6:00 p.m. Regular Meeting of the Plan Commission
Village of Weston · Marathon County · meeting of Oct 12, 2026 · Agendas
Open the original document More from Village of Weston
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Village of Weston, Wisconsin
Meeting of the PLAN COMMISSION
During the 30th legislative session of the elected
Board of Trustees (2026 – 2027)
Monday, October 12, 2026, at 6:00 P.M.
Packet Prepared By: Jennif er Higgins, Director of Planning & Development
Village of Weston, Wisconsin
MEETING NOTICE
Meeting of: PLAN COMMISSION
Commissioners: Lopes-Serrao {c}, Zeyghami {vc}, Cronin, Diesen, Guerndt, Jordan, Mumper
Staff: Jennifer Higgins, Director of Planning & Development
Audrey Webster, Assistant Planner
Date/Time: Monday, October 12, 2026, 6:00 p.m.
Location: Weston Municipal Center (4747 Camp Phillips Road) – Board Room
Agenda: The agenda packet will be sent out at least 3 days prior to the meeting.
Attendance: All Village officials are encouraged to attend. Commissioners, Committee
members, Department Directors, and guests, please indicate if you will, or
will not, be attending so we may determine in advance if there will be a
quorum by sending an RSVP to the assigned Administrative Support
person:
RSVP: Valerie Parker, Plan Commission Secretary
(715) 241-2613
vparker@westonwi.gov
Questions: Jennifer Higgins, Director of Planning & Development
(715) 241-2638
jhiggins@westonwi.gov
This notice was posted at the Municipal Center, 4747 Camp Phillips Road, Weston and was e-
mailed to local media outlets (Print, TV, and Radio) on 10/05/2026.
A quorum of members from other Village governmental bodies (boards, commissions, and committees) may attend the above-noticed meeting in order
to gather information. No actions will be taken by any other board, commission, or committee of the Village, aside from the Village Plan Commission.
Should a quorum of other government bodies be present, this would constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173
Wis.2d 553,494 N.W.2d 408 (1993).
Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in final form, 24 hours prior to the meeting. Any
posted agenda is subject to change up to 24 hours prior to the date and time of the meeting. All final agendas will be posted on the Village’s website at
www.westonwi.gov and a hard copy posted at the Village Municipal Center.
Any person who has a qualifying disability, as defined by the Americans with Disabilities Act, that requires the meeting or the materials to be in an
accessible location or format, must contact the Weston Clerk’s Department, by 12 noon, the Friday prior to the meeting, so any necessary arrangements
can be made to accommodate each request.
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
REGULAR MEETING AGENDA OF THE PLAN COMMISSION
Weston Municipal Center - Board Room
4747 Camp Phillips Road, Weston, WI 54476
Regular Plan Commission Meeting Agenda, October 12, 2026
Prepared by Jennifer Higgins, Director of Planning and Development
Monday, October 12, 2026, at 6:00 p.m.
Remote Participation & Public Comment Instructions
Members of the Plan Commission, applicants, and members of the public may participate remotely by Zoom or telephone.
Members of the public may provide comments in advance using the Public Comment Form or may participate live as
described below.
Join Zoom Meeting by Computer:
https://zoom.us/j/5445915099
Join Zoom Meeting by Phone:
+1 312 626 6799 US (Chicago)
Meeting ID: 544 591 5099
Public Comment:
Members of the public who wish to speak during the meeting—either during the Public Comment period or a specific hearing—
may do so in one of two ways:
1. Submit a Public Comment Form in advance: Complete the Public Comment form (external web link) and submit it to the
Clerk before the start of the meeting.
2. Participate live via Zoom or telephone: Join the meeting using one of the methods above. Zoom participants may
use the “Raise Hand” feature to be recognized by the Chair. Telephone participants may press *9 to raise their hand.
Please note: The public-comment period is an opportunity to provide information or viewpoints to the Commission; it is not
intended for debate or extended dialogue with commissioners.
1. Call to Order – Roll Call & Declaration of Quorum
• Plan Commission – Lopes-Serrao {C}, Zeyghami {VC}, Cronin, Diesen, Guerndt,
Jordan, Mumper
2. Public comment on Village matters not scheduled for a public hearing on this
agenda.
3. Receive written communications and allow commissioners to disclose potential
conflicts of interest or recusals.
a. Email from Jacob Wildeck regarding USSAM, 3107 Concord Avenue – CUP No.
20240072
4. Consider approval of the minutes from the September 14, 2026, Plan Commission
meeting.
5. C
onduct a public hearing and consider action on Project No. 20260333, a request by
U.S. Venture, Inc. for a Conditional Use Permit to operate a freight terminal and
mass transportation depot in the LI (Limited Industrial) District and to approve the
motor freight terminal use within the WHP-A Wellhead Protection Area Overlay
District at 6002 Saxon Avenue.
a. Open the public hearing
b. Receive the staff presentation
c. Receive the applicant presentation
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
REGULAR MEETING AGENDA OF THE PLAN COMMISSION
Weston Municipal Center - Board Room
4747 Camp Phillips Road, Weston, WI 54476
Regular Plan Commission Meeting Agenda, October 12, 2026
Prepared by Jennifer Higgins, Director of Planning and Development
d. Receive public testimony
e. Close the public hearing
f. Discuss and consider action on the request
6. C
onduct a public hearing and consider action on Project No. 20230129, a request by
BUG Properties, LLC to amend Conditional Use Permit No. 20230129 by extending
the deadline for completion of required site improvements at 6406 Schofield Avenue.
a. Open the public hearing
b. Receive the staff presentation
c. Receive the applicant presentation
d. Receive public testimony
e. Close the public hearing
f. Discuss and consider action on the request
7. Review and consider action on Project No. 20260308, a Special Exception Sign
Permit request for Turf MDs at 5605 Mesker Street.
8. Review proposed modifications to the approved site plan for the Mountain Bay
Metropolitan Police Department, Project No. 20260116, at 3600 Community Center
Drive, and consider recommending conditional authorization for staff to issue an
early-start permit for footings and foundation following verification of applicable
building setbacks and satisfaction of all other requirements.
9. Receive the September 2026 report of staff-approved Certified Survey Maps and
site plans.
10. Receive the September 2026 building permit report.
11. R
eceive the Planning and Development Department monthly project update report.
a. Update on USSAM, 3107 Concord Avenue – CUP No. 20240072
b. Update on Tommy Car Wash, 1611 Schofield Avenue – CUP No. 20191300
12. Announcements & Commissioner Remarks
a. S
haping Weston’s Tomorrow: Public Comprehensive Plan Workshop –
Thursday, November 12, 2026, 5:00 p.m. – 7:00 p.m.
13. F
uture Agenda Items or Staff Referrals
14. Next Meeting Dates
a. Regular Meeting: Monday, November 9, 2026, at 6:00 p.m.
b. Regular Meeting: Monday, December 14, 2026, at 6:00 p.m.
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
REGULAR MEETING AGENDA OF THE PLAN COMMISSION
Weston Municipal Center - Board Room
4747 Camp Phillips Road, Weston, WI 54476
Regular Plan Commission Meeting Agenda, October 12, 2026
Prepared by Jennifer Higgins, Director of Planning and Development
15. Consider a motion to adjourn.
A quorum of members of another Village board, commission, or committee may attend this meeting to gather information. If a
quorum of another governmental body is present, the gathering may constitute a meeting of that body under State ex rel. Badke v.
Greendale Village Board, 173 Wis. 2d 553, 494 N.W.2d 408 (1993). No action will be taken by any governmental body other than the
Plan Commission.
In accordance with Title II of the Americans with Disabilities Act, the Village of Weston does not discriminate against qualified
individuals with disabilities in its services, programs, or activities. To request assistance or a reasonable accommodation to
participate in this meeting, contact the Village Clerk at 715-359-6114 or clerks@westonwi.gov. Please submit requests at least 72
hours before the meeting. The Village will make a good-faith effort to accommodate requests received less than 72 hours before the
meeting.
This agenda was posted at the Weston Municipal Center and on the Village website and was transmitted to media partners on
October 7, 2026. Questions may be directed to the Planning and Development Department at 715-241-2613 or
plandev@westonwi.gov.
Outlook
Re: USSAM Storage
FromJacob Wildeck <jwild109@gmail.com>
Date Mon 9/21/2026 7:41 PM
To Jennifer Higgins <jhiggins@westonwi.gov>
1 attachment (2 MB)
USSAM Pics.docx;
Hi Jennifer,
Could you please forward this on to the Plan Commission and anyone else that you see fit? I would be
more than willing to answer any questions about the info and pics I've supplied so far. If there's a
meeting I could attend in the future regarding this, please let me know. Thanks,
Jake Wildeck
715-370-5667
On Fri, Sep 18, 2026 at 11:49 AM Jennifer Higgins <jhiggins@westonwi.gov> wrote:
Hi Jake,
Thanks for reaching out. I know there was a lot of discussion at the meeting, so I appreciate you taking
the time to stay involved. Based on the direction from the Plan Commission, Steve Meinel has been
asked to provide additional site information (better site plan) so the Commission has a clearer
understanding of the existing conditions on the property. Staff is currently anticipating that the item
will come back to the Plan Commission for a public hearing and further discussion.
One of the issues the Plan Commission is expected to discuss further is the greenspace setback along
the southern property line. The goal is to establish a clear setback requirement so everyone
understands what the standard is moving forward.
If there is any information, documentation, or perspective you would like the Plan Commission to
consider, please feel free to send it to me. While I am not requesting anything specific from you at this
time, I would be happy to include any information you believe would be helpful as part of the review
process.
Thanks again for your interest in the project, and don't hesitate to reach out if you have any questions.
Jennifer Higgins
Director of Planning & Development
Village of Weston
From: Jacob Wildeck <jwild109@gmail.com>
Sent: Thursday, September 17, 2026 3:22 PM
To: Jennifer Higgins <jhiggins@westonwi.gov>
Subject: Re: USSAM Storage
Hi Jennifer,
Thanks for covering the USSAM topics on Monday’s meeting. I was trying to follow along with what
was being discussed, but there was a lot being talked about. Is there another meeting coming up
soon that I should mark on my calendar to attend? Or any info I should work on putting together to
discuss at another meeting? Thanks,
Jake Wildeck
715-370-5667
> On Sep 13, 2026, at 8:08 PM, Jacob Wildeck <jwild109@gmail.com> wrote:
>
>
> Hi Jennifer,
>
> I plan to be available online for the meeting, but I won't be able to make it in person. Would you
please submit the attached letter to the meeting agenda so it can be read? Thank you,
>
> Jake Wildeck
> <USSAM Storage - Zoning 2026.docx>
USSAM Pics
August 2, 2026
Sept. 12, 2026
July 24, 2026
July 24, 2026
*New gravel improvements added
behind Acorn Apartments the week of
August 14th, 2026
* Left pic is behind Wildeck Dev.
& right pic is behind Acorn Apts.
August 14, 2026 August 14, 2026
* Left pic is behind Wildeck Dev.
& right pic is behind Acorn Apts.
*** The camper on the end with the lighter colored gravel is in the large Greenspace area
directly north of Wildeck Development that had roughly 55’ of Greenspace (north to south)
prior to the gravel improvements. The Greenspace area and Seasonal Outdoor Storage areas
directly north of Acorn Apartments would typically have a 25’ setback of greenspace from the
property line, but the recently added gravel improvements and railroad ties are roughly 12’
from the property line (it was unmaintained grass prior to the week of August 14
th, 2026).
Valerie Parker updated @ 9/15/2026 3:42 PM Page 1 Mtg_BOT_260921_Consent_Minutes_PC260914.docx60914
Village of Weston, Wisconsin
OFFICIAL PROCEEDINGS OF THE VILLAGE PLAN COMMISSION MEETING
held on Monday, September 14, 2026, at 6:00 p.m., in the Board Room, at 4747 Camp Phillips Road
AGENDA ITEMS.
1. Meeting called to order by Plan Commission Chair and Village Trustee Luis Lopes-Serrao at 6:16 p.m.
Roll Call of Village Plan Commission (PC) by Secretary Parker.
Roll call indicated 6 PC members present.
Member Present
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary ABSENT
Jordan, Joe YES
Mumper, Roy YES
Village Staff in attendance, in-person: Gebert, Higgins, Wodalski, Maguire, Webster, Meverden, and Parker
Village Staff in attendance, via Zoom: None
Other Village Representatives in attendance, in-person: SAFER Fire Marshall, Christiansen.
Other Village Representatives in attendance, via Zoom: Village Trustee, Lisa Beck.
Audience Members in attendance, in-person: There were 3 audience member present, in-person.
Audience Members in attendance, via Zoom: There were 2 audience member present, via Zoom.
2. Open Public Comment Period for items that do not appear on this agenda noted as public hearings. [0:00:40 Zoom
Recording]
Jim Pinsonneault, 5002 Arrow Street, was present regarding Agenda Item #7 and questioned the different procedural
handlings of the three different Conditional Use Permits. Pinsonneault also requested any Commissioner present who
has association with any of the businesses (Agenda Item #7) to declare it and recuse themselves.
3. Written Communications, Disclosures, and Recusals. [0:4:08 Zoom Meeting Recording]
Jake Wildeck, 9508 Sandhill Drive, who owns the duplex addressed as 3014-3016 Ross Avenue (located directly south of
the USSAM property), was present via Zoom, and read his (attached) written communication.
4. Minutes from August 10, 2026, PC Meeting. [0:09:08 Zoom Recording]
Motion by Diesen, second by Cronin: to approve the August 10, 2026, PC meeting minutes.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 9/15/2026 3:42 PM Page 2 Mtg_BOT_260921_Consent_Minutes_PC260914.docx60914
5. Project #202600315 – Preliminary Condominium Plat Review for 4603, 4605, 4607, 4609, 4611, and 4613 Camp
Phillips Road [0:09:25 Zoom Meeting Recording]
Higgins stated this request is for a condominium plat for the existing multi-building property, currently owned by the
Bender family. She stated that Lokre Development is proposing to purchase the overall property and establish this then
as a four-unit condominium plat with common and limited elements. She explained how under Chapter 74, the
preliminary and final condominium plat review stages can be combined. Staff is requesting Plan Commission to review
and make a recommendation to the Board of Trustees, with the 8 conditions as outlined in the staff report. She pointed
out that prior to this meeting, she received an email from the applicant and how they are calling this the Camp Phillips
Condominium Plat. She stated that their attorney will have the condo documents to her by tomorrow so that she will
have them and the final plat for the Board meeting.
