Sustainability and Natural Resources Committee Agenda
Tuesday, August 25, 2026 at 7:00 PM
Municipal Building Board Room
138 E. Main Street
Mount Horeb, WI
1) Call to order
2) Roll Call
3) Public Comments on Non-Agenda Items*
4) Consent Agenda
a. Consideration of July 28, 2026 Meeting Minutes
5) Reports
a. Chair Report
b. Staff Report
c. Green Team Report
6) Agenda Items
a. Introduction to Gabe Altenbernd, Village Administrator
b. Consider 2027 - 2031 Capital Project Requests
c. Consider MadiSUN Group Buy Promotion
d. Update regarding the progress on Village's Bike Friendly Community
Designation
e. Update regarding the progress on the Village's Bird City Designation
7) Future Agenda Items
8) Meeting adjournment.
*Public Comment Policy
Members of the public are invited to speak at meetings of all Mount Horeb Public Bodies. To comment, please complete a
Public Comment Form at the Meeting Room entrance and submit it to staff before the meeting begins. Comments are limited
to three minutes, must be made from the podium, and the speaker must return to the audience after speaking.
• Non-agenda item comments are heard at the start of the meeting. Public Body members and staff will not
engage in discussion during public comment but may consider topics for future agendas.
Page 1 of 19
• Agenda item comments are heard during the relevant item, after the proposers or staff present the item and
before Public Body discussion. All public comments on the item will be heard before any discussion by the Public
Body.
Members of the public will only be allowed to speak outside these public comment times if they are invited by the meeting
chair to share additional information requested by the Public Body. If so invited to speak, the member of the public must do
so from the podium.
Written comments are also welcome. Written comments shall include the name and address of the submitter and should be
submitted to the Deputy Treasurer/Governance Coordinator by email at niki.erickson@mounthorebwi.info (subject line:
Public Comment Request-Name of Public Body) or delivered by to the Village at: 138 E Main Street, Mount Horeb WI,
53572, ATTN Public Comment Request-Name of Public Body.
UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR INFORMATION OR TO REQUEST THIS
SERVICE, CONTACT ALYSSA GAFFNEY, CLERK, AT 138 E MAIN STREET, MOUNT HOREB, WI (608) 437-9404.
Page 2 of 19
SUSTAINABILITY & NATURAL RESOURCES COMMITTEE
Tuesday, July 28, 2026 at 7:00 PM
DRAFT MEETING MINUTES
1) Call to order
Chair White called the meeting to order at 7:00 pm.
2) Roll Call
Members present: White, Beheler, Best, Saltes, Roethle, Fendrick.
Absent: Pavlovich
3) Public Comments on non-agenda items
None.
4) Chair and Staff Reports were made available in meeting packet.
5) Consent Agenda
a. approval of minutes for June 29 committee minutes. Motion to approve Beheler,
Second by Best. Motion passed.
6a) Agenda items
Presentation from Ben Lyman, Transportation Planner for Greater Madison MPO
regarding Mount Horeb's Future Transportation Connectivity
Lyman presented information on public transportation for outlying area in MPO, as well as information
on e-bikes and State Trail. Slide deck for presentation was distributed to Committee members
6b) Consideration of 2027-2031 Capital Projects
Committee discussed inclusion of Energy Plan projects, as well as the yearly budget for Committee.
White brought a suggested recommendation of solar PV projects. As the request was new to
committee, there was no action taken, and the item will be on August agenda for action.
6c) Bike Friendly Community
Committee Member Roethle presented both up-date on Bike and Pedestrian Safety Plan. Discussed
were budget recommendation by Public Works concerning cross walk and wayfarer signage.
6d) Bird City (BC) Designation
Report on Bird City news by Beheler.
6e) Discuss adding Committee initiatives on Village Website
Discussion led to the idea of listing committee initiatives as well as link to Green Team on Committee
web page.
6f) Discuss Terrace Beautification and native plantings
Discussed the meeting that Saltes and White with Jeff Gorman. Discussed was registration
component to natural lawn and gardens.
7e) Future Agenda Items
Consideration of Capital Project/s.
6) Meeting adjournment.
Motion by Roethle motion to adjourn, second by Best. Motion carried. Meeting adjourned at 8:47 pm.
Page 3 of 19
Sustainability and Natural Resources Committee Recommendations for the
2027 Village of Mount Horeb Capital Budget
The Sustainability and Natural Resources Committee respectfully submits the following recommendations for
inclusion in the 2027 Village of Mount Horeb Capital Budget. These recommendations are drawn directly from
the 2026 Mount Horeb Energy Plan, approved by the Village Board. (See:
https://www.mounthorebwi.info/DocumentCenter/View/881/Mt-Horeb-Energy-PlanFinal).
