Utility Packet 09.30.2026
City of Marathon City · Marathon County · meeting of Sep 30, 2026 · Agenda packets
Open the original document More from City of Marathon City
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Andrew Berens.
Utility Commission Chair
Cassie Lang
Village Clerk / Deputy Treasurer
311 Walnut Street
P .O. Box 487
Marathon City, WI 54448
Tel: 715-443-2221
www.marathoncitywi.gov
VILLAGE UTILITY COMMISSION
OFFICIAL NOTICE & AGENDA
Wednesday, September 30, 2026
4:00 pm - Marathon Municipal Center
PUBLIC VIRTUAL ACCESS
Join Teams Meeting: https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting
Meeting ID: 261 174 214 35
Passcode: cY2jA33d
1. CALL TO ORDER
UTILITY ROLL CALL: A. BERENS, B. BOHR, M. TELFORD, D. SEILER, K. HANDRICK JR.
2. PLEDGE OF ALLEGIANCE
3. RECOGNITION OF VISITORS
a. Virtual Meeting Guidelines
i. This meeting will be recorded and available upon request
b. Public Participation at Government Meetings
4. APPROVAL OF AUGUST 26, 2026 UTILITY COMMISSION MEETING MINUTES
5. REVIEW AND APPROVAL OF PAYMENT OF BILLS
6. PUBLIC UTILITY REPORT
• Water Department Daily Operations Update
• Wastewater Department Daily Operations Update
7. UNFINISHED BUSINESS
a. Update on Well #5
b. Update on Cure-In-Place-Piping Project
c. Update on 4th Street Lift Station
d. Discuss and Establish Hauled Holding Tank Waste Rates Resolution (Dvorak Sanitation)
e. Discussion on Guidelines for Public Works Construction
8. NEW BUSINESS
a. Discuss and Possible Action on Utilizing the Sewer Replacement Fund for Rotork Actuating Valve Repair
on Aerobic Digester A
b. Discuss Draft 2027 Utility Budget
9. SCHEDULED MEETINGS
a. Regular Meeting: Wednesday, October 28, 2026 – 4:00 pm
b. Special Meetings as Needed
10. ADJOURNMENT
VILLAGE UTILITY COMMISSION
MINUTES
Wednesday, August 26, 2026
1. CALL TO ORDER at 4:00 pm
UTILITY ROLL CALL: A. BERENS-Present, B. BOHR-Present, M. TELFORD-Present, D. SEILER-Present,
K. HANDRICK JR.-Present
2. PLEDGE OF ALLEGIANCE
3. RECOGNITION OF VISITORS
a. Virtual Meeting Guidelines
i. This meeting will be recorded and available upon request
b. Public Participation at Government Meetings
In Person Attendance: Joey Knauf – Dvorak Sanitation
4. APPROVAL OF JULY 29, 2026 UTILITY COMMISSION MEETING MINUTES
MOTION – Approve July 29, 2026 Utility Commission Minutes
Motion made by Seiler second by Telford. Motion passed by voice vote.
5. REVIEW AND APPROVAL OF PAYMENT OF BILLS
Commission members questioned the following bill payments:
Check 49764 – Visu-Sewer – CIPP Payment Request 3
Check 49797 – Dodson Auto – Water main break asphalt repairs
MOTION – Approve Payment of Bills
Motion made by Handrick second by Bohr. Motion passed by voice vote.
6. PUBLIC UTILITY REPORT
• Water Department Daily Operations Update
• Wastewater Department Daily Operations Update
Director of Public works, Ken Bloom, updated the Commission of the daily operations of the Utility for the
month of August. His full report can be found in the Agenda Packet.
7. UNFINISHED BUSINESS
a. Update on Well #5
Cherek worked with Strand Associates to get together bid documents for test well drilling. A 2-week
Advertisement for Bids publication will be in the Record Review September 9th and 16th. Bid opening is
scheduled for October 1st at 1:30 pm. Test well drilling will occur near Well 1 and at the new potential
location off North Ridge Road. Cherek will be resubmitting the Clean Water Fund loan application due to
delays in the project and is working with Ehlers on the PSC audit for the conventional rate case.
b. Update on Cure-In-Place-Piping Project
The project is up to date on payment of bills for the work completed. There is a large amount of
contingency left in the budget. The Village, with Matt from Vierbicher, are looking to add more areas to the
project utilizing as much contingency as possible. There are 2 sections of pipe that are beyond the point
of lining and need to be dug and replaced before lining can occur. September 4th, Matt will be here to
paint the sections that need to be replaced so a dig can be scheduled.
c. Update on 4th Street Lift Station
No real update since the July 29th meeting.
d. Discuss and Establish Dvorak Sanitation Holding Tank Dumping Rates
i. Discuss Implementation of Dvorak Sanitation Dumping Contract
* Moved to after Item 3
Bloom noted he has not seen issues with permit limits in the 2-month trial period of Dvorak dumping.
Cherek proposed establishing a holding tank rate on the Utility Rate sheet as opposed to doing a
contract. Holding Tank rates would stay consistent with sewer rate increases. The Village Board would
adopt via resolution after the Utility Commission establishes the rate. No rate determination was made at
this time.
Cassie Lang
Village Clerk / Deputy Treasurer
MOTION – Approve the Extension of Pilot with Current Rate of $13/1,000 Gallons Until a Rate Can
be Established
Motion made by Handrick second by Seiler. Motion passed by voice vote.
8. NEW BUSINESS
a. Discussion on Guidelines for Public Works Construction
At the August 19th Plan Commission meeting, Cherek shared draft guidelines for residential development. He
brought to Utility Commission to determine the utility portion of guidelines. Commission members w ill be sent
the draft for review and will discuss and finalize draft at next meeting.
9. SCHEDULED MEETINGS
a. Regular Meeting: Wednesday, September 30, 2026 – 4:00 pm
b. Special Meetings as Needed
10. ADJOURNMENT at 5:56 pm
Motion to adjourn made by Seiler second by Handrick. Motion passed by voice vote.
