BUILDING BOARD MEETING
MONDAY, March 16, 2026
Virtual Meeting Phone/Video
4:00 P.M.
PLEASE TAKE NOTICE that a meeting of the Brown Deer Building Board will be held virtually.
The public can access this meeting of the Building Board by dialing 1-312-626-6799. The public
would then need to enter the code: 838 2556 3899 to join the meeting. The public can also join by
video using the following link https://us02web.zoom.us/s/83825563899
Please remember to mute your microphone to reduce background noise. The following items of
business will be discussed and possibly acted upon:
I Roll Call
II Persons Desiring to be Heard
III Consideration of Minutes: March 2, 2026
IV Old Business
1. None
V Plans Submitted for Consideration:
1. Resubmittal - New Retail Building – Target, 9034 N. Green Bay Road
2. Resubmittal - New Senior Care Building – Atlas Assisted Living, 4740 W. Bradley Road
VI Adjournment
Caren Brustmann
Caren Brustmann, Village Clerk
March 12, 2026
PERSONS REQUIRING SPECIAL ACCOMMODATIONS FOR ATTENDANCE AT THE
MEETING SHOULD CONTACT THE VILLAGE CLERK AT LEAST ONE BUSINESS DAY
PRIOR TO THE MEETING.
MINUTES OF THE
BROWN DEER BUILDING BOARD
Virtual Meeting Phone/Video
March 2, 2026
The meeting was called to order at 4:02 p.m.
I ROLL CALL
Present: Ryan Thacker, Will Manley, Chris Eger, Nicole Robbins
Excused: Mary Buckley
Also Present: Nate Piotrowski, Community Development Director; Aaron Hemquist, Arwin
Chan, Jeanette Majek-Day, Target; Bill Morris, Samantha Baker, Eihab Atout, Atlas Assisted
Living
II PERSONS DESIRING TO BE HEARD
None
III CONSIDERATION OF MINUTES
Mr. Eger motioned, and Ms. Robbins seconded to approve the minutes of October 6, 2025.
Approval was unanimous.
IV OLD BUSINESS
1. None
V PLANS SUBMITTED FOR CONSIDERATION
The following items were on the agenda for review:
1. Wall Sign – AT&T, 5960 W. Brown Deer Road
Mr. Piotrowski reviewed the proposal and noted that the monument sign, which was previously
reviewed in 2024, was still larger than allowed per code. He stated that the Board could approve
the tenant panel on condition that the monument sign come into compliance. The building wall sign
did meet code standards.
Mr. Eger motioned for approval of the signs and Ms. Robbins seconded on condition that the
tenant panel fit a monument sign that complies with Village code standards. Motion to approve
the new signs was unanimous.
2. New Retail Building – Target, 9034 N. Green Bay Road
Mr. Piotrowski discussed the proposed development and introduced Aaron Hemquist and
Arwin Chan with Target. Mr. Hemquist discussed the site plan details and Arwin Chan
discussed the design features of the proposed building.
Mr. Eger asked if it was possible to screen the loading dock as that area would be highly
visible to the south. Mr. Hemquist stated that landscaping around the perimeter would help
to screen the view but if desired an 8’ screen wall could be added. Mr. Eger and other
members felt that additional screening beyond landscaping would be preferred.
Mr. Eger asked for clarification on the red panels if they were precast or metal based on
the reflection shown in the rendering. He added that he was concerned with fading of the
panels if precast. Ms. Chan replied that the panels were precast with a Target branded red
color that was applied in the field. She noted that this was a specialized paint that was
tested for enhanced durability. Mr. Hemquist noted that it is in Target’s best corporate
interest to keep the color in good condition and not let it f ad to pink. He stated that they
have found that precast works the best to preserve the color over other materials such as
wood, metal or EIFS.
Mr. Eger asked if some additional visual interest could be added to the north elevation
since that would face new residential development. He suggested perhaps adding windows.
Ms. Chand replied that additional windows on this elevation were difficult given the
interior layout and that target did not wish to use fake windows. Mr. Thacker asked if the
textured precast panels could be used on this elevation to provide more visual interest. Ms.
Chan stated that they could look to introduce the textured panels and or additional red color
to this elevation.
Mr. Thacker asked if the screening of the loading docks would be done with cast in place
concrete. Mr. Hemquist stated that this was the likely solution. Mr . Thacker encouraged
the design team to look at alternative screening materials such as metal or composite to
help soften the appearance of the wall.
Mr. Manley stated he generally liked the design but had similar concerns about the loading
area and north elevation. He asked about the window film that was designated for some of
the storefront windows. Ms. Chan stated that some of the lower sections of the window
would have a patterned 3M film to hide “back of house” operations but they would be clear
above a certain height. She stated that the pattern and design for the film was not yet
finalized.
A discussion ensued as to requesting an additional review which would show the requested
changes.
It was consensus of the committee to request a resubmittal of the building plans to show revisions
along the north elevation, screening for the loading dock and detail on the film to be used for the
storefront windows
3. Building Sign Package- Target, 9034 N. Green Bay Road
Mr. Piotrowski introduced the sign package and Janette Majek- Day representing Target .
