Village Board — Agenda
Village of Fox Point · Milwaukee County · Village Board · meeting of Apr 13, 2026 · Agendas
Open the original document More from Village of Fox Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
NOTICE OF MEETING
VILLAGE OF FOX POINT
VILLAGE BOARD MEETING
SCHW
EMER HALL – MUNICIPAL BUILDING TUESDAY
7200 N. SANTA MONICA BLVD APRIL 14, 2026
FOX POINT, WI 53217 7:00 P.M.
NOTE: THE VILLAGE BOARD WILL BE MEETING IN PERSON AT VILLAGE HALL, WITH A REMOTE
ATTENDANCE OPTION, PER THE HYBRID MEETING PROCEDURES FURTHER DESCRIBED IN
SECTION 19-32 D. OF THE VILLAGE CODE. THIS MEETING IS OPEN TO ALL CITIZENS IN PERSON AT
VILLAGE HALL, OR THROUGH THE ZOOM PARTICIPANT INFORMATION SHOWN BELOW, SUBJECT
TO THE FOLLOWING: NO ASSURANCE IS PROVIDED TO THOSE GOVERNING BODY MEMBERS AND
CITIZENS INTENDING TO ATTEND REMOTELY THAT THE TECHNOLOGY WILL PERFORM
SUFFICIENTLY TO ALLOW FOR THEIR PARTICIPATION AND THE MEETING WILL PROCEDE
REGARDLESS. PUBLIC OFFICIALS AND CITIZENS WISHING TO ENSURE THEY CAN PARTICIPATE
ARE ENCOURAGED TO ATTEND IN PERSON. CITIZENS ARE ENCOURAGED TO SUBMIT ANY
COMMENTS IN WRITING IN ADVANCE OF THE MEETING TO THE VILLAGE MANAGER
AT manager@villageoffoxpoint.com, HOWEVER THERE IS NO LARGER RIGHT TO COMMENT
REMOTELY OR IN WRITING THAN IN PERSON.
Zoom Participant Information
https://us02web.zoom.us/j/87335256142
Meeting ID: 873 3525 6142
Dial: (312) 626-6799
AGE
NDA
1. Roll Call
2. Persons desiring to be heard
At this time, individuals can address the Village Board on one or more topics for up to three-minutes
with time extensions at the Village President's discretion. Citizen comment when agenda items are
called will
be heard at the discretion of the chair, subject to the overall three-minute limit. In
connection with non-agenda items, no action will be taken except for possible referrals to individuals
or
committees. NOTE: No comments will be heard during this agenda item concerning a pending
application for
a zoning code amendment, as the appropriate time for such comments will be at the
duly noticed public hearing, so that all interested persons can hear the comments and due process
i
s preserved.
3. Committee Reports
a. Plan Commission
4. Public Hearing
a. Public Hearing on a Conditional Use Permit application for Las Cazuelas, located at
8617 N Port Washington Road
The Village Board will hold a public hearing on a conditional use permit application to
operate a restaurant, Las Cazeulas, under Section 745-18D(1)(h) of the Village Code. The
proposed restaurant is located at 8617 N Port Washington Road (former Jose’s Blue
Sombrero)
in the D Business District.
5. Consent Agenda – All items listed under the Consent Agenda will be approved in one motion
without
discussion unless any Board member requests that the item be removed for individual
discussion and possible action. Any item(s) so removed shall be considered individually prior to
consideration of
any New Business agenda items in the same order in which they were originally
listed in the
Consent Agenda.
a. Approve the minutes of the March 10, 2026 Village Board meeting. (Pg.1-5)
b. Grant
the approval for the issuance of a Class "B" fermented malt beverage and "Class B"
intoxicati
ng liquor (on or off-premises consumption) for Las Cazuelas Fox Point, LLC, d/b/a Las
Cazuelas Chilaquiles and Taco Bar, 8617 N Port Washington Road, Fox Point, WI 53217,
Sandy
Hurtado, Agent, premises to be licensed: 8617 N. Port Washington Road, Fox Point, WI
53217 per
the Village Deputy Clerk’s memo dated April 8, 2026, subject to any conditions as
noted.
(Pg. 6)
c. Accept the proposal of Mared Mechanical Contractors in the amount of $119,730 for the
replacement of the Village Hall chiller system, packaged terminal air conditioner (PTAC) unit in
the water utility room, and packaged roof top unit and exhaust fan and authorize the Village
Manager
to sign the proposals per the Director of Public Work’s memorandum dated April 7,
2026. (Pg. 7-8)
d. Accept the bid of National Power Rodding Corporation in the amount of $208,715 for the 2026
Sanitary and Stormwater Improvement Project and authorize the Village President and Village
Clerk/Treasurer to sign the contract per the Director of Public Works’ memorandum dated April
7, 2026. (Pg. 9-12)
e. Accept the proposal of Kapur & Associates in an amount not to exceed $28,350 for construction
management
services associated with the rehabilitation of sanitary sewers in Basin Nos. 3 and 5
and a storm sewer on Beach Drive and authorize the Village President and Village
Clerk
/Treasurer to sign the contract per the Director of Public Works’ memorandum dated April
7, 2026. (Pg. 13-16)
f. Accept the proposal of Kapur & Associates in the amount of $17,940 for the design of
stormwater
improvements in the 7900 block of North Lake Drive and on Fox Lane west of
Goodrich
Lane and authorize the Village President and Village Clerk/Treasurer to sign the
contract
per the Director of Public Works memorandum dated April 7, 2026. (Pg. 17-22)
g. Adopt the proclamation establishing Friday, April 24, 2026 as Arbor Day in the Village of Fox
Point and urge all citizens to support the efforts to protect our trees and woodlands and to
support our Village’s urban forestry program. (Pg. 23)
h. Resolution Adding the Village Manager and Village Clerk as Agents with American Deposit
Management LLC for Deposited Village Funds in Existing Account. (Pg. 24)
i. Approve payment of the bills in the amount of $353,187.92 for the period March 1, 2026 through
March 31, 2026 per the report submitted by the Village Manager. (pg. 25-37)
6. New
Business
a. Consideration of a Conditional Use Permit application for Las Cazuelas, located at 8617 N
Port Washington Road
The Village Board will consider and may take action on a conditional use permit application
to operate a restaurant, Las Cazeulas, under Section 745-18D(1)(h) of the Village Code.
The proposed restaurant is located at 8617 N Port Washington Road (former Jose’s Blue
Sombrero) in the D Business District. (Pg. 38-46)
b. Discussion and Possible Action on Adding Design Services with The Sigma Group to
include the Road and Utility Project on Santa Monica Boulevard between Calumet
Road and Green Tree Road. (Pg. 47-68)
The Village Board will consider the proposal submitted by The Sigma Group to prepare design,
bidding and contract documents for the rehabilitation of Santa Monica Boulevard between
Calumet Road and Green Tree Road in the amount of $60,000 and may take action to accept
the proposal pursuant to the Director of Public Works’ memorandum dated April 7, 2026.
c. Consideration of acceptance of the quote of Lakeside International for the purchase of
the cab and chassis for Truck Numbers 5, 11 and 20 and the quote from Casper’s Truck
Equipment to retrofit Truck #17.
The Village Board will consider the acceptance of the quote of Lakeside International for the
purchase of
the cab and chassis for Truck Numbers 5, 11 and 20. through the State of
Wisconsin Source
Well Program in the amount of $397,404, authorize the downpayment of
associated body
and equipment in the amount of $142,757 and accept the quote Casper’s
Truck Equipment in the amount of $37,872.19 to purchase a Henderson Salt Brine Unit, 925
gallon to retrofit Truck #17 and authorize the Village Manager to execute the purchase orders
for
the trucks and Salt Brine Unit per the Director of Public Work’s memorandum dated April 7,
2026
. (Pg. 69-73)
d. Consideration of an ordinance to amend Article II of Chapter 276 of the Village of Fox
Point Municipal Code
The Village Board will consider and may act on adopting the Department of Natural resources
model recycling ordinance which will amend Article II of Chapter 276 of the Village of Fox Point
Municipal
Code with the final form of the adopting ordinance being approved by the Village
Manager.
e. Chipst
one Foundation Electrical Generator - Cultural Overlay Referral
The Village Board will refer the request of Uihlein Electric, on behalf of the Chipstone
Foundation, to allow a backup generator on the property located at 7820 North Club Circle
to the Plan Commission. (Pg. 74-81)
7. Future Agenda Items
The Vil
lage Board will act on any Trustee requests to place additional matters on an upcoming
agenda, without discussion.
8. Announcements
The foll
owing individuals will be given the opportunity to make announcements at the meeting in
regard to (i) actions taken since the previous Village Board meeting on behalf of the Village, (ii)
future Village activities and (iii) communications received from citizens. These matters will not be
discussed or acted on, and Board members shall not comment on matters announced by others.
Referrals may be made to committees and/or individuals.
a. Village President Symchych
b. Trustee Ollman
c. Trustee Aelion
d. Trustee Stoltz
e. Trustee Freedman
f. Trustee Miller
g. Trustee Barry
h. Village Manager
9. Adjournment
NEXT REGULAR VILLAGE BOARD MEETING: May 12, 2026 7:00 P.M.
PLEASE NOTE:
Upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals through sign language interpreters or other
auxiliary aids. Also, upon reasonable notice, best efforts will be used to ensure that members of the public lacking access to the virtual
meeting platform are provided alternative reasonable methods to attend. For additional information or to request these services, contact the
Village Clerk at (414) 351-8900. "Persons requiring an interpreter or other assistance should contact the Village Clerk’s office 72 hours prior to
the meeting. Notice is hereby given that a majority any other board, commission or committee may be present at the meeting to gather
information about a subject in which they are interested. This constitutes a meeting of any other board, commission or committee pursuant to
State ex rel. Badke v. Greendale Village Bd., 173 Wis. 2d 553, 494 2d 408 (1993), and must be noticed as such, although said boards,
commissions or committees will not take any formal action at this meeting."
