20260608 Plan Commission Packet
Village of Somers · Kenosha County · meeting of Jun 3, 2026 · Agenda packets
Open the original document More from Village of Somers
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Original Post Date: June 3, 2026
Village of Somers
7511 12th Street
Somers, WI 53171
Vi
llage Plan Commission Meeting
Agenda
Monday, June 8, 2026
5:30 P.M.
1. Ca
ll to order
2. Pl
edge of Allegiance
3. Appr
ove Minutes of January 12, 2026 and April 13, 2026 Meetings
4. Cor
respondence: none
5. Citiz
en Comments
6. Com
prehensive Plan Amendment:
Co
nsider adoption of Resolution 2026-001: David W Rasmussen & Scott B Rasmussen, 2004 3rd
Street, Kenosha, WI 53140 (Owner), Raymond C. Leffler, 8338 Corporate Drive, Mt. Pleasant, WI
53406 (Agent); requests an amendment to the land use plan map for the Village of Somers (Map 80)
as adopted in the Multi-Jurisdictional Comprehensive Plan for Kenosha County: 2035 from
Suburban-Density Residential, PEC, Nonfarmed Wetland, Other Conservancy Land to be Preserved
to Medium -Density Residential, Suburban- Density Residential, PEC, Nonfarmed Wetland, Other
Conservancy Land to be Preserved, on Tax Parcel # 83-4- 223-062- 0200, located in the NW ¼ of
Section 6, T2N, R23E, Village of Somers . (For information use only, the property is located on the
south side of Highway 195 at 1911 1
st Street).
7. Rezo
ne:
Reco
mmendation on Request by: David W Rasmussen & Scott B Rasmussen, 2004 3rd Street,
Kenosha, WI 53140 (Owner), Raymond C. Leffler, 8338 Corporate Drive, Mt. Pleasant, WI 53406
(Agent); requests approval of a rezoning from A-2 General Agricultural Dist. & C-2 Upland Resource
Conservancy Dist. to R -4.5 Urban Single -Family Residential Dist., R -2 Suburban Single -Family
Residential Dist., R-8 Urban Two-Family Residential Dist., C-2 Upland Resource Conservancy Dist.
& C-1 Lowland Resource Conservancy Dist., on Tax Parcel # 83 -4- 223-062-0200, located in the
NW ¼ of Section 6, T2N, R23E, Village of Somers. (For information use only, the property is located
on the south side of Highway 195 at 1911 1
st Street).
1/81
Original Post Date: June 3, 2026
8. Preliminary Plat (land division):
Recommendation on Request by: : David W Rasmussen & Scott B Rasmussen, 2004 3rd Street,
Kenosha, WI 53140 (Owner), Raymond C. Leffler, 8338 Corporate Drive, Mt. Pleasant, WI 53406
(Agent); requests approval of a preliminary plat (dated February 24, 2026 and prepared by John P.
Konopacki of Pinnacle Engineering Group), on Tax Parcel # 83-4- 223-062-0200, located in the NW
¼ of Section 6, T2N, R23E, Village of Somers. (For information use only, the property is located on
the south side of Highway 195 at 1911 1
st Street).
9. Plan Commission Conceptual Approval:
Recommendation on Request by: RPF Somers Outlots LLC, 1949 St Johns Ave., Ste 202,
Highland Park, IL 60035 (Owner), William A. Morris, 5313 87th Pl., Pleasant Prairie, WI 53158
(Agent), requesting a conceptual review of an assisted living facility on Tax Parcel #s 82-4-222-
104-0332 & 82-4-222-104-0333, located in the NW 1/4 of Section 19, T2N, R22E, Village of
Somers. Said conceptual approval is subject to formal approvals by the Village Board of a land
use plan amendment, rezoning, and site plan, building fenestration and stormwater management
plan approvals. (for information only, this property is located on one of the Hawthorn Apartments
outlots on the two parcels fronting Green Bay Road, just north of the Veterinarian Clinic).
10. Adjourn
I hereby certify that as the designee of the chief elected official of the Village of Somers, I posted this notice
of the June 8, 2026 Village Plan Commission Meeting Agenda in 1 public place & on the Village website.
Dated this Third day of June, 2026 Wendy Burnette, Clerk-Treasurer
Requests from person with disabilities who need assistance to participate in this meeting should be made to
the Clerk’s Office at 262-859-2822 with as much notice as possible. Notice is hereby given that members of
the Plan Commission members participate telephonically. Notice is hereby given that members of the Village
Board may be in attendance for the sole purpose of gathering information. A quorum may be present.
However, no Board action will be taken.
2/81
Village of Somers
Proceeding from the Village Plan
Commission Meeting
April 13, 2026
1. Call to Order
Chairman Stoner called the meeting to order at 5:30 p.m.
Present:
• Chairman George Stoner
• Commissioner Vinnie Chambers
• Commissioner Don Boxx
• Commissioner Michael DeLuca
• Commissioner Kent Mayes
Absent:
• Administrator Jim Hurley
• Commissioner Jerry Romanowski
• Commission Troy Steege
• Alternate Patrick Juliana
Staff present in person: Assistant Administrator Kevin Poirier, Deputy Clerk Treasurer Eugenia
Lara, and Chief Andersen
Village Trustees: Jackie Nelson, Karl Ostby, Joe Smith, Scott Fredrick and Ben Harbach
Doug Snyder Village Engineer
Kenosha County Planners: Andy Buehler
Others: Gregg Sinnen
2. Pledge of Allegiance
Chairman Stoner led everyone in the Pledge of Allegiance.
3. Approve Minutes of March 9, 2026 Meeting
Commissioner Donald Boxx moved to approve to the minutes.
Seconded by Commissioner Michael DeLuca.
3/81
Motion carried. 5-0 vote.
4. Correspondence
None
5. Citizen Comments
Multiple residents spoke during the citizen comment period, primarily expressing
concerns about two proposed developments. Staff reminded attendees of the three-minute
limit per speaker and that speakers could only comment once during this period.
• Margaret A. Earl -1901 2
nd Pl from Country Meadows spoke against the proposed
townhouse development, citing concerns about traffic congestion with only one
entrance/exit point, stormwater management issues, and the development's failure to
follow the comprehensive plan. She emphasized the increased volume of delivery
vehicles compared to when the comprehensive plan was written and warned of
potential flooding problems based on her experience with similar developments.
• Sherry Westhoff- 1360 88
th Ave expressed concerns about a development backing
up to her property on Highway 13, noting the area was becoming less peaceful with
increased development and dump truck traffic.
• Toni Kuehl – 2015 2
nd Pl representing the Country Meadows Association Board of
Directors, echoed concerns about surface water management and inadequate access
for the 35 adjacent units her association represents.
• Donna Poulsen – 136 13
th Ave questioned how emergency services would handle
increased population given the recent referendum failure and expressed concern about
the single entrance/exit point.
• Brian Sorensen – 1919 8
th Pl asked about traffic studies and requested to see the
data, particularly regarding the roundabout and future traffic projections.
• Jim Poulsen – 240 13th Ave appreciated that recent plans showed preservation of
trees on the eastern property line but requested consideration of a second
entrance/exit. He also expressed concerns about potential trespassing on his adjacent
wooded property.
• Scott Arneberg – 250 13
th Ave a Kenosha firefighter, emphasized preserving the
rural character of the community and stressed that emergency services are already
understaffed for current residents, making additional housing problematic.
• Ted Terletzky – 9015 12
th St spoke about flooding issues behind the MasterCraft
development, noting continuous flooding since Charmed Estates was built. He
criticized the lack of retention ponds in current plans and questioned why developers
are moving dirt before final approval.
• Patti Tetzlaff 9001 12
th St emphasized that no new building should occur until fire,
police, and public works services are adequately staffed, noting the referendum
4/81
failure left these issues unresolved.
6. Rezone:
Public Hearing and Action on Request by: Mastercraft Builders LLC, 5008 Green Bay Rd,
Kenosha, WI 53144 (Owner), Nancy Washburn, Land Development Administration, LLC, 7450
County Line Rd, Mount Pleasant, WI 53403 (Agent), requesting a rezoning from A-2 General
Agricultural Dist. to R-4.5 Urban Single-Family Residential Dist., C-1 Lowland Resource
Conservancy Dist. and PUD Planned Unit Development Overlay Dist. on Tax Parcel # 82-4-222-
171-0043, located in the NE 1/4 of Section 17, T2N, R22E, Village of Somers. (For information
use
only, the property is located on the south side of Highway E approximately in the 9100 block).
President Stoner opened the public hearing for the MasterCraft LLC rezoning request from A-2
General Agricultural District to R-4.5 Urban Single Family Residential District, C-1 Lowland
Resource Conservancy District, and PUD Plan Unit Development Overlay District. No one
spoke during the public hearing, so it was closed.
