TID 11 Draft Project Plan
Village of Pleasant Prairie · Kenosha County · meeting of Jun 17, 2026 · Notices
Open the original document More from Village of Pleasant Prairie
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Village of Pleasant Prairie Tax Increment District No. 11 - Amendment
Tax Increment District No. 11
(IH-94 Area Project – TID 11)
PROJECT PLAN AMENDMENT No. 1
District Type: Mixed Use
Creation Date: April 22, 2024
Expenditure Period Ends: April 22, 2039
Termination Date: April 22, 2044
First Amendment Date: August 10, 2026
F
or Consideration by the Village Board on
August 10, 2026
Table of Contents
Description Page
Introduction & Amendment Schedule ............................................................................................................................... 1
District Type Declaration and Confirmation ...................................................................................................................... 2
Statement of Kind, Number of, Location & General Description of Amended Project .................................................... 2
Project Cost Summary Updated ......................................................................................................................................... 3
Statement of Findings ........................................................................................................................................................ 4
Economic Feasibility Analysis ............................................................................................................................................. 5
Revenue and Cash Flow Projections .................................................................................................................................. 6
Historic Percent of Tax Rate for Overlapping Taxing Districts .......................................................................................... 7
Share of Tax Increments Paid by Other Taxing Entities ..................................................................................................... 7
Financing Methods ............................................................................................................................................................. 8
Public Debt–Preliminary Sources and Uses ....................................................................................................................... 8
Public Debt – Preliminary Debt Service Estimate s ............................................................................................................ 8
Developer Revenue Bond Aggregate Estimated Payment Schedule ................................................................................ 9
Proposed Zoning, Master Plan Changes & Non-Project Costs .......................................................................................... 9
Tax Increment District No. 11 Legal Description of Parcels (as amended) ....................................................................... 10
M
aps (attached as a separate file)
MAP 1 – Original TID Boundary & Parcels ......................................................................................................................... M-1
MAP 2 – Proposed Amended TID Boundary & Parcels ...................................................................................................... M-2
MAP 3 – Boundaries, Floodplain & Wetlands (Existing & Proposed Area) ....................................................................... M-3
MAP 4 – Existing Sewer, Water & Storm Main .................................................................................................................. M-4
MAP 5 – Proposed Sewer, Water & Storm Main ............................................................................................................... M-5
MAP 6 - Existing Zoning ...................................................................................................................................................... M-6
MAP 7 - Proposed Zoning ................................................................................................................................................... M-7
MAP 8 - Existing Uses ......................................................................................................................................................... M-8
MAP 9 - Existing Land Use Plan .......................................................................................................................................... M-9
MAP 10 - Proposed Land Use Plan – Entire TID 11 ............................................................................................................ M-10
S
upporting Documentation (attached as a separate file ; items will be added as they become available )
Appendix A: Legal Opinion for Completeness and Accuracy ............................................................................................
Appendix B: Resolution of Plan Commission ( Adopting Boundaries, Public Hearing Date, Preliminary Project Plan) ...
Appendix C: Resolution of Plan Commission Public Hearing (A ffirm Boundaries & Adopt Project Plan) ........................
Appendix D: Letters to Taxing Jurisdictions .......................................................................................................................
Appendix E: Affidavits of Publication for all Notices .........................................................................................................
Appendix F: Resolution of Village Board Approving Amendment of TID 11 .....................................................................
Appendix G: Resolution of Joint Review Board Approving Amendment of TID 11 ..........................................................
Appendix H: Plan Commission Meeting Minutes ..............................................................................................................
Appendix I: Village Board Meeting Minutes ......................................................................................................................
Appendix J: Joint Review Board Meeting Minutes ............................................................................................................
Introduction and Amendment Schedule
Tax Increment District No. 11 (“TID 11” or the “District” ) is an existing mixed -use district that was
created on April 22, 2024 within the boundaries of the Village of Pleasant Prairie (the “Village”). This
project plan amendment (“Amended Project Plan”) supplements and does not supersede or replace
any component of the original project plan dated April 22, 2024 (the “Project Plan”), unless specifically
stated. All original components of the Project Plan that are not amended in this document remain in
effect.
T
he Village proposes to amend the boundaries and the projects costs of TID 11. Map 1 shows the current
boundaries of TID 11 along with tax parcel numbers and Map 2 shows the proposed amended
boundaries. Additional maps include water, sewer and storm water, zoning & floodplain and wetlands
and are included in a separate file with all the maps.
Wi
sconsin Statutes Section 66.1105(4)(h)2 provides authority for a Village to amend the boundaries of
an existing Tax Increment District for purposes of adding or subtracting territory up to a total of four (4)
times during the life of the District. A three
-phas
ed approval process is required to amend TIF Districts
including approval by the Plan Commission, Village Board , and the Joint Review Board (JRB). The
following is the meeting schedule for the Village of Pleasant Prairie TID 11 amendment process:
Date Meeting
6/24/2026 First JRB Meeting
7/20/2026 Plan Commission Public Hearing & Meeting
8/10/2026 Village Board Meeting
8/25/2026 2nd JRB Meeting
On or after 8/26/2026 Submit Approval Documents to DOR
The Project Plan Amendment for TID 11 in the Village has been prepared in compliance with Wisconsin
Statutes Section 66.1105. The Amended Project Plan establishes the new boundaries and updates the
expected improvements or project costs within the TID. The Amended Project Plan is to be adopted by
resolution of the J RB and Village Board on the recommendation of the Village Plan Commission
following a public hearing and adoption of a resolution by the Plan Commission.
I
mplementation of the Amended Project Plan and construction of the public and private improvements
listed in this Amended Project Plan will still require individual consideration and authorization by the
Village Board. Public expenditures for projects listed in the Amended Project Plan should and will be
based on the ability of the Village and the Developer to finance the projects, market conditions, and the
status of development in the various time periods that portions of the project are scheduled for
construction.
06/17/2026
Page 1
The Village Board is not mandated to make the public expenditures described in this Amended Project
Plan but is limited to the types of expenditures listed herein. Any changes to the boundaries or types of
eligible projects will require a formal amendment to the Amended Project Plan with public review by
(including a public hearing) the Plan Commission and the Village Board with JRB approval. Redistribution
of project expenditures from one project category to another will not require an amendment to the
Amended Project Plan.
