Utility Packet 01.28.2026
City of Marathon City · Marathon County · meeting of Jan 28, 2026 · Agenda packets
Open the original document More from City of Marathon City
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Andrew Berens.
Utility Commission Chair
Cassie Lang
Village Clerk / Deputy Treasurer
311 Walnut Street | P .O. Box 487
Marathon City, WI 54448
Tel: 715-443-2221
www.marathoncitywi.gov
VILLAGE UTILITY COMMISSION
OFFICIAL NOTICE & AGENDA
Wednesday, January 28, 2026
4:00 pm
Marathon Municipal Center
PUBLIC VIRTUAL ACCESS
Join Teams Meeting: https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting
Meeting ID: 261 174 214 35
Passcode: cY2jA33d
1. CALL TO ORDER
UTILITY ROLL CALL: A. BERENS, B. BOHR, M. TELFORD, D. SEILER, K. HANDRICK
JR.
2. PLEDGE OF ALLEGIANCE
3. RECOGNITION OF VISITORS
a. Virtual Meeting Guidelines
i. This meeting will be recorded and available upon request
b. Public Participation at Government Meetings
4. APPROVAL OF DECEMBER 17, 2025 MEETING MINUTES
5. REVIEW AND APPROVAL OF PAYMENT OF BILLS
6. PUBLIC UTILITY OPERATIONS & FACILITIES REPORT
7. UNFINISHED BUSINESS
a. Update on Well #5
b. Update on Cure-In-Place-Piping Project
c. Update on 4
th Street Lift Station
8. NEW BUSINESS
a. Discussion on Maraview Drive Water Main Break
b. Discuss Draft WPDES (Wisconsin Pollutant Discharge Elimination System)
Permit
9. SCHEDULED MEETINGS
a. Regular Meeting: Wednesday, February 25, 2026 – 4:00 pm
b. Special Meetings as Needed
10. ADJOURNMENT
VILLAGE UTILITY COMMISSION
MINUTES
Wednesday, December 17, 2025
1. CALL TO ORDER at 4:01 pm
UTILITY ROLL CALL: A. BERENS-Present, B. BOHR-Present, M. TELFORD-Present, D.
SEILER-Present, K. HANDRICK JR.-Absent
2. PLEDGE OF ALLEGIANCE
3. RECOGNITION OF VISITORS
a. Virtual Meeting Guidelines
i. This meeting will be recorded and available upon request
b. Public Participation at Government Meetings
Attended Virtually: Kevin O’Brien – Record Review
4. APPROVAL OF OCTOBER 29, 2025 MEETING MINUTES
MOTION – Approve Minutes from October 29, 2025 Utility Commission Meeting
Motion made by Bohr second by Berens. Motion passed by voice vote.
5. REVIEW AND APPROVAL OF PAYMENT OF BILLS
Commission members questioned the following Bill Payments:
Check 49137 – Northern Lake Service, Inc. – disinfection by product testing
Check 49213 – Joann Draeger – utility refund for duplicate payment
Check 49220 – First Supply, LLC. – lug repair and parts replacement from 8th St water main
break
MOTION – Approve Payment of Bills
Motion made by Telford second by Seiler. Motion passed by voice vote.
6. PUBLIC UTILITY OPERATIONS & FACILITIES REPORT
Director of Public Works, Ken Bloom, presented the Commission with an update of daily
happenings and projects for November and December in his Facilities Report. The report
can be found in the Agenda Packet.
7. UNFINISHED BUSINESS
a. Update on Well #5
Administrator Cherek reported that Strand Associates worked with him and
Director of Public Works, Bloom, to present to the PSC and the DNR a need
assessment for a new municipal well. Cherek believes in the near future Strand
will be requesting financial data to help determine where rates would need to go
to cover loan for new municipal well. No further updates were given.
b. Update on Cure-In-Place-Piping Project
Cherek informed the Commission that a contract with Visu-Sewer was approved
for the cure-in-place piping project at the December 3rd Village Board meeting.
Visu-Sewer, a company the Village has utilized on past projects, came in with the
lowest bid at $450,745.75 for 11,525 linear feet of pipe. The bid came in under
budget about $196,000. Cherek and Bloom agreed to apply the extra budgeted
money to have Visu-Sewer televise and clean an additional area near Tower Park
to determine possible future need to line that area. Televising this section at the
same time of televising the planned project area will save the Commission on
mobilization fees. Cherek has not yet received the signed contract back from
Visu-Sewer with their anticipated timeline for the project.
