Public Works Committee Minutes
Monday, September 1 4 , 2026, at 5:30 p.m.
1. Call to Order:
Chairperson Serebin called the meeting to order at 5:3 0 p.m.
Present: President Buckley, Trustee Haller, James Zess, Ben McGillicuddy ,
Chairperson Serebin
Also Present: Matthew Collins – Public Works Director, Kelsey McElroy-Anderson –
Village Manager, Anna Christopherson – Assistant Village Manager , Patrick Whitaker –
Police Chief
2. Review and Approve Minutes of J uly 13 , 2026 Public Works Committee Meeting
PRESIDENT BUCKLEY MOVED TO APPROVE THE MINUTES, SECONDED BY
TRUSTEE HALLER . MOTION CARRIED 5-0.
3. Discussion/Recommendations regarding Craig Counsell Park Improvements
Director Collins reviewed the proposed improvements at Craig Counsell Park requested
and fully funded by Whitefish Bay Little League. Under the Village ’s agreement with the
organization, park improvements exceeding $5,000 require Village Board approval.
The proposed work includes installing donated trees, including conifers, arborvitae, and
spruce, to provide wind screening, shade, and park beautification. Plantings near the
Minors Field and Pee Wee Field would provide additional shade for spectators. Pee
Wee Field improvements are anticipated in fall 2026 or spring 2027.
Tree work included in this project will be reimbursed fully by the Little League . Village
staff will oversee installation through the Village ’s tree contractor, and the Village will
assume routine long-term pruning and maintenance responsibilities.
Committee members expressed support for the improvements and briefly discussed
whether the agreement ’s current $5,000 approval threshold should be reconsidered in
the future.
MR. ZESS MOVED TO RECOMMEND TO THE VILLAGE BOARD TO ACCEPT THE
PROPOSED CRAIG COUNSELL PARK IMPROVEMENTS AT NO COST TO THE
VILLAGE AS DESCRIBED WITHIN THE ATTACHED AND EXHIBITS , SECONDED
BY MR. MCGILLICUDDY . MOTION CARRIED 5-0.
4. Discussion/Recommendations regarding e-bikes and e-scooters
Chief Whitaker presented an overview of electric bicycles, electric scooters, and off-
road electric motorcycles, including applicable Wisconsin law s , current Village
regulations, enforcement concerns, and possible ordinance changes.
The Chief explained that Wisconsin classifies Class 1, Class 2, and Class 3 electric
bicycles as bicycles. These classifications generally allow operation on roadways, with
Class 1 and Class 2 motor assistance limited to 20 mph and Class 3 motor assistance
limited to 28 mph. Class 3 riders must be at least 16 years old. Off-road electric
motorcycles, sometimes called e-motos or electric dirt bikes, are not permitted on
Village streets and may be enforced under state traffic laws.
Electric scooters are regulated by state statute and may generally operate at up to 15
mph on roadways, sidewalks, and bicycle lanes unless locally restricted. The Chief
explained that the Village may regulate sidewalk operation, restrict electric scooters on
certain higher-speed roadways, and require helmets for minors. Current Village
regulations generally prohibit bicycle operation on sidewalks by persons over age 12.
The Village ordinance ’s single-file bicycle requirement conflicts with state law, which
permits riding two abreast under specified conditions.
Chief Whitaker identified ongoing concerns involving failure to stop at stop signs,
distracted riding, unsafe operation, groups of riders, sidewalk conflicts with pedestrians,
and the operation of off-road electric motorcycles. The Committee discussed balancing
pedestrian safety, children ’s transportation needs, enforceability, and consistency with
state law. Members emphasized parent education, coordination with schools, and clear
communication of high-priority safety expectations.
The Committee supported preparing an ordinance amendment allowing the Village to
hold parents or guardians accountable for a minor ’s unsafe bicycle operation, rather
than only for equipment violations. Members also reached general consensus on
exploring a change to allow bicycle operation on sidewalks only by children age 10 and
under.
Staff will consult with the Village Attorney regarding the Village ’s authority to distinguish
between conventional bicycles and electric bicycles, particularly for sidewalk
regulations. Staff will also contact the League of Wisconsin Municipalities regarding
legislative advocacy for greater local authority to distinguish electric bicycles from
conventional bicycles.
The Committee requested that staff explore additional parent education opportunities
through coordination with the School District, particularly at the middle-school level.
Members also discussed reviewing the feasibility, staff impact, and effectiveness of a
bicycle or e-bike registration program. The Chief indicated that such programs create
substantial administrative demands and may not provide an effective additional
enforcement tool.
A majority of members expressed support for developing a recommendation to prohibit
electric scooters on sidewalks, subject to further legal and policy review. Members also
discussed school-based education and voluntary safety acknowledgement or permit
approaches as alternatives to prohibiting e-bike or scooter parking at schools.
Proposed ordinance changes and recommendations will be brought to the Village Board
for consideration.
5 . Discussion/Recommendations regarding the 2027 Street Resurfacing Program
Staff Engineer , Maxine Miller , presented the proposed 2027 street resurfacing program,
consisting of Marlborough Drive from Henry Clay Street to Fairmont Avenue and a short
connecting segment of Lancaster Avenue.
Staff Engineer Miller explained that the proposed project area was selected using
roadway condition ratings, average daily traffic, constructability, and coordination with
water-main work and other infrastructure needs. Core samples will be collected to
evaluate pavement and subbase conditions before final design. The Village will also
evaluate catch basins, valves, sanitary sewer conditions, and other infrastructure to
minimize the need for utility cuts shortly after resurfacing.