Investments in renewable energy differ from most capital expenditures because they generate an ongoing
financial return. While the initial installation requires capital funding, these projects reduce operating costs
every year through lower utility expenses. Once the payback period is reached, the Village continues to realize
annual savings while benefiting from greater protection against future energy price increases.
In addition to these economic benefits, renewable energy projects significantly reduce greenhouse gas
emissions, helping address climate change while demonstrating the Village's commitment to environmental
stewardship.
The Committee also recommends that the Village actively pursue grant opportunities to offset project costs.
Several state and utility programs may provide financial assistance, including Focus on Energy, WPPI Energy,
the Public Service Commission of Wisconsin, and the Clean Energy Revolving Loan Fund. Securing grant
funding could substantially reduce the Village's upfront investment and shorten project payback periods.
Sustainability & Natural Resources Recommendations For 2027 Budget Cycle
1. Initiate funding for one or both of the following solar photovoltaic (PV) projects identified in the 2026
Mount Horeb Energy Plan (see pages 34–35 for detailed cost analysis):
Village Municipal Building
• Net Cost: $89,400
• Estimated Payback Period: 15.5 years
• Estimated Annual Energy Savings: $5,787
Wastewater Treatment Plant – Administrative Building
• Net Cost: $101,200
• Estimated Payback Period: 15.2 years
• Estimated Annual Energy Savings: $6,650
These projects provide long-term fiscal benefits by lowering operating expenses while reducing the Village's
carbon footprint. It is a starting point for adopting energy and money saving measures for our municipal
operations. Other projects should be addressed in future budget cycles.
2. Continue the transition to more fuel-efficient municipal vehicles.
The Committee recommends that the Village purchase electric or hybrid vehicles whenever operationally
appropriate and cost-effective for the intended vehicle use. Vehicle recommendations and analyses are provided
on page 18 of the 2026 Mount Horeb Energy Plan. Transitioning the municipal fleet over time will reduce fuel
and maintenance costs while lowering emissions and supporting the Village's long-term sustainability goals.
Page 4 of 19
Village of Mount Horeb
Municipal Energy Plan
January 16, 2026
Page 5 of 19
20
Solar Recommendations
RECOMMENDATION 1: INSTALL SOLAR PV ON
OPTIMAL MUNICIPAL BUILDINGS
Onsite solar can reduce the Village’s energy costs and also
lower its CO2 by leveraging existing roof or ground space
near existing facilities. The analysis examined Village
facilities for solar installations and identified 10 locations
that are potential candidates for solar installations.
Table 11. Solar PV installation recommendations for Mount Horeb facilities
Building Size
(kW DC)
Renewable
Offset
Payback
Period (Years)
Annual CO2
Savings (MT)
Annual Cost
Savings
Wastewater
Treatment Plant
(WWTP)
231.1 59% 15.7 196.65 $39,125
Public Safety
(Police Dep't)
146.1 41% 15.5 125.49 $24,967
Electric and
Water Shop15
65.7 65%* 15.5 56.53 $11,246
WWTP Admin
Building
38.2 12% 15.2 33.43 $6,650
Village Hall 33.8 74% 15.5 29.08 $5,786
Community
Center
33.5 74% 18.5 24.14 $4,803
Library 19.3 17% 16.3 15.80 $3,144
Public Works 11.8 80% 15.5 10.14 $2,017
Parks and
Forestry
4.3 67% 18.5 3.07 $611
Total 583.8 494.33 $98,349
Table12 estimates costs for each of the recommended arrays. The estimated upfront cost is based on size
and location on roof or ground. The Focus on Energy incentive shown in the table is a rebate of $50/kW, up
to a maximum incentive of $25,000 per installation. The Federal Investment Tax Credit (ITC), which is
currently available to non-tax paying entities via the Elective Pay provision will expire in July 2026 and it
therefore may not be feasible for the Village to fund, and complete installation of, a solar array within that
timeframe. For that reason, the ITC is not considered in the cost estimates in Table2.
15 The Electric and Water shop currently generates a portion of the electricity that it consumes with a 9 kW on-site
solar array. As part of the Mount Horeb Energy Plan, we recommend that the Village install additional PV capacity
at this site. All fields except the Renewable Offset column for the Electric and Water Shop in Table and Table
reflect information about the added PV capacity. The Renewable Offset field indicates the total renewable offset
for the combined systems. Note: Installing additional solar capacity at this facility would require WPPI issuing a
waiver for the installation.