8. NEW BUSINESS
9. SCHEDULED MEETINGS
a. Regular Meeting: Wednesday, January, 28, 2026 – 4:00 pm
b. Special Meetings as Needed
10. ADJOURNMENT at 5:08 pm
Motion to adjourn made by Telford second by Seiler. Motion passed by voice vote.
Cassie Lang
Village Clerk / Deputy Treasurer
Marathon City Utility Operations & Facilities Report
For January 2026
Water Treatment Facility Report
The water facility is operating well and meeting all the testing requirements.
On November 9th, the fire hydrant on the south side of 4th Street, just west of Pheasant Lane, was
hit by a vehicle, completely breaking off the hydrant and associated piping from the underground
watermain. PGA was hired to install a new fire hydrant and 2 new service valves. This was
completed by PGA on December 8th. An insurance claim, on behalf of the Utility, will be submitted
to cover the costs of the repair.
UPDATE – The total cost of the repair was $16,990.00. This is the amount that will be
submitted to the insurance company for reimbursement.
The potassium permanganate mixing/transfer pump has failed at the Water Treatment Plant. The
pump is the original pump that was installed at the time the Water Plant was built in 2000. They
no longer manufacture parts for this make and model of pump. A new Grundfos transfer pump
was ordered through Brabazon Pump & Compressor. Village/Utility Staff will install the new pump
at the Water Plant.
UPDATE – The new Grundfos potassium permanganate mixing/transfer pump, at the water
plant, has been installed and put in service.
Aaron Martin, Water Operator, claims the water utility is losing approximately 60,000 gallons of
water per day. Wisconsin Rural Water Association has previously tried to locate any water leaks in
the distribution system with no success. WRWA plans to be onsite again in the next week or so to
continue searching for any potential water loss. (Listening on fire hydrants, water valves, etc., to
pinpoint the location of any potential water leak)
Residential water meter replacements have resumed for 2026. Residential water meters are
required to be calibrated or replaced once every 10 years. Approximately 50-60 meters are
replaced annually.
A new 2” water meter will be installed in the new Menzner Hardwoods Building north of Highway
29.
A new 2” water meter replacement, will also be installed at the assisted living facility (The
Meadows of Marathon) on Maratech Avenue.
Wisconsin Rural Water Association (WRWA) has recommended that all water utilities join the
National Rural Water Association Lawsuit, if PFAS was detected in your water supply, even if it is
below the current hazard index. Marathon City Waterworks has submitted our information to the
Rural Water PFAS Settlement. (See attached email from WRWA)
Wastewater Treatment Facility Report
The wastewater treatment plant met all WPDES permit limits for the month of December 2025.
Wastewater Treatment Plant Laboratory Proficiency Testing, required annually by the WDNR, has
been completed for BOD, cBOD, TSS, Ammonia, and Total Phosphorus. A passing result for each
parameter accredits the laboratory to perform these analysis for the next calendar year. Results
should be received in early February.
The 2025 Total Phosphorus Credit Offset Report for Miltrim Farms has been completed. The
wastewater treatment facility discharged a total of 335.71 lbs. of phosphorus to the Big Rib River
in 2025. The target loading according to the Multi-Discharger Variance calculation, is 135.47 lbs.
of phosphorus. This leaves the Utility needing 200.24 lbs. of phosphorus credits from Miltrim
Farms, to comply with our WPDES permit. The total cost to the Utility to purchase these
phosphorus credits for the year 2025 from Miltrim Farms, is $12,014.00. (See attached report)
I’ve begun in-house process control testing to address elevated suspended solids in our effluent in
coordination with Troy Larsen, Strand Associates. Although the suspended solids concentrations
remain well below our effluent limit, reducing the concentration is beneficial overall. We’re trying
to determine why the concentration is elevated and what we can do to reduce those fine solids in
our effluent.
Wastewater Regulatory Requirements:
1) I have requested a copy of the WPDES draft permit, prior to the 30-day public notice. The
DNR has agreed to send me a copy of the draft permit and fact sheet. As of the meeting, I
have not received a copy of the draft permit, which leads me to suspect they will not
reissue our permit on time. Our current permit is set to expire on September 30
th, 2025. If
the new permit is not reissued on time, we continue operations under our current permit.