Marathon City Utility Operations & Facilities Report
For September 2026
Water Treatment Facility Report
The water facility is operating well and meeting all the monthly testing requirements.
A fire hydrant on 4th and Spring Valley Drive (by the school) broke during a Fire Department
drill/training session. Wisconsin Hydrant Repair will be onsite September 29th to repair the broken
hydrant. The hydrant will not completely shut off, so water continuously leaks out. The service
valve to the hydrant was closed until it gets repaired. It is cheaper to repair this hydrant than
replace it. While Wisconsin Hydrant Repair is here, they will also attempt to fix the 8” watermain
valve on Sonnentag Lane. The operating nut/bolt on top of the valve broke, so we cannot
currently operate this valve. If they are successful, they will be able to reattach the operating nut
from above ground and eliminate the need to excavate the roadway to make this repair.
The operating stem for the drain valve on the west side retention basin at the water treatment
facility is broken, so the tank cannot be completely drained, cleaned, and inspected when needed.
The retention basin overflow pipe is also presumed to be cracked, allowing water to periodically
overflow out the backside of the water treatment plant. Lane Tank Company is preparing a quote
to drain the tank and repair both the drain valve stem and overflow piping to that structure.
Update on new water meter reading software – Cassie Lang
Wastewater Treatment Facility Report
The Wastewater Treatment Facility met all permit limits for the month of August 2026.
The Rotork air actuating valve on Aerobic Digester A has not been consistently working properly.
The actuating valve adjusts the airflow to the digester as needed, by opening and closing the valve
a certain percentage. Currently it is not adjusting the airflow as intended and is under aerating the
digester, which can cause treatment issues long term, regarding biosolids and land spreading
limitations. I will be contacting the Rotork Representative for Wisconsin, LAI, to inquire about this
issue and get the problem resolved.
UPDATE 9/26 – The quote from LAI for $2,176.00, to have a technician onsite to fix the
issue with the Rotork actuating air valve was the cheapest. The quote was signed and set
back to LAI in June 2026. A technician is scheduled to be onsite on September 29
th to fix
the valve. Adequate aeration of the digester is very important to get proper treatment of
biosolids to meet all DNR permit limits, prior to land application. (Update at the meeting)
Wastewater Treatment Facility Report (Continued)
We have been having an issue with the pumps losing prime at the Spring Valley Lift Station. This
has caused several off-duty call-ins over the past month. The check valves are not sealing properly
allowing water to drain back into the wet well. The solution is to replace both check valves. Both
manual plug valves will also be replaced during this project since they are very difficult to operate.
The plug valves are the original valves that were installed in 1982. I’m currently in the process of
getting quotes and purchasing the 4” plug valves. We have both check valves in stock, in our
inventory.
UPDATE 9/26 – The check valve/plug valve assembly on Pump #2 (West Side) has been
replaced. A 5” spool piece was also replaced due to rust and deterioration of the pipe. The
plug valves are the original valves from 1982, when the lift station was installed, and were
very difficult to operate when needed. The east side valve assembly (Pump 1) will be
replaced in the next few weeks, as time permits.
The annual required biosolids sampling is scheduled for the week of September 28
th. This includes
fecal coliform, nutrients, and heavy metals analysis. Sampling for PFAS concentrations in our
biosolids (now required annually in our permit by the DNR) will also be conducted. Results of the
sampling, including PFAS concentrations, will be shared with the commission. The DNR has set an
interim strategy for land application of biosolids based on monitoring results. PFOA + PFOS at or
less than 20 ug/kg (ppb) is the threshold for imposing any additional requirements or reductions in
land application rates.
Currently we have approximately 100,000 gallons of sludge (biosolids) in storage, ready for land
application this fall.
Effluent PFAS sampling continues once every 2 months. So far, our results are looking very
promising, that we will not need a PFAS minimization plan; however, we still have approximately a
year and half of sampling to complete, prior to any determination for additional DNR
requirements.
The effluent disinfection season ends October 1st. The UV lamp racks will be removed, cleaned,
and put in storage for the winter. The UV disinfection system will be shut down and put into
winterization mode until late April 2027, prior to a May 1st start-up.
Submitted by: Ken Bloom, Director of Public Works & Utilities
1
Steve Cherek
From: Butzlaff, Kathy - PSC <Kathy.Butzlaff@wisconsin.gov>
Sent: Wednesday, September 23, 2026 10:41 AM
To: Steve Cherek
Cc: KateLynn Harrigan; Brian Roemer; Cassie Lang; Ken Bloom; Hanna, Alex - PSC; Saeed,
Zahra - PSC
Subject: [External] Marathon City Water Rate Case, docket 3350-WR-105
Hi Steve,
Commission staƯ has opened an investigation regarding unauthorized construction related to response
PSCW-KAB-2 in docket 3350-WR-105. The investigation docket number is 3350-WI-100.
Commission staƯ will issue a data request in docket 3350-WI-100. To ensure both dockets progress
smoothly, the Utility should respond to the data request as thoroughly and promptly as possible.
Please let us know if you have any questions.
Thanks, Kathy
Kathleen Butzlaff
Audit Manager
Division of Water UƟlity RegulaƟon and Analysis
Public Service Commission of Wisconsin
Kathleen.Butzlaff@wisconsin.gov | 608.267.9817
psc.wi.gov
Have you subscribed to your Docket? To receive notifications of documents that are filed to PSC’s Electronic Records Filing
System (ERF), you must subscribe to the docket. Subscribe at ERF-EZ Subscriptions, or go to Subscribing Instructions for
more information. Subscribe to our quarterly newsletter.
1
Steve Cherek
From: Butzlaff, Kathy - PSC <Kathy.Butzlaff@wisconsin.gov>
Sent: Wednesday, September 23, 2026 3:02 PM
To: Steve Cherek; KateLynn Harrigan
Cc: Hanna, Alex - PSC; Clark, Chassitti - PSC; Ken Bloom; Cassie Lang; Brian Roemer
Subject: [External] Docket 3350-WR-105 Data Request Follow-up Questions (Marathon City)
Steve and KateLynn,
We reviewed all the Data Request responses and have just three follow-up questions.