Ms. Majek-Day walked the committee through the various signs proposed for the building.
Mr. Eger asked if the signs would be illuminated. Ms. Majek- Day replied that all signs
would be internally illuminated. Mr. Eger asked if the signs conformed to code. M r.
Piotrowski replied that the code was flexible given the planned development zoning and
that generally the scale of this building put it well beyond typical code limits . He noted
that really it is up to the Board to determine if the proposed signage matched the aesthetics
of the building and did not overwhelm the various elevations. Mr. Thacker stated that he
was comfortable with the amount and scale of signage.
Mr. Thacker motioned for approval of the signs and Mr. Eger seconded. Motion to approve the
new sign package was unanimous.
4. New Senior Care Building – Atlas Assisted Living, 4740 W. Bradley Road
Mr. Piotrowski reviewed the proposal and introduced Bill Morris the project architect.
Mr. Eger stated that he would prefer to see the monotony of the single windows broken up along
with masonry added to the base of the canopy pillars. Mr. Morris stated this is something he could
look into. Mr. Thacker agreed that some changes to the windows should be made and suggested
that sizing could vary or trim could be added. He stated that spacing should be consistent.
Ms. Robbins asked whether landscaping could be used to soften the front elevation. Ms. Baker, the
owner, responded that a complete landscape plan is proposed to help provide curb appeal. Mr.
Piotrowski noted this plan was previously reviewed and approved by the Beautification Committee.
Mr. Eger asked whether the scale and pitch of roof was necessary to hide mechanicals as he was
concerned with its scale relative to the vertical wall sections. Mr. Morris replied that the roof was
indeed hiding mechanicals but noted that he could explore d ormers to help provide further visual
relief to the roof line. Mr. Eger thought that could help along with the possible introduction of
different siding material or perhaps a vertical orientation of the siding material.
Mr. Thacker asked about the comments the Board made when the project was previously reviewed
in 2023. Mr. Piotrowski shared the minutes from the 2023 review and noted that many of the same
comments being made reflected concerns from 2023. He added that whi le the designs were
conditionally approved in 2023, the delay in construction caused the approval to lapse and there
were changes to the building footprint during that time which necessitated a new review.
Mr. Manley stated that he would like to see further articulation of the building façade, shared the
concern about window placement and sizing and questioned if other siding material could be
explored. Mr. Morris said that he could look at other material but ruled out EIFS.
It was consensus of the committee to request a resubmittal of the building plans to show revisions
to window sizing and placement, additional articulation of the roof line and or front elevation,
possible alternative siding material and masonry elements to the base of the canopy
VII ADJOURNMENT
Mr. Piotrowski moved adjournment.
Approval was unanimous.
The meeting adjourned at 5:04 p.m.
The next regularly scheduled meeting is March 16, 2026
Nate Piotrowski
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Development Director, Village of Brown Deer
WI_Brown Deer
2026_March_06
FRONT ELEVATION
REAR ELEVATION
Precast with texture paint,
paint dark gray
Precast with texture paint
paint dark gray
2’-0” H x 2’-0” W(4 sf),
Internal illuminated sign,
behind glass
Clerestory windows, TYP.
11’-1 5/8” H x 40’ - 5 5/16” W(450.3 sf),
Internal illuminated sign
EL= 124’-8”
EL= 124’-8”
Precast with texture paint,
paint light gray
8’-1“ Hx14’-6 5/8” W (117.57 sf),
Internal illuminated sign
EL= 140’-0”
9’-0” H x 9’ - 0” W(81 sf),
Internal illuminated sign
23 3/8” H x 18’ - 3 3/4” W(36.62 sf),
Internal illuminated sign
Precast with texture paint,
paint brand color
Precast with reveals,
paint dark gray
Alum. storefront system,
film up @ 10ft
EIFS, paint light gray
Precast with texture paint,
paint light gray
1’-7 3/4” H x 10’ - 11 1/2” W(18.03 sf),
Internal illuminated sign
Alum. storefront system
RIGHT ELEVATION
LEFT ELEVATION
WI_Brown Deer
2026_March_06
EL= 124’-8”
8’-1 1/2”H x11’-1 3/16”W(89.94 sf) ,
Internal illuminated sign
Precast with texture paint,
paint light gray
Precast with reveals,
paint dark gray
Clerestory windows, TYP.
