Village Packet 09.16.2026
City of Marathon City · Marathon County · meeting of Sep 16, 2026 · Agenda packets
Open the original document More from City of Marathon City
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Kurt Handrick, Jr.
Village President
Cassie Lang
Village Clerk / Deputy Treasurer
PUBLIC VIRTUAL ACCESS
Join Teams Meeting: https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting
Meeting ID: 229 434 982 56
Passcode: 832Rn6k4
311 Walnut Street | P .O. Box 487
Marathon City, WI 54448
Tel: 715-443-2221
www.marathoncitywi.gov
VILLAGE BOARD OF TRUSTEES
OFFICIAL NOTICE & AGENDA
Wednesday, September 16, 2026
6:00 pm – Marathon Municipal Center
1. CALL TO ORDER
ROLL CALL: K. HANDRICK, M. AHRENS, K. SORENSON, K. PAUL, B. PARLIER, J. LAWRENCE, A.
CABRERA
2. PLEDGE OF ALLEGIANCE
3. RECOGNITION OF VISITORS
a) Virtual Meeting Guidelines
This meeting will be recorded and available upon request
b) Public Participation at Government Meetings
4. APPROVAL OF AUGUST 5, 2026 REGULAR VILLAGE BOARD MEETING MINUTES
5. REVIEW OF LICENSE APPLICATIONS
a) Operator Licenses for Elizabeth Larson– GPM Southeast, LLC (R-Store)
b) Temporary Liquor License - Breast Cancer Awareness Truck Show
c) Temporary Operator License – Nathan Karlen
6. ADMINISTRATOR’S REPORT
a) Village Permits Approved in August 2026
b) Fire Department and First Responder Calls
c) Administration Department Activity in August
d) Police Department Activity in August
e) Public Works/Utility Departments Activity in August
• STH 107
• N. Industrial PKWY
• County Materials Sports Complex
• Veterans Park
• CIPP
• Well #5
f) Administrators Activities
7. UNFINISHED BUSINESS
8. NEW BUSINESS
a) Discuss and Approve Conditional Use Permit for St. Matthews Church
b) Discuss and Possible Action on Naloxone Box installed at the Marathon City Library and/or Village Hall
c) Set Trick-Or-Treating Hours for 2026
d) Possible Action on New Cadet for Fire Department – Dylan Behnke
e) Discuss and Possible Action on South Road Rodent Population
f) Discuss and Approve Cooperative Waste Reduction, Reuse and Recycling Education Program Agreement
g) Appointment of Open Position on Board of Appeals – Keith Marks
h) Discuss and Approve Temporary Hunting Application for Matthew Kroepfl
i) Discuss and Approve STH 107 and 4th Street Intersection “No Parking Zone”
j) Discuss 2027 General Fund Draft Budget – Draft
k) Discuss 2027 CIP Projects and the CIP ‘28-‘29 Future Funding Plan as it relates to ‘27 General Fund
Budget
9. REVIEW AND APPROVAL OF BILLS
Kurt Handrick, Jr.
Village President
Cassie Lang
Village Clerk / Deputy Treasurer
PUBLIC VIRTUAL ACCESS
Join Teams Meeting: https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting
Meeting ID: 229 434 982 56
Passcode: 832Rn6k4
10. RESOLUTIONS AND ORDINANCES
a) Discuss and Approve Amending Ordinance Article 2, Section 2.2.4 Entitled “Salaries”
11. VILLAGE BOARD WILL GO IN CLOSED SESSION PER WIS. STAT. 19.85 (1)(c) “CONSIDERING
EMPLOYMENT, PROMOTION, COMPENSATION OR PERFORMANCE EVALUATION DATA OF
ANY PUBLIC EMPLOYEE OVER WHICH THE GOVERNMENTAL BODY HAS JURISDICTION OR
EXERCISES RESPONSIBILITY.”
a) 2026 Employee Wages & Compensation
12. VILLAGE BOARD WILL RETURN TO OPEN SESSION BY ROLL CALL VOTE
13. TAKE ACTION ON CLOSED SESSION ITEM(S)
14. FUTURE SCHEDULED MEETINGS:
a) Regular Village Board Meeting – Wednesday, October 7, 2026 – 6:00 pm
b) Special Village Board – As Needed
15. ADJOURNMENT
VILLAGE BOARD OF TRUSTEES
MINUTES
Wednesday, August 5, 2026
1. CALL TO ORDER at 6:01 pm
ROLL CALL: K. HANDRICK-Present, M. AHRENS-Present, K. SORENSON-Present, K. PAUL-Present, B.
PARLIER-Present, J. LAWRENCE-Present, A. CABRERA-Absent
2. PLEDGE OF ALLEGIANCE
3. RECOGNITION OF VISITORS
a) Virtual Meeting Guidelines
This meeting will be recorded and available upon request
b) Public Participation at Government Meetings
In Person Attendance: Chris Trice – Street Superintendent
Virtual Attendance: Kevin O’Brien – Record Review
4. INTRODUCTION AND WELCOME TO ANDY WUETHRICH – CANDIDATE FOR 86TH ASSEMBLY
Assembly Representative Wuethrich did not appear at Board Meeting
5. APPROVAL OF VILLAGE BOARD MEETING MINUTES
a) Regular Village Board Meeting Minutes – July 1, 2026
b) Special Joint Village Board/School Board Meeting Minutes – July 15, 2026
c) Special Joint Village Board/Utility Commission Meeting Minutes – July 20, 2026
MOTION – Approve All Minutes from 3 Board Meetings in July
Motion made by Sorenson second by Ahrens. Motion passed by voice vote.
6. REVIEW OF LICENSE APPLICATIONS
a) Operator Licenses for Mackenzie McKinney & Samantha Nelson– GPM Southeast, LLC (R-Store)
Both Operators passed background checks and turned in required paperwork. Both recommended for
approval.
MOTION – Approve Operator Licenses for M. McKinney and S. Nelson for GPM Southeast, LLC
Motion made by Sorenson second by Ahrens. Motion passed by voice vote.
7. ADMINISTRATOR’S REPORT
a) Village Permits Approved in July, 2026
b) Fire Department and First Responder Calls
c) Administration Department Activity in July
d) Police Department Activity in July
e) Public Works/Utility Departments Activity in July
• STH 107
• N. Industrial PKWY
• County Materials Sports Complex
• Veterans Park
• CIPP
• Well #5
f) Administrators Activities & Plans for August
Cherek updated the Board with the daily activities of the Village staff for July and upcoming activities/projects for
August. His full Administrators Report can be found in the Agenda Packet.
8. UNFINISHED BUSINESS
9. NEW BUSINESS
a) Discuss and Approve NO. 2026-08-05A Declaration of Official Intent – STH 107 Reconstruction
Cherek shared a Declaration of Official Intent for payment of the 2026 Highway 107 Project. It states the
Village used cash funds to pay for project and if, in 3 years, the Village runs into a cash flow issue, they
have the option to turn the cash flow payment into a borrowing loan to replenish the cash supply.
MOTION – Approve Declaration of Official Intent 2026-08-05A – STH 107 Reconstruction
Motion made by Paul second by Sorenson. Motion passed by voice vote.
b) Discuss and Approve Certified Survey Map for Herman Hilmershausen
Cherek received a CSM for 2 lots owned by Herman Hilmershausen. Hilmershausen is preparing to sell Lot
1 but is wishing to change lot lines to retain a shed on Lot 2.
MOTION – Approve CSM for Herman Hilmershausen
Motion made by Paul second by Ahrens. Motion passed by voice vote.
c) Discuss and Approve TEAMCARE-Central States Health Plan Contract for 2026, 2027 and not to exceed
amounts for 2028 & 2029
The Village health insurance contract with TEAMCARE is up for renewal. Cherek presented rates for 2027
through 2029 reflecting an increase of 3.95% for the first year. Overall Village expense to increase $12,840
for the 2027 year.
MOTION – Approve TEAMCARE Central States Health Plan Contract for 2027-2029
Motion made by Paul second by Parlier. Motion passed by voice vote.
d) Discuss and Approve Proposed 2027 Fire & EMS Department Budgets
The Village and Towns of Cassel, Rib Falls and Stettin will pay an increase of approximately 2% in fire
protection fees proportionately distributed to equalized values. The Village’s section fee will go up
$1,421.63. The 2027 Fire Contract Budget is proposed at $189,270.00. Increases in wages due to a trend
in larger call volumes, utilities and fuel contributed to an overall expenditure increase of 4.26%, totaling
$142,181.49 in operating expenses. The Proposed Budget reflects the approved move of the Public Fire
Protection fees (Hydrant Rental expenses) off the taxes and 100% on to the utility.
The proposed EMS Budget remains the same at $43,833.87 in expenditures. These expenditures will be
paid for by the Village (about 72%) and the Towns of Marathon, Cassel and Stettin paying 28% jointly. The
Village will pay approximately $3,600 more in 2027 due to the 2025 call volume in the Village increasing
compared to the townships. The Village pays for the ambulance service of $10,913 through a contract with
Edgar EMS approved at the April 1, 2026 meeting.
Proposed 2027 Fire/EMS Revenues of $151,479.07 and Expenditures of $265,393.60.
MOTION – Approve Proposed 2027 Fire & EMS Departments Budgets and Contract Rates
Motion made by Paul second by Sorenson. Motion made by voice vote.
e) Discuss and Approve Proposed 2027 Parks Budget
Cherek presented a preliminary parks budget to assist in setting the 2027 Use Agreements with the ball
groups. He noted a 9% expenditure difference with the 2026 budget and proposed increasing contracts by
9% or $1,831. Part of that increase includes budgeting $2,000 for equipment replacement in a capital
improvement fund. The Village will shift 3% of mowing expense to the clubs to pay for. Board members
would like to see a more defined 5-year schedule of the mowing subsidization. Cherek’s proposed parks
revenue will increase by 4% with the ball club contracts, sponsorship revenue and Veterans Park rental
revenue from the Farmer’s Market and Fundays.
MOTION – Approve the Parks Revenue Increase and Advise Cherek to Move Forward with the
Ballpark User Agreements at the 9% Increase
Motion made by Sorenson second by Ahrens. Motion passed by voice vote.
f) Discuss and Approve Sourcewell Purchase of Ventrac Tractor, Cab and Mower Attachment
*Moved to After Item 5
Cherek, along with Street Superintendent Trice, informed the Board that during the major 30” snowstorm in
March, the Village’s 1994 Stiener tractor broke down and has been inoperable since. It is past the point of
repair. Cherek shared a quote of $45,034 for a new Ventrac tractor including cab and mower attachments.
The Village is expected to receive a Wisconsin Emergency Management Disaster Fund Grant
reimbursement of about $16,851 from the snow event. Cherek noted the Capital Improvement Fund interest
earnings total $34,149 and proposed using $28,183 of those earnings along with the Grant earnings to
purchase the new Ventrac tractor. He suggested the remainder of the interest earnings for the year be
allocated toward the Utility Fund, stating a large sum of the money in the CIP LGIP account is due to the
Cure-In-Place Piping project.
MOTION – Approve Purchase of New Ventrac with Cab and Mower Attachments Using WDF Grant
Reimbursement and Capital Improvement Plan LGIP Interest Earnings
Motion made by Paul second by Parlier. Motion passed by voice vote.
g) Discuss and Approve Conditional use permit for St. Matthews Church
Tabled to September Meeting
h) Discuss and Possible Action on Building Permit – Unclassified Structure
The Village received a building permit for a storage structure of which Cherek could not determine
classification of use. He took it to the Plan Commission on August 3rd to determine what sheds/storage
buildings are as those are permitted in the code of ordinances however not defined as to what they are. The
Plan Commission forwarded it to the Village Board to determine ordinance language. Board members held
a lengthy discussion about what the definition of a shed/storage structure is with no outcome made. They
requested the resident submit plans to go along with the building permit for the shed they intend to install.
i) Discuss and Possible Action on New Fire Department Members
• Dylan Hartwig & Trey Schoelzel
Fire Chief Hall along with Cherek interviewed the 2 new firefighters and both are recommended for approval
to join the Department.
