Administrative Offices
Municipal Building - 138 East Main Street
Mount Horeb, Wisconsin 53572
608.437.6884 | mounthorebwi.info
PARKS, RECREATION, AND FORESTRY COMMISSION AGENDA
Tuesday, August 25, 2026 at 5:30 PM
Municipal Building Board Room
138 E. Main Street
Mount Horeb, WI
1) Call to order
2) Roll Call
3) Public Comments on Non-Agenda Items*
4) Consent Agenda
a. Consideration of July 28, 2026 Meeting Minutes
5) Agenda Items
a. Consider Mount Horeb Recreation Complex Phasing Plan
b. Consider 2027-2031 Capital Improvement Plan
c. Consider agreement for Mount Horeb Recreation Complex fundraising
d. Consider Grundahl Park Concession/Restroom Building Site Plan
6) Reports
a. Recreation Director's Report
b. Public Services Director's Report
7) Future agenda items
8) Meeting adjournment
*Public Comment Policy
Members of the public are invited to speak at meetings of all Mount Horeb Public Bodies. To comment, please complete a
Public Comment Form at the Meeting Room entrance and submit it to staff before the meeting begins. Comments are limited
to three minutes, must be made from the podium, and the speaker must return to the audience after speaking.
• Non-agenda item comments are heard at the start of the meeting. Public Body members and staff will not
engage in discussion during public comment but may consider topics for future agendas.
• Agenda item comments are heard during the relevant item, after the proposers or staff present the item and
before Public Body discussion. All public comments on the item will be heard before any discussion by the Public
Body.
Members of the public will only be allowed to speak outside these public comment times if they are invited by the meeting
chair to share additional information requested by the Public Body. If so invited to speak, the member of the public must do
so from the podium.
Written comments are also welcome. Written comments shall include the name and address of the submitter and should be
Page 1 of 31
submitted to the Deputy Treasurer/Governance Coordinator by email at niki.erickson@mounthorebwi.info (subject line:
Public Comment Request-Name of Public Body) or delivered by to the Village at: 138 E Main Street, Mount Horeb WI,
53572, ATTN Public Comment Request-Name of Public Body.
UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR INFORMATION OR TO REQUEST THIS
SERVICE, CONTACT ALYSSA GAFFNEY, CLERK, AT 138 E MAIN STREET, MOUNT HOREB, WI (608) 437-9404.
Page 2 of 31
MINUTES
PARKS, RECREATION AND FORESTRY COMMISSION
July 28, 2026, 5:30 pm, Municipal Building Board Room
PRESENT: Kelley, White, Grabe, Adler, Healy, Webber
ABSENT: Hogseth
OTHERS PRESENT: Gorman – Village of Mount Horeb
PUBLIC COMMENTS ON NON-AGENDA ITEMS
There were none.
CONSIDERATION OF THE JUNE 23, 2026 MEETING MINUTES
White moved, Grabe seconded to approve the minutes of the June 23, 2026 meeting
minutes. Motion carried.
CONSIDER 2027-2031 CAPITAL BUDGET REQUESTS
Gorman reviewed his proposed five-year capital improvement plan and reviewed the
2027 capital budget requests in more detail. There was some discussion regarding the
condition and age of the aquatic center.
PUBLIC COMMENTS: Resident Jason Fendrick spoke on the proposed budget. He was
glad to see funding for the Comprehensive Outdoor Recreation Plan in the budget but
was surprised and disappointed not to see any funding for the Mount Horeb Recreation
Complex. Fendrick explained the need for the park in this community and the amount of
public support for the project during the planning process.
Gorman reviewed the budget timeline and meeting schedule for approving the budget.
He will be meeting with Gabe Altenbernd and Dudley to try to develop a phasing plan
for the park and bring more information to the next meeting in August.
Healy moved, White seconded to table the budget discussion until August in order to get
more information on the phasing costs of the Mount Horeb Recreation Complex. Healy
asked Gorman if forestry was being funded adequately and Healy also would like to
discuss trails at a future meeting. Motion carried.
RECREATION DIRECTOR’S REPORT
Dudley provided a written report in her absence.
PUBLIC SERVICES DIRECTOR’S REPORT
Gorman reviewed his written report.
FUTURE AGENDA ITEMS
2017-2021 Capital Improvement Plan
Grundahl concession building
Page 3 of 31
Mount Horeb Recreation Complex fundraising
Discussion on trails
Commission guide
SET NEXT MEETING DATE AND TIME
August 25, 2026 at 5:30pm
MEETING ADJOURNMENT
Webber moved, White seconded to adjourn at 6:27pm
Page 4 of 31
PHASING PLAN
LUKKEN PROPERTY
08.20.2026
0
NORTH
100'50'
COUNTY HIGHWAY "S"
STATE HIGHWAY "78"
FRONTAGE ROAD
MANOR DRIVE
PERMEABLE
PARKING LOT
(176 STALLS)
BUS
DROP
OFF
PLAY AREA
w/ CLIMBING
WALL
LARGE SHELTER w/
RESTROOMS AND
CONCESSIONS
BENCH
(TYP.)
BIKE
PATH
NEIGHBORHOOD CONNECTION
LANDSCAPE
PLANTINGS
(TYP.)
DECIDUOUS
TREE (TYP.)
RECREATION CENTER
PARKING (70 STALLS)
(PHASE II)
SMALL
SHELTER
SMALL SHELTER AND
STORAGE BUILDING
PERMEABLE PAVER
PARKING LOT (55
STALLS)
STAIRS
(TYP.)
RECREATION
CENTER
(PHASE II)
PROPOSED PROPERTY LINE
(17)
(25)
46 TOTAL ACRES
RECREATION
CENTER
(PHASE II)
ORNAMENTAL
FENCE
SMALL
SHELTER
SPECTATOR
SEATING (TYP.)
(30)
(18)(19)(25)
(14)
(15)
EVERGREEN
TREE (TYP.)
PLAY
NOOK
PLAY
NOOK
BASEBALL/SOFTBALL FIELD:
- 70' BASELINE
- 225' OUTFIELD
- OUTFIELD FENCING
- SPORTS NETTING
- SPORTS LIGHTING (FUTURE)
- FOUL POLES
- SCOREBOARD
- ADJUSTABLE BASE PINS
BASEBALL/SOFTBALL FIELD:
- 90' BASELINE
- 350' OUTFIELD
- OUTFIELD FENCING
- SPORTS NETTING
- SPORTS LIGHTING (FUTURE)
- FOUL POLES
- SCOREBOARD
- ADJUSTABLE BASE PINS
TIERED
SPECTATOR
SEATING (TYP.)
TIERED
SPECTATOR
SEATING (TYP.)
SOCCER FIELD U16:
- 330' X 210'
- SPORTS LIGHTING (FUTURE)
- SCOREBOARD
FOOTBALL FIELD:
- 360' x 160'
- SPORTS LIGHTING
(FUTURE)
- SCOREBOARD
FOOTBALL FIELD:
- 360' x 160'
- SPORTS LIGHTING
(FUTURE)
- SCOREBOARD
PEDESTRIAN AND
MAINTENANCE ROUTE
DECIDUOUS
TREE (TYP.)
BOLLAND
BIKE PATH CONNECTION TO
FUTURE DEVELOPMENT
AND MILITARY RIDGE TRAIL
SOCCER FIELD U12:
- 210' X 135'
- SPORTS LIGHTING (FUTURE)
- SCOREBOARD
DRIVE
ENTRANCE
(19) (18)
(14)
(16)
SMALL
SHELTER
BASKETBALL
COURT
STORMWATER BASIN
PLACEHOLDER
(FINAL DESIGN TO BE PART OF
FUTURE DETAILED PLANS)
BIKE
PATH
PHASE 2
PHASE 1
PHASE 1
PHASE 3
Page 5 of 31
8/19/2026
Lukken Property
Master Plan
1 General Conditions, Site Preparation & Removals $480,750.00
2 $546,750.00
3 $406,825.00
4 $562,280.00
5 $390,000.00
6 $2,236,890.00
7 Basketball Court Development $38,282.00
8 Soccer Field Development $42,500.00
9 Shelters / Restroom Building / Structures $445,000.00
10 $75,300.00
11 $116,000.00
12 $156,500.00
Total: $5,497,077.00
20% Contingency $1,099,415.40
Project Total: $6,596,492.40
A/E/Permitting Fees $527,719.39
Grand Total: $7,124,211.79
1 General Conditions, Site Preparation & Removals $369,980.00
2 $1,553,150.00
3 $1,530,150.00
4 $378,390.00
5 $20,000.00
Phase 1: Opinion of Probable Construction Costs
Site Grading, Excavation & Drainage
Pavement (Concrete, asphalt, curb, stairs, etc.)
Creative Play Area & Surfacing
Site Electrical & Plumbing
Driveways & Parking Lots
Site Furnishings
Landscape Plantings
Turf Restoration
Phase 2: Opinion of Probable Construction Costs
Site Grading, Excavation & Drainage
Pavement (Concrete, asphalt, curb, stairs, etc.)
Play Nooks & Surfacing
Site Electrical & Plumbing
JSD Professional Services, Inc.
1400 E Touhy Ave, Suite 215
Des Plaines, IL 60018 312-644-3379
Page 6 of 31
6 Ballfield Development $1,306,055.00
7 Football / Soccer Field Development $395,700.00
8 Shelters / Restroom Building / Structures $200,000.00
9 $58,700.00
10 $10,475.00
11 $708,000.00
Total: $6,530,600.00
20% Contingency $1,306,120.00
Project Total: $7,836,720.00
A/E/Permitting Fees $626,937.60
Grand Total: $8,463,657.60
1 General Conditions, Site Preparation & Removals $83,470.00
2 $367,050.00
3 $155,705.00
4 $581,340.00
5 $8,650.00
6 $82,000.00
Total: $1,278,215.00
20% Contingency $255,643.00
Project Total: $1,533,858.00
A/E/Permitting Fees $122,708.64
Grand Total: $1,656,566.64
Site Grading, Excavation & Drainage
Pavement (Concrete, asphalt, curb, stairs, etc.)
Driveways & Parking Lots
*Phase 3 Opinion of Probable Construction Cost excludes all building-related costs, including, but
not limited to, structural, architectural, mechanical, electrical, plumbing, sanitary, and fire
protection systems.
Site Furnishings
Landscape Plantings
Turf Restoration
Phase 3: Opinion of Probable Construction Costs
Landscape Plantings
Turf Restoration
JSD Professional Services, Inc.
1400 E Touhy Ave, Suite 215
Des Plaines, IL 60018 312-644-3379
Page 7 of 31
Agenda Item Report
Park/Recreation/Forestry Commission: Tuesday, August 25,
2026
Agenda Items: Consider 2027-2031 Capital Improvement Plan
Recommendation
Background
Financial Impact
Attachments
Prepared By
1. capital improvement plan PARKS 27.31
2. capital requests PRF 27
Page 8 of 31
Mount Horeb Public Services Dept.
Capital Improvement Plan - Parks, Recreation and Forestry Commission
2027-2031
ITEM 2026 2027 2028 2029 2030 2031
Update Comp. Outdoor Recreation Plan 30,000
Playground equipment replacement-Himsel Park 100,000
Purchase wide area mower (11') 70,000
Aquatic Center Improvements:
-Replace shingles 25,000
-Paint bathhouse floors 10,000
-Plumbing repairs/valve replacements ??
-Replace rusty metal doors & frames - chemical rooms 12,000
-Resurface waterslide 26,000
-Replace one 6' lifeguard stand 5,000
-Replace robot vacuum 5,000
-Bathhouse exterior staining 7,500
Playground equipment replacement-Lions 100,000
Waltz Park shelter exterior staining 5,000
Replace 2019 Kubota utility vehicle 15,000
Playground equipment replacement-Foster Park 74,000
Pool painting - Wading/Plunge pools 12,000
Liberty shelter - prep and restain all wood 5,000
Waltz Park - Replace park sign 5,000
Waltz shelter - replace roof 15,000
Grundahl Park ball diamond shelter/storage 417,000
Grundahl Park ball diamond improvements 20,000
Replace 2020 Ford F450 chipper truck 85,000
Replace 2021 Ford F350 w/ plow and salt spreader 100,000
Tennis Court maint. 3,000 60,000
Mount Horeb Recreation Complex TBD TBD TBD TBD TBD
TOTALS 528,000 258,000 137,500 38,000 85,000 160,000
Page 9 of 31
Village of Mount Horeb
Public Services Department
138 E Main St
Mount Horeb, WI 53572
Phone (608) 437-3351/Fax (608) 437-3190
www.mounthorebwi.info
2027 CAPITAL BUDGET REQUESTS
PARKS, RECREATION AND FORESTRY COMMISSION
UPDATE THE COMPREHENSIVE OUTDOOR RECREATION PLAN $30,000
Our previous CORP expired in 2025. In the past, this has been a very helpful planning
document for park development and upgrades. This is especially important with the
Mount Horeb Recreation Complex future development.