1
A meeting and public hearing of the Fox Point Village Board was held by a combination 2
of in-person and virtual attendance via telephonic and video conferencing on Tuesday, 3
February 10, 2026 in Schwemer Hall, 7200 N. Santa Monica Boulevard. Village President 4
Symchych called the meeting to order at 7:00 p.m. and asked the Village Deputy Clerk to take 5
roll call. Roll Call of the Village Board present included: 6
7
Village Pr
esident Christine Symchych 8
Trustee Greg Ollman 9
Trustee Liz Aelion 10
Trustee Jennie Stoltz 11
Trustee Freedman 12
Trustee Miller 13
Trustee Barry 14
15
Also, pres
ent were Village Attorney Eric Larson, Interim Village Manager Mitch Reynolds, 16
Public Works Director Scott Brandmeier, Village Clerk Jennifer Boehm, Village Deputy Clerk 17
Teri Repins, and Assistant Village Manager Kevin Ausman 18
19
Notice of the m
eeting was provided to the North Shore Now and to all others as required by 20
State open meet
ings laws and posted on the official bulletin board at 7200 N Santa Monica 21
Boulevard, as well as the village website at www.villageoffoxpoint.com, as per 2015 Wisconsin 22
Act 79 and as described in Village Ordinance Chapter 116-2, 116-2(C). 23
24
PERSONS DE
SIRING TO BE HEARD 25
26
Terry Rindt
, 8316 N Indian Creek Pkwy, Fox Point; inquired if the Brew Pub will have a 27
CUP. Will it be zoned as manufacturing and will parking be enforced? 28
29
Mike McD
onagh, 7425 N Beach Court, Fox Point; stated that he is running for Village 30
Trustee and wanted to say hello to the Board. 31
32
Amy Rosenber
g, 7815 N Boyd Way, Fox Point; addressed pickleball noise and provided 33
studies on the matter. 34
35
Heari
ng no other comments, President Symchych closed public comment. 36
37
COMMITT
EE REPORTS – Plan Commission 38
39
a. Trustee
Miller stated that Plan Commission recommends that the Village Board40
approve the parcels located at 7225 n Santa Monica Blvd be combined. The41
requirements have been met and staff recommends that the parcels be42
combined into o
ne property subject to the applicants submitting the CSM for43
signature by the President and Clerk.44
45
CONSENT AGE
NDA 46
47
a. Approve t
he minutes of the February 5, 2026 Special Village Board meeting.48
49
b. Approve t
he minutes of the February 9, 2026 Special Village Board meeting.50
VB AGENDA PACKET 4/14/2026
Page 1 of 81
51
c. Approv
e t
he minutes of the February 10, 2026 Village Board meeting.52
53
d. Approv
e the minutes of the February 11, 2026 Special Village Board meeting.54
55
e. Approv
e the minutes of the February 27, 2026 Special Village Board meeting.56
57
f. Grant th
e approval for the issuance of a Class "B" fermented malt beverage and58
"Class B" intoxicating liquor (on or off-premises consumption) for Maxfield’s, LLC,59
d/b/a Maxfield’s Pancake House, 333 W. Brown Deer Road, Fox Point, WI 53217,60
Nikolia Zarmakoupis, Agent, premises to be licensed: 333 W. Brown Deer Road, Fox61
Point, WI 53217 per the Village Deputy Clerk’s memo dated March 4, 2026, subject to62
any conditions as noted.63
64
g. Accep
t the agreement with Southeastern Wisconsin Watersheds Trust, Inc. for65
Public Education and Outreach activity requirements in an amount not to exceed66
$11,781 and authorize the Interim Village Manager to sign the agreement per the67
Director of P
ublic Works’ memorandum dated February 27, 2026.68
69
h. Accept the proposal of Wachtel Tree Science & Service in the amount of $45,000 for70
the preparation of a multi-spectral imagery analysis of the canopy layer in the Village71
of Fox Point and authorize the Village President and Village Clerk/Treasurer to sign72
the agreement per the Director of Public Work’s memorandum dated February 27,73
2026.74
75
i. Approve the Land Combination and Certified Survey Map (CSM) for the parcels76
located at 7225 North Santa Monica Boulevard.77
78
j. Approve the COM2 electronic recycling renewal for five years per the Director of Public79
Work’s80
memorandum dated March 2, 2026.81
k. Approve payment of the bills in the amount of $375,372.26 for the period82
February 1, 2026 through February 28, 2026 per the report submitted by the83
Village Manager.84
85
l. Proclamation establishing Friday, April 24, 2026 as Arbor Day in the Village of Fox86
Point.87
88
Trus
tee Barry requested the removal of consent agenda item h.89
90
A motion by President Symchych, seconded by Trustee Freedman and carried by roll91
call vote (7-0), to approve the consent agenda with the removal of item h.92
93
94
95
NEW BUSI
NESS 96
97
Consent Agenda Item h 98
99
VB AGENDA PACKET 4/14/2026
Page 2 of 81
Accept the pr
oposal of Wachtel Tree Science & Service in the amount of $45,000 for 100
the preparation of a multi-spectral imagery analysis of the canopy layer in the Village 101
of Fox Point and authorize the Village President and Village Clerk/Treasurer to sign 102
the agreement per the Director of Public Work’s memorandum dated February 27, 103
2026. 104
105
Motion by President Symchych, seconded by Trustee Miller, and carried by roll call vote 106
(7-0), Approval of the proposal of Wachtel Tree Science & Service in the amount of 107
$45,000 for the preparation of a multi-spectral imagery analysis of the canopy layer in the 108
Village of Fox Point and authorize the Village President and Village Clerk/Treasurer to 109
sign the agreement per the Director of Public Work’s memorandum dated February 27, 110
2026. 111
112
With unanimous consent the Village Board moved item 7a to after item 9a. 113
114
Presen
tation of the 2025 Annual DNR Stormwater Report 115
116
The Village Board received a presentation from the Director of Public Works related to the 117
2025 DNR Annual Stormwater Report. 118
119
Accept the proposal of The Sigma Group for the design of the Santa Monica Boulevard 120
Road and Utility Project. 121
122
Scott Brandmeier will revisit our 5 Year Capital Plan and speak with staff regarding 123
water main breaks and will put together a memo for the Board. 124
Motion by Trustee Miller, seconded by Trustee Aelion, and carried by roll call vote 125
(7-0), to accept the proposal of The Sigma Group in the amount of $45,645 to 126
perform the design of the Santa Monica Boulevard and utility project between 127
Calumet Road and Bradley Road. 128
129
Accept the proposal of Ruekert & Mielke Inc. for additional scope of work for planned 130
Letter of Map Revision (LOMR) submittal. 131
132
Directo
r of Public Works, Scott Brandmeier gave a presentation to the Board. 133
Motion by President Symchych, seconded by Trustee Miller, and carried by roll call vote 134
(7-0), to accept the proposal of Ruekert & Mielke Inc. in the amount of $46,700 to 135
amend a current agreement and provide additional analysis for planned LOMR 136
submittal. 137
138
Accept the proposal of Baxter & Woodman Inc. for pre-submittal peer review of 139
Ruekert & Mielke LOMR 140
141
Motion by President Symchych, seconded by Trustee Barry, and carried by roll call vote 142
(7-0), to approve a proposal from Baxter & Woodman Inc. in the amount of $7,500 to 143
provide peer review of LOMR prepared by Ruekert & Mielke Inc. 144
145
Approval of a parental leave benefit provision for non-represented Village employees 146
147
VB AGENDA PACKET 4/14/2026
Page 3 of 81
Moti
on by President Symchych, seconded by Trustee Stoltz, and carried by roll call vote 148
(7-0), to approve a benefit provision allowing for two weeks of parental leave for non-149
represented employees. 150
151
Approval of a service agreement with North Shore Inspection Services LLC to provide 152
inspection and building plan review services to the Village of fox Point. 153
154
Motion by President Symchych, seconded by Trustee Miller, and carried by roll call vote 155
(7-0), to approve an agreement for North Shore Inspection Services LLC to provide 156
inspection and building plan review services to the Village of Fox Point. 157
158
FUTURE AGENDA ITEMS 159
160
President Symchych would like an update on the pool, what we have accomplished so far, and 161
to invite the Friends of the Fox Point Pool to update on the fundraising progress. 162
163
With unanimous consent the Village Board moved the announcements before the Closed 164
Session. 165
166
ANNOUNCE
MENTS 167
168
President Symchych thanked Mr. Renolds for taking good care of the Village and the staff. 169
Welcomed Ms. Boehm to Fox Point as Clerk and announced that Steve Kreklow will be 170
starting as Village Manager next week. The North Shore Fire Department meeting was moved 171
to Tuesday, 3/17 at 8:00am. 172
173
Trustee Ollman announced - Nothing 174
175
Trustee Aelion announced - Nothing 176
177
Trustee Stoltz announced - Nothing 178
179
Trustee Freedman announced the New North Shore Library grand opening is Saturday, 3/14 at 180
2:00pm now and invites everyone to attend. On behalf of the Board, interim Village Manager, 181
Mitch Reynolds was given a letter of appreciation. 182
183
Trustee Miller announced - Nothing 184
185
Trustee Barry announce - Nothing 186
187
Interim Manager Reynolds announced that Assistant Manager Kevin Ausman closed the State 188
and Local Fiscal funds. Thank you to the staff for their hard work to help orientate the new 189
Clerk. Leaf colle
ction will continue the spring through 4/10. Residents can rake the leaves to 190
the road or bag them. In-person absentee voting begins 3/24 through 4/3. The drop box has 191
been removed until after the election. Absentee ballots will be mailed out as soon as we 192
receive them. Thank you to the Board and staff for having an Interim Manager. 193
194
CLOSED SESSION 195
196
VB AGENDA PACKET 4/14/2026
Page 4 of 81
Motion m
ade by President Symchych, seconded by Trustee Ollman to convene into closed 197
session at 8:25p.m., pursuant to Wisconsin Statute Section 19.85(1)(e), deliberating or 198
negotiating the purchasing of public properties, the investing of public funds, or conducting 199
other specified public business, whenever competitive or bargaining reasons require a closed 200
session; the village board will deliberate a proposal from Harmoni Towers LLC to purchase the 201
Village-owned telecommunications tower located at 7200 N. Santa Monica Blvd. 202
203
Village President Christine Symchych 204
Trustee Ollman 205
Trustee Aelion 206
Trustee Stoltz 207
Trustee Freedman 208
Trustee Miller 209
Trustee Barry 210
211
Carried by roll call vote (7-0) 212
213
RECONVENE INTO OPEN SESSION 214
215
Motion by President Symchych, seconded by Trustee Barry and carried by roll call vote (7-0), 216
to reconvene into open session at 8:50 p.m. 217
218
Motion by President Symchych, seconded by Trustee Aelion, and carried by roll call vote (7-219
0), to reject the offer from Harmoni Towers LLC to provide a lump sum payout for lease of 220
telecommunications tower at 7200 N. Santa Monica Blvd and extend the lease on the tower. 221
222
223
ADJOURNMENT 224
225
Motion made by Trustee Ollmaan, second by Trustee Barry, and carried by roll call vote 226
(7-0) to adjourn the Village Board meeting at 8:52 p.m. 227
228
229
Respec
tfully submitted, 230
231
232
233
234
Jennif
er Bo
ehm 235
Village Clerk 236
237
238
239
240
241
Publi
shed and posted: March 20, 2026 242
VB AGENDA PACKET 4/14/2026
Page 5 of 81
VB AGENDA PACKET 4/14/2026
Page 6 of 81
VB AGENDA PACKET 4/14/2026
Page 7 of 81
VB AGENDA PACKET 4/14/2026
Page 8 of 81
VB AGENDA PACKET 4/14/2026
Page 9 of 81
VB AGENDA PACKET 4/14/2026
Page 10 of 81
VB AGENDA PACKET 4/14/2026
Page 11 of 81
VB AGENDA PACKET 4/14/2026
Page 12 of 81
VB AGENDA PACKET 4/14/2026
Page 13 of 81
VB AGENDA PACKET 4/14/2026
Page 14 of 81
VB AGENDA PACKET 4/14/2026
Page 15 of 81
VB AGENDA PACKET 4/14/2026
Page 16 of 81
VB AGENDA PACKET 4/14/2026
Page 17 of 81
VB AGENDA PACKET 4/14/2026
Page 18 of 81
VB AGENDA PACKET 4/14/2026
Page 19 of 81
VB AGENDA PACKET 4/14/2026
Page 20 of 81
VB AGENDA PACKET 4/14/2026
Page 21 of 81
VB AGENDA PACKET 4/14/2026
Page 22 of 81
VILLAGE OF FOX POINT
ARBOR DAY PROCLAMATION
WHEREAS; April 24, 2026, marks the 154th Anniversary of Arbor Day, the 144th year of
celebration by Wisconsin school children; and
WHEREAS; the Village of Fox Point has been recognized as a TREE CITY USA for 37 consecutive years
by the National Arbor Day Foundation and desires to continue its tree-planting ways; and
WHEREAS; trees can reduce the erosion of our precious topsoil by wind and water, lower our
heating and cooling costs, moderate the temperature, clean the air, produce oxygen and
provide habitat for wildlife; and
WHEREAS; trees are a renewable resource giving us paper, wood for our homes, fuel for our fires
and countless other wood products; and
WHEREAS; trees in our Village increase property values, enhance the economic vitality of
commercial areas, and beautify our community; and
WHEREAS; trees, wherever they are planted, are a source of joy and spiritual renewal,
NOW THEREFORE; The Village Board of Fox Point does hereby proclaim Friday, April 24th, 2026 as
in the Village of Fox Point, and urges all citizens to support the efforts to protect our
trees and woodlands and to support our Village’s urban forestry program; and
FURTHER; the Village Board urges all citizens to plant and care for trees to gladden hearts and
promote the well-being of present and future generations.