District Type Declaration and Confirmation
TID 11 is and will continue to be a mixed-use district and not less than fifty percent (50%) of the District,
by area, is suitable for mixed-use development. After the proposed amendment, approximately 28% of
the property in TID 11 is expected to be used for industrial development, 11% of the property in TID 11
is expected to be used for commercial development and 10% of the property is expected to be used for
newly platted residential development. It is estimated that 10% of the territory in TID 11 will be devoted
to retail business at the end of TID 11’s maximum expenditure period.
Diagrams detailing proposed boundaries, tax parcels, existing uses and conditions, wetlands, proposed
improvements, zoning, and land use information are shown on maps one through ten (1) through (10)
deemed attached hereto and submitted as a separate file due to file size constraints.
Statement of Kind, Number of, Location & General Description of Amended Project
Tax Increment District No. 11
The original TID 11 project boundaries are shown on Map 1, included in the appendices. The proposed
TID 11 amended project boundaries are included in Map 2 and described below.
The boundaries of the amended District will include the streets, highways and intersections as shown
on the boundary map attached. The district runs roughly from CTH C to the north, with parcels adjacent
to both sides of Interstate 94 south to CTH ML. See “Legal Description” herein for a legal description of
TID 11.
TID 11 includes the following additional Tax Parcels for Amendment No. 1:
(Remainder of page left blank intentionally)
06/17/2026
Page 2
There are no changes to the original parcels included in TID 11.
Project Cost Summary Updated
The amended estimated total project cost for the design and construction of TID 11 improvements is
$83,403,600. Financing Costs in the below table do not include interest on the debt obligations which
amounts may vary and are estimated in schedules contained in this Amended Project Plan . Interest
costs, including any capitalized interest, shall be eligible project costs in addition to the total project
costs set forth.
Project costs are currently estimated in the amounts and categories below and are subject to change:
Count Parcel Acres 2026 Asmt
1 92-4-122-181-0271 22.110 422,100
2 92-4-122-181-0275 21.260 413,600
3 92-4-122-181-0401 56.420 435,700
4 92-4-122-181-0541 3.190 186,200
5 92-4-122-182-0160 0.861 403,800
6 92-4-122-182-0171 0.658 104,600
7 92-4-122-182-0173 0.778 101,300
8 92-4-122-182-0175 0.901 380,500
9 92-4-122-183-0155 6.980 146,200
10 92-4-122-183-0160 2.956 0
11 92-4-122-183-0161 82.656 0
12 92-4-122-183-0162 2.099 6,300
13 92-4-122-183-0300 14.081 275,400
14 92-4-122-183-0320 0.919 459,900
15 92-4-122-184-0103 5.000 639,100
16 92-4-122-184-0104 33.062 647,100
17 92-4-122-184-0400 39.020 83,300
18 92-4-122-184-0450 27.710 0
320.661 4,705,100
Project Plan New Total Increase in
Category Projected Cost Projected Cost Projected Cost
Improvements 54,395,000 81,120,000 26,725,000
Legal, Admin, Other 1,631,850 2,283,100 651,250
Total 56,026,850 83,403,100 27,376,250
Total TID Costs 56,026,850 83,403,100 27,376,250
06/17/2026
Page 3
Statement of Findings
The Village finds as follows with respect to the project plan amendment:
The proposed Amended Project Plan is feasible and, with the proposed changes to the Village
Comprehensive Plan and Comprehensive Plan Map set forth in this Amended Project Plan , will be in
conformity with the Comprehensive Plan of the Village.
1) TID 11 is contiguous and contains only whole units of property as are assessed for general tax
purposes.
2) The creation date of the District for the purpose of allocating tax increment is January 1, 20 24 and
the amendment date is August 10, 2026.
3) The newly pl atted residential development in the District will not exceed 35% of the area of the
District.
4) Without the use of TIF funding, TID 11 development projects would not occur (“But For” statement).
5) The Project costs promote the orderly development of property within the Village boundaries.
6) Statute 66.1105(4)(gm)4.a.: Not less than fifty percent (50%) by area, of the real property within the
proposed district, is suitable for mixed-use development.
7) Statute 66.1105(4)(gm)4.b.: The improvement of the area will significantly enhance the value of all
real property within the proposed District.
8) Statute 66.1105(4)(gm)4.bm.: The proposed amended project costs within Tax Increment District 11
relate directly to promoting mixed -use development consistent with the purpose for which the Tax
Increment District was created.
Description Estimated Cost
Gr
ading 6,220,000
Roadways 19,200,000
Water 11,500,000
Sewer 8,525,000
Other 30,175,000
TOTAL 75,620,000
PLUS: Project Costs Expended to Date 5,500,000
Total TID#11 Project Costs 81,120,000
06/17/2026
Page 4
9) 66.1105(4)(gm)4.c. the equalized value of taxable property to be added to the district plus the value
increment of all existing districts, including the district, does not exceed 12% of the total equalized value
of taxable property within the Village.
2026 equalized value of taxable property added to TID#11 by Amendment No. 1: $4,705,100
2025 equalized value increment of all districts: $691,870,200
Combined equalized value of property to be added plus increment of all existing
Districts $696,575,300
12 percent of the total 2025 equalized value of taxable property in the Village: $788,955,384
Total EV 2025 $ 6,574,628,200
Based on the calculation above, the Village and the amended TID #11 meet the requirements of the 12% test.
Economic Feasibility Analysis
An updated cashflow projection for the amended TID 11 is attached. This projection shows the
economic feasibility using the amended total costs and includes public debt already issued in 2025 for
a portion of project costs of TID 11.