KAB-9: Account 465 (Other Water Sales) – The Utility responded these are pump house sales. What are
pump house sales? Are these sales metered and billed under Schedule BW-1? If not, explain what rates
are used.
CC-2: The utility didn’t indicate whether/how it explains the budget plan review at 12 months to
customers. Please provide additional details.
CC-3: The Utility did not revise the budget payment application as requested. It still contains the
language “in the event service is disconnected, it shall be reconnected only upon payment of all past due
charges and reconnection fees.” Please refer to the original question and provide more information.
If you want to discuss any of these questions, let us know and we can set up a short meeting. Otherwise,
please respond within one week.
Thanks, Kathy
Kathleen Butzlaff
Audit Manager
Division of Water UƟlity RegulaƟon and Analysis
Public Service Commission of Wisconsin
Kathleen.Butzlaff@wisconsin.gov | 608.267.9817
psc.wi.gov
Have you subscribed to your Docket? To receive notifications of documents that are filed to PSC’s Electronic Records Filing
System (ERF), you must subscribe to the docket. Subscribe at ERF-EZ Subscriptions, or go to Subscribing Instructions for
more information. Subscribe to our quarterly newsletter.
23 Sep 2026 - 1:36p C:\Users\jcha\appdata\local\temp\AcPublish_23320\Slip Lining Exhibit.dwg by: jcha
SANITARY SEWER CIPP LINING EXHIBIT
VILLAGE OF MARATHON CITY, WISCONSIN
SEPTEMBER 2026
RESOLUTION NO. U-2026-10-7
A RESOLUTION ESTABLISHING HAULED HOLDING TANK WASTE RATES
AND CHARGES
WHEREAS, the Village of Marathon City Wastewater Utility will begin accepting
hauled holding tank waste effective October 1, 2026; and
WHEREAS, the Utility Commission has recommended the establishment of rates and
charges for such service; and
NOW, THEREFORE, BE IT RESOLVED by the Village Board of the Village of
Marathon City, Wisconsin, as follows:
Section 1. Volume Charge
The volume charge for hauled holding tank waste shall be established at ninety percent
(90%) of the Residential, Commercial, Public Authority and Industrial Waste Water
volume charge in effect for Waste Water Utility Customers.
The hauled holding tank waste volume charge shall automatically adjust whenever the
Residential, Commercial, Public Authority and Industrial Waste Water volume charge is
amended by the Village Board.
Section 2. Administrative Charge
In addition to the volume charge, a fifty dollar ($50.00) administrative charge shall be
assessed for each bill issued.
The administrative charge shall automatically adjust by the same percentage whenever
the quarterly meter charge applicable to Residential, Commercial, Public Authority, and
Industrial customers is amended by the Village Board. Such adjustment shall become
effective concurrent with the amended quarterly meter charge without further action of
the Village Board.
Section 3. Billing Frequency
Customers may elect either monthly or quarterly billing.
The administrative charge established herein shall apply to each bill issued regardless of
billing frequency.
Section 4. Administration
The Waste Water Utility is authorized to establish procedures necessary to administer this
program and may require documentation of hauled volumes from customers and licensed
haulers.
Section 5. Effective Date
This Resolution shall take effect upon adoption and shall apply to all hauled holding tank
waste received on and after October 1, 2026.
Adopted this _____ day of __________, 2026.
APPROVED____________________________
Kurt Handrick, Jr., Village President
ATTEST_______________________________
Cassie Lang, Clerk / Deputy Treasurer
Design and Construction Guidelines
For Public Works Construction
All design and construction shall be in accordance with the Village of Marathon City
Ordinances, as well as all other State and local government regulations. Plans and
specifications for all public improvement shall be provided, signed and sealed by a
Professional Engineer registered in the State of Wisconsin.
Concrete Sidewalk
1. Sidewalks shall be provided on both sides of arterial and collector streets. Sidewalks
along minor streets shall be provided on at least one side of the street if within 1,000 feet
of a school.
2. All new concrete sidewalks shall be a minimum of 5 feet wide in residential areas.
3. Sidewalk shall be a minimum of 4 inches thick on a base of 6 inches of dense aggregate
base course. Sidewalks across driveways shall be a minimum of 6 inches thick on a base
of 6 inches dense aggregate base course in residential areas and a minimum of 8 inches
thick in commercial or industrial aeras.
4. Sidewalk shall be located 0.5 feet – 1.0 feet from the property line, except in areas in
which an approved offset may be required to match existing conditions.
5. Sidewalks shall meet ADA requirements.
6. Sidewalks shall have a slope of 1.5% sloped toward the curb.
7. Curb ramps and detectable warning fields (truncated domes) will be required at all
intersections and any mid-block crossings.
Multi-Use Path
1. Paved multi-use trails shall be provided in accordance with the sidewalk and trail plans or
other approved development plans, and shall have a minimum width of 10 feet.
2. Multi-use trails shall be designed in accordance with the Wisconsin Bicycle Facility Design
Handbook.
3. HMA pavement shall be a minimum of 2.5 inches thick on 12 inches of dense aggregate
base course. Multi-use trails shall meet ADA requirements where practical.
4. The minimum terrace width between the curb and street edge of the trail shall be 6 feet
unless otherwise approved by the Village.
Driveways
1. No residential driveway shall be less than 10 feet in width or more than 24 feet in width at
the edge of the street or sidewalk.
2. Cutting of flow line is prohibited for driveway construction. The curb head shall be cut
using a profile curb cut saw. Alternatively, the entire curb and gutter may be replaced.
3. Driveway width shall be in accordance with the appropriate Zoning District as noted in
Chapter 6 – Public Works and labeled on the plan set.
4. Driveway slopes shall not exceed twelve percent (12%) unless approved by the Village
Board.