DATED this day of in the year
Village President
Christine Symchych
VB AGENDA PACKET 4/14/2026
Page 23 of 81
RESOLUTION XX-X
ALLOWING SUCCESSOR AGENTS FOR VILLAGE
FUNDS WITH AMERICAN DEPOSIT MANAGEMENT
LLC
WHEREAS, VILLAGE OF FOX POINT may deposit funds in one or more
financial institutions as approved by the Village Board; AND
WHEREAS, THE VILLAGE has designated American Deposit Management
LLC (ADM) of Pewaukee, WI as an authorized agent for VILLAGE funds; AND
NOW THEREFORE, BE IT RESOLVED that the VILLAGE OF FOX POINT
for and on behalf of THE VILLAGE authorizes the continued deposit and withdrawal of
monies by American Deposit Management LLC in noninterest-bearing or interest-
bearing accounts;
BE IT FURTHER RESOLVED that the following Officers/Employees or their
Successors are authorized to order the deposit or withdrawal of monies with American
Deposit Management LLC until this authority is revoked by action of THE VILLAGE
BOARD and written notice of such action is received by American Deposit Management
LLC.
VILLAGE MANAGER STEVE KREKLOW
Title Name Signature
CLERK-TRASURER JENNIFER BOEHM
Title Name Signature
DATE:
APPROVAL:
Title Name Signature
Title Name Signature
DATE:
VB AGENDA PACKET 4/14/2026
Page 24 of 81
VB AGENDA PACKET 4/14/2026
Page 25 of 81
VB AGENDA PACKET 4/14/2026
Page 26 of 81
VB AGENDA PACKET 4/14/2026
Page 27 of 81
VB AGENDA PACKET 4/14/2026
Page 28 of 81
VB AGENDA PACKET 4/14/2026
Page 29 of 81
VB AGENDA PACKET 4/14/2026
Page 30 of 81
VB AGENDA PACKET 4/14/2026
Page 31 of 81
VB AGENDA PACKET 4/14/2026
Page 32 of 81
VB AGENDA PACKET 4/14/2026
Page 33 of 81
VB AGENDA PACKET 4/14/2026
Page 34 of 81
VB AGENDA PACKET 4/14/2026
Page 35 of 81
VB AGENDA PACKET 4/14/2026
Page 36 of 81
VB AGENDA PACKET 4/14/2026
Page 37 of 81
VILLAGE OF FOX POINT
MILWAUKEE COUNTY
WISCONSIN
VILLAGE HALL
7200 N. SANTA MONICA BLVD.
FOX POINT WI 53217-3505
414-351-8900
FAX 414-351-8909
To: Plan Commission
From: Kevin Ausman, Assistant Village Manager
CC: Steve Kreklow, Village Manager; Scott Brandmeier, DPW Director
Date: April 6, 2026
Re: Las Cazuelas - CUP
Overview
Sandy Hurtado has applied for conditional use to operate a restaurant, Las Cazeulas, under Section 745-
18D(1)(h) of the Village Code. The proposed restaurant is located at 8617 N Port Washington Road
(former Jose’s Blue Sombrero) in the D Business District, and in the southwest corner of the Riverpoint
Shopping Center, adjacent to Interstate 43.
Background
Jose’s Blue Sobrero closed in October of 2025 after more than a decade of operation, leaving the
building vacant.
Request
The applicant has indicated hours of operation are planned for 11AM – 10PM Monday through
Thursday, Friday 11AM – 12AM, Saturday 9AM – 12 AM, and Sunday 9AM – 9PM. Staff have reviewed
the application and determined sufficient parking within the Riverpoint Shopping Center to
accommodate restaurant patrons and employees.
The applicant has indicated an intention to offer seasonal outdoor dining. Existing outdoor dining is
currently limited to the area immediately along the north façade of the building. Additionally, the
applicant has indicated an intention to alter the site by replacing the existing landscaped garden area on
the east façade with a concrete patio. However, no site plan has been submitted under Section 745-
18(E). Prior to issuance of a Building Permit, the Village Board shall review and approve all conditional
use site plans including fences, walls, signs, lighting, and landscaped areas.
The applicant has further noted plans to include live acoustic music/entertainment. Given that the
subject property is adjacent to single-family residential to the south, Staff recommends that the Plan
Commission discuss all music/entertainment with the applicant and include conditions regarding hours
of operation for outdoor dining/seating separate from indoor operations along with establishing hours,
location, amplification, and direction of any music.
The Village DPW Director has indicated that the request will require a lighting plan which conforms to
Sections 670-49 through 670-58 in order to prevent light spillage onto adjacent properties. Further,
VB AGENDA PACKET 4/14/2026
Page 38 of 81
depe
nding on calculations within a submitted site plan, the applicant may be required to apply for
erosion control due to disturbed area and the inclusion of impervious surface for outdoor dining.
Recommendation
Should the Plan Commission feel comfortable with the proposed use, Staff recommends that the Plan
Commission recommend that the Village Board approve the conditional use request (following a
mandatory public hearing) subject to the following conditions:
1. Hours of operation limited to 11AM – 10PM Monday through Thursday, Friday 11AM – 12AM,
Saturday 9AM – 12 AM, and Sunday 9AM – 9PM. If noise complaints or late-night disturbance
complaints are received, the applicant shall take corrective action to resolve those complaints to
the satisfaction of the Village Manager.
2. Establishing hours of operation for outdoor dining/seating separate from indoor operations.
3. Establishing hours, location, amplification, and direction of any music.
4. Refuse containers must be fully screened in compliance with §745-18(F)(6).
5. Exterior modifications to the site require site plan approval by the Village Board under §745-
18(E) and §745-18(F).
6. Obtaining other required licenses, permits, and approvals. This includes but is not limited to site
plan approval, building permits, and Engineering/DPW permits completed to the satisfaction of
the Director of Public Works, Building Inspector, and Health Department.
VB AGENDA PACKET 4/14/2026
Page 39 of 81
VB AGENDA PACKET 4/14/2026
Page 40 of 81
Occupancy Permit Information Sheet
Business Name: Las Cazuelas – Chilaquiles & Taco Bar
Location: Fox Point, Wisconsin
Proposed Occupancy Load: Up to 200 persons
Hours of Operation
• Monday – Thursday: 11:00 AM – 10:00 PM
• Friday: 11:00 AM – 12:00 AM
• Saturday: 9:00 AM – 12:00 AM
• Sunday: 9:00 AM – 9:00 PM
Type of Business
Full-service restaurant offering dine-in, carry-out, private events, and seasonal outdoor
seating.
Outdoor Seating
• Outdoor seating will be included and expanded.
• Current capacity: approximately 5 tables.
• Planned expansion: removal of garden area to allow for an additional 6 tables.
• Total projected outdoor seating: approximately 10–11 tables (40–44 guests).
• Outdoor seating will operate seasonally and comply with all local regulations.
Outdoor Music / Entertainment
• Occasional live acoustic music will be offered.
• Performances will be low-volume and limited in frequency.
• Mariachi performances will occur only on special occasions, such as:
o Cinco de Mayo
o Mother’s Day
o Restaurant anniversaries or similar celebrations
VB AGENDA PACKET 4/14/2026
Page 41 of 81
• No DJs or high-amplified sound systems are planned.
• All music and entertainment will comply with local noise ordinances.
Parking
• Parking will be provided in accordance with local zoning requirements.
