Village Board Meeting — Agenda Packet
Village of Mount Horeb · Dane County · Village Board · meeting of Jun 3, 2026 · Agenda packets
Open the original document More from Village of Mount Horeb
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF MOUNT HOREB
E. Main Street
Mount Horeb, WI 53572
Phone: (608) 437-6884 Fax: (608) 437-3190
Email: mhinfo@mounthorebwi.info Web: mounthorebwi.info
VILLAGE BOARD AGENDA
Wednesday, June 3, 2026 at 7:00 PM
Municipal Building Board Room
138 E. Main Street
Mount Horeb, WI
1) Call to order
2) Pledge of Allegiance
3) Roll call
4) Public Comments on Non-Agenda Items*
5) Consent Agenda
a. Consideration of May 6, 2026 Meeting Minutes
b. Consideration of Appointment of Ken Scott to Utility Commission
c. Consideration of 101 Perimeter Road GDP Amendment
d. Consideration of 101 Perimeter Road SIP Amendment
e. Consider New Alcohol Beverage License Applications: The Doghouse
Tavern and Grill, 117 S 1st Street; Zenith Food Group, DBA Vita Bella
Italiano Ristorante, 209 E Main Street; and Firefly Events Decor &
Flowers LLC, 109 N 8th Street
f. Consider Appointment of Agent Applications for New Alcohol Beverage
Licenses: Jeff Ackerman for The Doghouse Tavern and Grill, Jermaine
Butler for Zenith Food Group LLC, and Heidy Rizzi Lange for Firefly
Events Decor & Flowers LLC
g. Consider Alcohol Beverage License Renewal Applications: Premier
Cooperative, 501 W Main Street; Miller and Sons Inc, 1845 Springdale
Street; Trollway Liquor, 504 W Main Street; Walgreens #11648, 1401
Springdale Street; Kwik Trip #794, 525 Springdale Street; Kwik Trip
#1130, 9255 Ridgeview Road; Wiscoboxes, 305 E Main Street; Elegant
Bridal, 101 E Main Street; Buck & Honey's Restaurants, 108 S 2nd Street;
Norsk Golf Club, 2755 Golf Bowl Road; Grumpy Troll LLC, 105 S 2nd
Street; Aztlan Mexican Grill, 407 W Main Street; Driftless Social, 128 E
Main Street; Bistro 101, 101 E Main Street; Isaac's Antiques, 132 E Main
Street; Moho Jo LLC, 100 S 1st Street; Sunn Cafe, 201 E Main Street;
The Doghouse Tavern and Grill, 117 S 1st Street
Page 1 of 127
h. Consider Appointment of Agent Applications for Alcohol Beverage
License Renewals: Joshua Kitelinger for Premier Cooperative, William
Miller for Miller and Sons Supermarket, Michael Rogers for Trollway
Liquor, Rebecca Wentworth for Walgreens #11648, Daniel Hying for Kwik
Trip #794, Tracy Alvey for Kwik Trip #1130, Mills Botham for Wiscoboxes,
Marah Odgers for Elegant Bridal, Thomas Anderson for Buck & Honey's
Restaurants, Michael Woodward for Norsk Golf Club, Robin Pharo for
Grumpy Troll LLC, Jose Onate for Aztlan Mexican Grill, Matthew
Schmock for Driftless Social, Mark Valaskey for Bistro 101, Janelle
Holmstrom for Isaac's Antiques, Tyler Marks for Moho Jo LLC, Taddeus
Rokitowski Jr for Sunn Cafe, Jeff Ackerman for The Doghouse Tavern
and Grill
i. Consider Street Use Permit Application from Mount Horeb Area Chamber
of Commerce for the Art Fair, July 17-19, 2026
6) Agenda Items
a. 2025 Village Audit Presentation by Baker Tilly
b. Proclamation Affirming the Village of Mount Horeb's Commitment to
Diversity & Inclusion
c. Consideration of Public Art Ordinance 2026-06
d. Consider Fundraising Agreement with Dennis Cooley for Recreation
Complex
e. Consideration of the Pedestrian and Bike Safety Plan
7) Committee Reports:
a. Community Development Authority
b. Dane County Cities & Villages Association Report
c. Finance/Personnel
d. Historic Preservation Committee Report
e. Library Board
f. Mount Horeb Area Chamber of Commerce
g. Mount Horeb Area Joint Fire Department
h. Parks, Recreation, and Forestry Commission
i. Plan Commission
j. Public Safety Committee
k. Public Works Committee
l. School Liaison
m. Sustainability and Natural Resources Committee
n. Tourism Commission
o. Utility Commission
Page 2 of 127
8) Village President's report
9) Village Administrator's report
a. Written Report
10) Village Clerk’s report
11) Meeting adjournment.
*Public Comment Policy
Members of the public are invited to speak at meetings of all Mount Horeb Public Bodies. To comment, please complete a
Public Comment Form at the Meeting Room entrance and submit it to staff before the meeting begins. Comments are limited
to three minutes, must be made from the podium, and the speaker must return to the audience after speaking.
• Non-agenda item comments are heard at the start of the meeting. Public Body members and staff will not
engage in discussion during public comment but may consider topics for future agendas.
• Agenda item comments are heard during the relevant item, after the proposers or staff present the item and
before Public Body discussion. All public comments on the item will be heard before any discussion by the Public
Body.
Members of the public will only be allowed to speak outside these public comment times if they are invited by the meeting
chair to share additional information requested by the Public Body. If so invited to speak, the member of the public must do
so from the podium.
Written comments are also welcome. Written comments shall include the name and address of the submitter and should be
submitted to the Deputy Treasurer/Governance Coordinator by email at niki.erickson@mounthorebwi.info (subject line:
Public Comment Request-Name of Public Body) or delivered by to the Village at: 138 E Main Street, Mount Horeb WI,
53572, ATTN Public Comment Request-Name of Public Body.
UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR INFORMATION OR TO REQUEST THIS
SERVICE, CONTACT ALYSSA GAFFNEY, CLERK, AT 138 E MAIN STREET, MOUNT HOREB, WI (608) 437-9404.
Page 3 of 127
Page 4 of 127
Page 5 of 127
Page 6 of 127
Page 7 of 127
Page 8 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 5.c
Consideration of 101 Perimeter Road GDP Amendment
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. 5.7.26 JTK Amendment Application
2. 101 Perimeter GDP and SIP Amendment (1)
3. 101 Perimeter Rd JT Klein PD Amendment 300 letter
Page 9 of 127
PD-SIP
Page 10 of 127
To: Village of Mount Horeb Plan Commission
From: Village Planner Ben Rohr, AICP
Date: May 27, 2026
Re: Proposed Zoning Map Amendment for a Planned Development - General Development
Plan (GDP) for two 3-Story Multi-Family Building at 101 Perimeter Road for JT Klein, Inc.
Introduction
Project Overview
The project received General Development Plan approval from the Plan Commission in July 2025 and
Specific Implementation Plan approval from the Plan Commission in January 2026. Today, the applicant,
JT Klein, is seeking an amendment to both the GDP and SIP to include one additional dwelling unit.
Building 1 Building 2
Previously Approved Proposed Change Previously Approved Proposed Change
49 dwelling units None 40 dwelling unit 41 dwelling units
6 studios, 30 1-
bedrooms, and 13 2-
bedroom units
None 0 studios, 21 1-
bedrooms, and 19 2-
bedrooms
0 studios, 22 1-
bedrooms, 19 2-
bedrooms
Each structure is proposed to be the exact same footprint. The only change is the unit configuration
within Building 2. The previously approved GDP included a total of 8 requested flexibilities for Building
1/Lot 1 and 9 requested flexibilities for Building 2/Lot 2. Only one requested flexibility is proposed to be
amended to accommodate the change (Lot 2 item number 2 below – 40 total units to 41 total units).
This staff report is intended to be utilized in conjunction with the July 23, 2025 staff report associated
with the previously approved GDP for the site.
Formal General Development Plan (GDP) Review
Analysis of Requested Flexibilities
The proposed GDP amendment is needed to accommodate one additional dwelling unit withing Building
2/Lot 2. As the plans were further refined and prepared for construction, the interior building layout was
modified slightly, providing the opportunity for one additional unit to be accommodated within the same
building footprint. However, the GDP clearly approved only 40 total units for Building 2/Lot 2, thus
creating the need to amend the GDP to accommodate the new unit.
Page 11 of 127
May 27, 2026 Page 2 of 5
Requested Flexibility from Zoning Ordinance Requirements:
The proposed GDP identifies the following items of flexibility from the standards of the Planned
Business (PB) zoning district for Lot 1:
1. The Permitted Principal Land Use established for the PB district in Section 17.42 of the Zoning
Ordinance only allows multi-family uses as an accessory use. Multi-Family is proposed to be the
principal land uses for this project. Specifically, Commercial Apartments are permitted as an accessory
land use. The proposed principal land use is Multi-Family (Apartments).
2. The Maximum Number of Dwelling Units Limit established for Multi-Family uses in Section
17.20(1)(a)7. of the Zoning Ordinance will not be met by this proposal. Specifically, the maximum
number of dwelling units per building is 8 for Apartment land uses. The proposed use is a total of 49
units in one building.
3. The Minimum Setbacks for Apartment Land Uses established for Multi-Family uses in Section
17.20(1)(a)7. of the Zoning Ordinance will not be met by this proposal. Specifically, the minimum
setbacks for Apartment land uses are 30 feet on all sides. The proposed development has setbacks as
low as 10 feet from the property line.
4. The Maximum Floor Area Ratio established for the PB district in Section 17.42 of the Zoning
Ordinance will not be met by this proposal. Specifically, the maximum floor area ratio is 0.30. The
proposed project will have a floor area ratio of 1.07.
5. The Maximum Building Height established for the PB the district in Section 17.42 of the Zoning
Ordinance will not be met by this proposal. Specifically, the maximum building height requirement is
45 feet. The proposed project is 54 feet tall.
6. The Minimum Setbacks established for the PB district in Section 17.42 of the Zoning Ordinance
will not be met by this proposal. Specifically, the minimum front setback requirement is 20 feet. The
proposed project has a 10-foot front setback.
7. The Minimum Paved Surface Setback established for the PB district in Section 17.42 of the
Zoning Ordinance will not be met by this proposal. Specifically, the minimum paved surface setback
from all property lines is 10 feet. The proposed project has a 0-foot paved surface setback from
multiple property lines.
8. The Minimum Required Parking established for Apartment land uses in Section 17.132 of the
Zoning Ordinance will not be met by this proposal. Specifically, the minimum required off-street
parking is 77 stalls based on the unit configuration. The proposed project has 73 off-street parking
stalls.
Requested Flexibility from Zoning Ordinance Requirements:
The proposed GDP identifies the following items of flexibility from the standards of the Planned
Business (PB) zoning district for Lot 2:
1. The Permitted Principal Land Use established for the PB district in Section 17.42 of the Zoning
Ordinance only allows multi-family uses as an accessory use. Multi-Family is proposed to be the
principal land uses for this project. Specifically, Commercial Apartments are permitted as an accessory
land use. The proposed principal land use is Multi-Family (Apartments).
2. The Maximum Number of Dwelling Units Limit established for Multi-Family uses in Section
17.20(1)(a)7. of the Zoning Ordinance will not be met by this proposal. Specifically, the maximum
number of dwelling units per building is 8 for Apartment land uses. The proposed use is a total of
4140 units in one building.
3. The Minimum Setbacks for Apartment Land Uses established for Multi-Family uses in Section
17.20(1)(a)7. of the Zoning Ordinance will not be met by this proposal. Specifically, the minimum
setbacks for Apartment land uses are 30 feet on all sides. The proposed development has setbacks as
low as 3 feet from the property line.
Page 12 of 127
May 27, 2026 Page 3 of 5
4. The Maximum Floor Area Ratio established for the PB district in Section 17.42 of the Zoning
Ordinance will not be met by this proposal. Specifically, the maximum floor area ratio is 0.30. The
proposed project will have a floor area ratio of 1.14.
5. The Maximum Building Height established for the PB the district in Section 17.42 of the Zoning
Ordinance will not be met by this proposal. Specifically, the maximum building height requirement is
45 feet. The proposed project is 54 feet tall.
6. The Minimum Setbacks established for the PB district in Section 17.42 of the Zoning Ordinance
will not be met by this proposal. Specifically, the minimum front setback requirement is 20 feet. The
proposed project has a 3-foot front setback. Specifically, the minimum rear setback requirement is 25
feet. The proposed project has a 13-foot rear setback.
7. The Minimum Paved Surface Setback established for the PB district in Section 17.42 of the
Zoning Ordinance will not be met by this proposal. Specifically, the minimum paved surface setback
from all property lines is 10 feet. The proposed project has a 0-foot paved surface setback from
multiple property lines.
8. The Minimum Required Parking established for Apartment land uses in Section 17.132 of the
Zoning Ordinance will not be met by this proposal. Specifically, the minimum required off-street
parking is 68 stalls based on the unit configuration. The proposed project has 48 off-street parking
stalls.
9. The Minimum Street Frontage established for the PB district in Section 17.42 of the Zoning
Ordinance will not be met by this proposal. Specifically, the minimum street frontage requirement for
the lot is 50 feet. The proposed project has 34 feet of street frontage.
Village Planner’s Recommendations Regarding the GDP
If acceptable to the Plan Commission, the Village Planner recommends the Plan Commission make,
consider, and adopt a motion which makes a finding that the criteria for GDP submittals and approval
have been met, and that also recommends approval of the proposed GDP Amendment by the Village
Board, inclusive of full and continuous compliance with the submittal documents, the list of flexibilities
and conditions provided in the submittal, and with any conditions identified by Village Staff and the Plan
Commission, including 1-11, below for Lot 1:
1. The proposed flexibility to allow Apartments as a principal by-right land use in the PB zoning district
should be granted as proposed in the GDP submittal.
2. The proposed flexibility to allow the maximum building size to exceed 8 dwelling units per building
should be granted up to 49 dwelling units as proposed in the GDP submittal.
3. The proposed flexibility to allow a minimum building setback less than 30 feet down to 10 feet should
be granted as proposed in the GDP submittal.
4. The proposed flexibility to allow a maximum floor area ratio greater than 0.30 should be granted up to
1.07 as proposed in the GDP submittal.
5. The proposed flexibility to allow a maximum height greater than 45 feet tall should be granted up to
54 feet as proposed in the GDP submittal.
Page 13 of 127
May 27, 2026 Page 4 of 5
6. The proposed flexibility to allow minimum front setbacks less than 20 feet down to 10 feet should be
granted as proposed in the GDP submittal.
7. The proposed flexibility to allow a minimum paved surface setback of less than 10 feet down to 0 feet
should be granted as proposed in the GDP submittal.
8. The proposed flexibility to allow minimum off-street parking of less than 77 spaces down to 73
spaces should be granted as proposed in the GDP submittal.
9. The Village’s design review standards be applied through the SIP phase of project review.
10. The applicant shall record a cross-access easement between Lot 1 and Lot 2 to allow parking and
access to be permitted on both properties.
11. Any additional requirements identified by Village Staff, the Village Engineer, the Plan Commission, or
the Village Board.
Village Planner’s Recommendations Regarding the GDP
If acceptable to the Plan Commission, the Village Planner recommends the Plan Commission make,
consider, and adopt a motion which makes a finding that the criteria for GDP submittals and approval
have been met, and that also recommends approval of the proposed GDP Zoning Map Amendment by
the Village Board, inclusive of full and continuous compliance with the submittal documents, the list of
flexibilities and conditions provided in the submittal, and with any conditions identified by Village Staff
and the Plan Commission, including 1-12, below for Lot 2:
1. The proposed flexibility to allow Apartments as a principal by-right land use in the PB zoning district
should be granted as proposed in the GDP submittal.
2. The proposed flexibility to allow the maximum building size to exceed 8 dwelling units per building
should be granted up to 41 dwelling units as proposed in the GDP submittal.
3. The proposed flexibility to allow a minimum building setback less than 30 feet down to 3 feet should
be granted as proposed in the GDP submittal.
4. The proposed flexibility to allow a maximum floor area ratio greater than 0.30 should be granted up to
1.14 as proposed in the GDP submittal.
5. The proposed flexibility to allow a maximum height greater than 45 feet tall should be granted up to
54 feet as proposed in the GDP submittal.
6. The proposed flexibility to allow minimum front setbacks less than 20 feet down to 3 feet and allow
minimum rear setbacks less than 25 feet down to 13 feet should be granted as proposed in the GDP
submittal.
7. The proposed flexibility to allow a minimum paved surface setback of less than 10 feet down to 0 feet
should be granted as proposed in the GDP submittal.
Page 14 of 127
May 27, 2026 Page 5 of 5
8. The proposed flexibility to allow minimum off-street parking of less than 68 spaces down to 48
spaces should be granted as proposed in the GDP submittal.
9. The proposed flexibility to allow a minimum street frontage for Lot 2 to be less than 50 feet down to
34 feet should be granted as proposed in the GDP submittal.
10. The Village’s design review standards be applied through the SIP phase of project review.
11. The applicant shall record a cross-access easement between Lot 1 and Lot 2 to allow parking and
access to be permitted on both properties.
12. Any additional requirements identified by Village Staff, the Village Engineer, the Plan Commission, or
the Village Board.
Page 15 of 127
To: Village of Mount Horeb Plan Commission
From: Village Planner: Ben Rohr, AICP
Date: May 27, 2026
Re: Specific Implementation Plan (SIP) Amendment and Design Review for Two Proposed 3-
Story Multi-Family Buildings at 101 Perimeter Road for JT Klein, Inc.
Introduction
The project received General Development Plan approval from the Plan Commission in July 2025 and
Specific Implementation Plan approval from the Plan Commission in January 2026. Today, the applicant,
JT Klein, is seeking an amendment to both the GDP and SIP to include one additional dwelling unit.
Each structure is proposed to be the exact same footprint. The only change is the unit configuration
within Building 2. No other site changes are proposed.
To note, when the SIP was approved in January 2026, the Plan Commission approved the following:
1. Design Review as submitted to the Village, including waivers from the Design Review
requirements approved by the Plan Commission, including:
a. 2.a. for the removal of five existing mature trees along the Perimeter Road frontage
to be replaced with new trees in a similar location, as depicted.
b. 10.a. for the non -decorative service and garage doors on the façade of both
buildings for the in- building parking entry, as depicted.
c. 14.b. for the metal awnings to be permitted on each façade, as depicted.
2. Village staff review and approval of the following that meets all Design Review
requirements. If any waivers are requested by the applicant from the Design Review
requirements, the proposed plans must be reviewed and approved by the Plan
Commission.
a. 13.a. Require updated elevation plans with the proposed location of the meter
boxes and proposed screening approach.
b. 19.a. and b. Require detailed signage plans for all proposed signs.
3. Additional conditions as approved by the Plan Commission:
a. Building 1 includes 2’ overhangs on the gables.
b. Building 2 includes a lighter grey façade color vs. the darker grey proposed.
c. Building 1 and 2 includes hanging bicycle racks within the underground parking
garage.
Page 16 of 127
May 27, 2026 Page 2 of 3
The only changes made to the SIP amendment submittal include:
• 41 vs. 40 total dwelling units in Building 2
• Meter boxes are identified on the elevations for both buildings and are proposed to be screened with
landscaping
• 2’ overhangs on the gables on Building 1
• Lighter grey siding on the façade of Building 2
• 45 bicycle parking spaces in the underground parking area of Building 1, 17 in Building 2
To receive final Village approval of the Planned Development, this project requires approval of the SIP
and Design Review by the Plan Commission and the Village Board. This report addresses the SIP first,
followed by the Design Review.
Specific Implementation Plan Review
If the amended GDP is approved, the proposed amendment to the SIP is consistent with the GDP.
Lot 1/Building 1: Specific SIP Flexibilities Consistent with the Amended GDP include:
1. Allowable Land Uses: The GDP approved Apartments (Multi-Family) as a by-right principal land use
for the property. The SIP is consistent with the approved GDP.
2. Number of Dwelling Units: The GDP approved a building with up to 49 dwelling units. The SIP is
consistent with the approved GDP.
3. Apartment Land Use Setbacks: The GDP approved minimum setbacks of 10 feet from all property
lines. The SIP is consistent with the approved GDP.
4. Floor Area Ratio: The GDP approved greater minimum floor area ratios for the property of up to
1.07. The SIP is consistent with the approved GDP.
5. Building Height: The GDP approved a building up to 54 feet in height. The SIP is consistent with the
approved GDP.
6. Front Yard Building Setbacks: The GDP approved a minimum front yard setback of 10 feet. The SIP
is consistent with the approved GDP.
7. Pavement Setbacks: The GDP approved minimum pavement setbacks of 0-foot from all property
lines. The SIP is consistent with the approved GDP.
8. Parking: The GDP approved a minimum of 73 off-street parking spaces be provided. The SIP is
consistent with the approved GDP.
Lot 2/Building 2: Specific SIP Flexibilities Consistent with the Amended GDP include:
1. Allowable Land Uses: The GDP approved Apartments (Multi-Family) as a by-right principal land use
for the property. The SIP is consistent with the approved GDP.
2. Number of Dwelling Units: The GDP approved a building with up to 41 dwelling units. The SIP is
consistent with the approved GDP.
3. Apartment Land Use Setbacks: The GDP approved minimum setbacks of 3 feet from all property
lines. The SIP is consistent with the approved GDP.
Page 17 of 127
May 27, 2026 Page 3 of 3
4. Floor Area Ratio: The GDP approved greater minimum floor area ratios for the property of up to
1.14. The SIP is consistent with the approved GDP.
5. Building Height: The GDP approved a building up to 54 feet in height. The SIP is consistent with the
approved GDP.
6. Front and Rear Yard Building Setbacks: The GDP approved a minimum front yard setback of 3 feet
and a minimum rear yard setback of 13 feet. The SIP is consistent with the approved GDP.
7. Pavement Setbacks: The GDP approved minimum pavement setbacks of 0-foot from all property
lines. The SIP is consistent with the approved GDP.
8. Parking: The GDP approved a minimum of 48 off-street parking spaces be provided. The SIP is
consistent with the approved GDP.
9. Street Frontage: The GDP approved a minimum 34 feet of street frontage be provided for the parcel.
The SIP is consistent with the approved GDP.
Planner’s Recommendation for the Specific Implementation Plan:
I recommend the Plan Commission recommend the Amended SIP for 101 Perimeter Road for approval
by the Village Board, subject to the conditions as approved by the Plan Commission on January 28, 2026.
Design Review Requirements per Section 17-14:
As noted above, the only proposed changes within the SIP are reflective of conditions of approval from
the January 28, 2026 Plan Commission meeting, outside of the proposed addition of one dwelling unit
within Building 2.
This staff report is intended to be utilized in conjunction with the January 28, 2026 staff report associated
with the previously approved SIP for the site.
Village Planner’s Recommendations:
I recommend the Plan Commission consider and approve the following requirements for the
approval of the Amendment to the Specific Implementation Plan for 101 Perimeter Road :
1. A recommendation to the Village Board that t he Specific Implementation Plan Amendment
for 101 Perimeter Road be approved, subject to any and all requirements identified by the Plan
Commission under Design Review.
2. A recommendation to the Village Board that the Amendment to Site Plan packet be approved,
subject to any and all requirements identified by the Plan Commission under Design Review.
3. All Design Review waives identified within the January 28, 2026 SIP approval shall remain
granted.
4. All conditions of approval identified within the January 28, 2026 SIP approval have been met.
5. Village Engineer review and approval of the proposed Stormwater Management and Grading
Plans.
6. Any additional requirements identified by Village Staff, the Village Engineer, the Plan
Commission, or the Village Board.
Page 18 of 127
PD-SIP
Page 19 of 127
Page 20 of 127
Page 21 of 127
Page 22 of 127
Page 23 of 127
Page 24 of 127
Page 25 of 127
Page 26 of 127
Project Comparison Exhibit2/6/26 Approved Karakahl Redevelopment Project
Proposed Resubmittal Karakahl Redevelopment Project
Page 27 of 127
Project Comparison Exhibit2/6/26 Approved Karakahl Redevelopment ProjectProposed Resubmittal Karakahl Redevelopment Project
Page 28 of 127
1.
A. Project Developer - JT Klein Company, Inc.
JT Klein Company, Inc. (JTK) was founded in 2014 with the ambition of increasing access to
senior and multifamily affordable housing in Wisconsin and Dane County. Based in Madison,
Wisconsin, JTK is a leading workforce housing developer and has successfully developed 871
housing units in Dane County. Most recently, JTK started construction on Phase II of it’s
redevelopment of the former Westgate Mall in Madison. Upon completion, this project will contain
over 620 apartments, including market rate, affordable senior and workforce housing.
Using years of experience and a high level of attention to detail, JT Klein is able to navigate each
project’s unique challenges to ensure each building is built in a timely fashion without sacrificing
quality. JT Klein understands the challenges of developing multifamily housing and continues to
complete successful projects on time and on budget.
818 S. Park Madison, WI 53715
B. Project Contacts
Architect: Knothe Bruce & Associates
KBA was founded on the principle that thoughtful design can improve the way we live and work.
With over half a century of architectural expertise, we have grown into a firm recognized for our
dedication to creating meaningful spaces that balance innovation and practicality. Over the years,
we’ve remained true to our belief that great design is about more than aesthetics, it’s about creating
spaces that truly serve the people who use them. Our approach is rooted in collaboration, ensuring
that each design is a thoughtful response to our clients' needs while enhancing the surrounding
environment.
8401 Greenway Blvd Suit 900 Middleton, WI 53562
Civil Engineering: Wyser Engineering
Our team of professional engineers and land surveyors provides site planning, water resources
engineering, utility and infrastructure design, traffic engineering and surveying solutions to public
and private sector clients for complete project delivery. Wyser Engineering aims to establish long
lasting relationships with all Clients as a vested consultant to serve your needs. Concept through
Construction.
300 E Front St Mount Horeb WI 53572
Page 29 of 127
Property Management Team- Oakbrook Corporation
This project will be professionally managed by an entity controlled by Oakbrook Corporation, Inc.
Based in Madison, WI, Oakbrook’s multifamily property management group has extensive
experience managing apartment communities of all types and sizes. Their portfolio consists of
senior and family communities which operate as market rate properties or were financed with
Section 42 Low Income Housing Tax Credits or under various other state and federal programs.
Oakbrook Corporation currently employs over 280 individuals and manages over 8,300 apartments
in 118 different properties in Wisconsin, Iowa and Illinois, and 46 commercial properties in the
Madison area totaling over 1,900,000 square feet.
2 Science Court Madison, WI 53704
C. Description of Proposed Uses:
JT Klein Company, Inc. is pleased to present this proposal for the redevelopment of the former
Karakahl Country Inn, located at 101 Perimeter Road in Mount Horeb, Wisconsin. The current site
has sat vacant and deteriorating for years and is considered by all definitions blighted. This
redevelopment presents a unique opportunity to eliminate a longstanding eyesore at one of Mount
Horeb’s most visible entry points and replace it with a thoughtfully designed, high-quality residential
community.
The project consists of two separate three-story apartment buildings, constructed above underground
parking. This new community will offer a mix of studio, one, and two-bedroom apartment homes
designed to attract a diverse range of residents. One building will feature 49 market-rate units, while
the other will provide 40 affordable housing units for seniors. Units will feature open layouts,
contemporary finishes, in-unit laundry, and private outdoor space. Common amenities will include a
community room, fitness center, underground heated parking, elevator access, and secure entry.
During the concept review and neighborhood meeting for the project, the development team heard
clear and consistent feedback from the community expressing a strong desire for senior and market
rate housing. Each building will be funded independently, and the lots will be separated with a CSM.
This structure will allow the development to serve a wide range of tenants from different
socioeconomic backgrounds
Page 30 of 127
Location Map:
The redevelopment site is located at 101 Perimeter Rd, formerly the Karakahl Country Inn, a long-
vacant hotel property directly visible from US-151. The site has deteriorated significantly and is
now considered blighted, with overgrown landscape, unsafe structures, and deteriorating
pavement. This redevelopment offers an opportunity to transform an underutilized and highly
visible site into a modern, vibrant asset for the community.
101 Perimeter Rd. Map
Page 31 of 127
Project Themes and Images:
Below are example imagines from JTK’s recently completed development Oak Ridge University
Park. JTK will use materials and high-level finishes similar in quality to these imagines.
Page 32 of 127
General Relationship of the Project to the Master Plan:
The proposed 90-unit multi-family development aligns closely with the Village of Mount Horeb’s
Comprehensive Plan, which emphasizes expanding housing options for a range of income levels
and household types. It encourages zoning amendments to support higher density, promotes
redevelopment of underutilized or blighted properties, and prioritizes infill housing projects. This
proposal addresses these objectives directly by revitalizing the former Karakahl Country Inn site—
a long-vacant and blighted property—into high-quality, well-designed housing that increases
supply without expanding the village’s footprint. By redeveloping this underutilized site into a
vibrant residential community, the project supports the Village’s commitment to sustainable
growth, economic revitalization, and housing affordability.
VILLAGE OF MOUNT HOREB VISION STATEMENT The Village of Mount Horeb will continue
to be a thriving and active community that builds on its unique culture, character, assets, location,
and history to foster community, economic, and tourism development. The Village will continue to
grow and evolve by developing and retaining local businesses, attracting new businesses and
employers, and offering housing availability and affordability, while maintaining its character,
aesthetic look, and feel. A vibrant downtown featuring the community’s historic past and bright
future acts as the community’s center piece for cultural, recreational, business, shopping, and
tourism activities. Building on its high quality of life, the Village will be a welcoming, safe, clean,
healthy, and inclusive place to live, work, and play.