(Remainder of page left blank intentionally)
TID4 $2,847,300
TID5 $359,450,600
TID6 $23,286, 700
TID7 $59,152,600
TID8 $70,754,400
TID10 $122,021,900
TID11 $45,989,500
TID12 $8,367,200
Total $691,870,200
06/17/2026
Page 5
Revenue and Cash Flow Projections
Village of Pleasant Prairie Estimated Cashflow for Project Plan Amendment No. 1
Cash Flow Projections - TID No. 11 - IH-94 Area Project - Mixed Use
Creation Year: 2024
Resolution Date: 4/22/2024
Expenditure Period Ends: 4/22/2039
Termination Date: 4/22/2044
Last Collection Year: 2045
Extension Available: Yes up to 3 years
Date Prepared: 6/10/2026
MRO
33,700,000
2026 $5,515,000 $8,560,000 $4,385,000 $10,590,000 $6,495,000 $13,200,000 5.00%
Value Taxable For Collect Tax Eligible Total Actual Projected Projected Projected Projected Projected Projected Returned to Fund For
During as of Incremental Collection Tax Increment Capitalized Interest Village All G.O. Debt G.O. Debt G.O. Debt G.O. Debt G.O. Debt G.O. Debt MRO Taxing Balance Collection
Year Amount 01/01 Value Year Rate Collections Interest Income Expenses Revenues 05/28/25 11/01/26 11/01/27 11/01/28 11/01/29 11/01/32 01/01/28 Jurisdictions 12/31 Year
2021 2022 2023 (2,323) (A) (2,323) (2,323) (E) 2023
2022 2023 2024 (88,910) (A) (88,910) (91,233) (A) 2024
2023 2024 2025 416,344 (A) 6,472 (A) (17,774) (A) 405,043 313,810 (A) 2025
2024 45,989,500 (A) 2025 45,989,500 (A) 2026 14.350 (A) 659,970 (A) 30,000 (E) (20,150) (P) 669,820 (292,634) 690,996 (E) 2026
2025 74,488,700 (E) 2026 120,478,200 (E) 2027 14.350 (E) 1,728,862 (E) (2,500) (P) 1,726,362 (249,050) (428,000) 1,740,308 (E) 2027
2026 115,412,250 (E) 2027 235,890,450 (E) 2028 14.350 (E) 3,385,028 (E) (2,500) (P) 3,382,528 (249,050) (2,228,000) (219,250) (1,117,059) 1,309,477 (E) 2028
2027 175,767,400 (N) 2028 411,657,850 (E) 2029 14.350 (E) 5,907,290 (E) (2,500) (P) 5,904,790 (249,050) (2,938,000) (219,250) (529,500) (1,949,406) 1,329,061 (E) 2029
2028 112,815,900 (E) 2029 524,473,750 (E) 2030 14.350 (E) 7,526,198 (E) (2,500) (P) 7,523,698 (1,059,050) (2,908,000) (219,250) (529,500) (324,750) (2,483,645) 1,328,564 (E) 2030
2029 80,419,950 (E) 2030 604,893,700 (E) 2031 14.350 (E) 8,680,225 (E) (2,500) (P) 8,677,725 (1,066,650) (1,533,000) (2,319,250) (529,500) (324,750) (2,864,474) 1,368,665 (E) 2031
2030 33,170,550 (E) 2031 638,064,250 (E) 2032 14.350 (E) 9,156,222 (E) (2,500) (P) 9,153,722 (1,072,650) (2,399,250) (2,329,500) (324,750) (3,021,553) 1,374,684 (E) 2032
2031 40,074,750 (E) 2032 678,139,000 (E) 2033 14.350 (E) 9,731,295 (E) (2,500) (P) 9,728,795 (1,073,150) (4,439,500) (324,750) (660,000) (3,211,327) 1,394,751 (E) 2033
2032 22,851,750 (E) 2033 700,990,750 (E) 2034 14.350 (E) 10,059,217 (E) (2,500) (P) 10,056,717 (1,085,750) (4,639,500) (324,750) (660,000) (3,319,542) 1,421,926 (E) 2034
2033 23,423,100 (E) 2034 724,413,850 (E) 2035 14.350 (E) 10,395,339 (E) (2,500) (P) 10,392,839 (1,081,500) (409,500) (4,874,750) (660,000) (3,430,462) 1,358,553 (E) 2035
2034 24,008,550 (E) 2035 748,422,400 (E) 2036 14.350 (E) 10,739,861 (E) (2,500) (P) 10,737,361 (2,042,250) (5,160,000) (3,544,154) 1,349,511 (E) 2036
2035 24,608,700 (E) 2036 773,031,100 (E) 2037 14.350 (E) 11,092,996 (E) (2,500) (P) 11,090,496 (4,935,000) (6,101,148) 1,403,859 (E) 2037
2036 25,224,075 (E) 2037 798,255,175 (E) 2038 14.350 (E) 11,454,962 (E) (2,500) (P) 11,452,462 (4,410,000) (6,300,229) 2,146,092 (E) 2038
2037 25,854,600 (E) 2038 824,109,775 (E) 2039 14.350 (E) 11,825,975 (E) (2,500) (P) 11,823,475 (10,643,378) 3,326,189 (E) 2039
2038 26,501,025 (E) 2039 850,610,800 (E) 2040 14.350 (E) 12,206,265 (E) (2,500) (P) 12,203,765 (2,414,876) (13,115,078) 0 (E) 2040
2039 27,163,425 (E) 2040 877,774,225 (E) 2041 14.350 (E) 12,596,060 (E) (2,500) (P) 12,593,560 0 (E) 2041
2040 27,842,550 (E) 2041 905,616,775 (E) 2042 14.350 (E) 12,995,601 (E) (2,500) (P) 12,993,101 0 (E) 2042
2041 28,538,700 (E) 2042 934,155,475 (E) 2043 14.350 (E) 13,405,131 (E) (2,500) (P) 13,402,631 0 (E) 2043
2042 29,252,025 (E) 2043 963,407,500 (E) 2044 14.350 (E) 13,824,898 (E) (2,500) (P) 13,822,398 0 (E) 2044
2043 29,983,425 (E) 2044 993,390,925 (E) 2045 14.350 (E) 14,255,160 (E) (2,500) (P) 14,252,660 0 (E) 2045
993,390,925 191,626,555 416,344 36,473 (176,657) 191,902,715 (7,478,534) (10,035,000) (5,376,250) (13,406,500) (8,540,750) (16,485,000) (50,401,254) (13,115,078)
(A) Actual Project Costs 5,500,000 + 8,300,000 + 4,250,000 + 10,270,000 + 6,300,000 + 12,800,000 + 33,700,000 = 81,120,000
(E) Estimated. 2029-2030 2032-2035
(N) Includes addition of new project projected value $79 million on additional property after amendment.
