Beautification & Public Works Materials
Village of Brown Deer · Milwaukee County · meeting of Jun 3, 2026 · Agendas
Open the original document More from Village of Brown Deer
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PERSONS REQUIRING SPECIAL ACCOMMODATIONS FOR ATTENDANCE AT THE MEETING SHOULD
CONTACT THE VILLAGE CLERK AT LEAST ONE BUSINESS DAY PRIOR TO THE MEETING.
PUBLIC WORKS/BEAUTIFICATION
COMMITTEE MEETING
Wednesday, June 3rd, 2026
Dept. of Public Works Conference Room, 6:00 P.M
PLEASE TAKE NOTICE that a meeting of the Brown Deer Public Works & Beautification
Committee will be held at the Department of Public Works, 8950 N. Arbon Drive, Brown Deer,
WI 53223, in the conference room at the above noted time and date.
The meeting will also be accessible virtually via Microsoft TEAMS:
https://teams.microsoft.com/meet/287272300111751?p=N3kczgsVsXZa6PpLyi
Meeting ID: 287 272 300 111 751 Passcode: j8DW9sG3
The following items of business will be discussed and possibly acted upon:
I. Roll Call
II. Persons Desiring to be Heard – Please submit your full name, address, and your comment
by 4:30pm June 3rd, 2026, to mmaederer@browndeerwi.gov
III. Consideration of Minutes: May 13th, 2026 – Regular Meeting.
IV. Report of Staff/Committee Members
V. Unfinished Business
A) None.
VI. New Business
A) Re-Consider Approval for the Purchase of a new Kubota Extended Bed
Equipment & Re-Allocation of Remaining 2026 CIP Funds for Village Hall A/C
Chiller.
B) Consider Approval of the Compliance Maintenance Annual Report (CMAR) and
Adoption of the Resolution Authorizing Submittal to the Wisconsin Department of
Natural Resources (WDNR).
C) Schedule for the Next Meeting (in-person) July 8th, 2026, at 6pm.
VII. Adjournment
s/ Caren Brustmann, Village Clerk
May 29th, 2026
1
REQUEST FOR CONSIDERATION
COMMITTEE: Public Works & Beautification Committee
ITEM DESCRIPTION: Equipment Purchase - Kubota
PREPARED BY: Matthew S. Maederer, Director of Public Works
REPORT DATE: June 2, 2026
MANAGER'S REVIEW/COMMENTS:
No additional comments to this report.
See additional comments attached.
RECOMMENDATION: Consider Approval for the Purchase of a new Kubota (change
in 2026 CIP item for Village Hall A/C Chiller).
EXPLANATION:
DPW is requesting funding for a new Kubota. This is a change from an originally planned
CIP item for 2026 for replacement of the Village Hall A/C Chiller.
The original budget for the A/C chiller was $40,000; however, replacement costs came in
far exceeding the original budgeted amount.
Instead DPW will budget for the A/C chiller replacement in future years and proposes to
spend the original $40,000 as follows:
• A/C Chiller Repair = $4,146.00
• Kubota = $20,633.47 REVISED PRICE
• Total = $24,779.47
• Remaining budget for miscellaneous Village Hall expenses.
Attachments:
1. Quote for Kubota
2. A/C Chiller Repair Quote
3. CIP Excerpt
Quote Provided By
LOCHEN EQUIPMENT
Cory Kulibert
512 FRANKLIN ST
NEWBURG, WI 53060
email: ckulibert@lochenequipment.com
phone: 9202102225
Standard Features Custom Options
V Series RTVX1130WLH
* * * EQUIPMENT IN STANDARD MACHINE * * *
DIESEL ENGINE
Model Kubota D1105
3 Cyl. 68.5 cu in
+23.3 Gross Eng HP
60 Amp Alternator
TRANSMISSION
VHTX
Variable Hydro Transmission
Forward Speeds:
Low 0 15 mph
High 0 25 mph
Reverse 0 17 mph
Limitedslip Front Differential
Rear differential lock
HYDRAULICS
Hydrostatic Power Steering
Hydraulic Cargo Dump
Hydraulic Oil Cooler
FLUID CAPACITY
Fuel Tank 7.9 gal
Cooling 8.6 qts
Engine Oil 4.3 qts
Transmission Oil 1.8 gal
Brake Fluid 0.4 qts
DIMENSIONS
Width 63 in
Height 80 in
Length 153 in
Wheelbase 98.2 in
Tow Capacity 1300 lbs
Ground Clearance F/R 11.3in
/ 9.4in
Suspension Travel 8 in
Turning Radius 17.1 ft
+ Manufacturer Estimate
KEY FEATURES
Digital Multimeter
Speedometer
Front Independent Adjustable
Suspension
Rear Independent Adjustable
Suspension
Brakes Front/Rear Wet Disc
Rear Brake Lights / Front
Headlights
2” Hitch Receiver, Front and Rear
Deluxe 60/40 split bench seats
with driver's side seat adjustment
Under front seat Storage
Compartments
Lockable Glove Box
Front Guard (radiator guard and
bumper, lens guard)
SAFETY EQUIPMENT
SAE J2194 & OSHA 1928 ROPS
Horn
Spark Arrestor Muffler
Retractable 2point Seat Belts
Adjustable Head Lights
Rear Protection Screen
DashMounted Parking Brake
CARGO BOX
Width 54.5 in
Length 72.3 in
Depth 11.6 in
Load Capacity 1212 lbs.