Page 33 of 127
D. Approximate Residential Densities and Non-Residential Intensities:
For dwelling units per acre, floor area ratio, and impervious surface area ratio, please see the
chart below put together by the design architect, Knothe Bruce Architects (KBA)
Page 34 of 127
2. Scaled Site Plan
3. Building Plan
The following architectural exhibits meet all applicable requirements for items 2 &3.
Page 35 of 127
PROJECT NUMBER
SHEET NUMBER
ISSUED FOR:SHEET INDEX
© Knothe & Bruce Architects, LLC
Klein Perimeter Rd.101 Perimeter Rd. Mt.Horeb, WI
2514
G 000
2025.05.23 PLAN COMMISSION SUBMITTAL2025.11.17 SIP SUBMITTAL
SITE
G 000 COVER SHEETC100 SITE PLANC101 DEMOLITION PLANC200 GRADING PLANC201 DETAILED GRADING PLANC202 DETAILED GRADING PLANC300 UTILITY PLANC400 DETAILSC401 DETAILSCA101 ARCHITECTURAL SITE PLANCA102 SITE LIGHTING PLANCA103 PERVIOUS/ GREEN SPACEL100 LANDSCAPE PLANL101 LANDSCAPE DETAILS
AC101.1 FIRST FLOOR PLANAC102.1 SECOND FLOOR PLANAC103.1 THIRD FLOOR PLANAC104.1 ROOF PLANAC201.1 EXTERIOR ELEVATIONSAC202.1 EXTERIOR ELEVATIONSAC203.1 EXTERIOR COLORED ELEVATIONSAC204.1 EXTERIOR COLORED ELEVATIONSAC100.2 BASEMENT FLOOR PLANAC101.2 FIRST FLOOR PLANAC102.2 SECOND FLOOR PLANAC103.2 THIRD FLOOR PLANAC104.2 ROOF PLAN
SITE SHEETSARCHITECTURAL SHEETS
AC201.2 EXTERIOR ELEVATIONSAC202.2 EXTERIOR ELEVATIONSAC203.2 EXTERIOR COLORED ELEVATIONSAC204.2 EXTERIOR COLORED ELEVATIONS
2 BUILDINGS, 3 STORY, 90 UNITS
81 UNDERGROUND PARKING STALLS
2026.04.28 SIP RESUBMITTAL
Page 36 of 127
KEYED PLAN NOTESACCESSIBLE ROUTE - 5% RUNNING SLOPE / 2% CROSS SLOPE MAXIMUM.ACCESSIBLE PARKING STALL - MAXIMUM 2% SLOPE IN ALL DIRECTIONS.MOUNT ACCESSIBLE PARKING SIGN @ 60" HIGH TO BOTTOM OF SIGN.STOP SIGN - MOUNT @ 7' HIGH TO BOTTOM OF SIGNLIGHT POLE (TYP.) - SEE CA102 FOR FIXTURE SCHEDULEEXISTING FENCING TO BE REMOVEDBASEMENT WALL BELOWRETAINING WALL - SEE CIVIL PLANS FOR HEIGHTSOUTDOOR AMENITY SPACE - SEE SHEET L100TRANSFORMER ON CONCRETE PAD
123
26 PARKING STALLS
14 PARKING STALLS
lp16051189.64
E
8'
18' TYP.24' 18' TYP.
6'
ENTRANCE TOUNDERGROUND PARKING
BUILDING 149 UNIT47 UNDERGROUND STALLS3 STORIES
SEE CIVIL PLANSFOR SLOPE
10' PROPOSED SIDEYARD SETBACK
10' PROPOSED SIDEYARD SETBACK
10' PROPOSED REARYARD SETBACK
10' PROPOSEDREAR YARDSETBACK
10' PROPOSED SIDE YARD SETBACK
10' PROPOSEDFRONT YARDSETBACK
20'
5'
5'
24'
5'
5'
EXISTING LIGHT POLE (TYP.)
EXISTING SIGNAGE (TYP.)
EXISTING SIDEWALK TO BE REMOVED
EXISTING DRIVEWAY TO BE REMOVED
EXISTING DRIVEWAY TO BE REMOVED
ASPHALT DRIVE
ASPHALT DRIVE
COMMUNITYROOM
8'
6' 1
23
3
LOBBYENTRANCE
15.6'
13.46'
19.85'
EXISTING STREET TREES
AREAWELL
SEE CIVIL PLANSFOR SLOPE
ENTRANCE TOUNDERGROUND PARKING
11' NO BUILD EASEMENT
9' TYP.
4 BIKESTALLS
PERIMETER ROAD
PROPOSED PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPOSED PROPERTY LINE
PROPOSED PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
4
4
RETAINING WALLRETAINING WALL
T
T
18' TYP.24' 18' TYP.9' TYP.
10.42'
LOT 2
4
44
4
5
5
5
5
66
6
LOT 1
12.06'10'
LOBBYENTRANCE
6'2'
CONC. WALK
COMMUNITYROOM
78
7
8
9
9
9
AREAWELL
9.33'
ELEC.METERSGASMETER
ELEC.METERS
GASMETER
9.31'11.33'
RETAINING WALL FORMETER LOCATION
BUILDING 241 UNIT34 UNDERGROUND STALLS3 STORIES
PROJECT TITLE
SHEET NUMBER
SHEET TITLE
ISSUED
PROJECT NO.©Knothe & Bruce Architects, LLC
Phone: 8401 Greenway Blvd., Suite 900608.836.3690 Middleton, WI 53562
1CA1011" = 20'-0"ARCHITECTURAL SITE PLAN1 INCH =
GRAPHIC SCALE0 (24X36 SHEET) FT2020 40 60
SITE DEVELOPMENT DATA:ZONINGPD - PLANNED DEVELOPMENTDENSITIES:LOT 1LOT 2 LOT AREA46,579 S.F. / 1.06 ACRES37,916 S.F. / 0.87 ACRES DWELLING UNITS49 UNITS41 UNITSLOT AREA / D.U. 951 S.F. / D.U.924 S.F. / D.U.DENSITY46 UNITS / ACRE47 UNITS / ACREPERVIOUS / GREEN SPACE14,274 S.F. (31%)16,122 (43%)BUILDING HEIGHT 3 STORIES 3 STORIES (SEE ELEVATION SHEETS)RESIDENTIAL BUILDING AREA:50,634 S.F.41,523 S.F.GROSS AREA BUILDING AREA:69,679 S.F.56,046 S.F.DWELLING UNIT MIX:STUDIO 6 0ONE BEDROOM30 20ONE BED + DEN 0 2TWO BEDROOM13 19TOTAL 49 D.U.41 D.U.+ 41 STORAGE UNITSVEHICLE PARKING STALLS:UNDERGROUND GARAGE47 (INCL. 1 ADA)34 (INCL. 1 ADA)SURFACE26 (INCL. 1 ADA)14 TOTAL73 PARKING STALLS48 PARKING STALLS PARKING RATIO1.49 STALLS / D.U.1.17 STALLS / D.U.
ARCHITECTURALSITE PLAN
CA101
2025.04.17 - NEIGHBORHOOD MEETING2025.05.23 - PLAN COMMISSION SUBMITTAL2025.11.17 - SIP SUBMITTAL2026.03.23 - WHEDA REVIEW2026.04.22 - SIP RESUBMITTAL
PERIMETER ROADDEVELOPMENT
101 PERIMETER RD.MT. HOREB, WI
2514
Page 37 of 127
lp16051189.64
E
BUILDING 149 UNIT47 UNDERGROUND STALLS3 STORIES
PERIMETER ROAD
PROPOSED PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPOSED PROPERTY LINE
PROPOSED PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
T
T
A
LOT 2LOT 1
A
BB
B
B B
B
C
C
CC
C
D
0.60.30.20.10.10.10.1
0.20.00.10.20.40.71.9
0.61.21.21.6
0.40.50.60.80.91.21.5
2.32.42.0
2.83.02.5
2.03.02.82.6
1.12.02.1
0.91.51.61.31.10.90.70.50.40.40.30.30.30.40.30.20.20.20.20.1 0.5
1.6
0.8
2.21.61.1
2.01.9
1.92.02.7
1.0
1.41.3
1.9
0.7
0.70.6
0.9
0.40.30.20.20.20.30.30.50.6
0.30.3
0.10.20.30.30.20.40.81.61.81.2
1.62.42.52.01.91.31.1
0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
0.10.00.00.00.00.0
0.10.00.00.00.00.0
0.10.00.00.00.00.0
0.10.00.00.00.00.00.00.0
0.10.00.00.00.00.00.00.0
0.00.00.00.0
0.00.00.00.0
0.00.00.00.00.0
0.00.00.00.00.0
0.10.10.00.00.0
0.10.10.10.00.00.0
0.10.10.10.00.00.0
0.10.10.00.00.0
0.10.10.00.00.0
0.10.00.00.0
0.10.00.00.0
0.10.00.00.0
0.10.00.00.0
0.10.00.00.0
0.10.00.00.0
0.00.00.00.0
0.10.00.00.0
0.10.00.00.0
0.10.10.00.0
0.20.10.00.0
0.20.10.00.0
0.10.10.00.0
0.10.10.00.0
0.10.10.10.0
0.10.10.10.0
0.10.10.10.0
0.10.10.10.0
0.10.10.10.0
0.10.10.00.0
0.20.10.00.0
0.20.10.00.0
0.10.10.00.0
0.10.00.00.0
0.10.00.00.0
0.00.00.00.0
0.00.00.00.0
0.10.00.00.0
0.10.00.00.0
0.10.00.00.0
0.10.00.00.0
0.10.00.00.0
0.00.00.00.0
0.00.00.00.0
0.00.10.1
0.00.10.2
0.00.10.2
0.00.00.10.3
0.00.10.1
0.00.10.1
0.10.10.2
0.10.20.3
0.10.20.4
0.10.20.4
0.10.20.3
0.10.20.3
0.10.10.2
0.10.10.2
0.10.10.1
0.00.10.1
0.00.00.1
0.00.00.1
0.00.00.0
0.00.00.0
0.00.00.0
0.00.00.0
0.00.00.0
0.00.00.0
0.00.00.0
0.00.00.0
0.00.00.1
0.00.00.1
0.00.0
0.00.00.0
0.00.00.1
0.00.10.1
0.00.10.1
0.10.10.2
0.10.10.2
0.10.10.2
0.10.10.2
0.10.1
0.00.10.1
0.00.10.1
0.00.00.1
0.00.00.0
0.00.00.0
0.00.00.0
0.00.00.0
0.00.00.00.0
0.00.00.0
0.00.00.0
0.00.00.0
1.11.91.12.6
1.01.80.71.6 1.60.72.91.1
0.41.21.01.6
0.71.5
0.41.21.01.6
0.51.21.01.6
0.51.21.01.6
0.51.61.13.4
1.71.02.10.5
1.01.81.31.8
1.01.90.61.3
0.91.10.51.1
1.01.80.61.3
1.41.50.61.0
1.11.81.41.3
1.11.50.60.9
1.40.91.60.5
1.40.91.60.51.11.50.60.9
1.00.61.41.5 0.90.81.61.4 1.00.51.51.3
1.31.0
0.51.50.81.2
1.10.61.61.4
0.61.40.81.2
1.20.62.71.4
0.40.72.01.23.4
0.81.71.21.2
1.91.71.91.10.50.40.20.2
0.70.80.80.80.7
0.50.60.60.60.6
0.40.50.50.50.50.60.60.60.60.60.50.50.50.50.5
0.60.60.60.60.60.60.70.70.70.60.60.60.60.60.6
0.70.80.80.80.80.80.80.80.80.80.70.70.80.70.7
0.90.91.01.01.00.90.91.01.00.90.90.91.01.00.9
1.01.11.21.21.11.11.11.11.11.11.11.11.21.11.0
1.21.31.41.41.31.21.21.21.21.21.21.31.31.41.3
1.61.61.71.61.41.31.21.21.21.21.31.51.61.61.5
2.01.91.91.81.51.31.21.21.21.21.31.61.81.91.8
2.42.12.01.81.51.31.21.21.21.21.41.61.92.12.0
2.22.12.01.81.51.31.21.21.21.21.41.61.92.12.0
1.81.81.81.71.41.31.21.21.21.21.41.61.81.91.8
1.31.41.51.51.31.21.21.21.21.21.31.51.61.61.4
1.11.21.31.31.21.11.11.21.21.21.21.31.31.31.2
0.91.01.11.11.01.01.01.11.11.01.01.11.21.11.0
0.80.90.90.90.90.90.91.00.90.9
0.70.70.70.70.70.70.70.70.70.7
0.50.60.60.60.60.60.60.60.60.50.5
0.40.40.50.50.50.50.50.50.50.50.40.40.4
0.30.40.40.40.40.40.40.4
0.30.30.30.30.30.30.40.4
0.20.30.30.30.30.30.3
0.20.20.20.30.30.3
0.20.20.30.30.3
0.20.30.30.30.30.4
0.30.30.40.40.4
0.40.40.40.50.5
0.50.50.60.60.7
0.60.70.70.70.8
0.80.90.91.00.8
0.91.01.11.11.0
1.11.21.31.41.3
1.31.41.61.71.6
1.81.82.02.02.1
2.22.12.22.32.6
2.42.12.22.42.8
2.01.92.12.22.6
1.61.81.92.12.5
1.31.51.51.61.7
1.11.21.21.21.2
0.91.01.00.90.9
0.70.80.80.70.7
0.60.60.60.50.5
0.40.40.40.40.4
0.30.30.30.30.3
0.30.30.30.30.3 1.11.82.62.82.22.0
1.01.62.32.52.11.7
1.01.31.41.31.1
1.91.92.62.93.43.73.23.02.32.01.61.3
0.40.40.50.50.50.2
0.30.40.40.40.50.60.60.70.80.50.2
0.40.40.40.50.60.70.80.90.90.80.5
0.50.50.50.60.70.91.01.11.11.11.0
0.60.50.60.70.91.01.21.31.31.41.4
0.50.60.70.80.91.11.31.51.61.72.0
0.40.50.70.81.01.21.41.71.82.12.3
0.30.40.60.81.01.21.41.61.92.12.1
0.91.11.31.51.81.92.01.81.51.00.4
1.01.21.41.61.71.71.41.31.00.4
0.91.11.31.41.51.51.31.10.90.6
0.60.91.01.21.21.31.31.11.00.90.7
0.40.40.40.50.60.80.91.01.11.11.11.00.90.70.6
0.40.40.50.50.60.70.90.90.90.90.90.80.70.60.5
0.50.50.50.50.60.70.80.80.80.70.70.60.60.50.4
0.70.70.70.60.60.70.70.70.60.60.50.50.50.40.4
0.90.90.90.80.70.70.70.60.50.50.40.40.40.30.3
1.11.11.10.90.90.80.70.50.50.40.40.40.30.30.2
1.31.31.21.11.00.80.70.50.40.30.30.30.30.30.2
1.61.61.41.21.10.90.70.50.30.30.30.30.30.20.2
2.01.81.61.31.10.90.70.40.30.30.30.30.20.20.2
2.32.01.71.41.10.90.70.40.30.30.30.30.20.20.2
2.32.01.71.41.10.90.70.50.30.30.30.30.30.20.2
2.11.91.71.41.10.90.70.50.40.30.30.30.30.30.2
1.81.71.61.31.11.00.80.60.50.40.40.40.40.30.3
1.41.51.41.21.11.00.90.70.60.50.50.40.40.40.3
1.21.21.21.11.01.00.90.90.70.60.60.50.50.40.4
1.01.01.00.90.91.01.01.00.90.80.70.70.60.50.4
0.80.80.80.80.91.01.11.11.01.00.90.90.80.60.5
0.60.60.70.70.81.01.11.21.21.21.11.10.90.80.6
0.50.50.60.70.91.11.21.31.41.41.31.21.00.90.7
0.40.50.60.81.01.11.31.41.51.71.61.41.10.90.6
0.40.50.70.91.01.21.41.51.81.81.81.51.21.00.4
0.40.50.70.91.11.31.51.71.92.12.01.81.40.80.4
0.40.60.81.01.11.31.51.82.02.22.22.11.40.60.3
0.40.60.70.91.11.31.51.71.91.92.3
0.40.50.70.81.01.21.31.51.51.7
0.40.50.60.70.91.11.21.21.31.3
0.30.40.50.60.70.91.01.01.01.00.6
0.60.70.80.90.80.50.3
0.50.60.7
0.00.00.00.00.10.10.10.20.30.30.30.20.20.10.10.20.20.20.40.40.40.4
0.00.00.00.00.10.10.10.10.10.20.20.10.10.10.10.10.10.20.20.20.20.2
0.00.00.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.20.20.20.2
0.00.10.10.10.20.40.50.40.30.20.10.10.20.40.50.40.30.20.20.20.20.2
0.10.10.10.20.21.35.23.61.30.30.10.10.31.74.33.11.00.30.20.20.20.2
0.80.70.60.50.40.40.82.11.81.10.40.10.10.20.81.81.50.80.30.10.00.00.00.00.00.0
C
C
E
E
E
E
D
D
D
D
D D
DD D
DD
D DD
DDDD
DDD
D
D
D
D
D
D
D
D
D
D
BUILDING 241 UNIT34 UNDERGROUND STALLS3 STORIES
PROJECT TITLE
SHEET NUMBER
SHEET TITLE
ISSUED
PROJECT NO.©Knothe & Bruce Architects, LLC
Phone: 8401 Greenway Blvd., Suite 900608.836.3690 Middleton, WI 53562
SITE LIGHTINGPLAN
CA1021CA1021" = 20'-0"SITE LIGHTING PLAN1 INCH =
GRAPHIC SCALE0 (24X36 SHEET) FT2020 40 60
PERIMETER ROADDEVELOPMENT
101 PERIMETER RD.MT. HOREB, WI
2514
LUMINAIRE SCHEDULESYMBOLLABELQTY. FILECATALOGDESCRIPTIONMOUNTINGMANUF.
B6 LED POLE MOUNTLIGHT, 3000K, 80CRI,DARK BRONZE FINISHDSX0 LED P1 30KT4M MVOLT HSDSX0_LED_P1_30K_T4M_MVOLT_HS.ies14'-0" POLEON 2'-0"CONC. BASELITHONIALIGHTINGC7 LED 3" WAFERDOWNLIGHT, 3000K,MATTE BLACK FINISHWF3 LED 30KWF3_LED_30K.iesLITHONIALIGHTING 10'-0" ABOVEGRADE ONBUILDING
A2 LED WALLPACK,3000K, 80CRI, DARKBRONZE FINISHWDGE1 LED P130K MVOLTWDGE1 LED P030K 80CRI VF.ies10'-0" ABOVEGRADE ONBUILDINGLITHONIALIGHTING
LIGHT LEVEL STATISTICSDESCRIPTION SYMBOLAVG.MAX.MIN.MAX. / MIN.AVG. / MIN.
EXAMPLE LIGHT FIXTURE DISTRIBUTION
North Surface Parking & Drive Aislefcfcfc1.02.80.2:114.0:15.0
ISOLUX CONTOUR = 0.25 FCISOLUX CONTOUR = 0.5 FCISOLUX CONTOUR = 1.0 FCLIGHT FIXTURE
Underground Driveway Entrance - Building 1fcfcfc2.53.71.3:12.8 :11.9
South Surface Parking & Drive Aislefcfcfc0.92.30.2:111.5:14.5
2025.04.17 - NEIGHBORHOOD MEETING2025.05.23 - PLAN COMMISSION SUBMITTAL2025.11.17 - SIP SUBMITTAL2026.04.22 - SIP RESUBMITTAL
Underground Driveway Entrance - Building 2fcfcfc1.82.81.0:12.8 :11.8
D32 LED WALL SCONCE,3000K, 80CRI, BLACKFINISHB8907-TBKB8907-TBK.iesHUDSONVALLEY 7'-0" ABOVEGRADE ONBUILDINGE4 28" LED BOLLARD,2700K, 80CRI, BLACKFINISHEB82229-BK-UNVEB82229-BK-UNV.iesKUZCOLIGHTING 28" BOLLARDON FLUSHCONC. BASE
Page 38 of 127
lp16051189.64
E
BUILDING 149 UNIT47 UNDERGROUND STALLS3 STORIES
PERIMETER ROAD
T
T
LOT 2LOT 1
BUILDING 241 UNIT34 UNDERGROUND STALLS3 STORIES
PROJECT TITLE
SHEET NUMBER
SHEET TITLE
ISSUED
PROJECT NO.©Knothe & Bruce Architects, LLC
Phone: 8401 Greenway Blvd., Suite 900608.836.3690 Middleton, WI 53562
PERVIOUS/GREEN SPACE
CA1031CA1031" = 20'-0"PERVIOUS/GREEN SPACE
PERVIOUS AREA / GREEN SPACE
LOT 1LOT 2LOT AREA46,579 S.F.37,916 S.F.PROPOSED GREEN SPACE14,274 S.F. / 31%16,122 S.F. / 43%
1 INCH =
GRAPHIC SCALE0 (24X36 SHEET) FT2020 40 60
PERIMETER ROADDEVELOPMENT
101 PERIMETER RD.MT. HOREB, WI
2514
2025.04.17 - NEIGHBORHOOD MEETING2025.05.23 - PLAN COMMISSION SUBMITTAL2025.11.17 - SIP SUBMITTAL2026.04.22 - SIP RESUBMITTAL
Page 39 of 127
AC201.1 2
AC202.1
2
AC201.1
3
AC202.1
1
AC202.1 3
47 RESIDENTIAL ONLY VEHICLE PARKING STALLS
2 'EV CAPABLE' VEHICLE PARKING STALLS
19 FLOOR MOUNT BIKE RACKS
26 WALL MOUNT BIKE RACKS
72'-0"
72'-0"
75'-5 17/32"
192'-9 45/64"
141'-10 31/64"
18'-0" 24'-0" 18'-0"
18'-0"
24'-0"
18'-0"
8'-0"
TYP.
9'-0"
126'-4 3/4"
8'-0"
45 44 43 42 41 40 39 38 37 36 35 34 33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14 13 12 11 10 9 8 7 6 5 4 3 2 1
47
EV CAPABLE
46
EV CAPABLE
STAIR A
STAIR B
MECH.
TRASH
ELEV.
ST-28 ST-27 ST-26 ST-25 ST-24 ST-23 ST-22 ST-21 ST-20 ST-19 S T-18 ST-17
ST-16 ST-15 ST-14 ST-13 ST-12 ST-11 ST-10 ST-09 ST-08 ST-07 ST-06 ST-05 ST-04 ST-03 ST-02 ST-01
TYPICAL WALL MOUNT BIKE RACK
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1
BASEMENT FLOOR
PLAN
AC100.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
1/8" = 1'-0" AC100.1
1 BASEMENT FLOOR PLAN
Page 40 of 127
AC201.1 2
AC201.1
1
AC202.1
2
AC201.1
3
AC202.1
1
AC202.1 3
611 SF
STYLE F
#104
STUDIO
761 SF
STYLE B1
#105
ONE BEDROOM
1205 SF
STYLE D
#107
TWO BEDROOM
654 SF
STYLE E
#110
STUDIO
761 SF
STYLE B1
#112
ONE BEDROOM
777 SF
STYLE C1
#114
ONE BEDROOM
777 SF
STYLE C1
#116
ONE BEDROOM
763 SF
STYLE B1
#118
ONE BEDROOM
1156 SF
STYLE A1.1
#120
TWO BEDROOM
1166 SF
STYLE A1
#119
TWO BEDROOM
761 SF
STYLE B1
#117
ONE BEDROOM
777 SF
STYLE C1
#115
ONE BEDROOM
777 SF
STYLE C1
#113
ONE BEDROOM
761 SF
STYLE B1
#111
ONE BEDROOM
761 SF
STYLE B1
#109
ONE BEDROOM
STAIR B
ELEV.
MECH.
STAIR A
CAFÉ
MAIL
LOBBY
VESTIBULE
FITNESS
TOILET
MECH.
PARCEL
OFFICE
ST-29
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1 FIRST
FLOOR PLAN
AC101.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
1/8" = 1'-0" AC101.1
1 FIRST FLOOR PLAN
Page 41 of 127
AC201.1 2
AC201.1
1
AC202.1
2
AC201.1
3
AC202.1
1
AC202.1 3
617 SF
STYLE F
#204
STUDIO
761 SF
STYLE B (TYPE A)
#205
ONE BEDROOM
1205 SF
STYLE D
#207
TWO BEDROOM
654 SF
STYLE E
#210
STUDIO
761 SF
STYLE B
#212
ONE BEDROOM
777 SF
STYLE C
#214
ONE BEDROOM
777 SF
STYLE C
#216
ONE BEDROOM
763 SF
STYLE B
#218
ONE BEDROOM
1156 SF
STYLE A.1
#220
TWO BEDROOM
1166 SF
STYLE A
#219
TWO BEDROOM
761 SF
STYLE B
#217
ONE BEDROOM
777 SF
STYLE C
#215
ONE BEDROOM
777 SF
STYLE C
#213
ONE BEDROOM
761 SF
STYLE B
#211
ONE BEDROOM
761 SF
STYLE B
#209
ONE BEDROOM
STAIR B
ELEV.
MECH.
STAIR A
1156 SF
STYLE A.1
#202
TWO BEDROOM
1166 SF
STYLE A
#201
TWO BEDROOM
ST-30
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1
SECOND FLOOR
PLAN
AC102.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
1/8" = 1'-0" AC102.1
1 SECOND FLOOR PLAN
Page 42 of 127
AC201.1 2
AC201.1
1
AC202.1
2
AC201.1
3
AC202.1
1
AC202.1 3
611 SF
STYLE F
#304
STUDIO
906 SF
STYLE G
#305
ONE BEDROOM
1205 SF
STYLE D
#307
TWO BEDROOM
654 SF
STYLE E
#310
STUDIO
761 SF
STYLE B
#312
ONE BEDROOM
777 SF
STYLE C
#314
ONE BEDROOM
777 SF
STYLE C
#316
ONE BEDROOM
763 SF
STYLE B
#318
ONE BEDROOM
1156 SF
STYLE A.1
#320
TWO BEDROOM
1166 SF
STYLE A
#319
TWO BEDROOM
906 SF
STYLE G
#317
ONE BEDROOM
777 SF
STYLE C
#315
ONE BEDROOM
777 SF
STYLE C
#313
ONE BEDROOM
761 SF
STYLE B
#311
ONE BEDROOM
761 SF
STYLE B
#309
ONE BEDROOM
STAIR B
ELEV.
MECH.