(P) Projected, actual expenses to be reimbursed to the extent eligible under Wisconsin statutes. Borrowed in 2025 5,500,000
Remaining 75,620,000
Change Takes Place
Taxable Incremental Value
06/17/2026
Page 6
Historic Percent of Tax Rate for Overlapping Taxing Districts
Share of Tax Increments Paid by Other Taxing Entities
All Gateway
Budget School Technical Kenosha
Year Village Districts College County TOTAL
2026 4.01 6.01 0.57 3.52 14.11
2025 3 . 94 5.08 0.56 3.41 12.99
2024 4.29 6.08 0.64 3.88 14.89
2023 3.71 6.52 0.65 3.95 14.83
2022 4.68 9.47 0.88 5.42 20.45
2021 4.64 9.97 0.89 5.22 20.72
2020 4.28 9.07 0.84 5.10 19.29
2019 4.28 9.48 0.81 5.11 19.68
2018 4.60 10.64 0.84 5.50 21.58
2017 4.46 10.38 0.82 5.48 21.14
42.89 82.70 7.50 46.59 179.68
Village of Pleasant Prairie 42.89 23.87%
All School Districts 82.70 46.03%
Gateway Technical College 7.50 4.17%
Kenosha County & Library 46.59 25.93%
179.68 100.00%
Determination of Historic Percent of Tax Rate
for Overlapping Taxing Districts
46.03% 4.17% 25.93%
Projected All Gateway
Collection Tax School Technical Kenosha
Year Increment Districts C o llege County
2026 659,970 303,759 27,548 171,126
2027 1,728,862 795,731 72,164 448,284
2028 3,385,028 1,558,002 141,294 877,718
2029 5,907,290 2,718,905 246,575 1,531,727
2030 7,526,198 3,464,028 314,150 1,951,500
2031 8,680,225 3,995,184 362,320 2,250,733
2032 9,156,222 4,214,267 382,189 2,374,156
2033 9,731,295 4,478,952 406,193 2,523,269
2034 10,059,217 4,629,882 419,881 2,608,298
2035 10,395,339 4,784,587 433,911 2,695,452
2036 10,739,861 4,943,158 448,291 2,784,785
2037 11,092,996 5,105,692 463,031 2,876,351
2038 11,454,962 5,272,292 478,140 2,970,206
2039 11,825,975 5,443,055 493,627 3,066,408
2040 12,206,265 5,618,088 509,500 3,165,015
2041 12,596,060 5,797,497 525,771 3,266,087
2042 12,995,601 5,981,390 542,448 3,369,685
2043 13,405,131 6,169,882 559,542 3,475,874
2044 13,824,898 6,363,085 577,063 3,584,717
2045 14,255,160 6,561,118 595,023 3,696,282
191,626,555 88,198,553 7,998,660 49,687,674
Share of Tax Increments Paid by
Other Taxing Jurisdictions
06/17/2026
Page 7
Financing Methods
The Village may use either general obligation promissory notes or developer revenue bonds for
TID 11 projects. Based on current estimates, which are subject to change, the general obligation
promissory note financing s are expected to occur between 2026 & 2035 as detailed in this TID
11 Amended Project Plan and developer revenue bonds will be issued once a developer
completes the infrastructure projects that it is responsible for and provides detailed invoices to
the Village for the work, as outlined in a development agreement.
Public Debt– Total Borrowing Preliminary Sources and Uses
Public Debt – Preliminary Debt Service Estimates
2026 TID#11 2027 TID#11 2028 TID#11 2029 TID#11 2032 TID#11 Summary
Sources Of Funds
Par Am ount of Bonds $8,560,000.00 $4,385,000.00 $10,590,000.00 $6,495,000.00 $13,200,000.00 $43,230,000.00
Total Sources $8,560,000.00 $4,385,000.00 $10,590,000.00 $6,495,000.00 $13,200,000.00 $43,230,000.00
Uses Of Funds
Deposit to Project Construction Fund 8,300,000.00 4,250,000.00 10,270,000.00 6,300,000.00 12,800,000.00 41,920,000.00
Costs of Issuance 256,800.00 131,550.00 317,700.00 194,850.00 396,000.00 1,296,900.00
Rounding Am ount 3,200.00 3,450.00 2,300.00 150.00 4,000.00 13,100.00
Total Uses $8,560,000.00 $4,385,000.00 $10,590,000.00 $6,495,000.00 $13,200,000.00 $43,230,000.00
D AT E 2026 TID#11 2027 TID#11 2028 TID#11 2029 TID#11 2032 TID#11 TOTA L
11/01/2027 428,000.00 - - - - 428,000.00
11/01/2028 2,228,000.00 219,250.00 - - - 2,447,250.00
11/01/2029 2,938,000.00 219,250.00 529,500.00 - - 3,686,750.00
11/01/2030 2,908,000.00 219,250.00 529,500.00 324,750.00 - 3,981,500.00
11/01/2031 1,533,000.00 2,319,250.00 529,500.00 324,750.00 - 4,706,500.00
11/01/2032 - 2,399,250.00 2,329,500.00 324,750.00 - 5,053,500.00
11/01/2033 - - 4,439,500.00 324,750.00 660,000.00 5,424,250.00
11/01/2034 - - 4,639,500.00 324,750.00 660,000.00 5,624,250.00
11/01/2035 - - 409,500.00 4,874,750.00 660,000.00 5,944,250.00
11/01/2036 - - - 2,042,250.00 5,160,000.00 7,202,250.00
11/01/2037 - - - - 4,935,000.00 4,935,000.00
11/01/2038 - - - - 4,410,000.00 4,410,000.00
Total $10,035,000.00 $5,376,250.00 $13,406,500.00 $8,540,750.00 $16,485,000.00 $53,843,500.00
06/17/2026
Page 8
Developer Revenue Bonds Aggregate Estimated Payment Schedule
Proposed Zoning & Master Plan Changes & Non-Project Costs
Existing & proposed floodplain and wetlands (which are not included in TID 11) are shown on
Map 3. The existing water, sewer and storm main is shown on Map
4 and proposed water, sewer and storm main is found on Map 5. Th e existing zoning map is
shown on Map 6 and proposed new zoning appears on Map 7. Existing uses and conditions of
TID 11 are a mix of commercial, industrial, and open space as shown on Maps 8 & 9 and the new
proposed land use for the additional territory is shown on Map 10.
The proposed zoning of the added parcels will include A -3, General Agriculture, B -4 Freeway
Service Business, R-4, Urban Single Family Residential, R-11, Multifamily Residential, C-1, Lowland
Resource Conservancy District, and PR-1 Neighborhood, Park-Recreational and Other Open Space
District. There are no proposed zoning or master plan changes to the original project plan.
