Plan Commission — Minutes
Village of Germantown · Washington County · Plan Commission · meeting of Jun 8, 2026 · Minutes
Open the original document More from Village of Germantown
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MEETING: REGULAR MEETING OF THE PLAN COMMISSION
DATE AND TIME: Monday, June 8, 2026 6:30 PM
LOCATION: Germantown Village Hall Board Room
N112 W17001 Mequon Road
MINUTES
I. CALL TO ORDER: This meeting has been given public notice in accordance with
Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public
and news media of subject matter that is intended for consideration and action.
Chairman Soderberg called the meeting to order at 6:30pm.
II. ROLL CALL:
Committee Members Soderberg, Warren, Williams, Henk, Tarantino and Fisher were
present. Also present were Community Development Director Retzlaff, Associate
Planner Yanke and Planning Assistant Deb Remich (via Webex). Committee Member
Ewert was absent excused.
III. CITIZEN INPUT/PUBLIC APPEARANCE: (Please be advised per 19.84(2) that
information and comment will be received from the public. It is the policy of this
municipality that public input be limited to a four (4) minute period per person with a
time extension granted at the discretion of the Chairperson. Be advised that there may
be limited discussion of the information received but no action will be taken under
public comments.) Comments that may be injurious to village personnel or other
individuals will not be allowed.
Citizens who spoke included:
Lynn Bednarz who lives on Pawnee Court.
IV. MEETING MINUTES:
A. PC Minutes 5-11-26
Motion: Approve as presented
Motioned By: Robert Warren
Seconded By: Bridget Henk
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion Passed (Yes 6, No 0, Abstained 0)
V. NEW BUSINESS:
A. Brandon O'Bryon, Agent for Mark Posey and Randall Wendland, Property
Owner, at W212 N11206 Meeker Hill Lane; Application to Rezone 2.1 acres
from the R-2: Single-Family Residential to the B-3: General Business District;
and a Conditional Use Permit (CUP) Application to Allow the Operation of a
Page 2
Construction Service/Contractor Shop for a Tree Removal Business Operation.
(PUBLIC HEARING & ACTION)
Director Retzlaff went over the proposal and the history of the property and stated that
the previous tree service was deemed to be an illegal/non-conforming business use of
the property and violations were issued. He stated that there are several businesses
zoned B-3 in that immediate area and said that it's catch-all to put businesses into that
don't fit into any other zoning categories. He introduced Attorney O'Bryon who is
representing the Posey family who operate a tree service in Menomonee Falls and
wish to move their business to Germantown. He stated that the Posey's would like a
building to store their equipment and parking for their employees, but most of the
operations of the business will be done off-site.
Chairman Soderberg opened the public hearing at 6:49pm.
Residents that spoke included:
Lynn Bednarz who lives on Pawnee Court stated that the local residents in that area
do not want this in their neighborhood.
15 emailed comments were received that were opposed to this proposal.
Chairman Soderberg closed the public hearing at 6:52pm.
Discussion followed with Committee members mutually agreeing that this unusually
shaped lot is not the correct place for this business.
Staff recommends denial of the request to rezone a 2.1-acre property from the Rs-2:
Single-Family Residential to the B-3: General Business District and the request to
grant a Conditional Use Permit (CUP) to allow operation of a construction
services/contractor shop for a tree removal and firewood processing business on the
property located at W212N11206 Meeker Hill Lane.
Motion: Approve the denial as presented
Motioned By: Robert Warren
Seconded By: Brian Fisher
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion to Deny Passed (Yes 6, No 0, Abstained 0)
B. Cirrus Property Group, LLC, Agent for Faith Lutheran Church, Property Owner.
Site Plan and Sign Permit applications for a 36-unit multifamily residential
development ("The Carillon at Germantown") totaling 5.4 acres located at
W172N11187 Division Road in the Lannon-Mequon Road Corridor. (ACTION)
Associate Planner Yanke went over the background and history of the development
and stated that this site plan proposal includes 36 multi-family units, landscaping, and
a monument sign. He showed examples of the multiple color schemes and housing
elevations and types. He introduced Daniel Hasbani from Cirrus Property Group, who
stated that they made changes as directed, including: shifting the backyard fencing to
maintain a 5' setback, extending the aborvitae screening, adding 10 trees, did a
combo of fencing and landscape screening where the property meets the commercial
properties. They are proposing almost 500 trees and shrubs around the property,
Page 3
which is almost 7 times the required amount. They will use a combo of board and
batten/shake siding, masonry wainscot at the base and changed the rooflines, by
adding gables, windows, cedar shake siding and vents.
Committee members discussed:
Sidewalk installation along the west side of the property which extends from Mequon
Road to the south and will end at a dead end until the Village connects to it.