MOTION – Approve New Fire Department Members
Motion made by Paul second by Ahrens. Motion passed by voice vote.
j) Discuss and Approve 2026-2027 School Year Crossing Guards
• Larry Berres, David Martin, Brenda Wirkus, Kathy Grell, Paige Koch
All returning crossing guards are recommended for approval for the 2026-2027 school year
MOTION – Approve Crossing Guards for the 2026-2027 School Year
Motion made by Paul second by Parlier. Handrick abstained from the vote. Motion passed by voice vote.
10. REVIEW AND APPROVAL OF BILLS
Trustees questioned the following checks:
Check 49726 – Flock Group, Inc. – paid by donation sources
Check 49756 – Frontier – cancelled Fire Dept line
MOTION – Approve Payment of Bills
Motion made by Ahrens second by Lawrence. Motion passed by voice vote.
11. RESOLUTIONS AND ORDINANCES
a) Discuss and Approve Resolution 2026-08-05 - Amending the 2026 General Fund and 2026 Capital
Improvement Fund Budgets for Fire Engine #50 Purchase / Fire Engine #46 Replacement
Cherek proposed amending the budget to borrow $25,000 from General Fund and Capital Improvement
Fund Reserves with intention to be paid back thru budgeted payments of $8,333.34 from fire contracts in
the next 3 years with full reimbursement in 2029. Another 1-time budget amendment to transfer $10,000
from the FD Equipment account and $2,000 from the FD IT account to the Capital Improvement Fund for
2026 would cover the full $37,000 cost of the new engine and set-up.
MOTION – Approve Resolution 2026-08-05
Motion made by Paul second by Sorenson. Motion passed by voice vote.
• Discuss and Approve NO. 2026-08-05B Declaration of Official Intent
The Declaration of Intent states that if the Village runs in to cash flow issues from using reserve funds
for new fire engine, they have 3 years to borrow the amount spelled out in the Declaration as a loan to
replenish cash funds.
MOTION – Approve Declaration of Official Intent 2026-08-05B
Motion made by Parlier second by Paul. Motion passed by voice vote.
b) Discuss and Approve U-2026-08-05 Resolution Establishing Public Fire Protection Charges
At the July 20, 2026 Joint Village/Utility meeting, both Board and Commission members voted to move the
Public Fire Protection (PFP) off residents’ taxes and fully to a charge on the utility bills. The Village currently
has been charging 50/50 on taxes and a charge on utility bills. The change is coming with a rate case study
with the PSC. A resolution is needed to establish this change.
MOTION – Approve Resolution U-2026-08-05
Motion made by Sorenson second by Ahrens. Motion passed by voice vote.
12. VILLAGE BOARD WILL GO INTO CLOSED SESSION BY ROLL CALL VOTE PER WIS. STAT.
19.85(1)(e) “DELIBERATING OR NEGOTIATING THE PURCHASE OF PUBLIC PROPERTIES,
THE INVESTING OF PUBLIC FUNDS, OR CONDUCTING OTHER SPECIFIED PUBLIC
BUSINESS, WHENEVER COMPETITIVE OR BARGAINING REASONS REQUIRE A CLOSED
SESSION.”
a) St Matthew’s Parking Lot Agreement
b) Seubert Development Agreement
Cassie Lang
Village Clerk / Deputy Treasurer
MOTION – Go Into Closed Session at 8:01 pm.
Motion made by Paul second by Lawrence. Motion made by roll call vote.
ROLL CALL: AHRENS-Yes, SORENSON-Yes, PAUL-Yes, PARLIER-Yes, LAWRENCE-Yes, HANDRICK-Yes
13. VILLAGE BOARD WILL CONTINUE IN CLOSED SESSION PER WIS. STAT. 19.85 (1)(c)
“CONSIDERING EMPLOYMENT, PROMOTION, COMPENSATION OR PERFORMANCE
EVALUATION DATA OF ANY PUBLIC EMPLOYEE OVER WHICH THE GOVERNMENTAL BODY
HAS JURISDICTION OR EXERCISES RESPONSIBILITY.”
a) 2026 Employee Wages & Compensation
14. VILLAGE BOARD WILL RETURN TO OPEN SESSION BY ROLL CALL VOTE
MOTION – Return to Open Session at 9:20 pm
Motion made by Sorenson second by Paul. Motion passed by roll call vote.
ROLL CALL: SORENSON-Yes, PAUL-Yes, PARLIER-Yes, LAWRENCE-Yes, HANDRICK-Yes, AHRENS-Yes
15. TAKE ACTION ON CLOSED SESSION ITEM(S)
12a) St Matthew’s Parking Lot Agreement
MOTION – Approve St Matthew’s Parking Lot Agreement
Motion made by Paul second by Lawrence. Ahrens abstained from the vote. Motion passed by voice vote.
16. FUTURE SCHEDULED MEETINGS:
a) Regular Village Board Meeting – Wednesday, September 2, 2026 – 6:00 pm
b) Special Village Board – As Needed
17. ADJOURNMENT at 9:21 pm
Motion to adjourn made by Lawrence second by Ahrens. Motion passed by voice vote.
Village Administrator’s Report | September 2026 | 1
Administrator’s Report – September 2026
1) Permits
Building Permits – Administrator Permits (2)
• 924 County Road B – New fence
• 1102 5th St. – Windows
Sign Permits (3)
• 302 County Road NN – St. Matthew’s Church – Pending CUP/variance review
• 668 Maratech Ave. – The Red Rooster
• 400 Main St. – Stittleburg – Pending zoning review
Utility Permits
• WPS – CTH B/East St. and 8th St./South Rd.
• Frontier Fiber Optic – Pending review
2) Fire Department – August
• First Responder: 10 calls, 6 Town Sections and 4 Village
• Fire: 2 calls, both mutual aid calls to the Towns of Emmet and Hamburg
3) Administration
The Administration Office remained busy throughout August and early September. Major
items included developing residential subdivision requirements, coordinating street capital
projects with grant funding and the CIP, the PSC audit, Water Lead Service Line Inventory,
and preparation of the 2027 Budget Draft.
Overall, significant progress was made on several ongoing Village priorities.
4) Police Department
The Police Department had a successful 2026 Marathon Fun Days event with relatively few
issues and also participated in the 911 Walk.
The Police Department will be assisting the Wisconsin DNR with enforcement of the
Weisenberger Site Access Warrant as the DNR begins the grant-funded site investigation.
Site activity is expected September 17 and September 28–29.
5) Public Works/Utility
Public Works and Utility staff continued daily operations while completing several projects.
Staff prepared Veterans Park and downtown streets for Marathon Fun Days, replaced two
water valves on Heindal Ln., installed a culvert on N. Business Parkway, and replaced a
damaged storm inlet on Pine St.
Village Administrator’s Report | September 2026 | 2
Major Project Updates
• STH 107: Project completed prior to Marathon Fun Days. Remaining punch-list items will
be reviewed, primarily near 4th St. and Main St.
• N. Industrial Parkway: Storm drain repairs are substantially complete. Cost to date is
$6,774, excluding the final asphalt invoice. The required 40-foot driveway access north of
Kwik Trip was also installed. Total estimated driveway/curb project cost is $9,262. Fence
posts and the required evergreen tree line will be completed as site conditions allow.
• County Materials Sports Complex: The parking lot addition is complete, with signage
remaining. Walking trail lighting work began in late August and is expected to be
completed in September.
• Veterans Park: American Legion-funded electrical and lighting improvements continue.
The first phase was completed before Fun Days, with additional electrical work anticipated
this fall.
• CIPP Project: The project continues to progress. Public Works plans to replace
approximately 40 feet of damaged sewer main on 2nd St. before additional CIPP work
proceeds.
• Well #5: Planning and review continue. Staff are working with Ehlers and the PSC on the
rate study and project financing requirements.
6) Administrator’s Activities & Plans
• Continue working with Ehlers, the auditor, and department staff on the 2027 Budget.
• Continue working with Ehlers on the PSC rate study for Well #5.
• Continue coordination of current capital, infrastructure, and grant-funded projects.
Steven Cherek
Village Administrator
Monthly Report- Aug. 2026
Fire Calls-2 Calls
Mutual Aid-Mosinee Fire
Mutual Aid-Hamburg Fire
EMS Calls- 10 calls
Village of Marathon-4 Calls
Town of Marathon-1 Call
Town of Stettin-5 Calls
Training/School-3 members in EMR class at NTC.
Members- 2 new Firefighters and 1 Cadet interviewed.
Public Relations- National Night Out on 8/4 supporting Marathon Police Dept.
Upcoming Events- Fun Days weekend 9/4-9/6 (Open house, bartending, 5K run, parade)
9/11 Silent Walk on 9/11 at 6:00pm
Upcoming Meetings/Drills-
Officer Meeting. Wed. 9/9 @ 6:30 PM
Fire Meeting and Drill. Wed. 9/9 @ 7:00 PM
EMS Meeting and Drill. Wed. 9/16 @6:30 PM
Fire Drill. Wed. 9/23 @ 6:00 PM
State/County Activity-None.
Truck Report-
Truck #50 (Replacement Engine just purchased)-working on wiring lights that were installed from Truck
#46.
Truck #46 (Current unusable Engine)-Provided information and pictures to list on auction site.
ORDER GRANTING A CONDITIONAL USE PERMIT FOR
ST MATTHEWS CHURCH
VILLAGE OF MARATHON CITY,
MARATHON COUNTY, WISCONSIN
WHEREAS, a complete application has been filed by ST MATTHEW’S LUTHERAN
CHURCH, (hereinafter “Applicant”) for a monument sign to display illumination messages as a
conditional use for Church and Village community events, on Applicant’s property located at 302
County Road NN, Marathon City, WI; and
WHEREAS, the A pplicant’s application and submitted documents consists of a
completed and Conditional Use Permit Application dated July 13, 2026, Variance Request letter
dated July 13, 2026, and Sign Permit Application on June 29, 2026 that depicts the Illumination
Sign design details along with location on Subject Property; and
WHEREAS, Applicant represents and warrants that the application and materials
submitted heretofore are true, accurate, and correct; are incorporated fully herein and shall be relied
upon by the Village in its determination(s) herein; and
WHEREAS, the Applicant is the fee simple owner of that property located within the
Village of Marathon City with a mailing address and Parcel ID as follows:
302 County Road NN
Marathon City, WI 54448
Parcel ID: 151-2806-082-0958
(“Subject Property”)
WHEREAS, the Subject Property is zoned CF - Community Facilities and Institutions
pursuant to the Zoning Code of the Village; and
WHEREAS, pursuant to §13.5.16 and Article 12, Section 13.12.8(2) of the Zoning Code,
The Plan Commission shall review all applications for electronic message unite signs that the
Applicant proposes in its Application and is permitted as conditional accessory use in the CF
Community Facilities and Institutions District use; and
WHEREAS, Applicant further intends to utilize the Subject Property for those permitted
uses identified in the CF Community Facilities and Institutions District and as set forth in that
Conditional Use Permit Application with the Village of Marathon City; and
WHEREAS, upon receipt of the completed application for a Conditional Use Permit,
Variance Request and materials identified hereinabove, the Village Clerk properly referred the
same to the Board of Appeals and Plan Commission of the Village of Marathon City for a public
hearings and recommendations; and
-2-
WHEREAS, upon referral of the Conditional Use Permit application by the Village Clerk,
the Plan Commission for the Village of Marathon City scheduled a public hearing thereon as soon
as practical; and
WHEREAS, upon the necessary publication of the required notice of public hearing as
required by §13.4.8( 4) of the Zoning Code, the Plan Commission held a public hearing on the
application on August 3, 2026; and
WHEREAS, the Plan Commission, following the public hearing and necessary study and
investigation, having given the matter due consideration, and having based its recommendation on
those factors set forth in §13.4.8(6) Zoning Code of the Village of Marathon City including the
health, general welfare, safety and economic prosperity of the Village, as well as the
Comprehensive Plan of the Villa ge, recommended approval of the Conditional Use Permit with
conditions; and
WHEREAS, the Village Board after review of the recommendation of the Plan
Commission and after it also conducted the necessary study and investigation, having giving the
matter due consideration, and basing its determination on the effects of those standards as set forth
in §13.4.8(6) as well as §13.5.16 of the Zoning Code, and as long as the conditional use operates
in strict compliance with the following conditions resolves, orders and finds that:
IT IS THEREFORE, ORDERED AND RESOLVED AS FOLLOWS:
Commencing upon the date hereof, a Conditional Use Permit for the Subject Property is
hereby granted as set forth herein. The Conditional Use Permit granted herein shall apply only to
the specific use of the Subject Property by St. Matthews Lutheran Church, and the Conditional
Use Permit shall continue and exist only so long as the Subject P roperty is operated in strict
compliance with the terms of this Permit. This Conditional Use Permit is subject to initial and
continued compliance with each and every one of the following conditions, restrictions, and
limitations:
1. This Conditional Use Permit is granted to allow an electronic message sign as
depicted in the application, to be constructed as set forth in the application and
related materials under the following conditions:
A. Illumination Restrictions:
(i) Illumination shall be designed and maintained to eliminate negative impacts on
surrounding rights-of-way and properties. The light from an illuminated sign shall
not be of an intensity or brightness that will create a negative impact on property
uses in direct line-of-sight to the sign.