Village Engineer Doug Snyder explained the development would include a stormwater pond
designed to discharge at pre-development rates according to village ordinances. Water service
would extend from the new 12th Street, and sewer would be extended throughout the
development. He noted the current filling was permitted and using material from the water main
installation.
However, Snyder expressed reservations about moving forward with the preliminary plat, stating
the developer was opposed to village standards for curb and gutter, and more design work was
needed to ensure the proposal would fit the intended parcel.
Plan Commissioner Donald Boxx expressed similar concerns about ensuring engineering
resources were comfortable with the development before proceeding.
Nancy Washburn, representing MasterCraft, clarified that the rezoning was a separate issue from
the preliminary plat. She explained they were re-hearing the rezoning due to improper village
notices, though it had been previously approved. She mentioned an important meeting scheduled
for the next morning to discuss engineering standards.
President Stoner explained that access points are controlled by state and county authorities, not
the village, with both Highway KR and Highway E limited to single access points despite village
efforts to obtain multiple access points.
Motion: Commissioner Boxx moved to table the rezoning until engineering questions were
resolved.
Commissioner DeLuca seconded. The motion passed unanimously.
7. Land Division (Preliminary Plat):
Discussion and Action on Request by: Mastercraft Builders LLC, 5008 Green Bay Rd,
Kenosha,
5/81
WI (Owner), Nancy Washburn, Land Development Administration, LLC, 7450 County Line Rd,
Mount Pleasant, WI 53403 (Agent), requesting Preliminary Plat review of Bella Terra
Subdivision
on Tax Parcel #82-4-222-171-0043, located in the NE 1/4 of Section 17, T2N, R22E, Village of
Somers.
This item was tabled along with the rezoning as they were related matters requiring resolution of
engineering standards.
8. Comp Plan Amendment:
Public Hearing and Action on Request by: David W Rasmussen & Scott B Rasmussen, 2004
3
rd Street, Kenosha, WI 53140 (Owner), Raymond C. Leffler, 8338 Corporate Drive, Mt.
Pleasant, WI 53406 (Agent); requests an amendment to the land use plan map for the Village of
Somers (Map 80) as adopted in the Multi-Jurisdictional Comprehensive Plan for Kenosha
County: 2035 from Suburban-Density Residential, PEC, Nonfarmed Wetland, Other
Conservancy Land to be Preserved to Medium-Density Residential, Suburban-Density
Residential, PEC, Nonfarmed Wetland, Other Conservancy Land to be Preserved, on Tax Parcel
# 83-4- 223-062-0200, located in the NW ¼ of Section 6, T2N, R23E, Village of Somers. (For
information use only, the property is located on the south side of Highway 195 at 1911 1st
Street). Original Post Date: April 2, 2026, Amended April 7, 2026
President Stoner opened the public hearing for the David W. Rasmussen and Scott B. Rasmussen
comprehensive plan amendment request. No one spoke during the public hearing, so it was
closed.
Commissioner Boxx provided extensive background on the request, noting that seven neighbors
had spoken against it at the March 9 meeting. He explained the comprehensive planning process,
which involved Rueckert Milke consulting firm working with the Plan Commission through
public meetings from 2007-2010 to develop 16 neighborhood plans.
Boxx expressed concern about the amendment's proposal to add multifamily residential
development to an area planned for low-to-medium density single-family residential at one unit
per acre. He noted the plan already identified two small multifamily areas and questioned adding
more when 45 percent would become multifamily units.
He also addressed procedural concerns, citing Wisconsin statute 66.1001 and SEWRPC
requirements for comprehensive plan amendments, questioning whether the Plan Commission's
advisory role was binding. He noted SEWRPC's 2010 population projection of 22,471 residents
by 2025 was significantly higher than the actual 2025 population of 8,711.
President Stoner expressed frustration with the commission's approach to development, arguing
that stopping all development would harm the village financially and chase away developers. He
emphasized the high quality of the village's development standards and noted that homes in
current developments were selling for $550,000 to $900,000, with acre lots potentially reaching
$1 million.
Commissioner DeLuca suggested another joint meeting between the board and commission to
discuss these issues.
Motion: Commissioner Boxx moved to deny the comprehensive plan amendment.
Michael DeLuca Seconded the motion. After discussion, the motion passed 3-2 vote.
6/81
9. Rezone:
Public Hearing and Action on Request by: David W Rasmussen & Scott B Rasmussen, 2004
3
rd Street, Kenosha, WI 53140 (Owner), Raymond C. Leffler, 8338 Corporate Drive, Mt.
Pleasant, WI 53406 (Agent); requests approval of a rezoning from A-2 General Agricultural
Dist. & C-2 Upland Resource Conservancy Dist. to R-4.5 Urban Single-Family Residential Dist.,
R-2 Suburban Single-Family Residential Dist., R-8 Urban Two-Family Residential Dist., C-2
Upland Resource Conservancy Dist. & C-1 Lowland Resource Conservancy Dist., on Tax Parcel
# 83-4- 223-062-0200, located in the NW ¼ of Section 6, T2N, R23E, Village of Somers. (For
information use only, the property is located on the south side of Highway 195 at 1911 1st
Street).
Motioned by Commissioner Michael DeLuca to deny the rezone.
Seconded by Commissioner Donald Boxx
3-2 vote.
10. Preliminary Plat (land division):
Discussion and Action on Request by: David W Rasmussen & Scott B Rasmussen, 2004 3rd
Street, Kenosha, WI 53140 (Owner), Raymond C. Leffler, 8338 Corporate Drive, Mt. Pleasant,
WI 53406 (Agent); requests approval of a preliminary plat (dated February 24, 2026 and
prepared by John P. Konopacki of Pinnacle Engineering Group), on Tax Parcel # 83-4- 223-062-
0200, located in the NW ¼ of Section 6, T2N, R23E, Village of Somers. (For information use
only, the property is located on the south side of Highway 195 at 1911 1st Street).
Motioned by Commissioner Don Boxx to deny the rezone.
Seconded by Commissioner Michael DeLuca
3-2 vote.
11. Adjourn
The meeting and was adjourned at 6:24pm by Commissioner Michael DeLuca
Seconded by Commissioner Don Boxx
5-0 vote.
Drafted 04.13. 2026.
These minutes are not official until approved by the Plan Commission. Submitted by Assistant to
the Deputy Clerk Treasurer Eugenia Lara
7/81
Village of Somers
Proceeding from the Village Plan
Commission Meeting
January 12, 2026
1. Call to Order
Chairman Stoner called the meeting to order at 5:30 p.m.
Present:
• Chairman George Stoner
• Commissioner Vinnie Chambers
• Commissioner Donald Boxx
• Commissioner Gregg Thompson
• Commissioner Troy Steege
• Alternate Pat Juliana
Absent:
• Commissioner Jerry Romanowski
• Commissioner Michael Deluca
Staff present in person: Administrator Jim Hurley, Deputy Clerk Treasurer Eugenia Lara, and
Chief Andersen
Village Trustees: Jackie Nelson
2. Pledge of Allegiance
Chairman Stoner led everyone in the Pledge of Allegiance.
3. Approve Minutes of December 9, 2025 Meeting
Commissioner Boxx moved to approve minutes of December 9, 2025 meeting.
Seconded by Commissioner Juliana Motion carried. 6-0 vote.
4. Correspondence
None
5. Citizen Comments
None
8/81
6. Rezone with PUD:
Public Hearing and Action on Request by: ENGENDREN LLC, 9625 55TH ST., Kenosha,
WI 53144 (Owner); requesting a rezoning approval for a PUD Planned Unit Development
Overlay Dist. amendment to allow a reduced side yard setback of 9.2 feet from the southwest
corner of existing building, on Tax Parcel #82-4-221-131-0503, located in the NE ¼ Section
13, T2 N, R21 E, Village of Somers. (For information use only, the property is located at the
southwest corner of Highway E and the West Frontage Road).
Commissioner Donald Boxx moved to action on request by: ENGENDREN LLC,
9625 55TH ST., Kenosha, WI 53144 (Owner); requesting a rezoning approval for a
PUD Planned Unit Development Overlay Dist. amendment to allow a reduced side
yard setback of 9.2 feet from the southwest corner of existing building, on Tax Parcel
#82-4-221-131-0503, located in the NE ¼ Section 13, T2 N, R21 E, Village of
Somers. (For information use only, the property is located at the southwest corner of
Highway E and the West Frontage Road).
Seconded by: Commissioner Juliana Motion carried 6-0 vote.
