Village Board — Agenda Packet
Village of Jackson · Washington County · Village Board · meeting of Feb 10, 2026 · Agenda packets
Open the original document More from Village of Jackson
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
February 10, 2026 Village of Jackson - Village Board Meeting Agenda
VILLAGE OF JACKSON
VILLAGE BOARD MEETING AGENDA
Tuesday, February 10, 2026 at 7:30 PM
(Or immediately following Budget and Finance Committee meeting)
Jackson Municipal Complex
Village Board Room
N168W19851 Main Street
Jackson, WI 53037
1. Call to Order and Roll Call
2. Pledge of Allegiance
3. Presentations
a. 2026 Preliminary Financing Plan - Ehlers Financial Advisors
4. Village Citizen Comment on an Agenda Item (Please sign-in with the Clerk prior to
speaking. Please note this is the Village Board's monthly business meeting, not a public
hearing. People wishing to speak on an item on the agenda should present their comments
under this agenda item. Each commenter will be limited to a total of 2 minutes.)
5. Consent Agenda
a. Approval of Minutes for the Village Board Meeting of January 13, 2026
b. Consideration and Approval of Meeting Date Change - August 2026
c. Resolution #26-02 Authorizing the Continued Conversation of the Creation of a
Washington County Countywide Emergency Medical Services (EMS) System
d. Resolution #26-03 Approving Additional Election Officials for the 2026-2027 Election
Cycle
e. Resolution #26-04 Honoring Tyler Mentzel for Achieving Certification as a Park and
Recreation Professional
f. Resolution #26-05 Honoring Jacob Caltagerone for Achieving Certification as a Park
and Recreation Professional
g. Resolution #26-06 A Resolution Opposing Wisconsin Assembly Bill 885
6. Approval of Licenses
a. Transfer of Manufactured Home Park License - N168W21700 Main Street - Green
Valley MHC LLC
7. Budget and Finance Committee
a. Change Order #2 - Final - 2025 Oaks of Jackson Surface Course - Spruce Street and
Ridgeway Drive - Stark Pavement Corporation for an increase in the amount of
$24,493.60
b. Pay Request #1 - 2025 Oaks of Jackson Surface Course - Spruce Street and Ridgeway
Drive - Stark Pavement Corporation in the amount of $207,838.41
c. Pay Request #1 - 2025 Dog Park at Cedar Creek Park - Lowe Underground, Inc. in the
amount of $90,134.29
Page 1 of 66
February 10, 2026 Village of Jackson - Village Board Meeting Agenda
d. Review of 2022 Stormwater Pond Compliance Report and Invoicing — Request for
Refund of Special Assessments
e. Review of Bids - Wastewater Treatment Plant Fill Removal Project
f. Review of Bids – Purchase of Brush Chipper
g. Resolution #26-01 Accepting Funds from the Washington County Roadway Shared
Services Grant Program
8. Personnel Committee
a. Discussion and Possible Action – Operations Manager Reclassification and Operations
Manager Internship Proposal
9. West Bend School District
10. Washington County Board Report
11. Greater Jackson Business Alliance
12. Mid-Moraine Municipal Association Report
13. Closed Session Pursuant to Wis. Stats. §19.85(1)(e) “deliberating or negotiating the
purchasing of public properties, the investing of public funds, or conducting other specified
public business, whenever competitive or bargaining reasons require a closed session” and
§19.85(1)(f) "Considering financial, medical, social or personal histories or disciplinary data
of specific persons, preliminary consideration of specific personnel problems or the
investigation of charges against specific persons except where par. (b) applies which, if
discussed in public, would be likely to have a substantial adverse effect upon the reputation
of any person referred to in such histories or data, or involved in such problems or
investigations.
The closed session is for the following purposes:
1. To Discuss the Oaks of Jackson Development Agreement
2. To Discuss TID 6 Development Agreement
3. To Discuss a Personnel Matter
4. To Discuss Village Square Development
14. Reconvene in Open Session with Possible Action Related to the Subject of the Preceding
Closed Session
15. Adjourn
Persons with disabilities requiring special accommodations for attendance at the meeting should contact the
Administration Department at the Jackson Municipal Complex at least one (1) business day prior to the
meeting.
It is possible that members of the Village Board may attend the above meeting. No action will be taken by any
governmental body at this meeting other than the governmental body specifically referred to in this meeting
notice. This notice is given so that members of the Village Board may attend the meeting without violating the
open meeting law.
Page 2 of 66
Village of Jackson, WI
2026 Preliminary Financing Plan
February 10, 2026 Village Board
Page 3 of 66
2
• G.O. Notes: $3,325,449
• Revenue Bonds: $3,369,645
• Grants/Aids/Cash: $1,547,000
*See full CIP table attached at the end of the
presentation
2026 G.O. Notes & Revenue Bonds
Sources of Funding
G.O. Debt 3,325,449 3,325,449
Cap. Projects 3,208,154 3,208,154
TID 7 117,295 117,295
Revenue Debt 3,369,645 3,369,645
Water 1,177,045 1,177,045
Sewer 2,192,600 2,192,600
Grants/Aids 112,000 112,000
Fire/EMS 112,000 112,000
Special Assessment/Impact Fees 100,000 100,000
Cap. Projects 100,000 100,000
Cash 1,547,000 1,547,000
Water 170,000 170,000
Sewer 991,000 991,000
Cap. Projects 364,000 364,000
Fire/EMS 22,000 22,000
Total 8,454,095 8,454,095
Page 4 of 66
3
2026 G.O. Notes & Revenue Bonds Sizing
2026 2026
G.O. Notes Levy
Portion
TID #7
Portion
Revenue
Bonds
Water
Portion
Sewer
Portion
CIP Projects1
Water - 1,177,045 1,177,045
Sewer - 2,192,600 2,192,600
Cap. Projects 3,208,154 3,208,154 -
Fire/EMS - -
TID 7 117,295 117,295 -
Subtotal Project Costs 3,325,449 3,208,154 117,295 3,369,645 1,177,045 2,192,600
CIP Projects1 3,325,449 3,208,154 117,295 3,369,645 1,177,045 2,192,600
Debt Service Reserve
DSR Funds On Hand 0 0 0 (535,012) (187,002) (348,011)
New DSR Requirement 0 0 0 729,293 254,908 474,385
Reserve Fund Requirement 0 0 0 194,281 67,906 126,374
Estimated Issuance Expenses 129,325 124,801 4,524 164,563 57,519 107,043
Municipal Advisor (Ehlers) 28,600 27,599 1,001 49,400 17,267 32,133
Bond Counsel 25,000 24,125 875 30,000 10,486 19,514
Disclosure Counsel 17,500 16,888 612 21,000 7,340 13,660
Rating Fee 14,500 13,993 507 17,000 5,942 11,058
Maximum Underwriter's Discount 12.50 42,875 41,375 1,500 12.50 46,313 16,188 30,125
Paying Agent 850 820 30 850 297 553
Subtotal Issuance Expenses 129,325 124,801 4,524 164,563 57,519 107,043
TOTAL TO BE FINANCED 3,454,774 3,332,955 121,819 3,728,488 1,302,471 2,426,018
Estimated Interest Earnings 3.00% (24,941) (24,061) (880) 3.00% (25,272) (8,828) (16,445)
Assumed spend down (months) 3.00 3.00
Rounding 167 1,106 (940) 1,784 1,357 427
NET SIZE 3,430,000 3,310,000 120,000 3,705,000 1,295,000 2,410,000
Page 5 of 66
4
2026 G.O. Notes Tax Impact
2026 G.O. Notes
Net Debt Change Annual Taxes 3,430,000 Total Levy Change Total Tax Annual Taxes Annual Taxes
Year Service From Prior Tax Rate $365,000 Dated: 5/1/2026 Less: Less: Net Debt from Prior Rate for $365,000 Difference Year
Ending Levy Year Levy Per $1,000 Home Total Prin. & Int. CP Fund TID 7 Service Levy Year Debt Home From Existing Ending
2026 1,754,766 $1.28 $467.31 0 0 1,754,766 $1.28 $467 $0 2026
2027 1,755,364 599 $1.24 $452.95 256,490 (136,437) (16,243) 1,859,175 104,409 $1.31 $480 $12 $27 2027
2028 1,693,508 (61,857) $1.16 $423.43 182,870 (206,450) (13,798) 1,656,130 (203,045) $1.13 $414 ($66) ($9) 2028
2029 1,627,683 (65,825) $1.08 $394.34 181,610 (54,124) (13,483) 1,741,686 85,556 $1.16 $422 $8 $28 2029
2030 1,401,233 (226,450) $0.90 $328.94 254,111 0 (13,163) 1,642,181 (99,504) $1.06 $385 ($36) $57 2030
2031 1,420,240 19,008 $0.86 $315.30 230,651 (12,833) 1,638,059 (4,122) $1.00 $364 ($22) $48 2031
2032 1,417,422 (2,818) $0.84 $304.91 227,398 (12,490) 1,632,330 (5,729) $0.96 $351 ($13) $46 2032
2033 1,403,425 (13,997) $0.80 $292.53 224,025 (12,135) 1,615,315 (17,015) $0.92 $337 ($14) $44 2033
2034 1,378,521 (24,904) $0.76 $278.42 225,440 (11,768) 1,592,193 (23,122) $0.88 $322 ($15) $43 2034
2035 1,366,505 (12,016) $0.73 $267.42 221,690 (11,393) 1,576,802 (15,391) $0.85 $309 ($13) $41 2035
2036 1,355,296 (11,208) $0.70 $256.03 217,940 (11,018) 1,562,219 (14,583) $0.81 $295 ($13) $39 2036
2037 1,349,514 (5,783) $0.67 $244.60 213,990 (10,623) 1,552,881 (9,338) $0.77 $281 ($14) $37 2037
2038 1,332,800 (16,714) $0.64 $234.07 209,840 (10,208) 1,532,433 (20,449) $0.74 $269 ($12) $35 2038
2039 1,304,999 (27,802) $0.61 $222.08 195,898 0 1,500,896 (31,537) $0.70 $255 ($14) $33 2039
2040 1,096,000 (208,999) $0.49 $177.99 289,945 0 1,385,945 (114,951) $0.62 $225 ($30) $47 2040
2041 813,156 (282,844) $0.35 $127.95 511,723 0 1,324,879 (61,066) $0.57 $208 ($17) $81 2041
2042 794,538 (18,619) $0.33 $121.14 493,023 0 1,287,560 (37,319) $0.54 $196 ($12) $75 2042
2043 770,613 (23,925) $0.31 $113.85 473,898 0 1,244,510 (43,050) $0.50 $184 ($12) $70 2043
2044 702,138 (68,475) $0.28 $100.51 454,773 0 1,156,910 (87,600) $0.45 $166 ($18) $65 2044
2045 262,438 (439,700) $0.10 $36.40 440,105 0 702,543 (454,368) $0.27 $97 ($68) $61 2045
2046 0 (262,438) $0.00 $0.00 0 0 0 (702,543) $0.00 $0 ($97) $0 2046
Total 25,000,156 5,505,418 (397,011) (149,150) $867.97 Total
Total Cost of new DS to sample taxpayer
Proposed DebtExisting Debt
Abatements Debt Service Levy Taxes
Tax Levy
Change from
Prior Year
Page 6 of 66
5
Tax Impact Full FMP CIP
Total Levy Change Total Tax Annual Taxes Annual Taxes
Year Net Debt from Prior Rate for $365,000 Difference Year
Ending Service Levy Year Debt Home From Existing Ending
2026 1,754,766 $1.28 $467 $0 2026
2027 1,859,175 104,409 $1.31 $480 $12 $27 2027
2028 1,967,754 108,579 $1.35 $492 $12 $69 2028
2029 2,051,640 83,886 $1.36 $497 $5 $103 2029
2030 2,068,855 17,216 $1.33 $486 ($11) $157 2030
2031 2,098,579 29,724 $1.28 $466 ($20) $151 2031
2032 2,128,101 29,522 $1.25 $458 ($8) $153 2032
2033 2,154,604 26,503 $1.23 $449 ($9) $157 2033
2034 2,188,736 34,132 $1.21 $442 ($7) $164 2034
2035 2,155,695 (33,041) $1.16 $422 ($20) $154 2035
2036 2,132,805 (22,890) $1.10 $403 ($19) $147 2036
2037 2,114,915 (17,890) $1.05 $383 ($20) $139 2037
2038 2,085,574 (29,341) $1.00 $366 ($17) $132 2038
2039 2,044,955 (40,619) $0.95 $348 ($18) $126 2039
2040 1,969,589 (75,366) $0.88 $320 ($28) $142 2040
2041 1,901,674 (67,915) $0.82 $299 ($21) $171 2041