Also, an Urban Landholding Overlay (UHO) District may be placed over certain commercial lands
within the TID until more detailed Master Conceptual Plans are provided to the Village.
The current land uses, as shown on the Village of Pleasant Prairie 2035 Land Use Plan (Maps 8 &
9) are not proposed to be changed from the original project plan. The proposed new land uses
for the land areas added include Freeway-Oriented Service Centers, Freeway Oriented Business
Centers, Low Medium Density Residential; Wetlands (environmental corridor), 100 -year
5% Infrastructure
Date Principal Interest* Interest Paid Unpa id Int. Total Paid Revenues Cost Balance
1/1/2025
1/1/2026 - - - -
1/1/2027 - - - - -
1/1/2028 - - - - 33,700,000 33,700,000
1/1/2029 1,685,000 1, 117,059 567,941 1,117,059 1,117,059 - 34,267,941
1/1/2030 236,009 1, 713,397 1,713,397 - 1,949,406 1,949,406 34,031,932
1/1/2031 782,049 1, 701,597 1,701,597 - 2,483,645 2,483,645 33,249,883
1/1/2032 1,201,980 1, 662,494 1,662,494 - 2,864,474 2,864,474 32,047,903
1/1/2033 1,419,158 1, 602,395 1,602,395 - 3,021,553 3,021,553 30,628,745
1/1/2034 1,679,890 1, 531,437 1,531,437 - 3,211,327 3,211,327 28,948,855
1/1/2035 1,872,099 1, 447,443 1,447,443 - 3,319,542 3,319,542 27,076,756
1/1/2036 2,076,624 1, 353,838 1,353,838 - 3,430,462 3,430,462 25,000,132
1/1/2037 2,294,148 1, 250,007 1,250,007 - 3,544,154 3,544,154 22,705,985
1/1/2038 4,965,849 1, 135,299 1,135,299 6,101,148 6,101,148 17,740,136
1/1/2039 5,413,222 88 7,007 887,007 6,300,229 6,300,229 12,326,914
1/1/2040 10,027,032 61 6,346 616,346 10,643,378 10,643,378 2,299,882
1/1/2041 2,299,882 11 4,994 114,994 2,414,876 10,985,638 (0)
1/1/2042 (0) (0) (0) 4,156,700 (0)
1/1/2043 (0) (0) (0) 4,288,548 (0)
1/1/2044 (0) (0) (0) 4,423,693 (0)
1/1/2045 (0) (0) (0) 4,562,216 (0)
1/1/2046 (0) (0) (0) 4,704,203 (0)
34,267,941 16,701,253 1 6,133,312 567,941 50,401,253 81,107,376 33,700,000 334,025,062
* interest rate to be determined at issuance of each developer revenue bond based on market conditions.
Developer Revenue Bond - Aggregate
06/17/2026
Page 9
Floodplain and Park, Recreation and Open Space Lands as shown on Map 10. There will be newly
created storm water retention ponds and smaller areas of environmental corridors (including
wetland conservancy and 100 -year floodplain areas) that will remain after floodplain
adjustments and wetland filling.
In addition to information as set forth above, as projects are proposed, changes to the Zoning
Ordinance, Master Plan, Map, Building Code or Ordinances may be made to accommodate the
activities planned for this Amended Project Plan, however, at this time no additional changes are
contemplated.
There are no non-project costs.
All individuals and businesses to be displaced because of the activities occurring within the district
as a part of this Project Plan Amendment will be provided assistance in conformance with Chapter
32, Wisconsin Statutes, and in conformance with any other state and federal rules and regulations
as applicable.
Tax Increment District 11 - Legal Description of Parcels as Amended
Commencing at the southwest corner of the northwest ¼ of Section 31, Range 22, Town 1 at the
intersection of Interstate 94 and 122nd Avenue, traverse northwesterly 3967.31 ft; northeasterly
1204.31 ft to the northeast corner of parcel 92 -4-122-303-0300; thence northwest 1275.28 ft;
northwest 267.78 ft; thence southwest 34.87 ft; thence northwest 274.00 ft; thence northeast
94.29 ft; th ence southeast 94.01 ft; thence southwest 24.76 ft; thence southeast 127.01 ft;
thence northeast 159.75 ft; thence northwest 127.00 ft; thence northeasterly 689.72 ft to the
northwest corner of parcel 92 -4-122-302-0375; thence northwest 575.99 ft along the southern
right-of-way line of 120th street; thence southwesterly 916.62 ft along the eastern edge of right-
of-way of 120 th Avenue; thence continue southwesterly 2737.10 ft to the southwest corner of
91-4-121-251-0300, thence continue northwesterly 1327.39 ft along the western boundary of
parcel 91 -4-121-251-0300; thence northeasterly 2238.47 ft along the northern boundary of
parcel 91-4-121-251-0300; thence southeasterly along the northern boundary of parcel 91 -4-
121-251-0300 to a point along the western boundary of Interstate 94; thence continue
northwesterly 225.1 ft to the southeastern most point of parcel 91-4-121-251-0153 as described
in CSM 2684; thence follow the eastern row of 122 nd Avenue also known as the West Frontage
Rd as described in CSM 2684 1704.18 ft to the northern corner of said parcel; thence
southwesterly along the southern edge of right-of-way of 104th Street also known as Highway Q
2735.11ft; thence northwest 160.09 ft to the southwestern corner of parcel 91 -4-121-244-0616
as described in CSM 2905 lot 6; thence northwesterly 5205.02 ft to the northwest corner of parcel
91-4-121-244-0613 which is the northern edge of Section 24, Range 21, Town 1; thence continue
northeasterly along said northern edge of Section 24 1320.26 ft, to the southwest corner of the
06/17/2026
Page 10
southeast ¼ of Section 13, Range 21, Town 1 ; thence continue northwesterly 1061.98 ft along
the civil boundary of Pleasant Prairie; thence continue along the civil boundary of Pleasant Prairie
northeasterly 2819.34 to the western edge of Section 18, Range 22, Town 1; thence northeasterly
along the Wilmot Road corridor parallel to and offset 33 ft southeast from the southeast
boundary of parcel 92 -4-122-183-0020 970.74 ft to the northern edge of the southwest ¼ of
Section 18, Range 22, Town 1; thence northeasterly along the centerline of Wilmot Road 967.4
feet to a point of intersection with the northerly extension of the centerline of 114
th Avenue;