UPDATE 12/25 – The 3 Zinc samples collected in October 2025, were higher than the
effluent limit set by the DNR; therefore, the DNR has requested that I take additional
samples, for a total of 11 samples, collected 3 days apart from one another. From
those 11 samples, the DNR will determine whether an effluent Zinc limit is appropriate,
and whether a limit will be included in our next wastewater permit. The DNR also
contacted Marathon Industrial Finishing and Aluminum Fabricated Products to inquire
about their operations, but was informed that neither of these facilities generate any
wastewater from their production lines. If effluent zinc concentrations remain an issue
at the wastewater treatment plant, the DNR will then schedule a site visit with these
industries, to verify their operations.
UPDATE 1/26 – After submitting a total of 11 effluent zinc samples, the DNR has
determined that the Village will NOT receive an effluent zinc limit in the next WPDES
permit. Although the zinc concentrations remained higher than normal, they were not
at a concentration to trigger an effluent zinc limit in our permit.
2) The 2025 Sludge Characteristics Report (Heavy Metals, Nutrients, Fecal Coliform results)
and the Land Application Report (Quantity of Sludge and Land Application Locations) has
been submitted to the WDNR.
Submitted by: Ken Bloom, Director of Public Works & Utilities
Page 1 of 11
Marathon Public Noticed Permit Fact Sheet
General Information
Permit Number WI-0020273-10-0
Permittee Marathon Water & Sewer Dept, P O Box 487, Marathon City, WI 54448
Permitted Facility Marathon Water & Sewer Department Wastewater Treatment Plant, 104 Chestnut Street,
Marathon City, WI 54448
Permit Term April 01, 2026 to March 31, 2031
Discharge Location Outfall Location: Stormwater swale on the south bank of the Rib River, northeast of the Village
of Marathon garage/yard waste site
NE14/ SE1/4, Section 6, T28N R06E, Village of Marathon City, Marathon County, WI
Receiving Water Big Rib River in Lower Rib River Watershed of Central Wisconsin River Basin in Marathon
County
Stream Flow (Q7,10) 19 cfs
Stream
Classification
Warmwater sport fisheries, non-public water supply
Discharge Type Existing, Continuous
Annual Average
Design Flow
0.360 MGD
Industrial or
Commercial
Contributors
Marathon Cheese Corporation, Custom Meats, Inc, Marathon Cheese Truck Garage. They are not
categorical industrial contributors
Plant Classification A1 - Suspended Growth Processes; B - Solids Separation; C - Biological Solids/Sludges; P -
Total Phosphorus; D - Disinfection; L - Laboratory; SS - Sanitary Sewage Collection System
Approved
Pretreatment
Program?
N/A
Facility Description
The Marathon Water & Sewer Wastewater Treatment Facility treats domestic wastewater from the Village of Marathon
City and various wastewaters from the following industries: Marathon Cheese Corporation (processes & packages cheese-
discharges process wastewater), Custom Meats, Inc (a meat processing plant- discharges process wastewater), Marathon
Cheese Transportation Equipment (discharges washwater), The design flow of the facility is 0.36 million gallons per day
(MGD) and had an actual annual average effluent flow of 0.223 MGD in 2025. The new Aero-Mod treatment plant was
fully operational September 2023. treatment plant is an activated sludge, secondary wastewater treatment facility. The
plant consists of a Huber step screen, Pista grit collector/removal system with a Wemco Hygrogritter-grit classifier,
influent pumping station, Aero-Mod secondary treatment (consisting of a bio-p fermenter tank, a bio-p selector tank, and
2 trains of each of the following; 1st, 2nd, and 3rd stage aeration, and final clarifiers), biological and chemical (alum)
phosphorus removal, and UV disinfection prior to discharge to the Big Rib River. Biosolids are stabilized in two aerobic
digesters. Solids are allowed to gravity settle and then are pumped to a digested sludge storage tank. The digested sludge
Page 2 of 11
is then mixed and aerated in the digested sludge storage tank for approximately one week, prior to thickening on an
Ashbrook 0.8 M gravity belt thickener. Thickened digested sludge is then pumped to an above ground 280,000-gallon
Biosolids Storage Tank, until land application each spring and fall.
Substantial Compliance Determination
Enforcement During Last Permit: A Notice of Noncompliance was issued on 5/26/2023 for a treatment facility overflow.
The facility has completed all previously required actions as required in the Notice of Noncompliance.