Precast with texture paint,
paint light gray
Precast with texture paint,
paint dark gray
EL= 140’-0”
EL= 124’-8”
EL= 124’-8”
Precast with texture paint,
paint dark gray
Precast with texture paint,
paint brand color
EIFS, paint light gray
Alum. storefront system,
film up @ 10ft
EL= 140’-0”
Precast with texture paint,
paint light gray
9’-0” H x 9’ - 0” W(81 sf),
Internal illuminated sign
Precast with texture paint,
paint brand color
EL= 108’-0”
Precast with reveals,
paint dark gray
Precast with reveals,
paint dark gray
WI_Brown Deer
2026_March_06
WI_Brown Deer
2026_March_06
WI_Brown Deer
2026_March_06
WI_Brown Deer
2026_March_06
FRONT ELEVATION
2’-0” H x 2’-0” W(4 sf),
Internal illuminated sign,
behind glass
11’-1 5/8” H x 40’ - 5 5/16” W(450.3 sf),
Internal illuminated sign
EL= 124’-8”
8’-1“ Hx14’-6 5/8” W (117.57 sf),
Internal illuminated sign
EL= 140’-0”
9’-0” H x 9’ - 0” W(81 sf),
Internal illuminated sign
23 3/8” H x 18’ - 3 3/4” W(36.62 sf),
Internal illuminated sign
Precast with texture paint,
paint brand color
Precast with formliner/reveals,
paint dark gray
Alum. storefront system,
film up @ 10ft
EIFS, paint light gray
Precast with texture paint,
paint light gray
1’-7 3/4” H x 10’ - 11 1/2” W(18.03 sf),
Internal illuminated sign
Alum. storefront system
C-1 Target Red
SW #7014 Eider White
SW #7018 Dovetail
Reveal Patterns on
Precast panels
WI_Brown Deer
2026_February_23
LARGE SCALE
CURTAIN WALL ELEVATION @ CHECK LANES - EXTERIOR
4
CURTAIN WALL ELEVATION @ ORDER PICKUP STORAGE - EXTERIOR CURTAIN WALL ELEVATION @ ORDER PICKUP STORAGE - EXTERIOR
1 2
CURTAIN WALL ELEVATION @ COMMUNITY LOUNGE - EXTERIOR
3
WINDOW FILM
BAHAR PARTOVI
/zero.lf/one.lf//zero.lf/nine.lf//two.lf/zero.lf/two.lf/five.lfSingle Entry Window Film
P/L
P/L
P/LP/L
P/L
P/L
P/L P/L
W
W
W
W
W
W
W
W
10.0'
10.0'
20' SEWER/WATER EASEMENT PER CSM 8940
12' WEPCO & WTC EASEMENT DOC. 3941285 AS SHOWN ON CSM 8940
6.0'
6.0'
20' DRIVEWAY EASEMENT PER CSM 334 & 8940
SEMENT DOC.
ON CSM 8940
FOUND 3/4"
IRON ROD
ASPHALT
WEST BRADLEY ROAD
110' PUBLIC R.O.W.
ASPHALT
GRASS & GRAVEL
FOUND 3/4"
IRON ROD
FOUND 3/4"
IRON ROD
FOUND 3/4"
IRON ROD
FOUND 3/4"
IRON ROD
FOUND
RR SPIKE
PARCEL 2
CSM 334
PLASTIC FENCE
WOOD FENCE
WOOD FENCE
OHW
OHW
X X
X
WOOD FENCE
GRASS & GRAVEL
ASPHALT
ASPHALT
CONCRETE
ASPHALT
ASPHALT
FENCE 1.1' NORTH
FENCE 4.9' NORTH
FENCE 0.8' NORTH
FENCE 1.2' SOUTH
WOOD PLANTERS
TYPICAL
TREES
7.0'
FENCE 6.7'
3.5'
10.0'
18.7'
ASPHALT 0.2' EAST
FENCE
6.0' SOUTH
CONCRETE
CURB CUT
CURB CUT
CURB CUT
CONCRETE WALK
CONCRETE
CONCRETE
E(P)
MAPLEHART
RIM 104.75
10"SW. 103.03
RIM 105.08
36"E. 97.72
36"W. 97.78
RIM 104.62
10"NE, 102.6±
6"E. 101.76
WATER 101.68
RIM 105.00
12"N. 99.55
RIM 104.96
42"W. 96.85
36"E. 97.18
12"S. 99.43
18"N. NOT OBSERVED
RIM 104.01
42"E. 96.5±
RIM 104.42
15"S. 101.85
RIM 104.99
15"N. 101.69
18"S. 99.19
STO
STO
STO
STO
STO
STO
STO
STO
STO
STO
STO
STO
STO
STO
STO
STO
E
E
S. LINE SE 1/4 SECTION 11
BM-BOX ON SW SIDE OF LIGHT POLE
BASE, ELEV= 107.69
BM-TOP CENTER NUT ON
HYDRANT, ELEV= 107.83
STO STO
3"
14"14"
14"24"
876.89'
N88°33'05"E 2674.29'
150.00'
55.01'
N00°21'43"W
GARAGE
BUILDING
SHED
PROPOSED BUILDING
FFE: 107.50
20.0'
20.0'
34.3'
10.8'
33.9' 49.4'
16.7'
9.0'
18.0'
16.0'
24.0'
30.0'
40.0'
DUMPSTER ENCLOSURE
R10.0'
R10.0'
R10.0'
5.0'
R5.0'
ADA RAMP - TYPE 1B
C401
CURB CUT OPENINGH
C401
CURB CUT OPENINGH
C401
8.0'
ADA SIGN AND POSTC
C401
BIOFILTRATION BASINA
C402
BIOFILTRATION BASINA
C402
R12.0'
R12.0'
EX. LIGHT POLE RELOCATION
(COORDINATE WITH VILLAGE)
20.5'
12.0'
20.0'
22.4'
5.0'
PROPOSED
MONUMENT SIGN
NEW CURB AND GUTTER
TO CLOSE DRIVEWAY
23.0'
28.1'
31.2'
26.5'
5" THICK CONCRETE WALK
CONCRETE PAVEMENT
ASPHALT SURFACE
LEGEND:
C401
E
C401
F
C401
D
CURB & GUTTER
(ACCEPT)
CURB & GUTTER
(REJECT)
C401
A
C401
A
GENERAL NOTES:
1. THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS
DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS
FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE
LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED.