2042 1,861,905 (39,769) $0.78 $284 ($15) $163 2042
2043 1,805,905 (56,000) $0.73 $267 ($17) $153 2043
2044 1,729,606 (76,299) $0.68 $248 ($19) $147 2044
2045 1,655,841 (73,765) $0.63 $230 ($18) $193 2045
2046 1,508,599 (147,243) $0.56 $203 ($27) $203 2046
2047 1,350,451 (158,148) $0.48 $176 ($27) $176 2047
2048 1,145,503 (204,949) $0.40 $145 ($31) $145 2048
2049 940,605 (204,898) $0.32 $115 ($30) $115 2049
2050 0 (940,605) $0.00 $0 ($115) $0 2050
Total $3,284.05 Total
Total Cost of new DS to sample taxpayer
Proposed Debt
Debt Service Levy Taxes
Tax Levy
Change from
Prior Year
Page 7 of 66
6
Debt Coverage – All In Water & Sewer
Year Existing Debt Proposed Debt Total Debt Coverage D.S. Capacity Existing Debt Proposed Debt Total Debt Coverage D.S. Capacity Existing Debt Proposed Debt Total Debt Coverage D.S. Capacity Year
$605,211 @ 1.6x 953,478.32 @ 1.6x $1,558,689 @ 1.6x
2025 Net Revenues 2025 Net Revenues 2025 Net Revenues
2026 219,844 0 219,844 2.75 158,413 731,364 0 731,364 1.30 (135,440) 951,208 0 951,208 1.64 22,973 2026
2027 226,138 132,025 358,163 1.69 20,094 733,593 161,654 895,247 1.07 (299,324) 959,731 293,680 1,253,410 1.24 (279,229) 2027
2028 219,888 102,584 322,471 1.88 55,786 723,277 147,050 870,326 1.10 (274,403) 943,164 249,633 1,192,797 1.31 (218,617) 2028
2029 213,638 100,784 314,421 1.92 63,836 703,209 165,250 868,459 1.10 (272,535) 916,847 266,033 1,182,880 1.32 (208,699) 2029
2030 207,388 98,979 306,366 1.98 71,891 693,390 163,084 856,473 1.11 (260,549) 900,777 262,062 1,162,839 1.34 (188,659) 2030
2031 201,138 102,056 303,194 2.00 75,063 683,569 165,795 849,364 1.12 (253,440) 884,706 267,851 1,152,557 1.35 (178,377) 2031
2032 194,888 99,988 294,876 2.05 83,381 683,496 173,160 856,656 1.11 (260,732) 878,384 273,148 1,151,532 1.35 (177,351) 2032
2033 193,963 102,768 296,730 2.04 81,527 678,897 175,168 854,064 1.12 (258,141) 872,859 277,935 1,150,794 1.35 (176,614) 2033
2034 188,363 105,298 293,660 2.06 84,597 670,021 176,908 846,929 1.13 (251,005) 858,384 282,205 1,140,589 1.37 (166,408) 2034
2035 182,963 107,545 290,508 2.08 87,749 661,343 178,340 839,683 1.14 (243,759) 844,306 285,885 1,130,191 1.38 (156,010) 2035
2036 177,763 109,461 287,224 2.11 91,033 652,864 179,406 832,270 1.15 (236,346) 830,626 288,868 1,119,494 1.39 (145,313) 2036
2037 172,563 106,199 278,761 2.17 99,496 644,382 180,165 824,547 1.16 (228,623) 816,945 286,364 1,103,309 1.41 (129,128) 2037
2038 172,263 102,899 275,161 2.20 103,096 640,799 180,654 821,453 1.16 (225,529) 813,062 283,553 1,096,614 1.42 (122,433) 2038
2039 166,863 99,561 266,424 2.27 111,833 632,114 180,870 812,984 1.17 (217,060) 798,976 280,431 1,079,408 1.44 (105,227) 2039
2040 166,300 96,186 262,486 2.31 115,771 628,264 175,920 804,184 1.19 (208,260) 794,564 272,106 1,066,670 1.46 (92,490) 2040
2041 165,469 97,660 263,129 2.30 115,128 624,144 175,801 799,945 1.19 (204,021) 789,613 273,461 1,063,074 1.47 (88,893) 2041
2042 159,531 93,980 253,511 2.39 124,746 614,915 175,395 790,310 1.21 (194,386) 774,446 269,375 1,043,821 1.49 (69,641) 2042
2043 153,594 90,260 243,854 2.48 134,403 605,684 179,583 785,267 1.21 (189,343) 759,278 269,843 1,029,120 1.51 (54,940) 2043
2044 64,275 86,480 150,755 4.01 227,502 434,670 349,120 783,790 1.22 (187,866) 498,945 435,600 934,545 1.67 39,636 2044
2045 66,463 97,280 163,743 3.70 214,514 66,463 675,840 742,303 1.28 (146,379) 132,925 773,120 906,045 1.72 68,136 2045
2046 0 0 0 N/A 378,257 0 0 0 N/A 595,924 0 0 0 N/A 974,181 2046
Total 3,513,288 1,931,991 5,445,279 12,506,459 3,959,161 16,465,619 16,019,746 5,891,152 21,910,898 Total
Notes:
1) Water has implemented a 24% adjustment, effective 4/1/2026, which is projected to add $370k of additional revenues.
2) Sewer completed a 1/1/2026 18% adjustment which is projected to add $374k of additional revenues.
Water Debt Service1 Sewer Debt Service2 Water & Sewer Debt Service
Page 8 of 66
Projected Existing
Year Equalized Principal Year
Ending Value (TID IN) 1 Debt Limit Outstanding % of Limit % of Limit Residual % of Limit Residual Ending
2025 1,431,604,400 71,580,220 26,484,893 37% $26,484,893 37% $45,095,327 62% $16,463,239 2025
2026 1,474,500,560 73,725,028 24,973,713 34% $28,403,713 39% $45,321,315 64% $15,831,303 2026
2027 1,518,682,048 75,934,102 23,288,171 31% $32,238,171 42% $43,695,932 71% $13,322,291 2027
2028 1,564,187,377 78,209,369 21,610,000 28% $33,545,000 43% $44,664,369 71% $13,380,621 2028
2029 1,611,056,214 80,552,811 20,065,000 25% $31,820,000 40% $48,732,811 66% $16,511,686 2029
2030 1,698,742,514 84,937,126 18,695,000 22% $30,060,000 35% $54,877,126 59% $20,902,275 2030
2031 1,749,643,120 87,482,156 17,260,000 20% $28,250,000 32% $59,232,156 54% $24,239,294 2031
2032 1,802,068,896 90,103,445 15,780,000 18% $26,360,000 29% $63,743,445 49% $27,702,067 2032
2033 1,860,251,561 93,012,578 14,270,000 15% $24,425,000 26% $68,587,578 44% $31,382,547 2033
2034 1,921,909,040 96,095,452 12,755,000 13% $22,470,000 23% $73,625,452 39% $35,187,271 2034
2035 1,992,695,939 99,634,797 11,210,000 11% $20,475,000 21% $79,159,797 34% $39,305,878 2035
2036 2,061,255,856 103,062,793 9,640,000 9% $18,445,000 18% $84,617,793 30% $43,392,676 2036
2037 2,129,511,089 106,475,554 8,040,000 8% $16,370,000 15% $90,105,554 26% $47,515,333 2037
2038 2,200,003,103 110,000,155 6,385,000 6% $14,220,000 13% $95,780,155 22% $51,780,093 2038
2039 2,296,747,374 114,837,369 4,725,000 4% $12,065,000 11% $102,772,369 18% $56,837,421 2039
2040 2,372,736,616 118,636,831 3,635,000 3% $10,340,000 9% $108,296,831 15% $60,842,098 2040
2041 2,451,214,381 122,560,719 2,825,000 2% $8,835,000 7% $113,725,719 12% $64,701,431 2041
2042 2,532,261,480 126,613,074 2,005,000 2% $7,315,000 6% $119,298,074 10% $68,652,844 2042
2043 2,615,961,329 130,798,066 1,180,000 1% $5,735,000 4% $125,063,066 7% $72,743,840 2043
2044 2,702,400,033 135,120,002 385,000 0% $4,155,000 3% $130,965,002 5% $76,917,001 2044
2045 2,791,666,472 139,583,324 0 0% $2,580,000 2% $137,003,324 3% $81,169,994 2045
2046 2,883,852,391 144,192,620 0% $1,395,000 1% $142,797,620 2% $85,120,572 2046
2047 2,979,052,491 148,952,625 0% $250,000 0% $148,702,625 0% $89,121,575 2047
2048 3,077,364,523 153,868,226 0% $0 0% $153,868,226 0% $92,320,936 2048
Notes:
1) Projected TID IN EV based on 5-year average at 3.0% annual inflation.
Proposed DebtExisting Debt
Statutory Limit (5% EV)Combined
Principal Existing
& Proposed
Village Limit (3% EV)
7
G.O. Debt Capacity – 2025 FMP All Proposed Debt
Page 9 of 66
8
• Funding 2026 CIP:
✓ Preliminary Offering Statement Prep: February/March 2026
✓ Set sale: March 10, 2026
✓ Sale: April 14, 2026
✓ Closing: around May 1, 2026
Next Steps
Page 10 of 66
9
Questions/Discussion
Page 11 of 66
10
2026 CIP
Projects Department Purpose Plan Issue Funding 2026 Totals
Linden Drive - Hickory Lane to Dead End Cap. Projects Streets - Improvements 2026 G.O. Notes G.O. Debt 340,909 340,909
Linden Drive - Hickory Lane to Dead End Water Water - Improvements 2026 Revenue Bonds Revenue Debt 340,909 340,909
Linden Drive - Hickory Lane to Dead End Sewer Sewer - Improvements 2026 Revenue Bonds Revenue Debt 340,909 340,909
Aspen Drive - Hickory Lane to Dead End Cap. Projects Streets - Improvements 2026 G.O. Notes G.O. Debt 402,519 402,519
Aspen Drive - Hickory Lane to Dead End Water Water - Improvements 2026 Revenue Bonds Revenue Debt 402,519 402,519
Aspen Drive - Hickory Lane to Dead End Sewer Sewer - Improvements 2026 Revenue Bonds Revenue Debt 402,519 402,519
Hawthorne Drive - Hickory Lane to Dead End Cap. Projects Streets - Improvements 2026 G.O. Notes G.O. Debt 433,617 433,617
Hawthorne Drive - Hickory Lane to Dead End Water Water - Improvements 2026 Revenue Bonds Revenue Debt 433,617 433,617
Hawthorne Drive - Hickory Lane to Dead End Sewer Sewer - Improvements 2026 Revenue Bonds Revenue Debt 433,617 433,617
Eagle Drive - Hickory Lane to STH 60 Cap. Projects Streets - Improvements 2026 G.O. Notes G.O. Debt 2,031,109 2,031,109
Eagle Drive - Hickory Lane to STH 60 Sewer Sewer - Improvements 2026 Revenue Bonds Revenue Debt 1,015,555 1,015,555
CPR Training Equipment - Manikins/AED Trainers Fire/EMS Fire - Building None Cash 3,400 3,400
Heart Montiors - 1250, 1251, Paramedic First Responder Fire/EMS Fire - Equip. None Grants/Aids 112,000 112,000
AED's - first responders, 1285 Fire/EMS Fire - Equip. None Cash 18,600 18,600
EQS #9 - Turf Mower (2018) Cap. Projects Streets - Equip./Vehicle None Cash 16,000 16,000
EQS #10 - Turf Mower (2019) Cap. Projects Streets - Equip./Vehicle None Cash 16,000 16,000
ENG #2 - Engineering Tech Vehicle Cap. Projects Streets - Equip./Vehicle None Cash 30,000 30,000
EQS #6 - Vermeer Chipper Cap. Projects Streets - Equip./Vehicle None Cash 110,000 110,000
4 Badger Books Cap. Projects Treasurer None Cash 12,000 12,000
JCC HVAC Unit Replacement Cap. Projects Community Center None Cash 18,000 18,000
Fiber Internet & Security Cameras - Hickory Lane Park & Splash Pad Cap. Projects Parks & Rec None Cash 45,000 45,000
Fiber Internet & Security Cameras - Jackson Park Cap. Projects Parks & Rec None Cash 75,000 75,000
Jackson Park - Picnic Table Replacement Cap. Projects Parks & Rec None Cash 17,000 17,000
Hasmer Lake Park - Park Development Engineering Cap. Projects Parks & Rec None Special Assessment/Impact Fees 100,000 100,000
Fiber and Cameras to Well 1, 4 and 5 Water Water - Improvements None Cash 170,000 170,000
EQWW5 - Electric Scissors Lift Sewer Sewer - Equip./Vehicle None Cash 25,000 25,000
EQWW8 - Toro Turf Mower Sewer Sewer - Equip./Vehicle None Cash 16,000 16,000
2026 Fleet Addition - Pick Up Truck Sewer Sewer - Equip./Vehicle None Cash 35,000 35,000
Fiber and Cameras to Lift Station Sherman Road Sewer Sewer - Improvements None Cash 35,000 35,000
Digitizing Clerk files, Treasurer Files, DPW files Cap. Projects Admininstration None Cash 25,000 25,000
WWTP Improvements Phase 2A - Aeration Basin Sewer Sewer - Improvements None Cash 880,000 880,000
TID #7 Incentive Payment TID 7 GHU Incentive 2026 G.O. Notes G.O. Debt 117,295 117,295
Actual CIP Costs 8,454,095 8,454,095
Page 12 of 66
January 13, 2026 Village of Jackson - Village Board Meeting Minutes
Page 1 of 4
VILLAGE OF JACKSON
VILLAGE BOARD MEETING
Tuesday, January 13, 2026 at 7:30 PM
Minutes
1. Call to Order and Roll Call
The meeting was called to order at 7:30 PM by Pres. Heckendorf.