Vol. Capacity 26.1 cu ft
TIRES AND WHEELS
ATV Tire 25 x 10 12, 6 ply
Heavy Duty Worksite 25 x 10 12, 6ply
RTVX1130WLH Base Price: $22,599.00
Configured Price: $22,599.00
Sourcewell Discounts:
Kubota Items: ($4,971.78)
Total Discount: ($4,971.78)
SUBTOTAL: $17,627.22
3Yr RTVX1130WLH Extended Warranty $1,950.00
Kubota Item Fees:
Dealer Assembly: $0.00
Freight Cost: $656.25
PDI: $400.00
Total Unit Price:$20,633.47
Quantity Ordered: 1
Final Sales Price: $20,633.47
Purchase Order Must Reflect Final Sales Price.
To order, place your Purchase Order directly with the quoting
dealer
*All equipment specifications are as complete as possible as of the date on the quote. Additional attachments, options, or accessories may be added (or deleted) at the
discounted price. All specifications and prices are subject to change. Taxes are not included. The PDI fees and freight for attachments and accessories quoted may have additional charges
added by the delivering dealer. These charges will be billed separately. Prices for product quoted are good for 60 days from the date shown on the quote. All equipment as quoted is subject to
availability.
© 2018 Kubota Tractor Corporation. All rights reserved.
RTVX1130WLH WEB QUOTE #2968839
Date: 5/19/2026 7:57:48 AM
Customer Information
Streim, Matt
202513
Village of Brown Deer
mstreim@browndeerwi.org
4143713024
198.143.38.22
FY 2026-2030 Capital Improvement Plan
Project Description
Department: Public Works
Project Name: Replace Outside A/C Chiller
Total Project Cost: $40,000 Estimated Life of Project: 20 years
Priority (1–Absolutely necessary | 2–Strong preference | 3–Nice to have but can get by without it): 2
Expenditure Detail:
Year 2026 2027 2028 2029 2030
Budget $40,000 $ $ $ $
Funding Sources: Levy ☒ Debt ☐ Grant ☐ Donations ☐ Fund Balance ☐
Project Description: This outside air conditioning chiller serves for both the Village Hall and Police
building areas.
Project Justification: It is approaching its 20-year life span and building maintenance identified a need
to replace the system. Each year there are more maintenance needs to keep the chiller operable. The
chiller was originally installed in 2008, and the Village is increasingly experiencing significant
maintenance issues with it.
1220 Mineral Springs Drive
Port Washington, WI 53074
Phone: (262) 284-5589
chrisw@jhheating.co
INCORPORATED
To: Brown Deer Admin
Attn: Dan Bishop
Email: dbishop@browndeerwi.org
From: Chris Wittig
Date: April 29, 2026
Re: Chiller Repairs Q042926-2121
This quote is a result of service request. Current Hot Gas Bypass valve has failed closed and is causing
start up issues with circuit #1 which is locking out the unit. With the age of the unit, replacement should
be considered over repair. I am working on this quote for you. J&H provided scope listed below.
Scope
Travel to site and gain access to equipment
Provide and install (1) pc new HGB Valve with Solenoid option
Evac, pressure test and R410A Trim Charge
Start up and set unload pressure
Notes:
Current 1-week lead time on materials
Base Bid less Tax: $ 4,146.00
Thank you.
Chris Wittig
Service Manager
J & H Heating, Inc.
1220 Mineral Springs Drive
Port Washington, WI 53074
Phone: (262) 284-5589
chrisw@jhheating.co
INCORPORATED
To: Brown Deer Admin
Attn: Dan Bishop
Email: dbishop@browndeerwi.org
From: Chris Wittig
Date: April 30, 2026
Re: Admin Chiller Replacement Q043026-2123
This quote is a result of your request and service request. Current system has been in service for 17 years
and replacement should be considered. J&H provided scope listed below.