• Adequate parking will be available to support the proposed occupancy load.
Number of Employees (Estimated)
• The restaurant will operate with approximately 20 employees during peak hours.
• Staffing levels will vary based on business volume and time of day.
• Adequate staffing will be maintained to ensure safe operations and customer
service.
Interior Modifications
• A non-structural wall is proposed to be removed to create a private event room.
• This modification will improve space functionality while maintaining safe occupancy
flow and required egress.
• All construction will be completed with proper permits and in compliance with
applicable codes.
Additional Notes
• The establishment will comply with all health, fire, safety, and building regulations.
• Occupancy limits and safe egress will be maintained at all times.
• Staff will be trained in food safety and emergency procedures.
VB AGENDA PACKET 4/14/2026
Page 42 of 81
Conditional Use Order
WHEREAS, an application has been filed by Las Cazuelas (hereinafter "Applicant"); and
WHEREAS, the Applicant is requesting that a conditional use permit be granted pursuant to the
Zoning Ordinance of the Village of Fox Point for the property located at 8617 N Port Washington Road,
Fox Point, Wisconsin.
NOW, THEREFORE, the Village of Fox Point Village Board, upon consideration of thoughts
expressed by all persons heard at the Village Board meeting in this matter, upon consideration of the
recommendation from the Plan Commission, and following all necessary study and investigation, having
given the matter due consideration, hereby ORDERS AS FOLLOWS: Commencing upon the date hereof,
the Applicant is hereby granted a conditional use permit, subject to initial and continued compliance with
each and every one of the following conditions, restrictions and limitations.
1. Use Restricted. The Applicant shall operate a restaurant with limited outdoor seating subject to the
following conditions.
a. Hours of operation limited to 11AM – 10PM Monday through Thursday, Friday 11AM
– 12AM, Saturday 9AM – 12 AM, and Sunday 9AM – 9PM. If noise complaints or late-
night disturbance complaints are received, the applicant shall take corrective action to
resolve those complaints to the satisfaction of the Village Manager.
b. Hours of operation, outdoors. The outdoor hours of operation are limited to 10 p.m.,
unless additional hours are approved in writing by the Village Manager from time to
time. If noise complaints or late -night disturbance complaints are received, the
applicant shall take corrective action to resolve those complaints to the satisfaction of
the Village Manager.
c. Outdoor Music. Outdoor music be limited to small portable amplifiers directed away
from nearby residences. The applicant shall submit to the Village Manager a plan
describing the hours, location, amplification, and direction of any outdoor music,
which sha ll be subject to the approval of the Village Manager. This plan, upon
approval, shall apply to all outdoor music activities, and may not be changed unless a
new plan is submitted and approved in the manner described herein.
d. Refuse containers must be fully screened in compliance with §745-18(F)(6).
e. Additional outdoor seating shall include additional screening. Details of such shall be
submitted to the Village Manager for approval.
f. Exterior modifications to the site require site plan approval by the Village Board under
§745-18(E) and §745-18(F).
g. Obtaining other required licenses, permits, and approvals. This includes but is not
limited to site plan approval, building permits, and Engineering/DPW permits
completed to the satisfaction of the Director of Public Works, Building Inspector, and
Health Department.
2. Presentation Compliance. All of the Applicant’s plans, specifications, terms and representations as
submitted with the application, or in support thereof, or as represented to the Village Board in the
course of the approval process, are specifically incorporated herein and made a part hereof by
reference, and the use of the subject property shall be in substantial conformance with the same
except as further restricted or modified herein.
3. Not Transferable. This conditional use permit is granted to the Applicant and shall not be transferred
or assigned without the Village Board’s prior written consent, which may only be granted following
the Village Board’s receipt of a recommendation from the Plan Commission.
4. Applicant and Owner Agreement. As a condition precedent to the issuance of the conditional use
permit, the owner of the Subject Property shall approve the issuance of this conditional use permit
upon the terms and conditions described herein in writing, and the Applicant is required to accept
the terms and conditions of the same in its entirety in writing.
5. Other Uses Prohibited. Any use not specifically listed as permitted shall be considered to be
prohibited except as may be otherwise specifically provided herein. In case of a question as to
whether a use is permitted, the question shall be submitted to the Plan Commission fo r
recommendation to the Village Board, and then to the Village Board for determination.
6. No Nuisances, and Compliance with Applicable Laws. No use is hereby authorized unless the use
VB AGENDA PACKET 4/14/2026
Page 43 of 81
is conducted in a lawful, orderly and peaceful manner. Nothing in this order shall be deemed to
authorize any public or private nuisance or to constitute a waiver, exemption or exception to any
law, ordinance, order or rule of either the municipal governing body, the County of Milwaukee, the
State of Wisconsin, the United States of America or other duly constituted authority, except only to
the extent that it authorizes the use of the subject property above described in any specific respects
described herein. This order shall not be deemed to constitute a building permit, nor shall this order
constitute any other license or permit required by Village ordinance or other law.
7. Subject Property Only. This conditional use hereby authorized shall be confined to the Subject
Property described, without extension or expansion other than as noted herein.
8. Abandonment. Should the permitted conditional use be abandoned in any manner, or discontinued
in use for twelve (12) months, or continued other than in strict conformity with the conditions of the
original approval, or should the Applicant be delinquent in payment of any monies due and owing
to the Village, or should a change in the character of the surrounding area or the use itself cause it
to be no longer compatible with the surrounding area or for similar cause based upon consideration
of public health, safety or welfare, the conditional use may be terminated by action of the Village
Board following receipt of a recommendation from the Plan Commission and after the Village Board
holds a public hearing in the matter.
9. Amendments . Any change, addition, modification, alteration and/or amendment of any aspect of
this conditional use, including but not limited to an addition, modification, alteration, and/or
amendment to the use, premises (including but not limited to any change to the boundary limits of
the Subject Property), structures, lands or owners, other than as specifically authorized herein, shall
require a new permit and all procedures in place at the time must be followed.
10. Plan Amendments. Unless this conditional use permit expressly states otherwise, plans that are
specifically required by this conditional use order may be amended (a) without separate approval in
the limited circumstances described in Section 14.19(11) of the Village Code; or (b) by the Village
Board upon receipt of a recommendation from the Plan Commission if the Village Board finds the
plan amendment to be minor and consistent with the conditional use permit. Any change in any
plan that the Village Board, in its sole discretion, finds to be substantial shall require a new permit,
and all procedures in place at the time must be followed.
11. S everability. Should any paragraph or phrase of this conditional use permit be determined by a
Court to be unlawful, illegal or unconstitutional, said determination as to the particular phrase or
paragraph shall not void the rest of the conditional use and the remainder shall continue in full force
and effect.
12. Most Restrictive Applies . If any aspect of this conditional use permit or any aspect of any plan
contemplated and approved under this conditional use is in conflict with any other aspect of the
conditional use or any aspect of any plan of the conditional use, the more restrictive provision shall
be controlling as determined by the Plan Commission.
13. Prior Conditional Use Permits Terminated . Unless stated otherwise herein or in the documents
incorporated herein, all conditional use permits previously granted for the Subject Property, if any,
shall be automatically terminated without further action of the Village Board immediately following
full satisfaction of all condition’s precedent to this conditional use order taking effect.
14. Payment of fees. Applicant shall, on demand, reimburse the Village for all costs and expenses of
any type that the Village incurs in connection with this conditional use order including the cost of
professional services incurred by the Village (including engineering, legal, planning and other
consulting fees) for the review and preparation of required documents or attendance at meetings or
other related professional services for this application, as well as to enforce the conditions in this
conditional use order due to a violation of these conditions.
15. Payment of Taxes and Charges. Any unpaid bills owed to the Village by the Subject Property Owner
or his or her tenants, operators or occupants, for reimbursement of professional fees; or for personal
property taxes; or for real property taxes; or for licenses, permit fees or any other fees owed to the
Village; shall be placed upon the tax roll for the Subject Property if not paid within thirty (30) days
of billing by the Village, pursuant to Section 66.0627, Wisconsin Statutes. Such unpaid bills also
constitute a breach of the requirements of this conditional use order, that is subject to all remedies
VB AGENDA PACKET 4/14/2026
Page 44 of 81
available to the Village, including possible cause for termination of the conditional use order.
16. Condit
ions Shown in Minutes Incorporated. All conditions of approval imposed by duly adopted
motion of the Village Board in its consideration of the Applicant’s application, as noted in the
Minutes of the Village Board meeting at which approval was granted, are specifically incorporated
herein by reference.
17. The A
pplicant is obligated to file with the Village Clerk a current mailing address and current phone
number at which the Applicant can be reached, which must be continually updated by the Applicant
if such contact information should change, for the duration of this conditional use. If the Applicant
fails to maintain such current contact information the Applicant thereby automatically waives notice
of any proceedings that may be commenced under this conditional approval, including proceedings
to terminate this conditional use.
VB AGENDA PACKET 4/14/2026
Page 45 of 81
Let
copies of this order be filed in the permanent records of the Village Board for the Village of Fox
Point, and let copies be sent to the proper Village of Fox Point authorities and the Applicant and Owner.
Signe
d this _____ day of ______________, 2026, nunc pro tunc the _______ day of ________________,
2026.
BY THE FOX POINT VILLAGE BOARD:
Christine Symchych, Village President
Attes
t:
Jennifer Boehm, Village Clerk/Treasurer
APPRO
VAL
I her
eby approve the issuance of this Conditional Use Permit to the Applicant on the terms and conditions described
herein.
Dated
this day of , 2026.
SUBJ
ECT PROPERTY OWNER
____________________________
By:___________
_______________________________________
Authorized Signatory
Title
: ________________________________________________
ACCEPT
ANCE
I her
eby accept the terms and conditions of this Conditional Use in its entirety.
Dated
this da y of , 2026.
APPLIC
ANT:
By:
__________________________________________________
Authorized Signatory
Title:
___________________________
VB AGENDA PACKET 4/14/2026
Page 46 of 81
VB AGENDA PACKET 4/14/2026
Page 47 of 81
VB AGENDA PACKET 4/14/2026
Page 48 of 81
February 27, 2026 Project Reference #24996
Mr. Scott Brandmeier, P.E.