(ii) Flashing, flickering and/or other lighting which may distract motorists are
prohibited.
(iii) The sign shall comply with the applicable provisions of the electrical
code as adopted by the Village and must be UL Listed.
-3-
(iv) The s ign shall not be illuminated in a manner that interferes with (including
glaring or blinding), misleads or confuses traffic.
(v) External light sources shall be directed and shielded to limit direct illumination
of any object other than the sign.
(vi) In no instance shall the amount of illumination attributable to the sign, as
measured a distance of 10 inches from the face, exceed 60 foot -candles above
ambient lighting conditions.
(vii) In no case, with all lighting components energized, shall the lighting intensity
of any sign, whether resulting from internal or external illumination, exceed 60 feet
candles when measured with a standard light meter held at a distance of ten inches
from the sign face.
(viii) The electronic message portion of the sign shall not exceed 0.3 footcandles
above ambient light conditions measured from a distance based on the area of the
sign [measurement distance = √ (Area of Sign Sq. Ft. x 100)], perpendicular to the
sign face, and using an illuminance meter capable of accuracy of two decimals.
Example: A 24 square foot electronic message center would be limited to 0.3
footcandles when measured at a distance of 49 feet. Measurement Distance =
√(24*100) = 49 feet.
(vx) The sign shall be equipped with photosensitive equipment which
automatically adjusts the brightness and contrast of the sign in direct relation to the
ambient outdoor illumination.
(x) Messages displayed on the sign shall not change, scroll, flash, rotate or
otherwise transition more frequently than once every four (4) seconds.
B. Time Restrictions: The electronic message board shall be turned off, or otherwise
not illuminated, between the hours of 11:00 p.m. and 6:00 a.m. No messages or light
emitted from the sign shall be visible during these hours.
2. This Conditional Use Permit is granted solely and exclusively to the Applicant for
only so long as it continues to own in fee simple the Subject Property. This
Conditional Use Permit is not transferrable to any other person or entity without
the prior approval of the Village.
3. This Conditional Use Permit is conditioned upon the Applicant and the Subject
Property being and remaining compliant with all other Village, County, State, and
Federal laws, rules, and regulations. The Applicant shall apply for, receive, and
file proof of such permission with the Village Administrator of all other required
local, state, and federal permits before activities commence.
-4-
4. The terms, conditions, and representations of the submittal s by the Applicant for
Conditional Use Permit dated July 13, 2026, are hereby incorporated herein and
made a part of the conditions hereof to the extent not otherwise modified by the
requirements herein and to the extent so modified, the conditions set forth herein
shall control.
5. The Applicant shall promptly reimburse the Village for all costs and expenses of
any type that the Village incurs in connection with this Conditional Use Permit,
including by way of enumeration without limitation, the cost of professional
services incurred by the Village (including legal and other consulting fees) for
review of and preparation of the Conditional Use Permit, attendance at meetings or
other related professional services as well as for any actions the Village is required
to take to enforce any of the conditions in this Conditional Use Permit due to a
violation of these conditions by the Applicant.
6. Any use not specifically listed as permitted shall be considered to be prohibited
except as maybe otherwise specifically provided herein. In case of a question as to
the classification of use, the question shall be submitted to the Plan Commission
for recommendation and Village Board for determination.
7. No use is hereby authorized unless the use is conducted in a lawful, orderly, and
peaceful manner. Nothing in this Permit shall be deemed to authorize any public
or private nuisance or to constitute a waiver, exemption, or exception to any law,
ordinance, order, or rule by the Village , Marathon County, State of Wisconsin,
United States, or other duly constituted authority, except only to the extent that it
authorizes the use of the Subject Property in any specific respects described herein.
8. Should this permitted Conditional Use be abandoned or discontinued in any manner
for twelve (12) months or greater or continued other than in strict conformity with
the conditions of the original approval or should the Applicant be delinquent in
payment of any monies due and owing to the Village, this Conditional Use shall be
deemed terminated and therefore null and void.
9. Any change, addition, modification, alteration and/or amendment of any aspect of
this Conditional Use, including but not limited to an addition, modification,
alteration and/or amendment to the use, premises, structures, land or owners other
than as specifically authorized herein, shall require a new permit and all procedures
in place at the time must be followed.
10. Should any paragraphs or phrase of this Conditional Use Permit be determined by
a court of competent jurisdiction to be unlawful, illegal, or unconstitutional, said
determination as to the particular phrase or paragraph shall not void the remainder
of this Conditional Use and the remainder shall continue in full force and effect.
-5-
11. If any aspect of this Conditional Use Permit is in conflict with any other aspect of
the Conditional Use Permit, the more restrictive provision shall be controlling as
determined by the Village Board.
12. Copies of this Order shall be filed in the permanent records of the Village Board
for the Village of Marathon City and copies sent to the proper authorities as well as
the Applicant.
Approved this _____ day of August, 2026.
VILLAGE BOARD, VILLAGE OF MARATHON CITY
By:_______________________________________
Kurt Handrick, Village President
Attest: ____________________________________
Cassandra Lang, Village Clerk
Approval/Acceptance of Applicant dated this ___ day of _________________, 2026.
ST MATTHEWS CHURCH
Applicant:
By:___________________________________
Attest: ________________________________
1
Steve Cherek
From: Lisa Haessly <Lisa.Haessly@marathoncountylibrary.org>
Sent: Friday, August 14, 2026 12:19 PM
To: Steve Cherek
Subject: [External] Naxolone box
Attachments: UWSP Nalox-Zone Box Example.jpg
Good Afternoon, Steve,
The Marathon County Health Department is interested in having our branch host a Naloxone box, which
would be supplied with the items listed in the attached photo. With your permission, Marathon County
Facilities will install the box in an area that is accessible to the public but not intrusive. I suggest the
installation of the box be in the entryway of the library on the left wall in the corner by the interior window.
The Marathon County Health Department will be responsible for maintaining and replenishing the box.
We will let them know when supplies run low.
I look forward to hearing your thoughts on helping with this Marathon County initiative!
Thank you,
Lisa Haessly
Branch Coordinator
Marathon County Public Library—Marathon City Branch | 515 Washington St.,
Marathon City, WI 54448
lisa.haessly@marathoncountylibrary.org | 715-443-2775 (direct) / 715-443-2775
(general)
mcpl.us / info@mcpl.us
Steve,
After interviewing Dylan Behnke I would like to make a recommendation to the Village Board to accept
bringing him on as Cadet.
Dylan is a Junior at Marathon High School and is interested in becoming a firefighter in the future. He is
eager to learn and help. He is familiar with the Department because his father has been a member since
2002.
I feel that Dylan will be a great addition to our department as a Cadet to start learning and training with
us.
Thank you.
Darrin Hall
Fire Chief
8/31/26
Marathon County Solid Waste Department
172900 Hwy 29, Ringle WI 54471
Director:
Operations Manager:
Main Office:
715-551-5864
715-297-0429
715-446-3101
marathoncountysolidwaste.org
TO: COOPERATIVE RECYCLING EDUCATION PARTICPATING MUNICPALITY
FROM: DAVID HAGENBUCHER – SOLID WASTE DIRECTOR
SUBJECT: COOPERATIVE PROGRAM FOR DNR RECYCLING BONUS GRANT
DATE: AUGUST 28, 2026
Since 2013 the Solid Waste Department (SWD) has helped connect towns and villages interested
in cooperating on their recycling education and outreach programs. This service of the SWD is
open to any municipality that submits a DNR Recycling Basic Grant and conducts an Effective
Recycling Program (as defined by Wisconsin Statute). The Cooperative Recycling Education
Program has brought in much needed dollars to local recycling programs; these dollars are in
addition to the Basic Grant dollars. To learn more about the grant, please see information on DNR’s
website: https://dnr.wisconsin.gov/aid/Consolidation.html
We are proud of this work and enjoy being a valuable resource to the Marathon County community.
The SWD program and its resources will compliment your existing program. Our goals are to:
1. Free up some of your busy schedule by providing you with additional resources for your
RU’s recycling education and outreach programs
2. Help your residents and businesses learn how to reduce waste and recycle right
3. Have available to your residents and businesses easy to access and understand information
on recycling and waste reduction via a toll-free number, a website and social media.
a. 715-446-3101
b. marathoncounty.gov/solidwaste
c. On Facebook at Marathon County Solid Waste
If you wish to participate you will need to approve and sign the attached agreement . I will then
provide each of the participants the names of the other participating RUs so you will have that
information for your 2027 Recycling Grant application. Keep a copy of the agreement and send a
copy back to me at your earliest convenience. The copy may be e-mailed or mailed.
Remember, you will need the list of participating RUs for your Basic Grant application. I will
work to get the list of RUs out to participants as quickly as possible so that you can complete your
grant process by the October 1
st deadline.
We look forward to again working with you to reduce, reuse & recycle!
David Hagenbucher
Solid Waste Director at Marathon County
172900 Highway 29
Ringle, WI 54471
715-551-5864 David.Hagenbucher@marathoncounty.gov
MARATHON COUNTY RESPONSIBLE UNITS OF RECYCLING
COOPERATIVE WASTE REDUCTION, REUSE AND RECYCLING EDUCATION
PROGRAM AGREEMENT
To Satisfy Eligibility for Recycling Consolidation Grant--Calendar Year 2027
This agreement is entered into between the cooperative group of Marathon County Responsible
Units of Recycling, listed in Appendix A, and the Marathon County Solid Waste Department for
the purpose of implementing efficiencies related to operating an effect ive recycling program in
accordance with ss. 287.11 and 287.24, Wis. Stats., and ch. NR 542, Wis. Admin. Code.
The City/Village/Town (circle one) of ____________________ and the cooperative group of
Marathon County Responsible Units of Recycling, along with the Solid Waste Department, agree
to jointly undertake the following effective recycling program activities:
• Develop and distribute educational materials relating to waste reduction, reuse, and
recycling.
• Carry out a program of technical assistance to businesses and owners and occupants of
multifamily dwellings to increase the availability and convenience of recycling (not
applicable for those municipalities without businesses and multi-family units).