7. Rezone:
Public Hearing and Action on Request by: Frederick Family Revocable Trust, 9322 11TH
AVE., Pleasant Prairie, WI 53158 (Owner), Chris Helle, Truck Country of Wisconsin, 501
Bell Street, Dubuque, IA 52001 (Agent), requests a rezoning from A-1 Agricultural
Preservation Dist. to B-3 Highway Business Dist. & C-1 Lowland Resource Conservancy
Dist., on current Tax Parcel # 45-4-221-241-0102, located in the NE 1/4 of Section 24, T2N,
R21E, Town of Paris (parcel to be annexed into Village of Somers). (For information use
only, the property is located on the West Frontage Road, just south of Point Ready Mix).
Commissioner Boxx moved to action on request by: Frederick Family Revocable
Trust, 9322 11TH AVE., Pleasant Prairie, WI 53158 (Owner), Chris Helle, Truck
Country of Wisconsin, 501 Bell Street, Dubuque, IA 52001 (Agent), requests a
rezoning from A-1 Agricultural Preservation Dist. to B-3 Highway Business Dist. &
C-1 Lowland Resource Conservancy Dist., on current Tax Parcel # 45-4-221-241-
0102, located in the NE 1/4 of Section 24, T2N, R21E, Town of Paris (parcel to be
annexed into Village of Somers). (For information use only, the property is located
on the West Frontage Road, just south of Point Ready Mix).
Seconded by: Commissioner Juliana Motion carried 6-0 vote
8. Conditional Use Permit:
Public Hearing and Action on Request by: Frederick Family Revocable Trust, 9322 11TH
AVE., Pleasant Prairie, WI 53158 (Owner), Chris Helle, Truck Country of Wisconsin, 501
9/81
Bell Street, Dubuque, IA 52001 (Agent), requests a Conditional Use Permit for large size
vehicle or equipment sales involving extensive outdoor display and storage in the B-3
Highway Business Dist. on current Tax Parcel # 45-4-221-241-0102, located in the NE 1/4 of
Section 24, T2N, R21E, Town of Paris (parcel to be annexed into Village of Somers). (For
information use only, the property is located on the West Frontage Road, just south of Point
Ready Mix).
Commissioner Boxx moved to action on request by: Frederick Family Revocable
Trust, 9322 11TH AVE., Pleasant Prairie, WI 53158 (Owner), Chris Helle, Truck
Country of Wisconsin, 501 Bell Street, Dubuque, IA 52001 (Agent), requests a
Conditional Use Permit for large size vehicle or equipment sales involving extensive
outdoor display and storage in the B-3 Highway Business Dist. on current Tax Parcel
# 45-4-221-241-0102, located in the NE 1/4 of Section 24, T2N, R21E, Town of
Paris (parcel to be annexed into Village of Somers). (For information use only, the
property is located on the West Frontage Road, just south of Point Ready Mix).
Seconded by: Commissioner Juliana Motion carried 6-0 vote.
9. Site Plan Review& Exterior Fenestration:
Discussion and Action Request by: Frederick Family Revocable Trust, 9322 11TH AVE.,
Pleasant Prairie, WI 53158 (Owner), Chris Helle, Truck Country of Wisconsin, 501 Bell
Street, Dubuque, IA 52001 (Agent), requests approval of site plan and exterior fenestration
on current Tax Parcel # 45-4-221-241-0102, located in the NE 1/4 of Section 24, T2N, R21E,
Town of Paris (parcel to be annexed into Village of Somers). (For information use only, the
property is located on the West Frontage Road, just south of Point Ready Mix).
Commissioner Boxx moved to action discussion request by: Frederick Family
Revocable Trust, 9322 11TH AVE., Pleasant Prairie, WI 53158 (Owner), Chris Helle,
Truck Country of Wisconsin, 501 Bell Street, Dubuque, IA 52001 (Agent), requests
approval of site plan and exterior fenestration on current Tax Parcel # 45-4-221-241-
0102, located in the NE 1/4 of Section 24, T2N, R21E, Town of Paris (parcel to be
annexed into Village of Somers). (For information use only, the property is located on
the West Frontage Road, just south of Point Ready Mix).
Owner Christopher Helle noted that there will be a customer waiting area and
showers only for employees.
Commissioner Steege asked question regarding exterior fenestration.
Commissioner Chambers like what was shown.
Commissioner Thompsen as what was the start and completion of the project.
Commissioner Boxx asked how many shifts and noise level.
10/81
Chris Helle noted that it would be standard repairs and doors would be closed.
Seconded by: Commissioner Juliana Motion carried 6-0 vote.
10.
Preliminary Plat (land division): Discussion and Action on Request by: Home Path
Financial Limited Partnership, 19435 W Capitol Dr #102, Brookfield, WI 53045 (Owner),
Ken Frank, Home Path Financial, 5116 N 126th St., Butler, WI 53007 (Agent), requesting
approval of a preliminary plat (dated November 18th, 2025 and prepared by James D. Baker
of Manhard Consulting) on Tax Parcel # 82-4-222-201-0100, located in the NE 1/4 of
Section 20, T2N, R22E, Village of Somers. (For information use only, the property is located
at the southwest corner of Highway H and 18th Street).
Greg Thompsen moved to action on request by: Home Path Financial Limited
Partnership, 19435 W Capitol Dr #102, Brookfield, WI 53045 (Owner), Ken Frank,
Home Path Financial, 5116 N 126th St., Butler, WI 53007 (Agent), requesting approval
of a preliminary plat (dated November 18th, 2025 and prepared by James D. Baker of
Manhard Consulting) on Tax Parcel # 82-4-222-201-0100, located in the NE 1/4 of
Section 20, T2N, R22E, Village of Somers. (For information use only, the property is
located at the southwest corner of Highway H and 18th Street).
Seconded by: Commissioner Juliana Motion carried 5-1 vote.
Commissioner Boxx did not wish to vote.
11. Discussion and Action on: Proposed Duplex Condominium Homes Standards. Those
standards were reviewed by the Village Board at the January 6 Work Session. Trustees
request Plan Commissioners comments and recommendation on the standard to be presented
to the Jan. 20 Village Work Session.
Commissioner Boxx moved to action on proposed Duplex Condominium Homes
standards. Those Standards were reviewed by the Village Board at the January 6
Work Session. Trustees request Plan Commissioners comments and recommendation
on the standard to be presented to the January 20 Village Work Session.
Commissioner Steege mentioned the signage on what were the standards of the
Village.
Trustee Nelson enforced compliance. Would like to have a form made out with boxes
and what exceptions to upcoming developments so there is a system in place for all to
not what they would like on developments.
11/81
12. Adjourn: 6:32 p.m.
Commissioner Boxx moved to adjourn.
Seconded by Commissioner Thompsen.
Motion carried 6-0 vote.
Drafted 1/14/ 2026. These minutes are not official until approved by the Plan
Commission. Submitted by Deputy/Clerk Treasurer Eugenia Lara.
12/81
VILLAGE OF SOMERS
VILLAGE PLAN COMMISSION
ITEM MEMORANDUM
WORK SESSION: June 8, 2026
TO: Village Plan Commission
PREPARED BY: Jim Hurley, Administrator
Jackie Nelson, Village Trustee
AGENDA ITEM: #6 Comprehensive Plan Amendment: Consider adoption of
Resolution 2026-001: David W Rasmussen & Scott B Rasmussen,
2004 3rd Street, Kenosha, WI 53140 (Owner), Raymond C.
Leffler, 8338 Corporate Drive, Mt. Pleasant, WI 53406 (Agent);
requests an amendment to the land use plan map for the Village of
Somers (Map 80) as adopted in the Multi-Jurisdictional
Comprehensive Plan for Kenosha County: 2035 from Suburban-
Density Residential, PEC, Nonfarmed Wetland, Other
Conservancy Land to be Preserved to Medium-Density
Residential, Suburban-Density Residential, PEC, Nonfarmed
Wetland, Other Conservancy Land to be Preserved, on Tax Parcel
# 83-4- 223-062-0200, located in the NW ¼ of Section 6, T2N,
R23E, Village of Somers. (For information use only, the property
is located on the south side of Highway 195 at 1911 1st Street).
#7 Rezone: Recommendation on Request by: David W Rasmussen &
Scott B Rasmussen, 2004 3rd Street, Kenosha, WI 53140 (Owner),
Raymond C. Leffler, 8338 Corporate Drive, Mt. Pleasant, WI
53406 (Agent); requests approval of a rezoning from A-2 General
Agricultural Dist. & C-2 Upland Resource Conservancy Dist. to R-
4.5 Urban Single-Family Residential Dist., R-2 Suburban Single-
Family Residential Dist., R-8 Urban Two-Family Residential Dist.,
C-2 Upland Resource Conservancy Dist. & C-1 Lowland Resource
Conservancy Dist., on Tax Parcel # 83-4- 223-062-0200, located in
the NW ¼ of Section 6, T2N, R23E, Village of Somers. (For
information use only, the property is located on the south side of
Highway 195 at 1911 1st Street).