PLAYGROUND EQUIPMENT REPLACEMENT – HIMSEL PARK $100,000
The existing playground equipment is 30 years old and is in need of replacement.
PURCHASE 11’ WIDE-AREA MOWER $70,000
We would like to purchase this equipment to be more efficient and lower the time that
it takes to mow our park areas. We have a difficult time keeping up with our parks mowing.
We mow approximately 40 acres of turf.
WALTZ PARK SHELTER POWER WASHING AND STAINING $5,000
The wood trim, fascia and roof decking are in need of staining
MOUNT HOREB RECREATION COMPLEX TBD
AQUATIC CENTER IMPROVEMENTS:
1. RESTORATION OF WATERSLIDE $26,000
The gelcoat is starting to flake and chip. Fischer Brothers did an in-season repair
this year but full restoration of the inside of the flume is needed prior to next season.
2. PAINT BATHHOUSE FLOORS $10,000
The floors are in need of painting. An epoxy paint is necessary due to the wet floors
and showers.
3. PLUMBING REPAIRS $6,500
There are some unions and valves that are rusty and in need of replacement. These
are mostly in the basement mechanical room.
4. REPLACE RUSTY DOORS AND FRAMES $12,000
There are three doors and frames for the two chemical storage rooms that are
very rusty. Price includes removal, install and all hardware.
5. REPLACE ONE LIFEGUARD STAND $5,000
Dudley would like to replace the 6’ lifeguard stand near the shallow end.
Page 10 of 31
Page 11 of 31
Agenda Item Report
Park/Recreation/Forestry Commission: Tuesday, August 25,
2026
Agenda Items: Consider agreement for Mount Horeb Recreation Complex
fundraising
Recommendation
Background
Financial Impact
Attachments
Prepared By
1. Fundraising Professional Services Agreement
Page 12 of 31
1
Administrative Offices
Municipal Building - 138 East Main Street
Mount Horeb, Wisconsin 53572
608.437.6884 | mounthorebwi.info
Professional Services Agreement
This Professional Services Agreement (“Agreement”) is entered into as of November 1, 2026 (“Effective
Date”) by and between the Village of Mount Horeb, Wisconsin, a Wisconsin municipal corporation, with
principal offices at 138 East Main Street., Mount Horeb, WI 53572 (“Village”) and LaCoona Consulting, LLC,
with principal offices at 1035 Kamla Ct., Platteville, WI 53818 (“LaCoona”).
1. Background and Purpose
The Village is undertaking a roughly $12.5 million capital improvement project for the design and
construction of an Outdoor Sport Complex in Mount Horeb, Wisconsin (“Project”).
2. Scope of Services
LaCoona agrees to provide professional fundraising development services to secure $6.5 million in
philanthropic contributions toward the project.
Professional Fundraising Services shall include:
1. Develop a comprehensive fundraising plan, including timelines, donor segmentation, and
solicitation strategies.
2. Identify, cultivate, solicit, and steward prospective donors, including individuals, corporations,
foundations, and public funding sources.
3. Coordinate campaign events, donor recognition programs, and public relations efforts related to
fundraising, including social media and website.
4. Maintain accurate donor records and provide regular progress reports.
5. Collaborate with Village boards, staff, and volunteers to maximize fundraising effectiveness.
3. Term and Termination
This Agreement shall commence on November 1, 2026 and continue until July 31, 2030, unless fundraising
goals are met before the deadline, or if Agreement is terminated earlier in accordance with Section 11.
This Agreement may be extended beyond July 31, 2030 if mutually agreed upon by both parties.
Either party may terminate this Agreement without cause with sixty (60) days’ written notice. LaCoona
shall be compensated for actual contributions made to the Village before the termination date.
4. Compensation
1. Fee Structure: LaCoona shall be compensated at five percent (5%) of the total funds raised,
calculated based upon actual contributions made to the Village. For avoidance of doubt, while
Page 13 of 31
2
Administrative Offices
Municipal Building - 138 East Main Street
Mount Horeb, Wisconsin 53572
608.437.6884 | mounthorebwi.info
third parties may sign commitments indicating that a donation to the Project will be made, a
contribution shall not be considered an actual contribution under this Section 4.1. until the Village
receives the actual funds. For avoidance of doubt, any payments made by the Village to LaCoona
under this Agreement shall only come from actual contributions made to the Village under this
Agreement. The Village shall not be obligated to make any payments to LaCoona under its general
fund or any other municipal funding sources.
2. Funds returned to Village: Twenty percent (20%) of the total fees paid to Contractor under this
Agreement will be returned to the Village by LaCoona to help fund the Project. The payment to
be paid by LaCoona to the Village under this subsection 2, shall b e made within thirty (30) days
after this Agreement ends or is terminated for any reason. To the extent LaCoona seeks to make
the payment as a charitable contribution to the Village and the Project, the Village agrees to
complete any standard documents necessary to confirm the charitable contribution.
3. Fundraising before December 31, 2026: LaCoona agrees that fundraised cash received before
December 31, 2026, or signed commitments received before December 31, 2026, will be exempt
from the compensation and fee structure contained in this Agreement and, specifically, Section 4.
4. Payment Schedule: Payments to LaCoona shall be made quarterly, within thirty (30) days after the
end of each quarter, based on verified contributions received.
5. Expenses
The Village shall reimburse LaCoona for pre-approved, reasonable out-of-pocket expenses directly related
to campaign activities, including travel, printing, and event costs, upon submission of receipts to the
Finance Department. These expenses are considered part of the maximum $325,000 Compensation total
and are not additional fees. To the extent the Village reimburses LaCoona under this Section 5, the
payment from the Village to LaCoona shall only be made from the account identified in Section 8 below,
and the subsequent quarterly payment to be made to the Village under Section 4.4. shall be reduced by
the amount of the most recent payment under this Section 5.
6. Reports
• Monthly Reports: LaCoona shall provide written updates detailing donor contracts, solicitations,
pledges, and funds received.
• Quarterly Reviews: the Village and LaCoona shall meet quarterly to review progress, adjust
strategies, and address challenges.
Page 14 of 31
3
Administrative Offices
Municipal Building - 138 East Main Street
Mount Horeb, Wisconsin 53572
608.437.6884 | mounthorebwi.info
7. Donor Exclusivity
During this term of this Agreement, LaCoona shall not solicit donations for any other project in direct
competition with the Village’s fundraising campaign within a 25-mile radius of Mount Horeb, WI, without
prior written consent.
8. Fundraising Amount
The Village will open a bank account where all funds raised under this Agreement will be deposited. This
account will be segregated from any other Village accounts. Expenses related to this Agreement will be
paid by the Village from this account.
9. Ownership of Materials
All campaign materials, donor lists, and related documents created by LaCoona in connection with this
Agreement shall be the property of the Village upon payment of all amounts due. Notwithstanding the
preceding sentence, all documents and records created or otherwise generated under this Agreement
shall be subject to the Wisconsin Public Records Law and LaCoona agrees to work with the Village in a
reasonable manner to respond to any public records requests.
10. Independent Contractor Status
LaCoona is an independent contractor and not an employee, partner, or agent of the Village. LaCoona shall
be solely responsible for all taxes, withholdings, and other statutory obligations related to compensation
paid to LaCoona under this Agreement.
11. Notices
All notices required or permitted under this Agreement shall be in writing and sent to the respective
addresses of the Parties as set forth above.
IN WITNESS WHEREOF , the Parties have executed this Agreement as of the Effective Date.
Village of Mount Horeb, WI: LaCoona Consulting, LLC
___________________________________ ___________________________
Gabriel C. Altenbernd Dennis R. Cooley
Village Administrator Owner
___________________ ___________________
Date Date
Page 15 of 31
Agenda Item Report
Park/Recreation/Forestry Commission: Tuesday, August 25,
2026
Agenda Items: Consider Grundahl Park Concession/Restroom Building Site Plan
Recommendation
Background
The attached site plan will be reviewed at the Plan Commission meeting on August
26. The Parks, Recreation and Forestry Commission has already agreed on the
building plans and the site plans in general. I would like a recommendation of the site
plan to go to the Plan Commission and I would like to decide on exterior siding and roof
colors so the Plan Commission can review those as well. My recommendation is
"burnished slate" or "charcoal" color siding with black wainscoting, trim and roof.
Financial Impact
$417,000 has been budgeted by the Village in 2026, with $50,000 coming from the Park
Development Fund, resulting in capital borrowing of $367,000. The Village is hoping to
reduce the capital borrowing substantially with donations from the Summer Frolic
Committee, Youth Baseball Association, other public donations and donated contractual
labor.
Attachments
Prepared By
Jeff Gorman, Public Services Director
1. 261616_Civil Design (002)
2. Grundahl Park Site Plan Staff Report 8.26.26
3. Graber-Supply-Metal-Color-Chart-PDF
Page 16 of 31
XXXXX
XXXXXXXX XXXXX
XXXXXXXXXX
XXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXX
EMEBM-1
STMSTMSTM
STMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTM
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
BM-3
BM-218.0'9.9' R15.0'R6.0'R6.0'
29.1' MATCH
5.0'
5.0'10.0'
18.0'
10.2'
GRUNDAHL PARK CONCESSIONSVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C100
GENERAL NOTES
LEGEND (PROPOSED)
PROPOSEDBUILDING1,961 SF
S BLUE MOUNDS STREET
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF MAY 4, 2026. WYSER ENGINEERING SHALLNOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS A RESULT OFERRONEOUS OR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TO CONFIRMALL ELEVATIONS, GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TOCONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THEBENCHMARKS SHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION.CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHINTHE VILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BYTHE OWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULTIN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALLBE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THATCLARIFICATION OR REDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLICEASEMENTS SHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARDSPECIFICATIONS.
PROPOSED PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINTROOF OVERHANGASPHALT PAVEMENTCONCRETE PAVEMENTDISTURBANCE LIMITSSAWCUT LIMITS
BENCHMARK TABLEBM - 1BM - 2BM - #ELEVATIONDESCRIPTION
BM - 31167.461158.951158.70CROSS CUT IN CURB AT THE SOUTH END OF THE STREET PARKING AREACROSS CUT IN CURB ON NORTH END OF THE PARKING LOT, SOUTH OF THE EXISTING SHELTERCROSS CUT IN CURB ON SOUTH SIDE OF THE NORTH PARKING LOT ENTRANCE
COVERED SHELTER AREA. REFERTO ARCHITECTURAL PLANS FORSTRUCTURAL DETAILS.
PAVEMENT SECTION (ASPHALT PAVEMENT):3" ASPHALT (WDOT SECTION 460, TABLE 460-1) OVER8" CRUSHED STONE (WDOT SECTION 301 AND 305).
PAVEMENT SECTION (CONCRETE APRON):5" CONCRETE OVER 4" CRUSHED STONE .
PAVEMENT SECTION (CONCRETE APRON):5" CONCRETE OVER 4" CRUSHED STONE .