Members Present: Pres. Heckendorf, Tr. Emmrich, Tr. Engelhardt, Tr. Kruepke, Tr. Kurtz,
Tr. Olson, and Tr. Wells
Members Excused: None
Members Absent: None
Staff Present: Administrator Jen Heidtke, Inspections and Zoning Director Collin Johnson,
Parks and Recreation Director Tyler Mentzel, Treasurer Darlene Smith, Public Works
Director Jack Straehler, Fire Chief Aaron Swaney, Police Chief Ryan Vossekuil and Clerk
Jackie Schuh
2. Pledge of Allegiance
The Pledge of Allegiance was recited by those in attendance.
3. Presentations
a. Discussion and Possible Action rega
rding Fire/EMS Services in Washington County
Administrator Heidtke presented information regarding the potential development of a
county-wide EMS service, noting that discussions have taken place among Washington
County representatives, municipal Fire/EMS Chiefs, area administrators, and chief elected
officials. She provided a summary of key advantages and disadvantages identified through
these discussions and advised that direction from the Board is needed regarding whether to
continue the evaluation process.
Board members engaged in discussion concerning the status of current funding, potential
impacts a county-wide EMS service could have on municipal budgets and funding, and how
services might evolve if the initiative were to proceed. President Heckendorf clarified that
staff is requesting authorization to continue discussions only and emphasized that doing so
would not constitute any commitment on the part of the Village.
The motion to direct Staff to prepare a resolution acknowledging the Village of Jackson’s
participation in the pursuit of a County EMS system was made by Pres. Heckendorf and
seconded by Tr. Kurtz.
Vote: 7 ayes, 0 nays. Motion carried.
4. Village Citizen Comment on an Agenda Item (Please sign-in with the Clerk prior to
speaking. Please note this is the Village Board's monthly business meeting, not a public
hearing. People wishing to speak on an item on the agenda should present their comments
under this agenda item. Each commenter will be limited to a total of 2 minutes.)
DRAFT
Page 13 of 66
January 13, 2026 Village of Jackson - Village Board Meeting Minutes
Page 2 of 4
None.
5. Consent Agenda
a. Approval of Minutes for the Village Board Meeting of December 9, 2025
b. Approval of the Agreement for 2026 Jackson Fire Department Services with the Town
of Polk, Town of Jackson, and Town of Germantown
President Heckendorf requested item 5b be pulled from the consent agenda for individual
consideration. There were no objections from the Board.
The motion to approve Minutes for the Village Board meeting of December 9, 2025, was
made by Tr. Emmrich and seconded by Tr. Olson.
Vote: 7 ayes, 0 nays. Motion carried.
Administrator Heidtke advised that the Town of Jackson requested section 3c and term 7 of
the contract be reconsidered. Section 3c relates to unpaid medical bills being the
responsibility of the Town, and term 7 relates to catastrophic events. Should an event exceed
$10,000.00 in cost, any amount beyond the first $10,000.00 shall be shared 50% Town, 50%
Village. Administrator Heidtke indicated that neither she nor Fire Chief Swaney could recall
a time when either had been invoked. The financial impact to the Village of Jackson of
removing these two items was discussed.
The motion to approve the 2026 Jackson Fire Department Services with the Town of Polk,
Town of Jackson, and Town of Germantown, as written, was made by Pres. Heckendorf and
seconded by Tr. Kruepke.
Vote: 7 ayes, 0 nays. Motion carried.
6. Plan Commission
a. Review of Extra-Territorial Three-Lot Certified Survey Map - Parcels: T7_0523,
T7_052700A, and T7_052700Z - Hans Lamm
The motion to approve the Certified Survey Map for properties identified as Parcels
T7_0523, T7_052700A, and T7_052700Z for Hans Lamm was made by Tr. Emmrich and
seconded by Tr. Engelhardt.
Vote: 7 ayes, 0 nays. Motion carried.
7. Parks and Recreation
a. Presentation and Possible Action - Eagle Scout Project
Hayden made a brief presentation of his proposed Eagle Scout project for a GaGa Ball Pit in
Hickory Lane Park.
The motion to approve the Eagle Scout Project was made by Tr. Olson and seconded by Tr.
Emmrich.
Vote: 7 ayes, 0 nays. Motion carried.
DRAFT
Page 14 of 66
January 13, 2026 Village of Jackson - Village Board Meeting Minutes
Page 3 of 4
8. West Bend School District
Tr. Wells gave a brief update regarding the West Bend School District.
9. Washington County Board Report
No report.
10. Greater Jackson Business Alliance
Pres. Heckendorf provided a summary for the Board.
11. Mid-Moraine Municipal Association Report
Tr. Olson provided a summary of meeting dates.
12. Closed Session Pursuant to Wis. Stats. §19.85(1)(e) “deliberating or negotiating the
purchasing of public properties, the investing of public funds, or conducting other specified
public business, whenever competitive or bargaining reasons require a closed session.”
The closed session is for the following purposes:
1. To Discuss Village Square Development
2. To Discuss the Creation of a County EMS System
3. To Discuss the Oaks of Jackson Development Agreement and Declaration of
Covenants
The motion to proceed into closed session pursuant to Wis. Stats. §19.85(1)(e) was made by
Pres. Heckendorf and seconded by Tr. Olson. A roll call vote was taken:
Pres. Heckendorf: Aye
Tr. Emmrich: Aye
Tr. Engelhardt: Aye
Tr. Kurtz: Aye
Tr. Kruepke: Aye
Tr. Wells: Aye
Tr. Olson: Aye
Vote: 7 ayes, 0 nays. Motion carried. The meeting proceeded into closed session at 8:22 PM.
Those present in the closed session were Board members, Administrator Heidtke, Fire Chief
Swaney for item 2, Economic Development of Washington County Representative Christian
Tscheschlok, and Village Attorney Matt Parmentier via video conferencing.
13. Reconvene in Open Session with Possible Action Related to the Subject of the Preceding
Closed Session
The motion to reconvene in open session was made by Tr. Wells and seconded by Tr.
Engelhardt.
Vote: 7 ayes, 0 nays. Motion carried. The meeting proceeded into open session at 9:44 PM.
DRAFT
Page 15 of 66
January 13, 2026 Village of Jackson - Village Board Meeting Minutes
Page 4 of 4
The motion authorizing the Village Administrator and Village Attorney to prepare, execute,
and record an amendment to the Declaration of Covenants for the Oaks of Jackson
development, removing Lot 41 from the Declaration, was made by Pres. Heckendorf and
seconded by Tr. Kruepke.
Vote: 7 ayes, 0 nays. Motion carried.
14. Adjourn
The motion to adjourn the meeting was made by Tr. Emmrich and seconded by Tr. Wells.
Vote: 7 ayes, 0 nays. Motion carried. The meeting adjourned at 9:46 PM.
Respectfully Submitted,
Jacqueline Schuh
Village Clerk
Village of Jackson
DRAFT
Page 16 of 66
Taking the lead in Washington County
STAFF MEMO Village of Jackson
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Village Board
From: Jacqueline Schuh, Village Clerk
Subject: Consideration and Approval of Meeting Date Change – August 2026
Meeting Date: February 10, 2026 - Village Board
Background and Analysis:
This memo is to inform the Board of a scheduling conflict for the Budget and Finance
Committee and Village Board meetings of August 11, 2026. These meetings will fall on
the same evening of the Partisan Primary election held in the training rooms at the
Jackson Municipal Complex. In line with past practice, I recommend moving the
meetings to Tuesday, August 18, 2026, at 7PM and 7:30PM, respectively.
Recommendation:
Motion to approve rescheduling of the August 11, 2026, Budget and Finance Committee
and Village Board meetings to Tuesday, August 18, 2026, at 7PM and 7:30PM,
respectively.
Page 17 of 66
Resolution #26-02
1
STATE OF WISCONSIN VILLAGE OF JACKSON WASHINGTON COUNTY
R
ESOLUTION #26-02
RESOLUTION AUTHORIZING THE CONTINUED CONVERSATION OF
THE CREATION OF A WASHINGTON COUNTY COUNTYWIDE
EMERGENCY MEDICAL SERVICES (EMS) SYSTEM
T
he Village Board of the Village of Jackson, Washington County, Wisconsin, does resolve as
follows:
W
HEREAS, Wisconsin Statutes §§ 59.03, 60.565, 61.34, and 62.11 authorize counties,
towns, villages, and cities to provide emergency services necessary to protect the public health,
safety, and welfare of their communities; and
W
HEREAS, the rising costs, staffing shortages, decreased volunteerism, and increasing
service demands for emergency medical services (EMS) have created challenges for individual
municipalities in maintaining reliable and sustainable local EMS systems; and
W
HEREAS, Wisconsin Statute § 66.0301 authorizes municipalities and counties to enter
into intergovernmental cooperation agreements for the joint exercise of powers and the joint
performance of duties; and
W
HEREAS, the Washington County Board of Supervisors, together with the Cities,
Villages, and Towns within Washington County, recognize the benefit of developing a unified,
cooperative, and efficient Countywide EMS System to ensure consistent service levels
countywide; and
W
HEREAS a countywide EMS system may improve response times, optimize resource
allocation, enhance quality of care, and create long-term financial sustainability; and
W
HEREAS, Washington County has initiated efforts under Wisconsin law to facilitate
the creation of such a Countywide EMS System, to be governed collaboratively by the County
and participating municipalities under a formal intergovernmental agreement; and
W
HEREAS, Wisconsin Statute §66.0602 authorizes the County to raise the tax levy to
fund a countywide EMS system.
NO
W, THEREFORE, BE IT RESOLVED, by the Village Board of the Village of
Jackson that this Board hereby expresses its willingness to engage in discussions and exploratory
planning efforts regarding the potential development of a Washington County Countywide EMS
DRAFT
Page 18 of 66
Resolution #26-02
2
System, in partnership with municipalities within Washington County, without obligating the
Village to participate in or implement such a system; and
BE IT FURTHER RESOLVED, that the Board authorizes the Village
Administrator, Fire Chief, and President or designee(s) to participate in informational meetings
and planning discussions related to the potential development of a countywide EMS system,
solely for the purpose of evaluation and information-gathering, committing to working
collaboratively with all municipalities within Washington County to develop fair and transparent
cost-sharing formulas, service expectations, and governance structures that reflect local needs;
and
BE IT FURTHER RESOLVED, that any development of an Intergovernmental
Cooperation Agreement under Wis. Stat. § 66.0301 related to a countywide EMS system shall be
subject to future consideration and separate approval by the Village Board of the Village of
Jackson, following review by the Village Attorney; and
BE IT FURTHER RESOLVED, that nothing in this resolution shall be
construed as a commitment by the Village of Jackson to funding, governance participation,
operational responsibility, or implementation of a countywide EMS system, and any such
commitment shall require explicit future Board approval.