1162 SF
STYLE A.1
#302
TWO BEDROOM
1166 SF
STYLE A
#301
TWO BEDROOM
ST-31
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1 THIRD
FLOOR PLAN
AC103.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
1/8" = 1'-0" AC103.1
1 THIRD FLOOR PLAN
Page 43 of 127
AC201.1 2
AC201.1
1
AC202.1
2
AC201.1
3
AC202.1
1
AC202.1 3
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1 ROOF
PLAN
AC104.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
1/8" = 1'-0" AC104.1
1 ROOF PLAN
Page 44 of 127
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
03 02 02 01
04
05
MID-SLOPE
39'-6"
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
08 05 09 01 03 02 03 04 06
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
BASEMENT
90' -8"
01 03 02 02
05 07
04
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1
EXTERIOR
ELEVATIONS
AC201.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 VERTICAL METAL SIDING CHAMCLAD 6" SHADOWLINE PANEL CINNAMON WALNUT
02 COMPOSITE LAP SIDING 6" EXPOSURE JAMES HARDIE AGED PEWTER
03 COMPOSITE PANEL JAMES HARDIE MIDNIGHT BLACK
04 WRAPPED COLUMN JAMES HARDIE MIDNIGHT BLACK
05 STONE VENEER HALQUIST "KENSINGTON FULL COLOR" BLEND
06 CAST STONE BANDS & SILLS BIG RIVER SMOOTH 14-31
07 RAILINGS & HANDRAILS SUPERIOR BLACK
08 ASPHALT SHINGLES CERTAINTEED CINDER BLACK
09 COMPOSITE WINDOWS ANDERSEN BLACK EXTERIOR / WHITE I NTERIOR
1/8" = 1'-0" AC201.1
2 SOUTH ELEVATION
1/8" = 1'-0" AC201.1
1 EAST ELEVATION
1/8" = 1'-0" AC201.1
3 NORTHEAST ELEVATION
Page 45 of 127
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
BASEMENT
90' -8"
07
01 03 02 02
04
05 06
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
BASEMENT
90' -8"
01 08 03 02
05
04
07 FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
01 03 09
05
02 02
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1
EXTERIOR
ELEVATIONS
AC202.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
1/8" = 1'-0" AC202.1
1 SOUTHWEST ELEVATION ALONG PERIMETER RD.
1/8" = 1'-0" AC202.1
3 NORTHWEST ELEVATION
1/8" = 1'-0" AC202.1
2 NORTH ELEVATION
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 VERTICAL METAL SIDING CHAMCLAD 6" SHADOWLINE PANEL CINNAMON WALNUT
02 COMPOSITE LAP SIDING 6" EXPOSURE JAMES HARDIE AGED PEWTER
03 COMPOSITE PANEL JAMES HARDIE MIDNIGHT BLACK
04 WRAPPED COLUMN JAMES HARDIE MIDNIGHT BLACK
05 STONE VENEER HALQUIST "KENSINGTON FULL COLOR" BLEND
06 CAST STONE BANDS & SILLS BIG RIVER SMOOTH 14-31
07 RAILINGS & HANDRAILS SUPERIOR BLACK
08 ASPHALT SHINGLES CERTAINTEED CINDER BLACK
09 COMPOSITE WINDOWS ANDERSEN BLACK EXTERIOR / WHITE I NTERIOR
Page 46 of 127
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
03 02 02 01
05
04
MID-SLOPE
39'-6"
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
BASEMENT
90' -8"
01 03 02 02
05
04
07
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
08 05 09 01 03 02 03 04 06
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1
EXTERIOR
ELEVATIONS
COLORED
AC203.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 VERTICAL METAL SIDING CHAMCLAD 6" SHADOWLINE PANEL CINNAMON WALNUT
02 COMPOSITE LAP SIDING 6" EXPOSURE JAMES HARDIE AGED PEWTER
03 COMPOSITE PANEL JAMES HARDIE MIDNIGHT BLACK
04 WRAPPED COLUMN JAMES HARDIE MIDNIGHT BLACK
05 STONE VENEER HALQUIST "KENSINGTON FULL COLOR" BLEND
06 CAST STONE BANDS & SILLS BIG RIVER SMOOTH 14-31
07 RAILINGS & HANDRAILS SUPERIOR BLACK
08 ASPHALT SHINGLES CERTAINTEED CINDER BLACK
09 COMPOSITE WINDOWS ANDERSEN BLACK EXTERIOR / WHITE I NTERIOR
1/8" = 1'-0" AC203.1
2 SOUTH ELEVATION
1/8" = 1'-0" AC203.1
3 NORTHEAST ELEVATION
1/8" = 1'-0" AC203.1
1 EAST ELEVATION
Page 47 of 127
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
BASEMENT
90' -8"
01 03 02 02
04
05 06 07
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
BASEMENT
90' -8"
01 08 03 02
05
04
07 FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
2025.05.23 PC SUBMITTAL
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.1
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #1
EXTERIOR
ELEVATIONS
COLORED
AC204.1
2514
2025.11.17 SIP SUBMITTAL
2026.04.22 SIP RESUBMITTAL
1/8" = 1'-0" AC204.1
1 ELEVATION - SOUTHWEST
1/8" = 1'-0" AC204.1
3 ELEVATION - NORTHWEST
1/8" = 1'-0" AC204.1
2 ELEVATION - NORTH
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 VERTICAL METAL SIDING CHAMCLAD 6" SHADOWLINE PANEL CINNAMON WALNUT
02 COMPOSITE LAP SIDING 6" EXPOSURE JAMES HARDIE AGED PEWTER
03 COMPOSITE PANEL JAMES HARDIE MIDNIGHT BLACK
04 WRAPPED COLUMN JAMES HARDIE MIDNIGHT BLACK
05 STONE VENEER HALQUIST "KENSINGTON FULL COLOR" BLEND
06 CAST STONE BANDS & SILLS BIG RIVER SMOOTH 14-31
07 RAILINGS & HANDRAILS SUPERIOR BLACK
08 ASPHALT SHINGLES CERTAINTEED CINDER BLACK
09 COMPOSITE WINDOWS ANDERSEN BLACK EXTERIOR / WHITE I NTERIOR
Page 48 of 127
FD FD FD FD FD FD FD
FD
FD
FD
UP
UP
DN
-
-
-
-
MECH.
TRASH
RECYCLE
STAIR B
STAIR A
ELEV.
34 RESIDENTIAL ONLY VEHICLE PARKING STALLS
2 'EV CAPABLE' VEHICLE PARKING STALLS
17 WALL MOUNT BIKE STALLS
9'-0" TYP. 8'-0" 8'-0"
AC203.2
1
AC203.2 2
AC204.2
1
AC204.2 2
18'-0" TYP. 24'-0" 18'-0" TYP.
3 5 6 7 8 9
1
EV
CAPABLE
2
EV
CAPABLE
4 10 11 12 13 14 15 16 17 18
19 20 21 23 22 24 25 26 27 28 29 30 31 32 33 34
ST -29 ST -28 ST -27 ST -26 ST -25 ST -24 ST -23 ST -22 ST -21 ST -20 ST -19 ST -18 ST -17 ST -16 ST -15 ST -14 ST -13 ST -12 ST -11 ST -10 ST -09 ST -08 ST -07 ST -03
ST -02
ST -01
ST -30
ST -31
ST -32
ST -33
ST -34 ST -35
ST -36
ST -37
ST -38
ST -06 ST -05 ST -04
15'-0" 203'-0"
2'-0" 67'-0" 2'-0"
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2
BASEMENT FLOOR
PLAN
AC100.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
1/8" = 1'-0" AC100.2
1 BASEMENT FLOOR PLAN
Page 49 of 127
DN DN
-
-
-
-
STAIR
MECH. STORAGE
STAIR
LOBBY
VESTIBULE
TOILET
MECH.
MAIL
ELEV.
TRASH
AC203.2
1
AC203.2 2
AC204.2
1
AC204.2 2
1056 SF
STYLE B
#114
TWO BEDROOM
693 SF
STYLE D
#112
ONE BEDROOM
737 SF
STYLE E1
#110
ONE BEDROOM
692 SF
STYLE D
#108
ONE BEDROOM
715 SF
STYLE E
#106
ONE BEDROOM
936 SF
STYLE J
#104
TWO BEDROOM
714 SF
STYLE E
#103
ONE BEDROOM
712 SF
STYLE F1
#105
ONE BEDROOM
876 SF
STYLE H
#107
TWO BEDROOM
874 SF
STYLE G
#111
TWO BEDROOM
690 SF
STYLE F
#113
ONE BEDROOM
1076 SF
STYLE C
#115
TWO BEDROOM
798 SF
STYLE L
#102
ONE BEDROOM
OFFICE
PARCEL
COMMUNITY
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2 FIRST
FLOOR PLAN
AC101.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
1/8" = 1'-0" AC101.2
1 FIRST FLOOR PLAN
Page 50 of 127
AC202.2
1
AC202.2 2
AC201.2
1
AC201.2 2
-
-
-
-
-
-
-
-
AC203.2
1
AC203.2 2
AC204.2
1
AC204.2 2
STAIR
MECH. STORAGE
STAIR
ELEV.
TRASH
1056 SF
STYLE B
#214
TWO BEDROOM
693 SF
STYLE D
#212
ONE BEDROOM
737 SF
STYLE E1
#210
ONE BEDROOM
692 SF
STYLE D
#208
ONE BEDROOM
715 SF
STYLE E (TYPE A)
#206
ONE BEDROOM
935 SF
STYLE J
#204
TWO BEDROOM
714 SF
STYLE E
#203
ONE BEDROOM
712 SF
STYLE F1
#205
ONE BEDROOM
876 SF
STYLE H
#207
TWO BEDROOM
874 SF
STYLE G (TYPE A)
#211
TWO BEDROOM
689 SF
STYLE F
#213
ONE BEDROOM
1076 SF
STYLE C
#215
TWO BEDROOM
1069 SF
STYLE A
#202
TWO BEDROOM
1068 SF
STYLE A
#201
TWO BEDROOM
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2
SECOND FLOOR
PLAN
AC102.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
1/8" = 1'-0" AC102.2
1 SECOND FLOOR PLAN
Page 51 of 127
AC202.2
1
AC202.2 2
AC201.2
1
AC201.2 2
-
-
-
-
-
-
-
-
AC203.2
1
AC203.2 2
AC204.2
1
AC204.2 2
STAIR
MECH. STORAGE
STAIR
ELEV.
TRASH
1056 SF
STYLE B
#314
TWO BEDROOM
693 SF
STYLE D
#312
ONE BEDROOM
715 SF
STYLE E
#310
ONE BEDROOM
692 SF
STYLE D
#308
ONE BEDROOM
715 SF
STYLE E (TYPE A)
#306
ONE BEDROOM
913 SF
STYLE J
#304
TWO BEDROOM
847 SF
STYLE K
#303
ONE BEDROOM + DEN
690 SF
STYLE F
#305
ONE BEDROOM
876 SF
STYLE H
#307
TWO BEDROOM
852 SF
STYLE G
#311
TWO BEDROOM
828 SF
STYLE K1
#313
ONE BEDROOM + DEN
1076 SF
STYLE C
#315
TWO BEDROOM
1069 SF
STYLE A
#302
TWO BEDROOM
1068 SF
STYLE A
#301
TWO BEDROOM
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2 THIRD
FLOOR PLAN
AC103.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
1/8" = 1'-0" AC103.2
1 THIRD FLOOR PLAN
Page 52 of 127
AC202.2
1
AC202.2 2
AC201.2
1
AC201.2 2
-
-
-
-
-
-
-
-
AC203.2
1
AC203.2 2
AC204.2
1
AC204.2 2
N
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2 ROOF
PLAN
AC104.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
1/8" = 1'-0" AC104.2
1 ROOF PLAN
Page 53 of 127
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
11 01 04 02 01 03 08 10 04 02 04 05 01 03 12 02 01 01 04
MID-SLOPE
39'-0"
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
11 01 01 02 02 01 06
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2
EXTERIOR
ELEVATIONS
AC201.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 COMPOSITE LAP SIDING 6" JAMES HARDIE NIGHT GRAY
02 COMPOSITE LAP SIDING 6" JAMES HARDIE - WOODTONE ROS EWOOD - RUSTIC SERIES
03 COMPOSITE PANEL JAMES HARDIE MIDNIGHT BLACK
04 COMPOSITE LAP SIDING 6" JAMES HARDIE AGED PEWTER
05 COMPOSITE TRIM JAMES HARDIE MATCH ADJACENT MATERIAL
06 STONE VENEER HALQUIST KENSINGTON FULL COLOR BLEND
07 CAST STONE BANDS & SILLS BIG RIVER SMOOTH 14-31
08 RAILINGS & HANDRAILS SUPERIOR BLACK
09 ALUMINIUM STOREFRONT KAWNEER BLACK
10 COMPOSITE WINDOWS LINDSAY OR CONTOUR BLACK
11 ASHPALT SHINGLES CERTAINTEED CINDER BLACK
12 STANDING SEAM METAL ROOF TBD GRAY
1/8" = 1'-0" AC201.2
1 WEST ELEVATION
1/8" = 1'-0" AC201.2
2 NORTH ELEVATION
Page 54 of 127
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
11 02 01 04 02 01 04 02 01 04 07 06 03 12 08
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
11 02 01
06
07
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2
EXTERIOR
ELEVATIONS
AC202.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 COMPOSITE LAP SIDING 6" JAMES HARDIE NIGHT GRAY
02 COMPOSITE LAP SIDING 6" JAMES HARDIE - WOODTONE ROS EWOOD - RUSTIC SERIES
03 COMPOSITE PANEL JAMES HARDIE MIDNIGHT BLACK
04 COMPOSITE LAP SIDING 6" JAMES HARDIE AGED PEWTER
05 COMPOSITE TRIM JAMES HARDIE MATCH ADJACENT MATERIAL
06 STONE VENEER HALQUIST KENSINGTON FULL COLOR BLEND
07 CAST STONE BANDS & SILLS BIG RIVER SMOOTH 14-31
08 RAILINGS & HANDRAILS SUPERIOR BLACK
09 ALUMINIUM STOREFRONT KAWNEER BLACK
10 COMPOSITE WINDOWS LINDSAY OR CONTOUR BLACK
11 ASHPALT SHINGLES CERTAINTEED CINDER BLACK
12 STANDING SEAM METAL ROOF TBD GRAY
1/8" = 1'-0" AC202.2
1 ELEVATION - EAST
1/8" = 1'-0" AC202.2
2 ELEVATION - SOUTH
Page 55 of 127
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
11 01 04 02 01 03 08 10 04 02 04 05 01 03 12 02 01 01 04
MID-SLOPE
39'-0"
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
11 01 01 02 02 01 06
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2
EXTERIOR
ELEVATIONS
COLORED
AC203.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 COMPOSITE LAP SIDING 6" JAMES HARDIE NIGHT GRAY
02 COMPOSITE LAP SIDING 6" JAMES HARDIE - WOODTONE ROS EWOOD - RUSTIC SERIES
03 COMPOSITE PANEL JAMES HARDIE MIDNIGHT BLACK
04 COMPOSITE LAP SIDING 6" JAMES HARDIE AGED PEWTER
05 COMPOSITE TRIM JAMES HARDIE MATCH ADJACENT MATERIAL
06 STONE VENEER HALQUIST KENSINGTON FULL COLOR BLEND
07 CAST STONE BANDS & SILLS BIG RIVER SMOOTH 14-31
08 RAILINGS & HANDRAILS SUPERIOR BLACK
09 ALUMINIUM STOREFRONT KAWNEER BLACK
10 COMPOSITE WINDOWS LINDSAY OR CONTOUR BLACK
11 ASHPALT SHINGLES CERTAINTEED CINDER BLACK
12 STANDING SEAM METAL ROOF TBD GRAY
1/8" = 1'-0" AC203.2
1 WEST ELEVATION
1/8" = 1'-0" AC203.2
2 NORTH ELEVATION
Page 56 of 127
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
11 02 01 04 02 01 04 02 01 04 07 06 03 12 08
FIRST FLOOR
100' -0"
SECOND FLOOR
111' -1 7/8"
THIRD FLOOR
122' -3 3/4"
11 02 01
06
07
© Knothe & Bruce Architects, LLC
PROJECT NUMBER
SHEET NUMBER
SHEET TITLE
PROJECT
ISSUED FOR
KEY PLAN
2025.04.17 - NEIGHBORHOOD MEETING
PERIMETER ROAD
DEVELOPMENT BUILDING
NO.2
101 PERIMETER RD. MT.
HOREB, WI
BUILDING #2
EXTERIOR
ELEVATIONS
COLORED
AC204.2
2514
2025.05.23 - PLAN COM. SUBMITTAL
2025.11.17 - SIP SUBMITTAL
2026.03.23 - WHEDA REVIEW
2026.04.22 - SIP RESUBMITTAL
EXTERIOR MATERIAL SCHEDULE
MARK BUILDING ELEMENT MANUFACTURER COLOR
01 COMPOSITE LAP SIDING 6" JAMES HARDIE NIGHT GRAY
02 COMPOSITE LAP SIDING 6" JAMES HARDIE - WOODTONE ROS EWOOD - RUSTIC SERIES
03 COMPOSITE PANEL JAMES HARDIE MIDNIGHT BLACK
04 COMPOSITE LAP SIDING 6" JAMES HARDIE AGED PEWTER
05 COMPOSITE TRIM JAMES HARDIE MATCH ADJACENT MATERIAL
06 STONE VENEER HALQUIST KENSINGTON FULL COLOR BLEND
07 CAST STONE BANDS & SILLS BIG RIVER SMOOTH 14-31
08 RAILINGS & HANDRAILS SUPERIOR BLACK
09 ALUMINIUM STOREFRONT KAWNEER BLACK
10 COMPOSITE WINDOWS LINDSAY OR CONTOUR BLACK
11 ASHPALT SHINGLES CERTAINTEED CINDER BLACK
12 STANDING SEAM METAL ROOF TBD GRAY
1/8" = 1'-0" AC204.2
1 EAST ELEVATION
1/8" = 1'-0" AC204.2
2 SOUTH ELEVATION
Page 57 of 127
4. Grading and Stormwater Management Plan
The following engineering exhibits address all grading and stormwater requirements.
Page 58 of 127
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
E
STMSTM
STM
STM
STMSTM
STM
STM
STM
STM
101 PERIMETER ROADTAX PARCEL NO. 157/0606-124-0065-1
EXISTING ASPHALT PARKING LOT
CONC.PAD
CONC. PAD
YARD PUMP
STMSTMSTMSTMSTM
R10.0'R5.0'R24.0'R28.0'R10.0'
R30.0'
R2.5' TYP.
R2.5' TYP.
20.0'
24.0'22.0'
18.0'
24.0'
18.0'
6.0'
7.6' 7.5'
18.0'
24.0'
18.0'
4.3'5.0'
3.3'
6.0'
29.17'
15.75'
1.00'
1.00'10.87'
17.0'
5.0'
6.0'
24.54'
6.0'8.0'8.0'6.0'6.0'
24.0'
20.0'
108.0' - 12 STANDARD STALLS
108.0' - 12 STANDARD STALLS
54.0' - 6STANDARD STALLS72.0' - 8 STANDARD STALLS20.0'
9.0'
9.0'
12.26'
15.06'
10.79'
10.75'
24.54'
6.87'6.87'
12.76'
6.0'
KLEIN PERIMETER ROADVILLAGE OF MT. HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C100
SITE INFORMATION BLOCK:SITE ADDRESS: PERIMETER ROADUSE OF PROPERTY: MULTI FAMILY RESIDENTIALZONING: PD (PLANNED DEVELOPMENT)LOT 1LOT 2SITE ACREAGE:46,660 SQ.FT. (1.07 AC)38,651 SQ.FT. (0.89 AC)SETBACKS:FRONT YARD: 10-FEET6-FEETREAR YARD: 10-FEET10-FEETBELOW GRADE: 0.5-FOOT- SIDE YARD: 10-FEET10-FEETNUMBER OF UNITS:4940 TOTAL NUMBER OF PARKING STALLS: 122UNDERGROUND:4735 SURFACE:40NUMBER OF SURFACE STALLS DESIGNATED ACCESSIBLE: 2TOTAL NUMBER OF EXTERIOR BIKE STALLS: 4EXISTING IMPERVIOUS SURFACE AREA: 57,918 SQ.FT.ROOFTOP: 19,918 SQ.FT.PAVED: 38,000 SQ.FT.NEW IMPERVIOUS SURFACE AREA: 55,312 SQ.FT.LOT 1: 33,998 SQ.FT. (32,560 SQ.FT. NOT INCLUDING GREEN ROOF)ROOFTOP: 19,758 SQ.FT. (19,320 SQ.FT. NOT INCLUDING GREEN ROOF)AT FIRST FLOOR: 17,202 SQ.FT.DECKS: 1,041 SQ.FT.BELOW GRADE PARKING: 1,077 SQ.FT.GREEN ROOF: 438 SQ.FT.PAVED DRIVEWAY / PARKING: 10,704 SQ.FT.SIDEWALK / STOOPS / PADS: 2,536 SQ.FT.LOT 2: 21,314 SQ.FT.ROOFTOP: 14,939 SQ.FT.AT FIRST FLOOR: 14,184 SQ.FT.DECKS: 755 SQ.FT.PAVED DRIVEWAY / PARKING: 5,246 SQ.FT.SIDEWALK / STOOPS / PADS: 1,129 SQ.FT.PERCENT IMPERVIOUS ON THE LOTS: 64.8%LOT 1: 72.9%LOT 2: 55.1%DISTURBANCE LIMITS: 82,000 SQ. FT.
GENERAL NOTES
LEGEND (PROPOSED)
PROPOSEDBUILDING 117,223 SQ.FT. AT FIRSTFLOOR LEVEL
PERIMETER ROAD
STORMWATERMANAGEMENT
20' WIDE COMMERCIALENTRANCE WITH 5' WIDE FLAIRSPER THE VILLAGE OF MOUNTHOREB REQUIREMENTS.
SIDEWALK TO BE FLUSHFROM EAST CURB TO WESTSIDE OF SHARED ACCESSSTRIPING. INSTALLDETECTABLE WARNING FIELDAT SHARED ACCESS ISLE.
STOP SIGN
ADA ROUTE TO PUBLICSIDEWALK.
PROPOSED TRANSFORMERPAD LOCATION
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF FEBRUARY 26, 2025. WYSER ENGINEERINGSHALL NOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS ARESULT OF ERRONEOUS OR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TOCONFIRM ALL ELEVATIONS, GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TOCONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THEBENCHMARKS SHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION.CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHINTHE VILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BYTHE OWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULTIN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALLBE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THATCLARIFICATION OR REDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLICEASEMENTS SHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARDSPECIFICATIONS.
PROPOSED PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINT18" CURB AND GUTTER18" REJECT CURB AND GUTTER18" CURB AND GUTTER FLUSH WITH PAVEMENTASPHALT PAVEMENTCONCRETE PAVEMENTSTORMWATER TREATMENT FACILITY
PROPOSEDBUILDING 214,184 SQ.FT. AT FIRSTFLOOR LEVEL
14 SHAREDPARKING STALLS
26 SHAREDPARKING STALLS
PROPOSED LOT 1PROPOSED LOT 2
PROPOSED TRANSFORMERPAD LOCATION
LIGHT POLELOCATION, TYP.
SITE RETAINING WALL
SITE AMENITY SPACE.CONCEPT LAYOUTFOR REFERENCEONLY.
SITE RETAINING WALL
SITE RETAININGWALL. INSTALLSAFETY RAILING ATTOP OF WALL.
EXISTING EXTERIORLOT TEMPORARYSAFETY CHAIN LINKFENCING.
NEW PUBLIC SIDEWALK
SHARED ACCESS ANDPARKING EASEMENT
SHARED ACCESS ANDPARKING EASEMENT
TWO ADA VAN ACCESS ABLESTALLS. 8'X18' WITH SHARED8'X18' ACCESS ISLE. INSTALLADA VAN STALL SIGNS ONTHE NORTH SIDE OF THESIDEWALK.
24' WIDE COMMERCIALENTRANCE WITH 5' WIDE FLAIRSPER THE VILLAGE OF MOUNTHOREB REQUIREMENTS.
STOP SIGN
STORMWATERMANAGEMENT
CURB WALL. SEE DETAIL
SITE RETAINING WALL.
Page 59 of 127
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
1206
1208
11941196
1198
1190
1192
1202
12041206
1208
1206
1208
1210
1212
1214
1216
1196
1198
1200
1202
1204
1206
119011921194
11981200
11941196
12021204
11921192
1192
1202
12041206
1202 1192
1202
1192
1196
1200
1202
1210120812061204
1202
GM
E
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
WATWATWATWATWATWATWATWATWATWATWATWAT
WATWAT
WATSANSANSAN
GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
GAS
GAS
GASGASGASGASGASGAS
STM
STM
STMSTM
STM
STM
STMSTM
STM
STM
1,754 SQFT 2-STORYMASONRY BUILDING
101 PERIMETER ROADTAX PARCEL NO. 157/0606-124-0065-1
BREEZEWAY
DOUBLE DOORFFE = 1192.78'
CHIMNEY = 1218.21'
CHIMNEY = 1218.12'
FFE = 1192.16'CHIMNEY = 1215.70'ROOF PEAK = 1209.81'2-STORYMASONRY BUILDING
CONCRETEPATIO
157.0'
45.0'
54.5'
163.0'
43.0' 9.5'8.5' 157.5'
31.0'
52.3'29.6' 36.0'
5.0'22.7'
EXISTING ASPHALT PARKING LOT
BRICKPAVERS
CONC.PAD
CONC. PAD
WATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWAT
Fo
Fo
FoFo
18,163 SQFT1-STORYMASONRY BUILDING
FFE = 1202.66'ROOF PEAK = 1213.46'51.0'
YARD PUMP
STMSTMSTM
STM
STM
STM
KLEIN PERIMETER ROADVILLAGE OF MT. HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C101
GENERAL NOTES
LEGEND (PROPOSED)
1.THIS PLAN INDICATES ITEMS ON THE SITE, NOT INCLUDING INTERNAL BUILDING DEMOLITION, INTENDEDFOR DEMOLITION BASED ON THE CURRENT SITE DESIGN THAT HAVE BEEN IDENTIFIED BY A REASONABLEOBSERVATION OF THE EXISTING CONDITIONS THROUGH FIELD SURVEY RECONNAISSANCE (BY OTHERS),"DIGGER'S HOTLINE" LOCATION, AND GENERAL "STANDARD OF CARE". THERE MAY BE ADDITIONAL ITEMSTHAT CAN NOT BE IDENTIFIED BY A REASONABLE ABOVE GROUND OBSERVATION, WHERE NOT INCLUDEDWITHIN THE FIELD SURVEY, OF WHICH THE ENGINEER WOULD HAVE NO KNOWLEDGE OR MAY BE A PARTOF ANOTHER DESIGN DISCIPLINE. IT IS THE CONTRACTOR'S / BIDDER'S RESPONSIBILITY TO REVIEW THEPLANS, INSPECT THE SITE AND PROVIDE HIS OWN DUE DILIGENCE TO INCLUDE IN HIS BID WHATADDITIONAL ITEMS, IN HIS OPINION, MAY BE NECESSARY FOR DEMOLITION. ANY ADDITIONAL ITEMSIDENTIFIED BY THE CONTRACTOR / BIDDER SHALL BE IDENTIFIED IN THE BID AND REPORTED TO THEOWNER AND ENGINEER OF RECORD. WYSER ENGINEERING TAKES NO RESPONSIBILITY FOR ITEMS ON THEPROPERTY THAT COULD NOT BE LOCATED BY A REASONABLE OBSERVATION OF THE PROPERTY OR OFWHICH THEY WOULD HAVE NO KNOWLEDGE.2.PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR:2.1.EXAMINING ALL SITE CONDITIONS RELATIVE TO THE CONDITIONS INDICATED ON THE ENGINEERINGDRAWINGS. ANY DISCREPANCIES ARE TO BE REPORTED TO THE OWNER AND ENGINEER AND RESOLVEDPRIOR TO THE START OF CONSTRUCTION.2.2.VERIFYING UTILITY ELEVATIONS AND NOTIFYING OWNER AND ENGINEER OR ANY DISCREPANCIES. NOWORK SHALL BE PERFORMED UNTIL THE DISCREPANCIES ARE RESOLVED.2.3.NOTIFYING ALL UTILITIES PRIOR TO THE REMOVAL OF ANY UNDERGROUND UTILITIES.2.4.NOTIFYING THE OWNER, DESIGN ENGINEER AND LOCAL CONTROLLING MUNICIPALITY 48 HOURS PRIORTO THE START OF CONSTRUCTION TO ARRANGE FOR APPROPRIATE CONSTRUCTION INSPECTION.3.CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY DURING THE CONSTRUCTION OF THESEIMPROVEMENTS.4.CONTRACTOR SHALL KEEP ALL STREETS AND ADJOINING SHARED ACCESS ROADWAYS FREE AND CLEAROF ALL CONSTRUCTION RELATED DIRT, DUST AND DEBRIS.5.ALL TREES WITHIN THE CONSTRUCTION LIMITS SHALL BE REMOVED UNLESS SPECIFICALLY CALLED OUTFOR PROTECTION. ALL TREES TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY. STUMPS SHALLBE GROUND TO PROPOSED SUBGRADE.6.PERFORM TREE PRUNING IN ALL LOCATIONS WHERE PROPOSED PAVEMENT AND / OR UTILITYINSTALLATION ENCROACH WITHIN THE EXISTING DRIP LINE OF THE TREES TO REMAIN. ALL TRENCHINGWITHIN THE EXISTING DRIP LINE OF THE TREES TO REMAIN SHALL BE DONE RADIALLY AWAY FROM THETRUNK IF ROOTS IN EXCESS OF 1" DIAMETER ARE EXPOSED. ROOTS MUST BE CUT BY REPUTABLE TREEPRUNING SERVICE PRIOR TO ANY TRANSVERSE TRENCHING.7.ALL LIGHT POLES TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY, INCLUDING BASE AND ALLAPPURTENANCES. SALVAGE FOR RELOCATION. COORDINATE RELOCATION AND / OR ABANDONMENT OFALL ELECTRIC LINES WITH ELECTRICAL ENGINEER AND OWNER PRIOR TO DEMOLITION.8.CONTRACTOR SHALL COORDINATE PRIVATE UTILITY REMOVAL / ABANDONMENT AND NECESSARYRELOCATIONS WITH RESPECTIVE UTILITY COMPANY. COORDINATION REQUIRED PRIOR TOCONSTRUCTION.9.ABANDONED / REMOVED ITEMS SHALL BE DISPOSED OF OFF SITE UNLESS OTHERWISE NOTED.10.THE CONTRACTOR SHALL INSTALL A PEDESTRIAN FENCE AROUND ALL EXCAVATIONS TO BE LEFT OPENOVERNIGHT AS REQUIRED.11.CONTRACTOR TO REMOVE EXISTING UTILITY PIPE AND BACKFILL WITH SELECT FILL OR PROVIDE PIPEBACK-FILLING WITHIN BUILDING FOOTPRINT USING "LOW DENSITY CONCRETE / FLOWABLE FILL".12.GRANULAR BACKFILL MATERIALS ARE REQUIRED FOR FILL UNDER PROPOSED PAVED AREAS.13.RESTORATION OF THE EXISTING RIGHT-OF-WAYS AS NEEDED ARE CONSIDERED INCIDENTAL AND SHOULDBE PART OF THE COST OF THE UNDERGROUND IMPROVEMENTS, DEMOLITION AND REMOVAL. THISINCLUDES, BUT IS NOT LIMITED TO, CURB & GUTTER, SIDEWALK, TOPSOIL, SEEDING AND MULCHING.14.ANY SANITARY SEWER, SANITARY SEWER SERVICES, WATER MAIN, WATER SERVICES, STORM SEWER, OROTHER UTILITIES, WHICH ARE DAMAGED BY THE CONTRACTORS, SHALL BE REPAIRED TO THE OWNER'SSATISFACTION AT THE CONTRACTOR'S EXPENSE.
DEMOLITION NOTES
SUBJECT PARCEL PROPERTY LINECONSTRUCTION LIMIT LINECONSTRUCTION FENCENEW BUILDING (FOR REFERENCE)SAWCUT LIMITSASPHALT ONLY REMOVAL AREAFULL SECTION ASPHALT REMOVAL AREACONCRETE REMOVAL AREACURB AND GUTTER REMOVALRETAINING WALL REMOVAL AREAUTILITY REMOVALTREE REMOVAL
REMOVE EXISTING CURB FORPROPOSED ENTRY. SAWCUTASPHALT 2' BEYOND CURB IN ACEALN STRAIGHT LINE
CHAINLINK FENCE TO BEREMOVED OR USED FORPERIMETER BUILDINGCONSTRUCTION FENCE.
