeding
Description of Project / Purchase
One overseeding necessary per year for each Jaycee Park baseball field and all irrigated multi-use fields (Jaycee,
Highlands, Gary Disch). Based on 2026 prices. Increase annually by 3% for inflation.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $11,200
Other:
Other:
Other:
Other:
Total $11,200
Comments
Capital Project / Purchase Worksheet
Field Treatment Expenses
Description of Project / Purchase
Sports field treatments for maintenance of Jaycee, Gary Disch and Highlands of Netherwood competitive playing
fields and diamonds. Includes growth regulator, wetting agent, and fungicide. Annual expense; increase annually
by 3% for inflation.
Sources of Funding
Annual expense.
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $10,000
Other:
Other:
Other:
Other:
Other:
Total $10,000
Comments
Capital Project / Purchase Worksheet
Park Signage
Description of Project / Purchase
Replace signage at parks with new signs. Target 2-3 signs/year. Increase for inflation.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $98,000
2029 New Debt (GO) $13,000
2031 New Debt (GO) $14,000
2032 New Debt (GO) $14,000
Other:
Other:
Total $139,000
Waterman Triangle Park restroom (proposed)
Keller Alpine Park restroom (proposed)
Florida Ave Park restroom (proposed)
Comments
Capital Project / Purchase Worksheet
Park Security
Description of Project / Purchase
Expand access control system to all park building facilities:
-Kiser, Jaycee, Bethel, Highlands restroom buildings (approximately 4 doors/building - total 16) (assume $12K per
facility)
-Jaycee Concession Stand new restroom door (to replace roll-up door) (2)
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2035 New Debt (GO) $54,000
Other:
Other:
Other:
Other:
Other:
Total $54,000
Comments
Capital Project / Purchase Worksheet
Field Grooming & Maintenance Machine & Appurtenances
Description of Project / Purchase
Dedicated machine to handle infield and warning track maintenance, annual tilling, dragging, combing, etc.
Machine with appurtenances allows for core aeration and fertilizer application. This is an all-in-one type of
machine that will help to maintain quality and safety of the playing surfaces. Purchased in 2025, replace in 10-15
years.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $5,000
Other:
Other:
Other:
Other:
Other:
Total $5,000
Comments
Capital Project / Purchase Worksheet
Field Grooming Machine Trailer
Description of Project / Purchase
Trailer to haul field grooming machine.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2036 New Debt (GO) $91,000
Other:
Other:
Other:
Other:
Other:
Total $91,000
Comments
Capital Project / Purchase Worksheet
Athletic Complex Mower
Description of Project / Purchase
Specialized mower for athletic fields at Jaycee Community Park, Highlands of Netherwood. Less damaging, more
precise, and lighter than mowers already owned by PW. Proposed model: Toro Groundmaster 4300-D, 4WD, 5
Deck Rotary, 7ft - 5" Width of Cut.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2036 New Debt (GO) $72,000
Other:
Other:
Other:
Other:
Other:
Total $72,000
Comments
Capital Project / Purchase Worksheet
Aerator
Description of Project / Purchase
Toro Procore 1298 (98" width). Tool that dethatches all park fields, prevents compaction, assists in seeding
fields. Optimal aeration intervals are 1/month per soccer field, 2/year per baseball field. Prolongs the life of the
fields.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $62,000
Other:
Other:
Other:
Other:
Other:
Total $62,000
Comments
Capital Project / Purchase Worksheet
Workman Vehicle w/ Sprayer Attachment
Description of Project / Purchase
UTV or Toolcat-style vehicle for parks maintenance. Compatible with various equipment attachments. Will
replace golf cart. To purchase with sprayer attachment. Proposed model: Toro Workman HD, 2WD, diesel option.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2028 New Debt (GO) $80,000
Other:
Other:
Other:
Other:
Other:
Total $80,000
Comments
Capital Project / Purchase Worksheet
Pull-Behind Finish Mower
Description of Project / Purchase
Current model: 2014 Rhino Model TX1700 finish mower. Vehicle number XXX. Used for mowing parks, detention
basins, and greenways. Replace with same model.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2036 New Debt (GO) $195,000
Other:
Other:
Other:
Other:
Other:
Total $195,000
Comments
Capital Project / Purchase Worksheet
Toro Mower #1
Description of Project / Purchase
Current model: 2026 Toro Groundmaster 5900. Originally purchased NEW 2026. Replace with new Toro
Groundmaster 5900. Used for parks, detention basins, greenways.
