PUBLIC WORKS/BEAUTIFICATION
COMMITTEE MEETING
Wednesday, May 13th, 2026
Dept. of Public Works Conference Room, 6:00 P.M
PLEASE TAKE NOTICE that a meeting of the Brown Deer Public Works & Beautification
Committee will be held at the Department of Public Works, 8950 N. Arbon Drive, Brown Deer,
WI 53223, in the conference room at the above noted time and date.
The meeting will also be accessible virtually via Microsoft TEAMS:
https://teams.microsoft.com/meet/222769176948079?p=Q5XQ6VkfWw3o23vAP5
Meeting ID: 222 769 176 948 079 Passcode: cG2oq2mL
The following items of business will be discussed and possibly acted upon:
I. Roll Call
II. Persons Desiring to be Heard – Please submit your full name, address, and your comment
by 4:30pm May 13th, 2026, to mmaederer@browndeerwi.gov
III. Consideration of Minutes: April 15th, 2026 – Regular Meeting.
IV. Report of Staff/Committee Members
A) Welcome new committee member, Sonteria Bowie!
V. Unfinished Business
A) None.
VI. New Business
A) Consider Approval of the Contract Award to Vinton Construction Company for
the N. 47
th
Street Culvert Replacement Project.
B) Consider Approval of the Contract Renewal to C.W. Purpero (formerly Keir w/
Natural Landscapes, Inc.) for Annual Maintenance of Stormwater/Natural Area
Sites.
C) Consider Approval for the Purchase of a new Kubota (change in 2026 CIP item for
Village Hall A/C Chiller).
D) Schedule for the Next Meeting (in-person) June 3
rd
, 2026, at 6pm.
VII. Adjournment
s/ Caren Brustmann, Village Clerk
May 11th, 2026
1
REQUEST FOR CONSIDERATION
COMMITTEE: Public Works & Beautification Committee
ITEM DESCRIPTION: N. 47th Street Culvert Replacement Construction Contract
Award
PREPARED BY: Matthew S. Maederer, Director of Public Works
REPORT DATE: May 13, 2026
MANAGER'S REVIEW/COMMENTS:
No additional comments to this report.
See additional comments attached.
RECOMMENDATION: Approval of Contract Award to Vinton Construction Company
for the N. 47th Street Culvert Replacement Project.
EXPLANATION:
The N. 47 th Street Culvert Re placement Project was publicly bid and opened on
Thursday, April 30th at 10am virtually via QuestCDN.
Five (5) bids were received, and the results are as follows:
Bidder Total Cost
Vinton Construction $322,623.02
All-Ways Contractors $337,530.00
Veit & Company $394,593.00
C.W. Purpero $409,965.00
Zignego Company $507,180.20
Vinton is the low -bidder and was also the contractor who completed the
emergency/temporary repair back in October of 2025.
The project is being funded as follows:
• CIP Stormwater Projects = $300,000
• CIP Road Projects (FEMA) = $300,000
• TOTAL = $600,000
Both above projects were included and approved by the Board in the bond issuance in
March of 2026.
Attachments:
1. Bid Tabulation
2. Plan-Set
COST COMPARISON OF BIDDERS
W233 N2080 Ridgeview Parkway OWNER:
Waukesha, WI 53188-1020 PROJECT:
BID OPENING DATE:
BASE BID
ITEM # ITEM DESCRIPTION UNIT QTY. UNIT $ TOTAL UNIT $ TOTAL UNIT $ TOTAL UNIT $ TOTAL UNIT $ TOTAL
1 Mobilization L.S. 1 $60,000.00 $60,000.00 $36,685.00 $36,685.00 $15,000.00 $15,000.00 $9,000.00 $9,000.00 $28,000.00 $28,000.00