Scope
Travel to site and gain access to equipment
Isolate and Demo existing Chiller
Provide a new Air-Cooled Remote Evaporator Chiller
Rig and Set new Equipment
Refrigeration Piping, Specialties and full operational charge
(1)pc New Taco Main System Pump with Specialties and new VFD with Disconnect
(1)pc New Taco Chiller Pump with Specialties and new VFD with Disconnect
Required Piping and Insulation
Fill and Vent System
Line Voltage Wiring
Low Voltage Controls to existing BAS System
Start up and Commissioning
First Year Parts and Labor Warranty
Notes:
Current 8–16 week lead time on equipment depending on mfg.
Base Bid less Tax: $ 157,996.80
Thank you.
Chris Wittig
Service Manager
J & H Heating, Inc.
1
REQUEST FOR CONSIDERATION
COMMITTEE: Public Works, Village Board
ITEM DESCRIPTION: CMAR & CMOM Report
PREPARED BY: Matthew S. Maederer, PE, Director of Public Works/Village Engineer
REPORT DATE: June 2, 2026
MANAGER'S REVIEW/COMMENTS:
No additional comments to this report.
See additional comments attached.
RECOMMENDATION: Approval of the Compliance Maintenance Annual Report
(CMAR) and adoption of the resolution authorizing submittal to the Wisconsin Dept. of
Natural Resources (WDNR).
EXPLANATION:
The Village of Brown Deer provides its residents with wastewater disposal via the
operation of a sanitary sewer collection system that discharges to the MMSD (Milwaukee
Metropolitan Sewerage District) for final treatment. The Village’s collection system is
regulated through the EPA and WDNR by a WPDES (Wisconsin Pollutant Discharge
Elimination System) permit (WPDES Permit No. GP WI-0047341-05). The WPDES
permit and NR 208 require that the Village submit a yearly report (CMAR – Compliance
Maintenance Annual Report) of operations of the collection system to the WDNR.
WDNR has developed an electronic report form that is used to develop a uniform report
of the activities from all system owners. A printout of the report is attached to this memo.
One of the requirements of the report is that the governing body of the collection system
reviews & approves the report and adopts a resolution for such approval which
authorizes submittal of the report to the WDNR. A draft resolution is attached for review
& adoption by the Village Board on Monday, June 15th, 2026.
In 2025 the Village’s system had Two (2) sanitary sewer overflows (SSOs) during the
August 2025 flooding event. Problematic areas remain at the normal problem locations
(N. 61st/Darnel and at N. 59th/Range/Betty). The grade for the collection system of the
report was an “A” which requires no action by the Village Board. The last page has the
recommended wording for a voluntary response by the Village Board. The overall grade
(4.00) remained the same as in 2024.
Lastly, In June of 2009 the Village of B rown Deer, in compliance with EPA, WDNR and
MMSD rules, developed and adopted a Capacity, Management, Operations,
Maintenance (CMOM) plan for the sanitary sewer collection system of the Village. The
purpose of the CMOM plan is to ensure that the Village’s wastewater collection system
functions to minimize the possibility of a sanitary sewer overflow (SSO) from occurring.
Additionally, the plan would provide a level of protection (LOP) to minimize sanitary
2
sewer back-ups from occurring in resident and business basements/buildings.
Per the CMOM plan, the Village shall develop a report of the previous year’s activities
and submit the report to MMSD (which includes the CMAR as an attachment). The
following report follows the recommended CMOM program annual r eport format as
provided by MMSD. The report provides an overview of 2025 activities, documented
changes to the program for approval, recommended changes to the program for
approval, planned activities for 2026 and the future. The report fulfills the reporting
requirement of the State of Wisconsin 2005 stipulation and MMSD rules.
Further action by the Village, other than that which is included in current plans, is not
deemed necessary.
Attachments:
• CMAR Resolution for 2025 activities
• CMOM w/ CMAR
STATE OF WISCONSIN VILLAGE OF BROWN DEER MILWAUKEE COUNTY
Approval of and
Submittal of the CMAR Resolution No. 26-
for the Activities of 2025
WHEREAS, the Village of Brown Deer is regulated by a WPDES (Wisconsin Pollution Discharge Elimination
System) permit for its wastewater collection system; and
WHEREAS, the WPDES permit and NR 208 of the Wisconsin Administrative Code requires the Village to
submit a CMAR (Compliance Maintenance Annual Report) annually for the previous year’s activities; and
WHEREAS, the CMAR Report for the Activities of 2025 has been submitted to and reviewed by the Village
Board;
NOW, THEREFORE, BE IT RESOLVED, by the Village Board of the Village of Brown Deer that the CMAR
Report for the Activities of 2025 is hereby approved, and the Director of Public Works/Village Engineer is directed to
submit the report to the Wisconsin Department of Natural Resources with all required certifications.
DATED this 15th day of June 2026.
________________________________
Wanda Montgomery, Village President
________________________________
Caren Brustmann, Village Clerk
Source: Village of Brown Deer website. First collected Oct 16, 2026.