BUILDING WATER SERVICE ANDSHUTOFF VALVE. REMOVEWATER FROM SHUTOFF TO THEBUILDING. INTERNAL LOTROUTING UNKNOWN.
PROPOSED BUILDINGFOR REFERENCE
XXX
PROPOSED BUILDINGFOR REFERENCE
REMOVE LIGHT POLE ANDBASE, TYPICAL TO ALL ONSITE. ELECTRICAL ROUTINGUNKNOWN. PROJECT LIMITS. SAWCUTSIDEWALK AT THE NEARESTJOINT.
REMOVE RETAINING WALL
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF FEBRUARY 26, 2025. WYSER ENGINEERING SHALLNOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS A RESULT OFERRONEOUS OR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TO CONFIRM ALLELEVATIONS, GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TO CONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THE BENCHMARKSSHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. CONTRACTOR ASSUMESRISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHIN THEVILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BY THEOWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULT INDISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALL BEBROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THAT CLARIFICATION ORREDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLIC EASEMENTS SHALLBE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARD SPECIFICATIONS.
BUILDING SEWER SERVICE. CAPAND REMOVE FROMRIGHT-OF-WAY LIMITS. INTERNALLOT ROUTING UNKNOWN.REMOVE INLET AND STORM PIPETO PROPOSED STORMCONNECTION POINT.
SLOPING CONCRETE WALL TOBE REMOVED.
REMOVE RETAINING WALL
REMOVE EXISTING CURB FORPROPOSED ENTRY. SAWCUTASPHALT 2' BEYOND CURB IN ACEALN STRAIGHT LINE
PATCH STREET AS REQUIREDFOR NEW PRIVATE SEWER ANDWATER SERVICE CONNECTIONSINTO PUBLIC MAINS. NOTE:WATER LOCATION SHOWN INTWO LOCATIONS BASED ON TWOTWO FIELD MARKINGS ONDIFFERENT DATES. ACTUALLOCATION UNKNOWN. MAYAFFECT LIMITS OF ROADWAYCUT.
XXXXXXXXXXXX
XXXXXXXXXXXXXXXXXX
Page 60 of 127
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
12051206120712081209
1193
11941195119611971198
11891190
1191
1191
1192
1205
1202120312041205120612071208
1209
12061207120812091210121112121213121412151216
119511961197119811991200120112021203120412051206
11901191119211931194
1198119912001201
1194119511961197
1201120212031204
11921192
11921193
1202
12031204120512061207
1202 1192
1202
1189
1192
1193
1193
11951196119711991200
1202
1210120812061204
1202
E
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
WATWATWATWATWATWATWATWATWATWATWATWAT WATSANSANSAN
GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS STM
STM
STMSTM
STM
STM
STMSTM
STM
STM
101 PERIMETER ROADTAX PARCEL NO. 157/0606-124-0065-1
EXISTING ASPHALT PARKING LOT
CONC.PAD
CONC. PAD1209.03
1209.26
1209.33
1209.451209.48
1209.63
1209.75
1210.03
1205.10
1207.28
1209.141208.491209.291209.561211.31
1211.881212.351212.891213.12
1211.361210.24
1212.431214.541215.641216.88
1215.88
1213.701209.50
1210.16
1210.571209.651209.681209.31
1208.751208.851213.62
1214.681214.311213.931213.451212.931212.931212.381210.551209.351208.871209.09
1205.96
1204.741203.021203.121202.94
1203.131202.95
1202.94
1202.60
1202.66 1202.511202.47
1202.491202.411202.341202.271201.741202.23
1202.11
1201.921201.45
1202.551201.321202.111202.361202.321202.301202.311202.45
1202.441202.461202.45
1202.021201.781201.62
1201.41
1201.63
1201.581201.501201.48
1201.88
1202.38
1202.36
1202.33
1202.341202.28
1201.92
1201.731203.38
1203.381204.661204.571205.341205.39
1205.69
1205.681206.58
1207.121207.071206.66
1207.87
1209.14
1210.31
1212.00
1213.72
1214.80
1202.59
1202.60
1202.53
1202.56
1202.44
1202.33
1202.25
1202.28
1202.89
1204.881205.77
1193.87
1193.381193.861193.851194.401193.90
1201.53
1201.38
1201.581202.25
1200.94
1196.78
1196.731195.45
1195.471194.00
1193.931193.511192.451192.62
1191.651191.021191.381190.971189.961190.321189.071188.941188.671190.39
1188.57
1188.06
1188.19
1188.44
1190.85
1190.62
1190.13
1190.44
1191.061190.68
1191.771192.23
1191.42
1191.311191.521191.731191.811191.89
1192.00
1191.981192.46
1192.47
1192.38
1192.54
1192.84
1193.42
1192.10
1192.02
1192.12
1193.99
1190.88
1191.61
1191.21
1192.521192.501192.531192.001191.701191.701192.101192.471192.461192.511192.58
1192.581192.37
1191.941191.681191.291191.261191.581191.851191.961192.091192.181192.101192.061192.00
1192.391192.36
1192.141191.841191.26
1191.551191.88
1191.991192.07
1190.74
1191.511191.711190.851190.54
1193.051194.17
1188.89
1192.51
1192.71
1192.751194.58
1193.391194.56
1197.12
1199.601200.121199.06
1193.86
1192.28
1194.59
1197.21
1198.721199.41
1200.991201.62
1200.48
1198.321195.83
1193.11 1188.711194.24
WATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWAT
1192.951192.801192.80
1202.65
1201.38
1201.321201.031200.32
1199.05
1197.88
YARD PUMP
STMSTMSTMSTMSTMSTMSANSANSANSAN
STMSTMSTMSTMSTM
STM
STM
STM
STM
STMSTMSTMSTMSTMSTM STMSTMSTM
STM
STM
STM
STM
STM
1204.0 FG
STMSTM
WATWATSAN
SANSANSANSANSANSAN
SAN
SAN
WATWATWATWATWATWATWAT
WAT
WAT
WAT
WAT
WAT
STMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTM
1203.25 FG
1197
1205
12051205
1205
1204
1205
1205
1205
120312041205
12061205
120312021201
120112021203
1203
1202120112001199119811971196119511941193
1195
119311921191
1193
11941195
1195
11951196
1196
119411951196119711981199120012011202120312041206
1206
1206
1206
1209.0 TW1204.0 BW
1208.0 TW1204.0 BW1204.0 TW1204.0 BWSTMperfSTMperfSTMperf1200
1200
1204.0 FG
1194
KLEIN PERIMETER ROADVILLAGE OF MT. HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C200
PROPOSEDBUILDING 1FFE = 1205.33BFE = 1196.00
PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINT18" CURB AND GUTTERASPHALT PAVEMENTCONCRETE PAVEMENTPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED STORM SEWERSILT FENCEINLET PROTECTIONDITCH CHECK
LEGEND (PROPOSED)
11811180
GENERAL NOTES
STM
SILT FENCE PER WDNRTECHNICAL STANDARD 1056
STONE TRACKING PAD (MIN. 50'LONG AND 12" DEEP BY USE OF 3"CLEAR STONE) IN THIS AREA PERWDNR TECHNICAL STANDARD 1057.INSTALL AT ANY LOCATION WHERECONSTRUCTION TRAFFIC MEETSTHE EXISTING PAVEDDEVELOPMENT AREA.
PLACE RIPRAP OR CLASS III TURFREINFORCEMENT MATTING AT THESTORM OUTLET.
TYPE D INLET PROTECTION PERWDNR TECHNICAL STANDARD 1060,TYP. INSTALL AT ANY LOCATIONWHERE CONSTRUCTION RUNOFFDRAINS INTO THE STORM SEWERSYSTEM.
EROSION CONTROL CONSTRUCTION SCHEDULE1.01/05/2026 - INITIAL LAND DISTURBING - INSTALL ALL PERIMETER EROSION CONTROL DEVICESINCLUDING STONE TRACKING PAD AND SILT FENCE.2.01/05/2026 - STRIP TOPSOIL AND STOCKPILE. DEMOLISH EXISTING BUILDINGS.3.DURING CONSTRUCTION3.1.IF THE START DATE IS DELAYED, NOTIFIED AUTHORITIES HAVING JURISDICTION WHENBREAKING GROUND.3.2.CULVERT RIPRAP OUTLET TO BE INSTALLED IMMEDIATELY AFTER INSTALLATION OFCULVERT PIPE.3.3.SOIL STOCKPILES WHICH ARE LEFT UNUSED FOR MORE THAN 7 DAYS SHALL BE STABILIZEDAND SILT FENCE INSTALLED AROUND THE PILE.3.4.ALL SLOPES GREATER THAN 5:1 SHALL BE STABILIZED WITHIN TWO MONTHS (60 DAYS) OFBEING DISTURBED.3.5.INSTALL ADDITIONAL PRACTICES AS REQUIRED BY STATE AND LOCAL INSPECTORS AND ASNECESSARY TO PREVENT RUNOFF DUE TO CONSTRUCTION MEANS AND METHODS.3.6.ALL PRACTICES SHALL BE ONGOING BASED ON THE PLAN VIEW AND NOTES.4.04/01/2026 - MASS GRADING/SUBGRADE PREPARATION AND BUILDING CONSTRUCTION.5.07/01/2026 - TEMPORARY STABILIZATION WITH STRAW MULCH/TACKIFIER FOR ALL DISTURBEDAREAS OUTSIDE OF ACTIVE GRADING AREAS.6.04/01/2027 - SITE PAVING AND FINISH GRADING.7.07/01/2027 - FINAL SITE STABILIZATION - ALL PERVIOUS AREAS DISTURBED DURINGCONSTRUCTION WILL BE RESTORED WITH A MINIMUM OF 6" OF TOPSOIL, FERTILIZER, SEED,AND MULCH WITHIN SEVEN (7) DAYS OF FINAL GRADING.
BIORETENTION BASIN 1.
1.POST WDNR CERTIFICATE OF PERMIT COVERAGE ANDMUNICIPAL EROSION CONTROL PERMITS ON SITE ANDMAINTAIN UNTIL CONSTRUCTION ACTIVITIES HAVECEASED, THE SITE IS STABILIZED, AND A NOTICE OFTERMINATION IS FILED WITH WDNR.2.KEEP A COPY OF THE CURRENT EROSION CONTROL PLANON SITE THROUGHOUT THE DURATION OF THE PROJECT.3.ENGINEER / VILLAGE OF MOUNT HOREB / WDNR HASTHE RIGHT TO REQUIRE CONTRACTOR TO IMPLEMENTADDITIONAL EROSION CONTROL MEASURES ASNECESSARY.CONTRACTOR MUST NOTIFY THEVILLAGE OF MOUNT HOREB BUILDING INSPECTORTWO (2) WORKING DAYS IN ADVANCE OF ANY SOILDISTURBANCE ACTIVITIES.4.SUBMIT PLAN REVISIONS OR AMENDMENTS TO THE WDNRAT LEAST 5 DAYS PRIOR TO FIELD IMPLEMENTATION.5.THE SITE CONTRACTOR IS RESPONSIBLE FOR ROUTINESITE INSPECTIONS AT LEAST ONCE EVERY 7 DAYS ANDWITHIN 24 HOURS AFTER A RAINFALL EVENT OF 0.5 INCHESOR GREATER. KEEP INSPECTION REPORTS ON-SITE ANDMAKE THEM AVAILABLE UPON REQUEST.6.INSPECT AND MAINTAIN ALL INSTALLED EROSIONCONTROL PRACTICES UNTIL THE CONTRIBUTINGDRAINAGE AREA HAS BEEN STABILIZED.7.WHEN POSSIBLE: PRESERVE EXISTING VEGETATION(ESPECIALLY ADJACENT TO SURFACE WATERS), MINIMIZELAND-DISTURBING CONSTRUCTION ACTIVITY ON SLOPESOF 20% OR MORE, MINIMIZE SOIL COMPACTION, ANDPRESERVE TOPSOIL.8.REFER TO THE WDNR STORMWATER CONSTRUCTIONTECHNICAL STANDARDS AThttp://dnr.wi.gov/topic/stormwater/standards/const_standards.html. 9.INSTALL PERIMETER EROSION CONTROLS AND ROCKTRACKING PAD CONSTRUCTION ENTRANCE(S) PRIOR TOANY LAND-DISTURBING ACTIVITIES, INCLUDING CLEARINGAND GRUBBING. USE WDNR TECHNICAL STANDARD STONETRACKING PAD AND TIRE WASHING #1057 FOR ROCKCONSTRUCTION ENTRANCE(S).10.INSTALL INLET PROTECTION PRIOR TO LAND-DISTURBINGACTIVITIES IN THE CONTRIBUTING DRAINAGE AREAAND/OR IMMEDIATELY UPON INLET INSTALLATION.COMPLY WITH WDNR TECHNICAL STANDARD STORMDRAIN INLET PROTECTION FOR CONSTRUCTION SITES#1060 AND DANE COUNTY REQUIREMENTS FOR FRAMEDINLET PROTECTION.11.CONTRACTOR TO PROVIDE SOLID LID OR METAL PLATE ONALL OPEN MANHOLES DURING CONSTRUCTION TOMINIMIZE SEDIMENT FROM ENTERING THE STORM SEWERSYSTEM.12.STAGE CONSTRUCTION GRADING ACTIVITIES TO MINIMIZETHE CUMULATIVE EXPOSED AREA. CONDUCT TEMPORARYGRADING FOR EROSION CONTROL PER WDNR TECHNICALSTANDARD TEMPORARY GRADING PRACTICES FOREROSION CONTROL #1067.13.PERMITTING OF GROUNDWATER DEWATERING IS THERESPONSIBILITY OF THE CONTRACTOR. GROUNDWATERDEWATERING IS SUBJECT TO A DNR WASTEWATERDISCHARGE PERMIT AND A DNR HIGH CAPACITY WELLAPPROVAL IF CUMULATIVE PUMP CAPACITY IS 70 GPM ORMORE.14.PROVIDE ANTI-SCOUR PROTECTION AND MAINTAINNON-EROSIVE FLOW DURING DEWATERING. PERFORMDEWATERING OF ACCUMULATED SURFACE RUNOFF INACCORDANCE WITH WDNR TECHNICAL STANDARDDE-WATERING #1061.15.CONSTRUCT AND PROTECT THE BIOINFILTRATION BASINAND VEGETATION FROM RUNOFF AND SEDIMENT DURINGCONSTRUCTION. REFERENCE THE WDNR TECHNICALSTANDARD BIORETENTION FOR INFILTRATION # 1004.16.INSTALL AND MAINTAIN SILT FENCING PER WDNRTECHNICAL STANDARD SILT FENCE #1056. REMOVESEDIMENT FROM BEHIND SILT FENCES AND SEDIMENTBARRIERS BEFORE SEDIMENT REACHES A DEPTH THAT ISEQUAL TO ONE-HALF OF THE FENCE AND/OR BARRIERHEIGHT.
17.REPAIR BREAKS AND GAPS IN SILT FENCES AND BARRIERSIMMEDIATELY. REPLACE DECOMPOSING STRAW BALES(TYPICAL BALE LIFE IS 3 MONTHS). LOCATE, INSTALL, ANDMAINTAIN STRAW BALES PER WDNR TECHNICALSTANDARD DITCH CHECKS #1062.18.INSTALL AND MAINTAIN FILTER SOCKS IN ACCORDANCEWITH WDNR TECHNICAL STANDARD INTERIMMANUFACTURED PERIMETER CONTROL AND SLOPEINTERRUPTION PRODUCTS # 1071.19.IMMEDIATELY STABILIZE STOCKPILES AND SURROUNDSTOCKPILES AS NEEDED WITH SILT FENCE OR OTHERPERIMETER CONTROL IF STOCKPILES WILL REMAININACTIVE FOR 7 DAYS OR LONGER.20.IMMEDIATELY STABILIZE ALL DISTURBED AREAS THATWILL REMAIN INACTIVE FOR 14 DAYS OR LONGER.BETWEEN SEPTEMBER 15 AND OCTOBER 15: STABILIZEWITH MULCH, TACKIFIER, AND A PERENNIAL SEED MIXEDWITH WINTER WHEAT, ANNUAL OATS, OR ANNUAL RYE, ASAPPROPRIATE FOR REGION AND SOIL TYPE OCTOBER 15THROUGH COLD WEATHER: STABILIZE WITH A POLYMERAND DORMANT SEED MIX, AS APPROPRIATE FOR REGIONAND SOIL TYPE.21.STABILIZE AREAS OF FINAL GRADING WITHIN 7 DAYS OFREACHING FINAL GRADE.22.SWEEP/CLEAN UP ALL SEDIMENT/TRASH THAT MOVESOFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORMEVENTS BEFORE THE END OF THE SAME WORKDAY OR ASDIRECTED BY THE AUTHORITIES WITH JURISDICTION.SEPARATE SWEPT MATERIALS (SOILS AND TRASH) ANDDISPOSE OF APPROPRIATELY.23.THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLINGDUST PER WDNR TECHNICAL STANDARD DUST CONTROLON CONSTRUCTION SITES # 1068.24.PROPERLY DISPOSE OF ALL WASTE AND UNUSEDBUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS,CLEANING WASTES, OR OTHER CONSTRUCTIONMATERIALS) AND DO NOT ALLOW THESE MATERIALS TO BECARRIED BY RUNOFF INTO THE RECEIVING CHANNEL.25.COORDINATE WITH THE AUTHORITIES WITH JURISDICTIONTO UPDATE THE LAND DISTURBANCE PERMIT TO INDICATETHE ANTICIPATED OR LIKELY DISPOSAL LOCATIONS FORANY EXCAVATED SOILS OR CONSTRUCTION DEBRIS THATWILL BE HAULED OFF-SITE FOR DISPOSAL. THE DEPOSITEDOR STOCKPILED MATERIAL NEEDS TO INCLUDE PERIMETERSEDIMENT CONTROL MEASURES (SUCH AS SILT FENCE,HAY BALES, FILTER SOCKS, OR COMPACTED EARTHENBERMS).26.FOR NON-CHANNELIZED FLOW ON DISTURBED ORCONSTRUCTED SLOPES, PROVIDE CLASS CLASS I TYPE BEROSION CONTROL MATTING. INSTALL AND MAINTAIN PERWDNR TECHNICAL STANDARD NON-CHANNEL EROSIONMAT #1052.27.FOR CHANNELIZED FLOW ON DISTURBED ORCONSTRUCTED AREAS, PROVIDE CLASS II TYPE B EROSIONCONTROL MATTING UNLESS OTHERWISE SPECIFIED ONTHE PLAN. INSTALL AND MAINTAIN PER WDNR TECHNICALSTANDARD CHANNEL EROSION MAT #1053.28.MAKE PROVISIONS FOR WATERING DURING THE FIRST 8WEEKS FOLLOWING SEEDING OR PLANTING OF DISTURBEDAREAS WHENEVER MORE THAN 7 CONSECUTIVE DAYS OFDRY WEATHER OCCUR.29.THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITHALL APPLICABLE WDNR REMEDIATION AND WASTEMANAGEMENT REQUIREMENTS FOR HANDLING ANDDISPOSING OF CONTAMINATED MATERIALS. SITE-SPECIFICINFORMATION FOR AREAS WITH KNOWN OR SUSPECTEDSOIL AND/OR GROUNDWATER CONTAMINATION CAN BEFOUND ON WDNR'S BUREAU OF REMEDIATION ANDREDEVELOPMENT RACKING SYSTEM (BRRTS) PUBLICDATABASE AT: http://dnr.wi.gov/botw/30.INSTALL AND MAINTAIN A CONCRETE WASHOUT BASIN PEREPA 833-F-11-006:https://www3.epa.gov/npdes/pubs/concretewashout.pdf. REQUIRE USE BY ALL CONCRETE CONTRACTORS. LIQUIDMAY BE REUSED IN CONCRETE MIXING, EVAPORATED, ORDISPOSED OF AS WASTEWATER.
CONSTRUCTION SITE EROSION CONTROL REQUIREMENTS
1.ALL GRADES SHOWN ARE FINAL FINISHED SURFACE GRADES.2.AREAS TO BE SEEDED SHALL HAVE A MINIMUM 6 INCHES TOPSOIL UNLESS OTHERWISENOTED.3.AREAS NOT RESTORED WITH EROSION MATTING OR OTHER STABILIZATION MEASURES SHALLBE STABILIZED WITH MULCH.4.APPLY ANIONIC POLYMER TO DISTURBED AREAS IF EROSION BECOMES PROBLEMATIC.5.MULCH SHALL BE WEED-FREE STRAW AND SHALL BE INSTALLED AT THE RATE OF 2 TONSPER ACRE PER SECTION 627 OF "STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURECONSTRUCTION" (WISDOT 2014)6.PERMANENT SEEDING SHALL NOT OCCUR BETWEEN SEPTEMBER 15TH AND APRIL 15TH.ALTERNATE SEEDING/PLANTING METHODS AND/OR EROSION PROTECTION MAY BENECESSARY FOR SEEDING/PLANTING THAT OCCURS DURING THAT TIME. COORDINATE WITHTHE OWNER AS NECESSARY.7.TEMPORARY STABILIZATION SHALL CONSIST OF ONE OR MORE OF THE FOLLOWING OPTIONS:a.TEMPORARY SEEDING CONSISTING OF ANNUAL RYE GRASS APPLIED AT A RATE OF 1.5LBS PER 1000 SQUARE FEET,b.WISDOT PAL CLASS I TYPE B URBAN EROSION CONTROL MAT.
GRADING, SEEDING & RESTORATION NOTES
PROPOSEDBUILDING 2FFE = 1205.33BFE = 1194.18
PERIMETER ROAD
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF FEBRUARY 26, 2025. WYSER ENGINEERINGSHALL NOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS ARESULT OF ERRONEOUS OR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TOCONFIRM ALL ELEVATIONS, GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TOCONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THEBENCHMARKS SHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION.CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHINTHE VILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BYTHE OWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULTIN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALLBE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THATCLARIFICATION OR REDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLICEASEMENTS SHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARDSPECIFICATIONS.COORDINATE SIDEWALKREMOVAL AND RE-GRADINGOF THIS AREA WITH THEADJACENT LAND OWNERS.TLE AGREEMENT REQUIRED.
COORDINATE RE-GRADINGAND RESTORATION OF THISAREA WITH THE ADJACENTLAND OWNERS. TLEAGREEMENT REQUIRED.
COORDINATE SIDEWALKREMOVAL AND RE-GRADINGOF THIS AREA WITH THEADJACENT LAND OWNERS.TLE AGREEMENT REQUIRED.
OVERFLOW
OVERFLOW
Page 61 of 127
WATWAT 1193.52 EP1192.70 EP
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
1205
1206
1193
1194 1195
1196
1197
1198
11891190
1191
1191
1192
1195
1196
1197
1198
1199
12011202
12031204
1192
1192
11921193
1192
1192
1193
119511961197
1199
1200
SANSANSANSANSANSAN
WATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWAT
WAT
WAT
SANSANSANSANSANSAN
GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
STM
STMSTM
STM
STM
STMSTM
STM
STM
STM
STMSTM
STM
STM
STMSTM
STM
STM
STMSTM
STM
1209.75
1205.10
1201.45
1202.551201.32
1202.11
1202.361202.321202.301202.31
1202.45
1193.87
1193.38
1196.78
1196.73
1195.45
1195.47
1194.00
1193.931193.51 1192.451192.62
1191.65
1191.02
1191.381190.97
1189.961190.32
1190.39
1188.57
1188.06
1188.19
1188.44
1190.85
1190.62
1190.13
1190.44
1191.061190.68
1191.771192.23
1191.42
1191.31
1191.52
1191.731191.811191.89
1192.00
1191.981192.46
1192.47
1192.38
1192.54
1192.84
1193.42
1192.10
1192.02
1192.12
1193.99
1190.88
1191.61
1191.21
1192.521192.501192.531192.00
1191.701191.70
1192.101192.471192.461192.511192.58
1192.58 1192.37
1191.941191.68
1191.291191.26
1191.581191.85 1191.96 1192.09
1192.181192.101192.061192.00
1192.39
1192.36
1192.141191.84 1191.26
1191.551191.88
1191.99
1192.07
1190.74
1191.51
1191.711190.851190.54
1193.05
1188.89
1192.51
1192.71
1192.75
1194.58
1193.391194.56
1197.12
1199.60
1200.12
1199.06
1193.86
1192.28
1194.59
1197.21
1198.721199.41
1200.99
1201.62
1200.48
1198.32
1195.83
1193.11
WATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWAT
1192.95 1192.80
1192.80
1199.05
1197.88
STMSTM
SANSANSANSANSANSANSANSANSAN
1191.81 EP1192.63 EP
1194.09 FG
1209.51 FG
1190.91 SW1190.96 SW
1197.88 EP
1196.08 EP
1196.60 SW
1198.40 SW
STMSTM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STMSTMSTM
1195.5 FG
1205.33 FFE
1194.08 BFE1194.08 BFE
1196.00 BFE
1196.98 DOOR
1195.84 EC1195.92 BC1195.48 EP
1195.62 EC1195.70 BC1195.26 EP
2.0%
3.0%
1195.0 FG
1196.5 FG
1.14%
1194.50 FG1194.58 BC1194.14 EP
1194.32 BC1193.88 EP1194.32 BC1193.88 EP
1195.86 BC1195.30 EP
STMSTMSTMSTM
STMSTM
1193.38 BC1192.94 EP
1203.5 FG
1204.0 FG
1194.66 BC1194.10 EP
2.0%1196.69 SW
1205.21 SW
1205.21 SW
1204.52 SW
1205.0 TW1201.0 BW
1205.0 TW1201.0 BW1200.60 TW1197.0 BW
1200.50 TW1197.5 BW
WAT
WAT
WATWATSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSAN
SANSAN
SAN
WATWATWATWATWATWATWATWATWATWATWATWATWAT
WATWAT
WATWAT
WATWAT
WAT
WAT
WAT
WAT
WAT
WAT
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STMSTMSTMSTM
STMSTMSTMSTMSTM
3.99%
1.5%2.0%
1193.30 FG1193.66 FG
1194.58DOOR
1194.26 SW
2.0%1194.99 FG1196.03 BC1195.47 EP2.0%0.94%
1196.16 BC1195.60 EP
7.16%5.90%
1196.86 SW1196.86 SW2.0%
1193.97 FG
1194.49 SW
1196.35 SW
4.06%
1197.0 FG
1194.05 SW2.0%4.64%
1196.69 SW
1196.62 SW
1196.53 SW2.0%0.88%1.5%
1195.64 SW1195.54 SW
2.59%
1204.52 SW1204.59 SW
2.0%
2.0%
0.98%2.0%
1200.57 SW1200.67 SW
2.0%2.71%
STMSTMSTMSTMSTMSTMSTMSTM STM
1194.48 SW
1204.52 SW
1195.64 BC1195.08 EP
1.93%
0.47%
4.15%
4.95% 4.58%
1197
1205
1203
1202120112001199119811971196
1195
11941193
1195
1193
1192
1191
1193
1194
1195
1195
11951196
1196
1194119511961197
1198
1199 1190.5 TW1190.5 BW
1192.5 TW1190.5 BW
1194.8 TW1190.8 BW
1191.6 TW1191.6 BW
1192.0 TW1192.0 BW
1193.0 TW1190.9 BW
1193.5 TW1191.5 BW
1192.8 TW1192.8 BW1194.0 TW1191.9 BW
1200.0 TW1200.0 BW
1209.0 TW1203.5 BW
SANSANSAN
STMSTM
7.13%
2.0%2.31%
STMSTM
1195.73 SW1195.63 SW3.24% 3.50%
1205.0 TW1201.0 BW1200.60 TW1197.0 BW
1200.5 TW1196.0 BW1199.5 TW1196.0 BW
1196.0 TW1195.7 BW
1194.14 SW1194.48 SW1194.52 BC1194.08 EP
1194.82 SW1194.73 SW
2.0%3.00%
1194.17 SW
4.5%
1.03%2.0%
1195.68 BC1195.24 EP
1194
1196.00 BFE
KLEIN PERIMETER ROADVILLAGE OF MT. HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C201
PROPOSEDBUILDING 1FFE = 1205.33BFE = 1196.00
PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINT18" CURB AND GUTTERASPHALT PAVEMENTCONCRETE PAVEMENTPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED STORM SEWERSILT FENCEINLET PROTECTIONDITCH CHECKSPOT GRADEDRAINAGE GRADE BREAKDRAINAGE ARROW
LEGEND (PROPOSED)
1181.25 EP
11811180
GENERAL NOTES
STM
1.0%
NOTE:SPOT GRADES ARE AS FOLLOWS: FFE - FINISHED FLOOR GRADE EP - EDGE OF ASPHALT PAVEMENT EC - EDGE OF CONCRETE PAVEMENT BC - BACK OF CURB SW - EDGE OF SIDEWALK FG - FINISH GRADE TW - FINISH GRADE ADJACENT TOP OF WALL BW - FINISH GRADE ADJACENT BOTTOM OFWALL (NOT FOOTING)
4.0%PROPOSEDBUILDING 2FFE = 1205.33BFE = 1194.16
PERIMETER ROAD
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF FEBRUARY 26, 2025. WYSER ENGINEERINGSHALL NOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS ARESULT OF ERRONEOUS OR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TOCONFIRM ALL ELEVATIONS, GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TOCONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THEBENCHMARKS SHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION.CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHINTHE VILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BYTHE OWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULTIN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALLBE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THATCLARIFICATION OR REDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLICEASEMENTS SHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARDSPECIFICATIONS.