Nathan Wincentson, Riverside Land Surveying, 5310 Willow Street, was present, representing the surveying company for
the applicant. He explained the land uses here will not be changing and how the road and storm water pond will be
common elements and will share in the maintenance costs. He commented any wells or septic systems will be owned
by each condo unit owner.
Motion by Diesen, second by Jordan, to recommend to the Board of Trustees approval of the Preliminary
Condominium Plat for the property located at 4603, 4605, 4607, 4609, 4611, and 4613 Camp Phillips Road, submitted
by Lokre Development and Riverside Land Surveying, subject to the 8 conditions outlined in the staff report.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
6. Project #202502424 – Amendment to Final Plat of Bull Junior View Subdivision (Reedy Builders/Vreeland) [0:13:38
Zoom Meeting Recording]
Higgins explained this request is for an amended final plat, due to WI DNR requesting they add a public easement on the
plat for public access to the Bull Junior Creek. She explained that two lots are affected, as they are being made slightly
smaller to allow for this 60 ft access. She stated that those two lots still meet lot size requirements.
Motion by Diesen, second by Mumper: to recommend to the Village Board of Trustees approval of the amended Final
Plat for Bull Junior View Subdivision (Project #20250424), submitted by Reedy Builders and Vreeland Land Surveying,
subject to the conditions outlined in the staff report.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Valerie Parker updated @ 9/15/2026 3:42 PM Page 3 Mtg_BOT_260921_Consent_Minutes_PC260914.docx60914
7. Discussion and possible action regarding compliance with approved Conditional Use Permits [0:16:47 Zoom
Meeting Recording]
Pursuant to Section 94.16.06(11) of the Village of Weston Zoning Code, discussion regarding identified violations of the
approved Conditional Use Permits and consideration of how to proceed through possible modification, revocation, or
other appropriate action for the properties listed below:
Higgins stated that there is a process we have to work through when there are potential compliance issues with issued
Conditional Use Permits (CUP’s). She said these compliance issues need to be brought through the Plan Commission (as
far as modification or possible revocation), as Plan Commission is the body who hears and takes action on the CUP
requests, and would need to hold any modification or revocation hearings needed.
Higgins explained how each of the below situations are a little different and unique, and how staff has provided a few
different avenues for each of them for Plan Commission to consider. She explained that Plan Commission could direct
staff to bring all 3 of these back in for public hearings to get the applicants back in the room to discuss these further and
to determine if any of these need to be modified or revoked.
Higgins explained that what we are discussing tonight is not a public hearing, but a way to find out from Plan
Commission where they want to go with these after hearing from staff what the compliance issues are.
a. USSAM, 3107 Concord Avenue – CUP No. 20240072 [0:17:30 Zoom Meeting Recording]
Higgins stated this item was brought to staff’s attention following a complaint received by the neighboring property
owner, Jacob Wildeck, along with photos and other documentation provided by him, which was then followed up by
additional photos taken by Maguire. Higgins explained that staff had identified outdoor storage of RV’s, campers, boats,
and trailers within the area designated at green space (on the approved and recorded CUP). She explained that a notice
of violation was issued to USSAM property owner, Steve Meinel, on July 22, 2026, with a compliance deadline of August
21, 2026. She explained the property was not brought into compliance and it appeared that additional gravel was
subsequently placed within the greenspace. Staff is now requesting Plan Commission determine if the property is not
currently in compliance with the approved CUP and direct staff to commence proceedings under Section 94.60.11(c), to
consider modification or revocation of the CUP.
Higgins stated that the site plan that was originally submitted with the CUP should have included dimensions which
would have allowed staff to be able to identify what area was actually required to remain in green space.
Steve Meinel, 8303 Alderson Street, was present in the audience. He handed out a historical document (attached) and
explained how this has been discussed going back to 2011. He stated how USSAM has been around for 30 years and has
always operated as a storage facility. He pointed out the original zoning being “M-1”. He stated how through
discussions in 2024, there was an agreement reached and approved before Plan Commission. He stated that no changes
have been made to the USSAM operations. He stated the previously submitted colored map shows about 8 – 10 feet of
greenspace along the southern fence, with outdoor storage on the north side of that 8-foot line. He stated when this
was all approved in 2024, all the containers were already there, and have not been moved since. He stated it would be
extremely difficult to move those containers. He explained how they recently used weed and crabgrass killer on the
already existing parking area. He plans to place railroad ties parallel to the fence to assure that trailers, vehicles, and
campers are not encroaching. Meinel also stated that as far as Wildeck’s claim on tenants hearing tarps flapping in the
wind, there is nothing covered like that, where it must have been heard from somewhere else.
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 9/15/2026 3:42 PM Page 4 Mtg_BOT_260921_Consent_Minutes_PC260914.docx60914
Higgins stated along the southern lot line we are not concerned about the east side, and how the issues all occurred
along the west side, where the greenspace area is supposed to be located per the CUP. She stated we received the
complaint that there were additional trailers starting to park there, which a letter was then sent. She stated that
Meinel may have done maintenance, but it appeared from staff that he also expanded the parking area by adding
additional gravel to this site area and without a dimension staff is unable to determine if he is or is not in compliance
with the CUP.
Maguire stated that per the 2020 County aerial, nothing was stored along the south property line, as that area appeared
to have been used for snow storage. Staff just needs to know what we are enforcing. This all stemmed from a
complaint, which we are attempting to follow up on.
Maguire further explained the history of this site when reviewing 2020 aerial photography with the approved drawn up
site plan, which showed the orange area as seasonal outdoor storage. From what staff can see, it appears that there is
parking occurring on the green space and that the gravel area has been expanded.
Jordan explained that he has been involved in this site since back in the day when the containers were moved from the
Log Cabin to this site. He stated back then, gravel was added to the entire site right up to the property line. He stated
the reason there is greenspace there was due to the water runoff issue Wildeck was having from the USSAM site onto
his duplex site. Jordan stated that particular water runoff issue was an unusual incident, but the greenspace was added
to help absorb some of the water before it ran down the hill to Wildeck’s. Jordan stated there was never any actual
topsoil added. He stated that it was gravel up to the property line and how grass was essentially allowed to grow
through that area to help with runoff. Jordan stated it was never his intention to limit the amount of square footage
Meinel could use to park vehicles, etc. He stated though, whatever the setback would have been should be observed.
He stated that where the parking is occurring is all within the fence. He stated he is not aware of what the distance of
the fence is to the property line. Maguire stated we would need a certified surveyor to determine that. Jordan
reiterated that the primary intent with the CUP was to control any potential run-off onto Wildeck’s property and is
thinking that with the current Concord Avenue road project going on, the water runoff issues may get resolved where
there would be less chances of the drainage issues.
Wodalski stated that there will be improvements made to the drainage, but how he is not sure exactly where the
breaking point is.
Cronin stated how the previously submitted (color coded) site plan is a poor representation as it provides no setbacks.
Cronin also pointed to the timeline of approvals, which spanned over several years. Higgins pointed to the 5 conditions
that were part of the original motion, back in 2024. Higgins stated this map is what was approved by Plan Commission,
which is very subjective when trying to determine how far things are supposed to be set back.
Mumper commented how the issue we have comes back to water runoff. Higgins stated that now this is a greenspace
issue. Mumper questioned if between the two owners, if a berm was put in, if it would clear up the issues here.
Lopes-Serrao confirmed that tonight, we are trying to determine if there is a violation here, and how there is language
that states one thing and a map that depicts something else.
Higgins stated PC can modify a CUP, as there are cases where situations change on properties. Higgins explained what
the normal required buffer yard would be when a residential property is adjacent the industrial zoned area. Higgins
stated, however, in order to modify the CUP, we have to go through the public hearing process again. She stated if PC is
okay with the way things are, then this issue stops here. Higgins stated how staff is unable to help either Meinel or
Wildeck in this case unless we have actual defined setback numbers to work from. Higgins stated that staff needs some
Valerie Parker updated @ 9/15/2026 3:42 PM Page 5 Mtg_BOT_260921_Consent_Minutes_PC260914.docx60914
direction from PC on how they want this issue handled. She pointed out how staff is not suggesting PC revoke Meinel’s
CUP.
After further discussion, it was agreed that this CUP should be re-opened before PC at an upcoming meeting.
It was confirmed that the complaint staff received was based on campers being parked up against the fence, not on the
water runoff.
It was discussed that normally, we would have a numerical setback noted on the site plan, which would give staff
something to measure from. She stated that when an industrial site abuts residential, the requirement is for a 25-foot
buffer setback. In this case, we are just trying to establish what the setback would have been so we have something to
reference.
Higgins explained that as far as the motion, PC can simply state that we are opening this back up so that we can try to
determine compliance.
Motion by Cronin, second by Diesen: to direct staff to commence proceedings, pursuant to Section 94.16.06 (11)(c), to
consider modification or revocation of CUP #20240072, and to direct staff to schedule the required public hearing and
provide notice in accordance with Sections 94.16.06(5) and (6). Q: Gebert commented that a goal would be for
Meinel to work with staff to get information before the next meeting. Cronin stated it would be helpful to see a plan
with some actual numbers. It was agreed that if an agreement between Meinel and Wildeck could be figured out to
satisfy the complaint then no modification may be needed. Wodalski stated a dimension (setback) is really important
to have, where the two owners come to some sort of agreement or not. Higgins stated that while currently the
required setback is 25 feet, if a measurement is added showing it to be closer, how Plan Commission has the ability to
approve that reduced setback, through other measures, such as privacy fencing, etc. Motion carried.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
b. BUG Properties, 6406 Schofield Avenue – CUP No. 20230129 [1:02:07 Zoom Meeting Recording]
Maguire explained how this CUP was originally approved on October 9, 2023. He stated how there was a development
agreement executed that required the property to be developed in accordance with the approved plans and Village
approvals. Maguire then explained that building permits were then issued. He stated the issue is on the satisfaction of
the CUP and development agreement where there are 8 key items that are in non-compliance with the CUP and how the
project was supposed to be completed by October 9, 2025. Upon site inspection, concrete work, fencing, gates,
landscaping, and cubing remained incomplete. Maguire pointed out how the building permit is now expired. He
explained that numerous emails were sent to the owner, and how the owner has not responded to him, and how he is
unable to leave any voicemails, as the owner’s voicemail box is full.
It was explained that there does not appear to be any business taking place inside of the building, just around the
outside of the site and how there has been no certificate of occupancy issued yet. Maguire described the incomplete
improvements.
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 9/15/2026 3:42 PM Page 6 Mtg_BOT_260921_Consent_Minutes_PC260914.docx60914
Lopes-Serrao confirmed that the goal is for the owner to become compliant or for PC to give them a deadline to become
compliant.
After some discussion it was agreed to give the owner until September 23rd.
Motion by Diesen, second by Jordan: the Plan Commission finds the property located at 6406 Schofield Avenue not in
compliance with the CUP #20230129 and the associated development agreement, and to direct the property owner
and operator to complete all remaining site improvements and obtain compliance with the approved site by
09/23/26. If this is not completed, for staff to schedule a public hearing for the October Plan Commission.
Yes Vote: 5 No Votes: 1 Abstain: 0 Not Voting: 1 Result: PASS
c. Tommy’s Car Wash, 1611 Schofield Avenue – CUP No. 20191300 [1:16:15 Zoom Meeting Recording]
Higgins explained staff is bringing this forward as the recorded CUP required an annual underground sediment tank
system inspection report and a certificate of environmental insurance. She stated we only have an inspection report
from 2021, and have not received a certificate of environmental insurance yet. She stated that staff has made several
attempts this year to resolve this matter, including providing a June 1
st deadline and following up again in August. Staff
has not received the required items to date and are bringing it forward to the Plan Commission.
Staff is recommending that PC find this CUP out of compliance and provide the owner 30 days to submit the outstanding
documentation and return the matter to the Commission if the deficiencies are not resolved. It was confirmed that with
this being a water quality issue there is a higher level of importance here than the previous CUP compliance issues on
the agenda. Wodalski explained further the water quality issue, having to do with their reclaimed water tanks. He
discussed some of the testing that has been done by the Village. Diesen stated he would like to know what the Village’s
costs were for that testing.
Cronin suggested to reach out to the local manager onsite. Higgins stated the management there changes but they will
attempt follow up with them directly. Mumper suggested in future to send letters via certified mail. Diesen agreed with
Mumper, at least to send this way for the ones who do not respond.
There was some discussion on the timing of the public hearing and deadline for notifications. She stated if the hearing
comes up and we are still waiting on things that we could just postpone action.
Motion by Jordan, second by Cronin: to recommend the finding that Conditional Use Permit E20191300, for Tommy’s
Car Wash, 1611 Schofield Avenue, is not in compliance with recorded CUP conditions #6 & 8, due to failure to provide
the required underground settlement system inspection reports and certificate of environmental insurance and direct
staff to provide the property owner written notice of the outstanding compliance requirement due by September 23rd
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave NO
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 9/15/2026 3:42 PM Page 7 Mtg_BOT_260921_Consent_Minutes_PC260914.docx60914
for the deficiencies to be corrected and direct staff to return the matter to the Plan Commission for further
consideration under Section 94.16.06(11) if the required documentation is not received within that time frame.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
8. August 2026 Staff-Approved Certified Survey Maps and Site Plans. [1:30:18 Zoom Meeting Recording]
Motion by Cronin, second by Mumper: to acknowledge agenda Item #8.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
9. August 2026 Building Permits [1:30:44 Zoom Meeting Recording]
Motion by Diesen, second by Mumper: to acknowledge agenda Item #9.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
10. Planning & Development Department Project Update Report. [1:31:00 Zoom Meeting Recording]
Higgins referred to her report in the packet.
Motion by Diesen, second by Cronin: to acknowledge agenda Item #10.
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 9/15/2026 3:42 PM Page 8 Mtg_BOT_260921_Consent_Minutes_PC260914.docx60914
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
11. Announcements & Committee/Commissioner Remarks/Staff Referrals [1:31:49 Zoom Recording]
Cronin stated he is hoping that staff can try to rectify the issues before they come to PC. He also stated that he feels
staff did try with these CUP’s. He asked what the Village’s recourses are in taking care of these. Higgins stated if non-
compliant we will need to get our attorney and the courts involved.
Mumper stated when it comes into public health and safety we need to have more stringent requirements when dealing
with the wellhead protection area. He stated how these should be handled similarly to the salt sheds, and how we could
consider discussion of this for a future agenda, especially when it affects drinking water.