Director of Public Works
Village of Fox Point
7200 N. Santa Monica Boulevard
Fox Point, Wisconsin 53217
Re: Proposal to Provide Survey and Civil Engineering Services
Santa Monica Water Main and Road Improvements - Fox Point, Wisconsin
Dear Scott,
The Sigma Group, Inc. (Sigma) appreciates this opportunity to submit our firm’s proposal to provide the
Village of Fox Point, Wisconsin (Village) with professional engineering design services for the proposed
water main improvements in North Santa Monica Boulevard.
Sigma is well positioned to provide the Village with dependable service delivery. Sigma’s extensive
breadth of history with public infrastructure design, permitting, and survey experience makes this the
perfect fit for us. Our team’s experience and applied expertise enable our designers to notice, understand,
and offer knowledge-based solutions to any issue that may come up during a project, and to communicate
in a positive and solution-based manner while advocating on behalf of the Village. Our Sigma Project Team
understands not only the scope of the project but the desires of the Fox Point Public Works Department
staff that the design be complete and accurate to minimize as many issues during the construction phase
as possible.
So why choose Sigma?
Seasoned Personnel with a Deep Bench | You will see from our proposal that we have brought together
a diverse team of professionals with extensive expertise in project management, municipal roadway,
utility and stormwater green infrastructure design, quality control, communication and public
involvement. This project work effort will take a collaborative approach, with our project team
respectfully obtaining input throughout the project duration from Village staff and all stakeholders.
John Edlebeck, PE, Sigma’s Municipal Services Group Leader will serve as the Project Manager for the
Village throughout this contract. With over 40 years of both Public Works Director and Municipal Engineer
experience, John is uniquely positioned to provide superior service to the Village on a cost-effective basis.
John has designed and managed over 100 municipal roadway / utility projects throughout his career. He
is intricately knowledgeable of the municipal roadway / utility design and construction process. John will
be the single point-of-contact for the management, administration, technical analysis and design,
regulatory coordination, permitting, and will provide overall support to the Village for this important
project. John also has substantial experience in successfully obtaining municipal grant funding which will
be of benefit to the Village.
Jim Hensel, PE, Senior Engineer will serve on the Project Team and provide quality control review for this
project throughout this contract. With Jim’s civil engineering career spanning over 42 years, including
work in the Village of Fox Point, he will be a valuable asset.
VB AGENDA PACKET 4/14/2026
Page 49 of 81
Village of Fox Point
February 27, 2026
Page 2
I:\Fox Point, Village of\24996 Santa Monica Water Main\010 Proposal\2026.02.26_Fox Point Water Main Proposal Proposal_24996.docx
Competitive Billing Rates | Our proposal presents value-oriented billing rates for all our personnel. We
will work to be as efficient as possible in our service delivery and will continually pursue potential savings
for the Village. This model holds true for both design and construction inspection services.
PROJECT UNDERSTANDING
Based on our review of the Request for Proposal email on January 27, 2026, and subsequent emails, the
project involves the replacement of approximately 2,600 lineal feet of 8-inch water main on Santa Monica
Boulevard from Calumet Road to Bradley Road. The replacement will also include service replacement,
hydrants, and valves. See attachment titled “2026-2027 Santa Monica Boulevard Scope of Services” for
clarification on included scope as provided by the Village.
The following are a list of key items and assumptions that were made for this proposal:
Sigma will provide a full topographic survey of the project limits. We assume the Village will provide
available GIS information including property lines and utilities.
We have included initial analysis of existing cross culverts along the alignments. If the pipes are in
poor condition, we will design replacements.
Sigma will prepare and submit required WDNR permitting.
Sigma has included a $5,000 allowance for geotechnical borings and report.
Any fees paid directly by Sigma will be invoiced at cost.
Sigma has included road design and traffic control plan preparation.
Our scope does not include any services during construction. Support can be provided as an Additional
Service as required.
SCOPE OF WORK
See attachment titled “2026-2027 Santa Monica Boulevard Scope of Services” for clarification on included
scope as provided by the Village.
Water Main Replacement
Meet with Village Staff (Assume 5)
Complete topographic survey along the project alignment.
Complete limited geotechnical borings along the project alignment.
Prepare two preliminary alignments for review by Village.
Provide alternatives for implementation of green infrastructure into the project including analysis of
available grants.
Review existing cross culverts
Prepare civil drawings for approval by Owner and City to include:
o Site Survey
o Site Preparation and Erosion Control Plan
o Site Utility Plan
o Road Plans with Green Infrastructure
o Site Details
o Technical Specifications
Prepare cost estimate
Coordinate completion of Project Manual and bidding process.
Review bids and provide final recommendation letter.
VB AGENDA PACKET 4/14/2026
Page 50 of 81
Village of Fox Point
February 27, 2026
Page 3
I:\Fox Point, Village of\24996 Santa Monica Water Main\010 Proposal\2026.02.26_Fox Point Water Main Proposal Proposal_24996.docx
COST ESTIMATE
Our proposed fee for the services outlined above is presented below. See attached breakdown of assumed
hours and rates.
Water Main Replacement and Road Improvements $ 45,645
In the meantime, please call us if you have any questions or need additional information.
Respectfully submitted,
THE SIGMA GROUP, INC.
John Edlebeck, PE Jim Hensel, PE
Municipal Group Leader Senior Engineer
Attachment: Cost Proposal
CC: Christopher Carr – Sigma
Kevin Slottke – Sigma
VB AGENDA PACKET 4/14/2026
Page 51 of 81
QA/QC Project Manager
John Edlebeck, P.E.
Project Manager
Jim Hensel, P.E. Project Engineer Project Surveyor Subconsultant
170.00$ $ 170.00 125.00$ 115.00$
TASK ONE - Project Management
Prepare design schedule / key milestones 2 340.00$
Project management / oversight 2 340.00$
Meetings (5) 16 2,720.00$
Topographic Survey 40 4,600.00$
Limited Geotechnical Analsys 5,000.00$ 5,000.00$
Green Infrastructure Analysis and Grant Alternatives 2 6 12 2,860.00$
Culvert condition analysis 2 8 1,340.00$
Evaluate water main alignments 2 6 1,090.00$
Preliminary Plan Set 8 65 9,485.00$
Cost Estimate 2 2 590.00$
Project Manual and Bidding 2 20 6 4,490.00$
Final Plan Set 4 80 10,680.00$
Permitting 4 2 930.00$
Review Bids and final recommendation letter 4 680.00$
Reimbursables 500.00$ 500.00$
Subtotal Hours 4 72 181 40 5,500.00$ 45,645.00$
Total Fee
Village of Fox Point - Santa Monica Water Main Replacement and Road Improvements
COST PROPOSAL - Total Fee and Hour Breakdown
SIGMA
VB AGENDA PACKET 4/14/2026
Page 52 of 81
2026-2027 Santa Monica Boulevard
Scope of Services
Pursuant to the Request for Proposals idenƟfied in e-mail correspondence dated January 27,
2026 and January 28, 2026 along with the response to quesƟons posed by the consultants in an
e-mail dated February 17, 2026, the Scope of Services for the replacement of the 8-inch water
main and water service laterals, storm water improvements and road reconstrucƟon includes
the following items in addiƟon to those items idenƟfied in the Agreement.
1. MeeƟngs:
a. Consultant anƟcipates five (5) project meeƟngs which includes a predesign
meeƟng to discuss logisƟcs (placement of the water main, issues along the road,
traffic control, etc.).
b. This task does not include meeƟngs with the public.
2. Design:
a. Prepare design of water main replacement in an alignment that meets all DNR
specificaƟons and code requirements.
b. Prepare design of water service lateral replacement up to the curb stop for all
connected properƟes (esƟmated at 20) plus three possible laterals that need to
be replaced into the adjacent structure (unknown material and, if lead, will need
to be replaced in its enƟrety).
c. Road reconstrucƟon to include 5-inches of asphalt and appropriate subbase
materials. A minimum of two borings shall be obtained.
d. Topographic survey to capture the necessary property lines, grade, inverts, uƟlity
locaƟons, etc. in order to complete the design.
e. Reestablish storm water grade along the ditches, recommend replacement of
culverts, and design appropriate green infrastructure components into the
design. Consultant shall also assist Village in the preparaƟon of the green
infrastructure grant applicaƟons to be submiƩed to MMSD.
f. Replacement of the sanitary sewer manhole seals with external seals.
3. PreparaƟon of all bidding documents associated with the project including the front end
documents, special provisions, plans, specificaƟons and details. Consultant shall
coordinate the bids for the project, assist the Village in opening bids and make a
recommendaƟon for the award of the project.
4. PreparaƟon of detailed construcƟon cost esƟmates so that the Village can budget
accordingly for the 2027 project.
5. AnƟcipated Schedule:
a. March 2026 – Award project design to selected consultant
VB AGENDA PACKET 4/14/2026
Page 53 of 81
b. March 2026 – Project kick-off meeƟng
c. April 2026 – December 2026 – Design acƟviƟes
d. August 2026 – ConstrucƟon cost esƟmate provided to Village
e. December 2026 - January 2027 – Bid project
f. January 2027 – Open bids
g. February 2027 – Award project to contractor
Response to QuesƟons
1. Shall consultant perform a full topographic survey within the project limits including
the grass area located between the northbound and southbound lanes? The short
answer is yes; the long answer is that, as the consultant, you should plan to provide the
Village with ample data (property corners, topographic contours, etc.) that you as a
consultant can use to properly design the work and give the Village enough informaƟon
to make reasoned decisions on what design opƟons are best for the Village.
2. Shall survey team capture property corners within the project limits, check the invert
elevaƟons of each driveway culvert and two to three ditch shots between driveway
culverts (that will include boƩom of ditch, fore slope and backslope), locate the water
curb boxes? See above. While the original intent with my first message was to just
replace the water main and the road and not worry about the ditching, the realizaƟon is
that the number of water main breaks we’ve experienced on the west side of the road
has likely impacted the drainage. As a result, it is a good idea to capture this informaƟon
across the enƟre road (see my notes below as well). In parƟcular, if we incorporate GI
along the west ditch and/or the boulevard area, having this data will be important to
prepare the appropriate design.
3. What type of analysis does the Village expect for sizing of the storm sewer or shall
they be replaced in kind (if necessary)? Again, a bit of a qualified response but you
should plan accordingly – if we are incorporaƟng GI, then one typically designs for a 100-
year storm and you will have to address the storm sewer pipes and drainage. So, to
push back on the consultant (if you will), where do you think the Village will get more
bang for its buck in incorporaƟng GI and what will be done along the other areas? In
essence, plan to perform an analysis and, if an area will not need it, then those dollars
just won’t be spent.
