Lake Protection & Rehabilitation District - Steering Council Agenda Packet
Village of Twin Lakes · Kenosha County · meeting of Mar 28, 2026 · Agenda packets
Open the original document More from Village of Twin Lakes
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Twin Lakes Protection & Rehabilitation District
Steering Council
Saturday, March 28, 2026 - 10:30 P.M.
Twin Lakes Community Library, 110 S. Lake Ave, Twin Lakes
Community Room
Agenda
1. Meeting called to order
2. Roll Call
3. Minutes: November 15, 2025
4. Public Comment
5. Committee Reports
6. New Business
A. Discussion approval of lake treatment by Wisconsin Lakes and Ponds Resources
B. Discussion on cleaning sewer basins by outside source.
C. Discussion regarding status of lighting around the lakes and adopting ordinance.
D. Discussion regarding shared funding of a drone with Police Dept.
E. Discussion regarding Lake District information to public via website / social media.
F. Discussion Lance Park shoreline.
7. Next Meeting
A. Set date and time
8. Adjourn
Committee Members
• Bryan Neal
• Jack Magnusen
• Bev Kendall / Rhett Suhre
• Bill Slominski
• Vicki Skinner / Pam Becker
• Tony Migon
• Dean Todaro
Distribution: Village Board, Administrator, Clerk, Village Hall Posting, Website Notice is hereby given that a majority
of the village board and/or lake protection and rehabilitation district board of commissioners or other related
governmental bodies may be present at this meeting to gather information about a subject over which they have
decision making responsibility. No action will be taken by any governmental body at this meeting other than the
governmental bodies specifically referred to in this notice. This constitutes a meeting of the village board pursuant to
state ex rel badke vs. Greendale village board, 173 wis 2d 553, 494 nw 2d 408 (1993), and must be noticed as such.
Twin Lakes Protection & Rehabilitation District
Steering Council
Saturday, November 15, 2025 - 10:00 A.M.
Twin Lakes Community Room, 105 E. Main Street, Twin Lakes
Meeting Minutes
1. Meeting called to order. 10:05 am
2. Roll Call – Bill, Tony, Dean, Pam, Bryan, Jack, Bev, (Rhett Suhre, Ken Perl, board member)
3. Minutes: October 4, 2025. Bryan moved to approve, Pam seconded, passed.
4. Public Comment: None
5. Committee Reports
A. Communication – none
B. Nonpoint – Get the new committee members contact information from Laura, 4all a
meeting, review with Laura the actions taken on current approved projects
C. Fishing – no new report, see new business
D. Aquatic – Dean, has new contact at Wi. Lakes and Ponds, Sydney Skanz, a new weed is
emerging in lakes but there is little recognition by DNR. We paid $300 to check our
commercial piers for regulatory adherence.
(100+ foot limit with depth of water dependency for extending length.)
6. New Business
A. Discussion of chairperson position – Bev moved to elect Tony as chairperson, Pam
seconded, passed. We are extremely grateful for Tony’s continued support of the Lakes.
B. Discussion implementing pier address numbering system by Boat Safety. – police are
looking into signage to identify addresses from the Lake.
C. Lake Mary Aquanuts performing shoreline enhancement proposal approval request.
Lance Park shoreline revitalization construction planning document proposal from Hey and
Associates, Inc.. This shoreline stabilization project, which could be over $100’s of
thousands, to protect the lakefront of Lance Park. It is a professional design of what may
be needed, but changes are easily made. The cost of the proposal is $8,000. If we act
now on this, we could possibly have it done by July 4th, 2026. Bev questions the
availability of funds for the project based on laws. Agreement was made to follow up on
this and address it with legal opinions and other actions as deemed necessary. Also, she
questions whether there are others who should be involved, like the Aquanuts.
Bryan moves: “The Twin Lakes Protection and Rehabilitation District Steering Council
accept the Hey and Associates, Inc. November 4, 2025 Lance Park Shoreline Restoration
engineering proposal for the Lance Park Shoreline revitalization at Lance Park.” Pam
seconds. Discussion of history of former activity involving the Village and Aquanuts, along
with the status of that project. It is dead according to Bryan. Further actions are pending
on this, however, that may impact its future. Tony questions doing shoreline in
cooperation with the park district and/or the Aquanuts, the Village, etc. A lot of discussion
about this project and the management of money by the Village in general. Rhett asks
what parties would be involved and Bryan answered all parties, (i.e. The Park District,
Village, Aquanuts.) Timing was also discussed, as we must avoid having Lance Park
under construction during the 4th. Bev questions that the shoreline needs protection. Rhett
would like to include the other parties in discussion before we spend the money on the
proposal. Tony concurs with more open discussion.