Introduced by: Seconded by:
Vote: Ayes Nays Passed and Approved:
Brian J. Heckendorf – Village President
Attest:
Jacqueline Schuh – Village Clerk
Proof of Posting:
I, the undersigned, certify that I posted this Resolution on bulletin boards at the Village Hall, Post Office, the Jackson
Community Center, and the Village of Jackson website.
Village Official Date
DRAFT
Page 19 of 66
Resolution #26-03 1
STATE OF WISCONSIN VILLAGE OF JACKSON WASHINGTON COUNTY
R
ESOLUTION #26-03
APPROVING ADDITIONAL ELECTION OFFICIALS FOR THE 2026-2027
ELECTION CYCLE FOR THE VILLAGE OF JACKSON,
WASHINGTON COUNTY, WISCONSIN
T
he Village Board of the Village of Jackson, Washington County, Wisconsin, does resolve as follows:
W
HEREAS, pursuant to Wis. Stats. § 7.30, the governing body of a municipality shall appoint
election officials in December of each odd numbered year for the next two-year term; and
W
HEREAS, the municipality may nominate and approve additional election officials at certain
times throughout the election cycle to increase the total number to a level sufficient for staffing polling
places; and
W
HEREAS, a list of additional individuals who have indicated their willingness to serve the
Village of Jackson in the capacity of election inspector or poll worker is attached with this Resolution;
NO
W, THEREFORE, BE IT RESOLVED that the Village of Jackson Village Board does
hereby approve and appoint the additional nominated election officials for the 2026-2027 Election Cycle.
I
ntroduced by: Seconded by:
Vo
te: Ayes Nays Passed and Approved:
Brian J. Heckendorf – Village President
A
ttest:
Jacqueline Schuh – Village Clerk
DRAFT
Page 20 of 66
Resolution #26-03 2
Proof of Posting:
I, the undersigned, certify that I posted this Resolution on bulletin boards at the Village Hall, Post Office, the Jackson Community
Center, and the Village of Jackson website.
Village Official Date
DRAFT
Page 21 of 66
2026-2027 ELECTION CYCLE
APPOINTED POLL WORKERS/SVDs
NAME ADDRESS POLICITAL
AFFILIATION JOB DUTIES
ADAMS-BUTLER, KIM W205N17038 PARKVIEW DR, JACKSON WI 53307 UNAFFILIATEDPOLL WORKER/SPECIAL VOTING DEPUTY
FECHTER, LINDA N171W20548 NORTHVIEW DR, JACKSON WI 53037REPUBLICAN POLL WORKER
KITZKE, LISA N169W20322 CHATEAU DR, JACKSON WI 53037 DEMOCRAT POLL WORKER
Page 22 of 66
Resolution #26-04 1
STATE OF WISCONSIN VILLAGE OF JACKSON WASHINGTON COUNTY
R
ESOLUTION #26-04
RESOLUTION HONORING TYLER MENTZEL FOR ACHIEVING
CERTIFICATION AS A PARK AND RECREATION PROFESSIONAL
T
he Village Board of the Village of Jackson, Washington County, Wisconsin, does resolve as follows:
W
HEREAS, Tyler Mentzel serves the Village of Jackson with dedication and professionalism as
Parks and Recreation Director; and
W
HEREAS, Tyler Mentzel has successfully passed the Certified Park and Recreation
Professional (CPRP) Examination administered by the National Recreation and Park Association (NRPA);
and
W
HEREAS, attainment of the CPRP credential reflects a high level of knowledge, competency,
and commitment to excellence in the field of parks and recreation; and
W
HEREAS, Tyler Mentzel’s achievement enhances the quality of programs, services, and
facilities provided to the residents of the Village of Jackson;
NO
W, THEREFORE, BE IT RESOLVED by the Village Board of the Village of Jackson that
this Board hereby congratulates and commends Tyler Mentzel for earning the Certified Park and
Recreation Professional designation and expresses its appreciation for his continued service and leadership
on behalf of the community.
I
ntroduced by: Seconded by:
Vo
te: Ayes Nays Passed and Approved:
Brian J. Heckendorf – Village President
A
ttest:
Jacqueline Schuh – Village Clerk
DRAFT
Page 23 of 66
Resolution #26-04 2
Proof of Posting:
I, the undersigned, certify that I posted this Resolution on bulletin boards at the Village Hall, Post Office, the Jackson Community
Center, and the Village of Jackson website.
Village Official Date
DRAFT
Page 24 of 66
Resolution #26-05 1
STATE OF WISCONSIN VILLAGE OF JACKSON WASHINGTON COUNTY
R
ESOLUTION #26-05
RESOLUTION HONORING JACOB CALTAGERONE FOR ACHIEVING
CERTIFICATION AS A PARK AND RECREATION PROFESSIONAL
T
he Village Board of the Village of Jackson, Washington County, Wisconsin, does resolve as follows:
W
HEREAS, Jacob Caltagerone serves the Village of Jackson with dedication and professionalism
as Parks and Recreation Adult Recreation Supervisor; and
W
HEREAS, Jacob Caltagerone has successfully passed the Certified Park and Recreation
Professional (CPRP) Examination administered by the National Recreation and Park Association (NRPA);
and
W
HEREAS, attainment of the CPRP credential reflects a high level of knowledge, competency,
and commitment to excellence in the field of parks and recreation; and
W
HEREAS, Jacob Caltagerone’s achievement enhances the quality of programs, services, and
facilities provided to the residents of the Village of Jackson;
NO
W, THEREFORE, BE IT RESOLVED by the Village Board of the Village of Jackson that
this Board hereby congratulates and commends Jacob Caltagerone for earning the Certified Park and
Recreation Professional designation and expresses its appreciation for his continued service and leadership
on behalf of the community.
I
ntroduced by: Seconded by:
Vo
te: Ayes Nays Passed and Approved:
Brian J. Heckendorf – Village President
A
ttest:
Jacqueline Schuh – Village Clerk
DRAFT
Page 25 of 66
Resolution #26-05 2
Proof of Posting:
I, the undersigned, certify that I posted this Resolution on bulletin boards at the Village Hall, Post Office, the Jackson Community
Center, and the Village of Jackson website.
Village Official Date
DRAFT
Page 26 of 66
Resolution #26-06 1
STATE OF WISCONSIN VILLAGE OF JACKSON WASHINGTON COUNTY
R
ESOLUTION #26-06
A RESOLUTION OPPOSING WISCONSIN ASSEMBLY BILL 885
T
he Village Board of the Village of Jackson, Washington County, Wisconsin, does resolve as follows:
W HEREAS , Wisconsin Assembly Bill 885 would limit the use of extraterritorial jurisdiction and
extraterritorial zoning by cities and villages, including the Village of Jackson’s authority to exercise
zoning control within 1.5 miles of its municipal boundaries; and
W HEREAS , extraterritorial jurisdiction is a vital planning tool that allows the Village of Jackson
to manage and coordinate development in adjacent towns in a manner that protects public health, safety,
and welfare; and
W HEREAS , extraterritorial powers enable the Village to grow in an orderly and planned fashion,
supporting the development of housing, employment opportunities, commercial activity, and
manufacturing that benefit both Village residents and the surrounding region; and
W HEREAS , Assembly Bill 885 would allow townships to approve developments within 1.5 miles
of Village boundaries, potentially resulting in development that relies on Village services without
providing the Village any ability to collect offsetting tax revenue to support those services;
NO W, THEREFORE, BE IT RESOLVED, that the Village Board of the Village of Jackson,
Washington County, Wisconsin, hereby expresses its opposition to Wisconsin Assembly Bill 885; and
BE I T FURTHER RESOLVED, that the Village Board urges state legislators to preserve local
control and extraterritorial authority necessary for responsible growth, sound land-use planning, and fiscal
fairness.
I
ntroduced by: Seconded by:
Vo
te: Ayes Nays Passed and Approved:
Brian J. Heckendorf – Village President
A
ttest:
Jacqueline Schuh – Village Clerk
DRAFT
Page 27 of 66
Resolution #26-06 2
Proof of Posting:
I, the undersigned, certify that I posted this Resolution on bulletin boards at the Village Hall, Post Office, the Jackson Community
Center, and the Village of Jackson website.
Village Official Date
DRAFT
Page 28 of 66
Taking the lead in Washington County
STAFF MEMO Village of Jackson
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Village Board
From: Jacqueline Schuh, Village Clerk
Subject: Transfer of Manufactured Home Park License – N168W21700 Main Street –
Green Valley MHC LLC
Meeting Date: February 10, 2026 - Village Board
Background and Analysis:
This memo is to inform the Board of a request for transfer of license for Green Valley
Manufactured Home Community. Dittmar Realty Inc. closed on the sale of the property
on Friday, January 30, 2026. The new owner (buyer), Green Valley MHC LLC, notified
me of the closing on January 30, 2026, with Carla Dunn of Dittmar Realty Inc. copied on
the email.
Per Village Code the following must occur for a transfer of license:
1. Notification of the sale / update of owner and contact information
2. Licensing fee paid
3. Compliance with Village code regarding maintenance
4. Village Board approval for the transfer
Notification of sale was made on January 30, 2026, and all necessary information was
obtained. The licensing fee of $415.00 for 2026 was previously paid by Dittmar Realty
Inc. in December 2025. Zoning and Inspections Director Collin Johnson reported
nothing of significance regarding maintenance at the property that should affect the
transfer of license. My recommendation to the Board is to grant the transfer of license.
Recommendation:
Motion to approve the transfer of the 2026 Manufactured Home Park License from
Dittmar Realty Inc. to Green Valley MHC LLC effective as of February 10, 2026.
Page 29 of 66
The local governing body of the Village of Jackson, County of Washington, State of
Wisconsin, has hereby granted this Manufactured Home Park License to:
Manufactured Home Park
License # M-2026 TRX
Green Valley MHC
N168W21700 Main Street
Jackson, Wisconsin 53037
Green Valley MHC has paid the sum of $415.00 to the Treasurer of the Village of Jackson as
required by the Resolutions and Ordinances of the Village of Jackson and has complied with all
requirements necessary to obtain this license.
Green Valley MHC LLC
7050 W. Palmetto Park Road, Suite 15-234
Boca Raton, Florida 33433
who is hereby authorized and licensed to operate a Manufactured Home Park for the
period of February 10, 2026, through December 31, 2026, subject to all the conditions
and provisions of the Resolutions and Ordinances of the Village of Jackson.
Given under my hand and the corporate seal of the Village of Jackson, County of
Washington, State of Wisconsin, on this ______ day of ________________, 2026.
Jacqueline Schuh
Village Clerk
Village of Jackson - N168W19851 Main Street - Jackson, Wisconsin 53037 - 262-677-9001
(SEAL)
DRAFT
Page 30 of 66
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Change Order #2 - Final - 2025 Oaks of Jackson Surface Course - Spruce Street
and Ridgeway Drive - Stark Pavement Corporation for an increase in the amount of
$24,493.60
Meeting Date: January 27, 2026 - Board of Public Works
Background and Analysis:
This memo is to inform the Board of Change Order #2 related to the 2025 Oaks of Jackson
Surface Course, Spruce Street, and Ridgeway Drive Project.
This change order addresses necessary field modifications and revisions to material sizes
and quantities encountered during construction. It also provides the final reconciliation of all
quantities associated with the project.
The changes are summarized as follows:
• Catch Basin chimney rebuilds using poly ProRings: increase of $7,400.00
• Catch Basin chimney rebuilds using concrete rings: credit of ($875.00)
• Final reconciliation of installed quantities: increase of $17,968.60
Funding for this change order will come from Account Number:
670-00-56700-000-000 (TID #7 Miscellaneous TID Expense)
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village Board
approve Change Order #2 for an increase in the amount of $24,493.60 to Stark Pavement
Corporation.