Recommendations
1. Install rooftop solar on municipal
buildings
2. Supplement with offsite
renewable energy
3. Facilitate solar group buy
Page 6 of 19
21
Table 12. Cost details of solar PV installations for Mount Horeb facilities
Buildings Upfront Cost Focus on Energy
Incentives
Net Cost
Wastewater Treatment
Plant (WWTP)
$624,000 $11,550 $612,400
Public Safety (Police
Dep't)
$394,400 $7,300 $387,200
Electric and Water Shop $177,300 $3,300 $197,900
WWTP Admin Building $103,000 $1,900 $101,200
Village Hall $91,100 $1,700 $89,400
Community Center $90,500 $1,700 $88,800
Library $52,100 $950 $51,200
Public Works $31,800 $600 $31,200
Parks and Forestry $11,500 $200 $11,300
Total $1,575,700 $29,200 $1,570,600
RECOMMENDATION 2: SUPPLEMENT ROOFTOP SOLAR WITH PURCHASE OF OFF-SITE
RENEWABLE ENERGY
As described in Solar Recommendation 1, this Energy Plan recommends installing rooftop and/or ground
mounted solar arrays at most municipal facilities. Table13 includes an indication of the percentage of each
building’s current electricity consumption that the recommended solar array would offset. For most facilities,
due to either limited space available to install solar panels at the site, or for purposes of optimizing cost-
effectiveness of the array based on the terms of the applicable electric tariff, the recommended array would
offset a maximum of 80 percent of the facility’s current electricity use.
Additionally, the estimated combined net cost of the recommended arrays is $1,570,600. Unless the Village is
able to leverage outside funding sources to pay for the cost of these installations, we anticipate that the
Village will need to install these arrays over a period of 5-10 years.
While it may be necessary for the Village to fund and install the arrays over an extended period of time, the
Village can take immediate and near-term action to reduce its municipal emissions by working with Mount
Horeb Utilities and WPPI to procure offsite renewable energy. Offsite renewable energy is electricity that a
facility purchases, which is generated at a different location from the building that is using the electricity. Due
to Wisconsin’s regulatory framework, in Wisconsin, offsite renewable energy generating facilities are usually
owned by a third party or by the property owner’s electric utility, rather than by the owner of the facility.
Table 1313 identifies benefits and drawbacks of both on-site and off-site renewable energy.
Table 13. Comparison of on-site and off-site renewable energy procurement
Installing on-site solar Purchasing off-site renewable energy
Initial cost Significant initial investment
required
Initial cost varies depending on procurement method
• No initial investment required for adding
renewable attributes to conventional electricity
purchases (Choose Renewables program.
• Low initial investment may be required for
community solar participation.
Page 7 of 19
22
Installation
process
Installed by third-party
contractor.
Requires project management
by Village
Not applicable or managed by third party
Energy cost
savings
Generated electricity directly
reduces utility expenses.
Choose Renewables: Adds surcharge to electricity
purchases.
Community Solar and RER: Savings vs. added expense
determined by rate structure.
Community
Leadership
Offers visible and recognizable
evidence to the community of
Village’s investment in clean
energy.
May demonstrate leadership if purchase of renewable
energy is effectively communicated to the community.
Ease of use Minimal maintenance
occasionally required
No extra effort required following initial registration
Emissions
reduction
Renewable energy generated
directly reduces Village’s Scope 2
emissions from purchased
electricity.
Emissions reduction value dependent upon emissions
inventory or energy performance standard applied.16
The 2024 IECC (International Energy Conservation Code) Section CC103.3.2 of Appendix CC establishes
standards for assuring the validity of off-site renewable energy that a building procures to offset its electricity
use. We recommend that, if the Village chooses to purchase off-site renewable electricity, it works with the
provider of the off-site renewable electricity to ensure that the electricity it purchases meets these
standards, as well as the standards provided by Zero Code 2.0.
IECC Section CC 103.3.217 Key Requirements for off-site procurement of renewable energy:
• Renewable energy procurement agreement shall be legally binding, have a term of at least 15 years,
and be transferrable to a new property owner.
• Renewable energy credits (RECs) associated with the purchased energy must have been created
within the past 12 months by a renewable energy system that was constructed within the past five
years.
• The renewable electricity must be either directly transmitted to the building or must be provided
through the local utility.
