Plan Commission — Agenda packet
Town of Burlington · Racine County · Plan Commission · meeting of Jul 9, 2026 · Agenda packets
Open the original document More from Town of Burlington
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Neal Czaplewski, Chairman
Ben Kerr
Keith Nielsen
Philip Peterson
Joseph Greeter
William Korducki
James Luedeke
Plan Commission Agenda July 9, 2026 / 6:30PM
▪ Agenda is subject to change
▪ Discussion and action may occur on any agenda item
▪ All meetings are subject to the Open Meetings law and will be recorded
▪ If you are disabled and have accessibility needs or need information interpreted for you, please call Town Office at 262.763.3070 at
least 24 hours to the meeting
▪ Limited citizen comments on agenda items will be allowed at the discretion of the chairman/acting chairman as they are
announced before board discussion.
Notice is hereby given that a meeting of the Plan Commission of the Town of Burlington will be held on
Thursday, July 9, 2026 at 6:30 PM at the Burlington Town Hall, 32288 Bushnell Road, Burlington, Racine
County, Wisconsin.
If you would like to join via conference call, please call 701.802.5429 and use Access Code #6330779.
1. Call to order,
a. Roll Call
b. Pledge to the flag
c. Verification of Posting
2. Approval of the minutes for the Plan Commission meeting held on May 14, 2026
Action: Approve/Deny
3. Land Division
a. Petitioner Nick & Danyel Koldeway
Owner: Daniel E Koldeway & Dorothy M Koldeway Revocable Trust
Parcel: 002-02-19-13-006-000 / 7601 Wheatland Rd
Action: Discussion and possible recommendation
4. Oversized Garage
a. Petitioner: Neil Demant (3D Construction)
Owner: Mark Pekelnicky
Parcel: 002-03-19-34-055-000
30936 Weiler Rd
Action: Discussion and possible recommendation
5. Chapter 16 Ordinance – Land Division Regulations
Action: Discussion only
6. Adjournment
Rachel Naber, Deputy Clerk
2026 July 02
Neal Czaplewski, Chairman
Ben Kerr
Keith Nielsen
Philip Peterson
Joseph Greeter
William Korducki
James Luedeke
Plan Commission Minutes May 14, 2026
Page 1 of 2
Call to order: Roll Call / Pledge to the flag / Verification of Posting
Chairman Czaplewski called the meeting of the Town of Burlington Plan Commission to order at
6:30PM. The meeting was held in the auditorium of the Town Hall at 32288 Bushnell Road, Burlington
Wisconsin. Those in attendance stood and recited the pledge of allegiance.
Members Present: Neal Czaplewski, Ben Kerr, Keith Nielsen, Phil Peterson, Joe Greeter, Bill Korducki, and
Jim Luedeke.
Also present: Town Engineer Robert Wielgos, raSmith (via telephone).
Approval of the minutes for the Plan Commission meeting held on March 12, 2026
Korducki moved to approve the minutes from the March 12, 2026 meeting as presented; Greeter
seconded the motion. Kerr abstained. Motion carried.
Land Division: Petitioner: Dylan Rusch / Owner: Kathleen Mundo
Parcel: 002-02-19-11-032-010 / Wheatland Rd
Land Use Variance: Petitioner Dylan Rusch / Owner: Kathleen Mundo
Parcel: 002-02-19-11-032-010 / Wheatland Rd
The applications for parcel 002-02-19-11-032-010 were discussed together.
Dylan Rusch presented a land use plan waiver and a land division request on behalf of the petitioner,
Kathleen Mundo. He is under contract to purchase the parcel. The request is to approve the land use
plan waiver and to divide the parcel into 3 parcels varying in size from 5.11 acres to 7.46 acres.
Robert Wielgos, raSmith, reviewed his written report and recommended tabling the land division until
such time that documentation can be furnished that demonstrates direct driveway access to the
proposed lots off Wheatland Rd complies fully with the Town driveway ordinance for design controls
for the location of the driveway access point.
Bryce Hembrook, SEH, provided a written report which included some considerations for the
commission and several possible actions.
The commission discussed the applications with the petitioner, the engineer and town staff members.
The discussion included flooding issues and the ability for emergency services to access each of the
proposed parcels.
MOTION: Korducki moved to approve the land use plan waiver from agricultural preservation to
agricultural estate. There was no second.
Town of Burlington Plan Commission
Minutes May 14, 2026
MOTION: Peterson moved to deny the land use plan waiver; Greeter seconded the motion. Motion
carried 6-1
MOTION: Peterson moved to deny the land division; Greeter seconded the motion. Motion carried
unanimously.
Adjournment
Greeter motioned to adjourn at 7:05PM; Peterson seconded the motion. Motion carried.
Jeanne Rennie, Clerk
Plan Commission Report for July 9, 2026
7601 Wheatland Road
Owner:
Daniel E Koldeway & Dorothy M Koldeway
Revocable Trust dated 5/1/2025
Petitioner: Nick & Danyel Koldeway
Project: New Home Construction
Requested Action: Approval of Land Division
Existing Zoning: A-2
Location: Parcel # 002-02-19-130-06-000
Report
The applicant for the subject property has submitted an application for Land Division (4 lots or less). The application
package includes a Certified Survey Map (CSM) and a soil evaluation report. The applicant wishes to create a 1.518
private parcel and dedicate 33 feet from the propos ed west parcel line for public right-of-way. The pr oposed lot is
situated adjacent to Lot 1 of CSM No. 3631 which was created in 2025 by the same applicant under a previous land
division in the Town of Burlington.
John Casucci, P.L.S., from my office reviewed the s ubmitted CSM. Technical review comments were provid ed on
June 24, 2026. The applicant’s surveyor re-submitted the CSM on June 26, 2026 that addressed all comments. The
re-submitted CSM meets all state requirements. Upon signatures and notarizing, copies of the CSM shoul d be
furnished to the Town.
Staff Recommendation:
I recommend that the Plan Commission provide a posi tive recommendation of approval to the Town Board.
Robert Wielgos, P.E.
July 1, 2026
Engineers | Architects | Planners | Scientists
Short Elliott Hendrickson Inc., N19 W24133 Riverwood Dr Suite #160, Waukesha, WI 53188
SEH is 100% employee -owned | sehinc.com | 262.646.6855 | 888.908.8166 fax
TOWN OF B URLINGTON PLAN COMMISSION
TO: Plan Commission
FROM: Bryce Hembrook, AICP
Town Planner
REPORT DATE: July 2, 2026
PC MEETING DATE: July 9, 2026
RE: Koldeway CSM – Land Division Request
SEH No. 188914, TASK 5
Applicant: Nick & Danyel Koldeway
Property Owner: Daniel & Dorothy Koldeway
Application Type: Land Division
Location: 7601 Wheatland Road (PIN 002-02-19-13-006-000)
Land Use Plan: Agricultural Estate (5.0 Acres or More per Dwelling)
Existing Zoning: A-2 General Farming District II
The following report is provided to the Plan Commission for cursory review prior to action. Specifics relating to
the submitted documents of this application may be referenced in the Commission’s packet.
Background
The applicant is requesting to subdivide a portion of the existing parcel to create a lot intended for a new single-
family residence. The parent parcel (PIN 002-02-19-13-006-000), addressed at 7601 Wheatland Road, is owned
by the Daniel & Dorothy M. Koldeway REVOC Trust and is currently used as farmland. The applicants, Nick and
Danyel Koldeway, are seeking to create a new parcel for residential construction. A similar land division from the
same parent parcel was approved in 2025 for another family member, establishing a pattern of family farm
homestead divisions on this property. The property is zoned A-2 General Farming District II under the Racine
County Zoning Ordinance. The proposed Lot 1 contains 66,101 square feet (1.518 acres) excluding road right-of-
way. The Certified Survey Map dedicates the west 33 feet of the lot to the public right-of-way. The parcel has
frontage on Wheatland Road and A-2 zoning setbacks of 75 feet (street yard), 25 feet (side yard), and 25 feet
(rear yard) are noted on the map. The remaining unplatted land to the north and east is retained by the owner
and continues in agricultural use. It appears that the proposed land division meets county zoning code
requirements and staff is supportive of this request.
Land Use Plan Analysis
The subject parcel is designated Agricultural Estate (5.0 Acres or More per Dwelling) in the Town of Burlington
2050 Land Use Plan. This district is established to allow for low-density residential uses in areas of the Town that
are not prime farmland and are not planned for urban expansion. Staff has evaluated this request against the
applicable Land Use Plan policies as follows.
Koldeway CSM – Land Division Page 2
Minimum Parcel Size – Consistent. The Land Use Plan establishes a minimum parcel size of 40,000 square feet
in the Agricultural Estate District. The proposed Lot 1 contains 66,101 square feet (1.518 acres), which exceeds
this minimum. This standard is met.
Maximum Density – Consistent with Area Context. The Land Use Plan recommends a maximum density of 1
dwelling unit per 5 acres in the Agricultural Estate District. The proposed lot, at 1.518 acres, does not meet this
ratio as a singular parcel; however, the intent of this density standard is appropriately evaluated in the context
of the surrounding area, rather than applied solely to the parcel being created alone. The subject parcel is being
subdivided from a larger agricultural holding, and the remaining unplatted land to the north and east is retained
by the owner and continues to be used for agricultural purposes. The surrounding area along Wheatland Road
consists predominantly of large agricultural tracts and rural residential uses at low densities generally consistent
with the 1 unit per 5 acres guideline when viewed at the corridor scale. This division, along with the previously
approved 2025 family division from the same parcel, represents a limited residential carve-out from a larger
agricultural parcel, which permits separation of a dwelling from a farm operation upon sale or family transfer.
Staff finds the density standard is met in the context of the surrounding agricultural area.
Rural Character and Agricultural Preservation – Consistent. The Land Use Plan identifies preservation of rural
character and the ongoing viability of farm operations as primary goals of the Agricultural Estate District. The
proposed division creates a single residential lot from a larger agricultural parcel, with the remainder continuing
in farm use. The request is not part of a larger subdivision or development proposal, and no additional lots are
proposed at this time. The CSM notes the presence of farm field drain tiles and assigns maintenance obligations,
reflecting the agricultural context. Staff finds the proposal is consistent with these goals.
Plan Commission Options
The Commission can make the following recommendations:
1. Approval of the request.
2. Denial of the request with justification stated by the Commission.
3. Table the request for further study.
Recommendation
APPROVE the land division request as presented, with the following conditions:
1. The CSM shall be approved by Racine County prior to recording, including county review for compliance
with the Racine County Zoning Ordinance, A-2 District standards, and land division regulations.
2. Any additional conditions required by the Town Engineer or other applicable approving authorities shall
be satisfied prior to recording of the CSM.
x:\ae\b\burtn\188914\8-planning\task 5 - 7601 wheatland rd land division - koldeway\2026-7-9 pz report - koldeway land division report.docx
Plan Commission Report for July 9, 2026
Applicant:
Mark Pekelnicky
Project: Garage Construction
Requested Action: Oversized Garage Space Approval
Current Zoning: R-3
Location: 30936 Weiler Road
Report
The applicant has requested approval to construct a 38’x25.5’ garage near the southwest corner of the subject
property under coverage of a Town Oversized Garage Space Application. The existing garage within this location
would be demolished, new garage constructed, and a rain garden excavated south of the proposed garage. Along
with the application, the applicant has provided a proposed garage layout overlaid on a Plat of Survey of the
subject property as well as an impervious surface breakdown of the parcel that includes the proposed w ork.
The proposed garage appears to encompass a similar footprint as the existing garage, with expanded roof area
stretching north and south while the proposed east-west garage dimensions appear to be similar to exis ting. The
proposed rain garden is set between the south edge of the proposed garage and the front parcel line, w ith
dimensions noted as 10’x15’.
On the Plat of Survey Exhibit, there is a note that reads: “The proposed rain garden depicted hereon w ill be made
up of materials referenced in the Wisconsin D.N.R. rain garden guide and the downspouts from the new g arage
will be directed to the rain garden. Said rain garden to be dug a minimum of 6 inches deep.” After add itional
discussions and coordination between Town staff and the applicant, I confirmed that this rain garden is being
constructed to supplement the added impervious area that is resulting from this work in a property that is within
County shoreland zoning. The applicant should comply with all Racine County zoning regulations as they relate to
the design and construction of this rain garden.
A detailed grading and drainage plan should be furnished to the Town for review. The plan should include the
following detail: finished floor elevation of the proposed garage, locations and elevations of all gar age downspout
outfalls, existing and proposed contours, bottom of rain garden elevation, rain garden overflow relief drainage
information, and all erosion control measures. It should be demonstrated that the construction of the proposed
garage does not negatively impact drainage of adjac ent properties. The use of swales and/or spillways should be
considered to channelize the storm water runoff in a manner that perpetuates the existing condition.
Recommendation
Per the discretion of the committee. If approval is granted, it should be subject to the following con ditions:
• Town approval of a grading and drainage plan for t he proposed work.
Robert Wielgos, P.E.
July 1, 2026
Engineers | Architects | Planners | Scientists
Short Elliott Hendrickson Inc., 501 Maple Avenue, Delafield, WI 53018 -9351
SEH is 100% employee -owned | sehinc.com | 262.646.6855 | 888.908.8166 fax
TOWN OF BURLINGTON PLAN COMMISSION
TO: Plan Commission
FROM: Bryce Hembrook, AICP
Planner
REPORT DATE: July 2, 2026
PC MEETING DATE: July 9, 2026
RE: 30936 Weiler Road – Oversized Garage
SEH No. 188914, TASK 6
Applicant: Neil Demant (3D Construction Inc.)
Property Owner: Mark Pekelnicky
Application Type: Oversized Garage – Zoning Review
Location: 30936 Weiler Road (PIN 002-03-19-34-055-000)
Land Use Plan: Residential-Sewered (25,000 Square Feet to 1.49 Acres Per Dwelling Unit)
Zoning: R-3 Suburban Residential District (Sewered) / Shoreland
The following report is provided to the Plan Commission for cursory review prior to action. Specifics relating to
the submitted documents of this application may be referenced in the Commission’s Packet.
Background
The applicant, Neil Demant of 3D Construction Inc., is requesting approval on behalf of property owner Mark
Pekelnicky to raze an existing garage and construct a new detached garage at 30936 Weiler Road. The proposed
new garage measures 38’ x 25’-7”, resulting in approximately 969 square feet of floor area. The permit
application identifies this as a new accessory structure (garage), with a peak height of approximately 22’-1” and
an eave height of approximately 9’-5”. The property is located on the north side of Weiler Road along the
shoreline of Browns Lake and is zoned R-2 Suburban Residential District (Sewered) by Racine County, with
shoreland overlay regulations also applicable. The subject parcel totals approximately 0.34 acres.
Section 15.10.010(C) (Prohibited Buildings in Residential Zones) of the Town of Burlington Municipal Code states
that “any detached garage proposed to be constructed in residential zones (R-1 through R-8), greater than 900
square feet but less than 1,200 square feet shall require a hearing before the Town of Burlington Planning and
Zoning Committee; and approval by the Town of Burlington Town Board.” At 969 square feet, the proposed
garage exceeds the 900 square foot threshold and therefore requires Plan Commission review and Town Board
approval before the zoning permit can be issued.
30936 Weiler Rd – Oversized Garage Page 2
Analysis
Location
The subject property is located on Weiler Road along the southern shoreline of Browns Lake in the Town of
Burlington. The parcel is a narrow, elongated lakefront lot typical of the Browns Lake area, measuring
approximately .34 acres. The lot fronts Weiler Road to the south and extends north to the ordinary high water
mark of Browns Lake. The surrounding neighborhood consists of single-family residential with similar lot
configurations. The proposed new garage is sited in the southern portion of the lot near Weiler Road, where the
existing garage is currently located.
Land Use
The Town of Burlington 2050 Land Use Plan identifies this property as Residential-Sewered (25,000 Square Feet
to 1.49 Acres Per Dwelling Unit). The principal use of the property is single-family residential, and the proposed
garage is an accessory structure. The Land Use Plan does not specifically address accessory structure size limits,
as those are governed by the Town’s Municipal Code and Racine County zoning. No conflict with the Land Use
Plan’s policies is identified for this request. The plan does encourage protection of lake quality and discourages
development that would adversely affect Browns Lake. The proposed rain garden to manage stormwater from
the new garage is a positive measure in that context.
Zoning
The property is zoned R-2 Suburban Residential District (Sewered) under the Racine County Zoning Ordinance,
which permits single-family dwellings and their accessory structures. The zoning permit indicates that all
applicable yard setbacks are met: a 25.5’ street yard setback (R-2 requires a minimum street yard), a 5.5’ first
side yard, a 20.9’ second side yard, and a shore setback of approximately ±218’. The total accessory structure
area after construction is noted on the permit as 969 sq. ft. of 1,000 sq. ft. permitted, indicating the proposed
garage is at or near the Racine County R-2 accessory structure size limit. The property also falls within the
Shoreland overlay district due to its location within 300 feet of Browns Lake. Shoreland regulations under the
Racine County Zoning Ordinance and Wisconsin Administrative Code NR 115 apply and will be reviewed by the
county.
Neighborhood Context
Based on a review of available aerial photos, the existing garage proposed for removal appears to be smaller
than most of the detached garages on the nearby lots along this stretch of Weiler Road. The submitted plan
depicts the proposed garage to be located roughly in the same location and between two existing garages on
the adjoining parcels to the east and west. The garage on the adjoining lot to the west is approximately 920
square feet and the garage on the adjoining lot to the east is approximately 1,060 square feet. At approximately
969 square feet, the proposed garage would be comparable in size to the adjacent garages and more consistent
with nearby structures than the smaller garage it would replace. The dimensions of the existing garage are not
stated in the submitted materials, but it appears to be 600 square feet or less.
Plan Commission Options
The Commission can make the following recommendations:
1. Approval of the request with any conditions or modifications the Commission finds justifiable and
applicable.