Page 17 of 31
1159.82
1160.45
1160.00
1160.20
1159.95
1159.92
1160.01
1160.05
1160.39
1160.55
1160.25
1160.19
1160.17
1160.07
1160.19
1160.28
1160.34
1160.34
1160.38
1160.49
1160.82
1160.66
1160.57
1160.55
1160.47
1160.39
1160.26
1160.43
1160.69
1160.76
1160.69
1160.79
1160.92
1161.04
1161.27
1161.17
1161.13
1161.11
1161.12
1161.07
1160.86
1160.95
1161.42
1161.33
1161.41
1161.41
1161.47
1161.45
1161.76
1161.73
1161.651161.05
1158.241159.15
1159.73
1159.631159.48
1158.30
1158.56
1158.74
1158.96
XXXXX
XXXXXXXX XXXXX
XXXXXXXXXX
XXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXX
EMEBM-1
E E E E E E E E E E E E
EEEEE
EE
E
EE
E
E
E
E
E
E
WAT
WAT
WATWATWATWAT
WATWATWATWATWATWATWATWATWATWATWATWAT
WAT
WAT
WAT
WAT
WAT
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
WATWAT
WATWATWATWATWATWATWAT
SANSANSANSAN
SANSANSANSANSANSAN
SANSANSANSAN
SANSANSAN
E
EEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
STMSTMSTM
STMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTM
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
BM-3
BM-2
11581158
1159
1159
1160
1160 1161
1161
1162
116211631164116511661167
1160
1160
1161
E E E E E E E E
GRUNDAHL PARK CONCESSIONSVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C101
GENERAL NOTES
LEGEND (PROPOSED)
1.THIS PLAN INDICATES ITEMS ON THE SITE, NOT INCLUDING INTERNAL BUILDING DEMOLITION,INTENDED FOR DEMOLITION BASED ON THE CURRENT SITE DESIGN THAT HAVE BEEN IDENTIFIED BY AREASONABLE OBSERVATION OF THE EXISTING CONDITIONS THROUGH FIELD SURVEYRECONNAISSANCE (BY OTHERS), "DIGGER'S HOTLINE" LOCATION, AND GENERAL "STANDARD OF CARE".THERE MAY BE ADDITIONAL ITEMS THAT CAN NOT BE IDENTIFIED BY A REASONABLE ABOVE GROUNDOBSERVATION, WHERE NOT INCLUDED WITHIN THE FIELD SURVEY, OF WHICH THE ENGINEER WOULDHAVE NO KNOWLEDGE OR MAY BE A PART OF ANOTHER DESIGN DISCIPLINE. IT IS THE CONTRACTOR'S/ BIDDER'S RESPONSIBILITY TO REVIEW THE PLANS, INSPECT THE SITE AND PROVIDE HIS OWN DUEDILIGENCE TO INCLUDE IN HIS BID WHAT ADDITIONAL ITEMS, IN HIS OPINION, MAY BE NECESSARY FORDEMOLITION. ANY ADDITIONAL ITEMS IDENTIFIED BY THE CONTRACTOR / BIDDER SHALL BEIDENTIFIED IN THE BID AND REPORTED TO THE OWNER AND ENGINEER OF RECORD. WYSERENGINEERING TAKES NO RESPONSIBILITY FOR ITEMS ON THE PROPERTY THAT COULD NOT BELOCATED BY A REASONABLE OBSERVATION OF THE PROPERTY OR OF WHICH THEY WOULD HAVE NOKNOWLEDGE.2.PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR:2.1.EXAMINING ALL SITE CONDITIONS RELATIVE TO THE CONDITIONS INDICATED ON THE ENGINEERINGDRAWINGS. ANY DISCREPANCIES ARE TO BE REPORTED TO THE OWNER AND ENGINEER ANDRESOLVED PRIOR TO THE START OF CONSTRUCTION.2.2.VERIFYING UTILITY ELEVATIONS AND NOTIFYING OWNER AND ENGINEER OR ANY DISCREPANCIES.NO WORK SHALL BE PERFORMED UNTIL THE DISCREPANCIES ARE RESOLVED.2.3.NOTIFYING ALL UTILITIES PRIOR TO THE REMOVAL OF ANY UNDERGROUND UTILITIES.2.4.NOTIFYING THE OWNER, DESIGN ENGINEER AND LOCAL CONTROLLING MUNICIPALITY 48 HOURSPRIOR TO THE START OF CONSTRUCTION TO ARRANGE FOR APPROPRIATE CONSTRUCTIONINSPECTION.3.CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY DURING THE CONSTRUCTION OF THESEIMPROVEMENTS.4.CONTRACTOR SHALL KEEP ALL STREETS AND ADJOINING SHARED ACCESS ROADWAYS FREE ANDCLEAR OF ALL CONSTRUCTION RELATED DIRT, DUST AND DEBRIS.5.ALL TREES WITHIN THE CONSTRUCTION LIMITS SHALL BE REMOVED UNLESS SPECIFICALLY CALLEDOUT FOR PROTECTION. ALL TREES TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY. STUMPSSHALL BE GROUND TO PROPOSED SUBGRADE.6.PERFORM TREE PRUNING IN ALL LOCATIONS WHERE PROPOSED PAVEMENT AND / OR UTILITYINSTALLATION ENCROACH WITHIN THE EXISTING DRIP LINE OF THE TREES TO REMAIN. ALL TRENCHINGWITHIN THE EXISTING DRIP LINE OF THE TREES TO REMAIN SHALL BE DONE RADIALLY AWAY FROMTHE TRUNK IF ROOTS IN EXCESS OF 1" DIAMETER ARE EXPOSED. ROOTS MUST BE CUT BY REPUTABLETREE PRUNING SERVICE PRIOR TO ANY TRANSVERSE TRENCHING.7.ALL LIGHT POLES TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY, INCLUDING BASE AND ALLAPPURTENANCES. SALVAGE FOR RELOCATION. COORDINATE RELOCATION AND / OR ABANDONMENTOF ALL ELECTRIC LINES WITH ELECTRICAL ENGINEER AND OWNER PRIOR TO DEMOLITION.8.CONTRACTOR SHALL COORDINATE PRIVATE UTILITY REMOVAL / ABANDONMENT AND NECESSARYRELOCATIONS WITH RESPECTIVE UTILITY COMPANY. COORDINATION REQUIRED PRIOR TOCONSTRUCTION.9.ABANDONED / REMOVED ITEMS SHALL BE DISPOSED OF OFF SITE UNLESS OTHERWISE NOTED.10.THE CONTRACTOR SHALL INSTALL A PEDESTRIAN FENCE AROUND ALL EXCAVATIONS TO BE LEFT OPENOVERNIGHT AS REQUIRED.11.CONTRACTOR TO REMOVE EXISTING UTILITY PIPE AND BACKFILL WITH SELECT FILL OR PROVIDE PIPEBACK-FILLING WITHIN BUILDING FOOTPRINT USING "LOW DENSITY CONCRETE / FLOWABLE FILL".12.GRANULAR BACKFILL MATERIALS ARE REQUIRED FOR FILL UNDER PROPOSED PAVED AREAS.13.RESTORATION OF THE EXISTING RIGHT-OF-WAYS AS NEEDED ARE CONSIDERED INCIDENTAL ANDSHOULD BE PART OF THE COST OF THE UNDERGROUND IMPROVEMENTS, DEMOLITION AND REMOVAL.THIS INCLUDES, BUT IS NOT LIMITED TO, CURB & GUTTER, SIDEWALK, TOPSOIL, SEEDING ANDMULCHING.14.ANY SANITARY SEWER, SANITARY SEWER SERVICES, WATER MAIN, WATER SERVICES, STORM SEWER,OR OTHER UTILITIES, WHICH ARE DAMAGED BY THE CONTRACTORS, SHALL BE REPAIRED TO THEOWNER'S SATISFACTION AT THE CONTRACTOR'S EXPENSE.
DEMOLITION NOTES
SUBJECT PARCEL PROPERTY LINECONSTRUCTION LIMIT LINENEW BUILDING (FOR REFERENCE)SAWCUT LIMITSFULL SECTION ASPHALT REMOVAL AREACONCRETE REMOVAL AREAUTILITY REMOVALTREE REMOVAL
PROJECT LIMITS. REMOVE EXISTINGASPHALT PAVEMENT UP TO THEEXISTING BACK OF CURB.PROJECT LIMITS.SAWCUT EXISTINGCONCRETE CURB HEAD.
PROJECT LIMITS. SAWCUTASPHALT IN A CLEANSTRAIGHT LINE.
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF MAY 4, 2026. WYSER ENGINEERING SHALL NOTBE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS A RESULT OF ERRONEOUSOR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TO CONFIRM ALL ELEVATIONS,GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TO CONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THE BENCHMARKSSHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. CONTRACTORASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHIN THEVILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BY THEOWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULT INDISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALL BEBROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THAT CLARIFICATION ORREDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLIC EASEMENTSSHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARD SPECIFICATIONS.PROPOSEDBUILDINGFOR REFERENCE
S BLUE MOUNDS STREETEXISTING WATER FOUNTAINAND WATER MANHOLE TO BEREMOVED IN THEIR ENTIRETY.REFER TO SHEET C300 FORPROPOSED WATER ROUTING.
EXISTING LIGHT POLE IN THISAREA TO REMAIN PROTECTEDDURING CONSTRUCTION.
EXISTING 6" TREE IN THIS AREA TO BEPROTECTED DURING CONSTRUCTION.NO CONSTRUCTION SHALL BE PARKEDIN THE TREE DRIPLINE.
EXISTING FOUL BALL NETTINGPOST TO REMAIN PROTECTEDDURING CONSTRUCTION.
EXISTING BUILDING AND ADJACENTCONCRETE PAVEMENT TO BEREMOVED IN THEIR ENTIRETY.
REMOVAL ALL ASPHALT PAVEMENTWITHIN PROJECT LIMITS. REFER TOC100 FOR NEW ASPHALT LIMITS,AND C200 FOR PROPOSED GRADING.
EXISTING SANITARY SEWER SERVICETO REMAIN PROTECTED DURINGDEMOLITION. REFER TO SHEET C300FOR PROPOSED BUILDINGCONNECTION INFORMATION.
Page 18 of 31
1159.82
1160.45
1160.00
1160.20
1159.95
1159.92
1160.01
1160.05
1160.39
1160.79
1160.55
1160.25
1160.19
1160.17
1160.07
1160.19
1160.28
1160.34
1160.34
1160.38
1160.49
1160.71
1160.82
1160.66
1160.57
1160.55
1160.47
1160.39
1160.26
1160.43
1160.69
1160.76
1160.69
1160.79
1160.92
1161.04
1161.13
1161.27
1161.17
1161.13
1161.11
1161.12
1161.07
1160.86
1160.95
1161.42
1161.33
1161.41
1161.41
1161.47
1161.45
1161.76
1161.73
1161.651161.05
1158.241159.15
1159.73
1159.631159.48
1158.30
1158.56
1158.74
1158.96
1159.07
XXXXX
XXXXXXXX XXXXX
XXXXXXXXXX
XXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXX
EMEBM-1
E E E E E
EEEEE
E
WAT
WAT
WATWATWATWAT
WATWATWATWAT
WATWATWATWATWATWATWAT
COMM
COMM
COMM
WATWAT
WATWATWAT
SANSANSANSAN
SANSANSANSANSANSAN
SANSANSANSAN
SANSANSANE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
STMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTM
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
BM-3
BM-2
11581158
1159
1159
1160
1160 1161
1161
1162
116211631164116511661167
1160
1160
1161
E E E E E
WATWATWAT
E
E
E
EWATWATWAT
WAT
WATE
E E E
E E E
E E E E EE E
COMMCOMM
COMM
COMM
SANSAN
STMSTMSTMSTMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTMSTM
E
E11651164116311621161
1161
1160
1159
1159 1160
1160
1159
11591158 11601160
1160
1160
1160
11602.0%
2.0%
3.5% 2.0%
2.0%
8.8%
6.4%
4.66%
1.8%
4.5%
2.7% 6.4%
5.1%
2.0%
2.0%
0.5%
1.0%
1.0%2.3%
2.8%
8.8%
7.4%
1.0%
1.1%
1160.05 EC1160.05 EP
1160.25 FFE
1160.25 FFE
1160.25 FFE
1160.25 FFE1158.00 RIM
1158.39 BCMATCH1157.98 FLMATCH1157.83 FLMATCH
1157.98 BCMATCH
1158.22 BCMATCH
1160.05 EC1160.05 EP
1160.07 EC1160.07 EP
1160.07 EC1160.07 EP
1159.90 EC
1160.56 EPMATCH
1160.10 EPMATCH1159.72 EPMATCH
1159.59 EPMATCH
1158.80 EPMATCH
1159.47 RIM
1159.46 FG
1159.10 FG
1158.49 FG
1159.72 EPMATCH
1158.84 FG1158.28 EPMATCH
1158.50 RIM
1160.14 EC
1159.85 EC
1159.01 BCMATCH1158.50 FLMATCH
1158.36 FLMATCH1158.83 BCMATCH
1160.15 EC
1159.33 FG
1159.33 FG
1160.15 EC
GRUNDAHL PARK CONCESSIONSVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C200
PROPOSEDBUILDINGFFE = 1160.25
PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINTROOF OVERHANGASPHALT PAVEMENTCONCRETE PAVEMENTPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED STORM SEWERSILT SOCKINLET PROTECTIONSPOT GRADEDRAINAGE GRADE BREAKDRAINAGE ARROWCLASS I TYPE B EROSION MATTING
LEGEND (PROPOSED)
1181.25 EP
11811180
GENERAL NOTES
STM
1.0%
SILT SOCK OR EQUAL PERIMETERSEDIMENT CONTROL PER WDNRTECHNICAL STANDARD 1056.REFER TO INSTALLATION DETAILON SHEET C400.STONE TRACKING PAD (MIN. 50' LONG AND12" DEEP BY USE OF 3" CLEAR STONE) INTHIS AREA PER WDNR TECHNICALSTANDARD 1057. INSTALL AT ANY LOCATIONWHERE CONSTRUCTION TRAFFIC MEETSTHE EXISTING PAVED DEVELOPMENT AREA.