12. Future Agenda Items or Staff Referrals [1:37:58 Zoom Recording]
13. Next Meeting Dates
a. Comprehensive Plan Steering Committee Meeting – Monday, September 28, 2026, at 6:00pm
b. Community Outreach Night at the Municipal Center – Tuesday, September 29, 2026, at 4:00pm – 6:00pm
c. Regular Meeting – Monday, October 12, 2026, at 6:00pm
Diesen confirmed item 13.b. is open to residents to ask questions.
14. Adjourn Plan Commission
Motion by Cronin, second by Jordan: to adjourn at 7:54 p.m.
Luis Lopes-Serrao, Village Trustee and Plan Commission Chair
Jennifer Higgins, Director of Planning & Development
Valerie Parker, Recording Secretary
Member (PC) Voting
Lopes-Serrao, Luis {Chair} YES
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary -----
Jordan, Joe YES
Mumper, Roy YES
Good evening,
Two years ago, Steve Meinel received Village approval for additional storage units that had
already been installed before permits were submitted or approved. The units were approved in
2024, even though certain Village employees stated that they would not have approved a
Conditional Use Permit under those conditions.
This appears to create an unspoken precedent: if someone does not follow the formal permit or
zoning process established by the Village, they can seek approval in different ways. I believe this
approach is unacceptable and should not be condoned by the Village.
Mr. Meinel has once again made new improvements to his property, this time in the ‘Seasonal
Outdoor Storage’ area. This was done shortly after I spoke with him about the boat/RV storage
that he was utilizing in the large Green Space area directly north of my property, which didn’t
allow for any storage. He was previously instructed to notify the Village prior to any new
improvements on his property, but he has not followed through with those requests. The
Seasonal Outdoor Storage area is also shown in his permit to end before reaching the back of
my property line at 3018 Ross Ave, but it has now been extended by roughly 12’ into the main
Green Space north of my lot with gravel and RV parking. I believe the setback of smaller Green
Space that’s located directly south of the ‘Seasonal Outdoor Storage’ area is also supposed to be
25’, and that clearly hasn’t been followed either (the new gravel that was added sometime
around Tuesday August 11
th is about 12’ from his south fenceline).
The Green Space required under his current permit is only 50 feet from the townhomes I own at
3018 Ross Ave. Tenants have reported loud tarps flapping on windy days and pieces of tarp in
the grass on the property. I have also observed storage renters spending time in their RVs with
music playing during the day, as well as trash that was thrown over the fence since it’s a close
and convenient option for them.
The additional storage units approved in 2024 were already a concern of mine because of
excess water runoff that created erosion concerns on my property. The deliberate removal of
Green Space in multiple areas and the added gravel and RV storage located outside of the
Seasonal Outdoor Storage area shows negligence for following his permit.
I am concerned about the precedent being set by Mr. Meinel to continually make improvements
to areas not approved by the Village. Changes to the USSAM property directly affect me as the
owner of a townhome near the Green Space in question, and which is being diminished by
continued improvements that are not allowed and do not follow his permit.
I respectfully ask that you consider this matter from the perspective of a landlord who owns
townhomes near this storage facility, and to consider following the process of reverting these
‘improvements’ back to permit compliance. Thank you for considering these concerns as you
review this request.
Jake Wildeck
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
Public Mtg/Date: Plan Commission, October 12, 2026
Description: Public Hearing - Project #20260333 – Conditional Use Permit for U.S.
Venture, Inc to operate a freight terminal and mass transportation depot in
the LI (Limited Industrial) District and to approve the motor freight terminal
use within the WHP-A Wellhead Protection Area Overlay District at 6002
Saxon Avenue.
From: Jennifer Higgins, Planning & Development Director/Zoning Administrator
Question: Following the public hearing, should the Plan Commission approve the
Conditional Use Permit requested by U.S. Venture, Inc. d/b/a U.S.
AutoForce, subject to the proposed conditions and the completion of the
required WHP-A Environmental Assessment before is suance of the permit
and commencement of the conditional use, or defer final action?
BACKGROUND
U.S. Venture, Inc. d/b/a U.S. AutoForce is requesting a Conditional Use Permit to operate a cross -
dock and delivery distribution hub at 6002 Saxon Avenue. The property is approximately 74,250
square feet (1.71 acres), is zoned LI – Limited Industrial, and is located within the WHP-A – Wellhead
Protection Area Zone A Overlay District. The property owner identified on the CUP application is
Coppercraft Enterprises, LLC.
The application materials describe a flow -through cross -dock operation. Inbound transfer trailers
deliver product to the site for unloading, route sorting, and direct transfer to outbound delivery
vehicles. Normal operations are anticipated to include two inbound trailers per day, up to three during
the October-November peak season, six delivery trucks normally and seven during peak season, and
seven employees. Only one inbound trailer will remain on site at a time. The building is not intended
to function as a traditional warehouse or large-scale inventory storage operation; limited quantities of
automotive-related materials and operational equipment may be stored temporarily and incidentally.
On October 5, 2026, US AutoForce representative, James Fenlon advised that the applicant has
submitted the revised operations plan and is actively engaging an environmental engineering firm,
but the required WHP -A environmental assessment will not be completed in time for the October 5
staff deadline to prepare the meeting packet. The applicant has requested that the application remain
on the October 12 agenda and asked the Village to consider a conditional approval framework subject
to completion and Village review of the environmental assessment and any associated
recommendations. The applicant also requested a meeting with Village staff and its environmental
consultant to confirm scope and deliverables later this week. At the time of writing this report, staff is
still verifying calendars to schedule the meeting.
Attached Docs: • Public Hearing Notice and property-owner notice materials
• Conditional Use Permit Application
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
• Zoning Map
• Staff Analysis
•Conditional Permit Determination by the Village of Weston Plan Commission
• Draft Conditional Use Permit with Exhibits
Committee Action: Plan Commission to conduct the public hearing and consider the
Conditional Use Permit. Staff recommends approval subject to the
conditions of the Conditional Use Permit, including completion and Village
approval of the required WHP-A Environmental Assessment and
satisfaction of all conditions before the CUP is issued or the conditional use
commences. Alternatively, the Commission may defer final action until the
Environmental Assessment has been submitted and reviewed.
Fiscal Impact: $350 Conditional Use Permit application fee; no direct Village capital
expenditure is anticipated. Applicant is responsible for applicable WHP-A
consultant costs under Section 94.6.03. No additional consultant costs are
anticipated at this time.
Recommendation: Staff recommends the Plan Commission approve the Conditional Use Permit
subject to the conditions set forth in the draft permit, including later
submission and Village approval of the required WHP -A Environmental
Assessment, incorporation of any required groundwater -protection
measures, and satisfaction of all conditions before the CUP is issued or the
conditional use commences. The September 4, 2026 site plan is acceptable
as Exhibit A for the approved operational layout and site-
use areas; the
approved operational description shall be incorporated as Exhibit B; the
approved WHP -A Environmental Assessment shall be incorporated as
Exhibit C; the final Plan Commission Written Determination shall be
incorporated as Exhibit D; and a certified excerpt documenting the Plan
Commission's action shall be incorporated as Exhibit E. Alternatively, the
Commission may defer final action until the Environmental Assessment has
been submitted and reviewed.
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
I move to approve Conditional Use Permit Project #20260333 for U.S. Venture, Inc. d/b/a U.S.
AutoForce to operate a Freight Terminal and Mass Transportation Depot at 6002 Saxon
Avenue pursuant to Section 94.4.07(3) of the Village of Weston Zoning Code, subject to the
conditions contained in the Conditional Use Permit, including incorporation of the September
4, 2026 site plan as Exhibit A, incorporation of the approved operational description as Exhibit
B, submission and approval of the required WHP-A Environmental Assessment, incorporation
of any required groundwater -
protection measures, and satisfaction of all conditions before
the Conditional Use Permit is issued or the conditional use commences. The final Plan
Commission Written Determination shall be incorporated as Exhibit D, and a certified excerpt
documenting the Plan Commission's action shall be incorporated as Exhibit E.
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
ADDITIONAL ACTION: Alternate deferral motion: I move to defer action on Conditional Use
Permit Project #20260333 for U.S. Venture, Inc. d/b/a U.S. AutoForce to
operate a Freight Terminal and Mass Transportation Depot at 6002 Saxon
Avenue pursuant to Section 94.4.07(3) of the Village of Weston Zoning
Code, to allow completion and Village review of the required WHP-A
Environmental Assessment and any related recommendations. Staff shall
return the matter to the Plan Commission with the final Conditional Use
Permit and proposed conditions for action once the outstanding review
requirements are satisfied.
NOTICE OF PUBLIC HEARINGS
VILLAGE OF WESTON PLAN COMMISSION
NOTICE IS HEREBY GIVEN that the Village of Weston Plan Commission will hold a
Public Hearing on Monday, October 12, 2026, at 6:00 p.m. in the Board Room of the
Weston Municipal Center, 4747 Camp Phillips Road, Weston, Wisconsin, to consider
the following requests:
1. P
roject # 20260333 - A request by U.S. Venture, Inc. for a Conditional Use
Permit to allow a Freight Terminal and Mass Transportation Depot and for
approval of the motor freight terminal use within the Wellhead Protection Area
(WHP-A) Overlay District on property located at 6002 Saxon Avenue (PIN 192-
2808-153-0987) (Project #20260333).
2. Project #20230129 - A request by BUG Properties, LLC for a modification of
Conditional Use Permit No. 20230129, including modification of the completion
deadline for certain required site improvements, for property located at 6406
Schofield Avenue (PIN 192-2808-153-0946).
Copies of the applications and supporting materials are available for public review at the
Village Municipal Center during regular business hours or viewed online at
www.westonwi.gov.
All interested persons are invited to attend and be heard. Written comments may be
submitted to the Commission Clerk prior to the hearing at plandev@westonwi.gov or
4747 Camp Phillips Rd, Weston WI 54476.
Dated this 24th day of September, 2026.
Valerie Parker
Commission Clerk
Publish: September 28, 2026 and October 5, 2026
PUBLIC HEARING NOTICE - CONDITIONAL USE PERMIT
Property Address: 6002 Saxon Avenue
Applicant/Property Owners: Yaseer Kamali, U.S. Venture, Inc./ Coppercraft Enterprises, LLC
Project Number: 20260333
The Village of Weston Plan Commission will hold a public hearing to consider a request from Yaseer
Kamali, on behalf of U.S. Venture, Inc., for a Conditional Use Permit to allow a Freight Terminal
and Mass Transportation Depot for the property located at 6002 Saxon Avenue.
The property is approximately 1.71 acres in size, is zoned LI (Limited Industrial), and is located
within the WHP-A (Wellhead Protection Area Zone A) Overlay District. The property is identified
as PIN 192 2808 153 0987.
The proposed use will operate primarily as a cross-dock delivery facility, where inbound transfer
trailers will deliver product to the site, the product will be unloaded and sorted by delivery route, and
transferred directly to outbound delivery vehicles for distribution. The current operations plan
anticipates two inbound trailers per day during normal operations and up to three inbound trailers per
day during the October and November peak season, with only one trailer remaining on site at any
given time. The facility will include truck staging, delivery vehicle parking and staging, loading and
unloading, and delivery dispatch operations. Limited quantities of automotive-related materials and
operational equipment associated with the distribution operation may be stored temporarily and
incidentally within the building. The facility is not intended to function as a traditional warehouse or
large-scale inventory storage operation, and tire inventory will not be stored within the building.
The Conditional Use Permit is required because the proposed Freight Terminal and Mass
Transportation Depot is a conditional use in the LI zoning district. In addition, the WHP-A Overlay
District identifies motor freight terminals as a conditional use and requires additional review
under the Village's Wellhead Protection Area regulations. The proposed use is regulated under
Section 94.4.07(3) of the Village of Weston Zoning Code.
PUBLIC HEARING INFORMATION
Date: Monday, October 12, 2026
Time: 6:00 p.m.
Location: Weston Municipal Center Board Room
4747 Camp Phillips Road, Weston, WI
The purpose of the public hearing is to receive comments from interested residents and property
owners regarding the proposed Freight Terminal and Mass Transportation Depot before the Plan
Commission considers action on the request.
REVIEW PROJECT MATERIALS
Application materials, site plans, and supporting documents are available for review at the Planning &
Development Department during normal business hours (Monday through Friday, 8:00 a.m. to 4:30
p.m.) and online through the Village website at www.westonwi.gov.
SUBMIT COMMENTS
Residents who wish to provide comments may attend the public hearing or submit written comments
to the Planning & Development Department prior to the meeting. Written comments to be included in
the meeting packet should be submitted no later than noon on Wednesday, October 7, 2026.
Written comments received after the packet deadline and before the hearing will be provided to the
Plan Commission for consideration at the meeting
For additional information, please contact the Village of Weston Planning & Development Department
at (715) 241-2613 or plandev@westonwi.gov.
NOTICE TO ADJACENT PROPERTY OWNERS AND MUNICIPALITIES
In accordance with Wis. Stat. § 62.23(7)(d)2 and Weston Zoning Ordinance Chapter 94, notice of this
public hearing has been mailed to property owners within 300 feet of the affected parcel and to any
adjacent municipality within 1,000 feet.
Project #20260333 | 6002 Saxon Avenue | Plan Commission – October 12, 2026
STAFF ANALYSIS – PROJECT #20260333
Property Address 6002 Saxon Avenue, Weston, WI 54476
Parcel ID 192 2808 153 0987
Parcel Size Approximately 74,250 sq. ft. / 1.71 acres
Property Owner Coppercraft Enterprises, LLC
Applicant / Operator U.S. Venture, Inc. d/b/a U.S. AutoForce
Zoning District LI – Limited Industrial
Overlay District WHP-A – Wellhead Protection Area Zone A
Existing Site Existing building and gravel parking/staging area; no exterior
building/site improvements are proposed with the CUP application.
1. REQUEST
The applicant is requesting a Conditional Use Permit to operate a Freight Terminal and Mass
Transportation Depot under Section 94.4.07(3) at 6002 Saxon Avenue. The proposed operation is
a cross-dock freight-transfer and delivery operation serving Central and Northern Wisconsin. The
property is also located within the WHP-A – Wellhead Protection Area Zone A Overlay District, where
a motor freight terminal is identified as a conditional use. Accordingly, the request includes review
under the WHP -A Overlay requirements, including submission of an environmental assessment
prepared by a licensed environmental engineer (referred to throughout this report as the
“Environmental Assessment”), review and approval by Michael Wodalski, Director of Public Works,
incorporation of any required groundwater -protection measures, and reimbursement of applicable
Village consultant review costs.
