RecordWell Data

Budget and Finance Committee — Agenda Packet

Village of Jackson · Washington County · Budget and Finance Committee · meeting of Dec 9, 2025 · Agenda packets

Open the original document More from Village of Jackson

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

December 9, 2025 Village of Jackson - Budget and Finance Committee Meeting Agenda VILLAGE OF JACKSON BUDGET AND FINANCE COMMITTEE MEETING AGENDA Tuesday, December 9, 2025 at 7:00 PM (Or immediately following Personnel Committee meeting) Jackson Municipal Complex Village Board Room N168W19851 Main Street Jackson, WI 53037 1. Call to Order and Roll Call 2. Approval of Minutes for the Budget and Finance Committee Meeting of November 11, 2025 3. Approval of November 2025 Check Register and Treasurer's Report 4. Change Order #3 - 2025 Hickory Lane Reconstruction Project - Vinton Construction for an increase in the amount of $1,046.51 5. Change Order #4 - Final - 2025 Ridgeway Drive and Chestnut Court Reconstruction Project – Advanced Construction for an increase in the amount of $19,142.61 6. Pay Request #5 - 2025 Hickory Lane Reconstruction Project - Vinton Construction in the amount of $293,286.04 7. Pay Request #6 - Final - 2025 Ridgeway Drive and Chestnut Court Reconstruction Project – Advanced Construction in the amount of $44,697.88 8. Approving Completion of 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project and Authorizing Closure of the Clean Water Fund Loan 9. 2025-2026 Contract Amendment #3 - Gremmer and Associates in the amount of $309,667.00 10. Review of Draft Tax Incremental District #4 Independent Auditor's Report and Financial Statements 11. Citizens/Village Staff to Address the Budget and Finance Committee 12. Adjourn Persons with disabilities requiring special accommodations for attendance at the meeting should contact the Administration Department at the Jackson Municipal Complex at least one (1) business day prior to the meeting. It is possible that members of the Village Board may attend the above meeting. No action will be taken by any governmental body at this meeting other than the governmental body specifically referred to in this meeting notice. This notice is given so that members of the Village Board may attend the meeting without violating the open meeting law. Page 1 of 81 November 11, 2025 Village of Jackson - Budget and Finance Committee Meeting Minutes Page 1 of 4 VILLAGE OF JACKSON BUDGET AND FINANCE COMMITTEE MEETING Tuesday, November 11, 2025 at 7:00 PM Minutes 1. Call to Order and Roll Call The meeting was called to order at 7:01 PM by Pres. Heckendorf. Members Present: Pres. Heckendorf, Tr. Wells, and Tr. Olson Members Excused: None Members Absent: None Staff Present: Administrator Jen Heidtke, Lieutenant Mike Foeger, Parks and Recreation Director Tyler Mentzel, Treasurer Darlene Smith, Public Works Director Jack Straehler, Fire Chief Aaron Swaney, and Clerk Jackie Schuh 2. Approval of Minutes for the Budget and Finance Committee Meeting of October 14, 2025 The motion to approve Minutes for the Budget and Finance Committee Meeting of October 14, 2025, was made by Tr. Wells and seconded by Tr. Olson. Vote: 3 ayes, 0 nays. Motion carried. 3. Approval of October 2025 Check Register and Treasurer's Report The motion to approve the October 2025 Check Register and Treasurer's Report was made by Tr. Wells and seconded by Tr. Olson. Vote: 3 ayes, 0 nays. Motion carried. 4. Change Order #2 - Final - 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project - J.H. Hassinger for a decrease in the amount of $8,470.66 The motion to recommend the Village Board approve Final Change Order #2 for the 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project for a decrease in the amount of $8,470.66 was made by Tr. Olson and seconded by Tr. Wells. Vote: 3 ayes, 0 nays. Motion carried. 5. Pay Request #18 - 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project - J.H. Hassinger in the amount of $28,036.59 The motion to recommend the Village Board approve Pay Request #18 for the 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project to J.H. Hassinger in the amount of $28,036.59 was made by Tr. Olson and seconded by Pres. Heckendorf. Vote: 3 ayes, 0 nays. Motion carried. DRAFT Page 2 of 81 November 11, 2025 Village of Jackson - Budget and Finance Committee Meeting Minutes Page 2 of 4 6. Pay Request #19 - Final - 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project - J.H. Hassinger in the amount of $230,930.58 The motion to recommend the Village Board approve Final Pay Request #19 for the 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project to J.H. Hassinger in the amount of $230,930.58 was made by Tr. Olson and seconded by Tr. Wells. Director Straehler verified for Pres. Heckendorf that he anticipates the project to come in under budget. Vote: 3 ayes, 0 nays. Motion carried. 7. Pay Request #4 - 2025 Hickory Lane Reconstruction Project - Vinton Construction in the amount of $618,120.14 The motion to recommend the Village Board approve Pay Request #4 for the 2025 Hickory Lane Reconstruction Project to Vinton Construction in the amount of $618,120.14 was made by Tr. Wells and seconded by Tr. Olson. Vote: 3 ayes, 0 nays. Motion carried. 8. Reimbursement Request #15 - 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project - Clean Water Fund Loan in the amount of $296,155.05 The motion to recommend the Village Board approve Reimbursement Request #15 for the 2024 Wastewater Treatment Plant and UV Disinfection Project from the Clean Water Fund Loan in the amount of $296,155.05 was made by Tr. Olson and seconded by Tr. Wells. Director Straehler stated he expects one more reimbursement request for engineering fees for this project. He stated the reimbursement requests mirror the pay requests plus engineering fees incurred. Vote: 3 ayes, 0 nays. Motion carried. 9. Authorization to Increase Sewer Utility Rates Effective January 1, 2026 The motion to recommend the Village Board approve the authorization to increase sewer utility rates effective January 1, 2026, was made by Tr. Olson and seconded by Pres. Heckendorf. Administrator Heidtke asked that the percentage of the increase be included in the motion. Tr. Olson and Pres. Heckendorf both agreed to add 18% as the percentage of the increase to the motion. Vote: 3 ayes, 0 nays. Motion carried. 10. Resolution #25-30 Establishing 2026 Fees The motion to recommend the Village Board approve Resolution #25-30 Establishing the 2026 Fee Schedule for the Village of Jackson was made by Tr. Olson and seconded by Tr. Wells. DRAFT Page 3 of 81 November 11, 2025 Village of Jackson - Budget and Finance Committee Meeting Minutes Page 3 of 4 Vote: 3 ayes, 0 nays. Motion carried. 11. Resolution #25-31 Adopting 2026 General Fund Budget The motion to recommend the Village Board approve the Resolution #25-31 Adopting the 2026 General Fund Budget for the Village of Jackson was made by Pres. Heckendorf and seconded by Tr. Olson. Vote: 3 ayes, 0 nays. Motion carried. 12. Resolution #25-32 Adopting 2026 Water Utility Budget The motion to recommend the Village Board approve Resolution #25-32 Adopting the 2026 Water Utility Budget for the Village of Jackson was made by Tr. Wells and seconded by Tr. Olson. Vote: 3 ayes, 0 nays. Motion carried. 13. Resolution #25-33 Adopting 2026 Sewer Utility Budget The motion to recommend the Village Board approve Resolution #25-33 Adopting the 2026 Sewer Utility Budget for the Village of Jackson was made by Tr. Olson and seconded by Tr. Wells. Vote: 3 ayes, 0 nays. Motion carried. 14. Resolution #25-34 Adopting the 2025 Tax Levy for the 2026 Budget The motion to recommend the Village Board approve Resolution #25-34 Adopting the 2025 Tax Levy for the 2026 Budget for the Village of Jackson was made by Tr. Wells and seconded by Tr. Heckendorf. Vote: 3 ayes, 0 nays. Motion carried. 15. Citizens/Village Staff to Address the Budget & Finance Committee Administrator Heidtke informed the Board of a correction to the 2026 General Fund Budget Summary. Treasurer Smith explained that before adopting the 2026 General Fund Budget, staff identified errors in the published 2026 Budget Summary regarding several fund totals. The General Fund revenues and expenditures were listed as $5,496,609 and should be $5,496,613. The Debt Service Fund revenues and expenditures were listed as $2,164,624 and should be $2,409,700. The Capital Projects Fund revenues were listed as $340,368 and should be $331,119. The Sewer Utility Fund revenues were listed as $2,409,700 and should be $2,789,645, while expenditures were listed as $2,409,700 and should be $2,041,367. These corrections do not affect the total tax levy. Treasurer Smith asked that the Village Board acknowledge the corrections when adopting the 2026 General Fund Budget so it can be entered into the official record. DRAFT Page 4 of 81 November 11, 2025 Village of Jackson - Budget and Finance Committee Meeting Minutes Page 4 of 4 16. Adjourn The motion to adjourn the meeting was made by Tr. Wells and seconded by Pres. Heckendorf. Vote: 3 ayes, 0 nays. Motion carried. The meeting adjourned at 7:13 PM. Respectfully Submitted, Jacqueline Schuh Village Clerk Village of Jackson DRAFT Page 5 of 81 Page 6 of 81 Company Name: VILLAGE OF JACKSON Page 2 of 6 /Cc2/Cc1/Cd3/Cc1/Cd5/Cc3/Cc5 /Ce2 /Ce4/Cc2 /Cd1 /Cc5/Cc3 /Ce3 /Ce3/Cd6 /Cc9/Cd5/Ce3/Cc5/Cd9 /Cc5/Ce2 /Ce3/Cd9 /Cc1 /Ce3/Cc5 /Cc1/Ca5 /C85/C99/C81 /C87/C85 /Cc4/C81 /C89/C93/Ca8 /Cc2/C81 /C93/C81/C95/C83/C85 /C4d/Cc9 /C95/C83/C93/Ca4 /C84/C89/C95 /C87/Cc3 /Ca4 /C99 /C99 /C85 /C95 /Ca3 /Ce3/C99 /C81/C95 /Ca2/C81/C83/Ca3/C89/C96/C95 /Ca2/C5d /Ce3/C88/C85 /C82/C81/C93/C81/C95/C83/C85 /Ca2 /Ca4/C82/C91/C85/C83 /Ca3 /Ca3 /C96/Cc9 /C95 /Ca3 /C85 /C99/C85/Ca2 /Ca3 /C89 /Ca2 /Ca3/C88/C85 /C81/Ca5/C85/C99/C81/C87/C85 /C84/C81/C89 /C93/Ca8 /C82/C81/C93/C81/C95/C83/C85 /C96 /C95 /Ca8/C96 /Ca4/C99 /Cc1/C83 /C83/C96 /Ca4/C95/Ca3 /C4b/Ce6 /C85 /C83/C81 /C93 /C83/Ca4 /C93 /C81/Ca3/C85 /Ca3 /C88/C85 /C81/Ca5/C85 /C99/C81/C87 /C85/C84 /C81 /C89 /C93 /Ca8/C82 /C81 /C93 /C81/C95/C83 /C85 /C96/C95 /Ca8/C96/Ca4/C99 /Cc1/C83/C83 /C96/Ca4/C95/Ca3 /C89/C95 /Ca3/C88/C99/C85/C85 /C83 /C81/Ca3 /C85/C87 /C96/C99 /C89 /C85/Ca2 /C7a /C4d /Cf1 /C5d /Cd7/Ca4/C99/C83 /C88/C81/Ca2/C85 /Ca2/C6b /C4d/Cf2 /C5d /Cc3/C81/Ca2 /C88 /Cc1/C84/Ca5/C81/C95/C83 /C85/Ca2 /C6b /C81/C95/C84 /C4d/Cf3 /C5d/Cc2 /C81 /C93 /C81/C95/C83 /C85 /Ce3/C99/C81/C95/Ca2/C86/C85 /C99/Ca2/C4b /Ce3/C96 /C96 /C82/Ca3 /C81/C89/C95 /C94/C96 /C99/C85 /C89 /C95/C86/C96 /C99/C94/C81/Ca3 /C89/C96/C95 /C81/C82/C96 /Ca4/Ca3 /Ca3 /C88/C89/Ca2 /C82/C81/C93 /C81/C95/C83 /C85 /C83/C96 /C94/C97/Ca4/Ca3 /C81/Ca3/C89 /C96 /C95 /C94/C85 /Ca3 /C88/C96 /C84 /C81/C95/C84 /C88/C96/Ca6 /C99/C85 /Ca2/Ca4/C93/Ca3 /C89/C95/C87 /Cc9/C95/Ca3/C85/C99/C85 /Ca2/Ca3 /C83 /C88/C81/C99/C87 /C85/Ca2 /Ca6 /C85/C99 /C85 /C84/C85 /Ca3 /C85 /C99/C94/C89 /C95/C85 /C84/C6b /C83 /C81/C93 /C93 /Ca4/Ca2 /C81/Ca3 /Ca3/C88/C85 /Cc3/C96 /C95/Ca3 /C81/C83 /Ca3 /Ce4 /Ca2 /C95/Ca4/C94/C82/C85 /C99 /C96 /C95 /Ca3/C88/C85 /C86/C99/C96/C95/Ca3 /C96 /C86 /Ca3/C88/C89 /Ca2/Ce2 /Ca3 /C81/Ca3/C85/C94/C85 /C95/Ca3 /C4b /Cc7/C99/C81 /C83/C85 /Cd7/C85/C99/C89/C96/C84 /C7a /Cc9/C86 /Ca8/C96/Ca4 /C97/C81/Ca8 /Ca8/C96 /Ca4/C99 /Cd5/C85/Ca6 /Cc2/C81/C93/C81/C95/C83/C85 /C89/C95 /C86/Ca4/C93/C93 /C82/Ca8 /Ca3/C88/C85 /Cd7/C81/Ca8/C94/C85/C95/Ca3 /Cc4/Ca4/C85 /Cc4/C81/Ca3/C85/C6b /Ca8/C96/Ca4 /C94/C81/Ca8 /C83 /C96/C95/Ca3/C89 /C95/Ca4/C85 /Ca3/C96 /C81/C83/C83 /C99/Ca4/C85 /C89 /C95/Ca3/C85/C99/C85 /Ca2/Ca3 /C96 /C95 /Cc3 /C81/Ca2/C88 /Cc1/C84/Ca5/C81/C95/C83/C85 /Ca2 /C81/C95/C84 /Cc2/C81/C93/C81/C95/C83/C85 /Ce3/C99/C81/C95/Ca2 /C86/C85/C99/Ca2 /C86/C96 /C99 /Ca3/C88/C85 /C97/C85/C99/C89/C96/C84 /C82/C85 /Ca3 /Ca6/C85/C85 /C95 /Ca6/C88/C85/C95 /Ca8/C96/Ca4/C99 /Ce2/Ca3/C81/Ca3 /C85/C94 /C85 /C95 /Ca3 /C89 /Ca2 /C89 /Ca2 /Ca2/Ca4/C85 /C84 /C81/C95/C84 /Ca3 /C88/C85 /C84/C81/Ca3/C85 /Ca8/C96/Ca4 /C97/C81/Ca8 /Ca8/C96 /Ca4/C99 /C82/C89/C93 /C93/C4b /Ce3/C96 /C96 /C82/Ca3 /C81/C89/C95 /C81 /C97/C81/Ca8 /C96/C86/C86 /C81/C94/C96/Ca4/C95/Ca3 /Ca3/C88/C81/Ca3 /C89 /C95/C83 /C93 /Ca4/C84/C85 /Ca2 /C81/C95/Ca8 /Ca3/C99/C81/C89 /C93/C89 /C95/C87 /C89/C95/Ca3 /C85/C99 /C85 /Ca2/Ca3 /C6b/C83 /C81 /C93 /C93 /Ca4 /Ca2/C81 /Ca3 /Ca3 /C88/C85 /C95/Ca4/C94/C82/C85 /C99 /C96 /C95 /Ca3/C88/C85 /C86/C99/C96/C95/Ca3 /C96/C86 /Ca3 /C88 /C89 /Ca2/Ce2 /Ca3 /C81/Ca3/C85/C94/C85 /C95/Ca3 /C4b /Cd7/C81 /Ca8 /C94 /C85/C95 /Ca3/Cc9 /C95/C86/C96 /C99/C94 /C81 /Ca3/C89/C96 /C95/C7a /Ce8/C96 /Ca4 /C83 /C81/C95 /C94/C81/C89/C93 /Ca8/C96/Ca4/C99 /C97/C81/Ca8/C94/C85/C95/Ca3 /C89/C95 /Ca3/C88/C85 /C85/C95/Ca5/C85 /C93 /C96 /C97/C85 /C97/C99/C96/Ca5/C89/C84/C85/C84/C6b /C96/C99 /Ca2/C85 /C95/C84 /Ca8/C96 /Ca4/C99 /C97/C81/Ca8/C94/C85 /C95/Ca3 /Ca3 /C96 /C7a /Cc2/Cd4/Cd6 /Cc2/C81/C95/C92 /Cd5/C4b/Cc1/C4b /C6b /Cd7/C4b /Cd6/C4b /Cc2/C96/Ca7 /Cf5/Cf7 /Cf3/Cf2 /C6b /Cc3/C81/C99/C96 /C93 /Ce2/Ca3/C99/C85/C81/C94/C6b /Cc9/Cd3 /Cf6 /Cf0/Cf1 /Cf9/Cf7 /C60/Cf5/Cf7 /Cf3/Cf2 /C4b /Cd6/C95 /C93/C89/C95/C85 /Cd7/C81 /Ca8 /C94/C85 /C95/Ca3 /C60/Ce6 /C85/C94 /Ca4 /Ca2 /Ca3 /C99 /C85 /C83 /C85 /C89 /Ca5/C85 /C81/Ca4/Ca3/C88/C96/C99/C89/Ca9/C81/Ca3/C89 /C96 /C95 /Ca3/C96 /C85/C86/C86/C85 /C83/Ca3 /C97/C81/Ca8/C94/C85 /C95/Ca3 /C82/Ca8 /Cf1/Cf0 /C7a/Cf5/Cf9 /C97/C4b/C94/C4b /Cc3 /C85/C95/Ca3/C99/C81/C93 /Ce3/C89 /C94/C85 /Ca5/C89/C81 /C96 /Ca4/C99 /C84/C85 /C84/C89 /C83/C81 /Ca3 /C85 /C84 /C83 /C99/C85/C84/C89/Ca3 /C83/C81/C99/C84 /Ca6 /C85 /C82/Ca2/C89/Ca3 /C85 /C81/Ca3 /C82/C94/C96 /C4b/C83 /C96/C94/C61/C82/Ca4/Ca2 /C89 /C95/C85 /Ca2/Ca2 /C83/C99/C85 /C84/C89 /Ca3/C83/C81/C99/C84/C4b /Cd7 /C81 /Ca8/C82 /Ca8/Cd7 /C88 /C96 /C95/C85 /C60 /Ce8/C96 /Ca4 /C94/C81/Ca8 /C94/C81/C92/C85 /Ca8/C96/Ca4/C99 /C97/C81/Ca8/C94/C85/C95/Ca3 /C82/Ca8 /C97/C88/C96/C95/C85 /C82/Ca8 /Ca4/Ca2/C89/C95/C87 /Ca3 /C88/C85 /Cd7/C81/Ca8 /C82/Ca8 /Cd7/C88/C96 /C95/C85 /Ca2 /C85/C99/Ca5/C89/C83/C85 /C4b /Cc3/C81/C93/C93 /C82/Ca8 /Cf5 /C97/C4b /C94/C4b /Cc3/C85 /C95/Ca3 /C99/C81/C93 /Ce3/C89/C94/C85 /C96/C95 /C81 /C82/C81/C95/C92 /C82/Ca4/Ca2/C89/C95/C85/Ca2 /Ca2 /C84/C81/Ca8 /Ca3/C96 /C88/C81/Ca5/C85 /Ca8/C96/Ca4/C99 /C97/C81/Ca8/C94/C85/C95/Ca3 /C83 /C99/C85/C84/C89/Ca3 /C85 /C84 /C81/Ca2 /C96 /C86 /Ca3/C88/C81/Ca3 /C84/C81/Ca8/C4b /Cc9/C86 /Ca8/C96/Ca4 /C83/C81/C93/C93 /C81/C86/Ca3 /C85 /C99 /Ca3/C88/C81/Ca3 /Ca3 /C89/C94/C85/C6b /Ca8/C96/Ca4/C99 /C97/C81/Ca8/C94/C85/C95/Ca3 /Ca6/C89 /C93/C93 /C82/C85 /C83/C99/C85 /C84/C89 /Ca3/C85/C84 /C81/Ca2 /C96/C86 /Ca3/C88/C85 /C95/C85/Ca7/Ca3 /C82/C81/C95/C92 /C82/Ca4/Ca2 /C89 /C95/C85 /Ca2/Ca2 /C84/C81/Ca8/C4b /Ce6/C85 /C99/C85 /Ca2/C85 /C99/Ca5/C85 /Ca3 /C88/C85 /C99/C89/C87 /C88/Ca3 /Ca3/C96 /C97/C99/C96/C83 /C85/Ca2 /Ca2 /Ca8/C96/Ca4/C99 /C97/C81/Ca8/C94/C85/C95/Ca3 /C85/C93 /C85 /C83/Ca3/C99/C96/C95/C89/C83/C81/C93/C93 /Ca8 /Ca4/C97/C96/C95 /Ca5/C85/C99/C89/C86/C89 /C83/C81 /Ca3 /C89/C96/C95 /C96/C86 /Ca8/C96/Ca4/C99 /C89 /C84/C85 /C95/Ca3 /C89/C86/C89 /C83/C81 /Ca3 /C89/C96/C95/C4b /Cc9/C95 /Cd7/C85/C99/Ca2/C96 /C95 /C60 /Cd7/C81/Ca8/C94/C85/C95/Ca3 /C94/C81/Ca8 /C82/C85 /C94/C81/C84/C85 /C81/Ca3 /Cc2/Cd4/Cd6 /Cc2/C81/C95/C92 /Cd5 /C4b /Cc1/C4b /C82/C81/C95/C92 /C82/C99/C81/C95/C83 /C88/C85/Ca2 /C4b /Cc9 /C86 /C97/C81/Ca8/C94/C85 /C95/Ca3 /C89 /Ca2 /C94/C81/C84/C85 /Ca6/C89 /Ca3/C88/C96/Ca4/Ca3 /Ca3/C88/C85 /C97/C81/Ca8/C94/C85/C95/Ca3 /C83 /C96/Ca4/C97/C96 /C95 /C96 /C99 /Ca8/C96 /Ca4/C99 /C81/C83 /C83/C96 /Ca4/C95/Ca3 /C95/Ca4/C94/C82/C85/C99/C6b /Ca3 /C88/C85 /C99/C85 /C94/C81/Ca8 /C82/C85 /C81 /C84/C85/C93/C81/Ca8 /C89/C95 /C97 /C99 /C96/C83 /C85/Ca2 /Ca2/C89 /C95/C87/C4b /C35 /Ce6/C85 /C94/C81/Ca8 /C95/C96 /Ca3 /C89 /C95/C83 /C93 /Ca4/C84/C85 /C84/C89/Ca2/C97/Ca4/Ca3/C85/C84 /C81/C94/C96/Ca4/C95/Ca3/Ca2 /C89 /C95/Ca8 /C96 /Ca4 /C99/Cd4 /C89 /C95/C89/C94/Ca4/C94 /Cd7/C81/Ca8/C94/C85 /C95/Ca3 /C84/Ca4/C85 /C81/C86/Ca3 /C85/C99 /Ca8/C96 /Ca4 /C95/C96/Ca3/C89 /C86/Ca8 /Ca4/Ca2 /C96/C86 /C84/C89 /Ca2/C97 /Ca4 /Ca3 /C85/C84 /C89 /Ca3 /C85/C94 /Ca2 /C4b /C35 /Cd7/C93 /C85 /C81/Ca2/C85 /C95/C96 /Ca3 /C85 /Ca8/C96 /Ca4/C99 /C86/Ca4/C93/C93 /C81/C83/C83 /C96/Ca4/C95/Ca3 /C95/Ca4/C94/C82/C85 /C99 /C96 /C95 /Ca3/C88/C85 /C86/C99/C96/C95/Ca3 /C96 /C86 /Ca8/C96 /Ca4/C99 /C97/C81/Ca8/C94/C85 /C95/Ca3 /C4b /C35 /Cd7/C81/Ca8/C94/C85/C95/Ca3/Ca2/C6b /C81/C84/C91/Ca4/Ca2/Ca3/C94/C85/C95/Ca3/Ca2/C6b /C81/C95/C84 /C83 /C88/C81/C99/C87 /C85 /Ca2 /C99/C85/C83 /C85/C89/Ca5/C85/C84 /C81/C86/Ca3 /C85 /C99 /Ca3/C88/C85 /C85/C95/C84 /C84/C81/Ca3 /C85/C96 /C86 /Ca3 /C88 /C85 /C81/C83 /Ca3 /C89/Ca5/C89 /Ca3/Ca8 /C97/C85 /C99/C89 /C96/C84 /C89 /C95 /C84 /C89 /C83/C81 /Ca3 /C85 /C84 /C96 /C95 /Ca3/C88/C85 /C86/C99/C96/C95/Ca3 /C96 /C86 /Ca3/C88/C85 /Ca2/Ca3/C81/Ca3 /C85 /C94/C85/C95/Ca3 /C84/C89/C99/C85/C83 /Ca3 /C93/Ca8 /Ca4/C95/C84/C85 /C99 /Ca8/C96 /Ca4/C99 /Cc1/C83 /C83/C96 /Ca4/C95/Ca3 /C95/Ca4/C94/C82/C85/C99 /Ca6 /C89/C93 /C93/C81 /C97 /C97 /C85 /C81 /C99/C96 /C95/Ca8 /C96 /Ca4 /C99/C95 /C85 /Ca7 /Ca3/Ca2 /Ca3 /C81/Ca3/C85/C94/C85 /C95/Ca3 /C4b /C35 /Cc1/C86 /C85 /C85/Ca6 /C89 /C93 /C93/C82 /C85/C81 /Ca2 /Ca2 /C85/Ca2 /Ca2/C85 /C84 /C81 /C87/C81/C89/C95/Ca2 /Ca3/C99 /C85 /Ca3 /Ca4 /C99/C95 /C85/C84 /C97 /C81/Ca8 /C94/C85 /C95/Ca3/Ca2 /C4b /Cc6/C96 /C99 /C97/C81/Ca8/C94 /C85/C95 /Ca3 /C81/C95/C84 /C82 /C81 /C93/C81/C95/C83/C85 /C89/C95 /C98/Ca4 /C89/C99 /C89/C85 /Ca2/C7a /Cc3/C81 /C93 /C93 /Ca3/C88/C85 /C33/Ce3/C96/C93/C93 /Cc6/C99/C85 /C85/C34 /C95/Ca4/C94/C82/C85/C99 /C96/C95 /Ca3 /C88/C85 /C86/C99/C96 /C95/Ca3 /C96/C86 /Ca3 /C88/C89/Ca2 /Ca2/Ca3 /C81/Ca3/C85/C94/C85 /C95/Ca3 /Ca4/C95/C84/C85/C99 /C33/Cc3/C81/C93/C93 /Ce4 /Ca2/C34 /C4b /Cd4/C81 /Ca2 /Ca3 /C85/C99 /C83/C81/C99 /C84/C89 /Ca2 /C81 /C99/C85/C87/C89/Ca2/Ca3/C85 /C99 /C85/C84 /Ca3/C99 /C81/C84/C85 /C94/C81/C99 /C92 /C6b /C81/C95/C84 /Ca3/C88/C85 /C83/C89 /C99/C83 /C93/C85/Ca2 /C84/C85/Ca2/C89/C87/C95 /C89/Ca2 /C81 /Ca3/C99/C81/C84/C85/C94/C81/C99/C92 /C96/C86 /Cd4/C81/Ca2/Ca3 /C85/C99/C83 /C81/C99/C84 /Cc9 /C95/Ca3/C85 /C99 /C95/C81/Ca3 /C89 /C96/C95/C81/C93 /Cc9 /C95/C83 /C96/C99/C97/C96/C99 /C81/Ca3 /C85/C84/C4b /Cc2/Cc9 /Cd3/Cd3 /Cc9 /Cd5 /Cc7/Cd9 /Cc9 /Cc7 /Cc8/Ce3 /Ce2 /Ce2 /Ce4 /Cd4 /Cd4/Cc1 /Cd9/Ce8 /Ce6 /Cc8/Cc1/Ce3 /Ce3/Cd6 /Cc4 /Cd6 /Cc9 /Cc6 /Ce8/Cd6/Ce4 /Ce3 /Cc8/Cc9/Cd5/Cd2 /Ce8/Cd6/Ce4 /Cc6 /Cc9 /Cd5/Cc4 /Cc1 /Cd4 /Cc9 /Ce2/Ce3/Cc1/Cd2/Cc5 /Cd6/Cd5 /Ce8/Cd6/Ce4/Cd9 /Ce2 /Ce3/Cc1 /Ce3/Cc5 /Cd4 /Cc5 /Cd5 /Ce3 /Cc9/C86 /Ca8 /C96/Ca4 /Ca3 /C88/C89/C95/C92 /Ca3/C88/C85/C99/C85 /C89/Ca2 /C81/C95 /C85/C99/C99/C96 /C99 /C96 /C95 /Ca8/C96/Ca4/C99 /Ca2/Ca3/C81/Ca3 /C85 /C94/C85/C95/Ca3 /Ca8/C96/Ca4 /C94/Ca4/Ca2/Ca3 /C95/C96 /Ca3 /C89/C86/Ca8 /Ca4/Ca2 /C89 /C95/Ca6 /C99/C89/Ca3 /C89/C95/C87 /C4b/Ce6 /C99 /C89 /Ca3 /C85 /Ca3/C96 /Ca4/Ca2 /C81/Ca3 /C7a /Cc2/Cd4/Cd6 /Cc2/Cc1/Cd5 /Cd2/Cd5 /C4b/Cc1 /C4b /Cc1/Ce3/Ce3/Cd5/C7a /Cc4/Cc9 /Ce2/Cd7/Ce4/Ce3/Cc5 /Cd9/Cc5/Ce2 /Cd6/Cd3/Ce4 /Ce3/Cc9 /Cd6/Cd5 /Cc4/Cc5/Cd7/Ce3 /Cd7/C4b /Cd6/C4b /Cc2/C96/Ca7 /Cf6/Cf2 /Cf2/Cf5 /Cc3/C81/C99/C96 /C93 /Ce2/Ca3/C99/C85/C81/C94/C6b /Cc9/Cd3 /Cf6 /Cf0/Cf1 /Cf9/Cf7 /C60/Cf6/Cf2 /Cf2/Cf5 /Cc9 /C95 /Ca8/C96 /Ca4/C99 /C93/C85/Ca3/Ca3 /C85/C99 /C6b /C87 /C89 /Ca5/C85 /Ca4/Ca2 /Ca3/C88/C85 /C86/C96/C93/C93 /C96/Ca6 /C89/C95/C87 /C89 /C95/C86/C96 /C99/C94/C81/Ca3 /C89/C96/C95/C7a /C35 /Ce8/C96/Ca4/C99 /C95/C81/C94/C85 /C81/C95/C84 /C81/C83 /C83/C96 /Ca4/C95/Ca3 /C95/Ca4/C94/C82/C85/C99/C4b /C35 /Ce3/C88/C85 /C94/C85/C99/C83 /C88/C81/C95/Ca3 /C95/C81/C94/C85/C6b /C84/C81/Ca3 /C85 /C81/C95/C84 /C84/C96/C93/C93 /C81/C99 /C81/C94/C96/Ca4/C95/Ca3 /C96 /C86 /Ca3/C88/C85 /Ca2/Ca4/Ca2 /C97/C85/C83 /Ca3 /C85 /C84 /C85 /C99/C99/C96/C99/C4b /C35 /Cc4/C85/Ca2 /C83/C99/C89/C82/C85 /Ca3 /C88/C85 /C85 /C99/C99/C96/C99 /C81/C95/C84 /C85 /Ca7 /C97/C93/C81/C89 /C95/C6b /C89 /C86 /Ca8/C96/Ca4 /C83/C81/C95/C6b /Ca6 /C88/Ca8 /Ca8/C96/Ca4 /C82/C85/C93/C89 /C85/Ca5 /C85 /Ca3 /C88/C85 /C99/C85 /C89 /Ca2 /C81/C95 /C85/C99/C99/C96 /C99/C4b /Cc9/C86 /Ca8/C96/Ca4 /C95/C85/C85 /C84 /C94/C96 /C99/C85 /C89 /C95/C86/C96 /C99/C94/C81/Ca3 /C89/C96/C95/C6b /C84/C85/Ca2 /C83/C99/C89/C82/C85 /Ca3 /C88/C85 /C89/Ca3 /C85 /C94 /Ca8/C96 /Ca4 /C81/C99/C85 /Ca4/C95/Ca2 /Ca4/C99/C85 /C81/C82/C96/Ca4/Ca3/C4b /Cd9/C85 /Ca2/C96 /C93/Ca5/C89/C95 /C87/Cc4 /C89 /Ca2 /C97 /Ca4/Ca3/C85 /Ca2/C7a /Cc9 /C86/Ca8 /C96 /Ca4/C86 /C89 /C95 /C84/Ca3 /C88 /C81 /Ca3/C81 /C95/C89 /Ca3 /C85/C94 /C89 /Ca2 /C94 /C89 /Ca2/Ca3 /C81/C92/C85 /C95/C93 /Ca8 /C97/C96/Ca2 /Ca3 /C85 /C84 /Ca3/C96 /Ca8/C96/Ca4/C99 /Ca2/Ca3/C81/Ca3 /C85/C94 /C85 /C95 /Ca3 /C6b /Ca8/C96 /Ca4 /C81/C99/C85 /C99/C85 /Ca2/C97/C96 /C95/Ca2/C89/C82/C93 /C85 /C86 /C96/C99 /C83/C96 /C95 /Ca3 /C81 /C83 /Ca3 /C89 /C95/C87 /Ca3/C88/C85 /C94/C85/C99/C83 /C88/C81/C95/Ca3 /Ca3 /C96 /C83 /C96/C99/C99/C85 /C83/Ca3 /Ca3/C88/C85 /C83/C88/C81/C99/C87/C85/C4b /Ce2/Ca3/C85/C97/Ca2 /Ca3/C96 /Ce3/C81/C92/C85 /C7a /Cf1/C5d /Cc9 /C84/C85/C95/Ca3/C89 /C86/Ca8 /Ca3 /C88/C85 /C89/Ca3 /C85/C94 /C6b /C84 /C96/C93 /C93/C81/C99 /C81/C94/C96 /Ca4/C95/Ca3 /C6b /C81/C95/C84 /C84/C81/Ca3/C85 /C96/C86 /C83/C88/C81/C99/C87/C85 /Ca3 /C96 /C97/C99/C96 /Ca5/C89 /C84/C85 /Ca3/C96 /Ca3 /C88/C85 /C94/C85 /C99/C83/C88/C81/C95/Ca3/C4b /Cf2/C5d /Cc9 /C86 /Ca3/C88/C85 /C94/C85/C99/C83 /C88/C81/C95/Ca3 /C83/C81/C95/C95/C96 /Ca3 /C99/C85/Ca2 /C96/C93/Ca5/C85 /Ca3 /C88/C85 /C89/Ca2/Ca2 /Ca4/C85 /Ca3 /C96/Ca8 /C96 /Ca4 /C99 /Ca2 /C81 /Ca3 /C89/Ca2/C86/C81/C83 /Ca3 /C89/C96/C95/C6b /C84/C96/C83 /Ca4/C94/C85/C95/Ca3 /Ca8/C96 /Ca4/C99 /C84/C89/Ca2/C97/Ca4/Ca3/C85 /C89 /C95/Ca6 /C99/C89/Ca3 /C89/C95/C87 /Ca3 /C96 /Ca4/Ca2 /C89/C95/C83/C93/Ca4/C84/C89 /C95/C87 /Ca3/C88/C85 /C94/C85/C99/C83 /C88/C81/C95/Ca3 /C95/C81/C94/C85/C6b /C84/C81/Ca3 /C85 /C6b /C81/C95/C84 /C84/C96/C93/C93 /C81/C99 /C81/C94/C96/Ca4/C95/Ca3 /C81/C93/C96/C95/C87 /Ca6/C89 /Ca3/C88 /C84/C85 /Ca2/C83 /C99/C89 /C97/Ca3/C89 /C96 /C95 /C96 /C86 /Ca3/C88/C85 /C85/C99/C99/C96 /C99/C4b /Ce6/C85 /C94/C81/Ca8 /C89 /Ca2/Ca2 /Ca4 /C85 /C81 /Ca3 /C85 /C94/C97/C96/C99/C81/C99/Ca8 /C83/C99/C85 /C84/C89 /Ca3/C86 /C96 /C99/Ca3 /C88 /C85 /C81/C94/C96 /Ca4/C95/Ca3 /C96/C99 /C97/C99/C96/Ca5/C89/C84/C85 /C81 /C99/C85 /C81/Ca2/C96 /C95 /Ca6/C88/Ca8 /Ca3/C88/C85 /C83/C88/C81/C99/C87/C85 /C89 /Ca2/Ca5 /C81 /C93 /C89 /C84/C4b /Ce8/C96/Ca4 /C94/Ca4/Ca2/Ca3 /C83 /C96/C95/Ca3/C81/C83/Ca3 /Ca4/Ca2 /Ca6/C89 /Ca3/C88/C89 /C95/Cf3 /C82/Ca4/Ca2 /C89 /C95/C85 /Ca2/Ca2 /C84/C81/Ca8/Ca2 /C82/C85 /C86/C96/C99/C85 /C81/C95 /C81/Ca4/Ca3 /C96/C94 /C81 /Ca3 /C85 /C84 /C97/C81/Ca8/C94/C85 /C95/Ca3 /C89 /Ca2 /Ca2 /C83/C88/C85 /C84/Ca4/C93 /C85 /C84 /C89/C86 /Ca8/C96 /Ca4 /Ca6/C81/C95/Ca3 /Ca3 /C96/Ca2 /Ca3 /C96/C97 /C97/C81/Ca8/C94/C85 /C95/Ca3 /C96/C95 /Ca3 /C88/C85 /C81/C94/C96 /Ca4/C95/Ca3 /Ca8/C96/Ca4 /Ca3 /C88/C89/C95/C92 /C89/Ca2 /Ca6 /C99/C96 /C95/C87 /C4b /Cc4/C89/Ca2/C97/Ca4/Ca3/C85/Ca2 /C95/C85 /C85/C84 /Ca3 /C96 /C82/C85 /C99/C85 /C97/C96/C99/Ca3/C85/C84 /C89 /C95/Ca6 /C99/C89/Ca3 /C89/C95/C87 /C95/C96 /C93 /C81/Ca3/C85/C99 /Ca3 /C88/C81/C95 /Cf6 /Cf0 /C84/C81/Ca8/Ca2 /C81/C86/Ca3/C85/C99 /Ca3 /C88/C85 /C85 /C99/C99/C96/C99 /C81/C97/C97/C85 /C81/C99/C85/C84 /C96/C95 /Ca8/C96/Ca4/C99 /Ce2/Ca3/C81/Ca3 /C85 /C94/C85/C95/Ca3/C4b /Cc4/C89/Ca2/C83 /C99/C85/C97/C81/C95/C83 /C89 /C85 /Ca2 /Ca2/C88/C96 /Ca4/C93 /C84/C82 /C85/C99 /C85 /C97 /C96 /C99 /Ca3 /C85 /C84 /C81/Ca2 /Ca2 /C96/C96 /C95 /C81/Ca2 /Ca8/C96 /Ca4 /Ca2/Ca4 /Ca2 /C97 /C85/C83 /Ca3 /Ca3 /C88 /C81 /Ca3 /Ca3 /C88 /C85 /Ca8/C83 /C81 /C95 /C95 /C96 /Ca3/C82 /C85 /C99 /C85 /Ca2 /C96 /C93 /Ca5/C85 /C84 /C89/C94/C94/C85/C84/C89/C81/Ca3 /C85/C93 /Ca8/Ca6 /C89/Ca3 /C88/Ca3 /C88/C85 /C94/C85 /C99/C83/C88/C81/C95/Ca3/C4b /Cc3 /C99/C85/C84 /C89/Ca3 /Cd9/C85/C97 /C96/C99/Ca3/C89/C95/C87 /Cd5/C96/Ca3/C89/C83/C85 /Ca2/Ca3 /C96/Cd5 /C81 /Ca3 /Ca4 /C99/C81 /C93 /Cd7/C85/C99/Ca2/C96 /C95 /Cc1/C83/C83/C96 /Ca4/C95 /Ca3 /Cc8/C96/C93/C84 /C85/C99 /Cc3/C99 /C85 /C84 /C89/Ca3 /Cd9/C85/C97 /C96/C99/Ca3/C89/C95/C87 /C60 /Ce6/C85 /C94/C81/Ca8 /C99/C85 /C97/C96/C99/Ca3 /C89/C95/C86/C96/C99/C94/C81/Ca3/C89 /C96 /C95 /C81/C82/C96 /Ca4/Ca3 /Ca8/C96/Ca4/C99 /C81/C83/C83 /C96/Ca4/C95/Ca3 /Ca3/C96 /C83/C99/C85 /C84/C89 /Ca3 /C82/Ca4/C99/C85 /C81/Ca4/Ca2/C4b /Cd3/C81/Ca3 /C85 /C97/C81/Ca8/C94/C85 /C95/Ca3 /Ca2 /C6b /C94/C89/Ca2/Ca2 /C85/C84 /C97/C81/Ca8/C94/C85/C95/Ca3/Ca2 /C81/C95/C84 /C96 /Ca3 /C88/C85 /C99 /C84/C85 /C86/C81/Ca4/C93 /Ca3/Ca2 /C94/C81/Ca8 /C82/C85 /C99/C85 /C86/C93 /C85 /C83/Ca3/C85/C84 /C96/C95 /Ca8/C96 /Ca4/C99 /C83 /C99/C85/C84/C89/Ca3 /C99/C85/C97/C96 /C99/Ca3 /C4b /Cc9/C95 /C81 /C83/C83/Ca4 /C99 /C81/Ca3/C85 /Cc9/C95 /C86/C96/C99/C94/C81/Ca3/C89/C96/C95 /C60/Cc9 /C86/Ca8 /C96 /Ca4/C82 /C85 /C93 /C89/C85/Ca5/C85 /Ca3/C88/C81/Ca3 /Ca6 /C85 /C88/C81/Ca5/C85 /C89/C95/C81/C83/C83 /Ca4/C99/C81/Ca3 /C85 /C89/C95/C86/C96/C99/C94/C81/Ca3/C89 /C96/C95 /C81 /C82 /C96/Ca4 /Ca3 /Ca8/C96 /Ca4 /C96 /C99 /C94/C81/Ca8 /C88/C81/Ca5/C85 /C99/C85/C97/C96 /C99/Ca3 /C85 /C84 /C89/C95/C81/C83/C83 /Ca4/C99/C81/Ca3 /C85 /C89/C95/C86/C96/C99/C94/C81/Ca3/C89 /C96/C95 /C81 /C82 /C96/Ca4 /Ca3 /Ca8 /C96 /Ca4 /Ca3 /C96/C81/C83 /C99 /C85 /C84 /C89 /Ca3 /C99/C85 /C97/C96/C99/Ca3/C89 /C95/C87 /C81/C87/C85/C95/C83 /Ca8/C6b /C97/C93/C85/C81/Ca2 /C85 /C83/C96 /C95/Ca3 /C81 /C83 /Ca3/Ca4 /Ca2 /C81 /Ca3/Cc2 /Cd4 /Cd6/Cc2 /C81 /C95 /C92 /Cd5 /C4b /Cc1/C4b/C6b /Cd7/C4b/Cd6/C4b /Cc2/C96 /Ca7 /Cf6 /Cf1/Cf0 /Cf1/C6b /Cc3 /C81/C99/C96/C93 /Ce2 /Ca3 /C99/C85 /C81/C94/C6b /Cc9 /Cd3 /Cf6/Cf0 /Cf1/Cf9 /Cf7/C60/Cf6 /Cf1/Cf0 /Cf1/C4b /Cc9/C95 /C84/C96/C89/C95/C87 /Ca2/C96 /C6b /C97/C93/C85/C81/Ca2 /C85 /C89 /C84/C85 /C95/Ca3 /C89/C86/Ca8 /Ca3/C88/C85 /C89 /C95/C81/C83 /C83/Ca4/C99/C81/Ca3/C85 /C89 /C95/C86/C96 /C99/C94/C81/Ca3 /C89/C96/C95 /C81/C95/C84 /Ca3/C85/C93/C93 /Ca4/Ca2 /Ca6 /C88/Ca8 /Ca8/C96 /Ca4 /C82/C85 /C93 /C89/C85/Ca5/C85 /C89/Ca3 /C89 /Ca2 /C89/C95/C83/C96 /C99/C99/C85/C83 /Ca3 /C4b /Cc9 /C86 /Ca8/C96 /Ca4 /C88/C81/Ca5/C85 /C81 /C83/C96 /C97/Ca8 /C96 /C86 /Ca3/C88/C85 /C99/C85/C97/C96 /C99/Ca3 /Ca3 /C88/C81/Ca3 /C89/C95/C83/C93/Ca4/C84/C85/Ca2 /Ca3/C88/C85 /C89/C95/C81/C83/C83 /Ca4/C99/C81/Ca3 /C85 /C89/C95/C86/C96/C99/C94/C81/Ca3/C89 /C96 /C95/C6b /C97/C93/C85/C81/Ca2 /C85 /Ca2/C85 /C95/C84 /C81 /C83/C96 /C97/Ca8 /C96 /C86 /Ca3/C88/C81/Ca3 /C99/C85/C97/C96 /C99/Ca3 /Ca3 /C96 /Ca4/Ca2 /C81/Ca2 /Ca6/C85/C93/C93 /C4b /Cc6/C96 /C99 /C83/C88/C81/C95/C87/C85 /C96 /C86/C81 /C84 /C84 /C99/C85 /Ca2/Ca2 /C99/C85/C98 /Ca4/C85 /Ca2/Ca3/Ca2 /C7a /Cc3/C81/C93/C93 /Ca3 /C88/C85 /Cc3 /Ca4/Ca2/Ca3/C96/C94/C85 /C99 /Ce2 /C85/C99/Ca5/C89/C83/C85 /C95/Ca4/C94/C82/C85 /C99 /C96 /C95 /Ca3/C88/C85 /C86/C99/C96/C95/Ca3 /C96 /C86 /Ca3/C88/C89 /Ca2/Ca2 /Ca3 /C81/Ca3/C85/C94/C85 /C95/Ca3 /C4b /Cd3/C96 /Ca2/Ca3 /C96/C99 /Ce2 /Ca3/C96/C93/C85 /C95/Cc3 /C81 /C99 /C84 /C7a /Cd7/C93 /C85/C81 /Ca2 /C85 /C95 /C96/Ca3 /C89/C86/Ca8 /Ca4/Ca2 /C89/C94/C94/C85/C84/C89/C81/Ca3 /C85/C93 /Ca8/C4d /C84 /C81 /Ca8 /C96 /C99 /C95 /C89 /C87 /C88/Ca3/C5d /C82/Ca8 /Ca3 /C85/C93 /C85 /C97/C88/C96/C95/C85 /C81/Ca3 /Ca3/C88/C85 /C33/Cd3/C96 /Ca2/Ca3 /C96 /C99 /Ce2 /Ca3 /C96/C93 /C85 /C95/C34 /C95/Ca4/C94/C82/C85 /C99 /C96 /C95 /Ca3/C88/C85 /C86/C99/C96/C95/Ca3 /C96 /C86 /Ca3/C88/C89 /Ca2/Ca2 /Ca3 /C81/Ca3/C85/C94/C85 /C95/Ca3 /Ca4/C95/C84/C85/C99 /C33/Cc3/C81/C93/C93 /Ce4 /Ca2/C34 /C96/C99 /C89 /C86 /Ca8 /C96/Ca4 /C81 /C99 /C85 /C96/Ca4 /Ca3 /Ca2/C89 /C84/C85 /Ca3/C88/C85 /Ce4 /Ce2/C6b /C83/C81 /C93 /C93/Ca4 /Ca2 /C83 /C96 /C93 /C93 /C85 /C83/Ca3 /C81/Ca3 /Ca3/C88/C85 /Cc9/C95/Ca3/C85/C99/C95/C81/Ca3/C89 /C96 /C95/C81/C93 /Ce3/C85/C93/C85/C97/C88/C96 /C95/C85 /C95/Ca4/C94/C82/C85/C99/C4b /Cc1/C86/Ca3 /C85 /C99 /Ca8/C96 /Ca4 /C95/C96 /Ca3 /C89 /C86 /Ca8/Ca4 /Ca2 /C6b/Ca8 /C96 /Ca4/Ca6 /C89 /C93/C93 /C95/C96/Ca3 /C82/C85 /C93/C89 /C81/C82/C93/C85 /C86/C96/C99 /C81/C95/Ca8 /Ca4/C95/C81/Ca4/Ca3/C88/C96/C99/C89/Ca9/C85 /C84 /Ca4/Ca2 /C85 /C96/C86 /Ca8/C96/Ca4/C99 /C83/C81/C99/C84/C4b Page 7 of 81 Page 8 of 81 Page 9 of 81 Page 10 of 81 Page 6 of 6 Page 11 of 81 Reprint Check Register - Quick Report - Regular 111:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:11/01/2025 12/02/2025 Page: 835.6556014 5 CORNERS DODGE, INC ISUZU MIRROR REPAIR / 10/29/25 11/07/2025 3,699.0056015 A-1 POOLS INFRARED SAUNA / JPD 11/07/2025 234.0056016 ALBIERO PLUMBING INC TOILET REPAIR / 10-27-25 / JPD 11/07/2025 595.4256017 AMAZON CAPITAL SERVICES PRINTER TONER / ENG 11/07/2025 305.0056018 AURORA MEDICAL GROUP DRUG/ALOCHOL TEST (2) / DPW 11/07/2025 1,249.8656019 BOUND TREE MEDICAL, LLC MEDICAL SUPPLIES PER INVOICE / JFD 11/07/2025 200.0056020 CASH PETTY CASH / REC DEPT 11/07/2025 14,343.9556021 CEDAR CORPORATION RIDGEWAY/CHESTNUT CT RECON THRU 10-18-25 11/07/2025 5,370.6056022 CHEMTRADE CHEMICALS US LLC ALUM SULFATE LIQ STD BULK / WWTP 11/07/2025 255.0056023 CIVI TEK CONSULTING LLC WBSD APPLICATION REVIEW 11/07/2025 161.5056024 CIVI TEK CONSULTING LLC FLOODPLAIN ORDINANCE 11/07/2025 4,000.0056025 CIVI TEK CONSULTING LLC ZONING CODE UPDATE THRU 10-30-25 11/07/2025 458.8156026 COMPANION LIFE INSURANCE COMPANY MONTHLY DENTAL INS PREMIUMS / NOV 2025 11/07/2025 161.4056027 CONLEY MEDIA, LLC - CLASSIFIED 2026 BUDGET PUBLISH / ADMIN 11/07/2025 20.0056028 COOK, RICHARD A PICKLEBALL INSTRUCTOR / 09-22-2025 / REC 11/07/2025 185.0056029 DEITSCH, JEFF L. HEALTH & LIFE INS PREMIUMS / NOV 2025 11/07/2025 11,096.5056030 DEMPSEY LAW FIRM, LLP SEPT & OCTOBER 2025 SERVICES 11/07/2025 358.7056031 DIGGERS HOTLINE, INC FAX FEES / OCT 2025 / WATER 11/07/2025 1,395.4356032 ENDURACLEAN, INC. CLEANING PRODUCTS / PARKS, WWTP 11/07/2025 Page 12 of 81 Reprint Check Register - Quick Report - Regular 211:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:11/01/2025 12/02/2025 Page: 1,040.8856033 FISHER, RENEE HEALTH INSUR PREMIUM / NOV 2025 / REC 11/07/2025 852.6256034 FRISTED, TODD A HEALTH/MEDICAL REIMBURSEMENT / NOV 2025 11/07/2025 170.7156035 GRAINGER SOLENOID VALVE COIL / WWTP 11/07/2025 75.0056036 HANSEN, CHRISTIE DANCE & BATONS CLASS REFUND / REC 11/07/2025 3,098.1856037 HAWKINS, INC AQUA HAWK/POLYMER / WWTP 11/07/2025 99.8056038 HEIN ELECTRIC SUPPLY CO HIGH PRESSURE SODIUM LAMP (2) / WWTP 11/07/2025 85.2156039 HILLIARD, LORI A CREDIT CARD REFUND / PAYMENT ERROR 11/07/2025 28.5656040 IMPACT ACQUISITIONS LLC COLOR COPIES / 7/29/25-10/28/25 / ADMIN 11/07/2025 55.8956041 JACKSON AUTO SERVICE INC 2023 FORD EXPLORER BATTERY / JPD 11/07/2025 645.7056042 JACKSON PROFESSIONAL POLICE ASSOCIATION POLICE UNION DUES / 11-03-25 11/07/2025 32,131.0056043 JACKSON TRUCK BODY, INC 2025 CHEVY 1-TON FENDERS / STREETS 11/07/2025 205.0056044 JOHNSON'S NURSERY INC. MAPLE TREE / PARKS 11/07/2025 830.2856045 KOBER, BRIAN W. HEALTH/MED/DENTAL/VISION - ENG 11/07/2025 400.0056046 KOWALESKI, STEFANIE STRIKE CLASSES / 03/17-05/12/25 / REC 11/07/2025 341.0056047 KREUTZINGER, JEFF HEALTH PREMIUMS 11/07/2025 1,581.8056048 L-R METER TESTING & REPAIR INC METER TESTING (5 METERS) 9-26-25 / WATER 11/07/2025 113.8556049 LANGE ENTERPRISES, INC. ROAD NAME SIGNS (2) / STREETS 11/07/2025 273.0856050 MENARDS - WEST BEND MISC SUPPLIES / DPW 11/07/2025 805.0056051 MIDWEST FIBER NETWORKS MONTHLY INTERNET / ADMIN / NOV 2025 11/07/2025 Page 13 of 81 Reprint Check Register - Quick Report - Regular 311:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:11/01/2025 12/02/2025 Page: 35.0056052 NELLIGAN, MEGAN FLAG FOOTBALL REFUND / REC 11/07/2025 330.0056053 NORTHLAND RECREATION, LLC POURED RUBBER REPAIR KIT / PARKS 11/07/2025 233.9956054 O'REILLY AUTOMOTIVE, INC TRUCK BATTERY / WATER 11/07/2025 10,357.0056055 POBLOCKI PAVING CORPORATION GLEN BROOKE PATH FINAL / CAP PRJT 11/07/2025 250.0056056 PORT PUBLICATIONS, INC. FALL FESTIVAL OF FUN 2025 AD 11/07/2025 3,834.2156057 PROS 4 TECHNOLOGY, INC COMPUTER, MONITOR, WALL MOUNTS / JPD 11/07/2025 85.2556058 REGISTRATION FEE TRUST FEILING TRAILER LICENSE RENEWAL / STREET 11/07/2025 32.0056059 REICH, GREGORY REC CARTOON INSTRUCTION / OCT 2025 11/07/2025 746.8756060 SABEL MECHANICAL LLC PUMP OVERLOAD REPAIR 10-23-25 / WWTP 11/07/2025 1,127.5756061 SCHAEFER'S SERVICE CENTER, INC. 2015 SILVERADO BRAKE SVC 08-01-25 / JFD 11/07/2025 30.9556062 SHERWIN WILLIAMS CO., THE GALLON PAINT / REC 11/07/2025 350.2156063 SUPERIOR CHEMICAL LLC BREAK AWAY LUBRICANT, DEGREASER / WWTP 11/07/2025 339.1656064 SUPPORT PAYMENT CLEARINGHOUSE 000431284201 / N WELCH / 11/03/25 11/07/2025 1,150.0056065 TELEFLEX LLC MEDICAL SUPPLIES / NEEDLES / JFD 11/07/2025 60.0056066 TIP TOP TAP CLEANING BEER LINE MAINT 10-22-25 / REC 11/07/2025 21,323.0256067 TOWN & COUNTRY ENGINEERING, INC. FILTER & UV CONST THRU 10-18-25 / WWTP 11/07/2025 1,097.0056068 TRANSCENDENT TECHNOLOGIES ANNUAL SFTWR MAINT / TAX RCPTING/PET LIC 11/07/2025 275.0056069 TSR SOLUTIONS, INC. DIAL TONE & DISASTER RECOV/ NOV 25/ADMIN 11/07/2025 298.5756070 U.S. CELLULAR MONTHLY PHONE / 10/14 - 11/13/25 / JFD 11/07/2025 Page 14 of 81 Reprint Check Register - Quick Report - Regular 411:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:11/01/2025 12/02/2025 Page: 185.7456071 USA BLUE BOOK VINYL WINDSOCK ONLY (NO FRAME) / WWTP 11/07/2025 1,207.6056072 VALENTINO, KELLY HEALTH/DENTAL/VISION NOV 2025 11/07/2025 732.9456073 VULCAN INDUSTRIES, INC. SWIVEL JOINT 1/2" / WWTP 11/07/2025 370.0056074 WALTHER, JOHN M. HEALTH INSURANCE / JOHN / NOV 2025 11/07/2025 30.0056075 WASHINGTON COUNTY REGISTER OF DEEDS CSM RECORDING FEE/WBSD DOC #1623017 11/07/2025 120.0056076 WAUKESHA COUNTY TECHNICAL COLLEGE BOOKSTORE FEE / N BACH / JFD 11/07/2025 39,283.0356077 WE ENERGIES UTILITIES / OCT 2025 / ADMIN 11/07/2025 50.0056078 WI FBINAA FBI NA HOLIDAY LUNCHEON / JPD 11/07/2025 183.7056079 WIECHMANN ENTERPRISES REFUND / A APPEL / ACCT #000-7091-02 11/07/2025 183.8056080 ZARNOTH BRUSH WORKS, INC. DISPOSABLE GUTTER BROOM / STREETS 11/07/2025 135.8756081 AIRGAS USA, LLC OXYGEN RENTAL / OCT 2025 / JFD 11/14/2025 115.0156082 AMAZON CAPITAL SERVICES MISC DEPARMENT SUPPLIES 11/14/2025 600.0056083 ARBON EQUIPMENT CORPORTAION EQUIPMENT SERVICE 09-29-25 / WWTP 11/14/2025 104.8556084 AT&T MOBILITY ACCT #287298726432 / SQ 6 WI-FI / JPD 11/14/2025 23,685.0056085 BADGER STATE WASTE LLC BIOSOLIDS HAULNG 11-6-2025 / WWTP 11/14/2025 50.0056086 BADTKE-PYTEL, RENEE CARDIO LITE PROGRAM REFUND / REC 11/14/2025 239.9056087 BOUND TREE MEDICAL, LLC MEDICAL SUPPLIES PER INVOICE / JFD 11/14/2025 66.5556088 CAWLEY COMPANY, THE ACCOUNTABILITY TAGS / JFD 11/14/2025 70.6256089 CONLEY MEDIA, LLC - CLASSIFIED PHN/PLAN COMM WBSD OCT 2025 / ADMIN 11/14/2025 Page 15 of 81 Reprint Check Register - Quick Report - Regular 511:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:11/01/2025 12/02/2025 Page: 200.0056090 COOLEY, SETH REC FLAG FOOTBALL REF / FALL 2025 11/14/2025 134.1856091 CORE & MAIN LP 6" CHERNE TEST BALL / PARKS 11/14/2025 3,288.1656092 EAST SIDE MART MONTHLY FUEL / OCT 2025 / JFD 11/14/2025 2,414.7356093 ENVIROTECH EQUIPMENT TRUNKING BLASTER HOOD LEFT / STREETS 11/14/2025 818.2256094 ERGOMETRICS, INC FIRETEAM PROMOTE TESTS (QTY 10) / JFD 11/14/2025 1,116.0256095 EUROFINS S-F ANALYTICAL LABS, INC EFFLUENT-CHLORIDE / 10-22-25 / WWTP 11/14/2025 116.4056096 FERGUSON WATERWORKS #1476 BLUE MARK PAINT (24) / WATER 11/14/2025 244.1056097 FOX BROTHER'S PIGGLY WIGGLY ACCT # 1710 / OCTOBER 2025 11/14/2025 201.8356098 FREEDOM SUPPLY LLC MISC FIRESUDZ WASH CLEANERS / JFD 11/14/2025 305.4456099 GREATAMERICA FINANCIAL SVCS COPIER USAGE / JPD, ADMIN 11/14/2025 28,036.5956100 J.H. HASSINGER, INC. TERTIARY FLTERS & UV PRJ PYMT #18 / WWTP 11/14/2025 525.2356101 LAMM GARDENS LANDSCAPE MAINT / NOV 2025 / MUNI COMPLX 11/14/2025 52.7056102 LANGE ENTERPRISES, INC. NO PARKING SIGNS (2) / STREETS 11/14/2025 900.0056103 LIESENER SOILS INC. 5 YDS LAWN & GARDEN (2) / PARKS 11/14/2025 77.2056104 MASTER PRINTWEAR T-SHIRTS FOR BALLET / REC 11/14/2025 500.0056105 MOTOROLA SOLUTIONS SERVICE REPAIR 9-5-25 / JPD 11/14/2025 459.0056106 NICKALLS, ANTHONY YOGA INSTRCTR / 10/28-12/09/2025 / REC 11/14/2025 512.8556107 O'REILLY AUTOMOTIVE, INC MOTOROIL, AIR & CABIN FILTER / WATER 11/14/2025 229.5856108 ODP BUSINESS SOLUTIONS, LLC PRINTER TONER & DRUM / JFD 11/14/2025 Page 16 of 81 Reprint Check Register - Quick Report - Regular 611:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:11/01/2025 12/02/2025 Page: 2,998.1856109 PERFECT CIRCLE TIRE LLC TIRES (6) / JFD 11/14/2025 8,592.3856110 PROS 4 TECHNOLOGY, INC IT SUPPORT / NOV 2025 11/14/2025 3,380.7356111 SAFE STEP, LLC SIDEWALK EVALUATION & REPAIR / STREETS 11/14/2025 726.0056112 SCHLOEMER LAW FIRM OCTOBER 2025 / JPD 11/14/2025 1,527.0056113 SECURIAN FINANCIAL GROUP, INC. DEC 2025 Accident Insurance 11/14/2025 1,851.5656114 SYMBOLARTS LLC JPD TOKENS (300) / JPD 11/14/2025 330.5356115 U.S. CELLULAR NOV 2025 / PHONE/INTERNET / JPD 11/14/2025 618,120.1456116 VINTON CONSTRUCTION COMPANY 2025 HICKORY LN RECON PRJT PYMT #4 11/14/2025 5,429.1056117 VMC LLC JAC2501 / PHONE/WTR TOWER/ JUL-OCT 2025 11/14/2025 100.0056118 VRANA FRAME & BODY SHOP, INC. ALIGNMENT / STREETS 11/14/2025 56.0056119 WISCONSIN DEPT OF JUSTICE BACKGROUND CHECKS / OCTOBER 2025 11/14/2025 150.0056120 WRWA ANNUAL MEMBERSHIP 2026 / REC 11/14/2025 4,135.4856121 BMO HARRIS BANK N.A. OCTOBER CREDIT CARD BILL 11/21/2025 26.4356122 CINTAS CORP SIG AIR SVC / 09-09-25 / REC 11/21/2025 447.6156123 GREATAMERICA FINANCIAL SVCS STANDARD & USAGE 09/21 - 10/20/25 / REC 11/21/2025 1,400.0056124 GUYTON ENTERTAINMENT 2026 PERFORMANCE DEPOSIT / MONTE CARLO 11/21/2025 625.0056125 H2I GROUP INDOOR VOLLEYBALL NETS / REC 11/21/2025 80.0056126 HAWKINS, INC CHLORINE CYLINDER / WATER 11/21/2025 1,280.0056127 PERFORMANCE ROOFING SYSTEMS, INC BUILDING REPAIRS / REC & WWTP 11/21/2025 Page 17 of 81 Reprint Check Register - Quick Report - Regular 711:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:11/01/2025 12/02/2025 Page: 560.6356128 U.S. CELLULAR NOVEMBER CELL PHONE INVOICE 11/21/2025 1,560.0056129 WASHINGTON COUNTY SHERIFF'S OFFICE SQUAD CAR DAMAGE SETTLEMENT PAYMENT 11/21/2025 550.0056130 WTKM FALL FESTIVAL OCTOBER 10 2025 11/21/2025 360.0056131 4K'Z CONTRACTING LLC PERMIT REFUNDS / W204N17671-75 LAUREL PL 11/25/2025 94.7856132 AMAZON CAPITAL SERVICES MISC DEPARTMENT SUPPLIES 11/25/2025 494.4256133 AURORA MEDICAL CENTER GRAFTON LLC MISC PHARMACY SUP / NOV 2025 / JFD 11/25/2025 25.0056134 AURORA MEDICAL GROUP OWI TESTS (1) / JPD 11/25/2025 400.0056135 BOND TRUST SERVICES CORPORATION 99537-PA / 1.235 GO BONDS, SERIES 2019A 11/25/2025 1,926.4956136 BURKE TRUCK & EQUIPMENT CYLINDER TRUNION MOUNT / STREETS 11/25/2025 3,050.0056137 CATALIS LLC 2025 ASSESSOR CNTRACT INSTALL #11/ ADMIN 11/25/2025 508.5356138 COMPANION LIFE INSURANCE COMPANY MONTHLY DENTAL INS PREMIUMS / DEC 2025 11/25/2025 2,500.0056139 CORE & MAIN LP SENSUS PROGRAM SET UP / WATER 11/25/2025 1,361.6056140 DELTA DENTAL OF WISCONSIN DEC 2025 DELTAVISION 11/25/2025 2,786.3456141 EAST SIDE MART MONTHLY FUEL / OCT 2025 / VOJ 11/25/2025 8,750.0056142 EHLERS 2025 FINANCIAL PLAN / 10-20-25 / ADMIN 11/25/2025 97.5556143 ELAN FINANCIAL SERVICES CANDY & PAPER TOWELS / JFD 11/25/2025 44,456.1556144 GREMMER & ASSOCIATES, INC HICKORY LANE PROF SVCS 231116 / OCT 2025 11/25/2025 18,000.0056145 HILLCREST BUILDERS OAKS OF JACKSON PERMIT FEES 11/25/2025 57.9156146 JACKSON AUTO SERVICE INC 2023 FORD EXPLORER OIL / JPD 11/25/2025 Page 18 of 81 Reprint Check Register - Quick Report - Regular 811:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:11/01/2025 12/02/2025 Page: 1,264.3956147 LANNON STONE PRODUCTS WASHED MAN SAND / WWTP 11/25/2025 4,771.0456148 LEAGUE OF WISCONSIN MUNICIPALITIES 2026 ANNUAL MEMBERSHIP RENEWAL/ VB 11/25/2025 73.2556149 MENARDS - WEST BEND MISC EQUIPMENT / JFD 11/25/2025 7,183.4556150 MSA PROFESSIONAL SERVICES INC JACKSON DOG PARK / 7-7-25 TO 11-1-25 11/25/2025 885.0356151 SCHAEFER'S SERVICE CENTER, INC. 2015 SILVERADO TIRES / JFD 11/25/2025 169.8056152 SIRCHIE ACQUISITION COMPANY, LLC EVIDENCE SUPPLIES / JPD 11/25/2025 269.1256153 ST. LAWRENCE EQUIPMENT, INC. MISC EQUIPMENT / PARKS 11/25/2025 95.0756154 STERICYCLE, INC. SHRED SERVICE 10-27-2025 / ADMIN 11/25/2025 339.1656155 SUPPORT PAYMENT CLEARINGHOUSE 000431284201 / N WELCH / 11/17/25 11/25/2025 729.0656156 TENNIES ACE HARDWARE INC. ACCT 48714 OCT 2025 / JFD 11/25/2025 708.1756157 TOP PACK DEFENSE UNIFORM PIECES / NEW HIRE, SPEAKS / JPD 11/25/2025 3,150.6256158 WEST BEND SCHOOL DISTRICT OCT 2025 MOBILE HOME PARKING FEES 11/25/2025 11,150.5056159 WESTBURY BANK 3.025M INTEREST PAYMENT / 12-01-2025 11/25/2025 1,006,846.22Grand Total Page 19 of 81 Reprint Check Register - Quick Report - Regular 911:55 AM ACCT GENERAL VILLAGE CHECKING Accounting Checks Posted From: Thru Account:Thru: 11/30/2025 ______________________________________________________________________________________ Amount From Account:11/01/2025 12/02/2025 Page: 120,550.45Total Expenditure from Fund # 100 - GENERAL FUND 939.82Total Expenditure from Fund # 150 - HOTEL / MOTEL 238,842.00Total Expenditure from Fund # 200 - WATER UTILITY 325,631.55Total Expenditure from Fund # 300 - SEWER UTILITY 4,000.00Total Expenditure from Fund # 450 - ARPA FUND 8,280.93Total Expenditure from Fund # 500 - RECREATION 270,214.75Total Expenditure from Fund # 600 - CAPITAL PROJECT FUND 7,892.30Total Expenditure from Fund # 670 - TID #7 11,550.50Total Expenditure from Fund # 700 - DEBT SERVICE FUND 18,943.92Total Expenditure from Fund # 900 - FIRE & RESCUE 1,006,846.22Total Expenditure from all Funds Page 20 of 81 TREASURERS REPORT (Depository Accounts) November 30, 2025 BALANCE BALANCE 10/31/2025 11/30/2025 GENERAL: GENERAL CHECKING $604,744.41 $497,342.00 CREDIT CARD ACCOUNT $61,093.84 $159,721.23 HIPPA ACCOUNT $71,947.48 $102,402.98 MONEY MARKET $9,019,180.07 $9,033,573.69 DONATION ACCOUNT $1,649.73 $1,649.73 PARK FEES $235,368.72 $247,393.73 FIRE/RESCUE RESERVE $14,448.79 $14,496.58 FIRE IMPACT FEE $224,227.48 $234,186.40 POLICE IMPACT FEE $149,655.20 $156,301.06 ANTIQUE FIRE TRUCK $3,419.79 $3,431.10 PERSHING ADVISOR SOLUTIONS LLC - ARPA $49,332.17 $45,459.52 PERSHING ADVISOR SOLUTIONS LLC - GENERAL FUNDS $1,608,110.12 $1,617,708.50 PERSHING ADVISOR SOLUTIONS LLC - MUNI BLDG RESERVE ACCT$287,224.85 $287,721.98 PERSHING ADVISOR SOLUTIONS LLC - 2025A GO PROM NOTES $2,017,806.95 $1,404,018.75 PERSHING ADVISOR SOLLUTIONS LLC - 2024A GO PROM NOTES $110,497.86 $110,810.43 PERSHING ADVISOR SOLUTIONS LLC - DSR REVENUE BOND $532,121.80 $533,575.99 PERSHING ADIVSOR SOLUTIONS LLC - 2023B $37,451.90 $37,554.25 ---------------------- ---------------------- TOTAL GENERAL $15,028,281.16 $14,487,347.92 ---------------------- ---------------------- WATER UTILITY: WATER UTILITY DEPRECIATION FUND $26,713.77 $26,802.13 WATER UTILITY RESERVE $138,897.96 $139,357.38 WATER IMPACT FEES $101,460.37 $110,327.80 ---------------------- ---------------------- TOTAL WATER UTILITY $267,072.10 $276,487.31 ---------------------- ---------------------- SEWER UTILITY: DNR REPLACEMENT FUND $1,200,810.18 $1,204,781.97 SEWER UTILITY RESERVE $86,746.33 $87,033.25 SEWER DEPRECIATION FUND $6,717.59 $6,739.81 SEWER SERVICE FEES $2,027,455.30 $2,071,057.43 SEWER SPECIAL REDEMPTION FUND $2,920.68 $2,930.34 ---------------------- ---------------------- TOTAL SEWER UTILITY $3,324,650.08 $3,372,542.80 ---------------------- ---------------------- ---------------------- ---------------------- GRAND TOTAL: $18,620,003.34 $18,136,378.03 ---------------------- ---------------------- Page 21 of 81 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC: Board of Public Works; Budget and Finance; Village Board From: Jack Straehler, Director of Public Works Subject: Change Order #3 – 2025 Hickory Lane Reconstruction Project – Vinton Construction for an increase in the amount of $1,046.51 Meeting Date: November 25, 2025 - Board of Public Works Background and Analysis: This memo is to inform the Board of Change Order #3 associated with the 2025 Hickory Lane Reconstruction Project. This change order reflects necessary field modifications and unforeseen conditions encountered during construction. A breakdown of the net cost adjustments is summarized below: • Additional $615.75 for additional stream substrate material required for the 60” culvert per DNR permit specifications. • Additional $2,649.50 for modifications to offset the 12” water main that was found to be in conflict during construction. • Additional $1,250.00 for installation of a turbidity barrier during construction. • Reduction of $3,468.74 resulting from Vinton Construction’s request to utilize Village of Jackson equipment and labor. Funding for this Change Order will come from Account Numbers: 600-00-56700-400-000 (Capital Projects Repairs/Construction) 300-00-17600-000-380 (Sewer Construction Work) 200-00-18600-395-000 (Water Construction Work) JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board approve Change Order #3 for an increase in the amount of $1,046.51 to Vinton Construction. Page 22 of 81 Page 23 of 81 Page 24 of 81 Page 25 of 81 Page 26 of 81 Page 27 of 81 Page 28 of 81 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC: Board of Public Works; Budget and Finance; Village Board From: Jack Straehler, Director of Public Works Subject: Change Order #4 - Final - 2025 Ridgeway Drive and Chestnut Court Reconstruction Project – Advanced Construction for an increase in the amount of $19,142.61 Meeting Date: November 25, 2025 - Board of Public Works Background and Analysis: This memo is to inform the Board of Change Order #4 related to the Ridgeway Drive and Chestnut Court Reconstruction Project. This change order addresses necessary field modifications and revisions to material sizes and quantities encountered during construction. It provides the final reconciliation of all quantities associated with the project. Funding for this Change Order will come from Account Numbers: 600-00-56700-400-000 (Capital Projects Repairs/Construction) 300-00-17600-000-380 (Sewer Construction Work) 200-00-18600-395-000 (Water Construction Work) JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board approve Change Order #4 for an increase in the amount of $19,142.61 to Advanced Construction. Page 29 of 81 SECTION 00 63 63 CHANGE ORDER NO.: 4 Owner: Engineer: Engineer's Project No.: Contractor: Contractor's Project No.: Project: Contract Name: Date Issued: Description: 1 = TOTAL = Reason for Change Order: a) Attachments: a) Original Contract Price Original Contract Times: Substantial completion (date): $ Ready for Final Payment (date): [Increase] from previous approved [Increase] from previous approved Change Orders No. 1 to No. : Change Orders No. 1 to No. 3 Substantial Completion (days): $ Ready for Final Payment (days): Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion (date): $ Ready for Final Payment (date): [Increase] this Change Order: [Increase][Decrease] this Change Order: Substantial Completion (days): $ Ready for Final Payment (days): Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion (date): $ Ready for Final Payment (date): Recommended by Engineer (if required) Accepted by Contractor By: Title: Date: Authorized by Owner Approved by Funding Agency (if applicable) By: Title: Date: $19,142.61 Effective Date of Change Order: Advance Construction Cedar Corporation Ridgeway Dr and Chestnut Ct Reconstruction - REBID November 4, 2025 05789-0020 November 4, 2025 The Contract is modified as follows upon execution of this Change Order: FINAL Village of Jackson Ridgeway Dr and Chestnut Ct Reconstruction - REBID Owner's Project No. ADD Reconciliation of Installed Quantities $19,142.61 3 119,295.07 19,142.61 1,755,738.12 14 September 15, 2025 September 12, 2025 CHANGE IN CONTRACT TIMES:CHANGE IN CONTRACT PRICE: August 29, 2025 14 0 September 12, 2025 September 29, 2025 0 1,774,880.73 Senior Construction Manager Change Order Item No. 1: Final Reconciliation of Installed Quantities (Extimated (Bid) Vs Installed) 11/4/2025 September 29, 2025 1,636,443.05 1) Change Order Item No. 1: Engineer's Unit Price Quantity Summary dated 10/20/25. Project Manager 11/5/2025 Page 30 of 81 UNIT PRICE QUANTITY SUMMARY Village of Jackson Ridgeway Dr./Chestnut Ct. Reconst. REBID Advance Construction QUANTITIES VALUES Installed Estimated Installed Estimated VS Quantities VS Installed Values Installed 1 0 -1 -$ (2,000.00)$ 2 53.01 -2.99 29,155.50$ (1,644.50)$ 3 853.5 12.5 179,235.00$ 2,625.00$ 4 147.58 147.58 24,424.49$ 24,424.49$ 5 509.53 0.53 5,095.30$ 5.30$ 6 1 0 500.00$ -$ 7 341.5 -11.5 44,736.50$ (1,506.50)$ 8 493 -7 81,345.00$ (1,155.00)$ 9 1 0 2,562.00$ -$ 10 1 0 4,580.00$ -$ 11 264.66 235.66 52,932.00$ 47,132.00$ 12 218.99 -203.01 16,862.23$ (15,631.77)$ 13 3 0 25,560.00$ -$ 14 396 0 2,772.00$ -$ 15 490 0 6,370.00$ -$ 16 2 0 2,000.00$ -$ 17 1192.83 572.83 71,569.80$ 34,369.80$ 18 2400 0 52,800.00$ -$ 19 275.09 -50.91 962.82$ (178.19)$ 20 4003 0 2,401.80$ -$ 21 8656 1139 57,129.60$ 7,517.40$ 22 2 0 3,000.00$ -$ 23 1710 0 9,405.00$ -$ 24 1710 0 34,200.00$ -$ 25 704 0 422.40$ -$ 26 2790.25 -488.75 23,438.10$ (4,105.50)$ 27 567 0 2,835.00$ -$ 28 340 -3 2,856.00$ (25.20)$ 29 375.5 -21.5 1,858.73$ (106.43)$ 30 374 -23 12,342.00$ (759.00)$ 31 5 0 37.50$ -$ 32 151.6 -88.4 3,486.80$ (2,033.20)$ 33 266.95 -213.05 4,271.20$ (3,408.80)$ 34 1896.72 -59.28 30,347.52$ (948.48)$ 35 580.72 -52.28 52,409.98$ (4,718.27)$ 36 322.68 -18.32 30,977.28$ (1,758.72)$ 37 2 0 600.00$ -$ 38 1 0 80,000.00$ -$ 39 5 0 5,000.00$ -$ 40 1 0 13,000.00$ -$ 41 10 0 650.00$ -$ A1-1 71.83 -2.17 41,661.40$ (1,258.60)$ A1-2 465 -3 120,900.00$ (780.00)$ A1-3 0 0 -$ -$ A1-4 466 -20 76,890.00$ (3,300.00)$ A1-5 0 -1 -$ (7,035.00)$ A1-6 43.33 6.33 8,666.00$ 1,266.00$ A1-7 141.3 43.3 10,880.10$ 3,334.10$ A1-8 1 0 8,520.00$ -$ A1-9 1 0 1,000.00$ -$ A1-10 1 0 3,500.00$ -$ A1-11 16.75 -9.25 1,926.25$ (1,063.75)$ A1-12 361 -232 21,660.00$ (13,920.00)$ A1-13 3 1 1,500.00$ 500.00$ A1-14 960 10 21,120.00$ 220.00$ A1-15 223 12 825.10$ 44.40$ A1-16 2376 0 1,425.60$ -$ Storm Lateral Cleanout Common Excavation (Including Pavement Removal) Saw Cutting Roadway & Driveways Remove Concrete Sidewalk 1 1/4" Water Service & Curb Stop & Box (3 Units) Hydrant Assembly Salvage Hydrant and Valve Nyloplast Yard Inlet Manhole with Grate 12" Dia PVC Storm Sewer Pipe 4" Dia. Storm Lateral (5 Units) 48" Sanitary Manhole (4 Units) 8" PVC Sanitary Sewer Pipe 6" PVC Sanitary Sewer Lateral (7 Units) 12" PVC Water Main Pipe 8" Tapping Gate Valve 4" PVC Water Service & Valve & Box (2 Unit) 10/20/2025 7" Concrete Driveway Remove Asphalt Driveway Asphalt Driveway Gravel Driveway Excavation Below Subgrade (EBS) 4" Concrete Sidewalk Curb Ramp Type 1 Remove Curb & Gutter 30" Curb & Gutter Type "D" Remove Concrete Driveway Apron 7" Concrete Driveway Apron & Sidewalk Abandon 12" Water Main Salvage Hydrant and Valve 4" Dia. Storm Lateral (10 Units) Common Excavation (Including Pavement Removal) Client Project Contractor EBS Backfill 1 1/4" Dense 1 1/4" Dense Crushed Aggregate Base Course Lower Layer HMA Pavement 3-1/4" Upper Layer HMA Pavement 1-3/4" Relocate Sign Traffic Control Remove Trees Lawn Restoration Inlet Protection Remove Concrete Driveway ESTIMATED VS INSTALLED Bid Items Sanitary Manhole Chimney & Casting Replacement 48" Sanitary Manhole (4 Units) Project No. Date 05789-0020 Saw Cutting Roadway & Driveways Remove Concrete Sidewalk 8" Gate Valve 12" Gate Valve 4" PVC Water Service & Valve & Box (1 Unit) 1 1/4" Water Service & Curb Stop & Box (13 Units) Hydrant Assembly Abandon 6" Water Main 8" PVC Sanitary Sewer Pipe 6" PVC Sanitary Sewer Lateral (14 Units) Abandon 8" Sanitary Sewer Sanitary Lateral Cleanout 8" PVC Water Main Pipe 12" PVC Water Main Pipe Community Infrastructure • Architecture • Environmental Services Cedarburg • Green Bay • Madison • Menomonie 1 of 3 Page 31 of 81 UNIT PRICE QUANTITY SUMMARY Village of Jackson Ridgeway Dr./Chestnut Ct. Reconst. REBID Advance Construction QUANTITIES VALUES Installed Estimated Installed Estimated VS Quantities VS Installed Values Installed 10/20/2025 Client Project Contractor ESTIMATED VS INSTALLED Bid Items Sanitary Manhole Chimney & Casting Replacement Project No. Date 05789-0020 Community Infrastructure • Architecture • Environmental Services A1-17 2422 -1656 15,985.20$ (10,929.60)$ A1-18 1 0 1,500.00$ -$ A1-19 905 0 4,977.50$ -$ A1-20 924 19 18,480.00$ 380.00$ A1-21 348 0 208.80$ -$ A1-22 2547.97 1473.97 21,402.95$ 12,381.35$ A1-23 33 0 165.00$ -$ A1-24 12 0 100.80$ -$ A1-25 99 -3 490.05$ (14.85)$ A1-26 56 -130 1,848.00$ (4,290.00)$ A1-27 16 0 120.00$ -$ A1-28 23.42 -76.58 538.66$ (1,761.34)$ A1-29 46.84 -153.16 749.44$ (2,450.56)$ A1-30 1267.99 227.99 20,287.84$ 3,647.84$ A1-31 312.7 -24.3 28,221.18$ (2,193.08)$ A1-32 173.75 -7.25 16,680.00$ (696.00)$ A1-33 1 0 16,000.00$ -$ A1-34 1 -2 1,000.00$ (2,000.00)$ A1-35 1 0 5,500.00$ -$ A1-36 4 0 260.00$ -$ A2-1 1 0 3,500.00$ -$ A2-2 0 0 -$ -$ A2-3 1 0 500.00$ -$ A2-4 1 0 500.00$ -$ A2-5 50 0 1,300.00$ -$ A2-6 0 0 -$ -$ A2-7 0 -20 -$ (150.00)$ A2-8 1 0 200.00$ -$ A2-9 0 0 -$ -$ A2-10 2 0 130.00$ -$ Bid Item Totals = 1,455,251.40$ 46,025.35$ CO1 23 8 11,500.00$ 4,000.00$ CO1 14 -2 (1,022.00)$ 146.00$ CO1 1 0 450.00$ -$ CO1 202.17 -17.83 13,141.05$ (1,158.95)$ CO1 2 1 1,000.00$ 500.00$ CO1 2 0 1,676.00$ -$ CO1 4 -3 3,600.00$ (2,700.00)$ CO1 7 0 14,000.00$ -$ CO1 2 0 4,000.00$ -$ CO1 1 0 3,000.00$ -$ CO1 81 -7 5,265.00$ (455.00)$ CO1 1 0 275.00$ -$ CO1 1 0 2,000.00$ -$ CO1 1366 -194 191,240.00$ (27,160.00)$ CO1 2 0 7,600.00$ -$ CO1 1 0 3,292.32$ -$ CO1 1 0 8,000.00$ -$ CO2 1087 37 (2,174.00)$ (74.00)$ CO2 34 0 3,230.00$ -$ CO2 1 0 7,040.00$ -$ CO2 1 0 5,280.00$ -$ CO3 78 0 16,380.00$ -$ Temporary Water Service Connections - Ridgeway Dr. CREDIT Sanitary Lateral Pipe Bursting (6" Vs 4" Material Credit) ADD 34 Lineal Feet of 12” Dia RCP Storm Sewer Pipe ADD Lump Sum Investingation of Existing Water Main Location 6/11/25 ADD Lump Sum Cutting & Capping Existing 12" Water Main 6/12/25 6" PVC Water Service & Valve & Box (1 Unit) ADD 88 LF 6" Dia PVC Storm Sewer Pipe @ 65.00/LF ADD 1 EA 12"x 6" Reducer Fitting @ $275.00 EA ADD Lump Sum Lawn Restoration @ $2,000.00 ADD 1560 Lineal Feet 6" HDPE Pipe Bursted Sanitary Sewer Lateral @ ADD 2 EA 2'x 3' Catch Basins w/ 3067 Castings @ $3,800.00 EA Site Investigation - Existing WTM Location - Ridgeway Dr #REF! Gravel Driveway Restoration Traffic Control Lawn Restoration Inlet Protection Nyloplast Yard Inlet Manhole with Grate 12" Dia PVC Storm Sewer Pipe Storm Cleanout Connection to Existing Catch Basin Remove & Replace Concrete Sidewalk Remove & Replace Curb & Gutter Lower Layer HMA Pavement 3-1/4" Upper Layer HMA Pavement 1-3/4" Traffic Control Remove Trees Lawn Restoration Inlet Protection Remove Asphalt Driveway Asphalt Driveway Gravel Driveway Excavation Below Subgrade (EBS) EBS Backfill 1 1/4" Dense 1 1/4" Dense Crushed Aggregate Base Course Remove Curb & Gutter 30" Curb & Gutter Type "D" Remove Concrete Driveway Apron 7" Concrete Driveway Apron & Sidewalk Remove Concrete Driveway 7" Concrete Driveway 4" Concrete Sidewalk Curb Ramp Type 1 Storm Lateral/Sump Discharge Connections Delete Water Service Curb Box ADD 1 EACH 4” Dia Storm Lateral Cleanout ADD 220 Lineal Feet of 6” Dia Storm Lateral ADD 1 EACH 6” Dia Storm Lateral Cleanout Replace Storm Catch Basin 2’x3’ w/ Casting & Chimney (Salvage Casting Replace Catch Basin Castings 3070 (Salvage Casting for Owner) Catch Basin Chimney Reconstruction 2' Round Catch Basin Chimney Reconstruction 2'x3' CHANGE ORDER ITEMS: NEW ITEMS Cedarburg • Green Bay • Madison • Menomonie 2 of 3 Page 32 of 81 UNIT PRICE QUANTITY SUMMARY Village of Jackson Ridgeway Dr./Chestnut Ct. Reconst. REBID Advance Construction QUANTITIES VALUES Installed Estimated Installed Estimated VS Quantities VS Installed Values Installed 10/20/2025 Client Project Contractor ESTIMATED VS INSTALLED Bid Items Sanitary Manhole Chimney & Casting Replacement Project No. Date 05789-0020 Community Infrastructure • Architecture • Environmental Services CO3 119.17 0.17 13,466.21$ 19.21$ CO3 143 0 6,327.75$ -$ CO3 24 0 1,062.00$ -$ 0 0 0 -$ -$ 0 0 0 -$ -$ 0 0 0 -$ -$ 1,774,880.73$ 19,142.61$ 0 2" Water Service & Curb Stop & Box (3 Units) Remove/Replace Concrete Curb & Gutter (Driveway Corrections) Remove/Replace Concrete Curb & Gutter (Owner Changes) 0 0 0 FINAL PROJECT TOTALS = Cedarburg • Green Bay • Madison • Menomonie 3 of 3 Page 33 of 81 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC: Board of Public Works; Budget and Finance; Village Board From: Jack Straehler, Director of Public Works Subject: Pay Request #5 – 2025 Hickory Lane Reconstruction Project - Vinton Construction in the amount of $293,286.04 Meeting Date: November 25, 2025 – Board of Public Works Background and Analysis: This memo is to inform the Board of Pay Request #5 from Vinton Construction in the amount of $293,286.04 for work completed on the Hickory Lane Reconstruction Project. The work has been reviewed and verified for accuracy and completion in accordance with the project contract documents and schedule. Funding for this payment will come from Account Numbers: 600-00-56700-400-000 (Capital Projects Repairs/Construction) $97,762.01 300-00-17600-000-380 (Sewer Construction Work) $97,762.01 200-00-18600-395-000 (Water Construction Work) $97,762.02 If you have any questions, please let me know. JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board approve Pay Request #5 for Vinton Construction in the amount of $293,286.04. Page 34 of 81 November 18, 2025 Village of Jackson W194 N16660 Eagle Drive Jackson, WI 53037 Atte ntion: Jack Straehler Director of Public Works Subj ect: Project: VOJ 25-01 Hickory Lane Reconstruction Pay Request #5 Dear Mr. Straehler: Enc losed you will find Pay Request #5 for the Hickory Lane Reconstruction project in the Village of Jackson. The total amount, due to the contractor, included a retainage reduction to equal 2% of the total Work completed upon Substantial Completion. This is per Article 6.02.A.2 Progress Payments; Retainage, of Contract Document 00500, Agreement: Wor k completed, Pay Request #5 = $281,088.36 Retainage Reduction, Pay Request #5 = $12,197.68 Amount due to Contractor, Pay Request #5 = $293,286.04 If you have any questions or comments, please contact me at (262) 343-0351. Si ncerely, Et han Wedemayer Project Inspector Gremmer & Associates, Inc. Page 35 of 81 11/18/2025 $293,286.04 Page 36 of 81 Page 1 of 4Unit Cost Breakdown Project: Jackson Hickory Lane VOJ-25-01 Contractor: Vinton Construction Company Application Date: 11/13/25 VCC Job# 25057 Payment Application #: 5 REVISED ITEM DESCRIPTION OF WORK Scheduled Vs. Percent NO. Actual Complete Quantity UOM Unit Price Amount Quantity Amount Quantity Amount Quantity Amount Add(Deduct) Section 100 Roadway Items 1 100-01 Clearing & Grubbing 1 LS $ 10,000.00 $ 10,000.00 1.00 10,000.00$ - -$ 1.00 10,000.00$ -$ 100.0% 2 100-02 Removing Curb & Gutter 665 LF $ 5.00 $ 3,325.00 665.00 3,325.00$ - -$ 665.00 3,325.00$ -$ 100.0% 3 100-03 Removing Concrete Driveways and Sidewalk 740 SY $ 6.30 $ 4,662.00 603.00 3,798.90$ - -$ 603.00 3,798.90$ 863.10$ 81.5% 4 100-04 Removing Guardrail 311 LF $ 2.00 $ 622.00 311.00 622.00$ - -$ 311.00 622.00$ -$ 100.0% 5 100-05 Excavation Common 7,315 CY $ 24.09 $ 176,218.35 7,315.00 176,218.35$ - -$ 7,315.00 176,218.35$ -$ 100.0% 6 100-06 Excavation Below Subgrade 1,508 CY $ 18.25 $ 27,521.00 - -$ - -$ - -$ 27,521.00$ 0.0% 7 100-07 Base Aggregate Dense 3/4-Inch 470 TON $ 34.20 $ 16,074.00 384.00 13,132.80$ 228.00 7,797.60$ 612.00 20,930.40$ (4,856.40)$ 130.2% 8 100-08 Base Aggregate Dense 1 1/4-Inch 8,475 TON $ 16.55 $ 140,261.25 7,498.00 124,091.90$ 128.00 2,118.40$ 7,626.00 126,210.30$ 14,050.95$ 90.0% 9 100-09 Base Aggregate Dense 3-Inch 3,320 TON $ 19.47 $ 64,640.40 - -$ - -$ - -$ 64,640.40$ 0.0% 10 100-10 Concrete Driveway 7-Inch 115 SY $ 72.00 $ 8,280.00 125.00 9,000.00$ - -$ 125.00 9,000.00$ (720.00)$ 108.7% 11 100-11 Drilled Tie Bars 52 EA $ 10.00 $ 520.00 39.00 390.00$ 14.00 140.00$ 53.00 530.00$ (10.00)$ 101.9% 12 100-12 HMA Pavement 3 LT 58-28 S 2,615 TON $ 65.80 $ 172,067.00 1,835.00 120,743.00$ 903.00 59,417.40$ 2,738.00 180,160.40$ (8,093.40)$ 104.7% 13 100-13 HMA Pavement 4 LT 58-28 S 1,745 TON $ 71.80 $ 125,291.00 1,405.00 100,879.00$ 607.00 43,582.60$ 2,012.00 144,461.60$ (19,170.60)$ 115.3% 14 100-14 Asphaltic Surface Driveways 9 TON $ 120.00 $ 1,080.00 11.00 1,320.00$ - -$ 11.00 1,320.00$ (240.00)$ 122.2% 15 100-15 Concrete Curb & Gutter 24-Inch 335 LF $ 33.75 $ 11,306.25 157.00 5,298.75$ 100.00 3,375.00$ 257.00 8,673.75$ 2,632.50$ 76.7% 16 100-16 Concrete Curb & Gutter 30-Inch Type D 835 LF $ 33.75 $ 28,181.25 498.00 16,807.50$ 438.00 14,782.50$ 936.00 31,590.00$ (3,408.75)$ 112.1% 17 100-17 Concrete Sidewalk 4-Inch 9,580 SF $ 6.50 $ 62,270.00 7,544.00 49,036.00$ 258.00 1,677.00$ 7,802.00 50,713.00$ 11,557.00$ 81.4% 18 100-18 Concrete Sidewalk 6-Inch 965 SF $ 7.50 $ 7,237.50 1,048.00 7,860.00$ 236.00 1,770.00$ 1,284.00 9,630.00$ (2,392.50)$ 133.1% 19 100-19 Curb Ramp Detectable Warning Field Natural Patina 190 SF $ 28.00 $ 5,320.00 150.00 4,200.00$ 40.00 1,120.00$ 190.00 5,320.00$ -$ 100.0% 20 100-20 Mobilization 1 EA $ 95,500.00 $ 95,500.00 0.85 81,175.00$ 0.15 14,325.00$ 1.00 95,500.00$ -$ 100.0% 21 100-21 Silt Fence 3,515 LF $ 2.05 $ 7,205.75 3,435.00 7,041.75$ - -$ 3,435.00 7,041.75$ 164.00$ 97.7% 22 100-22 Temporary Ditch Checks 72 LF $ 8.00 $ 576.00 72.00 576.00$ - -$ 72.00 576.00$ -$ 100.0% 23 100-23 Culvert Pipe Checks 42 EA $ 25.00 $ 1,050.00 4.00 100.00$ 38.00 950.00$ 42.00 1,050.00$ -$ 100.0% 24 100-24 Inlet Protection Type B 20 EA $ 70.00 $ 1,400.00 20.00 1,400.00$ - -$ 20.00 1,400.00$ -$ 100.0% 25 100-25 Inlet Protection Type C 25 EA $ 73.00 $ 1,825.00 25.00 1,825.00$ - -$ 25.00 1,825.00$ -$ 100.0% 26 100-26 Topsoil, Seed, Fertilizer, and Mulch 10,000 SY $ 6.59 $ 65,900.00 - -$ 7,840.00 51,665.60$ 7,840.00 51,665.60$ 14,234.40$ 78.4% 27 100-27 Topsoil, Seed, Fertilizer, and Erosion Mat 1,100 SY $ 9.99 $ 10,989.00 - -$ 3,160.00 31,568.40$ 3,160.00 31,568.40$ (20,579.40)$ 287.3% 28 100-28 Riprap Medium w/ Geotextile Fabric Type HR 30 CY $ 120.00 $ 3,600.00 45.00 5,400.00$ 4.00 480.00$ 49.00 5,880.00$ (2,280.00)$ 163.3% Previous Request This Request To Date Scheduled- Work Completed Total Completed/Stored Page 37 of 81 Page 2 of 4Unit Cost Breakdown Project: Jackson Hickory Lane VOJ-25-01 Contractor: Vinton Construction Company Application Date: 11/13/25 VCC Job# 25057 Payment Application #: 5 REVISED ITEM DESCRIPTION OF WORK Scheduled Vs. Percent NO. Actual Complete Quantity UOM Unit Price Amount Quantity Amount Quantity Amount Quantity Amount Add(Deduct) Previous Request This Request To Date Scheduled- Work Completed Total Completed/Stored 29 100-29 Geotextile Fabric Type SAS 4,524 SY $ 1.75 $ 7,917.00 - -$ - -$ - -$ 7,917.00$ 0.0% 30 100-30 Traffic Control 1 LS $ 6,000.00 $ 6,000.00 0.85 5,100.00$ 0.15 900.00$ 1.00 6,000.00$ -$ 100.0% 31 100-31 Permanent Signing 1 LS $ 2,300.00 $ 2,300.00 - -$ 1.00 2,300.00$ 1.00 2,300.00$ -$ 100.0% 32 100-32 Marking Line Epoxy 4-Inch 13,795 LF $ 0.63 $ 8,690.85 - -$ 13,795.00 8,690.85$ 13,795.00 8,690.85$ -$ 100.0% 33 100-33 Marking Stop Line Epoxy 18-Inch 150 LF $ 13.50 $ 2,025.00 - -$ 150.00 2,025.00$ 150.00 2,025.00$ -$ 100.0% 34 100-34 Marking Crosswalk Epoxy Transverse Line 6-Inch 725 LF $ 10.50 $ 7,612.50 - -$ 725.00 7,612.50$ 725.00 7,612.50$ -$ 100.0% 35 100-35 Sawing Asphalt 468 LF $ 4.00 $ 1,872.00 483.00 1,932.00$ - -$ 483.00 1,932.00$ (60.00)$ 103.2% 36 100-36 Sawing Concrete 124 LF $ 5.00 $ 620.00 74.00 370.00$ - -$ 74.00 370.00$ 250.00$ 59.7% 37 100-37 Remove Fallen Trees from Cedar Creek 1 LS $ 5,000.00 $ 5,000.00 1.00 5,000.00$ - -$ 1.00 5,000.00$ -$ 100.0% Section 200 Storm Sewer Items 38 200-01 Removing Manholes 20 EA $ 515.00 $ 10,300.00 6.00 3,090.00$ - -$ 6.00 3,090.00$ 7,210.00$ 30.0% 39 200-02 Removing Inlets 13 EA $ 305.00 $ 3,965.00 26.00 7,930.00$ - -$ 26.00 7,930.00$ (3,965.00)$ 200.0% 40 200-03 Removing Storm Sewer 3,207 LF $ 29.00 $ 93,003.00 2,848.00 82,592.00$ 63.00 1,827.00$ 2,911.00 84,419.00$ 8,584.00$ 90.8% 41 200-04 Abandoning Storm Sewer 40 CY $ 255.00 $ 10,200.00 40.00 10,200.00$ 27.00 6,885.00$ 67.00 17,085.00$ (6,885.00)$ 167.5% 42 200-05 Apron Endwalls for Culvert Pipe Reinforced Concrete 15-Inch 2 EA $ 1,225.00 $ 2,450.00 2.00 2,450.00$ - -$ 2.00 2,450.00$ -$ 100.0% 43 200-06 Apron Endwalls for Culvert Pipe Reinforced Concrete 18-Inch 1 EA $ 1,515.00 $ 1,515.00 1.00 1,515.00$ - -$ 1.00 1,515.00$ -$ 100.0% 44 200-07 Apron Endwalls for Culvert Pipe Reinforced Concrete 24-Inch W/ Pipe Grate 1 EA $ 3,565.00 $ 3,565.00 1.00 3,565.00$ - 1.00 3,565.00$ -$ 100.0% 45 200-08 Apron Endwalls for Culvert Pipe Reinforced Concrete 60-Inch 1 EA $ 4,060.00 $ 4,060.00 1.00 4,060.00$ - -$ 1.00 4,060.00$ -$ 100.0% 46 200-09 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptical 38x60-Inch W/ Pipe Grate 1 EA $ 6,545.00 $ 6,545.00 1.00 6,545.00$ - -$ 1.00 6,545.00$ -$ 100.0% 47 200-10 Concrete Masonry Endwall 1 EA $ 17,678.00 $ 17,678.00 1.00 17,678.00$ - -$ 1.00 17,678.00$ -$ 100.0% 48 200-11 Storm Sewer Pipe Reinforced Concrete Class III 42- Inch 310 LF $ 194.50 $ 60,295.00 310.00 60,295.00$ - -$ 310.00 60,295.00$ -$ 100.0% 49 200-12 Storm Sewer Pipe Reinforced Concrete Class III 48- Inch 325 LF $ 240.00 $ 78,000.00 295.00 70,800.00$ 34.00 8,160.00$ 329.00 78,960.00$ (960.00)$ 101.2% 50 200-13 Storm Sewer Pipe Reinforced Concrete Class III 60- Inch 60 LF $ 356.95 $ 21,417.00 60.00 21,417.00$ - -$ 60.00 21,417.00$ -$ 100.0% 51 200-14 Storm Sewer Pipe Reinforced Concrete Class IV 12- Inch 34 LF $ 84.00 $ 2,856.00 33.00 2,772.00$ - -$ 33.00 2,772.00$ 84.00$ 97.1% 52 200-15 Storm Sewer Pipe Reinforced Concrete Class IV 15- Inch 61 LF $ 84.50 $ 5,154.50 55.00 4,647.50$ - -$ 55.00 4,647.50$ 507.00$ 90.2% 53 200-16 Storm Sewer Pipe Reinforced Concrete Class IV 18- Inch 207 LF $ 89.60 $ 18,547.20 202.00 18,099.20$ - -$ 202.00 18,099.20$ 448.00$ 97.6% 54 200-17 Storm Sewer Pipe Reinforced Concrete Class IV 24- Inch 43 LF $ 135.00 $ 5,805.00 44.00 5,940.00$ - -$ 44.00 5,940.00$ (135.00)$ 102.3% 55 200-18 Storm Sewer Pipe Reinforced Concrete Class IV 48- Inch 242 LF $ 278.00 $ 67,276.00 228.00 63,384.00$ - -$ 228.00 63,384.00$ 3,892.00$ 94.2% Page 38 of 81 Page 3 of 4Unit Cost Breakdown Project: Jackson Hickory Lane VOJ-25-01 Contractor: Vinton Construction Company Application Date: 11/13/25 VCC Job# 25057 Payment Application #: 5 REVISED ITEM DESCRIPTION OF WORK Scheduled Vs. Percent NO. Actual Complete Quantity UOM Unit Price Amount Quantity Amount Quantity Amount Quantity Amount Add(Deduct) Previous Request This Request To Date Scheduled- Work Completed Total Completed/Stored 56 200-19 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 38x60-Inch 426 LF $ 357.00 $ 152,082.00 420.00 149,940.00$ - -$ 420.00 149,940.00$ 2,142.00$ 98.6% 57 200-20 Storm Sewer Pipe Class III-A 12-Inch 186 LF $ 87.35 $ 16,247.10 190.00 16,596.50$ - -$ 190.00 16,596.50$ (349.40)$ 102.2% 58 200-21 Storm Sewer Pipe Class III-A 15-Inch 188 LF $ 76.30 $ 14,344.40 198.00 15,107.40$ - -$ 198.00 15,107.40$ (763.00)$ 105.3% 59 200-22 Storm Sewer Pipe Class III-A 18-Inch 152 LF $ 90.85 $ 13,809.20 137.00 12,446.45$ - -$ 137.00 12,446.45$ 1,362.75$ 90.1% 60 200-23 Storm Sewer Pipe Class III-A 24-Inch 506 LF $ 113.00 $ 57,178.00 506.00 57,178.00$ - -$ 506.00 57,178.00$ -$ 100.0% 61 200-24 Storm Sewer Pipe Class III-A 30-Inch 25 LF $ 109.20 $ 2,730.00 24.00 2,620.80$ - -$ 24.00 2,620.80$ 109.20$ 96.0% 62 200-25 Storm Sewer Pipe Class III-A 36-Inch 576 LF $ 130.00 $ 74,880.00 582.00 75,660.00$ - -$ 582.00 75,660.00$ (780.00)$ 101.0% 63 200-26 Storm Sewer Pipe PVC 4-Inch 49 LF $ 35.00 $ 1,715.00 691.00 24,185.00$ - -$ 691.00 24,185.00$ (22,470.00)$ 1410.2% 64 200-27 Storm Sewer Pipe PVC 6-Inch 12 LF $ 35.00 $ 420.00 15.00 525.00$ - -$ 15.00 525.00$ (105.00)$ 125.0% 65 200-28 Storm Sewer Pipe PVC 15-Inch 7 LF $ 127.00 $ 889.00 - -$ - -$ - -$ 889.00$ 0.0% 66 200-29 Storm Sewer Pipe PVC 18-Inch 5 LF $ 155.00 $ 775.00 6.00 930.00$ - -$ 6.00 930.00$ (155.00)$ 120.0% 67 200-30 Catch Basins 4-FT Diameter w/ Casting 6 EA $ 3,820.00 $ 22,920.00 7.00 26,740.00$ - -$ 7.00 26,740.00$ (3,820.00)$ 116.7% 68 200-31 Catch Basins 5-FT Diameter w/ Casting 1 EA $ 5,870.00 $ 5,870.00 1.00 5,870.00$ - -$ 1.00 5,870.00$ -$ 100.0% 69 200-32 Catch Basins 2.5x3-FT w/ Casting 13 EA $ 3,670.00 $ 47,710.00 12.00 44,040.00$ - -$ 12.00 44,040.00$ 3,670.00$ 92.3% 70 200-33 Manholes 4-FT Diameter w/ Casting 6 EA $ 3,995.00 $ 23,970.00 6.00 23,970.00$ - -$ 6.00 23,970.00$ -$ 100.0% 71 200-34 Manholes 5-FT Diameter w/ Casting 1 EA $ 5,961.00 $ 5,961.00 1.00 5,961.00$ - -$ 1.00 5,961.00$ -$ 100.0% 72 200-35 Manholes 6-FT Diameter w/ Casting 3 EA $ 7,414.00 $ 22,242.00 3.00 22,242.00$ - -$ 3.00 22,242.00$ -$ 100.0% 73 200-36 Manholes 7-FT Diameter w/ Casting 3 EA $ 9,734.00 $ 29,202.00 3.00 29,202.00$ - -$ 3.00 29,202.00$ -$ 100.0% 74 200-37 Manholes 8-FT Diameter w/ Casting 3 EA $ 12,662.00 $ 37,986.00 3.00 37,986.00$ - -$ 3.00 37,986.00$ -$ 100.0% 75 200-38 Inlets Median 