thence southeasterly along the extension of the centerline of 114 th Avenue 44.92 ft to the
southeastern edge of the right-of-way of Wilmot Road; thence continue southeasterly along the
extension of the centerline of 114 th Avenue 130.73 ft; thence continue southeasterly along the
centerline of 114th Avenue 400.00 ft to the northern edge of the southwest ¼ of section 18, Range
22, Town 1 ; thence continue southwesterly along the northern edge of the southwest ¼ of
section 18, Range 22, Town 1 25.6 to the western edge of the right -of-way of 114 th Avenue;
thence southeasterly along the western edge of the right-of-way of 114th Avenue 875.85 ft to the
northwest corner of parcel 92 -4-122-183-0375; thence southeasterly along the western
boundary of parcel 92 -4-122-183-0161 437.26 ft to the northern boundary of parcel 92 -4-122-
183-0161; thence northeasterly along said boundary 480. 01 ft to the western edge of the right -
of-way of River Road; thence southeasterly 295.17 ft to the southwest corner of parcel 92-4-122-
183-0410; thence northeasterly 295.60 ft along the southern boundary of parcels 92-4-122-183-
0410 and 92-4- 122-183-0420 t o the western edge of the right -of-way of River Road; thence
continue at the same bearing across the right -of-way of River Road 49.57 ft to the western
boundary of parcel 92-4-122-184-0104; thence northwesterly 265 ft to the northwest corner of
parcel 92 -4-122-184-0104; thence northeasterly along the northern boundary of said parcel
960.5 ft to the southeast corner of parcel 92 -4-122-184-0010; thence northwesterly 385.00 ft
along the eastern boundary of said parcel; thence northwesterly along the boundary o f said
parcel 580.6 ft; thence northwesterly along the northern boundary of said parcel 563.5 ft to the
intersection with the western boundary of parcel 92 -4-122-181-0401; thence northwesterly
along said western boundary 521.17 ft to the southwest corner of the northeast ¼ of section 18,
Range 22, Town 1 ; thence continue northwesterly along the western edge of the northeast ¼ of
section 18, Range 22, Town 1 1077.34 ft to the northern edge of the right -of-way for Wilmot
Road; thence northeasterly along said right -of-way edge 271.60 ft to the southwest corner of
parcel 92-4-122-181-0008; thence continue northeasterly along the northern right -of-way for
Wilmot Road 497.39 ft to the southeast corner of parcel 92 -4-122-181-0002; thence continue
across the right-of-way for 111
th Avenue to the southwest corner of parcel 92 -4-122-181-1020;
thence continue northeasterly along the northern right-of-way for Wilmot Road 272.98 ft to the
southeast corner of parcel 92-4-122-181-1018; thence southeasterly across the right-of-way for
Wilmot Rd 83.0 ft to the northwest corner of parcel 92 -4-122-181-0405; thence southeasterly
along the western boundary of said parcel 575.42 feet to the parcels southwest corner; thence
northeasterly along said parcel’s southern boundary 17 6.92 ft; thence continue northwesterly
06/17/2026
Page 11
along said parcel’s eastern boundary 280.00 ft to the northwest corner of parcel 92 -4-122-181-
0271; thence northeasterly along said parcels northern boundary 706.17 ft to the northeast
corner of said parcel; thence continue southwesterly along the eastern boundary of said parcel
794.26 ft; thence northwesterly 354.0 ft along the boundary of parcel 92-4-122-181-0275; thence
southeast along the eastern boundary of said parcel 260.33 ft; thence continue northeasterly
along the boundary of said parcel 141 ft to the western edge of the right-of-way of 105
th Avenue;
thence continue northeasterly across the right-of-way for 105th Avenue 67.13 ft to the northwest
corner of parcel 92-4-122-181-0541; thence continue northeasterly along the northern boundary
of said parcel 155 ft to the parcel’s northeast corner which is on the eastern edge of the northeast
¼ of section 18, Range 22, Town 1 ; thence continue southeasterly along the eastern edge of the
section 3206.59 ft to the southeast corner of section 18, Range 22, Town 1 ; thence continue
northwesterly along the southern edge of the southeast ¼ of section 18, Range 22, Town 1
1985.5 ft to the southeast corner of parcel 92 -4-122-184-0102; thence continue northwesterly
along the eastern boundary of said parcel 27 0.6 ft; thence continue southwesterly along the
northern boundary of said parcel 257.01 ft; thence continue southeasterly along the western
boundary of said parcel 171.39 ft to the southern edge of the southeast ¼ of section 18, Range
22, Town 1 ; thenc e continue northwesterly following the southern edge of said section 82.85
to the southeast corner of parcel 92-4-122-184-0104; thence continuing northwesterly along the
southern edge of said parcel 355.29 ft to the northeast corner of the northwest ¼ of section 19,
Range 22, Town 1 ; thence continue southeasterly along the eastern edge of said quarter section
262.42 ft to the southeast corner of parcel 92 -4-122-183-0161; thence continue southwesterly
along the southern boundary of said parcel 2349.82 ft to the southwest corner of said parcel also
being on the eastern edge of the right -of-way for 1 -94; thence continue along an extension of
the southern boundary of parcel 92-4-122-183-0161 200 ft ; thence southeasterly along the I-94
corridor 1,645.98 ft; thence continue northeasterly 182.34 ft to the northwest corner of parcel
92-4-122-192-0302; thence northeast along the northern edge of parcel 92-4-122-192-0302 756
600.50 ft; thence southeasterly along the eastern boundary of parcels 92 -4-122-192-0302 and
92-4-122-193-0125 to the southern point of parcel 92-4-122-193-0125 as described as parcel 22