2. PROPOSED OPERATIONS
• Normal inbound trailers: 2 per day; peak season (October-November): up to 3 per day.
• Maximum trailers remaining on site at one time: 1; no tractors remain on site after the trailer
is dropped.
• Delivery trucks: 6 during normal operations; 7 during peak season.
• Employees: 7.
• Loading/unloading: product is transferred directly from the staged trailer to outbound delivery
vehicles; loading is described as approximately 20 minutes per delivery truck.
• Delivery vehicle parking/staging is on the south side of the building; employee parking is
along the east side of the parking lot.
• Inbound trucks enter via the west driveway and exit via the east driveway; truck parking,
staging, loading/unloading, and vehicle circulation are proposed to occur on private property.
• No outdoor storage is proposed. The conceptual site plan identifies the gravel lot as “NO
OUTDOOR STORAGE” and the building as “NO TIRE PRODUCT INSIDE BUILDING.”
Project #20260333 | 6002 Saxon Avenue | Plan Commission – October 12, 2026
• The facility will not include retail sales, customer pickup, manufacturing, vehicle repair, or tire
installation.
3. LAND USE CLASSIFICATION
Staff reviewed whether the proposed operation should be classified as a Freight Terminal and Mass
Transportation Depot or as a Distribution Center. Section 94.4.07(3) describes a Freight Terminal
and Mass Transportation Depot as a transportation use focused on the storage or staging of multiple
large vehicles and related freight -transfer facilities. Section 94.4.07(4) describes a Distribution
Center as a facility oriented to short-term indoor storage and possible repackaging and reshipment
of materials and products of a single user.
The zoning permit use description contained a statement that could be read to suggest storage of
automotive parts or distribution- related product in the building. Staff requested clarification. In his
September 21, 2026 response, James Fenlon clarified that the facility is primarily a cross -dock
operation and that only limited quantities of automotive- related materials and equipment may be
stored temporarily and incidentally. He stated that the facility is not intended to function as a
traditional warehousing operation and that tire inventory will not be stored in the building.
The updated Operations Site Plan submitted with the application states that the facility will not
function as a warehouse or traditional inventory storage operation and that limited quantities of items
such as disassembled tire racking, tire valves and stems, and similar items may be stored
temporarily and incidentally. Based on the applicant’s clarification, staff concludes that the proposed
use has not changed sufficiently to warrant changing the land use classification. Staff therefore
continues to classify the proposed use as a Freight Terminal and Mass Transportation Depot under
Section 94.4.07(3).
The approved CUP should clearly establish that the cross -dock/freight-transfer function is the
primary use and that any incidental storage remains limited and subordinate. A future change to a
warehouse, inventory storage, or Distribution Center operation would require further zoning review
and may require an amended or new Conditional Use Permit.
4. ZONING AND ORDINANCE REVIEW
Comprehensive Plan Consistency
The proposed Freight Terminal and Mass Transportation Depot is generally consistent with the
Village of Weston's adopted Comprehensive Plan. The property is currently zoned LI – Limited
Industrial, and the proposed use is consistent with the Plan's industr ial land use framework, which
provides for industrial, storage, office, and other compatible business and support uses.
The proposed operation is primarily a cross-dock freight and delivery operation involving the staging
of transfer trailers and delivery vehicles, loading and unloading of product, and delivery dispatch.
The applicant's current operations plan identifies tw o inbound trailers per day during normal
operations, up to three during the October and November peak season, six delivery vehicles during
normal operations, seven during peak season, and seven employees. Only one transfer trailer will
remain onsite at a time, and the applicant states that the building will not function as a warehouse
or traditional inventory storage operation.
Project #20260333 | 6002 Saxon Avenue | Plan Commission – October 12, 2026
The Comprehensive Plan also emphasizes appropriate transitions between industrial and
residential areas and the use of development and performance standards to address potential traffic,
environmental, and neighborhood impacts. These considerations are particularly relevant because
the property has residentially zoned property along the north property line. Staff has therefore
identified compliance with the applicable bufferyard, setback, screening, and other performance
standards as part of the CUP review.
Staff finds the proposed use to be generally consistent with the Comprehensive Plan, subject to
compliance with the applicable zoning performance standards and the requirements of the WHP -A
Overlay District.
Zoning District and Conditional Use
• LI Zoning District: Freight Terminal and Mass Transportation Depot is a conditional use in the
LI zoning district. The requested use is therefore subject to Plan Commission review under
Section 94.16.06.
• Freight Terminal Standards: Section 94.4.07(3) includes performance standards relating to
bufferyards and setbacks where residentially zoned property is involved, outdoor storage
screening, activity/storage in required front yards, and parking of one space per employee
on the largest work shift.
• Parking: The applicant identifies seven employees, and the submitted site plan depicts seven
employee parking spaces together with the delivery -vehicle parking and staging areas
needed for normal and peak-season operations.
• Early-Morning Deliveries: The proposed operation anticipates inbound arrivals at
approximately 1:00 a.m. Any pre-6:00 a.m. business deliveries must comply with applicable
Village requirements, including Section 50.104(4) where applicable.
WHP-A Overlay District
• WHP-A Overlay: Motor freight terminals are identified as conditional uses in WHP -A. The
WHP-A review requires an Environmental Assessment prepared by a licensed environmental
engineer, review and approval by Michael Wodalski, Director of Public Works , and
reimbursement by the applicant for applicable consultant costs.
5. CONDITIONAL USE APPROVAL CRITERIA
Criterion Staff Review
1. Consistency with
Comprehensive Plan / Zoning
Code
See the Comprehensive Plan Consistency discussion above. Staff finds the
proposed use to be generally consistent with the Comprehensive Plan, subject to
compliance with applicable zoning and WHP- A requirements. The use is
conditionally allowed in LI as a Freight Terminal and Mass Transportation Depot.
The applicant’s clarified primary use is freight transfer and staging, not
warehousing or retail.
2. No substantial or undue
adverse impact
Operations are proposed to be contained on private property, with one trailer
onsite at a time, no tractors remaining onsite, no outdoor storage, and no public -
right-of-way activity. Early-morning delivery requirements should be enforced.
3. Consistency of land uses
and intensities
The stated scale is limited to 2–3 inbound trailers per day, 6–7 delivery vehicles,
and 7 employees. Activities are concentrated on an existing industrial property.
4. Adequate public services /
no undue burden
The proposal uses the existing site and access and identifies no new public
improvements. The submitted site plan depicts onsite circulation, fire access,
Project #20260333 | 6002 Saxon Avenue | Plan Commission – October 12, 2026
Criterion Staff Review
employee and delivery -vehicle parking, trailer staging, and loading/unloading
areas.
5. Public benefits outweigh
potential adverse impacts
The proposal provides a productive transportation/distribution use of an existing
industrial site while containing truck activity onsite. The operational controls and
CUP conditions address the identified impacts.
6. WHP-A REVIEW
The property is located in the WHP-A Overlay District. Because the requested use is a motor freight
terminal, the overlay requires the additional review described in the Village’s wellhead protection
regulations. The required Environmental Assessment must be prepared by a licensed environmental
engineer and reviewed by a Village- designated engineer. The WHP -A review must address
groundwater-protection considerations identified in the ordinance, and the applicant is responsible
for applicable consultant review costs.
As of October 5, 2026, the required Environmental Assessment has not been submitted. The
applicant advised that it is actively engaging an environmental engineering firm but cannot complete
the Environmental Assessment by the October 5 deadline to make the meeting packet . The
applicant has requested consideration of a conditional approval framework. Staff recommends that
the Plan Commission approve the CUP subject to later submission and Village approval of the
required Environmental Assessment, incorporation of any required groundwater -protection
measures, and completion of those requirements before the CUP is issued or the conditional use
commences. As an alternative, the Plan Commission may defer final action until the Environmental
Assessment has been submitted and reviewed.
If the Environmental Assessment is received and reviewed before the meeting, staff will update its
recommendation and identify any consultant recommendations or additional conditions that should
be incorporated into the CUP.
7. APPLICANT REQUEST FOR CONDITIONAL APPROVAL
On October 5, 2026, James Fenlon requested that the application remain on the October 12 Plan
Commission agenda. He stated that the applicant is actively engaging an environmental engineering
firm but will not have the Environmental Assessment completed in time for the October 5 deadline.
He asked the Village to discuss whether a conditional approval framework could be considered,
subject to completion and Village review of the Environmental Assessment and any associated
recommendations. He also requested a meeting with Village staff and the applicant’s environmental
consultant to confirm the scope and expected deliverables.
Staff supports continued processing of the application and recommends that the Plan Commission
approve the Conditional Use Permit subject to conditions precedent to issuance, including later
submission and Village approval of the Environmental Assessment, incorporation of any required
groundwater-protection measures, and satisfaction of all applicable WHP -A requirements. The
Conditional Use Permit shall not be issued and the conditional use shall not commence until those
requirements have been completed. Alternatively, the Commission may defer final action until the
Environmental Assessment review is complete.
Project #20260333 | 6002 Saxon Avenue | Plan Commission – October 12, 2026
8. SITE PLAN REVIEW
• The submitted site plan dated September 4, 2026 is marked “PRELIMINARY – NOT FOR
CONSTRUCTION.” Staff finds the plan acceptable as the controlling CUP exhibit for the
approved operational layout and site-use areas. The exhibit does not constitute approval of
construction plans, authorize construction, or waive any separately required permits or
approvals. The use shall be operated in accordance with the layout and operational areas
shown.
• The submitted site plan depicts the trailer staging area at the south end of the parking area,
delivery vehicle parking and peak-season accommodation, seven employee parking spaces,
the loading/unloading area, drive aisles, turning movements, and emergency/fire access. No
additional site-plan revisions are required for these items.
• Because residentially zoned property abuts the north property line, the approved operation
shall maintain the bufferyard, screening, and minimum 100- foot separation required by
Section 94.4.07(3) for freight-terminal buildings, structures, outdoor storage areas, and other
activity areas. The operational areas shown on Exhibit A shall be maintained in compliance
with these requirements.
• Consistent with the submitted site plan, outdoor storage is prohibited, and all truck parking,
trailer staging, loading/unloading, and vehicle circulation shall remain on private property.
• The final approved CUP documents should consistently describe the cross -dock operation
and should not contain conflicting statements about warehouse or product storage.
• The CUP should incorporate the September 4, 2026 site plan as Exhibit A , the approved
operational description as Exhibit B, and the future approved Environmental Assessment as
Exhibit C.
9. PROPOSED CONDITIONS OF APPROVAL
1. The approved use is limited to a Freight Terminal and Mass Transportation Depot under
Section 94.4.07(3), operated primarily as the cross -dock distribution operation described in
the approved application materials.
2. The facility shall not operate as a traditional warehouse, large-scale inventory storage facility,
or Distribution Center. Tire inventory shall not be stored within the building.
3. Only limited quantities of automotive- related materials and operational equipment that are
temporary and incidental to the approved cross -dock operation may be stored within the
building. Any expansion of storage or change in the primary character of the use requires
prior zoning review and may require an amended or new Conditional Use Permit.
4. The use shall comply with all applicable Freight Terminal and Mass Transportation Depot
performance standards in Section 94.4.07(3), including applicable bufferyards and residential
setbacks, vehicle and outdoor -storage screening, front -yard restrictions, and off -street
parking requirements.
5. No outdoor storage is permitted as part of the approved use.
6. No more than one inbound transfer trailer may remain onsite at any one time. No tractors
may remain parked onsite after the trailer is dropped.
Project #20260333 | 6002 Saxon Avenue | Plan Commission – October 12, 2026
7. Truck parking, trailer staging, delivery vehicle parking, loading/unloading, and vehicle
circulation shall occur entirely on the subject property and shall not occur in or obstruct the
public right-of-way.
8. The site plan dated September 4, 2026 shall be incorporated into the CUP as Exhibit A and
shall control the approved operational layout and site-use areas. Incorporation of the site plan
does not constitute construction- plan approval, authorize construction, or waive any
separately required permits or approvals.
9. The approved site plan shall maintain seven employee parking spaces and accommodate
six regular delivery vehicles and up to seven delivery vehicles during the peak season,
consistent with the approved operational description.
10. Any business deliveries occurring before 6:00 a.m. shall comply with applicable Village
requirements, including Section 50.104(4) where applicable.
11. The required WHP -A Environmental Assessment shall be submitted and reviewed through
the Village’s WHP-A review process and approved by Michael Wodalski, Director of Public
Works. Upon approval, the Environmental Assessment shall be incorporated into the CUP as
Exhibit C. The Director of Public Works may require incorporation of recommendations or
groundwater-protection measures identified through that review. The CUP shall not be issued
and the conditional use shall not commence until the required WHP -A review has been
completed, the Environmental Assessment has been approved, and all resulting
requirements have been satisfied. The applicant shall reimburse the Village for applicable
consultant review costs.
12. The approved operational description shall be incorporated into the CUP as Exhibit B and
shall control the approved scope and operational characteristics of the use. The approved
cross-dock/freight-transfer function shall remain the primary use of the facility.
13. The use shall remain in compliance with all applicable Village, Marathon County, State of
Wisconsin, and federal requirements. This Conditional Use Permit does not waive any other
required permit, approval, inspection, or review.
14. Any future expansion, modification, or change in the approved use, operations, site plan, or
storage characteristics shall be reviewed by the Zoning Administrator and, where required,
brought before the Plan Commission for amendment of this Conditional Use Permit or
issuance of a new Conditional Use Permit.
10. STAFF RECOMMENDATION
Preferred: Staff recommends approval of the Conditional Use Permit subject to conditions
precedent to issuance, including later submission and review and approval by Michael Wodalski,
Director of Public Works, of the required WHP -A Environmental Assessment, incorporation of any
required groundwater -protection measures, incorporation of the future approved Environmental
Assessment as Exhibit C, reimbursement of applicable Village consultant review costs, and
satisfaction of all conditions before the CUP is issued or the use commences.
Alternative: Defer final action until the Environmental Assessment has been submitted and
reviewed. The September 4, 2026 site plan is acceptable as Exhibit A for the approved operational
layout and site-use areas; the approved operational description shall be incorporated as Exhibit B.