Page 62 of 127
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1200
1201
1202
1203
1204
1205
1206 1198119912001201
1194119511961197
1193
1202
12031204120512061207
1202
1192
1202
1193
1202
1210
1208 12061204
1202
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
SANSAN
101 PERIMETER ROADTAX PARCEL NO. 157/0606-124-0065-1
1211.361210.24
1216.88
1215.88
1213.701209.50
1210.16
1210.571209.65
1209.68 1202.94
1203.13
1202.95
1202.94
1202.60
1202.66
1202.511202.47
1202.49
1202.45
1202.441202.46
1202.45
1202.02
1201.78 1201.62 1201.58
1201.88
1202.38
1202.36
1202.33
1202.34
1202.28
1201.92
1201.73
1203.38
1203.381204.661204.57
1205.341205.39
1205.69
1205.681206.58
1206.66
1207.87
1209.14
1210.31
1212.00
1213.72
1214.80
1202.59
1202.60
1202.53
1202.56
1202.44
1202.33
1202.25
1202.28
1202.89
1204.881205.77
1193.87
1193.38
1193.861193.85
1194.40
1193.90
1201.53
1201.38
1201.581202.25
1200.94
1192.46
1192.47
1193.99
1192.511192.58
1192.58 1192.37
WATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWAT
1202.65
1201.38
1201.32
1201.03
1200.32
1199.05
YARD PUMP
1203.35 EP1204.41 EP
1206.70 FG
1207.83 FG
1206.12 SW
1206.14 SW
1197.88 EP
1200.96 EP
1198.40 SW
1201.84 SW
1204.24 EP1205.30 EP1204.15 FG
1203.21 SW
1205.58 BC1205.02 EP
1204.02 BC1203.58 EP
4.58%1203.93 SW
1205.18 SW
1205.53 BC1205.09 SW1205.09 EP1205.18 SW
1204.35 SW1203.91 EP1204.44 SW
1204.71 SW1205.65 BC1205.09 EP1204.70 SW
1205.09 BC1204.65 EP
2.25%
1205.79 BC1205.23 EP
STMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM
STM
STM
STM
STM
STM
STM
STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
1205.33 FFE
1205.33 FFE1205.56 BC1205.00 EP1206.00 SW1205.44 EP
1205.33 FFE
1205.33 FFE
1196.69 SW
1205.21 SW
1205.21 SW
1205.06 SW1205.06 SW
1205.06 SW
1204.52 SW
1205.0 TW1201.0 BW
1205.0 TW1201.0 BW1200.60 TW1197.0 BW
1200.50 TW1197.5 BW
STMSTM
1205.56 BC1205.00 EP
STM
1196.69 SW
1196.62 SW
1196.53 SW2.0%0.88%1.5%
2.59%
1204.52 SW1204.59 SW
1.35%
1200.57 SW1200.67 SW
2.0%2.71%
1205.33 FFE
2.0%
1.0%1204.70 SW
1204.70 SW
1205.23 SW
1205.23 SW1205.23 SW
1205.18 SW
2.0%
1.5%
1205.18 SW
2.0%
1204.43 FG
5.0%1205.09 SW1205.09 EP
1204.70 SW6.18%1205.23 SW
1204.45 SW
1.47%1.19%
1205.0 FG
1204.5 FG
STM1204.52 SW1204.61 SW
2.0%1204.71 FG
1204.93 FG1.31%
1.0%2.0% 1.40%2.0%
1205.15 FG
1205.12 FG1205.99 BC1205.43 EP
1206.37 BC1205.81 EP
1202.29 EP1202.55 EP
1203.47 SW
5.0%
1.5%
1.47%2.0%
4.0% 3.0%
1.0%
3.82%
1.47%1204.28 BC1203.84 EP1204.64 FG2.31%
1205.05 SW
1204.97 SW1205.13 EC
1205.21 EC
1.47%2.44%1204.37 SW1204.0 FG
4.42%
4.07%
STMSTM1202.80 RIM
0.84%
3.75%
3.62%
1197
1205
1205
1205
1205
1204
1205
1205
1205
1203
1204
1205
1206
1205
1198
1199
1200
1201
120212031204
1206
1206
1206
1206
STMperf
1205.0 TW1201.0 BW1200.60 TW1197.0 BW
1204.0 FG
1204.0 FG
KLEIN PERIMETER ROADVILLAGE OF MT. HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C202
PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINT18" CURB AND GUTTERASPHALT PAVEMENTCONCRETE PAVEMENTPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED STORM SEWERSPOT GRADEDRAINAGE GRADE BREAKDRAINAGE ARROW
LEGEND (PROPOSED)
1181.25 EP11811180
GENERAL NOTES
STM1.0%
NOTE:SPOT GRADES ARE AS FOLLOWS: FFE - FINISHED FLOOR GRADE EP - EDGE OF ASPHALT PAVEMENT EC - EDGE OF CONCRETE PAVEMENT BC - BACK OF CURB SW - EDGE OF SIDEWALK FG - FINISH GRADE TW - FINISH GRADE ADJACENT TOP OF WALL BW - FINISH GRADE ADJACENT BOTTOM OFWALL (NOT FOOTING)
4.0%
PROPOSEDBUILDING 2FFE = 1205.33BFE = 1194.18
PERIMETER ROAD
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF FEBRUARY 26, 2025. WYSER ENGINEERINGSHALL NOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS ARESULT OF ERRONEOUS OR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TOCONFIRM ALL ELEVATIONS, GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TOCONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THEBENCHMARKS SHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION.CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHINTHE VILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BYTHE OWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULTIN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALLBE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THATCLARIFICATION OR REDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLICEASEMENTS SHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARDSPECIFICATIONS.
PROPOSEDBUILDING 1FFE = 1205.33BFE = 1196.00
Page 63 of 127
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
WATWATWATWATWATWATWATWATWATWATWATWAT WATSANSANSAN
GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS STMSTM
STM
STM
STMSTM
STM
STM
STM
STM
101 PERIMETER ROADTAX PARCEL NO. 157/0606-124-0065-1
EXISTING ASPHALT PARKING LOT
WATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWAT
YARD PUMP
STMSTMSTMSANSANSANSAN
STMSTMSTMSTMSTM
STM
STM
STM
STM
STMSTMSTMSTMSTMSTM STMSTMSTM
STM
STM
STM
STM
STMSTMSTM
WATWATSANSANSANSANSANSANSANSAN
SAN
WATWATWATWATWATWATWAT
WAT
WAT
WAT
WAT
WAT
STMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTM
STMperfSTMperfSTMperf
STM MHNO. 1STM INLNO. 4STM MHNO. 9
STM MHNO. 10 STM MHNO. 2STM MHNO. 3
STM AESNO. 11
STM MHNO. 12STM INLNO. 13 STM INLNO. 14 STM INLNO. 15
P - 4
P - 5
P - 6
P - 1P - 3
RD - 101
RD - 102
RD - 100
RD - 103
P - 7
P - 8
P - 9 P - 10
P - 2 STM MHNO. 100
KLEIN PERIMETER ROADVILLAGE OF MT. HOREB, DANE COUNTY, WI
C300
LEGEND (PROPOSED)
GENERAL NOTES
1.DIMENSIONS TAKE PRECEDENCE OVER SCALE. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD.2.LENGTHS OF ALL UTILITIES ARE TO CENTER OF STRUCTURES OR FITTINGS AND MAY VARY SLIGHTLY FROM PLAN. LENGTHS SHALL BE VERIFIED INTHE FIELD DURING CONSTRUCTION.3.CONTRACTOR SHALL VERIFY ALL ELEVATIONS, LOCATIONS, AND SIZES OF SANITARY, WATER AND STORM LATERALS AND CHECK ALL UTILITYCROSSINGS FOR CONFLICTS.4.THE PROPOSED IMPROVEMENTS MUST BE CONSTRUCTED IN ACCORDANCE WITH ENGINEERING PLANS DESIGNED TO MEET ORDINANCES ANDREQUIREMENTS OF THE MUNICIPALITY AND WISDOT, WISDSPS, AND WDNR.5.PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR:·EXAMINING ALL SITES CONDITIONS RELATIVE TO THE CONDITIONS INDICATED ON THE ENGINEERING DRAWINGS. ANY DISCREPANCIES ARE TOBE REPORTED TO THE ENGINEER AND RESOLVED PRIOR TO THE START OF CONSTRUCTION.·OBTAINING ALL PERMITS INCLUDING PERMIT COSTS, TAP FEES, METER DEPOSITS, BONDS, AND ALL OTHER FEES REQUIRED FOR PROPOSEDWORK TO OBTAIN OCCUPANCY.·VERIFYING UTILITY ELEVATIONS AND NOTIFYING ENGINEER OF ANY DISCREPANCY. NO WORK SHALL BE PERFORMED UNTIL THE DISCREPANCYIS RESOLVED.·NOTIFYING ALL UTILITIES PRIOR TO THE INSTALLATION OF ANY UNDERGROUND IMPROVEMENTS.·NOTIFYING THE DESIGN ENGINEER AND MUNICIPALITY 48 HOURS PRIOR TO THE START OF CONSTRUCTION TO ARRANGE FOR APPROPRIATECONSTRUCTION OBSERVATION.9.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE ENGINEER WITH AS-BUILT CONDITIONS OF THE DESIGNATED IMPROVEMENTS IN ORDERTHAT THE APPROPRIATE DRAWINGS CAN BE PREPARED, IF REQUIRED. ANY CHANGES TO THE DRAWINGS OR ADDITIONAL ITEMS MUST BEREPORTED TO THE ENGINEER AS WORK PROGRESSES.10.ANY SANITARY SEWER , SANITARY SEWER SERVICES, WATER MAIN, WATER SERVICES, STORM SEWER, OR OTHER UTILITIES, WHICH ARE DAMAGEDBY THE CONTRACTORS, SHALL BE REPAIRED TO THE OWNER'S SATISFACTION AT THE CONTRACTOR'S EXPENSE. NO BLASTING IS ALLOWED WITHIN30 FEET OF EXISTING UTILITIES.11.ALL PRIVATE INTERCEPTOR WATER MAIN AND WATER SERVICES SHALL BE INSTALLED WITH A 6' MINIMUM BURY. PROVIDE INSULATION ABOVEPIPES WITH LESS THAN 5' OF GROUND COVER.12.GRANULAR BACKFILL MATERIALS ARE REQUIRED IN ALL UTILITY TRENCHES UNDER SIDEWALKS AND PROPOSED PAVED AREAS (UNLESSOTHERWISE SPECIFIED BY A GEOTECHNICAL ENGINEER). ALL UTILITY TRENCH BACKFILL SHALL BE COMPACTED PER SPECIFICATIONS. ALLPAVEMENT PATCHING SHALL COMPLY WITH THE VILLAGE OF MOUNT HOREB STANDARD SPECIFICATIONS. ADDITIONAL PAVEMENT MILLING ANDOVERLAY MAY BE REQUIRED BY PERMIT.13.CONTRACTOR SHALL NOTIFY THE MUNICIPAL PUBLIC WORKS DEPARTMENT A MINIMUM OF 48 HOURS BEFORE CONNECTING TO PUBLIC UTILITIES.14.ALL NON-METALLIC BUILDING SEWER AND WATER SERVICES MUST BE ACCOMPANIED BY MEANS OF LOCATING UNDERGROUND PIPE. TRACER WIREVALVE BOXES SHALL BE INSTALLED ON ALL LATERALS AND AS INDICATED ON THESE PLANS.15.EXTERIOR CLEANOUTS SHALL BE PROVIDED AS REQUIRED BY SPS 382.35. ALL EXTERIOR CLEANOUTS SHALL BE PROVIDED WITH A FROST SLEEVE INACCORDANCE WITH SPS 382.34(5)(a)b AND SPS 384.30(2)(c).16.ALL PRIVATE PLUMBING MATERIALS SHALL CONFORM TO SPS 384.30.17.ALL PRIVATE PIPE JOINTS SHALL BE INSTALLED PER SPS 384.40.18.ALL PRIVATE WATER PIPE, INCLUDING DEPTH AND SEPARATION REQUIREMENTS, SHALL BE IN ACCORDANCE WITH SPS 382.40(8).19.THE CONTRACTOR SHALL ALLOW 10 WORKING DAYS FOR THE CONSTRUCTION OF GAS MAINS WHEN SCHEDULING THE WORK AND SHALL NOTRESTRICT ACCESS TO THE GAS MAIN CONTRACTOR OR OTHER UTILITY COMPANIES.20.INLET CASTINGS SHALL BE SET TO GRADE PRIOR TO AND SEPARATE FROM THE POURING OF THE CONCRETE CURB AND GUTTER. IS IS REQUIREDTHAT THREE FEET OF CONCRETE CURB AND GUTTER ON EACH SIDE OF THE INLET SHALL BE POURED BY HAND, NOT THROUGH THE USE OF A CURBMACHINE. THE INLET CASTING SHALL BE SET TO GRADE ON A BED OF MORTAR WHICH SHALL BE A MINIMUM OF TWO INCHES THICK. THE INLETSHALL BE PLACED ON THE MORTAR BED AND SHALL BE ADJUSTED TO GRADE BY APPLYING DIRECT PRESSURE TO THE CASTING. ONCE THECASTING ADJUSTMENT IS COMPLETE, THREE FEET OF CURB AND GUTTER ON EACH SIDE OF THE CASTING SHALL BE POURED BY HAND.21.CONTRACTOR SHALL VERIFY AND COORDINATE ALL UTILITY CONNECTIONS WITH THE BUILDING PRIOR TO CONSTRUCTION.22.THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS SO AS TO BE IN CONFORMANCE WITH THE VILLAGE EROSION CONTROL AND STORMWATERORDINANCE, AND DNR ADMINISTRATIVE RULE NR 216 AT ALL TIMES.
UTILITY NOTES
PROPOSED PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINT18" CURB AND GUTTERASPHALT PAVEMENTCONCRETE PAVEMENTPROPOSED WATER MAINPROPOSED SANITARY SEWERPROPOSED STORM SEWERPROPOSED GAS SERVICE (DESIGN BY OTHERS)PROPOSED ELECTRIC SERVICE (DESIGN BY OTHERS)STORMWATER TREATMENT FACILITY
WATSANSTMGASE
CONNECTION INTO EXISTING 8" PVC SANITARYSEWER SERVICE LOCATED IN THIS AREA.RIM = 1195.53I.E.(EX 8" PVC) = 1184.34 (NE)I.E.(8" PVC) = 1186.34 (S)I.E.(8" PVC) = 1186.34 (E)EXISTING PVC DEPTH ASSUMED BASED ON A2.0% SLOPE FROM CONNECTION TO EXISTINGMANHOLE. CONTRACTOR TO VERIFYELEVATION AND SIZE DURING DEMOLITIONACTIVITIES. CONTACT THE ENGINEER FORREDESIGN IF THERE IS ANY DISCREPANCY.
SANITARY BUILDINGCONNECTION LOCATIONI.E. = 1186.69 (ARC. 81'3")COORDINATE WITH INTERIORPLUMBING PLANS.WATER BUILDING CONNECTIONLOCATION. COORDINATE WITHINTERIOR PLUMBING PLANS.
ROOF DOWNSPOUTS TO BE CONNECTEDINTO ADJACENT STORM SEWER SYSTEMFOR DISCHARGE INTO THESTORMWATER MANAGEMENT SYSTEM.
45°BEND
17 LF OF 8"PVC @ 2.08%
8" VALVE
UNDERGROUND WET POND SYSTEM(TWO 40 LF 72" CMP OR APPROVEDEQUIVALENT WITH ACCESSSTRUCTURE FOR CLEANING). REFER TODETAIL ON C401.
246 LF OF 8" DUCTILE IRON PIPE
WARNING: ULO REQUIRED. GASCROSSING IN THIS AREA. CONTRACTORTO COORDINATE RELOCATION OFEXISTING UTILITIES AS NEEDED TOALLOW FOR NEW PIPE AT THE DESIGNELEVATION.
NOTE: CURB INLET RIM ELEVATION IS TO FLAG OF CURB. ADD 0.44-FEET TO GET TO BACK OF CURB.
PERIMETER ROAD
CONNECTION INTO EXISTING 8"WATERMAIN IN PERIMETERROAD. CONTRACTOR TOVERIFY ELEVATION AND SIZEAND LOCATION PRIOR TOCONSTRUCTION. FIELDMARKINGS ON DIFFERENTDATES SUGGEST DIFFERENTLOCATIONS. CONTACT THEENGINEER FOR REDESIGN IFTHERE IS ANY DISCREPANCY.
ADS FLEXSTORM PUREWITH OIL & GREASEPOUCH (OR APPROVEDEQUAL) TO BEINSTALLED IN INLETAFTER CONSTRUCTION.
STORMWATERMANAGEMENT
CONNECTION INTO EXISTING STORMLINE DRAINING THROUGH THEADJACENT PARCELINV (NW) = ±1187.8 (12" HDPE)
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA AS SURVEYED BY WYSER ENGINEERING ON THE WEEKOF FEBRUARY 26, 2025. WYSER ENGINEERING SHALL NOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS A RESULTOF ERRONEOUS OR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TO CONFIRM ALL ELEVATIONS, GENERAL DRAINAGE ANDEARTHWORK REQUIREMENTS PRIOR TO CONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THE BENCHMARKS SHALL BE VALIDATED BY LICENSED LANDSURVEYOR PRIOR TO CONSTRUCTION. CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHIN THE VILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BY THE OWNER OR CONTRACTOR FROM THEAPPROVED CONSTRUCTION PLANS THAT MAY RESULT IN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALL BE BROUGHT TO THE ATTENTION OF THEENGINEER PRIOR TO CONSTRUCTION SO THAT CLARIFICATION OR REDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLIC EASEMENTS SHALL BE IN ACCORDANCE WITH VILLAGE OFMOUNT HOREB STANDARD SPECIFICATIONS.
PROPOSEDBUILDING 1FFE = 1205.33BFE = 1196.00
PROPOSEDBUILDING 2FFE = 1205.33BFE = 1194.18
42 LF OF 8" DUCTILE IRON PIPESANITARY BUILDINGCONNECTION LOCATIONI.E. = 1190.08 (ARC. 84'9")COORDINATE WITH INTERIORPLUMBING PLANS.180 LF OF 8" PVC @ 2.08%
45°BEND45°BEND45°BENDWATER BUILDING CONNECTIONLOCATION. COORDINATE WITHINTERIOR PLUMBING PLANS.
ROOF DOWNSPOUTS TO BE CONNECTEDINTO ADJACENT STORM SEWER SYSTEMFOR DISCHARGE INTO THESTORMWATER MANAGEMENT SYSTEM.
8" VALVE
WARNING: ULO REQUIRED. GASCROSSING IN THIS AREA. CONTRACTORTO COORDINATE RELOCATION OFEXISTING UTILITIES AS NEEDED TOALLOW FOR NEW PIPE AT THE DESIGNELEVATION.
NOTE: WATER MAIN MARKINGS TWO MONTHSAFTER INITIAL SURVEY SHOWING WATERMARKINGS IN THE STREET WERE SHOWNNEAR THE CURB LINE AS SHOWN. IT IT LIKELYTHAT THIS IS A MISS-MARKED LOCATION ANDTHE WATER MAIN FOLLOWS THE ALIGNMENTOF THE SANITARY WITHIN THE PAVEMENT OFPERIMETER ROAD WHERE WE SHOW THEPROPOSED WATER TIE-IN LOCATIONS.
C.O.C.O.
C.O.
45°BEND
8X6 TEE, 9 LF OF 6" DI PIPE AND HYDRANT.
Page 64 of 127
KLEIN PERIMETER ROADVILLAGE OF MT. HOREB, DANE COUNTY, WI
C400
FLOWDIRECTION
SEE PLANS FOR ANCHOR TRENCH LOCATIONS
CHANNEL TERMINATION TWOROWS OF STAPLES 6" APARTOFFSET BY 3"
MATERIAL NOTES1.ONLY PRODUCTS LISTED IN THE WISCONSIN DEPARTMENT OFTRANSPORTATION EROSION CONTROL PRODUCT ACCEPTABILITY LIST(PAL) ARE ACCEPTABLE FOR USE.2.STAPLES USED FOR CLASS I TYPES A & B MATS SHALL BE 1-2 INCHWIDE, U-SHAPED, MADE OF NO.11 (3.05mm) OR LARGER DIAMETERSTEEL WIRE, AND NOT LESS THAN 6 INCHES LONG FOR FIRM SOILSAND 12 INCHES LONG FOR LOOSE SOILS.INSTALLATION NOTES1.EROSION CONTROL REVEGETATIVE MATS (ECRM) SHALL BEINSTALLED AFTER TOPSOIL AND SEED HAVE BEEN PLACED.2.INSTALLATION OF ECRM SHOULD BE COORDINATED WITHPERMANENT RESTORATION PRACTICES.3.INSTALLATION SHALL CONFORM WITH WDNR CONSERVATIONPRACTICE STANDARD 1053.4.ALL PRODUCTS SHALL BE INSTALLED PER THE MANUFACTURER'S
RECOMMENDATIONS. THIS STANDARD DETAIL IS AN EXAMPLE OFTYPICAL INSTALLATION GUIDANCE.5.MATS SHALL BE IN FIRM AND CONTINUOUS CONTACT WITH THE SOIL.6.IF SECTIONS OF ECRM NEED TO BE OVERLAPPED, ENSURE THAT THEOVERLAP IS FACING DOWNSTREAM TO PREVENT WATER FROMFLOWING BENEATH THE ECRM.INSPECTION & MAINTENANCE NOTES1.INSTALL ADDITIONAL ANCHORING IN AREAS OF OBSERVED RILLINGAND CONCENTRATED FLOW BENEATH THE EROSION MAT. IF RILLINGIS SEVERE ENOUGH TO PREVENT VEGETATION ESTABLISHMENT,REMOVE EROSION MAT, REGRADE, COMPACT, RE-SEED, AND REPLACETHE SECTION OF MAT.2.IF PRODUCTS WITH PLASTIC NETTING ARE USED, REMOVE NETTINGOR REPLACE MAT IF SEPARATION OF THE NETTING FROM THE MAT ISOBSERVED.3.ALL MAINTENANCE ACTIVITIES SHOULD OCCUR AS SOON ASPOSSIBLE WITH CONSIDERATION OF SITE CONDITIONS.EROSION CONTROL MAT (CHANNELS)
TRENCH APPROX.10" WIDE x 8" DEEP
SOIL PILEFROMTRENCH
FLOW
STEP 1
STEP 2
STAPLES ARE THROUGHBOTH BLANKETS
BLANKET OVERLAP,2"-4"
FLOW6" OVERLAP
2 ROWS OF STAPLES4" APART
FLOW
2 ROWS OF STAPLES: 4"SPACING BETWEENROWS, 12" SPACINGBETWEEN STAPLES2 ROWS OF STAPLES: 4"SPACING BETWEENROWS, 12" SPACINGBETWEEN STAPLES
ANCHOR TRENCH DETAIL
GENERAL STAPLE PATTERN:USE MANUFACTURER'S RECOMMENDATIONS. MAXIMUMDISTANCE BETWEEN STAPLES IS 4 FEET.
FLOWDIRECTION
WOVEN GEOTEXTILE FABRIC
ANCHOR TRENCH
SECURE FABRIC TO POST WITH 0.5" STAPLESIN 5 PLACES MIN.
SUPPORT CORD118 " x 118 " x 48" (MIN.) AIR OR KILN DRIEDHICKORY OR OAK POSTSGEOTEXTILE FABRIC
18" MIN. POLYESTEROR NYLON SUPPORTCORDFLOW
4" WIDE x 6" DEEPANCHOR TRENCH8" MIN. GEOTEXTILE INANCHOR TRENCH
BACKFILL AND COMPACTANCHOR TRENCH
+ 24"
FLOW MATERIAL NOTES1.GEOTEXTILE FABRIC SHALL BE WOVEN AND SHALL CONFORM TO THE MATERIALREQUIREMENTS LISTED IN SECTION 628 OF THE WISDOT STANDARDSPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION, 2003EDITION.INSTALLATION NOTES1.INSTALLATION SHALL CONFORM WITH THE REQUIREMENTS OF WDNRCONSERVATION PRACTICE STANDARD 1056.2.CONSTRUCT THE SILT FENCE IN AN ARC WITH THE ENDS POINTING UPSLOPE TOAVOID EROSION AROUND THE ENDS OF THE FENCE.3.FAILURE TO PROPERLY ANCHOR SILT FENCE COULD RESULT IN WATER ANDSEDIMENT RELEASE BENEATH THE SILT FENCE. PROPERLY SECURE THE SILTFENCE INTO THE ANCHOR TRENCH.4.CONSTRUCT THE FENCE FROM A CONTINUOUS ROLL OF GEOTEXTILE TO AVOIDJOINTS. WHERE JOINTS ARE NECESSARY, OVERLAP TO THE NEXT POST ORWRAP ADJOINING FABRICS TOGETHER AROUND THE JOINT POST AND TIGHTLYFASTEN.5.SILT FENCE SHALL NOT BE USED IN AREAS OF CONCENTRATED FLOW.
INSPECTION & MAINTENANCE NOTES1.AT A MINIMUM, PERFORM INSPECTIONS WEEKLY ANDWITHIN 24 HOURS OF PRECIPITATION EVENTSPRODUCING 0.5 INCHES OR MORE OF RAINFALL.2.INSPECT FENCES FOR DAMAGE TO STAKES AND FABRIC,UNDERCUTTING, EXCESSIVE SEDIMENT ACCUMULATION(GREATER THAN 12 OF THE FENCE HEIGHT), ANDINDICATIONS OF SCOUR AROUND THE EDGES.3.REPAIR OR REPLACE SILT FENCE WITHIN 24 HOURS OFIDENTIFYING AND DEFICIENCIES.SILT FENCE
48" MIN.
FOLD 3"MAX.
6' TYP. / 8' MAX.
20" MIN. POSTBURIAL
11.5
2' MIN.1' MIN.L
11.5
1.2.
2'
FLOW
ELEVATION
CROSS-SECTION
8-INCH THICK LAYER (MIN.) OF 3/4"CLEAR STONE
TOPSOIL ORSTONEBERMSTONEWEEPER
BERM TO BE CONSTRUCTED WITH 3" CLEAR STONE, 1.5' HIGH ABOVE THE SWALEBOTTOM AND LEVEL WITH THE CREST.EXTEND BERM ACROSS SWALE TO MEET SWALE SIDE SLOPES GRADES. WHERE SWALEIS LESS THAN 1.5' DEEP, REDUCE BERM HEIGHT TO 1.0', WITH A 4' LENGTH.INSTALL GEOTEXTILE FABRIC SAS UNDER CLEAR STONE.3.STONE BERM
1" TOPSOIL (TO BE SEEDED)EROSION CONTROLREVEGETATIVE MAT
3" TOPSOILTURF REINFORCEMENT MATNOTE: VARIATION ON INSTALLATION PROCEDURESMAY OCCUR. REFER TO MANUFACTURER'SRECOMMENDED INSTALLATION GUIDELINES.TURF REINFORCEMENTINSTALLATION DETAIL
CLASS III, TYPE C(BOTTOM AND SIDES)CLASS III, TYPE A (TOP)4" INTEGRAL CURB AND WALKOR 18" CURB AND GUTTER
1.5%
12:1FLATPAVEMENT/PARKING
5'12:11.5%
1.5% SIDEWALK FLUSH WITH PAVEMENTRAMPS PER WISCONSINADMINISTRATIVE CODE COMM 69.37AND ADAAG 705
TRUNCATED DOME (STAMPEDCONCRETE PAINTED YELLOW, YELLOWPLASTIC OR CAST IRON PAINTEDYELLOW) PER WISCONSINADMINISTRATIVE CODE COMM 69.37 ANDADAAG 705
ADA RAMP
GEOTEXTILE FABRIC (IF NECESSARY)EXISTING ROAD
50'
12" MIN.
12' MIN.
REFER TO MATERIALS NOTES
MATERIAL NOTES
INSTALLATION NOTES
INSPECTION & MAINTENANCE NOTES
CONSTRUCTION ENTRANCE (STONE TRACKING PAD)
1. USE HARD, DURABLE, ANGULAR STONE OR RECYCLED CONCRETEMEETING THE GRADATION IN TABLE 1. WHERE THIS GRADATION ISNOT AVAILABLE, MEET THE GRADATION IN WISCONSIN DEPARTMENTOF TRANSPORTATION (DOT) STANDARD SPECIFICATION, SECTION 312SELECT CRUSHED MATERIAL. USE MATERIAL SUBSTANTIALLY FREEFROM DIRT, DEBRIS, STEEL, VEGETABLE MATTER, AND OTHERDELETERIOUS MATERIAL. PLACE THE AGGREGATE IN A LAYER ATLEAST 12 INCHES THICK.2. THE TRACKING PAD SHALL BE UNDERLAIN WITH A WDOT TYPE RGEOTEXTILE FABRIC WHERE WARRANTED BASED ON SOIL TYPE ORHIGH GROUNDWATER.1. INSTALLATION SHALL CONFORM WITH THE REQUIREMENTS OFWDNR CONSERVATION PRACTICE STANDARD 1057.2. INSTALL THE TRACKING PAD ACROSS THE FULL WIDTH OF THEACCESS POINT, OR RESTRICT EXITING TRAFFIC TO A DEDICATEDEGRESS LANE WITH A DRIVING SURFACE AT LEAST 12 FEET WIDE.3. DIMENSIONS OF THE TRACKING PAD SHALL BE MINIMUM AS NOTEDON THE FIGURE ABOVE.4. DIVERT SURFACE FLOWS AWAY FROM TRACKING PADS OR CONVEYFLOW UNDER AND/OR AROUND USING CULVERTS AND SWALES. DIRECTRUNOFF FROM TRACKING PADS TO SEDIMENT CONTROL PRACTICES.5. DO NOT COMPACT AGGREGATE PRIOR TO USE. COMPACTION,GROUTING, OR OTHER MEANS OF CREATING A SMOOTH SURFACECOMPROMISE THE EFFECTIVENESS OF THE TRACKING PAD.6. TRACKING PAD SHALL BE REMOVED OR INCORPORATED INTOGRAVEL DRIVEWAY ONLY AFTER CONSTRUCTION IS COMPLETE ANDTHE SITE HAS BEEN STABILIZED.