Description of Effective Recycling Program Component
o What: Waste Reduction, Reuse and Recycling Education and Community
Outreach
o The education and community outreach program is a full -time,
continuous program that uses multiple types of media to engage
residents, businesses and organizations to increase recycling rates
and reduce wastes entering landfills. The program capitalizes on
the strengths of the Solid Waste Department waste management
experts and the connection that each the local RU has with its
constituents, leveraging these assets into a broad-based, consistent
message across the diverse range of RUs in Marathon County
o Additionally, the program will outreach to businesses and multi -
family unit owners to outline recycling responsibilities and
requirements
o Where: The cooperating group of Marathon County Responsible Units of
Recycling
Describe Each Responsible Unit’s Responsibilities
Each Responsible Unit will do the following:-
o Meet the statutory terms of a Responsible Unit of Recycling and conduct an
Effective Recycling Program
o Apply for the DNR Basic Recycling Grant and the Recycling Consolidation Grant
o Administer the terms of service contracts for collection and transportation of
recyclables
o Make all payments to their respective recycling service provider for collection and
transportation of recyclables
o Have available to constituents information that directs them to the Solid Waste and
Recycling Information Line and Solid Waste Department website
o Enforce the provisions of their respective recycling ordinance
o Administer a Compliance Assurance Plan to ensure residents, businesses and
organizations meet conduct recycling as specified in the recycling ordinance
o Keep and use their Basic Grant and RU Consolidation Grant per the grant terms
The Solid Waste Department will do the following:-
o Administer the department’s waste reduction, reuse and recycling education
program
o Have available to residents, businesses and organizations a toll -free Solid Waste
& Recycling Information Line and up- to-date website with a wide variety of
resources related to waste reduction, reuse and recycling
o Conduct community presentations on waste reduction, reuse and recycling
o Manage a Facebook page that promotes waste reduction, reuse and recycling
o Promote and advertise Department’s toll-free number/website through a variety of
media and the “Central Wisconsin Recycling Collective” and “Recycle Right
Wisconsin” messages
o Assist RUs with strategies on reducing the waste stream and recycling more
Benefits of a Cooperative Education Program
o RUs will be able to free up staff resources from recycling education/outreach to
other work by directing inquiries to the fully staffed Solid Waste & Recycling and
Information Line and resource-rich Solid Waste Department website
o A consistent message of what to recycle and on waste reduction will increase
recycling rates and reduce waste; both aiding local government in saving money
on waste disposal and assist the Solid Waste Department in ensuring that banned
materials do not enter the landfill
o With the expert resources of the Solid Waste Department any inquiry about waste
reduction, reuse or recycling is quickly and effectively handled. Even when
smaller municipalities have either limited or part- time recycling staff, a resident
has one call or one click access to information, expanding recycling education
customer service to all of Marathon County.
Cooperative Agreement Effective Dates
January 1, 2027 through December 31, 2027
Cooperative Agreement Termination
Any RUs that do not comply with their statutory obligations, as determined by the DNR,
will not be eligible for participation in the cooperative program.
The undersigned parties mutually agree to the terms and conditions of this Cooperative Agreement.
For the Responsible Unit of Recycling:
__________________
Signature & title of Authorized Representative Date
For the Marathon County Solid Waste Department
_______________________________________________________ August 28, 2026
David Hagenbucher Director-SWD Date
Central File: Planning\Project Agreement\Marathon County Page 1 of 9 ID 6360-05-05 NC Region
STATE/MUNICIPAL FINANCIAL AGREEMENT Date: July 16, 2024 I.D.: 6360-05-05, 25, & 75 Road Name: STH 107 Title: V Marathon, Main Street Limits: CTH B to North Street County: MarathonRoadway Length: 0.493 Miles The signatory village of Marathon, hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and affect the highway or street improvement hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility - Describe and give reason for request: The existing roadway is a combination of rural and urban template which consists of asphalt pavement, asphalt shoulders, urban shoulders, curb and gutter, concrete and grass terrace, sidewalk, storm sewer, street lighting, and on-street parking in various locations. The existing pavement has alligator cracking, longitudinal and transverse cracking. The existing crosswalk curb ramps may not meet current Americans with Disabilities Act (ADA) Standards. Proposed Improvement - Nature of work: The proposed improvement is a resurfacing. Work will consist of removing a portion of the pavement and replacing with a new asphaltic surface to extend the service life of the roadway. The project will also upgrade cross walk curb ramps, complete curb and gutter replacement in spot locations, and complete spot storm sewer improvements. The project will also include intersection improvement at 4th Street (CTH NN) and parking lane improvements as requested by the Municipality. Describe non-participating work included in the project and other work necessary to finish the project completely which will be undertaken independently by the municipality: A nominal amount is included to cover items in paragraph 3 (to be adjusted in the final plan).
Central File: Planning\Project Agreement\Marathon County Page 2of 9ID 6360-05-05NC Region
TABLE 1:SUMMARY OF COSTSTotal Federal/State Municipal PhaseEst. CostFunds%Funds%6360-05-05Preliminary Engineering: 298,000$ 298,000$ 100% -$ 0%6360-05-25Real Estate Acquisition: 24,250$ 24,250$ 100% -$ 0%6360-05-752Roadway Items (Cat 0010)885,450$ 885,450$ BAL2Parking25,650$ 25,650$ LS24th Street IntersectionImprovement (Cat 0020) 104,450$ 104,450$ 100% -$ 0%2Non-Participating Local Utitlites(Cat 0030) 26,160$ -$ 0% 26,160$ 100%Subtotal: 1,041,710$ 989,900$ 51,810$ Total Cost Distribution 1,363,960$ 1,312,150$ 51,810$ 1Estimates include construction engineering2See #8 of Terms and Conditions1Construction:This request shall constitute agreement between the Municipality and the State; is subject to the terms and conditions that follow (pages 39); is made by the undersigned under proper authority to make such request for the designated Municipality, upon signature by the State, upon fully executed signature of applicable State Municipal Maintenance Agreement and delivery to the Municipality. The initiation and accomplishment of the improvement will be subject to the applicable federal and state regulations. No term or provision of neither the State/Municipal Financial Agreement nor any of its attachments may be changed, waived or terminated orally but only by an instrument in writing executed by both parties to the State/Municipal Financial Agreement. Signed for and in behalf of the village of Marathon (please sign in blue ink)Name (print) TitleSignature DateSigned for and in behalf of the State(please sign in blue ink)NameShannon P RileyTitleWisDOT North Central Region Planning Chief Signature DateVillage AdministratorSteven A. Cherek8/8/2024
Central File: Planning\Project Agreement\Marathon County Page 3 of 9 ID 6360-05-05 NC Region
TERMS AND CONDITIONS: 1. The Municipality shall pay to the State all costs incurred by the State in connection with the improvement which exceeds federal/state financing commitments or are ineligible for federal/state financing. Local participation shall be limited to the items and percentages set forth in the Summary of Costs table, which shows Municipal funding participation. pay the State, the Municipality, through its above duly authorized officers or officials, agrees and authorizes the State to set off and withhold the required reimbursement amount as determined by the State from General Transportation Aids or any moneys otherwise due and payable by the State to the Municipality. 2. Funding of each project pDevelopment Manual (FDM) standards. Federal aid and/or state transportation fund financing will be limited to participation in the costs of the following items as specified in the Summary of Costs: (a) Design engineering and state review services. (b) Real Estate necessitated for the improvement.(c) Compensable utility adjustment and railroad force work necessitated for the project. (d) The grading, base, pavement, curb and gutter, and structure costs to State standards, excluding the cost of parking areas. (e) Storm sewer mains, culverts, laterals, manholes, inlets, catch basins, and connections for surface water drainage of the improvement; including replacement and/or adjustments of existing storm sewer manhole covers and inlet grates as needed. (f) Construction engineering incidental to inspection and supervision of actual construction work, except for inspection, staking, and testing of sanitary sewer and water main. (g) Signing and pavement marking necessitated for the safe and efficient flow of traffic, including detour routes. (h) Replacement of existing sidewalks necessitated by construction and construction of new sidewalk at the existed before. (i) Replacement of existing driveways, in kind, necessitated by the project.(j) New installations or alteration resulting from roadway construction of standard State street lighting and traffic signals or devices. Alteration may include salvaging and replacement of existing components. 3. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or facility owner includes the following items: (a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone, telegraph, fire or police alarm facilities, parking meters, and similar utilities.(b) New installation or alteration of signs not necessary for the safe and efficient flow of traffic. (c) Roadway and bridge width in excess of standards. (d) Construction inspection, staking, and material testing and acceptance for construction of sanitary sewer and water main.(e) Provide complete plans, specifications, and estimates for sanitary sewer and water main work. The Municipality assumes full responsibility for the design, installation, inspection, testing, and operation of the sanitary sewer and water system. This relieves the State and all of its employees from the liability for all suits, actions, or claims resulting from the sanitary sewer and water system construction.
Central File: Planning\Project Agreement\Marathon County Page 4 of 9 ID 6360-05-05 NC Region
(f) Parking lane costs. (g) Coordinate, clean up, and fund any hazardous materials encountered for Municipal utility construction. All hazardous material cleanup work shall be performed in accordance to state and federal regulations. 4. As the work progresses, the Municipality will be billed for work completed which is not chargeable to federal/state funds. Upon completion of the project, a final audit will be made to determine the final division of costs. 5. If the Municipality should withdraw the project, it shall reimburse the State for any costs incurred by the State in behalf of the project. 6. The work will be administered by the State and may include items not eligible for federal/state participation. 7. The Municipality shall, in cooperation with the State, assist with public relations for the project and announcements to the press and such outlets as would generally alert the affected property owners and the community of the nature, extent, and timing of the project and arrangements for handling traffic within and around the project. 8. Basis for local participation: a) Preliminary Engineering 6360-05-05: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of all design engineering costs necessary for the state construction project. Additional design work, at the request of the Municipality, may require local participation. b) Real Estate Acquisition 6360-05-25: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of all real estate acquisition costs necessary for the state construction project. c) Participating Construction 6360-05-75: 1. Roadway Items (Cat 0010): In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of the costs necessitated by the roadway project (grading, paving, etc.) unless otherwise noted in the sections below. Driveways: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of replacement driveways necessitated by roadway construction as follows: where there is no sidewalk, replacement in kind beyond the curb; where there is a sidewalk, concrete from curb to sidewalk and replacement in kind beyond the sidewalk. New driveways are not eligible for Federal/State funding. Replacement Sidewalks: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of replacement sidewalks costs, in kind, necessitated by roadway construction if the Municipality agrees to accept responsibility for sidewalk maintenance and repair per the SMMA. The Municipality is responsible for 100% of any alternate design, over and above State standards and acceptable to the State. New Sidewalks: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of continuous new sidewalk costs only if they are installed to WisDOT standards at the time of project construction, required through WisDOT design process and if the Municipality agrees to accept responsibility for sidewalk maintenance and repair per the SMMA.