2. Denial of the request with justification stated by the Commission.
3. Table the request for further study.
Recommendation
Per the discretion of the Commission. The Commission should determine whether this proposed garage fits in
the surrounding neighborhood and is compatible with the aesthetics of the surrounding neighborhood.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 1
TOWN OF BURLINGTON
Racine County, Wisconsin
AMENDED ORDINANCES
Chapters 16.04 – 16.60
Land Division Regulations
DRAFT
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 2
May 2026
Title 16
LAND DIVISION
Chapters:
16.04 Definitions
16.08 General Requirements
16.12 Land Suitability
16.14 Post-Construction Storm Water Management
16.15 Conceptual Plan
16.16 Preliminary Plats
16.20 Final Plats
16.24 Minor Land Divisions
16.28 Design Standards for Streets
16.32 Design Standards for Blocks and Lots
16.36 Required Improvements
16.40 Open Space and Public Facilities
16.44 Variances
16.48 Fees and Costs
16.52 Administration and Enforcement
16.56 Other Developments
16.60 Financial Security
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 3
May 2026
Chapter 16.04
DEFINITIONS
Amended May 2026
Sections:
16.04.010 Definitions [includes new: Period of Guaranty, Electronic Submission, Town Administrator]
16.04.010 Definitions
Unless otherwise defined in this section, the definitions contained in Chapter 236 of the Wisconsin Statutes
apply to this title unless the context or subject matter clearly indicate otherwise. The following definitions apply
to this title:
"Access corridor" (also referred to as a "flagpole") means the narrow strip of land within a flag lot or
panhandle lot that connects the buildable portion of the lot to its frontage on a public or private street and over
which the lot’s driveway access is provided. (Added May 2026)
"Adjacent" means abutting or sharing a common boundary line. For purposes of this title, two parcels
separated only by a street, road, alley, or other public right-of-way shall be considered adjacent to one
another. (Added May 2026)
"Block" means a tract of land bounded by streets, or by a combination of streets and public parks, cemeteries,
railroad right-of-way, bulkhead lines, or shorelines of waterways, or corporate boundary lines of the city.
"Building" means any structure designed, built or intended for the shelter, enclosure or protection of persons,
animals, chattels, or movable property of any kind.
"Building setback line(s)" means a line within a lot or other parcel of land, so designated on the plat of a
subdivision, between which and the adjacent boundary of the street or adjoining properties or wetlands upon
which the land abuts the erection of a building is prohibited.
"Certified survey map" means a survey map prepared in accordance with the provisions of Section 236.34,
Wis. Stats., and this title to create a minor division.
"Corridor," when used in this title in reference to lot configuration or access, means an access corridor as
defined above. This term is distinct from a "Primary Environmental Corridor," which refers to the
environmentally significant lands so designated in the Town of Burlington 2050 Land Use Plan and by the
Southeastern Wisconsin Regional Planning Commission (SEWRPC). (Added May 2026)
"Cul-de-sac" means a minor street having one open end and being permanently terminated by a vehicle turn
around.
"Development plan" means a plan designating use areas, roads, lot and block boundaries and such other
information, including a subdivision plat or certified survey map.
"Developer" means a person, firm, association or corporation which proposes to divide land.
"Easement" means a grant by a property owner to another for a specific limited purpose or purposes.
"Expressway" means a divided arterial highway for through traffic with full or partial control of access and
generally with grade separations at intersections.
"Flag lot" means any lot where access to a public street is provided solely through a narrow strip of land (an
"access corridor" or "flagpole") that is less than the required minimum frontage width for the majority of the
lot's depth (Added May 2026)
"Highway" means a right-of-way for vehicular traffic which traverses a non-urban area, usually a state or
federally numbered route.
"Land use plan" means the extensively developed plan also called a comprehensive plan, adopted by the
Plan Commission and certified to the Town Board pursuant to Section 62.23, Wis. Stats., including proposals
for future land use, transportation and public facilities.
Commented [BH1]: May want to define “access
corridor” and “corridor”
Commented [BH2]: Should panhandle lot also be
defined?
Commented [BH3]: I typically recommend to not
include information like this in the definitions. But it is
fine to keep if desired.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 4
"Lot" means a portion of a subdivision, minor division or other parcel of land intended for transfer of ownership
or for building development.
"Map" means the certified survey map defined above.
"Minor land division" means the division of land resulting in the creation of not more than four parcels or
building sites within a period of five years. This limitation shall not apply to non-buildable outlots which are
deed restricted to prevent any future development.
"Multiple family" means two or more dwelling units, including apartments and attached houses.
"Official map" means the map indicating the location, width and extent of existing and proposed streets,
highways, parkways, parks and playgrounds as adopted and amended by the Town Board.
"Outlot" means a parcel of land, other than a lot or block, so designated on the plat, but generally not of
standard lot size, which is used to convey or reserve parcels of land for purposes other than residential
development and which may be either redivided into lots or combined with one or more other adjacent land
divisions in the future for the purpose of creating buildable lots.
"Panhandle lot" means a lot that obtains access to a public or private street through an access corridor at
least sixty-six (66) feet in width for its entire length, and which otherwise complies with all applicable zoning
and setback requirements. A panhandle lot is distinguished from a flag lot, which has a narrower access
corridor. (Added May 2026)
"Parkway" means a route intended to be used primarily by passenger vehicles which may have a varying
width of right-of-way and which right-of-way is or is intended to be developed with a park-like character.
"Pedestrian way" means a public right-of-way of land located across a block to provide pedestrian access to
adjacent streets or areas and/or for the installation of underground utilities.
"Planned development" means a development permitting uses and building placement which need not
conform to zoning district regulations.
"Plat" means a plan, map, drawing or chart on which the subdivider's plan of the subdivision is presented and
which the subdivider submits for approval and intends to record in final form.
Plat, Final. "Final plat" means the map of a subdivision presented for final approval and prepared in
accordance with this title and all other applicable ordinances and state statutes and rules.
Plat, Preliminary. "Preliminary plat" means the map of a proposed subdivision and documents presented for
the purpose of preliminary consideration prepared in accordance with this title.
"Public way" means any public road, street, highway, walkway, drainage way, or part thereof.
"Residential development" means the conversion of agricultural or vacant land to residential use.
"Roadway" or "pavement" means the paved area for vehicular traffic existing on a street right-of-way and not
the street right-of-way width.
"Street" means an area which primarily serves or is intended to serve as vehicular and pedestrian access to
abutting lands or to other streets whether designated as street, highway, thoroughfare, parkway, throughway,
road, drive, avenue, boulevard, lane, place or however otherwise designated. The word "street" refers to the
width of the street right-of-way or easement, whether public or private, and shall not be considered as the
width of the roadway or paving or other improvements on the street right-of-way.
1. Street, Collector. "Collector street" means a street intended to be used to carry traffic from minor
streets to primary and secondary streets, including the principal entrance streets of a residential
development and streets for circulation within such a development.
2. Street, Major. "Major street" means a street intended to be used primarily for fast or heavy through
traffic.
3. Street, Minor. "Minor street" means a street intended primarily as access to abutting properties.
4. Street, Primary. "Primary street" means a street of considerable continuity which serves or is intended
to serve as a major traffic artery between the various sections of the town as shown on the master
plan.
5. Street, Private. "Private street" means any street which is under the jurisdiction of an individual,
corporation or trustee or any street which is privately owned or established, and which has been
approved by the Town Board pursuant to Section 16.28.060 of this title. An approved private street
provides legal access equivalent to a public street for purposes of lot frontage under Section
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 5
16.12.030. The street shall be designated on the preliminary plat and final plat as a numbered outlot
with the label 'Private Street.' (Amended May 2026)
6. Street, Public. "Public street" means all primary, secondary, collector and minor streets which are
shown on the subdivision plat and are to be dedicated for public use.
7. Street, Secondary. "Secondary street" means a street which carries traffic from minor and collector
streets to the primary street system and designated as secondary streets on the master plan.
"Subdivider" means the person responsible for preparing and recording the plats of the subdivision and for
carrying out all appropriate requirements outlined in this title.
"Subdivision" means a division of land which creates four or more parcels or building sites of less than thirty-
five (35) acres within a period of five years.
"Subdivision development agreement" means a written agreement between the town and the subdivider
which provides for the terms of development and payment for improvements.
"Period of Guaranty" means the period of time, beginning on the date the Town Board formally accepts all
required public improvements, during which the developer remains responsible for defects, failures, or
maintenance of those improvements. The Period of Guaranty shall be one (1) year unless otherwise specified
in the subdivision development agreement. The financial surety required under Chapter 16.60 shall remain
available to the Town through the expiration of the Period of Guaranty. (Added May 2026)
"Electronic submission" means the delivery of required applications, plans, plats, and supporting documents
in digital format to the Town Clerk and Town Administrator via email or a Town-approved file transfer system.
Electronic submissions shall be in PDF format at a minimum resolution of 300 DPI, shall be clearly named
with the project name and document type, and shall be accompanied by a signed transmittal letter. Where a
licensed surveyor or engineer certification is required, a digitally signed PDF bearing the certifier's electronic
seal as authorized under Wisconsin Statutes is acceptable. (Added May 2026)
"Town Administrator" means the individual appointed by the Town Board to serve as the chief administrative
officer of the Town of Burlington, responsible for coordinating land division applications, maintaining records,
and serving as the primary administrative point of contact for applicants under this title. (Added May 2026)
"Town Engineer" means the individual or firm appointed by the town who is licensed to practice professional
engineering in the state of Wisconsin and is responsible for reviewing subdivision plats and documents on
behalf of the town, and performs other duties as directed by the town. (Ord. dated 12/12/02; Ord. dated
7/27/95 § 4; amended May 2026)
"Town Planner" means the individual or firm appointed by the Town who is responsible for reviewing land
divisions, plats, and certified survey maps for consistency with the Town’s Land Use Plan, zoning, and the
planning provisions of this title; advising the Plan Commission and Town Board on planning matters; and
performing other duties as directed by the Town. (Added May 2026)
Commented [BH4]: Should we define Town Planner or
is that not necessary?
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 6
May 2026
Chapter 16.08
GENERAL REQUIREMENTS
Amended May 2026
Sections:
16.08.010 Purpose
16.08.020 Jurisdiction
16.08.030 Compliance
16.08.040 Covenants
16.08.050 No division of land
16.08.060 Relationship to Racine County regulations and state law [NEW]
16.08.070 Consistency with the Land Use Plan [NEW]
16.08.010 Purpose
The purpose of this title is to regulate and control the division of land within the town in order to promote the
public health, safety, prosperity, aesthetics and general welfare of the community and to:
A. Lessen congestion on the streets and highways;
B. Further the orderly layout and appropriate use of land;
C. Secure safety from fire and other dangers;
D. Provide adequate light and air;
E. Prevent the overcrowding of land;
F. Avoid undue concentration of population;
G. Facilitate adequate provision for transportation, water, sewerage, schools, parks, playgrounds, and other
public requirements;
H. Secure safety from flooding, water pollution, disease and other hazards;
I. Prevent flood damage to persons and property, and minimize expenditures for flood relief and flood control
projects;
J. Ensure adequate legal description and proper survey monumentation of subdivided land;
K. Ensure sound, harmonious subdivision development and community growth, and to safeguard the interests
of the home owners, the subdivider, the investor and the town;
L. Provide quality environment for human habitation;
M. Provide permanent assets to the locality and to the town;
N. Control scattered development;
O. Assure the development of land for the highest possible use and protect against deterioration and
obsolescence;
P. Provide for the administration and enforcement of this title. (Ord. dated 7/27/95 § 1)
16.08.020 Jurisdiction
This title applies to all lands and water within the town except:
A. Transfers of interest in land by will or court order;
B. Leases for a term not to exceed ten (10) years, mortgages or easements; or
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 7
C. Sale or exchange of parcels of land between owners of adjoining property where no new lot line and no
additional lots are created and the lots resulting are not reduced below the minimum size required by
these regulations, the zoning ordinance, or other applicable laws or applications of laws or ordinances.
(Ord. dated 7/27/95 § 2)
16.08.030 Compliance
No person, firm, association or corporation shall divide any land located within the jurisdictional limits of these
regulations which results in a subdivision, minor division or replat, shall be entitled to record, no building
issued and no street shall be laid out, or improvements made to land without compliance with all requirements
of this title, and:
A. The provisions of Chapter 236, Wis. Stats. as amended from time-to-time;
B. Rules of Wisconsin Department of Safety and Professional Services regulating lot size and lot elevation if
the land to be subdivided is not served by a public sewer and provisions for such service have not been
made;
C. Rules of the State Department of Transportation relating to safety of access and the preservation of the
public interest and investment in the highway system if the land owned or controlled by the subdivider
abuts on a state and county trunk highway or connecting street;
D. Rules of the Wisconsin Department of Natural Resources setting water quality standards, preventing and
abating pollution and regulation of septic systems;
E. Approved land use or land use plan components including the zoning ordinances, sanitary codes, official
maps and all other applicable ordinances of the town and county;
F. Applicable ordinances and official map of the town when the land is located within the one and one-half
mile extra-territorial review jurisdiction of the town; and
G. The policies, district standards, and density requirements of the Town of Burlington Land Use Plan (as
amended), as implemented by Section 16.08.070 of this title. (Ord. dated 7/27/95 § 3; amended May
2026)
G. The Town of Burlington 2050 Land Use Plan and any amendments thereto. No plat or certified survey map
shall be approved that is inconsistent with the density, land use district, or policies of the Land Use Plan
applicable to the subject property. The Plan Commission shall make an explicit finding of Land Use Plan
consistency as part of its recommendation on every application. (Added May 2026)
16.08.040 Covenants
Protective covenants may be required by which the subdivider intends to regulate land use in the proposed
subdivision and otherwise protect the proposed development. (Ord. dated 7/27/95 § 6(3))
16.08.050 No division of land
No division of land shall be permitted in the town unless all real estate taxes or special assessments affecting
the land sought to be divided are not delinquent. Prior to approval of the divisions of land by the town,
applicant for the division of land shall submit proof, satisfactory to the town, that there are no delinquent taxes
or special assessments affecting the parcel of land sought to be divided. (Ord. dated 6/13/88; prior code §
8.07)
16.08.060 Relationship to Racine County regulations and state law [NEW]
The requirements of this title are intended to work in conjunction with the Racine County Zoning Ordinance
(Chapter 20), Racine County sanitary and Private Onsite Wastewater Treatment System (POWTS)
regulations, Racine County shoreland and floodplain ordinances, and all applicable Wisconsin Statutes and
administrative rules. Where any provision of this title conflicts with or is less restrictive than any applicable
county ordinance, state statute, or administrative rule, the more restrictive provision shall govern, consistent
with § 236.45, Wis. Stats. No plat or certified survey map shall receive final Town approval until the subdivider
has obtained or demonstrated eligibility for all required Racine County approvals, including but not limited to
sanitary permits, shoreland-wetland permits, and floodplain compliance determinations. Cross-reference:
Racine County Code Chapter 20 (Zoning); Wisconsin Administrative Code Chapters NR 115, NR 116
(Shoreland/Floodplain); DSPS Chapter SPS 383 (POWTS). (Added May 2026)
Commented [BH5]: Because there is greater detail
mentioned later on (16.08.070) I think we could remove
the minimum parcel size information for later.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 8
16.08.070 Consistency with the Land Use Plan [NEW]
All land divisions within the Town of Burlington shall be consistent with the Town of Burlington Land Use Plan
(as amended), and with the applicable land use district policies, density standards, and natural resource
protection standards set forth therein. No plat or certified survey map shall be approved that would create lots,
parcels, or densities inconsistent with the Land Use Plan district applicable to the property. The following
minimum standards, drawn directly from the Land Use Plan, apply to all land divisions:
A. Holding Tanks Prohibited for New Construction. Holding tanks shall not be permitted as an acceptable
form of sewage disposal for new residential construction. Holding tanks may be permitted for existing
structures only when no other sewage treatment system is suitable or until public sewers are available,
consistent with Land Use Plan policy.
B. Land Use Plan Amendment Required. Where a proposed land division would require lot sizes, densities, or
uses inconsistent with the applicable Land Use Plan district, the applicant shall first obtain an amendment
to the Land Use Plan. A Land Use Plan amendment application may be submitted simultaneously with a
preliminary plat or Certified Survey Map application. The Town Board shall not approve a land division
that is inconsistent with the Land Use Plan unless and until a Land Use Plan amendment has been
approved. The Plan Commission shall serve as the recommending body for all Land Use Plan
amendments. A Land Use Plan amendment changes the Land Use Plan and its map.
C. Land Use Plan Waiver. In the alternative to a Land Use Plan amendment under subsection I, the Town
Board may grant a Land Use Plan waiver authorizing a specific land division to depart from the otherwise
applicable Land Use Plan district standards. A Land Use Plan waiver does not amend the Land Use Plan
and does not change any land use designation, district boundary, or density shown on the Land Use Plan
map; it applies only to the specific land division for which it is granted. A Land Use Plan waiver application
may be submitted simultaneously with a preliminary plat or Certified Survey Map application, and the Plan
Commission shall serve as the recommending body for all Land Use Plan waivers. The Town Board may
grant a waiver only upon finding that the waiver is consistent with the general intent and policies of the
Land Use Plan and will not be detrimental to the public health, safety, or welfare.
D. Official Map. No land division shall be approved that would conflict with or permanently foreclose the future
rights-of-way designated on the Town of Burlington official map. Where a proposed land division abuts or
traverses a designated future right-of-way, the subdivider shall reserve or dedicate the necessary right-of-
way width as a condition of plat approval.
E. Access Management. Residential land divisions in areas designated for development on the Land Use
Plan map shall be served by collector or minor streets. Direct individual lot access onto state or county
trunk highways shall be prohibited where an alternative access via a collector or local street exists or can
reasonably be provided. Frontage roads shall be required where direct highway access would otherwise
be necessary, consistent with Land Use Plan transportation policies. (Added May 2026)
Commented [BH6]: Test out some examples to see if
we run into any unintended consequences.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 9
May 2026
Chapter 16.12
LAND SUITABILITY
Amended May 2026
Sections:
16.12.010 Determination of land suitability
16.12.020 Soil tests
16.12.030 Road frontage and lot configuration [NEW]
16.12.040 Primary Environmental Corridor and environmental resource areas [NEW]
16.12.010 Determination of land suitability
A. No land shall be divided which is unsuitable for use by reason of flooding, inadequate drainage, adverse
soil or rock formations, unfavorable topography, or any other feature likely to be harmful to the health,
safety or welfare of the future residents of the proposed area. The Town Board may require the developer
to conduct and provide the results of tests to determine soil suitability, groundwater and rock conditions.