TYPE D INLET PROTECTION PER WDNRTECHNICAL STANDARD 1060, TYP.INSTALL AT ANY LOCATION WHERECONSTRUCTION RUNOFF DRAINS INTOTHE STORM SEWER SYSTEM.
TEMPORARY CONCRETEWASHOUT LOCATION. REFERTO SHEET C400 FOR DETAILSAND NOTES
NOTE:SPOT GRADES ARE AS FOLLOWS: FFE - FINISHED FLOOR GRADE EP - EDGE OF ASPHALT PAVEMENT EC - EDGE OF CONCRETE PAVEMENT BC - BACK OF CURB FL - FLOW LINE OF CURB FG - FINISH GRADE
1.POST MUNICIPAL EROSION CONTROL PERMITS ON SITE AND MAINTAIN UNTIL CONSTRUCTION ACTIVITIES HAVECEASED, THE SITE IS STABILIZED, AND A NOTICE OF TERMINATION IS FILED WITH THE MUNICIPALITY.2.KEEP A COPY OF THE CURRENT EROSION CONTROL PLAN ON SITE THROUGHOUT THE DURATION OF THE PROJECT.3.ENGINEER / VILLAGE OF MOUNT HOREB / DANE COUNTY LAND AND WATER RESOURCES HAS THE RIGHT TOREQUIRE CONTRACTOR TO IMPLEMENT ADDITIONAL EROSION CONTROL MEASURES ASNECESSARY.CONTRACTOR MUST NOTIFY THE VILLAGE OF MOUNT HOREB BUILDING INSPECTOR TWO (2)WORKING DAYS IN ADVANCE OF ANY SOIL DISTURBANCE ACTIVITIES.4.SUBMIT PLAN REVISIONS OR AMENDMENTS TO THE MUNICIPALITY AT LEAST 5 DAYS PRIOR TO FIELDIMPLEMENTATION.5.THE SITE CONTRACTOR IS RESPONSIBLE FOR ROUTINE SITE INSPECTIONS AT LEAST ONCE EVERY 7 DAYS AND WITHIN24 HOURS AFTER A RAINFALL EVENT OF 0.5 INCHES OR GREATER. KEEP INSPECTION REPORTS ON-SITE AND MAKETHEM AVAILABLE UPON REQUEST.6.INSPECT AND MAINTAIN ALL INSTALLED EROSION CONTROL PRACTICES UNTIL THE CONTRIBUTING DRAINAGE AREAHAS BEEN STABILIZED.7.WHEN POSSIBLE: PRESERVE EXISTING VEGETATION (ESPECIALLY ADJACENT TO SURFACE WATERS), MINIMIZELAND-DISTURBING CONSTRUCTION ACTIVITY ON SLOPES OF 20% OR MORE, MINIMIZE SOIL COMPACTION, ANDPRESERVE TOPSOIL.8.REFER TO THE WDNR STORMWATER CONSTRUCTION TECHNICAL STANDARDS AThttp://dnr.wi.gov/topic/stormwater/standards/const_standards.html. 9.INSTALL PERIMETER EROSION CONTROLS AND ROCK TRACKING PAD CONSTRUCTION ENTRANCE(S) PRIOR TO ANYLAND-DISTURBING ACTIVITIES, INCLUDING CLEARING AND GRUBBING. USE WDNR TECHNICAL STANDARD STONETRACKING PAD AND TIRE WASHING #1057 FOR ROCK CONSTRUCTION ENTRANCE(S).10.INSTALL INLET PROTECTION PRIOR TO LAND-DISTURBING ACTIVITIES IN THE CONTRIBUTING DRAINAGE AREA AND/ORIMMEDIATELY UPON INLET INSTALLATION. COMPLY WITH WDNR TECHNICAL STANDARD STORM DRAIN INLETPROTECTION FOR CONSTRUCTION SITES #1060 AND DANE COUNTY REQUIREMENTS FOR FRAMED INLET PROTECTION.11.STAGE CONSTRUCTION GRADING ACTIVITIES TO MINIMIZE THE CUMULATIVE EXPOSED AREA. CONDUCT TEMPORARYGRADING FOR EROSION CONTROL PER WDNR TECHNICAL STANDARD TEMPORARY GRADING PRACTICES FOR EROSIONCONTROL #1067.12.PERMITTING OF GROUNDWATER DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR. GROUNDWATERDEWATERING IS SUBJECT TO A DNR WASTEWATER DISCHARGE PERMIT AND A DNR HIGH CAPACITY WELL APPROVAL IFCUMULATIVE PUMP CAPACITY IS 70 GPM OR MORE.13.PROVIDE ANTI-SCOUR PROTECTION AND MAINTAIN NON-EROSIVE FLOW DURING DEWATERING. PERFORM DEWATERINGOF ACCUMULATED SURFACE RUNOFF IN ACCORDANCE WITH WDNR TECHNICAL STANDARD DE-WATERING #1061.14.INSTALL AND MAINTAIN SILT FENCING PER WDNR TECHNICAL STANDARD SILT FENCE #1056. REMOVE SEDIMENT FROMBEHIND SILT FENCES AND SEDIMENT BARRIERS BEFORE SEDIMENT REACHES A DEPTH THAT IS EQUAL TO ONE-HALFOF THE FENCE AND/OR BARRIER HEIGHT.15.REPAIR BREAKS AND GAPS IN SILT FENCES AND BARRIERS IMMEDIATELY. LOCATE, INSTALL, AND MAINTAIN DITCHCHECKS PER WDNR TECHNICAL STANDARD DITCH CHECKS #1062.16.INSTALL AND MAINTAIN FILTER SOCKS IN ACCORDANCE WITH WDNR TECHNICAL STANDARD INTERIM MANUFACTUREDPERIMETER CONTROL AND SLOPE INTERRUPTION PRODUCTS # 1071.17.IMMEDIATELY STABILIZE STOCKPILES AND SURROUND STOCKPILES AS NEEDED WITH SILT FENCE OR OTHERPERIMETER CONTROL IF STOCKPILES WILL REMAIN INACTIVE FOR 7 DAYS OR LONGER.18.IMMEDIATELY STABILIZE ALL DISTURBED AREAS THAT WILL REMAIN INACTIVE FOR 14 DAYS OR LONGER. BETWEENSEPTEMBER 15 AND OCTOBER 15: STABILIZE WITH MULCH, TACKIFIER, AND A PERENNIAL SEED MIXED WITH WINTERWHEAT, ANNUAL OATS, OR ANNUAL RYE, AS APPROPRIATE FOR REGION AND SOIL TYPE OCTOBER 15 THROUGH COLDWEATHER: STABILIZE WITH A POLYMER AND DORMANT SEED MIX, AS APPROPRIATE FOR REGION AND SOIL TYPE.19.STABILIZE AREAS OF FINAL GRADING WITHIN 7 DAYS OF REACHING FINAL GRADE.20.SWEEP/CLEAN UP ALL SEDIMENT/TRASH THAT MOVES OFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORM EVENTSBEFORE THE END OF THE SAME WORKDAY OR AS DIRECTED BY THE AUTHORITIES WITH JURISDICTION. SEPARATESWEPT MATERIALS (SOILS AND TRASH) AND DISPOSE OF APPROPRIATELY.21.THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING DUST PER WDNR TECHNICAL STANDARD DUST CONTROL ONCONSTRUCTION SITES # 1068.22.PROPERLY DISPOSE OF ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANINGWASTES, OR OTHER CONSTRUCTION MATERIALS) AND DO NOT ALLOW THESE MATERIALS TO BE CARRIED BY RUNOFFINTO THE RECEIVING CHANNEL.23.COORDINATE WITH THE AUTHORITIES WITH JURISDICTION TO UPDATE THE LAND DISTURBANCE PERMIT TO INDICATETHE ANTICIPATED OR LIKELY DISPOSAL LOCATIONS FOR ANY EXCAVATED SOILS OR CONSTRUCTION DEBRIS THATWILL BE HAULED OFF-SITE FOR DISPOSAL. THE DEPOSITED OR STOCKPILED MATERIAL NEEDS TO INCLUDE PERIMETERSEDIMENT CONTROL MEASURES (SUCH AS SILT FENCE, HAY BALES, FILTER SOCKS, OR COMPACTED EARTHEN BERMS).24.FOR NON-CHANNELIZED FLOW ON DISTURBED OR CONSTRUCTED SLOPES, PROVIDE CLASS CLASS I TYPE B EROSIONCONTROL MATTING. INSTALL AND MAINTAIN PER WDNR TECHNICAL STANDARD NON-CHANNEL EROSION MAT #1052.25.FOR CHANNELIZED FLOW ON DISTURBED OR CONSTRUCTED AREAS, PROVIDE CLASS II TYPE B EROSION CONTROLMATTING UNLESS OTHERWISE SPECIFIED ON THE PLAN. INSTALL AND MAINTAIN PER WDNR TECHNICAL STANDARDCHANNEL EROSION MAT #1053.26.MAKE PROVISIONS FOR WATERING DURING THE FIRST 8 WEEKS FOLLOWING SEEDING OR PLANTING OF DISTURBEDAREAS WHENEVER MORE THAN 7 CONSECUTIVE DAYS OF DRY WEATHER OCCUR.27.THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE WDNR REMEDIATION AND WASTEMANAGEMENT REQUIREMENTS FOR HANDLING AND DISPOSING OF CONTAMINATED MATERIALS. SITE-SPECIFICINFORMATION FOR AREAS WITH KNOWN OR SUSPECTED SOIL AND/OR GROUNDWATER CONTAMINATION CAN BEFOUND ON WDNR'S BUREAU OF REMEDIATION AND REDEVELOPMENT RACKING SYSTEM (BRRTS) PUBLIC DATABASEAT: http://dnr.wi.gov/botw/28.INSTALL AND MAINTAIN A CONCRETE WASHOUT BASIN PER EPA 833-F-11-006:https://www3.epa.gov/npdes/pubs/concretewashout.pdf. REQUIRE USE BY ALL CONCRETE CONTRACTORS. LIQUID MAY BEREUSED IN CONCRETE MIXING, EVAPORATED, OR DISPOSED OF AS WASTEWATER.
CONSTRUCTION SITE EROSION CONTROL REQUIREMENTS
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA AS SURVEYEDBY WYSER ENGINEERING ON THE WEEK OF MAY 4, 2026. WYSER ENGINEERING SHALL NOT BE HELDRESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS A RESULT OF ERRONEOUS ORINCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TO CONFIRM ALL ELEVATIONS, GENERALDRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TO CONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THE BENCHMARKS SHALLBE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. CONTRACTOR ASSUMES RISKASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHIN THE VILLAGE'SLAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BY THEOWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULT IN DISCIPLINARYACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALL BEBROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THAT CLARIFICATION ORREDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLIC EASEMENTS SHALL BEIN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARD SPECIFICATIONS.