Central File: Planning\Project Agreement\Marathon County Page 5 of 9 ID 6360-05-05 NC Region
If the new sidewalk is NOT required through WisDOT design process; the Municipality is responsible for 100% of continuous new sidewalk costs only if they are installed to WisDOT standards at the time of project construction and if the Municipality agrees to accept responsibility for sidewalk maintenance and repair per the SMMA. The Municipality is responsible for 100% of any alternate design, over and above State standards and acceptable to the State. Bicycle Accommodations: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of the costs for bicycle ent Manual. Storm Sewers: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of costs necessary to construct a storm sewer system that accommodates roadway drainage, and surface water naturally flowing to the state trunk highway. The Municipality is responsible for 100% of the cost to over-size the storm sewer system to accommodate all additional local storm water caused by existing or future developments, and the Municipality agrees to pay these costs. Replacement Street Lighting: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 100% of replacement lighting costs, in kind, necessitated by roadway construction if the Municipality agrees to accept responsibility for the energy, operation, maintenance and replacement of the lighting system per the SMMA. The Municipality is responsible for 100% of any alternate design, over and above State standards and acceptable to the State. New Street Lighting: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State is responsible for 50% and the Municipality agrees to pay 50% of continuous new street lighting costs if necessitated by the project and only if they are installed to WisDOT standards at the time of project construction and if the Municipality agrees to accept responsibility for the energy, operation, maintenance and replacement of the lighting system per the SMMA. The Municipality is responsible for 100% of any alternate design, over and above state standards and acceptable to the State. Parking Policy: In accordance with State statute 86.32(4), the Municipality is required to pay the actual construction costs and any associated costs (if applicable) of that part of the state trunk highway on which parking is permitted. The local cost share is the amount of the total project cost that represents the construction cost of the parking lane(s). The Municipality has requested to maintain parking on STH 107 between 6th Street and North Street at various locations, on both sides, and agrees to pay for the construction cost. The State has calculated the parking within the project limits for a total cost of $25,650 including construction engineering and pavement marking. The Municipality agrees to pay a lump sum of $25,650. (See Parking Exhibit) 2. 4th Street Intersection Improvements (Cat 0020): In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the State may negotiate a cost share when there is a benefit to the State. The Municipality requested the intersection with 4th Street be widened to minimize vehicle encroachment on the through traffic and vehicle over tracking on the sidewalk. The intersection improvement requires real estate acquisition from the Municipality. The State and the Municipality reviewed all costs associated with the intersection widening including the required real estate. The State agrees to pay 100% of the construction costs and the Municipality agrees to donate the real estate needed for the improvement as the Municipalit cost share for the intersection widening. (See Village Real Estate Exhibit)
Central File: Planning\Project Agreement\Marathon County Page 6 of 9 ID 6360-05-05 NC Region
3. Non-Participating Construction Local Utilities (Cat 0030): The Municipality has requested to include sanitary manhole and water value repairs with the project. In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the Municipality is responsible for 100% of all costs associated with Municipal owned utilities or appurtenances, including but not limited to, new installation or alteration of sanitary sewer and water, including service connections. The Municipality is also responsible for 100% of all costs caused by changes to Municipal owned utilities related to other utilities (gas, electric, telephone, fire, or police alarm facilities, parking meters, irrigation systems and similar utilities). Hazmat: In accordance with the State's Local Cost Sharing Policy of the Program Management Manual, the Municipality agrees to pay 100% of the costs associated with excavating and transporting hazardous material for which the Municipality has been identified as the responsibly party. The Municipality is responsible for securing a suitable site to store the material. Comments and Clarification: This agreement is an active agreement that may need to be amended as the project is designed. It is understood that these amendments may be needed as some issues have not been fully evaluated or resolved. The purpose of this agreement is to specify the local and state involvement in funding the project. A signed agreement is required before the State will prepare or participate in the preparation of detailed designs, acquire right of way, or participate in construction of a project that merits local involvement.
Central File: Planning\Project Agreement\Marathon County Page 7 of 9 ID 6360-05-05 NC Region Parking Exhibit
Central File: Planning\Project Agreement\Marathon County Page 8 of 9 ID 6360-05-05 NC Region Parking Exhibit
Central File: Planning\Project Agreement\Marathon County Page 9 of 9 ID 6360-05-05 NC Region Village Real Estate Exhibit
VILLAGE OF MARATHON CITY September 14, 2026
PROPOSED
2027 GENERAL FUND BUDGET Draft
ADOPTED REVENUES AS OFPROJECTED YEAR-ENDADOPTED ADOPTED YOY Percent
REVENUES 2025 BUDGET 9/28/2025 2026 2026 BUDGET 2027 BUDGET Change
LOCAL TAXES 930,712.00 $ 200,929.45$ 948,381.00$ 948,381.00$ 957,465.00$ 0.96%
SPECIAL ASSESSMENTS 103,316.88$ 42,797.31$ 107,758.93$ 106,375.62$ 110,106.90$ 3.51%
INTERGOVERNMENTAL REVENUES 505,135.94$ 223,578.29$ 529,834.39$ 529,590.40$ 529,834.39$ 0.05%
LICENSES AND PERMITS 33,318.00$ 30,555.04$ 41,859.37$ 33,034.00$ 39,321.00$ 19.03%
FINES & FORFEITURES 7,800.00$ 6,253.08$ 10,203.08$ 7,500.00$ 10,185.00$ 35.80%
PUBLIC CHARGES FOR SERVICES 7,150.00$ 10,045.21$ 26,977.47$ 29,785.60$ 33,071.59$ 11.03%
INTERGOVERNMENTAL CHARGES 139,484.31$ 135,570.44$ 149,980.49$ 148,312.84$ 151,479.07$ 2.13%
MISCELLANEOUS REVENUE 100,596.00$ 97,591.74$ 137,292.03$ 131,720.00$ 127,220.00$ -3.42%
PROCEEDS FROM BORROWING -$ -$ -$ -$ -$
SUB-TOTAL REVENUE 1,827,513.13$ 747,320.56$ 1,952,286.76$ 1,934,699.46$ 1,958,682.95$ 1.24%
PROCEEDS FROM FUND BALANCE -$ 283,106.23$ 16,818.99$ -$ 17,629.62$
TOTAL REVENUE 1,827,513.13$ 1,030,426.79$ 1,969,105.75$ 1,934,699.46$ 1,976,312.57$ 2.15%
ADOPTED Expenses as ofPROJECTED YEAR-ENDADOPTED ADOPTED YOY Percent
EXPENDITURES 2025 BUDGET 9/28/2025 2026 2026 BUDGET 2027 BUDGET Change
GENERAL GOVERNMENT 293,645.00 $ 210,660.30$ 279,445.36$ 280,841.20$ 303,433.19$ 8.04%
PUBLIC SAFETY 674,681.61$ 406,930.61$ 685,999.60$ 700,894.27$ 653,409.08$ -6.77%
PUBLIC WORKS 328,818.03$ 212,629.94$ 343,886.99$ 315,302.28$ 336,368.77$ 6.68%
HEALTH & HUMAN SERVICES 107,087.64$ 63,798.94$ 110,106.90$ 109,761.94$ 109,761.94$ 0.00%
PARKS, CULTURE & RECREATION 53,384.83$ 46,167.19$ 64,844.37$ 67,490.48$ 63,817.21$ -5.44%
CONSERVATION & DEVELOPMENT 1,000.00$ 4,452.00$ 4,452.00$ 3,000.00$ 1,850.00$ -38.33%
MISCELLANEOUS 2,000.00$ 1,287.81$ 1,811.49$ 2,000.00$ 2,000.00$ 0.00%
SUB-TOTAL OPERATIONS 1,460,617.11$ 945,926.79$ 1,490,546.71$ 1,479,290.17$ 1,470,640.19$ -0.58%
Capital Project Fund Transfer -$ 84,500.00$ 121,500.00$ 96,500.00$ 152,215.24$ 57.74%
Debt Service Fund Transfer 365,683.43$ -$ 357,059.04$ 357,059.04$ 353,457.14$ -1.01%
PROCEEDS TO FUND BALANCE 1,212.59$ -$ -$ 1,850.25$ -$ -100.00%
TOTAL EXPENDITURES 1,827,513.13$ 1,030,426.79$ 1,969,105.75$ 1,934,699.46$ 1,976,312.57$ 2.15%
VILLAGE OF MARATHON CITY September 14, 2026
2027 GENERAL FUND BUDGET Draft
Page 2 ADOPTED REVENUES AS OFPROJECTED YEAR-ENDADOPTED ADOPTED YOY Percent
REVENUES 2025 BUDGET 9/28/2025 2025 REVENUES 2026 BUDGET 2027 BUDGET Change
GENERAL PROPERTY TAXES
LOCAL PROPERTY TAXES 930,712.00$ 200,929.45$ 948,381.00$ 948,381.00$ 957,465.00$ 0.96%
TOTAL TAXES 930,712.00$ 200,929.45$ 948,381.00$ 948,381.00$ 957,465.00$ 0.96%
SPECIAL ASSESSMENTS & CHARGES
SPECIAL ASSESSMENTS 899.00$ 899.00$ -$ -$
INTEREST ON SPECIAL ASSESSMENTS 125.61$ 125.61$ -$ -$
GARBAGE & RECYCLING CHARGES 103,316.88$ 41,772.70$ 106,734.32$ 106,375.62$ 110,106.90$ 3.51%