5. Where concrete approaches are required, residential driveway approaches shall be
constructed with a minimum of six (6) inches of concrete over a minimum of four (4)
inches of compacted crushed limestone. For asphalt driveways, a minimum of two and
one half (2 ½) inches of bituminous surface material over a minimum of ten(10) inches of
compacted crushed stone shall be provided.
6. Where concrete approaches are required, non-residential driveway approaches shall
consist of a minimum of eight (8) inches poured concrete over a minimum of four (4)
inches compacted crushed stone.
Streets, Grading, & Site
1. Streets shall conform to Chapter 14 of the Village Ordinance.
2. Streets shall have a minimum paving width of 32 feet for residential or minor streets and
40 feet for collector streets.
3. All streets shall include curb and gutter.
4. All pavements shall have a minimum crown cross slope of 2.0%. Detailed intersections
plans shall be provided, showing design elevations and slopes. Crosswalks and curb
ramps at intersections shall be ADA compliant.
5. The street surface shall consist of not less than ten inches of crushed gravel and surfaced
with asphalt (3.5” minimum) or concrete (8” minimum). Additional base course may be
required following a proof roll.
6. The constructed base course shall pass a proof roll prior to placement of asphalt paving.
7. Asphalt paving during inclement weather shall be completed in conformance with
applicable WisDOT specifications.
8. The minimum terrace width shall be 6 feet and shall have a slope of 4%, draining towards
the street.
9. Detailed engineering drawings shall be provided prior to final plan approval, including
the following:
a. Include a plan for streetlights and street signage. Signage shall include stop signs,
street name signs, speed limit signs, and no parking signs.
b. All crosswalks shall comply with ADA slope requirements.
c. Provide construction details for proposed improvements including manholes, inlets,
erosion control, hydrants, etc.
d. Provide typical sections for all streets.
e. Survey and clearly show all existing improvements at connection points including
street, sanitary sewer, water main, storm sewer, and all dry utilities.
f. Provide plan and profile drawings for all sanitary sewer, storm sewer, and water main
outside the right of way.
Water Main
1. Water main shall be Ductile Iron pipe unless otherwise approved and bedded with Type
3 Embedment (sand or sand screenings). Bedding shall be a minimum of 6 inches under
and 12 inches over top of the pipe. The Village may consider PVC C900 Pressure Class
150 (DR 18) Water Main on a case-by-case basis.
2. Water services 1 inches and smaller shall be copper.
3. The minimum spacing between taps on C900 water main shall be 3 feet and 2 feet away
from any bell or joint restraint.
4. Water main shall be installed with tracer wire. Tracer wire shall extend to the surface at all
hydrants in a tracer wire access box.
5. All mains shall be a minimum of 8 inches in diameter with the exception of hydrant leads,
which shall be 6 inches.
6. Water main shall have a minimum cover of 7 feet, with proper clearances between the
water main and storm/sanitary sewers. Detailed elevations shall be provided at all water
and sewer crossings.
7. All water mains are required to be looped or as approved by Village Board.
8. Mechanical Joint fittings with mega lugs are required for all directional change fittings
and water main ends.
9. Fire hydrants shall be located 3.5 feet behind the back of the curb unless otherwise
approved. Hydrant valves shall be placed in the street.
10. A fire hydrant shall be required at the end of all dead-end lines.
11. Fire hydrants shall be Waterous Pacer WB67, or as approved by the Village Board.
12. Curb Boxes shall be Bingham and Taylor Buffalo Type and installed with the extension rod
and guide ring.
13. Curb valves shall be Mueller H15209 for 1 inches services, equivalent for larger services, or
as approved by the Director of Public Services.
14. Corporation stops shall be Mueller H15008 for 1 inches services, equivalent for larger
services, or as approved by the Director of Public Services.
15. Curb boxes shall be located 3.5 feet behind the back of curb. Curb boxes shall be
referenced by station and offset on the engineering drawings.
16. Water valves shall be American Flow Control Series 2500 Resilient Wedge Gate Valves or
as approved by the Village Board.
17. A sign reading 'Water Valve' shall be installed next to any valves situated outside the
right-of-way. These signs shall be affixed to treated 4 inches x 4 inches wooden posts.
18. Lateral ends shall be marked with a painted 4 inches x 4 inches wood post.
19. Water mains shall undergo a pressure and leakage test. Services shall be tested to the
curb stop.
20. A minimum of two safe water samples are required, with a minimum of 24 hours between
each sample. If the second water sample fails, two consecutive safe water samples are
required.
21. Excavated material from the trench not suitable for backfill, as deemed by the Village,
shall be removed and replaced with select trench backfill.
22. All water main construction shall meet the Standard Specifications for Sewer and Water
Construction in Wisconsin.
Sanitary Sewer
1. The sanitary sewer shall be PVC and bedded with Class C Bedding (clear stone). SDR
shall be determined by the design depth.
2. Tracer wire shall be installed with all new laterals.
3. Tracer wire boxes shall be provided and located 3.5 feet behind the back of the curb.
Tracer wire shall extend to the right-of-way. “Sewer” shall be stamped on the lid of the
access box.
4. All manhole castings shall be Neenah R-1550 with Type B Non-rocking lids and concealed
pick holes.
5. Excavated material from the trench, deemed not suitable for backfill by the Village, shall
be removed and replaced with select trench backfill.
6. All new sanitary sewer mains shall be televised. Two copies of the televising report and a
suitable electronic file shall be provided to the Village.
7. Mandrel testing is required on all sanitary sewer. Low pressure air tests are required on all
new sanitary sewer construction.
8. All manholes installed outside of the right-of-way shall have a rim elevation one foot
above the existing ground. A sign with the text “Sanitary Sewer” shall be installed
adjacent to manholes located outside of the right-of-way. Signs should be mounted on
treated 4 inches x 4 inches wood posts.
9. Lateral depth at the right-of-way shall not exceed 12 feet without proper justification.
Variances from this requirement may be approved by the Village.
10. Lateral ends shall be capped with a glued-on cap and marked with a painted 4 inches x
4 inches post.
11. All sanitary sewer construction shall meet the Standard Specifications for Sewer and
Water Construction in Wisconsin.