After a desk top review of all discharge monitoring reports, CMARs, land application reports, and all compliance
schedule reports for a treatment plant upgrade/replacement, phosphorus watershed project requirements, and a phosphorus
schedule for continued optimization, and a site visit on 05/02/2025, the Marathon Water & Sewer DPT WW Treatment
Plant has been found to be in substantial compliance with their current permit.
Compliance determination made by Nick Lindstrom on 07/11/2025.
Sample Point Descriptions
Sample Point Designation
Sample
Point
Number
Discharge Flow, Units, and
Averaging Period
Sample Point Location, Waste Type/Sample Contents and
Treatment Description (as applicable)
701 0.223 MGD Representative influent samples shall be taken after the pista grit
chamber, prior to the influent pumping station.
001 Flow monitoring not reported last
permit term, but it is assumed it
was equal to influent flow at 0.223
MGD
Representative effluent samples shall be taken within the concrete
channel downstream of the secondary clarifiers and upstream of the
effluent Parshall flume and UV disinfection modules. Bacteria
samples shall be taken downstream of UV disinfection modules.
002 244,000 gallons (2025) Representative sludge samples shall be collected and monitored
annually for Lists 1, 2, 3, 4 and PFAS, and once in 2027 for PCBs.
Page 3 of 11
Permit Requirements
1 Influent – Monitoring Requirements
1.1 Sample Point Number: 701- AFTER PISTA GRIT CHAMBER
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Flow Rate MGD Daily Continuous
BOD5, Total mg/L 3/Week 24-Hr Flow
Prop Comp
CBOD5 mg/L 3/Week 24-Hr Flow
Prop Comp
Suspended Solids,
Total
mg/L 3/Week 24-Hr Flow
Prop Comp
Changes from Previous Permit:
Influent limitations and monitoring requirements were evaluated for this permit term. The following changes were made
this permit term” 1) An increase in the CBOD, BOD & TSS monitoring frequency from 2/week to 3/week to match the
effluent monitoring frequency.
Explanation of Limits and Monitoring Requirements
Monitoring of influent flow, BOD5 and total suspended solids is required by s. NR 210.04(2), Wis. Adm. Code, to assess
wastewater strengths and volumes and to demonstrate the percent removal requirements in s. NR 210.05, Wis. Adm.
Code, and in the Standard Requirements section of the permit.
2 Surface Water - Monitoring and Limitations
2.1 Sample Point Number: 001- EFFLUENT to RIB RIVER
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Flow Rate MGD Daily Continuous
CBOD5 Monthly Avg 25 mg/L 3/Week 24-Hr Flow
Prop Comp
CBOD5 Weekly Avg 40 mg/L 3/Week 24-Hr Flow
Prop Comp
Suspended Solids,
Total
Monthly Avg 30 mg/L 3/Week 24-Hr Flow
Prop Comp
Suspended Solids, Weekly Avg 45 mg/L 3/Week 24-Hr Flow
Page 4 of 11
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Total Prop Comp
pH Field Daily Max 9.0 su Daily Grab
pH Field Daily Min 6.0 su Daily Grab
Nitrogen, Ammonia
Variable Limit
mg/L 5/Week See Table Look up the variable
ammonia limit from the
‘Variable Daily Max
Ammonia Limitation’ table
below and report the
variable limit in the
Ammonia Variable Limit
column on the eDMR.
Nitrogen, Ammonia
(NH3-N) Total
Daily Max -
Variable
mg/L 5/Week 24-Hr Flow
Prop Comp
Report the daily maximum
Ammonia result in the
Nitrogen, Ammonia (NH3-
N) Total column of the
eDMR. See Ammonia
Limitation Section below.
Nitrogen, Ammonia
(NH3-N) Total
Monthly Avg 108 mg/L 5/Week 24-Hr Flow
Prop Comp
Nitrogen, Ammonia
(NH3-N) Total
Weekly Avg 108 mg/L 5/Week 24-Hr Flow
Prop Comp
E. coli Geometric
Mean -
Monthly
126 #/100 ml Weekly Grab Limit effective May
through September
E. coli % Exceedance 10 Percent Monthly Calculated Limit effective May
through September. See the
E. coli Percent Limit
section in the permit. Enter
the result in the DMR on
the last day of the month.
Phosphorus, Total Monthly Avg 1.0 mg/L 3/Week 24-Hr Flow
Prop Comp
Phosphorus, Total Monthly Avg 1.73 lbs/day 3/Week Calculated See TMDL section below
and in permit.