The Town Board shall recite the particular facts upon which it bases its conclusions that the land is not
suitable for residential use and afford the subdivider an opportunity to present evidence regarding such
unsuitability. Thereafter, the town may affirm, modify or withdraw its determination of unsuitability.
The Town Board may require the developer to provide an EPA audit.
B. In addition, the following criteria must be met:
1. All lands to be subdivided shall be at least one foot above the elevation of the one hundred (100) year
recurrence interval flood or, where such data is not available, five feet above the elevation of the
maximum flood on record.
2. No building sites shall be created which do not meet the standards as established in the Department of
Safety and Professional Services of the Wisconsin Administrative Code, and the Racine County code
of ordinances.
3. Any lot must be of sufficient size relative to the topography to permit the location of any building to
meet zoning requirements. The average grade must be compatible to the surrounding area. The
Town Board may grant an exception where such grant would not be contrary to the spirit or intent of
this chapter, providing the proposed building would not be of such character or quality as to
depreciate the property values of the surrounding area. (Ord. dated 7/27/95 § 5(5))
4. All lots located within a shoreland or floodplain area as defined by Racine County Zoning Ordinance
(Chapter 20) and Wisconsin Administrative Code Chapters NR 115 and NR 116 shall comply with all
applicable county shoreland setback, shoreland-wetland, and floodplain requirements. No building
site shall be created within a delineated 100-year floodplain, consistent with Land Use Plan surface
water protection policies. The boundaries of any shoreland or floodplain area affecting the proposed
division shall be delineated on all plats and certified survey maps. A Racine County floodplain inquiry
or FIRM-based determination shall be submitted with any application involving land within or adjacent
to a mapped floodplain. (Added May 2026)
5. All lots proposed within or adjacent to a Primary Environmental Corridor (PEC), Secondary
Environmental Corridor (SEC), or Isolated Natural Resource Area (INRA), as identified on the Town
of Burlington Land Use Plan map or SEWRPC maps, shall comply with the environmental corridor
density and development standards of Section 16.08.070 E. The applicant shall delineate any PEC,
SEC, or INRA boundaries on the plat or certified survey map and demonstrate that no building site is
located on steep slopes greater than twelve (12) percent, in a wetland, or within a delineated
floodplain. (Added May 2026)
5. Holding tanks shall not be permitted as an acceptable form of sewage disposal for new residential
construction in any land division. Holding tanks may be permitted for existing structures only where
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 10
no other sewage treatment system is technically suitable, or as a temporary measure until public
sewer service becomes available, subject to Racine County and DSPS approval. This prohibition is
consistent with the Town of Burlington 2050 Land Use Plan. (Added May 2026)
16.12.020 Soil tests
All plats and certified surveys which include lands not served by sanitary sewer, shall be accompanied by the
results of current pedology tests meeting the standards of the Department of Safety and Professional
Services (DSPS), the Racine County Code Administration Department, and other pertinent agencies, showing
that each proposed parcel is suitable for on-site sewage treatment. (Ord. dated 7/27/95 § 5(6); amended May
2026)
16.12.030 Road frontage and lot configuration [NEW]
A. Purpose. The requirements of this section are intended to ensure adequate access, emergency
serviceability, and compatibility with surrounding development, while discouraging lot configurations that
create substandard access, maintenance burdens, or visual incompatibility with adjacent properties.
B. Minimum Road Frontage. Every lot within a land division not served by public sanitary sewer shall meet the
minimum lot frontage, lot width, and lot area requirements of the applicable Racine County Zoning
Ordinance district and shall have direct access to a public street, unless one of the alternatives in
subsection C or F is approved by the Town Board.
C. Frontage Alternatives. The Town Board may approve a reduced frontage of not less than sixty-six (66) feet
where the applicant demonstrates all of the following:
1. The lot width at the required building setback line meets or exceeds one hundred (100) feet (the
"building envelope width" standard);
2. The lot configuration is not a flag lot as defined in subsection D;
3. The reduced frontage is necessitated by unique topographic or natural feature constraints documented
in writing by the applicant; and
4. Emergency vehicle access is not impaired, as confirmed in writing by the applicable fire department
prior to Town Board approval.
D. Flag Lots — General Prohibition and Special Circumstances Waiver. No land division shall be approved
that creates a flag lot configuration except as provided in subsection D.1 below.
1. Special Circumstances Waiver. The Town Board may, upon recommendation of the Plan Commission,
grant a waiver of the flag lot prohibition for special circumstances where all of the following findings
are made:
a. The flag lot configuration is the only practicable means of providing access to a landlocked or
geographically constrained parcel, and no alternative lot layout or public street extension is
reasonably feasible given topography, wetlands, existing development patterns, or other
documented physical constraints;
b. The access corridor (flagpole) is at least twenty (20) feet in width for its entire length and
provides an access drive that aligns with the Town’s driveway ordinance;
c. The flag lot will not adversely affect drainage, access, or the character of the surrounding area;
d. The granting of the waiver is consistent with the purpose of this title and the Town's
comprehensive plan; and
e. Conditions of approval may be imposed by the Town Board, including minimum access
corridor width greater than twenty (20) feet, paving or maintenance requirements for the access
corridor, maximum number of flag lots served by a single corridor, landscaping or screening, or
any other condition reasonably necessary to mitigate the impacts of the flag lot configuration.
2. Application. A waiver application under this subsection shall be submitted simultaneously with the
preliminary plat or Certified Survey Map application, shall include a written statement of special
circumstances with supporting documentation, and shall pay any applicable fee established by Town
Board resolution. The burden of demonstrating special circumstances rests with the applicant.
Commented [BH7]: I think these changes sound great
in theory, but will be interesting to see if there are any
issues when we actually can apply these.
Commented [BH8R2]: Unless this is trying to suggest
that the building envelope width is where the lot
becomes normal.
Commented [BH8]: Think about this one further.
Maybe create a graphic showing what this means. I
feel like this is not going to work.
Commented [BH9]: Is corridor defined? If not, we
should define it or provide more clarity for what is
meant here.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 11
3. Limitation. No more than one (1) flag lot may be created from any single parcel of record in any five (5)
year period under this waiver provision.
E. Panhandle Lots. A lot whose access corridor is at least sixty-six (66) feet wide for its entire length and
which otherwise complies with all applicable zoning and setback requirements shall not be considered a
flag lot for purposes of this section. Such panhandle lots shall nonetheless require specific Town Board
approval upon a finding that the configuration is necessitated by topography or existing parcel constraints
and that no alternative lot layout is practicable. The access road within the corridor shall comply with all
applicable standards of Chapter 12.14 of this Code. The access corridor serving a panhandle lot shall not
constitute buildable area and shall not count toward minimum lot area, and no principal or accessory
building or structure shall be erected within the access corridor.
F. Shared Access Alternative. As an alternative to reduced frontage, the Town Board may approve a shared
private driveway or access easement serving no more than three (3) fire numbers (as assigned by Racine
County 911), provided that:
1. Each lot has a minimum of sixty-six (66) feet of frontage on the shared access easement;
2. The easement meets the minimum width and private-lane standards of the Town’s driveway ordinance;
3. The driveway or access road within the easement meets the roadbed, overhead clearance, and
emergency vehicle access standards of the Town’s driveway ordinance;
4. Any bridge or structure within the easement meets the inspection, load-rating, and width standards of
the Town’s driveway ordinance;
5. A permanent maintenance agreement, binding on all lot owners and their successors, is prepared by a
Wisconsin-licensed attorney and recorded with the plat or certified survey map;
6. All lots otherwise comply with all applicable zoning, setback, and suitability standards of this title; and
7. Expansion of Use. If the shared access easement is subsequently used to serve four (4) or more fire
numbers, the easement width must be expanded to sixty-six (66) feet, thirty-three (33) feet in each
direction from the centerline, and the access road must comply fully with the private road standards of
Chapter 12.14. A maintenance agreement acceptable to the Town must be recorded at the time of
any land division that results in the fourth or subsequent fire number being served by the easement.
16.12.040 Primary Environmental Corridor and Environmental Resource Areas [NEW]
The Town of Burlington 2050 Land Use Plan identifies Primary Environmental Corridors (PEC), Secondary
Environmental Corridors (SEC), and Isolated Natural Resource Areas (INRA) on its Land Use Plan Map.
These designations are based on SEWRPC mapping and reflect areas of significant natural resource value.
The following standards apply to all land divisions involving or adjacent to these areas:
A. Mapping Required. All plats and certified survey maps shall delineate any Primary Environmental Corridor,
Secondary Environmental Corridor, or Isolated Natural Resource Area located on or within 300 feet of the
subject property, based on current SEWRPC and Racine County mapping. The source and date of the
mapping shall be noted on the plat.
B. PEC Development Standards. Development within a Primary Environmental Corridor shall be limited to
uses consistent with the Town of Burlington 2050 Land Use Plan PEC policies.
C. Plan Commission Findings. Before recommending approval of any plat or certified survey map involving
land within or adjacent to a Primary Environmental Corridor, the Plan Commission shall make a written
finding that the proposed land division is consistent with the PEC policies of the Town of Burlington 2050
Land Use Plan and will not materially diminish the ecological integrity or linear connectivity of the corridor.
D. SEC and INRA. Development proposals involving Secondary Environmental Corridors or Isolated Natural
Resource Areas shall be referred to Racine County and SEWRPC for comment prior to Plan Commission
hearing. The Town Board may impose conditions to protect the resource values of these areas as a
condition of plat or CSM approval. (Added May 2026)
Commented [BH10]: Include graphics?
Commented [BH11]: Will Chapter 12 still keep these
regulations? If so, we will want this to stay consistent.
Commented [BH12R2]: I think this may not be the
best way to express which properties are applicable for
this section. It may best to include a distance
requirement instead and clarify that any portion of a
land division that is located within these lands or within
XX amount of feet”...
Commented [BH12]: Should probably define adjacent.
Does that include properties split by right-of-way
(roads)?
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 12
May 2026
Chapter 16.14
POST-CONSTRUCTION STORMWATER MANAGEMENT
Amended May 2026
Sections:
16.14.010 Authority
16.14.020 Findings of fact
16.14.030 Purpose
16.14.040 Stormwater quality and quantity management applicability
16.14.050 Definitions
16.14.060 Technical standards
16.14.070 Performance standards
16.14.080 Permitting requirements, procedures, and fees
16.14.090 Stormwater management plan
16.14.100 Maintenance agreement
16.14.110 Financial guarantee
16.14.120 Reserved
16.14.130 Enforcement
16.14.140 Appeals
16.14.010 Authority
This chapter is adopted by the Town Board under the authority granted by Section 60.627, for towns, Wis.
Stats. (Ord. dated 3/24/05)
16.14.020 Findings of fact
The Town Board finds that uncontrolled, post-construction runoff has a significant impact upon water
resources and the health, safety and general welfare of the community and diminishes the public enjoyment
and use of natural resources. Specifically, uncontrolled post-construction runoff can:
A. Degrade physical stream habitat by increasing stream bank erosion, increasing streambed scour,
diminishing groundwater recharge, diminishing stream base flows and increasing stream temperature;
B. Diminish the capacity of lakes and streams to support fish, aquatic life, recreational and water supply uses
by increasing pollutant loading of sediment, suspended solids, nutrients, heavy metals, bacteria,
pathogens and other urban pollutants;
C. Alter wetland communities by changing wetland hydrology and by increasing pollutant loads;
D. Reduce the quality of groundwater by increasing pollutant loading;
E. Threaten public health, safety, property, and general welfare by overtaxing storm sewers, drainage ways,
and other minor drainage facilities;
F. Threaten public health, safety, property, and general welfare by increasing major flood peaks and volumes;
G. Undermine floodplain management efforts by increasing the incidence and levels of flooding; and
H. Aggravate excessive infiltration and inflow of water into sanitary sewer connections during peak storm
events causing the conveyance system to surcharge, overflow, or backup into basements. (Ord. dated
3/24/05)
16.14.030 Purpose
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 13
This chapter integrates federal and state construction post-construction site stormwater quality standards with
duties to reasonably manage the quantity of water runoff for regional flood abatement. (Ord. dated 3/24/05)
16.14.040 Stormwater quality and quantity management applicability
A. The water quality management duties apply to property development disturbing one or more acres and the
water quantity management duties apply to subdivisions, condominium developments, Planned Unit
Developments, multifamily housing, commercial developments, and private recreational developments,
unless the site is exempt under subsection B, C, or D of this section.
B. A site meeting any one of the following criteria is exempt from stormwater quality requirements:
1. A redevelopment post-construction site with no increase in exposed parking lots or roads;
2. A post-construction site with less than ten (10) percent connected imperviousness based on complete
development of the post-construction site, provided the cumulative area of all parking lots and
rooftops is less than one acre;
3. Non-point discharges from agricultural facilities and practices;
4. Non-point discharges from silviculture activities;
5. Routine maintenance for project sites under five acres of land disturbance if performed to maintain the
original line and grade, hydraulic capacity or original purpose of the facility;
6. Underground utility construction such as water, sewer, and fiber optic lines. This exemption does not
apply to the construction of any aboveground structures associated with utility construction.
C. Water quantity management duties do not apply if:
1. Residential infill where the lot is five acres or less, the development is exclusively residential, the net
increase in the area of impervious surface is less than twenty (20) percent of the area of the site; and
each boundary of the site is contiguous to: sites that contain earlier development served by sanitary
sewers, streets, or public water supply when the governmental unit receives the plans for the new
development or parkland; or other public land, a utility right-of-way, or a watercourse;
2. Sites where the area of impervious surface after development will be five percent or less of the total
area of the site;
3. Recreational trails if the trail is less than or equal to ten (10) feet in width and has a continuous
pervious buffer at least five feet wide on each side, disregarding interruption by streets, driveways, or
other impervious surfaces crossing the trail; or
4. Notwithstanding the applicability requirements in subsection (C)(1) of this section, this chapter applies
to post-construction sites of any size that, in the opinion of the project administrator, is likely to result
in runoff that exceeds the capacity of the existing drainage facilities or the level of flooding protection
in a watercourse that causes undue channel erosion, that increases water pollution by scouring or the
transportation of particulate matter or that endangers property or public safety.
D. Town Board Exemption. The Town Board may, at its sole discretion, waive the requirements of this chapter
for any development or activity.
E. Comity. State agencies should design and incorporate best management practices for surface water
quality and stormwater quantity management for new impervious surfaces. The runoff management
techniques should be the same as flood abatement plans and techniques utilized by local governments in
the watershed. The lead agency preparing an environmental assessment for a federal or state project
shall identify the mitigating runoff management techniques to prevent increases in peak flood flows from
new impervious areas. (Ord. dated 3/24/05)
16.14.050 Definitions
As used in this chapter:
"Administering authority" means the Town of Burlington or their designee, municipal employees under Section
60.627, Wis. Stats., as designated by the Town Board to administer this chapter.
"Agricultural facilities and practices" has the meaning given in Section 281.16, Wis. Stats.
"Average annual rainfall" means a calendar year of precipitation, excluding snow, which is considered typical.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 14
"Best management practice" or "BMP" means structural or nonstructural measures, practices, techniques, or
devices employed to: (1) Avoid or minimize sediment or pollutants carried in runoff to waters of the state; or
(2) Manage the rate or volume of runoff.
"Business day" means a day the office of the project administrator is routinely and customarily open for
business.
"Cease and desist order" means a court-issued order to halt land-disturbing construction activity that is being
conducted without the required permit.
"Combined sewer system" means a system for conveying both sanitary sewage and stormwater runoff.
"Connected imperviousness" means an impervious surface that is directly connected to a separate storm
sewer or water of the state via an impervious flow path.
"Critical time" means the period starting at the time of peak rainfall intensity with a duration equal to the time
of concentration of the watershed.
"Design storm" means a hypothetical discrete rainstorm characterized by a specific duration, temporal
distribution, rainfall intensity, return frequency, and total depth of rainfall.
"Development" means construction of residential, commercial, industrial or institutional land uses and
associated roads, including redevelopment.
"Division of land" means the creation from one parcel of two or more parcels or building sites of one and one-
half or fewer acres each in area where such creation occurs at one time or through the successive partition
within a five-year period.
"Effective infiltration area" means the area of the infiltration system that is used to infiltrate runoff and does not
include the area used for site access, berms or pretreatment.
"Erosion" means the process by which the land's surface is worn away by the action of wind, water, ice or
gravity.
"Exceptional resource waters" mean waters listed in Section NR 102.11, Wis. Adm. Code.
"Extraterritorial" means the unincorporated area within three miles of the corporate limits of a first, second, or
third class city, or within one and one-half miles of a fourth class city or village.
"Final stabilization" means that all land-disturbing construction activities at the construction site have been
completed and that a uniform, perennial, vegetative cover has been established, with a density of at least
seventy (70) percent of the cover, for the unpaved areas and areas not covered by permanent structures, or
employment of equivalent permanent stabilization measures.
"Financial guarantee" means a performance bond, maintenance bond, surety bond, irrevocable letter of
credit, or similar guarantees submitted to the project administrator by the responsible party to assure that
requirements of the ordinance are carried out in compliance with the stormwater management plan.
"Governing body" means the Town Board.
"Impervious surface" means any pavement or structural element that prevents rain, surface water runoff, or
melting snow from infiltrating into the ground below, including, but not limited to, roofs and paved roads,
driveways, and parking lots.
"In-fill area" means an undeveloped area of land located within existing development.
"Infiltration" means the entry of precipitation or runoff into or through the soil.
"Infiltration system" means a device or practice such as a basin, trench, rain garden or swale designed
specifically to encourage infiltration, but does not include natural infiltration in pervious surfaces such as
lawns, redirecting of rooftop downspouts onto lawns or minimal infiltration from practices, such as swales or
roadside channels designed for conveyance and pollutant removal only.
"Karst feature" means an area or surficial geologic feature subject to bedrock dissolution so that it is likely to
provide a conduit to groundwater, and may include caves, enlarged fractures, mine features, exposed
bedrock surfaces, sinkholes, springs, seeps or swallets.
"Land-disturbing construction activity" means any man-made alteration of the land surface resulting in a
change in the topography or existing vegetative or nonvegetative soil cover, that may result in runoff and lead
to an increase in soil erosion and movement of sediment into waters of the state. Land-disturbing construction
activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading
activities.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 15
"Maintenance agreement" means a legal document that provides for long-term maintenance of stormwater
management practices.