12. Manholes shall be constructed with steps.
Storm Sewer and Storm Water Management
1. Storm sewer within street right-of-ways shall be reinforced concrete pipe.
2. All public endwalls shall be reinforced concrete pipe unless approved by the Village
Board.
3. Storm sewer bedding shall be clear stone.
4. The minimum cover for all storm sewers shall be 2 feet unless approved by the Village.
5. Excavated material from the trench not suitable for backfill, as deemed by the Village
Engineer, shall be removed and replaced with select trench backfill.
6. Adjustment rings for all curb inlets shall have a minimum height of 4 inches and a
maximum height of 12 inches.
7. Manholes 3 feet deep and greater shall be constructed with steps.
8. All manholes installed outside of the right-of-way shall have a rim elevation 1 foot above
the existing ground. A sign reading “Storm Sewer” shall be installed adjacent to manholes
outside of the right-of-way. The signs shall be mounted on treated 4 inches x 4 inches
wooden posts.
9. Inlets at low points shall have Neenah Type R grates. Inlets on grade shall be directional
Type L. All inlets shall be stamped “Drains to River”.
10. Infiltration basins shall not be restored until the remainder of the site has been fully
restored.
11. Test pits shall be completed within the infiltration area of all proposed infiltration facilities.
Test pit locations shall be shown on the engineering drawings.
12. All stormwater facilities shall conform to WDNR Technical Standards for pre and post
construction stormwater management.
13. All storm sewer shall be sized for the 10-year storm event and a safe overflow shall be
provided for the 100 year storm event. Large drainageways, as determined by the
Village Board, may require additional capacity.
14. Double inlets shall be provided at all low points.
15. The last two pipes shall be strapped together at end sections on all pipes 18 inches and
greater.
16. No slopes shall exceed 3:1 (H:V) unless approved by the Village.
17. Erosion matting is required for all restoration on slopes with a gradient of 4:1 or greater, as
well as in areas that channel water.
Grading, Restoration & Erosion Control
1. All disturbed areas shall be seeded and mulched within 15 days of disturbance and shall
be completed before the end of the construction season.
2. All storm drain inlets shall have adequate erosion control protection.
3. All silt fence shall be properly installed, maintained, and removed upon establishment of
turf.
4. All sites shall be adequately protected to prevent sediment from leaving the site.
5. Adequate survey data shall be shown on the engineering drawings, showing existing
elevations sufficient enough to ensure no adverse impacts to adjacent properties.
Easements
1. All Easements shall be specific to the intended use.
2. All sanitary sewer, water main, and storm sewer pipes outside of the right-of-way shall be
covered by an easement to the benefit of the Village of Marathon City.
3. All sanitary sewer, water main, and storm sewer easements shall be a minimum of 30 feet,
unless approved by the Village. Easements that hold two utilities shall be a minimum of 35
feet wide. Easements with more than two uses shall be determined by the Village.
Additional easement width may be required, depending on the depth of utilities.
QUARTERLY METER CHARGES
Q4, 2025 Q4, 2026 Q4, 2027
RESIDENTIAL RATE 5.50% 5.50% 3.00%
5/8" METER 61.79$ 65.19$ 67.14$
3/4" METER 61.79$ 65.19$ 67.14$
COMMERCIAL, INDUSTRIAL, PUBLIC AUTHORITY RATES
5/8" METER 92.67$ 97.77$ 100.70$
3/4" METER 92.67$ 97.77$ 100.70$
1" METER 138.92$ 146.56$ 150.95$
1 1/4" METER 185.30$ 195.49$ 201.35$
1 1/2" METER 231.45$ 244.18$ 251.50$
2" METER 277.83$ 293.11$ 301.90$
3" METER 476.74$ 502.96$ 518.05$
VOLUME CHARGE Per 1000 GL 19.72$ 20.80$ 21.43$
HIGH STRENGTH INDUSTRIAL CHARGES
VOLUME CHARGE Per 1000 GL 10.79$ 11.39$ 11.73$
SURCHARGE
BOD OVER 250 MG/L PER POUND 1.49$ 1.57$ 1.62$
SS OVER 150 MG/L PER POUND 1.21$ 1.28$ 1.32$
PHOSPHORUS OVER 5 MG/L PER POUND 26.52$ 27.98$ 28.82$
HIGH STRENGTH CUSTOMER FIXED CHARGE 2,422.86$ 2,556.12$ 2,632.80$
(Fixed charge is for water and sewer combined)