4. Assuming that there are some lead water services, shall consultant prepare required
applicaƟon/documents for DNR for further reimbursement? We have not submiƩed a
request to the DNR for lead service lateral cost share funding (in part because it is our
VB AGENDA PACKET 4/14/2026
Page 54 of 81
understanding that there are socio-economic factors associated with this) so the answer
to this quesƟon is no. However, for the unknown service laterals, the consultant should
anƟcipate designing replacement of the enƟre lateral into the house (including all the
fiƫngs).
5. Is the Village planning to install surge suppressors on the water main within the
project limits? We have in the past and will rely on the consultant’s recommendaƟon.
6. For the pavement analysis, will the Village be requiring the consultant to perform
traffic counts or will the Village be performing them for the consultant to use during
the design? The answer is neither. WisDOT provides a Traffic Count map (TCMap) that
idenƟfies the traffic along various Village streets, including Santa Monica and the traffic
count between Bradley and Calumet is 1,700 vehicles per day as of July 2023. I believe
this is fairly representaƟve of the traffic we see along Santa Monica. I had noted
increasing the pavement thickness to 5-inches to accommodate the traffic loads (though
not significant) but to plan for the future and hopefully get more longevity out of the
road.
7. Please confirm the enƟre Santa Monica roadway pavement will be replaced on both
sides of the boulevard regardless of the water main locaƟon. That is
correct. Originally, I thought we would only replace the southbound lanes but,
considering we are possibly incorporaƟng GI in the boulevard and that I don’t want to
come back to the board in 5-8 years and ask to do the northbound lanes (the quesƟon
will be – why didn’t we do both in 2027), we decided internally to include both the
northbound and southbound lanes. This means looking at the topo across the enƟre
road.
8. What informaƟon does the Village have on the exisƟng roadway base course for
thickness? The asphalt is 4-inches thick but we do not have any documentaƟon on the
thickness of the subbase. It was pulverized the last Ɵme the road was repaved. I
suspect that the borings you conduct will confirm the subbase thickness.
9. Does the Village have standard Front End documents, Division 01 and Village Technical
SpecificaƟons for the project manual? If so, will the Village provide these documents
for the consultant to use? We do have standard front end documents we can
share. The Division 01 and technical specificaƟons seem to be specific to the project and
I suspect each consultant has their own general requirements for these provisions.
10. Will consultant manage bidding process or will Village post bidding documents to
plaƞorms and manage? Consultant should plan to manage this part of the work as well.
VB AGENDA PACKET 4/14/2026
Page 55 of 81
11. Other notes:
a. Please plan to coordinate all acƟviƟes with other uƟliƟes. I know that
telecommunicaƟons lines exist on the west side of the road, amongst other
things.
b. Grant opportuniƟes:
i. Last week I received an email from the DNR noƟng that the Urban
Nonpoint Source and Storm Water ConstrucƟon Grant ApplicaƟon
process is now open. Consultant should recommend whether our GI
would be a potenƟally eligible project for DNR funding and, if so, plan to
submit a grant applicaƟon on behalf of the Village.
ii. I also received an email from the DOT (yesterday) regarding a grant
opportunity for Local Small Structures Improvement Program (LSSIP). Fox
Point undertook a small structures inventory in 2024 and idenƟfied the
area at Fairchild and Santa Monica as being a small structure (see screen
shot below). Consultant should consider submiƫng a grant applicaƟon to
the DOT for the replacement of these structures as part of the project.
c. Borings. Consultant should plan an appropriate number of borings for the
project and staff will rely on their recommendaƟons for the number of borings.
VB AGENDA PACKET 4/14/2026
Page 56 of 81
1
THE SIGMA GROUP, INC.
SERVICES AGREEMENT
Project Reference No. 24996
THIS AGREEMENT is entered into on this 7 th day of April 2026 by and between The Sigma Group, Inc. (hereinafter called
"Sigma") and Village of Fox Point (hereinafter called the "Client").
W I T N E S S E T H:
WHEREAS, Client desires that Sigma perform
professional consulting services as described in this Agreement;
and
WHEREAS, Sigma agrees to perform such services in
accordance with the terms of this Agreement.
NOW, THEREFORE, in consideration of the premises and
of the mutual covenants contained herein, the parties hereto
agree as follows:
1. Site.
"Site" means the location on which the Services will be
performed or to which they relate. The Site is defined in the
Work Authorization, which is attached hereto as Exhibit A and
is incorporated herein by this reference.
2. Services.
(a) Services. Services mean those services to be
performed by Sigma pursuant to Agreement. The scope of the
Services is set forth in the Work Authorization. Additional
Work Authorizations may be issued pursuant to this Agreement
if agreed to by the Parties. Under such circumstances, this
Agreement shall be expressly incorporated by reference into
each subsequent Work Authorization and the services pursuant
to each Work Authorization shall be performed pursuant to this
Agreement and the applicable Work Authorization. To the
extent any term of this Agreement conflicts with a term of any
Work Authorization, then the terms of this Agreement shall
control.
(b) Standard of Care. Sigma shall exercise that degree
of care, skill and judgment that is usually exercised by a
professional person or firm in the performance of services
similar to the Services at the same time, under similar
circumstances and conditions and in the same or similar
locality.
(c) Permits and Licenses. Except as required by the
scope of Services, Client shall obtain all permits and licenses
that are necessary for the performance of the Services. If the
scope of Services includes Sigma obtaining on behalf of Client
any such permits or licenses, then Client shall fully cooperate
with Sigma in obtaining any such permits and licenses. Client
shall pay all costs and fees required for such permits and
licenses.
(d) Safety. Sigma is not responsible for safety
precautions and programs at the Site except as it relates to the
Services and then only to the extent of its own personnel.
(e) Regulatory Matters. Except as required by the
scope of Services, Sigma will not meet or confer with any
member of any federal, state or local regulatory agency
concerning the Services without obtaining the prior consent of
Client.
(f) Compliance with Law. Sigma shall substantially
comply with all laws and regulations, which to its knowledge,
information and belief; apply to its obligations under this
Agreement. If any change in laws or regulations applicable to
the Services after the execution of this Agreement results in a
change in the scope of Services, then Client is responsible to
Sigma for any increased cost or expense relating to the same.
(g) Warranty. Other than any express warranty
contained in this Agreement, Sigma makes no warranty with
respect to the Services. All other warranties, express or implied,
are hereby disclaimed.
3. Contract Time.
Sigma shall commence and complete the Services
within a reasonable time following the execution and delivery
of this Agreement or at such lat er time as otherwise agreed to
by the Parties in writing.
4. Alterations of Instruments of Service.
Client agrees that designs, plans, specifications,
reports, and similar documents prepared by Sigma are
instruments of professional service and, as such, no matter who
owns or uses them, they may not under any circumstances be
altered by any party except Sigma. Client warrants that Sigma’s
instruments of service will be used only and exactly as
submitted by Sigma. Accordingly, Client shall waive any claim
against Sigma, and shall, to the fullest extent permitted by law,
indemnify, defend, and hold Sigma harmless from any claim or
liability for injury or loss arising from unauthorized alterati on
of Sigma’s instruments of service by Client, its employees,
agents and contractors. Client also shall compensate Sigma for
any time spent or expenses incurred by Sigma in defense of any
such claim. Such compensation shall be based upon Sigma’s
prevailing fee schedule and expense reimbursement policy.
5. Compensation and Payment.
(a) Compensation. Client shall pay Sigma
compensation for the Services. The compensation shall be
based on a fixed fee or time and materials basis based on those
rates contained in the Hourly Rate Fee Schedule, which, if
applicable, is attached to the Work Authorization, or as
otherwise agreed to by the Parties. The method for determining
the amount of compensation is prescribed in the Work
Authorization. Any proposed cha rges or time to complete the
Services represents only an estimate of the possible charges
and/or time required to perform the Services.
(b) Payments. Sigma shall submit progress invoices
to Client on a monthly basis showing the Services performed
during the invoice period and the charges, therefore. Payments
shall be due and owing upon Client’s receipt of each invoice.
Interest of 1% per month shall accrue on any invoice balance
not paid within thirty (30) days when due. All payments
received will first apply to accrued interest and then principa l
balances. Client shall be responsible to Sigma for any and all
costs Sigma may incur in collecting any outstanding invoices or
enforcing any term of this Agreement. Timely and full
payments of invoices are of the essence of this Agreement.
6. Change in Services.
Any service performed by Sigma outside the scope of
the Services shall constitute an additional service, which, unless
otherwise agreed in writing, sha ll be performed on a time and
materials basis. Client may request that Sigma perform services
outside the scope of the Services by a written change order. The
change order shall set forth the change in services,
compensation for the change in services and an extension of
time the Services.
VB AGENDA PACKET 4/14/2026
Page 57 of 81
2
7. Site Access, Information and Conditions.
(a) Site Access. Client shall provide Sigma and its
consultants, contractors and agents with access to the Site, an y
facilities located on the Site and any adjacent lands thereto s o
that Sigma can properly and timely perform the Services. Client
shall obtain, at its own expense, any and all permits, licenses,
easements, rights-of-way, agreements and permission
necessary for such access.
(b) Site and Other Information.
( i ) C l i e n t r e p r e s e n t s a n d w a r r a n t s t h a t p r i o r t o t h e
execution and delivery of this Agreement, Client has supplied
to Sigma all information and documents in its possession,
custody or control that are material to the Site or necessary f or
the proper and timely performan ce of the Services, including,
but not limited to: surveys describing the physical
characteristics and any legal limitations of the Site; a legal
description of the Site; and reports, surveys, drawings or test s
concerning the conditions of the Site, including the presence of
Hazardous Waste, as defined herein, or the location of
subterranean structures and conditions (“Site Information”).
( i i ) C l i e n t s h a l l p r o m p t l y s u p p l y t o S i g m a S i t e
Information through the perform ance of the Services if such
information or documents become known to Client. Client shall
obtain, at its cost and expense, any Site Information as
reasonably requested by Sigma if such Site Information is not
required to be obtained by Sigma in the scope of Services.
( iii) Client shall give prompt notice to Sigma
whenever it becomes aware of any development, event or
condition that materially or adversely affects the Site or scope,
timing or cost of the Services.
( i v ) C l i e n t s h a l l cooperate fully with Sigma in the
performance of its Services. Client’s obligations with respect to
cooperation, compliance with laws and obtaining permits,
licenses, access and Site Information are of the essence of thi s
Agreement.
