Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
St Margaret Mary Congregation
439 Washington St
Neenah WI 54956
RE: 602 Divisio St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Addison Bond
506 Reed St
Neenah WI 54956
RE: 506 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Andrew Muenzel
510 Reed St
Neenah WI 54956
RE: 510 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Dennis R. Bednarz
602 Reed St
Neenah WI 54956
RE: 602 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Joselin Torres De La Cruz
610 Reed St
Neenah WI 54956
RE: 610 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
MCClone Development LLC
152 Schramm Rd
Neenah WI 54956
RE: 614 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Current Resident
614 Reed St
Neenah wI 54956
RE: 614 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Gerry P. Graphos
618 Reed St
Neenah WI 54956
RE: 618 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Scott Daniel
646 Reed St
Neenah WI 54956
RE: 646 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Joshua A. Mattfeld
642 Reed St
Neenah WI 54956
RE: 642 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Brian Becker
640 Reed St
Neenah WI 54956
RE: 640 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Luis Lavalle-Castellanos
636 Reed St
Neenah WI 54956
RE: 636 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Jamie Fravel
632 Reed St
Neenah WI 54956
RE: 632 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Jessica E. Williams
628 Reed St
Neenah WI 54956
RE: 628 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Mary K. Zeumer
624 Reed St
Neenah WI 54956
RE: 624 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Brian A. Cole
339 Lake Rd
MENASHA WI 54952
RE: 620 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Current Resident
620 Reed st
Neenah wI 54956
RE: 620 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Ryan N. Peters
650 Reed St
Neenah WI 54956
RE: 650 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Kristen Bartels
654 Reed St
Neenah WI 54956
RE: 654 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Michael O. Dunham
658 Reed St
Neenah WI 54956
RE: 658 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Jennifer M. Radtke
662 Reed St
Neenah WI 54956
RE: 662 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Keith J. Runnerstrom
666 Reed St
Neenah WI 54956
RE: 666 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Thomas Kneip
670 Reed St
Neenah WI 54956
RE: 670 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Rabe
674 Reed St
Neenah WI 54956
RE: 674 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Nevis R. Martin
678 Reed St
Neenah WI 54956
RE: 678 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Gwen A. Schwartzkopf
306 W Bell St
Neenah WI 54956
RE: 682 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Current Resident
682 Reed St
Neenah WI 54956
RE: 682 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Shattuck Neenah LLC
PO Box 91
Neenah WI 54956
RE: 390 Laudan Blvd
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Texas Herter
782 Reed St
Neenah WI 54956
RE: 782 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Lisa M. Lafleur
778 Reed St
Neenah WI 54956
RE: 778 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Tyler Vanden Bloomer
776 Reed St
Neenah WI 54956
RE: 776 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Jacob Becker
772 Reed St
Neenah WI 54956
RE: 772 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Nicholas Pearlman
768 Reed St
Neenah WI 54956
RE: 768 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Sally A. Erdman
764 Reed St
Neenah WI 54956
RE: 764 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Matthew J. Bartz
760 Reed St
Neenah WI 54956
RE: 760 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Rebecca Marrazzo
752 Reed St
Neenah WI 54956
RE: 752 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
David W. Butzlaff
748 Reed St
Neenah WI 54956
RE: 748 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Kaleigh L. Hilger
744 Reed St
Neenah WI 54956
RE: 744 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Mark Jensen
740 Reed St
Neenah WI 54956
RE: 740 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Christopher Engelke
736 Reed St
Neenah WI 54956
RE: 736 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Martin Arias
732 Reed St
Neenah WI 54956
RE: 732 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Susan Gabriel
726 Reed St
Neenah WI 54956
RE: 726 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Kristine L. Augustine
724 Reed St
Neenah WI 54956
RE: 724 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Laura J. Kading
720 Reed St
Neenah WI 54956
RE: 720 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Thomas Camann
716 Reed St
Neenah WI 54956
RE: 716 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Bruce Wiater
710 Reed St
Neenah WI 54956
RE: 710 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are committed to working with the property owners to make this project run as
smoothly as possible.
If you would like to receive weekly emails on construction updates, you can sign up for the
Construction Newsletter on the City of Neenah webpage (www.neenahwi.gov) under the
Department of Public Works. We thank you for your help and patience during this construction
project. Please contact our department if you require special consideration for accessibility. If
you have any questions, contact the individuals listed below or the Public Works Department at
920-886-6240.