Island "porkchop" at the entrance with right in/out, was not desired. They would prefer
full access.
Number of different color schemes was discussed, with members preferring 2 or 3
max. Roof shingles will all be the same.
Landscape bond was suggested, to make sure the landscaping was installed and
maintained if the plantings died. A one-year occupancy bond is what is normally
required. Suggestion was made to plant balled/burlaped arborvitae and multiple types
to add some texture/change. Most pine trees would be too large, growing as big at 30'.
Grading plan concerns: Between the middle building everything drains to the center,
overland water can't get to the drainage ponds, west side is draining to rear property
line, where water may not be able to get out. Daniel stated that this is the preliminary
engineering plan and those issues would be addressed before the final designs move
forward to the construction phase. Retzlaff stated that what we are looking at is
workable, according to our consulting engineer, and at this point, we are looking for
only a 60–80% completion. Retzlaff stated that the stormwater management for this
project has been analyzed by our consultant and if we need to make changes, we
certainly will.
Staff recommends approval of the site development plan architectural building plans
submitted by Cirrus Property Group, LLC, for a 36-unit multifamily residential
development (“The Carillon at Germantown”) on a 5.4-acre property located at
W172N11187 Division Road, subject to the following conditions:
1. This approval is for the various plan sheets that comprise the site development
plan set as noted below and is subject to compliance with all the conditions and
requirements set forth herein and subsequently adopted and/or revised by the
Plan Commission. Approval is granted for the following unless superseded by
subsequent plan sheets approved by Village Staff pursuant to revisions
required herein and/or by the Plan Commission: a. Site/civil engineering plans
dated May 20, 2026, b. Landscaping and planting plan dated May 5, 2026,
c. Photometric lighting plan dated October 13, 2025, d. Architectural building
plans and elevations dated October 6, 2025; March 13, 2026; May 18, 2026. If
revised plan sheets are necessary, each revised sheet shall contain the date of
said revision clearly stamped in the lower right corner.
2. A revised landscape plan shall be submitted and subject to final review and
approval by the Village Forester. Said plan shall address the following
comment: a. Planting Notes and Details, Sheet LP501. The included tree
planting specifications/details should note that “If needed, soil should be
removed from the top of root ball to expose the tree root flare. The exposed tree
root flare shall be planted at, or slightly above, the existing grade.”
3. The technical issues and plan revisions identified in the June 3, 2026, memo
from Public Works and the Village Engineer shall be addressed in revised plan
Page 4
sheets and/or supplemental documents as necessary prior to commencing
construction activities and/or issuance of building permits.
4. State agency (DSPS) approved plans and a $20,000 occupancy bond are
required by Inspection Services. The Village of Germantown is an authorized
delegated agent of DSPS and may be used as an alternative to provide all
commercial plan review and inspection services through SAFEBuilt of WI and
the Village of Germantown.
5. The Developer shall install a 6-foot wide sidewalk along the west side of
Division Road from Mequon Road to the southern end of the subject 5.4-acre
parcel. Sidewalk construction method shall be in compliance with the Village of
Germantown Development Handbook design standards and constructed as set
forth in a Development Agreement.
6. Public utilities (i.e. sanitary and water) shall be installed in compliance with the
Village of Germantown Development Handbook design standards and/or as set
forth in a Development Agreement. Final utility profiles, plans, and precise
location shall be coordinated with the Public Works Director, Village Engineer,
and Water and Wastewater Utility Superintendents.
7. The private road construction and driveway intersections on Division Road shall
be designed and coordinated with the Public Works Director, Village Engineer,
and the Fire Department.
8. Unless mutually agreed to between the Developer and the Village as set forth in
the Development Agreement, the provisions of Village Code Section 11.08
pertaining to garbage and recycling collection for a property containing five (5)
or more residential units (“multiple-family dwellings”) shall apply.
9. The approved Certified Survey Map (CSM) creating the subject development
site shall be recorded at the Washington County Register of Deeds prior to
commencing construction activities and/or issuance of building permits.
10. A Development Agreement shall be reviewed by the Public Works and
Highways Committee and approved by the Village Board. Maintenance
guarantees pertaining to stormwater management facilities, walking paths, and
utilities shall be included in the Development Agreement.
Motion 1: Approve site plan with changes: remove pork chop (right-in, right-out) in
northern driveway; increase size of arborvitae and mix in shade trees or columnar
pines; require landscape bond (110% of cost) for 5 years to ensure planting health;
allow three (3) color schemes to be incorporated in the buildings.