Dean asks if anyone has asked the Village Board whether they want it and who would
carry it forward, should we approve. Bryan said he would be glad to turn it over to the
Shoreline committee. The project approval will provide the Village a recommendation to
spend the $8k, they will then decide whether to proceed with the purchase of the proposal.
Brayn calls for role vote of motion.
Bryan – Yes, Tony – No, Pam – Yes, Dean - No Bev – No, Jack – Yes
Tie vote, the motion fails.
Question of whether the chairperson should vote or just break a tie by their vote. We
looked it up and Tony can vote.
Rhett moves to have a meeting on December 13 with the “parties”, including this steering
committee, the Aquanuts, the Village, The Park District, and Hey & Associates to discuss
getting this proposal. Pam seconded.
Pam – Y, Jack Y, Bryan N, Dean Y, Tony Y, Bev Y motion passed.
D. Discussion regarding lighting around the lakes and adopting an ordinance. – Bev provided
a DNR brochure about lighting. Bev moved: “The Twin Lakes Protection and
Rehabilitation District Steering Council recommends the Village of Twin Lakes Village
Board enter discussion regarding the creation of and adoption of a lakeshore lighting
ordinance applicable to both Lake Mary and Lake Elizabeth which would establish limits
on light intensity (lumens) and require directional downward-focused lighting to minimize
glare across the lakes, protect nighttime views, and reduce light pollution in the spirit of the
DNR sensible shoreline lighting brochure entitled, "Sensible Shoreland
Lighting. Preservative the Beauty of the Night."
Dean seconded. Jack says it’s good to do!
Pam Y Bryan Y Dean Y Bev Y Jack Y Motion Passed.
E. Discussion regarding shoreline ordinances and enforcement. - Bev provided 17.39.070
sub f sub 2 “Shoreline Protection Overlay District, Special Regulation.” Bev talked about a
non-conformity and got guidance on how to address this with the Village and homeowner.
F. Discussion regarding Lake District information to public via website / social media. – Pam
talked about posting on the Village Website. The status of residents has information that
applies to nonresidents and Lake information should be under a different, more apparent
banner on the Website. Posting information is problematic, (like you must post a link, not
a picture, (like the new brochure for boat safety.) Now, it must be done with a link and
people do not do “likes.” Pam moves to have the Website enabled to post such
information easily. She asked to be involved in the Village Website rework discussions.
Pam will call Laura on Monday, as the work on the Website will be part of meetings this
Monday.
G. Discussion of weir – Homeowners of the properties that boarder the Lake Elizabeth side of
the weir have landscaped in such a manner that they encroach on the width of the weir
and impact water and sediment movement. There is an ordinance against doing that.
Whether this is happening and what to do about it is problematic. Maintenance can be
done, (expensive), and the weir could be removed. Bryan mentioned a study could be
done about removing the weir. Tabling discussion.
H. Discussion regarding wake enhanced activity by wake boats and creating collaborative
subcommittee of Lake District Members. – Bryan moves: "The Twin Lakes Water Quality,
Lake Habitat, Fish, & Fishing Committee’s motion that there be consideration of and
recommendation for the Twin Lakes Protection & Rehabilitation District Steering Council
and The Village of Twin Lakes to regulate wake enhancement activities on both lakes."
Pam seconded. Tony agrees there should be some recommendations. There are
activities to regulate at the state level, but this would be a Village ordinance to be
determined in the future. General discussion is positive. Bryan – Yes, Tony – Yes, Pam –
Yes, Dean - Yes Bev – Yes, Jack – Yes
7. Next Meeting
A. December 13, 2025 10:00am
Committee Members
• Bryan Neal
• Jack Magnusen
• Bev Kendall / Rhett Suhre
• Bill Slominski
• Vicki Skinner / Pam Becker
• Tony Migon
• Dean Todaro
Distribution: Village Board, Administrator, Clerk, Village Hall Posting, Website Notice is hereby given that a majority
of the village board and/or lake protection and rehabilitation district board of commissioners or other related
governmental bodies may be present at this meeting to gather information about a subject over which they have
decision making responsibility. No action will be taken by any governmental body at this meeting other than the
governmental bodies specifically referred to in this notice. This constitutes a meeting of the village board pursuant to
state ex rel badke vs. Greendale village board, 173 wis 2d 553, 494 nw 2d 408 (1993), and must be noticed as such.
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
December 18, 2025
V
illage of Twin Lakes
Attn: Laura Jager
R
e: 2025 Aquatic Plant Survey & Report, Lakes Mary & Elizabeth, Kenosha County, WI
Dear Ms. Jager & Village Board:
In response to your request for aquatic plant management and surveying, Wisconsin Lake & Pond
Resource (WLPR) visited the sites in early and late summer, 2025 . The purpose of the visit s was to
control existing stands of aquatic invasive species (AIS) and document remaining populations of AIS
and lake conditions to plan for 2026 management.