TOTAL SPECIAL ASSESSMENTS 103,316.88$ 42,797.31$ 107,758.93$ 106,375.62$ 110,106.90$ 3.51%
INTERGOVERNMENTAL REVENUES
STATE SHARED REVENUE 181,315.69$ 31,276.92$ 181,858.33$ 181,858.33$ 181,858.33$ 0.00%
STATE COMPUTER AID 6,669.94$ 6,669.94$ 6,669.94$ 6,669.94$ 6,669.94$ 0.00%
STATE HIGHWAY AIDS 162,627.62$ 140,144.04$ 186,858.73$ 186,858.73$ 186,858.73$ 0.00%
STATE RECYCLING GRANT 11,082.40$ 11,047.10$ 11,047.10$ 11,043.11$ 11,047.10$ 0.04%
Video Provider AIDS 2,973.10$ 2,973.10$ 2,973.10$ 2,973.10$ 2,973.10$ 0.00%
STATE PERSONAL PROPERTY AID 31,467.19$ 31,467.19$ 31,467.19$ 31,467.19$ 31,467.19$ 0.00%
STEWARDSHIP GRANT-COUNTY -$ -$ -$ -$
FEDERAL GRANTS / Fire Truck -$ -$ -$ -$
UTILITY DEPT. TAX EQUIVALENT 108,000.00$ -$ 108,000.00$ 108,000.00$ 108,000.00$ 0.00%
LAW ENFORCEMENT STATE AIDS 1,000.00$ -$ 960.00$ 720.00$ 960.00$ 33.33%
TOTAL INTERGOVERNMENTAL REVENUES 505,135.94$ 223,578.29$ 529,834.39$ 529,590.40$ 529,834.39$ 0.05%
LICENSES AND PERMITS
MOBILE HOME TAX 8,200.00$ 9,989.83$ 13,013.87$ 8,200.00$ 13,400.00$ 63.41%
CABLE FRANCHISE FEE 7,008.00$ 4,679.71$ 6,230.00$ 7,008.00$ 6,200.00$ -11.53%
BUS. & OCCUPATIONAL FEES 5,970.00$ 4,025.00$ 7,745.00$ 7,595.00$ 7,740.00$ 1.91%
LIQUOR LICENSES 5,090.00$ 5,040.00$ 5,050.00$ 4,520.00$ 5,050.00$ 11.73%
LICENSES PUBLICATION FEE 200.00$ 200.00$ 200.00$ 180.00$ 200.00$ 11.11%
DOG LICENSES 450.00$ 720.50$ 720.50$ 731.00$ 731.00$ 0.00%
BUILDING PERMITS 5,000.00$ 3,550.00$ 3,600.00$ 3,000.00$ 3,000.00$ 0.00%
UTILITY PERMITS 600.00$ 1,850.00$ 2,800.00$ 800.00$ 1,500.00$ 87.50%
SIGN PERMITS 800.00$ 500.00$ 2,500.00$ 1,000.00$ 1,500.00$ 50.00%
TOTAL LICENSES & PERMITS 33,318.00$ 30,555.04$ 41,859.37$ 33,034.00$ 39,321.00$ 19.03%
LAW & ORDINANCE VIOLATIONS 7,000.00$ 5,273.08$ 8,923.08$ 6,000.00$ 8,760.00$ 46.00%
PARKING VIOLATIONS 800.00$ 980.00$ 1,280.00$ 1,500.00$ 1,425.00$ -5.00%
FINES AND FORFEITURES 7,800.00$ 6,253.08$ 10,203.08$ 7,500.00$ 10,185.00$ 35.80%
PUBLIC CHARGES FOR SERVICES
CLERK'S SERVICE INCOME 1,900.00$ 2,196.67$ 2,671.67$ 1,750.00$ 2,000.00$ 14.29%
POLICE SERVICE INCOME 1,000.00$ 695.00$ 1,025.00$ 1,000.00$ 1,080.00$ 8.00%
CHARGES - GARBAGE STICKERS 750.00$ 535.00$ 535.00$ 750.00$ 550.00$ -26.67%
CHARGES - RECYCLING FEES 1,500.00$ 725.00$ 1,100.00$ 1,500.00$ 1,100.00$ -26.67%
STREETS MAT. & SERVICES INCOME 1,500.00$ 918.75$ 918.75$ 1,500.00$ 2,800.00$ 86.67%
PARKS REVENUE 500.00$ 4,974.79$ 19,227.05$ 21,785.60$ 24,041.59$ 10.36%
SAFETY FUND INCOME - DARE -$ -$ 1,500.00$ 1,500.00$ 1,500.00$
TOTAL PUBLIC CHARGES FOR SERVICES 7,150.00$ 10,045.21$ 26,977.47$ 29,785.60$ 33,071.59$ 11.03%
September 14, 2026
Page 3
ADOPTED REVENUES AS OFPROJECTED YEAR-ENDADOPTED ADOPTED YOY Percent
REVENUES 2025 BUDGET 9/28/2025 2025 REVENUES 2026 BUDGET 2027 BUDGET Change
INTERGOVERNMENTAL CHARGES
FIRE CALLS -$ -$ -$ -$
FIRE INS. DUES 17,327.05$ 11,186.88$ 21,376.73$ 19,709.08$ 21,376.73$ 8.46%
FIRE SECTION FEES 113,202.78$ 112,566.98$ 112,566.98$ 112,566.98$ 117,725.72$ 4.58%
FIRST RESPONDER SECTION CHARGES 8,954.48$ 11,816.58$ 16,036.78$ 16,036.78$ 12,376.62$ -22.82%
TOTAL INTERGOVERNMENTAL CHARGES 139,484.31$ 135,570.44$ 149,980.49$ 148,312.84$ 151,479.07$ 2.13%
MISCELLANEOUS REVENUE
OTHER INCOME - F.D. 5,694.67$ 8.95$ -$ -$
DIVIDENDS & INTEREST 39,000.00$ 57,672.07$ 81,544.00$ 68,400.00$ 68,400.00$ 0.00%
RENTAL REVENUE 35,096.00$ 23,521.65$ 37,861.69$ 37,320.00$ 37,820.00$ 1.34%
LIBRARY REVENUE 10,000.00$ 4,840.81$ 9,374.39$ 10,000.00$ 10,000.00$ 0.00%
PARK SPONSORSHIP & DONATIONS 5,500.00$ 500.00$ 2,500.00$ 1,500.00$ 2,500.00$ 66.67%
DONATIONS - PD 1,200.00$ 1,200.00$ -$ 4,500.00$
DONATIONS - ADMIN 1,000.00$ -$ -$ 1,000.00$ -$ -100.00%
MISC. RECEIPTS & REIMBURSEMENTS 1,500.00$ 3,803.00$ 4,303.00$ 3,000.00$ 3,500.00$ 16.67%
SALES OF GOODS & PROPERTY 8,000.00$ -$ -$ 10,000.00$ -$ -100.00%
Other MISC Rev 500.00$ 359.54$ 500.00$ 500.00$ 500.00$ 0.00%
TOTAL MISCELLANEOUS REVENUE 100,596.00$ 97,591.74$ 137,292.03$ 131,720.00$ 127,220.00$ -3.42%
PROCEEDS FROM DEBT
PROCEEDS FROM DEBT -$ -$ -$ -$ -$
PROCEEDS FROM DEBT - FD -$
TOTAL DEBT REVENUES -$ -$ -$ -$ -$
SUB-TOTAL 1,827,513.13$ 747,320.56$ 1,952,286.76$ 1,934,699.46$ 1,958,682.95$ 1.24%
PROCEEDS FROM FUND BALANCE -$ 283,106.23$ 16,818.99$ -$ 17,629.62$
TOTAL REVENUES 1,827,513.13 $ 1,030,426.79$ 1,969,105.75$ 1,934,699.46$ 1,976,312.57$ 2.15%
September 14, 2026
Page 4
ADOPTED Expenses as ofPROJECTED YEAR-ENDADOPTED ADOPTED YOY Percent
EXPENDITURES 2025 BUDGET 9/28/2025 2026 2026 BUDGET 2027 BUDGET Change
GENERAL GOVERNMENT
BOARD SALARIES & EXPENSE 14,360.00$ 11,480.58$ 14,141.75$ 12,408.75$ 16,313.75$ 31.47%
ADMIN STAFF WAGES & SALARIES 77,637.59$ 64,037.86$ 91,516.79$ 90,871.30$ 101,493.30$ 11.69%
ADMIN STAFF BENEFITS 32,745.96$ 27,621.35$ 40,486.64$ 40,593.46$ 42,678.45$ 5.14%
PUBLICATIONS & DUES 3,100.00$ 707.60$ 2,150.00$ 3,100.00$ 3,100.00$ 0.00%
OFFICE SUPPLIES & SERVICES 31,751.30$ 23,654.10$ 29,566.43$ 33,650.00$ 33,000.00$ -1.93%
VILLAGE HALL MAINTENANCE 3,400.00$ 2,686.81$ 3,000.00$ 3,400.00$ 3,400.00$ 0.00%
ELECTIONS 2,834.00$ 1,581.13$ 2,649.98$ 2,932.69$ 2,932.69$ 0.00%
LEGAL & PROFESSIONAL SERVICES 90,866.15$ 45,502.90$ 57,742.75$ 58,700.00$ 62,000.00$ 5.62%
AUDIT -$ -$ -$ -$
VILLAGE HALL UTILITIES 9,700.00$ 6,737.53$ 9,877.68$ 10,700.00$ 10,700.00$ 0.00%
ASSESSMENT OF PROPERTY -$ -$ -$ -$
MOBILE HOME TAX $ 3,250.00 $ 2,328.08 $ 3,990.98 $ 3,000.00 $ 4,000.00 33.33%
INSURANCE AND BONDS 24,000.00$ 24,322.36$ 24,322.36$ 21,485.00$ 23,815.00$ 10.84%
TOTAL GENERAL GOVERNMENT 293,645.00$ 210,660.30$ 279,445.36$ 280,841.20$ 303,433.19$ 8.04%
PUBLIC SAFETY
EMPLOYEE WAGES & SALARIES 213,150.78$ 134,541.69$ 233,205.60$ 232,123.97$ 249,631.59$ 7.54%
EMPLOYEE BENEFITS 102,533.01$ 52,789.05$ 100,640.84$ 100,105.75$ 104,541.61$ 4.43%
LEGAL FEES 2,000.00$ 485.00$ 1,500.00$ 3,000.00$ 3,000.00$ 0.00%
OPERATIONS 48,579.00$ 23,683.11$ 47,755.34$ 48,623.00$ 47,900.00$ -1.49%
INSURANCE AND BONDS 12,300.00$ 11,277.68$ 11,277.68$ 8,448.00$ 11,500.00$ 36.13%
IT SW, HW, SUPPORT 16,100.00$ 15,388.61$ 18,741.91$ 20,139.00$ 20,050.00$ -0.44%
CROSSING GUARDS 7,836.92$ 4,406.05$ 8,069.56$ 8,111.22$ 8,357.52$ 3.04%
SUBTOTAL - POLICE DEPT. 402,499.71$ 242,571.19$ 421,190.93$ 420,550.94$ 444,980.72$ 5.81%
FIRE DEPT. OPERATIONS 131,878.96$ 53,067.49$ 127,965.87$ 136,366.46$ 142,181.49$ 4.26%
FIRST RESPONDER OPERATIONS 42,872.95$ 16,705.15$ 42,256.02$ 43,833.87$ 43,833.87$ 0.00%
INSURANCE AND BONDS 16,000.00$ 10,443.78$ 10,443.78$ 16,000.00$ 11,500.00$ -28.13%
AMBULANCE SERVICE 8,200.00$ 10,913.00$ 10,913.00$ 10,913.00$ 10,913.00$ 0.00%
HYDRANT RENTAL 73,230.00$ 73,230.00$ 73,230.00$ 73,230.00$ -$ -100.00%
SUBTOTAL - FIRE DEPT. 272,181.91$ 164,359.42$ 264,808.67$ 280,343.33$ 208,428.36$ -25.65%
TOTAL PUBLIC SAFETY 674,681.62$ 406,930.61$ 685,999.60$ 700,894.27$ 653,409.08$ -6.77%
September 14, 2026
Page 5
ADOPTED Expenses as ofPROJECTED YEAR-ENDADOPTED ADOPTED YOY Percent
2025 BUDGET 9/28/2025 2026 2026 BUDGET 2027 BUDGET Change
PUBLIC WORKS
EMPLOYEE WAGES & SALARIES 108,675.45$ 80,869.70$ 123,876.38$ 116,695.84$ 127,657.19$ 9.39%
EMPLOYEE BENEFITS 44,520.58$ 36,610.50$ 53,913.91$ 53,631.44$ 56,147.58$ 4.69%
GARAGE UTILITIES 8,432.00$ 5,682.14$ 9,819.38$ 9,292.00$ 10,800.00$ 16.23%
VEHICLES OPERATION & MAINTENANCE 20,500.00$ 17,102.04$ 20,231.44$ 20,500.00$ 20,500.00$ 0.00%
GARAGE OPERATION & MAINTENANCE 28,490.00$ 25,341.25$ 36,236.35$ 28,490.00$ 33,000.00$ 15.83%
CAPITAL EXPENSE - EQUIPMENT
INSURANCE AND BONDS 16,200.00$ 9,156.60$ 9,156.60$ 9,193.00$ 10,764.00$ 17.09%
STREET MAINTENANCE 60,000.00$ 18,677.28$ 57,807.75$ 35,500.00$ 35,500.00$ 0.00%
STREET LIGHTING 40,000.00$ 18,270.85$ 31,045.18$ 40,000.00$ 40,000.00$ 0.00%
TRAFFIC CONTROL 2,000.00$ 919.58$ 1,800.00$ 2,000.00$ 2,000.00$ 0.00%
TOTAL PUBLIC WORKS 328,818.03$ 212,629.94$ 343,886.99$ 315,302.28$ 336,368.77$ 6.68%
HEALTH & HUMAN SERVICES
REFUSE COLLECTION $ 69,732.12 $ 39,459.65 $ 73,859.91 $ 73,420.02 $ 73,420.02 0.00%
RECYCLING $ 37,055.52 $ 24,339.29 $ 36,246.99 $ 36,241.92 $ 36,241.92 0.00%
RECYCLING SUPPLIES $ 300.00 $ - $ - $ 100.00 $ 100.00 0.00%
SUBTOTAL - SANITATION 107,087.64$ 63,798.94$ 110,106.90$ 109,761.94$ 109,761.94$ 0.00%
CEMETERY -$ -$ -$
TOTAL HEALTH & HUMAN SERVICES 107,087.64$ 63,798.94$ 110,106.90$ 109,761.94$ 109,761.94$ 0.00%
PARKS, CULTURE & EDUCATION
LIBRARY WAGES & OPERATION & MAINTENANCE6,014.20$ 4,005.79$ 5,985.07$ 6,119.70$ 5,714.43$ -6.62%
LIBRARY EMPLOYEE BENEFITS -$ -$ -$ -$
LIBRARY UTILITIES 6,100.00$ 2,908.35$ 5,380.42$ 6,000.00$ 6,000.00$ 0.00%
PARKS EMPLOYEE WAGES & BENEFITS 29,145.63$ 22,038.96$ 30,737.86$ 33,797.03$ 30,042.78$ -11.11%
PARKS UTILITIES 4,500.00$ 5,289.57$ 9,369.02$ 10,424.59$ 11,160.00$ 7.05%
PARK OPERATION & MAINTENANCE 6,000.00$ 11,529.24$ 12,872.00$ 10,149.16$ 10,400.00$ 2.47%
PARKS INSURANCE & BONDS 625.00$ -$ -$ -$ -$ #DIV/0!