THERE MAY BE ADDITIONAL UNDERGROUND UTILITY
INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT
SHOWN.
2. VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY
POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO
PROCEEDING WITH CONSTRUCTION.
3. WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND
EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES.
4. ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN REQUEST.
DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT FOUNDATIONS,
COLUMN LINES, LIGHT POLES, OR OTHER NON CIVIL SITE WORK.
REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF
BUILDING AND ARCHITECTURAL FEATURES.
5. DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF PAVEMENT.
6. WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT NOT
LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND RAMPS, PAVING,
AND CURB AND GUTTER SHALL BE COMPLETED PER MUNICIPAL
AND/OR COUNTY REQUIREMENTS AND STANDARDS.
7. EARTHWORK SHALL BE IN ACCORDANCE WITH GEOTECHNICAL
ENGINEER'S RECOMMENDATIONS.
SITE INFORMATION
SITE AREA 49251 1.131 AC
SITE DISTURBED AREA 43391 0.996 AC
EXISTING IMPERVIOUS AREA 46996 1.079 AC 95.4 %
PROPOSED IMPERVIOUS AREA 26605 0.611 AC 54.0 %
TOTAL PARKING SPACES 17
ADA PARKING SPACES 2
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED
ON FIELD MARKINGS AND INFORMATION FURNISHED BY UTILITY
COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS INFORMATION IS
BELIEVED TO BE RELIABLE, ITS ACCURACY AND COMPLETENESS CANNOT
BE GUARANTEED.
GRAPHIC SCALE
02 0 4 0
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210THE
G R O UP
Single Source. Sound Solutions.
DRAWN BY:
DESIGN DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
SHEET NO:
PLOT DATE:
NO. REVISION DATE
ISSUANCE DATE
----
----
21940
----
----
C100
4740 W BRADLEY ROAD
4740 BRADLEY ROAD
BROWN DEER, WI 53223
SITE PLAN
2025.09.30
i:\emil ovbiagele\21940 - 4740 bradley road\060 CAD\030_Production Sheets\100_Civil\C100 Site Plan.dwg21940 C100 JRUEDAGUTIERREZ2025.09.30
----
----
----
----
----
----
----
----
----
----
----
----
----
1. All work shall be performed in accordance with all applicable local, federal, state and national codes
and ordinances and all authorities having jurisdiction.
2. The Contractor and its Subcontractors shall verify all dimensions and/or discrepancies in plans and
report any errors to the Architect prior to commencement of the work, or be responsible for same.
3. Do not scale drawings. Verify all on site dimensions and conditions by each subcontractor.
4. All carpentry, plumbing, mechanical and electrical work is to be coordinated between the trades as
part of their installation layout. Verify locations of plumbing and HVAC lines with Builder before
installation.
5. On site verification of all dimensions and conditions shall be the responsibility of each subcontractor.
6. Architect shall not have control or charge of, and not be responsible for construction means,
methods, techniques, sequences or procedures, or for safety precautions and programs in connection with
the work, or for the acts or omissions of the subcontractors, or other persons performing any of the work, or
for the failure of any of them to carry out the work in accordance with the intent of the contract documents.
7. Verify sizes and installation requirements and specifications of all items supplied by others before
proceeding with work related thereto.
8. The commencement of each subcontractor's work shall constitute acceptance of all sub-surfaces.
9. Should unsuitable soil conditions arise, promptly advise the Architect of same before proceeding
with any further work.
10. Stock pile material as directed by Owner or Builder, Protect all trees and wetland areas retained on
site. Provide erosion control as required by the governing authority.
11. Verify locations of all underground lines before proceeding with sub-soil work.
12. Contact Diggers Hot line 48 hours before any underground work.
13. Each Subcontractor shall obtain and provide necessary bonds, permits and necessary inspections as
required by municipal, county, state, federal or other agencies having jurisdiction.
14. Truss manufacturer to design and fabricate floor and roof trusses in accordance with all applicable
codes.