Motioned By: Brian Fisher
Seconded By: Robert Warren
Discussion Followed: Tarantino would like the developer to run the arborvitae choices
past him, so he could assist and Retzlaff would like to be included in that. The
arborvitaes should be larger than the proposed #10 size in pots and the columnar
pines, where would they fit? Fisher will defer to Tarantino's expertise in choosing the
size and type of shrubs. The amount of the landscape bond would be 110% of the cost
of the landscaping and if the applicant doesn't replace the deceased plantings, then
the Village can replace them at the developer's expense. Hasbani would like to work
with the municipality and feels what is suggested is high and would like some
flexibility. The standard warranty on landscape installations is usually between the
Page 5
developer and the landscape installer and the Village does not have anything to do
with it. Plant warranties are usually for 1 year through the contractor. Hasbani said he
would prefer to handle this with the warranty from the landscaping company, and they
could bring back the landscape plan in a few years if the plants aren't doing well where
they planted them. Their property management would be in charge of maintaining the
landscape as they don't want their residents to look out and see dead arborvitae.
Motion 2: Amend landscape bond to 2 years and refer final planting types to
Commissioner Tarantino for approval/acceptance.
Motioned By: Josh Tarantino
Seconded By: Bridget Henk
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion Passed Yes 6, No 0, Abstained 0
Results of Motion 1:
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion Passed (Yes 6, No 0, Abstained 0)
APPROVE the Sign Permit for Cirrus Property Group, LLC, for property located at
W172N11187 Division Road, subject to the following condition:
1. Prior to sign installation, the applicant shall revise the sign plan details to
incorporate landscaping for the real estate development (monument) sign
meeting the requirements of Village Sign Code Section 17.46(7). Said plan is to
be submitted to the Village Planner for review and approval prior to sign
installation.
Motion 3: Approve Sign Permit
Motioned By: Robert Warren
Seconded By: Bridget Henk
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion Passed (Yes 6, No 0, Abstained 0)
C. Pinnacle Engineering Group, Agent for ZPG Development LLC, Property
Owner - W210 N13145 Gateway Crossing; Site Development & Building Plans
for a 252,512 sqft Multi-Tenant Industrial Building in the Germantown Gateway
Corporate Park. (ACTION)
Director Retzlaff stated that the proposed building #7 is the last building for the Zilber
property group in Gateway Park and is a multi-tenant building for industrial or light
manufacturing. There are no plans for rooftop mechanicals at this point, depends on
Page 6
the potential tenant. The landscape plan shows a significant amount of planting along
Rockfield Road to create a visual buffet for the land to the north, it's the same
landscaping as their other buildings and all those plants are doing well.
Staff recommends approval of the site development and building plans for the 252,512
sqft Zilber #7 industrial building located at W210 N13145 Gateway Crossing in the
Germantown Gateway Corporate Park subject to the following conditions:
1. This approval is subject to all the conditions and requirements set forth
herein and adopted by the Plan Commission. Approval is granted for the
following architectural and engineering plans unless superseded by
subsequent plan sheets approved by Village Staff pursuant to revisions
required herein and/or by the Plan Commission:
a. Civil Engineering and Infrastructure Plans labeled Germantown Zilber
7 at Gateway Corporate Park dated April 16, 2026;
b. Architectural plans labeled Zilber7 at Germantown Gateway
Corporate Park dated April 15, 2026;
c. Exterior lighting plans dated April 14, 2026;
d. Landscaping Plans dated April 16, 2026
2. All landscaping, screening, grading, and paving improvements shown on the
approved site plans shall be installed as proposed prior to issuance of an
occupancy permit unless a cash bond or letter of credit in an amount equal
to 120 percent of the estimated installation and material costs reviewed and
approved by the Village is submitted to the Village as necessary to ensure
that installation of the proposed features and improvements will be
completed within one (1) year after issuance of the occupancy permit.
3. All exterior doors (except primary entrance) shall be clearly marked with
reflective 5” or larger letters/numbers to aid emergency personnel access as
required by the Police Department.
4. All outstanding items, issues and plan revisions required by Village Staff in
the following review memos shall be resolved and reflected in additional
information and/or revised plans submitted to Staff for further review,
comment and approval prior to issuance of a building permit for the Zilber #7
building (excluding “early start” site clearing and footing/foundation work
approved by the Village and/or WI DSPS):
a. June 2, 2026,memo from Public Works Director, Tim Zimmerman
5. State agency (DSPS) approved plans and a $20,000 occupancy bond are
required by Inspection Services at the time of building permit application.
The Village of Germantown is an authorized delegated agent of DSPS to
Page 7
provide all commercial plan review and inspection services through
SAFEBuilt of WI and the Village of Germantown (if necessary).