2 Traffic Control L.S. 1 $2,000.00 $2,000.00 $1,400.00 $1,400.00 $1,625.00 $1,625.00 $1,500.00 $1,500.00 $1,450.00 $1,450.00
3 Tracking Pad S.F. 2500 $0.01 $25.00 $0.01 $25.00 $2.50 $6,250.00 $2.40 $6,000.00 $1.00 $2,500.00
4 Silt Fence or Erosion Logs L.F. 400 $4.00 $1,600.00 $3.00 $1,200.00 $4.00 $1,600.00 $7.00 $2,800.00 $4.00 $1,600.00
5 Inlet Protection EA. 1 $100.00 $100.00 $75.00 $75.00 $168.00 $168.00 $200.00 $200.00 $100.00 $100.00
6 Clearing and Grubbing L.S. 1 $5,000.00 $5,000.00 $1,000.00 $1,000.00 $7,300.00 $7,300.00 $7,000.00 $7,000.00 $6,500.00 $6,500.00
7 Full Depth Sawcutting L.F. 80 $10.00 $800.00 $4.00 $320.00 $3.00 $240.00 $7.00 $560.00 $2.25 $180.00
8 Stream Bypassing L.S. 1 $7,500.00 $7,500.00 $23,180.00 $23,180.00 $22,500.00 $22,500.00 $21,500.00 $21,500.00 $50,000.00 $50,000.00
9 Remove Existing Culvert, Roadway & Concrete Channel L.S. 1 $37,000.00 $37,000.00 $19,560.00 $19,560.00 $6,800.00 $6,800.00 $17,500.00 $17,500.00 $60,000.00 $60,000.00
10 Precast 72"x96" RCB Culvert L.F. 80 $1,300.80 $104,064.00 $1,685.00 $134,800.00 $2,250.00 $180,000.00 $2,330.00 $186,400.00 $3,000.00 $240,000.00
11 Precast RCB Wingwalls EA. 4 $7,547.71 $30,190.84 $8,290.00 $33,160.00 $6,700.00 $26,800.00 $7,575.00 $30,300.00 $7,500.00 $30,000.00
12 Precast RCB Cutoff Wall EA. 2 $2,562.59 $5,125.18 $4,765.00 $9,530.00 $9,200.00 $18,400.00 $3,900.00 $7,800.00 $10,000.00 $20,000.00
13 Precast RCB Headwall EA. 2 $1,958.60 $3,917.20 $1,200.00 $2,400.00 $1,450.00 $2,900.00 $3,800.00 $7,600.00 $5,000.00 $10,000.00
14 Construct Roadway to Subgrade L.S. 1 $15,000.00 $15,000.00 $6,720.00 $6,720.00 $25,500.00 $25,500.00 $17,000.00 $17,000.00 $10,000.00 $10,000.00
15 Crushed Aggregate Base Course TON 90 $35.00 $3,150.00 $40.00 $3,600.00 $30.00 $2,700.00 $66.00 $5,940.00 $50.00 $4,500.00
16 3-Inch Asphaltic Concrete Trail TON 45 $199.00 $8,955.00 $165.00 $7,425.00 $240.00 $10,800.00 $217.00 $9,765.00 $214.00 $9,630.00
17 WisDOT Medium RipRap TON 140 $67.00 $9,380.00 $89.00 $12,460.00 $94.00 $13,160.00 $118.00 $16,520.00 $5.00 $700.00
18 WisDOT Light RipRap TON 40 $47.06 $1,882.40 $89.00 $3,560.00 $110.00 $4,400.00 $137.00 $5,480.00 $5.00 $200.00
19 Washed Sand (for fill of riprap in culvert) TON 20 $55.66 $1,113.20 $20.00 $400.00 $89.00 $1,780.00 $190.00 $3,800.00 $300.00 $6,000.00
20 Topsoil, Native Seed and Armored Turf Reinforcement Mat S.Y. 620 $27.80 $17,236.00 $49.75 $30,845.00 $56.00 $34,720.00 $60.00 $37,200.00 $27.80 $17,236.00
21 Topsoil, Native Seed and Class 1 Type B Urban Erosion Mat S.Y. 220 $13.86 $3,049.20 $9.50 $2,090.00 $13.00 $2,860.00 $28.00 $6,160.00 $13.86 $3,049.20
22 Topsoil, Lawn Seed, Fertilizer and Class 1 Type B Urban Erosion Mat S.Y. 330 $9.50 $3,135.00 $9.50 $3,135.00 $13.00 $4,290.00 $18.00 $5,940.00 $9.50 $3,135.00
23 Street Signage on Post EA. 8 $300.00 $2,400.00 $495.00 $3,960.00 $600.00 $4,800.00 $500.00 $4,000.00 $300.00 $2,400.00
$322,623.02 $337,530.00 $394,593.00 $409,965.00 $507,180.20
Village of Brown Deer
April 30, 2026
North 47th Street Culvert Replacement
Zignego Company, Inc.C.W. Purpero, Inc
TOTAL OF ALL ESTIMATED PRICES (ITEMS 1 - 23)
Vinton Construction
Company All-Ways Contractors, Inc. Veit & Company, Inc.