Mount Horeb Utilities offers the Choose Renewables rate option. Business and residential customers who
opt-in to this program agree to purchase a quantity of 300 kWh blocks of renewable energy each month. For
each block of renewable energy, the customer agrees to pay a surcharge in addition to their regular energy
charges. For each block that customers purchase, Mount Horeb utilities agrees to procure an additional 300
kWh of electricity produced from renewable sources. The Village could purchase 6,735 blocks of energy18
16 Table 6 of Zero Code 2.0 provides useful framework for comparison of offsite renewable energy procurement
options. https://www.zero-code.org/wp-content/uploads/2018/04/Zero-Code-TSD-OffSiteRenewables.pdf
17 2024 IECC Appendix CC 103.3.2. https://codes.iccsafe.org/content/IECC2024P1/appendix-cc-zero-energy-
commercial-building-provisions
18 Number of blocks based on weather-normalized 2024 electricity consumption for all municipal facilities
Page 8 of 19
214 North Hamilton Street, Suite 300 • Madison, Wisconsin 53703
Copyright © 2018 - All Rights Reserved
About Us
MadiSUN is the City of Madison’s initiative to expand solar energy for homes and businesses. RENEW Wisconsin, a local nonprofit
organization working to grow renewable energy statewide, administers the programs on behalf of the City.
In 2007, the City of Madison was named one of 25 Solar America Cities. Since receiving this
designation, the City of Madison’s Solar program, MadiSUN, has helped hundreds of businesses
and thousands of residents learn more about solar energy, understand their solar production
potential and assist with the solar purchasing process. Since 2016, the City has expanded the
number of solar installations on its own buildings while supporting residents to make similar
investments. In 2017, Madison earned “Gold” designation from the national SolSmart program
for its work to improve permitting and solar installation processes.
RENEW Wisconsin is a nonprofit organization that promotes renewable energy in Wisconsin.
We work on policies and programs that expand solar power, wind power, renewable fuels, local
hydropower, building electrification, energy storage, and electric vehicles. Since 1991 we have
been a champion for clean energy solutions in the Badger State.
As part of the MadiSUN solar group purchase program, you may receive pre-proposals from up to three different installers,
providing you with a comprehensive range of options to consider. To streamline the decision-making process, we recommend that
you seek full quotes from one to three installers whose pre-proposals align closely with your preferences and requirements.
Throughout this process, our team is here to provide support and guidance. We understand that navigating the solar market can
be daunting, which is why we’re committed to assisting you every step of the way. Whether you have questions about the
proposals, need assistance comparing bids, or seek clarification on technical aspects, we’re available to address your concerns
and equip you with the tools you need to make an informed decision.
Arch SolarArch SolarArch SolarArch Solar
Based in Plymouth, WI, and with offices in Milwaukee and Madison, Arch has been investing in
Wisconsin’s renewable energy future since 2003 by educating residents and future
professionals about solar + energy storage. As a certified Women’s Business Enterprise (WBE)
Arch is proud to be fostering the growth of a diverse solar workforce in Wisconsin, with over
60MW of experience installing solar, our trusted NABCEP certified staff assists homeowners,
businesses, and utilities make the smart switch to renewable energy.
Full Spectrum SolarFull Spectrum SolarFull Spectrum SolarFull Spectrum Solar
Full Spectrum Solar is a family owned and operated business that has been proudly serving
Wisconsin for 20-years, with over 1,300 installations. Founded by brothers and UW-Madison
Mechanical Engineering alumni, Burke and Mark have always strived to create a company
culture that believes that the ethics of good business practice and contributing to the wellness
of nature come first. The team prides themselves for how little they focus on marketing and
instead believe that through great work and trust, Full Spectrum’s customers become their
greatest supporters as a local small business.
Midwest Solar PowerMidwest Solar PowerMidwest Solar PowerMidwest Solar Power
Midwest Solar Power is dedicated to transforming homes in the Madison, Wisconsin area with
state-of-the-art residential solar power systems. With over a decade of experience, their team
of skilled residential solar installers specializes in customized solar solutions that seamlessly
integrate with each home’s unique architecture and the local utility grid. With extensive
backgrounds in construction, the Midwest Solar Power team takes a detail-oriented approach
to ensure the finished solar array looks beautiful and performs even better, every line is followed
and the final look of the system is as clean as possible.
Contact Us!
