Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Shattuck Neenah LLC
PO Box 91
Neenah WI 54956
RE: 600 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Thomas Manena
517 Division St
Neenah WI 54956
RE: 517 Division St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Kimberly L. Biedermann
605 Elm St
Neenah WI 54956
RE: 605 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Julie Sauer
613 Elm St
Neenah WI 54956
RE: 613 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Darin L. Krause
619 Elm St
Neenah WI 54956
RE: 619 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Dana Benz
625 Elm St
Neenah WI 54956
RE: 625 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Chong Her
633 Elm St
Neenah WI 54956
RE: 633 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Mark C. Noffke
637 Elm St
Neenah WI 54956
RE: 637 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Taylor Banker
641 Elm St
Neenah WI 54956
RE: 641 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Kirk Moore-Nokes
645 Elm St
Neenah WI 54956
RE: 645 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
DSKS LLC
7529 Sunburst Ln
Neenah WI 54956
RE: 649 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Current Residents
649 Elm St
Neenah WI 54956
RE: 649 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Jennifer J. Ryberg
653 Elm St
Neenah WI 54956
RE: 653 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Patrick D. Riley
655 Elm St
Neenah WI 54956
RE: 655 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Joel Anger
657 Elm St
Neenah WI 54956
RE: 657 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Carol C. Lendrum
419 11th St
Neenah WI 54956
RE: 659 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Current Resident
659 Elm St
Neenah WI 54956
RE: 659 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Benjamin L. Arendt
667 Elm St
Neenah WI 54956
RE: 667 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Diane M. Eparvier
669 Elm St
Neenah WI 54956
RE: 669 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Kevin Mccann
671 Elm St
Neenah WI 54956
RE: 671 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Karmelle Bert
673 Elm St
Neenah WI 54956
RE: 673 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
R M Gravelle Holdings LLC
PO Box 585
Neenah WI 54957
RE: 600 E Cecil St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Current Resident
600 E Cecil St
Neenah WI 54957
RE: 600 E Cecil St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Mark Stritch
782 Elm St
Neenah WI 54956
RE: 782 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Chad Pelky
778 Elm St
Neenah WI 54956
RE: 778 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Jeffery E. Fogle
774 Elm St
Neenah WI 54956
RE: 774 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Rhexenor Arboleda V
770 Elm St
Neenah WI 54956
RE: 770 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Valerie Hurm
776 Elm St
Neenah WI 54956
RE: 776 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Larry A Vaubel Living Trust
766 Elm St
Neenah WI 54956
RE: 766 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Sandra L. Forseth
762 Elm St
Neenah WI 54956
RE: 762 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Patricia A. Ermis
754 Elm St
Neenah WI 54956
RE: 754 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Perry Clough
750 Elm St
Neenah WI 54956
RE: 750 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Shattuck Neenah, Llc
PO Box 91
Neenah WI 54956
RE: 720 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Jacob D. Jensen
777 Elm St
Neenah WI 54956
RE: 777 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
William Osborne
773 Elm St
Neenah WI 54956
RE: 773 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Michelle R. Babbitts
769 Elm St
Neenah WI 54956
RE: 769 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Dylan Hedtke
765 Elm St
Neenah WI 54956
RE: 765 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Edward & Tami Faulks
761 Elm St
Neenah WI 54956
RE: 761 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Jay L. Kresheck
757 Elm St
Neenah WI 54956
RE: 757 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Spencer D. Jamrock
753 Elm St
Neenah WI 54956
RE: 753 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Diconnery Properties LLC
N1466 Fairwinds Dr
Greenville WI 54952
RE: 749 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Current Resident
749 Elm St
Neenah WI 54956
RE: 749 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Matthew B. Verhage
745 Elm St
Neenah WI 54956
RE: 745 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Scott D. Blank
741 Elm St
Neenah WI 54956
RE: 741 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Mary P. Fink
733 Elm St
Neenah WI 54956
RE: 733 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Joshua P. Kutney
729 Elm St
Neenah WI 54956
RE: 729 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Gregory S. Bucholtz
725 Elm St
Neenah WI 54956
RE: 725 Elm St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as p