"MEP" or "maximum extent practicable" means a level of implementing best management practices in order
to achieve a performance standard specified in this chapter which takes into account the best available
technology, cost effectiveness and other competing issues such as human safety and welfare, endangered
and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to
meet the performance standards and may vary based on the performance standard and site conditions.
"New development" means development resulting from the conversion of previously undeveloped land or
agricultural land uses.
"Off-site" means located outside the property boundary described in the permit application.
"On-site" means located within the property boundary described in the permit application.
"Ordinary high water mark" has the meaning given in Section NR 115.03(6), Wis. Adm. Code.
"Outstanding resource waters" mean waters listed in Section NR 102.10, Wis. Adm. Code.
"Percent fines" means the percentage of a given sample of soil, which passes through a No. 200 sieve.
"Performance standard" means a narrative or measurable number specifying the minimum acceptable
outcome for a facility or practice.
"Permit" means a written authorization made by the project administrator to the applicant to conduct land-
disturbing construction activity or to discharge post-construction runoff to waters of the state.
"Permit administration fee" means a sum of money paid to the project administrator by the permit applicant for
the purpose of recouping the expenses incurred by the authority in administering the permit.
"Pervious surface" means an area that releases as runoff a small portion of the precipitation that falls on it.
Lawns, gardens, parks, forests, or other similar vegetated areas are examples of surfaces that typically are
pervious.
"Pollutant" has the meaning given in Section 283.01(13), Wis. Stats.
"Pollution" has the meaning given in Section 281.01(10), Wis. Stats.
"Post-construction site" means a construction site following the completion of land-disturbing construction
activity and final site stabilization.
"Pre-development condition" means the extent and distribution of land cover types present before the
initiation of land-disturbing construction activity; assuming that all land uses prior to development activity are
managed in an environmentally sound manner.
"Preventive action limit" has the meaning given in Section NR 140.05(17), Wis. Adm. Code.
"Project administrator" means the Town of Burlington or their designee.
"Public right-of-way" means any road, alley, street, parking lot, sidewalk, plaza, mall, or pathway owned by or
dedicated to a governmental unit.
"Recreational trail" means a path that is: (1) Distinctly set apart from a roadway, street, or sidewalk; (2)
Designed for activities such as jogging, walking, hiking, bird-watching, bicycle riding, roller skating, or similar
recreational activities not involving the use of motorized vehicles; and (3) Not a sidewalk according to Section
340.01(58), Wis. Stats.
"Redevelopment" means new construction, modification or replacement of older development.
"Regional flood" means the peak flow and peak elevation of water with a one percent probability of occurring
during any one year, considering rainfall time and intensity patterns, rainfall duration, area distribution,
antecedent moisture, and snow melt. The common misnomer, "one hundred (100) year flood or floodplain"
implies a temporal element rather than a one in one hundred (100) random probability of the event.
"Responsible party" means any entity holding fee title to the property or other person contracted or obligated
by other agreement to implement and maintain post-construction stormwater BMPs.
"Runoff" means stormwater or precipitation including rain, snow, or ice melt or similar water that moves on the
land surface via sheet or channelized flow.
"Separate storm sewer" means a conveyance or system of conveyances including roads with drainage
systems, streets, catch basins, curbs, gutters, ditches, constructed channels or storm drains, which: (1) Is
designed or used for collecting water or conveying runoff; (2) Is not part of a combined sewer system; (3) Is
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 16
not draining to a stormwater treatment device or system; and (4) Discharges directly or indirectly to waters of
the state.
"Site" means the entire area included in the legal description of the land on which the land-disturbing
construction activity occurred.
"Stop work order" means an order issued by the project administrator, which requires that all construction
activity on the site be stopped.
"Stormwater management plan" means a comprehensive plan designed to reduce the discharge of pollutants
from stormwater after the site has undergone final stabilization following completion of the construction
activity.
"Stormwater management system plan" is a comprehensive plan designed to reduce the discharge of runoff
and pollutants from hydrologic units on a regional or municipal scale.
"Technical standard" means a document that specifies design, predicted performance, and operation and
maintenance specifications for a material, device, or method.
"Time of concentration" means the time period for the furthest runoff from the outlet of a watershed to
contribute to flow at the watershed outlet.
"Top of the channel" means an edge, or point on the landscape, landward from the ordinary high water mark
of a surface water of the state, where the slope of the land begins to be less than twelve (12) percent
continually for at least fifty (50) feet. If the slope of the land is twelve (12) percent or less continually for the
initial fifty (50) feet, landward from the ordinary high water mark, the top of the channel is the ordinary high
water mark.
"TR-55" means the United States Department of Agriculture, Natural Resources Conservation Service
(previously Soil Conservation Service), Urban Hydrology for Small Watersheds, Second Edition, Technical
Release 55, June 1986.
"Type II distribution" means a rainfall type curve as established in the United States Department of
Agriculture, Soil Conservation Service, Technical Paper 149, published 1973. The Type II curve is applicable
to all of Wisconsin and represents the most intense storm pattern.
"Water quality management" means the stormwater standards and duties established under the Clean Water
Act, 33 U.S.C. 1251 et seq., parallel state law regulating the discharge of pollutants, and implementing
regulations.
"Waters of the state" has the meaning given in Section 281.01(18), Wis. Stats. (Ord. dated 3/24/05)
16.14.060 Technical standards
The following methods shall be used in designing the water quality, peak flow shaving and infiltration
components of stormwater practices needed to meet the requirements of this chapter:
A. Technical standards identified, developed, or disseminated by the Wisconsin Department of Natural
Resources under Subchapter V of Chapter NR 151, Wis. Adm. Code.
B. Where technical standards have not been identified or developed by the Wisconsin Department of Natural
Resources, other technical standards may be used provided that the methods have been approved by the
project administrator.
C. The most recent rainfall data available from the Southeastern Wisconsin Regional Planning Commission or
more protective data shall be the basis for the analyses required by this chapter. (Ord. dated 3/24/05)
D. Technical Standards — Current DNR Lis t. Notwithstanding subsections A through C of this section, the
Town recognizes that the Wisconsin Department of Natural Resources updates its list of approved
technical standards for post-construction stormwater management on an ongoing basis. The most current
DNR-approved technical standards, as published on the DNR website under NR 151, shall be deemed
acceptable for use under this chapter without requiring amendment to this ordinance. Where a newer
DNR-approved method provides equivalent or greater protection than TR-55 or other methods referenced
in this chapter, the project administrator may approve its use. (Added May 2026)
16.14.070 Performance standards
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 17
A. Responsible Party. The responsible party shall implement a post-construction stormwater management
plan that incorporates the requirements of this section.
B. Plan. A written stormwater quality and quantity management plan in accordance with Section 16.14.090 of
this chapter shall be developed and implemented for each post-construction site.
C. Requirements. The water quality plan required under subsection B of this section shall include the
following:
1. Total Suspended Solids. BMPs shall be designed, installed, and maintained to control total suspended
solids carried in runoff from the post-construction site as follows:
a. For new development, by design, reduce to the maximum extent practicable, the total
suspended solids load by eighty (80) percent, based on the average annual rainfall, as compared
to no runoff management controls. No person shall be required to exceed an eighty (80) percent
total suspended solids reduction to meet the requirements of this subsection.
b. For redevelopment, by design, reduce to the maximum extent practicable, the total suspended
solids load by forty (40) percent, based on the average annual rainfall, as compared to no runoff
management controls. No person shall be required to exceed a forty (40) percent total suspended
solids reduction to meet the requirements of this subsection.
c. For in-fill development under five acres that occurs within ten (10) years after the effective date
of this chapter (February 2005), by design, reduce to the maximum extent practicable, the total
suspended solids load by forty (40) percent, based on an average annual rainfall, as compared to
no runoff management controls. No person shall be required to exceed a forty (40) percent total
suspended solids reduction to meet the requirements of this subsection.
d. For in-fill development that occurs ten (10) or more years after the effective date of this chapter
(February 2005), by design, reduce to the maximum extent practicable, the total suspended
solids load by eighty (80) percent, based on an average annual rainfall, as compared to no runoff
management controls. No person shall be required to exceed an eighty (80) percent total
suspended solids reduction to meet the requirements of this subsection.
e. Notwithstanding subsections (C)(1)(a) through (C)(1)(d) of this section, if the design cannot
achieve the applicable total suspended solids reduction specified, the stormwater management
plan shall include a written and site-specific explanation why that level of reduction is not attained
and the total suspended solids load shall be reduced to the maximum extent practicable.
2. Water Quantity and Management of Peak Runoff.
a. BMPs shall manage the volume, timing, and peak flow rate of runoff to prevent increases in the
regional flood and stream bank erosion rates.
b. These BMPs may be implemented on either a watershed basis or an individual site basis.
c. When implemented on a watershed basis, the BMPs implemented at a particular site shall
comply with the findings of the relevant local or regional stormwater management plan, rather
than subsection (C)(2)(d) of this section.
d. Unless otherwise provided for in this chapter, all land development activities subject to this
chapter shall establish on-site management resources to control the peak flow rates of
stormwater discharge from the site. Infiltration of stormwater runoff from driveways, sidewalks,
rooftops, and landscaped areas shall be incorporated to the maximum extent technically and
financially practical to provide volume control in addition to control peak flows. On-site
management measures shall be used to meet the following minimum performance standards: (A)
The peak flow rates of stormwater runoff from the development shall not exceed those calculated
for the series of design storms specified in subsection (C)(2)(d) occurring under pre-development
conditions. Discharge velocities must be nonerosive to discharge locations, outfall channels, and
receiving streams. (B) At a minimum, post-development peak flow rates for the two-year and the
ten (10) year rainfall events shall be controlled either at or below pre-development discharge
rates and post-development peak flow rates for the one hundred (100) year rainfall events shall
be controlled either at or below the twenty-five (25) year rainfall event pre-development discharge
rates. (C) When the NRCS TR-55 method is used to calculate peak flow discharge rates and
runoff volumes for the pre-development condition, NRCS curve numbers shall not exceed the
following maximums for cropland areas — Hydrologic Soil Group A: 56; B: 70; C: 79; D: 83. (D)
Stormwater discharges to wetlands may be appropriate when the increase or decrease in runoff
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 18
volumes do not negatively change the wetland functional values, assessed using a methodology
acceptable to the Wisconsin Department of Natural Resources.
3. Infiltration. BMPs shall be designed, installed, and maintained to infiltrate runoff to the maximum extent
practicable in accordance with this subsection, except as provided in subsections (C)(3)(e) through
(C)(3)(g).
a. For residential developments, one of the following shall be met: (i) Infiltrate sufficient runoff
volume so that the post-development infiltration volume shall be at least equal to the pre-
development infiltration volume, based on an average annual rainfall, with no more than one
percent of the project site required as an effective infiltration area; or (ii) Infiltrate twenty-five (25)
percent of the post-development runoff from the two-year, twenty-four (24) hour design storm with
a Type II distribution, with no more than one percent of the project site required as an effective
infiltration area.
b. For nonresidential development, including commercial, industrial, and institutional
development, one of the following shall be met: (i) Infiltrate sufficient runoff volume so that the
post-development infiltration volume shall be at least sixty (60) percent of the pre-development
infiltration volume, based on an average annual rainfall, with no more than two percent of the
project site required as an effective infiltration area; or (ii) Infiltrate ten (10) percent of the runoff
from the two-year, twenty-four (24) hour design storm with a Type II distribution, with no more
than two percent of the project site required as an effective infiltration area.
c. Pre-development condition shall be as specified in subsection (C)(3)(b)(ii).
d. Pretreatment shall be required for parking lot runoff and for runoff from new road construction
in commercial, industrial and institutional areas before infiltration. Pretreatment options may
include oil/grease separation, sedimentation, biofiltration, filtration, swales or filter strips.
e. Infiltration Exclusions: the following areas are prohibited from meeting the infiltration
requirements: (i) Tier 1 industrial facility areas (NR 216.21(2)(a)); (ii) Storage and loading areas of
tier 2 industrial facilities (NR 216.21(2)(b)); (iii) Fueling and vehicle maintenance areas; (iv) Areas
within 1,000 feet upgradient or 100 feet downgradient of karst features; (v) Areas with less than
three feet separation to seasonal high groundwater or bedrock (except roof runoff); (vi) Areas with
less than five feet separation for industrial/commercial/institutional parking and arterial residential
roads; (vii) Areas within 400 feet of a community water system well or 100 feet of a private well
(for commercial/industrial/institutional or regional residential devices); (viii) Areas with
contaminants of concern in the infiltration soil; (ix) Areas without qualifying soil fines percentage
between the infiltration system and seasonal high groundwater.
f. Infiltration Exemptions — the following are not required to meet infiltration requirements: (i)
Areas with soil infiltration rate less than 0.6 inches/hour; (ii) Parking areas and access roads
under 5,000 sq. ft. for commercial/industrial development; (iii) Redevelopment post-construction
sites; (iv) In-fill development areas less than five acres; (v) Infiltration areas when the soil is
frozen; (vi) Roads in commercial, industrial, institutional, and arterial residential land uses.
g. Infiltration systems shall, to the extent technically and economically feasible, minimize
pollutants infiltrating to groundwater and shall maintain compliance with the preventive action limit
under Chapter NR 140, Wis. Adm. Code. The discharge from BMPs shall remain below the
enforcement standard at the point of standards application.
4. Protective Areas.
a. Protective area means an area commencing at the top of the channel of lakes, streams and
rivers, or at the delineated boundary of wetlands, of the following minimum widths measured
horizontally from the top of the channel or wetland boundary to the closest impervious surface: (i)
Outstanding and exceptional resource waters, and wetlands in areas of special natural resource
interest: 75 feet; (ii) Perennial and intermittent streams (per USGS 7.5-minute or county soil
survey): 50 feet; (iii) Lakes: 50 feet; (iv) Highly susceptible wetlands (fens, sedge meadows, bogs,
low prairies, conifer swamps, shrub swamps, forested wetlands, fresh wet meadows, shallow
marshes, deep marshes, seasonally flooded basins): 50 feet; (v) Less susceptible wetlands: 10
percent of average wetland width, minimum 10 feet, maximum 30 feet; (vi) Concentrated flow
channels with drainage areas greater than 130 acres: 10 feet.
b. This subsection applies to post-construction sites within a protective area, except those
exempted under subsection (C)(4)(d).
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 19
c. Within protective areas: (i) Impervious surfaces shall be kept out to the maximum extent
practicable; (ii) Where land-disturbing activity occurs and no impervious surface is present,
adequate vegetative cover of at least 70 percent shall be established and maintained; (iii) BMPs
such as filter strips, swales, or wet detention basins may be located in the protective area.
d. Protective area requirements do not apply to: (i) Redevelopment post-construction sites; (ii) In-
fill development under 5 acres; (iii) Structures crossing or accessing surface waters (boat
landings, bridges, culverts); (iv) Structures per Section 59.692(1v), Wis. Stats.; (v) Sites from
which runoff does not enter the surface water, except as needed for bank stability.
5. Fueling and Vehicle Maintenance Areas. Fueling and vehicle maintenance areas shall, to the maximum
extent practicable, have BMPs designed, installed, and maintained to reduce petroleum within runoff,
such that the runoff that enters waters of the state contains no visible petroleum sheen.
6. Swale Treatment for Transportation Facilities. Transportation facilities using swales for runoff
conveyance and pollutant removal meet the requirements of this section if the swales are designed to
the maximum extent practicable to be vegetated and to carry runoff for at least two hundred (200) feet
with a flow velocity no greater than one and one-half feet per second based on a two-year, twenty-
four (24) hour design storm. The project administrator may require other provisions on transportation
facilities with average daily travel greater than 2,500 vehicles discharging to outstanding resource
waters, exceptional resource waters, Section 303(d) impaired waters, or waters with targeted
performance standards under NR 151.004.
D. General Considerations for On-Site and Off-Site Stormwater Management Measures. Natural topography
and land cover features shall be preserved and used to the extent possible. Emergency overland flow
shall be provided for all stormwater facilities. BMPs for water quantity management shall utilize, in order
of preference: (1) Preservation of natural site features; (2) Preservation of existing natural streams and
drainageways; (3) Minimization of new impervious surfaces; (4) Conveyance in open vegetated channels;
(5) Structures providing both quantity and quality control (multi-site preferred); (6) Structures providing
only quantity control (multi-site preferred). (Ord. dated 3/24/05)
E. Location and Regional Treatment Option. BMPs may be located on-site or off-site as part of a regional
stormwater device within the same watershed. The project administrator may approve off-site measures
where a stormwater management system plan approved by the Town covers the post-construction runoff,
and the off-site facility is in place, adequately sized, and has a legally obligated entity responsible for
long-term operation and maintenance. Where a regional treatment option exempts the applicant from on-
site requirements, a fee reflecting an equitable share of land, design, construction, and maintenance
costs shall be paid. (Ord. dated 3/24/05)
F. Alternate Requirements. The project administrator may establish stormwater management requirements
more stringent than those set forth in this section if an added level of protection is needed to protect
sensitive resources. (Ord. dated 3/24/05)
16.14.080 Permitting requirements, procedures, and fees
A. Approval Required. No responsible party may undertake a land-disturbing construction activity subject to
this chapter without receiving a post-construction runoff approval letter from the project administrator prior
to commencing the proposed activity.
B. Any responsible party desiring a post-construction stormwater management approval shall submit to the
project administrator a stormwater management submittal according to the requirements of this chapter.
1. Unless specifically excepted, a stormwater management submittal must contain a stormwater
management plan and a maintenance agreement.
2. The stormwater management plan shall be prepared to meet the requirements of Sections 16.14.070
and 16.14.090; the maintenance agreement shall be prepared to meet the requirements of Section
16.14.100; the financial guarantee shall meet the requirements of Section 16.14.110.
C. Review and Approval. The project administrator shall review any stormwater management plan submittal
as follows:
1. Within twenty (20) business days of receipt of a complete submittal, the project administrator shall
inform the applicant whether the plan and maintenance agreement are approved or disapproved.
2. If approved, the project administrator shall issue a stormwater runoff management approval letter.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 20
3. If disapproved, the project administrator shall detail in writing the reasons for disapproval.
4. The project administrator may request additional information. If additional information is submitted, the
project administrator shall have fifteen (15) business days from receipt to inform the applicant of
approval or disapproval.
