Utility Packet 08.27.2025
City of Marathon City · Marathon County · meeting of Aug 27, 2025 · Agenda packets
Open the original document More from City of Marathon City
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Cassie Lang
Village Clerk / Deputy Treasurer
VILLAGE OF MARATHON CITY, MARATHON COUNTY, WISCONSIN
AGENDA
UTILITY COMMISSION MEETING – HYBRID
VILLAGE HALL – BOARD ROOM
WEDNESDAY, AUGUST 27, 2025 - 4:00 p.m.
PUBLIC VIRTUAL ACCESS
Join Teams Meeting: https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting
Meeting ID: 261 174 214 35
Passcode: cY2jA33d
Notice Posted at the Municipal Center Notice Received by Record-Review
DATE: Monday, August 25, 2025 DATE: Monday, August 25, 2025
TIME: 2:15 pm TIME: 2:15 pm
_____________________________________________________________________________________
1. CALL TO ORDER
UTILITY ROLL CALL: A. BERENS, B. BOHR, M. TELFORD, D. SEILER, K. HANDRICK JR.
2. PLEDGE OF ALLEGIANCE
3. RE
COGNITION OF VISITORS
a. Virtual Meeting Guidelines
i. This meeting will be recorded and available upon request
b. Public Participation at Government Meetings
4. AP
PROVAL OF MINUTES OF PREVIOUS MEETINGS
a. Discuss and Possible Action on Approval of Minutes for June 18, 2025 Utility
Commission Meeting
5. RE
VIEW AND APPROVAL OF PAYMENT OF BILLS
6. P
UBLIC UTILITY OPERATIONS & FACILITIES REPORT
7. UNF
INISHED BUSINESS
8. NE
W BUSINESS
a. Discuss Water Tower Project Progress
b. Discuss and Approval Well #1 Project Progress
c. Discuss and Approval on Water & Sewer Connection for 704 Thornapple St
9. S
CHEDULED MEETINGS
a. Regular Meeting: Wednesday, September 24, 2025 – 4:00 p.m.
b. Special Meetings as Needed
10. ADJ
OURNMENT
Cassie Lang
Village Clerk / Deputy Treasurer
VILLAGE OF MARATHON CITY, MARATHON COUNTY, WISCONSIN
UTILITY COMMISSION MEETING – HYBRID
VILLAGE HALL – BOARD ROOM
WEDNESDAY, JUNE 18, 2025 - 4:00 p.m.
MINUTES
_____________________________________________________________________________________
1. CALL TO ORDER at 4:02 pm
UTILITY ROLL CALL: A. BERENS-Present, B. BOHR-Present, M. TELFORD-Absent,
D. SEILER-Present, K. HANDRICK JR.-Present
2. PLEDGE OF ALLEGIANCE
3. RECOGNITION OF VISITORS
a. Virtual Meeting Guidelines
i. This meeting will be recorded and available upon request
b. Public Participation at Government Meetings
Attending in Person – Village Public Works Intern – Connor Smith
Attending Virtually – Kevin O’Brien from the Record Review
4. APPROVAL OF MINUTES OF PREVIOUS MEETINGS
a. Discuss and Possible Action on Approval of Minutes for May 28, 2025 Utility
Commission Meeting
MOTION – Approve Minutes from May 28, 2025 Utility Commission Meeting
Motion made by Bohr second by Handrick. Motion passed by voice vote.
5. REVIEW AND APPROVAL OF PAYMENT OF BILLS
Commission Members questioned the following bill payments:
Check #48763 – Aquafix, Inc. – Bug on a Rope degreaser for lift stations
Check #48765 – Bassett Mechanical – 3 different invoices at WWTP
Check #48794 – Land Clearing Services, Inc. – Curb stop at Peoples State Bank
MOTION – Approve Payment of Bills
Motion made by Handrick second by Bohr. Motion passed by voice vote.
6. PUBLIC UTILITY OPERATIONS & FACILITIES REPORT
Director of Public Works, Ken Bloom, presented the Commission with a Facilities Report for
June. The report and supplemental material can be found in the Agenda Packet.
7. UNFINISHED BUSINESS
a. Discussion on Cure-In-Place Piping Options
Administrator Cherek opened discussion stating he reached out to other municipalities
that have utilized cure-in-place piping. The City of Wausau Public Works Supervisor told
Cherek they have seen good results from the process. The project would add an estimated
50 years to the life of the sewer mains.
Cherek explained a price break by doing more lineal feet at one time. The whole project
would cost an estimated $40 per lineal foot, whereas, splitting the project in half is
estimated at $45 per lineal foot. He explained it made sense to do the whole project at
once to save on the mobilization fees of having the company come with equipment 2
Cassie Lang
Village Clerk / Deputy Treasurer
different times and the rate of inflation may push the $45/foot higher by time the Village
would be ready to do the second half of the project.
Financially, it is a good time to do the full cure-in-place project as it is included in the
Capital Improvement Plan financial restructuring that the Village Board is planning to
approve in July. This allows the project to be funded by a bond as opposed to a bank
General Obligation (GO) note. Bonds typically get better interest rates than GO notes. If
Commission were to approve half the project to be completed in the 2025-2027 CIP, the
second half would likely be ineligible to be bonded due to the smaller financial size of the
loan needed. A bank note would be the finance option. That could mean higher interest
rates.
Cherek notified the Commission that doing the whole project at once would require a
sewer rate increase of about 7.5% (2.5% for the next 3 years).
MOTION – Approve Full Cure-In-Place Project and Forward to Village Board for
Final Approval
Motion made by Handrick second by Seiler. Motion passed by voice vote.
8. NEW BUSINESS
No new business discussed.
9. SCHEDULED MEETINGS
a. Waste Water Treatment Plan Tours – Wednesday, June 18, 2025 – 5:30pm & 6:30
pm
b. Regular Meeting: Wednesday, July 30, 2025 – 4:00 p.m.
c. Special Meetings as Needed
10. ADJOURNMENT at 5:15 pm
Motion to adjourn made by Bohr second by Handrick. Motion passed by voice vote.
M
arathon City Utilities Report for July-August 2025
W
ater Treatment Facility Report
The water facility is operating well and meeting all the testing requirements.
The backwash flow meter at the water plant failed in late 2024. This meter records the daily flow
of backwash water used to clean the iron & manganese removal filter. This volume of water is
required by the DNR, to be reported on our monthly operating report for the water treatment
plant. Currently we are estimating the volume of backwash water used. We have requested a
quote for a new meter and will work to fit this expense into our previously approved 2025 annual
operations budget, coded under a water treatment plant maintenance expense. The cost of the
new meter is approximately $5,200.00.
UPDATE 8/25 – The backwash flow meter has been installed and integrated into the SCADA
system. We will now be able to report to the DNR, the exact amount of water used for
backwashing our iron and manganese removal filters, instead of estimating the volume.
LW Allen will be onsite on May 13th, 2025, to integrate the previously used liquid fluoridation
chemical feed system. After LW Allen has completed the integration, Strand will configure our
SCADA system to incorporate operational controls. Once the chemical feed system is back online
(operational), Jessica Minich, WDNR, will be notified prior to placing the equipment back in
service. If she deems an inspection is necessary, this could further delay the start-up of
fluoridation.
UPDATE 8/25 – An email was sent to Jessica Minich, WDNR, on 6/12/25, to inquire
whether an inspection and/or written authorization was deemed necessary, prior to start-
up of the liquid fluoridation system. No inspection was required, other than sending some
pictures of our fluoridation system for documentation. The fluoridation system was put
back in service on June 23
rd.
A portable, temporary, transducer provided by Badger Meter, was mounted on each of the 4 iron
and manganese removal filter cells to monitor the backwash cycles. This gave us useful
information on how efficiently the filter cell was getting backwashed (Optimal expansion of the
filter bed during the backwash cycle, for maximum removal of sediment). The operator can then
increase or decrease the amount of time the cell is aerated or backwashed, to get the optimal
removal of sediments and increase the filtering efficiency of the filter bed (green sand).
New plywood and insulation, has been installed in Well #3.
A fire hydrant was replaced on the north side of 1
st Street, between Hickory and Washington. This
hydrant replaced a 1930’s model fire hydrant that didn’t have a pumper nozzle.
Ongoing activities: Valve Turning (Exercising of watermain valves)
Wastewater Treatment Facility Report
The wastewater treatment plant met all WPDES permit limits for the months of June and July
2025.
A drawdown test was conducted by Vierbicher Associates on the Trailer Court Lift Station. This
was done to determine GPM@TDH. William Reid will use the design characteristics to match
motor and pump size, to meet those requirements.
UPDATE – 8/25 – William/Reid was here on August 19th to install the new pumps and
motors at the Trailer Court Lift Station. After installation and start-up, the new pumps are
still cavitating. The dynamic (pumping) head pressures and flows were recorded.
Vierbicher Associates recommended the pumps be designed for 100 gpm @ 65 ft TDH. The
dynamic readings on the new pumps were approximately 120-130 gpm @ 53 ft TDH. This
is most likely causing the cavitation of the pumps. A smaller impeller may fix the issue
according to the pump curve. The problem is who will pay for these modifications?
William/Reid purchased the new pumps and motors that were recently installed at a cost
of 1000’s of dollars. I am waiting on the official start-up report from William/Reid and any
input from Smith and Loveless, before we proceed with any changes. Paul from
William/Reid called me on Monday morning. He is going to have one of their engineers
look at the pumping data from the start-up report, and possibly make a recommendation. I
will also forward the start-up report to Vierbicher Associates, since they were responsible
for the design point characteristics of the new pumping equipment.
Huber was onsite last week to make adjustments to the screenings wash press. We have not had
consistent screenings discharge into the dumpster since start-up last fall. Huber cleared the
discharge piping and adjusted the washing times and compaction auger set points on the SCADA
system. It will take some time to find out if these changes help improve the process.
UPDATE 8/25 – Market & Johnson was onsite on August 14th to install the new discharge
pipe on the Huber Wash Press. The entire pipe and bagger, from the wash press to the
dumpster was replaced, including the support brace. Since the pipe was lowered from
22.5° angle to approximately a 10° angle, the movement of the screenings through the pipe
into the dumpster, has significantly improved.
Recent cold weather has caused ice formation on the final clarifiers. The ice has caused some
Return Activated Sludge (RAS) airlines to start leaking. Aeromod has commented, that some
contractors overtighten or under tighten the hose clamps on the airlines, causing the airlines to
leak in cold weather. Staff will investigate the cause of the leaks on multiple RAS airlines, as the
weather warms up. The airline leaks are approximately 3-4 inches beneath the surface of the
water.
UPDATE 8/25 – The 2
nd Clarifier (Clarifier B) was drained and modified on August 13th-14th.
Market & Johnson was onsite to assist our staff with the project. All 24 airlines in that
clarifier were raised up approximately 4 inches, and new flexible tubing was replaced on
the upper portion of the RAS airlines. This modification raised the connection between the
Wastewater Treatment Facility Report (Continued)
rigid stainless-steel airline and the flexible tubing up and out of the water, hopefully
eliminating any future problems from ice formation on the clarifier surface over the winter.
Aeromod provided all parts and materials for the project, at no charge to the Utility.
Ongoing Activities: Sanitary Sewer Cleaning & Televising
Wastewater Regulatory Requirements:
1) The Utility received a letter from the DNR requesting additional information, for
determination of eligibility of the Multi-Discharger Phosphorus Variance.
UPDATE 8/25 – Strand Associates, the DNR, and Village Staff met on July 21
st, to
discuss the Multi-Discharger Variance for Phosphorus compliance, that was
submitted to the DNR on behalf of the Utility. The DNR stated the Utility is
currently meeting the final phosphorus limit, therefore; a Variance is not needed;
however, we are currently not discharging at the design flow of the wastewater
treatment plant, which could impact future phosphorus removal efficiencies. After
the meeting, it is our understanding that the DNR will not grant the MDV, and we
will be required to meet the final phosphorus limit of 1.55 lbs. per day. We have
not received an official denial letter from the DNR, regarding our application for the
MDV, as a Phosphorus compliance option.
2) I have requested a copy of the WPDES draft permit, prior to the 30-day public notice.
The DNR has agreed to send me a copy of the draft permit and fact sheet. As of the
meeting, I have not received a copy of the draft permit, which leads me to suspect they
will not reissue our permit on time. Our current permit is set to expire on September
30
th, 2025. If the new permit is not reissued on time, we continue operations under
our current permit.