Phosphorus, Total Monthly Avg lbs/month Monthly Calculated Calculate the Total
Monthly Discharge of
phosphorus and report on
the last day of the month on
the DMR. See TMDL
section below and in
Page 5 of 11
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
permit.
Phosphorus, Total lbs/yr Monthly Calculated Calculate the 12-month
rolling sum of total monthly
mass of phosphorus
discharged and report on
the last day of the month on
the DMR. See TMDL
section below and in
permit.
PFOS ng/L 1/ 2 Months Grab Monitoring only. See
PFOS/PFOA Minimization
Plan Determination of Need
schedule.
PFOA ng/L 1/ 2 Months Grab Monitoring only. See
PFOS/PFOA Minimization
Plan Determination of Need
schedule.
Nitrogen, Total
Kjeldahl
mg/L See Listed
Qtr(s)
24-Hr Flow
Prop Comp
Monitoring required
annually in specific
quarters. See Nitrogen
Series Monitoring section
in permit.
Nitrogen, Nitrite +
Nitrate Total
mg/L See Listed
Qtr(s)
24-Hr Flow
Prop Comp
Monitoring required
annually in specific
quarters. See Nitrogen
Series Monitoring section
in permit.
Nitrogen, Total mg/L See Listed
Qtr(s)
Calculated Monitoring required
annually in specific
quarters. See Nitrogen
Series Monitoring section
below. Total Nitrogen shall
be calculated as the sum of
reported values for Total
Kjeldahl Nitrogen and
Total Nitrite + Nitrate
Nitrogen.
Acute WET TUa See Listed
Qtr(s)
24-Hr Flow
Prop Comp
See WET testing section in
permit
Chronic WET TUc See Listed
Qtr(s)
24-Hr Flow
Prop Comp
See WET testing section in
permit
Page 6 of 11
Changes from Previous Permit
Effluent limitations and monitoring requirements were evaluated for this permit term and the following changes were
made from the previous permit: 1) Addition of flow monitoring. 2) PFOS/PFOA monitoring added once every two
months and a schedule included associated with this monitoring. 3) Removal of the phosphorus multidischarger variance
(MDV). The permittee has optimized and is able to meet the WIRB TMDL phosphorus limit. 4) Chronic WET testing
added twice during the permit term
Explanation of Limits and Monitoring Requirements
Monitoring Frequencies- The Monitoring Frequencies for Individual Wastewater Permits guidance (April 12, 2021)
recommends that standard monitoring frequencies be included in individual wastewater permits based on the size and type
of the facility, in order to characterize effluent quality and variability, to detect events of noncompliance, and to ensure
consistency in permits issued across the state. Guidance and requirements in administrative code were considered when
determining the appropriate monitoring frequencies for pollutants that have final effluent limits in effect during this
permit term. After consideration, an increase in frequency for BOD5 and TSS 2/week to 3/week has been included to meet
the minimum monitoring frequency and ammonia has been increased from 3/week to 5/week to meet the standard
monitoring frequency.
Limits were determined for Marathon Water & Sewer Department’s existing discharge to the Wisconsin River using chs.
NR 102, 104, 105, 106, 207, 210, 212 and 217 of the Wisconsin Administrative Code (where applicable). For additional
information on any of the limits see the October 27, 2025 memo from Ben Hartenbower to Holly Heldstab titled “Water
Quality-Based Effluent Limitations for the Marathon Water and Sewer Department Wastewater Treatment Plant WPDES
Permit No. WI-0020273”.
MUNICIPAL EFFLUENT LIMITS – In accordance with the federal regulation 40 CFR 122.45(d), and to comply with
the expression of limits requirements in ss. NR 106.07 and NR 205.065(7), Wis. Adm. Codes, limits in this permit are to
be expressed as weekly average and monthly average limits whenever practicable.
Ammonia: Water quality-based effluent limitations were evaluated for Ammonia Nitrogen based upon water quality
criteria in ch. NR 105 (as revised March 2004), including acute toxicity criteria (ATC) and chronic toxicity criteria (CTC).
Effluent limitations for ammonia are calculated using the procedures in s. NR 106.32, Wis. Adm. Code and are shown in
the WQBEL memo dated 10/27/2025 referenced above. In addition to weekly and monthly average ammonia, daily
maximum ammonia limits that vary with effluent pH apply year-round. See table below for more information. Monitoring
for pH shall occur on the same day total ammonia (NH3-N) sampling occurs.