Background Information
Lakes M ary and Elizabeth m ake u p the Twi n Lakes in souther n Kenosh a County. Elizabeth i s the
largest a t 725 acres and sits on the border of I llinois and Wisconsin. Lake Mary i s 310 a cres and
directly to the north of Elizabeth. A small stream connects the lakes, flowing from Mary into Elizabeth
and eventually out of Elizabeth and connecting to the North Branch Nippersink Creek. In each lake,
there are two confirmed aquatic i nvasive species (AIS) plant present; Eurasian water-milfoil (HWM)
and Curly-leaf pondweed (CLP). Curly-leaf pondweed has remained at low background levels and does
not need management.
Past surveys have shown that Eurasian water -milfoil has grown to nuisance levels and required
management throughout the years. Control of HWM has focused on the use of aquatic herbicides,
which has been on the decline over the past years. No active HWM management has occurred in Lake
Mary since 2021, until 2025. Hybrid Eurasian watermilfoil, along with nuisance vegetation, was treated
for in small, select areas. A total of 4.16 acres of EWM were treated for in spring of 2025.
The aquatic plant community of the l akes has been healthy, though periodically dense , in shallow
areas of both Lakes. Both lakes have also managed for a general mix of aquatic plant species impeding
navigation in select, near-shore areas. Introduction of aquatic invasive species caused an expanding
problem with excessive aquatic plant growth.
A September 2023 survey documented 84.13 acres of HWM, not including individual stems and/or
clumps, which was found primarily in Lake Elizabeth and in widely -scattered, low-density beds. Only
the densest areas were recommended for management in 2025 and totaled 7.5 acres for direct HWM
control. In addition, 2.2 acres were recommended for management of general nuisance-cause species.
While 2024 showed very decreased HWM populations and only managing for 4.4 acres of HWM only
and an additional 3.1 acres of a HWM and navigation relief mix. 2025 HWM management areas
consisted of similar areas as 2024. Vegetation in Lake Mary was less dense, with only 1.6 acres noted
for potential nuisance management for 2025. No management had taken place on Lake Mary in 2024
or 2025.
WDNR aquatic herbicide permits were applied for and approved to control these areas of HWM and a
general mix of nuisance-causing growth (Figures 1-2). The aquatic herbicide ProcellaCOR EC (active
ingredient florpyrauxifen-benzyl) was permitted for use within target areas for HWM while a mix of
the active ingredients copper, diquat, and flumioxazin was used for general nuisance relieve.
Application occurred on May 12, 2025, to areas in Lake Elizabeth.
Any approved permits are
at the end of the report.
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
Hybrid Eurasian water-m ilfoil has caused the most significant problem within the lakes. To gauge
current conditions and assess the need for 2026 management, follow-up aquatic plant surveys were
completed on September 2-3, 2025, by WLPR.
2025 Aquatic Plant Surveys
WLPR conducted the 2025 surveys using a meander method throughout the entire photic zone of the
lakes with rake throws and v isual observations to v erify the presence of AIS. All locations of HW M
were recorded on a GPS. Observations of native aquatic plant species were recorded to create a list
of those present within the lakes. Water temperatures were 73-degrees during the surveys and great
water clarity was present. Results of the surveys are found on Figures 1-2.
The composition of the aquatic plant community remained steady and of good diversity for
similar lakes within the same region. Overall, 19 different native aquatic plant species were noted
in Lake Elizabeth along with one AIS; hybrid Eurasian water-m ilfoil (Table 1, below) . Lake Mary had
11 native plants and HWM (Table 1, below). Like past surveys, moderately dense vegetation was noted
in select portions of the lake s, primarily near-s hore areas and around docks/marinas, and included
a mix of shallow beds of widgeon grass, sago pondweed, muskgrass, and spiny naiad.
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
The 2025 surveys identified HWM growing at various densities and distribution in the survey locations.
The following densities were used to describe the HWM populations:
1. Spo
ts – small locations of individual plants or clumps that were not large enough to map
around their perimeter.
2. Scattered – locations of HWM that had plants close enough to map as an area but were
st
ill widely scattered. HWM is merely present and not a large component of the biomass.
3. Low – HWM identified in distinct beds. While individual plants or clumps may reach the
surface, most are lower growing or not as dense. Often mixed with other vegetation.
4. Moderate – HWM occupies over half the water column with many plants or clumps at or
just below the surface. Few other plant species found.
5. High – locations of HWM that were at or near the surface and occupied much of the
water column. HWM may be the only plant found growing in these locations.
O
verall, populations of HWM have increased in Elizabeth Lake compared to the 2024 plant survey.