11. PLAN COMMISSION ACTION OPTIONS
Project #20260333 | 6002 Saxon Avenue | Plan Commission – October 12, 2026
• Approve the Conditional Use Permit subject to later submission of the required WHP -A
Environmental Assessment, review and approval by Michael Wodalski, Director of Public
Works, incorporation of any required groundwater -protection measures, reimbursement o f
applicable Village consultant review costs, and satisfaction of all conditions before the CUP
is issued or the conditional use commences. The September 4, 2026 site plan shall be
incorporated as Exhibit A and shall control the approved operational layout and site- use
areas; the approved operational description shall be incorporated as Exhibit B and shall
control the approved scope and operational characteristics of the use; and the future
approved Environmental Assessment shall be incorporated as Exhibit C. The approved
cross-dock/freight-transfer function shall remain the primary use of the facility. Incorporation
of Exhibit A does not constitute construction-plan approval or waive any separately required
permits or approvals.
• Approve the Conditional Use Permit with the proposed conditions if the required WHP -A
Environmental Assessment has been received and adequately reviewed before the
Commission acts, with any additional recommendations incorporated into the CUP.
• Defer action after the public hearing to allow completion and Village review of the WHP -A
Environmental Assessment and any related recommendations.
• Deny the Conditional Use Permit, stating the specific reasons for denial.
Decision Framework: Staff recommends conditional approval subject to later submission of the
WHP-A Environmental Assessment and review and approval by Michael Wodalski, Director of Public
Works, provided the CUP is not issued and the use does not commence until the WHP -A review,
required groundwater-protection measures, and all other conditions are complete. Alternatively, the
Commission may defer final action until the Environmental Assessment has been submitted and
reviewed. The September 4, 2026 site plan would be incorporated as Exhibit A, the approved
operational description would be incorporated as Exhibit B, and the future approved Environmental
Assessment would be incorporated as Exhibit C.
12. DRAFT MOTION
I move to approve Conditional Use Permit Project #20260333 for U.S. Venture, Inc. d/b/a U.S.
AutoForce to operate a Freight Terminal and Mass Transportation Depot at 6002 Saxon Avenue
pursuant to Section 94.4.07(3) of the Village of Weston Zoning Code, subject to the conditions
contained in the Conditional Use Permit, including incorporation of the September 4, 2026 site plan
as Exhibit A for the approved operational layout and site- use areas, incorporation of the approved
operational description as Exhibit B, which shall control the approved scope and operational
characteristics of the use, with the cross-dock/freight-transfer function remaining the primary use of
the facility, incorporation of the future approved Environmental Assessment as Exhibit C, submission
of the required WHP -A Environmental Assessment, review and approval of the Environmental
Assessment by Michael Wodalski, Director of Public Works, incorporation of any required
groundwater-protection measures, and satisfaction of all other conditions before the CUP is issued
or the conditional use commences. Incorporation of Exhibit A does not constitute construction-plan
approval or waive any separately required permits or approvals.
Alternate deferral motion: I move to defer action on Conditional Use Permit Project #20260333
for U.S. Venture, Inc. d/b/a U.S. AutoForce to operate a Freight Terminal and Mass Transportation
Project #20260333 | 6002 Saxon Avenue | Plan Commission – October 12, 2026
Depot at 6002 Saxon Avenue pursuant to Section 94.4.07(3) of the Village of Weston Zoning Code,
to allow completion and Village review of the required WHP -A Environmental Assessment and any
related recommendations. Staff shall return the matter to the Plan Commission with the final
Conditional Use Permit and proposed conditions for action once the outstanding review
requirements are satisfied.
Application for Conditional Use Permit
CONDITIONAL PERMIT DETERMINATION
BY THE VILLAGE OF WESTON PLAN COMMISSION
Application/Petition No.: 20260333 Hearing Date: October 12, 2026
Applicant: U.S. Venture, Inc. d/b/a U.S. AutoForce
Location: 6002 Saxon Avenue, Weston, WI 54476
Description: Conditional Use Permit for U.S. Venture, Inc to operate a freight terminal and mass
transportation depot in the LI (Limited Industrial) District and to approve the motor
freight terminal use within the WHP-A Wellhead Protection Area Overlay District at 6002
Saxon Avenue.
Property Owner:
Parcel ID:
Property Area:
Coppercraft Enterprises, LLC
192 2808 153 0987
Approximately 1.71 acres / 74,250 square feet
The Department of Planning and Development of the Village of Weston, pursuant to the Village of Weston Zoning Code,
Article 16 Procedures and Administration, Section 94.16.06 Conditional Use Permits, hereby makes the following findings
and evaluation to the Village of Weston Plan Commission:
GENERAL INFORMATION:
Zoning: LI Limited Industrial
Definition:
94.2.02(3)f
LI Limited Industrial. The LI district accommodates primarily light industrial, storage, office, and other
compatible businesses and support uses. Allowable uses are geared toward activities which are not
associated with high levels of noise, odor, particulate emissions, outdoor activities, and other potential
nuisances. Development within this district is served by public sanitary sewer and water services. This
district is intended for mapping in areas planned for industrial uses within the Comprehensive Plan.
(Predecessor district: LMD Light Manufacturing Distribution).
Sec 94.4.07 Transportation Land Use Types
(3) Freight Terminal and Mass Transportation Depot.
Lands and buildings representing either end of one or more truck carrier line(s) principally serving several businesses,
bus storage yards or garages, bus transfer stations, train stations, or similar facilities focused on the storage or staging
of multiple trucks, busses, train cars, and/or other large vehicles designed to carry goods or passengers. Such uses
may have some or all of the following facilities: large vehicle storage and/or staging yards, multiple loading docks,
management offices, indoor and outdoor storage yards, fueling stations, weighing stations, parking areas, vehicle
maintenance and repair facilities serving the use, and other related facilities.
Performance Standards:
1. A bufferyard meeting the requirements of Section 94.11.02(3)(d) shall be provided along all property borders
abutting residentially zoned property.
2. For freight terminals and train stations, all buildings, structures, outdoor storage areas, and any other activity
areas shall be located a minimum of 100 feet from all lot lines abutting residentially zoned property.
3. For freight terminals and train stations, all outdoor storage areas and vehicles shall be completely enclosed by
any permitted combination of buildings, structures, walls, and/or fencing. Such walls or fencing shall be
designed to completely screen all stored materials and vehicles from view from non-industrial zoned areas and
public rights-of-way, up to the maximum fence heights allowed under Section 94.12.03. For other types of
transportation depot uses, landscaping installed to screen the vehicles from v iew are sufficient meet this
requirement (but not outdoor storage areas).
4. Activity and storage areas shall not be permitted in the minimum required front yard setback, except for
employee or patron parking.
5. Minimum Required Off-Street Parking: one space per each onsite employee on the largest work shift and one
space for each four passengers for uses where patrons are parking on-site.
The applicable performance standards have been reviewed and are addressed through the approved operational
layout and conditions of this Conditional Use Permit.
DETERMINATION (To be completed by the Plan Commission):
1. Is t he proposed conditional use consistent with the Comprehensive Plan, this Chapter, and all other plans,
programs, and ordinances adopted by the Village?
Applicant Response: Yes. The proposed cross-dock use appears compatible with applicable planning and zoning
objectives because the operation is limited to controlled transfer activity, on -site staging, and delivery support.
Trailer staging, delivery vehicle parking, employee parking, circulation, and loading areas will be identified on the
revised site plan.
Staff Analysis: See the Comprehensive Plan Consistency discussion in the Staff Analysis in the meeting packet.
Staff finds the proposed use to be generally consistent with the Comprehensive Plan, subject to compliance with
applicable zoning and WHP-A requirements. The use is conditionally allowed in LI as a Freight Terminal and Mass
Transportation Depot. The appli cant’s clarified primary use is freight transfer and staging, not warehousing or
retail.
Plan Commission Finding:
2. The proposed conditional use, in its proposed location and as depicted on the required site plan, will not result
in a substantial or undue adverse impact on nearby property, the character of the neighborhood,
environmental factors, traffic factors, parking, public improvements, public property or rights-of-way, or other
matters affecting the public health, safety, or general welfare, either as they now exist or as they may in the
future be developed as a result of the implementation of the provisions of this Chapter, the Comprehensive
Plan, or all other plans, programs, and ordinances adopted by the Village.
Applicant Response: No substantial or undue adverse impact is anticipated. Truck parking, trailer staging, loading,
unloading, and circulation will occur entirely on private property, approximately 200 feet from the public
roadway. Only one trailer will remain on site at a time, and drive aisles, fire access, parking areas, and public
rights-of-way will remain clear.
Staff Analysis: Operations are proposed to be contained on private property, with one trailer onsite at a time, no
tractors remaining onsite, no outdoor storage, and no public -right-of-way activity. Early -morning delivery
requirements should be enforced.
Plan Commission Finding:
3. Does the proposed conditional use maintain the desired consistency of land uses, land use intensities, and land
use impacts as related to the environs of the subject property?
Applicant Response: Yes. The proposed use maintains consistency with the surrounding site environment by
operating as a limited cross-dock distribution function with modest vehicle counts: two inbound trailers per day
under normal operations, up to three during peak season, six delivery trucks normally, seven during peak season,
and seven employees. Activities are confined to designated on-site areas.
Staff Analysis: Yes. The stated scale is limited to 2 –3 inbound trailers per day, 6 –7 delivery vehicles, and 7
employees. Activities are concentrated on an existing industrial property.
Plan Commission Finding:
4.
Is the proposed conditional use located in an area that will be adequately served by, and will not impose an
undue burden on, any of the improvements, facilities, utilities, or services provided by public agencies serving
the subject property?
Applicant Response: Yes. The property appears adequately served for the proposed use based on the operations
plan and revised site plan requirements. Inbound trucks will enter through the west driveway and exit through
the east driveway, while trailer staging, delivery vehicle parking, employee parking, loading areas, drive aisles,
and fire access will be shown and maintained on site. The operation should not impose an undue burden on public
facilities, utilities, or services.
Staff Analysis: Yes. The proposal uses the existing site and access and identifies no new public improvements. The
submitted site plan depicts onsite circulation, fire access, employee and delivery -vehicle parking, trailer staging,
and loading/unloading areas.
Plan Commission Finding:
5.
Do the potential public benefits of the proposed conditional use outweigh potential adverse impacts of the
proposed conditional use, after taking into consideration the applicant’s proposal and any requirements
recommended by the applicant to ameliorate such impacts.
Applicant Response: The proposal supports efficient local distribution while keeping truck activity contained on
private property. Public benefits include defined truck circulation, reduced risk of public right -of-way impacts,
maintained fire access, and productive use of the existing site. These benefits are expected to outweigh potential
adverse impacts because the operational controls and site layout address staging, parking, loading, and circulation
on site.
Staff Analysis: Yes. The proposal provides a productive transportation/distribution use of an existing industrial
site while containing truck activity onsite. The operational controls and CUP conditions address the identified
impacts.
Plan Commission Finding:
BACKGROUND INFORMATION:
U.S. Venture, Inc. d/b/a U.S. AutoForce is requesting a Conditional Use Permit to operate a cross-dock Freight
Terminal and Mass Transportation Depot at 6002 Saxon Avenue. The property is approximately 74,250 square feet
(1.71 acres), is zoned LI – Limited Industrial, and is located within the WHP-A – Wellhead Protection Area Zone A
Overlay District. The property owner identified on the CUP application is Coppercraft Enterprises, LLC.
The application materials describe a flow-through cross-dock operation. Inbound transfer trailers deliver product to
the site for unloading, route sorting, and direct transfer to outbound delivery vehicles. Normal operations are
anticipated to include two inbound trailers per day, up to three during the October-November peak season, six
delivery trucks normally and seven during peak season, and seven employees. Only one inbound trailer will remain on
site at a time. The building is not intended to function as a traditional warehouse or large-scale inventory storage
operation; limited quantities of automotive-related materials and operational equipment may be stored temporarily
and incidentally.
CURRENT PROPERTY CONDITIONS:
The subject property consists of approximately 1.71 acres, is developed with an existing building and gravel
parking/staging area; no exterior building/site improvements are proposed with the CUP application.
REQUIRED FINDINGS
Based on staff review and the applicable standards of Section 94.4.0 7(3), the following findings are provided for Plan
Commission consideration:
• Land use classification and district consistency. The proposed operation is appropriately classified as a Freight
Terminal and Mass Transportation Depot under Section 94.4.07(3) because its primary function is the staging of
an inbound transfer trailer and the direct transfer of product to outbound delivery vehicles. The use is
conditionally allowed in the LI – Limited Industrial District and is consistent with the Comprehensive Plan’s
industrial land-use framework. The facility will not operate as a traditional warehouse, large-scale inventory
storage facility, retail use, or Distribution Center; any indoor storage will be temporary, incidental, and
subordinate to the cross-dock operation.
• Residential bufferyard requirement. Section 94.4.07(3) requires a bufferyard meeting Section 94.11.02(3)(d)
along property boundaries abutting residentially zoned property. Because residentially zoned property is located
along the north property line, the approved use must maintain the required bufferyard and associated screening
along that boundary as a continuing condition of approval. The existing building is located between the
residentially zoned property to the north and the proposed freight-terminal operational areas. The required
bufferyard, screening, and separation shall be maintained in accordance with Section 94.4.07(3).
• One-hundred-foot separation from residentially zoned property. Section 94.4.07(3) requires freight-terminal
buildings, structures, outdoor storage areas, and other activity areas to be at least 100 feet from lot lines
abutting residentially zoned property. The approved operational layout must maintain this required separation
for trailer staging, delivery-vehicle parking and staging, loading and unloading, and other freight-terminal activity
areas. Compliance shall be maintained through operation in accordance with the September 4, 2026 site plan
incorporated as Exhibit A.
• Outdoor storage and vehicle screening. Section 94.4.07(3) requires outdoor storage areas and vehicles to be
enclosed and screened from non-industrially zoned property and public rights-of-way. The applicant proposes
no outdoor storage, and the site plan expressly identifies the gravel lot as “NO OUTDOOR STORAGE.” The CUP
conditions prohibit outdoor storage and require all truck parking, trailer staging, delivery-vehicle parking,
loading, unloading, and circulation to remain within the approved onsite areas. The required residential
bufferyard and screening must also be maintained. The approved vehicle parking, staging, and loading areas are
subject to the screening requirements of Section 94.4.07(3), and such screening shall be maintained for the
duration of the conditional use.
• Required front-yard setback. Section 94.4.07(3) prohibits activity and storage areas within the minimum
required front-yard setback, except for employee or patron parking. The September 4, 2026 site plan places
trailer staging, delivery-vehicle staging, loading and unloading, and internal circulation within designated
operational areas on private property. These activities must remain outside the required front-yard setback, and
no storage is permitted in that setback.