D. Stormwater Approvals. All approvals issued under this chapter shall be subject to the following conditions:
(1) The responsible party shall design and install all structural or identify nonstructural stormwater
management measures in accordance with the approved plan; (2) The responsible party shall notify the
project administrator at least three business days before commencing work and within three business
days upon completion; (3) Practice installations shall be certified as-built and must pass a final inspection;
(4) The responsible party shall maintain all stormwater management practices until responsibility is
transferred per the maintenance agreement; (5) The responsible party consents to special assessment or
charge against the financial guarantee for work by the project administrator to bring measures into
conformance; (6) The responsible party shall repair damage to municipal facilities caused by non-
compliant runoff activities; (7) The responsible party shall permit property access for compliance
inspections; (8) Where site development involves increases in peak rate or total volume of runoff, the
project administrator may require legal arrangements with affected property owners.
E. Approval Conditions. Approvals may include reasonable and necessary conditions beyond those needed to
meet performance standards, including a financial guarantee as provided in Section 16.14.110.
F. Approval Duration. Approvals shall be valid from the date of issuance through the date the project
administrator notifies the responsible party that all stormwater management practices have passed the
final inspection. (Ord. dated 3/24/05)
16.14.090 Stormwater management plan
A. Plan Requirements. The stormwater management plan required under Section 16.14.080(B) shall contain
at a minimum the following information:
1. Name, address, and telephone number for the following or their designees: landowner; developer;
project engineer for practice design and certification; person(s) responsible for installation of
stormwater management practices; and person(s) responsible for maintenance of stormwater
management practices prior to the transfer, if any, of maintenance responsibility to another party.
2. A proper legal description of the property proposed to be developed, referenced to the U.S. Public
Land Survey system or to block and lot numbers within a recorded land subdivision plat.
3. Pre-development site conditions, including: (a) One or more site maps at a scale of not less than 1" =
100' showing: site location and legal description; predominant soil types and hydrologic soil groups;
existing cover type and condition; topographic contours not to exceed two feet; topography and
drainage network for contiguous properties; watercourses that may affect or be affected by runoff;
flow path and direction for all stormwater conveyance sections; watershed boundaries; lakes,
streams, wetlands, channels, ditches, and other watercourses; regional floodplain limits; location of
wells and wellhead protection areas. (b) Hydrology and pollutant loading computations with all major
assumptions stated and geographic areas clearly referenced to the required maps.
4. Post-development site conditions, including: (a) Explanation of provisions to preserve natural
topography and land cover to minimize changes in peak flow runoff; (b) Explanation of restrictions
imposed by wellhead protection plans; (c) Site maps showing post-construction conditions including
pervious areas, impervious surfaces, topographic contours, drainage network, drainage easements,
maintenance easements, flow paths, stormwater management practice locations and types,
conveyance system routing to the nearest adequate outlet, watershed boundaries, and any changes
to watercourses; (d) Hydrology and pollutant loading computations for each discharge point; (e)
Results of soil and groundwater investigations; detailed drawings of all permanent stormwater
conveyance and treatment practices.
5. A description and installation schedule for the stormwater management practices needed to meet the
performance standards in Section 16.14.070.
6. A maintenance plan developed for the life of each stormwater management practice including required
maintenance activities and schedule.
7. Cost estimates for the construction, operation, and maintenance of each stormwater management
practice.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 21
8. Other information requested in writing by the project administrator to determine compliance with this
chapter.
9. All site investigations, plans, designs, computations, and drawings shall be certified by a licensed
professional engineer.
B. Alternate Requirements. The project administrator may prescribe alternative submittal requirements for
applicants seeking an exemption to on-site stormwater management performance standards under
Section 16.14.070(E). (Ord. dated 3/24/05)
16.14.100 Maintenance agreement
A. Maintenance Agreement Required. The maintenance agreement required under Section 16.14.080(B) for
stormwater management practices shall be an agreement between the Town of Burlington and the
responsible party to provide for maintenance of stormwater practices beyond the duration period of this
permit. The maintenance agreement shall be filed with the county register of deeds as a property deed
restriction so that it is binding upon all subsequent owners of the land served by the stormwater
management practices.
B. Agreement Provisions. The maintenance agreement shall contain the following information and provisions:
(1) Identification of the stormwater facilities and designation of the drainage area served; (2) A schedule
for regular maintenance of each aspect of the stormwater management system; (3) Identification of the
responsible party(s) or organization responsible for long-term maintenance; (4) Requirement that the
responsible party maintain stormwater management practices in accordance with the schedule; (5)
Authorization for the project administrator, its designee and Racine County to access the property to
conduct inspections; (6) Agreement that the responsible party for long-term maintenance shall be notified
of maintenance problems and shall undertake corrective actions within a reasonable time frame set by
the project administrator; (7) Authorization for the project administrator to perform corrective actions if the
responsible party does not make required corrections, with costs entered on the tax rolls as a special
charge pursuant to Subchapter VII of Chapter 66, Wis. Stats. (Ord. dated 3/24/05)
16.14.110 Financial guarantee
A. Establishment of the Guarantee. The project administrator may require the submittal of a financial
guarantee, the form and type of which shall be acceptable to the project administrator. The financial
guarantee shall be in an amount determined by the project administrator to be the estimated cost of
construction and the estimated cost of maintenance of the stormwater management practices during the
period which the designated party in the maintenance agreement has maintenance responsibility. The
financial guarantee shall give the project administrator the authorization to use the funds to complete the
stormwater management practices if the responsible party defaults or does not properly implement the
approved stormwater management plan, upon written notice to the responsible party.
B. Conditions for Release. Conditions for the release of the financial guarantee are as follows:
1. The project administrator shall release the portion of the financial guarantee, less any costs incurred by
the Town of Burlington to complete installation of practices, upon submission of "as built plans" by a
licensed professional engineer. The project administrator may make provisions for a partial pro-rata
release based on the completion of various development stages.
2. The project administrator shall release the portion of the financial guarantee to assure maintenance of
stormwater practices, less any costs incurred by the Town of Burlington, at such time that the
responsibility for practice maintenance is passed on to another entity via an approved maintenance
agreement. (Ord. dated 3/24/05)
16.14.120 Reserved
Reserved.
16.14.130 Enforcement
A. Any land-disturbing construction activity or post-construction runoff initiated after the effective date of the
ordinance codified in this chapter by any person subject to the ordinance provisions shall be deemed a
violation unless conducted in accordance with the requirements of this chapter.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 22
B. The project administrator shall notify the responsible party of any noncomplying land-disturbing
construction activity or post-construction runoff. The notice shall describe the nature of the violation,
remedial actions needed, a schedule for remedial action, or additional enforcement action which may be
taken.
C. If the violations are likely to result in damage to properties, public facilities, or waters of the state, the
project administrator may enter the land and take corrective actions necessary to prevent such damage.
The costs incurred by the project administrator plus interest and legal costs shall be paid by the
responsible party.
D. If the project administrator determines that any person is in violation of this chapter or a stormwater permit,
the authority may issue a notice of violation, a stop work order, a cease and desist order, or revoke the
permit, or refer the noncompliance to the Town Attorney for civil enforcement, penalties, injunctive orders
or other appropriate relief.
E. Every violation of this chapter is a public nuisance. Any person who violates this chapter shall be subject to
a forfeiture of not less than one hundred dollars ($100.00) or more than one thousand dollars ($1,000.00)
per offense, together with the costs of prosecution. Each day each violation continues shall constitute a
separate offense.
F. When the project administrator determines that the holder of a permit has failed to follow practices or
comply with schedules in a stormwater management plan, the project administrator may enter upon the
land and perform the work necessary to bring the condition into conformance with the approved plan.
Costs shall be deducted from any financial security posted pursuant to Section 16.14.110 or, where no
security exists or is insufficient, entered on the tax roll as a special charge. (Ord. dated 3/24/05)
16.14.140 Appeals
A. Town Board. The Town Board shall hear and decide appeals where it is alleged that there is error in any
order, decision or determination made by the project administrator in administering stormwater quality or
quantity duties arising from development. The board may authorize variances that are not contrary to the
public interest, and where owing to special conditions unique to the property, a literal enforcement would
be an unnecessary hardship.
B. Who May Appeal. Appeals to the Town Board may be taken by any aggrieved person or by an officer,
department, board, or bureau of the Town of Burlington affected by any decision of the project
administrator. (Ord. dated 3/24/05)
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 23
May 2026
Chapter 16.15
CONCEPTUAL PLAN
Amended May 2026
Sections:
16.15.010 Preconceptual meeting
16.15.020 Conceptual plan data
16.15.030 Conceptual plan review
16.15.010 Preconceptual meeting
Prior to submitting a conceptual plan or preliminary plat to the Plan Commission for review, a cost recovery
agreement, on a form prepared and approved by the Town, must be signed and a pre-conceptual meeting
must be held with the Town Engineer, the Town Planner and applicable town staff members. The meeting will
address the land division feasibility, protection of existing natural features, the land division process, and
required submittals. This pre-conceptual meeting satisfies the presubmission conceptual review required
under § 236.105, Wis. Stats. Opinions and comments provided at the preconceptual meeting are not binding
on the Town, the Plan Commission, the Town Board, or the subdivider.
16.15.020 Conceptual plan submittal requirements
The purpose of the conceptual plan is to receive initial feedback from the Plan Commission regarding the
feasibility of the proposed land division. The conceptual plan should include the following:
A. An accurate property boundary from a property survey or site plan.
B. Adjacent highways, roads, and streets labeled on the plan.
C. All natural features, including but not limited to Primary Environmental Corridor, Floodplain, and Wetlands
shown on the plan.
D. Proposed stormwater management facility areas, a primary focus being storm water infiltration areas.
E. Proposed connections to surrounding properties.
F. Proposed lot layout with minimum sizes.
G. Existing and, if applicable, proposed zoning classifications.
H. If the plan includes construction in phases, each phase shall be defined, and estimated start and finish
dates shall be noted.
16.15.030 Conceptual plan review
Before submitting a conceptual plan for review, the petitioner shall prepare a conceptual plan complying with
this title. The necessary applications, fees, and two (2) copies of the conceptual plan and any supporting
information must be submitted to the Town Clerk at least twenty-one (21) days before the next Plan
Commission meeting at which the matter is to be considered. An electronic copy in PDF format shall be
submitted to the Town Clerk and Town Administrator simultaneously with any paper copies.
It shall be the subdivider's responsibility to post the town-supplied notification sign at least twenty-one (21)
days prior to that hearing date.
The Town Engineer and the Town Planner will review the submitted conceptual plan and notify the subdivider
when the conceptual plan is scheduled for a Plan Commission meeting. Following notice from the Town
Commented [BH13]: Or Town Planner. It is probably
fine as is but if both of us sat in on their meeting and
billed time they could point to this and say it only
mentioned the Town Engineer.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 24
Engineer or the Town Planner, copies of the conceptual plan and supplemental information must be
submitted to the Town Clerk at least eight (8) days prior to the Plan Commission meeting, in such number as
directed by the Town Clerk, together with an electronic copy in PDF format.
The conceptual plan does not receive an approval or denial from the Plan Commission or Town Board. The
concept is presented solely for Town comment.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 25
May 2026
Chapter 16.16
PRELIMINARY PLATS
Amended May 2026
Sections:
16.16.010 Preliminary plat submittal requirements
16.16.020 Street plans and profiles
16.16.030 Preliminary plat review for subdivisions
16.16.040 Preliminary plat approval for subdivisions
16.16.050 Replat
16.16.060 Assessor's plat
16.16.010 Preliminary plat submittal requirements
A. An application shall accompany the preliminary plat. It shall include, at a minimum, the following
information:
1. A list of the names and addresses of all persons owning abutting property;
2. A list of improvements proposed to be installed;
3. A letter of financial stability or proper evidence of the applicant’s financial capability to complete
required improvements;
4. An estimate of the costs of the proposed improvements.
B. A preliminary plat shall be required for all subdivisions and shall be signed, sealed and dated by a land
surveyor registered in the state of Wisconsin. The plat shall be prepared on suitable materials of good
quality capable of clearly legible reproduction at a scale of not more than one hundred (100) feet to the
inch and shall show correctly on its face information required by § 236.12, Wis. Stats and the following:
1. Name under which the proposed subdivision is to be recorded;
2. Location of proposed subdivision by: government lot, quarter section, township, range, county and
state;
3. Small location map orienting proposed division with nearest primary road(s);
4. Date, graphic scale, north arrow;
5. Names and address of the owner, subdivider and land surveyor preparing the plat;
6. Land contiguous to the proposed plat owned or controlled by the subdivider, even though only a portion
of the area is proposed for immediate development;
7. Exact length and bearing of the exterior boundaries of the proposed subdivision referenced to a corner
established in U.S. Public Land Survey and the total acreage encompassed thereby;
8. Contours at vertical intervals of not more than two feet, but where ground slopes exceed ten (10)
percent, five foot vertical intervals will be sufficient. Elevation shall be based on mean sea level
datum;
9. Ordinary High water mark of all ponds, streams, lakes, flowages, and wetlands based upon mean sea
level datum. Floodland and shoreland boundaries shall be delineated and the contour line lying a
vertical distance of two feet above the elevation of the one hundred (100) year recurrence interval
flood or, where such data is not available, five feet above the maximum flood on record or a known
high water elevation;
10. Location and names of any adjacent developments and/or property along with the location,
established and existing width of all roads and names of all existing streets, alleys, or other public
ways, easements, railroad and utility rights-of-way and easements, and all section and quarter
section lines in the immediate area of the plat. The type, width and elevation of existing street
Commented [BH14]: This may be a bit too vague.
Would a letter(s) of recommendation from a bank
work?
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 26
pavements within or adjacent to the proposed development together with any legally established
centerline elevations referred to mean sea level;
11. Location, size and invert elevation of any existing sanitary or storm sewers, culverts and drain pipes,
the location of manholes, catch basins, hydrants, electric power and telephone poles or underground
installations, location and size of any existing water and gas mains within the area of the plat or
adjacent thereto. If no sewers, water mains or other utility facilities are present, those which might be
extended to serve the tract shall be indicated by their direction and distance from the tract, their size,
and their invert elevation;
12. Location of all existing property boundary lines, structures, drives, streams or water courses,
marshes, wetlands, primary environmental corridors or isolated natural areas, rock outcrops, wooded
areas, railroad tracks and other similar significant features within the tract being subdivided or
immediately adjacent thereto;
13. The scaled dimensions of all lots, proposed roadways, proposed open space dedications,
drainageways, or other public use areas or other nonpublic uses that do not require lotting;
14. Existing zoning on and adjacent to the proposed subdivision along with corporate limit lines;
15. Proposed lake and stream access in the subdivision along with any improvement or relocation of the
lake or stream;
16. Soil types, slopes and boundaries as shown on the soil survey maps, prepared by the Natural
Resources Conservation Service, U.S. Department of Agriculture and the location of soil borings with
numerical cross reference to data;
17. The location of the proposed conventional, mound or other private onsite septic treatment system for
each lot as approved by Racine County Code Administration;
18. The location of the proposed building envelopes in conformance with the planned zoning classification
and existing site conditions;
19. Vision corner easements per Section 16.28.020 D;
20. Any additional information required by the Town Board or Town Engineer;
21. Certification by the surveyor that the preliminary plat is an accurate representation of all matters
required to be shown and that it fully complies with this title. (Ord. dated 7/27/95 § 6(1)).
C. A preliminary stormwater management plan shall be prepared in accordance with Chapter 16.14 of this
ordinance prior to submittal of a preliminary plat for review.
D. Plats only need comply with those requirements in existence as of the date the preliminary plat is filed.
This means that if a new ordinance is adopted, or an existing ordinance is amended, after a plat has been
submitted, the new requirements shall not apply to the plat.
E. GIS Data Submittal. In addition to the required plat drawings, the subdivider shall submit plat boundary, lot
line, easement, and right-of-way data in a GIS-compatible digital format (ESRI Shapefile or geodatabase,
or equivalent format approved by the Town Engineer) for integration into the Racine County land
information system. The GIS data shall be referenced to the Wisconsin State Plane Coordinate System,
South Zone, NAD83. This requirement may be waived by the Town Engineer for minor land divisions of
four or fewer lots where GIS submittal would be impractical. (Added May 2026)
16.16.020 Street plans and profiles
The subdivider shall prepare and submit street plans and profiles to the Town Engineer for recommendation
and/or approval prior to submittal of the final plat. These plans and profiles shall show existing ground
surface, proposed and established street grades and profiles, including extensions for a reasonable distance
beyond the boundary of the proposed subdivision. If the subdivision is phased, the plans shall identify which
street and utility improvements are included in each phase. (Ord. dated 7/27/95 § 6(2))
16.16.030 Preliminary plat review for subdivisions
Before submitting a final plat for approval, the subdivider shall prepare a preliminary plat complying with this
title. The necessary applications, fees, and two (2) copies of the preliminary plat must be submitted to the
Town Clerk and Town Administrator at least twenty-one (21) days before the next Plan Commission meeting
at which the matter is to be considered. An electronic copy in PDF format shall be submitted to the Town
Clerk and Town Administrator simultaneously with any paper copies. Within ten (10) business days after
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 27
submittal, the Town shall determine whether the application is complete. If incomplete, the applicant shall be
notified in writing of the missing items. The official review period shall commence upon filing of a complete
application.
It shall be the subdivider's responsibility to post the town-supplied notification sign at least twenty-one (21)
days prior to that hearing date.
The Town Staff will review the submitted preliminary plat and notify the subdivider when the preliminary plat is
scheduled for a Plan Commission hearing. Following notice from the Town Staff, copies of the preliminary plat
must be submitted to the Town Clerk at least eight (8) days prior to the Plan Commission meeting, in such
number as directed by the Town Clerk, together with an electronic copy in PDF format.
If the applicant submits a substantially revised preliminary plat, determined by the Town Engineer, after staff
or Plan Commission review, the Town may require a revised application, additional review fees, and
rescheduling for a future Plan Commission meeting.
The Town Board is the approving authority and shall receive a recommendation from the Plan Commission.