S BLUE MOUNDS STREET
BENCHMARK TABLEBM - 1BM - 2BM - #ELEVATIONDESCRIPTION
BM - 31167.461158.951158.70CROSS CUT IN CURB AT THE SOUTH END OF THE STREET PARKING AREACROSS CUT IN CURB ON NORTH END OF THE PARKING LOT, SOUTH OF THE EXISTING SHELTERCROSS CUT IN CURB ON SOUTH SIDE OF THE NORTH PARKING LOT ENTRANCE
PROPOSED 0.5-FOOT DEEP BY2-FOOT WIDE SWALE WITH 1.7%SLOPE TO DIRECT WATERAROUND PROPOSED BUILDING.
SILT SOCK (OR EQUAL) TO BE INSTALLEDONCE FINAL GRADE HAS BEEN REACHEDPER DNR TECHNICAL STANDARD 1056.SILT SOCK TO REMAIN IN PLACE UNTILVEGETATING IS FULLY ESTABLISHED.
Page 19 of 31
1159.82
1160.45
1160.00
1160.20
1159.95
1159.92
1160.01
1160.05
1160.39
1160.79
1160.55
1160.25
1160.19
1160.17
1160.07
1160.19
1160.28
1160.34
1160.34
1160.38
1160.49
1160.71
1160.82
1160.66
1160.57
1160.55
1160.47
1160.39
1160.26
1160.43
1160.69
1160.76
1160.69
1160.79
1160.92
1161.04
1161.13
1161.27
1161.17
1161.13
1161.11
1161.12
1161.07
1160.86
1160.95
1161.42
1161.33
1161.41
1161.41
1161.47
1161.45
1161.76
1161.73
1161.651161.05
1158.241159.15
1159.73
1159.631159.48
1158.30
1158.56
1158.74
1158.96
1159.07
XXXXX
XXXXXXXX XXXXX
XXXXXXXXXX
XXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXX
EMEBM-1
E E E E E
EEEEE
E
WAT
WAT
WATWATWATWAT
WATWATWATWAT
WATWATWATWATWATWATWAT
COMM
COMM
COMM
WATWAT
WATWATWAT
SANSANSANSAN
SANSANSANSANSANSAN
SANSANSANSAN
SANSANSANE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
STMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTM
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
BM-3
BM-2
11581158
1159
1159
1160
1160 1161
1161
1162
116211631164116511661167
1160
1160
1161
E E E E E
WATWATWAT
E
E
E
EWATWATWAT
WAT
WATE
E E E
E E E
E E E E EE E
COMMCOMM
COMM
COMM
SANSAN
STMSTMSTMSTMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTMSTM
E
E
GRUNDAHL PARK CONCESSIONSVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C300
LEGEND (PROPOSED)
GENERAL NOTES
1.DIMENSIONS TAKE PRECEDENCE OVER SCALE. CONTRACTOR TO VERIFY ALL DIMENSIONS INFIELD.2.LENGTHS OF ALL UTILITIES ARE TO CENTER OF STRUCTURES OR FITTINGS AND MAY VARYSLIGHTLY FROM PLAN. LENGTHS SHALL BE VERIFIED IN THE FIELD DURING CONSTRUCTION.3.CONTRACTOR SHALL VERIFY ALL ELEVATIONS, LOCATIONS, AND SIZES OF SANITARY, WATERAND STORM LATERALS AND CHECK ALL UTILITY CROSSINGS FOR CONFLICTS.4.THE PROPOSED IMPROVEMENTS MUST BE CONSTRUCTED IN ACCORDANCE WITH ENGINEERINGPLANS DESIGNED TO MEET ORDINANCES AND REQUIREMENTS OF THE MUNICIPALITY ANDWISDOT, WISDSPS, AND WDNR.5.PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR:·EXAMINING ALL SITES CONDITIONS RELATIVE TO THE CONDITIONS INDICATED ON THEENGINEERING DRAWINGS. ANY DISCREPANCIES ARE TO BE REPORTED TO THE ENGINEERAND RESOLVED PRIOR TO THE START OF CONSTRUCTION.·OBTAINING ALL PERMITS INCLUDING PERMIT COSTS, TAP FEES, METER DEPOSITS, BONDS,AND ALL OTHER FEES REQUIRED FOR PROPOSED WORK TO OBTAIN OCCUPANCY.·VERIFYING UTILITY ELEVATIONS AND NOTIFYING ENGINEER OF ANY DISCREPANCY. NOWORK SHALL BE PERFORMED UNTIL THE DISCREPANCY IS RESOLVED.·NOTIFYING ALL UTILITIES PRIOR TO THE INSTALLATION OF ANY UNDERGROUNDIMPROVEMENTS.·NOTIFYING THE DESIGN ENGINEER AND MUNICIPALITY 48 HOURS PRIOR TO THE START OFCONSTRUCTION TO ARRANGE FOR APPROPRIATE CONSTRUCTION OBSERVATION.9.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE ENGINEER WITH AS-BUILTCONDITIONS OF THE DESIGNATED IMPROVEMENTS IN ORDER THAT THE APPROPRIATEDRAWINGS CAN BE PREPARED, IF REQUIRED. ANY CHANGES TO THE DRAWINGS OR ADDITIONALITEMS MUST BE REPORTED TO THE ENGINEER AS WORK PROGRESSES.10.ANY SANITARY SEWER , SANITARY SEWER SERVICES, WATER MAIN, WATER SERVICES, STORMSEWER, OR OTHER UTILITIES, WHICH ARE DAMAGED BY THE CONTRACTORS, SHALL BEREPAIRED TO THE OWNER'S SATISFACTION AT THE CONTRACTOR'S EXPENSE. NO BLASTING ISALLOWED WITHIN 30 FEET OF EXISTING UTILITIES.11.ALL PRIVATE INTERCEPTOR WATER MAIN AND WATER SERVICES SHALL BE INSTALLED WITH A 6'MINIMUM BURY. PROVIDE INSULATION ABOVE PIPES WITH LESS THAN 5' OF GROUND COVER.12.GRANULAR BACKFILL MATERIALS ARE REQUIRED IN ALL UTILITY TRENCHES UNDER SIDEWALKSAND PROPOSED PAVED AREAS (UNLESS OTHERWISE SPECIFIED BY A GEOTECHNICALENGINEER). ALL UTILITY TRENCH BACKFILL SHALL BE COMPACTED PER SPECIFICATIONS. ALLPAVEMENT PATCHING SHALL COMPLY WITH THE VILLAGE OF MOUNT HOREB STANDARDSPECIFICATIONS. ADDITIONAL PAVEMENT MILLING AND OVERLAY MAY BE REQUIRED BYPERMIT.13.CONTRACTOR SHALL NOTIFY THE MUNICIPAL PUBLIC WORKS DEPARTMENT A MINIMUM OF 48HOURS BEFORE CONNECTING TO PUBLIC UTILITIES.14.ALL NON-METALLIC BUILDING SEWER AND WATER SERVICES MUST BE ACCOMPANIED BYMEANS OF LOCATING UNDERGROUND PIPE IN ACCORDANCE WITH SPS 382.30(11)(h) AND SPS382.36(7)(d). TRACER WIRE VALVE BOXES SHALL BE INSTALLED ON ALL LATERALS AND ASINDICATED ON THESE PLANS.15.EXTERIOR CLEANOUTS SHALL BE PROVIDED AS REQUIRED BY SPS 382.35. ALL EXTERIORCLEANOUTS SHALL BE PROVIDED WITH A FROST SLEEVE IN ACCORDANCE WITH SPS382.34(5)(a)b AND SPS 384.30(2)(c).16.ALL PRIVATE PLUMBING MATERIALS SHALL CONFORM TO SPS 384.30.17.ALL PRIVATE PIPE JOINTS SHALL BE INSTALLED PER SPS 384.40.18.ALL PRIVATE WATER PIPE, INCLUDING DEPTH AND SEPARATION REQUIREMENTS, SHALL BE INACCORDANCE WITH SPS 382.40(8).19.THE CONTRACTOR SHALL ALLOW 10 WORKING DAYS FOR THE CONSTRUCTION OF GAS MAINSWHEN SCHEDULING THE WORK AND SHALL NOT RESTRICT ACCESS TO THE GAS MAINCONTRACTOR OR OTHER UTILITY COMPANIES.20.CONTRACTOR SHALL VERIFY AND COORDINATE ALL UTILITY CONNECTIONS WITH THEBUILDING PRIOR TO CONSTRUCTION.21.THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS SO AS TO BE IN CONFORMANCE WITHTHE VILLAGE EROSION CONTROL AND STORMWATER ORDINANCE, AND DNR ADMINISTRATIVERULE NR 216 AT ALL TIMES.
UTILITY NOTES
PROPOSED PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINT18" CURB AND GUTTERASPHALT PAVEMENTCONCRETE PAVEMENTPROPOSED WATER MAINPROPOSED SANITARY SEWERPROPOSED STORM SEWERPROPOSED GAS SERVICE (DESIGN BY OTHERS)PROPOSED ELECTRIC SERVICE (DESIGN BY OTHERS)STORMWATER TREATMENT FACILITY
WATSANSTMGASE
SANITARY BUILDINGCONNECTION LOCATIONCOORDINATE WITH INTERIORPLUMBING PLANS.
WATER BUILDING CONNECTIONLOCATION. COORDINATE WITHINTERIOR PLUMBING PLANS.
45°BEND
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF MAY 4, 2026. WYSER ENGINEERING SHALLNOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS A RESULT OFERRONEOUS OR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TO CONFIRMALL ELEVATIONS, GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TOCONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THEBENCHMARKS SHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION.CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHINTHE VILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BYTHE OWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULTIN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALLBE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THATCLARIFICATION OR REDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLICEASEMENTS SHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARDSPECIFICATIONS.
S BLUE MOUNDS STREET
BENCHMARK TABLEBM - 1BM - 2BM - #ELEVATIONDESCRIPTION
BM - 31167.461158.951158.70CROSS CUT IN CURB AT THE SOUTH END OF THE STREET PARKING AREACROSS CUT IN CURB ON NORTH END OF THE PARKING LOT, SOUTH OF THE EXISTING SHELTERCROSS CUT IN CURB ON SOUTH SIDE OF THE NORTH PARKING LOT ENTRANCE
CONNECTION INTO EXISTING SANITARYSEWER SERVICE. EXISTING INVERTELEVATION IS UNKNOWN.CONTRACTOR TO VERIFY ELEVATIONAND SIZE PRIOR TO CONSTRUCTION.CONTACT THE ENGINEER FOR DESIGNCONFIRMATION.
NOTE: GAS, ELECTRIC, AND COMMUNICATIONSERVICES SHOWN FOR GRAPHIC PURPOSESONLY. CONTRACTOR TO COORDINATE LOCATIONWITH APPROPRIATE UTILITY COMPANIES.
WATER MANHOLE NO. 148" DIA MANHOLENEENAH R-1550, SOLID,NON-ROCKING, LIDRIM = 1160.20N I.E. = 1153.45 (2" COPPER)S I.E. = 1153.45 (2" COPPER)E I.E. = 1153.45 (1" PEX)REFER TO PLUMBING PLANSBY OTHERS FOR INTERNALROUTING AND CONNECTIONS.
CONTRACTOR TO VERIFY WATER SERVICEDEPTH. PROVIDE INSULATION ON ANYAREAS WHERE DEPTH IS LESS THAN6-FEET. ANY AREAS WITH LESS THAN3.5-FEET OF DEPTH SHALL BE REPLACED.
20 LF OF 4" PVC @ 2.08%
STORM INLET NO. 112" DIA NYLOPLAST DRAIN BASINSTANDARD 12" DRAIN BASIN GRATERIM = 1159.47N I.E. = 1155.48 (6" PVC)S I.E. = 1155.31 (8" PVC)
94 LF OF 8" PVC PIPE @ 2.0%
80 LF OF 6" PVC PIPE @ 1.0%
70 LF OF 6" PVC PIPE @ 1.0%
STORM INLET NO. 212" DIA NYLOPLASTDRAIN BASINSTANDARD 12" DRAINBASIN GRATERIM = 1158.50S I.E. = 1156.28 (6" PVC)
STORM INLET NO. 312" DIA NYLOPLASTDRAIN BASINSTANDARD 12" DRAINBASIN GRATERIM = 1158.00E I.E. = 1155.73 (6" PVC)
8 X 6TEE
30 LF OF 1" PEX PIPE
55 LF OF 1" COPPER PIPE
EX. 48" DIA STORM INLETCORE NEW 12" DIA HOLE FORPROPOSED 8" PVC PIPEN I.E. = 1153.43 (8" PVC)NE I.E. (EX) = 1151.39 (48" RCP)SW I.E. (EX) = 1151.43 (48" RCP)
CONNECT EXISITNG COPPERLINE INTO NEW 1" COPPERLINE IN THIS AREA.