Submitted by: Ken Bloom, Director of Public Works & Utilities
Project Number:
PWSID#:
DNR Region:
County:
W-2025-0660
73701518
WCR
Marathon
SU
BJECT: WATER SYSTEM FACILITIES PLAN AND SPECIFICATION APPROVAL
D
ear Ms. Lang:
T
he Wisconsin Department of Natural Resources (department), Division of Environmental Management, Bureau
of Drinking Water and Groundwater, is conditionally approving plans and specifications for the following project.
An engineering report or information of sufficient detail to meet the requirements of s. NR 811.09(3), Wis. Adm.
Code, was submitted along with the plans and specifications.
W
ater system name: Marathon City Waterworks
Date received: 07/07/2025
Consultant: Matt Fisher – Lane Tank Company
Regional DNR Contact: Jessica Minich, 1300 W Clairemont, Eau Claire WI 54701, (715) 797-5360,
jessica.minich@wisconsin.gov
DNR Plan Reviewer: Kevin Karpinski, 101 South Webster Street, Madison WI 53707, (608) 852-2880,
kevin.karpinski@wisconsin.gov
P
roject description: On behalf of the Village of Marathon City (Village), Lane Tank Company has submitted
plans and specifications for the interior and exterior painting and modifications of the 75,000-gallon single
pedestal elevated storage tank located at the intersection of Main Street and Town Road. The department is
approving the plans and specifications subject to the conditions below.
T
he elevated storage tower manufactured by Chicago Bridge & Iron has an access tube air gap that is currently
sealed with a rubber boot and will be permanently sealed with a steel plate as a part of this project.
Wet
interior paint system: The following paint and coating system will be used for coating the wet interior of the
tank. The coating system will be NSF/ANSI 61 certified.
Manufacturer Prime Coat Stripe Coat (Seams) Finish Coat
Tnemec 94H2O Zinc Series N140 Epoxy Series 21 Epoxy
S
eam Sealer: Sika Flex 1a
State of Wisconsin
DEPARTMENT OF NATURAL RESOURCES
101 S. Webster Street
Box 7921
Madison WI 53707-7921
July 23, 2025
CASSANDRA LANG CLERK
VILLAGE OF MARATHON CITY
311 WALNUT ST, PO BOX 487
MARATHON CITY WI 54448
Project Number: W-2025-0660 Page 2 of 4
Modifications and Repairs:
• Replace the rubber boot that is currently installed to cover the access tube air gap
o Weld a ¼-inch thick steel plate from the roof to the access tube to permanently seal the access
tube air gap
• Install a new roof safety railing
• Install new insulation and aluminum jacketing along the fill/drain pipe
Recommendations: The following recommendations are based on staff review of the project. The owner is not
required to implement the recommendations in order to comply with the approval.
1. The facility should be aware of any applicable air quality and hazardous waste regulations which may
apply to the removal and disposal of the old paint or coatings. For additional information, please refer to
the information sheet at http://dnr.wi.gov/files/PDF/pubs/wa/WA173.pdf or contact the Air Management
or Waste and Materials Management program staff in your region.
2. The department recommends that during the annual inspection of the exterior of the tank, as required in
s. NR 810.14(1), Wis. Adm. Code, the access tube gap seal is thoroughly inspected to ensure it is sealed
completely.
Approval conditions related to Chapters NR 810 and NR 811, Wis. Adm. Code:
1. A resident project representative shall be designated by the water supply owner or by the agent retained
by the owner. The resident project representative shall be knowledgeable regarding the proposed
construction and be able to ensure the improvements are being constructed in accordance with the
department approved plans, specifications, and conditions of the approval. The project representative
shall be present on the work site as needed to assure proper construction and installation of the
improvements. (s. NR 811.11, Wis. Adm. Code)
2. After construction, maintenance, repair or modification, waterworks facilities shall be disinfected by
procedure outlined in the applicable AWWA standards for wells, water mains, storage facilities or
treatment facilities. Waterworks may not be placed in service until bacteriological samples have
established that the water is bacteriologically safe. (s. NR 810.09(4), Wis. Adm. Code)
3. The access tube air gap shall be covered as detailed in the specification and a photo of the access tube gap
cover be submitted to the undersigned when complete. (s. NR 811.64(1)(a), Wis. Adm. Code)
4. Interior paints and coating systems and application procedures shall be consistent with the latest version
of AWWA standard D102 and have NSF/ANSI Standard 61 approval. The paint shall be allowed to cure
to the manufacturer’s recommendations. (s. NR 811.64(15)(b), Wis. Adm. Code)
5. The disinfection of the tank shall be in accordance with one of the three methods in AWWA Standard
C652-11. (s. NR 810.09(4), Wis. Adm. Code)
6. The water supply owner shall obtain approval of coverage under a Wisconsin Pollutant Discharge
Elimination System (WPDES) wastewater general permit prior to the discharge of any chlorinated or
treated water to waters of the state as a result of construction, disinfection, normal operations, or
backwashing pursuant to s. 283.31, Wis. Stats and s. NR 810.19, Wis. Adm. Code. The approval process
for WPDES wastewater general permits may take up to 30 days. Contact the wastewater general permits
inbox (DNRWYWastewaterGeneralPermits@wisconsin.gov) or go to
https://dnr.wisconsin.gov/topic/Wastewater/GeneralPermits.html for more information.
7. Two safe samples collected 24 hours apart shall be obtained; or one safe sample shall be obtained (only if
a free chlorine residual of at least 0.1 mg/L is remaining when the results of the safe sample are reported)
prior to placing the tank back into service. (NR 810.09(4), Wis. Adm. Code)
Project Number: W-2025-0660 Page 3 of 4
8. The owner or owner’s agent shall provide notification to Jessica Minich from the department’s Eau Claire
office upon completion of the improvements so that she can inspect the completed improvements and
issue written authorization prior to placing the improvements in service if she deems necessary. (s. NR
810.26(1), Wis. Adm. Code)
Approval constraints: The project was reviewed in accordance with ss. 281.34 and 281.41, Wis. Stats., for
compliance with Chapters NR 108, NR 810, NR 811 and NR 820, Wis. Adm. Code and is hereby approved in
accordance with ss. 281.34 and 281.41, Wis. Stats., subject to the conditions listed above. This approval is valid
for two years from the date of approval. If construction or installation of the improvements has not commenced
within two years the approval shall become void and a new application must be made and approval obtained prior
to commencing construction or installation.
This approval is based upon the representation that the plans submitted to the department are complete and
accurately represent the project being approved. Any approval of plans that do not fairly represent the project
because they are incomplete, inaccurate, or of insufficient scope and detail is voidable at the option of the
department.
Be advised that this project may require permits or approvals from other federal, state or local authorities. For
example, a certificate of authority from the Public Service Commission of Wisconsin may be required per s.
196.49, Wis. Stats. and ch. PSC 184, Wis. Adm. Code.
Appeal rights: If you believe that you have a right to challenge this decision, you should know that the
Wisconsin Statutes and administrative rules establish time periods within which requests to review department
decisions must be filed. To request a contested case hearing pursuant to s. 227.42, Wis. Stats., you have 30 days
after the decision is mailed, or otherwise served by the department, to serve a petition for hearing on the Secretary
of the Department of Natural Resources. Requests for contested case hearings must be made in accordance with
ch. NR 2, Wis. Adm. Code. Filing a request for a contested case hearing does not extend the 30 day period for
filing a petition for judicial review. For judicial review of a decision pursuant to ss. 227.52 and 227.53, Wis.
Stats., you must file your petition with the appropriate circuit court and serve the petition on the department
within 30 days after the decision is mailed. A petition for judicial review must name the Department of Natural
Resources as the respondent.
Project Number: W-2025-0660 Page 4 of 4
STATE OF WISCONSIN
DEPARTMENT OF NATURAL RESOURCES
Pr
oject Plan Reviewer
Ke
vin Karpinski
Public Water Engineering Section
Bureau of Drinking Water and Groundwater
Fo
r the Secretary
Be
njamin M. Mand, P.E.
Public Water Engineering Section
Bureau of Drinking Water and Groundwater
cc: Ken Bloom – Director of Public Works, Marathon City (by email)
Luanne Wiesman – Marathon City (by email)
Matt Fisher – Lane Tank Company, Menomonie (by email)
Jessica Minich – DNR, Eau Claire (by email)
Emily Pedersen – DNR, Eau Claire (by email)
PSC – Madison (by email)
August 22, 2025
Mr. Steven Cherek
Village Administrator
Village of Marathon City
311 Walnut Street
Marathon City, WI 54448
Re: Well Replacement Project
Dear Mr. Cherek:
This letter describes the steps needed to implement a new water supply well (Well No. 6) and facility into the
Village of Marathon City water system. Also included is a tentative Project Schedule, proposed Scope of Services,
and Project Fee.
In general, construction of a new well facility requires the following tasks:
Preliminary Design and Well Site Investigation Report
Well Drilling Design and Bidding
Well Drilling Construction
Well Facility Design and Bidding
Well Facility Construction
Well Head Protection Plan
The following section presents our project understanding as well as our approach, which has been proven on
dozens of similar successful projects in Wisconsin. Our approach is based on previous experience on projects
with the Village and the recent discussions with you and Ken Bloom, including our meeting on Thursday,
August 7, 2025.
Project Understanding and Approach
The Village has been proactive in maintaining its water supply wells and water treatment facility over the years.
It currently operates three shallow aquifer wells that pump to the centralized water treatment facility on 3rd Street.
The wells are located just north of the Big Rib River and pump through transmission main to the treatment facility.
Well No. 1 was constructed in 1936 to a depth of 86 feet, including 18-inch casing to a depth of 56 feet and 30 feet
of well screen. The well has been rehabilitated over time, including installation of liner casings, reportedly to
address previous casing failures. The well has experienced a recent decrease in capacity and further rehabilitation
is not likely cost effective. The effective diameter of the well limits the size of the well pump and the condition of
the screen is thought to be poor. Any work in the well will be limited to improvements to prolong the life of the
well by several years while the Village plans for a new well.
The Village would like to begin the process of siting a new well to replace Well No. 1 and to satisfy the needs
of the community into the future. The first step in the project will be completion of an Engineering Report
and Well Site Investigation Report in accordance with State of Wisconsin Administrative Code, chapter
NR 811.09(4)(1). One report can be used to cover both code requirements.
5
Mr. Steven Cherek
Village of Marathon City
Page 2
August 22, 2025
The report should answer the following questions:
Given plans for continued growth on the Village’s water service area, what are the projected future water
demands that need to be satisfied by the water system?
Where is the best location for a new shallow aquifer well and what are the impacts of the flood plain along the
Big Rib River?
Can a new well be drilled immediately adjacent to Well No. 1 to take advantage of the elevation, which is not
located within the 100-year floodplain?
What are the impacts of known potential sources of contamination in the area?
Current Wisconsin Department of Natural Resources (WDNR) code calls for a minimum casing depth of
60 feet. How might that impact well construction and capacity?
What is the likely capacity of a new shallow aquifer well?
How can the length of new transmission main be minimized?
Communication with the WDNR and the Public Service Commission of Wisconsin (PSCW) will be important
throughout the project. We will coordinate a pre-application meeting with the WDNR and PSCW to provide
information on the need for the project and timelines for submittals and approvals.
Once the engineering report and well site is approved by the WDNR, the well drilling design phase will begin.
Well drilling design is expected to take 3 months, followed by WDNR plan review. Bidding and well drilling will
take place upon agency approvals. Well
drilling construction is expected to take 5
to 6 months.
The well is anticipated to be shallow
aquifer well similar in construction to the
existing wells. We will work with the
Village and well drillers to determine the
most economical approach to drilling a
test well and production well. If the new
well is to be located in close proximity to
the existing Well No. 1, the production
well could be specified to include a test
well. Alternatively, a pilot hole could be
used to sample the sand and gravel to
confirm suitable material and the
production well drilled over the pilot
hole.
The well facility is anticipated to include a small structure to house the well pump, electrical gear, and controls.
Based on initial design criteria, the opinion of probable construction cost (OPCC), in 2025 dollars, for the
replacement well project is $2 million. Project costs will be evaluated in more detail as part of the Engineering
Report.
Item Cost Opinion
Test Well Drilling $100,000
Well Drilling $600,000
Well House Construction $800,000
Transmission Main (50 LF) $20,000
Subtotal $1,520,000
Professional Service and Contingency (30%) $456,000
Total OPCC $1,976,000
Existing wells and proximity to flood zones.
Mr. Steven Cherek
Village of Marathon City
Page 3
August 22, 2025
The Scope of Services also includes loan assistance and tasks associated with regulatory approvals from the
WDNR and PSCW. As described below, we have included tasks related to the PSCW Construction Authorization.