Failure of the Town Board to act within ninety (90) days of filing of a plat shall constitute an approval,
consistent with § 236.11, Wis. Stats. The Plan Commission shall include in its recommendation a written
finding of consistency or inconsistency with the Town of Burlington 2050 Land Use Plan. (Ord. dated 7/27/95
§ 6(2); amended May 2026)
16.16.040 Preliminary plat approval for subdivisions
Approval or conditional approval of a preliminary plat shall not constitute automatic approval of the final plat,
except that if the final plat is submitted within 36 months of preliminary plat approval and conforms
substantially to the preliminary plat layout as indicated in Section 236.11(1)(b), Wis. Stats., the final plat shall
be entitled to approval with respect to such layout. The preliminary plat shall be deemed an expression of
approval of the layout submitted as a guide to the preparation of the final plat which will be subject to further
consideration by the Plan Commission at the time of its submission. (Ord. dated 7/27/95 § 8(3))
16.16.050 Replat
When it is proposed to replat a recorded subdivision, or part thereof, so as to change the boundaries of a
recorded subdivision, or part thereof, the subdivider or person wishing to replat shall vacate or alter the
recorded plat as provided in Sections 236.40 through 236.44, Wis. Stats. The subdivider, or person wishing to
replat, shall then proceed as specified in this chapter. (Ord. dated 7/27/95 § 8(6))
16.16.060 Assessor's plat
Where it is not practicable to require that a plat of a subdivision created by successive divisions be filed in
accordance with this title, the Town Board may, in lieu thereof, order an assessor's plat to be made under
Section 70.27, Wis. Stats., and may assess the cost thereof as provided in such section or to the developer.
Regardless of the type of plat filed, any such division shall comply with all provisions of this title to the extent
that they may reasonably be applied. (Ord. dated 7/27/95 § 11)
Commented [C15]: Timing check for the Town: with
the application deadline now anchored to the next
Town Board meeting (21 days prior), the Plan
Commission meeting and the sign-posting (21 days
before the Plan Commission hearing) both fall inside
that 21-day window. Please confirm this works with the
actual Plan Commission / Town Board meeting
cadence — if the Plan Commission hearing occurs
fewer than 21 days before the Town Board meeting,
the sign could not be posted in time. Options: (a)
anchor sign-posting to the Town Board meeting as
well; (b) state that the sign must be posted within a set
number of days of submittal; or (c) keep as-is if the
meeting schedule already provides the needed lead
time.
Commented [BH16]: Not sure if we need this but
figured I would include for discussion.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 28
May 2026
Chapter 16.20
FINAL PLATS
Amended May 2026
Sections:
16.20.010 Final plat submittal requirements
16.20.020 Final plat review for subdivisions
16.20.030 Final plat approval for subdivisions
16.20.010 Final plat submittal requirements
A final plat prepared by a registered land surveyor shall be required for all subdivisions. It shall comply in all
respects with the requirements of Sections 236.15, 236.16, 236.20 and 236.21 of the Wisconsin Statutes and
amendments thereto, this title, and applicable rules of the Wisconsin Department of Transportation (WisDOT)
and the Department of Safety and Professional Services (DSPS). The final plat shall also be consistent with
the approved preliminary plat in accordance with § 236.11(1)(b), Wis. Stats., and any conditions of preliminary
plat approval. The final plat shall also include the following:
A. All lands reserved for future public acquisition or reserved for the common use of property owners within
the plat;
B. Special restrictions as may be required by the Town Board or the county planning and development
committee;
C. Location of the soil absorption field if portions of the proposed lots would be unsuitable for a septic system;
D. Floodland and shoreland boundaries and the contour line lying a vertical distance of one foot above the
elevation of the one hundred (100) year recurrence interval flood or, where such data is not available, a
vertical distance of five feet above the elevation of the maximum flood of record;
E. If the plan includes construction in phases, each phase shall be defined, and estimated start and finish
dates shall be noted. Phased construction is permitted, as approved by the Town Board;
F. Any additional information required by the Town Board. (Editorially amended during 2001 codification; Ord.
dated 7/27/95 § 6(4))
16.20.020 Final plat review for subdivisions
The subdivider shall prepare a final plat complying with this title and any applicable state statutes and rules
and county ordinances and any condition previously requested by the town.
Two (2) copies of the final plat must be submitted to the Town Clerk and Town Administrator at least twenty-
one (21) days before the next Plan Commission meeting at which the matter is to be considered. An
electronic copy in PDF format shall be submitted to the Town Clerk and Town Administrator simultaneously
with any paper copies. Within ten (10) business days after submittal, the Town shall determine whether the
application is complete. The review period under § 236.20, Wis. Stats., shall commence upon filing of a
complete application.
It is the subdivider's responsibility to gain approval for any municipal extra-territorial jurisdictions.
The Town Staff will review the submitted final plat and determine if the final plat substantially conforms to the
preliminary plat. The Town Staff shall give a recommendation for approval or denial of the final plat to the
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 29
town board, orally or in writing, and made part of the public record at the proceeding at which the final plat is
being considered.
The Town Staff shall notify the subdivider when the final plat is scheduled for a Plan Commission hearing.
Following notice from the Town Staff, copies of the final plat must be submitted to the Town Clerk at least
eight (8) days prior to the Plan Commission meeting, in such number as directed by the Town Clerk, together
with an electronic copy in PDF format.
The Town Board is the approving authority and shall receive a recommendation from the Plan Commission.
The Plan Commission shall examine the final plat as to its conformance with the approved preliminary plat;
any conditions of approval of the preliminary plat; this and all ordinances, rules, regulations, land use plans
and land use plan components which may affect it; and shall recommend approval, conditional approval or
rejection of the plat to the Town Board. (Ord. dated 7/27/95 § 8(4); amended May 2026)
16.20.030 Final plat approval for subdivisions
A. Submission. If the final plat is not submitted within 36 months of the last required approval of the
preliminary plat, the Town Board may refuse to approve the final plat. The Town Board may extend the
time for submission of the final plat as it may deem appropriate.
B. Subdivision Development Agreement. At the time of submission of the final plat to the Town Board, the
subdivider shall submit the executed subdivision development agreement as required by this title.
C. Within sixty (60) days of the date of filing the original final plat with the Town Clerk, the Town Board shall
approve or reject such plat, unless the time is extended by agreement with the subdivider. If the plat is
rejected, the reasons shall be stated in the minutes of the meeting and a written statement of the reasons
forwarded to the subdivider. See § 236.20, Wis. Stats.
D. Failure of the Town Board to act within sixty (60) days, the time having not been extended and no
unsatisfied objection having been filed, the plat shall be deemed approved.
E. Recordation. After the final plat has been approved by the Town Board, the Town Clerk shall cause the
certificate inscribed upon the plat, attesting to such approval, to be duly executed and the plat returned to
the subdivider for recording with the register of deeds. The register of deeds cannot record the plat unless
it is offered within twelve months from the date of the last approval and within 36 months of the first
approval. A copy of the recorded plat, required restrictions, covenants, or easements, and developer's
agreement, must be submitted to the Town Clerk. (Ord. dated 7/27/95 § 8(5))
F. Bond or Security. After approval of the final plat, but prior to the commencement of work, the developer
shall establish a bond or other financial security per s. 236.13(2)(a)1, Wis. Stat., in an amount not to
exceed one hundred twenty percent (120%) of the estimated cost of the project, as determined by the
Town Engineer.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 30
May 2026
Chapter 16.24
MINOR LAND DIVISIONS
Amended May 2026
Sections:
16.24.010 Requirements for minor land divisions
16.24.020 Survey map
16.24.030 Certified Survey Map review
16.24.040 Certified Survey Map approval
16.24.010 Submittal requirements for minor land divisions
A. Certified Survey Map. A certified survey map prepared by a registered surveyor shall be required for all
minor subdivisions. It shall comply in all respects with the requirements of Section 236.34 of the Wis.
Stats. and this title.
B. Additional Information. The map shall show correctly on its face, in addition to the information required by
Section 236.34 Wis. Stats., and the following:
1. All existing buildings, watercourses, drainage ditches, and other features pertinent to proper division;
3. All lands being dedicated and/or reserved for future acquisition;
4. Date, graphic scale, names and address of surveyor, owner and subdivider;
5. Names of adjoining streets, highways, parks, cemeteries, subdivisions, ponds, streams, lakes,
flowages, and wetlands;
6. Floodland, shoreland, and wetland boundaries and the contour line at a vertical distance of two feet
above the elevation of the one hundred (100) year recurrence interval flood or where such data is not
available, at a vertical distance of five feet above the elevation of the maximum flood of record;
7. Any additional information as may be required by the Plan Commission, Town Board, or Town
Engineer.
C. Certificates. The surveyor shall certify on the face of the map that the survey has fully complied with all the
provisions of this title. The town shall also certify its approval on the map. Dedication of streets and other
public areas shall require the owner's certificate and the mortgagee's certificate in substantially the same
form as required by Section 236.21(a), Wis. Stats. (Ord. dated 7/27/95 § 7)
16.24.020 Survey map
A. Certified Survey Map Required.
1. Any division of land which results in a minor land division shall be surveyed and a certified survey map
thereof prepared at a graphic scale of not more than 100 feet to one inch, to be approved and
recorded as required by this title. Upon application to the Town Board, this requirement may be
waived in whole or in part, based upon the circumstances of each case. The Town Board may require
one or more, but not all of the parcels created by the land division to be surveyed.
16.24.030 Certified Survey Map review
A. Before submitting a Certified Survey Map for approval, the subdivider shall prepare a Certified Survey Map
complying with this title.
The necessary applications, fees, and two (2) copies of the Certified Survey Map must be submitted to the
Town Clerk and Town Administrator at least twenty-one (21) days before the next Plan Commission meeting
at which the matter is to be considered. An electronic copy in PDF format shall be submitted to the Town
Clerk and Town Administrator simultaneously with any paper copies. Within ten (10) business days after
Commented [RW17]: Should add wetland boundaries
to the list.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 31
submittal, the Town shall determine whether the application is complete. The review period
shall commence upon filing of a complete application.
It shall be the subdivider's responsibility to post the town-supplied notification sign at least twenty-one (21)
days prior to the meeting date.
The Town Staff will review the submitted Certified Survey Map and notify the applicant when the Certified
Survey Map is scheduled for a Plan Commission meeting. Following notice from the Town Staff, copies of the
Certified Survey Map must be submitted to the Town Clerk at least eight (8) days prior to the Plan
Commission meeting, in such number as directed by the Town Clerk, together with an electronic copy in PDF
format. (Amended May 2026)
16.24.040 Certified Survey Map approval
A. The Town Board is the approving authority and shall receive a recommendation from the Plan
Commission. Failure of the Town Board to act within ninety (90) days of filing of a Certified Survey Map
shall constitute an approval.
B. The Town Board shall approve, approve conditionally or reject such map within ninety (90) days from the
date of filing of the map unless the time is extended by agreement with the applicant. If the map is
rejected, the reason shall be stated in the minutes of the meeting and a written statement forwarded to
the subdivider. If the map is approved, the Town Board shall cause the Town Clerk to so certify on the
face of the map.
C. Recordation. The developer shall record the map with the register of deeds within six (6) months of its
approval. Costs of recording shall be borne by the developer. A copy of the recorded certified survey map
must be submitted to the Town Clerk. (Ord. dated 7/27/95 § 8(7))
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 32
May 2026
Chapter 16.28
DESIGN STANDARDS FOR STREETS
Amended May 2026
Sections:
16.28.010 Design standards
16.28.020 Intersection design
16.28.030 Construction standards
16.28.040 Final asphalt surface
16.28.050 Transfer of private roads to the Town [NEW]
16.28.060 Private street standards [NEW]
16.28.010 Design standards
All land division improvements and designs shall at a minimum conform to the standards set forth in this
chapter and other applicable statutes, rules, regulations and ordinances relating to standards.
A. General Consideration.
1. Arrangement. In any new land division, the street layout shall conform to the arrangement, width and
location indicated on the official map, comprehensive plan, or the component neighborhood
development plan of the governmental unit. In areas for which such plans have not been completed,
the street layout shall recognize the functional classification of the various types of streets and shall
be developed and located in proper relation to existing and proposed streets, to the topography, to
such natural features as streams and vegetative growth, to public convenience and safety, to the
proposed use of the land to be served by such streets, and to the most advantageous development of
adjoining areas. The division shall be designed so as to provide each lot with satisfactory access to a
public street or a Town Board-approved private street meeting the standards of Section 16.28.060.
Residential developments shall be served by internal collector or minor streets rather than by direct
multiple individual lot access onto town, county, or state highways, consistent with the Town of
Burlington 2050 Land Use Plan Transportation Policy 3. Where a proposed subdivision abuts
undeveloped land that may be further subdivided in the future, the street layout shall include stub
streets or reserved rights-of-way of not less than sixty-six (66) feet to the boundary of the adjacent
parcel to provide for future connections, consistent with Land Use Plan Transportation Policy 4.
2. Construction Standards. All streets to be constructed shall conform to the construction standards as
required by the Town Board standards.
B. Street Classification.
1. Arterial streets: provide for efficient safe and direct connection to, or separation of, neighborhoods; for
circulation to destination outside the residential area.
a. Where a division abuts or contains an existing or proposed major highway of primary
classification the Town Board may require a frontage road or a non-access reservation along the
property contiguous to such highway, or other treatment as may be necessary for adequate
protection of residential properties and to separate minor and arterial traffic.
b. Where the proposed division abuts the arterial street, the width, as required, shall be
dedicated. If the division abuts only one side of the arterial one-half of the width as required shall
be dedicated. Where the division abuts both sides of the arterial, the entire width as required shall
be dedicated.
2. Collector streets: provide for circulation to serve local traffic moving between minor streets and arterial
streets.
3. Minor streets: provide access and service to abutting properties.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 33
3a. Private streets: privately owned and maintained streets approved by the Town Board under Section
16.28.060, providing access to abutting properties within a land division. Private streets are not
dedicated to or maintained by the Town and are the sole maintenance responsibility of the property
owners served. See Section 16.28.060 for standards and approval requirements.
4. Cul-de-sac. Cul-de-sac shall normally not be longer than one thousand, two hundred (1,200) feet,
except where topographical and particular conditions warrant an extension and will be subject to
approval of the Plan Commission and the Town Board. The closed end shall have a paved turning
diameter of a clear ninety (90) feet and a right-of-way diameter of one hundred fifty (150) feet.
5. Alley. Alleys shall be provided in commercial and industrial districts except that the town may waive this
requirement where other provisions are made for service access such as off-street loading and
parking adequate for the uses proposed. Alleys shall be prohibited in residential areas unless
necessary because of exceptional circumstances. Dead end alleys shall be avoided. Alleys shall have
a minimum width of thirty (30) feet.
6. Half-Streets. Half-streets are streets which are only a portion of the required width and are usually
platted along property lines. These half-streets shall be prohibited except where it is deemed
essential for reasonable development in conformity with the other requirements of these regulations
and where the Town Board finds it will be practical to require the dedication of the other half when the
adjoining property is subdivided; the other half of the street shall be platted within such tract.
C. Width. The right-of-way of all streets shall be no less than sixty-six (66) feet. Pavement widths for minor
streets shall be no less than two (2) eleven (11') foot paved driving lanes with five (5) foot shoulders on
both sides of the pavement. Right-of-way and pavement widths for collectors and arterials will be as
required by the Town Board.
D. Grades. The Wisconsin Facilities Development Manual shall define the maximum allowable changes in
grade without vertical curves and vertical curve geometry based on the design speed of the roadway.
E. Sight Distance. Proper sight distances must be provided with respect to both horizontal and vertical
alignment as per Procedure 11-10-5 of the State of Wisconsin Facilities Development Manual.
F. Curves. The Wisconsin Facilities Development Manual shall define the maximum deflections of a roadway
without a horizontal curve based on the design speed of the roadway.
G. Street Names. Street names shall be required for all proposed public streets and shall not duplicate or be
confused with the name of an existing street within the town or the same zip code. Streets that are
extensions, or that are proposed to be aligned with existing named streets, must bear the names of these
streets. Street signs shall be required at all intersections. Their location and design shall be coordinated
with the Town Highway Superintendent and the Town Engineer. (Ord. dated 6/13/96; Ord. dated 7/27/95
§ 10(1))
H. Drainage Facilities. Roadside drainage facilities must be designed to convey the storm water runoff from a
twenty-five (25) year reoccurrence level storm. Crossing culverts and driveway culverts within a
subdivision shall be a minimum of fifteen (15) inch diameter pipe, or as required by the Town Highway
Superintendent or Town Engineer; this standard is intentionally more restrictive than the twelve (12) inch
minimum applicable to individual non-subdivision driveway permits under Chapter 12.14. Culverts shall
be installed with at least sixteen (16) inches of cover from the top of the pipe to the finished road grade.
Culvert material shall be galvanized steel or as required by the Town Highway Superintendent or Town
Engineer. Driveway construction within any town road right-of-way, including material requirements and
surface type restrictions, is also governed by Chapter 12.14 of this Code.
16.28.020 Intersection design
A. Streets shall intersect at right angles and not more than two streets shall intersect at one point.
B. Intersections must be approached on all sides by grades not to exceed four percent for a distance of at
least fifty (50) feet in length unless exceptional topography prohibits these grades.
C. The minimum edge of roadway turning radius at an intersection shall not be less than forty (40) feet.
D. Vision triangles providing unobstructed views in both directions perpendicular to the line of sight shall be
maintained at all intersections. Measured along the centerline, there shall be a clear sight triangle
easement with sides as follows: state and federal highways, two hundred fifty (250) feet; arterials, one
hundred fifty (150) feet; collectors, one hundred (100) feet. No building shall form an obstruction to the
view.
Commented [RW18]: Defer to Jake on this but in
another one of my communities they prefer 90’
diameter max since that can accommodate large
vehicles and minimizes maintenance time. Cul-de-sacs
larger than 90’ tend to chew up plowing time.
Commented [RW19]: Revise to: The Wisconsin
Facilities Development Manual shall define the
maximum allowable changes in grade without vertical
curves and vertical curve geometry based on the
design speed of the roadway.”
Commented [RW20]: FDM 11-10-5 Lays out criteria
for maximum deflection angles as well that has been
vetted. Recommend revising to: The Wisconsin
Facilities Development Manual shall define the
maximum deflections of a roadway without a horizontal
curve based on the design speed of the roadway.”