15. The minimum live load for floor shall be 50 p.s.f. and the minimum snow load for roofs shall be 35
p.s.f. The minimum dead load for floors and roofs shall be 10 p.s.f. The maximum deflection shall be
L/480. All girder trusses shall be designed to accept all concentrated loads as required. Truss drawings
shall be submitted to the Builder and shall be sealed by a State of Wisconsin licensed structural engineer or
by the truss manufacturers engineer registered in Wisconsin. Truss Manufacturer shall confirm headers and
lam beams for truss bearing on all span
16. All concrete and reinforcing work shall conform to ACI specifications and recommendations. All
concrete footings shall bear on 3000 p.s.f. minimum soil capacity on virgin ground, minimum 3'-8" below
grade. All concrete shall attain a 28-day compressive strength of 4000 P.S.I. for walls slabs; 4000 P.S.I.
exterior slab use 6% air entrainment
17. All construction lumber shall be Southern Yellow Pine Fb 1000, E-1.3 #2 or better, unless otherwise
noted. All wood in contact with concrete or grade shall be pressure treated. Shim all sill plates and provide
sill sealer below plate and grout any gaps greater than ¼".
18. All engineered joists and beams, i.e., micro lams, TJI's, etc. shall be installed in accordance with the
manufacturers specifications.
19. Provide doubts cripples under all headers greater than 4'-0".
20. All concentrated loads from headers and beams shall be solid-blocked down to foundation, steel, or
girder beams. No back filling of foundation shall occur until floor system is in place to brace top of
concrete walls
21. All work shall be performed in a good workmanlike manner. Each subcontractor shall amend and
make good at his own cost any defects and other faults in his workmanship and materials.
22. Each contractor to clean up debris inside and outside the building site which has been caused by his
work and place in dumpster provide by builder on a daily basis.
23. All electrical work shall conform to the National Electric Code, NEC latest edition and local building
code.
APPLICABLE CODES: CHAPTER 6 - TYPES OF CONSTRUCTION
BUILDING CODE: INTERNATIONAL BUILDING CODE - 2015 AS MODIFIED BY THE WISCONSIN ENROLLED
COMMERCIAL BUILDING CODE IN CHAPTERS COMM 61 AND COMM 62. WISCONSIN ADMINISTRATIVE CODE
CHAPTER DHS 83 COMMUNITY-BASED RESIDENTIAL FACILITIES NFPA 72, NATIONAL FIRE ALARM CODE, 2022
EDITION NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2002 EDITION.
CHAPTER 4 - SPECIAL DETAILED REQUIREMENTS BASED
CHAPTER 3 - USE AND OCCUPANCY CLASSIFICATION
ATLAS - ASSISTED LIVING FACILITY (CBRF CLASS 'C' NON-AMBULATORY (CNA)) SHALL BE
ACCORDING TO SECTION 308.3 CONSIDERED, INSTITUTIONAL GROUP I-2 USE.
ON USE AND OCCUPANCY
407.2 'CORRIDORS' - CORRIDORS ARE CONTINUOUS TO THE EXITS.
407.2.1 'SPACES OF UNLIMITED AREA'
1) ALL COMMON SPACES OPEN TO THE CORRIDORS SHALL NOT BE OCCUPIED FOR PATIENT SLEEPING
ROOMS, TREATMENT ROOMS, OR INCIDENTAL USE AREAS.
2) THE OPEN SPACES SHALL BE PROTECTED W/ AN AUTOMATIC FIRE DETECTION SYSTEM IN
ACCORDANCE W/ SECTION 907.
3) THE CORRIDORS ONTO WHICH THE SPACES OPEN SHALL BE EQUIPPED W/ AN AUTOMATIC FIRE
DETECTION SYSTEM IN ACCORDANCE W/ SECTION 907.
4) THE SPACE SHALL BE ARRANGED SO AS NOT TO OBSTRUCT ACCESS TO REQUIRED EXITS.
407.3 'CORRIDOR WALLS' - CORRIDOR WALLS SHALL EXTEND FROM THE FLOOR TO THE UNDERSIDE OF THE
ROOF DECK ABOVE OR TO THE UNDERSIDE OF CEILING ABOVE WHEN CEILING IS CONSTRUCTED TO LIMIT
THE TRANSFER OF SMOKE.
407.5 SMOKE COMPARTMENTS CONTAINING PATIENT SLEEPING UNITS SHALL BE EQUIPPED THROUGHOUT
WITH AN AUTOMATIC FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 903.
3.1.1. THE SMOKE COMPARTMENTS SHALL BE EQUIPPED WITH APPROVED QUICK-RESPONSE SPRINKLERS IN
ACCORDANCE WITH SECTION 903.3.2
CHAPTER 5 - GENERAL BUILDING HEIGHTS AND AREAS
NOTE: THE EXTENT OF THIS PROJECT IS AN ASSISTED LIVING FACILITY CONSTRUCTED W/ MASONRY VENEER AND
WOOD STUD EXTERIOR BEARING WALLS, WOOD ROOF TRUSSES & FRAMING, AND WOOD ROOF DECK
PROTECTED WHERE REQUIRED BY TABLE 601 WITH 1 HOUR FIRE RESISTANCE RATED PROTECTION.
THEREFORE THE CONSTRUCTION CLASSIFICATION FOR THE BUILDING IS TYPE V A.