(c) Diggers Hotline. Sigma shall contact Digger’s
Hotline prior to any underground drilling, excavation or
intrusion by Sigma. Sigma shall not be liable for damage or
injury to any subterranean structures or conditions, or the
consequences of such damage or injury, that were not identified
by Digger’s Hotline or the Client supplied information
prescribed in subparagraph (b) above.
(d) Changed Conditions. The discovery of any
hazardous or toxic substance, waste, material, pollutant or
contaminant included under or regulated by Resource
Conservation and Recovery Act ("RCRA"), Comprehensive
Environmental Response, Compensation and Liability Act
("CERCLA") or any other similar federal, state or local law,
regulation or ordinance or that would pose a health, safety or
environmental hazard (“Hazardous Waste”), concealed
physical conditions or underground obstructions, conditions or
utilities at or around the Site that were not brought to the
attention of Sigma prior to the date of this Agreement, or any
subsequently issued Work Authorization, will constitute a
materially different site condition entitling Sigma, at its option,
to terminate the Agreement (and to receive payment for all
Services performed up to and including the date of such
termination) or to receive an extension of time to complete the
Services in a duration at least equal to the delay caused by such
condition(s) and an adjustment in the compensation for the
Services in an amount at least equal to the costs and expenses
Sigma incurs because of such condition(s).
8. Hazardous Materials.
(a) Presence and Disposal of Contaminated
Materials. Sigma is not responsible for Hazardous Wastes that
may exist at the Site. Sigma assumes no possession or control
for Hazardous Waste that may be present at the Site. Client
acknowledges that Sigma has played no part in and assumes no
responsibility for generation or creation of any Hazardous
Waste that may exist at the Site. Nothing in this Agreement
shall be construed or interpreted as requiring Sigma to assume
the status of, and Client acknowledges that Sigma does not act
in the capacity nor assume responsibilities of Client or others ,
as an owner, handler, generator, operator, transporter or
arranger in the treatment, storage, disposal or transportation of
any Hazardous Waste. Sigma sha ll have no responsibility for
the transportation, storage, treatment or disposition of
contaminated or potentially contaminated Hazardous Waste,
whether directly or indirectly generated from Sigma's
performance of the Services hereunder. Client shall be
responsible for the disposal of any such waste materials and
shall be the named party on any such waste manifests.
Notwithstanding anything to the contrary in this Agreement,
Client shall defend, indemnify and hold Sigma and its officers,
directors, employees, agents, consultants, contractors,
successors and assigns harmless from any and all claims arising
out of or relating to the presence of Hazardous Wastes at the
Site or the treatment, storage , transportation or disposition o f
the same.
(b) Samples. If samples collected by Sigma or
received by Sigma on behalf o f Client contain Hazardous
Waste, Sigma shall, after testing and analysis, return the
samples to Client for final disposal or treatment. Client shall
c o m p l e t e a l l f o r m s n e c e s s a r y a n d p a y a l l c o s t s f o r s t o r a g e ,
transport and disposal or treatment of samples. Client
acknowledges and agrees that Sigma is acting as a bailee and at
no time assumes title to such samples.
9. No Third Party Reliance.
This Agreement shall not create any rights or benefits
to parties other than Client or Sigma. Client shall not under any
circumstances permit such reliance except with Sigma’s
express written consent. Sigma may withhold consent if the
third party does not agree, in writing, to: (i) be bound by the
terms of this Agreement including without limitation, any
provision limiting Sigma’s liability, (ii) use such information
only for the purposes contemplated by Sigma in performing its
services, and (iii) be bound by the qualifications and limitations
expressed in the opinions, conclusions, certificate, or report
produced.
10. Ownership of Instruments of Professional Service.
Plans, specifications, reports, boring logs, calculations, fiel d
data, field notes, laboratory test data, estimates, training
materials and similar documents and materials (other than
samples) prepared by or for Sigma as instruments of
professional service are Sigma’s property. Sigma shall retain
these instruments of professiona l service for seven (7) years
following submissions of final project deliverables, during
which period Sigma’s instruments of professional service will
be made available for Client’s review at any reasonable time.
11. Indemnification.
(a) Client shall indemnify, defend and hold Sigma and
its directors, officers, employees, agents, successors and assigns
harmless from and against any and all loss, damage, injury,
claim, liability, demand, cost or expense, including, but not
limited to attorneys fees, attributable to personal injury, bodily
injury or property damage, including loss of use thereof, arising
out of or relating to this Agreement, the Site or the Services, but
only to the extent caused by Client’s breach of this Agreement
or the negligence or willful acts or omissions of Client or
anyone for whose acts or omissions Client may be liable.
(b) Sigma shall indemnify, defend and hold Client and
its directors, officers, employees, agents, successors and assigns
harmless from and against any and all loss, damage, injury,
claim, liability, demand, cost or expense, including, but not
limited to attorneys fees, attributable to personal injury, bodily
VB AGENDA PACKET 4/14/2026
Page 58 of 81
3
injury or property damage, including loss of use thereof, arising
out of or relating to the Services, but only to the extent caus ed
by Sigma’s breach of this Agreement or the negligence or
willful acts or omissions of Sigma or anyone for whose acts or
omissions Sigma may be liable.
12. Limitation of Liability and Waiver of
Consequential Damages. To the fullest permitted by law,
Sigma’s liability under this Agreement shall not exceed the
limits of Sigma’s insurance.
13. Insurance.
Sigma shall maintain in connection with the Services,
until the earlier of the completion of the Services or termination
of this Agreement, one or more insurance policies with the
following coverage and limits:
Worker's Compensation Statutory
Employer's Liability: $1,000,000 per accident
$1,000,000 per employee
(disease)
Commercial General Liability: $2,000,000 per occurrence
$2,000,000 aggregate
Pollution Coverage: $2,000,000 each pollution
condition
$2,000,000 policy
aggregate
Professional Liability Errors &
Omissions:
$2,000,000 each claim
$2,000,000 aggregate
Automobile Liability: $1,000,000 per occurrence
14. Suspension and Termination.
(a) Client may terminate this Agreement for cause if
Sigma breaches a material term of this Agreement and fails to
commence and continue action to cure the breach within seven
(7) days of Sigma’s receipt of Client’s written notice of
termination, which termination notice shall describe with
particularity the breach all ot her material information relatin g
thereto.
(b) Sigma may suspend the Services, in whole or in
part, under any Work Authorization if payment on any invoice
is not made in full within thirty (30) days when due or in the
event of a Force Majeure condition, as prescribed in Section 15
below. Sigma will return to work within a reasonable time after
payment of the outstanding invoice(s) giving rise to the
suspension or resolution of the event or cause giving rise to the
Force Majeure.
(c) Sigma may terminate this Agreement and any
outstanding Work Authorization if (i) the Services under any
Work Authorization are suspended for more than thirty (30)
consecutive days, (ii) Sigma reasonably believes, in Sigma’s
sole decision, that Client is withholding information from
Sigma, is not cooperating with Sigma or is hindering Sigma’s
performance of its obligations under this Agreement or is in
violation of laws and is not willing to take appropriate or
sufficient corrective action, (iii) if a payment on an invoice is
not made in full within thirty (30) days when due or (iv) Client
breaches a material term of this Agreement. Sigma shall give
Client seven (7) days’ written notice of Sigma’s intent to
terminate the Agreement and any outstanding Work
Authorization. Client shall have an opportunity to fully cure the
alleged condition, default or breach giving rise to the
termination within said seven (7) day period.
15. Force Majeure.
Sigma shall not be responsible for any suspension,
delay or failure to perform if such suspension, delay or failur e
is caused by an occurrence beyond Sigma’s reasonable control,
including, but not limited to, Site conditions, Hazardous
Wastes, acts of God, acts or omi ssions of Client or anyone for
whose acts or omissions Client may be responsible, Client’s
breach of this Agreement, government or other regulatory
orders, changes in the Services, changes in applicable law, war,
legal disputes, rebellion, sabotage or riots, theft or floods,
weather, fires, explosions, or other catastrophes. Sigma shall be
entitled to an extension of time to perform the Services in a
duration at least equal to the length of any suspension or dela y
caused by a foregoing type of condition. Client shall pay Sigma
all costs and damages attributable to any suspension or delay
not caused by Sigma.
16. Sigma As Independent Contractor.
Sigma, in performing the Services, shall be deemed to
be an independent contractor and not an agent or employee of
Client.
17. Assignment of Agreement.
Client shall not assign this Agreement in whole or in
part without the prior written consent of Sigma, which consent
shall not be unreasonably withheld. Any assignment not made
in accordance with this Agreement shall be void.
18. Subcontracts.
Sigma may subcontract any part of the Services
without the prior written appr oval of Client, but such
subcontracting shall not relieve Sigma of any of its obligations
to Client under this Agreement.
19. Survival of Obligations.
Obligations of the parties under this Agreement shall
survive termination or suspension of the Services or of this
Agreement.
20. Entire Agreement.
This
Agreement constitutes the entire Agreement
between the parties and supersedes all prior negotiations,
representations or agreements relating thereto, written or oral,
except to the extent they are expressly incorporated herein.
Unless otherwise provided for herein, no amendments, changes,
alterations or modifications of this Agreement shall be effective
unless in writing signed by Client and Sigma. There are no third
party rights or benefits under this Agreement, except as
explicitly noted in this Agreement.
21. Successors and Assigns.
This Agreement shall inure t o t h e b e n e f i t o f a n d b e
binding upon the successors and permitted assigns of the
parties.
22. Notices.
Any notice required or permitted to be given under this
Agreement shall be in writing and shall be deemed duly given
if delivered by facsimile, commercial delivery services, in
person or deposited in the Unite d States mail, first-class
certified or registered mail, postage prepaid, return receipt
requested.
23. Governing Law.
This Agreement and any disputes arising thereunder
shall be governed by the laws of the State of Wisconsin without
giving effect to provisions of law that would result in the
application of the substantive law of any other state.
VB AGENDA PACKET 4/14/2026
Page 59 of 81
4
24. Severability.
The various terms, provisions and covenants herein
contained shall be deemed to be separable and severable, and
the invalidity or unenforceability of any of them shall in no
manner affect or impair the validity or enforceability of the
remainder hereof.