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 34
E. If a proposed street is to intersect a town, county, or state highway and it is deemed a hazardous entrance
by the governing body having jurisdiction over the road, it will be the responsibility of the developer to
correct the potential hazard through an agreement with the Town Board or to relocate the proposed
entrance to a more suitable location.
F. The following distances between intersections must be observed:
1. Minor and collector streets may not empty into state and federal highways at intervals less than one
thousand (1,000) feet. They shall be in alignment with existing and planned streets entering the
above highways from the opposite side.
2. If the intersections on minor and collector streets are not in alignment, the distance between streets
opening up on opposite sides of any existing or proposed streets must be at least one hundred fifty
(150) feet measured along the intersecting centerline. Where the streets enter on the same side, the
intersection distance measured from the centerline shall be at least three hundred (300) feet. (Ord.
dated 7/27/95 § 10(2); amended May 2026)
16.28.030 Construction standards
All streets and roads shall be constructed in conformance with those standards adopted by the town. The
minimum standards of the State of Wisconsin Department of Transportation shall apply. Restrictions may also
require the installation and/or improvement of curbs, sidewalks, gutters, storm drainage, sewers, etc. These
improvements shall be constructed in accord with town requirements. (Ord. dated 7/27/95 § 10(3))
16.28.040 Final Asphalt Surface
Final surface asphalt cannot be installed over basecoat until at least one winter season has passed. (Ord.
dated 9/11/08; amended May 2026)
16.28.050 Transfer of Private Roads to the Town [NEW]
Prior to the transfer of any private road or lane to the Town of Burlington for acceptance as a public street, the
road or lane must meet all design and construction standards set forth in this chapter, including but not limited
to right-of-way width, pavement width, grade, drainage, and sight distance requirements. The subdivider or
road owner shall submit certification by a Wisconsin-licensed professional engineer that the road meets all
applicable Town standards. The Town Board shall not accept any private road as a public street until such
certification is received and the Town Engineer has confirmed compliance. See also Chapter 12.14 of this
Code, which governs driveway and private road construction standards and establishes the requirement for
roads to meet these standards prior to Town acceptance. (Added May 2026)
16.28.060 Private street standards [NEW]
The Town of Burlington recognizes that certain rural residential land divisions are best served by privately
owned and maintained streets rather than dedicated public streets, particularly where topography, lot size,
low traffic volumes, or the rural character of the area makes full public street dedication impractical. This
section establishes standards for Town Board approval of private streets in land divisions.
A. Applicability. The Town Board may approve a private street as part of a preliminary plat or Certified Survey
Map where the subdivider demonstrates that a private street is appropriate given the character of the
development, the anticipated traffic volume, and the costs of public street construction relative to the
number of lots served. Private streets are permitted to serve residential land divisions only. Commercial
and industrial developments shall not use private streets.
B. Gravel Surface Option. Private streets may be constructed with a gravel surface provided all of the
following conditions are met:
1. The private street serves no more than eight (8) lots or fire numbers;
2. The gravel surface is constructed to a minimum roadbed width of twenty-two (22) feet with a minimum
twelve (12) foot traveled way and five (5) foot gravel shoulders on each side;
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 35
3. The road base meets a minimum depth of eight (8) inches of compacted crushed aggregate,
constructed on a properly graded and compacted subgrade, to the satisfaction of the Town Engineer;
4. The grade aligns with the Town’s driveway ordinance;
5. Drainage is provided per Section 16.28.010 H; and
6. The private street maintenance agreement, required under subsection F of this section, specifically
addresses gravel surface grading, replenishment, and dust control obligations.
C. Paved Surface Standard. Private streets serving four (4) or more lots or fire numbers, or any private street
where the Town Board determines that traffic volumes or safety warrant a paved surface, shall be paved
with a minimum of three (3) inches of asphalt on a properly prepared aggregate base, consistent with the
construction standards of Section 16.28.030, and shall comply with the minimum width standards of
Section 16.28.010 C for minor streets.
D. Design Standards. All private streets, whether gravel or paved, shall comply with the following minimum
design standards:
1. Right-of-way or easement width as required by the Town’s driveway ordinance;
2. Overhead clearance as required by the Town’s driveway ordinance;
3. Any bridge or structure on the private street meets the inspection, load-rating, and width standards of
the Town’s driveway ordinance;
4. Grades, curves, sight distance, and intersection design shall conform to the applicable standards of
Sections 16.28.010 and 16.28.020 to the maximum extent practicable given topographic constraints,
as approved by the Town Engineer;
5. Cul-de-sac turnarounds shall be provided at dead ends per the standards of Section 16.28.010 B.4;
and
6. Street name signs shall be posted at all intersections with public roads. Private street names shall not
duplicate existing public or private street names within the same zip code. The name shall include a
designation such as 'Private Road,' 'Private Lane,' or 'Private Drive' to distinguish it from public
streets.
E. Plat Requirements. A private street approved under this section shall be shown on the plat or certified
survey map as a numbered outlot labeled 'Private Street' with the easement width, centerline, and full
geometry clearly delineated. The plat shall note the following on its face: '[Private Street Name] is a
private street. It is not dedicated to or maintained by the Town of Burlington. Maintenance is the sole
responsibility of the owners of lots served by this street pursuant to the recorded private street
maintenance agreement.'
F. Maintenance Agreement Required. No private street shall be approved without a recorded private street
maintenance agreement that:
1. Is prepared by a Wisconsin-licensed attorney and approved by the Town Attorney prior to final plat or
CSM approval;
2. Is recorded with the Racine County Register of Deeds and runs with the land, binding all current and
future owners of lots served by the private street;
3. Establishes a property owners association or similar entity responsible for street maintenance, or
allocates maintenance responsibilities and costs among the lot owners in proportion to use or lot
count;
4. Specifies maintenance standards and frequency for the surface type (gravel replenishment and grading
schedules for gravel streets; crack sealing, overlay, and pothole repair schedules for paved streets);
5. Provides a funding mechanism, such as a reserve fund or assessment authority, sufficient to cover
anticipated maintenance and reconstruction costs; and
6. Addresses winter maintenance (snow removal) responsibilities.
G. Financial Guarantee. Prior to recording of the final plat or CSM, the subdivider shall provide a financial
guarantee acceptable to the Town Board, in an amount equal to one hundred twenty percent (120%) of
the Town Engineer's estimated cost of constructing the private street, to ensure completion of street
construction to the approved standards. The guarantee shall be released by the Town Board upon
certification by the Town Engineer that the private street has been constructed in compliance with this
section.
Commented [RW21]: If the minimum grades
requirement changes above this will have to change.
Commented [RW22R2]: Wondering if there should be
a cap on number of lots allowed to have a single gravel
access drive. Dust will be a concern as more vehicles
traverse along a gravel driveway without any periods of
rain.
Commented [BH22]: Would private streets that have
less than 8 lots provide paved surface even if not
required by town board? Just want to make sure that
this would also be included.
Commented [BH23R2]: Maybe it could be an outlot
specifically designed for road purposes only.
Commented [BH23]: Would this be ROW if it is a
private street?
Commented [BH24]: Should include some language
saying that the Town Engineer or Town Board may
determine that a private road must be repaired if in
unsafe condition or something along that lines. It is
good to codify that the Town can require maintenance
of the road somehow. It is somewhat touched on in
subsection H but may want to work in additional
lan
guage.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 36
H. Town Has No Maintenance Obligation. Approval of a private street under this section does not obligate the
Town of Burlington to maintain, repair, plow, or otherwise service the private street at any time. If a private
street falls into disrepair and the owners fail to maintain it, the Town may, after written notice and
opportunity to cure, cause the necessary work to be done and assess the costs against the benefited
properties as a special assessment under Wisconsin Statutes, but is not required to do so.
I. Transfer to Public Street. A private street may be transferred to the Town for acceptance as a public street
only if it meets all applicable design and construction standards for a public street under this chapter,
including paved surface requirements, at the time of transfer. Gravel private streets must be upgraded to
a paved surface before Town acceptance. See Section 16.28.050 and Chapter 12.14. The Town Board
retains sole discretion to accept or reject any private street offered for transfer. (Added May 2026)
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 37
May 2026
Chapter 16.32
DESIGN STANDARDS FOR BLOCKS AND LOTS
Amended May 2026
Sections:
16.32.010 Design standards
16.32.010 Design standards
All land division improvements and designs shall at a minimum conform to the standards set forth in this
chapter and other applicable statutes, rules, regulations and ordinances relating to standards.
A. The lengths, widths and shapes of blocks shall be determined by: provisions for building sites suitable to
meet the needs of the type of use contemplated; zoning ordinance requirements pertaining to lot size and
dimensions; needs for convenient access; limitation and opportunities of topography. Block lengths shall
normally not exceed two thousand (2,000) feet, or be less than six hundred (600) feet in length.
B. The dimensions of the lots must conform to any applicable zoning ordinance. Corner lots shall be twenty
(20) percent wider than the minimum width as required for lots less than one hundred fifty (150) feet in
width. Where the required minimum average width of lots is one hundred fifty (150) feet or greater, corner
lots shall not be required to be increased in width.
C. Road frontage and access for unsewered lots shall be governed by Section 16.12.030 of this title, which
establishes minimum frontage standards, frontage alternatives, generally prohibits flag lots, and provides
a special circumstances waiver process. (Amended May 2026)
D. Lot lines shall be at right angles or radial to the street lines. Double frontage shall be avoided except where
essential to provide separation of the development from traffic arteries or to overcome particular
topographic or orientation disadvantages. Where residential lots abut a commercial or industrial district,
additional depth shall be provided for the lot in an amount equal to at least twenty (20) percent of the
minimum depth which would normally be required. All lots shall be designed with a suitable proportion
between width and depth. Neither long narrow nor wide shallow lots are normally desirable. Depth of lots
shall not be less than one hundred fifty (150) feet. (Editorially amended during 2001 codification; Ord.
dated 6/13/96; Ord. dated 7/27/95 § 10(4); amended May 2026)
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 38
May 2026
Chapter 16.36
REQUIRED IMPROVEMENTS
Sections:
16.36.010 Dedication and installation of improvements
16.36.020 Fire protection
16.36.030 Survey monuments
16.36.010 Dedication and installation of improvements
A. The Town Board may require the developer to dedicate and install public improvements as follows:
Such improvements must be completed within the time required by the Town Board following plat approval.
Consistent with § 236.13(2)(am)1., Wis. Stats. (as amended by 2025 Wis. Act 68, effective July 1, 2026), the
Town may require the subdivider to agree to install public improvements and to provide financial security
ensuring installation within a reasonable time after approval, but the Town may not require the installation or
acceptance of public improvements as a condition of submitting, reviewing, approving, or recording a
preliminary or final plat. The public improvements required shall be as follows where appropriate to the
circumstances of the development:
1. Street grading;
2. Street pavement and right-of-way;
3. Concrete curb and gutter;
4. Pedestrian ways;
5. Sanitary sewer system — septic system;
6. Water supply and treatment facilities;
7. Fire storage or supply facilities;
8. Drainage system and easements for the development;
9. Street lighting;
10. Street name signs;
11. Street trees and landscaping (every tree removed — two planted);
12. Guard rails, protective fencing and barricades;
13. Erosion control for the development;
14. Survey monuments;
15. Lot grading, drainage and erosion control;
16. Utility company services and easements to the utilities above or below ground as required by the
Town Board.
B. Improvement Standards. Public improvements shall be installed in accord with specifications as adopted
by the Town Board and shall be subject to the requirements, inspection and approval of the Town Board,
Town Engineer, utilities and other agencies having the power of approval.
C. Improvement Plans and Specifications. The divider shall apply to the Town Board for the preparation by
the Town Engineer or his representative of plans and specifications for the public improvements required.
The Town Board, in lieu of the foregoing shall require that the divider cause to have prepared any such
plans or specifications by a Wisconsin Registered Professional Engineer in accord with town standards
and subject to the approval of the Town Engineer and Town Board. Plans and specifications for other
improvements shall be provided by the divider in such form as approved by the Town Engineer.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 39
D. Partial Improvement. In all instances where it shall appear to the satisfaction of the Town Board that the
whole of a land division cannot immediately be fully improved for some good reason or cause, the Town
Board may authorize the divider to proceed with the installation of improvements required under this
chapter on a portion or part of the parcels. In such event, the requirements of this chapter shall apply to
that portion or part authorized for immediate improvement and later to the remainder of the land division.
(Ord. dated 7/27/95 § 5(4))
16.36.020 Fire protection
A. The developer of any residential, commercial or industrial subdivision or minor land division or planned
development shall provide and dedicate the following facilities and improvements which must be installed
or provided within the time established by the Town Board: a well, cistern, tank, dry hydrant or other
device suitable to the needs of the fire department as determined by the Town Board, sufficient to provide
a supply of water for fire protection purposes for the development planned for that site. (Editorially
amended during 2001 codification; Ord. dated 7/27/95 § 5(2))
16.36.030 Survey monuments
The developer shall install survey monuments in accordance with the requirements of Section 236.15, Wis.
Stats. (Ord. dated 7/27/95 § 10(6))
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 40
May 2026
Chapter 16.40
OPEN SPACE AND PUBLIC FACILITIES
Amended May 2026
Sections:
16.40.010 Requirements for all land divisions
16.40.020 Open space and neighborhood recreational areas
16.40.030 Reservation for public purposes
16.40.040 Easements
16.40.010 Requirements for all land divisions
All land divisions, whether by certified survey map or by subdivision, shall comply with all provisions of
Chapter 236, Wisconsin Statutes, all applicable state agency rules and regulations and all applicable county
and town ordinances and shall comply with the requirements of this chapter and this title. (Ord. dated 7/27/95
§ 5 (part))
16.40.020 Open space and neighborhood recreational areas
Applicability. The provisions of this section shall apply to all new development with a residential component
that is subdivided by, or requires, a major subdivision plat or a Certified Survey Map (CSM), including the
replatting of a recorded subdivision. The provisions of this section shall not apply to: (1) lot line adjustments,
lot combinations, or retracement Certified Survey Maps where no new residential dwelling unit is created; (2)
any land division that contains no residential component; (3) property zoned for agricultural use under the
Racine County Zoning Ordinance; or (4) development for which the Town Board grants credit for existing lots,
or for development projects that have already received Town approval. (Added May 2026)
A. The Town Board may require the developer to provide appropriate area and facilities to serve the
recreational needs of the immediate neighborhood in the form of "tot lots," greenways with pedestrian
walkways and bicycle paths, small open spaces of meadow or woods, plazas, water courses or ponds.
The Town Board may also require the developer to provide open spaces in the form of undeveloped
woods, meadow, marsh or water, pasture or cropland, golf courses, riding trails, or ski hills or similar uses
consistent with the preservation of open space for its aesthetic and ecologic value to the community.
B. The minimum amount of open space and neighborhood recreational space required depends on the lot
size in the development and shall be provided at no less than the following amount of land per dwelling
unit: for one-half (1/2) acre lots, 0.10 acre (ten percent of an acre) per dwelling unit; for one (1) acre lots,
0.08 acre (eight percent of an acre) per dwelling unit; and for lots of three (3) acres or more, 0.04 acre
(four percent of an acre) per dwelling unit.
C. Such open space and neighborhood recreational space may be retained as private common lands or may
be dedicated to the public with the consent of the Town Board. In the case of private ownership, the
protection of such reservation and provision for care and maintenance shall be assured as provided
below.
C-1. Fee in Lieu of Dedication. As an alternative to land dedication, the Town Board may accept a fee in lieu
of open space dedication, provided that: (1) the fee bears a rational relationship to the need for park and
open space facilities generated by the development; (2) the Town has prepared a public facilities needs
assessment supporting the fee; and (3) the fee amount has been established by resolution of the Town
Board after a public hearing. Fee-in-lieu payments shall be deposited in a separate, segregated, interest-
bearing account and expended only for the acquisition or initial improvement of parkland or open space
serving the development. Any fee not expended within seven (7) years of collection shall be refunded,
with interest, to the current owner of the property for which the fee was paid. (Added May 2026)
D. Open Space Easements and Care And Maintenance Provisions.
Commented [BH25R2]: At a minimum, it would make
sense to mention something along the lines of “All land
divisions, whether by certified survey map or by
subdivision, shall comply with the requirements of this
chapter and this title.” But I find this interesting to
require for CSM’s as well. If anything you could
consider requiring the fee in lieu of dedication for all
new residential CSM’s.
Commented [BH25]: Is this relevant to remain Ch.
16.40? If it is mentioned earlier in the chapter, then
consider removin
g.
Commented [BH26]: I don’t love the word “shall” in
this sentence. It could be swapped with the Town
Board may require….
Commented [BH26R3]: Here’s an example of how
applicability language could be changed from a
different municipality :
Applicability. The provisions of this Article shall apply to
all new development with a residential component
where land is subdivided or requires a plat for a major
subdivision, or Certified Survey Map (CSM), including
the replatting of subdivisions. The provisions shall not
apply to:
(a) Lot line adjustments, lot combinations, or
retracement CSMs zoned single family residential.
(b) Lot line adjustments, lot combinations, or
retracement CSMs where no new residential
development is proposed.
(c) Property zoned RH-35 “Rural Holding” district.
(d) Development that contains no residential
component.
(e) Development where the Common Council grants
credit for existing development or existing lots where
development projects have already been approved.
Commented [BH26R2]: The fee in lieu of dedication
can be the alternative route but I still think you would
want to consider changing language here.
Commented [BH27]: I don’t fully understand this
paragraph and may be confusing for other users.
Commented [BH28]: I’d recommend removing the
statute language and tailoring specifically for the Town.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 41
1. If lands are set aside for recreational or open space purposes under private ownership, the area
reserved shall be protected against additional building development by conveying to the town a
permanent open space easement over such areas restricting them against additional future building
or use except as is consistent with that of providing open space for the aesthetic, ecologic and
recreational benefit of the community. Buildings or uses for recreational, cultural or other purposes
compatible with this objective may be permitted only where specifically authorized as part of the
development plan or subsequently with the express approval of the Plan Commission following
approval of building, site, and operational plans.
2. The care and maintenance of private reservations shall be assured by establishment of an appropriate
management organization such as a property owners association. The manner of assuring
maintenance and assessing the cost thereof to individual properties shall be established in the bylaws
for such organization and in correlated deed restrictions, and shall be included in the conditions of
approval and recorded with the title for each property.