The Committee discussed coordinating the resurfacing program with planned 2027
water-main replacement and roadway work on Shoreland and Hollywood. Staff
indicated that no known lead service lines had been identified within the Marlborough
Drive resurfacing area. Staff emphasized the importance of early planning, utility
coordination, and bidding to obtain competitive pricing.
Members raised concerns about pavement cuts, settlement, and drivability on Santa
Monica Boulevard. Staff agreed to review manhole conditions, restoration practices, and
compaction requirements. The Committee also suggested considering recent utility cuts
and service-line work as additional factors in roadway prioritization. Staff explained that
contractors must restore disturbed pavement to an equal or better condition, including
concrete restoration where concrete pavement is disturbed.
TRUSTEE HALLER MOVED TO RECOMMEND TO THE VILLAGE BOARD
APPROVAL OF THE PROPOSED LOCATIONS FOR THE 2027 STREET
RESURFACING PROGRAM PROJECT AREA , SECONDED BY PRESIDENT
BUCKLEY . MOTION CARRIED 5-0.
6 . Discussion/Recommendations on Buckley Stormwater Improvements
Director Collins presented a proposed ecological restoration project for the upper bluff
at Buckley Park in response to resident concerns about vegetation obstructing views of
Lake Michigan. Director Collins explained that the former practice of cutting vegetation
on the steep slope raised concerns about employee safety, erosion, and bluff stability.
The Village Engineer advised against removing vegetation without an appropriate
restoration plan.
The proposed project would replace sumac and other undesirable vegetation within the
upper bluff project area with lower-growing native plants to improve lake views while
maintaining soil stability and providing stormwater and ecological benefits. Staff
described a multiyear approach involving design, vegetation removal and treatment,
erosion-control measures, native seeding, and continued maintenance. The lower bluff
would not be included in the proposed work.
The Committee discussed the project ’s scope, cost, maintenance requirements, and
potential use of goats for vegetation control. Staff indicated that goats would not
eliminate regrowth and could damage native plantings after restoration. Members also
requested that the Village Engineer review the proposed restoration approach and
existing ecological improvements at the Village ’s other lakefront park.
Director Collins clarified that the bluff was considered relatively stable under existing
conditions and that the project primarily responded to requests to restore lake views
while protecting bluff stability. The estimated total cost was approximately $40,000 over
three years, including design and implementation, with funding from the stormwater
utility reserve balance. Approval at this stage would cover only the design proposal;
implementation recommendations would return for subsequent consideration.
Chairperson Serebin opened the meeting for public comment .
George S voboda , 4973 North Lake Drive, thanked staff for recent pathway maintenance
and emphasized the importance of preserving lake views as a public park amenity.
Kell e y Farnsworth , 4965 North Lake Drive, described the park ’s frequent use by
residents and visitors and supported the proposed approach to preserve its public
value.
Jerry T. Gardner , 4925 North Bartlett Avenue, supported restoring lake views for park
visitors and the broader community.
MR. ZESS MOVED TO RECOMMEND TO THE VILLAGE BOARD APPROVAL OF
THE NATIVE RANGE ECOLOGICAL PROPOSAL FOR BUCKLEY PARK BLUFF
IMPROVEMENTS IN THE AMOUNT OF $9,230 AS OUTLINED IN THE STAFF MEMO
AND EXHIBITS, SECONDED BY TRUSTEE HALLER . MOTION CARRIED 5-0.
7 . Department Status Report and Project Updates
Director Collins clarified that the forestry update referred to removing ash trees and
replacing them with a variety of non-ash species, not planting additional ash trees.
Approximately 75 replacement trees were planned for fall planting, reflecting removals
associated with storm damage, disease, dieback, and safety concerns.
The Committee discussed the permanent pedestrian improvements planned at four
locations currently using temporary yellow bollards. Director Collins reported that
construction funding had been approved through the Transportation Alternatives
Program grant. Design is expected to be complete by the end of 2026, with bidding
anticipated around January and construction in 2027. Staff solicited proposals for
construction oversight and management. QR codes had been installed to collect public
feedback.
Members raised concerns about low branches and trees obscuring street signs. Director
Collins explained that the Village maintains a seven-year pruning cycle, with a map
available on the Village website, and evaluates safety-related requests outside that
cycle. Director Collins also discussed a proposed budget request for tablets to allow
field employees to document inspections and improve follow-up communication with
residents. New tree locations are being reviewed to avoid planting within 20 feet of stop
signs to improve intersection visibility.
Director Collins provided an update on the Silver Spring Drive intersection at Consaul
Place and Diversey Boulevard. Traffic signal installation is anticipated in November
because of the lead time for signal poles. Until installation, stop signs will remain on the
intersecting streets, with through traffic on Silver Spring Drive.
The Committee discussed pedestrian access and construction impacts on nearby
businesses. Director Collins reported ongoing coordination with the contractor to
improve temporary pedestrian routes and expedite reopening the intersection corners.
Staff estimated that corner work could take up to approximately three weeks but
expressed hope for earlier completion. Director Collins explained that coordinating
concrete, brick pavers, grades, and accessible ramps had added complexity to the
work .
8 . Adjournment
PRESIDENT BUCKLEY MOVED TO ADJOURN AT 7 :22 P.M., SECONDED BY
TRSUTEE HALLER . MOTION PASSED 5-0.
Respectfully submitted,