#8 Preliminary Plat (land division): Recommendation on Request by:
David W Rasmussen & Scott B Rasmussen, 2004 3rd Street,
Kenosha, WI 53140 (Owner), Raymond C. Leffler, 8338 Corporate
Drive, Mt. Pleasant, WI 53406 (Agent); requests approval of a
13/81
preliminary plat (dated February 24, 2026 and prepared by John P.
Konopacki of Pinnacle Engineering Group), on Tax Parcel # 83-4-
223-062-0200, located in the NW ¼ of Section 6, T2N, R23E,
Village of Somers. (For information use only, the property is
located on the south side of Highway 195 at 1911 1st Street).
BACKGROUND:
The proposed plan is summarized in the memo from Luke Godshall, Senior Land Use
Planner. The Petitioner is proposing to allow for a 41-lot single-family residential
subdivision development on 43.24 acres. The proposal includes future plans for
condominium duplexes, or side-by-sides. The specific requests are reviewed in the
attached memo from Senior Land Use Planner Luke Godshall.
A concept plan was reviewed by the Village Plan Commission in December 2025, and a
public hearing on April 13, 2026. The Village Plan Commission voted 3-2 to negatively
recommend the project. In review of the meeting, the objection was due to non-
conformance with Village’s Comprehensive Plan.
The 2008 Country Club Neighborhood Plan designates the area as Low to Medium
Density Residential due to access constraints caused by the Pike River (the Kenosha
County Bike Trail and Union Pacific Railroad are further east), and the River’s
environmental significance. The Plan recommends one unit per acre density for this type
of land use.
UPDATES:
At the May 19 Village Work Session, the Developer requested reconsideration of the
application. After discussion, the Village Board unanimously agreed that the Plan
Commission should reconsider the requested Comprehensive Plan amendment for the
reasons set forth below:
• Five neighboring subdivisions, including Whispering Meadows, Golf Glen,
Shannon Farms, Avalon Estates, and Covelli Heights, are all located within one
mile of the proposed development. Lots within these subdivisions are all less than
one acre in size. The majority of lots are one-half acre or smaller, with the
adjacent Whispering Meadows subdivision consisting primarily of approximately
0.35-acre lots.
• The current proposal includes a range of lot sizes from 12,150 – 19,000 square
feet, which provides a variety of options for prospective buyers. Current market
trends show higher demand for quality homes on lots less than one acre.
• The Developer estimates the value of the proposed detached single-family homes
will be $600,000 or greater. The existence of five nearby subdivisions developed
with lot sizes substantially smaller than one acre demonstrates that the local
housing market readily supports smaller lot configurations without adversely
affecting neighborhood character, stability, or property values.
• The average 2025 assessed value among sampled homes within the five
subdivisions is approximately $511,779, below the proposed single-family
proposed home.
14/81
• Water and sewer infrastructure are available to the subdivision.
• The 2008 Country Club Neighborhood Plan is eighteen years old and should be
reevaluated based on current population estimates and infrastructure capacity.
• State statute does allow for Plans to be amended under certain conditions, such as
infrastructure expansion, changes in market trends, and development patterns. The
Village Board agreed that the proposal is compatible with the surrounding
neighborhoods, and these factors support reconsideration by the Plan
Commission.
The Developer requested two access points to the proposed subdivision, but only one
was allowed on S.T.H 195 (KR) by the DOT. Even if the Village were to receive a
proposal for a development with larger lots, the DOT still will not allow a second
access point.
ATTACHMENTS:
Project Narrative
Memo from Luke Godshall, Senior Land Use Planner
Rezone Application
Comprehensive Plan Amendment Application
Preliminary Plat Application
Site Plan
Stormwater Memo
4.23.2026 SEWRPC Letter
Proposed Resolution 2026-001
15/81
16/81
17/81
Shelly Billingsley, Director
Department of Public Works &
Development Services
Andy M. Buehler, Director
Division of Planning & Development
19600 75th Street, Suite 185-3 • Bristol, WI 53104-9772 • 262-857-1895
www.kenoshacounty.org
TO: Village of Somers Plan Commission
FROM: Luke Godshall, Senior Land Use Planner
APPLN DATE: 02-27-26
RPT DATE: 04-07-26
MTG DATE: 04-13-26
RE: Bose Farms Land Use Plan Amendment, Rezone & Preliminary Plat
PROJECT/SITE INFO:
1. Petitioner/Agent: Nancy Washburn, Land Development Administration, LLC
2. Property Owner: David W & Scott B Rasmussen
3. Location/Address: 1911 1ST ST
4. Tax key Number(s): 83-4-223-062-0200
5. Area: 43.24 acres
6. Existing Zoning: A-2 General Agricultural Dist., C-2 Upland Resource Conservancy Dist.
7. Proposed Zoning: R-4.5 Urban Single -Family Residential Dist., R-2 Suburban Single -Family
Residential Dist., R-8 Urban Two-Family Residential Dist., C-1 Lowland Resource
Conservancy Dist., C-2 Upland Resource Conservancy Dist.
8. Existing Land Use: Suburban-Density Residential , Primary Environmental Corridor, Nonfarmed
Wetland, Other Conservancy Land to be Preserved
9. Proposed Land Use: Medium-Density Residential, Suburban -Density Residential, Primary
Environmental Corridor, Nonfarmed Wetland, Other Conservancy Land to be
Preserved
PROJECT OVERVIEW:
The Petitioner is proposing to amend the land use and zoning designations on the subject parcel to allow for a
proposed 41-Lot single-family residential subdivision development to be known as Bose Farms. Additionally,
three of the Outlots shown on the preliminary plat (Outlots 1, 4 and 5) are intended for future development of
condominium duplexes. A concept of this development was brought before the Plan Commission in December
2025
PLANNER COMMENTS:
The submitted rezoning application proposes R-4.5 zoning for most Lots of the subdivision, with the exception
of Lots 10 and 11 which are proposed to be zoned R-2. These Lots are shown to meet R -2 zoning minimum
standards for lot area (40,000 square feet), frontage (150 feet or at least 75 feet on a cul -de-sac or curve
provided there is at least 150 feet of width at the required building setback line) and setbacks (30’ from Village
roads, 15’ side and 25’ rear) . The proposed R-2 zoning for Lots 10 and 11 of the preliminary plat is consistent
with the existing land use plan category of ‘Suburban -Density Residential’ and therefore no amendment to the
land use plan is required for this area of the plat.
The majority of the Lots in the subdivision are proposed to be zoned R-4.5 and are shown to meet minimum R-
4.5 zoning standards for lot area (at least 12,000 square feet) and minimum setback requirements (65’ from
CTH E, 30’ from Village roads, 10’ side and 25’ rear). The proposed R -4.5 zoning for these Lots will require
18/81
RPT 2026-04-07 - Rasmussen Rezone & Preliminary Plat
- 2 -
approval of the petitioner’s submitted application for land use plan amendment from ‘Suburban-Density
Residential’ to ‘Medium-Density Residential’.
Outlots 1, 4, and 5 at the northern end of the preliminary plat are proposed to be rezoned to R -8 Urban Two-
Family Residential District , as the petitioner intends to build 2 -unit condominium buildings on these Outlots
with a future condominium plat . The proposed R -8 zoning for these Outlots will require approval of the
petitioner’s submitted application for land use plan amendment from ‘Suburban -Density Residential’ to
‘Medium-Density Residential’.
The submitted preliminary plat dated February 24 , 2026 and prepared by John P. Konopacki of Pinnacle
Engineering Group, generally conforms to the requirements found in the Village of Somers Land Division and
Platting Control ordinance (Chapter 18). Several items that will need to be added to and revised on the
preliminary plat have been indicated in the staff recommendation below. These items, and any other items
determined by the Plan Commission and Board, will need to be incorporated into a revised plat for eventual
Final Plat approval.
The plat is shown to be accessed from STH 195 (1 st Street) on the eastern side of the development tract via a
new public road entrance (“Road A”) with several other roads forming the internal subdivision street network.
The connection to STH 195 falls under the jurisdiction of Wisconsin Dept. of Transportation (WisDOT) and
therefore the petitioner will need to obtain any necessary permits and approvals through WisDOT.
All road rights-of-way within the development are shown to be 66’ in width to conform with Village standards.
The two cul-de-sacs proposed are shown to have a radius of 75’. “Road C” is shown to stub off at the eastern
boundary of the plat allowing for future extension into the land to the east. Per Village code, “ temporary
termination of streets intended to be extended at a later date shall be constructed with a temporary cul-de-sac
in accordance with the standards set forth above or by construction of a temporary "T" 25 feet wide extending
to each adjacent right-of-way.” The plat should be revised to comply with this section of Village code.