Effluent pH Limit Effluent pH Limit Effluent pH Limit
s.u. mg/L s.u. mg/L s.u. mg/L
6.0 ≤ pH ≤ 6.1 108 7.0 < pH ≤ 7.1 66 8.0 < pH ≤ 8.1 14
6.1 < pH ≤ 6.2 106 7.1 < pH ≤ 7.2 59 8.1 < pH ≤ 8.2 11
6.2 < pH ≤ 6.3 104 7.2 < pH ≤ 7.3 52 8.2 < pH ≤ 8.3 9.4
6.3 < pH ≤ 6.4 101 7.3 < pH ≤ 7.4 46 8.3 < pH ≤ 8.4 7.8
6.4 < pH ≤ 6.5 98 7.4 < pH ≤ 7.5 40 8.4 < pH ≤ 8.5 6.4
6.5 < pH ≤ 6.6 94 7.5 < pH ≤ 7.6 34 8.5 < pH ≤ 8.6 5.3
6.6 < pH ≤ 6.7 89 7.6 < pH ≤ 7.7 29 8.6 < pH ≤ 8.7 4.4
6.7 < pH ≤ 6.8 84 7.7 < pH ≤ 7.8 24 8.7 < pH ≤ 8.8 3.7
6.8 < pH ≤ 6.9 78 7.8 < pH ≤ 7.9 20 8.8 < pH ≤ 8.9 3.1
6.9 < pH ≤ 7.0 72 7.9 < pH ≤ 8.0 17 8.9 < pH ≤ 9.0 2.6
Wisconsin River Total Maximum Daily Load (TMDL): The permitted facility is included within the Wisconsin River
Basin Total Maximum Daily Load (TMDL), which was approved by EPA April 26, 2019. The TMDL establishes Waste
Page 7 of 11
Load Allocations (WLAs) for point source dischargers and determines the maximum amounts of phosphorus that can be
discharged and still protect water quality. The final effluent limits and monitoring expressed in the permit were derived
from Site-Specific Criteria (SSC) for Lakes Petenwell, Castle Rock, and Wisconsin originally included in Appendix K of
the TMDL report and approved by the U.S. Environmental Protection Agency on July 9, 2020. The permittee’s approved
SSC-based limits are consistent with the assumptions and requirements of the EPA-approved WLA in the TMDL, which
is 393 lbs/yr for Marathon. The approved TMDL expresses WLAs as lbs/year and lbs/day (maximum annual load divided
by 365 days). As outlined in Section 4.6 of the department’s TMDL Development and Implementation
Guidance: Integrating the WPDES and Impaired Waters Program, mass limits must be given in the permit that are
consistent with the TMDL WLA and the phosphorus impracticability agreement that was approved by USEPA in
2012 (see NPDES MOA Addendum dated July 12, 2012
at https://apps.dnr.wi.gov/swims/Documents/DownloadDocument?id=167886175). Continuously discharging facilities
covered by the WRB TMDL are given monthly average mass limits. The equivalent effluent concentration of 0.36 mg/L
was calculated for the facility, thus, TMDL based mass limits are expressed as a monthly average. Facilities with WRB
TMDL based effluent limits for phosphorus must report the 12-month rolling sum of total monthly discharge (lbs/yr). If
reported 12-month rolling sums exceed the facility’s max annual WLA, the facility’s mass limits (monthly average) may
be recalculated using more appropriate CVs or monitoring frequencies when the permit is reissued to bring discharge
levels into compliance with the facility’s given WLA.
PFOS and PFOA – NR 106 Subchapter VIII – Permit Requirements for PFOS and PFOA Dischargers became effective
on August 1, 2022. At the first reissuance of a WPDES permit after August 1, 2022, the new rule requires WPDES
permits for municipal dischargers with an average flow rate less than 1 MGD, to be evaluated on a case-by-case basis to
determine if monitoring is required pursuant to s. NR 106.98(2)(c), Wis. Adm. Code. The department evaluated the need
for PFOS and PFOA monitoring taking into consideration the presence of potential PFOS or PFOA industrial wastes,
remediation sites and other potential sources of PFOS or PFOA. Based on information available at the time the permit was
drafted, indirect dischargers contributing to the collection system indicates potential for PFOS/PFOA. Therefore,
monitoring once every two months is included. A sample frequency of 1/2 months means one sample is taken during any
two-month period. Examples of 1/2 month sample would be every other month (Jan, March, May, etc.) or back-to-back
months with a break in between (February & March, May & June, Aug & Sept, etc.). DMR Short Forms will be generated
for the following time periods: January-February, March-April, May-June, July-August, September-October, and
November-December. At a minimum one sample result will be present on each form.