1. STONE TRACKING PADS SHALL BE INSPECTED WEEKLY AND WITHIN 24HOURS AFTER EVERY PRECIPITATION EVENT THAT PRODUCES 0.5 INCHES OFRAIN OR MORE DURING A 24 HOUR PERIOD.2. MONITOR AND MAINTAIN DEVICES TO MINIMIZE SHIFTING, RUTTING OFADJACENT SURFACES, AND STRUCTURAL FAILURE. MAINTAIN A LOOSENED,ROUGH SURFACE BY SCRAPING, LOOSENING, OR TOP-DRESSING WITHADDITIONAL AGGREGATE.2. ADDITIONAL AGGREGATE SHALL BE PLACED IF THE TRACKING PAD BECOMESBURIED OR IF SEDIMENT IS NOT BEING REMOVED EFFECTIVELY FROM THEVEHICLE TIRES.3. A MINIMUM 30-FEET WIDE BY 50-FEET LONG BY 12-INCH THICK PAD SHALLBE MAINTAINED AT ALL TIMES. ADD STONE AS NEEDED TO MAINTAIN THEMINIMUM PAD THICKNESS.4. THE TRACKING PAD PERFORMANCE SHALL BE MAINTAINED BY SCRAPING ORTOP-DRESSING WITH ADDITIONAL AGGREGATE.5. ANY SEDIMENT TRACKED ONTO A PUBLIC OR PRIVATE ROAD SHOULD BEREMOVED BY STREET CLEANING AT THE END OF EACH WORKING DAY.6. REMOVE STONES LODGED BETWEEN THE TIRES OF DUAL WHEEL VEHICLESPRIOR TO LEAVING THE CONSTRUCTION SITE.7. MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE WITHCONSIDERATION FOR SITE CONDITIONS.8. REPLACE DAMAGED OR CRUSHED CULVERTS UNDER TRACKING PAD.
SIEVESIZEPERCENT BYWEIGHT PASSING 3" 1002-1/2" 90-1001-1/2" 25-60 3/4" 0-20 3/8" 0-5TABLE 112
12"1'-6"6"
2'-6"3/4"
6"R2-1/2"R3" 6-1/4"6" MIN
1DENSE GRADED BASE 1-1/4"(TYP.),2COMPACTED SUB BASECURB WALL
INSET
NOTES:1.DETAIL BASED ON WDNR TECHNICAL STANDARD 1060. ANY VARIATIONS FROMTHAT STANDARD IS UNINTENDED AND SHOULD NOT BE USED.2.TAPER BOTTOM OF BAG TO MAINTAIN 8" OF CLEARANCE BETWEEN THE BAG ANDTHE STRUCTURE, MEASURED FROM THE BOTTOM OF THE OVERFLOW OPENINGSTO THE STRUCTURE WALL.3.THE RIGID FRAME SHALL BE CONSTRUCTED OF GALVANIZED STEEL AND HAVEADEQUATE STRENGTH TO SUPPORT THE WEIGHT OF THE SEDIMENT BAG WHENCOMPLETELY FULL.4.THE RIGID FRAME SHALL NOT INTERFERE WITH OR ELEVATE THE GRATE MORETHAN 1/8".5.DROP THE INLET FILTER THOUGH THE CLEAR OPENING SUCH THAT THE HANGERSREST FIRMLY ON THE LIP OF THE STRUCTURE.TYPE D-RF INLET PROTECTION
CURB BACKEXTENSION FORINLETS WITHCURB BOXES
MAINTENANCE NOTES:1.WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARS SHALL BE TAKENSO THAT THE SEDIMENT TRAPPED IN THE FABRIC DOES NOT FALL INTO THESTRUCTURE. MATERIAL THAT HAS FALLEN INTO THE STRUCTURE SHALL BEIMMEDIATELY REMOVED.
REPLACEABLEFILTER BAG (22"MIN. TOTAL DEPTH)DUAL FABRIC BAGSSHALL BE STITCHEDTOGETHER.12" MIN.
LENGTH AND WIDTHDIMENSIONS SHALL BE PERINLET TYPE SPECIFIED ON PLANHANGERS (SEE NOTE #5)
AVAILABLE OVERFLOW DEPTHRIGID FRAME (SEE NOTES #2 AND #3)TYPE FF GEOTEXTILE FABRICNON-WOVEN INNER BAG LINER(COVERING LOWER HALF OF BAG)
CAN BE INSTALLED IN INLETSWITH OR WITHOUT CURB BOXES
MATERIALTHICKNESSSPECIFICATIONBITUMINOUS UPPER LAYER1.75"SECTION 460, TABLE 460-1BITUMINOUS LOWER LAYER2.25"SECTION 460, TABLE 460-1DENSE GRADED BASE12.0"SECTION 301 AND 305, 3" AND 1.25"TOTAL THICKNESS16.0"
PAVEMENT SECTIONS
1.SPECIFICATIONS BASED ON GEOTECHNICAL REPORT AS PREPARED BY CGC, INC., DATEDJULY 23, 2025. IF ANY DISCREPANCY BETWEEN THIS DETAIL AND THE GEOTECHNICALREPORT IS FOUND, THE GEOTECHNICAL REPORT HOLDS.2.LIGHT DUTY AREAS (REFERS TO THE STRIPED PARKING AREAS ONLY). MAY HAVEREDUCED BITUMINOUS LOWER LAYER TO 1.75" AND DGB TO 10.0".3.UNDERCUTTING IS LIKELY BASED ON UNDERLYING SOILS. ASSUME 30% OF SITE WILLREQUIRE UNDERCUTTING. UNDERCUT SECTION ASSUMED TO BE 12" OF 3" DGB OVERBIAXIAL GEOGRID (TENSAR BX TYPE 1 OR EQUAL). FINAL DETERMINATION BASED ONFIELD PROOF-ROLL.4.COMPACTION REQUIREMENTS4.1.BITUMINOUS CONCRETE: REFER TO SECTION 460-3.4.2.BASE COURSE: REFER TO SECTION 301.3.4.2, STANDARD COMPACTION5.MIXTURE TYPE LT BITUMINOUS PAVEMENT IS RECOMMENDED, REFER TO SECTION 460,TABLE 460-2 OF THE STANDARD SPECIFICATIONS.6.THE UPPER 4" OF DGB SHALL BE 1.25"; THE BOTTOM PART OF THE LAYER CAN BE 3"DGB.MATERIALTHICKNESSSPECIFICATIONCONCRETE SLAB LAYER 6.0"* SECTION 501, GRADE A, CLASS IDENSE GRADED BASE 8.0"**SECTION 301 AND 305, 31.5 MMTOTAL THICKNESS 14.0"NOTE: CONCRETE SIDEWALK TO BE 5" CONCRETE OVER 4" DENSE GRADED BASE.* REINFORCEMENT TO INCLUDE #4 REBAR 12" O.C. BOTH WAYS OR EQUIVALENT** SITE PROOF ROLLS TO BE COMPLETED WITH ADDITIONAL THICKNESS ADDED PERGEOTECHNICAL RECOMMENDATION. BASED ON CURRENT GEOTECHNICALRECOMMENDATIONS; 12" DGB TO BE ADDED BELOW 6" LAYER WITH ADDITIONAL BIAXIALGEOGRID (TENSAR BX TYPE I OR EQUIVALENT)
JOINT BETWEENSIDEWALK AND CURB6"125"4"
Page 65 of 127
KLEIN PERIMETER ROADVILLAGE OF MT. HOREB, DANE COUNTY, WI
C401
RIP RAP AND ENDWALL
CROSS SECTION B-B
CROSS SECTION A-ASLOPED/FLAT SWALE DISCHARGEAND FLAT POND DISCHARGESLOPED POND DISCHARGE
PLAN VIEW
DW - SEE CHART
L - SEE CHART
PER PLANS3D MIN.
AA
B
B EXTENDGEOTEXTILEFILTER FABRIC12' PAST ENDOF RIP RAP
EXTEND GEOTEXTILEFILTER FABRIC 12"PAST END OF RIP RAPGEOTEXTILEFILTER FABRIC,TYPE HRGEOTEXTILE FILTERFABRIC, TYPE HR
NOTE: RIPRAP SHALLEXTEND TO TOE OFSLOPE MIN.12" MIN.
RIPRAP(SEE CHART)
RIPRAP(SEE CHART)MIN. 1/2 D
12" MIN.
EXTEND RIPRAPTO SPRING LINEOF ENDWALLENDWALL
GEOTEXTILE FILTERFABRIC, TYPE HRRIPRAP(SEE CHART)MN. 1/2 D
1) JOINT TIES SHALL BE INSTALLED AT THE LAST(DOWNSTREAM) TWO JOINTS ON ANY PIPE RUN ENDING INAN APRON ENDWALL
STRUCTUREWLDEPTHTYPE STM AE NO. 117.1'5.0'1.5'LIGHT RIPRAP
STM
STMSTM
BIORETENTION BASIN OUTLETNTS TOP VIEWSIDE VIEW
10" PIPE FROM MANHOLE TOOUTFALL. I.E. = 1197.50
6" DIA ORIFICEI.E. = 1200.75
10" PIPE FROMMANHOLE TO OUTFALLFLOW
6" DIA. ORIFICE
5:1
5:1 TOP OF BERMELEVATION = 1204.0WEIR OVERFLOWELEVATION = 1203.2510' NOTE: OVERFLOW SHALL BE REINFORCED WITH TURF REINFORCED MAT (TRM) - CLASS III,TYPE C BY PYRAMAT OR APPROVED EQUAL. TRM SHALL BE INTALLED PER MANUFACTURER'SRECOMMENTDATIONS.
CONE GRATE TRASHRACKSBY HAALA - CG36TM (ORAPPROVED EQUAL)RIM = 1202.50
TRASH GRATE
1"X1" GALVANIZED WIREMESH TRASH GRATE WITHGALVANIZED SCREWCONNECTION. SIZE/SHAPEMAY VARY - ORIFICE SHALLBE COVERED BY GRATE
BIORETENTION BASINOVERFLOW WEIRNTS
36" DIAMETER MANHOLE
1-FOOT DEEP SUMPI.E. = 1196.56" PERFORATED PIPE FROMBASIN TO MANHOLEI.E. = 1197.5
STM6" PERFORATED PIPEFROM BASIN TO MANHOLE
FLOW
6" TOP SOIL>31
1.ALL CONSTRUCTION PRACTICES SHALL MEET THE SPECIFICATIONS OFTHE WDNR TECHNICAL STANDARD 1004 - BIORETENTION FORINFILTRATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ACOPY OF THIS STANDARD AND CONSTRUCT THE BIORETENTIONDEVICE IN ACCORDANCE WITH THE REQUIREMENTS OUTLINEDTHEREIN.2.CONTRACTOR SHALL INSTALL NATIVE PLANT PLUGS IN THE BASIN ANDINSTALL A CLASS II EROSION CONTROL MAT (OVERLAPPED ANDANCHORED WITH MIN. 6" LONG HARDWOOD STAKES). CUT AN "X" INTHE MATTING AND AUGER DOWN TO PLACE APPROPRIATE PLANTINGPLUGS EVERY 12 INCHES ON CENTER.
3.CONTRACTOR SHALL INSTALL 18" OF ENGINEERED SOIL CONSISTINGOF: 70% ASTM C33 SAND AND 30% CERTIFIED COMPOST (SEE GENERALNOTE 4).4.CERTIFIED COMPOST SHALL CONSIST OF: >40% ORGANIC MATTER,<60% ASH CONTENT, PH OF 6-8, AND MOISTURE CONTENT OF 35-50%BY WEIGHT.5.FILTER FABRIC SHALL BE PLACED ABOVE THE PERFORATED PIPE,BETWEEN THE PEA GRAVEL AND THE ENGINEERED SOIL, A WIDTH OF 4FEET CENTERED OVER THE FLOW LINE OF THE PIPE.
6.ANNUAL RYE GRASS SHALL BE SEEDED AT 40 LB/ACRE WITH THE SEEDMIX IN THE AREAS SURROUNDING THE BASIN, ON SIDE SLOPES, ANDOVER ANY LAND THAT DISCHARGES INTO THE BASIN FOR EROSIONCONTROL WHEN BASIN IS BROUGHT ON-LINE. ROOTSTOCK AND PLUGSARE REQUIRED TO ESTABLISH VEGETATION AT THE INVERT OF THEBASIN.7.ALL WORK TO BE CONDUCTED IN CONFORMANCE WITH APPLICABLELOCAL, REGIONAL, AND STATE STORMWATER STANDARDS FOR THEPROJECT SITE AS APPROVED BY THE REGULATORY ENGINEER.8.REFER TO LANDSCAPE PLAN FOR PLANTING REQUIREMENTS.
GENERAL NOTES:SECTIONN.T.S.SECTIONN.T.S.
6" COARSE GRAVELLAYER
18" ENGINEEREDSOILS LAYERREFER TO LANDSCAPE PLAN FORBIORETENTION BASIN PLANTINGS
AB
OUTLET STRUCTURE.REFER TO DETAIL6" PERFORATED UNDERDRAIN
BIORETENTION DEVICE1204.0
1200.00
1198.501198.00
REFER TO GENERALNOTE NO. 5
CLEAN OUT - 6" PVC PIPECONNECTED WITH A TEE TO THEUNDERDRAIN. TOP OF WELL TOHAVE A SECURED ABOVEGROUNDCAP PLACED AT THE BOTTOM OF
THE BASIN.PROVIDE TYPE B POND LINER ON BOTTOMAND SIDES OF BASIN PER WDNR STANDARDS(APPENDIX D, TECHNICAL STANDARD 1001).ACCEPTABLE LINERS INCLUDE 2-FEET THICKCLAY, 40 MIL THICK HDPE OR 30 MIL THICKPPL.
TYPE B LINER CUTOFFELEVATION ON SIDESLOPES: 1202.066" TOP SOIL
TYPE B LINER CUTOFFELEVATION ON SIDESLOPES: 1202.06
6" TOP SOIL
WATER SURFACE ELVATION100-YR EL = 983.12'
UNDERGROUND WET POND TYPICAL SECTION
STMSTMSTMSTMSTMSTM
STMSTM
STMSTMSTMSTMSTMSTM
STMSTM
BEDDING STONE TO EXTEND A MINIMUM OF6" ABOVE THE PIPE AND BELOW THE PIPE.ALTERNATE WATER TIGHT LINER TO WATERTIGHT PIPES6-FOOT DIAMETER WATER TIGHT PIPES.WATER LEVEL IN PIPES TO THE HALFFILLED POINT.
6.0'TYP.1.5' TYP.
0.5'TYP.
0.5'TYP. VARIES.APPROXIMATE 2.0'1192.5 - TOP OF BEDDING STONE1192.0 - TOP OF PIPE
1189.0 - WATER SURFACE /OUTLET PIPE INVERT
1186.0 - BOTTOM OF PIPE1185.5 - BOTTOM OF BEDDINGSTONE
VARIES (1195.4 - 1194.4)- TOPOF PAVEMENT
STMSTM
TOP VIEWSIDE VIEW
24" PIPE FROMSTORMWATER FACILITY TOMANHOLE. I.E. = 1188.94
12" PIPE FROMMANHOLE TO OUTFALLFLOW
12" PIPE FROM MANHOLE TOUNDERGROUND WET POND.I.E. = 1188.22
48" DIAMETER MANHOLEREFER TO UTILITY NOTES FORRIM TYPE AND ELEVATION.
UNDERGROUND WET POND OUTLETSTM MH NO. 2NTS
STMSTMFLOW
24" PIPE FROMSTORMWATERFACILITY TO MANHOLE
6" DIA ORIFICE IN INTERIORWEIR WALL.I.E. = 1189.0
SHARP CRESTED RECTANGULARWEIR.I.E. = 1190.25
WEIR WALLWITH 6"ORIFICE
EACH PIPE 40 LF. TOTAL 80 LF
Page 66 of 127
5. Landscaping Plan
The following exhibit is a detailed landscaping plan for the site designed by Olson Toon. The
landscape design for this project will meet all Village of Mount Horeb landscape design standards.
This plan contains an itemized plant detailing the types of plants and quantities that will be
incorporated.
Page 67 of 127
lp16051189.64
PERIMETER ROAD
PROPOSED PROPERTY LINE
PROPERTY LINETT
LOT 2LOT 11Pp
LANDSCAPE NOTES:• Please refer to Grading & Erosion Control Plan for final contour information.• Individual tree and shrub groupings in lawn areas to receive brown dyed wood mulch rings with trenchedge.SODPremium Kentucky Bluegrass sodSEEDSMPremium sunny grass seed blend with straw mat.(Class 1 Type B single net)All planting beds to be Capitol Washed Stone with DimexEdgePro polyvinyl (black plastic) edging
3Po
1AG8ag2Rk3Dk1Vd2QW2Ha3ag2Ha3pa3St1ag6rf1Cc3St3Po6rf1Cc3ca3Po3ca3St
2AF
1MJ1Cc3pa1JC3sh5pa5Rr3sh6pa1JC6ca
1Vd4hr2Dk5cm6cm9TO10ca4ct1Pj1aj3Hp3Iv1Pj3Am1Fs1Cp1Pj1Fs3Iv1Fs1Cp2Am3Dk2Rk1AF 1TA8ag3MR2GB
1GB1Vd1Ha3Sa3Dk2Am2Tm3Sa1Vd2Am1Cp3pa3Pf2Am3pa1Cp3Hp1Cp3ep1ca2Am1Cp3pa3Pf1ep3Cp1Cp3ep3Hp3Pf2hh6ca3Rr2hh2JC4sh3sh3St1Pp1Pp3sh3Po7rf3St3ep4ca1ct3Iv5ep1Pj3Po1Pj3ep1ca3Iv2Ha1Pj3ep1ca15ca6aj8pa1MR1CO1CO3JC
2AG3PG
1QB3MJ1QB 1TA3St3sh1TA5St6sh
SEEDSEEDSEEDSEEDSEED
SEEDSEED
SEED
SEED
SEED
SEEDSEED
SOD
2MR
SOD
SEED
SOD
SOD
SODSOD
SM
SM
SMSM SMSM
SM SMSM
SMSMSM
SM
SM
SM
SM
SMSMCONCRETE PATIO
EXISTING TREE (TYP)ORNAMENTAL TREESEVERGREEN TREESDECIDUOUS SHRUBSORNAMENTAL GRASSES & PERENNIALS
DECIDUOUS TREESGBGingko biloba 'Princeton Sentry'Princeton Sentry Ginkgo PLANT LISTKEYSCIENTIFIC NAMECOMMON NAMEQTYSIZE
#1 caCalamagrostis x acutiflora 'Karl Foerster'Karl Foerster Feather Reed Grass
TOThuja occidentalis 'Emerald Green'Emerald Green Arborvitae#3 DkDiervilla 'G2X885411'Kodiak Red Bush Honeysuckle6'
ROOTB&B
Cont.
B&BCont.
STEMJCJuniperus chinensis 'Trautman'Trautman Juniper6'B&B2"B&B3 QBQuercus bicolorSwamp White OakB&BTATilia americana 'McKSentry'American Sentry LindenB&B
#3Cont.#3 HaHydrangea arborescens 'Abetwo'Incrediball HydrangeaCont.PoPhysocarpus opulifolius 'SMPOTW'Tiny Wine Ninebark#3Cont.#1 hrHosta 'Rainbow's End'Rainbow's End HostaCont.
32412911121526494
EVERGREEN SHRUBSTmTaxus x media 'Tautonii'Taunton Yew#5Cont.PpPicea pungens 'Globosa'Dwarf Globe Blue Spruce#5Cont.32 RrRosa 'Meiggili'Coral Drift Rose#3Cont.8#3 AmAronia melanocarpa 'UCONNAM166'Low Scape Hedger AroniaCont.13#5Cont.4
AFAcer x freemanii 'Jefersred'Autumn Blaze Maple
StSpiraea betulifolia 'Tor'Tor Birchleaf SpireaVdViburnum dentatum 'Christom'Blue Muffin Arrowwood Viburnum
2"2"2"
#3 IvItea virginica 'Sprich'Little Henry Dwarf Virginia SweetspireCont.12 CpChamaecyparis pisifera 'Golden Mop'Golden Mop Japanese False Cypress#5Cont.8 MJMalus 'Red Jewel'Red Jewell Crabapple2"B&B4 RkRhododendron 'Karen'Karen Rhododendron#5Cont.4#5 CcCotinus coggygria 'NCCO1'Winecraft Black SmokebushCont.3 PjPhysocarpus opulifolius 'Jefam'Amber Jubilee Ninebark#3Cont.6#3 HpHydrangea paniculata'NCHP1'Puffer Fish HydrangeaCont.9#1 epEchinacea 'Prairie Splendor'Prairie Splendor ConeflowerCont.25 shSporobolus heterolepisPrairie Dropseed#1Cont.25
PGPicea glauca var. densataBlack Hills Spruce6'B&B3 MRMalus 'Royal Raindrops'Royal Raindrops Crabapple2"B&B9
PfPotentilla fruticosa 'Bailbrule'Creme Brulee Potentilla#3Cont.9
2"B&B2 COCeltis occidentalisCommon HackberryQWQuercus x warei 'Long'Regal Prince OakB&B52" AGAmelanchier x grandiflora 'Autumn Brilliance'Autumn Brilliance Serviceberry2"B&B3
paPerovskia atriplicifolia 'Little Lace'Little Lace Russian Sage#1Cont.37
tree form
#1 agAndropogon gerardii 'Blackhawks'Blackhawks Big Bluestem GrassCont.37 rfRudbeckia fulgida 'fulgida'Black Eyed Susan#1Cont.19#3Cont.6 SaSymphoricarpos albusCommon Snowberry#1 cmCarex morrowii 'Ice Dance'Ice Dance Sedge GrassCont.11#1 ctClematis ternifloraSweet Autumn ClematisCont.5#1 hhHibiscus 'Holy Grail'Holy Grail HibiscusCont.4
#3 FsForsythia x 'Mindor'Show Off ForsythiaCont.3
3ep
5MR
SMSM SM1QW1QW3JC3ag3JV3ag3JV3ag3JV3ag3JC
JVJuniperus virginiana 'Taylor'Taylor Juniper6'B&B9
1TA
Limestone Boulder retaining walls
1QW
QUARRIED LIMESTONE BOULDERS SET ONCOMPACTED NATIVE SOIL.MATERIAL THICKNESS RANGE: 8" TO 12"6 OZ. WOVEN WALL FABRICBETWEEN NATIVE SOIL BACK-FILL AND LIMESTONEPARTIALLY BURY BASE ROWFOR STABILITYTYPICAL LIMESTONE RETAININGWALL CROSS SECTION(HEIGHT VARIES)
SCALE: 1"=20'-0"0204060
PROPOSED BUILDING 1PROPOSED BUILDING 2
2sh
STORMWATER BASIN
STORMWATER BASIN PLUGS: 742 SQ FTMarsh MilkweedPurple ConeflowerBlue VervainCulver's Root2.5"Plug2.5"Plug2.5"Plug2.5"PlugBlue Flag IrisBrown Eyed SusanCardinal FlowerMarsh Blazingstar2.5"Plug2.5"Plug2.5"Plug2.5"PlugSwamp GoldenrodTorrey's RushBristly SedgeBrown Fox Sedge2.5"Plug2.5"Plug2.5"Plug2.5"PlugSwitch Grass2.5"PlugJoe Pye Weed2.5"Plug12" O.C.38STORMWATER BASIN NOTES:• See SITE DETAILS on Civil sheet C401for Stormwater basin information• place Coconut Fabric on Bio Basins and install native plant plugs 12" on center3838387676767676383838383812" O.C.12" O.C.12" O.C.12" O.C.12" O.C.12" O.C.12" O.C.12" O.C.12" O.C.12" O.C.12" O.C.12" O.C.12" O.C.Date:Scale:Designer:Revisions:Reference Name:red, as ORIGINAL.document unless stamped inDesigner. This is not an originalapproved by the Landscape "construction documents" unlessoutsourced as "biddable" or"schematic," and should not bethe plans presented herein areTo protect against legal liability,
www.olsontoon.com
Seal:
(608) 827-9401Verona, WI 535933570 Pioneer RoadKLEIN PERIMETER ROADPerimeter RoadMount Horeb, Wisconsin
May 23, 20251" = 20'-0"kms
JTKlein
Job # L100Plan Commission Submittal
LANDSCAPE PLAN
Page 68 of 127
6. Parking Calculations
Building 1
Underground Parking Stalls: 47
Surface Parking Stalls: 26
Total 73 (1.49 Per Unit)
Building 2
Underground Parking Stalls: 34
Surface Parking Stalls: 14
Total 48 (1.17 Per Unit)
7. Escrow Fees
All applicable fees and deposits will be paid in full in a timely manner.
8. Erosion Control and Stormwater Management Application & Fees
9. Erosion Control Plan
The application and plans have been sent in a separate link due to the size of the Stormwater
Management and Erosion Control plan files.
10. Signage Plan
The development team will return with a detailed signage application once available. Below is an
outline of the existing signage and an example of what the proposed onsite signage will look
like.
Existing Signage
Springdale Signage: Currently, there is an illuminated monument sign
between Springdale St and the Walgreens parking lot. (Indicated in Map)
Perimeter Signage: The main Perimeter entrance also has a stand-alone
illuminated sign.
Page 69 of 127
Current Signage
Page 70 of 127
Proposed Signage
After the 90 units are completed, the following signage elements will be installed or updated.
The picture below represents what a future monument sign could look like. The sign below is
4’x6’.
Main Development Sign
Positioned for visibility from main thoroughfare
Branding and name of the development prominently displayed
Landscaping integrated around base
Page 71 of 127
Leasing/Temporary Marketing Signage (Pre-Occupancy)
To be placed in existing monument frame or a removable ground sign
Duration: Until lease-up is complete
Must comply with local ordinances for temporary signs
Design & Materials
Materials: Sign bases and panels will utilize the same exterior cladding
materials as the residential buildings (e.g., stone veneer, cement board, metal
accents, and fiber cement trim).
Color Palette: Natural, earthy tones that reflect the building’s color scheme
Typography & Branding: Consistent font, iconography, and logo use across
all signs
Illumination: Low energy, shielded LED lighting for readability and
neighborhood compatibility
Page 72 of 127
VILLAGE OF MOUNT HOREB
PUBLIC HEARING
MAY 27, 2026
The Plan Commission of the Village of Mount Horeb will hold a public hearing on
the above date at 7:00pm in the Board Room of the Municipal Building, 138 E
Main Street, Mount Horeb, WI.
The purpose of the hearing is to consider an application from JT Klein Company,
INC for an amendment to the PD-Planned Development General Development
Plan to construct two multi-family residential apartment buildings at 101
Perimeter Road further described as parcel 0606-124-0065-1. The proposed
amendment includes one additional dwelling unit for a total of 90. The existing
General Development Plan allows up to a total of 89 dwelling units.
The Village Board, by its Plan Commission will hear all persons concerning all
matters and/or objections written or oral at that time.
PUBLISH: Mount Horeb Mail April 30, 2026
Mount Horeb Mail May 7, 2026
PROPERTY OWNERS: You are receiving this notice as you own property
that is within 300 feet of the proposed request. Please contact Interim
Village Administrator Jon Hochkammer at 608 437-6884 ext 2109 or
email jon.hochkammer@mounthorebwi.info with any questions.