The Kenosha County Land Information Office has reviewed the street layout and indicates the streets shown on
the preliminary plat shall be named as follows:
• Road A – 18th Ave.
• Road B – 1st Pl. (east-west portion) / 20th Ct. (north-south portion)
• Road C – 2nd St.
• Road D – 2nd Cir.
• Road E – 2nd Pl.
A draft copy of restrictive covenants was not submitted by the petitioner. A copy of such restrictive covenants
shall be submitted for Village review prior to submittal of a final plat, to ensure that any contemplated
restrictions are no less restrictive than Village of Somers ordinance regulations.
STAFF RECOMMENDATION:
Should the Plan Commission choose to recommend approval of th e proposed rezoning and preliminary plat ,
staff would recommend the following:
19/81
RPT 2026-04-07 - Rasmussen Rezone & Preliminary Plat
- 3 -
1. Subject to addressing and incorporating any necessary preliminary plat review comments/conditions from
external entities, including but not limited to the Wisconsin Department of Administration-Plat Review,
Southeastern Wisconsin Regional Planning Commission (SEWRPC), Wisconsin Department of Natural
Resources (DNR), and local utility companies.
2. Subject to subdivision restrictive covenants any by -laws being submitted for review and approval by the
Village of Somers prior to final plat submittal.
3. The following items shall be added to the face of the preliminary plat:
a. Per Section 18.20(B)(18) of the Village ordinance, add conceptual sanitary sewer, water main and
storm sewer layout.
b. Per Section 18.27(C)(2) of the Village ordinance, add a temporary cul -de-sac or temporary "T" to
the east end of “Road C”.
c. On Lot 10, show that there is at least 150’ of width at a tangent to the building setback line (as
shown for Lot 11).
d. On Sheet 1, indicate owners of adjacent unplatted parcels 83-4-223-062-0220 and 83-4-223-062-
0250.
e. Indicate the Ordinary High Water Mark of the unnamed stream running through the western and
southern portion of the plat.
f. Add a note that reads: “ Any land below the ordinary high water mark of a lake or navigable stream
is subject to the public trust in navigable waters that is established under article IX, section 1, of the
state constitution”.
g. If applicable, identify all proposed phases of the proposed subdivision on the preliminary plat.
h. If applicable, locate and identify any proposed development sign easements on the preliminary plat.
4. The following items shall be revised on the face of the preliminary plat:
a. Change title of plat on all sheets to “Bose Farms”.
b. On Sheet 1, remove the statement ‘(ALSO KNOWN AS COUNTY TRUNK “KR”)’.
c. Revise the street names on the preliminary plat as follows:
• Road A – 18th Ave.
• Road B – 1st Pl. (east-west portion) / 20th Ct. (north-south portion)
• Road C – 2nd St.
• Road D – 2nd Cir.
• Road E – 2nd Pl.
d. The floodplain boundary shown on the preliminary plat does not appear to match the boundary as
indicated on FEMA’s National Flood Hazard Layer (NFHL). Revise floodplain boundary to match
FEMA’s layer.
e. Revise ‘shoreland zoning’ line to match as shown on Kenosha County Interactive Mapping, and label
as ‘Shoreland Boundary’.
f. Revise legend item for ‘300’ shoreland setback’ to read as ‘Shoreland Boundary’.
5. Subject to receiving approval for a stormwater management plan from the Village engineer.
20/81
21/81
22/81
23/81
24/81
25/81
26/81
27/81
28/81
29/81
VILLAGE OF SOMERS
PLAN COMMISSION
RESOLUTION NO. 2026-001
RESOLUTION APPROVING AN AMENDMENT TO THE MULTI-JURISDICTIONAL
COMPREHENSIVE PLAN FOR KENOSHA COUNTY AS IT PERTAINS TO THE
VILLAGE OF SOMERS
WHEREAS, the Village of Somers, pursuant to § 62.23, and § 61.35, of Wisconsin
Statutes, created the Village Plan Commission to function in accordance with the provisions of
§ 62.23, Wisconsin Statutes; and
WHEREAS, the Town Board adopted the Multi-Jurisdictional Comprehensive Plan for
Kenosha County: 2035 as the Town Comprehensive Plan on March 9, 2010, following extensive
public participation. Per § 18.38(A) of the Town Code, the Plan was adopted by the Village of
Somers; and
WHEREAS, David W Rasmussen & Scott B Rasmussen, owners, has submitted a
petition to the Plan Commission consistent with the application procedures for comprehensive
plan amendments established by the Village; and
WHEREAS, the petitioner requests an amendment to the land use plan map for the
Village of Somers (Map 80) as adopted in the Multi-Jurisdictional Comprehensive Plan for
Kenosha County: 2035 from Suburban-Density Residential, PEC, Nonfarmed Wetland, Other
Conservancy Land to be Preserved to Medium-Density Residential, Suburban-Density
Residential, PEC, Nonfarmed Wetland, Other Conservancy Land to be Preserved, on Tax Parcel
# 83-4- 223-062-0200, located in the NW ¼ of Section 6, T2N, R23E, Village of Somers.
WHEREAS, the Plan Commission finds that the comprehensive plan, with the proposed
amendment, contains all the required elements specified in § 66.1001(2) of the Wisconsin
Statutes and the comprehensive plan, with the proposed amendment, is internally consistent; and
WHEREAS, the Village has duly noticed and held a public hearing on the proposed
amendment, following the procedures in § 66.1001(4)(d) of the Wisconsin Statutes and the
public participation plan for comprehensive plan amendments adopted by the Village Board.
NOW, THEREFORE, BE IT RESOLVED that pursuant to § 66.1001(4)(b) of the
Wisconsin Statutes, the Village of Somers Plan Commission hereby approves the amendment to
the Multi-Jurisdictional Comprehensive Plan for Kenosha County as it pertains to the Village of
Somers.
BE IT FURTHER RESOLVED that the Plan Commission does hereby recommend that
the Village Board enact an ordinance to adopt the comprehensive plan amendment.
30/81
Dated at Somers, Wisconsin, this_______day of June, 2026.