CONNECT EXISTING 2" COPPER LINEINTO NEW 1" COPPER LINE IN THISAREA WITH REDUCER.ALTERNATIVE: PROVIDE A REDUCEIN THE PROPOSED MANHOLE ANDPROVIDE AN ADDITIONAL 47 LFREPLACEMENT OF THE 2" LINEWITH 1" COPPER FROM THEMANHOLE TO THIS LOCATION.
CONNECT EXISTING 2"COPPER LINE INTO NEW 2"COPPER LINE IN THIS AREA.
CONNECT EXISTING 2"COPPER LINE INTO NEW 2"COPPER LINE IN THIS AREA.
Page 20 of 31
GRUNDAHL PARK CONCESSIONSVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
C400
FLOWDIRECTION
SEE PLANS FOR ANCHOR TRENCH LOCATIONS
CHANNEL TERMINATION TWOROWS OF STAPLES 6" APARTOFFSET BY 3"
MATERIAL NOTES1.ONLY PRODUCTS LISTED IN THE WISCONSIN DEPARTMENT OFTRANSPORTATION EROSION CONTROL PRODUCT ACCEPTABILITY LIST(PAL) ARE ACCEPTABLE FOR USE.2.STAPLES USED FOR CLASS I TYPES A & B MATS SHALL BE 1-2 INCHWIDE, U-SHAPED, MADE OF NO.11 (3.05mm) OR LARGER DIAMETERSTEEL WIRE, AND NOT LESS THAN 6 INCHES LONG FOR FIRM SOILSAND 12 INCHES LONG FOR LOOSE SOILS.INSTALLATION NOTES1.EROSION CONTROL REVEGETATIVE MATS (ECRM) SHALL BEINSTALLED AFTER TOPSOIL AND SEED HAVE BEEN PLACED.2.INSTALLATION OF ECRM SHOULD BE COORDINATED WITHPERMANENT RESTORATION PRACTICES.3.INSTALLATION SHALL CONFORM WITH WDNR CONSERVATIONPRACTICE STANDARD 1053.4.ALL PRODUCTS SHALL BE INSTALLED PER THE MANUFACTURER'S
RECOMMENDATIONS. THIS STANDARD DETAIL IS AN EXAMPLE OFTYPICAL INSTALLATION GUIDANCE.5.MATS SHALL BE IN FIRM AND CONTINUOUS CONTACT WITH THE SOIL.6.IF SECTIONS OF ECRM NEED TO BE OVERLAPPED, ENSURE THAT THEOVERLAP IS FACING DOWNSTREAM TO PREVENT WATER FROMFLOWING BENEATH THE ECRM.INSPECTION & MAINTENANCE NOTES1.INSTALL ADDITIONAL ANCHORING IN AREAS OF OBSERVED RILLINGAND CONCENTRATED FLOW BENEATH THE EROSION MAT. IF RILLINGIS SEVERE ENOUGH TO PREVENT VEGETATION ESTABLISHMENT,REMOVE EROSION MAT, REGRADE, COMPACT, RE-SEED, AND REPLACETHE SECTION OF MAT.2.IF PRODUCTS WITH PLASTIC NETTING ARE USED, REMOVE NETTINGOR REPLACE MAT IF SEPARATION OF THE NETTING FROM THE MAT ISOBSERVED.3.ALL MAINTENANCE ACTIVITIES SHOULD OCCUR AS SOON ASPOSSIBLE WITH CONSIDERATION OF SITE CONDITIONS.EROSION CONTROL MAT (CHANNELS)
TRENCH APPROX.10" WIDE x 8" DEEP
SOIL PILEFROMTRENCH
FLOW
STEP 1
STEP 2
STAPLES ARE THROUGHBOTH BLANKETS
BLANKET OVERLAP,2"-4"
FLOW6" OVERLAP
2 ROWS OF STAPLES4" APART
FLOW
2 ROWS OF STAPLES: 4"SPACING BETWEENROWS, 12" SPACINGBETWEEN STAPLES2 ROWS OF STAPLES: 4"SPACING BETWEENROWS, 12" SPACINGBETWEEN STAPLES
ANCHOR TRENCH DETAIL
GENERAL STAPLE PATTERN:USE MANUFACTURER'S RECOMMENDATIONS. MAXIMUMDISTANCE BETWEEN STAPLES IS 4 FEET.
GEOTEXTILE FABRIC (IF NECESSARY)EXISTING ROAD
50'
12" MIN.
12' MIN.
REFER TO MATERIALS NOTES
MATERIAL NOTES
INSTALLATION NOTES
INSPECTION & MAINTENANCE NOTES
CONSTRUCTION ENTRANCE (STONE TRACKING PAD)
1. USE HARD, DURABLE, ANGULAR STONE OR RECYCLED CONCRETEMEETING THE GRADATION IN TABLE 1. WHERE THIS GRADATION ISNOT AVAILABLE, MEET THE GRADATION IN WISCONSIN DEPARTMENTOF TRANSPORTATION (DOT) STANDARD SPECIFICATION, SECTION 312SELECT CRUSHED MATERIAL. USE MATERIAL SUBSTANTIALLY FREEFROM DIRT, DEBRIS, STEEL, VEGETABLE MATTER, AND OTHERDELETERIOUS MATERIAL. PLACE THE AGGREGATE IN A LAYER ATLEAST 12 INCHES THICK.2. THE TRACKING PAD SHALL BE UNDERLAIN WITH A WDOT TYPE RGEOTEXTILE FABRIC WHERE WARRANTED BASED ON SOIL TYPE ORHIGH GROUNDWATER.1. INSTALLATION SHALL CONFORM WITH THE REQUIREMENTS OFWDNR CONSERVATION PRACTICE STANDARD 1057.2. INSTALL THE TRACKING PAD ACROSS THE FULL WIDTH OF THEACCESS POINT, OR RESTRICT EXITING TRAFFIC TO A DEDICATEDEGRESS LANE WITH A DRIVING SURFACE AT LEAST 12 FEET WIDE.3. DIMENSIONS OF THE TRACKING PAD SHALL BE MINIMUM AS NOTEDON THE FIGURE ABOVE.4. DIVERT SURFACE FLOWS AWAY FROM TRACKING PADS OR CONVEYFLOW UNDER AND/OR AROUND USING CULVERTS AND SWALES. DIRECTRUNOFF FROM TRACKING PADS TO SEDIMENT CONTROL PRACTICES.5. DO NOT COMPACT AGGREGATE PRIOR TO USE. COMPACTION,GROUTING, OR OTHER MEANS OF CREATING A SMOOTH SURFACECOMPROMISE THE EFFECTIVENESS OF THE TRACKING PAD.6. TRACKING PAD SHALL BE REMOVED OR INCORPORATED INTOGRAVEL DRIVEWAY ONLY AFTER CONSTRUCTION IS COMPLETE ANDTHE SITE HAS BEEN STABILIZED.
1. STONE TRACKING PADS SHALL BE INSPECTED WEEKLY AND WITHIN 24HOURS AFTER EVERY PRECIPITATION EVENT THAT PRODUCES 0.5 INCHES OFRAIN OR MORE DURING A 24 HOUR PERIOD.2. MONITOR AND MAINTAIN DEVICES TO MINIMIZE SHIFTING, RUTTING OFADJACENT SURFACES, AND STRUCTURAL FAILURE. MAINTAIN A LOOSENED,ROUGH SURFACE BY SCRAPING, LOOSENING, OR TOP-DRESSING WITHADDITIONAL AGGREGATE.2. ADDITIONAL AGGREGATE SHALL BE PLACED IF THE TRACKING PAD BECOMESBURIED OR IF SEDIMENT IS NOT BEING REMOVED EFFECTIVELY FROM THEVEHICLE TIRES.3. A MINIMUM 12-FEET WIDE BY 50-FEET LONG BY 12-INCH THICK PAD SHALLBE MAINTAINED AT ALL TIMES. ADD STONE AS NEEDED TO MAINTAIN THEMINIMUM PAD THICKNESS.4. THE TRACKING PAD PERFORMANCE SHALL BE MAINTAINED BY SCRAPING ORTOP-DRESSING WITH ADDITIONAL AGGREGATE.5. ANY SEDIMENT TRACKED ONTO A PUBLIC OR PRIVATE ROAD SHOULD BEREMOVED BY STREET CLEANING AT THE END OF EACH WORKING DAY.6. REMOVE STONES LODGED BETWEEN THE TIRES OF DUAL WHEEL VEHICLESPRIOR TO LEAVING THE CONSTRUCTION SITE.7. MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE WITHCONSIDERATION FOR SITE CONDITIONS.8. REPLACE DAMAGED OR CRUSHED CULVERTS UNDER TRACKING PAD.
SIEVESIZEPERCENT BYWEIGHT PASSING 3" 1002-1/2" 90-1001-1/2" 25-60 3/4" 0-20 3/8" 0-5
TABLE 1
INSET
NOTES:1.DETAIL BASED ON WDNR TECHNICAL STANDARD 1060. ANY VARIATIONS FROMTHAT STANDARD IS UNINTENDED AND SHOULD NOT BE USED.2.TAPER BOTTOM OF BAG TO MAINTAIN 8" OF CLEARANCE BETWEEN THE BAG ANDTHE STRUCTURE, MEASURED FROM THE BOTTOM OF THE OVERFLOW OPENINGSTO THE STRUCTURE WALL.3.THE RIGID FRAME SHALL BE CONSTRUCTED OF GALVANIZED STEEL AND HAVEADEQUATE STRENGTH TO SUPPORT THE WEIGHT OF THE SEDIMENT BAG WHENCOMPLETELY FULL.4.THE RIGID FRAME SHALL NOT INTERFERE WITH OR ELEVATE THE GRATE MORETHAN 1/8".5.DROP THE INLET FILTER THOUGH THE CLEAR OPENING SUCH THAT THE HANGERSREST FIRMLY ON THE LIP OF THE STRUCTURE.TYPE D-RF INLET PROTECTION
CURB BACKEXTENSION FORINLETS WITHCURB BOXES
MAINTENANCE NOTES:1.WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARS SHALL BE TAKENSO THAT THE SEDIMENT TRAPPED IN THE FABRIC DOES NOT FALL INTO THESTRUCTURE. MATERIAL THAT HAS FALLEN INTO THE STRUCTURE SHALL BEIMMEDIATELY REMOVED.
REPLACEABLEFILTER BAG (22"MIN. TOTAL DEPTH)DUAL FABRIC BAGSSHALL BE STITCHEDTOGETHER.12" MIN.
LENGTH AND WIDTHDIMENSIONS SHALL BE PERINLET TYPE SPECIFIED ON PLANHANGERS (SEE NOTE #5)
AVAILABLE OVERFLOW DEPTHRIGID FRAME (SEE NOTES #2 AND #3)TYPE FF GEOTEXTILE FABRICNON-WOVEN INNER BAG LINER(COVERING LOWER HALF OF BAG)
CAN BE INSTALLED IN INLETSWITH OR WITHOUT CURB BOXES
EL. 100EL. 105EL. 110EL. 115EL. 120DISTURBED AREA
PROTECTED AREA
10 L.F. PER ENDPLACED AT A 30°ANGLE TO PREVENTEND-AROUND FLOW
ALWAYS INSTALLSILT SOCKPERPENDICULARTO SLOPE
ALWAYS USE INCONJUNCTION WITHEROSION CONTROL MAT
2" X 2" X 36" WOODEN STAKESPLACED 10' O.C.