TABLE 503 'ALLOWABLE HEIGHT AND BUILDING AREA'
OCCUPANCY GROUP I-2:
ACTUAL BUILDING:
SINGLE STORY
10,888 SF
SECTION 506.3 'AUTOMATIC SPRINKLER SYSTEM INCREASE'
FOR SINGLE STORY BUILDINGS EQUIPPED W/ APPROVED AUTOMATIC SPRINKLER SYSTEM IN
ACCORDANCE W/ SECTION 903.3.1.1 THE ALLOWABLE AREA IS PERMITTED TO BE INCREASED BY 300
PERCENT.
HEIGHT LIMITATION OF 50'-0" ABOVE THE GRADE PLANE AREA
LIMITATIONS OF 1 STORIES AT 9,500 SF PER STORY.
32'-8" HIGH
CHAPTER 8 - INTERIOR FINISHES
803.1 'GENERAL' - STATES INTERIOR WALL AND CEILING FINISHES SHALL BE CLASSIFIED IN ACCORDANCE
WITH ASTM E84. INTERIOR FINISH MATERIAL SHALL BE GROUPED IN THE FOLLOWING CLASSES IN
ACCORDANCE WITH THEIR FLAME SPREAD AND SMOKE DEVELOPED RATINGS:
CLASS A: FLAME SPREAD 0 - 25, SMOKED DEVELOPED 0 - 450
CLASS B: FLAME SPREAD 26-75, SMOKED DEVELOPED 0 - 450
CLASS C: FLAME SPREAD 76-200, SMOKED DEVELOPED 0-450
803.3 'STABILITY' - REQUIRES INTERIOR FINISH MATERIAL TO BE APPLIED OR FASTENED IN SUCH A MANNER
THAT THE MATERIALS WILL NOT BECOME DETACHED WHEN SUBJECTED TO ROOM TEMPERATURES OF 200
DEGREES FAHRENHEIT FOR NOT LESS THAN 30 MINUTES.
803.4.4 'MATERIALS' - REQUIRES INTERIOR OR CEILING FINISHES THAT ARE NOT MORE THAN 0.25 INCHES
THICK TO APPLIED DIRECTLY TO A NONCOMBUSTIBLE BACKING, WITH THE EXCEPTION OF CLASS A
MATERIALS AND MATERIALS WHERE QUALIFYING TEST WERE MADE WITH THE MATERIAL SUSPENDED OR
FURRED OUT FROM A NONCOMBUSTIBLE BACKING.
803.5 'INTERIOR FINISH REQUIREMENTS BASED ON GROUP' - STATES INTERIOR WALL AND CEILING FINISH
SHALL HAVE A FLAME SPREAD RATING NOT GREATER THAN THAT SPECIFIED IN TABLE 803.4 FOR THE
GROUP AND LOCATION SPECIFIED. TABLE 803.5 REQUIRES THE FOLLOWING IN A SPRINKLERED ASSEMBLY:
EXIT ENCLOSURES AND EXIT PASSAGEWAYS - B
CORRIDORS - B
ROOMS AND ENCLOSED SPACES - B
THIS BUILDING MEETS THE REQUIREMENTS OF ALLOWABLE AREA BUILDING PER SECTION 506.
804.4.1 MINIMUM CRITICAL RADIANT FLUX CLASS II (FOR I-2 OCCUPANCIES EQUIPPED THROUGHOUT WITH
AUTOMATIC SPRINKLER SYSTEM) AND MATERIALS COMPLYING WITH DOC FR-1 'PILL TEST' (CPSC 16 CFR
PART 1630) ARE PERMITTED.
806.1 COMBUSTIBLE DECORATIVE MATERIALS SHALL MEET THE FLAME PROPAGATION CRITERIA OF NFPA
701.
CHAPTER 9 - FIRE PROTECTION SYSTEMS
903.2.5 STATES THAT GROUP 'I' IS REQUIRED TO HAVE AN APPROVED AUTOMATIC SPRINKLER SYSTEM
THROUGHOUT.
907.2.6.2 PROVIDE AUTOMATIC FIRE DETECTION SYSTEM WHERE REQUIRED.
THIS BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH SECTION 903 (NFPA 13)
CHAPTER 7 - FIRE-RESISTANCE-RATED CONSTRUCTION
704.8.2 'FIRST STORY' - IN 'I' OCCUPANCIES, UNLIMITED UNPROTECTED OPENINGS ARE PERMITTED IN THE
FIRST STORY OF EXTERIOR WALLS FACING A STREET THAT HAS A FIRE SEPARATION DISTANCE OF
GREATER THAN 15 FEET, OR FACING AN UNOCCUPIED SPACE OF AT LEAST 30 FEET IN WIDTH.
717.4.3 'OTHER GROUPS' - DRAFTSTOPPING IS NOT REQUIRED IN BUILDINGS EQUIPPED THROUGHOUT WITH
AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 903.3.1.1.
SECTION 602.5 'TYPES V'
TYPE 'V' CONSTRUCTION IS THAT TYPE OF CONSTRUCTION IN WHICH THE STRUCTURAL ELEMENTS,
EXTERIOR WALLS, AND INTERIOR WALLS ARE OF ANY MATERIAL PERMITTED BY THIS CODE.