We suggest the Village consult with its Municipal Advisor on matters related to the PSCW water rate case.
We have been successful on recent projects in establishing open and frequent communication with the WDNR and
PSCW by coordinating a pre-application meeting with both agencies in attendance. This step is encouraged by the
agencies as a way of conveying project objectives and timelines before submitting for permits and construction
authorization. Based on recent experience, the PSCW will request justification for the project, including data on
water use trends, future development, conservation efforts, future water demand forecasts, and project costs.
Scope of Services
We propose the following scope of services for the project.
Preliminary Engineering and Well Site Investigation Report
Evaluate up to three well sites for adequacy for placement of a well. The evaluation will include the
following:
o Perform reconnaissance of the well site and surrounding area.
o Review areas currently mapped within the 100-year floodway and floodplain.
o Conduct a survey of the WDNR Bureau for Remediation and Redevelopment Tracking System Database
and the State of Wisconsin Department of Safety and Professional Services Storage Tank Database to
review and map past and current potential sources of contamination, in accordance with State of
Wisconsin Administrative Code, chapter NR 811.
o Review the Village’s maps of storm and sanitary sewer systems, including pumping stations and
stormwater detention basins.
o Perform a desktop groundwater hydraulic evaluation for the well site.
Provide information from the site evaluation to the Village. Attend one in-person meeting with the Village to
discuss the evaluation.
Prepare a Well Site Investigation Report in accordance with State of Wisconsin Administrative Code, chapter
NR 811.09(4)(1), after completion of final site selection by the Village. The report will include the following:
o Well location by quarter-quarter section, township, range, county, longitude, and latitude
o The boundaries of the site and the location of the proposed well on the site
o The topography of the site
o The regional flood elevation
o The past and present use of the proposed site
o Potential contamination sources within one half-mile of the well location, as identified in databases
prepared by others and by site reconnaissance
o The specific geological formations from which water will be withdrawn
o Final well construction details
o The proposed final well pumping capacity
o The direction of groundwater flow
o The estimated zone of influence of the proposed well
o The estimated recharge areas for the well
o Anticipated annual volume of water to be withdrawn
Mr. Steven Cherek
Village of Marathon City
Page 4
August 22, 2025
o Location and data from existing nearby piezometers
o Location of nearby wetlands
o The distance and direction of the proposed well from the nearest existing well serving another water
utility
o The distance and direction of the proposed well from the nearest private well within 1,200 feet of the
proposed well site
o The location and distance of surface water and springs
o The location of alternative well sites for the proposed well
o A summary of the site, including advantages and disadvantages and the potential need for water treatment
Prepare an Engineering Report in accordance with State of Wisconsin Administrative Code, chapters
NR 811.09(3) and (4). The report will include the following, as applicable:
o A brief description of the project and the potential need for improvements
o A description of the geographic location of the project
o A brief description of the topography of the general area and its relation to the area involved in the project
o Past census data and Village-provided projected future population to the design year of the project
o The design period used to design major system components
o The results of the well investigations
o Areas of the project within the floodplain
o Areas of the project location within a wetland
Prepare preliminary facility layouts, elevation views, site plan, water main routing, equipment lists, and
design criteria for review with the Village. Attend one meeting with the Village to discuss preliminary
information.
Conduct a topographic survey of the potential well site. Correspond with utility marking company to locate
underground utilities prior to topographic survey.
Assist the Village with procurement of geotechnical services for borings.
Assist the Village with procurement of a radio path survey.
Prepare a preliminary OPCC.
Prepare a draft report that combines the Well Site Investigation Report, Engineering Report, and preliminary
design into one document. Submit draft report to the Village for review and incorporate the Village’s
comments, as appropriate.
Prepare a portable document format (PDF) file and three final hard copies of the report and submit to the
Village. Submit a PDF file of the report to the WDNR for review.
Address Village and WDNR comments, as appropriate.
Agency Coordination
Prepare presentation and attend one virtual preapplication meeting with the WDNR and PSCW.
The presentation will include the following:
Mr. Steven Cherek
Village of Marathon City
Page 5
August 22, 2025
o Background information on the community and water system
o Potential need for the project within the community
o Project alternatives considered
o Village selection of the alternatives
o Project OPCC and proposed funding
o Project schedule
Prepare the General Application Checklist for PSCW Construction Authorization in accordance with the
State of Wisconsin Administrative Code, chapter PSC 184.04[3]. The letter will include the following:
o Description of project components, phases, and schedule
o Information supporting the purpose and need of the project
o Project alternatives considered, including OPCC comparisons
o Analysis of the effect of the project on quality and reliability of services
o Project accounting with respect to PSCW uniform system of accounts
o Project funding
o Project estimated operation and maintenance (Q&M) costs
o Village-planned system facility retirements
o Site plan
o List of other agency approvals
o Alternatives to mitigate the need for the project
o Floodplain review
o Environmental and historical review, including a Type 3 Environmental Impact Information (EII)
Review. The Type 3 EII will include the following:
- Project overview
- Project development and alternatives
- Natural resource impact review, including an endangered resources (Form 1700-047) review
prepared by the WDNR
- Historical and archaeological review based on information from the Wisconsin Historical Society
(WHS). The Village shall pay fees associated with data collection by the WHS.
o Utility information from previous annual reports
o Estimated rate impact of the project
Prepare information for the Supplemental Checklist for Construction of Water Supply Facilities.
The additional information will be an attachment to the General Application Checklist. The supplemental
information will include the following:
o Need for the project
o Water system capacity analysis
o Future demand analysis
o WDNR project need
o Project alternatives considered, including OPCC comparison
o Analysis of large water customers with respect to the project
Submit information from the two previous bulleted items above to the PSCW for review and authorization.
Address agency comments, as appropriate, and provide supplemental information.
Mr. Steven Cherek
Village of Marathon City
Page 6
August 22, 2025
Production Well Design and Bidding
We will finalize the production well design based on the findings of the well exploration work, siting study,
and preliminary design phase. We will draw on our experience with more than 100 well designs completed
over our 79-year history to prepare clear, concise bid documents.
Prepare Technical Specifications, Bid and Contract Documents – The contract will be set up in a unit
price format to allow the Village to pay for only the quantity of work completed.
Review Design Documents with Village Personnel – We propose technical reviews be completed at
60 and 90 percent for the well construction project. We will send draft documents to the Village for review
and incorporate comments, as necessary.
Prepare Pre-Bid Opinion of Probable Construction Cost – Our method of cost analysis assists the
Village with sound financial planning. Costs will be determined based on historical data, recent similar
projects, and consultation with numerous contractors.
Submit Documents to the WDNR and Local Agencies – Plans and specifications will be sent to the
WDNR and local agencies, as necessary, for review and approval.
Advertising and Bid Assistance – Assistance during bidding will include duplication of drawings and
specifications, preparation of addenda (if necessary), electronic distribution of documents to prospective
bidders, and answering of questions related to the project. We will attend the bid opening, review the bids,
and assist the Village with award of the contract.
Production Well Drilling
The following services highlight the well drilling phase on the project.
Provide Construction-Related Services – Routine engineering services required during the well drilling
phase include on-site observation and contract administration, including review of contractor pay requests,
change order preparation, and shop drawing/material review (for casing material and grouting methods).
We will be on-site to observe test pumping of the well, review water levels, and analyze data in order to
finalize production pump design. Specific, on-site observation will include staking of the well centerline and
periodic construction and general observation trips during various stages in the drilling process, including
casing installation, grouting, well development, plumbness and alignment, and final test pumping and water
quality tests.
o Well screen and gravel pack design will be reviewed during drilling based on the material encountered
during drilling.
o If a line-shaft-style turbine pump is desired, it will be essential for the Village to have a straight and
plumb hole, or premature pump wear and failure may occur. We are one of the few consulting engineers
that require well drillers to meet the alignment specification with passage of a clear cylinder without
deflection, which is more stringent and useful than the standard American Water Works Association
(AWWA) 40-foot dummy alignment procedures.
o A final, 24-hour performance test will be completed after the well has been developed. Drawdown
information and water quality samples collected during this test will finalize well hydraulic capacity
and water quality characteristics. The contractor will be required to collect samples showing safe
bacteriological conditions in the well.
o We require the contractor to collect geologic samples every 5 feet and at changes in the formation.
Water samples will be taken for iron and other inorganic parameters. Drilling reports are submitted to
our office each day and will be reviewed throughout the course of well construction. We will also request
that the well driller submit required reports to the Wisconsin Geological and Natural History Survey.
The contractor will submit the Well Construction Completion Form.
Mr. Steven Cherek
Village of Marathon City
Page 7
August 22, 2025
Well House Design and Bidding
Upon completion of the production well, we will proceed with final design of the well house. Design will be
based on the final well capacity.
Prepare Technical Specifications, Bidding and Contract Documents – We will provide the engineering
services required for the design, including structural, mechanical, electrical, heating and ventilating, and
plumbing, as necessary. As a full-service engineering firm, we complete all facets of design in-house.
Review Design Documents with Village Personnel – The Village will be informed of the contents of the
design documents and provided the opportunity to comment. Technical review meetings will be held with the
Village at 60 and 90 percent completion. With full submittals of documents, both digital and hard copies will
be provided at 60, 90, and 100 percent completion.
Prepare Opinion of Probable Construction Cost – An engineer’s OPCC will be prepared with each
technical review and with the final bid documents. Cost opinions are developed from our historical data and
from data obtained from contractors and equipment vendors.
Submit Documents to the WDNR and Local Agencies – Plans and specifications will be sent to the
WDNR and local agencies, as necessary, for review and approval.
Advertising and Bid Assistance – Assistance during bidding will include duplication of drawings and
specifications, preparation of addenda, if necessary, electronic distribution of documents to prospective
bidders, and answering of questions related to the project. We will attend the bid opening, review the bids,
and assist the Village with award of the contract.
Using a similar approach on past projects has proven to
result in tightly grouped bid prices and a history of low
change orders. While the industry average for construction
change orders is approximately 5 percent, the average for
projects designed by our firm is 1.5 percent. On a typical
well facility project that has a $3 million construction
budget, the difference in change orders of 3.5 percent
equates to $105,000 in savings achieved through attention
to detail in design.
Attention to detail and well facility experience also provides
value to the Village in the form of longer facility lifetimes
and lower O&M costs.
Well House Construction
The following services highlight the construction phase on the project.
Construction-Related Services – Construction-related services required to successfully complete a facility
project are significantly different to those needed to complete a well construction project. There are more
‘moving parts’ that require coordination and, as such, an approach that facilitates communication between the
contractor, engineer, and owner is more critical. Our approach to construction services, developed from years
of experience, is as follows:
o Preconstruction meeting – The preconstruction meeting sets the tone of the entire construction project.
Project expectations with respect to schedule, communication, and deliverables will be discussed. This is
also the first opportunity to discuss the contractor’s concerns regarding the scope of work or schedule.
o Construction administration – This will include reviewing and responding to shop drawings, requests for
information (RFIs), pay requests, and change orders. We will perform typical administration services,
as necessary. These services include tracking and responding to contractor-provided schedules, shop
drawings, and O&Ms. In the contract, we require that shop drawings be submitted by 25 percent contract
completion. Additionally, we will respond to RFIs, prepare owner- or contractor-requested cost proposal
requests, and prepare, route, and finalize any necessary change orders.
Mr. Steven Cherek
Village of Marathon City
Page 8
August 22, 2025
o Construction progress meetings – Attend, lead, and submit minutes for monthly construction progress
meetings during active construction. Communication is critical to any successful project. We find it most
cost-effective to hold monthly progress meetings and then plan separate additional progress meetings at
key project milestones. We have assumed 12 construction progress meetings for this project.
o Part-time resident project representative (RPR) services – Provide part-time RPR services during key
phases and milestones of construction. Part-time RPR services will be conducted prior to any work being
closed in, cast-in place or buried, during any key milestones, and periodically to check the progress of the
work. We have assumed 20 on-site visits with this proposal, but once the final design documents have
been prepared and discussed with the Village, this quantity may change based on Village preferences.
o Contract Closeout
- Provide pre-final and final inspection services and prepare punch lists of remaining work or
restoration. Once substantial completion is met by the contractor, we will provide final inspection
services in accordance with the general conditions of the contract. The punch list will not be
finalized until start-up has occurred and the items have been discussed with the Village.
- Review and compile contractor-provided record drawings. Submit record drawings to the Village in
AutoCAD and PDF formats. We review the contractor record drawings and draft changes in
AutoCAD. Additionally, throughout the project we will review the contractor’s record drawings on
a monthly basis.