Page 31 of 66
Page 32 of 66
1
Doug Kroes
From: Doug Kroes
Sent: Tuesday, September 23, 2025 10:06 AM
To: Dan Mueller
Cc: 'Jack Straehler'; Logan Myers; Matt Stephan; Joseph Coe
Subject: RE: Jackson - Spruce, Ridgeway, Oaks Surface Course: Inlet Reset Materials 9/23/25
Dan:
FYI, we met on site this morning with your subcontractor to discuss the curb inlet resets. The
subcontractor had concrete rings on site that they were intending on using for the reset. The Owner
prefers the use of ProRings by Cretex. Your subcontractor stated that they will install ProRings for the
difference in material cost as the only additional cost. Therefore, when the work is complete, please
submit detail information that provides the total difference in material costs.
Thank you,
Douglas Kroes
Senior Construction Manager/O(ice Manager | Cedar Corporation
doug.kroes@cedarcorp.com
W61N497 Washington Avenue
Cedarburg, WI 53012
Oice 262.204.2360 Direct 262.204.2343 Mobile 920.246.6326
www.cedarcorp.com | Facebook | LinkedIn | Instagram
This e-mail and any attachments may contain proprietary and conf idential inf ormation f rom Cedar Corporation. Please visit our website at
http://www.cedarcorp.com/disclaimer f or more details.
From: Jack Straehler <jack.straehler@villageofjacksonwi.gov>
Sent: Tuesday, September 23, 2025 7:21 AM
To: Dan Mueller <danmueller@starkcorp.us>; Adrian Ruiz <adrianr@starkcorp.us>; Logan Myers
<Logan.Myers@villageofjacksonwi.gov>
Cc: Doug Kroes <doug.kroes@cedarcorp.com>
Subject: Re: Jackson - Contact List and Written Schedule
Thanks, Dan!
Jack B. Straehler II
Director of Public Works
Village of Jackson
W194 N16660 Eagle Drive
Jackson, WI 53037
Of f ice: 262-677-0707
Cell: (262) 305-5012
Page 33 of 66
INVOICE
DXT
5337 State Road 28
Allenton, WI 53002
jdonald_1388@hotmail.com
+1 (920) 382-5816
Bill to
Dan Mueller
Stark
Ship to
Dan Mueller
Stark
Invoice details
Invoice no.: 1112
Terms: Net 30
Invoice date: 09/25/2025
Due date: 10/25/2025
# Date Product or service Description Qty Rate Amount
1. Spruce, Ridgeway, oaks of Jackson
2. Services Reset select Catch basin castings 8 $750.00 $6,000.00
3. Services ADDITIONAL-Rebuild chimney's with
pro rings
8 $925.00 $7,400.00
4. Services concrete ring credit 7 −$125.00 −$875.00
Contact DXT to pay.
Total $12,525.00
Overdue 10/25/2025
to k e n =2 9 3 0fc c 1fd 4 2 4 2 1e 9 a 7 9 e 7 f2 fb e 4 e c 7 b 0a e 9 5 a 2 13 4 c f4 b 9 0b 5 05 c 6 7 1d e b c 17 9 3 7 e c 2 108 6 9 6 b 7 4 4 03 8 02 a d 7 5 3 9 9 5 9 4 07 8
BID UNIT
PRICE ITEM
CO ITEM
CO ITEM
LESS BID ITEM = ($6,000.00)
TOTAL CO AMOUNT = $6,525.00
Page 34 of 66
Deliver To:
From:
Comments:
EMAIL DUPLICATE INVOICE
FERGUSON WATERWORKS #1476
Erik Lewis
erik.lewis@ferguson.com
PO BOX 802817
CHICAGO, IL 60680-2817
Invoice Number Customer Page
Please Contact With Questions:
920-731-3252
CW020257 21373 1
Please refer to Invoice Number when making payment and remit to:
Sold To: Ship To:
TOTAL DUE --->
FERGUSON WATERWORKS #1476
PO BOX 802817
CHICAGO, IL 60680-2817
DONALD EXCAVATING & TRCKNG INC
DBA DXT
W5337 HWY 28
ALLENTON, WI 53002
COUNTER PICK UP
N49 W22990 COMMERCE CENTRE DR
PEWAUKEE, WI 53072-0000
2494.80
Ship
Whse
Sell
Whse
Tax
Code
Customer
Order Number
Sales
Person Job Name Invoice
Date Batch
1479 1479 WI67 MERTON ACP MERTON 09/12/2025
ALL ACCOUNTS ARE DUE AND PAYABLE PER THE CONDITIONS AND TERMS OF THE ORIGINAL INVOICE. ALL PAST DUE AMOUNTS
ARE SUBJECT TO A SERVICE CHARGE AT THE MAXIMUM RATE ALLOWED BY STATE LAW PLUS COSTS OF COLLECTION INCLUDING
ATTORNEY FEES IF INCURRED. FREIGHT TERMS ARE FOR OUR DOCK UNLESS OTHERWISE SPECIFIED ABOVE. COMPLETE TERMS AND
CONDITIONS ARE AVAILABLE UPON REQUEST
GOVT BUYERS: ALL ITEMS QUOTED ARE OPEN MARKETUNLESS NOTED OTHERWISE.
OR CAN BE VIEWED ON THE WEB AT https://www.ferguson.com/content/website-info/terms-of-sale
LEAD LAW WARNING: IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT "LEAD FREE" IN ACCORDANCE WITH US FEDERAL OR OTHER
APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION. PRODUCTS WITH *NP IN THE DESCRIPTION
ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS. BUYER IS SOLELY RESPONSIBLE FOR PRODUCT
SELECTION.
Ordered Shipped Item Number Description Unit Price UM Amount
12 12 CRT3624300 36X24X3 M/HOLE RECT SYS *X 198.000 EA 2376.00
Invoice Sub-Total 2376.00
Tax
Total Amt
118.80
2494.80
TOTAL DUE ---> 2494.80
Page 35 of 66
Deliver To:
From:
Comments:
EMAIL DUPLICATE INVOICE
FERGUSON WATERWORKS #1476
Erik Lewis
erik.lewis@ferguson.com
PO BOX 802817
CHICAGO, IL 60680-2817
Invoice Number Customer Page
Please Contact With Questions:
920-731-3252
CW020256 21373 1
Please refer to Invoice Number when making payment and remit to:
Sold To: Ship To:
TOTAL DUE --->
FERGUSON WATERWORKS #1476
PO BOX 802817
CHICAGO, IL 60680-2817
DONALD EXCAVATING & TRCKNG INC
DBA DXT
W5337 HWY 28
ALLENTON, WI 53002
COUNTER PICK UP
N49 W22990 COMMERCE CENTRE DR
PEWAUKEE, WI 53072-0000
5722.79
Ship
Whse
Sell
Whse
Tax
Code
Customer
Order Number
Sales
Person Job Name Invoice
Date Batch
1479 1479 WI67 MERTON ACP MERTON 09/12/2025
ALL ACCOUNTS ARE DUE AND PAYABLE PER THE CONDITIONS AND TERMS OF THE ORIGINAL INVOICE. ALL PAST DUE AMOUNTS
ARE SUBJECT TO A SERVICE CHARGE AT THE MAXIMUM RATE ALLOWED BY STATE LAW PLUS COSTS OF COLLECTION INCLUDING
ATTORNEY FEES IF INCURRED. FREIGHT TERMS ARE FOR OUR DOCK UNLESS OTHERWISE SPECIFIED ABOVE. COMPLETE TERMS AND
CONDITIONS ARE AVAILABLE UPON REQUEST
GOVT BUYERS: ALL ITEMS QUOTED ARE OPEN MARKETUNLESS NOTED OTHERWISE.
OR CAN BE VIEWED ON THE WEB AT https://www.ferguson.com/content/website-info/terms-of-sale
LEAD LAW WARNING: IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT "LEAD FREE" IN ACCORDANCE WITH US FEDERAL OR OTHER
APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION. PRODUCTS WITH *NP IN THE DESCRIPTION
ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS. BUYER IS SOLELY RESPONSIBLE FOR PRODUCT
SELECTION.
Ordered Shipped Item Number Description Unit Price UM Amount
13 7 CRT3624400 36X24X4 RECT FLT PRO RNG *X 243.000 EA 1701.00
18 18 CRT3624200 36X24X2 M/HOLE RECT SYS *X 138.000 EA 2484.00
6 6 CRT3624100 36X24X1 M/HOLE RECT SYS *X 98.000 EA 588.00
3 3 CRT3624150 36X24X1-1/2 M/HOLE RECT SYS *X 116.000 EA 348.00
12 12 C098050 M-1 28OZ ADHESIVE CART 27.440 EA 329.28
Invoice Sub-Total 5450.28
Tax
Total Amt
272.51
5722.79
TOTAL DUE ---> 5722.79
Page 36 of 66
UNIT PRICE QUANTITY SUMMARY
Village of Jackson
Spruce, Ridgeway, Oaks of Jackson Surface
Course
Stark Pavement Corp.
QUANTITIES VALUES
Installed Estimated Installed Estimated VS
Quantities VS Installed Values Installed
1 10420 0 16,151.00$ -$
2 142 0 710.00$ -$
3 27 0 2,700.00$ -$
4 2033 183 146,985.90$ 13,230.90$
5 58.5 9.5 1,755.00$ 285.00$
6 58.5 9.5 8,073.00$ 1,311.00$
7 0 -52 -$ (2,132.00)$
8 0 -104 -$ (2,704.00)$
9 8 1 6,000.00$ 750.00$
10 18 0 2,700.00$ -$
Bid Item Totals = 185,074.90$ 10,740.90$
CO1 287.5 107.5 12,190.00$ 4,558.00$
CO1 28.86 -31.14 2,741.70$ (2,958.30)$
CO1 39.5 33.5 6,636.00$ 5,628.00$
CO2 8 0 7,400.00$ -$
CO2 7 0 (875.00)$ -$
213,167.60$ 17,968.60$
ESTIMATED VS INSTALLED
Bid Items
Asphaltic Pavement Milling at Curbs
Asphaltic Pavement Milling at Intersections
Project No.
Date
J5789-0023
Reset Select Catchbasin Castings
Water Valve Box Adjustment
Asphaltic Pavement Milling at Manholes
Upper Layer HMA Pavement 1-3/4"
Remove Curb and Gutter
30" Concrete Curb and Gutter Type D
EBS (18")
EBS Backfill, 1-1/4" Dense (2 ton/cy)
Client
Project
Contractor
FINAL PROJECT TOTALS =
Removal & Replacement of 4” Concrete Sidewalk
Removal & Replacement of Concrete Curb Ramps to include Removal
Removal & Replacement of Concrete Curb and Gutter
ADD 8 Each Catch Basin Chimney Rebuilds w/ ProRing Materials
CREDIT Concrete Adjusting Rings related to Resetting Catch Basins
CHANGE ORDER ITEMS: NEW ITEMS
12/8/2025
0
Community Infrastructure • Architecture • Environmental Services
Cedarburg • Green Bay • Madison • Menomonie 1 of 1
Page 37 of 66
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Pay Request #1 - 2025 Oaks of Jackson Surface Course - Spruce Street and
Ridgeway Drive - Stark Pavement Corporation in the amount of $207,838.41
Meeting Date: January 27, 2026 – Board of Public Works
Background and Analysis:
This memo is to inform the Board of Pay Request #1 for Stark Pavement Corporation in the
amount of $207,838.41 for work completed on the Oaks of Jackson Surface Course -
Spruce Street and Ridgeway Drive Project .
The work has been reviewed and verified for accuracy and completion in accordance with
the project contract documents and schedule.
Funding for this payment will come from Account Number:
670-00-56700-000-000 (TID #7 Miscellaneous TID Expense)
If you have any questions, please let me know.
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village Board
approve Pay Request #1 for Stark Pavement Corporation in the amount of $207,838.41.
Page 38 of 66
Cedarburg • Green Bay • Madison • Menomonie
Community Infrastructure • Architecture • Environmental Services
W61N497 Washington Avenue
Cedarburg, WI 53013
262-204-2360
www.cedarcorp.com
December 9, 2025
Village of Jackson
N168 W20733 Main Street
PO Box 637
Jackson, WI 53037
Attn: Mr. Jack Straehler II, Director of Public Works
Subject: Contractor’s Application for Payment No. 1
Spruce, Ridgeway, Oaks of Jackson Surface Course
Cedar Project No. 05789-0023
Dear Mr. Straehler:
Enclosed for your use in payment to Stark Pavement Corp in the amount of $207,838.41 is Contractor’s
Application for Payment No. 1.