VILLAGE OF SOMERS
By:__________________________________
George Stoner, Village Plan Commission Chairperson
Attest:______________________________________
Wendy Burnette, Clerk/Treasurer
31/81
32/81
33/81
34/81
35/81
36/81
37/81
38/81
39/81
40/81
41/81
42/81
43/81
44/81
45/81
46/81
47/81
48/81
49/81
50/81
51/81
52/81
53/81
F
MB
MB
G
F
F
WETLANDS PER
KENOSHA COUNTY GIS
WETLANDS PER
KENOSHA COUNTY
GIS
S
S S
S
S
S
S
S
S
W
LOT 38
LOT 39
LOT 40
LOT 41
LOT 37
LOT 36
LOT 1LOT 2
LOT 31
LOT 30
LOT 29
LOT 28
LOT 27
LOT 32
LOT 33
LOT 34 LOT 35
LOT 3
LOT 4
LOT 23
LOT 24
LOT 25
LOT 26
ROAD B
ROAD B
ROAD A
EXISTING 30' SANITARY
SEWER EASEMENT
PROPOSED RIGHT OF WAY
ROAD C
14.5'
2.5'
16.0'16.0'
2.5'
14.5'
66.0'
R100.0'
R35.0'
R35.0'
R35.0'
R35.0'
66.0'
14.5'
2.5'16.0'16.0'
2.5'14.5'
R100.0'
R100.0'
CTH KR/1ST STREET
22ND STREET
25.0'
65.0'
30.0'
65.0'
25.0'
30.0'
30.0'
30.0'
25.0'25.0'
30.0' 30.0'
10.0'10.0'
30.0'
10.0'
10.0'
10.0'
30.0'
25.0'
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\SITE PLAN.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
SITE PLAN- NORTH
1
1" = 50'
SITE PLAN- NORTH
RASMUSSEN ESTATES
1" = 50' 0100'
GRAPHICAL SCALE (FEET)
NORTH
POND
SITE DATA
- NUMBER OF CONDO BUILDINGS: 16 (32 UNITS)
- NUMBER OF LOTS: 41 LOTS
- LENGTH OF ROADWAY: 3,945 LF
ZONING:
CONDO (OUTLOT 1, 4 & 5): R-8 ZONING
- MIN HIGHWAY SETBACK: 65 FEET
- MIN FRONT SETBACK: 30 FEET
- MIN SIDE YARD: 10 FEET
- MIN REAR YARD: 25 FEET
- MIN LOT FRONTAGE: 100 FEET
- MIN LOT AREA: 20,000 SQ FT
SINGLE FAMILY (LOTS 1-41)
- MIN HIGHWAY SETBACK: 65 FEET
- MIN FRONT SETBACK: 30 FEET
- MIN SIDE YARD: 15 FEET
- MIN REAR YARD: 25 FEET
- MIN LOT FRONTAGE: 150 FEET
- MIN LOT AREA: 40,000 SQ FT
SITE DATA TABLE
54/81
WETLANDS PER
KENOSHA COUNTY GIS
WETLANDS PER
KENOSHA COUNTY GIS
MATCH LINE 2
CONCRETE
S
S
S
S
S
S
LOT 4
LOT 5
LOT 6LOT 7LOT 8LOT 9
LOT 14 LOT 15 LOT 16 LOT 17
LOT 18LOT 13
LOT 12 LOT 19
LOT 20
LOT 21
LOT 22
LOT 23
LOT 24
LOT 25
LOT 26
LOT 10
LOT 11
EXISTING SANITARY
SEWER EASEMENT
ROAD C
66.0'
14.5'
2.5'16.0'
2.5'14.5'
R35.0'
R35.0'
R200.0'
R100.0'
EXISTING 15' ACCESS
AND UTILITY EASEMENT
ROAD A
10.0'
10.0'
30.0'
25.0'
10.0'
16.0'
30.0'
25.0'
10.0'
10.0'
30.0'
30.0'
58.0'
2.5'
14.5'
30.0'
58.0'
2.5'
14.5'
30.0'
15.0'
15.0'
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\SITE PLAN.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
SITE PLAN- SOUTH
2
1" = 50'
SITE PLAN- SOUTH
RASMUSSEN ESTATES
1" = 50' 0100'
GRAPHICAL SCALE (FEET)
NORTH
POND
POND
SITE DATA
- NUMBER OF CONDO BUILDINGS: 16 (32 UNITS)
- NUMBER OF LOTS: 41 LOTS
- LENGTH OF ROADWAY: 3,945 LF
ZONING:
CONDO (OUTLOT 1, 4 & 5): R-8 ZONING
- MIN HIGHWAY SETBACK: 65 FEET
- MIN FRONT SETBACK: 30 FEET
- MIN SIDE YARD: 10 FEET
- MIN REAR YARD: 25 FEET
- MIN LOT FRONTAGE: 100 FEET
- MIN LOT AREA: 20,000 SQ FT
SINGLE FAMILY (LOTS 1-41)
- MIN HIGHWAY SETBACK: 65 FEET
- MIN FRONT SETBACK: 30 FEET
- MIN SIDE YARD: 15 FEET
- MIN REAR YARD: 25 FEET
- MIN LOT FRONTAGE: 150 FEET
- MIN LOT AREA: 40,000 SQ FT
SITE DATA TABLE
55/81
626
623
623
623
624
625
625 625 626
627
626
627
628
629
627
625
627
626
625
624
622
623
623
623
620
615
612
615
615614
620
624
624
623
622
621
620
619
618
620
622
622
F
MB
MB
G
F
F
WETLANDS PER
KENOSHA COUNTY GIS
WETLANDS PER
KENOSHA COUNTY
GIS
10+00
11+00
12+0013+0014+0015+0016+0017+0018+00
19+00
20+00
10+00.0010+33.00
11+81.00
17+96.26
18+26.9418+57.63
19+68.85
10+50
11+5012+5013+5014+5015+5016+5017+50
18+50
19+50
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+0038+0039+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
47+72
30+00.00
35+54.12
36+32.63
37+11.1338+92.13
39+70.71
40+49.28
46+04.21
47+72.21
30+50
31+50
32+50
33+50
34+50
35+50
36+50
37+5038+50
39+50
40+50
41+50
42+50
43+50
44+50
45+50
46+50
47+50
53+00
53+77
53+77.12
52+50
53+50
S
S S
S
S
S
S
S
S
W
624
625
626
627
628
624
625
626
627
627
626
625
624
623
622
622
622
623 624
626625
625
624
623
624
623
624
622
623
624
625
626
627
629
628
626
624
623
625
623
624
625
626
627
628 629
628
626
629
627
628627626
627625
626
624
627621618
625
623
621
620
621
622
623
621
621
619
619
608610
613
618
617
620
LOT 38
LOT 39
LOT 40
LOT 41
LOT 37
LOT 36
LOT 1LOT 2
LOT 31
LOT 30
LOT 29
LOT 28
LOT 27
LOT 32
LOT 33
LOT 34 LOT 35
LOT 3
LOT 4
LOT 23
LOT 24
LOT 25
LOT 26
ROAD B
ROAD B
ROAD A
ROAD C
CTH KR/1ST STREET
22ND STREET
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\GRADING PLAN.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
GRADING PLAN- NORTH
3
1" = 50'
GRADING PLAN- NORTH
RASMUSSEN ESTATES
LEGEND
STORM SEWER MANHOLE
STORM SEWER INLET / CATCH BASIN (ROUND CASTING)
STORM SEWER INLET / CATCH BASIN (RECTANGULAR CASTING)
FLARED END SECTION / END APRON
EXISTING 1' CONTOUR INTERVAL
EXISTING 5' CONTOUR INTERVAL
PROPOSED 1' CONTOUR INTERVAL
PROPOSED 5' CONTOUR INTERVAL
SURFACE FLOW
DIRECTION INDICATOR
750.00
OVERFLOW
RELIEF ROUTING GRASSPAVEMENT
SPOT ELEVATION
CLEANOUT
101
100
101
100
1" = 50' 0100'
GRAPHICAL SCALE (FEET)
NORTH
POND
56/81
622
623
615
615 620
605
605
605
608
608
620
615
612
615
623
622
621
620
619
618
620
615
620
610
611
612 613
615
617
619
620
621
622
621
620
619
618617
616
615
620
615
622
621
621
WETLANDS PER
KENOSHA COUNTY GIS
WETLANDS PER
KENOSHA COUNTY GIS
MATCH LINE 2
CONCRETE
19+00
20+00
21+0022+0023+0024+00
25+00
26+00
27+00
27+96
18+26.9418+57.63
19+68.85
20+30.2220+91.59
24+92.03
27+96.03
18+50
19+50
20+5021+5022+5023+5024+50
25+50
26+50
27+50
50+00
51+00
52+00
53+00
53+77
50+00.00
51+12.50
51+38.00
51+63.50
53+77.12
50+50
51+50
52+50
53+50
S
S
S
S
S
S
621618
623
621
620
621
621
621
619
619
619
619
608610
612
608
612
613
618
617
617
616
613
613
616 618
617
612612
606
603
613
610
610
607
614
618
618
620
623
621
623
606
603
606
606
607
612606
623
621
617
612
607
612607603
608
610
614
619
622
623
624
622
623
623
623 622
621
620
619
618618
620
624
625
624
623
622
LOT 4
LOT 5
LOT 6LOT 7LOT 8LOT 9
LOT 14 LOT 15 LOT 16 LOT 17
LOT 18LOT 13
LOT 12 LOT 19
LOT 20
LOT 21
LOT 22
LOT 23
LOT 24
LOT 25
LOT 26
LOT 10
LOT 11
ROAD C
ROAD A
TREE REMOVAL TO BE LIMITED TO
AMOUNT NEEDED TO CONSTRUCT
ROADWAY AND MATCH IN GRADING
EXISTING TREES TO REMAIN.
PROPOSED GRADING TO BE
FEATHERED IN BEFORE TREES.
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\GRADING PLAN.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
GRADING PLAN- SOUTH
4
1" = 50'
GRADING PLAN- SOUTH
RASMUSSEN ESTATES
LEGEND
STORM SEWER MANHOLE
STORM SEWER INLET / CATCH BASIN (ROUND CASTING)
STORM SEWER INLET / CATCH BASIN (RECTANGULAR CASTING)
FLARED END SECTION / END APRON
EXISTING 1' CONTOUR INTERVAL
EXISTING 5' CONTOUR INTERVAL
PROPOSED 1' CONTOUR INTERVAL
PROPOSED 5' CONTOUR INTERVAL
SURFACE FLOW
DIRECTION INDICATOR
750.00
OVERFLOW
RELIEF ROUTING GRASSPAVEMENT
SPOT ELEVATION
CLEANOUT
101
100
101
100
1" = 50' 0100'
GRAPHICAL SCALE (FEET)
NORTH
POND
POND
57/81
F
MB
MB
G
F
F
WETLANDS PER
KENOSHA COUNTY GIS
WOOD FENCE
WETLANDS PER
KENOSHA COUNTY
GIS
S
S S
S
S
S
S
S
S
W
W
W W W W W W W W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
LOT 38
LOT 39
LOT 40
LOT 41
LOT 37
LOT 36
LOT 1LOT 2
LOT 31
LOT 30
LOT 29
LOT 28
LOT 27
LOT 32
LOT 33
LOT 34 LOT 35
LOT 3
LOT 4
LOT 23
LOT 24
LOT 25
LOT 26
ROAD B
ROAD B
ROAD A
EXISTING 30' SANITARY
SEWER EASEMENT
ROAD C
CTH KR/1ST STREET
22ND STREET
PROPOSED WATER MAIN EXTENSION FOR
DEVELOPMENT. WATER MAIN TO BE
CONNECTED TO EXISTING MAIN PRIOR TO
METER TO ALLOW DEVELOPMENT TO BE
SERVICED BY SOMERS WATER.