Lake Mary continued to have low and scattered EWM. In Elizabeth, 11.58 acres of HWM while 2.67
acres were identified in Lake Mary during the September 2025 survey (Table 2 and 3 below, Figures
1-2). Populations of HWM undoubtably exist outside the areas identified in 2025 . The breakdown of
Eurasian water-milfoil present by density across the Lakes are as follows:
F
or Elizabeth Lake, most locations of HWM populations were found as scattered beds in shallow
water, transitioning to individual stems or clumps in slightly deeper flats (6 -10 ft). Prior surveys
recorded HWM growing in the same areas year to year. A low density bed was found by the public
boat launch along with many scattered beds and stems in that general area. A handful of low density
areas were mapped in shallow, high -traffic locations with more organic components mixed in the
sediment, generally around docking slips on the western shoreline . Scattered beds of HWM were
noted to be outside of low density beds. Many were located by the boat launch along with the northern
bay. Single stems/clumps were very widely scattered throughout the lake. The densest areas should
be targeted for control in 2026 to reduce nuisance to the adjacent landowners.
H
WM populations in Lake Mary were again documented at very low density and spread. An increase
of HWM was noted from 1.61 acres of scattered density beds in 2024 to 2.67 scattered density beds
in 2025. All beds were primarily in narrow, near -shore bands in the southwestern bay. The rest of the
HWM was noted as individual spots or clumps (Figure 2 ). In 2026, it is recommended to continue a
monitoring only approach. Most of the vegetation in Lake Mary was dominated by sporadically dense
beds of sago pondweed and spiny naiad. An aquatic plant community is dynamic and changes year to
year based on growing conditions and many other factors. Some species identified in 2025 were not
directly sampled in the past and vice versa, but this should not be a cause for concern.
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
NEXT STEPS
Successful, historical management of AIS in Lakes Elizabeth and Mary by the Village has reduced
populations substantially, resulting in periodic, small- scale control. The district’s approach has
allowed native populations to flourish and enhance the health of the lake.
C
urrent DNR recommendations for control of AIS include the use of an integrated pest management
approach, or IPM. The use of IPM includes changing methods of control, including but not limited to:
varying herbicide active ingredients, mechanical harvesti ng, hand or suction harvesting, monitoring -
only, and no- action. The spread of HWM in Lakes Elizabeth and Mary recorded in 2025 is found
primarily in the shallow, near -shore areas and scattered at very low density in most locations. A few
small to moderate locations in Lake Elizabeth are dense enough to warrant control in 2026 while
populations in Lake Mary continue to be very low and scattered, not requiring active management.
Continued management for HWM has maintained a low-frequency, background population.
I
t is our recommendation to continue to conduct management in select areas for control of denser
areas of HWM and navigational relief of a general mix of species, if necessary, in select locations.
Continued monitoring for new or existing populations of AIS is an important, recommended
management step to continue. HWM control should focus on the densest areas of growth with a highly
selective, early -season herbicide application. In total, 15.14 acres are recommended for control of
HWM and nuisance relief (Figure 3). A recommended timeline for 2026 actions is as follows:
• M
arch 2026: Apply for WDNR permit for up to AIS and/or nuisance relief (Figure 3)
o 9.84 acres for HWM control and 5.3 acres for nuisance relief on Elizabeth only
• May 2026: Selective herbicide application for HWM control with ProcellaCOR EC in Lake Elizabeth.
• May/June 2026: Nuisance control application to areas in Lake Elizabeth - only if necessary.
• August/September 2026: aquatic plant survey and mapping to assess AIS populations.
• October/November 2026: Complete an assessment of AIS present for 2027 planning.
• Update management report and recommendations to the district. Future planning may
involve any of the following actions:
o Varying scale of AIS control in 2027
o Continued monitoring
o No action
I
f you have any questions, require any additional information, or would like a formal proposal on any
of the above management options please contact us directly as follows:
S
ydney Kanz: (920) 872-2032 or skanz@wisconsinlpr.com
R
espectfully,
S
ydney Kanz
Aquatic Field Biologist
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
2025 WDNR Aquatic Herbicide Permits
Management Locations
Lake Mary
Kenosha County, WI
2025 Nuisance Management Locations
Figure 6
Elizabeth Lake
Kenosha County, WI
2025 HWM Management Locations
Figure 5
Elizabeth Lake
Kenosha County, WI
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
2025 WDNR Treatment Records
Aquatic Plant Management
NOTE: Missing or incomplete fields are highlighted at the bottom of each page. You may save, close an d return to your draft permit as often as necessary to complete your
application. If there are no updates in 90 days, y our draft is deleted
This Application has been Signed and Submitted by: i:05.t|mywisconsin id|jim@wisconsinlpr.com signed on 2025-08-26T08:34:51
Complete form.