Following your review and approval, please complete the application for payment forms within the areas reserved
for the Owner. Thereafter, retain one copy for your records, provide the second copy to the Contractor with
payment and provide the third copy to our office.
Should you have any questions, please feel free to contact me at our Cedarburg office.
Sincerely,
CEDAR CORPORATION
Douglas T. Kroes
Senior Construction Manager
Enclosed: As Noted
Cc: Dan Mueller, Stark Pavement Corp.
Page 39 of 66
12/9/25
Page 40 of 66
Page 41 of 66
[OFFICE STREET ADDRESS], [OFFICE ADDRESS2] [OFFICE CITY], [OFFICE STATE] [OFFICE ZIP]
P [OFFICE PHONE] • TF [OFFICE TOLL FREE] • F [OFFICE FAX]
[OFFICE WEBSITE]
Page 1 of 1
G:\05\05900\05900011\_Construction\11-Pay Apps_Change Orders\Pay App No. 01\05900011 Pay App No. 1 Memo.dotm
Memo
To: Tyler Mentzel, Parks & Recreation Director
From: Shelley Granberg, Project Manager
Subject: Cedar Creek Dog Park Pay Application No. 1
Date: February 2, 2026
MSA recommends review and processing of the attached Pay Application No. 1 in the amount of $90,134.29 from
Lowe Underground, Inc. for work completed on the Village’s Cedar Creek Dog Park project. A summary of the
contract can be found on the cover sheet of the pay application. Once approved please retain a copy of the pay
application for your records and return a copy of the signed pay application to MSA.
Summary of Work:
Clearing, Grubbing, and Tree Removal
• Sitewide clearing and grubbing work was performed.
• Additional clearing and grubbing removal per MSA/Village field markings to occur.
Erosion Control & Site Access
• Silt fence installation completed
• Tracking pad relocated and new pad installed.
Trail Installation Progress
• Trail corridors excavated.
• Began installing dense graded base.
Additional Site Work
• General site cleanup operations initiated after first round of clearing/grubbing.
Project Schedule
• Substantial completion is May 15, 2026; final completion is June 15, 2026.
Page 42 of 66
From
1.
2.
3.
4.
5.
a. X
b. X
c.
6.
7.
8.
9.
PAYMENT OF:
4,743.91$
-$
4,743.91$
90,134.29$
-$
94,878.20$
90,134.29$
-$
217,614.10$
217,614.10$
Approved by Funding Agency
By: By:
Date: Date:
Title: Title:
Date: Date:
90,134.29$
(line 8 or other - attach explanation of the other amount)
Recommended by Engineer Approved by Owner
The undersigned Contractor certifies, to the best of its knowledge, the following:
Contractor:
Signature: Date:
Balance to finish, including retainage (Line 3 - Line 4, plus 5c)
Contractor's Certification
Amount eligible to date (Line 4 - Line 5.c)
Less previous payments (Line 6 from prior application)
$ 94,878.20 Work Completed
$ - Stored Materials
127,479.81$
Contractor: Lowe Underground, Inc. Contractor's Project No.: 1256-TL
Total Work completed and materials stored to date
(Sum of Column G Lump Sum Total and Column G Unit Price Total)
Original Contract Price
Net change by Change Orders
Application Period: 1/1/2026 to 1/21/2026
Application No.: 01 Application Date: 1/21/2026
By: By:
Title: Title:
Contractor's Application for Payment
Owner: Village of Jackson Owner's Project No.:
5%
Total Retainage (Line 5.a + Line 5.b)
Amount due this application
Current Contract Price (Line 1 + Line 2)
Retainage
Project: Village of Jackson Cedar Creek Dog Park
Contract:
Engineer: MSA Professional Services, Inc. Engineer's Project No.: 059000007
EJCDC® C-620 Contractor's Application for Payment
© National Society of Professional Engineers for EJCDC. All rights reserved.
00 62 76 - 1 of 1\\WSE-NAS-01\Office\Active Jobs\Jobs\Lowe\JOBS - ACTIVE\1256 Ceder Creek Dog Park - 05900007\Billing\App 1 01.26\Copy of Project #059000007_Pay Applications_No 1_draft
Lowe Underground, Inc
01/26/2026
Project Manager
1/26/2026
Page 43 of 66
Page 44 of 66
Page 45 of 66
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Review of 2022 Stormwater Pond Compliance Report and Invoicing – Request for
Refund of Special Assessments
Meeting Date: January 27, 2026 - Board of Public Works
Background and Analysis:
This memo is to inform the Board of an agreement entered in 2021 between former Director
Kober and CDM Smith to support compliance with the Village of Jackson’s MS4 permit. The
agreement required inspections of both Village-owned and privately owned stormwater
detention and retention ponds as required on a five-year cycle.
In July 2022, all respective pond owners were notified that inspections would be conducted
and were provided with two options:
• Option One: Retain their own consultant to perform the inspection and submit a
report to the Village, with the Village reviewing the report for a fee of $500.00 per
pond.
• Option Two: Have the inspections performed by the Village’s consultant, with the
Village providing the report at a fee of $2,000.00 per pond.
Based on my review, no pond owners selected Option One. All elected to have the Village
consultant perform the inspections and provide the reports, with the associated inspection
fees assessed accordingly.
My understanding is that all inspections and reporting were to be completed in 2022.
However, further review shows that inspections were conducted across both 2022 and
2023, and the final report was not received until September 2025, nearly three years later
than expected.
Upon reviewing the contents of the report for both accuracy and completeness, and after
speaking with multiple pond owners, I have identified several inaccuracies, including issues
with photographs and descriptions, as well as the timeliness of the report. The significant
delay in receiving the final report has also caused considerable frustration among pond
owners.
Page 46 of 66
Taking the lead in Washington County
At the Board’s request, assessments totaling approximately $115,000 were issued to the
respective pond owners. To date, the Village has received approximately $33,000.00. I
have also contacted our stormwater compliance DNR representative, who confirmed that all
ponds will be required to be inspected again in 2027 to remain compliant with our MS4
permit.
Given these circumstances, I am respectfully requesting that the Board consider the
following actions refunding the inspection assessments to pond owners who have already
paid, and forgoing collection of any remaining unpaid fees related to the 2022 inspection
cycle.
I further intend to seek a new consultant engineer and enter into a new agreement in the fall
of 2026 to conduct inspections of all Village-owned and privately owned stormwater
detention and retention ponds as part of our MS4 compliance in 2027. This approach will
allow the Village to move forward transparently and ensure accurate, timely inspections and
reporting.
If you have any questions, please let me know.
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village Board
refund the inspection assessments to pond owners who have already paid and forego
collection of any remaining unpaid fees related to the 2022 inspection cycle.
Page 47 of 66
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Review of Bids – Wastewater Treatment Plant Fill Removal Project
Meeting Date: January 27, 2026 - Board of Public Works
Background and Analysis:
This memo is to inform the Board of a dumping situation that occurred behind the Public
Works and Utility Building. The issue was brought to my attention in April 2025 by a
neighboring property owner.
It was reported that over the past several years, fill material originating from previous road
construction projects had been dumped behind the Public Works and Utility Building. This
material was placed not only on Village-owned property but also encroached onto
neighboring private property. In addition, it was determined that fill was placed within a
designated floodplain and floodway.
The Village of Jackson’s Engineering Technician visited the site and conducted surveys to
confirm property boundaries and identify the locations of the fill. Since that time, I have been
working closely with the Village’s consulting engineer, Cedar Corp., as well as the
Wisconsin Department of Natural Resources (DNR), to correct the issue.
Cedar Corp. submitted a letter of self-compliance along with a plan of correction to the DNR
on behalf of the Village. Both submissions were reviewed and approved. Cedar Corp.
subsequently prepared detailed plans that comply with the requirements forwarded to and
approved by the DNR.
The project was recently advertised for public bidding. Bids were received from five
contractors, with the lowest responsible bid submitted by BMCI Construction in the amount
of $125,055.00. Please see the attached bid tab provided by Cedar Corp showing all bids
received.
After reviewing the budget with the Village Administrator, it has been determined that
funding for this project will be split 50/50 between the Water Utility and the Sewer Utility
coming from Account Numbers:
200-00-52000-625-301 (Water – Building/Grounds)
300-00-57320-834-000 (Sewer – Building/Grounds)
Page 48 of 66
Taking the lead in Washington County
After reviewing the bid received and the qualifications it is my recommendation to award the
contract for the Wastewater Treatment Plant Fill Removal Project to BMCI Construction in
the amount of $125,055.00.
If you have any questions, please let me know.
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village Board
award the contract for the Wastewater Treatment Plant Fill Removal Project to BMCI
Construction in the amount of $125,055.00.
Page 49 of 66
BID ANALYSIS
Cedarburg • Green Bay • Madison • Menomonie • New Berlin
Page 1 of 1
Community Infrastructure • Architecture • Environmental Services
Client Village of Jackson Project No. J5789-0026
Project WWTP Fill Permitting Date January 20, 2026
Prepared By Joshua Molter
The Village of Jackson (hereinafter referred to as the OWNER) has received bids on the 20th day of
January 2026 for WWTP Fill Permitting (hereinafter referred to as the Project); and
Cedar Corporation (hereinafter referred to as ENGINEER) has been retained by the OWNER to prepare
bid tabulations, analyze bid results and consult with the OWNER on the award of contracts.
The ENGINEER hereby consults as follows:
1. Bids were received from five (5) bidders. Bids ranged from a low of $125,055.00 to a high of
$219,395.00. A summary of the bid tabulation is attached.
2. Based upon ENGINEER's analysis of the bids received on the above PROJECT, the responsive low
bidder is:
BMCI Construction Inc.
7040 N. Trenton Road
West Bend, WI 53090
Bid Amount: $125,055.00
3. It is understood that by this analysis, that the ENGINEER does not guarantee the Contractor's
performance which is covered by the Contractor's bond, but it is a statement by the ENGINEER
that the ENGINEER has no information which would lead the ENGINEER to believe that the
Contractor does not have the necessary equipment and personnel to complete the PROJECT in
compliance with the drawings and specifications within reasonable tolerances generally accepted
in the trade.
4. It is further understood that this analysis is not a representation that the ENGINEER has reviewed
the proposal for possible legal irregularities which should be a function of the OWNER'S legal
counsel, and at the option of the OWNER.
5. It is further understood that in the event that OWNER feels that the Contract should be awarded
on some basis other than price, the OWNER should defer further action on this PROJECT until a
thorough legal review can be made by OWNER'S legal counsel.
Page 50 of 66
PROJECT NO:
ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
1 Excavation CY 6,500 $14.30 $92,950.00 $17.20 $111,800.00 $20.54 $133,510.00 $20.00 $130,000.00
2 Mobilization LS 1 $2,500.00 $2,500.00 $5,763.87 $5,763.87 $6,120.55 $6,120.55 $9,500.00 $9,500.00
3 Temporary Silt Fence LF 720 $2.75 $1,980.00 $2.64 $1,900.80 $4.10 $2,952.00 $3.00 $2,160.00
4 Temporary Stone Tracking Pad EA 1 $1,200.00 $1,200.00 $3,886.61 $3,886.61 $3,010.85 $3,010.85 $2,500.00 $2,500.00
5 Restoration – Erosion Matting, Turf and Grasses SY 1,400 $5.75 $8,050.00 $7.72 $10,808.00 $6.99 $9,786.00 $10.00 $14,000.00
6 Restoration – Turf and Grasses SY 3,500 $5.25 $18,375.00 $8.25 $28,875.00 $6.57 $22,995.00 $8.75 $30,625.00
PROJECT TOTAL $125,055.00 $163,034.28 $178,374.40 $188,785.00
Willkomm Excavating
and Grading, Inc.
17108 County Line Road
Union Grove, WI 53182
BMCI Construction Inc.
7040 N. Trenton Road
West Bend, WI 53090
Buteyn-Peterson
Construction Co., Inc.
N7337 Dairyland Drive
Sheboygan, WI 53083
Payne & Dolan, Inc.