Page 73 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 5.e
Consider New Alcohol Beverage License Applications: The Doghouse Tavern and
Grill, 117 S 1st Street; Zenith Food Group, DBA Vita Bella Italiano Ristorante, 209 E
Main Street; and Firefly Events Decor & Flowers LLC, 109 N 8th Street
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. 4078_001
Page 74 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 5.f
Consider Appointment of Agent Applications for New Alcohol Beverage Licenses: Jeff
Ackerman for The Doghouse Tavern and Grill, Jermaine Butler for Zenith Food Group
LLC, and Heidy Rizzi Lange for Firefly Events Decor & Flowers LLC
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. 4077_001
Page 75 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 5.g
Consider Alcohol Beverage License Renewal Applications: Premier Cooperative, 501
W Main Street; Miller and Sons Inc, 1845 Springdale Street; Trollway Liquor, 504 W
Main Street; Walgreens #11648, 1401 Springdale Street; Kwik Trip #794, 525
Springdale Street; Kwik Trip #1130, 9255 Ridgeview Road; Wiscoboxes, 305 E Main
Street; Elegant Bridal, 101 E Main Street; Buck & Honey's Restaurants, 108 S 2nd
Street; Norsk Golf Club, 2755 Golf Bowl Road; Grumpy Troll LLC, 105 S 2nd Street;
Aztlan Mexican Grill, 407 W Main Street; Driftless Social, 128 E Main Street; Bistro
101, 101 E Main Street; Isaac's Antiques, 132 E Main Street; Moho Jo LLC, 100 S 1st
Street; Sunn Cafe, 201 E Main Street; The Doghouse Tavern and Grill, 117 S 1st
Street
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. 4079_001
Page 76 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 5.h
Consider Appointment of Agent Applications for Alcohol Beverage License Renewals:
Joshua Kitelinger for Premier Cooperative, William Miller for Miller and Sons
Supermarket, Michael Rogers for Trollway Liquor, Rebecca Wentworth for Walgreens
#11648, Daniel Hying for Kwik Trip #794, Tracy Alvey for Kwik Trip #1130, Mills
Botham for Wiscoboxes, Marah Odgers for Elegant Bridal, Thomas Anderson for Buck
& Honey's Restaurants, Michael Woodward for Norsk Golf Club, Robin Pharo for
Grumpy Troll LLC, Jose Onate for Aztlan Mexican Grill, Matthew Schmock for Driftless
Social, Mark Valaskey for Bistro 101, Janelle Holmstrom for Isaac's Antiques, Tyler
Marks for Moho Jo LLC, Taddeus Rokitowski Jr for Sunn Cafe, Jeff Ackerman for The
Doghouse Tavern and Grill
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. 4080_001
Page 77 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026 Alyssa Gaffney, Village Clerk
AGENDA ITEM # 5.i
Consider Street Use Permit Application from Mount Horeb Area Chamber of
Commerce for the Art Fair, July 17-19, 2026
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. 4076_001
Page 78 of 127
Page 79 of 127
Page 80 of 127
Page 81 of 127
Page 82 of 127
Page 83 of 127
Page 84 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 6.a
2025 Village Audit Presentation by Baker Tilly
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. 200.13 FS Highlights - Final for 2025 Audits - Muni
Page 85 of 127
Village of Mount Horeb
Financial highlights
June 3, 2026
Client service team
John Rader, CPA, Managing Director
Casandra Chase, CPA, Senior Manager
© 2025 Baker Tilly US, LLP
Page 86 of 127
Village of Mount Horeb
General fund results
Summarized income statement
Actual Final budget Variance
Revenues and other financing sources 6,166,126$ 6,297,363 $ (131,237) $
Expenditures and other financing uses 6,641,950 7,321,959 680,009
Net change in fund balance (475,824) $ (1,024,596)$ 548,772 $
Fund balance category definitions
Nonspendable - amounts cannot be spent either because they are not in spendable form or because
legal or contractual requirements require them to be maintained in tact.
Restricted - amounts that can be spent only for the specific purposes stipulated by an external source.
Committed - amounts constrained for specific purposes that are internally imposed through formal
action of the governing body.
Assigned - spendable amounts that are intended to be used for specific purposes that are not
considered restricted or committed.
Unassigned - residual amounts that have not been classified within other categories above.
$968,350
$-
$-
$85,937
$-
$1,054,287
$1,401,099
$-
$-
$129,012
$-
$1,530,111
$- $500,000 $1,000,000 $1,500,000 $2,000,000
Nonspendable
Restricted
Committed
Assigned
Unassigned
Total
General fund - fund balance by category2024 2025
© 2025 Baker Tilly US, LLP
Source: current and prior year financial statement information and other benchmark information as noted. Page 1
Page 87 of 127
Village of Mount Horeb
General fund - fund balance trends
Fund balance policy:
To maintain unassigned fund balance between 20-25% of the subsequent years budgeted general fund
expenditures. Unassigned fund balance that exceeds this range shall be transferred to the capital
improvement projects fund to reduce future borrowing needs.
Other reference values
GFOA recommends a minimum of no less than 2 months (16.7%) of general fund expenditures.
Median reference value generated from 2021 - 2024 Baker Tilly municipal client data for population ranges
less than 10,000.
21.5%
0.0%
7.5%
0.0% 0.0%
30.85% 30.39% 29.41% 30.90%
0%
5%
10%
15%
20%
25%
30%
35%
2021 2022 2023 2024 2025
Unassigned general fund - fund balance
as a percentage of subsequent year's budgeted
expenditures
General Fund Actual Policy minimum Policy maximum Reference - Median
© 2025 Baker Tilly US, LLP
Source: current and prior year financial statement information and other benchmark information as noted. Page 2
Page 88 of 127
Village of Mount Horeb
General obligation debt
Debt management policy:
Total outstanding general debt obligations should remain within 50% of the Village's legal debt
margin capacity (5% of the Village's total equalized value). Non-utility and non-TIF related
general debt obligations should remain within 40% of the legal debt margin unless otherwise
authorized by the Village Board.
Non-Utility
Non-TIF GO
Total GO Debt Debt
Actual percentage of debt limit at 12/31/25: 40% 30%
Total debt outstanding by type at 12/31/2025
General obligation Revenue debt Other Total
Village 20,005,260$ - $ 834,526$ 20,839,786$
Utility 1,722,785 19,670,414 - 21,393,199
TIF 5,059,740 - - 5,059,740
Total 26,787,785$ 19,670,414 $ 834,526 $ 47,292,725$
Comparative metrics available online through the Wisconsin Policy Forum.
Select "Debt" -- options for custom comparisons or comparisons by county
https://wispolicyforum.org/research/municipal-datatool-examining-and-comparing-wisconsin-cities-and-villages/
$20,936,723
$18,915,000
$19,065,000 $21,975,000
$26,787,785
$45,619,590
$51,079,120
$58,979,195
$63,393,475
$67,411,605
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
$70,000,000
$80,000,000
2021 2022 2023 2024 2025
General obligation debt capacity
Total G.O. debt outstanding G.O. debt limit
© 2025 Baker Tilly US, LLP
Source: current and prior year financial statement information and other benchmark information as noted. Page 3
Page 89 of 127
Village of Mount Horeb
Governmental funds - debt service
Current and prior year data
2025 2024
Principal (excludes refunding) 2,195,000$ 2,090,000 $
Interest 712,141 686,746
Total 2,907,141 $ 2,776,746 $
Non-capital expenditures 11,199,620$ 11,128,676 $
Other reference values
Median reference value generated from 2021 - 2024 Baker Tilly municipal client data for population
ranges less than 10,000.
29.1%
26.4% 26.8%
25.0% 26.0%
16.6% 16.7%
14.1% 14.3%
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
2021 2022 2023 2024 2025
Debt service to non-capital expenditures
Village of Mount Horeb Reference - Median
© 2025 Baker Tilly US, LLP
Source: current and prior year financial statement information and other benchmark information as noted. Page 4
Page 90 of 127
Village of Mount Horeb
TIF District Historical Summary Through December 31, 2025
TIF District No. 3 % TIF District No. 5 %
Sources of funds
Tax increments 8,783,035$ 27% 4,453,980 $ 40%
Transfer from general fund 860,834 3% - 0%
Exempt computer aid 45,637 0% 404,970 4%
Investment income 359,601 1% 100,568 1%
Developer guarantees 20,000 0% - 0%
WEDC Grant - 0% 180,738 2%
Miscellaneous Revenues 329,537 1% 109,802 1%
Sales of property - 0% 1,174,934 11%
Premium on debt Issuance 394,829 1% - 0%
Long-term debt issued 21,638,703 67% 4,740,740 42%
TOTAL 32,432,176$ 100% 11,165,732 $ 100%
Uses of Funds
Capital, administration, and professional services 7,170,740 $ 22% 2,756,228 $ 27%
Interest on long-term debt 4,659,244 14% 1,201,799 12%
Discount and issuance costs - 0% - 0%
Developer grants 0% 4,830,531 47%
Debt issuance costs 321,426 1% 90,513 1%
Payment escrow 389,739 1% - 0%
Principal on long-term debt 19,969,703 61% 1,350,000 13%
TOTAL 32,510,852$ 100% 10,229,071 $ 100%
TIF Fund Balance (Deficit) - December 31, 2025 (78,676) $ 936,661 $
Calculation of Net Cost Recoverable through TIF Increments
General obligation debt outstanding 1,669,000 3,390,740
Levy/ transfer from general fund to be repaid 860,834 -
TIF Fund (Balance)/Deficit - December 31, 2025 78,676 (936,661)
Net cost recoverable through TIF increments - December 31, 2025 2,608,510$ 2,454,079 $
Creation date: March 24, 2004 August 18, 2016
Last date to incur project costs: March 24, 2022 August 18, 2038
Last year to collect increment: 2027 2043
5
Page 91 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026 Ryan Czyzewski, Village Board
President
AGENDA ITEM # 6.b
Proclamation Affirming the Village of Mount Horeb's Commitment to Diversity &
Inclusion
BACKGROUND
In 2019 the Village Board and Department Heads conducted a strategic planning
session to identify the Village’s Mission, Vision, and Core Values. Valuing diversity
and inclusion was approved as part of the Vision statement, with reaffirmation in 2023
and 2025 strategic planning session.
The League of Wisconsin Municipality’s November 2019 magazine edition, Inclusive
Communities, provided abundant information on how diversity & inclusion are
beneficial for local municipalities, with subsequent information reinforcing the benefit.
Diversity and inclusion seeks to promote and embrace a workforce or environment
with different characteristics such as age, race, color, gender, sexual orientation,
disabilities, religions, cultures, education, beliefs, interests, abilities, and much more.
All of the municipalities identified as Mount Horeb’s peers already have frameworks in
place to help their staff and community with diversity and inclusion.
This proclamation officially recognizes the importance of being a part of Mount Horeb’s
Vision, and reemphasize the need remains. The goal is to further implement and
integrate diversity and inclusion into Village operations to better communicate with and
serve internal and external stakeholders. With this proclamation, Village staff and
committees are empowered and encouraged to consider diversity and inclusion in
their decision-making processes, just as they have already done for outstanding
service, sustainable growth, and enhancing quality of life for all.
RECOMMENDATION
ATTACHMENTS
1. Proclamation - Diversity & Inclusion
Page 92 of 127
Village of Mount Horeb
138 E Main Street
Mount Horeb, WI 53572
Phone (608) 437-6884/Fax (608) 437-3190
Email: admin@mounthorebwi.info Website: www.mounthorebwi.info
PROCLAMATION AFFIRMING THE VILLAGE OF MOUNT
HOREB’S COMMITMENT TO DIVERSITY & INCLUSION
Whereas, the Village of Mount Horeb has adopted a Strategic Vision
that recognizes the importance of diversity and inclusion within the
community and organization; and
Whereas, the Village acknowledges that barriers and inequities can
exist within communities and institutions, and affirms the importance
of treating all individuals fairly, respectfully, and without
discrimination or bias; and
Whereas, fostering an inclusive workplace and community
strengthens communication, collaboration, public trust, and the
delivery of services to residents, businesses, visitors, and employees;
and
Whereas, education, training, and ongoing dialogue help Village staff
and officials better understand diverse perspectives and enhance
engagement with both internal and external stakeholders; and
Whereas, the Village is committed to reviewing and improving its
policies, procedures, and organizational culture in order to meet or
exceed legal standards and support the needs of employees and the
broader community; and
Whereas, the Village recognizes that a diverse and inclusive
workforce and community contribute to innovation, stronger decision-
making, civic participation, and the overall well-being of Mount
Horeb;
Page 93 of 127
NOW, THEREFORE, BE IT PROCLAIMED, by the Village Board of the
Village of Mount Horeb that the Village reaffirms its commitment to
diversity and inclusion and will continue working to integrate these
values into its policies, practices, programs, and organizational
culture for the benefit of all members of the community.
DATED this 3rd day of June 2026.
Signed: ___________________________________
Ryan Czyzewski, Village President
Page 94 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 6.c
Consideration of Public Art Ordinance 2026-06
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. Public Art Ordinance Memo 5.27.26 (2)
Page 95 of 127
To: Village of Mount Horeb Plan Commission
From: Village Planner: Ben Rohr, AICP
Date: May 27, 2026
Re: Public Art Ordinance
WHY IS THIS NEEDED?
Over time, the Village has received requests for the installation of public art. Each situation has been
handled slightly differently. For example, some murals have been brought forth to the Plan Commission
for review while troll sculptures have not.
Today, there is an inconsistent approach to handling public art and the core purpose of the proposed
ordinance is to create a process so that every new project moving forward is treated fairly, objectively,
and the same.
If the Village continues to handle each situation differently and does not have a defined process, there
will be an overall lack of consistency over time. This results in a potential situation where Village staff is
left to figure out how to handle each situation, which leads to interpretations, inconsistent
administration, and an unknown outcome for those wishing to increase the presence of public art in the
community.
WHY NOW?
The issue has been identified by Village staff for many years, but the focus was to complete the new
Zoning Ordinance first before addressing this issue.
The new Zoning Ordinance creates a content-neutral Sign Code. This means that the Village is no longer
reviewing signage based on what it says, but rather by where its located, what its made of, and its size,
shape, and configuration. Its explicitly stated within the Sign Code (Section 17.09.03) that “art works,
including but not limited to wall murals and statues, which do not contain a commercial message, logo,
or branding” are not regulated as a sign under the ordinance.
Further, within Section 17.07.20-17.07.40, there are façade articulation requirements for multi-family,
commercial, mixed-use, institutional, and industrial land uses. One of the methods that can be used to
accomplish façade articulation is “public art installation located directly on the façade of the structure.”
Finally, within Section 17.03.28(7), there are defined minor accessory structures and obstructions. This
list includes statues and art objects and allows them to be located within the front, street side, side, or
rear yard if they are no more than 5 feet tall and no larger than 20 square feet.
Page 96 of 127
May 27, 2026 Page 2 of 2
In combination, there are some new standards within the Zoning Ordinance to handle public art, but it
does not cover the full breadth of all situations and leaves potential gaps.
WHY A LICENSE?
Chapter 12 of the Municipal Code includes multiple other licenses and permits that the Village requires
for specific/unique activities (mobile food vendors, taxicabs, dogs and cats, sidewalk cafes, etc.).
The purpose of a license is different than that of Site Plan or other zoning-related action. The intent of a
license is to document approval of the action, provide staff with the ability to track actions over time,
and offer a mechanism for enforcement in the event of a complaint or violation. As noted above, none
of this is happening today and the proposed ordinance is an attempt to remedy that situation.
WHERE WOULD THE LICENSE APPLY?
As drafted, the proposed ordinance would apply across the entire community – all zoning districts, land
uses, etc. This could be altered or changed, if desired, but the idea would be that there is uniformity in
application for improved staff efficiency.
HOW WOULD THIS WORK?
Below is a scenario for context – 1) without the Public Art Ordinance and 2) with the Public Art
Ordinance.
A property owner wishes to install a 5-foot-tall freestanding art piece in the front yard. The property is
located within the Neighborhood Mixed-Use Zoning District on Main Street.
1) Without the Public Art Ordinance
The art piece is installed, but there is no documentation of it and there’s no standards regulating it
outside of the minor accessory structures section limiting height and size.
2) With the Public Art Ordinance
A license is obtained through the Village and the art piece is installed. The Village has a record of it if
there’s an issue, the Village ensures that its located in a manner that doesn’t impact vehicle traffic
visibility or safety, and the Village benefits from a new public art project.
WHAT IF THIS DOESN’T WORK?
There’s a significant amount of change occurring right now within Mount Horeb following the adoption
of a brand-new Zoning Ordinance.
It’s recommended that the new Public Art Ordinance be tested over the next 12 months to see if its
accomplishing the intended purpose or if there needs to be a new approach taken. If approved by the
Plan Commission and Village Board, staff could obtain one year of data and present that at a meeting in
June 2027 to be reevaluated.
WHAT ARE NEXT STEPS?
If acceptable to the Plan Commission, recommend the draft ordinance to the Village Board for approval.
To note, no changes have been made to the ordinance from the April version. Instead, a summary guide
has been produced to assist future applicants with understanding the process. See attached.
Page 97 of 127
Village staff person name and title
Village staff email
138 E. Main St | Mount Horeb, WI 53572
Frequently Asked Questions
This document is intended to help answer common questions related to public art. It provides
general guidance and does not replace required Village of Mount Horeb review and approval.
How do I apply for a public art license?
Please fill out the license application here: (insert link)
Village staff will review and issue the license within 30 days of submission.
What is public art?
A temporary or permanent work of art that is located outdoors and intended to be
visible by the public. It includes sculptures, murals, mosaics, water features,
earthworks, glass, or function art.
Where is public art allowed?
Anywhere in the Village so long as a public art license is obtained by the property owner.
Village of Mount Horeb Public Art
Sculptures, Murals, Mosaics, Water Features, Earthworks, Etc.
Page 98 of 127
Village staff person name and title
Village staff email
138 E. Main St | Mount Horeb, WI 53572
Additional Questions?
If you still have questions or would like to submit a license application, please contact (insert contact
information).
What are the local requirements?
Location • Outdoors and viewable by the public from the property
• Must meet required setbacks of the applicable zoning
district
• Must not impede traffic patterns, vision triangles, or public
safety
• Outside of easements or public infrastructure
• If attached to a building, extend 6 inches or less from the
façade
• If attached to a building, not cover any windows, doors,
vents, or architectural features
Height • If attached to a building, be shorter than the height of the
structure
• If freestanding, be 5 feet in height or shorter
Design • Contains no changing or flashing images or lights
• Contains no brand names, product names, or
logos/trademarks
• Made of durable materials that prevent weathering, theft,
and vandalism
Maintenance • Property owner is responsible for maintenance and removal
• Maintenance agreement must be completed with license
application
Page 99 of 127
Village of Mount Horeb
DRAFT Chapter 12.075 Public Art Permits
(1) Purpose.
(a) The purpose of this chapter is to establish a permitting process that will allow for
and encourage the installation of public art throughout the community. Art
contributes to livable, aesthetically pleasing and pedestrian-friendly streetscapes.
The experience of public art makes a space seem more welcoming. It helps a
community remember its past, honor an ideal, and express its values and concerns
to future generations. Public art makes a community more livable and more visually
stimulating.
(b) Specific goals of public art are to:
1. Further the goals Village Comprehensive Plan and applicable area plans.
2. Enhance the Village's sense of place in the region by providing unique artwork
throughout the community in a manner unlike any other place in the area.
3. Celebrate the Village's history and cultural spirit and identity through the
creation of art that is accessible to the public.
4. Create a recognizable icon.
5. Enhance the appearance and livability of public spaces through the placement
of site-specific art projects that respond to the natural and built landscape.
6. Enliven public spaces.
7. Enhance overall quality and identity of the place and/or building.
8. Strengthen community identity, spirit and collective cultural experience through
the placement of public art throughout the Village.
9. Allow local, regional, national and international artists to share their creations
with the community.
10. Stimulate the economic success of businesses.
11. Attract visitors and leave them with a positive impression and a desire to return.
12. Create a more livable community by linking arts and everyday life with the
objective of making Mount Horeb the place of choice to live, work, recreate and
raise a family.
(2) Definitions. As used in this chapter, the following terms shall have the meaning
indicated:
(a) Alteration. Includes any change to a permitted public art, including but not limited
to any change to the image(s), materials, colors, or size of the public art. "Alteration"
does not include naturally occurring changes caused by exposure to the elements
or the passage of time. Minor changes that result from the maintenance or repair of
the public art shall not constitute "alteration. " Such minor changes may include
Page 100 of 127
slight and unintended deviations from the original image, colors, or materials that
occur when the art piece is repaired due to the passage of time or as a result of
vandalism.
(b) Applicant. Any person, firm, corporation or association who applies for and secures
a public art permit for the purpose of installing public art as provided for in this
chapter. The sponsor shall be responsible for ensuring compliance with all
requirements and obligation of the permit including but not limited to obligations
relating to maintenance of the public art and its removal if a permit is revoked or
terminated. The sponsor shall be a party to any and all agreement(s) provided
herein.
(c) Public Art. Includes temporary or permanent works of art in any media that have
been planned and executed with the specific intention of being sited or staged in or
have the ability to be viewed from the physical public domain, usually outside and
accessible to all. Public art includes all forms of visual art that is located outdoors
and is visible to the general public. Works of public art to be placed in the
community may include:
1. SCULPTURE AND KINETIC ART. Freestanding, wall supported or suspended; in
any appropriate material or combination of materials.
2. MURALS AND PAINTINGS. In any appropriate material or variety of materials,
with or without collage.
3. MOSAICS. Including tiled composites on walkway, street furniture and wall
surfaces.
4. WATER FEATURES. Including fountains, waterfalls and decorative pools.
5. EARTHWORKS. Environmental works in appropriate outdoor sites.
6. GLASS. Including but not limited to ceramics and lighted glass, including neon
and plastic.
7. FUNCTIONAL ART. Including decorative furnishings or fixtures, but not limited to
gates, railings, streetlights or seating, if created or decorated by artists as unique
elements.
(3) Eligibility criteria.
(a) To be considered "public a r t ," the art must be located either upon public property or
upon private property and must be freely viewable by the general public during the
normal hours of operation of the premises upon which the art is located. All public
art projects must be reviewed and approved by Village staff. The following factors
are to be considered in approving "public art":
1. Alignment with the Purpose Statement in Section 12.075(1).
Page 101 of 127
2. Consistency with the requirements of the Public Art Location Criteria in Section
12.075(4), Public Art Program Criteria in Section 12.075(5), and Public Art
Maintenance Criteria in Section 12.075(6).
(4) Public art location criteria.
(a) Display of public art throughout the Village is encouraged. There may, however, be
areas that are not appropriate for an art display. The following criteria will be
considered in determining whether a proposed location for public art can be
approved:
1. Meets the required setbacks of the applicable zoning district.
2. Provides visibility from a publicly accessible location.
3. Does not impede traffic patterns, vision triangles, or public safety.
4. Is located outside of any easement or area utilized for public infrastructure.
(5) Public art program criteria.
(a) A public art project shall:
1. Not be moved or have any alterations to the permitted public art, outside of
normal maintenance such as cleaning, repainting, or replacing identical
structural components, materials, etc.
2. Not, if attached to a building:
a. Exceed the height of the structure.
b. Extend more than six inches from the building facade.
c. Cover windows, doors, vents or other architectural elements such as
cornices and pilasters.
3. Not contain changing images to include flashing or sequential lights or other
automated methods that result in movement, the appearance of movement, or
change of imaging. This does not include static illumination turned on during
nighttime hours.
4. Not contain any brand name, product name, or abbreviation of the name of any
product, company, profession or business, or any logo, trademark, trade name
or other commercial message that would fall within the Zoning Ordinance’s
definition of Sign (see Section 17.09.03).
5. Shall be durable, permanent, and easily protected from vandalism and
weathering; consideration shall be given to the structural and surface integrity
and stability of the building façade (if the public art is a painting or mural), the
permanence and durability, and resistance to weathering, theft, and vandalism.
(6) Public art maintenance criteria.
(a) The applicant shall retain responsibility for maintenance and regular upkeep of the
approved public art per the maintenance plan reviewed and approved in
conjunction with the approval of the public art project.
Page 102 of 127
(b) If, for any reason, a public art piece is removed, destroyed, or has deteriorated, the
property owner on which the art is located is responsible for removal or repair.
(7) Permit application process.
(a) A public art permit must be secured for all public art installations. See the Village of
Mount Horeb fee schedule for permit application fees.
(b) Application for a permit for public art must be completed by the applicant,
submitted to the Village, and shall include the following information:
1. Completed Village application form for a public arts permit.
2. Project information on the program including:
a. Each art installation location and the time in which the art will be
displayed.
b. A dimensioned sketch for each location identifying the boundaries within
which the public art element is to be located.
c. Pictures depicting the relationship of the public art element to adjacent
buildings and spaces.
3. Information on the materials to be utilized for the project and the durability of
these materials.
4. A maintenance plan meeting the requirements of Section 12.075(6).
(8) Permit review process.
(a) Once submitted, a public art permit application shall be reviewed for completeness
by the Zoning Administrator as follows:
1. The Building and Zoning Administrator shall determine whether the application
is complete and whether the proposed project meets the eligibility criteria to be
considered a public art project.
a. If the Zoning Administrator determines that the application is not
complete or does not fulfill the eligibility criteria to be considered public
art, they shall return the application to the applicant.
b. If the Zoning Administrator determines that the application is complete,
they shall notify the applicant.
2. Upon notifying the applicant that the application is complete, the Zoning
Administrator shall review the application and evaluate whether the public art
project meets the criteria established under the program.
3. Within 30 days of submission of a completed application, the Zoning
Administrator may approve the public art permit application as originally
proposed, may approve the application with modifications, may deny approval
of the application, or may recommend the project be reviewed and acted upon
by the Plan Commission or Historic Preservation Commission.
Page 103 of 127
a. Any public art project proposed to be located on a locally-designated
historic property shall also obtain approval from the Historic Preservation
Commission prior to the issuance of a public art permit.
b. If recommended to the Plan Commission, the project will be placed on
the next available meeting agenda for consideration.
i. The Plan Commission shall base its decision upon a report
provided by the Zoning Administrator and the project’s
consistency with the Purpose Statement in Section 12.075(1) and
in meeting the requirements of the Public Art Location Criteria in
Section 12.075(4), Public Art Program Criteria in Section 12.075(5),
and Public Art Maintenance Criteria in Section 12.075(6).
(9) Effect of denial. No application which has been denied shall be resubmitted for a period
of 12 months from the date of said order of denial, except if new information is
submitted to the Zoning Administrator, Historic Preservation Commission, or Plan
Commission sufficient to change their recommendation.
(10) Time limits on completion. Once a permit for a public art project has been
approved, the project must commence within 90 days of said approval of the permit,
and shall be completed within 365 days of the project initiation date. The failure to
initiate or complete the project within the periods set forth herein shall automatically
constitute a revocation of the public art permit.
(11) Termination or revocation of an approved permit.
(a) Any public art project found not to be in compliance with the terms of this chapter
and/or the conditions under which a permit for the project was issued under this
chapter shall be considered in violation of this chapter and shall be subject to the
penalties set forth under Chapter 25.04. A public art permit may be revoked for such
a violation.
(b) Public art created or installed under a public art permit that has been terminated or
revoked must be removed within 60 days of the date of notice. If said public art is
not removed within the time period provided in the notice, the Village shall have the
right, but not the obligation, to either remove or contract for the removal of the non-
project and shall bill the property owner for all costs incurred in taking this action.
Any costs incurred shall be in addition to the penalties set forth in Chapter 25.04.
Page 104 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 6.d
Consider Fundraising Agreement with Dennis Cooley for Recreation Complex
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. Mount Horeb Recreation Complex Proposal DRAFT
2. Mount Horeb Recreation Complex draft agreement
3. Mount Horeb Sports Complex fundraising reference DRC
Page 105 of 127
Proposed Fundraising Plan
Mount Horeb Outdoor Sports Complex
Project Cost: $12.5 Million in Phases
Campaign Goal: $6.5 Million in Philanthropic Support
Development Costs: Not to exceed 5% of Campaign Goal ($325,000)
Costs include all campaign-related costs for Case for Support materials used in
identification, qualification, cultivation, solicitation and stewardship of gifts. Also
included are the donor recognition elements, special to this project
Fundraising Lead: Dennis Cooley
Campaign Duration: 3 Years, starting in fall 2026
I. Executive Summary
The Mount Horeb Outdoor Sports Complex will be a transformational community
investment that enhances recreation, youth development, tourism, and economic
vitality for Mount
Horeb and the
surrounding
region. Designed
as a multi‑use,
year‑round
destination, the
Complex will
support local
residents, visiting
teams, leagues,
tournaments,
and community
events while strengthening Mount Horeb’s identity as a healthy, family‑friendly
community.
The total project cost is $12.5 million, with $6.5 million to be raised through private
philanthropy over three years. Remaining funds will be secured through public
funding, grants, municipal participation, and financing. This fundraising plan outlines a
disciplined, relationship‑driven campaign emphasizing leadership gifts, broad
community participation, and long‑term donor engagement.
The campaign will prioritize early leadership investments to build credibility and
momentum, followed by a strong public phase that invites widespread community
support. Success will depend on active volunteer leadership, strategic donor
cultivation, and consistent communication of impact.
Page 106 of 127
II. Case for Support
The Mount Horeb Outdoor Sports Complex addresses four compelling community
needs:
1. Youth and Family Recreation
The Complex will provide safe, modern facilities that promote physical activity,
teamwork, and character development for youth and families across all ages
and abilities.
2. Economic Impact and Tourism
Tournaments and regional events will increase overnight
stays, restaurant traffic, and retail spending—generating
ongoing economic benefits for Mount Horeb businesses.
3. Community Identity and Quality of Life
The Complex will serve as a civic gathering place that
strengthens community pride, volunteerism, and intergenerational connection.
4. Year‑Round Access and Equity
The project is designed for inclusive access, ensuring affordable and equitable
recreational opportunities for residents across demographics and income
levels.
Donors are not simply funding facilities - they are investing in Mount Horeb’s long‑term
vitality, health, and growth.
III. Campaign Goal and Gift Strategy
Fundraising Goal
• $6.5 million in philanthropic contributions
• Three‑year comprehensive campaign
Gift Range and Donor Pyramid
The campaign will be anchored by a small number of significant leadership
commitments, followed by a strong mid‑level and broad‑base giving strategy.