Hauled Holding Tanks Waste
Volume Charge Per 1000 GL 18.72$ 19.28$
Administration fee (per billing cycle) 50.00$ 51.50$
Hauled Holding Tank Waste - Quarterly or Monthly
VILLAGE OF MARATHON CITY
QUARTERLY UTILITY METER CHARGES
SEWER RATE
PHASED RATE INCREASE
195,621.14$
5 Year Waste Water Trends
01,000,0002,000,0003,000,0004,000,0005,000,0002022 2023 2024 2025 2026Residential
0500,0001,000,0001,500,0002,000,0002,500,0003,000,0002022 2023 2024 2025 2026Industrial0200,000400,000600,000800,0001,000,0001,200,0001,400,0001,600,0001,800,0002,000,0002022 2023 2024 2025 2026Commercial
0100,000200,000300,000400,000500,000600,000700,000800,000900,0002022 2023 2024 2025 2026Public Authority
0200,000400,000600,000800,0001,000,0001,200,0002022 2023 2024 2025 2026Multifamily7,000,0007,500,0008,000,0008,500,0009,000,0009,500,00010,000,0002022 2023 2024 2025 2026Waste Water Billed Consumption by Quarter
Prepared by Steven Cherek 9/27/2026 Page 1
195,621.14$
2 Year Waste Water Trends
3,400,0003,500,0003,600,0003,700,0003,800,0003,900,0004,000,0004,100,0004,200,0004,300,0002025 2026Residential
0500,0001,000,0001,500,0002,000,0002,500,0003,000,0002025 2026Industrial0200,000400,000600,000800,0001,000,0001,200,0001,400,0001,600,0001,800,0002,000,0002025 2026Commercial
050,000100,000150,000200,000250,000300,000350,000400,000450,000500,0002025 2026Public Authority
0200,000400,000600,000800,0001,000,0001,200,0002025 2026Multifamily7,000,0007,500,0008,000,0008,500,0009,000,0009,500,00010,000,0002025 2026Waste Water Billed Consumption by Quarter
Prepared by Steven Cherek 9/27/2026 Page 1
REVENUES Count 1Year - 2025 Q2 to 2026 Q2 MC CM 2027 Projected Rev
200-00-46410-000-450 Sales - Residential 496 15,979,735 461,759.97 $
200-00-46410-000-451 Sales - Commercial 70 6,133,720 162,649.39 $
200-00-46410-000-452 Sales - Industrial 27 4,645,108 93,796.87$ 15,793.33$ 212,548.53$
200-00-46410-000-453 Sales - Multifamily 14 3,851,263 92,037.85 $
200-00-46410-000-454 Sales - Public Auth. 13 1,490,628 43,434.99 $
SUBTOTAL WASTEWEATER SALES620 36,260,589 972,430.73$
2 Year average 2027 Projected Rev
200-00-46410-000-450 Sales - Residential 496 15,723,610 456,431.78 $
200-00-46410-000-451 Sales - Commercial 70 5,811,580 155,947.89 $
200-00-46410-000-452 Sales - Industrial 27 4,471,580 97,589.33 $ 15,517.98$ 212,441.07$
200-00-46410-000-453 Sales - Multifamily 14 3,847,442 91,958.35 $
200-00-46410-000-454 Sales - Public Auth. 13 1,579,119 45,275.88 $
SUBTOTAL WASTEWEATER SALES 620 35,742,342 962,054.97$
5 year average 2027 Projected Rev
200-00-46410-000-450 Sales - Residential 496 16,110,803 464,486.58 $
200-00-46410-000-451 Sales - Commercial 70 5,375,298 146,871.89 $
200-00-46410-000-452 Sales - Industrial 27 4,329,261 98,486.36 $ 15,831.21$ 210,690.68$
200-00-46410-000-453 Sales - Multifamily 14 3,196,967 78,426.49 $
200-00-46410-000-454 Sales - Public Auth. 13 2,079,870 55,693.03 $
SUBTOTAL WASTEWEATER SALES 620 35,259,486 956,168.67$
2027 WASTE WATER BUDGET - 9-28-2026 Draft
5.5% Rate Increase - (Q4 2026)
2024-26 Inactive Accounts - combined/replaced in 2027
ACTUAL ACTUAL ACTUAL As Of 9/22/2026 PROJECTED ADOPTED PROPOSEDYOY Percent
REVENUES 2023 REVENUES2024 REVENUES2025 REVENUES2026 REVENUESYear End 20262026 REVENUES2027 REVENUESChange
200-00-46410-000-450 Sales - Residential 291,473.49$ 387,104.89$ 416,909.41$ 330,013.56$ 440,018.08$ 430,064.52$ 456,431.78$ 6.13%
200-00-46410-000-451 Sales - Commercial 153,298.37$ 224,228.89$ 139,236.95$ 111,188.00$ 148,250.66$ 138,473.99$ 155,947.89$ 12.62%
200-00-46410-000-452 Sales - Industrial 179,432.65$ 178,488.16$ 213,014.51$ 160,499.87$ 213,999.83$ 208,516.80$ 212,441.07$ 1.88%
200-00-46410-000-453 Sales - Multifamily 18,042.50$ 23,161.24$ 82,693.71$ 64,369.00$ 85,825.33$ 85,708.84$ 91,958.35$ 7.29%
200-00-46410-000-454 Sales - Public Auth. 39,097.85$ 46,203.78$ 42,068.05$ 35,408.43$ 47,211.24$ 45,046.76$ 45,275.88$ 0.51%
200-00-46410-200-000 Sewer Sales - Sewer Dumping -$ 130.00$ 165.00$ 4,137.27$ 5,516.36$ -$ 11,032.00$
SUBTOTAL WATER SALES 681,344.86$ 859,316.96$ 894,087.63$ 705,616.13$ 940,821.50$ 907,810.91$ 973,086.97$ 7.19%