The initial determination of the need for sampling shall be conducted for up to two years in order to determine if the
permitted discharge has the reasonable potential to cause or contribute to an exceedance of the PFOS or PFOA standards
under s. NR 102.04(8)(d)1, Wis. Adm. Code.
3 Land Application - Monitoring and Limitations
Municipal Sludge Description
Sample
Point
Sludge
Class (A
or B)
Sludge Type
(Liquid or
Cake)
Pathogen
Reduction
Method
Vector
Attraction
Method
Reuse
Option
Amount Reused/Disposed
(Dry Tons/Year)
002 B Liquid Fecal Coliform
& Aerobic
Digestion
Aerobic
SOUR
Land
Application
34 dry US tons
Does sludge management demonstrate compliance? Yes
Is additional sludge storage required? No
Is Radium-226 present in the water supply at a level greater than 2 pCi/liter? No
Page 8 of 11
Municipal Sludge Description
Sample
Point
Sludge
Class (A
or B)
Sludge Type
(Liquid or
Cake)
Pathogen
Reduction
Method
Vector
Attraction
Method
Reuse
Option
Amount Reused/Disposed
(Dry Tons/Year)
Is a priority pollutant scan required? No
Priority pollutant scans are required once every 10 years at facilities with design flows between 5 MGD and 40 MGD,
and once every 5 years if design flow is greater than 40 MGD.
3.1 Sample Point Number: 002- SLUDGE at STORAGE TANK
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Solids, Total Percent Annual Composite
Arsenic Dry Wt Ceiling 75 mg/kg Annual Composite
Arsenic Dry Wt High Quality 41 mg/kg Annual Composite
Cadmium Dry Wt Ceiling 85 mg/kg Annual Composite
Cadmium Dry Wt High Quality 39 mg/kg Annual Composite
Copper Dry Wt Ceiling 4,300 mg/kg Annual Composite
Copper Dry Wt High Quality 1,500 mg/kg Annual Composite
Lead Dry Wt Ceiling 840 mg/kg Annual Composite
Lead Dry Wt High Quality 300 mg/kg Annual Composite
Mercury Dry Wt Ceiling 57 mg/kg Annual Composite
Mercury Dry Wt High Quality 17 mg/kg Annual Composite
Molybdenum Dry Wt Ceiling 75 mg/kg Annual Composite
Nickel Dry Wt Ceiling 420 mg/kg Annual Composite
Nickel Dry Wt High Quality 420 mg/kg Annual Composite
Selenium Dry Wt Ceiling 100 mg/kg Annual Composite
Selenium Dry Wt High Quality 100 mg/kg Annual Composite
Zinc Dry Wt Ceiling 7,500 mg/kg Annual Composite
Zinc Dry Wt High Quality 2,800 mg/kg Annual Composite
Nitrogen, Total
Kjeldahl
Percent Annual Composite
Nitrogen, Ammonium
(NH4-N) Total
Percent Annual Composite
Page 9 of 11
Monitoring Requirements and Limitations
Parameter Limit Type Limit and
Units
Sample
Frequency
Sample
Type
Notes
Phosphorus, Total Percent Annual Composite
Phosphorus, Water
Extractable
% of Tot P Annual Composite
Potassium, Total
Recoverable
Percent Annual Composite
PCB Total Dry Wt Ceiling 50 mg/kg Once Composite Once in 2027
PCB Total Dry Wt High Quality 10 mg/kg Once Composite Once in 2027
PFOA + PFOS ug/kg Annual Calculated Report the sum of PFOA
and PFOS. See PFAS
Permit Sections for more
information.
PFAS Dry Wt Annual Grab Perfluoroalkyl and
Polyfluoroalkyl Substances
based on updated DNR
PFAS List. See PFAS
Permit Sections for more
information.
Changes from Previous Permit:
Sludge limitations and monitoring requirements were evaluated for this permit term and the following changes were made
from the previous permit: PFAS monitoring is required annually pursuant to s. NR 204.06(2)(b)9., Wis. Adm. Code.