N3W23650 Badinger Road
Waukesha, WI 53188
BID TABULATION
WWTP FILL PERMITTING
VILLAGE OF JACKSON
WASHINGTON COUNTY, WI
BID DATE - JANUARY 20, 2026
05789-0026
WWTP FILL PERMITTING PROJECT NAME:
\\cedarcorp.com\DATA\I-Drive\Clients-Cdrbrg\J\J5789 Jackson Village of\026 WWTP Fill Permitting\10 Bid Info\Bid Info-Jackson\Bid Tabulation.xlsx Page 1 of 2
Page 51 of 66
PROJECT NO:
ITEM NO. ITEM DESCRIPTION UNIT QTY
1 Excavation CY 6,500
2 Mobilization LS 1
3 Temporary Silt Fence LF 720
4 Temporary Stone Tracking Pad EA 1
5 Restoration – Erosion Matting, Turf and Grasses SY 1,400
6 Restoration – Turf and Grasses SY 3,500
PROJECT TOTAL
05789-0026
WWTP FILL PERMITTING PROJECT NAME:
UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
$28.50 $185,250.00
$5,000.00 $5,000.00
$2.25 $1,620.00
$6,000.00 $6,000.00
$6.00 $8,400.00
$3.75 $13,125.00
$219,395.00
Wondra Construction, Inc.
W2874 Graylog Road
Iron Ridge, WI 53035
BID TABULATION
WWTP FILL PERMITTING
VILLAGE OF JACKSON
WASHINGTON COUNTY, WI
BID DATE - JANUARY 20, 2026
\\cedarcorp.com\DATA\I-Drive\Clients-Cdrbrg\J\J5789 Jackson Village of\026 WWTP Fill Permitting\10 Bid Info\Bid Info-Jackson\Bid Tabulation.xlsx Page 2 of 2
Page 52 of 66
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Review of Bids – Purchase of Brush Chipper
Meeting Date: January 27, 2026 - Board of Public Works
Background and Analysis:
This memo is to inform the Board of quotes received for the purchase of a new brush
chipper, which was included in the 2026 budget. As approved by the Board, the 2026
capital budget includes funding for the purchase of one new brush chipper at a cost not to
exceed $110,000.00.
Quotes were requested from two vendors, with the following pricing received:
Vendor / Equipment Model Price
Vermeer Wisconsin – BC1500XL $88,273.00
LF George – Morbark BVR16 $89,073.50
Based on the quotes received, it is my recommendation that the Village move forward with
the purchase of one new brush chipper from Vermeer Wisconsin. Purchasing from a local
distributor provides easier access to parts and service if maintenance is needed.
Additionally, our team is familiar with the Vermeer chipper and has been very satisfied with
the performance of our current equipment.
The total purchase price is $88,273.00, which is $21,727.00 under budget.
Funding for this purchase will come from Account Number:
600–00–53310–450–000 (Capital Projects – Streets Machinery).
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village Board
approve the purchase of one new brush chipper in the amount of $88,273.00 from Vermeer
Wisconsin.
Page 53 of 66
Page 1 of 2 - Quote #: 02670-MS
W223 N6250 Richard Rd
Lisbon,WI 53089
(414) 303-7951
msyverson@vermeerwisconsin.com
Bill To:
Ship To:
Village of Jackson Village of Jackson
W194 N16660 Eagle Drive W194 N16660 Eagle Drive
Jackson, WI 53037-0147 Jackson, WI 53037-0147
1 - VERMEER BC1500 BRUSH CHIPPER $86,527.00
NEW S/N:
- 15” Capacity Drum Style Chipper 15” x 20” Opening
- 130 h.p. Cummins QSF3.8L Turbo Diesel T4F Engine with DEF System
- EcoIdle Engine Control System - 3 settings ( 1 minute / 5 Minute / Off )
- Low RPM Clutch Engagement System
- Vermeer Smartfeed System-Monitors Engine RPM
- Hydraulic Over-Pressure Sensor
- Twin Vertical Helical knifed Feed Wheel Rollers --- 20” x 21” each
- Fold-up Infeed Table with 52” x 32” Infeed Opening
- 4 position Infeed Control Bar ( Fwd/Neutral/Reverse/Stop )
- Upper and Lower Feed Stop Bar for Safety.
- 2 Reset Buttons for Safety Feed System
- 270 Degree Rotating Discharge Chute w adjustable Deflector & Manual Rotation
- 2 double sided Chipper Knives / Adjustable Bed knife
- 8,000 lb. Rubber Torsion Axle with Electric Brakes with Breakaway switch
- LT235/75R17.5 LR H/J Tires
- Fuel Tank 45 Gal. / Hydraulic Tank 12 Gal.
- Adjustable Height Pintle Hitch / Jackstand / Safety Chains & LED Light Package
Balance of New Machine Warranty
- Standard 1 Year/1,000 Hour Vermeer Limited Equipment Warranty
- 3 Year/3,000 Hour Extended Limited Warranty on Drum Housing, Cutter Drums,
Shaft & Ring-fetter Hubs
- 2 Year/2,000 Hour Parts and Labor Cummins Engine Warranty per Cummins Policy
- INCLUDES 1 EXTRA SET OF KNIVES WITH BOLTS
1/13/2026 Quote #: 02670-MS vs3
Account Number: 62639 P.O. #
Page 54 of 66
Page 2 of 2 - Quote #: 02670-MS
W223 N6250 Richard Rd
Lisbon,WI 53089
(414) 303-7951
msyverson@vermeerwisconsin.com
Vermeer has been awarded Sourcewell Government Bid Contract #010925-VRM.
The Sell Price will be at the Current Sourcewell Contract Pricing when Delivered.
Member Sourcewell #
Current Lead Time is to be confirmed upon being awarded Bid and Machine Build
Specifications.
Government Contract #010925-VRM Machine $86,527.00
Freight $1,746.00
Tax Exempt
Total Due $88,273.00
Pricing Valid through February, 11th.
Accepted by: Date:
Title:
Sincerely,
Mark Syverson / Sales Representative / (414) 303-7951 / msyverson@vermeerwisconsin.com
Page 55 of 66
Page 56 of 66
Resolution #26-01 1
RESOLUTION #26-01
ACCEPTING FUNDS FROM THE WASHINGTON COUNTY ROADWAY
SHARED SERVICES GRANT PROGRAM
The
Village B oard of the Village of Jackson, Washington County, Wisconsin, does resolve as
follows:
WHEREAS, Washington County has allocated a pool of dollars to create a grant program
to provide direct assistance to Municipalities in the County for road work and related professional
services; and
W
HEREAS, the County has worked in conjunction with local chief elected officials to
create a distribution formula and has calculated the award amounts for each eligible
municipality; and
W
HEREAS, Washington County has awarded $12,468.00 to the Village of Jackson for
this purpose; and
W
HEREAS, the Village of Jackson has reviewed the terms and conditions of the grant
program as reflected in the attached presentation and agrees to abide by them.
N
OW, THEREFORE, BE IT RESOLVED by the Village of Jackson Board that the Village
of Jackson does hereby accept the grant award in accordance with the Washington County
Roadway Maintenance Shared Services Grant Program.
Int
roduced by: Seconded by:
Vo
te: Ayes Nays Passed and Approved:
Brian J. Heckendorf – Village President
A
ttest:
J acqueline Schuh - Village Clerk
DRAFT
Page 57 of 66
Resolution #26-01 2
Proof of Posting:
I the undersigned, certify that I posted this Resolution on posting boards at the Jackson Municipal
Complex, Post Office, and one other location in the Village.
Village Official Date
DRAFT
Page 58 of 66
Shared Revenue Roadway Funding for Local Municipalities
This form is due December 12, 2025 to scott.schmidt@washcowisco.gov (earlier is appeciated) - contact Scott with any questions 262-335-6881
Please fill out all highlighted cells (If you do not want a particular service, leave the quantity at 0)
Municipality:
Rank your
projects
above with
1 being
your
highest
priority
The red number
above would be
the municipalities
financial
responsibility
The green number
above should closely
match the green
highlighted number
for your municipality
below
This green amount will
be forgiven once the
local municaplity takes
official action to accept
the grant. Municipality
will only have to pay this
amount if it does not
take action.
Exact locations are not needed at this time and can be modified at a
later date.
DESCRIPTION OF SERVICE ITEM PRIORITY UNIT QTYS MATERIAL MATERIAL LABOR & EQUIP LABOR & EQUIP TOTAL LOCATIONS and NOTES
# UNIT COST COST UNIT COST COST PROJECT COST
PAVEMENT MARKING (CENTER LINE ONLY) MILES $225.00 $0.00 $150.00 $0.00 $0.00
PAVEMENT MARKING (CENTER AND EDGE LINE) MILES $600.00 $0.00 $400.00 $0.00 $0.00
PAVEMENT MARKINGS (SPECIAL MARKINGS) EACH $25.00 $0.00 $150.00 $0.00 $0.00
CRACK FILLING MILES $2,400.00 $0.00 $7,000.00 $0.00 $0.00
MASTIC - ROADWAY MILES $5,000.00 $0.00 $7,000.00 $0.00 $0.00
MASTIC - SPOT LOCATIONS 3 EACH 12 $250.00 $3,000.00 $300.00 $3,600.00 $6,600.00
Hickory Lane & Pine Drive (5) Ridgeway Drive North of Willow
Ridge (7)
CHIP SEAL MILES $12,000.00 $0.00 $6,500.00 $0.00 $0.00
CULVERT REPLACEMENT (24" - 50') EACH $7,000.00 $0.00 $11,000.00 $0.00 $0.00
CULVERT LINING (50' - 30" liner dry conditions) EACH $4,250.00 $0.00 $3,200.00 $0.00 $0.00
SHOULDER RECLAIMING (BOTH SIDES OF ROADWAY) MILES $1,000.00 $0.00 $2,400.00 $0.00 $0.00
SHOULDERING (3' WIDE 4" DEEP) MILES $4,000.00 $0.00 $4,000.00 $0.00 $0.00
DITCHING 1 LF 1,000 $1.00 $1,000.00 $7.50 $7,500.00 $8,500.00
250' on Eagle Drive at Spruce Stret near W194N16660 Eagle
Drive. & 750' along Hickry lane between Hawthorne Circle and
Cedar Creek bridge.
STORM INLET REPAIR (ONE CONCRETE RING, MORTAR, 10' CONCRETE
CURB, ASPHALT) EACH $1,200.00 $0.00 $3,600.00 $0.00 $0.00
BRIDGE APPROACH ASPHALT (BOTH SIDES) EACH $1,700.00 $0.00 $5,000.00 $0.00 $0.00
INSTALL ROAD SIGNS EACH $50.00 $0.00 $200.00 $0.00 $0.00
ROADSIDE VEGETATION/TREE REMOVAL - WINTER WORK 2 LF 700 $0.02 $14.00 $2.00 $1,400.00 $1,414.00
W194N16660 Eagle Drive along North and West property line
drainage ditch.
ROADSIDE MOWING (both sides of roadway included) MILES $0.00 $0.00 $400.00 $0.00 $0.00
ASPHALT PATCHING (24'x30') EACH $1,700.00 $0.00 $5,000.00 $0.00 $0.00
VEGETATION SPRAYING (both sides of roadway included) MILES $100.00 $0.00 $70.00 $0.00 $0.00
GUARD RAIL REPAIR LF $140.00 $0.00 $50.00 $0.00 $0.00
INSERT ANOTHER SERVICE - SPRAY FLEX BEAM AND BRIDGES EACH $0.00 $0.00 $250.00 $0.00 $0.00
Possibly Pave Townline RD 2 inch overlay 20Feet Wide FEET
TOTAL $4,014.00 $12,500.00 $16,514.00
All the numbers above are estimates, invoicing will occur based on actual time
and materials. Municipality Total Have Plan Included Above?
T. Addison 25,132$
T. Barton 17,827$
T. Erin 21,845$
T. Farmington 26,083$
T. Germantown 1,718$
T. Hartford 18,983$
T. Jackson 21,298$
T. Kewaskum 14,660$
T. Polk 22,585$
T. Trenton 25,567$
T. Wayne 22,558$
T. West Bend 17,257$
V. Jackson 12,468$
V. Newburg 2,516$
V. Richfield 57,749$
V. Slinger 11,755$
Village of Jackson
Page 59 of 66
Jackson Parks & Recreation
N165W20330 Hickory Lane
Jackson, WI 53037
(262) 677-9665
parkrec@villageofjacksonwi.gov
MEMO
DATE 2/10/2026
TO FROM REGARDING
Personnel Committee and Village Board T
yler Mentzel
Jackson Parks & Recreation Director
tyler.mentzel@villageofjacksonwi.gov
Phone Ext: (262) 677-9665 x113
Discussion and Possible
Action - Operations Manager
Reclassification and
Operations Manager
Internship Proposal
Parks and Recreation Department Staffing Reorganization Proposal
In 2024, the Personnel Committee and Village Board approved updated job descriptions for the Parks and
Recreation Department. As part of this process, the existing Recreation Supervisor position was
restructured into two full-time positions: Youth Recreation Supervisor and Adult Recreation Supervisor.