6. The Zilber Property Group shall notify the prospective tenant that the tenant
is responsible for providing a roof plan with the location of all roof-mounted
HVAC units and any other roof-mounted equipment, along with sight-line
diagrams, as part of all future building “build out” plans at the time a
Zoning/Occupancy Permit is obtained. RTU’s shall be setback a minimum of
14 feet from the perimeter roof/wall edge to obscure the view of all RTU’s
from property lines around the building and the centerline of the Gateway
Crossing. If RTU’s cannot be hidden from view, screen walls or other
mutually acceptable features intended to shield the view of said RTU’s shall
be submitted to the Village Planner (or Plan Commission if determined
necessary by the Village Planner) for review and approval prior to build out
construction and issuance of an occupancy permit.
7. Dumpster enclosures shall be designed to meet the Village’s dumpster
enclosure guidelines. Future tenants shall be required to provide proposed
dumpster enclosure plans for review and approval by the Village Planner
prior to issuance of an occupancy permit.
Motion: Approve as presented
Motioned By: Robert Warren
Seconded By: Josh Tarantino
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion Passed (Yes 6, No 0, Abstained 0)
D. Joseph Schultz, Property Owner of N128W16824 Holy Hill Road. Request for a
variance from the architecture and exterior materials requirements under
Section 17.41(2a) of the Zoning Code for a detached accessory building.
(ACTION)
Staff recommends approval of the Zoning Permit application for an architectural
variance from Section 17.41(2a) of the Zoning Code to construct a detached
accessory building (pole building) with metal siding/roof materials on property located
at N128W16824 Holy Hill Lane.
Motion: Approve as presented
Motioned By: Robert Warren
Seconded By: Bridget Henk
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion Passed (Yes 6, No 0, Abstained 0)
Page 8
E. Signs & Gear, Agent for Daryl & Ralph Willing/Maple German LLC, Property
Owner W188 N10707 Maple Road - Sign Review for Multi-Tenant Monument
Sign. (ACTION)
Director Retzlaff stated that the original non-conforming pylon sign for this building was
damaged in a storm and is being replaced with this sign that is code compliant.
Staff recommends approval of the proposed monument sign for the Maple German
LLC property located at W188 N10707 Maple Road subject to the following
conditions:
1. Applicant/owner shall obtain an electrical permit(s) from Building Inspection
Services prior to sign installation.
Motion: Approve as presented
Motioned By: Bridget Henk
Seconded By: Robert Williams
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion Passed (Yes 6, No 0, Abstained 0)
F. Keaton Harrison, Property Owner. Zoning Permit application to install a 6' fence
in a public drainage easement on property located at W142N9935 Amber
Drive. (ACTION)
Associate Planner Yanke stated that staff visited this site and there is no evidence of
an underground drainage pipe and the public drainage easement directs surface flow
to the pipe located in the ground to the south.
Discussion Followed: Their consensus was that drainage is easily determined and that
this fence would not affect any other property owner except this one.
Staff recommends approval of the zoning permit application to install a 6’ cedar fence
in a public drainage easement along the western (rear) lot line of property located at
W142N9935 Amber Drive, subject to the following conditions:
1. A fence permit is required from Building Inspection Services. The property
owner is required to contact SAFEBuilt Inspection Services for more
information.
2. The property owner shall enter into an encroachment agreement with the
Village that specifies the property owner assumes responsibility for removing
and/or replacing the fence and any other damages or costs if access to or
maintenance of the easement is required by the Village.
3. It shall be the responsibility of the homeowner to maintain a free flow of water
within the drainage easement at all times. Bottom of fence shall be installed at
3” above grade.
4. If the fence needs to be removed to make improvements and/or conduct
maintenance within the easement, the property owner shall be responsible for
all costs associated with removing the fence to the extent necessary within
Page 9
seven (7) days of being notified by the Village (or another mutually agreeable
deadline). The property owner shall be responsible for any and all costs
associated with any damage, removal, or re-installation of said fence.
Motion: Approve as presented
Motioned By: Robert Warren
Seconded By: Josh Tarantino
Yes: Bob Soderberg, Robert Warren, Robert Williams, Bridget Henk, Josh Tarantino,
Brian Fisher
No: None
Abstain: None
Motion Passed (Yes 6, No 0, Abstained 0)
VI. COMMUNITY DEVELOPMENT DIRECTOR'S REPORT:
Retzlaff handed out a summary sheet of ongoing projects and their status.
VII. NEXT MEETING DATE:
VIII. ANNOUNCEMENTS:
None.
IX. ADJOURNMENT:
Chairman adjourned the meeting at 8:15pm.
Source: Village of Germantown website. First collected Oct 7, 2026.