2" X 2" X 36" WOODEN STAKESPLACED 10' O.C.DISTURBEDAREA
PROTECTEDAREA
1:3 MAX. SLOPESILT SOCK
SECTION
12" MIN.SPACING VARIESREFER TO PLAN30.0°'10'
PLANSILT SOCK SLOPE INTERRUPTION
ANCHOR TRENCH
DIRECTION OFSURFACE FLOW
1.DIG 6" X 6" TRENCH2.LAY BLANKET IN TRENCH3.STAPLE AT 1.5' INTERVALS4.BACKFILL WITH NATURAL SOIL AND COMPACT5.BLANKET LENGTH SHALL NOT EXCEED 100'WITHOUT AN ANCHOR TRENCHEROSION CONTROL BLANKET INSTALLATION
STAPLE DENSITY SHALL BE A MINIMUM OF 3U-SHAPED 8", 11 GAUGE METAL STAPLES PERSQUARE YARD (THIS MAY VARY AS DIRECTEDBY GOVERNING AUTHORITY).
6"6"
1' TO 3'
OVERLAP LONGITUDINALJOINTS MINIMUM OF 6"
ANCHOR TRENCH (SEEDETAIL AND NOTES)OVERLAP END JOINTSMINIMUM OF 6" ANDSTAPLE OVERLAP AT1.5' INTERVALS.
EROSION CONTROL BLANKET(SEEDED AREAS) ON SIDE SLOPES OF 3:1 OR GREATER.BIO-DEGRADABLE, DOUBLE NETTED, LIGHT DUTY (WisDOT CLASS 1 TYPE B)
MATERIAL NOTES1.GEOTEXTILE FABRIC SHALL BE WOVEN ANDSHALL CONFORM TO THE MATERIALREQUIREMENTS LISTED IN SECTION 628 OFTHE WISDOT STANDARD SPECIFICATIONS FORHIGHWAY AND STRUCTURE CONSTRUCTION,2003 EDITION.INSTALLATION NOTES1.INSTALLATION SHALL CONFORM WITH THEREQUIREMENTS OF WDNR CONSERVATIONPRACTICE STANDARD 1056.2.CONSTRUCT THE SILT SOCK IN AN ARC WITHTHE ENDS POINTING UPSLOPE TO AVOIDEROSION AROUND THE ENDS OF THEBOUNDARY.3.FAILURE TO PROPERLY ANCHOR SILT SOCKCOULD RESULT IN WATER AND SEDIMENTRELEASE BENEATH THE SILT SOCK.PROPERLY SECURE THE SILT SOCK ASSHOWN.4.CONSTRUCT THE BOUNDARY FROM ACONTINUOUS ROLL OF GEOTEXTILE TO AVOIDJOINTS. WHERE JOINTS ARE NECESSARY,OVERLAP TO THE NEXT POST.5.SILT SOCK SHALL NOT BE USED IN AREAS OFCONCENTRATED FLOW.INSPECTION & MAINTENANCE NOTES1.AT A MINIMUM, PERFORM INSPECTIONS WEEKLYAND WITHIN 24 HOURS OF PRECIPITATIONEVENTS PRODUCING 0.5 INCHES OR MORE OFRAINFALL.2.INSPECT FENCES FOR DAMAGE TO STAKES ANDFABRIC, UNDERCUTTING, EXCESSIVE SEDIMENTACCUMULATION (GREATER THAN 12 OF THEFENCE HEIGHT), AND INDICATIONS OF SCOURAROUND THE EDGES.3.REPAIR OR REPLACE SILT SOCK WITHIN 24HOURS OF IDENTIFYING AND DEFICIENCIES.SILT SOCK PERIMETER CONTROL
2" HEADWIDTH WOODENSTAKESPLACED 10' ONCENTER12" SILT SOCKAREA TO BE PROTECTEDWORK AREA
SECTION VIEW2" HEADWIDTH WOODENSTAKESPLACED 10' ON CENTER
AREA TO BE PROTECTED
WORK AREA
FLOW12" SILT SOCK
TOP VIEW
SECTION
PLANNOTES:1.ALL MATERIAL TO MEET SPECIFICATIONS.2. FILTER MEDIA TO MEET APPLICATION REQUIREMENTS.3. FILTER MEDIA TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER.
SiltSoxxTM (8" , 12", or 18" TYPICAL)AREA TO BE PROTECTEDWORK AREA
WORK AREA
AREA TO BEPROTECTEDSiltSoxxTM (8", 12", 18" TYPICAL)WATER FLOW
Pavement or Impervious SurfaceConcrete blocks or sand bagssized as needed (10' O.C.)
Concrete blocks or sand bags sized as needed (10' O.C.)
SILT SOCK FOR SEDIMENT CONTROL ON PAVEMENT
WASHOUT NOTES
5' MIN10 MILPLASTICLINERSTAKES(TYP)
SANDBAG10 MILPLASTIC LINERPLAN
10 MILPLASTIC LINERBINDING WIRESTRAW BALESNATIVE MATERIAL(OPTIONAL)
OTHER MATERIALMAY BE USEDAS APPROVED BYCITY
STRAW BALES
SECTIONSANDBAGWOOD ORMETAL STAKES
CONCRETE WASHOUT
SANDBAG
5' MIN.
1.ALTERNATIVE CONCRETE WASHOUTS ALLOWABLE AS APPROVED BY ENGINEER, INCLUDING DISPOSABLE WASHOUTS, ETC.2.NO WASHING OUT OF CONCRETE TRUCKS OR WASHING OF SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE INTO STORM DRAINS, OPEN DITCHES, STREETS, OR STREAMS IS ALLOWED.3.EXCESS CONCRETE IS NOT ALLOWED TO BE DUMPED ON-SITE, EXCEPT IN DESIGNATED TEMPORARY CONCRETE WASHOUT PIT AREAS.4.ON-SITE TEMPORARY CONCRETE WASHOUT AREAS WILL BE LOCATED AT LEAST 50 FEET FROM STORM DRAINS, OPEN DITCHES, OR WATER BODIES AS DETERMINED IN THE FIELD.5.TEMPORARY CONCRETE WASHOUT FACILITIES WILL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BYWASHOUT OPERATIONS.6.WASHOUT FACILITIES WILL BE CLEANED OUT OR REPLACED ONCE THE WASHOUT IS 75% FULL.7.PLASTIC LINING MATERIAL WILL BE MINIMUM OF 10 MIL POLYETHYLENE SHEETING AND WILL BE FREE OF HOLES, TEARS, OR OTHER DEFECTS.8.WHEN WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR WORK, THE HARDENED CONCRETE WILL BE REMOVED AND DISPOSED OF OFFSITE. MATERIALS USED TO CONSTRUCTTEMPORARY CONCRETE WASHOUT FACILITIES WILL BE REMOVED FROM THE SITE AND DISPOSED OF.
TYPICAL SWALE SECTION
2'
SECTION VIEW0.5'3:1
3:1 REFER TO GRADING PLANFOR CONTINUATIONREFER TO GRADING PLANFOR CONTINUATION
3:1 MAX
3:1 MAX
Page 21 of 31
SITE PLAN REVIEW
REPORT TO THE PLAN COMMISSION
DATE: August 26, 2026
PROPERTY ADDRESSES: 401 Blue Mounds Road
PARCEL NUMBER: 60611470023 &
60614103058
OWNER: Village of Mount Horeb
APPLICANT: Village of Mount Horeb
EXISTING ZONING: PR, Parks and Recreation
PROPOSED ZONING: PR, Parks and Recreation
EXISTING LAND USE: Active Outdoor Recreation
REQUESTED USES: Active Outdoor Recreation
BACKGROUND ON CSM AND SITE PLAN REVIEW:
Section 17.10.43 of the Village of Mount Horeb Zoning Ordinance outlines the requirements for the Site Plan
application. This requires review of the proposed development’s building configuration, site layout and access,
parking, exterior building design, landscaping, grading and erosion, stormwater, exterior lighting, signage, and
operational plan.
REQUEST OVERVIEW:
The applicant is proposing to demolish the existing
structure west of the baseball diamond at Grundahl Park
and replace it with a 1,961 square foot structure in
approximatley the same location. Other proposed changes
include:
• Replacement of the existing asphalt between the
structure and the parking lot
• Expanded asphalt to the northeast to accommodate
bleachers
• Landscaping within the replaced asphalt area island
and replacement of trees being removed
• Exterior lighting
The proposed new structure is part of the Phase 1
improvements identified within the 2023 Grundahl Park
Master Plan. It replaces an outdated structure (1986) with
a new facility that can accommodate storage, restrooms,
concessions, and covered picnic area.
The existing property is surrounded by a mixed residential
neighborhood that includes apartments, duplexes, and
single-family homes, in addition to the fire station.
Proposed Development Area
Page 22 of 31
Site Plan
August 26, 2026
2
The proposed land use of the property (Active Outdoor Recreation) is not proposed to change and is a
permitted by-right land use within the PR zoning district.
Within the new Zoning Ordinance, only new additions, improvements, and development are subject to the
requirements of the ordinance. This memo reviews only those proposed new features of the site and its
operations.
SITE PLAN REVIEW:
The proposed improvements to the properties are required to meet the minimum dimensional standards of
the zoning district. These requirements are met, as shown below.
Requirement Standard Proposed Development
Minimum Front Setback 20’ 60’
Minimum Side Setback 20’ >20’
Minimum Rear Setback 20’ >20’
Maximum Principal Building Height 20’ 20’
Minimum Pavement Setback (lot line to pavement,
excludes driveway entrances)
Street: 10’
Side/Rear: 5’
Street: 47’
Side/Rear: >5’
Minimum Principal Building Separation* Per Building Code
Requirements
Met
Maximum Impervious Surface Ratio 25% 16%
*To note, multiple principal buildings are permitted on the same lot so long as all Building Code requirements
are met for separation distances. Additionally, on-site stormwater will be handled with existing facilities.
The proposed Active Outdoor Recreation land use is permitted as by-right use in the PR Zoning District. Land
use requirements include:
• Each location shall have appropriate hours of use and comply with the noise provisions of Article VI
Performance Standards = Met
• Facilities using recreational facility night lighting and adjoining a residentially zoned property shall install
and continually maintain a bufferyard with a minimum opacity of 0.50. Said bufferyard shall be located at
the property line adjacent to said residentially zoned property. = N/A
• All structures, paved areas, and active recreational improvements such as sandboxes, tot lots, tennis
courts, and baseball backstops shall be located a minimum of 20 feet from any residentially zoned
property. = Met
• Facilities which serve a regional or community-wide function shall provide an off-street passenger loading
area if the majority of the users will be children or seniors. = Met
• Minimum and maximum required parking: See Section 17.06.06. = N/A (no change)
The proposed project has submitted the required elements for Site Plan review that are included within the
attachment. Below is a review of the various other zoning standards that are required with the proposed
development:
Access and Visibility Standards (Section 17.06.03)
• Multiple access points from one street can be approved through the Site Plan process on lots greater than
100 feet long = N/A (no new access points proposed)
• No access is permitted within 30 feet of an intersection = N/A (no new access points proposed)
Page 23 of 31
Site Plan
August 26, 2026
3
• Minimum driveway width is 14 feet = N/A (no new access points proposed)
• Maximum driveway width is 24 feet wide = N/A (no new access points proposed)
• At least one ped/bicycle access point to at least one street frontage is required = N/A (no new access
points proposed)
• All structures must be located outside of vision triangles at the right-of-way intersections = Met
Parking and Loading Standards (Section 17.06.06 and 17.06.07)
• All access points, drive isles, driveways, and parking areas must be constructed of a hard surface = Met
• Curbs are required around all traffic circulation, parking areas, and internal landscape islands = Not Met
(none provided)
• Throat depth (distance between street access and traffic circulation area/parking area) must be a
minimum of 20 feet = N/A (no new parking areas proposed)
• All parking stalls must provide pavement markings = N/A (no new parking areas proposed)
• Minimum parking stall dimensions are required to be 9 feet wide and 18 feet long = N/A (no new parking
areas proposed)
• Minimum parking isles widths are required to be 24 feet wide = N/A (no new parking areas proposed)
• Minimum off-street parking stalls = Met (see above)
• No minimum number of on-site bicycle stalls are required = N/A (no new parking proposed)
Exterior Lighting Standards (Section 17.06.20)
• Corelated Color Temperature (CCT) shall not exceed 2700 Kelvin = Unknown
• At the property line, a maximum of 0.1 footcandle is required = Uknown
• All fixtures shall have a IES zero-uplighting rating (U0) and be downward facing = Unknown
• The average on-site lighting intensity of illumination shall not be greater than 25% above the
recommended by the IES within the Low Light Lighting Zone (LZ1) = Unknown
• The maximum height of all freestanding light fixtures is 20 feet = N/A (none proposed)
Outdoor Storage and Screening Standards (Section 17.06.21)
• All trash containment structures are required to be enclosed, a minimum of 6 feet in height, made of
materials that match the exterior building design, and include an opaque gate = Met (trash handled within
structure)
• All building mechanicals on the exterior of the building are required to be screened = Met (none proposed)
• Outdoor storage areas must be screened = N/A (none proposed)
Exterior Building Design Standards (Section 17.07.20)
There are defined exterior building design standards for different types of uses in the Zoning Code. This project
is an institutional use in the PR Zoning District. Additionally, the design standards classify the following
materials by type: Class I (brick, stone, glass), II (block, EIFS, stucco), or III (siding).