SPECIAL EVENTS 1,000.00$ 395.28$ 500.00$ 1,000.00$ 500.00$ -50.00%
TOTAL PARKS, CULTURE & EDUCATION 53,384.83$ 46,167.19$ 64,844.37$ 67,490.48$ 63,817.21$ -5.44%
CONSERVATION & DEVELOPMENT
PLANNING & ZONING PROF. SERVICES 1,000.00$ 4,452.00$ 4,452.00$ 3,000.00$ 1,850.00$ -38.33%
ECONOMIC DEVELOPMENT -$ -$ -$ -$ -$
TOTAL CONSERVATION & DEVELOPMENT 1,000.00$ 4,452.00$ 4,452.00$ 3,000.00$ 1,850.00$ -38.33%
September 14, 2026
Page 6
ADOPTED Expenses as ofPROJECTED YEAR-ENDADOPTED ADOPTED YOY Percent
2025 BUDGET 9/28/2025 2026 2026 BUDGET 2027 BUDGET Change
MISCELLANEOUS
RENTAL PROPERTY MAINTENANCE $ 1,287.81 $ 1,811.49 $ 2,000.00 $ 2,000.00
MICSELLANEOUS -$ -$ -$ -$ -$
TOTAL MISCELLANEOUS -$ 1,287.81$ 1,811.49$ 2,000.00$ 2,000.00$
CAPITAL OUTLAY
Fire Departmetn Capital Outlay -$ -$ 37,000.00$ 12,000.00$ 16,715.24$
Streets Department Capital Outlay -$ 84,500.00$ 84,500.00$ 84,500.00$ 125,000.00$
Parks - Equiptment Replacement Fund CIP -$ -$ -$ -$ 2,000.00$
PD Capital Outlay -$ -$ -$ -$ 8,500.00$
ADMIN - Capital Outlay -$ -$ -$ -$ -$
-$ -$ -$
-$ -$ -$
-$ -$ -$
Land Acquisition -$ -$ -$
TOTAL CAPITAL OUTLAY -$ 84,500.00$ 121,500.00$ 96,500.00$ 152,215.24$
DEBT SERVICE
ADMIN - DEBT SERVICE 316,861.43$ -$ 316,157.65$ 316,157.65$ 313,207.14$ -0.93%
FD - DEBT SERVICE 48,822.00$ -$ 40,901.39$ 40,901.39$ 40,250.00$ -1.59%
TOTAL DEBT SERVICE $ 365,683.43 $ - $ 357,059.04 $ 357,059.04 $ 353,457.14 -1.01%
EXPENDITURE SUMMARY
GENERAL GOVERNMENT 293,645.00$ 210,660.30$ 279,445.36$ 280,841.20$ 303,433.19$ 8.04%
PUBLIC SAFETY 674,681.61$ 406,930.61$ 685,999.60$ 700,894.27$ 653,409.08$ -6.77%
PUBLIC WORKS 328,818.03$ 212,629.94$ 343,886.99$ 315,302.28$ 336,368.77$ 6.68%
HEALTH & HUMAN SERVICES 107,087.64$ 63,798.94$ 110,106.90$ 109,761.94$ 109,761.94$ 0.00%
PARKS, CULTURE & EDUCATION 53,384.83$ 46,167.19$ 64,844.37$ 67,490.48$ 63,817.21$ -5.44%
CONSERVATION & DEVELOPMENT 1,000.00$ 4,452.00$ 4,452.00$ 3,000.00$ 1,850.00$ -38.33%
MISCELLANEOUS 2,000.00$ 1,287.81$ 1,811.49$ 2,000.00$ 2,000.00$ 0.00%
SUBTOTAL OPERATIONS 1,460,617.11$ 945,926.79$ 1,490,546.71$ 1,479,290.17$ 1,470,640.19$ -0.58%
DEBT SERVICE 365,683.43 $ - $ 357,059.04$ 357,059.04$ 353,457.14$ -1.01%
CAPITAL OUTLAY -$ 84,500.00$ 121,500.00$ 96,500.00$ 152,215.24$
SUB-TOTAL OPERATIONS1,826,300.54$ 1,030,426.79$ 1,969,105.75$ 1,932,849.21$ 1,976,312.57$ 2.25%
PROCEEDS TO FUND BALANCE 1,212.59$ -$ -$ 1,850.25$ -$ -100.00%
TOTAL EXPENDITURES $ 1,827,513.13 $ 1,030,426.79 $ 1,969,105.75 $ 1,934,699.46 $ 1,976,312.57 2.15%
YearPROJECT LIMITS Department 2027 GO Note 2025 GO Note/Bond 2024 GO Note Grants fundsGeneral Fund
Budget
Sale of
Equiptment/
capital
Donations TID 1 - GO
Note Water Budget Sewer Budget
Utility Fund
Balance /
Reserve
Fund
DNR Safe Drinking
Water Loan (low
interest rate)
Total Project Cost Notes
2025 *Post Office Floor Replacement Building & Grounds $20,000.00 $20,000.00
2025 *Veterans Park Sewer Line Replacement Parks, Rec & Forestry $21,500.00 $21,500.00 $43,000.00
2025 *County Materials Sports Complex – Phase 1C Parks, Rec & Forestry $175,000.00 $175,000.00
2025 *County Materials Sports Complex – Phase 1A & 1B Parks, Rec & Forestry $258,282.00 $174,087.81 $432,369.81
2025 *4th Street Sidewalk Expansion Public Works $79,188.13 $91,217.87 $170,406.00
2025 *Water - Reservoir & Inspections Water Utility $10,000.00 $10,000.00
2025 *North Business Park Expansion Tax Increment Districts (TID) $924,097.00 $924,097.00
Contract: Blacktop, Lights, Menzner-
Utilities (3-phase Power, Gas,
Communications)
2028 Replacement of Municipal Well 1
Water Utility $40,000.00 $2,990,000.00 $3,030,000.00July 2025 - Municipal well to verify
if well can be rehabilitated. If yes,
project moves back 10 years.
2025 *Water Tower – Maintenance Painting and Repairs Water Utility $120,000.00 $120,000.00
2025 *Community Circle – Culvert Replacement Public Works $25,000.00 $25,000.00
2025 *Oak Street – 4th to 5th Public Works $15,000.00 $15,000.00
2025 *Sonnentag Road – Pine Street to Village’s West Boundary Public Works $20,000.00 $20,000.00
2026 Sanitary Sewer Main - Cured-in-place Pipe Lining Sanitary Sewer Utility $674,213.00 $674,213.00 7.5 Sewer Rate Increase, Adds 50
Years use life on pipes.
2026 STH 107 - State Project 6360-05-05 Reconstruction Public Works $84,500.00 $5,500.00 $90,000.00
2026 Street Overlays and Surface Treatments Public Works $35,500.00 $35,500.00
2026 1999 Street Sweeper Replacement VOM $370,000.00 $8,000.00 $378,000.00
2027 Market St – 4th to 8th Reconstruction Public Works $54,648.00 $174,648.00 $120,000.00 $349,296.00 Pending Grant approval
$0.00 $1,477,143.00 $253,275.94 $265,865.87 $341,500.00 $8,000.00 $196,500.00 $924,097.00 $55,500.00 $0.00 $0.00 $2,990,000.00 $6,511,881.81
2025-2027 TWO-YEAR FUNDING CYCLE OF CIP - *Top Priority Projects started and approved prior to this CIP.
Total Cost
Year PROJECT LIMITS Department 2027 GO Note 2025 GO Note/Bond 2024 GO Note Grants fundsGeneral Fund
Budget
Sale of
Equiptment/
capital
Donations TID 1 - GO
Note Water Budget Sewer Budget
Utility Fund
Balance /
Reserve Fund
DNR Safe Drinking
Water Loan (low
interest rate)
Total Project
Cost Notes
2028 2012 Dodge Truck Replacement VMO $1,000.00 $30,000.00 $18,500.00 $49,500.00 Older truck, still in great shape
2028 4th Street - Thornapple to Pheasant Public Works $14,589.84 $120,000.00 $134,589.84
2028 1996 International Plow-Dump Truck Replacement VMO 255000 $10,000.00 $265,000.00
2025 CIP Bond restructured debt
for this project in 2028 future
Bond
2028 2019 Dodge Durango Replacement Public Safety 47000 $18,000.00 $65,000.00
2026 Budget can not fund this.
Car only has 50,000 miles, low
maintenance cost . Should we
hold to replace tell 2028?
2029 5th Street - Main St to Washington Street (part of Main to East St project
due to self funding ) Public Works $120,000.00 $120,000.00
Maybe do the very bad parts
under the budget. $120K gets
two block done at a time. No
room within budget.
2029 1994 Stiner Utility Tractor VOM 58000 $2,000.00 $60,000.00 Fund balance / budget?
$360,000.00 $0.00 $0.00 $14,589.84 $242,000.00 $29,000.00 $0.00 $0.00 $0.00 $30,000.00 $18,500.00 $0.00 $694,089.84
2028 to 2029 - Priority Projects - to be Re-Evaluated in 2027 for next 2-year funding cycle - Prices does not include inflation
Total Cost
Year PROJECT LIMITS Department Future GO NoteMSID Grant
50/50 Split
General Fund
Budget
Sale of
Equiptment/
capital
American
legion / Park
contract
Donation/Park
fund (500)
TID 1 - Bond
Water Budget Sewer Budget
Utility Fund
Balance /
Reserve Fund
Water Loan Sewer Loan
(rate increase)
DNR Safe Drinking
Water Loan (low
interest rate) Total Project
Cost
Notes
2030 5th Spruce Street to Main Street
Public Works $417,949.84 $417,949.84
Maybe do the very bad parts
under the budget. $120K gets two
block done at a time. No room
within budget.
2030 5th - Washigton Street to Hickory St (part of Main to East St project due
to self funding) Public Works $60,000.00 $60,000.00
Maybe do the very bad parts
under the budget. $120K gets two
block done at a time. No room
within budget.
2030 5th - Chestnut Street to East Street Public Works $60,000.00 $60,000.00
2030 Water Plant Chemical Room Upgrade Water Utility $21,000.00 $70,000.00 $91,000.00
2030 Ordinance- Codification, Supplementation, and Online Hosting Administration $32,334.00 $32,334.00 Needed, no budget space
2031 Washington Street Reconstruction (6th St to 7th St) Public Works $28,575.00 $120,000.00 $66,090.50 $66,090.50 $280,756.00
Removed due to General Fund
Situation. Note: Large inflation if
project is pushed back. Utility
can pay its part of the project, not
Streets.
2031 2002 CAT Loader/Plow VOM $380,000.00 $380,000.00
2032 2023 Dodge Durango Replacement Public Safety $47,000.00 $18,000.00 $65,000.00
2032 Water Main Loop Project Water Utility $927,725.00 $927,725.00 Water Rate increase needed or
grant funding
2032 Spruce St - 4th to 5th Public Works $39,497.92 $39,497.92
2032 Walnut / Maraview Dr (Culvert Replacement) Public Works $15,000.00 $15,000.00
2032 Chestnut Street - 6th to 7th Public Works $51,777.88 $51,777.88
2033 Pine Street – 3rd to 4th Public Works $67,513.60 $67,513.60
2033 7th Street – Chestnut Street to Washington Public Works $197,520.40 $197,520.40
2033 6th Street – Washington Street to Hickory Street Public Works $93,216.82 $93,216.82
2034 Hickory Street – 6th to 7th Public Works $89,615.68 $89,615.68
2034 Pine Street – 2nd North to Cul-De-Sac Public Works $40,823.06 $40,823.06
2035 Hemlock Street – 8th to 7th Public Works $103,882.24 $103,882.24
2035 Washington Street – 2nd to 3rd Public Works $89,763.52 $89,763.52
2036 Hickory Street – 1st to 2nd Public Works $54,445.16 $54,445.16
? 1990 Idaho Norland loader Mounted Snow Blower VOM $175,000.00 $175,000.00
? Drainage Retention Pond - Culvert – 4th Street Public Works $30,000.00 $30,000.00
$1,246,045.24 $0.00 $917,869.88 $18,000.00 $0.00 $0.00 $0.00 $21,000.00 $0.00 $70,000.00 $66,090.50 $993,815.50 $0.00 $3,332,821.12
2030 to 2035 and up - All Projects to be Re-Evaluated in 2027 Funding cycle and could change pending board decision at that time
Total Cost
Project Grant Local Fund Total project
Market Street $245,712.89$245,712.90 $491,425.79
5th Street $35,295.39$52,228.71 $87,524.10
Crack Sealing $15,000.00 $15,000.00
Totals $281,008.28$312,941.61 $593,949.89
Project Grant Local Fund Total project
TAP Grant - Move to 28' $55,968.00$13,992.00 $69,960.00
2028 Crack Sealing / Chip Sealing $106,008.00 $106,008.00
Totals $55,968.00$120,000.00 $175,968.00
Project Grant Local Fund Total project
Street Reconstruction $120,000.00 $120,000.00
Totals $0.00 $120,000.00 $120,000.00
Amount
$54,648.00
$120,000.00
$15,000.00
$124,500.00
$314,148.00
$124,500.00
$265,000.00
$65,000.00
$50,000.00
$504,500.00
2027 Streets
2027 Street Projects
2027 Street Project Proposed Funding
Funding
2025 Market St Bond
2028 Street Projects
2029 Street Projects
2027 CIP General Fund Cash
2027 Street Maintenance Budget
2028-29: CIP Borrowing (27 Note) ?