Sources of Funding
Assume 3% annual inflation (based on 2026 cost)
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2030 New Debt (GO) $164,000
Other:
Other:
Other:
Other:
Other:
Total $164,000
Comments
Capital Project / Purchase Worksheet
Toro Mower #2
Description of Project / Purchase
Current model: 2020 Toro Groundmaster 5900. Replace with new Toro Groundmaster 5900. Used for parks,
detention basins, greenways.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2028 New Debt (GO) $90,000
Other:
Other:
Other:
Other:
Other:
Total $90,000
Comments
Capital Project / Purchase Worksheet
John Deere 4720 Tractor (Vehicle No. 81 - 2013)
Description of Project / Purchase
Current model: 2013 John Deere 4720. Pulls finish mower, would be used to tow aerator and seeder. Due for
replacement on 15 year schedule.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2030 New Debt (GO) $88,000
Other:
Other:
Other:
Other:
Other:
Total $88,000
Comments
Capital Project / Purchase Worksheet
2002 John Deere Tractor & Mower (Vehicle No. 80)
Description of Project / Purchase
We use this tractor and mower in drainageways, ditch banks, rural roads (Netherwood, Lincoln)
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2029 New Debt (GO) $64,000
2034 New Debt (GO) $75,000
Other:
Other:
Other:
Other:
Other:
Total $139,000
Capital Project / Purchase Worksheet
John Deere F-1585 Mower #1
Description of Project / Purchase
We have two of these front mounted mowers that we use year round with attachments (e.g. mower, snowblower,
broom, plow, salter, etc.). May be replaced with Ventrac if staff prefers the latter. All same attachments. Replace
every 5 years.
Sources of Funding
Comments
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $60,000
2032 New Debt (GO) $70,000
Other:
Other:
Other:
Other:
Other:
Total $130,000
Capital Project / Purchase Worksheet
Ventrac 4520 Wide
Description of Project / Purchase
Ventrac 4520 Wide, will replace John Deere F-1585 Mower #2. Used primarily for sidewalk snow removal in
winter, mowing in summer. Include sidewalk salting attachment, broom and blower, cab, suspension seat, and
mowing attachment. Replace every 5 years.
Sources of Funding
Comments
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2030 New Debt (GO) $24,000
2035 New Debt (GO) $27,000
Other:
Other:
Other:
Other:
Total $51,000
Comments
Capital Project / Purchase Worksheet
61" SCAG Parks Mower #2
Description of Project / Purchase
New in 2025. 2nd 61" SCAG mower. W/ bagger. Replace every 5 years.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2031 New Debt (GO) $19,000
2036 New Debt (GO) $22,000
Other:
Other:
Other:
Other:
Total $41,000
Comments
Capital Project / Purchase Worksheet
61" SCAG Parks Mower #1
Description of Project / Purchase
61" SCAG mower. Previously used mainly for cemetery and parks; transitioning to parks and facilities.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2036 New Debt (GO) $61,000
Other:
Other:
Other:
Other:
Other:
Total $61,000
Comments
Capital Project / Purchase Worksheet
Forestry Head/Drum Mulcher
Description of Project / Purchase
This skid steer attachment will allow Public Works staff to perform large-area brushing operations in-house. This
is particularly useful for the Village's west side conservation parks, and could save significant money for future
projects in those parks.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $11,000
Other:
Other:
Other:
Other:
Other:
Total $11,000
Annual for each CIP year.
Comments
Capital Project / Purchase Worksheet
Playing Field Tools and Maintenance
Description of Project / Purchase
This includes smaller powered and hand tools (e.g. rakes, hand pull drag nets, etc) for parks maintenance.
Annual allotment for misc park tools necessary for safety and maintenance tasks. Increase by $1,000 annually to
accommodate inflation.
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO) $225,000
2030 New Debt (GO) $225,000
2033 New Debt (GO) $225,000
2036 New Debt (GO) $225,000
Other:
Other:
Other:
Other:
Total $900,000
Comments
Capital Project / Purchase Worksheet
Trail Maintenance & Repairs
Description of Project / Purchase
The Village of Oregon has approximagely 7 miles of paved trail surface including the rotary trail. This asphalt
surfacing needs periodic maintenance, repair, and even replacment. We have estimated that the annual
allotment for trail repair is about $75,000 per year and our CIP includes $225,000 every three years for a trail
repair project. (e.g. seal coating, crack filling, etc.)