25. Reports and Ownership of Documents.
Upon payment in full to Sigma for all Services, Sigma
shall furnish one (1) copy of each report required to be produced
by Sigma to Client. Additional copies shall be furnished for the
cost of copying. With the exception of such report(s) to Client,
all other documents and information relating to the preparation
of the report(s), including, but not limited to, notes, support
data, text data, memoranda and other preparation materials are
and remain the property of Sigma.
26. Wisconsin Construction Lien Law.
AS REQUIRED BY THE WISCONSIN
CONSTRUCTION LIEN LAW, SIGMA HEREBY NOTIFIES
CLIENT THAT PERSONS OR COMPANIES FURNISHING
LABOR OR MATERIALS FOR THE CONSTRUCTION ON
CLIENT'S LAND MAY HAVE LIEN RIGHTS ON CLIENT'S
LAND AND BUILDINGS IF NOT PAID. THOSE
ENTITLED TO LIEN RIGHTS, IN ADDITION TO SIGMA,
ARE THOSE WHO CONTRA CT DIRECTLY WITH THE
CLIENT OR THOSE WHO GIVE THE CLIENT NOTICE
WITHIN 60 DAYS AFTER THEY FIRST FURNISH LABOR
OR MATERIALS FOR THE CONSTRUCTION.
ACCORDINGLY, CLIENT PROBABLY WILL RECEIVE
NOTICES FROM THOSE WHO FURNISH LABOR OR
MATERIALS FOR THE CONSTRUCTION, AND SHOULD
GIVE A COPY OF EACH NOTICE RECEIVED TO THE
MORTGAGE LENDER, IF ANY. SIGMA AGREES TO
COOPERATE WITH CLIENT AND THE CLIENT'S
LENDER, IF ANY, TO SEE THAT ALL POTENTIAL LIEN
CLAIMANTS ARE DULY PAID.
27. Counterparts.
This Agreement may be signed in two or more
counterparts, each of which sha ll be treated as an original but
which, when taken together, shall constitute one and the same
instrument.
28. Further Assurances.
Sigma and Client each covenant and agree to sign,
execute and deliver, or cause to be signed, executed and
delivered, and to do or make, or cause to be done or made, upon
written request of the other Party , all agreements, instruments,
papers, deeds, acts or things, supplemental, confirmatory or
otherwise, as may be reasonably required by either Party hereto
for the purpose of or in connection with consummating the
Services described herein.
29. Dispute Resolution.
(a) All claims, disputes, controversies or matters in
question arising out of, or relating to this Agreement or any
breach thereof, shall be, at Sigma’s sole discretion, subject t o
binding arbitration. If arbitration is elected by Sigma, then such
arbitration shall be held in accordance with, at Sigma’s sole
discretion, Wis. Stats. Chapter 788 before an arbitrator mutually
agreeable to either parties or the Construction Industry
Arbitration Rules of the American Arbitration Association then
in effect. The award rendered, if any, by the arbitrator(s) sha ll
be final and binding on both parties and judgment may be
entered upon it in accordance with applicable law in any court
having jurisdiction.
(b) The forum and venue for any arbitration or
litigation shall be Milwaukee County, Wisconsin. Sigma’s
preservation and/or perfection of its lien rights, including th e
commencement of a foreclosure action relating the same, shall
not be deemed a waiver of Sigma’s right to arbitration.
(c) In no event shall a demand for arbitration or
commen
cement of litigation be made more than two (2) years
from the date the party making demand knew or should have
known of the dispute or six (6) years from the date of substantial
completion of Services, whichever date shall occur earlier.
30. Testimony.
Sigma agrees that, at the request of Client, the persons
performing the Services under this Agreement shall be made
available as consultants or witnesses, at 2.0 times the Hourly
Rate Schedule, in any litigation, hearing or proceeding to
explain or defend, as appropriate, any aspect of methods used
by Sigma, or results or conclusions developed in connection
with Sigma's Services described in this Agreement.
IN WITNESS WHEREOF, this Agreement has been
executed on behalf of Sigma and on behalf of Client as of the
date first above written.
Firm: Villa
ge of Fox Point
Signature:
Name (please print):
Title (please print):
D a t e :
THE SIGMA GROUP, INC.
Signature:
Name (please print): Christo pher Carr, PE
Title (please print): Vice Presiden t
Date:
Project Reference No. 24996
VB AGENDA PACKET 4/14/2026
Page 60 of 81
EXHIBIT A
WORK AUTHORIZATION NO. 1
Project Reference No.: 24996
This Work Authorization is entered into by and between The Sigma Group, Inc. ("Sigma") and Village of Fox Point ("Client").
This Work Authorization incorporates by reference the Agreement entered into by the Parties dated April 7, 2026 (the "Agreement").
The Agreement is hereby amended and supplemented as follows:
Site: Santa Monica Water Main and Road Improvements - Fox Point, Wisconsin
General Description of Basic Services.
Client hereby authorizes Sigma to perform and complete the following Service(s):
1. Those Services contained in Si gma’s proposal dated February 27, 2026, which is attached hereto and incorporated
herein by this reference #24996.
2 .
Compensation.
1. Water Main Replacement and Road Improvements $45,645
2 .
3 .
4 .
5 .
6 .
7 .
8 .
9 .
1 0 .
Other Terms. [Insert any other terms specific to the work authorization, i.e., dates of performance.]
1 .
Firm: Villa ge of Fox Point
Signature:
Name (please print):
Title (please print):
D a t e :
THE SIGMA GROUP, INC.
Signature:
Name (please print): Christopher Carr, PE
Title (please print): Vice Presiden t
Date:
VB AGENDA PACKET 4/14/2026
Page 61 of 81
VB AGENDA PACKET 4/14/2026
Page 62 of 81
VB AGENDA PACKET 4/14/2026
Page 63 of 81
VB AGENDA PACKET 4/14/2026
Page 64 of 81
VB AGENDA PACKET 4/14/2026
Page 65 of 81
VB AGENDA PACKET 4/14/2026
Page 66 of 81
VB AGENDA PACKET 4/14/2026
Page 67 of 81
VB AGENDA PACKET 4/14/2026
Page 68 of 81
VB AGENDA PACKET 4/14/2026
Page 69 of 81
VB AGENDA PACKET 4/14/2026
Page 70 of 81
VB AGENDA PACKET 4/14/2026
Page 71 of 81
VB AGENDA PACKET 4/14/2026
Page 72 of 81
VB AGENDA PACKET 4/14/2026
Page 73 of 81
VILLAGE OF FOX POINT
MILWAUKEE COUNTY
WISCONSIN
VILLAGE HALL
7200 N. SANTA MONICA BLVD.
FOX POINT WI 53217-3505
414-351-8900
FAX 414-351-8909
To: Village Board
From: Kevin Ausman, Assistant Village Manager
CC: Steve Kreklow, Village Manager
Date: April 14, 2026
Re: Chipstone Electrical Generator – Cultural Overlay
Overview
Uihlein Electric, on behalf of the Chipstone Foundation, has applied for a permit to allow a backup
generator on the property located at 7820 North Club Circle.
The Village Attorney has determined that the existing property is governed by Cultural Overlay approval
and a modification of the site to allow a generator requires formal approval under Section 745-22 Cultural
Overlay District of the Fox Point Municipal Code (LINK).
Background
The Chipstone Foundation operates a museum on the subject property and entered into an agreement for
the operations of such facility with the Village in 1988 under Cultural Overlay authority.
Request
The property owner is requesting to add a backup generator on the east facade of the principal
structure, immediately adjacent to the rear of the building, and located 151ft from the north property
line and 96ft from the rear property line.
Process
Under Section 745-22, the Village Board shall refer the request to the Plan Commission for study and
investigation. The Plan Commission will then make findings, before the Village Board holds a public
hearing and makes a determination.
Recommendation
Staff recommends that the Village Board refer request to the Plan Commission for study and
recommendation per Sections 745-22.
VB AGENDA PACKET 4/14/2026
Page 74 of 81
Re:
THE CHIPSTONE FOUNDATION
February 1I,2026
Village of Fox Point
7200 N Santa Monica Boulevard
Fox Point, Wl53217
Proposed Backup Generator
7820 North Club Circle, Fox Point, WI
To Whom It May Concern:
The Chipstone Foundation would like to place a backup generator on its museum
property located at7820 North Club Circle in Fox Point. The property experiences frequent
power outages during storms. Since the museum houses the Foundation's collection, a backup
generator will help protect the collection during those power outages. The generator will be
placed on the east side of the museum, between the museum and the ravine, where an existing
half wall will shield the generator from view.
The Chipstone Foundation has requested that Uihlein Electric submit the necessary
application to the Village on its behalf. By signing this letter, the undersigned hereby confirms
that The Chipstone Foundation has authorized Uihlein Electric to submit the application and any
supporting information on its behalf.
If you need any additional information or confirmation of the authority granted to Uihlein
Electric, please contact me at 414-238-6255 or edunn@chipstone.org.
Sincerely,
The Chipslone Foundation
General Counsel, Sec'y, Asst. Treasurer
7So North Lincoln Memorial Drive Suite 4o5 Milwaukee, Wisconsin 53zoz Telephone 4t4.22o.492r Facsimile 4r4.22o.429t
VB AGENDA PACKET 4/14/2026
Page 75 of 81
Statement of Intended Use – Backup Generator Installation
This statement is submitted in response to the requirement for a description of the general
character of the intended use of the premises, including the days of the week and hours of
the day during which people will be permitted on site.
The intended use of the premises is the installation and maintenance of a standby generator
system to provide backup electrical power in the event of a utility outage. The generator
will serve as an emergency power source only and will not be used for continuous or
routine power generation.
All installation, testing, and related labor activities will be conducted during normal
weekday business hours. Work is anticipated to occur Monday through Friday, unless
otherwise approved. No regular evening, overnight, weekend, or public access use is
proposed as part of this installation.
Once installed, the generator will remain on-site in a standby capacity and will operate only
during power outages or during brief, scheduled testing in accordance with applicable
codes and manufacturer requirements.
VB AGENDA PACKET 4/14/2026
Page 76 of 81
VB AGENDA PACKET 4/14/2026
Page 77 of 81
VB AGENDA PACKET 4/14/2026
Page 78 of 81
VB AGENDA PACKET 4/14/2026
Page 79 of 81
VB AGENDA PACKET 4/14/2026
Page 80 of 81
VB AGENDA PACKET 4/14/2026
Page 81 of 81
Source: Village of Fox Point website. First collected Oct 16, 2026.