2 Grate w/ Casting 2 EA $ 4,172.00 $ 8,344.00 1.00 4,172.00$ 1.00 4,172.00$ 2.00 8,344.00$ -$ 100.0% 76 200-39 Bulkhead Storm Sewer 15-Inch 4 EA $ 175.00 $ 700.00 2.00 350.00$ - -$ 2.00 350.00$ 350.00$ 50.0% 77 200-40 Connect to Existing Storm Sewer Lateral 3 EA $ 195.00 $ 585.00 23.00 4,485.00$ - -$ 23.00 4,485.00$ (3,900.00)$ 766.7% 78 200-41 Connect to Existing Storm Sewer Structure 1 EA $ 325.00 $ 325.00 1.00 325.00$ - -$ 1.00 325.00$ -$ 100.0% 79 200-42 Connect to Existing Storm Sewer Pipe 2 EA $ 850.00 $ 1,700.00 2.00 1,700.00$ - -$ 2.00 1,700.00$ -$ 100.0% Section 300 Water Main Items 80 300-01 Connect to Existing Water Main Pipe 2 EA $ 2,635.00 $ 5,270.00 7.00 18,445.00$ - -$ 7.00 18,445.00$ (13,175.00)$ 350.0% 81 300-02 Remove and Replace Water Service Curb Box 2 EA $ 1,170.00 $ 2,340.00 2.00 2,340.00$ - -$ 2.00 2,340.00$ -$ 100.0% 82 300-03 Water Main PVC 8-Inch 16 LF $ 72.00 $ 1,152.00 66.50 4,788.00$ - -$ 66.50 4,788.00$ (3,636.00)$ 415.6% Page 39 of 81 Page 4 of 4Unit Cost Breakdown Project: Jackson Hickory Lane VOJ-25-01 Contractor: Vinton Construction Company Application Date: 11/13/25 VCC Job# 25057 Payment Application #: 5 REVISED ITEM DESCRIPTION OF WORK Scheduled Vs. Percent NO. Actual Complete Quantity UOM Unit Price Amount Quantity Amount Quantity Amount Quantity Amount Add(Deduct) Previous Request This Request To Date Scheduled- Work Completed Total Completed/Stored 83 300-04 Water Service Pipe 1-Inch 42 LF $ 95.00 $ 3,990.00 - -$ - -$ - -$ 3,990.00$ 0.0% 84 300-05 Water Gate Valve 8-Inch 2 EA $ 3,080.00 $ 6,160.00 2.00 6,160.00$ - -$ 2.00 6,160.00$ -$ 100.0% 85 300-06 Adjusting Water Valve 17 EA $ 300.00 $ 5,100.00 9.00 2,700.00$ 9.00 2,700.00$ 18.00 5,400.00$ (300.00)$ 105.9% 86 300-07 Offset Water Main 4 EA $ 7,950.00 $ 31,800.00 5.00 39,750.00$ - -$ 5.00 39,750.00$ (7,950.00)$ 125.0% Section 400 Sanitary Sewer Items 87 400-01 Sanitary Sewer Manhole Covers Type J-Special 13 EA $ 1,440.00 $ 18,720.00 13.00 18,720.00$ - -$ 13.00 18,720.00$ -$ 100.0% 88 400-02 Sanitary Sewer Manhole Covers Type J-Special - Anchored 1 EA $ 1,540.00 $ 1,540.00 1.00 1,540.00$ - -$ 1.00 1,540.00$ -$ 100.0% 89 400-03 Reconstructing Sanitary Sewer Manhole 63 VF $ 450.00 $ 28,350.00 34.80 15,660.00$ - -$ 34.80 15,660.00$ 12,690.00$ 55.2% 90 400-04 Connect to Existing Sanitary Sewer Pipe 1 EA $ 1,325.00 $ 1,325.00 - -$ - -$ - -$ 1,325.00$ 0.0% 91 400-05 Sanitary Sewer PVC 12-Inch 5 LF $ 88.00 $ 440.00 - -$ - -$ - -$ 440.00$ 0.0% Change Orders CO1 Added Watermain Work @ Hickory Land & Eagle Drive 1 LS $ 39,952.00 $ 39,952.00 1.00 39,952.00$ - -$ 1.00 39,952.00$ -$ 100.0% CO2 6" Natural Habitat Stream for 60" Cross Pipe 1 LS $ 5,950.00 $ 5,950.00 1.00 5,950.00$ - -$ 1.00 5,950.00$ -$ 100.0% CO3.1 Non-Native Materal for Strem Substrate in 60" Culvert 1 LS $ 615.75 $ 615.75 - -$ 1.00 615.75$ 1.00 615.75$ -$ 100.0% CO3.2 12" WM Offiset - Material Cost & 1 Hr Labor 1 LS $ 2,649.50 $ 2,649.50 - -$ 1.00 2,649.50$ 1.00 2,649.50$ -$ 100.0% CO3.3 Turbidity Barrier installed 1 LS $ 1,250.00 $ 1,250.00 - -$ 1.00 1,250.00$ 1.00 1,250.00$ -$ 100.0% CO3.4 Credit VOJ Hyrdro Vac Truck & Operator 1 LS $ (3,468.74) $ (3,468.74) - -$ 1.00 (3,468.74)$ 1.00 (3,468.74)$ -$ 100.0% Total: 2,203,312.01$ 1,861,859.80$ 281,088.36$ 2,142,948.16$ 60,363.85$ Less: 5% Retainage up to first 50% of contract 55,056.64$ (12,197.68)$ 42,858.96$ Total: 1,806,803.16$ 293,286.04$ 2,100,089.20$ Amount Previously Requested 1,806,803.16$ -$ 1,806,803.16$ Amount DueThis Request -$ 293,286.04$ 293,286.04$ Page 40 of 81 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC: Board of Public Works; Budget and Finance; Village Board From: Jack Straehler, Director of Public Works Subject: Pay Request #6 - Final - 2025 Ridgeway Drive and Chestnut Court Reconstruction Project – Advanced Construction in the amount of $ 44,697.88 Meeting Date: November 25, 2025 – Board of Public Works Background and Analysis: This memo is to inform the Board of Pay Request #6 for Advanced Construction in the amount of $44,697.88 for work completed on the Ridgeway Drive and Chestnut Court Reconstruction Project. The work has been reviewed and verified for accuracy and completion in accordance with the project contract documents and schedule. Funding for this payment will come from Account Numbers: 600-00-56700-400-000 (Capital Projects Repairs/Construction) $14,899.29 300-00-17600-000-380 (Sewer Construction Work) $14,899.29 200-00-18600-395-000 (Water Construction Work) $14,899.30 If you have any questions, please let me know. JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board approve Pay Request #6 for Advanced Construction in the amount of $ 44,697.88. Page 41 of 81 Cedarburg • Green Bay • Madison • Menomonie Community Infrastructure • Architecture • Environmental Services W61N497 Washington Avenue Cedarburg, WI 53012 262-204-2360 www.cedarcorp.com November 7, 2025 Village of Jackson N168 W20733 Main Street PO Box 637 Jackson, WI 53037 Attn: Mr. Jack Straehler II, Director of Public Works Subject: Contractor’s Application for Payment No. 6 FINAL Ridgeway Drive & Chestnut Court Reconstruction - REBID Cedar Project No. 05789-0020 Dear Mr. Straehler: We have reviewed the above referenced project and find it in order. Therefore, it is our recommendation that the Village of Jackson issue final payment associated with the Ridgeway Drive & Chestnut Court Reconstruction - REBID project. Enclosed for your use in payment to Advance Construction in the amount of $44,697.88 is Contractor’s Application for Payment No. 6 (Final). Also enclosed are the following documents: • Final Lien Waivers • Consent of Surety to Final Payment • Contractor Certificate of Completed Operations Insurance Following your review and approval, please complete the application for payment form within the areas reserved for the Owner. Thereafter, retain one copy for your records, provide the second copy to the Contractor with payment, and provide the third copy to our office. Should you have any questions, please feel free to contact me at our Cedarburg office. Sincerely, CEDAR CORPORATION Douglas T. Kroes Senior Construction Manager Encl: As Noted Cc: Shane Kofler, Advance Construction Page 42 of 81 11/7/25 Page 43 of 81 Page 44 of 81 Page 45 of 81 Page 46 of 81 Page 47 of 81 Page 48 of 81 Page 49 of 81 Page 50 of 81 Page 51 of 81 Page 52 of 81 Page 53 of 81 Page 54 of 81 Page 55 of 81 Page 56 of 81 Page 57 of 81 Page 58 of 81 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC : Board of Public Works; Budget and Finance; Village Board F rom: Jack Straehler, Director of Public Works S ubject: Approving Completion of 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project and Authorizing Closure of the Clean Water Fund Loan M eeting Date: November 25, 2025 – Board of Public Works Background and Analysis: This memo is to inform the Board of the requirements issued by the Wisconsin Department of Natural Resources (WDNR) related to the 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project. As part of the project’s final closeout process, the WDNR requires formal acknowledgment from the Village Board confirming the project and its completion. In addition, the final closeout documents for the Clean Water Fund loan must be signed by the Village Administrator. If you have any questions, please let me know. JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board accept the completed 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project and authorize the Village Administrator to sign the documents for closure of the clean water fund loan. . Page 59 of 81 Taking the lead in Washington County. www.villageofjacksonwi.gov The undersigned officials of the Village of Jackson (the "Municipality") hereby certify that, for all expenditures made for construction of DNR Project No. 4266-04 (the "Project"), the Municipality has met the prevailing wage rate requirements of the Davis-Bacon Act. The Municipality further certifies that, after taking into account any national or project-specific waivers approved by the U.S. Environmental Protection Agency, DNR Project No. 4266-04 has met the requirements for the Use of American Iron and Steel contained in Section 608 of the Federal Water Pollution Control Act, as amended. The above certification is determined, after due and diligent inv estigation, to be true and accurate to the best of my knowledge. By: Dated as of: Jen Heidtke, Village Administrator Attest: Dated as of: Jacqueline Schuh, Village Clerk N168W19851 Main Street Jackson, WI 53037 Phone: 262-677-9001 Fax: 262-677-1710 Page 60 of 81 State of Wisconsin Department of Natural Resources Bureau of Community Financial Assistance 101 S. Webster St., PO Box 7921 Madison WI 53707-7921 Phone (608) 266-7555 Fax (608) 267-0496 Environmental Improvement Fund (EIF) Project Acceptance Certification Form 8700-280 (R 1/11) Notice: This form is authorized by ss. 281.58 and 281.61, Wis. Stats. Submittal to the Department of a completed form is mandatory for all recipients of EIF loans. A separate form is required for each prime contractor. Failure to submit a completed form shall result in the denial of final disbursement of loan funds. Personally identifiable information provided on this form will be used to determine compliance with closeout procedures as outlined in the Financial Assistance Agreement and may be made available upon request under Wisconsin's Open Records laws (ss. 19.32-19.39, Wis. Stats.) and requirements. Project Information Municipality Name Vi II age of Jackson Prime Contractor J. H. Hassinger, Inc. Contract Number 2024 Improvements - Tettiary Filters and Disinfection Upon final inspection and approval of all change order(s), all work performed by the awarded contractor(s) and subcontractor(s) (if any) has been constructed according to the plans and specifications approved by the Department of Natural Resources (DNR). DNR Plan and Specification Approval Number S-2023-0758 Project Description Date Approved 11/06/2023 Tertiary Filter Building- Construct an approximate 40" x 54' addition to the Village's existing Te1tiary Filter Building to house new filter equipment. The building construction generally consists of masonry construction on a new concrete foundation adjacent to the building. Work also includes renovations and modifications to the existing structure, as well as HY AC and plumbing, and upgrades to the electrical systems in the building. Remove the existing chemical disinfection equipment and modify the tank for a new UV disinfection system. The work also includes covering the existing channels with aluminum grating, addition of a framed shelter, and electrical upgrades associated with the new equipment. Engineer Certification On behalf of the engineering consulting firm contracted by the above named municipality, I hereby certify to the best of my knowledge that the above mentioned project has been constructed and inspected to conform to the referenced specifications. Name of Engineer Gregory J. Droessler Signature of Engineer Name of Engineering Firm Town and Country Engineering, Inc. Date Signed // 1<; t.o� The above named municipality has accepted at its regular meeting of officials the above mentioned project from the contractor and engineer. Name of Authorized Representative Jen Heidtke Signature of Authorized Representative Title Village Administrator Date Signed Page 61 of 81 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC: Board of Public Works; Budget and Finance; Village Board From: Jack Straehler, Director of Public Works Subject: 2025-2026 Contract Amendment #3 – Gremmer and Associates in the amount of $309,667.00 Meeting Date: November 25, 2025 – Board of Public Works Background and Analysis: This memo is to inform the Board of Contract Amendment #3 for the engineering and design cost of $7,842.00 associated with streetlight design for Hawthorne Drive, Aspen Drive, and Linden Drive. The Village currently holds a professional services agreement with Gremmer and Associates in the amount of $301,825.00 for engineering and design services related to the 2026 street reconstruction of Eagle Drive, Hawthorne Drive, Aspen Drive, and Linden Drive. Contract Amendment #3 proposes to expand the scope of services to include streetlight engineering and design for the 2026 reconstruction of Hawthorne Drive, Aspen Drive, and Linden Drive. The previously approved Contract Amendment #2 included engineering and design of streetlights along Eagle Drive. Funding for this contract will come from the following accounts: 600-00-56700-400-000 (Capital Projects Repairs/Construction) $103,222.33 300-00-17600-000-380 (Sewer Construction Work) $103,222.33 200-00-18600-395-000 (Water Construction Work) $103,222.34 If you have any questions, please let me know. JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board approve Contract Amendment #3 for Gremmer and Associates in the amount of $309,667.00. Page 62 of 81 November 14, 2025 Village of Jackson W194 N16660 Eagle Drive Jackson, WI 53037 Attention: Mr. Jack Straehler Director of Public Works Subject: Hickory Lane Contract Amendment No. 3 Dear Mr. Straehler: The following is Contract Amendment No. 3 for the subject project. The original contract dated October 26, 2023, Amendment No. 1 dated 12/11/2024, and Amendment No. 2 dated 7/9/2025 is amended as follows: REVISED SCOPE OF SERVICES 6. Street Lighting design (sublet to KL Engineering). c. Preliminary and final design for continuous street lighting along alternating sides of Linden Drive, Aspen Drive and Hawthorn Drive. d. Preliminary and final design for parking lot lighting at the Village of Jackson Department of Public Works north