BUILDING ELEMENTS
STRUCTURAL FRAME
BEARING WALLS
NONBEARING WALLS
INCLUDING COLUMNS, GIRDERS, TRUSSES
EXTERIOR
INTERIOR
EXTERIOR (TABLE 602)
INTERIOR (SECTION 602)
FLOOR CONSTRUCTION INCLUDING SUPPORTING BEAMS AND JOIST
ROOF CONSTRUCTION INCLUDING SUPPORTING BEAMS AND JOIST
THIS BUILDING IS CLASSIFIED TYPE V-A
1 HOUR
1 HOUR
1 HOUR
0 HOURS
0 HOURS
1 HOUR
1 HOURS
CHAPTER 10 - MEANS OF EGRESS
TABLE 1004.1.1 'MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT'
ACCESSORY STORAGE/MECH. = 646 GROSS SF
646 GROSS SF (1 OCCUPANT / 300 GROSS) = 3 OCCUPANTS
ASSEMBLY AREA = 1800 NET SF
1800 NET SF (1 OCCUPANT / 15 NET) = 120 OCCUPANTS
BUSINESS AREA = 1.390 GROSS SF
1,390 GROSS SF (1 OCCUPANT / 100 GROSS) = 14 OCCUPANTS
INSTITUTIONAL AREAS, SLEEPING AREAS = 5,040 GROSS SF
5,040 GROSS SF (1 OCCUPANT / 120 NET) = 42 OCCUPANTS (ACTUAL RESIDENTS IS 20 MAX.)
1005.1 'EGRESS WIDTH' - TABLE 1005.1 'EGRESS WIDTH PER OCCUPANT SERVED'
INSTITUTIONAL, I-2 W/ SPRINKLER = 0.2 INCHES PER OCCUPANT
CALCULATION: 20 OCCUPANTS (0.2" / OCCUPANT) = 29.2" OF EGRESS WIDTH (147" PROVIDED)
1014.2 EGRESS THROUGH INTERVENING SPACES EGRESS FROM A ROOM OR SPACE SHALL PASS THROUGH
ADJOINING OR INTERVENING ROOMS OR AREAS, EXCEPT WHERE SUCH ADJOINING ROOMS OR AREAS ARE
ACCESSORY TO THE AREA SERVED, ARE NOT A HIGH-HAZARD OCCUPANCY, AND PROVIDE A DISCERNIBLE
PATH OF EGRESS TRAVEL TO AN EXIT.
1016.1 'EXIT ACCESS TRAVEL DISTANCE' EXITS SHALL BE SO LOCATED THAT THE MAXIMUM LENGTH OF EXIT
ACCESS TRAVEL, MEASURED FROM THE MOST REMOTE POINT TO THE ENTRANCE TO AN EXIT ALONG THE
NATURAL AND UNOBSTRUCTED PATH OF EGRESS TRAVEL SHALL NOT EXCEED THE DISTANCES GIVEN IN
TABLE 1016.1.
TABLE 1016.1 'EXIT ACCESS TRAVEL DISTANCE'
INSTITUTIONAL, I-2, = 200 FEET OF EXIT DISTANCE WITH A SPRINKLER SYSTEM.
1014.3 ' COMMON PATH OF EGRESS TRAVEL
IN I-2 OCCUPANCIES THE COMMON PATH OF EGRESS TRAVEL SHALL NOT EXCEED 75 FEET WITH A
SPRINKLER SYSTEM.
CHAPTER 29 - PLUMBING SYSTEMS
TABLE 2902.1 ' MINIMUM NUMBER OF PLUMBING FACILITIES'
CALCULATION:
TOTAL OCCUPANCY = ACTUAL (INCLUDES 20 RESIDENTS MAX., VISITORS AND EMPLOYEES)
20 RESIDENTS (1 PER ROOM) = 20 W.C.
(1 PER ROOM OCCUPANTS BY CODE)
(4 ACTUAL) EMPLOYEES (INSTITUTIONAL EMPLOYEE : 1 PER 35 OCCUPANTS) = 1 W.C.
40 VISITORS OCCUPANTS (INSTITUTIONAL VISITORS: 1 PER 100 OCCUPANTS) = 0 W.C.
REQUIRED NUMBER OF W.C. = 21 W.C.
EXISTING NUMBER OF W.C. = 23 W.C.
THEREFORE CONDITIONS ARE MET
64 VISITORS OCCUPANTS (INSTITUTIONAL VISITORS: 1 PER 100 OCCUPANTS) = 1 LAVATORY
(4 ACTUAL) EMPLOYEES (INSTITUTIONAL EMPLOYEE : 1 PER 35 OCCUPANTS) = 1 LAVATORY
32 RESIDENTS (INSTITUTIONAL RESIDENT CARE: 1 PER ROOM) = 20 LAVATORIES
REQUIRED NUMBER OF LAVATORIES = 21 LAVATORIES
EXISTING NUMBER OF LAVATORIES = 23 LAVATORIES
THEREFORE CONDITIONS ARE MET
20 RESIDENTS (INSTITUTIONAL RESIDENT CARE: 1 PER 100 OCCUPANTS) = 1/2 D.F.
(4 ACTUAL) EMPLOYEES (INSTITUTIONAL EMPLOYEE : 1 PER 100 OCCUPANTS) = 1/8 D.F.