Attach map with treated area(s) and dimension(s), if necessary.
Attach file with additional sites if necessary
Sign and submit form.
Site or Project Name: The permit application will be saved automatically with this name
Elizabeth Lake
Activity: Chemical Treatment Record
Enter permit number to begin your treatment record or control report
Permit ID #: SE-2025-30-22957
Permit Name: Elizabeth Lake
Waterbody Name: Elizabeth Lake
Permit Holder Name: Village of Twin Lakes
Treatment or Control Completed : Yes No
Permit Import Successful – Please Proceed to Treatment Tab
3200 -111 Chemical Control Treatment Record
State of Wisconsin
Department of Natural Resources
dnr.wi.gov
Aquatic Plant Management Herbicide
Treatment Record
Form 3200-111 (R4/20) Page 1 of 2
Notice : Completion of this form is a condition of the permit and provides records required by WDNR (NR 107) and DATCP (ATCP 29.21 and
29.22). The Department may not issue you future permits unless you complete and submit this form. Personal information collected will be
used for administrative purposes and may be provided to requesters to the extent required by Wisconsin's Open Records Law [ss. 19.31-19.39,
Wis. Stats.].
Submit this form: (1) immediately if any unusual circumstances occurred during treatment
(2) as soon after treatment as possible, no later than 30 days
(3) by October 1 if no treatment occurred
Completion of this form along with the permit satisfies the requirements of WDNR (NR 107) and DATCP (ATCP 29.21 and 29.22).
Applicator shall provide each customer with a free copy of each pesticide label used (if requested)
Permit Number
SE-2025-30-22957
Water body Name (including ponds, e.g., Smith Pond)
Elizabeth Lake
County
Kenosha
Permit Holder Name (Customer Name)
Village of Twin Lakes
Permit Holder Address
108 E Main st
City
Twin Lakes
State
WI
Zip Code
53181
Treatment Information
Treatment Date(mm/dd/yyyy)
8/21/2025
Starting Time (24:00 hour)
09:00
Ending Time (24:00 hour)
11:00
Water Temp
76 C
F
Ambient Air Temp
74 C
F
Wind Speed (mph)
3-5
Wind Direction
North East
Expected Duration of Chemical Residuals
5 days
Adverse Conditions Noted (i.e., dead fish, spawning fish, algae bloom, etc.)
If adverse conditions noted, indicate corrective ac tions taken
Comments
Onsite Supervision by DATCP
and/or DNR Staff Yes No
If Yes, Supervisor Name :
Mixing and Loading Site Location (if other than bus iness site or from prepackaged retail container or applied with equipment with a total capacity of not more than 5 gallons
liquid or 50 pounds dry)
public boat launch
Water User Restriction
No Restrictions Consuming Fish Pet/Livestock Water Irrigation (Crop)
Swimming Drinking Water Irrigation Other:
Herbicide Treatment and Water Use Restrictions Sign s Posted In Accordance With NR 107 and ATCP 29.22?
Applicator Information
Individual or Business Name
Jones Fish Hatcheries and Distributors LLC DBA Wisconsin Lake & Pond Resource
Telephone xxx -xxx-xxxx
x920-872-2032
Street Address
N7828 Town Hall Rd
City
Eldorado
State
WI
ZIP Code
54932
Individuals Making or
Other Plants (not listed above)
Supervising
Pesticide Application
Last Name First Certification # License #
scharl james 77803 224355
kanz sydney 121646 532342
Name of Person Completing Form
James Scharl
Date: 8/21/2025 Aquatic Plant Management Herbicide
Treatment Record
Form 3200-111 (R4/20) Page 2 of 2
Site
No
Property Name Address / Fire No Treated
acreage
Permitted
Acreage
Sensitive
Area?
Latitude Longitude
C varioius 0.50 0.50
Herbicide Name Other Herbicide EPA Reg. No. Amount
Applied
Units Application
Concentration
Rate (mg/l = ppm)
Symmetry NXG 70506-249 0.75 gallons 0.111 ppm
Tribune Herbicide 100-1390 0.75 gallons 0.245 ppm
Flumigard SC 81927-78 0.18 gallons 0.125 ppm
TS SP Site(s) TS SP Site(s) TS SP Site(s)
Cattail Flat-Stem Pondweed Richardson Pondweed
Chara Floating-Leaf Pondweed Robbins Pondweed
Coontail Illinois Pondweed Sago Pondweed
Curly-Leaf Pondweed Large-Leaf Pondweed Watershield
Duckweed Northern Milfoil White Water Lily
Elodea Phragmites Wild Celery
Eurasion /hybrid Milfoil Planktonic Algae White-Stem Pondweed
Filamentous Algae Purple Loosestrife
TP SP Name Site(s)
water stargrass
Required Attachments and Supplemental Information
Upload Required Attachments ( 15 MB per file limit) - Help reduce file size and trouble shoot file uploads
* indicates completion of this item is required
Note: To add additional attachments using the down arrow icon. To replace an existing file, use the 'Click here to attach file ' link. To remove
additional items, select the item and press CNTRL Delete.