214 North Hamilton Street, Suite 300 Madison, WI 53703 608.255.4044
EmailEmailEmailEmail
INSTALLERS
About Programs Solar Financing Events FAQ I'm interested!I'm interested!I'm interested!I'm interested!U
Page 9 of 19
SOLAR PV Group Buy Discussion for August 25, SNR discussion
* Because of our contract with WIPPI, a group buy is not a possibility for municipal operations, but group
buy options can be promoted to area residents. It has been suggested by Dane County Office of Energy and
Climate Change that MadiSUN may be a great option. The Committee and Green Team could help to promote
residential and commercial benefits of solar group buy.
The following is from the Village Energy Plan.
RECOMMENDATION 3: FACILITATE A COMMUNITY-WIDE SOLAR GROUP BUY PROGRAM
Seventy-three percent of respondents to the Mount Horeb residential survey either strongly agreed or
somewhat agreed with the statement, “Using renewable energy is important to our household.” However,
only seven percent of respondents said that they had either installed solar on their home or used renewable
energy. The gap between the stated values of residents and the percentage of residents who are currently
using renewable energy reveals that many households face barriers in accessing renewable energy.
23Respondents identified barriers to using renewable energy, which included installation costs and lack of
knowledge in moving forward with installing on-site renewable energy systems. Qualitative responses also
suggested that residents have concerns about selecting a qualified and reliable solar installation company.
A solar group buy program could help residents and businesses overcome financial, technical, and
information barriers to installing solar arrays at their homes and businesses. Important components of a solar
group buy program are outlined below. * Mount Horeb can either create a new solar group buy program, or it
may consider partnering with nearby municipalities to offer a joint program.
• Contractor qualification. The municipality issues an RFP to residential and commercial solar installers
that serve the village. The RFP outlines the framework of the solar group buy program and requests
proposals from installers for the rate structure(s) that they would offer if selected as the sole
provider, as well as examples of the information about recommended solar arrays that they would
provide to participants, and references from previous clients who will attest to the quality and
reliability of the contractor’s work. From the proposals submitted, the Village selects the installer
who offers the greatest value to participants within the program framework.
• Sole sourcing. In exchange for being the sole installer servicing the program, the contractor reduces
its marketing and customer relations expenses, thus lowering the company’s cost of doing business
and reducing overall project costs for participants.
• Reliability of pricing and forecasts. The Village’s program implementer coordinates site visits and
cost bids by the contractor and provides quality control for the energy production and cost savings
forecasts that the contractor provides to participants.
• Streamlined process. Both quality control by the Village’s program implementer and the installer’s
pricing agreement with the Village eliminate the need for residents to obtain multiple and conflicting
bids from contractors. Oversight by the Village’s program implementer ensures that projects
progress on a timely basis and that participants have access to a qualified third-party to address any
questions or concerns that may arise during the project development and installation processes.
Page 10 of 19
BICYCLE AND PEDESTRIAN SAFETY PLAN
PURPOSE
Mount Horeb is a community that values safety, sustainability, and active living. This
plan outlines steps to make walking and biking safer, easier, and more enjoyable for
residents of all ages. By improving our streets and pathways, we support healthier
lifestyles, reduce traffic congestion, and strengthen our village’s sense of connection.
ACKNOWLEDGEMENTS
Sustainability and Natural Resources Committee
Tim White, Trustee
Sarah Best, Trustee
Kerry Beheler, Citizen Representative
Scott Roethle, Citizen Representative
Elizabeth Grabe, Citizen Representative
Jack Salttes, Citizen Representative
Aaron Fendrick, Student Representative
Village Staff:
Nic Owen, Village Administrator
Doug Vierck, Police Department Chief
Steve Salerno, Mount Horeb School District Administrator
VISION STATEMENT
A Mount Horeb where everyone can comfortably walk or bike to school, parks, shops,
and community destinations.
COMMUNITY CONTEXT
Mount Horeb’s compact layout and existing trail system make it well-suited for active
transportation, with the Military Ridge State Trail, the downtown district, and nearby
school campuses serving as major activity hubs. At the same time, high traffic volumes
on Main Street and Springdale Street create challenges for people walking and biking.
Seasonal tourism and community events further increase foot and bicycle activity
throughout the year, underscoring the need for safe, comfortable travel options for all
users.
Page 11 of 19
GOALS AND OBJECTIVES
The plan aims to improve safety for all travelers by enhancing visibility at key locations,
upgrading crossings, and creating safe, low-stress bicycle routes. It also seeks to increase
walking and biking by establishing continuous, well-connected routes, improving overall
comfort and convenience, and supporting Safe Routes to School initiatives. Finally, the
plan promotes sustainability and community health by reducing dependence on vehicles,
encouraging active transportation, and advancing broader climate and sustainability
goals.