Page 1 of 1 © 2021 Copyright Ruekert & Mielke, Inc.
Cost Comparison of Bidders.xlsx (COMPARISON OF BIDDERS)
1
REQUEST FOR CONSIDERATION
COMMITTEE: Public Works & Beautification Committee
ITEM DESCRIPTION: Annual Maintenance Contract for Natural Areas
PREPARED BY: Matthew S. Maederer, Director of Public Works
REPORT DATE: May 13, 2026
MANAGER'S REVIEW/COMMENTS:
No additional comments to this report.
See additional comments attached.
RECOMMENDATION: Consider Approval of the Contract Renewal to C.W. Purpero
(formerly Keir w/ Natural Landscapes, Inc.) for Annual Maintenance of
Stormwater/Natural Area Sites.
EXPLANATION:
For t he last 15 -years the Vi llage has utilized the services of Keir Peckham for
maintenance and management of the Village ’s natural areas which include the foll owing
sites:
1. Floral Lane Rain Gardens
2. Village Pond Rain Gardens
3. Beaver Creek (from W. Brown Deer Road to N. 60th Street)
4. Beaver Creek (from Village Park to N. Green Bay Road)
5. Original Village Ponds (Deerwood Drive & N. 43rd Street)
6. School District Ponds
7. N. 51st Street Drainage (from W. Brown Deer Road to Village Pond)
Keir’s work is unmatched and incredibly important in keeping our natural areas looking
aesthetically pleasing and managed properly.
Keir recently joined C.W. Purpero and will continue to manage the Village’s sites, but just
under a new name (formerly his business was “Natural Landscapes, Inc.).
This is a budgeted expense out of the stormwater utility and funded as follows:
• G/L No. 610-000-36-5-23-25 (Turf Maintenance) = $30,000
• Annual Contract Amount = $29,980.00
Attachments:
1. Proposal & Annual Maintenance Contract w/ C.W. Purpero
E A R T H W O R K • U T I L I T I E S • D E M O L I T I O N • E N V I R O M E N T A L
7030 South 13th Street • Oak Creek, Wisconsin 53154-1447 • 414-856-2850 • Accounting Fax 414-856-2855 • Estimating Fax 414-856-2856
An Equal Opportunity Employer
www.purpero.com
Date: February 9, 2026
To: Matthew Maederer / Village of Brown Deer
Re: 2026 Vegetation Management and Monitoring Proposal
Dear Mr. Maederer,
Per your request, following you will find proposal for continued vegetation management and monitoring services at the
properties as specified within for the Village of Brown Deer.
The overall goal of proposed work is designed to:
• Continuously promote healthy native plant cover throughout all naturalized growing spaces.
• Manage undesirable woody and herbaceous plant species.
• Manage stormwater runoff.
• Provide an environmentally friendly landscape for native insects and pollinator species.
• Aesthetically enhance the appearance of all naturalized growing spaces.
2026 Project Sites / Breakdown Costs:
1) $ 5,280 - Beaver Creek I - Brown Deer Road to 60th Street
2) $ 5,280 - Beaver Creek Segment 3 – Brown Deer Trail to Hwy 57
3) $ 2,400 - Village Hall Parking Lot Rain Gardens
4) $ 5,060 - N 51st Street Drainage to Brown Deer Road
5) $ 5,060 - High School Basins
6) $ 2,500 - Floral Lane Rain Gardens
7) $ 2,200 - Deerwood Drive Detention Pond
8) $ 2,200 - 43rd Street Detention Pond
Monitoring of naturalized growing spaces throughout the entire 2026 growing season shall consist of periodic inspections
during the entire growing season to evaluate the site’s vegetative state to determine what methods of management may be
necessary. Management recommendations shall focus on the control of noxious plant species that may pose a threat to the
establishment of desirable native vegetation. An end of year vegetation management and monitoring report will be
submitted when all work is completed.
Management shall consist of selective cutting, mowing and spot herbicide applications of invasive plant species when
necessary. All contracted areas shall be mowed at the completion of 2026 growing season to mimic natural fire by thatching
up dormant plant matter and setting back invasive woody species.
Total cost for 2026 Vegetation Management and Monitoring Services as listed within: $ 29,980.00.
Thank you for the opportunity to provide you with this quote. If you have any questions, comments, or concerns, please
don’t hesitate to contact me.