Explanation of Limits and Monitoring Requirements
Requirements for disposal, including land application of municipal sludge, are determined in accordance with ch. NR 204,
Wis. Adm. Code. Ceiling and high-quality limits for metals in sludge are specified in s. NR 204.07(5). Requirements for
pathogens are specified in s. NR 204.07(6) and in s. NR 204.07 (7) for vector attraction requirements. Limitations for
PCBs are addressed in s. NR 204.07(3)(k).
PFAS- The presence and fate of PFAS in municipal and industrial sludges is an emerging public health concern. EPA has
developed a draft risk assessment to determine future land application rates and released this risk assessment in January of
2025. The department is evaluating this new information. Until a decision is made, the “Interim Strategy for Land
Application of Biosolids and Industrial Sludges Containing PFAS” should be followed
Collecting sludge data on PFAS concentrations from a wide range of wastewater treatment facilities will help protect
public health from exposure to elevated levels of PFAS and determine the department’s implementation of EPA’s
recommendations. To quantitate this risk, PFAS sampling has been included in this WPDES permit pursuant to ss. NR
214.18(5)(b) and NR 204.06(2)(b)9., Wis. Adm. Code.
\
Page 10 of 11
4 Schedules
4.1 PFOS/PFOA Minimization Plan Determination of Need
Required Action Due Date
Report on Effluent Discharge: Submit a report on effluent PFOS and PFOA concentrations and
include an analysis of trends in monthly and annual average PFOS and PFOA concentrations. This
analysis should also include a comparison to the applicable narrative standard in s. NR 102.04(8)(d),
Wis. Adm. Code.
This report shall include all additional PFOS and PFOA data that may be collected including any
influent, intake, in-plant, collection system sampling, and blank sample results.
03/31/2027
Report on Effluent Discharge and Evaluation of Need: Submit a final report on effluent PFOS and
PFOA concentrations and include an analysis of trends in monthly and annual average PFOS and
PFOA concentrations of data collected over the last 24 months. The report shall also provide a
comparison on the likelihood of the facility needing to develop a PFOS/PFOA minimization plan.
This report shall include all additional PFOS and PFOA data that may be collected including any
influent, intake, in-plant, collection system sampling, and blank sample results.
The permittee shall also submit a request to the department to evaluate the need for a PFOS/PFOA
minimization plan.
If the Department determines a PFOS/PFOA minimization plan is needed based on a reasonable
potential evaluation, the permittee will be required to develop a minimization plan for Department
approval no later than 90 days after written notification was sent from the Department. The
Department will modify or revoke and reissue the permit to include PFOS/PFOA minimization plan
reporting requirements along with a schedule of compliance to meet WQBELs. Effluent monitoring
of PFOS and PFOA shall continue as specified in the permit until the modified permit is issued.
If, however, the Department determines there is no reasonable potential for the facility to discharge
PFOS or PFOA above the narrative standard in s. NR 102.04(8)(d), Wis. Adm. Code, no further
action is required and effluent monitoring of PFOS and PFOA shall continue as specified in the
permit.
03/31/2028
Explanation of Schedule: PFOS/PFOA Minimization Plan Determination of Need - As stated above, ch. NR 106
Subchapter VIII – Permit Requirements for PFOS and PFOA Dischargers became effective on August 1, 2022. Section
NR 106.98, Wis. Adm. Code, specifies steps to generate data in order to determine the need for reducing PFOS and PFOA
in the discharge. Data generated per the effluent monitoring requirements will be used to determine the need for
developing a PFOS/PFOA minimization plan. As part of the schedule, the permittee is required to submit two annual
Reports on Effluent Discharge. If the Department determines that a minimization plan is needed, the permit will be
modified or revoked/reissued to include additional requirements.
Other Comments
Publishing Newspaper: Wausau Daily Herald, 800 Scott Street, Wausau, WI, 54402-1286
Page 11 of 11
Attachments
Water Quality Based Effluent Limits: October 27, 2025 memo from Ben Hartenbower to Holly Heldstab titled “Water
Quality-Based Effluent Limitations for the Marathon Water and Sewer Department Wastewater Treatment Plant WPDES
Permit No. WI-0020273”.
Justification Of Any Waivers From Permit Application Requirements
No waivers requested or granted as part of this permit reissuance
Prepared By: Holly Heldstab, Wastewater Specialist Date: January 20, 2026