EDUCATION
Engineering improvements alone are not sufficient to achieve lasting pedestrian and
bicycle safety outcomes. Ongoing public education is essential to increasing driver
awareness and improving compliance with pedestrian and bicycle laws. Recommended
initiatives include:
Driver awareness campaigns emphasizing yielding requirements and speed
compliance
Crosswalk safety campaigns highlighting proper driver and pedestrian behavior
Roundabout safety campaigns
Bicycle skills workshops for youth and adults to build confidence and safe riding
practices
Helmet distribution partnerships to improve access to properly fitted safety
equipment
The Village will continue to support and expand Safe Routes to School initiatives
that promote safe, active transportation for students and families.
Public outreach should be coordinated seasonally and aligned with high-traffic
events, including National Bike Month and community festivals.
BICYCLE NETWORK & DESIGNATED ROUTES
To build a safer, more connected village, Mount Horeb will establish two designated
bicycle routes that help riders travel comfortably across town without relying on
high-traffic streets. Wayfinding signs will be installed along each route to raise awareness
and guide bicycle traffic along these routes.
The base cost for this project would likely be $3,250 for the signage, plus labor cost for
installation. Estimate is based on 10 signs per mile on the 2.6-mile bike route. Wisconsin
DOT estimates cost $125/sign. Cost shall be finalized and included in the 2027 budget.
EAST / WEST ROUTE: Connecting Parks, Schools, Downtown, and the library
1.3 Miles | +87 FT / -36 FT Elevation Change (West to East)
POINTS OF INTEREST:
Western Terminus: Grundahl Park.
Garfield Park
Downtown Mount Horeb Business District
Mount Horeb Middle School
Viking Park (Tennis/Pickleball Courts)
Page 12 of 19
Liberty Park
Mount Horeb Intermediate School
Eastern Terminus: Mount Horeb Public Library
NORTH / SOUTH ROUTE: Connecting Aquatic Center, Downtown, Elementary
School and Hofstetter Conservation Park
1.3 Miles | +26 FT / -105 FT Elevation Change (North to South)
POINTS OF INTEREST:
Northern Terminus: Aquatic Center
Downtown Mount Horeb Business District
Garfield Park
Mount Horeb Elementary School
Southern Terminus: Hofstetter Conservation
FUTURE EXPANSION: STEWART LAKE ROUTE:
Connect Mount Horeb Downtown to Stewart Lake County Park.
Click to View Interactive Map
Page 13 of 19
BICYCLE STORAGE
Providing additional bicycle parking is a practical way for Mount Horeb to improve
pedestrian and bicycle safety. As bicycling continues to grow, including the rapid
adoption of electric bicycles, more residents are traveling farther and using bikes for
everyday trips. E-bikes are heavier, more valuable, and often used by riders who may not
feel comfortable carrying them inside buildings, which increases the need for stable,
secure outdoor bike storage. Bike racks reduce sidewalk clutter, prevent unsafe locking to
railings or signs, discourage theft, and create more orderly, predictable pedestrian spaces.
By clearly defining where bicycles should be parked, the village can improve
accessibility, sightlines, and overall safety for all users of the public right of way.
Establishing a dedicated $1,250 per year budget for bicycle rack installation is a
low-cost, high-impact implementation strategy within the pedestrian and bicycle safety
plan. This funding level is sufficient to install multiple commercial-grade bike parking
spaces at a single location each year, allowing the village to focus on priority areas such
as downtown, schools, and parks.
PEDESTRIAN IMPROVEMENT: MAIN STREET CROSSWALKS
Tourism plays a significant role in Mount Horeb’s local economy. Visitors are drawn to
the Village to experience the Trollway, local shops, restaurants, and community events.
As a result, downtown Main Street functions not only as a transportation corridor, but
also as a pedestrian-oriented destination.
Many visitors are unfamiliar with downtown parking locations and traffic patterns. This
can create confusion and increase the likelihood of mid-block crossings or unsafe
crossing attempts along Main Street. The situation is further intensified during the weekly
Farmers Market, which is located along this corridor and coincides with evening peak
traffic volumes. During these periods, both pedestrian and vehicle activity increase
substantially, elevating the potential for conflict.