Fee Calculation
Chemical Treatment Record
No additional payment required for submitting treat ment records.
Sign and Submit
You can not submit your form until you have complet ed all areas of the treatment record .
Please complete the following missing items.
Applicant Responsibilities and Certification
I certify that I have completed the Chemical Treatment Record as required by WDNR (NR107) and DATCP (ATCP 29.21 and 29.22).
Steps to Complete the signature process
IMPORTANT: All email correspondence will be sent to the address associated with your WAMS ID).
1. Read and Accept the Responsibilities and Certification
2. Press the Initiate Signature Process button
3. Open the confirmation email for a one time confirmation code and instructions to complete the signature
process.
You will receive a final acknowledgement email upon completing these steps .
Site Map
File Attachment
Lake
Management
Plan
File Attachment
Status
Treatment Activity: Complete
Attachments and Supplemental Information: Optional
Check if you are signing as Agent for Applicant.
I hereby certify that the above information is true and correct and that
copies of this submittal shall be provided to the appropriate parties named in
i:05.t|mywisconsin id|jim@wisconsinlpr.com signed
the contact section and that the conditions of the permit and pesticide use
will be adhered to.
2025 Eurasian water-milfoil
Surveyed: 09/02/25
Figure 1
Lake Mary
Kenosha County
Figures
2025 Eurasian water-milfoil
Surveyed: 09/03/25
Figure 2
Lake Mary
Kenosha County
2026 Management Locations
Figure 3
Elizabeth Lake
Kenosha County, WI
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
February 9, 2026 - REVISED
Village of Twin Lakes
Lakes Mary and Elizabeth
E-mail to: villageadmin@twinlakes.gov , tonyfmigon@yahoo.com , deanandpamtodaro@gmail.com
Re: Costs for 2026 Lake Management Activities
Dear Ms. Jager, Mr. Migon and Mr. Todaro:
In response to your request, Wisconsin Lake & Pond Resource (WLPR), has prepared a cost estimate
for comprehensive lake and aquatic plant management services for Twin Lakes (Mary and Elizabeth),
Kenosha County. This scope of services briefly describes the proposed work plan, anticipated project
schedule and estimated project costs. All work would be completed in accordance with applicable
federal, state, and local regulations, as outlined below.
Work Scope
These costs include labor, equipment, chemical costs, and direct costs to complete the described
work plan. If more than one mobilization is required because DNR does not allow the treatment or it is
outside of the allowable label parameters because of weather or other environmental factors, multiple
mobilization charges may apply. Chemical and equipment costs are based on the referenced products,
application rates and acreages and those costs are fixed as proposed, per unit labor costs generally
increase as the treatment area decreases and are subject to change based on the final DNR approved
treatment areas and application rates.
T
ASK 1.0 PREPARE WDNR & WPDES PERMIT APPLICATION
WLPR will prepare the Wisconsin Department of Natural Resources (WDNR) permit application for
chemical control using treatment areas and maps created by WLPR with assistance from the Client.
Additional attachments required, including a draft legal publication, if necessary, will be provided by
WLPR to the District. Any local publishing requirements in local newspaper(s) will be the responsibility
of the Client. Once the permit application and riparian owner notifications are completed, they will be
submitted to the DNR using the online electronic permit system. The Client is responsible for any
WDNR permit fees.
T
ASK 2.0 EDUCATIONAL MAILING
A packet of information regarding the proposed treatment will be distributed to riparian property
owners consistent with NR107.04 (3) that are located within or adjacent to the permitted application
(150’) areas. It is assumed that the Client will provide an Excel spreadsheet mailing list of all riparian
property owners to WLPR. It is also assumed for the purposes of this proposal that this Task will be
completed by the lake group , and it must be completed at least 15 days prior to the chemical
treatment. All pertinent information for notification will be provided by WLPR.
TASK 3.0 HERBICIDE TREATMENT TARGETING EWM & GENERAL NAVIGATIONAL NUISANCE SPECIES
WLPR would treat areas of the Lake consistent with the permitted application areas for EWM and/or
general species causing a navigational nuisance (if necessary). Initial treatment would be in May and
during periods of calm wind (<7 mph). If liquid, the herbicide would be injected subsurface through
trailing hoses. Product by application areas is included below. All products that were chosen ha d
shown good success in controlling target species throughout Wisconsin.