40 VISITORS OCCUPANTS (INSTITUTIONAL VISITORS: 1 PER 500 OCCUPANTS) = 1/5 D.F.
REQUIRED NUMBER OF DRINKING FOUNTAINS = 1 D.F.
EXISTING NUMBER OF DRINKING FOUNTAINS = 1 D.F.
THEREFORE CONDITIONS ARE MET
GENERAL NOTES
1. PROVIDE SMOKE SEALS AT BOTTOMS
OF CORRIDOR DOORS
Sky-Global Product Management
1-800-88-VELUX
www.VELUXUSA.com
1418 Evans Pond Road
Greenwood, SC 29649
VELUX
VELUX is a registered trademark2022 VELUX GROUP
FS - Fixed Skylight
* BUILDER SERIES SKYLIGHT
PRODUCT DIMENSIONS
A06 A06
M02
C04
C06
C01
C12
C08
D26*
M04
D06*
M08
S06
S01
M06
D06*
M04
D26*
C08
C12
C01
C06
C04
M02
S01
S06
M08
M06
VERTICAL CROSS SECTION
Size
HORIZONTAL CROSS SECTION
METRIC UNITS IMPERIAL UNITS
DETAIL 1
Width
Frame
ApertureFrame
Width Aperture
Height
FrameSkylight
Width
Frame
Height
Skylight
Height
Daylight
Area
(Sq. Meters)
SEE DETAIL1
14-85
3:12 - 137:12
Width
Rough
Opening
Height
Rough
Opening Size
Width
Frame
ApertureFrame
Width Aperture
FrameSkylight
Width
Frame
Height
Skylight
Height
Daylight
Area
(Sq. Feet)Width
Rough
Opening
Height
Rough
Opening
CABINETS — FX2—FIRE-RATED — 14I-102
INSTALLATION AND MAINTENANCE GUIDE
TOOLS AND HARDWARE NEEDED: (optional)
Screw gun, Universal # 6 x 2-1/2” (6.4 cm) self-drilling screws
METAL OR WOOD FRAMING INSTALLATION (FIG 1):
1. Remove all hardware and glazing, unlock cabinet if lock provided.
2. Install a framed opening above, below and at both sides of cabinet opening at specified location. Wall opening width, height
and depth must correspond with dimensions indicated in catalog or submittal sheet.
3. Use holes provided in cabinet tub for attaching to studding. If wall configuration does not allow for that, then follow step 4
below; otherwise, skip to step 5.
4. [Drilling Additional Holes] Drill (2) 1/8”(3.2 mm) holes through tub on each side of cabinet.
5. Place cabinet in position and attach with Universal # 6 x 2-1/2” (6.4 cm) self-drilling screws. Be sure not to over-tighten on ei-
ther side, which could pull the cabinet out of position in the opening and result in an exposed gap between the cabinet frame
and wall opening.
6. Start the screw without completely tightening; then start a screw on the opposite side of the tub. Once all screws are started,
tighten each screw in a “criss-cross” pattern. A torque setting of 4-6 is recommended if using a screw gun.
7. Once screws are fully tightened, check cabinet for square and plumb. Adjust if necessary. All interior sides should be straight
with no bowing or warping.
8. Check cabinet door assembly for freedom of movement. If it binds, shim as necessary to remove any racking of tub at attach-
ments of stud. Cabinet will need to be removed temporarily in order to add shims.
9. Remove protective plastic from acrylic or glass and install decal if intended for glass. (Panorama models glazing is pre-installed
10. Align glazing on inside of door, holding in place while installing glass mounting clips on inside of door. Do not over-tighten.
11. Install handle and roller catch or SAF-T-LOK™ in door. Check alarm if provided.
NOTES: For Trimless Cabinets (except Embassy)—see separate installation instructions. See separate Valve and Hose Cabinet
installation instructions if knockouts are needed.
Note: Drawings shown on this page are examples only of typical installation in a fire-rated wall, and are not to be used as recommendations for wall construction
800-554-6077
sales@activarcpg.com
www.activarcpg.com
9702 Newton Av S. Bloomington, MN 55431 | Many Locations Nationwide
@ 2023 Activar Construction Products Group, Inc.
INSTALLATION AND MAINTENANCE
GUIDE 14I-102
The information contained in this document is the sole property of Activar Construction Products Group, Inc. Any reproduc-
tion in part of as a whole without the written permission of Activar Construction Products Group, Inc. is prohibited. REV B – JAN 2023
©
15 min
380
48 max
1220
transfer
side
12 min
305
24 min
610
36 min
915
15 min
380
42 MIN
Source: Village of Brown Deer website. First collected Oct 16, 2026.