• Off-street parking. Section 94.4.07(3) requires one parking space for each onsite employee on the largest work
shift. The applicant identifies seven employees, and the submitted site plan depicts seven employee parking
spaces along the east side of the parking lot, satisfying the minimum employee-parking requirement. The
approved layout also provides designated spaces for six regular delivery vehicles and a seventh vehicle during
peak season.
• Operational impacts and public right-of-way protection. The proposed scale is limited to two inbound trailers
per day during normal operations, up to three during the October–November peak season, six delivery vehicles
normally, seven during peak season, and no more than one transfer trailer onsite at any time. No tractors will
remain onsite after a trailer is dropped. Inbound trucks will enter by the west driveway and exit by the east
driveway, and all parking, staging, loading, unloading, and circulation will occur on private property without
obstructing the public right-of-way. Any deliveries before 6:00 a.m. must comply with applicable Village
requirements, including Section 50.104(4), where applicable.
• WHP-A groundwater-protection review. Because the property lies within the WHP-A – Wellhead Protection
Area Zone A Overlay District and the use is a motor freight terminal, the required Environmental Assessment
must be prepared by a licensed environmental engineer, reviewed and approved by Michael Wodalski, Director
of Public Works, and incorporated into the CUP as Exhibit C. The CUP shall not be issued and the conditional use
shall not commence until the assessment is approved, all required groundwater-protection measures are
incorporated and satisfied, and applicable Village consultant review costs are reimbursed.
• Overall finding. Subject to the proposed CUP conditions, continued compliance with the Section 94.4.07(3)
performance standards, and completion of the WHP-A review, staff finds that the proposed use is compatible
with the existing industrial site, will be adequately served by existing access and public services, and is not
expected to create a substantial or undue adverse impact on nearby property, traffic, parking, the public right-
of-way, or the public health, safety, and general welfare.
ANALYSIS
Staff reviewed the proposed use, the applicant’s operational description, and the September 4, 2026 Operations Site Plan.
The proposed operation is appropriately classified as a Freight Terminal and Mass Transportation Depot under Section
94.4.07(3) because its primary function is the staging of inbound transfer trailers and the direct transfer of product to
outbound delivery vehicles. The operation is not intended to function as a traditional warehouse, large -scale inventory
storage facility, retail use, or Distribution Center. Limited indoor storage of automotive-related materials and operational
equipment may occur only when temporary, incidental, and subordinate to the approved cross-dock operation.
Specifically:
• Scale and intensity. Normal operations include two inbound trailers per day, up to three during the October–
November peak season, six delivery vehicles normally, seven during peak season, and seven employees. No
more than one transfer trailer may remain onsite at a time, and no tractor may remain after the trailer is
dropped. This limited operating scale is compatible with the existing industrial property, subject to continued
compliance with the approved operational limits.
• Residential interface. Residentially zoned property is located along the north property line. Section 94.4.07(3)
therefore requires the applicable bufferyard and a minimum 100-foot separation between the residential lot line
and freight-terminal buildings, structures, outdoor storage areas, and activity areas. The existing building is
located between the residentially zoned property to the north and the proposed freight-terminal operational
areas. The required bufferyard, screening, and 100-foot separation shall be maintained in accordance with
Section 94.4.07(3) and the approved site plan (Exhibit A).
• Storage and screening. No outdoor storage is proposed, and the site plan identifies the gravel lot as “NO
OUTDOOR STORAGE.” The CUP should prohibit outdoor storage and require trailer staging, delivery-vehicle
parking, loading, unloading, and circulation to remain within the approved onsite areas. These controls, together
with the required residential bufferyard and screening, address the ordinance requirement to screen outdoor
storage areas and vehicles from non-industrially zoned property and public rights-of-way.
• Front-yard and circulation controls. Section 94.4.07(3) prohibits activity and storage areas in the required front-
yard setback, other than employee or patron parking. The operational plan places trailer staging, delivery-
vehicle staging, loading and unloading, and circulation in designated areas on private property. Inbound trucks
will enter through the west driveway and exit through the east driveway. All operational activity must remain
outside the required front-yard setback and may not obstruct the public right-of-way or emergency access.
• Parking. Section 94.4.07(3) requires one off-street parking space for each onsite employee on the largest work
shift. The applicant identifies seven employees, and Exhibit A depicts seven employee parking spaces along the
east side of the parking lot. The plan also identifies parking and staging for six regular delivery vehicles and a
seventh peak-season vehicle.
• Hours and neighborhood impacts. Delivery vehicles may depart during early-morning hours. Any business
deliveries before 6:00 a.m. must comply with applicable Village requirements, including Section 50.104(4),
where applicable. Limiting vehicle counts, prohibiting outdoor storage, keeping tractors from remaining onsite,
and confining operations to private property reduce potential noise, traffic, parking, and right-of-way impacts.
• WHP-A review. The property is within the WHP-A – Wellhead Protection Area Zone A Overlay District, where a
motor freight terminal requires an Environmental Assessment prepared by a licensed environmental engineer
and reviewed through the Village’s wellhead-protection process. As of October 5, 2026, the assessment had not
been submitted. Staff supports conditional approval only if the CUP is not issued and the use does not
commence until Michael Wodalski, Director of Public Works, approves the assessment, all required
groundwater-protection measures are incorporated and satisfied, and applicable consultant review costs are
reimbursed. The Commission may alternatively defer final action until that review is complete.
Based on the submitted materials, staff finds that the proposed freight-terminal use can satisfy Section 94.4.07(3) and the
general Conditional Use Permit approval criteria if it is operated in accordance with the approved plans and operational
description, remains subject to the proposed conditions, and completes the required WHP -A review before the CUP is
issued or the use commences. The September 4, 2026 Operations Site Plan should be incorporated as Exhibit A, the
approved operational description as Exhibit B, and the future approved Environmental Assessment as Exhibit C.
PLAN COMMISSION ACTION OPTIONS FOR OCTOBER 12, 2026:
1) Approve the Conditional Use Permit subject to completion of the WHP -A review. Approve Conditional Use
Permit Project #20260333 for U.S. Venture, Inc. d/b/a U.S. AutoForce to operate a Freight Terminal and Mass
Transportation Depot at 6002 Saxon Avenue pursuant to Section 94.4.07(3) of the Village of Weston Zoning Code,
subject to the following conditions:
The required WHP -A Environmental Assessment shall be submitted and reviewed through the Village’s WHP -A
review process and approved by the Director of Public Works. The Director of Public Works may require
incorporation of recommendations or groundwater -protection measures identified through that review. The
Conditional Use Permit shall not be issued and the conditional use shall not commence until the required WHP-
A review has been completed, the Environmental Assessment has been approved, all resulting requirements
have been satisfied, and applicable Village consultant review costs have been reimbursed.
a. Limit the approved use to a Freight Terminal and Mass Transportation Depot under Section 94.4.07(3),
operated primarily as the cross -dock distribution operation described in the approved application
materials. The facility shall not operate as a traditiona l warehouse, large-scale inventory storage facility,
or Distribution Center.
b. Allow only limited quantities of automotive -related materials and operational equipment that are
temporary and incidental to the approved cross-dock operation. Tire inventory shall not be stored within
the building. Any expansion of storage or change in th e primary character of the use shall require prior
zoning review and may require an amended or new Conditional Use Permit.
c. Prohibit outdoor storage.
d. Limit onsite trailer staging to one inbound transfer trailer at a time. No tractors may remain parked onsite
after a trailer is dropped.
e. Require all truck parking, trailer staging, delivery -vehicle parking, loading, unloading, and vehicle
circulation to occur entirely on the subject property and not occur in or obstruct the public right-of-way.
f. Require compliance with all applicable Freight Terminal and Mass Transportation Depot performance
standards in Section 94.4.07(3), including required bufferyards and residential setbacks, vehicle and
outdoor-storage screening, front-yard restrictions, and off- street parking requirements. Maintain seven
employee parking spaces and accommodate six regular delivery vehicles and up to seven delivery vehicles
during the peak season, consistent with the approved operational description.
g. Require any business deliveries before 6:00 a.m. to comply with applicable Village requirements, including
Section 50.104(4), where applicable.
h. Incorporate the September 4, 2026 Operations Site Plan as Exhibit A, the approved operational
description as Exhibit B, and the future approved WHP-A Environmental Assessment as Exhibit C. Exhibit
A shall control the approved operational layout and site -use areas, and Exhibit B shall control the
approved scope and operational characteristics of the use. The approved cross -dock/freight-transfer
function shall remain the primary use of the facility. Incorporation of Exhibit A does not constitute
construction-plan approval, authorize construction, or waive any separately required permits or
approvals.
i. Require compliance with all applicable Village, Marathon County, State of Wisconsin, and federal
requirements. This Conditional Use Permit does not waive any other required permit, approval,
inspection, or review. Any future expansion, modification, or change in the approved use, operations, site
plan, or storage characteristics shall be reviewed by the Zoning Administrator and, where required,
brought before the Plan Commission for amendment of this Conditional Use Permit or issuance of a new
Conditional Use Permit.
2) Approve after completion of the WHP -A review. If the required Environmental Assessment is received and
adequately reviewed before the Commission acts, approve the CUP with the conditions above and incorporate
any additional recommendations or groundwater-protection measures identified through that review.
3) Defer action. Defer final action after the public hearing to allow completion and Village review of the required
WHP-A Environmental Assessment and any related recommendations. Staff would return the matter to the Plan
Commission with the final Conditional Use Permit and proposed conditions once the outstanding review
requirements are satisfied.
4) Deny the Conditional Use Permit. State the specific findings and reasons supporting denial based on the
applicable Conditional Use Permit criteria and ordinance requirements.
FINAL PLAN COMMISSION DETERMINATION
The Plan Commission, having conducted the public hearing on October 12, 2026, reviewed the application, staff analysis,
submitted plans and operational materials, public testimony, and applicable provisions of the Village of Weston Zoning
Code, hereby:
☐ APPROVES the Conditional Use Permit subject to the conditions and requirements identified herein and in the approved
Conditional Use Permit.
☐ DEFERS action pending completion and review of the required WHP-A Environmental Assessment.
☐ DENIES the Conditional Use Permit for the reasons stated below.
Motion: __________________________________________
Vote: ______ in favor ______ opposed ______ abstained
Additional Conditions/Amendments:
Plan Commission Chair: ______________________________________________ Date: ___________________
Commission Clerk: __________________________________________________ Date: ___________________
VILLAGE OF WESTON, MARATHON COUNTY, WI
CONDITIONAL USE PERMIT # 20260333
This CONDITIONAL USE PERMIT is approved this 12th day of October , 2026 by the PLAN COMMISSION of the
VILLAGE OF WESTON, to U.S. Venture, Inc. d/b/a U.S. AutoForce, as applicant/operator, with Coppercraft Enterprises,
LLC as property owner.
WHEREAS, U.S. Venture, Inc. d/b/a U.S. AutoForce has applied for a Conditional Use Permit to operate a Freight
Terminal and Mass Transportation Depot at 6002 Saxon Avenue in the Village of Weston; and
WHEREAS, the subject property is legally described as follows:
SEC 15-28-08 PT OF NW 1/4 SW 1/4 BEG 892.35' ELY OF NW COR N 89 DEG E 225' S 330' S 89 DEG W 225'
N 330' TO BEG, Marathon County, Wisconsin. (PIN 192 2808 153 0987); and
WHEREAS, the property is zoned LI Limited Industrial, in which a Freight Terminal and Mass Transportation
Depot is a Conditional Use pursuant to Section 94.4.07(3) of the Village of Weston Municipal Code; and
WHEREAS, the subject property is located within the WHP-A Wellhead Protection Area Zone A Overlay District,
in which a motor freight terminal is identified as a conditional use and is subject to the applicable Wellhead Protection Area
requirements; and
WHEREAS, a petition for a Conditional Use Permit has been duly filed, reviewed by Village staff, noticed in
accordance with applicable law, and considered by the Plan Commission following a public hearing held on October 12,
2026; and
WHEREAS, after review of the application, supporting materials, testimony received at the public hearing, the
Village Comprehensive Plan, and the applicable provisions of Chapter 94 of the Village Code, the Plan Commission finds
that:
A. The proposed Freight Terminal and Mass Transportation Depot is generally consistent with the intent and
purpose of the LI Limited Industrial Zoning District and the Village of Weston Comprehensive Plan;
B. The proposed use is conditionally permitted under Section 94.4.07(3) and shall comply with the applicable
performance standards for a Freight Terminal and Mass Transportation Depot;
C. Subject to the conditions of this Conditional Use Permit, the proposed use will not result in a substantial or undue
adverse impact on nearby property, the character of the neighborhood, traffic, public rights-of-way, public health,
safety, or general welfare; and
D. The property is served by existing access and public utilities and services adequate for the proposed use, subject
to compliance with all applicable Village requirements and completion of the required WHP-A review; and
E. The Plan Commission's approval of this Conditional Use Permit is subject to the conditions contained herein,
including the conditions precedent to issuance and commencement of the use established by Condition 11; and
WHEREAS, the subject property is located within the WHP -A Overlay District and the required Environmental
Assessment must be prepared by a licensed environmental engineer and reviewed and approved through the Village's WHP-
A review process, with any required groundwater -protection measures incorporated before the Conditional Use Permit is
issued and the conditional use may commence; and
WHEREAS, upon discontinuance of the approved conditional use for a period exceeding three hundred sixty -five
(365) consecutive days, this Conditional Use Permit shall automatically become null and void. The burden of proof shall be
upon the property owner to demonstrate that the conditional use has remained in operation during such period; and
WHEREAS, this Conditional Use Permit and all conditions contained herein shall run with the land and shall remain
binding upon the current owner and all successors and assigns unless modified or terminated in accordance with the Village
of Weston Municipal Code.
NOW, THEREFORE, BE IT RESOLVED, the PLAN COMMISSION of the Village of Weston, Marathon County,
Wisconsin, hereby grants Conditional Use Permit No. 20260333 authorizing a Freight Terminal and Mass Transportation
Depot as defined in Section 94.4.07(3) of the Village of Weston Municipal Code, subject to the following conditions:
1. The approved use is limited to a Freight Terminal and Mass Transportation Depot under Section 94.4.07(3),
operated primarily as the cross-dock distribution operation described in the approved application materials.
2. The facility shall not operate as a traditional warehouse, large- scale inventory storage facility, or Distribution
Center. Tire inventory shall not be stored within the building.
3. Only limited quantities of automotive-related materials and operational equipment that are temporary and incidental
to the approved cross-dock operation may be stored within the building. Any expansion of storage or change in the
primary character of the use requires prior zoning review and may require an amended or new Conditional Use
Permit.