Sources of Funding
Project / Purchase Name
Amount
Fund Balance
Grants
Donations
2027 New Debt (GO)
2030 New Debt (GO)
2033 New Debt (GO)
Other:
Other:
Other:
Other:
Other:
Total $0
Comments
Capital Project / Purchase Worksheet
Description of Project / Purchase
Sources of Funding
Village Hall · 101 Alpine Parkway · Oregon, Wisconsin 53575-3812
Telephone: (608) 835-3118 · Fax: (608) 835-6503
7(a)
MEMO
TO: Village of Oregon Park Board
FROM: Elise Cruz, Director of Community Development
DATE: August 12, 2026
RE: Proposed Rotary Club Projects at Lerner Park and Rotary Trail
The Rotary Club has requested to install two metal benches and a six-stall bike rack at Lerner Park and
two message boards at the Rotary Trail. The message boards will contain information about Oregon
Rotary Club and the Friends of Oregon Rotary Tail: who they are, events, and how to get involved. Both
organizations will be responsible for updating information.
A map detailing proposed locations of the items will be provided at the Park Board meeting.
Recommended Motion: Motion to recommend to the Village Board approval of the placement of
two benches and a bike rack at Lerner Park and two message boards at the Rotary Trail.
1
Elise Cruz
From: Richard Strohmenger <rjstrohmenger@yahoo.com>
Sent: Thursday, August 6, 2026 4:42 PM
To: Elise Cruz
Subject: Park Board Agenda item
Attachments: Grant 26-27 Applic Completed_ District 6250.pdf; Belson Message Board.jpg.pdf; U200-
SQ-SquareURacksonRails.zip; Thomas-Steele-Carnival-Armless-CRBA-L.PDF; COLOR
CHART.png
Hi Elise,
Could Oregon Rotary get our next project on your August 18 Park Board agenda? I am attaching some info about it but
basically we want to install 2 metal benches and one 6 stall bike rack at Lerner Park and then at the Rotary Trail we want
to add 2 message boards. I will be happy to attend the meeting to present an overview and answer any questions.
Thanks.
Rich
You don't often get email from rjstrohmenger@yahoo.com. Learn why this is important
CRBA-2 26"
CRBA-4 46"
CRBA-5 61"
CRBA-6 71" (SHOWN)
CRBA-8 91"
19"
32"
PRODUCT: CRBA (2, 4, 5, 6, 8)
DESCRIPTION: CARNIVAL BENCH, NO ARMS
DATE: 1-10-20
ENG: SMC
1 5/8" STEEL TUBE
1/2" X 2 1/2" FLAT BAR
1/4" X 1 1/2" FLAT BAR
SPACED AT 1" INTERVALS
1/2" X 2 1/2" FLAT BAR
1/4" X 2 1/2" FLAT BAR
WITH 9/16" MOUNTING HOLE
27 3/16"
THOMAS STEELE DIVISION
GRABER MANUFACTURING, INC.
1080 UNIEK DRIVE
WAUNAKEE, WI 53597
P(800) 448-7931, P(608) 849-1080, F(608) 849-1081
WWW.MADRAX.COM, E-MAIL: SALES@MADRAX.COM
CONFIDENTIAL DRAWING AND INFORMATION IS NOT TO BE COPIED OR DISCLOSED
TO OTHERS WITHOUT THE CONSENT OF GRABER MANUFACTURING, INC.
SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
©2020 GRABER MANUFACTURING, INC. ALL PROPRIETARY RIGHTS RESERVED.
SITE FURNISHING IS POWDER COATED WITH TGIC POLYESTER.
STEEL SURFACE PREP INCLUDES MECHANICAL AND CHEMICAL
ETCHING FOLLOWED WITH A COATING TO IMPROVE ADHESION
AND CORROSION RESISTANCE.
Project Overview
Lerner Park Amenities & Rotary Bike Trail Message Boards
PROJECT DESCRIPTION
Provide a general description of your grant project, including the humanitarian need it will address, the intent of the project, implementation
plans, and how Rotarians will be directly involved in the project.
Note: The estimated budget reflects only the initial grant request amount. To outline a detailed breakdown of all budget items, including
those funded by other sources, please go to the Budget tab.