PROPOSED WATER MAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED SANITARY SEWER
PROPOSED WATER MAINPROPOSED STORM SEWER
CONNECT TO EXISTING 12"
WATER MAIN WITH 12"X12" TEE
AND 12" GATE VALVE
PROPOSED WATER MAIN TO CROSS OVER
EXISTING SANITARY. PROVIDE 18 INCHES OF
CLEARANCE BETWEEN UTILITIES.
12" GATE VALVE & PLUG
PROPOSED WATER MAIN TO BE
INSTALLED A MINIMUM OF 8.0'
OFF THE OVERHEAD WIRES
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\UTILITY PLAN.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
UTILITY PLAN- NORTH
5
1" = 50'
UTILITY PLAN- NORTH
RASMUSSEN ESTATES
LEGEND
SANITARY SEWER MANHOLE
STORM SEWER INLET / CATCH BASIN (ROUND CASTING)
STORM SEWER INLET / CATCH BASIN (RECTANGULAR CASTING)
FLARED END SECTION / END APRON
CLEANOUT
VALVE BOX
FIRE HYDRANT
PROPOSED COMBINED SEWER
STORM SEWER MANHOLE
PROPOSED DRAIN TILE
PROPOSED ELECTRIC
PROPOSED FIBER OPTIC|FO|
PROPOSED FIRE PROTECTION
PROPOSED GAS |G|
PROPOSED SANITARY SEWER
PROPOSED SANITARY FORCEMAIN
PROPOSED INLET DRAIN TILE
(DRAIN TILE DONUT, SEE DETAIL)
PROPOSED STORM SEWER
PROPOSED TELEPHONE|T|
PROPOSED WATERMAINW
LIGHT POLE
ELECTRIC TRANSFORMER
UTILITY CROSSING#
1" = 50' 0100'
GRAPHICAL SCALE (FEET)
NORTH
POND
SEWER SERVICE DIVIDING LINE
BETWEEN RACINE WASTEWATER AND
KENOSHA UTILITY
58/81
MATCH LINE 2
CONCRETE
S
S
S
S
S
S
W W W W W W
W
W
W
W
W
W
W
W
W
W
W
LOT 4
LOT 5
LOT 6LOT 7LOT 8LOT 9
LOT 14 LOT 15 LOT 16 LOT 17
LOT 18LOT 13
LOT 12 LOT 19
LOT 20
LOT 21
LOT 22
LOT 23
LOT 24
LOT 25
LOT 26
LOT 10
LOT 11
EXISTING SANITARY
SEWER EASEMENT
ROAD C
EXISTING 15' ACCESS
AND UTILITY EASEMENT
ROAD A
PROPOSED SANITARY SEWER
PROPOSED WATER MAIN
PROPOSED STORM SEWER
PROPOSED STORM SEWER
PROPOSED WATER MAIN
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\UTILITY PLAN.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
UTILITY PLAN- SOUTH
6
1" = 50'
UTILITY PLAN- SOUTH
RASMUSSEN ESTATES
LEGEND
SANITARY SEWER MANHOLE
STORM SEWER INLET / CATCH BASIN (ROUND CASTING)
STORM SEWER INLET / CATCH BASIN (RECTANGULAR CASTING)
FLARED END SECTION / END APRON
CLEANOUT
VALVE BOX
FIRE HYDRANT
PROPOSED COMBINED SEWER
STORM SEWER MANHOLE
PROPOSED DRAIN TILE
PROPOSED ELECTRIC
PROPOSED FIBER OPTIC|FO|
PROPOSED FIRE PROTECTION
PROPOSED GAS |G|
PROPOSED SANITARY SEWER
PROPOSED SANITARY FORCEMAIN
PROPOSED INLET DRAIN TILE
(DRAIN TILE DONUT, SEE DETAIL)
PROPOSED STORM SEWER
PROPOSED TELEPHONE|T|
PROPOSED WATERMAINW
LIGHT POLE
ELECTRIC TRANSFORMER
UTILITY CROSSING#
1" = 50' 0100'
GRAPHICAL SCALE (FEET)
NORTH
POND
POND
SEWER SERVICE DIVIDING LINE
BETWEEN RACINE WASTEWATER AND
KENOSHA UTILITY
59/81
615
620
625
630
635
11+00
(622.71)
622.71
12+00
(622.72)
622.72
13+00
(622.85)
622.85
14+00
(622.76)
622.76
15+00
(622.81)
622.81
16+00
(622.76)
622.76
17+00
(622.77)
622.77
18+00
(622.79)
622.79
19+00
(622.44)
622.44
20+00
(622.17)
622.17
21+00
(622.11)
622.11
22+00
(621.66)
621.66
-2.00%
-0.60%
-0.60%
+0.60%
+0.70%
-0.60%
PVI STA = 10+12.50
PVI ELEV = 625.12
PVI STA = 13+02.15
PVI ELEV = 624.20
PVI STA = 16+83.15
PVI ELEV = 621.91
PVI STA = 19+27.85
PVI ELEV = 620.44
PROPOSED
CENTERLINE GRADE
EXISTING
CENTERLINE GRADE
615
620
625
630
635
23+00
(621.18)
621.18
24+00
(620.83)
620.83
25+00
(621.17)
621.17
26+00
(621.27)
621.27
27+00
(621.63)
621.63
-0.60%
PVI STA = 24+92.03
PVI ELEV = 623.83
PVI STA = 27+96
PVI ELEV = 622.00
PROPOSED
CENTERLINE GRADE
EXISTING
CENTERLINE GRADE
615
620
625
630
635
615
620
625
630
635
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\ROADWAY PROFILES.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
ROADWAY PROFILE- RD A
7
1" = 40'
ROADWAY PROFILE- RD A
RASMUSSEN ESTATES
1" = 40' 080'
GRAPHICAL SCALE (FEET)
NORTH
60/81
615
620
625
630
635
31+00
(622.94)
622.94
32+00
(623.13)
623.13
33+00
(623.16)
623.16
34+00
(623.47)
623.47
35+00
(624.89)
624.89
36+00
(625.70)
625.70
37+00
(626.11)
626.11
38+00
(625.55)
625.55
39+00
(624.59)
624.59
40+00
(624.79)
624.79
41+00
(624.78)
624.78
42+00
(623.54)
623.54
-0.72%
-2.00%
+0.60%
PVI STA = 30+00
PVI ELEV = 624.21
PVI STA = 37+00
PVI ELEV = 627.89
EXISTING
CENTERLINE GRADE
PROPOSED
CENTERLINE GRADE
615
620
625
630
635
615
620
625
630
635
42+00
(623.54)
623.54
43+00
(623.32)
623.32
44+00
(623.10)
623.10
45+00
(622.90)
622.90
46+00
(622.79)
622.79
47+00
(622.34)
622.34
+2.00%
-2.00%
+1.20%
PVI STA = 45+85
PVI ELEV = 621.55
PVI STA = 47+72
PVI ELEV = 623.30 EXISTING
CENTERLINE GRADE
PROPOSED
CENTERLINE GRADE
615
620
625
630
635
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\ROADWAY PROFILES.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
ROADWAY PROFILES- RD B
8
1" = 40'
ROADWAY PROFILES- RD B
RASMUSSEN ESTATES
1" = 40' 080'
GRAPHICAL SCALE (FEET)
NORTH
61/81
610
615
620
625
630
610
615
620
625
630
51+00
(622.22)
622.22
52+00
(622.34)
622.34
53+00
(622.26)
622.26
+0.60%
+2.00%
PVI STA = 50+00
PVI ELEV = 618.02
PVI STA = 53+60
PVI ELEV = 620.18
PVI STA = 53+77.12
PVI ELEV = 620.52
EXISTING
CENTERLINE GRADE
PROPOSED
CENTERLINE GRADE
© COPYRIGHT 2025
REVISIONSSHEET
PEG JOB No.