4. The use shall comply with all applicable Freight Terminal and Mass Transportation Depot performance standards
in Section 94.4.07(3), including applicable bufferyards and residential setbacks, vehicle and outdoor -storage
screening, front-yard restrictions, and off-street parking requirements.
5. No outdoor storage is permitted as part of the approved use.
6. No more than one inbound transfer trailer may remain onsite at any one time. No tractors may remain parked onsite
after the trailer is dropped.
7. Truck parking, trailer staging, delivery vehicle parking, loading/unloading, and vehicle circulation shall occur
entirely on the subject property and shall not occur in or obstruct the public right-of-way.
8. The site plan dated September 4, 2026 shall be incorporated into this Conditional Use Permit as Exhibit A and shall
control the approved operational layout and site -use areas. Incorporation of the site plan does not constitute
construction-plan approval, authorize construction, or waive any separately required permits or approvals.
9. The approved site plan shall maintain seven employee parking spaces and accommodate six regular delivery
vehicles and up to seven delivery vehicles during the peak season, consistent with the approved operational
description.
10. Any business deliveries occurring before 6:00 a.m. shall comply with applicable Village requirements, including
Section 50.104(4) where applicable.
11. The required WHP-A Environmental Assessment shall be submitted and reviewed through the Village's WHP -A
review process and approved by the Director of Public Works. Upon approval, the Environmental Assessment shall
be incorporated into this Conditional Use Permit as Exhibit C. The Director of Public Works may require
incorporation of recommendations or groundwater -protection measures identified through that review. This
Conditional Use Permit shall not be issued, and the conditional use shall not commence, until the required WHP-A
review has been completed, the Environmental Assessment has been approved, all resulting requirements have been
satisfied, and Exhibit C has been incorporated into the final recorded Conditional Use Permit. The applicant shall
reimburse the Village for applicable consultant review costs.
12. The approved operational description shall be incorporated into this Conditional Use Permit as Exhibit B and shall
control the approved scope and operational characteristics of the use. The approved cross -dock/freight-transfer
function shall remain the primary use of the facility.
13. The use shall remain in compliance with all applicable Village, Marathon County, State of Wisconsin, and federal
requirements. This Conditional Use Permit does not waive any other required permit, approval, inspection, or
review.
14. Any future expansion, modification, or change in the approved use, operations, site plan, or storage characteristics
shall be reviewed by the Zoning Administrator and, where required, brought before the Plan Commission for
amendment of this Conditional Use Permit or issuance of a new Conditional Use Permit.
Except as specifically modified herein, all uses permitted within the LI Limited Industrial Zoning District shall remain
permitted. The conditions of this Conditional Use Permit and Exhibits A through C establish the approved use, operational
limitations, site-use areas, and required environmental and groundwater-protection measures. Exhibit D documents the Plan
Commission's written findings supporting approval, and Exhibit E documents the Plan Commission's action. Exhibits D and
E are included as part of the official record of approval but shall not be construed to impose requirements beyond those
expressly stated in the conditions of this Conditional Use Permit and Exhibits A through C.
Violation of any condition of this Conditional Use Permit may result in enforcement action or revocation of this Conditional
Use Permit in accordance with the Village of Weston Municipal Code.
Dated this 12th day of October, 2026
WESTON PLAN COMMISSION
By:
Hooshang Zeghami, its Vice-Chair
ATTEST:
Jennifer L. Higgins, Zoning Administrator
STATE OF WISCONSIN)
) ss.
COUNTY OF MARATHON)
Personally, came before this _______ day of October 2026, the above-named Hooshang Zeghami, Vice-
Chair, and Jennifer L. Higgins, Zoning Administrator, to me known to be the persons who execute the foregoing
instrument and acknowledge the same.
Notary Public
My Commission expires on _____________________.
THIS INSTRUMENT DRAFTED BY:
Jennifer Higgins, Village of Weston
Director, Planning and Development
Weston, WI 54476
EXHIBIT A – SEPTEMBER 4, 2026 KELLER, INC. C1.0 SITE
PLAN
Project: 20260333
Applicant/Operator: U.S. Venture, Inc. d/b/a U.S. AutoForce
Property Owner: Coppercraft Enterprises, LLC
Location: 6002 Saxon Avenue, Weston, WI 54476
Parcel: 192 2808 153 0987
Zoning District: LI – Limited Industrial
Overlay District: WHP-A – Wellhead Protection Area Zone A
Purpose
Approved site plan establishing the operational layout and site-use areas for the Freight Terminal and Mass
Transportation Depot at 6002 Saxon Avenue. The site plan is incorporated into and made a part of this
Conditional Use Permit as Exhibit A. Incorporation of the site plan does not constitute construction-plan
approval or waive any separately required permits or approvals.
Approved Documents
Site Plan – Keller, Inc., C1.0, dated September 4, 2026
This exhibit is incorporated into and made a part of Conditional Use Permit #20260333.
BUILDING CODE ANALYSIS
APPLICABLE CODES
2021 International Building Code (w/ WI Amendments)
2021 IECC
2021 IEBC (Level # Alteration)
OCCUPANCY
---
Accessory Use
----
Incidental Use
----
High-Piled Combustible Storage YES/NO
Hazardous Materials YES/NO
Multiple Control Areas YES/NO
HEIGHT & AREA
Building Height: -'--" Maximum Allowed: -'--"
Number of Stories: -- Maximum Allowed: --
Total Building Area: -,--- S.F. Maximum Allowed: -,--- S.F.
Total Fire Area: -,--- S.F. Maximum Allowed: -,--- S.F.
Mixed/Separated Occupancies
Unlimited Area Building YES/NO
CONSTRUCTION TYPE
Construction Classification -B
Fire Separation Distance -'--"
FIRE PROTECTION SYSTEMS
Assumed Sprinkler Type --
Fire Alarm System YES/NO
MEANS OF EGRESS
Occupant Load --
Panic Hardware YES/NO
STRUCTURAL DESIGN
Risk Category --
Design Loads
Roof Live Load -- psf
Walk-on IMP Ceiling Live Load -- psf
Steel Framing
Collateral Load -- psf
Wood Truss
Top Chord Dead Load -- psf
Bottom Chord Load -- psf
Mezzanine/Second Floor/Basement
Live Load -- psf
Point Load (Partition) -- psf
Snow Load Criteria
Ground Snow Load (Pg) -- psf
Exposure Factor (Ce) --
Thermal Factor (Ct) --
Wind Loads
Wind Load -- MPH
Surface Roughness --
Exposure Category --
Earthquake Load Criteria
Soil Site Class --
Ss --
S1 --
PLUMBING SYSTEMS
Mens WC Required #
Womens WC Required #
Drinking Fountain Required #
Other Source YES/NO
Ambulatory Stall Required YES/NO
MECHANICAL SYSTEMS
NO SINGLE PIECE OF EQUIPMENT OVER 400,000 BTU
NO BOILERS OVER 15 PSI AND 10 HORSEPOWER
SITE INFORMATION
SITE CONTENT
Building Size -,--- S.F. -.--%
Hard Surface -,--- S.F. -.--%
Green Space -,--- S.F. -.--%
Parcel Size (Approx.) -,--- S.F. -.-- Acres
Parking Provided -- Stalls
Area of Disturbance -,--- S.F.
ZONING
Property Zoning --
Setbacks FY -'--" SY -'--" RY -'--"
Hard Surface Setback -'--"
Coverage Limit --%
Greenspace Requirement --%
Parking Required -- Stalls
Refuse Enclosure YES/NO
RTU SCREENING YES/NO
FLOOR AREAS
SECOND FLOOR
BUILDING & FIRE AREA
SQUARE FOOTAGES
FIRST FLOOR
CANOPIES (COLUMN SUPPORTED)
BASEMENT
EXISTING NEW
------ S.F.
SUB-TOTAL
BUILDING AREA SUB-TOTALS
MEZZANINES
FIRE AREA TOTALS
------ S.F. ------ S.F.
------ S.F. ------ S.F. ------ S.F.
------ S.F. ------ S.F. ------ S.F.
------ S.F. ------ S.F. ------ S.F.
------ S.F. ------ S.F. ------ S.F.
------ S.F. ------ S.F. ------ S.F.
------ S.F. ------ S.F. ------ S.F.
REMODEL AREA TOTALS ------ S.F. --% OF BUILDING AREA
SAXON AVE.
15'-0"
50'-0"
5'-0"
(7) STALLS @
9'-0" = 63'-0"
15'-0"
50'-0"
5'-0"
26'-0"
14'-0"14'-0"14'-0"(6) DELIVERY TRUCK STALLS @ 12'-0" = 72'-0"
200'-0"15'-0"
IN-BOUND
OUT-BOUND
20'-0"
15'-0"
25'-0"
15'-0"
EXISTING LIGHT POLE
GRAVEL LOT
(NO OUTDOOR STORAGE)
SPOTTED TRAILER
EXISTING BUILDING
(NO TIRE PRODUCT INSIDE BUILDING)
PRELIMINARY NO:
SUPERVISOR:
EXPEDITOR:
DRAWN BY:
CONTRACT NO:
DATE:
SHEET:
REVISIONS
"COPYRIGHT NOTICE"
This design, drawing and detail is the
copyrighted property of KELLER, INC.
No part hereof shall be copied, duplicated,
distributed, disclosed or made available to
anyone without the expressed written
consent of KELLER, INC.
PRELIMINARY - NOT FOR CONSTRUCTIONWISCONSIN
WISCONSIN
DESIGNER:
PROJECT MANAGER:
INTERIOR DESIGNER:
C1.0
09.04.2026
J.R.S.
-------
-------
P26210
-------
PROPOSED FOR:
WESTON,
US AUTOFORCE
PROPOSED FOR:
WESTON,
K. VERSTEGEN
S. KLESSIG
------- 6002 SAXON AVENUE
54476
NORTH
SHEET INDEX
C1.0 CONCEPTUAL SITE PLAN
THE LOT DIMENSIONS AND BEARINGS SHOWN ON THIS PLAN ARE INTERPRETED VALUES. BACKGROUND
INFORMATION TAKEN FROM LOCAL GIS DATE. AERIAL IMAGERY AND/OR CLIENT PROVIDED INFORMATION,
EASEMENTS, STREAMS AND ROADS ARE APPROXIMATE IN NATURE. FOLLOW UP INVESTIGATION WITH
STATE AND LOCAL AUTHORITIES AND/OR WITH CERTIFIED SURVEY MAP DATA WHEN AVAILABLE IS REQUIRED.
0' 15' 30' 60' 120'
1" = 30'-0"
CONCEPTUAL SITE PLAN
1
2
3
4
5
6
EXHIBIT B – APPROVED OPERATIONAL DESCRIPTION
Project: 20260333
Applicant/Operator: U.S. Venture, Inc. d/b/a U.S. AutoForce
Property Owner: Coppercraft Enterprises, LLC
Location: 6002 Saxon Avenue, Weston, WI 54476
Parcel: 192 2808 153 0987
Zoning District: LI – Limited Industrial
Overlay District: WHP-A – Wellhead Protection Area Zone A
Purpose
Approved operational description for the Freight Terminal and Mass Transportation Depot use at 6002 Saxon
Avenue.
Operational Description
The facility will operate primarily as a cross-dock distribution operation. Inbound transfer trailers will deliver
products to the site for unloading, route sorting, and direct transfer to outbound delivery vehicles for
distribution. The facility typically receives two inbound trailers per day during normal operations and up to
three inbound trailers per day during the October and November peak season; however, only one trailer may
remain on site at any given time. No tractors shall remain onsite after the trailer is dropped. The operation
utilizes six delivery trucks during normal operations and seven delivery trucks during the peak season, with
seven employees. Delivery vehicle parking and staging shall occur on the south side of the building, and
employee parking shall be provided on site as shown on Exhibit A. Loading and unloading occurs at the rear of
the staged trailer, with product transferred directly from the trailer to the delivery vehicles. Truck parking,
trailer staging, delivery vehicle parking, loading/unloading, and vehicle circulation shall occur entirely on
private property. No outdoor storage is permitted. The facility shall not function as a traditional warehouse,
large-scale inventory storage operation, or Distribution Center. Tire inventory shall not be stored within the
building. Limited quantities of automotive-related materials and operational equipment, such as disassembled
tire racking, tire valves and stems, and similar items, may be stored temporarily and incidentally in the building
in support of the distribution operation. The facility will not include retail sales, customer pickup,
manufacturing, vehicle repair, or tire installation. Any future expansion or material modification of the
approved operation, including changes to storage characteristics, shall require review under the Conditional Use
Permit and applicable zoning requirements.
This exhibit is incorporated into and made a part of Conditional Use Permit #20260333.
Internal
Proposed Conditional Use – Operations Site Plan
The facility will not function as a warehouse or traditional inventory storage operation. Limited
quantities of automotive -related materials and operational equipment, such as disassembled tire
racking, tire valves and stems, and similar items, may be stor ed temporarily and incidentally in the
building in support of the distribution operation. Tire inventory will not be stored within the building.
The facility typically receives two inbound trailers per day during normal operations and up to three inbound trailers per day during
the peak season (October and November). However, only one trailer will remain on site at any given time. This trailer staging area
shall be identified and dimensioned on the revised site plan.
The operation utilizes six delivery trucks during normal operations and seven delivery trucks during the peak season. Due to the
building layout, all delivery vehicle parking and staging occurs on the south side of the building, with vehicles facing north toward the
building. Once loaded, delivery vehicles remain in their designated parking/staging spaces until departing for their assigned routes during
the early morning hours. The location and quantity of all delivery vehicle parking spaces shall be shown on the revised site plan.
Employee parking is provided on-site along the east edge of the parking lot adjacent to the grass area. The facility employs seven
employees, and employee parking spaces shall be identified on the revised site plan.
Loading and unloading operations occur at the rear of the staged transfer trailer. Product is transferred directly from the trailer to the
delivery vehicles, with loading activities typically requiring approximately 20 minutes per delivery truck. The building is not utilized for
warehousing or product storage and is limited to operational support equipment such as pallet jacks, barrel carts, and similar delivery
support items.
The revised site plan shall identify and dimension the following:
• Delivery Trucks: Six (6) regular delivery trucks; seven (7) during peak season.
• Tractor/Trailer Spaces: One (1) designated trailer staging space located at the south end of the parking lot; no tractors remain
on site.
• Delivery Vehicle Parking/Staging: Located on the south side of the building.
• Employee Parking: Seven (7) employee parking spaces located along the east edge of the parking lot.