in CSM 2177; thence north westerly along the southern boundary of parcel 92 -4-122-193-0125
as described in CSM 2177 to the southwestern point which falls on the eastern right-of-way edge
of 120th Avenue; thence southeasterly to the northwestern point of parcel 92-4-122-193-0170 as
described in CSM 2871 as outlot 1; then southeasterly along the eastern edge of parcel 92-4-122-
193-0170 to a point on the northern right-of-way edge of 104th Street also known as Highway Q;
thence southeast 171.34 ft to the southern edge of right -of-way of 104 th Street and also the
northeast point of parcel 92 -4-122-302-0167 as described in CSM 1938; thence follow the
boundary for parcel92-4-122-302-0167 southeasterly 411.97 ft to the western edge of Corporate
Drive; continue southeasterly along the right -of-way edge of Corporate Drive to the southwest
corner of parcel 92-4-122-302-0171; thence continue northeasterly along the southern boundary
of parcel 92-4-122-302-0171 to the northeast point of said parcel, also known as the northern
06/17/2026
Page 12
point of parcel 92-4-122-302-0172; thence northeast 427.50 ft to the northeast corner of parcel
92-4-122-302-0172; thence southeast to the southeast corner of parcel 92 -4-122-302-0172;
thence southeast along the eastern boundary of parcel 92 -4-122-302-0165 to the southeast
corner of said parcel; thence northwest along the southern boundary of parcel 92 -4-122-302-
0165 to the southwest corner which falls on the eastern edge right -of-way of Corporate Drive;
then southwest along the right -of-way curve of Corpor ate Drive 90.13 ft; thence southeast
784.04 ft to the southeast corner of parcel 92 -4-122-302-0160; thence southwest 481.49 ft to
the northwest corner of parcel 92 -4-122-302-0201; thence southeasterly 734.00 ft to the
southwest corner of parcel 92 -4-122-302-0201; thence northeasterly 171.30 ft along the
southern boundary of said parcel; thence southeasterly 45 ft along the western boundary of
parcel 92-4-122-303-0110; thence northeasterly 916.72 ft along the southern boundary of said
parcel; thence southeast 834.95 ft along the western edge of the southeast ¼ section of Section
30, Range 22, Town 1; thence northeast 2640 ft along the boundary of parcel 92-4-122-301-0200
to a point on the eastern edge of Section 30, Range 22, Town 1; thence southeast along th e
eastern edge of Section 30 441 ft; thence southwest 1321.01 ft; thence southeast 2660.57 ft to
the southeast point of parcel 92 -4-122-303-0012; thence southwest 2700.49 ft to the western
edge of right-of-way of 120th Avenue also known as the East Frontage Road; thence southeasterly
1180.75 ft along the western edge of the East Frontage Road; thence southwesterly 205.63 ft;
thence southeasterly 75.67 ft to the centerline of the right- of-way of 122
nd Street; thence
northwesterly along the southern edge of right -of-way of 122nd Street 994.56 ft to the point of
beginning.
06/17/2026
Page 13
Village of Pleasant Prairie Tax Increment District No. 11 - Amendment
Tax Increment District No. 11
(IH-94 Area Project – TID 11)
PROJECT PLAN AMENDMENT No. 1
MAPS
04/08/2024
Page 1
GOLDBEAR DR
128TH AVE
104TH ST
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
122ND ST
120TH AVE
CORPORATE
DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
120TH AVE
RIVER RD
105TH AVE
92-4-122-183-0155
92-4-122-183-0161
92-4-122-184-0104
92-4-122-184-0103
92-4-122-183-0300
92-4-122-183-0320
92-4-122-183-0160
92-4-122-183-0162
92-4-122-181-0401
92-4-122-
181-0271
92-4-122-
181-0275
92-4-122-
181-0541
92-4-122-184-0400
92-4-122-184-0450
92-4-122-182-0175
92-4-122-182-0173
92-4-122-182-0171
92-4-122-182-0160
Parcel Line
Parcels Added
Tax Increment District #11
Amendment 1
Boundaries and
Parcels (2026)
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,100 feet
Tax Increment District
GOLDBEAR DR
128TH AVE
104TH ST
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
122ND ST
120TH AVE
CORPORATE DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
120TH AVE
RIVER RD
105TH AVE
Parcel Line
Tax Increment District
Tax Increment District #11
Amendment 1
Proposed Boundaries, Floodplain
& Wetlands (2026)
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,100 feet
Floodplain
Staked Wetlands
Interpolated Wetlands
GOLDBEAR DR
128TH AVE
104TH ST
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
122ND ST
120TH AVE
CORPORATE
DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
120TH AVE
RIVER RD
105TH AVE
Public Sanitary Sewer Main
Public Water Main
Tax Increment District #11
Amendment 1
Existing Sewer &
Water Main (2026)
Parcel Line
Tax Increment District
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,100 feet
Public Sanitary Sewer Forcemain
GOLDBEAR DR
128TH AVE
104TH ST
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
122ND ST
120TH AVE
CORPORATE
DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
120TH AVE
RIVER RD
105TH AVE
Public Sewer Main
Public Water Main
Tax Increment District #11
Amendment 1
Proposed Sewer &
Water Main (2026)
Parcel Line
Tax Increment District
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,100 feet
Public Sewer Forcemain
M-5
M-5 (PUD)
PR-1
C-1C-1 (PUD)
PR-1
C-1
C-1
M-5 M-5 (PUD)
C-1
B-6
C-1
C-1
B-4
B-5
C-2
B-4
B-5
B-3 (PUD)
R-11
(PUD)
A-2
R-3
C-2
C-1
R-2
C-1
A-2
R-2
C-1 C-2
C-2
C-1
C-2
C-1
C-2
B-4 (PUD)
I-1 (PUD)
C-1 PR-1
B-4 (PUD)
B-6 (UHO)
B-6 (PUD)
B-5
PR-1 (PUD)
C-1 (PUD)
M-5
C-1
I-1
C-1
M-5 (PUD)
M-5
M-5
B-5
M-5
C-1
C-2
C-1
PR-1
C-1
A-2
A-2
A-2
A-3
C-1
A-2
B-4
(UHO)
R-3
I-1 (AGO)
R-4 (UHO)
C-1
PR-1
C-1
GOLDBEAR DR
128TH AVE
104TH ST
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
122ND ST
120TH AVE
CORPORATE
DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
120TH AVE
RIVER RD
105TH AVE
Tax Increment District #11
