VILLAGE UTILITY COMMISSION
MINUTES
Wednesday, May 27, 2026
1. CALL TO ORDER at 4:00 pm
UTILITY ROLL CALL: A. BERENS-Present, B. BOHR-Present, M. TELFORD-Present, D. SEILER-Present,
K. HANDRICK JR.-Present
2. PLEDGE OF ALLEGIANCE
3. RECOGNITION OF VISITORS
a. Virtual Meeting Guidelines
i. This meeting will be recorded and available upon request
b. Public Participation at Government Meetings
In Person Attendance: Joey Knauf – Dvorak Sanitation
Virtual Attendance: Kevin O’Brien – Record Review, Mike Forslund – Strand Associates, Brian Roemer –
Ehlers Financial, KateLynn Harrigan – Ehlers Financial
4. PSC WATER RATE STUDY PRESENTATION WITH EHLERS FINANCIAL
Mike Forslund from Strand Associates presented 2 options for the new Well 5. Both options include about a
30% (around $1,000,000) contingency.
Option 1: Raise the road to current Well 1 to create year-round dryland access and build the new Well near
Well 1. Forslund estimated $1.2 million to construct the dryland access and about $4.5 million for the overall
well project. He voiced there may be additional DNR regulatory hurdles to overcome with this option as the
area may be considered wetland, not just a floodplain, creating more unknowns.
Option 2: Relocate Well 5 to a brand-new location near North Ridge Road. Forslund stated that a Well at this
location may require a treatment facility to remove the iron and manganese anticipated to be present in the
ground. This would eliminate water being pumped to the central water treatment plant and would pump
directly into the distribution system from Well 5. Estimated cost for this option is $6.5 million.
Brian Roemer from Ehlers Financial presented a rate study for both options/costs presented by Forslund.
Both options were based on a 30-year loan with principal payments beginning in 2028. The last Conventional
Rate Case (CRC) for the Village was effective April 1, 2016. The Village is currently looking at a 10-year audit
process from the PSC to update rates. Roemer explained the lack of recent rate studies shows the Village
should implement a 38% rate increase before the Well Project. He stated that it would make sense for the
Utility to apply for a CRC before July 31st to get rates in place for the current year. Waiting until after July 31st
or until Well 5 project is underway, could significantly raise rates.
Option 1: To cover cost of the $4.5 million option, a CRC reflects a 38% increase for 2027 and the Utility could
then continue with Simplified Rate Cases (SRC) in subsequent years to maintain funds to pay for Well 5. SRC
rates were assumed at 3% annual inflation in the presentation given. Roemer showed the impact to be a $36
increase in the water portion of customer bills based on 12,000 gallons of consumption per quarter for the first
year, with a 10-year overall increase of $58 per quarter (about $230 per year).
Option 2: To relocate Well 5 to North Ridge Road the Utility would need to implement 2 CRCs in sequential
years. First would be the same as Option 1 at 38% increase or about $36 per quarter. The 2nd CRC presented
showed a rate increase of about 35%, resulting in a quarterly bill increase of $45. After the 2 CRCs, Ehlers
again recommends SRCs in subsequent years. Roemer’s presentation showed a 10-year overall increase of
$99 per quarter or just under $400/year, based on 12,000 gallons of consumption.
5. DISCUSS HOLDING TANK ACCEPTANCE AT WASTE WATER TREATMENT PLANT – JOEY
KNAUF TO PRESENT
At the previous meeting in April, Director of Public Works, Ken Bloom, explained that he was approached by
Joey Knauf, owner of Dvorak Sanitation Services, to see if the Utility would consider accepting holding tank
waste at the wastewater treatment plant. Bloom went back to Knauf with a quote of $15 per 1,000 gallons
plus a $10 admin fee per load. Knauf asked to appear before the Commission at the May meeting to discuss
options. He proposed $11 per 1,000 gallons plus a $10 admin fee, similar to what Wausau and Rib Mountain
charge. Edgar is currently at $13 per 1,000 gallons with no admin fee.
Bloom voiced concerns with bringing on extra waste to treat. The WWTP is not currently set up to fully handle
the capacity of waste that Knauf is proposing to dispose of, although holding tank waste is typically a lower
concentration of waste to treat. It does not have prescreening capabilities, though Knauf addressed these
Cassie Lang
Village Clerk / Deputy Treasurer
issues and plans to fabricate a screen to filter out the sediment before it enters treatment plant. Knauf’s intent
would be to bring 2-3 loads per day, up to 100,000 gallons.
The Commission agreed to accept the holding tank waste for $13 per 1,000 gallons for a trial period to
determine if it would be worthwhile for the Utility.
6. APPROVAL OF APRIL 29, 2026 MEETING MINUTES
MOTION – Approve April 29, 2026 Meeting Minutes
Motion made by Handrick second by Bohr. Motion passed by voice vote.
7. REVIEW AND APPROVAL OF PAYMENT OF BILLS
Commission members questioned the following bill payments:
Check 49536 – PSC of Wisconsin – Assessment for Well 5
Check 49573 – Marathon Plumbing Service – Damage to pumphouse hose by Visu-Sewer – to be reimbursed
MOTION – Approve Payment of Bills
Motion made by Handrick second by Seiler. Motion passed by voice vote.
8. PUBLIC UTILITY REPORT
• Water Department Daily Operations Update
• Wastewater Department Daily Operations Update
Director of Public Works, Ken Bloom, updated the Commission with the daily operations of the Utility for the
month of May. His full report can be found in the Agenda Packet.
9. UNFINISHED BUSINESS
a. Update on Well #5
Update on Well 5 came with the Presentation from Strand and Ehlers.
b. Update on Cure-In-Place-Piping Project
Visu-Sewer is continuing with the sewer lining project as scheduled. They noted one sewer lateral leaking
groundwater into the lateral and main. Lateral repair would be the homeowner’s responsibility. There is a
collapsed main in a grass alley that is still flowing water thru it but is not getting relined as it would be a
cheaper dig to repair than a roadway.
c. Update on 4th Street Lift Station
The week of May 4th the new dual port impeller and refurbished motor were installed. Bloom reported the
lift station cavitated more than before resulting in the old impeller being put back in. A technician from
William Reid believes the pressure is too high. Bloom requested a write-up of what William Reid noticed
upon installation to forward on to Vierbicher and Smith & Loveless.
10. NEW BUSINESS
a. Discuss and Possible Action on 2025 CMAR Report
Public Works Director Bloom explained the CMAR (Compliance Maintenance Annual
Report) and scoring results. The WWTP scored an overall 3.86 GPA, down from the 4.0 score for 2024.
The 2025 score is down due to the biosolids portion of the report. Bloom stated that one of the farms the
Utility spreads biosolids to has not had the required testing every 4 years as the farmer does not plan to
continue with spreading biosolids. Administrator Cherek supplied the Commission with the Financial
section of the CMAR. He described that the Village should be able to reach the required LGIP Utility
Replacement Fund balance in just over 2 years with the help of interest income earned. The WWTP
scored a 4.0 GPA on the Financial section of report. After Commission approval, the Village Board will
need to approve before the CMAR can be submitted. Deadline for CMAR submission is June 30, 2026.
MOTION – Approve 2025 CMAR Report and Forward to Village Board for Final Approval
Motion made by Telford second by Berens. Motion passed by voice vote.
11. SCHEDULED MEETINGS
a. Regular Meeting: Wednesday, June 24, 2026 – 4:00 pm
b. Special Meetings as Needed
12. ADJOURNMENT at 6:11 pm
Motion to adjourn made by Handrick second by Bohr. Motion passed by voice vote.