parking lot and driveway. COMPENSATION ENGINEER will be compensated by the OWNER for work outlined in the Revised Scope of Services a lump sum amount of $7,842. Contract Amendment No. 3 increases the lump sum fee for the project from $301,825 (Original w/ Amendment No. 1 and Amendment No. 2) to $309,667. AUTHORIZATION AND TIMING A receipt of a signed copy of the CONTRACT AMENDMENT shall be considered as authorization to proceed with the services described. Submitted by the ENGINEER Accepted by the OWNER _________________________________ ___________________________________ Jeff Chvosta, Vice President Jack Straehler Gremmer & Associates, Inc. Director of Public Works ___11/14/2025_____________________ ___________________________________ Date Date Page 63 of 81 Page 64 of 81 V ILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 _____________________________ INDEPENDENT AUDITORS’ REPORT AND FINANCIAL STATEMENTS _____________________________ FROM DATE OF CREATION THROUGH SEPTEMBER 15, 2025 DRAFT 12/3/2025 Page 65 of 81 VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 TABLE OF CONTENTS P AGE(s) I NDEPENDENT AUDITORS’ REPORT 1 - 3 B ASIC FINANCIAL STATEMENTS B ALANCE SHEET 4 HISTORICAL SUMMARY OF PROJECT COSTS, PROJECT REVENUES, AND NET COSTS RECOVERED THROUGH TAX INCREMENTS 5 HISTORICAL SUMMARY OF SOURCES, USES, AND STATUS OF FUNDS 6 NOTES TO FINANCIAL STATEMENTS 7 - 9 SUPPLEMENTARY INFORMATION D ETAILED SCHEDULE OF SOURCES, USES, AND STATUS OF FUNDS 11 - 14 INDEPENDENT AUDITORS’ REPORT ON OTHER LEGAL AND REGULATORY REQUIREMENTS 15 DRAFT 12/3/2025 Page 66 of 81 INDEPENDENT AUDITORS’ REPORT To the Village Board Village of Jackson, Wisconsin Opinion We have audited the accompanying financial statements of the Village of Jackson Tax Incremental District No. 4 (the “District”), which comprise the accompanying Balance Sheet, Historical Summary of Project Costs, Project Revenues, and Net Costs to be Recovered through Future Tax Increments and Historical Summary of Sources, Uses, and Status of Funds of the Village of Jackson’s Tax Incremental District No. 4, and the related notes to the financial statements, from the date the District was created through September 15, 2025. In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of the District and the net project costs recovered through tax increments as of September 15, 2025 and the sources, uses, and status of funds from the date of creation through September 15, 2025, on the basis of the financial reporting provisions of the Wisconsin Department of Revenue as described in Note A. Basis for Opinion We conducted our audit in accordance with auditing standards generally accepted in the United States of America. Our responsibilities under those standards are further described in the Auditors’ Responsibilities for the Audit of Financial Statements section of our report. We are required to be independent of the District and to meet our other ethical responsibilities, in accordance with the relevant ethical requirements relating to our audit. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Emphasis of Matter As discussed in Note A, the financial statements present only the Village of Jackson Tax Incremental District No. 4 and do not purport to, and do not, present fairly the financial position of the Village of Jackson, Wisconsin as of September 15, 2025, and the changes in its financial position, or, where applicable, cash flows for the year then ended in accordance with accounting principles generally accepted in the Unites States of America. Our opinion is not modified with respect to this matter. Responsibilities of Management for the Financial Statements Management is responsible for the preparation and fair presentation of these financial statements in accordance with the reporting provisions of the Wisconsin Department of Revenue as described in Note A; and for the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error. DRAFT 12/3/2025 Page 67 of 81 To the Village Board Village of Jackson, Wisconsin - 2 - Auditors’ Responsibilities for the Audit of the Financial Statements Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditors’ report that includes our opinions. Reasonable assurance is a high level of assurance but is not absolute assurance and therefore is not a guarantee that an audit conducted in accordance with generally accepted auditing standards will always detect a material misstatement when it exists. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control. Misstatements are considered material if there is a substantial likelihood that, individually or in the aggregate, they would influence the judgment made by a reasonable user based on the financial statements. In performing an audit in accordance with generally accepted auditing standards, we:  Exercise professional judgment and maintain professional skepticism throughout the audit.  Identify and assess the risks of material misstatement of the financial statements, whether due to fraud or error, and design and perform audit procedures responsive to those risks. Such procedures include examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements.  Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the District’s internal control. Accordingly, no such opinion is expressed.  Evaluate the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluate the overall presentation of the financial statements.  Conclude whether, in our judgment, there are conditions or events, considered in the aggregate, that raise substantial doubt about the District’s ability to continue as a going concern for a reasonable period of time. We are required to communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit, significant audit findings, and certain internal control- related matters that we identified during the audit. Required Supplementary Information Management has omitted the Management’s Discussion and Analysis that accounting principles generally accepted in the United States of America require to be presented to supplement the financial statements. Such missing information, although not a part of the financial statements, is required by the Governmental Accounting Standards Board, who considers it to be an essential part of financial reporting for placing the financial statements in an appropriate operational, economic, or historical context. Our opinions on the financial statements are not affected by this missing information. Supplementary Information Our audit was conducted for the purpose of forming opinions on the financial statements that collectively comprise the District’s financial statements. The accompanying supplementary information, as listed in the table of contents, is presented for purposes of additional analysis and is not a required part of the basic financial statements. Such information is the responsibility of management as was derived from and relates directly to the underlying accounting and other records used to prepare the financial statements. The information has been subjected to the auditing procedures applied in the audit of the financial statements and certain additional procedures, including comparing and reconciling such information directly to the underlying accounting and other records used to prepare the financial statements or to the financial statements themselves, and other additional procedures in accordance with auditing standards generally accepted in the United States of America. In our opinion, the information is fairly stated in all material respects in relation to the financial statements taken as a whole. DRAFT 12/3/2025 Page 68 of 81 To the Village Board Village of Jackson, Wisconsin - 3 - Report on Other Legal and Regulatory Requirements We have also issued our report dated December 3, 2025 on our tests of its compliance with Wisconsin State Statutes Section 66.1105. The purpose of that report is to describe the scope of our testing of compliance and the results of that testing, and not to provide an opinion on compliance. Restrictions on Use Our report is intended solely for the information and use of the Village of Jackson, Wisconsin, overlapping tax districts, the Wisconsin Department of Revenue and is not intended to be, and should not be, used by anyone other then these specified parties. Lucida LLC Lake Geneva, Wisconsin December 3, 2025 DRAFT 12/3/2025 Page 69 of 81 Tax Incremental District No. 4 ASSETS Cash and investments 7,200$ TOTAL ASSETS 7,200 LIABILITIES Accounts payable 7,200 TOTAL LIABILITIES 7,200 FUND BALANCES Restricted -$ September 15, 2025 VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 BALANCE SHEET See notes to financial statements - 4 - DRAFT 12/3/2025 Page 70 of 81 PROJECT COSTS Capital expenditures 8,105,311$ Administrative fees 201,760 Professional services 626,860 Development grants/incentives 4,971,981 Tax increment transferred to TID No. 7 796,592 Debt Service: Interest and fiscal charges 3,965,330 Debt issuance costs 176,640 TOTAL PROJECT COSTS 18,844,474 PROJECT REVENUES Tax increments 12,040,457 Exempt computer aid 81,282 Personal property aid 159,964 Special assessments 265,568 Investment income 148,329 Tax increments from TID No. 2 5,883,618 Settlement from developer 151,237 Contributions for debt service 114,019 TOTAL PROJECT REVENUES 18,844,474 NET COSTS TO BE RECOVERED THROUGH TAX INCREMENTS - SEPTEMBER 15, 2025 -$ Refund payable to other taxing units - BALANCE SEPTEMBER 15, 2025 -$ VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 HISTORICAL SUMMARY OF PROJECT COSTS, PROJECT REVENUES AND NET COST TO BE RECOVERED THROUGH TAX INCREMENTS From the Date of Creation through September 15, 2025 See notes to financial statements - 5 - DRAFT 12/3/2025 Page 71 of 81 SOURCES OF FUNDS Tax increments 12,040,457$ Tax increments from TID No. 2 5,883,618 Exempt computer aid 81,282 Personal property aid 159,964 Special assessments 265,568 Investment income 148,329 Proceeds of long-term debt 15,604,207 Settlement from developer 151,237 Contributions for debt service 114,019 TOTAL SOURCES 34,448,681 USES OF FUNDS Capital expenditures 8,105,311 Administrative fees 201,760 Professional services 626,860 Development grants/incentives 4,971,981 Tax increment transferred to TID No. 7 796,592 Debt Service: Interest and fiscal charges 3,965,330 Principal on long-term debt 15,604,207 Debt issuance costs 176,640 TOTAL USES 34,448,681 FUND BALANCE - SEPTEMBER 15, 2025 - Refund payable to other taxing units - FUND BALANCE - ENDING -$ VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 HISTORICAL SUMMARY OF SOURCES, USES AND STATUS OF FUNDS From the Date of Creation through September 15, 2025 See notes to financial statements - 6 - DRAFT 12/3/2025 Page 72 of 81 VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 NOTES TO FINANCIAL STATEMENTS FROM THE DATE OF CREATION THROUGH SEPTEMBER 15, 2025 - 7 - Note A - Summary of Significant Accounting Policies The accounting policies of the Village of Jackson Tax Incremental District No. 4 (the “District”) conform to accounting principles as applicable to governmental units and as defined by Wisconsin State Statutes section 66.1105. The Governmental Accounting Standards Board (“GASB”) is the accepted standard setting body for establishing governmental accounting and financial reporting principles. Wisconsin Statutes Section 66.1105 establishes reporting requirements for the District. The significant accounting principles and policies utilized by the Village of Jackson in preparing the financial statements of Tax Incremental District No. 4 are described below. Financial Reporting Entity This report contains the financial information of the Village of Jackson Tax Incremental District No.4. The summary statements were prepared from data recorded in the District’s fund of the Village of Jackson and are presented in a format prescribed by the Wisconsin Department of Revenue. The major purpose of this report is to determine the status of the District in collecting the proper tax increment to recover all project costs associated with the District. Therefore, the amounts shown in the accompanying financial statements may not necessarily correlate with amounts shown in the general purpose financial statements of the Village of Jackson. The District was created under the provisions of Chapter 66.1105 of the Wisconsin State Statutes. The purpose of that chapter is to allow a municipality to recover development and improvement costs in a designated area from the property taxes generated on the increased valuation of the property after the creation of the District. The tax on the increased value is called a tax increment. The statutes allow a municipality to collect tax increments until the net project costs have been fully recovered, or until 27 years after the creation date, whichever occurs first. Project costs uncollected at the dissolution date are absorbed by the Village of Jackson. Project costs may be incurred up to five years before the unextended termination date of the District. Original Creation Termination Project Plan Date Date TID #4 September 28, 1995 April 9, 2025 Measurement Focus and Basis of Accounting The District’s financial statements are reported using the current financial resources measurement focus and the modified accrual basis of accounting . Revenues are recognized as they are both measurable and available. Revenues are considered to be available when they are collectible within the current period or soon enough thereafter to pay liabilities of the current period. For this purpose, the District considers revenues to be available if they are collected within 60 days of the end of the current fiscal