High-visibility crosswalk markings are a proven safety counter measure that can
significantly improve pedestrian visibility and driver yielding behavior. According to
the Federal Highway Administration (FHWA), enhanced crosswalk visibility treatments
have been shown to reduce pedestrian injury crashes by up to 40 percent. Implementing
high-visibility crosswalks in key downtown locations would support tourism, improve
pedestrian comfort, and enhance overall safety for residents and visitors.
Page 14 of 19
High-visibility continental
(ladder) or bar-pair crosswalk
markings Constructed using
thermoplastic or inlay tape.
MUTCD-compliant R1-6 “State
Law – Yield to Pedestrian” signs
Installed on both sides of the
crosswalk
Main street has 10 crosswalks that are considered midblock or 2-way intersections that
would benefit from high-visibility markings. The 3 crosswalks between 3rd and 5th Street
would benefit the most due to high pedestrian traffic during the farmer’s market. In 2025
we had an incident where a child was struck by a vehicle during this peak period. The
Village shall prioritize updating these 3 crosswalks with R1-6 Yield to Pedestrian Signs
and painted high visibility crosswalk markings as soon as possible. The remaining 6
crosswalks shall be updated in subsequent fiscal years.
The Wisconsin DOT is planning to repave HWY 78 (Main St.) in 2033, installing colored
concrete crosswalks. In the interim, the village staff shall weigh the reduced up-front
cost of painting vs thermoplastic tape. Painted high-visibility crosswalk markings
typically require repainting on an annual basis due to traffic wear and snowplowing. The
village could proceed with annual maintenance of painted crosswalks until the corridor is
resurfaced, at which time more durable marking materials may be considered.
Page 15 of 19
PEDESTRIAN IMPROVEMENT: SIDEWALK NETWORK
ENHANCEMENTS
Mount Horeb should continue to implement its adopted Sidewalk Circulation Plan and
related sidewalk construction, maintenance, and inspection policies, which together
provide a clear, consistent, and effective framework for improving pedestrian safety and
connectivity. The Circulation Plan identifies specific sidewalk gaps, prioritizes
connections to schools, parks, and other high-use community destinations, and
coordinates sidewalk installation with street reconstruction, redevelopment, and budget
considerations, reflecting an incremental and fiscally responsible approach that is already
being actively implemented. Complementary Village policies governing sidewalk
construction, cost-sharing, and routine safety inspections ensure sidewalks are built to
consistent standards, maintained in a reasonably safe condition, and repaired based on
objective hazard criteria and pedestrian demand. Continuing these established programs
affirms the Village’s commitment to a safe, accessible, and connected pedestrian network
while supporting broader goals for walkability, active transportation, and community
livability without creating new or redundant policies.
ENFORCEMENT
Targeted, data-informed enforcement supports engineering and education efforts by
reinforcing safe behaviors. In collaboration with the Mount Horeb Police Department, the
Village will prioritize:
Targeted speed enforcement in school zones and high-pedestrian corridors
Crosswalk yield enforcement operations downtown and other high-activity areas
Ongoing coordination between enforcement personnel and safety committees to
address emerging concerns
DATA COLLECTION AND EVALUATION
The Village will establish an ongoing collaboration between the Mount Horeb Police
Department, Public Safety Committee and the Sustainability and Natural Resources
Committee to conduct an annual review of pedestrian and bicycle safety conditions.
This review will include:
Analysis of reported crash data involving pedestrians and bicyclists
Collection of pedestrian and bicycle counts at key corridors and crossings
Community engagement to assess perceived safety, barriers, and areas of concern
Conducting this evaluation on an annual basis will allow the Village to monitor trends,
identify emerging issues, and measure the effectiveness of implemented safety
improvements. The review will take place each May to align with National Bike Month,
reinforcing the Village’s commitment to active transportation and providing an
opportunity to share findings with the community.
Page 16 of 19
IMPLEMENTATION TIMELINE
Timeline Action Lead Estimated
Cost
2026 Create Education Plan Police Dept, Schools,
SNR, Parks &
Recreation
$0
2026 Enhance Public Access to
Walking and Biking
Information (website update)
Village Staff $0
2027 Install Bicycle Network
Wayfinding and Crossing
Signage for North/South &
East/West Routes.
Expand to Stewart Lake
County Park pending adoption
of initial routes.