Grant Project: Lerner Park Amenities & Rotary Bike Trail Message Boards
Primary Sponsoring Club:Oregon
Contact: Strohmenger, Richard
Date Submitted: Jul. 26, 2026 at 1:17 p.m.
Project Total Budget: $6,012.26
Grant Budget: $6,012.26
Project Expected Income:$6,012.26
Grant Expected Income:$2,500.00
GENERAL DESCRIPTION
Provide a brief (2-3 sentences) summary of the project. What is the project, and why is it needed?
Our project spans two separate public locations within the Village of Oregon. The first is Lerner Park where we are proposing to install two
6 foot metal benches and one metal bicycle rack for 6 bikes. The new benches will allow for a more enjoyable park experience and the
addition of a bike rack will allow bicyclists to safely and securely park their bikes while visiting the park. The second location is the Rotary
Bike Trail where we will install two weather resistant message boards that will be used in part to promote Oregon Rotary's events and
fundraisers as well as information about the newly forming 'Friends of the Oregon Rotary Trail'.
COMMUNITY ASSESSMENT & IMPACT
Provide relevant background information and project details. Describe how Rotarians from the primary and partner clubs will be involved in
the project. Include names and roles. Financial support without Rotarian involvement is not considered active involvement and will be
denied.
How are these community needs currently being addressed with local resources and/or government agencies, non-governmental
organizations (NGOs), etc.?
Explain how the benefiting community has confirmed the need and support for the project. Describe specific activities of the benefiting
community partners in implementing the project. Describe how the benefiting community partners will sustain and/or maintain the project
and/or equipment after grant funding has been fully completed.
Lerner Conservation Park is a 65.38-acre conservation property located on the northwest corner of the Village of Oregon. The park serves
multiple purposes, including stormwater management, environmental education, and passive recreation. Existing amenities include a
gathering space, benches, an outdoor classroom, and a memorial bridge honoring a local business and community leader. The park is
used regularly by local schools for hands-on learning experiences such as prairie burns, native plant restoration, invasive species removal,
and gravel trail maintenance. The Oregon Rotary Club proposes to enhance the park by purchasing and installing two durable metal
benches and a commercial-grade metal bicycle rack, each mounted on concrete pads. In addition, the club will install two weather-
protected message boards at each end of the Oregon Rotary Bike Trail, a scenic 3.4-mile paved multi-use trail connecting West
Netherwood Road/Cusick Parkway and Fish Hatchery Road. These message boards will provide trail users with information about Rotary,
promote rotary events and fundraisers, and highlight local service opportunities. The project will be led by a committee consisting of Chair
**Rich Strohmenger**, **Mike Brown**, **Larry Mahr**, **Bill Rockwell**, **Nike Loomis**, who will oversee planning, procurement,
volunteer coordination, project implementation and awareness on social media. Club members will actively participate by purchasing
materials, preparing the installation sites, pouring concrete pads, assembling and installing the benches, bicycle rack, and message
boards, and coordinating with Village staff throughout the project. Rotarians will also work with Village planning staff to ensure the
improvements are consistent with the park and trail master plans and comply with all Village codes and ordinances. This hands-on
participation demonstrates Rotary's commitment to meaningful community service beyond financial support alone.
The Village of Oregon provides routine seasonal maintenance for Lerner Conservation Park and the Oregon Rotary Bike Trail, including
mowing and general grounds maintenance. Due to limited municipal budgets, however, improvements such as additional park amenities
and visitor infrastructure are largely dependent upon partnerships with community service organizations. Local schools already utilize
Lerner Conservation Park as an outdoor classroom, conducting environmental education projects throughout the year. The Village has
established a strong history of collaborating with community organizations, including the Oregon Rotary Club, to improve and enhance
public parks and recreational facilities. In addition a newly forming organization called 'Friends of the Oregon Rotary Trail' is working to
facilitate expansion of the trail and supports the addition of our proposed message boards and has volunteered to help with installation and
upkeep.