200-00-46410-000-455 Cust. Penalties 1,763.91$ 2,097.93$ 1,988.27$ 1,426.03$ 1,901.38$ 2,000.00$ 2,000.00$ 0.00%
200-00-46410-000-500 Interest Income -$ -$ 9,298.57$ 7,195.17$ 10,792.75$ 10,956.24$ 19,723.00$ 80.02%
200-00-46410-000-510 Other Sewer Rev 1,615.47$ 1,615.47$
200-00-46420-000-635 MISC Rev 252,640.04$ 8,627.76$ -$ 251.54$ 251.54$ -$ -$
Transfer from Utility CIP LGIP Bank Account to Utility fund 491,548.10$ 491,548.10$ 674,213.00$ 182,664.90$ -72.91%
200-00-49110-000-000 Short-term Borrowing -$
200-00-47500-100-001 CWLF PROCEEDS 5,230,247.56$ - $ -$
200-00-48400-000-421 CONTRIBUTED PLANT SEWER410,428.00$ 122,765.00$ 118,657.00$
SUBTOTAL - OTHER WATER REV5,895,079.51$ 133,490.69$ 129,943.84$ 502,036.31$ 506,109.24$ 687,169.24$ 204,387.90$ -70.26%
TOTAL WASTE WATER REVENUES 6,576,424.37$ 992,807.65$ 1,024,031.47$ 1,207,652.44$ 1,446,930.74$ 1,594,980.15$ 1,177,474.87$ -26.18%
Prepared by Steven Cherek 9/28/2026 Page 1
ACTUAL ACTUAL ACTUAL As Of 9/22/2026 PROJECTED ADOPTED PROPOSEDYOY Percent
EXPENDITURES 2023 EXPENSES2024 EXPENSES2025 EXPENSES2026 EXPENSESYear End 20262026 EXPENSES2027 EXPENSESChange
200-00-53111-000-001 Board Wages 1,375.00$ 750.00$ -$ -$
200-00-53111-110-001 WW U. Board Wages 475.00$ 1,149.00$ 825.00$ 1,825.00$ 1,625.00$ 3,000.00$ 84.62%
200-00-53111-130-001 WW Board FICA & Medicare 44.06$ 63.24$ 136.88$ 121.88$ 225.00$ 84.61%
SUBTOTAL - BOARD WAGES & EXP 1,375.00$ 1,225.00$ 1,193.06$ 888.24$ 1,961.88$ 1,746.88$ 3,225.00$ 84.61%
200-00-53111-110-000 Waste Water Admin Office Wages 137,516.56$ 26,691.45$ 36,525.14$ 36,792.13$ 58,404.94$ 58.74%
200-00-53111-130-000 WW FICA/Medicare - all employees 2,754.48$ 10,979.00$ 7,491.99$ 10,293.37$ 11,515.43$ 13,415.97$ 16.50%
200-00-53111-000-100 Waste Water Operating Wages 95,092.75$ 89,413.65$ 513.00$ 73,602.91$ 100,719.77$ 113,248.79$ 115,741.06$ 2.20%
200-00-53111-000-105 FICA & Medicare 10,825.23$ 8,603.71$
200-00-53111-000-110 Administrator Wages 7,464.93$ 6,412.50$
200-00-53111-000-115 Clerical Wages 20,503.00$ 18,561.80$
200-00-53111-000-820 SALARIES & WAGES (53.00)$
200-00-53300-000-408 Fica & Medicare 689.00$
200-00-53500-000-120 PENSION & BENEFITS
SUBTOTAL - WAGES 134,521.91$ 125,746.14$ 149,008.56$ 107,786.35$ 147,538.28$ 161,556.35$ 187,561.97$ 16.10%
200-00-53111-140-000 WW Retirement 12,271.80$ 6,833.65$ 9,354.00$ 10,568.14$ 12,381.99$ 17.16%
200-00-53111-150-000 WW HEALTH INSURANCE 43,290.87$ 29,193.96$ 43,119.96$ 39,170.04$ 44,822.96$ 14.43%
200-00-53111-160-000 WW Life Insurance 150.89$ 152.08$ 209.11$ 210.60$ 210.60$ 0.00%
200-00-53111-000-116 Benefits 14,560.18 $ 7,675.47$ 34.75$ -$
200-00-53500-000-120 Benefits
200-00-53800-000-428 Sewer Pension / Benefites 35,382.86$ 37,534.09$
200-00-53200-135-000 wwtp Uniform Allowance 143.48$ 201.06$ -$ 300.00$ 600.00$ 600.00$ 0.00%
SUBTOTAL - BENEFITS 49,943.04$ 45,353.04$ 55,914.62$ 36,214.44$ 52,983.07$ 50,548.78$ 58,015.55$ 14.77%
200-00-53111-000-821 Power for Pumps 38,997.51$ 37,480.99$ 41,670.54$ 30,903.47$ 41,204.62$ 46,313.00$ 43,000.00$ -7.15%
200-00-53111-000-822 MDV Phosphorus Payment -$ 25,051.00$ 11,489.00$ 12,014.40$ 12,014.40$ 14,000.00$ -$ -100.00%
200-00-53111-000-826 Chemicals - Treatment 9,509.21$ 12,843.58$ 13,547.54$ 15,282.19$ 15,282.19$ 14,000.00$ 17,100.00$ 22.14%
200-00-53111-000-827 Supplies & Exp 39,260.86$ 31,665.30$ 31,831.69$ 21,561.28$ 28,750.00$ 29,000.00$ 29,616.00$ 2.12%
200-00-53111-000-828 Wastewater Vehicle Maintenance 157.35$ 1,333.02$ 16.99$ 32.97$ 600.00$ 1,000.00$ 1,000.00$ 0.00%
200-00-53111-000-829 Wastewater Dept Gasoline 334.67$ 478.39$ 271.50$ 335.62$ 636.00$ 750.00$ 750.00$ 0.00%
200-00-53300-000-831 Maint Collection System 4,775.72$ 303.59$ 374.31$ 1,550.78$ 1,550.78$ 5,000.00$ 2,500.00$ -50.00%
200-00-53300-000-832 Maint Lift Stations 14,023.61$ 7,905.60$ 2,573.06$ 10,339.03$ 13,800.00$ 9,000.00$ 11,500.00$ 27.78%
200-00-53300-000-833 Maint Tre & Disp 27,850.25$ 3,896.61$ 4,854.60$ 1,609.09$ 2,145.00$ 3,500.00$ 3,500.00$ 0.00%
200-00-53300-000-834 Maint GP STR & EQ 1,661.93$ 1,483.11$ 6,353.62$ 6,312.56$ 7,363.00$ 4,000.00$ 4,500.00$ 12.50%
200-00-83300-000-835 Maint Meters -$ -$ -$ -$ -$ -$ -$ #DIV/0!