PEG PM
PLAN DATE
SCALE
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP
www.pinnacle-engr.com
WISCONSIN OFFICE:
20725 WATERTOWN ROAD, SUITE 100
BROOKFIELD, WI 53186
(262) 754-8888
ENGINEERING I NATURAL RESOURCES I SURVEYING
PLAN I DESIGN I DELIVER
CHICAGO I MILWAUKEE : NATIONWIDE
w w w . p i n n a c l e - e n g r . c o m
Z:\PROJECTS\2025\6686.00-WI\CAD\SHEETS\PRELIM\ROADWAY PROFILES.DWG
OF
SOMERS, WISCONSIN
6686.00
AEK
02/27/26
9
ROADWAY PROFILES- RD C
9
1" = 40'
ROADWAY PROFILES- RD C
RASMUSSEN ESTATES
1" = 40' 080'
GRAPHICAL SCALE (FEET)
NORTH
33.0'
2.0%
1.0'
8"
BASE COARSE
6" TOPSOIL, SEED,
FERTILIZER AND MULCH
30" ROLL
BACK CURB
33.0'
1.75" ASPHALT SURFACE COARSE
(4 LT 58-28 S)
4.0%
2.0%
2.5' 16.0'14.5'
4.0%
66' RIGHT OF WAY
COMPACTED SUBGRADE
10" - 1 1/4" AGGREGATE BASE COURSE
3.5" ASPHALT BINDER COURSE
(3 LT 58-28 S)
66' RIGHT OF WAY
62/81
63/81
64/81
65/81
66/81
67/81
68/81
69/81
70/81
71/81
72/81
73/81
April 23, 2026
Ms. Wendy Burnette
Clerk/Treasurer
Village & Town of Somers
P.O. Box 1607
Somers, WI 53171
RE: Preliminary Plat, Rasmussen Estates
NW ¼ Section 6, T 2 N, R 23 E, Village & Town of Somers
SEWRPC No. CA-114-14
Dear Ms. Burnette:
This is to acknowledge receipt of your letter of March 10, 2026, concerning the above-captioned matter
and to advise of the following Commission staff findings and recommendations relative thereto:
1. The proposed plat is to be developed with centralized sanitary sewer service and is located within a
planned sewer service area as delineated in SEWRPC Community Assistance Planning Report
(CAPR) No. 106, Sanitary Sewer Service Areas for the City of Kenosha and Environs and CAPR
No. 147, Sanitary Sewer Service Area for the City of Racine and Environs.
2. The subject plat abuts upon CTH KR, which is identified in the transportation element of VISION
2050 as a four-lane arterial highway along the development site. The right-of-way shown on the
plat is adequate for this arterial facility.
3. The subject plat contains land delineated by the Commission as a primary environmental corridor
(PEC) which consists of wetlands, woodlands, floodplains, steep slopes, and wildlife habitat.
Commission adopted plans recommend that these areas be preserved in essentially natural open
uses to the greatest extent practicable as determined by county and local plans. The PEC is
contained in Parcel 10, 11, Outlot 2, and Outlot 3. As shown on the plat, building envelopes for
Parcel 10 and 11 are located outside of the PEC. It is recommended that deed restrictions against
any disturbance or development of the PEC and wetland areas be placed on the face of the plat.
Disturbance of any wetlands on the site including earth moving activities adjacent to wetlands may
require permits from the Wisconsin Department of Natural Resources and/or the U.S. Army Corps
of Engineers. Commission staff recommends that the developer contact those agencies to determine
if any permits are required and to apply for those permits.
74/81
Ms. Wendy Burnette
April 23, 2026
Page 2
4. The subject plat is partially located within an identified 1-percent-annual-probability (100-year
recurrence interval) flood hazard area as delineated in the Federal Flood Insurance Study (FIS) for
Kenosha County. As shown, the floodplain is entirely within the PEC and does not intersect with
any structures in the planned development.
5. The subject subdivision is located in the Pike River watershed. Runoff from the subject plat drains
to the Lower Pike River. The regional water quality management plan recommends that nonpoint
source pollution in this area be reduced. Adequate erosion control is necessary to reduce pollutant
runoff from construction sites, and post-construction stormwater management would be needed to
meet the nonpoint source pollution reduction requirements of the Village stormwater management
ordinance. We would suggest that the subdivider call upon the Village Engineer for technical
guidance in the attainment of sound erosion control management practices in connection with the
development process, and that the post-construction stormwater management plan for the site
comply with the requirements of the Village ordinance.
Should you have any questions concerning the foregoing, please do not hesitate to call.
Sincerely,
Benjamin R. McKay, AICP
Deputy Director
BRM/FGF
#280670 - RASMUSSSEN ESTATES PRELIMINARY PLAT
75/81
Shelly Billingsley, Director
Department of Public Works &
Development Services
Andy M. Buehler, Director
Division of Planning & Development
19600 75th Street, Suite 185-3 • Bristol, WI 53104-9772 • 262-857-1895
www.kenoshacounty.org
MEMORANDUM
TO: Jim Hurley, Village Administrator
FROM: Luke Godshall, Senior Land Use Planner
DATE: 2026-06-03
RE: The Lakes of Racine Assisted Living
Petitioner: William A Morris, Architect
Parcel Owner: RPF Somers Outlots LLC
Parcel(s): 82-4-222-104-0332 & 82-4-222-104-0333
Address: 1015 & 1071 58th Ave.
Area: 3.8 acres
Proposed Use: Two (2) 41-room assisted living facilities
Existing Land Use Plan: Commercial
Proposed Land Use Plan: Governmental and Institutional
Current Zoning: B-3 Highway Business District
Proposed Zoning: I-1 Institutional District
Project Overview:
Petitioner is seeking a conceptual review from the plan commission of a proposed assisted living facility
situated on two tax parcels along the west side of Green Bay Road, consisting of two (2) buildings each
containing 41 rooms.
The existing land use plan category designated for the subject parcels is ‘Commercial’ and would need to
be amended to the ‘Governmental and Institutional’ land use category to support the proposed use. The
parcels would then need to be rezoned from B -3 Highway Business District to I -1 Institutional District.,
which allows for this type of use as a principal use under the Village of Somers zoning ordinance (hospitals,
sanitariums, nursing homes and clinics).
Planner Comments:
The Petitioner has submitted a conceptual site plan, building floor plan and exterior building rendering.
The Petitioner has indicated that each building will be 21, 700 gross square feet. The submitted site plan
appears to show that each building could meet the minimum required setbacks of the I-1 zoning district (65’
from highway, 30’ from Village roads, 10’ side yard setback and 25’ rear yard setback). If this project
advances past the concept phase, it is expected that a more detailed/accurate survey or site plan will be
presented showing proposed setbacks from lot lines and street rights-of-way.
76/81
The conceptual site plan shows each parcel being accessed from 10 th Street, just west of its intersection
with STH 31/Green Bay Road. Due to the close proximity to STH 31 an inquiry was sent to WisDOT regarding
the location of the proposed access points, and on 6 -3-26 Kevin Koehnke of WisDOT indicated the
following:
“We would like to see the driveways be about halfway between the west edge of WIS 31 and the
east edge of the roadway to the west. The location shown would be difficult for turning vehicles to
react to if for some reason the vehicle entering the proposed driveway is unable to make the turn in
a free -flow fashion. Most concern would be for delivery trucks entering from WIS 31 and then
turning into one of the driveways. We have both the southbound right and northbound left to be
concerned about. We wouldn’t want a left turner backed up onto WIS 31 waiting for a vehicle to
maneuver into one of these driveways.
Please have them revise the site plan by mirroring the parking/driveway location to the west of the
buildings or completely revise to have the driveway locations split WIS 31 and the public road to the
west.”
Parking/paved areas are required to be located at least 20 feet from street rights -of-way. The submitted
site plan appears to show parking spaces located at a zero setback from the right-of-way line of STH 31 and
therefore will need to be amended on a future site plan.
The conceptual site plan appears to show 17 parking spaces for the facility on the northern parcel and 14
parking spaces for the facility on the southern parcel. Village ordinance requires a minimum of 1 parking
space for each bed, plus 1 space per 5 outpatients and 1 space for each employee on the largest work shift.
The Village ordinance does allow for adjustments to the number of required parking on a case -by-case
basis, which would require the petitioner to submit written documentation that the operation requires less
parking than the ordinance requires.
The conceptual site plan should be updated to show the existing 20 foot public path easement along the
west side of each parcel so it can be shown that buildings, landscaping and parking areas can be
constructed without encroaching upon the path.
This project is located just beyond the reach of the City’s airport overlays and therefore will not require a
City of Kenosha Airport Site Plan Review.
Necessary Applications/Approvals for this project would include:
• Land Use Plan amendment from ‘Commercial’ to ‘Governmental and Institutional’.
• Rezoning from B-3 Highway Business District to I-1 Institutional District.
• Site Plan & Building Fenestration Review
77/81
78/81
79/81
80/81
81/81