period. Project plan expenditures generally are recorded when a liability is incurred, as under accrual accounting. However, debt service expenditures, as well as expenditures related to compensated absences and claims and judgements, are recorded only when payment is due. DRAFT 12/3/2025 Page 73 of 81 VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 NOTES TO FINANCIAL STATEMENTS FROM THE DATE OF CREATION THROUGH SEPTEMBER 15, 2025 - 8 - Note A - Summary of Significant Accounting Policies (continued) District increments are recorded as revenues in the year due. Revenues susceptible to the accrual include intergovernmental grants, intergovernmental charges for services, public charges for services and interest. Other revenues are recognized when received in cash or when measurable and available. Use of Estimates The preparation of the District’s financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities, and the reported amounts of revenues and expenses/expenditures during the reporting period. Actual results could differ from those estimates. Project Plan Budget The estimated revenues and expenditures of the District are adopted in the project plan. Those estimates are for the life of the District and may not be comparable to results presented in this report. Claims and Judgments Claims and judgments are recorded as liabilities if all the conditions of Governmental Accounting Standards Board pronouncements are met. Claims and judgments that would normally be liquidated with expendable available financial resources are recorded during the year as expenditures in the governmental funds. If they are not liquidated with expendable financial resources, a long-term liability would be shown. The related expenditure is recognized when the liability is liquidated. There were no significant claims or judgements at the end of the period. Note B - Cash and Investments Cash and investments are combined in the financial statements. Vas deposits consist of demand and time deposits with financial institutions and are carried at cost. The District invests its funds in accordance with the provisions of Wisconsin Statutes. Investments are stated at fair value, which is the amount at which an investment could be exchanged in a current transaction between willing parties. Fair values are based on quoted market prices. No investments are reported at amortized cost. Adjustments necessary to record investments at fair value are recorded in the operating statement as increases or decreases in investment earnings. The District, as a fund of the Village of Jackson, maintains separate and common cash and investment accounts at the same financial institutions utilized by the Village. Federal depository insurance and the State of Wisconsin Guarantee Fund insurance apply to the Village of Jackson as an individual municipality and, accordingly, the amount of insured funds is not determinable for the District. Note C – Property Taxes When the District was created, the value of all taxable property within the defined boundaries of the District was determined by the Wisconsin Department of Revenue. This value is known as the base value of the District and remains unchanged through the life of the District unless the Village amends District boundaries to add or remove properties. The Wisconsin Department of Revenue annually certifies the current value of all taxable property within the District. DRAFT 12/3/2025 Page 74 of 81 VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 NOTES TO FINANCIAL STATEMENTS FROM THE DATE OF CREATION THROUGH SEPTEMBER 15, 2025 - 9 - Note C – Property Taxes (continued) Property taxes consist of taxes on real estate and personal property. They are levied during December of the prior year and become an enforceable lien on the property the following January 1. Property taxes are payable in various options depending on the type and amount. Personal property taxes are payable on or before January 31 in full. Real estate taxes are payable in full by January 31 or in two equal installments on or before January 31 and July 31. Real estate taxes not paid by January 31 are purchased by the County as part of the February tax settlement. Property taxes collected on the base value are shared with the overlying taxing jurisdictions while property taxes collected on the growth in value, also known as the increment value, are retained by the Village as tax increment revenue. The Village uses the tax increment revenue to pay for approved project plan expenditures. Note D - Project Plan Amendment Various amendments to the District’s original project plan were approved by the Village Board. Amendments were approved on July 25, 2002, July 22, 2003, and November 16, 2005. Note E – Tax Increments Transferred from TID No. 2 Excess increments generated from the Village of Jackson Tax Incremental District No. 2 were transferred to Village of Jackson Tax Incremental District No. 4 for a period of five years. An additional five years was added to the tax increments transferred from Tax Incremental District No. 2. The total amounts transferred equaled $5,883,618. Note F – Contribution to the Village’s TID No. 7 In accordance with provisions of Wisconsin Statute Section 66.1105(6)(G), the life of the District was extended one additional year. This statute requires that at least 75 percent of the increment received be used by the Village to improve the Villag’s housing stock. The District completed the transfer of $796,592 of tax increment revenue into the Village’s housing betterment program during 2025 in accordance with the provisions of Wisconsin Statute Section 66.1105(6)(G). Note G – Refund to Other Taxing Units The refund to other taxing units is calculated based on increments collected in excess of project costs using the ratio of tax levies in the 2024 tax roll. There was no refund due to other taxing units as the TID No. 4 fund closed with a deficit that was funded by the Village of Jackson. DRAFT 12/3/2025 Page 75 of 81 SUPPLEMENTARY INFORMATION DRAFT 12/3/2025 Page 76 of 81 SOURCES OF FUNDS 1995 1996 1997 1998 1999 2000 2001 2002 2003 Tax increments -$ -$ -$ -$ -$ -$ -$ -$ 31,517$ Exempt computer aid - - - - - - - - 587 Personal property aid - - - - - - - - - Special assessments - - - - 26,557 31,027 29,910 28,792 27,674 Investment income 194 670 42,677 50,093 16,590 5,757 30,652 1,696 - Tax increments from TID No. 2 - - - - - - - - - Proceeds of long-term debt 55,009 - 1,099,378 1,686,358 184,299 - 1,331,630 320,000 872,219 Settlement from developer - - - - - - - - - Contributions for debt service - - - - - - - - - TOTAL SOURCES 55,203 670 1,142,055 1,736,451 227,446 36,784 1,392,192 350,488 931,997 USES OF FUNDS Capital expenditures - - 228,738 1,449,741 705,289 165,719 832,765 247,144 - Administrative 2,500 5,802 4,000 4,000 8,087 7,783 8,637 9,638 10,000 Professional services 6,900 38,248 52,819 101,958 138,991 2,996 103,030 22,124 - Development grants/incentives - - - - - - - 5,690 97,968 Tax increment to TID No. 7 - - - - - - - - - Interest and fiscal charges - 2,518 28,814 80,895 131,066 135,626 172,120 184,243 203,882 Principal on long-term debt - - - 32,068 84,265 115,765 127,152 205,411 1,096,803 Debt issuance costs - - 13,866 48,064 2,298 - 14,271 - 15,597 TOTAL USES 9,400$ 46,568$ 328,237$ 1,716,726$ 1,069,996$ 427,889$ 1,257,975$ 674,250$ 1,424,250$ VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 DETAILED SUMMARY OF SOURCES, USES AND STATUS OF FUNDS From Date of Creation Through September 15, 2025 - 11 - DRAFT 12/3/2025 Page 77 of 81 VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 DETAILED SUMMARY OF SOURCES, USES AND STATUS OF FUNDS From Date of Creation Through September 15, 2025 SOURCES OF FUNDS 2004 2005 2006 2007 2008 2009 2010 2011 Tax increments 74,704$ 85,847$ 89,065$ 143,319$ 194,861$ 293,238$ 470,527$ 503,048$ Exempt computer aid 601 519 446 602 946 1,648 3,051 3,542 Personal property aid - - - - - - - - Special assessments 26,557 25,439 24,322 23,204 22,086 - - - Investment income - - - - - - - - Tax increments from TID No. 2 - - - - - 287,374 564,845 590,764 Proceeds of long-term debt 2,839,467 1,124,553 - 695,759 1,073,092 - 1,048,458 812,000 Settlement from developer - - - - - - - - Contributions for debt service - - - - - - - - TOTAL SOURCES 2,941,329 1,236,358 113,833 862,884 1,290,985 582,260 2,086,881 1,909,354 USES OF FUNDS Capital expenditures 2,620,000 - 44,055 350,609 1,109,769 15,584 1,667 2,650 Administrative 10,000 10,000 10,000 10,000 10,000 10,000 10,000 5,000 Professional services 36,816 58,759 - - 8,000 - 4,150 4,000 Development grants/incentives 93,024 88,080 195,753 237,078 264,601 335,976 792,801 1,353,192 Tax increment to TID No. 7 Interest and fiscal charges 176,123 334,535 334,565 321,394 308,450 296,032 264,554 234,998 Principal on long-term debt 199,702 1,712,103 271,992 283,621 1,429,443 422,562 1,421,961 415,315 Debt issuance costs - 13,173 - - 41,335 - 11,060 - TOTAL USES 3,135,665$ 2,216,650$ 856,365$ 1,202,702$ 3,171,598$ 1,080,154$ 2,506,193$ 2,015,155$ - 12 - DRAFT 12/3/2025 Page 78 of 81 VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 DETAILED SUMMARY OF SOURCES, USES AND STATUS OF FUNDS From Date of Creation Through September 15, 2025 SOURCES OF FUNDS 2012 2013 2014 2015 2016 2017 2018 2019 Tax increments 529,613$ 526,129$ 649,145$ 564,850$ 587,021$ 751,466$ 785,271$ 784,393$ Exempt computer aid 2,785 8,055 4,444 3,574 5,004 4,895 4,967 5,088 Personal property aid - - - - - - - 4,294 Special assessments - - - - - - - - Investment income - - - - - - - - Tax increments from TID No. 2 564,692 607,499 663,755 634,276 669,432 653,224 647,757 - Proceeds of long-term debt 1,056,374 - - 1,105,221 - 300,390 - Settlement from developer - - - - - - 151,237 - Contributions for debt service - - - - - - - 3,807,201 TOTAL SOURCES 2,153,464 1,141,683 1,317,344 2,307,921 1,261,457 1,709,975 1,589,232 4,600,976 USES OF FUNDS Capital expenditures 2,650 15,139 150 150 150 308,701 4,491 150 Administrative 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 Professional services 3,000 6,500 - - 14,281 10,438 2,300 11,550 Development grants/incentives 357,775 263,923 234,165 119,882 107,294 126,636 93,251 66,444 Tax increment to TID No. 7 Interest and fiscal charges 261,474 188,454 90,967 80,494 40,912 33,281 24,536 15,018 Principal on long-term debt 1,593,295 1,543,853 487,705 1,549,429 561,578 876,007 530,126 156,324 Debt issuance costs 3,572 - - 13,404 - - - - TOTAL USES 2,226,766$ 2,022,869$ 817,987$ 1,768,359$ 729,215$ 1,360,063$ 659,704$ 254,486$ - 13 - DRAFT 12/3/2025 Page 79 of 81 VILLAGE OF JACKSON TAX INCREMENTAL DISTRICT NO. 4 DETAILED SUMMARY OF SOURCES, USES AND STATUS OF FUNDS From Date of Creation Through September 15, 2025 SOURCES OF FUNDS 2020 2021 2022 2023 2024 2025 Totals Tax increments 834,886$ 883,835$ 867,460$ 831,555$ 762,115$ 796,592$ 12,040,457$ Exempt computer aid 5,088 5,088 5,088 5,088 5,088 5,088 81,282 Personal property aid 19,823 26,825 19,822 19,822 19,822 49,556 159,964 Special assessments - - - - - - 265,568 Investment income - - - - - - 148,329 Tax increments from TID No. 2 - - - - - - 5,883,618 Proceeds of long-term debt - - - - - - 15,604,207 Settlement from developer - - - - - - 151,237 Contributions for debt service (1,861,444) 163,648 170,500 (1,000,000) (1,165,886) 114,019 TOTAL SOURCES (1,001,647) 1,079,396 1,062,870 (143,535) 787,025 (314,650) 34,448,681 USES OF FUNDS Capital expenditures - - - - - - 8,105,311 Administrative 12,125 1,650 1,650 1,788 1,900 7,200 201,760 Professional services - - - - - - 626,860 Development grants/incentives 60,302 60,302 17,844 - - - 4,971,981 Tax increment to TID No. 7 796,592 796,592 Interest and fiscal charges 11,035 6,748 2,596 - - - 3,965,330 Principal on long-term debt 162,923 156,900 167,904 - - - 15,604,207 Debt issuance costs - - - - - - 176,640 TOTAL USES 246,385$ 225,600$ 189,994$ 1,788$ 1,900$ 803,792$ 34,448,681$ Fund Balance September 15, 2025 -$ Refund payable to overlying districts - Balance -$ - 14 - DRAFT 12/3/2025 Page 80 of 81 INDEPENDENT AUDITORS’ REPORT ON OTHER LEGAL AND REGULATORY COMPLIANCE To the Village Board of the Village of Jackson We have audited the accompanying Balance Sheet, Historical Summary of Project Costs, Project Revenues and Net Cost to be Recovered Through Tax Increments and the related Historical Summary of Sources, Uses and Status of Funds of the Village of Jackson Tax Incremental District No. 4 (District) as of September 15, 2025 and from the date the District was created through September 15, 2025 and have issued our report thereon dated December 3, 2025. We conducted our audit in accordance with auditing standards generally accepted in the United States of America. Compliance with State Statutes Section 66.1105 In connection with our audit, nothing came to our attention that caused us to believe that the District failed to comply with Wisconsin State Statutes Section 66.1105, insofar as it relates to accounting matters. However, our audit was not directed primarily toward obtaining knowledge of such noncompliance. Accordingly, had we performed additional procedures, other matters may have come to our attention regarding the District's noncompliance with the above-referenced statute, insofar as it relates to accounting matters. This report is intended solely for the information and use of the Village Board, management, and the overlapping taxing districts and is not intended to be, and should not be, used by anyone other than the specified parties. Lucida LLC Lake Geneva, Wisconsin December 3, 2025 DRAFT 12/3/2025 Page 81 of 81

Source: Village of Jackson website. First collected Oct 7, 2026.