Sincerely,
Keir Peckham / Superintendent of Landscaping
Email: peckhamk@purpero.com
Cell: 262.488.5347
E A R T H W O R K • U T I L I T I E S • D E M O L I T I O N • E N V I R O M E N T A L
7030 South 13th Street • Oak Creek, Wisconsin 53154-1447 • 414-856-2850 • Accounting Fax 414-856-2855 • Estimating Fax 414-856-2856
An Equal Opportunity Employer
www.purpero.com
Proposal Acceptance / Agreement
Date:
February 9, 2026
CWP Job:
10000 – Village of Brown Deer
Beaver Creek I - Brown Deer Road to 60th Street
Beaver Creek Segment 3 – Brown Deer Trail to Hwy 57
Village Hall Parking Lot Rain Gardens
N 51st Street Drainage to Brown Deer Road
High School Basins
Floral Lane Rain Gardens
Deerwood Drive Detention Pond
43rd Street Detention Pond
Submitted To:
Matthew Maederer / Village of Brown Deer
Address:
All sites listed above.
Email / Phone:
mmaederer@browndeerwi.gov
Notes / Work Included:
All 2026 services as specified in the attached proposal.
Proposal Acceptance / Agreement Amount:
$29,980.00
Based on the following assumptions:
Payment to be made monthly for work completed, less retainage.
Net 30 days, 1% interest per month on past due invoices.
All agreements contingent upon strikes, accidents, or delays beyond our control.
Owner to carry builders risk insurance and other project specific insurance.
Salvage value of excess materials figured in bid.
C.W. Purpero, Inc. reserves the right to negotiate terms of the contract.
Accepted By: _____________________________________________________ Date: ________________
(Name) (Title)
As required by the Wisconsin Construction Lien Law. Builder hereby notifies owner that persons or companies
furnishing labor or materials for the construction on owner’s land may have lien rights on owner’s land and
buildings if not paid. Those entitled to lien rights, in addition to the builder, are those who contract directly
with owner or those who give the owner notice within sixty days after they first furnish labor or materials for
the construction. Accordingly, owner probably will receive notices from those who furnish labor or materials for
the construction and should give a copy of each notice received to his mortgage lender, if any. Builder agrees to
cooperate with the owner and his lender, if any, to see that all potential lien clamant are duly.
1
REQUEST FOR CONSIDERATION
COMMITTEE: Public Works & Beautification Committee
ITEM DESCRIPTION: Equipment Purchase - Kubota
PREPARED BY: Matthew S. Maederer, Director of Public Works
REPORT DATE: May 13, 2026
MANAGER'S REVIEW/COMMENTS:
No additional comments to this report.
See additional comments attached.
RECOMMENDATION: Consider Approval for the Purchase of a new Kubota (change
in 2026 CIP item for Village Hall A/C Chiller).
EXPLANATION:
DPW is requesting funding for a new Kubota. This is a change from an originally planned
CIP item for 2026 for replacement of the Village Hall A/C Chiller.
The original budget for the A/C chiller was $40,000; however, replacement costs came in
far exceeding the original budgeted amount.
Instead DPW will budget fo r the A/C chiller replacement in future years and proposes to
spend the original $40,000 as follows:
• A/C Chiller Repair = $4,146.00
• Kubota = $27,666.22
• Total = $31,812.22
Attachments:
1. Quote for Kubota
2. A/C Chiller Repair Quote
3. CIP Excerpt
Quote Provided By
LOCHEN EQUIPMENT
Cory Kulibert
512 FRANKLIN ST
NEWBURG, WI 53060
email: ckulibert@lochenequipment.com
phone: 9202102225
Standard Features Custom Options
V Series RTVX2CSKLH1
* * * EQUIPMENT IN STANDARD MACHINE * * *
DIESEL ENGINE
Model Kubota D1105
3 Cyl. 68.5 cu in
+23.3 Gross Eng HP
75 Amp Alternator
TRANSMISSION
VHTX
Variable Hydro Transmission
Forward Speeds:
Low 0 15 mph
High 0 25 mph
Reverse 0 17 mph
Limitedslip Front Differential
Rear differential lock
HYDRAULICS
Hydrostatic Power Steering
with manual tiltfeature
Hydraulic Cargo Dump
Hydraulic Oil Cooler
FLUID CAPACITY
Fuel Tank 7.9 gal
Cooling 8.3 qts
Engine Oil 4.3 qts
Transmission Oil 1.8 gal
Brake Fluid 0.4 qts