- Review and compile contractor-provided O&M manuals. O&M manuals will be reviewed
electronically for completeness and comments provided to the contractor. After review, we will
require the contractor to provide final electronic and hard copies. After the contractor-provided
O&Ms are reviewed, we will organize and prepare final electronic and hard copies for Village use.
- Attend start-up and testing. This multi-faceted project will have substantial start-up requirements.
We will use start-up to verify facility operations in accordance with the specifications.
Well Head Protection Plan (WHPP)
A WHPP is required for any new well prior to placing the facility into service. Steps in completion of a WHPP in
accordance with NR 811 include the following:
Estimate the recharge area for the well.
Estimate the zone of influence for the well.
Estimate the direction of groundwater flow.
Inventory existing potential contamination sources within a one half-mile radius of the well and assess
existing potential contamination sources within the recharge area based on existing database information
provided by others.
Work with the Village to establish a well head protection area for the well.
Assist the Village in developing a contingency plan, management plan, education plan, and well head
protection ordinance update, as necessary.
Complete the Potential Contaminant Use Inventory checklist form as required by the WDNR.
We will prepare a draft WHPP and meet with the Village to review. We will then update and finalize the WHPP.
Three copies of the WHPP will be provided to the Village and three copies of the WHPP, along with the
Potential Contaminant Use Inventory checklist form, will be provided to the WDNR for review and approval.
We will coordinate to complete the WHPP such that WDNR approval is obtained prior to substantial completion
of the well facility.
Mr. Steven Cherek
Village of Marathon City
Page 9
August 22, 2025
Funding Assistance
We routinely assist clients with tasks related to project funding, including guidance through the Safe Drinking
Water Loan Program (SDWLP). We will assist the Village with submitting the Intent to Apply and Priority
Evaluation Ranking Form by the October 31 deadline. If the Village continues to pursue funding through the
SDWLP, we will assist the Village with the loan application process. During construction, we will prepare loan
disbursement requests and assist with project closeout.
Fee
We propose the following fees for the scope of engineering services described above.
Task Fee
Preliminary Design and Well Siting Report $35,000
Agency Coordination $10,000
Well Drilling Design and Bidding $30,000
Well Drilling Construction-Related Services $30,000
Well House Design and Bidding $90,000
Well House Construction-Related Services $85,000
Wellhead Protection Plan $5,000
Funding Assistance $10,000
Total $295,000
Schedule
The enclosed schedule reflects deliverables and completion times based on typical durations for each project
phase. Where possible, we show certain tasks being completed in parallel to save on implementation time.
In general, assuming the project begins in September 2025, we expect final completion by the end of 2027.
This letter is not to be considered an agreement between Strand Associates, Inc. ® and the Village of Marathon City
but, rather, as a general discussion of the type of tasks and magnitude of costs the Village may expect for a project
of this nature. If selected, we will prepare an Engineering Services Agreement and submit to the Village for review
and signature. Once the Engineering Services Agreement is executed, work on the project will begin.
Please call with questions during review of this information.
Sincerely,
STRAND ASSOCIATES, INC.®
Michael J. Forslund, P.E.
Enclosure
P250.754/MJF:mah
Village of Marathon City | Well Replacement Project
201 E. Main Street, Suite 100
Reedsburg, Wisconsin 53959
(800) 261-6468 Toll-Free
www.vierbicher.com
vision to reality
Reedsburg | Madison | Milwaukee | Prairie du Chien | Green Bay
April 8, 2025
Mr. Steve Cherek
Village of Marathon City
311 Walnut Street
Marathon City, WI 53448
Re: Agreement to Provide Professional Services
Public Water Supply Well No. 5
Dear Steve,
Vierbicher Associates, Inc. (Consultant) is pleased to submit this Agreement to provide Professional
Services to Village of Marathon City (Client). All sections included in this Agreement and the General
Terms and Conditions form the basis for this Agreement.
I. PROJECT UNDERSTANDING
The Client is seeking to locate and construct a new public water supply well (Well No. 5) to
replace their existing Well No. 1 public water supply well. The project will include searching for a
viable well site, completing a well site investigation report for the Wisconsin Department of
Natural Resources’ (WDNR) approval, constructing a test well and completing aquifer testing,
construction of a production well and pumphouse, and updating the SCADA system for the new
well facility. The pumphouse is to be of split-face concrete block wall and asphalt shingled roof
construction including a pump room, and chemical feed room. A transmission main will need to
be constructed to connect the proposed well to the Client’s existing water treatment facility.
In addition, the Client desires the completion of a water supply and storage system study to
include recommendations for improvements as needed to meet demands from growth within
the existing service area and future service areas.
Also, the Client is in need of project funding analysis and assistance including applications for
FY26 Congressionally Directed Spending, the WDNR Safe Drinking Water Loan (SDWL) Program,
and/or the US Department of Agriculture Rural Development (USDA-RD).
II. SCOPE OF SERVICES
A. General
The Consultant shall provide professional services for the project as described above.
These services include the preparation of engineering drawings and specifications,
applying for regulatory agency approvals, bidding, preparing a contract award
recommendation, and completing contact administration. Also, these services shall
include a water supply and storage system study and funding application and
administration.
April 8, 2025
Page 2 of 18
B. Specific Services Provided by Consultant
Task 1 - Preliminary Public Funding Investigation & Implementation Strategy
1. Consultant will contact public funding agencies to review the proposed project
and solicit input regarding the eligibility, competitiveness, and amount of
potential funding. Funding programs to be investigated include:
USDA Rural Development Water Program,
WDNR Safe Drinking Water Loan (SWDL),
Congressionally Directed Funding.
2. Review the funding summary with the Client to select the preferred funding
strategy(s).
Task 2 – Funding Applications
1. The preferred funding programs have been identified. The following are
applications for funding. The Consultant shall assist with these applications as
authorized by the Client:
a) SDWL Intent to Apply (ITA)and Priority Evaluation & Ranking Formula (PERF)
Prepare the ITA and PERF for the SDWL program.
Evaluate project ranking and estimate the amount of Principal
Forgiveness available.
b) USDA Rural Development Submittal Based on CDS Award
Coordinate with the Client and Engineer to compile information to
enable USDA to conduct analysis to finalize the amount of grant
funds for the project.
Coordinate with USDA to facilitate their analysis.
Task 3 – Water Supply & Storage System Study
1. Conduct a kick-off meeting with the Client to confirm the planning period and
study requirements.
2. Complete an inventory of the current public water supply & storage system
facilities including existing water sources, storage facilities, and treatment
facilities.
3. Provide a map of the current system’s facilities and service area.
4. Obtain water usage information from the past five years and the most current
WDNR Sanitary Survey of the water system.
5. Evaluate the adequacy of the current water system facilities to meet current
demands and provide acceptable water quality.
6. Draft an exhibit of the planning area including the current and future water
system service areas and review it with the Client to confirm the study boundaries.
7.
Obtain population estimates, the current comprehensive land use plan, future
population projections, ISO fire flow recommendations for the Village, and
information about planned future developments.
April 8, 2025
Page 3 of 18
8. Estimate future water demands from growth in the current service area and the
planned future service areas.
9. Evaluate the adequacy of the current water system facilities to meet demands
from the projected growth of the current service area and future service areas.
10. Make recommendations for future water supply, storage, and distribution system
improvements required to meet future demands. These recommendations would
include location, timing, and preparing an Opinion of Probable Cost for the
recommended improvements.
Task 4 – Well Site Search & Well Site Investigation Report
1. Coordinate with Client to determine up to three potential well sites.
2. Complete site viability evaluations of each potential site to assist the Client in
determining a preferred site and a secondary site.
3. Prepare a Well Site Investigation Report meeting the requirements of Wisconsin
Administrative Code NR 811.12(5)(c).
4. Provide a preliminary draft of the Well Site Investigation Report to the Client for
review comments.
5. Finalize the Well Site Investigation Report and submit the report on behalf of the
Client to the Wisconsin Department of Natural Resources (WDNR) for approval.
6. Respond to WDNR staff questions and request for additional information during
the review of the Well Site Investigation Report.
Task 5 – Well Site Topographic Map
1. Complete a topographic site map that depicts existing features and conditions
of the well site. The limits of the topographic site map shall extend 10 feet beyond
the site boundaries and include existing surface features, utilities, and other
elements that may affect the design. The topographic site map shall include
locating existing monumentation to the extent that said monumentation is in
existence at the time the field work is completed. Consultant has not attempted
to verify property boundaries and/or right-of-ways as a part of locating existing
monumentation. Said monumentation may, or may not, represent actual
property boundaries and or right-of-ways and does not constitute a property or
right-of-way survey.
The topographic site map shall depict the following items:
a) Features within the topographic site map limits include, but are not limited
to, sidewalk, pavement, curb and gutter, curb cuts, driveways, utilities,
utility poles, utility pedestals, utility structures, and signs.
b) Substantial, visible, above-ground structures and improvements, including
any existing buildings, driveways, and parking lots lying within the exterior
boundaries of the subject site.
c) Street trees and trees larger than 12” diameter at breast height (dbh).
d) Utilities shall be shown based on the Client of Marathon City’s GIS maps,
and as located in the field by Digger’s Hotline. The size and invert
April 8, 2025
Page 4 of 18
elevation of sanitary sewers and storm sewers shall be measured by
Consultant where practical. Where measurement of said utilities is not
practical, size and invert elevations shall be shown based on available
record drawings.
e) The location of private utilities that are not within the standard scope of
what would be marked as part of a diggers hotline locate request is not
included in the scope. Client shall request private utility locates, if desired.
Consultant shall coordinate this work as an additional service.
f) Topographic survey shots shall be taken at regular intervals and in
sufficient detail to prepare a digital terrain model within the exterior
boundaries of the subject site.
g) Contours at one-foot intervals shall be depicted. The Datum upon which
the elevations and contours are based shall be noted on the face of the
map, (i.e., assumed, NAVD27, NAVD88).
h) Improvements lying within the street right-of-way immediately adjacent to
the well site shall be located. Improvements will include, but are not
limited to, sidewalk, pavement, curb & gutter, curb cuts, utilities, utility
poles, utility pedestals and signs.
The topographic map does not constitute a boundary survey according to the
Minimum Standards for Property Surveys, Chapter A-E7 of the Wisconsin
Administrative Code. Consultant shall research available surveys of record and
show the property boundary based on found surveys of record to the extent
feasible.
2. Prepare a base map of the existing conditions for use in the design of the
improvements.
Task 6 – Well Site CSM
1. Certified Survey Map (CSM):
The Consultant shall prepare a CSM for the Client. The CSM shall conform to the
requirements of Chapter 236.34 of the Wisconsin Statutes and the Village of
Marathon City Ordinances. This work shall include:
a) Conducting survey record research to include locating surveys that may
have been previously completed in the vicinity of the proposed CSM to
aid in the preparation of the requested CSM.
b) Recovering and locating required public land corners to include
obtaining survey coordinates of existing section corner and quarter corner
monumentation.
c) Recovering existing parcel corners to include obtaining survey
coordinates on existing parcel monumentation adjacent to the proposed
CSM.
d) Setting new lot corners to represent the location boundary of the lot
created by the CSM.
April 8, 2025
Page 5 of 18
e) Field surveying the location of the existing structures and other items
located on the subject parcel.
f) Easements and other encumbrances as referenced in the title work
provided by the Client shall be depicted to the extent feasible.
g) Preparing required submittal materials for the Village of Marathon City;
preparing the final CSM for recording (surveyor’s, mortgagee, local
approval authority, and owner’s certificates, approval, and recording
certificates must be created).
h) Circulating the final CSM for the execution of necessary certificates.
i) Submitting the final, signed, and executed CSM to the County Register of
Deeds for recording.
The deliverables include one paper copy of the CSM, placement of lot corners,
and a completed copy of the land division application. All fees for recording the
CSM or any other governmental submittal or review shall be the responsibility of
the Client.
Task 7 – Assist Client with Public Service Commission Water Rate Case
1. Assist the Client’s Finance Director with completion of the water rate case
submission. This work shall include:
a) Furnishing Engineer’s Opinions of Probable Construction Costs for the
proposed well and pumphouse.
b) Assisting with estimates of operation and maintenance costs of the
proposed well facility.
Task 8 – Test Well & Aquifer Performance Testing Request for Proposals
1. Prepare preliminary Request for Proposals document including proposal form,
and test well plans and specifications for the test well construction, aquifer
performance testing and water quality testing.
2. Meet with the Client (virtually) to review the preliminary Request for Proposals
document. This agreement includes one preliminary design review meeting with
Client Staff.
3. Based on Client’s review comments, prepare final Request for Proposals
document required to obtain proposals from well drillers.