Gift Level Number of Gifts Subtotal
$1,000,000+ 1–2 $1,000,000–$2,000,000
$500,000–$999,999 2–3 $1,000,000–$2,000,000
$250,000–$499,999 3–4 $750,000–$1,500,000
$100,000–$249,999 6–8 $750,000–$1,500,000
$25,000–$99,999 15–20 $750,000–$1,000,000
Under $25,000 300–500 $500,000–$750,000
Total — $6.5M
Key principle: Approximately 70% of the goal will be secured from the top 15–20
donors.
Page 107 of 127
VI. Donor Segmentation and Strategies
Major Donors ($100,000+)
• Personalized proposals tied to naming opportunities
• Visits led by campaign leadership
• Multi‑year pledges encouraged
• Customized impact reporting
Mid‑Level Donors ($25,000–$99,999)
• Project‑specific funding opportunities
• Small group briefings and site tours
• Recognition in permanent donor
displays
Community Donors (Under $25,000)
• Broad participation campaigns
• Online giving, events, and peer‑to‑peer outreach
• Emphasis on community pride and shared impact
Corporate and Business Partners
• Sponsorship packages tied to tournaments, fields, or amenities
• Employee engagement opportunities
• Visibility through signage and marketing materials
Foundations and Grants
• Focus on recreation, youth development, health, and rural/community
development
• Strong alignment with measurable outcomes and economic impact
VII. Recognition and Naming Opportunities
Philanthropic recognition will be a core incentive and stewardship tool. Opportunities
may include:
• Naming of the Complex
• Field, court, and facility naming
• Programmatic naming (youth leagues, tournaments)
• Donor recognition wall
• Digital and print acknowledgments
All recognition will align with established gift thresholds and community standards.
Page 108 of 127
VIII. Communications and Marketing
Effective communication will reinforce donor confidence and community engagement.
Channels
• Dedicated campaign webpage
• Regular email updates and progress
reports
• Local media features and press
releases
• Social media storytelling focused on
athletes, families, and local impact
Messaging Focus
• Economic and community impact
• Youth development outcomes
• Donor leadership and generosity
• Transparent progress toward goals
IX. Stewardship and Donor Engagement
Long‑term success requires strong stewardship
beyond gift closure.
• Formal pledge acknowledgments and annual
reminders
• Construction and milestone updates
• Exclusive donor previews and tours
• Annual impact reports post‑completion
Strong stewardship will position the organization for
future phases, expansions, and endowment opportunities.
X. Plan of Action
The Mount Horeb Outdoor Sports Complex represents a once‑in‑a‑generation
investment in health, community, and economic vitality. With a clear goal, disciplined
execution, and engaged leadership, raising $6.5 million in private support over three
years is an achievable and inspiring objective. By prioritizing relationships,
transparency, and community pride, this campaign will not only fund a facility - but
strengthen Mount Horeb for decades to come.
Page 109 of 127
DEVELOPMENT SERVICES AGREEMENT
This Development Services Agreement (“Agreement”) is entered into as of September 1,
2026 (“Effective Date”) by and between:
Client: Village of Mount Horeb, Wisconsin a Wisconsin municipality with principal offices
at 138 East Main St., Mount Horeb, WI 53572 (“Client”)
Contractor: LaCoona Consulting, LLC, with principal offices at 1035 Kamla Ct., Platteville,
WI 53818
1. Background and Purpose
Client is undertaking a roughly $12.5 million capital project for the design and
construction of an Outdoor Sports Complex in Mount Horeb, Wisconsin (“Project”).
Contractor will provide professional fundraising development services to secure $6.5
million in philanthropic contributions toward the Project.
2. Scope of Services
Contractor shall:
1. Develop a comprehensive fundraising plan, including timelines, donor
segmentation, and solicitation strategies.
2. Identify, cultivate, solicit, and steward prospective donors, including individuals,
corporations, foundations, and public funding sources.
3. Coordinate campaign events, donor recognition programs, and public relations
efforts related to fundraising, including social media and website.
4. Maintain accurate donor records and provide regular progress reports.
5. Collaborate with Client’s board, staff, and volunteers to maximize fundraising
effectiveness.
6. Return 20% of development fees charged back to the project to cover costs related
to identification, cultivation and stewardship, including funding for donor
recognition.
Page 110 of 127
3. Term
This Agreement shall commence on September 1, 2026 and continue until August 31,
2029, unless fundraising goals are met before the deadline, both parties agree to extend
the deadline or if agreement is terminated earlier in accordance with Section 12.
4. Compensation
1. Fee Structure: Contractor shall be compensated at five percent (5%) of the total
funds raised, calculated on actual contributions or signed commitments to pay
received by Client.
2. Maximum Compensation: The total potential compensation shall not exceed
$325,000. In the event more than $6.5 million is raised, those additional funds will
be compensated at the five percent (5%) rate and would be additional to the
maximum compensation amount. Of the 5% compensation rate, 20% (or 1%) will be
returned to the project to cover fees related to identification, cultivation and
stewardship, including donor recognition.
3. Payment Schedule: Payments shall be made quarterly, within 30 days after the end
of each quarter, based on verified contributions received.
4. Milestone Bonuses (optional):
• 25% of goal ($1,625,000) reached: $10,000 bonus
• 50% of goal ($3,250,000) reached: $15,000 bonus
• 100% of goal ($6,500,000) reached: $25,000 bonus
5. Expenses
Client shall reimburse Contractor for pre-approved, reasonable out-of-pocket expenses
directly related to campaign activities, including travel, printing, and event costs, upon
submission of receipts. These expenses are considered part of the Maximum
Compensation total.
6. Reporting and Performance Reviews
1. Monthly Reports: Contractor shall provide written updates detailing donor
contacts, solicitations, pledges, and funds received.
Page 111 of 127
2. Quarterly Reviews: Parties shall meet quarterly to review progress, adjust
strategies, and address challenges.
3. Annual Evaluation: At the end of each contract year, Client may evaluate
Contractor’s performance and determine whether to continue under the same
terms.
7. Donor Exclusivity
During the term of this Agreement, Contractor shall not solicit donations for any other
project in direct competition with the Client’s fundraising campaign within a 25-mile radius
of Mount Horeb, WI, without prior written consent.
8. Confidentiality
Both parties agree to maintain the confidentiality of donor information, campaign
strategies, and proprietary materials, and to use such information solely for the purposes
of fulfilling this Agreement. Training of key team members will be performed.
9. Ownership of Materials
All campaign materials, donor lists, and related documents created by Contractor in
connection with this Agreement shall be the property of Client upon payment of all
amounts due.
10. Independent Contractor Status
Contractor is an independent contractor and not an employee, partner, or agent of Client.
Contractor shall be solely responsible for all taxes, withholdings, and other statutory
obligations.
11. Indemnification
Each party shall indemnify and hold harmless the other from and against any claims,
damages, liabilities, and expenses arising from its own acts or omissions in connection
with this Agreement.
Page 112 of 127
12. Termination
1. Without Cause: Either party may terminate this Agreement with 60 days’ written
notice.
2. For Cause: Either party may terminate immediately upon material breach by the
other party, if such breach is not cured within 30 days after written notice.
3. Effect of Termination: Contractor shall be compensated for services rendered and
funds raised through the effective termination date.
13. Governing Law
This Agreement shall be governed by and construed in accordance with the laws of the
State of Wisconsin.
IN WITNESS WHEREOF, the parties have executed this Agreement as of the Effective
Date.
Client: Village of Mount Horeb, Wisconsin
Name: ___________________________
Title: ___________________________
Signature: _______________________
Date: ___________________________
Consultant: LaCoona Consulting, LLC
Name: Dennis R. Cooley
Title: Owner
Signature: _______________________
Date: ___________________________
Page 113 of 127
Mount Horeb Sports Complex
Partial Project List (in no order): Dennis Cooley
1. Engineering Hall, UWP, Phase 1, successfully raised $8.5 million for electrical and mechanical
engineering. Created planned giving list for Phase 2 (Sesquicentennial Hall)
2. Bo Ryan Court Naming: First major giving event for athletics
3. Pioneer Gardens and Greenhouses: Multi-faceted project to name entire garden (Mansel and
Dottie Johns) as well as a series of gardens designed to create hands-on opportunities for
horticulture and other students. Multi-million dollar project over five years
4. Ralph E. Davis Pioneer Stadium: Turf field naming as well as visiting bleachers and aesthetics
after tornado cut through facility in 2010. Key gift: Lead gift made by the Chicago Bears and the
McCaskey family
5. Ullsvik Hall renovation: From the basement (Luce Center) to the walkways that honor Normal
School teachers and Mining School engineers to the naming of Velzy Commons for events, this
multi-million complete remodel was a blend of State dollars and private funding. This is the
project we established 25 percent of project cost for fundraising
6. Wright Veterans Center: Named for James Wright (former president of Dartmouth and UWP
graduate) and his brother Robert, this project brought together all levels of our military and the
alumni who served or families impacted
7. Barth Sports Complex: Named for legendary athletic director and coach John Barth, this project
brought together several disgruntled members of the “UWP family” by uniting around this
fundraising effort. This named the entire sports complex at UWP
8. Center for the Arts: Series of namings to raise funding for endowments around the arts. Raised
nearly $2 million that funds the summer arts program annually
9. Platteville Walking Trail: Assisted in raising the final $1.0 million to complete the project and to
organize the naming recognition, after the Platteville Community Arboretum landed a $631,000
grant from the DNR
10. Inclusive Playground: Assisted in finishing the $1.8 million project’s fundraising goal for this
large, wonderful park in Smith Park that is used by thousands annually
11. Sports signage program, City of Platteville. Helped create an ongoing revenue stream for the
City’s youth sports programs
12. Platteville Golf & Country Club: Endowment Committee. Recently formed a 501(c)(3) charitable
organization to create an endowment for the 125-year old course. Recently assisted with $1.2
million estate gift that will fund the initial fund balance
13. Mount Horeb Veterans Memorial Project: Worked with large number of volunteers, created
strategy and execution plans, developed fundraisers with professional approach to
identification, cultivation, solicitation and stewardship. My role at the beginning was to go with
volunteers to work with donors. Later on, role changed to focus on major gifts after volunteers
were trained. One of my favorite projects.
Page 114 of 127
14. Secured $5.8 million in new planned gifts in 2025-26 for Southwest Tech Foundation, in addition
to raising more than $1.0 million in cash gifts. Foundation has moved from a roughly $800,000
annual effort to pushing more than $2.0 million in annual gifts, with a focus on planned giving
growth
15. Completed $1.8 million Precision Agriculture Phase 1 to purchase 85 acres of land and to get
donations for crop inputs and fertilizer. Students in the Agronomy program manage and harvest
the crops and the proceeds from the sale of commodities (beans and corn) go to student project
funds in agriculture
16. In 18 months, raised $1.72 million for the Student Success Plan Scholarship Program and
matched the amount with a planned gift that includes liquidating appreciated stocks and
properties for a total of $3.5 millions endowed
17. Rountree Commons and Bridgeview Commons: Fully funded these two projects that created
more than 1,000 residence hall beds and a new food service area for students at UWP. Total
cost was more than $55 million. Won a national award for public-private partnership for
Rountree Commons
These are highlights of my work over the past 18-20 years. I have projects that I’m consulting on at a
local hospital, a domestic abuse shelter and others. All wrap up by the end of August 2026. In all, I could
share 41 projects that involve some level of private funding. If you need other, specific projects, please
let me know.
Thank you!
Dennis Cooley
Page 115 of 127
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
June 3, 2026
AGENDA ITEM # 6.e
Consideration of the Pedestrian and Bike Safety Plan
BACKGROUND
RECOMMENDATION
The draft was approved unanimously by Public Safety, Parks, Rec & Forestry, as well
as SNR committees. Village Board approval will allow us to submit the application
before the deadline. Also, the Village adoption of the plan will strengthen the
application chances.
ATTACHMENTS
1. Mount Horeb Pedestrian and Bicycle Safety Plan_v5
Page 116 of 127
BICYCLE AND PEDESTRIAN SAFETY PLAN
PURPOSE
Mount Horeb is a community that values safety, sustainability, and active living. This
plan outlines steps to make walking and biking safer, easier, and more enjoyable for
residents of all ages. By improving our streets and pathways, we support healthier
lifestyles, reduce traffic congestion, and strengthen our village’s sense of connection.
ACKNOWLEDGEMENTS
Sustainability and Natural Resources Committee
Tim White, Trustee
Sarah Best, Trustee
Kerry Beheler, Citizen Representative
Scott Roethle, Citizen Representative
Elizabeth Grabe, Citizen Representative
Jack Salttes, Citizen Representative
Aaron Fendrick, Student Representative
Village Staff:
Nic Owen, Village Administrator
Doug Vierck, Police Department Chief
Steve Salerno, Mount Horeb School District Administrator
VISION STATEMENT
A Mount Horeb where everyone can comfortably walk or bike to school, parks, shops,
and community destinations.
COMMUNITY CONTEXT
Mount Horeb’s compact layout and existing trail system make it well-suited for active
transportation, with the Military Ridge State Trail, the downtown district, and nearby
school campuses serving as major activity hubs. At the same time, high traffic volumes
on Main Street and Springdale Street create challenges for people walking and biking.
Seasonal tourism and community events further increase foot and bicycle activity
throughout the year, underscoring the need for safe, comfortable travel options for all
users.
Page 117 of 127
GOALS AND OBJECTIVES
The plan aims to improve safety for all travelers by enhancing visibility at key locations,
upgrading crossings, and creating safe, low-stress bicycle routes. It also seeks to increase
walking and biking by establishing continuous, well-connected routes, improving overall
comfort and convenience, and supporting Safe Routes to School initiatives. Finally, the
plan promotes sustainability and community health by reducing dependence on vehicles,
encouraging active transportation, and advancing broader climate and sustainability
goals.
EDUCATION
Engineering improvements alone are not sufficient to achieve lasting pedestrian and
bicycle safety outcomes. Ongoing public education is essential to increasing driver
awareness and improving compliance with pedestrian and bicycle laws. Recommended
initiatives include:
Driver awareness campaigns emphasizing yielding requirements and speed
compliance
Crosswalk safety campaigns highlighting proper driver and pedestrian behavior
Roundabout safety campaigns
Bicycle skills workshops for youth and adults to build confidence and safe riding
practices
Helmet distribution partnerships to improve access to properly fitted safety
equipment
The Village will continue to support and expand Safe Routes to School initiatives
that promote safe, active transportation for students and families.
Public outreach should be coordinated seasonally and aligned with high-traffic
events, including National Bike Month and community festivals.
BICYCLE NETWORK & DESIGNATED ROUTES
To build a safer, more connected village, Mount Horeb will establish two designated
bicycle routes that help riders travel comfortably across town without relying on
high-traffic streets. Wayfinding signs will be installed along each route to raise awareness
and guide bicycle traffic along these routes.
The base cost for this project would likely be $3,250 for the signage, plus labor cost for
installation. Estimate is based on 10 signs per mile on the 2.6-mile bike route. Wisconsin
DOT estimates cost $125/sign. Cost shall be finalized and included in the 2027 budget.
EAST / WEST ROUTE: Connecting Parks, Schools, Downtown, and the library
1.3 Miles | +87 FT / -36 FT Elevation Change (West to East)
POINTS OF INTEREST:
Western Terminus: Grundahl Park.
Garfield Park
Downtown Mount Horeb Business District
Mount Horeb Middle School
Viking Park (Tennis/Pickleball Courts)
Page 118 of 127
Liberty Park
Mount Horeb Intermediate School
Eastern Terminus: Mount Horeb Public Library
NORTH / SOUTH ROUTE: Connecting Aquatic Center, Downtown, Elementary
School and Hofstetter Conservation Park
1.3 Miles | +26 FT / -105 FT Elevation Change (North to South)
POINTS OF INTEREST:
Northern Terminus: Aquatic Center
Downtown Mount Horeb Business District
Garfield Park
Mount Horeb Elementary School
Southern Terminus: Hofstetter Conservation
FUTURE EXPANSION: STEWART LAKE ROUTE:
Connect Mount Horeb Downtown to Stewart Lake County Park.
Click to View Interactive Map
Page 119 of 127
BICYCLE STORAGE
Providing additional bicycle parking is a practical way for Mount Horeb to improve
pedestrian and bicycle safety. As bicycling continues to grow, including the rapid
adoption of electric bicycles, more residents are traveling farther and using bikes for
everyday trips. E-bikes are heavier, more valuable, and often used by riders who may not
feel comfortable carrying them inside buildings, which increases the need for stable,
secure outdoor bike storage. Bike racks reduce sidewalk clutter, prevent unsafe locking to
railings or signs, discourage theft, and create more orderly, predictable pedestrian spaces.
By clearly defining where bicycles should be parked, the village can improve
accessibility, sightlines, and overall safety for all users of the public right of way.
Establishing a dedicated $1,250 per year budget for bicycle rack installation is a
low-cost, high-impact implementation strategy within the pedestrian and bicycle safety
plan. This funding level is sufficient to install multiple commercial-grade bike parking
spaces at a single location each year, allowing the village to focus on priority areas such
as downtown, schools, and parks.
PEDESTRIAN IMPROVEMENT: MAIN STREET CROSSWALKS
Tourism plays a significant role in Mount Horeb’s local economy. Visitors are drawn to
the Village to experience the Trollway, local shops, restaurants, and community events.
As a result, downtown Main Street functions not only as a transportation corridor, but
also as a pedestrian-oriented destination.
Many visitors are unfamiliar with downtown parking locations and traffic patterns. This
can create confusion and increase the likelihood of mid-block crossings or unsafe
crossing attempts along Main Street. The situation is further intensified during the weekly
Farmers Market, which is located along this corridor and coincides with evening peak
traffic volumes. During these periods, both pedestrian and vehicle activity increase
substantially, elevating the potential for conflict.
High-visibility crosswalk markings are a proven safety counter measure that can
significantly improve pedestrian visibility and driver yielding behavior. According to
the Federal Highway Administration (FHWA), enhanced crosswalk visibility treatments
have been shown to reduce pedestrian injury crashes by up to 40 percent. Implementing
high-visibility crosswalks in key downtown locations would support tourism, improve
pedestrian comfort, and enhance overall safety for residents and visitors.
Page 120 of 127
High-visibility continental
(ladder) or bar-pair crosswalk
markings Constructed using
thermoplastic or inlay tape.
MUTCD-compliant R1-6 “State
Law – Yield to Pedestrian” signs
Installed on both sides of the
crosswalk
Main street has 10 crosswalks that are considered midblock or 2-way intersections that
would benefit from high-visibility markings. The 3 crosswalks between 3rd and 5th Street
would benefit the most due to high pedestrian traffic during the farmer’s market. In 2025
we had an incident where a child was struck by a vehicle during this peak period. The
Village shall prioritize updating these 3 crosswalks with R1-6 Yield to Pedestrian Signs
and painted high visibility crosswalk markings as soon as possible. The remaining 6
crosswalks shall be updated in subsequent fiscal years.
The Wisconsin DOT is planning to repave HWY 78 (Main St.) in 2033, installing colored
concrete crosswalks. In the interim, the village staff shall weigh the reduced up-front
cost of painting vs thermoplastic tape. Painted high-visibility crosswalk markings
typically require repainting on an annual basis due to traffic wear and snowplowing. The
village could proceed with annual maintenance of painted crosswalks until the corridor is
resurfaced, at which time more durable marking materials may be considered.
Page 121 of 127
PEDESTRIAN IMPROVEMENT: SIDEWALK NETWORK
ENHANCEMENTS
Mount Horeb should continue to implement its adopted Sidewalk Circulation Plan and
related sidewalk construction, maintenance, and inspection policies, which together
provide a clear, consistent, and effective framework for improving pedestrian safety and
connectivity. The Circulation Plan identifies specific sidewalk gaps, prioritizes
connections to schools, parks, and other high-use community destinations, and
coordinates sidewalk installation with street reconstruction, redevelopment, and budget
considerations, reflecting an incremental and fiscally responsible approach that is already
being actively implemented. Complementary Village policies governing sidewalk
construction, cost-sharing, and routine safety inspections ensure sidewalks are built to
consistent standards, maintained in a reasonably safe condition, and repaired based on
objective hazard criteria and pedestrian demand. Continuing these established programs
affirms the Village’s commitment to a safe, accessible, and connected pedestrian network
while supporting broader goals for walkability, active transportation, and community
livability without creating new or redundant policies.
ENFORCEMENT
Targeted, data-informed enforcement supports engineering and education efforts by
reinforcing safe behaviors. In collaboration with the Mount Horeb Police Department, the
Village will prioritize:
Targeted speed enforcement in school zones and high-pedestrian corridors
Crosswalk yield enforcement operations downtown and other high-activity areas
Ongoing coordination between enforcement personnel and safety committees to
address emerging concerns
DATA COLLECTION AND EVALUATION
The Village will establish an ongoing collaboration between the Mount Horeb Police
Department, Public Safety Committee and the Sustainability and Natural Resources
Committee to conduct an annual review of pedestrian and bicycle safety conditions.
This review will include:
Analysis of reported crash data involving pedestrians and bicyclists
Collection of pedestrian and bicycle counts at key corridors and crossings
Community engagement to assess perceived safety, barriers, and areas of concern
Conducting this evaluation on an annual basis will allow the Village to monitor trends,
identify emerging issues, and measure the effectiveness of implemented safety
improvements. The review will take place each May to align with National Bike Month,
reinforcing the Village’s commitment to active transportation and providing an
opportunity to share findings with the community.
Page 122 of 127
IMPLEMENTATION TIMELINE
Timeline Action Lead Estimated
Cost
2026 Create Education Plan Police Dept, Schools,
SNR, Parks &
Recreation
$0
2026 Enhance Public Access to
Walking and Biking
Information (website update)
Village Staff $0
2027 Install Bicycle Network
Wayfinding and Crossing
Signage for North/South &
East/West Routes.
Expand to Stewart Lake
County Park pending adoption
of initial routes.
Village Staff, Public
Services Department
$3,000 -
$4,000
2027 2nd Street Reconstruction –
Bike Lanes, Wayfinding and
Crossing Signage
Public Services
Department
TBD
2027–2031 High Visibility Crosswalks on
Main Street
Village Staff, Public
Services Department
$5,000/year
(2027-2031)
Annual Add Bicycle Racks at Key
Destinations
Village Staff, Public
Services Department
$1,250/year
Annual
(May)
Pedestrian and Bicycle Safety
Review (crash data, counts,
community engagement)
Police Dept, Public
Safety Committee,
SNR
$0
Future Pave Military Ridge State Trail Village Staff TBD
Page 123 of 127
IMPLEMENTATION SUMMARY
2026: Develop Education Plan
In 2026, the Village will lead the creation of a coordinated education and encouragement
strategy focused on safe walking and biking. This effort will be a collaboration between
the Mount Horeb Police Department, Mount Horeb Area Schools, the Sustainability and
Natural Resources Committee, and the Recreation Department. The plan will outline
appropriate school programs, community training resources, and public awareness
campaigns aimed at promoting safe travel behavior.
2026: Enhance Public Access to Walking and Biking Information
The Village website shall be updated to provide clear, easy access to pedestrian and
bicycle planning resources. These additions will help residents identify safe routes,
understand local infrastructure, and stay informed about ongoing improvements.
Web links will include:
Low-Stress Route Finder
Dane County Bike Map
Pedestrian Facilities Map
2027: Install Bicycle Network Wayfinding and Crossing Signage
To improve navigation and support a low-stress transportation network, new wayfinding
signs and bicycle/pedestrian crossing signs will be added along designated routes. This
will enhance safety by clearly directing riders and increasing driver awareness at key
conflict points.
DOT Property Signs
NACTO - Bike Wayfinding Routes
2027: 2nd Street Reconstruction – Bike Lanes, Wayfinding and Crossing Signage
Planned reconstruction of 2nd Street in 2027 offers an opportunity to integrate bicycle
infrastructure. The Village should install bicycle lane pavement markings when feasible
from Lincoln Street to Carver Street, improving north–south connectivity and safety.
2027-2031: Main Street - High Visibility Crosswalks
High-visibility crosswalk upgrades using thermoplastic markings and MUTCD-compliant
pedestrian yield signage are estimated at approximately $2,500 per crosswalk, consistent
with recent municipal pavement-marking unit costs used by communities in south-central
Wisconsin.
ANNUAL: Install Bicycle Racks at Key Destinations
As demand and usage grows, the Village will install secure bicycle parking at major
community destinations.
Page 124 of 127
FUTURE CONSIDERATION: Pave Military Ridge State Trail
Paving a portion of the Military Ridge State Trail within the Village of Mount Horeb is
possible, but it requires close coordination with the Wisconsin DNR, because the corridor
is a state trail with an existing master‑planned purpose, established surface
(predominantly crushed limestone), and winter shared‑use considerations (including
snowmobiling on the limestone segments). Today only about 2.5 miles are asphalt
(primarily near Fitchburg/Verona), with the remainder in limestone, and snowmobiles are
allowed only on the limestone sections, not on the paved segment between Fitchburg and
Verona. Any proposal to pave inside the village would therefore need to address how
winter uses (snowmobile routing, ski/snowshoe use) would be accommodated if a
segment were converted to asphalt.
A practical roadmap is to follow the Verona model. In 2025, the City of Verona approved
a Land Use Agreement with the DNR to replace bridges and pave an intown stretch of the
trail, with the city taking on design, construction, and defined maintenance
responsibilities for the paved surface while the DNR retained corridor oversight.
Verona’s public project page shows the agreement was signed in May 2025, design
advanced through 2026, and asphalt paving scheduled for 2027; meeting notes indicate
the city coordinated sequence (bridges first, then paving) and long‑term maintenance
terms with the DNR. For Mount Horeb, a similar pathway would likely include: (1) early
discussions with the DNR property manager to confirm master plan consistency and
scope; (2) a concept plan that maps limits, cross‑sections, winter use management (e.g.,
alternate snowmobile routing or seasonal agreements), and access points; (3) a draft land
use/operating agreement defining roles (construction, snow/ice control, surface
maintenance, vegetation management), term, and liability; (4) environmental/permit
review as needed; and (5) local funding commitments and public involvement. The
DNR’s own information page points to Property Master Plans as the touchstone for
proposed changes, while Verona’s project documentation provides a recent, local
precedent for the agreement structure, schedule, and deliverables.
Links:
https://www.veronawi.gov/918/Military-Ridge-State-Trail-Paving-Projec
https://dnr.wisconsin.gov/topic/parks/militaryridge/info
Page 125 of 127
Interim Village Administrator’s Report May 29, 2026 Committee Meetings: Since the May 6th Village Board meeting, I attended the Utility Commission meeting, Police Commission, CDA, Public Safety, Parks, Recreation and Forestry, Sustainability & Natural Resources, Historic Preservation Commission and Plan Commission meetings. Department Head Meetings: A Department Head meeting was conducted on May 26th and another is scheduled on June 16th. I meet with Department Heads individually as needed. Meetings/Conversations with Contracted Service Providers: Throughout the month there have been numerous meetings/conversations with Rob Wright, Ben Rohr, Ryan Lindsey, Kristen Fish-Peterson and Bryan Kleinmaier to ensure we are keeping things on task and running smoothly. Other Meetings: A few other meetings I attended were the Dane County Cities and Villages Annual meeting, a meeting with the lessee of the Lukken Farm cropland, a meeting with Tim White and two DNR staff who are assigned to the Green Tier Legacy Communities program, a meeting of the Joint Review Board regarding TIF 6, a meeting with Dennis Cooley, Jeff Gorman, and Denise Schwenn to discuss a draft fundraising agreement for a future sports complex, and I attended a pre-construction meeting regarding the 2026 Mount Horeb street construction projects. When not in meetings, I use the time to review files in the Administrator’s office, meet with elected officials, village staff, property owners, developers and the general public. A significant amount of my time is spent on zoning issues and development projects, although signage, erosion control, noise complaints, and general issues are dealt with frequently. A staff level meeting to discuss next steps at the Lukken Farm property will be held in early June. New Department Head: Joan Laundy began her employment with the Village on May 11th as the next SW Dane Outreach Director. The past three weeks she has been working closely with Lynn and Julie to familiarize herself with the responsibilities of her position. Please join me in welcoming Joan to the Village of Mount Horeb staff.
Page 126 of 127
Retirement: Our sincere appreciation goes out to Lynn Forshaug who retired from the Village effective May 29th. We appreciate everything Lynn did to advocate for seniors in our community, as well as all the hard work she did for the Village for the past 29 years. We wish Lynn a safe, healthy and enjoyable retirement. Annual Financial Audit: One item on the June Village Board agenda is the presentation of the highlights of the Financial Audit. The document is included in the meeting packet. If possible, please review this document in advance of the meeting. Representatives of Baker Tilly will be at the meeting to present the highlights and answer any of your questions. The audit is an accurate report of the Village’s financial position as of December 31, 2025, including fund balance and debt obligations. Our appreciation goes out to Denise and other Village staff who provided information to the auditors so that the auditors could conduct their independent audit. Much work goes into the annual audit. It is important that staff and the auditor’s work cooperatively during the audit. Miscellaneous: During the past month, I have conducted training on Ethics and Conflicts of Interest at most of the committee meetings. If you were not present for the training, you can view it on Trollway TV from the May 6th Village Board meeting. I continue to work on issues that will allow for a smooth transition once Gabe begins his employment with the Village on June 30th. I truly appreciate all the assistance and support of the Village staff and the Village Board. I especially appreciate the regular check-ins from Ryan Czyzewski. Please feel free to contact me if you have any questions. I can be reached at jon.hochkammer@mounthorebwi.info or at (608) 437-9409.
Page 127 of 127
Source: Village of Mount Horeb website. First collected Oct 16, 2026.