Amendment 1
Existing Zoning (2026)
Parcel Line
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,200 feet
100 - Year Floodplain
R-11 Urban Single-Family Residential District
R-4 Urban Single-Family Residential District
PR-1 Neighborhood, Park-Recreational and
Other Open Space District
M-5 Production Manufacturing District
I-1 Institutional District
C-2 Upland Resource Conservancy District
C-1 Lowland Resource Conservancy District
B-6 Freeway Oriented Business Center District
B-5 Freeway Office District
B-4 Freeway Service Business District
B-3 Regional Retail Business District
A-2 General Agriculture District
Zoning Districts
Zoning Overlay Districts
UHO Urban Land Holding Overlay District
PUD Planned Unit Development Overlay District
R-2 Urban Single-Family Residential District
R-3 Urban Single-Family Residential District
A-3 General Agriculture District
M-5
M-5 (PUD)
PR-1
C-1C-1 (PUD)
PR-1
C-1
C-1
M-5 M-5 (PUD)
C-1 (PUD)
PD
C-1
C-1
B-4
B-5
C-2
B-4
B-5
B-3
(PUD)
R-11
(PUD)
R-11
(PUD)
M-5
C-2
C-1
M-5
C-1
M-5
M-5
C-1
C-2
C-2
C-1
C-2
C-1
C-2
B-4 (PUD)
I-1 (PUD)
C-1
PR-1
B-4 (PUD)
B-6
B-6 (PUD)
B-5
PR-1 (PUD)
C-1 (PUD)
M-5
C-1
I-1
M-5 (PUD)
M-5
PR-1
M-5
R-11
(PUD)
PR-1
PR-1
PR-1
PR-1 PR-1
C-1
B-4
B-4
R-11
(PUD)
R-4
C-1
PR-1A-3
C-1
PR-1
C-1 (PUD)
C-1
I-1
GOLDBEAR DR
128TH AVE
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
122ND ST
120TH AVE
CORPORATE
DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
120TH AVE
RIVER RD
105TH AVE
104TH ST
Tax Increment District #11
Amendment 1
Proposed Zoning
Parcel Line
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,200 feet
100 - Year Floodplain
R-11 Multiple-Family Residential District
M-5 Production Manufacturing District
I-1 Institutional District
C-2 Upland Resource Conservancy District
C-1 Lowland Resource Conservancy District
B-6 Freeway Oriented Business Center District
B-5 Freeway Office District
B-4 Freeway Service Business District
B-3 Regional Retail Business District
Zoning Districts
Zoning Overlay Districts
PUD Planned Unit Development Overlay District
PD Planned Development District
R-4 Urban Single-Family Residential District
A-3 General Agriculture District
PR-1 Neighborhood, Park-Recreational and
Other Open Space District
Open Space/
Stormwater
Manufacturing
Open Space/
Stormwater
Water Tower
Vacant
Vacant
Open Space/
Stormwater
Commercial
Manufacturing
Manufacturing
Open Space/
Stormwater
Vacant
Agricultural
Vacant
Vacant
Vacant
Vacant
Vacant
Commercial
Open Space
Vacant
Agricultural
Conservancy
Vacant
Electrical
Substation
Residential/
Agricultural
Residential/
Agricultural
Residential
Residential
Commercial
Commercial
Commercial
Institutional
Institutional
Commercial
Commercial
Lift Station
Commercial
Commercial
Commercial
Commercial
Vacant
Water Tower
Vacant
Open Space/
Stormwater Vacant
Commercial
Vacant
Residential/
Agricultural
Residential
AgriculturalVillage
Lift Station
Vacant
Vacant
VacantResidential
Conservancy
ROW
Residential
Residential
Residential
Vacant
Conservancy
Vacant
Vacant
Agricultural
Vacant
Residential
Conservancy
Vacant
Residential
Residential
Agricultural
GOLDBEAR DR
128TH AVE
104TH ST
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
122ND ST
120TH AVE
CORPORATE
DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
RIVER RD
105TH AVE
120TH AVE
Parcel Line
Tax Increment District
Tax Increment District #11
Amendment 1
Existing Uses &
Conditions (2026)
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,100 feet
T
P
F
F
F
P
F
T
L L
O
F
W
TT
F
F
O
B
P
P
P/R
P
P
P
P
P
F O
P/R
P/R
F
P
P/R
P/R
P
P
R
B
B
O
T
GOLDBEAR DR
128TH AVE
104TH ST
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
122ND ST
120TH AVE
CORPORATE
DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
120TH AVE
RIVER RD
105TH AVE
Land Uses
Tax Increment District #11
Amendment 1
Existing Land Use (2026)
Parcel Line
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,200 feet
Commercial
Government and Institutional Lands
Industrial
Park, Recreation and Open Space Lands
Other Transportation, Communications
and Utilities
Isolated Natural Resource Areas
Primary Environmental Corridor
Field Verified Wetlands
Interpolated Wetlands
100 - Year Floodplain
T Overhead High Tension Wires
B Freeway-Oriented Business Centers
F Freeway-Oriented Service Centers
O Freeway Office Centers
R Freeway-Oriented Regional
Retail Centers
P Production and Manufacturing
P/R Production and Manufacturing or
Freeway-Oriented Regional Retail
Centers
Urban Reserves
Surface Water
High Density Residential
Low Medium Density Residential
F Fire Station
P P
P
P
BB
F
O
R R
F
F
R
P
P/R
P/R P/R
P/R
P
P
F
F
T
T
F
O
GOLDBEAR DR
128TH AVE
104TH ST
122ND AVE
WILMOT RD
120TH AVE
108TH ST
116TH AVE
120TH AVE
CORPORATE
DR
Q
C
94
165
122ND AVE
41
120TH CT
ML
120TH AVE
RIVER RD
105TH AVE
122ND ST
Land Uses
Tax Increment District #11
Amendment 1
Proposed Land Use
Parcel Line
Source: Village of Pleasant Prairie
Created: May 9, 2026
1 inch = 1,200 feet
Commercial
Government and Institutional Lands
Industrial
Park, Recreation and Open Space Lands
Other Transportation,
Communications and Utilities
Isolated Natural Resource Areas
Surface Water
Field Verified Wetlands
Interpolated Wetlands
100 - Year Floodplain
T Overhead High Tension Wires
B Freeway-Oriented Business Centers
F Freeway-Oriented Service Centers
O Freeway Office Centers
R Freeway-Oriented Retail Centers
L Limited Industrial
P Production and Manufacturing
P/R Production and Manufacturing or
Freeway-Oriented Regional Retail
Center
High Density Residential
Primary Environmental Corridor
Upper Medium Density Residential
Low Medium Density Residential
Mixed Use
Source: Village of Pleasant Prairie website. First collected Oct 16, 2026.