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
Some locations of the lakes can see dense growth of native aquatic plant species that may cause a
nuisance to navigation. In particular, near- shore areas and the narrow channel portions (Locations A -
D) of the lake can see navigational nuisance as in years prior. WLPR will manage these for reduction
of nuisance conditions during an initial application at the same time as control actions for EWM. Many
nuisance treatment lanes require multiple control actions throughout the growing season. Follow -
up applications may be necessary and may be completed if these areas are noted to be experiencing
dense growth later during the summer by the client.
All products proposed are registered by the EPA, DATCP, and the WDNR for use in Wisconsin to
remove populations of target aquatic plant growth. Areas of EWM growth in Lake Elizabeth (areas A-
E, figure at end of proposal for reference) will be controlled with ProcellaCOR EC at prescribed rates.
Areas on Elizabeth Lake seeing nuisance growth from non-algal species will be treated with a mixture
of the active ingredients flumioxazin, liquid copper, and diquat and rates of 0.125, 0.111, and 0.245
ppm, respectively. All treatment area dimensions are included below.
Task
4.0 AQUATIC PLANT SURVEYS AND MAPPING
WLPR will conduct limited late -season aquatic plant surveys on Lakes Mary and Elizabeth to assess
2025 management options and prepare for 2026. Approximate schedule for the survey is late August
or early September 2025 to ensure any aquatic plants present can be collected and identified. Data
collected will include species presence, density, depth, GPS location, and bottom substrate. This data
will be compiled in the WDNR spreadsheet (WiAPMS.xl) and submitted to the Village . Data collected
will be used to create maps of any aquatic invasive species present and will be compared with
historical data to assess ongoing results of AIS control and plan for potential management in 202 6.
SCHEDULE AND ESTIMATED COST
Work can begin on this project once a signed contract is received. All field work will be coordinated
with the Client and the WDNR. Sediment sampling is anticipated to take place as early as possible
once WDNR approval of the sampling plan is received.
Task 1.0 Prepare WDNR Permit Application and Notices
WDNR Permit Fee for both Lake Elizabeth and Mary* $322.88
TOTAL COST Task 1.0 $322.88
Task 2.0 Educational Mailing (optional) Base fee $250 + $1.50 each piece mailed = $Actual Costs
Task 3.0 Herbicide Treatment of EWM and General Nuisance Species
Initial EWM & Navigational Treatment – Elizabeth & Mary Lakes:
Mobilization, equipment, & vehicle/boat cost $675.00
Labor: Total Treatment area of 9.9 acres $ 1,575.00
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
ProcellaCOR EC to Areas A (52.5 PDU) $ 4,134.38
Flumioxazin, diquat, & copper Areas A-D & Lake Mary $2,450.00
Subtotal Cost $ 8,834.38
Follow-up Navigational Treatment – Elizabeth & Mary Lakes (If Requested):
Mobilization, equipment, & vehicle/boat cost $675.00
Labor: Total Treatment area of 6.9 acres $1,207.50
Flumioxazin, diquat, & copper Areas A-D & Lake Mary $2,4 50.00
Subtotal Cost $4,332.50 (If Requested)
Task 4.0 Aquatic Plant Surveys and Mapping
Labor Cost – survey of both lakes $2,750.00
Mobilization, equipment, and vehicle/boat charge $675.00
Mapping & data entry $875.00
Subtotal Cost $ 4,300.00
Total Costs Tasks 1.0-4.0 (initial treatment and survey only) $13,457.26
* WDNR permit fee includes an on -line convenience fee of 2.5% as charged by the WDNR. Treatment record(s) will be
completed at no cost.
PAYMENT TERMS & CONDITIONS
Payment for services and expenses are due upon receipt and will accrue interest after 30 days. Final
reports will be withheld until all payments are made in full. Invoices for the services performed will
be submitted either upon completion of such services or on a monthly basis. Refer to the attached
Agreement for additional terms and conditions.
We are pleased to submit this proposal and trust this information meets your needs. The above-stated
fee proposed for this scope of services is valid for 90 days from the date of this proposal and subject
to annual adjustments. Upon review and acceptance of the proposal and attached Standard terms
and Conditions, please return a signed copy of this Agreement in its entirety via mail, fax or email,
keeping one copy for your records.
If you have any questions, or require any additional information, please don’t hesitate to contact us at
(920) 872-2032 or via email at skanz@wisconsinlpr.com. We thank you for this opportunity and look
forward to working with you on this project.
Sincerely,
Sydney Kanz
Aquatic Biologist
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
Terms and Conditions
The following Terms and Conditions are attached to and form part of a proposal for lake
management services to be performed by Wisconsin Lake & Pond Resource (herein after referred to
as WLPR) when the Customer authorizes WLPR to proceed with the services, and together with the
proposal shall constitute the AGREEMENT. This shall encompass all related lake management
services for the Client, unless the Client is already under contract with another provider for
additional or similar services at the time of this Agreement.