• The primary entrance shall be clearly defined and articulated, buildings shall be oriented toward the front
façade facing the street, all facades facing the public right-of-way shall incorporate decorative doors,
windows, and other architectural components = N/A (building not oriented toward the street to reflect
intended use)
• Building shall be clad in a minimum of 50% Class I materials, Class II and III materials up to 50% = Not Met
(metal panel façade)
• Decorative metal wall panels may be used up to 30% of any façade area = Not Met (100% of façade)
Page 24 of 31
Site Plan
August 26, 2026
4
• Façade lengths greater than 40’ shall include horizontal or vertical façade articulation and/or roof form
variation = Not Met (very little articulation provided)
• Total area of windows and doors shall comprise a minimum of 20% of the façade facing the street = Not
Met (west elevation)
• On any façade facing a public street or parking area, hard and durable materials (block, brick, stone, etc.)
shall be required within 40” of the adjacent grade = Not Met (not included)
• Primary colors are prohibited = Unknown
• Decorative and articulated metal roofs may be permitted by the Plan Commission = Met (metal roof)
• Roof form shall be compatible with buildings in the immediate area = Met (pitched)
• All façade openings shall be articulated and appropriately trimmed and all exterior building apparatus shall
blend colors and features to exterior design = Met
• Façade or roof-mounted equipment shall be screened = N/A (none proposed)
Discussion Item: The design standards applicable to this project are those for institutional land uses. Not all
institutional uses are the same. These standards are well suited for highly visible areas and public buildings
such as Village Hall, the fire station, the library, etc. However, for structures within parks, these standards may
not be as reflective of the purpose and intent of the uses associated with said structures. Understanding this
situation, the Plan Commission has the ability to either require the standards to be met or grant a waiver per
Section 17.07.01(d)3.
Landscaping Standards (Section 17.08.30)
Per Section 17.08.10(5), all land uses within the Parks and Recreation zoning district are exempt from
landscaping requirements.
Signage Standards (Section 17.09.11)
• None proposed = N/A
PUBLIC NOTICE:
Public notice is not required for review and action on a Site Plan.
COMPREHENSIVE LAND USE PLAN (2022):
The subject property is shown as Parks and Open Space on the Future Land Use Map. This designation includes
park and open space facilities devoted to both active and passive recreation, such as playgrounds, play fields,
play courts, trails, picnic areas, natural areas, publicly owned golf courses and bowling alleys, and related
recreational activities. The proposed project aligns with this land use designation. Staff believe the proposal is
in concert with the Comprehensive Plan.
DISCUSSION:
The replacement of an outdated structure with a new structure is a relatively minor change to the overall site.
It will have very little impact on surrounding properties and will accommodate new storage, concessions, and
picnic areas for use within the park. Further, the proposed improvement area is on the Blue Mounds Street
side of the park, closest to the fire station, not the lower density residential properties. Finally, the proposed
improvements enhance the usability of the park and are in alignment with the Grundahl Park Master Plan.
Page 25 of 31
Site Plan
August 26, 2026
5
Overall, the proposed project meets the majority of the requirements of the Village’s ordinances, is in
alignment with adopted Village plans, and provides an improved amenity within the community. With a few
additional details, this project fully conforms to the requirements of the Village’s Zoning Ordinance.
Village staff have reviewed the application, and all comments have been included within this document.
RECOMMENDATION:
Village staff recommends approval of the Site Plan, subject to the following conditions:
1. Waive the requirement for curbing within the proposed paved areas because these areas are not intended
to be used for primary vehicle circulation and the existing pavement that’s being replaced does not include
curbing.
2. Village staff review and approval of the following that meets all requirements:
o Require the applicant to provide lighting fixture and photometric plans per Section 17.06.20.
3. Plan Commission Discussion and Action on either:
o Granting a waiver from the design requirements for building materials (all metal), articulation (not
enough), window and door openings (min. 20% of façade facing street), and the 40” hard, durable
base material (none provided).
o Require the applicant to update the plans to meet the minimum requirements.
4. Any other recommendations of Village staff and the Plan Commission.
ATTACHMENTS:
• Application
• Site Plan Package
Page 26 of 31
GRABER SUPPLY, LLC
491 Gap Newport Pike • Atglen PA 19310
Phone: 610-593-3500 • Fax: 610-593-2510
www.polebarn.com
3
/4"
Shiny Black
Bright White
Stone
Red
Gallery Blue
Black
White
Clay
Dark Red
Blue
Gold
Charcoal
Ivory
Burnished Slate
Crimson Red
Evergreen
Copper
Gray
Tan
Brown
Burgundy
Hartford Green
G-Rib Panel
36" coverage
Standing Seam Panel
15" coverage
1
1
/2"
COVERAGE Our 3/4" rib with its anti-siphon feature gives you a weather-tight seal.
The above colors are intended only as an approximation of actual colors. Exact color chips can be supplied if required. Color prices may vary. Call to check on availability of colors for 26 gauge.
R-Rib Panel
36" coverage
12"
4"4" 4"
Optional Perlin
Bearing Leg
1"9"
3
1
/8" 2
3
/4"
3
/4"1
3
/4" 3
/4"3
/32"
3
5
/64"1
3
/8"
3
/16" 1
1
/4"
Note: Additional cost applies to premium colors - Dark Red, Crimson Red, Copper
Page 27 of 31
Black Charcoal Burnished Slate
Evergreen Dark Red Burgundy
G-Rib Panel9"
3
1
/8" 2
3
/4"
3/4"
36" coverage
13/4"
Standing Seam Panel
15" coverage
1
1
/2"
COVERAGE Our 3/4” rib with its anti-siphon feature gives you a weather-tight seal.
The above colors are intended only as an approximation of actual colors. Exact color chips can be supplied if required. Color prices may vary. Call to check on availability of colors for 26 gauge.
Ceram-A-Star®
1050 Frost
GRABER SUPPLY, LLC
491 Gap Newport Pike • Atglen PA 19310
Phone: 610-593-3500 • Fax: 610-593-2510
www.polebarn.com
Page 28 of 31
…Village of Mount Horeb
…. Recreation Department
105 North Grove Street
Mount Horeb, WI 53572
Phone (608) 437-3400 | Email: jill.dudley@mounthorebwi.info
PARKS, RECREATION, AND FORESTRY COMMISSION
August 25, 2026
Recreation Director’s Report
1. August Program Numbers:
Program Name 2026 Participants 2025 Participant Numbers
Art Camp 30 10
Bodywise Yoga 13 N/A (new offering)
Fit For Life (Fall) 32 30
Lacrosse Camp 25 26
Line Dancing 7 N/A (new offering)
NFL Flag Football 312 300
2. Upcoming September Programs: Floor Hockey, Kids in Motion (NEW), Little Star Kickers
Soccer, Water Exercise (Mon & Wed classes), Total Body Fitness (Tues & Thurs classes),
Coed Volleyball, YEL! Bricktopia Racers, YEL! Fencing, YEL! Chess (Sess. 1), and YEL!
Junior Basketball.
3. Online registration for our fall programs started on Monday, August 10 and in-person
registration started on Tuesday, August 11. We had 91 transactions on August 11 alone.
The following fall programs are full: Fit For Life and Water Exercise (all four sessions).
4. Our flag football program is off and running with 30 teams (K-8th Grade) and 80 volunteer
coaches. This program practices at Blue Mounds Ball Field (outfield), Garfield Park,
Grundahl Park (outfield of baseball field and the soccer field), Sunrise Park (outfield of
baseball field #2) and Waltz Park Ball Field (outfield). With the loss of two fields at the
Primary Center due to construction, we had to get creative with our practice locations. We
are also currently working on finding flag football referees for our games in September and
October.
5. Our summer office assistant, Tatum Purin, will finish her employment with the Recreation
Department on August 21. This was Tatum’s second summer with the department, and she
has been a great help throughout the season. Having her return was especially beneficial,
as she was already familiar with how things worked and could jump right in with minimal
training. Tatum will likely not return next summer as she will be looking for an internship in
her field. We enjoyed having Tatum on our team and appreciate all of her hard work.
6. We sold discount tickets this summer through the Wisconsin Park and Recreation
Department to the following area attractions: Land of Natura, Milwaukee Zoo, Mt. Olympus,
and Noah’s Ark. We sold a total of 537 tickets and retain $1.00 from the sale of each ticket
in exchange for promoting and selling tickets on behalf of the attractions.
HERITAGE
COMMUNITY
OPPORTUNITY
Page 29 of 31
7. The Kingdom of Wonders Medieval Circus came to Mount Horeb on August 15 and 16.
Attendance for the four shows was 464 on Saturday at 3:00 pm, 506 on Saturday at 6:00
pm, 469 on Sunday at 3:00 pm, and 399 on Sunday at 6:00 pm, for a total attendance of
1,838 people. The circus representative said everything went very well and that people had
a great time. I am glad we were able to partner with them to bring this unique event to
Mount Horeb and give our community the opportunity to have a memorable experience.
8. The High School Girls Swim Team began morning practices at the Aquatic Center on
Tuesday, August 11. Beginning the week of August 17, the team will practice both
mornings and evenings. Their final practice will be on Friday, August 28.
9. Aquatic Center – 2026 Summer Season Recap: The 2026 pool season was a successful
one at the Mount Horeb Family Aquatic Center. We welcomed thousands of visitors
throughout the summer and sold 258 family pool passes and 62 individual passes – a little
below our pass sale numbers in 2025. We also had 14 private rentals and offered swim
lessons and other aquatic events throughout the season. While we had some challenges
with weather and air quality throughout the summer, the season went well. We received
positive feedback from patrons and staff, and I am proud of the work our seasonal team did
to provide a safe and enjoyable experience for the community.
A few pool updates/changes we are looking to make for 2027:
• Life Jacket Policy: Return to not allowing life jackets at the Aquatic Center. It was
difficult for staff to ensure that all life jackets were Coast Guard approved.
• Purchase approximately 10 more lounge chairs and 5 upright chars.
• Purchase a larger floor fan for the lifeguard room.
• Repaint the floors and walls throughout the Aquatic Center.
• Replace the wooden post near the slide area.
• Replace the ropes that go through the wooden posts by both staircases.
• Purchase a new lifeguard stand/chair for the deep end.
• Purchase a new backboard.
• Paint the hand rails leading up to the bridge.
• Add additional signage regarding the deep end age restrictions.
Page 30 of 31
Village of Mount Horeb
Public Services Department
138 E Main St
Mount Horeb, WI 53572
Phone (608) 437-3351/Fax (608) 437-3190
www.mounthorebwi.info
PARKS, RECREATION AND FORESTRY COMMISSION
AUGUST 25, 2026
PUBLIC SERVICES DIRECTOR’S REPORT
1. Our crew removed the old playground equipment and excavated the site for the new
playground at Grandma Foster Park. In the process, we discovered an old foundation
wall and had to jackhammer it to remove it. The contractor began install on 8/17 and
should be done in two weeks.
2. I found out that the Village will not be receiving any funds through Wisconsin
Emergency Management for the June 10 storm.
3. We set up and painted five flag football fields for the Recreation Department
4. We have been busy with tree removals and pruning low limbs throughout the Village.
5. Our crew installed 180 cubic yards of new wood mulch safety surfacing to several
playgrounds.