4. Prepare required permit applications and submit on behalf of the Client. Fees for
permits will be the responsibility of the Client. Permits anticipated to be required
include:
a) WDNR Public Water Supply Test Well Plan Approval
5. Contact several well drillers to solicit interest in completion of the test well
construction and aquifer testing.
6. Distribute the Request for Proposals document to interested well drillers.
7. Summarize and review proposals submitted by well drillers. Provide a summary
and recommendation to the Client regarding contract award.
April 8, 2025
Page 6 of 18
Task 9 – Test Well & Aquifer Performance Testing Administration Services
1. Assist the Client with preparing and executing an agreement with the well driller.
2. Provide coordination between the Client and the well driller during the test well
construction and aquifer performance testing.
3. Review data that the well driller is required to submit.
4. Conduct periodic observation of test well construction and aquifer performance
testing to evaluate conformity to the plans. The project engineer or a qualified
technician will provide these services.+ This proposal includes 12 hours for
construction observation.
5. Review and provide comments to the Client regarding all intermediate
performance testing data provided by the well contractor during the test well
drilling and aquifer performance testing.
6. Review and take appropriate action on all well driller pay request(s).
7. Review and comment on the test well/aquifer performance testing results and
provide final production well design recommendations.
Task 10 – Production Well Design Phase
1. Prepare preliminary plans, specifications, bidding documents and an Opinion of
Probable Cost (OPC) for the production well construction, pumping and water
quality testing. The plans will include:
a) Well Site and Erosion Controls Plan showing the proposed location of the
production well, construction entrance, drilling mud settling pond
locations, and erosion control measures
b) Production Well Profile Plan showing the proposed construction of the
production well
c) Construction & Erosion Control Details
2. Provide a preliminary draft of the plans, specifications, bidding documents and
OPC to the Client for review comments.
3. Meet with the Client (virtually) to review the preliminary plans, bid documents &
OPC. This agreement includes one preliminary design review meeting with Client
Staff.
4. Based on Client’s review comments, prepare final plans, specifications, and
bidding documents required to obtain competitive bids, regulatory agency
approval, and enable construction of the production well.
5. Update the Opinion of Probable Cost to reflect the final design and bid
quantities.
6. Prepare required permit applications and submit on behalf of the Client. Fees for
permits will be the responsibility of the Client. Permits anticipated to be required
include:
a) WDNR Public Water Supply Well Plan Approval
b) WDNR High Capacity Well Approval
April 8, 2025
Page 7 of 18
c) Public Service Commission of Wisconsin (PSCW) Well Facility Certificate of
Authority – Type III Water Project (Construction Authorization)
All necessary supplemental calculations for submittal of said permit applications
are included in this item. All permit and review fees are the responsibility of the
Client. Consultant shall coordinate with Client to obtain payment and submit fee
with all permit or review applications.
7. Attend the following meetings:
a) WDNR/PSCW Pre-Application Meeting
b) Utility Commission Meetings (two, attend virtually)
c) Village Board Meetings (two, attend virtually)
Task 11 – Production Well Bidding & Contract Award Phase
1. Coordinate the bidding process including issuing bidding documents through
QuestCDN.com online bid document distribution service.
2. Answer questions during the bid process to provide clarification to the bid
documents and issue addenda if necessary.
3. Conduct a bid opening through QuestCDN.com on-line bid document
distribution service, and prepare a tabulation of the bids received.
4. Make a recommendation to the Client concerning the award of the project to
the lowest responsible bidder.
5. Coordinate securing a contract between the Owner and Contractor using
standard Engineer’s Joint Contract Documents Committee (EJCDC) documents.
Task 12 – Production Well Contract Administration Phase
1. Coordinate a preconstruction conference with the Client, Contractor, Utility
Companies, and others as determined necessary. Provide meeting agenda &
meeting minutes.
2. Construction Staking:
a) Consultant shall provide one-time horizontal and vertical staking consisting
of the following:
(1) Provide a well center stake, three offsets, and two site
benchmarks.
(2) Property corners will be marked by lath and ribbon to assist
Contractor with keeping construction activities and materials on
the Clients property.
b) Staking provided shall be for the sole use by the Well Driller for the purpose
intended. Consultant shall not be responsible for work performed by
others use of the stakes provided.
c) Staking shall be completed at the time requested provided a minimum of
48 hours notice is given.
3.
Provide general coordination between the Client and the Contractor during the
April 8, 2025
Page 8 of 18
production well construction, development, and testing.
4. Review Contractor submittals and provide review comments. This agreement
includes the review of two submittal items.
5. Assist the Client in responding to Contractor requests for information (RFIs), and
issue Work Change Directives, Construction Bulletins, and Change Orders as may
be needed.
6. Review and provide comments to the Client regarding initial data provided by
the Contractor during well construction, development, and testing.
7. Review and finalize a Contractor proposed well pump test work plan.
8. Provide a pump test results analysis report including estimation of well specific
capacity and efficiency.
9. Review water quality test results and summarize results in a memo to Client.
10. Review Contractor submitted payment applications and recommend action to
the Client. This agreement anticipates one (1) payment application will be
submitted by the Contractor in addition to the final application.
11. Upon completion of the work, Consultant shall compile for, and deliver to Client,
a set of record documents conforming to information furnished to Consultant in
part, by the Contractor. This set of documents shall consist of record drawings
showing the final production well location on the site and final well cross section
(per Well Contractor’s Well Construction Report). Since record drawings are
based in part, on information provided by others, Consultant shall have no
responsibility for the accuracy of the modified information other than for record
information collected in the field by Consultant.
Task 13 – Production Well Construction Observation
1. Provide a Project Representative (PR) to conduct periodic observation of
production well construction, development, and testing to evaluate conformity
to the contract documents. The presence of the PR shall not relieve
the contractor of their obligations to conform to the requirements of the
agreement between the Owner and Contractor. One construction observation
trip is anticipated for each of the following milestones:
a) Grouting the Inner Casing/Grout Density Testing,
b) Plumbness & Alignment Testing to Full Depth,
c) Pump Testing/Water Quality Sampling.
2. Prepare and provide Client Staff with observation reports including descriptions
and photos of work activities. Plumbness & alignment and grout density tests
reports to include data evaluations.
3. Complete a site visit at project completion to develop a punch-list. Coordinate
completion of punch-list with contractor to gain project acceptance.
Task 14 – Pumphouse Design & Well No. 1 Abandonment Phase
1.
Conduct a kick-off meeting with the Client to review project requirements and
design considerations.
2. Coordinate with the electric, gas, and other utilities needed to serve the well
pumphouse.
April 8, 2025
Page 9 of 18
3. Prepare preliminary plans for construction of the well pumphouse site
improvements, building, pumping equipment, controls and connecting water
main.
a) The plans will include a Well No. 1 well abandonment and pumphouse
demolition plan.
4. Prepare a preliminary Opinion of Probable Cost (OPC) based on the preliminary
design for Client Staff to evaluate budget considerations.
5. Meet with the Client (virtually) to review the preliminary plans & OPC. This
agreement includes one preliminary design review meeting with Client Staff.
6. Based on Client’s review comments, prepare final plans. Final plans shall minimally
include:
Title Sheet
Gen Notes, Legends & Contact
Info
Site Plan
Grading & Erosion Control
Utility Plan
Construction Details
Floor, Ceiling & Roof Plans
Exterior Elevations
Building Sections
Door Schedules & Details
Foundation, Roof Framing Plans &
Structural Details
Structural Notes & Schedules
Process Piping & Equipment Plan
& Schedule
Well Pump Section & Piping
Details
Plumbing Floor Plan & Schedules
HVAC Floor Plan & Schedules
Electrical Floor Plan & Schedules
Electrical One-Line Diagram
Well No. 1 Abandonment Plan
Well No. 1 Pumphouse Demolition
Plan
7. Prepare project bidding documents required to obtain competitive bids.
8. Prepare project specifications estab lishing requirements for products and
execution required to complete construction of the pumphouse, site
improvements, connecting water main, modifications to the SCADA system to
add the new well facility, and abandonment of Well No. 1.
9. Update the Opinion of Probable Cost to reflect the final design and bid
quantities.
10. Prepare required permit applications an d submit on behalf of the Client. Fees for
permits will be the responsibility of the Client. Permits anticipated to be required
include:
a) WDNR Public Water Supply Pumphouse Plan Approval
b) WDNR Public Water Supply Well Pump Approval
c) WDNR Chemical Feeder(s) Approval
d) WDNR Water Main Extension
e) Public Service Commission of Wisconsin (PSCW) Well Facility Certificate of
Authority – Type III Water Project (Construction Authorization) Included in
the Production Well Design Phase above.
Well No. 1 Abandonment Permitting: No prior approval is required to abandon
Well No. 1 if the abandonment materials and methods comply with NR 811.13.
The WDNR requires the well abandonment contractor (certified well driller) to
April 8, 2025
Page 10 of 18
complete and submit a Well/Drillhole/Borehole Filling & Sealing Report (DNR
Form 3300-5) to the WDNR after the well has been abandoned.
11. Attend the following meetings:
a) Utility Commission Meetings (two, attend virtually)
b) Village Board Meetings (two, attend virtually)
Task 15 – Pumphouse Bidding & Contract Award Phase
1. Coordinate the bidding process including issuing bidding documents through
QuestCDN.com online bid document distribution service.
2. Answer questions during the bid process to provide clarification to the bid
documents and issue addenda if necessary.
3. Conduct a pre-bid meeting with Client Staff and interested contractors.
4. Conduct a bid opening through QuestCDN.com on-line bid document
distribution service, and prepare a tabulation of the bids received.
5. Make a recommendation to the Client concerning the award of the project to
the lowest responsible bidder.
6. Coordinate securing a contract between the Owner and Contractor using
standard Engineer’s Joint Contract Documents Committee (EJCDC) documents.
Task 16 – Pumphouse Contract Administration Phase
1. Coordinate a preconstruction conference with the Client, Contractor, Utility
Companies, and others as determined necessary. Provide meeting agenda &
meeting minutes.
2. Construction Staking:
a) Consultant shall provide one-time horizontal and vertical staking consisting
of the following:
(1) Pumphouse Building: Provide a center stake, and three offsets for
each building corner; and two site bench marks. Property corners
will be marked by lath and ribbon to assist Contractor with keeping
construction activities and materials on the Clients property.
(2) Watermain: Consultant shall provide horizontal and vertical
locations for the watermain along the alignment. Staking shall
include one trip and shall include bends, valves, hydrants, and
offsets at 100’ intervals.
b) Staking provided shall be for the sole use by the Contractor for the
purpose intended. Consultant shall not be responsible for work performed
by others use of the stakes provided.
c) Staking shall be completed at the time requested provided a minimum of
48 hours notice is given.
April 8, 2025
Page 11 of 18
d) This agreement assumes a one-time staking for each of the various
components described. Any re-staking that may be required shall be
completed as an additional service on a time and expense basis.
3. Provide general coordination between the Client and the Contractor during the
Pumphouse construction.
4. Review Contractor shop drawings and submittals and provide review comments.
This agreement includes the review of thirty-five (35) items.
5. Assist the Client in responding to Contractor requests for information (RFIs), and
issue Work Change Directives, Construction Bulletins and Change Orders as
needed.
6. Review Contractor submitted payment applications and recommend action to
the Client. This agreement anticipates four (4) payment applications will be
submitted by the Contractor in addition to the final application.
7. Upon completion of the work, Consultant shall compile for, and deliver to Client,
a set of record documents conforming to information furnished to Consultant in
part, by the Contractor. This set of documents shall consist of record drawings
showing the pumphouse site and interior of the pumphouse (per Contractor’s
Record Drawings). Since record drawings are based in part, on information
provided by others, Consultant shall have no responsibility for the accuracy of the
modified information other than for record information collected in the field by
Consultant.
Task 17 – Pumphouse Construction Observation
1. Provide a Project Representative (PR) to conduct periodic observation of
production well construction, development, and testing to evaluate conformity
to the contract documents. The presence of the PR shall not relieve
the contractor of their obligations to conform to the requirements of the
agreement between the Owner and Contractor. One construction observation
trip is anticipated for each of the following milestones:
a) Footings & Foundations
b) Under-Slab Electrical, Plumbing & Chemical Feed Conduit
c) Site Water Main
d) Framing (walls, and roof)
e) Fenestrations (windows, doors, & louvers)
f) Pump Base Concrete Pour
g) Well Pump Installation
h) Well Discharge (Process) Piping & Chemical Feed Equipment
i) Well Pump Startup & Pump Testing
j) Chemical Feed System Startup & Testing
k) Controls & SCADA RTU Startup
l) Well No. 1 Abandonment
2. Prepare and provide Client Staff with observation reports including descriptions
and photos of work activities.