The Village supports these partnerships through the approval process, technical guidance, and by loaning equipment when appropriate,
allowing volunteer organizations to maximize their impact. The need for this project has been confirmed through ongoing collaboration
between the Oregon Rotary Club and the Village of Oregon Parks Department. A recent Village parks survey identified Lerner
Conservation Park as one of the five most-visited parks in the community, demonstrating the high level of public use and the need for
additional visitor amenities such as seating, bicycle parking, and informational signage. Village officials have expressed strong support for
these improvements and welcome service organizations like Rotary to help enhance community parks. The Village will assist through
project review, permitting, coordination with planning staff, and equipment loans as needed during installation. Following project
completion, the Village will continue its regular maintenance of the park and trail as part of its seasonal operations. Because the benches,
bicycle rack, and message boards are commercial-grade, durable products designed for outdoor public use, ongoing maintenance
requirements are expected to be minimal. The Oregon Rotary Club will continue its long-standing stewardship of both the park and the
Oregon Rotary Bike Trail by periodically monitoring the condition of the improvements and coordinating with Village staff should repairs or
maintenance become necessary. This partnership has existed for more than 25 years and provides confidence that the project will remain
a valuable community asset for many years to come.
SUSTAINABILITY
What will be the immediate and long-term outcomes of the project?
Who will own, maintain, operate, and secure equipment/items purchased with grant funds. A Rotary club or a Rotarian may not own
equipment purchased with grant funds.
Will training and software for the use and/or maintenance of technical equipment be provided? If so, who will provide training and software
Please explain the plan on how to maintain this project for a long period of time.
The immediate outcome of this project will be improved accessibility, comfort, and visitor experience at Lerner Conservation Park and
along the Oregon Rotary Bike Trail. The addition of benches and a bicycle rack will provide needed amenities for park visitors, trail users,
families, students, and individuals participating in recreational and educational activities. The two weather-protected message boards will
serve as an effective communication tool to inform trail users about Rotary, promote Rotary events and service opportunities, and share
information that enhances community engagement.
The long-term outcomes include increased use and enjoyment of these public spaces, enhanced community pride, and continued support
for healthy outdoor recreation and environmental education. The project will also strengthen the long-standing partnership between the
Oregon Rotary Club and the Village of Oregon while increasing public awareness of Rotary's commitment to community service. These
durable improvements are expected to benefit residents and visitors for many years with minimal maintenance requirements.
Upon completion of the project, all benches, the bicycle rack, concrete pads, and the message boards will become the property of the
Village of Oregon. The Village will own, maintain, and secure these improvements as part of its public park and trail system. The Oregon
Rotary Club will assume responsibility for keeping the information displayed in the message boards current and relevant by updating
announcements, event information, and Rotary messaging as needed. This shared partnership ensures that the physical improvements
remain public assets while Rotary continues to actively support their ongoing value to the community.
No training or software is required for this project. The amenities being installed consist of durable park furnishings and weather-protected
message boards that require no specialized operation or technical maintenance.
The Village of Oregon will incorporate the benches, bicycle rack, and message boards into its existing park maintenance program, which
includes routine inspections and seasonal maintenance of public parks and trails. The selected products are commercial-grade, weather-
resistant, and designed for long-term outdoor use, minimizing future maintenance needs. The Oregon Rotary Club will continue its long-
standing stewardship of the Oregon Rotary Bike Trail and Lerner Conservation Park by periodically monitoring the condition of the
improvements and working cooperatively with Village staff if maintenance or repairs become necessary. Rotary members will also maintain
the message boards by regularly updating their contents with current community and Rotary information. This collaborative approach
between the Village and the Oregon Rotary Club ensures that the project will remain attractive, functional, and beneficial to the community
well into the future.
IMPLEMENTATION PLAN
Describe specific activities of the sponsoring club and any partners in implementing the project. What will the Rotarians who are members
of the partner clubs do during the project? Please note that financial support is not considered active involvement.
How will the name of Rotary be publicized?
The Oregon Rotary Club will be responsible for all aspects of planning and implementing this project. Rotarians will coordinate with the
Village of Oregon throughout the planning process to obtain the necessary approvals and ensure the improvements comply with park
master plans and municipal requirements. Under the leadership of Project Chair Rich Strohmenger, committee members Mike Brown, Larry
Mahr, Bill Rockwell and Nike Loomis will oversee procurement of materials, volunteer coordination, scheduling, and project implementation
plus awareness on social media. Club members will purchase the benches, bicycle rack, message boards, concrete, and installation
materials, prepare the installation sites, pour the concrete pads, assemble and install the amenities, and complete site cleanup using
volunteer labor.
The Oregon Rotary Club is the sole Rotary sponsor of this project; there are no partner Rotary clubs participating. The Village of Oregon is
not a funding partner but will support the project by reviewing plans, providing technical guidance as needed, and assisting with equipment
loans when appropriate. In addition a newly forming organization called 'Friends of the Oregon Rotary Trail' is working to facilitate
expansion of the trail and supports the addition of our proposed message boards and has volunteered to help with installation and upkeep.