CARGO BOX
Width 57.7in
Length 40.5 in
Depth 11.2 in
Load Capacity 1102 lbs
Vol. Capacity 15.2 cu ft
+ Manufacturer Estimate
KEY FEATURES
Factory Cab with A/C, Heater,
Defroster
Digital Multimeter
Fullyopening rolldown side
windows
Speedometer
Prewired w/ speakers/antenna for
stereo
Front Independent Adjustable
Suspension
Rear Independent Adjustable
Suspension
Brakes Front/Rear Wet Disc
Rear Brake Lights / Front
Headlights
2” Hitch Receiver, Front and Rear
Deluxe 60/40 split bench seats
with driver's side seat adjustment
Underseat Storage Compartments
Deluxe Front Guard
(radiator guard, bumper, and lens
guard)
DIMENSIONS
Width 63.2 in
Height 81.9 in
Length 120.3 in
Wheelbase 80.5 in
Tow Capacity 1300 lbs
Ground Clearance 10.4 in
Suspension Travel 8 in
Turning Radius 13.1 ft
SAFETY EQUIPMENT
SAE J2194 & OSHA 1928 ROPS
Horn
Dashmounted Parking Brake
Spark Arrestor Muffler
Retractable 2point Seat Belts
TIRES AND WHEELS
ATV Tire 25 x 10 12, 6 ply
HDMP Tires 25 x 10 12, 6 ply
RTVX2CSKLH1 Base Price: $31,399.00
Configured Price: $31,399.00
Sourcewell Discounts:
Kubota Items: ($6,907.78)
Total Discount: ($6,907.78)
SUBTOTAL: $24,491.22
3Yr RTVX2CSKLH1 Extended Warranty $1,950.00
Kubota Item Fees:
Dealer Assembly: $0.00
Freight Cost: $825.00
PDI: $400.00
Total Unit Price:$27,666.22
Quantity Ordered: 1
Final Sales Price: $27,666.22
Purchase Order Must Reflect Final Sales Price.
To order, place your Purchase Order directly with the quoting
dealer
*All equipment specifications are as complete as possible as of the date on the quote. Additional attachments, options, or accessories may be added (or deleted) at the
discounted price. All specifications and prices are subject to change. Taxes are not included. The PDI fees and freight for attachments and accessories quoted may have additional charges
added by the delivering dealer. These charges will be billed separately. Prices for product quoted are good for 60 days from the date shown on the quote. All equipment as quoted is subject to
availability.
© 2018 Kubota Tractor Corporation. All rights reserved.
RTVX2CSKLH1 WEB QUOTE #2966582
Date: 5/11/2026 8:01:47 AM
Customer Information
Streim, Matt
202513
Village of Brown Deer
mstreim@browndeerwi.org
4143713024
198.143.38.22
1220 Mineral Springs Drive
Port Washington, WI 53074
Phone: (262) 284-5589
chrisw@jhheating.co
INCORPORATED
To: Brown Deer Admin
Attn: Dan Bishop
Email: dbishop@browndeerwi.org
From: Chris Wittig
Date: April 29, 2026
Re: Chiller Repairs Q042926-2121
This quote is a result of service request. Current Hot Gas Bypass valve has failed closed and is causing
start up issues with circuit #1 which is locking out the unit. With the age of the unit, replacement should
be considered over repair. I am working on this quote for you. J&H provided scope listed below.
Scope
Travel to site and gain access to equipment
Provide and install (1) pc new HGB Valve with Solenoid option
Evac, pressure test and R410A Trim Charge
Start up and set unload pressure
Notes:
Current 1-week lead time on materials
Base Bid less Tax: $ 4,146.00
Thank you.
Chris Wittig
Service Manager
J & H Heating, Inc.
FY 2026-2030 Capital Improvement Plan
Project Description
Department: Public Works
Project Name: Replace Outside A/C Chiller
Total Project Cost: $40,000 Estimated Life of Project: 20 years
Priority (1–Absolutely necessary | 2–Strong preference | 3–Nice to have but can get by without it): 2
Expenditure Detail:
Year 2026 2027 2028 2029 2030
Budget $40,000 $ $ $ $
Funding Sources: Levy ☒ Debt ☐ Grant ☐ Donations ☐ Fund Balance ☐
Project Description: This outside air conditioning chiller serves for both the Village Hall and Police
building areas.
Project Justification: It is approaching its 20-year life span and building maintenance identified a need
to replace the system. Each year there are more maintenance needs to keep the chiller operable. The
chiller was originally installed in 2008, and the Village is increasingly experiencing significant
maintenance issues with it.