3. Complete a site visit at project completion to develop a punch-list. Coordinate
completion of punch-list with contractor to gain project acceptance.
April 8, 2025
Page 12 of 18
Task 18 – Transmission Main Design
1. Conduct a kick-off meeting with the Client to review project requirements and
design considerations.
2. Complete a topographic survey that depicts existing features and conditions. The
limits of the topographic survey shall extend to the right-of-way and include
existing surface features, utilities, roadway sections, and other elements that may
affect the design. Existing utilities shall be located through Digger’s Hotline
Service. Topographic survey shall include locating essential existing property irons
to the extent they are in existence at the time of the survey. This does not
constitute a right-of-way survey.
The survey shall include:
b) Features within the survey limits including, but are not limited to, sidewalk,
pavement, curb and gutter, curb cuts, driveways, utilities, utility poles,
utility pedestals, utility structures, and signs.
c) Topographic survey shots shall be taken at regular intervals and in
sufficient detail to prepare a digital terrain model within the exterior limits
of the project site.
d) Topographic shots shall also be taken at 50’ intervals within the streets and
at driveway centerlines.
e) Contours at one-foot intervals shall be depicted. Elevations shall be based
upon NAVD 88 datum.
f) A minimum of two project benchmarks shall be located and identified on
the topo map.
g) Existing utilities shall be shown on the map from field located markings by
a Diggers Hotline One-Call request and utility maps obtained by the
Consultant from the Village and utility companies serving the subject
property. Consultant shall not perform any excavations as part of this
survey to determine the location of underground facilities. Private utility
locates are not part of this survey. The size and invert elevation of the
storm and sanitary sewer utilities shall be measured where practical.
Where not practical, size and inverts shall be depicted based upon record
drawings (if available). The size of the water main shall be depicted based
upon record drawings (if available).
3. Prepare a base map of the existing conditions for use in the design of the
improvements.
4. Complete a preliminary design of the transmission main. The preliminary design
shall be used to identify any design challenges or limiting features affecting the
design. The preliminary design shall be shared with Client Staff to review prior to
preparing the final design. Preliminary design shall be shared with Client Staff on
an ongoing basis to discuss various elements as they become apparent. This
scope includes up to two design phase meetings with Client Staff as necessary.
5. Prepare a preliminary Opinion of Probable Cost based on the preliminary design
for Client Staff to evaluate budget considerations.
6. Determine potential conflicts between the proposed construction and existing
dry utilities (gas, electric, communication, etc.).
April 8, 2025
Page 13 of 18
7. Coordinate with dry utilities to address any identified conflicts and/or consider
any upgrades the utility company may be consider
ing.
8. Prepar
e final plans of the proposed water transmission main. Final plans shall
inclu
de:
Title Sheet,
Legend, General No
tes, and Contact Information,
Transmission Main Plan and Profile
Sheets, and
Construction Details per Village and/or Regulatory Standards.
9. Prepar
e project bidding documents.
10. Update the Opinion of Probable Cost to reflect the final design and bid
qua
ntities.
11. Prepare and submit regulatory agency permits required to gain approval to
constr
uct the improvements. Permits anticipated to be required include:
WDNR Water Main Extension,
WDN
R Water Resources Application for Project Permit, and
A
ll necessary supplemental calculations for submittal of said permit applications
are included in this item. All permit and review fees are the responsibility of the
Client. Consultant shall coordinate with Client to obtain payment and submit fee
with all permit or review applications.
Task 19 – Transmission Main Bidding & Contract Award
1. Coordinate the bidding process including issuing bidding documents through
Qu
estCDN.com online bid document distribution service. Answer questions during
the
bid process to provide clarification to the bid documents and issue addenda
if ne
cessary.
2. Attend the bid opening and prepare a tabulation of the bids received.
3. Make a recommendation to the Client concerning the award of the project to
th
e lowest responsible bidder.
4. Coordinate
securing a contract between the Owner and Contractor using
standard
Engineer’s Joint Contract Documents Committee (EJCDC) documents.
Task 2
0 – Transmission Main Construction Administration
1. Coordinate a preconstruction conference with the Client, Contractor, Utility
Companies, and others as determined necessary.
2. Provide on
e-time horizontal alignment and vertical control staking for each
constr
uction activity. Any restaking required by vandalism, contractor
negligence,
or other causes is not a part of this contract.
3. Review and
approve, or take other appropriate action, with respect to Shop
Drawings and Sample
s and other data that Contractor is required to submit.
April 8, 2025
Page 14 of 18
4. Review contractor submitted pay applications and recommend action to the
Client.
5. Review and make recommendations on contractor-requested change orders.
6. Attend construction progress meetings.
7. Provide general project management and coordination throughout construction.
8. Upon completion of the work, Consultant shall compile for, and deliver to, the
Client a set of record documents conforming to information furnished to
Consultant in part, by construction contractors. This set of documents shall consist
of record drawings showing the reported location of work. Since record drawings
are based in part, on information provided by others, Consultant shall have no
responsibility for the accuracy of the modified information other than for record
information collected in the field by Consultant.
Task 21 – Transmission Main Construction Observation
1. Provide a Project Representative (PR) to observe construction activities. The PR
shall be on-site on a periodic basis during underground utility (water main) and
street construction activities to determine conformity to the plans and
specifications. The presence of the PR shall not relieve the contractor of their
obligations to conform to the requirements of the agreement between the
Owner and Contractor.
2. Prepare and provide Client Staff with observation reports including descriptions
and photos of work activities.
3. Provide weekly project summaries to Client Staff for distribution to Client Officials
and affected businesses and residents. Weekly summaries shall include brief
descriptions of work completed during the preceding week and planned
activities for the upcoming week.
4. Complete a site visit at project completion to develop a punch-list. Coordinate
completion of punch-list with the contractor to gain project acceptance.
III. SERVICES NOT PROVIDED AS PART OF THIS PROJECT
In addition to the “Services Not Provided as Part of This Agreement” section indicated in the
attached
General Terms and Conditions, the following services are not included as part of this
work.
A. Permit application fees.
B. CSM recording fees, review fees, and any other services not specifically identified above.
C. Rate Case Application (Water User Rate Increase) submittal to PSCW.
D. Water Quality Testing.
E. WDNR Well Abandonment Form for Well No. 1.
F. Wellhead Protection Plan Amendment.
G. Re-design and construction related services needed in the event that the initially
constructed
production well does not meet the requirements of the contract documents.
IV. INFORMATION PROVIDED BY OTHERS
April 8, 2025
Page 15 of 18
In order to complete our scope of services, the following information shall be provided by others:
A. Provide Consultant with all criteria and full information as to Client’s requirements for the
project, including design objectives and constraints, capacity and performance
re
quirements, flexibility, expandability, and any budgetary limitations; furnish copies of all
de
sign and construction standards which Client will require to be included in the
drawings and specifications; and furnish copies of Client’s standard forms, and
condit
ions, including insurance requirements and related documents for Consultant to
inclu
de in the bidding documents, or otherwise when applicable.
B. Record drawings within the project
limits to the extent they exist.
C. WDNR’s most recent Sanitary Survey Report of the water system.
D. New well facility’s anticipated annual operation and maintenance expenses (for PSCW
application).
V. SCHE
DULE
A. This Agreement is based upon the following anticipated schedule:
Acti
vity Date
1. Authorization to Proceed ...................................................................................... May 2025
2. Funding Applications, Water System Study & Well Site
Investigation Report .................................................................................... May-June 2025
3. Test Well:
a. Topo. Survey & Design
................................................................................... May 2025
b. Regulatory Approvals ........................................................................... June-July 2025*
c. Solicit Proposals ................................................................................................ July 2025
d. Contract Award ............................................................................................... July 2025
e. Start Construction (anticipated) ................................................................... July 2025
f. Complete Construction (anticipated) ................................................... August 2025
g. Water Quality Laboratory Testing (Radio Nuclides) ...................... August 1-30, 2025
* Av
erage WDNR review time is typically 60 days. Consultant can neither guarantee nor control
review times of
regulatory agencies.
4. Production Well:
a. CSM & Design ................................................................................................... July 2025
b. Regulatory Approvals ................................................................ July-December 2025*
c. Bidding ...................................................................................... January-February 2026
d. Contract Award ...................................................................................... February 2026
e. Start Construction (anticipated) .......................................................... March 1, 2026
f. Complete Construction (anticipated) .............................................. March 31, 2026
g. Water Quality Laboratory Testing (Radio Nuclides) ........................... April 1-30, 2026
* PSCW r
eview can take up to 6 months. Average WDNR review time is typically 60 days. Consultant
can n
either guarantee nor control review times of regulatory agencies.
5. Pumphouse:
a. Design ....................................................................................... August-November 2025
b. Regulatory Approvals ................................................... November-December 2025*
c. Bidding ...................................................................................... January-February 2026
d. Contract Award .......................................................................................... March 2026
e. Start Construction (anticipated) ................................................................... May 2026
f. Complete Construction (anticipated) ............................................. September 2026
* Av
erage WDNR review time is typically 60 days. Consultant can neither guarantee nor control
review times of
regulatory agencies.
April 8, 2025
Page 16 of 18
6. Water Transmission Main:
a. Design ....................................................................................... August-November 2025
b. Regulatory Approvals ................................................... November-December 2025*
c. Bidding ...................................................................................... January-February 2026
d. Contract Award .......................................................................................... March 2026
e. Start Construction (anticipated) ................................................................... May 2026
f. Complete Construction (anticipated) ............................................. September 2026
* Average WDNR review time is typically 60 days. Consultant can neither guarantee nor control
review times of regulatory agencies.
VI. SCHEDULE OF DELIVERABLES
The following deliverables shall be provided to the Client throughout the course of the project:
A. Water System Evaluation Report
B. Well Site Investigation Report
C. Well Site Topographic Map
D. Well Site CSM
E. Preliminary Production Well Plans, Specifications, Bidding Documents & Opinion of
Probable Cost (OPC)
F. Final Production Well Plans, Bidding Documents, Specifications & OPC
G. Preliminary Pumphouse Plans, Specifications, Bidding Documents & Opinion of Probable
Cost (OPC)
H. Final Pumphouse Plans, Bidding Documents, Specifications & OPC
I. Preliminary Transmission Main Plans, Specifications, Bidding Documents & Opinion of
Probable Cost (OPC)
J. Final Transmission Main Plans, Bidding Documents, Specifications & OPC
K. WDNR and WPSC Permit Applications*
L. Two hard copies of plans and specifications for bidding*
M. Bid Tabulation*
N. Contract Award Letter of Recommendation*
O. Client/Contactor Contract Documents for Execution (EJCDC)*
P. Notice to Proceed Letter to Contractor*
Q. Computerized (Microsoft Word, Excel, AutoCAD compatible) copy of plans, contract
volume, cost estimate, bid tabulation, and record drawings. Records to include PDFs of
each plan sheet.
* These items will be provided for the well, pumphouse, and transmission main
phases/construction contracts of the project.
VII. DESIGNATION OF RESPONSIBLE PARTIES
The designated responsible parties representing the Client and Consultant, respectively, shall
have authority to transmit instructions, receive information, and render decisions relative to the
project on behalf of each respective party.
Overall coordination and project supervision for Consultant is the responsibility of Todd
Halvensleben, Project Manager. He, along with other personnel, shall provide the services
required for the various aspects of the project. Please direct all communications that have a
substantive impact on the project to Todd.
The Client designates Steve Cherek as its representative. Consultant shall direct all
communications that have a substantive impact on the project to that individual, and that
individual’s responses shall be binding on the Client.
April 8, 2025
Page 17 of 18
VIII. SUBCONSULTANTS
The following subconsultants will be used for the project. The costs for the subconsultants are
included in the Fees section below.