This change formally recognized the department’s need to expand from three to four full-time staff
members to support program growth and service demands.
W
ith the recent departure of the long-term Operations Manager, staff believe this is an appropriate time to
evaluate and pursue a broader reorganization of the department to ensure long-term growth,
sustainability, and service to the community. While a fourth full-time position has been approved, it was
not budgeted in 2026. Staff believe that prioritizing a second Recreation Supervisor position at this time is
in the department’s best long-term interest.
T
his proposed reorganization does not eliminate the need for an Operations Manager. Rather, it allows staff
to evaluate the structure of the position and determine how best to allocate resources to expand
programming capacity while maintaining strong operations and customer service. Through this evaluation,
staff have determined the Operations Manager position is no longer needed as a full-time, exempt role.
Instead, staff recommend reclassifying the position to permanent, part-time. This change would allow the
department to increase staff capacity focused on program growth and revenue generation, while
continuing to meet operational and customer service needs.
U
nder this proposal, the approved 2024 staffing plan would shift from four full-time staff positions to three
full-time positions and one three-quarter-time position, with the Operations Manager working
approximately 30 hours per week. Amended job descriptions for these two roles are attached for the
Personnel Committee’s consideration.
Page 60 of 66
Page 2
Budget Impact and Staffing Timeline
Hiring the permanent part-time Operations Manager position in 2026 would equate to approximately
$24,000.00 in additional expenses. Staff are also considering the consolidation of existing part-time hours
and increased program revenues generated through expanded capacity of Recreation Supervisors. These
opportunities could further reduce the budget impact, well below $24,000.00.
Two 2026 Operational Manager hiring timelines have been identified:
• O
ption 1: Hire an Operations Manager Intern beginning in May, with the intent to transition the
intern into a permanent, part-time Operations Manager role upon completion of the internship, as
early as September.
• Option 2: Hire a permanent, part-time Operations Manager beginning in July.
S
taff request the Personnel Committee’s flexibility to first pursue option 1 listed above. Should the Village
fail to receive applications for the internship, option 2 would be pursued. Until the Operations Manager role
is filled, operational responsibilities will be distributed among Building Supervisors, the Office Assistant,
Recreation Supervisors, and the Parks and Recreation Director. While this interim approach will allow the
newly hired Youth Recreation Supervisor to build relationships, learn operations, become familiar with
existing programming, and begin planning for fall programs, an extended vacancy will continue to limit
departmental capacity and place strain on front-facing services.
Rec
ommendations
1. Personnel Committee recommends Village Board approve the Operations Manager Role
reclassification as either a permanent part-time position or an Intern position and approve the
associated job descriptions.
2. Personnel Committee recommends Village Board authorize staff to recruit for a permanent, part-
time Operations Manager position for a net budget impact not to exceed $24,000.00 in 2026.
Page 61 of 66
VILLAGE OF JACKSON
JOB DESCRIPTION
POSITION: Operations Manager - Internship
DEPARTMENT: Jackson Parks & Recreation
IMMEDIATE SUPERVISOR: Parks & Recreation Director
CLASSIFICATION: Seasonal, Part-Time
EXERCISES DIRECT SUPERVISION:
GENERAL STATEMENT OF DUTIES:
The Operations Manager – Intern is responsible for the coordination and scheduling of the
Jackson Community Center (JCC) and Village Parks. Assists the Director in planning and
implementation of recreational programming and special events. Performs clerical, secretarial,
financial, and administrative work by answering phones, greeting the public, providing customer
assistance, cashiering, data processing and building supply ordering. Role also includes
bookkeeping registration, administration and departmental marketing. This role will work
approximately 30 hours per week.
SKILLS, KNOWLEDGE, AND ABILITIES:
Working knowledge of computers and electronic data processing; working knowledge of modern
office practices and procedures; knowledge of accounting principles and practices. Ability to
perform daily accounting duties accurately; ability to effectively meet and serve the public;
ability to communicate effectively verbally and in writing. The ability to multi-task and use a
phone system; a higher level of computer literacy including Microsoft Office, general desktop
publishing software; registration and facility registration programs RecDesk; copy machine. The
ideal candidate will have basic knowledge of facility maintenance. The ability to handle stressful
situations and function well within a fast paced, multi-tasking environment.
EDUCATION AND PRIOR EXPERIENCE:
Must be enrolled in or a recent graduate of, an accredited college or university pursuing a degree
in Parks and Recreation, Sports Management, Communications, or Business Education.
Previous experience working in parks and recreation, event coordination, or facility operations is
preferred, but not required. Candidates also should demonstrate knowledge of best practices as it
applies to accounting, scheduling, bookkeeping, Microsoft Office, Google Docs and social media
account management. Valid driver’s license and reliable transportation is required.
SPECIFIC POSITION RESPONSIBILITIES:
Other duties or functions may be required from time to time, and thus the information below is
not an exhaustive list of responsibilities for this role.
• Responsible for scheduling and coordinating Community Center and Village Parks
facilities for programming, rentals, and special events.
• Maintains rental records and communicates rental schedules and requirements to public
works.
• Performs janitorial/custodial tasks as needed at the Jackson Community.
• Maintains office forms, files, and procedures for the department.
• Assist with administrative tasks involving seasonal personnel, budgeting, facilities, and
program information/registration.
• Oversight of Fitness Center operations, memberships, reports, check-ins, renewals, 3rd
party reimbursements and reports.
• Responsible for marketing including, but not limited to print and web ads, email blasts
Page 62 of 66
and Facebook page updates.
• Works with Village Clerk for updating departmental information on the Village Website.
• Assists in the coordination of special events along with the Recreation Supervisors and
Director, including Action in Jackson and multiple Friends of Jackson Parks and
Recreation events.
• Maintains a positive, helpful and cohesive partnership between the Parks and Recreation
Department and long-term facility rental groups.
• Responds to inquiries from employees, citizens, and others and refer, when necessary, to
appropriate persons.
• Compose, type, and edit correspondence, reports, memoranda, and other materials
required.
• Acts as “substitute” for front desk staff when applicable and necessary.
ENVIRONMENTAL ADAPTABILITY:
The work environment characteristics described are representative of those an employee
encounters while performing the essential functions of this job. While performing the duties of
this job, the employee is occasionally required to work abnormal hours. The noise level in the
work environment is usually moderate and employee must have ability to sustain prolonged
visual concentration and ability to sit or stand for long periods of time. The Village of Jackson is
an equal opportunity employer. In compliance with the Americans with Disabilities Act, the
Village will provide reasonable accommodations to qualified individuals with disabilities and
encourages both prospective and current employees to discuss potential accommodations with
employer.
Job Description Updated on: 2/01/2026
Supervisor’s Signature Date
Employee’s Signature Date
Page 63 of 66
VILLAGE OF JACKSON
JOB DESCRIPTION
POSITION: Operations Manager
DEPARTMENT: Jackson Parks & Recreation
IMMEDIATE SUPERVISOR: Parks & Recreation Director
CLASSIFICATION: Permanent Part Time
EXERCISES DIRECT SUPERVISION: Office Assistant, Custodial Staff and Building
Supervisors
GENERAL STATEMENT OF DUTIES:
The Operations Manager is responsible for the coordination and scheduling of the Jackson
Community Center (JCC) and Village Parks. Hires, trains, supervises, schedules, and evaluates
building staff. Serves as the liaison for long-term renters of the Community Center. Assists the
Director in planning and implementation of recreational programming and special events.
Performs clerical, secretarial, financial, and administrative work by answering phones, greeting
the public, providing customer assistance, cashiering, data processing and building supply
ordering. Role also includes bookkeeping which shall be comprised of daily deposits, registration
administration and departmental marketing.
SKILLS, KNOWLEDGE, AND ABILITIES:
Working knowledge of computers and electronic data processing; working knowledge of modern
office practices and procedures; knowledge of accounting principles and practices. Ability to
perform daily accounting duties accurately; ability to effectively meet and serve the public;
ability to communicate effectively verbally and in writing. The ability to multi-task and use a
phone system; a higher level of computer literacy including Microsoft Office, general desktop
publishing software; registration and facility registration programs RecDesk; copy machine. The
ideal candidate will have basic knowledge of facility maintenance. The ability to handle stressful
situations and function well within a fast paced, multi-tasking environment.
EDUCATION AND PRIOR EXPERIENCE:
A minimum of 3 years of progressive experience managing recreation activities. Candidates also
should demonstrate knowledge of best practices as it applies to accounting, scheduling,
bookkeeping, Microsoft Office, Google Docs and social media account management. Bachelor
or associate degree in Recreation Management, Business Administration or related field;
National Certification through NRPA (National Recreation and Park Association) as a Certified
Park and Recreation Professional is desired.
SPECIFIC POSITION RESPONSIBILITIES:
Other duties or functions may be required from time to time, and thus the information below is
not an exhaustive list of responsibilities for this role.
• Responsible for scheduling and coordinating Community Center and Village Parks
facilities for programming, rentals, and special events.
• Serves as liaison to contracted users of the Community Center including but not limited
to, the Washington County Boys and Girls Club and Kettlebrook Church.
• Maintains rental records and communicates rental schedules and requirements to public
works.
• Coordinates the office and custodial/maintenance operations for the Jackson Community
Center.
• Maintains safety records and logs for cleaning chemicals and procedures as required.
Page 64 of 66
• Performs janitorial/custodial tasks as needed at the Jackson Community.
• Develops and maintains office forms, files, and procedures for the department.
• Responsible for the layout and printing of bi-annual Activity Guide and all event
marketing, coordinates content with Recreation Supervisors and Director.
• Assist with administrative tasks involving seasonal personnel, budgeting, facilities, and
program information/registration.
• W orks with the Director and Recreation Supervisors in acquiring grants and
sponsorships.
• O versight of Fitness Center operations, memberships, reports, check-ins, renewals, 3rd
party reimbursements and reports.
• R esponsible for marketing including, but not limited to print and web ads, email blasts
and Facebook page updates.
• W orks with Village Clerk for updating departmental information on the Village Website.
• Assists in the coordination of special events along with the Recreation Supervisors and
Director, including Action in Jackson and multiple Friends of Jackson Parks and
Recreation events.
• Maintains a positive, helpful and cohesive partnership between the Parks and Recreation
Department and long-term facility rental groups.
• R esponds to inquiries from employees, citizens, and others and refer, when necessary, to
appropriate persons.
• S erves as treasurer including receipting various payments, posting monies to appropriate
accounts and balancing deposits for the Village Treasurer and provides financial reports
to the Director.
• W orks with the Village Treasurer in preparing weekly batch deposits for the Village
accounting system.
• Compose, type, and edit correspondence, reports, memoranda, and other materials
required.
• Hires, trains, supervises, schedules, and evaluates front staff including Office Assistant,
Custodians and Building Supervisors, and Building Assistants.
• Acts as “substitute” for front desk staff when applicable and necessary.
• Attends conferences, workshops, and meetings to further educate and maintain
certifications.
ENVIRONMENTAL ADAPTABILITY:
The work environment characteristics described are representative of those an employee
encounters while performing the essential functions of this job. While performing the duties of
this job, the employee is occasionally required to work abnormal hours. The noise level in the
work environment is usually moderate and employee must have ability to sustain prolonged
visual concentration and ability to sit or stand for long periods of time. The Village of Jackson is
an equal opportunity employer. In compliance with the Americans with Disabilities Act, the
Village will provide reasonable accommodations to qualified individuals with disabilities and
encourages both prospective and current employees to discuss potential accommodations with
employer.
Job Description Updated on: 1/20/2025
Supervisor’s Signature Date
Page 65 of 66
Employee’s Signature Date
Page 66 of 66
Source: Village of Jackson website. First collected Oct 7, 2026.