SUBTOTAL - MAINT & OPS 136,571.11$ 122,441.19$ 112,982.85$ 99,941.39$ 123,345.99$ 126,563.00$ 113,466.00$ -10.35%
200-00-53500-000-857 Debt PMT Prinicpal -$ 0.02$ 0.27$ 395,093.06$ 395,093.06$ 396,573.04$ 404,643.30$ 2.03%
200-00-53500-000-858 Debt Payment Int 99,712.44$ 163,479.03$ 164,669.33$ 108,250.92$ 185,202.35$ 185,504.57$ 179,498.09$ -3.24%
SUBTOTAL - DEBT PAYMENTS 99,712.44$ 163,479.05$ 164,669.60$ 503,343.98$ 580,295.41$ 582,077.61$ 584,141.39$ 0.35%
200-00-53300-500-000 Accrued Sick Leave
200-00-53311-000-856 MISC EXP
200-00-53400-000-840 Billing & Accounting 226.73$ 429.62$ 329.07$ -$ -$ 200.00$ 200.00$ 0.00%
200-00-53400-000-842 Meter Reading -$ -$ -$ -$ -$
200-00-53400-000-843 Uncollectable A/R -$ -$ -$ -$ -$
200-00-53500-000-851 Supplies 4,969.91$ 9,211.56$ 6,488.33$ 7,840.24$ 11,274.00$ 9,000.00$ 11,000.00$ 22.22%
200-00-53500-000-852 Outside Services 3,528.28$ 13,711.08$ 26,416.57$ 15,181.44$ 17,000.00$ 15,500.00$ 17,500.00$ 12.90%
200-00-53500-000-853 Insurance 12,504.49$ 13,939.09$ 17,504.64$ 19,161.49$ 19,161.49$ 16,935.00$ 21,800.00$ 28.73%
200-00-53500-000-855 Regulatory Exp 527.32$ -$ -$ -$
200-00-53500-000-856 Misc Exp 466.35$ 1,439.48$ 1,575.85$ 1,168.93$ 1,477.00$ 1,500.00$ 2,000.00$ 33.33%
200-00-53500-383-000 Conf/Train/Mileage/Motel
200-00-53600-000-403 Other Expenditures #DIV/0!
200-00-53600-130-000 Sewer Fringe Benefits #DIV/0!
200-00-53800-000-000 Tax Equivalent
SUBTOTAL - ADMIN COSTS 22,223.08$ 38,730.83$ 52,314.46$ 43,352.10$ 48,912.49$ 43,135.00$ 52,500.00$ 21.71%
200-00-51510-210-105 WWTP Engineering
200-00-56100-100-500 General Construction 5,387,691.83$ 13,229.98$ - $
200-00-56200-000-001 WWTP Cure in place Piping 491,548.10$ 491,548.10$ 674,213.00$ 182,664.90$
SUBTOTAL - Capital Project Fund Transfer to Utility CIP5,387,691.83$ 13,229.98$ -$ 491,548.10$ 491,548.10$ 674,213.00$ 182,664.90$ 0.00%
TOTAL EXPENDITURES 5,832,038.41$ 510,205.23$ 536,083.15$ 1,283,074.60$ 1,446,585.22$ 1,639,840.62$ 1,181,574.81$ -27.95%
TO (FROM) RESERVE 744,385.96$ $482,602.43 $487,948.32 -$75,422.16 $345.52 ($44,860.47) ($4,099.94) -90.86%
Prepared by Steven Cherek 9/28/2026 Page 2
5.5% Rate Increase - (Q4 2026)
ACTUAL ACTUAL ACTUAL As Of 9/22/2026 PROJECTED ADOPTED PROPOSEDYOY Percent
REVENUES 2023 REVENUES2024 REVENUES2025 REVENUES2026 REVENUESYear End 20262026 REVENUES2027 REVENUESChange
SANITARY SALES 681,344.86 $ 859,316.96$ 894,087.63$ 705,616.13$ 940,821.50$ 907,810.91$ 973,086.97$ 7.19%
OTHER REVENUE 664,831.95$ 133,490.69$ 129,943.84$ 10,488.21$ 14,561.14$ 12,956.24$ 21,723.00$ 67.66%
PROCEEDS FROM BORROWING 5,230,247.56$ -$ -$ -$ -$ -$ -$ 0.00%
PROCEEDS FROM WWTP CIP RESERVE -$ -$ -$ 491,548.10$ 491,548.10$ 674,213.00$ 182,664.90$ -72.91%
TOTAL REVENUE 6,576,424.37$ 992,807.65$ 1,024,031.47$ 1,207,652.44$ 1,446,930.74$ 1,594,980.15$ 1,177,474.87$ -26.18%
ACTUAL ACTUAL ACTUAL As Of 9/22/2026 PROJECTED ADOPTED PROPOSEDYOY Percent
EXPENDITURES 2023 EXPENSES2024 EXPENSES2025 EXPENSES2026 EXPENSESYear End 20262026 EXPENSES #REF! Change
BOARD WAGES & EXPENSE 1,375.00 $ 1,225.00$ 1,193.06$ 888.24$ 1,961.88$ 1,746.88$ 3,225.00$ 84.61%
WAGES 134,521.91$ 125,746.14$ 149,008.56$ 107,786.35$ 147,538.28$ 161,556.35$ 187,561.97$ 16.10%
BENEFITS 49,943.04$ 45,353.04$ 55,914.62$ 36,214.44$ 52,983.07$ 50,548.78$ 58,015.55$ 14.77%
PLANT MAINTENANCE & OPS 136,571.11$ 122,441.19$ 112,982.85$ 99,941.39$ 123,345.99$ 126,563.00$ 113,466.00$ -10.35%
ADMINISTRATIVE COSTS 22,223.08$ 38,730.83$ 52,314.46$ 43,352.10$ 48,912.49$ 43,135.00$ 52,500.00$ 21.71%
Total Operating Expenditures 344,634.14$ 333,496.20$ 371,413.55$ 288,182.52$ 374,741.71$ 383,550.01$ 414,768.52$ 8.14%
Debt Service Fund Transfer 99,712.44$ 163,479.05$ 164,669.60$ 503,343.98$ 580,295.41$ 582,077.61$ 584,141.39$ 0.35%
Capital Project Fund Projects 5,387,691.83$ 13,229.98$ -$ 491,548.10$ 491,548.10$ 674,213.00$ 182,664.90$
TOTAL EXPENDITURES 5,832,038.41$ 510,205.23$ 536,083.15$ 1,283,074.60$ 1,446,585.22$ 1,639,840.62$ 1,181,574.81$ -27.95%
TO (FROM) RESERVE 744,386$ 482,602$ 487,948$ (75,422)$ 346$ (44,860)$ (4,100)$ -90.86%
2027 WASTE WATER BUDGET SUMMARY
Prepared by Steven Cherek 9/28/2026 Page 3