City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246
City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245
De Groot Inc.... .............................. Mark or Marty ....................... 920-866-2348
Scott Lamers Construction.... ........ Kirk Popp ............................... 920-427-0182
Sincerely,
Gerry Kaiser, PE
Director of Public Works
cc: Mayor Lang
Alderman
Police Chief Olson
Fire Chief Teesch
Department of Public Works
211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426
Phone: 920-886-6240 Fax: 920-886-6250
March 10, 2026
Robert A. Tunstall
702 Reed St
Neenah WI 54956
RE: 702 Reed St
The City's contractor, De Groot Inc., will begin utility and street construction on Elm Street,
Reed Street, and Laudan Boulevard next week. Construction will be completed by November
2026. We will need your help to make this a successful project.
General Project Sequence
The project will consist of the following work:
Install new sanitary sewer main
Install new water main
Install new sanitary laterals and water services
Install new storm sewer
Rest period (Contractor will not work for 14 days to allow trenches to settle more than
can be achieved with mechanical compaction)
Remove existing roadway (asphalt)
Excavate and install geogrid and new road base
Install new concrete curb & gutter
Install driveway aprons, repair sidewalks (or install new)
Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch
Install new hot mix asphalt roadway (two layers)
Garbage / Postal Service / Emergency Services
During construction, refuse and recycling pick-up will continue on your regularly
scheduled day. City crews may collect from construction areas first so please have your
carts out before 6:30 A.M. when the construction crew is working on your street. Carts
should be placed on the street or terrace area.
The postal service will continue delivering and collecting mail as usual.
Emergency services have been notified of the construction activity and will plan
accordingly.
P a g e | 2
Parking and Accessibility
The streets will be open to local traffic only and residents will have access to their driveways
during the majority of the project. Parking will not be permitted on the streets during the
construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO
PARKING zones, standard parking restrictions will be waived on adjacent streets for those
vehicles displaying one of the enclosed Construction Parking Permits. There will be a period
of time when residents will not have access to their driveways. This will occur during the
curb/gutter and driveway construction and will last approximately 3 weeks. At least 24 hours
advance notice will be given when limiting driveway access. Your driveway will also be
temporarily blocked while utilities are installed in front of your property. If you need to get in
or out of your driveway because special circumstances require access to your driveway while
work is taking place, please communicate with the inspector or workers on site
Terrace Restoration
The contractor will complete the terrace restoration adjacent to your property. After topsoil is
placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this
daily to keep the soil moist until the new grass is well established. Please mow the grass and
weeds when they reach 6". The grass should overtake the weeds with continued watering and
mowing. The contractor will notify you when to begin watering.
Private Sanitary Sewer Lateral Replacement
Please return your Property Owner Authorization Form (purple or grey sheet) if you
have not already done so. All sanitary laterals will be replaced to the homes unless previously
relayed. The cost estimate for the property owner’s share of sanitary lateral is approximately
$2,700. Scott Lamers Construction is the subcontractor installing the sanitary laterals into the
house and will be contacting you when the utilities in the road are complete.
Sump Pump
If you do not have a sump pump, please inform Scott Lamers Construction when they contact
you to have one installed. The cost to install a sump pump pit is $400-$600, depending on its
location. This cost does not include a pump or a discharge pipe.
Water Services Replacement
If there is lead or galvanized pipe, by ordinance, it is required to be replaced. The Utility-
owned portion of the service line (from the main to the curb stop), will be replaced at no cost to
you. However, the replacement of the private lead or galvanized service (from the curb stop to
the water meter) is the responsibility of the property owner. Property owners have the choice
of replacing the water service before construction begins or having the service line replaced as
part of the construction contract. Generally, having the service line replaced as part of the
construction contract is easier and less expensive. The cost of replacing a private service line
during a construction event and in conjunction with a sanitary lateral replacement is estimated
to be approximately $1,500.00.
P a g e | 3
Carriage Walk
If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it
will be removed with our project. If you would like to pay for this to remain, please contact the
City for an estimated cost.
During the course of this project, there will be inconveniences such as noise, travel delays,
dust, and other issues associated with street construction. The City of Neenah and the
contractor are c