A. Architectural Design Consultants, Inc. – Building
IX. FEES
A. The fixed fees (unless noted as time & expense with an estimate as noted by “T&E”) to
provide the scope of services described herein is s ummarized as follows:
1. Task 1 - Preliminary Public Funding Investigation & Implementation Strategy . $1,500
2. Task 2 – Funding Applications & Administration ................................................... $8,500
3. Task 3 – Water Supply & Storage System Study .................................................. $25,300
4. Task 4 – Well Site Search & Well Site Investigation Report ................................. $15,000
5. Task 5 – Well Site Topographic Map ....................................................................... $3,000
6. Task 6 – Well Site CSM .............................................................................................. $3,000
7. Task 7 – Assist Client with Public Service Commission Water Rate Case (T&E) . $3,600
8. Task 8 – Test Well & Aquifer Performance Testing Re quest for Proposals .......... $3,600
9. Task 9 – Test Well & Aquifer Performance Testing Ad ministration (T&E) ............. $3,900
10. Task 10 – Production Well Design Phase .............................................................. $26,700
11. Task 11 – Production Well Bidding & Contract Award Phase (T&E) ................... $4,900
12. Task 12 – Production Well Contract Administration P hase (T&E) ...................... $10,600
13. Task 13 – Production Well Construction Observation (T&E) ................................. $6,700
14. Task 14 – Pumphouse Design & Well No. 1 Abandonment Phase ................... $86,000
15. Task 15 – Pumphouse Bidding & Contract Award Phase (T&E) .......................... $7,600
16. Task 16 – Pumphouse Contract Administration Phase ( T&E) ............................. $27,100
17. Task 17 – Pumphouse Construction Observation (T&E) ..................................... $13,800
18. Task 18 – Transmission Main Design ...................................................................... $39,000
19. Task 19 – Transmission Main Bidding & Contract Awar d (T&E) ............................ $4,900
20. Task 20 – Transmission Main Construction Administra tion (T&E) ........................ $10,600
21. Task 21 – Transmission Main Construction Observatio n (T&E) ........................... $18,500
TOTAL ...................................... $323,800
Task 10 includes the PWSC Well Facility Certificate of Authority – Type III Water Project (Construction
Authorization) required for the well and pumphouse construction.
B. These fees assume that the work will be completed w ithin the time frame set forth herein.
If significant delays to the project occur, which are not due to the negligence of the
Consultant including, by way of example and not lim itation, decisions of the Client,
regulatory approvals, deferrals to the next construction season or calendar year, etc.,
the Consultant reserves the right to negotiate and adjust an appropriate change to the
fees.
C. Reimbursable expenses are included in the above sta ted fees. When sub-consultants are
required, a 10% administrative charge has been incl uded.
April 8, 2025
Page 18 of 18
X. GENERAL TERMS AND CONDITIONS
The General Terms and Conditions dated 4-1-22 and attached hereto are incorporated herein
by reference.
We appreciate the opportunity to work with you on this project. If this Agreement is acceptable to you,
please sign the Authorization below and return one copy to our Madison office. Should you have any
questions or require any additional information, please feel free to contact me.
Sincerely,
Todd Halvensleben, PE
Project Manager
Enclosure: General Terms and Conditions
AUTHORIZATION TO PROCEED
In witness whereof, the parties have made and executed this Agreement as of the day and year written
below.
Client
Mr. Steve Cherek
Village of Marathon City
311 Walnut Street
Marathon City, WI 53448
Date
Consultant
Craig Mathews, PE, Principal
Vierbicher Associates, Inc.
201 E. Main Street, Suite 100
Reedsburg, Wisconsin 53959
April 8, 2025
Date
© Vierbicher Associates, Inc.
R:\Marathon City, Village of\250268 - Well No 5\Admin and Marketing\Proposal and Contracts\2025-04-08 Agreement-MarathonCityWellNo5.docx
Rev. 4-1-22
Page 1 of 4
(General Terms and Conditions)
VIERBICHER ASSOCIATES, INC. (CONSULTANT)
GENERAL TERMS AND CONDITIONS OF SERVICES
1. Services Not Provided as Part of This Agreement
Environmental studies, resident construction observation services,
archaeological investigations, soil borings, geotechnical
investigations, flood plain analysis, wetland delineations, public
hearing representation, easements, property descriptions or
surveys, negotiations for property rights acquisitions, and other
detailed studies or investigations, unless specifically identified in
this Agreement for Services, are not included as part of this work.
2. Hazardous Environmental Conditions
Unless specifically identified in this Agreement for Services, it is
acknowledged by both parties that Consultant’s scope of services
does not include any services related to the discovery, identification,
presence, handling, removal, transportation, or remediation at the
site, or the inspection and testing of hazardous materials, such as
asbestos, mold, lead paint, PCBs, petroleum, hazardous waste, or
radioactive materials. Client acknowledges that Consultant is
performing professional services for Client, and Consultant is not
and shall not be required to become an “arranger,” “operator,”
“generator” or “transporter” of hazardous substances as defined in
the Comprehensive Environmental Response, Compensation, and
Liability Act of 1990 (CERCLA). Client shall defend, indemnify and
hold Consultant harmless from and against any CERCLA-based
claims.
3. Additional Services
The Scope of Services in this Agreement is intended to cover
services normally required for this type of project. However,
occasionally events occur beyond the control of the Consultant or
the Client that create a need for additional services beyond those
required for a standard agreement.
The Consultant and/or Client shall promptly and in a timely manner
bring to the attention of the other the potential need to change the
Scope of Services set forth above, necessitated by a change in the
Scope of Project, Scope of Services, or the Schedule. When a
change in the Scope of Services, Schedule, or Fees is agreed to by
the Consultant and Client, it shall be initiated by written
authorization of both parties.
4. Client’s Responsibility
A. Provide Consultant with all criteria and full information as to
Client’s requirements for the project, including design
objectives and constraints, capacity and performance
requirements, flexibility, expandability, and any budgetary
limitations; furnish previous plans, studies and other
information relevant to the project; furnish copies of all design
and construction standards which Client will require to be
included in the drawings and specifications; and furnish copies
of Client’s standard forms, and conditions, including insurance
requirements and related documents for Consultant to include
in the bidding documents, or otherwise when applicable.
B. Furnish to Consultant any other information pertinent to the
project including reports and data relative to previous designs,
or investigations at or adjacent to the site, including hazardous
environmental conditions and other data such as reports,
investigations, actions or citations.
C. Consultant shall be entitled to rely, without liability, on the
accuracy and completeness of any and all information
provided by Client, Client’s Consultants and contractors, and
information from public records, without the need for
independent verification.
D. Arrange for safe access to and make all provisions for
Consultant to enter upon public and private property as
required for Consultant to perform services under this
Agreement.
E. Examine all alternate solu tions, studies, reports, sketches,
drawings, specifications, proposals, and other documents
presented by Consultant and render timely decisions
pertaining thereto.
F. For projects involving c onstruction, attend any pre-bid
conference, bid opening, pre-construction conferences,
construction progress and other job related meetings, and
substantial completion and final payment inspections.
G. For projects invo lving construction, if more than one prime
contract is to be awarded for the work designed or specified by
Consultant, designate a person or entity to have authority and
responsibility for coordinating the activities among the various
prime contractors, and define and set forth in writing the
duties, responsibilities, and limitations of authority of such
individual or entity and the relation thereof to the duties,
responsibilities, and authority of Consultant.
H. For projects involving c onstruction, retain a qualified
contractor, licensed in the jurisdiction of the Project to
implement the construction of the Project. In the construction
contract, Client shall require Contractor to: (1) obtain
Commercial General Liability Insurance and auto liability
insurance and name Client, Consultant, and Consultant’s
employees and subconsultants as additional insureds of those
policies; and (2) indemnify and hold harmless Client,
Consultant, and Consultant’s employees and subconsultants
from and against any and all claims, damages, losses, and
expenses (“Claims”), including but not limited to reasonable
attorneys’ fees and economic or consequential damages,
arising in whole or in part out of any act or omission of the
Contractor, any subcontractor, or anyone directly or indirectly
employed by any of them.
I. If Client designates a Construc tion Manager or Contractor or
an individual or entity other than, or in addition to, Consultant
to represent Client at the site, the Client shall define and set
forth in writing the duties, responsibilities, and limitations of
authority of such other party and the relation thereof to the
duties, responsibilities, and authority of Consultant as defined
in this Agreement.
J. Provide information relati ve to all concealed conditions,
subsurface conditions, soil conditions, as-built information, and
other site boundary conditions. Consultant shall be entitled to
rely upon the accuracy and completeness of such information.
If Client does not provide such information, Consultant shall
assume that no conditions exist that will negatively affect the
Scope of Services or Project and Client will be responsible for
extra costs and/or damages resulting from the same.
5. Additional General Considerations (for projects involving
construction)
A. Consultant shall not at any time have any responsibility to
supervise, direct, or have control over any contractor’s work,
nor shall Consultant have authority over or responsibility for
the means, methods, techniques, sequences, or procedures of
construction selected or used by any contractor, for safety
precautions and programs incident to a contractor’s work
progress, nor for any failure of any contractor to comply with
laws and regulations applicable to contractor’s work.
B. Consultant neither guarantees the performance of any
contractor nor assumes responsibility for any contractor’s
failure to furnish and perform its work in accordance with the
contract between Owner and such contractor.
C. Consultant shall not be responsib le for the acts or omissions of
any contractor, subcontractor or supplier, or of any contractor’s
agents or employees or any other persons (except
Consultant’s own employees) at the project site or otherwise
furnishing or performing any of construction work; or for any
decision made on interpretations or clarifications of the
Rev. 4-1-22
Page 2 of 4
(General Terms and Conditions)
construction contract given by Owner without consultation and
advice of Consultant.
6. Fees
A. The fees set forth in this Agreement are based on the
assumption that the work will be completed within the time
frame set forth herein. If significant delays to the project occur,
which are not due to the negligence of the Consultant, e.g.
decisions of the Client, regulatory approvals, deferrals to the
next construction season or calendar year, etc., the Consultant
reserves the right to negotiate and adjust an appropriate
change to the fees.
B. Consultant may submit invoices monthly for work completed to
date. Fixed fees will be submitted on the basis of percent of
the Scope of Services completed. Estimated fees will be
submitted on the basis of time and expense incurred in
accordance with Consultant’s fee schedule in effect at the time
the costs are incurred.
C. Invoices are due upon receipt. For invoices not paid after 30
days, interest will accrue at the rate of 1 ½% per month.
Payments will be credited first to interest and then to principal.
In the event any portion of the account remains unpaid after 90
days after the billing, Consultant may initiate collection action
and the Client shall be responsible for all costs of collection,
including reasonable attorneys’ fees. As a matter of business
practice, Consultant would intend to file lien rights against the
property if payment is not received before lien rights would
expire. Consultant shall have the right to suspend its services
without any liability arising out of or related to such suspension
in the event invoices are not paid within 30 days of receipt.
D. When estimates of fees or expenses are quoted, they are
simply that, estimates. Actual costs invoiced may be higher or
lower due to actual fees or expenses incurred. When fees or
expenses are anticipated to be higher or lower than estimated,
Consultant shall make every effort to inform Client in a timely
manner, even prior to incurring the costs, if possible.
E. Consultant will bill additional services, if requested, in
accordance with the fee schedule in effect at the time the work
is performed or as otherwise negotiated.
7. Sales Tax for Landscape Design Services
State and local sales tax will be applied to projects for Landscape
Design Services, where applicable. The sales tax will be reflected
on regular Client invoices. Should sales tax be imposed, they shall
be in addition to Consultant’s agreed upon compensation.
Those services subject to the sales tax will be identified in the
Agreement and on invoices sent to the Client.
Applicable sales tax will not be applied to projects for Landscape
Design Services if the Client provides a Tax Exempt Certificate.
8. Dispute Resolution
In the event a dispute shall develop between the Client and the
Consultant arising out of or related to this Agreement, the Client and
Consultant agree to use the following process to resolve the
dispute:
A. The Client and Consultant agree to first negotiate all disputes
between them in good faith for a period of at least 30 days
from notice first being served in writing to the Client or
Consultant of the dispute.
B. If the Client and Consultant ar e unable to resolve the dispute
by negotiation as described above, the Client and Consultant
agree to submit the dispute to non-binding mediation. Such
mediation shall be conducted in accordance with Construction
Industry Dispute Resolution procedures of the American
Arbitration Association.
C. If the Client and Consultant ar e unable to resolve the dispute
by negotiation or by mediation, they are free to utilize whatever
other legal remedies are available to settle the dispute subject
to the “Controlling Laws” section of these General Terms and
Conditions located below.
9. Insurance
A. Consultant
Consultant maintains general liability and property insurance;
vehicle liability; and workers’ compensation coverage meeting
state and federal mandates. Consultant also carries
professional liability insurance. Certificates of Insurance will be
provided upon written request.
B. Client
The Client shall procure and maintain, at its expense, general
liability, property insurance and, if appropriate, workers’
compensation and builders risk insurance. Client waives all
claims against the Consultant arising out of losses or damages
to the extent such losses or damages are covered by the
foregoing insurance policies maintained by the Client.