Upon completion, the Village will accept ownership of the installed amenities and incorporate them into its regular park maintenance
program. Following installation, the Oregon Rotary Club will continue its involvement by monitoring the condition of the improvements,
maintaining and updating the information displayed in the message boards, and working cooperatively with Village staff to help ensure
these amenities continue to benefit the community for years to come.
The Oregon Rotary Club will actively promote Rotary's involvement throughout the project and after its completion. Upon completion, the
club will host a public ribbon-cutting ceremony and invite community members, Village officials, local organizations, and the media to
celebrate the new park improvements. The project will be publicized through an article submitted to the Oregon Observer, highlighting
Rotary's leadership, volunteer service, and commitment to improving community parks and recreational facilities. The club will also invite
the local cable access television station to cover the installation and the ribbon-cutting ceremony. The Oregon Rotary Club will further
publicize the project through its club website and Facebook page by sharing project updates, volunteer activities, photographs, and the
completed improvements. These communications will recognize Rotary members' service, highlight the partnership with the Village of
Oregon, and demonstrate Rotary's ongoing commitment to enhancing the community. In addition, the two weather-protected message
boards installed along the Oregon Rotary Bike Trail will prominently identify the Oregon Rotary Club and provide ongoing information about
Rotary, community service projects, club activities, fundraising events, and opportunities for community involvement. Rotary members will
keep the message boards current so they continue to serve as a long-term source of information and public recognition. Collectively, these
efforts will ensure that the community is aware of Rotary's leadership, volunteer service, and lasting investment in Oregon's parks and
recreational amenities.
EXPECTED EXPENSES
List all anticipated expenses for this project, including those that will be funded outside of the District grant portion. Note: Expected
expenses needs to equal the expected income.
Description Supplier Currency Total Amount
Forms for pads Menards USD $52.00 $52.00
Concrete with deliveryLycon USD $628.00 $628.00
Crushed gravel Lycon USD $100.00 $100.00
Set of Anchors for Bike
Rack Grabber ManufacturingUSD $43.18 $43.18
Total Two Anchor Sets for
Benches Grabber ManufacturingUSD $33.58 $33.58
One each U200 'U' on
Rail Bike Rack Grabber ManufacturingUSD $839.00 $839.00
Two Total Small Message
Center, One Side, One
Post
Belson Outdoors USD $1,166.00 $1,166.00
Two Total Carnival 6 foot
armless bench Grabber ManufacturingUSD $2,638.00 $2,638.00
Shipping for Benches and
Bike Rack to OregonGrabber ManufacturingUSD $200.00 $200.00
Shipping Message
Centers to Oregon Belson Outdoors USD $312.50 $312.50
Total: $6,012.26
EXPECTED INCOME
List all anticipated income for this project, including funds that will be contributed by the club, other partners and the District grant
portion. Note: Expected income needs to equal the expected expenses.
Description Funding Source Amount %
Additional Fundraising Club/Other $1,012.26 16.837%
Club Match Club/Other $2,500.00 41.582%
District 6250 Grant District Grant $2,500.00 41.582%
Total: $6,012.26 100.000%
LOCAL CLUB PARTNERS
List any partnering clubs within Rotary District 6250. Only the primary sponsoring club needs to submit the grant application.
There are no Sponsoring Clubs specified for this application.
COOPERATING ORGANIZATIONS
Explanation: Cooperating organizations are any groups or organizations (other than partnering Rotary clubs) that are working with the
sponsoring club in either funding or implementing the project.
A newly forming organization called 'Friends of the Oregon Rotary Trail' is working to facilitate expansion of the trail and supports the
addition of our proposed message boards and has volunteered to help with installation and upkeep. Because the project is located on
public property, the Village of Oregon will review and approve the proposed improvements to ensure they are consistent with park master
plans and municipal ordinances. Village staff may also provide technical guidance or loan equipment during installation if needed. Upon
project completion, ownership of the benches, bicycle rack, and message boards will be transferred to the Village of Oregon, which will
incorporate these amenities into its regular park maintenance program. The Oregon Rotary Club will remain actively involved by installing
the improvements, coordinating with Village staff throughout the project, and maintaining the information displayed in the message boards
on an ongoing basis.