3. The care, maintenance and appropriate operation of open space reservations involving agricultural,
recreational, or other use under individual private ownership, and not as common lands to the
development shall be assured by appropriate covenants and agreements with the town. Such
covenants and agreements shall be consistent with the specific situation, provide adequate
assurance that the use in perpetuity shall be consistent with the purpose of preserving the area as
open space.
E. Determination of Required Land Area.
1. The number of units of required land to be provided for the specific purpose as set forth in subsection B
of this section, shall be one for each dwelling unit anticipated from the layout of the development.
2. In the case of multiple-family developments, the number of units shall be the maximum permitted under
the zoning unless the number is specifically limited by the terms of a planned development.
3. In the case of a planned development the unit factor as related to the zoning district lot size shall be
converted to an average density for the entire development and the nearest appropriate factor
selected.
4. In the case of a minor division, the number of units required shall be only for the additional dwelling
units resulting from the division, and any permanent residential units which have existed for at least
one year prior to the date of the division shall be exempt.
F. Waiver. The Town Board may waive or reduce the open space and neighborhood recreational area
requirements of this section, in whole or in part, upon recommendation of the Plan Commission and upon
a finding that one or more of the following applies: (1) the development is of a size or type that does not
generate a need for additional neighborhood open space or recreational facilities; (2) adequate open
space or recreational facilities already serve, or are planned to serve, the development and its residents;
(3) the strict application of these requirements would be impractical or would not serve the purposes of
this section given the location, configuration, or character of the development; or (4) a fee in lieu of
dedication under subsection C-1 more appropriately meets the open space needs generated by the
development. Any waiver granted shall be stated in writing, shall set forth the reasons supporting it, and
may be conditioned as the Town Board deems necessary to protect the public interest. (Added May
2026)
16.40.030 Reservation for public purposes
A. Where a development includes land indicated in whole or part as a site for a public school, park, recreation
area, new highway, or other public use and any part of such land is not dedicated pursuant to the
provisions of this subsection, it shall be reserved for the town, county or school district and such
reservation may be released by the Town Board if it has not been accepted or developed within five years
of recording the plat or map.
B. Any site so reserved may be used for any purpose, consistent with the zoning regulation, except that no
permanent buildings or other improvements may be placed thereon unless a waiver is filed with the Town
Board releasing it from any claim for the value of such improvements if the property is acquired for such
public purpose. (Ord. dated 7/27/95 § 5(3))
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 42
16.40.040 Easements
A. Pedestrian easements or dedications, at least twenty (20) feet in width shall be required, where deemed
necessary, to provide access to playgrounds, parks, schools, shopping centers, or other community
facilities.
B. Utility easements shall be provided as may be deemed necessary by those utility companies having
installations in the plat. The utility companies shall review all plats to determine whether easements will
be necessary and where they should be required.
C. Where a division is traversed by a drainage way or stream, an adequate easement shall be provided as
deemed necessary by the Town Board. The location, width, alignment and improvement of such drainage
way or easement shall be subject to approval by the Town Engineer; and parallel streets or parkways
may be required in connection therewith. Where necessary, storm water drainage shall be maintained by
landscaped open channels of adequate size and grade to hydraulically accommodate maximum potential
volumes of flow, subject to review and approval by the Town Engineer. Where deemed necessary, the
town may require these channels to be enclosed with pipe. (Ord. dated 7/27/95 § 10(5))
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 43
May 2026
Chapter 16.44
VARIANCES
Amended May 2026
Sections:
16.44.010 General requirements
16.44.010 General requirements
In any particular case where the applicant and/or developer can show evidence of exceptional topographic or
other physical conditions which would cause an extraordinary hardship, the Town Board may vary and make
exceptions to the provisions of this title to the extent deemed just and proper, so as to relieve such
extraordinary hardship, provided such exception made or variance granted may be made or granted without
detriment to the public good and without impairing the intent and purpose of the provisions of this title, or the
desirable general development of the town in accordance with the official plan and County zoning ordinance,
provided:
A. An application for any variance from these regulations shall be filed in writing simultaneously with the
preliminary plat for the land division, or simultaneously with the Certified Survey Map application in the
case of a minor land division, and such application shall explain in detail the reasons and facts supporting
the request;
A-1. Extractive Use CSM Waiver. Consistent with the Town of Burlington Land Use Plan Extractive district
policies, the Town Board may waive the Certified Survey Map requirement for a temporary extractive use
(mining, quarrying, or similar activity) where: (1) the property has received Land Use Plan amendment
approval designating the temporary extractive use; (2) the use is temporary and the property will revert to
its prior land use designation upon completion of reclamation; and (3) no new permanent parcels or
building sites are created by the extractive activity. The waiver shall be documented in writing and filed
with the Town Clerk. Upon completion of reclamation, the Town Board shall administratively remove the
extractive designation from the Land Use Plan. (Added May 2026)
B. In no event shall the requirement of filing and recording of the plat or map be waived;
C. Any exception made or variance granted shall be stated in writing and filed with the records of division
setting forth the reasons which justified such exception or variation. (Ord. dated 7/27/95 § 9; amended
May 2026)
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 44
May 2026
Chapter 16.48
FEES AND COSTS
Sections:
16.48.010 Fees by resolution
16.48.020 Review fee
16.48.030 Inspection fee
16.48.040 Guaranty bond — Financial security
16.48.010 Fees by resolution
The town shall, from time to time, create and update a resolution with respect to base fees for developers
under this title. The Town Board shall review and, if necessary, update the fee resolution no less than once
every two (2) years, with a review to occur in conjunction with the annual budget process. In conducting each
review, the Town Board shall consider changes in construction costs, engineering fees, legal fees, and
general inflation since the last fee update. (Ord. dated 8/14/03; amended May 2026)
16.48.020 Review fee
In addition to the foregoing fees, established by resolution, the developer shall also enter into a cost recovery
agreement, by which the developer shall agree to reimburse the town for any and all costs associated with the
review and drafting of plans, documents and a development agreement by the Town Engineer, Town Planner,
Town Attorney, or other independent contractors of the town associated with the development. The cost
recovery agreement shall be signed in conjunction with the initial preconceptual conference. (Ord. dated
8/14/03)
16.48.030 Inspection fee
The Town Board may condition final approval of any land division upon payment of the costs of any final
inspection, and any outstanding costs subject to the cost recovery agreement. If all fees and costs have not
been paid in full, the town may deny final approval until payment of the same. (Ord. dated 8/14/03)
16.48.040 Guaranty bond — Financial security
When the Town Board requires the installation of public improvements, final approval of any land division
shall be conditioned upon the developer providing to the town a cash bond, letter of credit or other acceptable
financial security sufficient to guarantee quality and adequate completion of the improvements, in an amount
not to exceed 120% of the estimated cost of the project or phase of such project. The bond or other security
may be subject to partial release, but in any event shall be released at the end of one year from the date the
Town Board accepts all improvements. (Ord. dated 8/14/03)
Commented [BH29]: If Town Planner is added to
definitions, we should add here.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 45
May 2026
Chapter 16.52
ADMINISTRATION AND ENFORCEMENT
Sections:
16.52.010 Abrogation and greater restrictions
16.52.020 Interpretation
16.52.030 Violations
16.52.040 Penalties
16.52.010 Abrogation and greater restrictions
It is not intended by this title to repeal, abrogate, annul, impair or interfere with any existing easements,
covenants, agreements, rules, regulations or permits previously adopted or issued pursuant to laws.
However, where this title imposes greater restrictions, the provisions of this title shall govern. (Ord. dated
7/27/95 § 12)
16.52.020 Interpretation
In the interpretation and application of this title, the provisions of this title shall be held to be the minimum
requirements and shall be liberally construed in favor of the town and shall not be deemed a limitation or
repeal of any other power granted by the Wisconsin Statutes. (Ord. dated 7/27/95 § 13)
16.52.030 Violations
It is unlawful to build upon, divide, convey, record or monument any land in violation of this title or the
Wisconsin Statutes and no person shall be issued a building permit by the town authorizing the building on, or
improvement of, any subdivision, minor division, or replat not of record until the provisions and requirements
of this title have been fully met. The town may institute appropriate action or proceedings to enjoin violations
of this title or the applicable Wisconsin Statutes. (Ord. dated 7/27/95 § 14)
16.52.040 Penalties
Any person who fails to comply with the provisions of this title shall upon conviction forfeit not less than one
thousand dollars ($1,000.00), nor more than five thousand dollars ($5,000.00), and the costs of prosecution
for each violation and in default of payment of such forfeiture and costs shall be imprisoned in accordance
with Chapter 1.20. Each day a violation exists or continues shall constitute a separate offense. In addition, the
remedies provided by Sections 236.30, 236.31 and 236.32, Wis. Stats. shall be available to the town.
(Editorially amended during 2001 codification; Ord. dated 7/27/95 § 15; amended May 2026)
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 46
May 2026
Chapter 16.56
OTHER DEVELOPMENTS
Amended May 2026
Sections:
16.56.010 Purpose
16.56.020 Definitions
16.56.030 Scope
16.56.040 Compliance
16.56.050 Developer's agreement
16.56.060 Binding effect
16.56.070 Violation or non-compliance
16.56.010 Purpose
The purpose of this chapter is to govern the terms and conditions of larger developments or improvement of
properties in the town, which are not already governed by this title. The Town Board believes it has a vested
interest in ensuring quality and viable developments in the township, and wishes to regulate the terms and
conditions of any such development, and to meet all of the purposes set forth at Section 16.08.010. (Ord.
dated 9/25/03)
16.56.020 Definitions
A. The definitions at Section 16.04.010 of the town are incorporated into this chapter.
B. "Development" shall be utilized for all improvements subject to the terms of this chapter, as set forth below.
C. "Public improvements" shall refer to and include any of the following: Public and private streets or
sidewalks, surface and storm water drainage facilities, public utilities and grading. (Ord. dated 9/25/03)
16.56.030 Scope
This chapter shall govern any development, construction or improvement to real estate with a total estimated
cost in excess of seven hundred fifty thousand dollars ($750,000.00) or any development which shall include
public improvements as defined herein. However, single-family residences and subdivisions, which are
governed by another chapter in this title, are excluded. This chapter shall include and govern, but not be
limited to, condominium developments, PUDs, multi-family housing, commercial developments and private
recreational developments. The Town Board shall review and, if necessary, adjust the dollar threshold in this
section no less than once every five (5) years to account for changes in construction costs. (Ord. dated
9/25/03; amended May 2026)
16.56.040 Compliance
No person, firm, association or corporation shall develop or improve any property located within the
jurisdictional limits of these regulations which results in a development with a value of more than seven
hundred fifty thousand dollars ($750,000.00) without first complying with the terms and conditions of this
chapter. (Ord. dated 9/25/03)
16.56.050 Developer's agreement
Commented [BH30]: I am sort of confused what this is
reviewing. Is it a land division related to the reviews
listed (i.e PUD) or just in general?
Commented [BH30R2]: It is just questionable whether
it can/should be included in Chapter 16. But I am not
an attorney.
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 47
Prior to issuance of any building permit or construction, a developer shall prepare and submit, for review by
the Plan Commission and Town Board, a comprehensive developer's agreement, which shall include the
following terms and conditions which will address the following topics:
A. All improvements to the property;
B. The layout of public and private streets or sidewalks;
C. Surface and storm-water drainage;
D. Grading, erosion and silt control;
E. Landscaping and green space;
F. Street signs and traffic control signs;
G. Estimated completion of improvements and dedication of improvement;
H. Guarantees of improvements, including repairs, maintenance and warranties;
I. Financial guarantees for the improvements, including a cash deposit or letter of credit in an amount no less
than one hundred twenty (120) percent of the estimated cost of such improvements;
J. Building and occupancy permits;
K. Easements, deed restrictions, shared and common area agreements, and any other restrictions on the
property;
L. Park and public site dedication;
M. Cost recovery for the town;
N. Insurance;
O. Indemnification and liability; and
P. Any other terms and conditions requested by the Plan Commission, the Town Board, Town Engineer,
Town Attorney, Town Building Inspector or other representatives or employees of the town and other
approving authorities. (Ord. dated 9/25/03; amended May 2026)
16.56.060 Binding effect
It is intended that any developer's agreement entered into between developer and the town shall be binding
on the developer, its successors in interest, employees, representatives and assigns, including any
purchasers of property located within the development. In order to ensure the binding effect, the developer's
agreement shall be filed with the register of deeds of the county in which any of the property is situated. (Ord.
dated 9/25/03)
16.56.070 Violation or non-compliance
In the event of any violation or non-compliance with the terms of the developer's agreement, the town shall
have the right to enforce the same by such means as it deems appropriate, including bringing the
development into compliance, the cost of which may be included as a special assessment on all owners of
property in the development. (Ord. dated 9/25/03)
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 48
May 2026
Chapter 16.60
FINANCIAL SECURITY
Amended May 2026
Sections:
16.60.010 Purpose
16.60.020 Surety required
16.60.030 Reduction of surety
16.60.040 Use of proceeds
16.60.050 Failure to pay for improvements
16.60.060 Events of default
16.60.070 Town's rights upon default
16.60.010 Purpose
The Town of Burlington has an interest in ensuring that it does not bear the cost of private development. In
order to guarantee the financial security of the developer, the following ordinance is established. As used in
this chapter, 'Period of Guaranty' has the meaning set forth in § 16.04.010 of this title.
16.60.020 Surety required
As assurance of compliance with all of the requirements under this Chapter, the Developer shall file with the
Town a Performance Bond, or Irrevocable Letter of Credit or escrow a cash deposit representing one hundred
and twenty percent (120%) of the Town Engineer's estimate of the cost of improvements, which Performance
Bond, Irrevocable Letter of Credit, or cash deposit shall be adjusted periodically so that at all times it equals
or exceeds the total amount of improvement contracts entered into in accordance with this Agreement. The
said Performance Bond, Irrevocable Letter of Credit, or cash deposit shall be filed with the Town Board prior
to letting any improvement contracts hereunder and which Performance Bond shall be executed by the
Developer, as principal, and a Surety Corporation duly licensed and authorized to do business under the
Laws of the State of Wisconsin, as surety, that said Performance Bond shall be payable to the Town of
Burlington and be conditioned upon the faithful performance of any and all services and labor furnished by the
Developer. The surety shall specify that it shall remain effective until the Development is completed and all
public improvements are approved and accepted by the Town. Failure to file such bond within ten (10) days
after written demand shall result in the cessation of all development until such surety has been filed.
16.60.030 Reduction of surety
After the acceptance of any improvement by the Town, the amount which the Town is entitled to draw on the
Performance Bond, or Irrevocable Letter of Credit, or cash deposit in escrow shall be reduced by an amount
equal to ninety percent (90%) of the estimated cost of the improvement. At the request of the Developer, the
Town shall execute a certificate verifying the acceptance of the improvement and waiving its right to draw on
the Performance Bond, or Irrevocable Letter of Credit, or cash deposit in escrow to the extent of such amount.
If the Developer is in default under this Agreement, the Developer shall have no right to such a certificate.
Upon the acceptance of all of the improvements, the balance that may be drawn under the Performance
Bond, or Irrevocable Letter of Credit, or cash deposit in escrow shall be available to the Town for ninety (90)
days after expiration of the Period of Guaranty.
16.60.040 Use of proceeds
TOWN OF BURLINGTON — MUNICIPAL ORDINANCES | Amended May 2026
Page 49
The Town shall use funds drawn under the Performance Bond, or Irrevocable Letter of Credit, or cash deposit
in escrow only for the purposes of completing the improvements, correcting defects in or failures of the
improvements, or the completion of any of the Developer's obligations under this Agreement.
16.60.050 Failure to pay for improvements
In the event the Developer fails to pay a Contractor the required amount for the improvement or services
enumerated herein within thirty (30) days after being billed for each improvement of each stage, the Surety
Corporation shall make the said payments to the Contractor upon five (5) days demand by the Town. Demand
shall be by registered letter with a return receipt requested, addressed to the Surety Corporation at the
address indicated on the Performance Bond. It is understood between the parties to this Agreement, that the
billing for the improvements shall take place as the various segments and sections of said improvements are
completed and certified by the Town Engineer, and accepted by the Town. However, thereafter the sequence
and timing of the billing is to be entirely at the discretion of the Town.
16.60.060 Events of default
The following conditions, occurrences, or actions shall constitute a default by the Developer during the
completion period:
A. Developer's failure to cure the defective construction of any improvement within the applicable cure period;
or
B. Developer's failure to perform work within the Subdivision Plat for a period of more than sixty (60)
consecutive days; or
C. Developer's insolvency, the appointment of a receiver for the Developer or the filing of a voluntary or
involuntary petition in bankruptcy respecting the Developer; or
D. Foreclosure of any lien against the Property or a portion of the Property or assignment or conveyance of
the Property in lieu of foreclosure.
The Town may not declare a default until written notice has been given to the Developer.
16.60.070 Town's rights upon default
When any event of default occurs, the Town may draw on the Performance Bond, or Irrevocable Letter of
Credit, or cash deposit in escrow to the extent of the face amount of the credit less ninety percent (90%) of
the estimated cost of all improvements theretofore accepted by the Town, as determined by the Town
Engineer. The Town shall have the right to cure the default itself or contract with a third party to cure the
defaults, and the Developer hereby grants to the Town, its successors, assigns, agents, contractors, and
employees, a nonexclusive right and easement to enter the Property for the purposes of constructing,
maintaining, and repairing required improvements. Alternatively, the Town may assign the proceeds of the
Performance Bond, or Irrevocable Letter of Credit, or cash deposit in escrow to a subsequent developer (or a
lender) which agrees in writing to complete the unfinished improvements. In addition, the Town also may
suspend Final Plat approval during which time the Developer shall have no right to sell, transfer, or otherwise
convey lots or homes within the Subdivision or Condominium Plat without the express written approval of the
Town or until the improvements are completed and accepted by the Town. These remedies are cumulative in
nature; except that during the Period of Guaranty, the Town's only remedy shall be to draw funds under the
Performance Bond, or Irrevocable Letter of Credit, or cash deposit in escrow. The provisions herein shall not
affect the right of third parties who may have acquired lots in the subdivision prior to a default or their lenders.
Source: Town of Burlington website. First collected Oct 16, 2026.