C. Contractor
For projects involving construction, Contractor shall procure,
as directed by the Client and/or as provided in the
specifications or general conditions of the contract for
construction, Certificates of Insurance for the type and
amounts as directed by the Client, and shall require the
Contractor to name the Client and Consultant as an additional
insured under the Contractor’s general and auto liability
policies as defined in 4.H. above.
10. Limitations of Liability/Indemnity
A. Definitions:
1) Contract Administration. Contract Administration includes
services related to construction as outlined in the
Agreement. These services may include Construction
Staking, Construction Observation, and/or Administration
of the Construction Contract between the Owner and
Contractor.
2) Construction Documents. Documents (plans, and/or
specifications) conveying a design intent, used by a
qualified, capable Contractor for construction of a project.
B. Limitation of Liability
In recognition of the relative risks, rewards and benefits of
different types of projects to both the Client and Consultant,
the risks have been allocated such that the Client agrees to
the following depending upon the services outlined in the
Agreement.
1) For Agreements that include Contract Administration or
the development of construction documents with Contract
Administration:
The Consultant, Consultant’s subconsultants (if any), and
their agents or employees shall not be jointly, severally,
or individually liable to Client for any and all injuries,
damages, claims, losses or expenses arising out of this
Agreement from any cause or causes in excess of the
available limits of Consultant’s professional liability
insurance policy. Such causes include, but are not limited
to, Consultant’s negligence, errors, omissions, strict
liability, or breach of Agreement.
2) For Agreements that include the development of
construction documents but do not include Contract
Administration services as outlined in the Agreement:
Rev. 4-1-22
Page 3 of 4
(General Terms and Conditions)
The Consultant, Consultant’s subconsultants (if any), and
their agents or employees shall not be jointly, severally,
or individually liable to Client for any and all injuries,
damages, claims, losses or expenses arising out of this
Agreement from any cause or causes in excess of five
times the fee received by the Consultant, not including
reimbursable subconsultant fees and expenses, or the
available limits of Consultant’s professional liability
insurance policy, whichever is less. Such causes include,
but are not limited to, Consultant’s negligence, errors,
omissions, strict liability or breach of Agreement.
3) For Agreements that do not include the development of
construction documents or Contract Administration
services as outlined in the Agreement:
The Consultant, Consultant’s subconsultants (if any), and
their agents or employees shall not be jointly, severally,
or individually liable to Client for any and all injuries,
damages, claims, losses or expenses arising out of this
Agreement from any cause or causes in excess of two
times the fee received by the Consultant, not including
reimbursable subconsultant fees and expenses, or the
available limits of Consultant’s professional liability
insurance policy, whichever is less. Such causes include,
but are not limited to, Consultant’s negligence, errors,
omissions, strict liability or breach of Agreement.
C. Client and Consultant each agree to indemnify and hold the
other harmless, and their respective officers and employees
from and against liability for losses, damages and expenses,
including reasonable attorneys’ fees recoverable under
applicable law, to the extent they are caused by the
indemnifying party’s negligent acts, errors or omissions. In the
event claims, losses, damages or expenses are caused by the
joint or concurrent negligence of Client and Consultant, they
shall be borne by each party in proportion to its negligence
(whether sole, concurrent, or contributory). Neither Client nor
Consultant shall have a duty to provide the other an up-front
defense of any claim.
D. Nothing in this Agreement shall be construed to create,
impose, or give rise to any duty owed by Client or Consultant
to any contractor, subcontractor, supplier, other individual or
entity, or to any surety for or employee or any of them.
All duties and responsibilities undertaken pursuant to this
Agreement will be for the sole and exclusive benefit of Client
and Consultant and not for the benefit of any other party.
11. Betterment
If any item or component of the Project is required due to the
omission from the construction documents, Consultant’s liability
shall be limited to the reasonable costs of correction of the
construction, less the cost to Client if the omitted component had
been initially included in the contract documents. All costs of errors,
omissions, or other changes that result in betterment to the Project
shall be borne by Client and shall not be a basis of claim against
Consultant. It is intended by this provision that Consultant will not
be responsible for any cost or expense that provides betterment,
upgrade, added value, or enhancement of the Project.
12. Use of Documents
All documents prepared or furnished by Consultant pursuant to this
Agreement are instruments of Consultant’s professional service,
and Consultant shall retain an ownership and property interest
therein, including all copyrights. Consultant grants Client a license
to use instruments of Consultant’s professional service for the
purpose of planning, constructing, occupying or maintaining the
project or as otherwise intended. Reuse or modification of any such
documents by Client, without Consultant’s written permission and
professional involvement in the applicable reuse or modification,
shall be at Client’s sole risk, and Client agrees to waive all claims
against and defend, indemnify and hold Consultant harmless from
all claims, damages and expenses, including attorneys’ fees, arising
out of such reuse by Client or by others acting through Client.
13. Survey Stakes for Construction (for projects involving
construction)
Stakes placed by Consultant for use by the Contractor shall only be
used for the specific purpose indicated. Any use of stakes by the
Client for purposes other than indicated and/or communicated by
the Consultant, without Consultant’s written permission, shall be at
Client’s sole risk, and Client agrees to indemnify and hold
Consultant harmless for all claims, damages and expense, including
attorneys’ fees, arising out of such unauthorized use by Client or
others acting through Client.
14. Use of Electronic Media
Copies of documents that may be relied upon by Client are limited
to the printed copies (also known as hard copies) that are signed or
sealed by Consultant except for electronic copies of documents
available for printing by contractors during bidding and/or
construction from QuestCDN.com or as specified in this Agreement
for Services or as specifically indicated in writing by Consultant.
Files in electronic formats, or other types of information furnished by
Consultant to Client such as text, data or graphics, are only for
convenience of Client. Any conclusion or information obtained or
derived from such electronic files will be at the user’s sole risk.
When transferring documents in electronic formats, Consultant
makes no representations as to long-term compatibility, usability, or
readability of documents resulting from the use of software
application packages, operating systems or computer hardware
differing from those in use by Consultant at the beginning of the
project.
15. Opinions of Cost
When included in Consultant’s scope of services, opinions or
estimates of probable construction cost are prepared on the basis of
Consultant’s experience and qualifications and represent
Consultant’s judgment as a professional generally familiar with the
industry. However, since Consultant has no control over the cost of
labor, materials, equipment or services furnished by others, over
contractor’s methods of determining prices, or over competitive
bidding or market conditions, Consultant cannot and does not
warrant or guarantee that proposals, bids, or the actual construction
cost will not vary from Consultant’s opinions or estimates of
probable construction cost.
16. Approvals
Client acknowledges that the approval process necessary to
estimate or maintain a project timeline is both unpredictable and
outside the Consultant’s control. Consultant does not guarantee
reviews or approvals by any governing authority or outside agency,
nor the ability to achieve or maintain any project timeline.
17. Certifications
Consultant shall not be required to sign any documents, no matter
by whom requested, that would result in Consultant’s having to
certify, quantity, or warrant the existence of conditions that
Consultant cannot ascertain or otherwise represent information or
knowledge inconsistent with Consultant’s scope of services for the
Project.
18. Third Parties
Nothing contained in this Agreement shall create a contractual
relationship with, or a cause of action in favor of, a third party
against either the Client or Consultant. Consultant’s services
hereunder are being performed solely for the benefit of the Client,
and no other entity shall have any claims against Consultant
because of this Agreement or Consultant’s performance of services
hereunder.
Rev. 4-1-22
Page 4 of 4
(General Terms and Conditions)
19. No Express or Implied Warranty
Consultant makes no representation nor does consultant extend
any warranty of any kind, either express or implied, to client with
respect to this agreement or the project and hereby disclaims all
implied warranties of merchantability, fitness for a particular
purpose, or noninfringement of the intellectual property rights of
third parties with respect to any and all of the foregoing.
20. Damages Waiver
In no event shall consultant be liable to client, or anyone, for any
consequential, incidental, indirect, special, punitive, or exemplary
damages including, without limitation, loss of use, lost income, lost
profits, loss of reputation, unrealized savings, diminution in property
value, cost of replacement, business or goodwill, suffered or
incurred by such other party in connection with the this agreement
or the project, arising out of any and all claims including, but not
limited to, tort, strict liability, statutory, breach of contract, and
breach of express and implied warranty claims (should it be
determined that such warranty claims survive the disclaimers set
forth in this agreement).
21. Standard of Care
The Standard of Care for all professional services performed or
furnished by Consultant under this Agreement shall be the skill and
care used by members of Consultant’s profession practicing under
similar circumstances or similar scope of services at the same time
and in the same locality.
22. Termination
The obligation to provide further services under this Agreement may
be terminated:
A. For Cause
1) By either party upon 30 days written notice in the event of
substantial failure by the other party to perform in
accordance with the terms hereof, through no fault of the
terminating party. The failing party shall have the right,
within 30 days, to correct or remedy the cited failures.
2) By Consultant
a) Upon seven days written notice if Consultant
believes that he is being requested by Client to
furnish or perform services contrary to Consultant’s
responsibilities as a licensed professional.
Consultant shall have no liability to Client on account
of such termination.
b) Upon seven days written notice if the Consultant’s
services for the project are delayed or suspended for
more than 90 days for reasons beyond Consultant’s
control.
c) Upon seven days written notice if the Client has
failed to pay for previous services rendered and/or if
his account is more than 60 days past due.
B. To Discontinue Project
By Client effective upon the receipt of notice by Consultant.
C. Reimbursement for Services
Consultant shall be reimbursed for all services and expenses
rightfully incurred prior to termination.
23. Force Majeure/Project Schedule
Neither party shall be deemed in default of this Agreement to the
extent that any delay or failure in the performance of its obligations
results from any cause beyond its reasonable control and without its
negligence. . In the event Consultant is hindered, delayed, or
prevented from performing its obligations under this Agreement as a
result of any cause beyond its reasonable control, including but not
limited to delays due to power or data system outages, acts of
nature, public health emergencies including but not limited to
infectious disease outbreaks and pandemics, governmental orders
or directives, failure of any governmental or other regulatory
authority to act in a timely manner, failure of the Client to furnish
timely information or approve or review Consultant’s services or
design documents, or delays caused by faulty performance by
Client’s contractors or consultants, the time for completion of
Consultant’s services shall be extended by the period of resulting
delay and compensation equitably adjusted. Client agrees that
Consultant shall not be responsible for damages, nor shall the
Consultant be deemed in default of this Agreement due to such
delays.
24. Successors, Assigns and Beneficiaries
A. Client and Consultant each is hereby bound and the partners,
successors, executors, administrators and legal
representatives of Client and Consultant are hereby bound to
the other party by this Agreement and to the partners,
successors, executors, administrators and legal
representatives (and said assigns) of such other party, in
respect of all covenants, agreements and obligations of this
Agreement.
B. Neither Client nor Consultant may assign, sublet, or transfer
any rights under or interest (including, but without limitation,
moneys that are due or may become due) in this Agreement
without the written consent of the other, except to the extent
that any assignment, subletting, or transfer is mandated or
restricted by law. Unless specifically stated to the contrary in
any written consent to an assignment, no assignment will
release or discharge the assignor from any duty of responsibility
under this Agreement.
25. Municipal Financial Advisor Services
The Consultant is not registered with the Securities and Exchange
Commission as a municipal advisor. Consultant does not perform
municipal advisory services (as covered under the Dodd-Frank Wall
Street Reform and Consumer Protection Act, signed into law on
July 21, 2010, as it relates to financial products and services). In the
event Client desires such services, it is the Client’s responsibility to
retain an independent registered advisor for that purpose.
26. Controlling Laws
This Agreement is to be governed by the laws of the state in which
the project is located and in force at the time of completion of
deliverables.
27. Entire Agreement
These General Terms and Conditions and the accompanying
Agreement constitute the full and complete Agreement between
Client and Consultant and supersedes all prior understandings and
agreements between the parties and may be changed, amended,
added to, superseded, or waived only if Client and Consultant
specifically agree in writing to such amendment of the Agreement.
There are no promises, agreements, conditions, undertakings,
warranties, or representations, oral or written, express or implied,
between the parties other than as set forth in these General Terms
and Conditions and accompanying Agreement. In the event of any
inconsistency between these General Terms and Conditions, the
proposal, Agreement, purchase order, requisition, notice to
proceed, or like document, these General Term and Conditions
shall govern.
28. Authority
The person signing the accompanying agreement acknowledges that
if the person is signing in a ca pacity other than individually, the
execution and delivery of this document has been duly authorized
and the member, owner, officer, partner or other representative who
is executing this document have the full power, authority and right to
do so, and that such execution is sufficient and legally binding on the
entity on whose behalf this document is signed, to enable the
document to be enforceable in accord with its terms.
Source: City of Marathon City website. First collected Oct 17, 2026.