Village Staff, Public
Services Department
$3,000 -
$4,000
2027 2nd Street Reconstruction –
Bike Lanes, Wayfinding and
Crossing Signage
Public Services
Department
TBD
2027–2031 High Visibility Crosswalks on
Main Street
Village Staff, Public
Services Department
$5,000/year
(2027-2031)
Annual Add Bicycle Racks at Key
Destinations
Village Staff, Public
Services Department
$1,250/year
Annual
(May)
Pedestrian and Bicycle Safety
Review (crash data, counts,
community engagement)
Police Dept, Public
Safety Committee,
SNR
$0
Future Pave Military Ridge State Trail Village Staff TBD
Page 17 of 19
IMPLEMENTATION SUMMARY
2026: Develop Education Plan
In 2026, the Village will lead the creation of a coordinated education and encouragement
strategy focused on safe walking and biking. This effort will be a collaboration between
the Mount Horeb Police Department, Mount Horeb Area Schools, the Sustainability and
Natural Resources Committee, and the Recreation Department. The plan will outline
appropriate school programs, community training resources, and public awareness
campaigns aimed at promoting safe travel behavior.
2026: Enhance Public Access to Walking and Biking Information
The Village website shall be updated to provide clear, easy access to pedestrian and
bicycle planning resources. These additions will help residents identify safe routes,
understand local infrastructure, and stay informed about ongoing improvements.
Web links will include:
Low-Stress Route Finder
Dane County Bike Map
Pedestrian Facilities Map
2027: Install Bicycle Network Wayfinding and Crossing Signage
To improve navigation and support a low-stress transportation network, new wayfinding
signs and bicycle/pedestrian crossing signs will be added along designated routes. This
will enhance safety by clearly directing riders and increasing driver awareness at key
conflict points.
DOT Property Signs
NACTO - Bike Wayfinding Routes
2027: 2nd Street Reconstruction – Bike Lanes, Wayfinding and Crossing Signage
Planned reconstruction of 2nd Street in 2027 offers an opportunity to integrate bicycle
infrastructure. The Village should install bicycle lane pavement markings when feasible
from Lincoln Street to Carver Street, improving north–south connectivity and safety.
2027-2031: Main Street - High Visibility Crosswalks
High-visibility crosswalk upgrades using thermoplastic markings and MUTCD-compliant
pedestrian yield signage are estimated at approximately $2,500 per crosswalk, consistent
with recent municipal pavement-marking unit costs used by communities in south-central
Wisconsin.
ANNUAL: Install Bicycle Racks at Key Destinations
As demand and usage grows, the Village will install secure bicycle parking at major
community destinations.
Page 18 of 19
FUTURE CONSIDERATION: Pave Military Ridge State Trail
Paving a portion of the Military Ridge State Trail within the Village of Mount Horeb is
possible, but it requires close coordination with the Wisconsin DNR, because the corridor
is a state trail with an existing master‑planned purpose, established surface
(predominantly crushed limestone), and winter shared‑use considerations (including
snowmobiling on the limestone segments). Today only about 2.5 miles are asphalt
(primarily near Fitchburg/Verona), with the remainder in limestone, and snowmobiles are
allowed only on the limestone sections, not on the paved segment between Fitchburg and
Verona. Any proposal to pave inside the village would therefore need to address how
winter uses (snowmobile routing, ski/snowshoe use) would be accommodated if a
segment were converted to asphalt.
A practical roadmap is to follow the Verona model. In 2025, the City of Verona approved
a Land Use Agreement with the DNR to replace bridges and pave an intown stretch of the
trail, with the city taking on design, construction, and defined maintenance
responsibilities for the paved surface while the DNR retained corridor oversight.
Verona’s public project page shows the agreement was signed in May 2025, design
advanced through 2026, and asphalt paving scheduled for 2027; meeting notes indicate
the city coordinated sequence (bridges first, then paving) and long‑term maintenance
terms with the DNR. For Mount Horeb, a similar pathway would likely include: (1) early
discussions with the DNR property manager to confirm master plan consistency and
scope; (2) a concept plan that maps limits, cross‑sections, winter use management (e.g.,
alternate snowmobile routing or seasonal agreements), and access points; (3) a draft land
use/operating agreement defining roles (construction, snow/ice control, surface
maintenance, vegetation management), term, and liability; (4) environmental/permit
review as needed; and (5) local funding commitments and public involvement. The
DNR’s own information page points to Property Master Plans as the touchstone for
proposed changes, while Verona’s project documentation provides a recent, local
precedent for the agreement structure, schedule, and deliverables.
Links:
https://www.veronawi.gov/918/Military-Ridge-State-Trail-Paving-Projec
https://dnr.wisconsin.gov/topic/parks/militaryridge/info
Page 19 of 19
Source: Village of Mount Horeb website. First collected Oct 16, 2026.