SERVICE, EQUIPMENT & MATERIAL COSTS: SEE ATTACHED PROPOSAL FOR SPECIFIC COSTS
Travel, mileage or lump sum mobilization charge per each service date if applicable, will be based on
the site location as outlined in the proposal. Additional services that are specifically requested by the
Customer, and that are not covered in this contract, will be billed at a flat rate of $100 -
$150/hour/employee or quoted per project. Any such additional services will be presented to the
Customer as a quote and will no t commence until the Customer approves the quote for additional
services.
BILLING AND TERMS: Balance of payment will be due upon receipt of invoice. A late payment fee of
financing charges of 1.5% per month, will be applied to balances more than 30 days past due.
PERMITS: It is understood by both parties that state, federal, and/or local permits may be required
prior to performing aquatic management, installation, or construction services. WLPR will provide
assistance in completing the permit(s) as outlined in the proposal and provide permit applications to
the Customer, the Customer hereby agrees and is responsible to sign and submit said permit(s) with
the appropriate fees to each required governmental entity prior to commencement of aquatic
management services pe rformed by WLPR. The Customer understands and agrees there may be
certain liabilities and responsibilities within these permits.
PROFESSIONAL EXPECTATIONS AND LIABILITY: WLPR shall provide professional trained, insured,
and licensed staff to perform aquatic management, installation, or construction services. WLPR staff
shall exercise reasonable standard of care and will comply with the labeled requirements of all E.P.A.
registered aquatic pesticides pertaining to transportation, application, and disposal, and will also post
required warning signs that list any water use restrictions indicated on the label. Therefore, WLPR is
not liable for personal, environmental or property damages that may occur as a result of applications
of aquatic pesticides.
INDEMNITY: Customer agrees to defend, indemnify, and hold WLPR harmless against any claim,
demands, losses, liabilities, actions, lawsuits, arbitrations, or expenses of whatever nature, that may
be brought against WLPR, relating to the management services provided pursuant to this Agreement,
with the exception of claims arising directly out of alleged negligent conduct of WLPR’s staff while
actually performing the services which are the subject of this Agreement.
BUDGET: A budgetary range has been established based on multiple criteria. While the recommended
budget is required to successfully manage the described waters, WLPR reserves the right to request
an adjustment to the budget amount if there is a change in the scop e, size of the management areas,
product, or application rates. If this results in additional costs to the Customer, a change order
identifying the change in scope and associated cost(s) will be in submitted in writing to the Customer.
Any work and/or services associated with a change order will only commence upon Customer’s written
acceptance of the change order.
N7828 Town Hall Rd
Eldorado WI 54932
Phone: (920) 872-2032
Fax: (920) 872-2036
Professional Pond Management
Aquatic Herbicide and Algaecide Applications
Lake Management Planning and Services
Pond Design and Development
www.wisconsinlpr.com
ENVIRONMENTAL LOSS: While WLPR staff shall make every effort to reduce the risk of loss of non-
target aquatic life, including fish, this risk remains inherent with any aquatic management, installation,
or construction services. Therefore, WLPR is not liable for any non- target loss, the Customer
understands and accepts the risks associated with potential aquatic management activities.
SITE ACCESS: Customer agrees to provide a suitable vehicle access and boat launch to Customer’s
waters, if there is a fee to launch the Customer agrees to waive (if possible) or alternatively reimburse
said launch fees, as part of the project costs billed to the Customer. In the absence of suitable access
and launch, WLPR shall not be liable for damages done to lawns, shorelines or other property that may
occur during access to the waterway.
TERMINATION: Either party may termination this agreement without cause upon 30 days written
notice. Upon termination by either party, the Customer shall pay all outstanding fees for services
render under this agreement to the effective date of termination.
WARRANTY: Aquatic Applications - given the numerous environmental variables associated with
aquatic applications, no product performance guaranty or warranty, other than those provided by the
manufacturer, are given or implied. Motors, electrical equipment, and components – warranties vary
on these items due to different manufacturers. Please inquire with WLPR regarding specific
warranties.
CUSTOMER AUTHORIZATION : The attached Proposal (and/or subsequent work orders or task
revisions) and above Terms and Conditions are satisfactory and are hereby accepted. WLPR is
authorized to perform all the work as described.
WLPR Representative: Date: 02/04/2026
Customer: Date:
Authorized Representative Signature:
Customer Contact Name (Printed):
Email: Phone Number:
Customer Billing Address:
Prefer Invoiced emailed: Mailed:
Source: Village of Twin Lakes website. First collected Oct 16, 2026.