Total
2028-2029 CIP Bond Funding (proposed)
1996 Dump Truck Replacement (27/2028)
2019 Police Car (2027/28)
2014 Utility Tractor Replacement (2028/29)
Total projected Note as of 9/9/2026
Description Unit of Measure Estimated
Quantity Unit Price Item Total
Mobilization, Removals, Traffic Control & Bonds LS 1 26,000.00$ 26,000.00$
Pulverize and Re-laid Existing Asphalt SY 6700 10.00$ 67,000.00$
Haul Excess Pulverized Material CY 350 15.00$ 5,250.00$
Storm Sewer - 18" RCP LF 350 100.00$ 35,000.00$
Storm Curb Inlet - 2’ x 3’ Precast Box w/Frame & Grate EA 4 3,000.00$ 12,000.00$
Excavation Below Subgrade (EBS) (Excavation Only) CY 250 20.00$ 5,000.00$
Place Pulverized Material in EBS CY 250 10.00$ 2,500.00$
Finish Grading Base Aggregate in Prep of HMA Paving LF 1200 5.00$ 6,000.00$
Sawcut Asphalt LF 331 3.50$ 1,158.50$
Curb and Gutter LF 1200 27.00$ 32,400.00$
Concrete Ramp with Detetable Warning Fields EA 15 1,500.00$ 22,500.00$
HMA Pavement - Upper Layer (1.75"), 4 MT 58-28 S SY 6700 10.00$ 67,000.00$
HMA Pavement - Lower Layer (2.25"), 4 MT 58-28 S SY 6700 13.00$ 87,100.00$
Asphalt Cleaning & Sweeping SY 6700 0.10$ 670.00$
Asphaltic Tack Coat SY 6700 0.30$ 2,010.00$
371,588.50$
$55,738.28
$64,099.02
$491,425.79
Contingencies (15%)
Professional Services (15%)
Total - Market Street
Village of Marathon City
Market Street (8th Street to 4th Street)
Opinion of Probable Cost
October 2025
Market Street (8th Street to 4th Street, 35'/37'+/- Paved 1,200 LF)
Subtotal - Market Street
April 15, 2026
The Honorable Steven Cherek
Village of Marathon City
311 Walnut St
Marathon City, WI 54448
Dear Steven Cherek,
Congratulations! This letter confirms funding for your local project on Market St from the 2026-27
Municipal Street Improvement Discretionary Program (MSID) , which is a component of the Local
Roads Improvement Program (LRIP), a reimbursement program of the Wisconsin Department of
Transportation (WisDOT). This program assists local units of government in improving deteriorating
county highways, town roads, and municipal streets un der the authority of the local unit of government
by paying up to 50% of the total eligible project costs, with the balance of costs funded by the political
subdivision where the work is performed.
Your project was one of 28 MSID projects selected for funding in the 2026-27 biennium. The total eligible
cost of the project is currently estimated to be $491,425.79 based on the application materials submitted.
WisDOT will reimburse the Village of Marathon City for up to a limit of $245,712.89.
You will soon receive a signed State/Municipal Project Agreement (SMA) from WisDOT. It is important
that you not incur any project costs until receipt of your signed State Municipal Project Agreement
(SMA) from WisDOT. Additionally, please be aware of the new program requirement beginning this cycle
which is to provide advertising information to the department at least 7 days prior to advertising. More
information on how to provide this information is located in the LRIP Guidelines and Requirements a
nd
on the LRIP webpage.
I greatly appreciate your commitment to provide a quality transportation system that promotes public
safety and economic development. Our state and local partnership is imperative to the future of
Wisconsin’s transportation infrastructure. Congratulations on your project award, which is a key part of
this effort.
Sincerely,
Kristina Boardman, Secretary
Wisconsin Department of Transportation
Office of the Secretary
4822 Madison Yards Way, S903
Madison, WI 53705
Governor Tony Evers
Secretary Kristina Boardman
wisconsindot.gov
Telephone: (608) 266-1114
Email: sec.exec@dot.wi.gov
Description Unit of
Measure
Estimated
Quantity Unit Price Item Total
Mobilization, Removals, Traffic Control & Bonds LS 1 8,000.00 $ 8,000.00 $
Pulverize and Re-laid Existing Asphalt SY 1000 10.00 $ 10,000.00 $
Haul Excess Pulverized Material CY 50 20.00 $ 1,000.00 $
Removal Existing Curb and Gutter LF 300 8.00 $ 2,400.00 $
Excavation Below Subgrade (EBS) (Excavation Only) CY 40 25.00 $ 1,000.00 $
Place Pulverized Material in EBS CY 40 10.00 $ 400.00 $
Finish Grading Base Aggregate in Prep of HMA Paving LF 290 6.00 $ 1,740.00 $
Sawcut Asphalt LF 100 5.00 $ 500.00 $
Storm Curb Inlet - 2'x3' EA 1 3,600.00 $ 3,600.00 $
Storm Sewer - 12" RCP LF 8 120.00 $ 960.00 $
Concrete Sidewalk - 4" SF 200 8.00 $ 1,600.00 $
Concrete Driveway - 6" SF 100 10.00 $ 1,000.00 $
Detecable Warning Field (2'x2'') EA 4 300.00 $ 1,200.00 $
HMA Pavement - Upper Layer (1.75"), 4 MT 58-28 S SY 1030 12.00 $ 12,360.00 $
HMA Pavement - Lower Layer (1.75"), 4 MT 58-28 S SY 1030 14.00 $ 14,420.00 $
Asphalt Cleaning & Sweeping SY 1030 0.05 $ 51.50 $
Asphaltic Tack Coat SY 1030 0.25 $ 257.50 $
Curb and Gutter LF 290 30.00 $ 8,700.00 $
69,189.00 $
$6,918.90
$11,416.19
$87,524.09
Contingencies (10%)
Professional Services (15%)
Total - 5th St
Village of Marathon City
2030 Roadway Improvements
Opinion of Probable Cost
August 2026
5th Street - (Chestnut Street to East Street, - Paved 290 LF)
Subtotal - 5th
Description Unit of
Measure
Estimated
Quantity Unit Price Item Total
Mobilization, Removals, Traffic Control & Bonds LS 1 23,500.00 $ 23,500.00$
Pulverize and Re-laid Existing Asphalt SY 2400 10.00$ 24,000.00$
Haul Excess Pulverized Material CY 120 15.00$ 1,800.00$
Excavation Below Subgrade (EBS) (Excavation Only)CY 80 20.00$ 1,600.00$
Place Pulverized Material in EBS CY 80 10.00$ 800.00$
Finish Grading Base Aggregate in Prep of HMA PavingLF 700 5.00$ 3,500.00$
Sawcut Asphalt LF 150 3.50$ 525.00$
HMA Pavement - Upper Layer (2"), 4 MT 58-28 S SY 2400 11.00$ 26,400.00$
HMA Pavement - Lower Layer (2"), 4 MT 58-28 S SY 2400 11.00$ 26,400.00$
Asphalt Cleaning & Sweeping SY 2400 0.05$ 120.00$
Asphaltic Tack Coat SY 2400 0.25$ 600.00$
109,245.00$
$10,924.50
$14,420.34
$134,589.84
Opinion of Probable Cost
August 2024
4th Street (Thornapple to Pheasant, 30'/22'+/- Paved 700LF)
Subtotal - 4th Street
Contingencies (10%)
Professional Services (12%)
Total - 4th Street
Wisconsin Department of Transportation
Office of the Secretary
4822 Madison Yards Way, S903
Madison, WI 53705
Governor Tony Evers
Secretary Kristina Boardman
Wisconsindot.gov
Telephone: (608) 266-1114
FAX: (608) 266-9912
Email: sec.exec@dot.wi.gov
August 21, 2026
Steve Cherek
Village of Marathon
311 Walnut St
Marathon, WI 54448
Dear Mr. Cherek,
Congratulations! The Wisconsin Department of Transportation (WisDOT) Secretary’s Office has
approved the following project(s) considered during the 2026-2030 Transportation Alternatives
Program (TAP) program cycle:
Project Title Federal Award Limit
Marathon Rapid Flash Beacons $55,968.00
Your project is one of forty-nine (49) projects and approximately $32.6 million of federal TAP funding
awarded during this cycle. TAP projects are competitively awarded, and any expenditures beyond
this award are the responsibility of the sponsoring agency.
Section 85.021 of the Wisconsin Statutes requires TAP projects to commence within 4 years of the
project award date. Please note that the date of this letter constitutes the project award date and as
such begins the 4-year commencement deadline.
It is important that you do not incur any project costs until you receive your State/Municipal
Agreement (SMA) from WisDOT. A representative from the WisDOT region office will follow up
with you regarding project execution. If you have not yet completed the required training, please
navigate to TAPWeb to complete your training.
In the interim, if you have any questions, please contact WisDOT TAP and CMAQ Statewide
Program Manager, Will Keenan, at 608-266-5402 or will.keenan@dot.wi.gov.
Thank you for participating in the WisDOT Transportation Alternatives Program. We look forward to
collaborating with your community to make this project successful.
Sincerely,
Kristina Boardman
Secretary
Wisconsin Department of Transportation
VILLAGE OF MARATHON CITY, MARATHON COUNTY, WISCONSIN
AN ORDINANCE AMENDING ARTICLE 2, SECTION 2.2.4
ENTITLED “SALARIES”
The Village Board of the Village of Marathon City , Marathon County, Wisconsin, do
ordain as follows:
SECTION 1: Article 2, Section 2.2.4 of the Code of Ordinances of the Village of Marathon
City entitled “Salaries” is hereby amended by the deletion of the stricken text and addition of the
underlined text, to provide as follows:
2.2.4 SALARIES
The Village President and Trustees whether operating under general or special law, may,
by three-fourths vote of all the members of the village board, determine the salary to be
paid the President and Trustees. Salaries heretofore established shall so rem ain until
changed by ordinance resolution as from time to time approved by the village board as
provided herein and shall not be increased or diminished during the terms of office. ( Sec.
61.32, Wis. Stats. Wis. Stat. § 61.32)
SECTION 2: If any provision of this Ordinance is invalid or unconstitutional, or if the
application of this Ordinance to any person or circumstances is found invalid or unconstitutional
by a Court of competent jurisdiction, such invalidity or unconstitutionality shal l not affect the
provisions or application of this Ordinance which can be given effect without the invalid or
unconstitutional provision or application.
SECTION 3: All Ordinances and parts of ordinances in conflict herewith are hereby
repealed.
SECTION 4: This Ordinance shall take effect and be in full force and effect from and after
its passage and publication or posting as required by law.
Adopted this _____ day of September, 2026.
VILLAGE OF MARATHON CITY
__________________________________________
Kurt Handrick, Jr., President
ATTEST:
____________________________________
Cassandra Lang, Clerk
Adopted: ___________
Published: ____________