• Inbound Truck Staging: Trailer staging area at the south end of the parking lot.
• Loading/Unloading Area: Located at the rear of the staged trailer.
• Turning Movements: Inbound trucks enter via the west driveway and exit via the east driveway; delivery vehicle circulation
routes shall be shown.
• Drive Aisles: All internal circulation aisles serving trailer staging, delivery vehicle parking, and employee parking.
• Fire Lanes/Access: Emergency access routes maintained free of obstructions at all times.
• Overnight Parking: One staged trailer may remain on site; no tractors are parked overnight. Delivery vehicles may remain
parked in designated spaces until route departure.
All truck parking, trailer staging, delivery vehicle parking, loading/unloading activities, and vehicle circulation occur entirely on private
property within the approved site plan area. The site is approximately 200 feet from the public roadway, and no truck parking, staging,
loading, unloading, or circulation activities will occur within the public right-of-way or interfere with public road access.
Internal
Comparison of Proposed Conditional Use with Required Review Criteria (complete below or on an attached sheet as needed):
1. Is the proposed conditional use (the use in general, independent of its location) in harmony with the purposes, goals,
objectives, policies and standards of the Village of Weston Comprehensive Plan; zoning ordinance; and any other plan,
program or ordinance adopted or under consideration? Explain how, or why not. (Consult with Zoning Administrator as
necessary on applicable plans.)
Response: Yes. The proposed cross-dock use appears compatible with applicable planning and zoning objectives because the operation
is limited to controlled transfer activity, on-site staging, and delivery support. Trailer staging, delivery vehicle parking, employee parking,
circulation, and loading areas will be identified on the revised site plan.
2. Will the proposed conditional use in this location, result in a substantial or undue adverse impact on nearby property,
the character of the neighborhood, the natural environment, traffic, parking, public improvements, public property or
rights-of-way, or other matters affecting the public health, safety, or general welfare, either as they now exist or as they
may in the future be developed? Explain how, or why not.
Response: No substantial or undue adverse impact is anticipated. Truck parking, trailer staging, loading, unloading, and circulation will
occur entirely on private property, approximately 200 feet from the public roadway. Only one trailer will remain on site at a time, and drive
aisles, fire access, parking areas, and public rights-of-way will remain clear.
3. Will the proposed conditional use maintain the desired consistency of land uses, land use intensities, and land use
impacts as related to the environments of the subject property? How?
Response: Yes. The proposed use maintains consistency with the surrounding site environment by operating as a limited cross-dock
distribution function with modest vehicle counts: two inbound trailers per day under normal operations, up to three during peak season,
six delivery trucks normally, seven during peak season, and seven employees. Activities are confined to designated on-site areas.
4. Is the proposed conditional use located in an area that will be adequately served by, and will not impose an undue
burden on, any of the improvements, facilities, utilities or services provided by public agencies serving the subject
property? Explain how this has been evaluated.
Response: Yes. The property appears adequately served for the proposed use based on the operations plan and revised site plan
requirements. Inbound trucks will enter through the west driveway and exit through the east driveway, while trailer staging, delivery
vehicle parking, employee parking, loading areas, drive aisles, and fire access will be shown and maintained on site. The operation
should not impose an undue burden on public facilities, utilities, or services.
5. What are the public benefits of this proposal? Do the potential public benefits of the proposed conditional use
outweigh potential adverse impacts of the proposed conditional use?
Response: The proposal supports efficient local distribution while keeping truck activity contained on private property. Public benefits
include defined truck circulation, reduced risk of public right-of-way impacts, maintained fire access, and productive use of the existing
site. These benefits are expected to outweigh potential adverse impacts because the operational controls and site layout address
staging, parking, loading, and circulation on site.
US Venture, Inc. d/b/a U.S. AutoForce Zoning Permit Use Description
Zoning Permit Application Use Description
US Venture, Inc. d/b/a U.S. AutoForce | 6002 Saxon Ave, Schofield, WI 54476 | Village of Weston,
Wisconsin
Applicant / Operator US Venture, Inc. d/b/a U.S. AutoForce
Facility Address 6002 Saxon Ave, Schofield, WI 54476
Municipality Village of Weston, Wisconsin
Proposed Use Cross-dock and delivery distribution hub
Employees Onsite Seven (7) total employees, all delivery drivers
Summary of Proposed Use
US Venture, Inc. d/b/a U.S. AutoForce proposes to operate the facility at 6002 Saxon Ave., Schofield, WI
54476 as a cross-dock and delivery distribution hub serving Central and Northern Wisconsin.
The facility will not function as a warehouse, retail store, manufacturing operation, vehicle repair facility, or
tire installation location. No tire inventory will be stored onsite - various automotive parts and distribution
related product will be stored in the warehouse. Product delivered by inbound transfer trucks will be
unloaded, sorted by delivery route, and loaded directly onto outbound delivery vehicles for same-day
customer delivery.
Operational Details
The operation will employ seven (7) delivery drivers, all of whom will assist with unloading inbound transfer
shipments and loading their assigned delivery vehicles. Inbound transfer trucks are anticipated to arrive at
approximately 1:00 AM, with outbound delivery vehicles departing during the early morning hours. Delivery
vehicles are expected to return to the facility by approximately 2:00 PM each day.
Customer returns, cores, warranty items, and undelivered product will remain on delivery vehicles and will
not be stored within the building. The facility is intended solely for the temporary transfer of product between
inbound and outbound transportation equipment.
Use Limitations
The site will not be open to the public and will not include retail sales, customer pickup, outdoor storage,
manufacturing activities, or long-term inventory storage. The primary use of the property is transportation,
freight transfer, vehicle parking, and delivery dispatch operations.
Key zoning point: this is a flow-through transportation and delivery operation, not an inventory
storage warehouse or customer-facing retail use.
US Venture, Inc. d/b/a U.S. AutoForce Zoning Permit Use Description
Prepared for zoning permit application review.
EXHIBIT C – WHP-A ENVIRONMENTAL ASSESSMENT
Project: 20260333
Applicant/Operator: U.S. Venture, Inc. d/b/a U.S. AutoForce
Property Owner: Coppercraft Enterprises, LLC
Location: 6002 Saxon Avenue, Weston, WI 54476
Parcel: 192 2808 153 0987
Zoning District: LI – Limited Industrial
Overlay District: WHP-A – Wellhead Protection Area Zone A
Purpose
The Environmental Assessment required for the WHP-A Wellhead Protection Area Zone A Overlay District
shall be incorporated into and made a part of this Conditional Use Permit as Exhibit C upon approval by the
Director of Public Works. The approved Environmental Assessment, including any required recommendations
or groundwater-protection measures resulting from the Village’s WHP-A review process, shall control the
environmental and groundwater-protection requirements applicable to the approved use.
Approved Document
WHP-A Environmental Assessment – to be inserted following completion of Village review and approval by
the Director of Public Works.
Upon approval, this exhibit is incorporated into and made a part of Conditional Use Permit #20260333.
EXHIBIT D – PLAN COMMISSION WRITTEN
DETERMINATION DATED OCTOBER 12, 2026
Project: 20260333
Applicant/Operator: U.S. Venture, Inc. d/b/a U.S. AutoForce
Property Owner: Coppercraft Enterprises, LLC
Location: 6002 Saxon Avenue, Weston, WI 54476
Parcel: 192 2808 153 0987
Zoning District: LI – Limited Industrial
Overlay District: WHP-A – Wellhead Protection Area Zone A
Purpose
The Conditional Use Permit Determination completed and approved by the Village of Weston Plan Commission
on October 12, 2026, documenting the Plan Commission's findings regarding the Conditional Use Permit
application, including the applicable conditional-use approval criteria and the basis for approval of the Freight
Terminal and Mass Transportation Depot use.
Approved Document
Conditional Use Permit Determination by the Village of Weston Plan Commission, dated October 12, 2026.
This Exhibit D is incorporated into and made a part of Conditional Use Permit #20260333.
EXHIBIT E – CERTIFIED PLAN COMMISSION ACTION /
MINUTES EXCERPT DATED OCTOBER 12, 2026
Project: 20260333
Conditional Use Permit – 6002 Saxon Avenue
Plan Commission Meeting: October 12, 2026
Action Taken:
The Village of Weston Plan Commission conducted the required public hearing and took action on Conditional
Use Permit Project #20260333 for U.S. Venture, Inc. d/b/a U.S. AutoForce to operate a Freight Terminal and
Mass Transportation Depot at 6002 Saxon Avenue pursuant to Section 94.4.07(3) of the Village of Weston
Zoning Code.
Motion: [Insert final motion exactly as adopted.]
Vote: [Insert vote.]
Certified Excerpt:
This exhibit is a true and correct excerpt of the official minutes of the Village of Weston Plan Commission
meeting held on October 12, 2026, relating to Project #20260333.
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
Public Mtg/Date: Plan Commission, October 12, 2026
Description: Conduct a public hearing and consider action on Project No. 20230129, a
request by BUG Properties, LLC to amend Conditional Use Permit No.
20230129 by extending the deadline for completion of required site
improvements at 6406 Schofield Avenue.
From: Jennifer Higgins, Planning & Development Director/Zoning Administrator
Question: Should the Plan Commission amend Conditional Use Permit No. 20230129
to extend the deadline for completing the remaining approved site
improvements at 6406 Schofield Avenue to September 30, 2027?
BACKGROUND
On October 9, 2023, the Plan Commission approved Conditional Use Permit No. 20230129 for a
Light Industrial Contractor Shop and Outdoor Storage Area at 6406 Schofield Avenue. The CUP,
Development Agreement, and approved site plan require the property to be developed in
accordance with the approved plans and established a project completion deadline of October 9,
2025.
The project is also subject to a Development Agreement approved by the Village Board. Section 4
of the Development Agreement, “Automatic Termination of Site Plan Approval,” provides that the
Site Plan Approval automatically terminates upon: “a failure to complete construction of the
PROJECT within two (2) years of issuance of the site plan approval unless the PLAN
COMMISSION has extended this period by request of DEVELOPER based on reasons beyond the
reasonable control of the DEVELOPER.” Section 4 also provides for automatic termination upon
commencement of future additions, modifications, or changes to the property requiring Village
approval that were not approved in advance by the Village Approval Authority. Accordingly, the
requested extension also relates directly to the continuation of the Site Plan Approval under the
Development Agreement. Any extension should expressly preserve the requirement that future
additions, modifications, or property changes receive all required Village approvals in advance.
At its September 14, 2026 meeting, the Plan Commission reviewed the administrative record and
determined that the property was not in compliance with the CUP and Development Agreement.
Remaining site improvements included concrete work, fencing and gates, and landscape rock and
curbing. The Plan Commission directed the owner to complete the remaining site improvements by
September 23, 2026 and directed staff to document the compliance status.
Staff provided written follow-up on September 15, 2026. The owner was advised that, if additional
time was needed, a written request and proposed completion timeline should be submitted for Plan
Commission consideration. The owner subsequently requested an extension through September
30, 2027. The request cites project costs, limited funds for remaining materials, the potential
acquisition of adjacent property that could affect future site elevations and design, and weather
conditions. The request proposes September 30, 2027 as the completion date for the remaining
concrete, fencing and gate, and landscape improvements, as well as the outstanding items
identified in the August 11, 2026 Commercial Final Inspection Report.
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
The principal building and substantial portions of the approved development have been completed.
An updated October 2026 inspection confirms that the site remains incomplete under the approved
site plan, including incomplete concrete-to-gravel transitions, gravel-surfaced portions of the rear
storage yard and parking/access areas, incomplete fencing and gate improvements, and
incomplete frontage landscaping. Building, accessibility, electrical, HVAC, plumbing, and other final-
inspection items are administered separately through the applicable permit and inspection
processes and are not part of the requested CUP amendment.
A document titled “First Amendment to Conditional Use Permit No. 20230129 — BUG Properties
LLC — 6406 Schofield Avenue — Village of Weston, Marathon County, Wisconsin” will be included
in the meeting packet as a draft exhibit. The draft amendment is intended to document the revised
completion deadline and applicable conditions if approved by the Plan Commission and will be
conformed to the Commission’s final action before execution or recording.
The building, accessibility, electrical, HVAC, plumbing, and other final-inspection items are
administered separately through the applicable permit and inspection processes. Any CUP
amendment should not be interpreted as approval of those items, authorization of occupancy,
approval of a revised site plan, or an extension of any expired building or trade permit.
The requested extension is approximately one year beyond the date of this review and nearly two
years beyond the original CUP completion deadline. However, the principal building and substantial
site improvements have been completed, and the owner has submitted a written request before
further enforcement action. If the Plan Commission grants additional time, staff recommends that
the amended deadline be firm, apply only to completion of the currently approved site
improvements, require continued coordination with staff and documented progress, and preserve
the Village’s ability to pursue modification, revocation, or other enforcement if the amended
deadline is not met.
The attached Current Conditions Compliance Matrix identifies the applicable item as
“LANDSCAPE.” Under the approved site plan, the Plan Commission waived any requirement for
landscaping improvements immediately adjacent to the building, and the approved treatment for
those areas is concrete. If cost is a concern, staff recommends that the owner consider providing
limited landscaping adjacent to the building—such as minimal plantings with rock or mulch—as a
potentially less expensive alternative to installing the approved concrete. Any alternative treatment
would be subject to staff review and any additional approval required to modify the approved site
plan.
Attached Docs: 1. Hearing Notice
2. September 14, 2026 Plan Commission CUP Compliance Staff
Report and administrative record
3. September 15, 2026 Plan Commission follow-up letter
4. September 15, 2026 follow-up email to the property owner
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
5. August 11, 2026 Commercial Final Inspection Report
6. Property owner’s written request for extension through September
30, 2027
7. October 2026 Updated Site Inspection and Photographic Exhibits A–
D
8. Current Conditions Compliance Matrix
9. Development Agreement for 6406 Schofield Avenue, including
Section 4, Automatic Termination of Site Plan Approval
10. Draft CUP — First Amendment to Conditional Use Permit No.
20230129 — BUG Properties LLC — 6406 Schofield Avenue —
Village of Weston, Marathon County, Wisconsin
11. Conditional Use Permit Amendment Determination by the Plan
Commission
Committee Action: The Plan Commission may approve, approve with conditions or a different
completion deadline, deny, or defer the requested amendment. Any
approval should clearly establish the amended completion deadline and
required follow-up documentation.
Fiscal Impact: No direct fiscal impact is anticipated from the requested amendment, other
than staff time for administration, follow-up inspections, and enforcement.
Applicable permit, reinspection, or enforcement fees remain the
responsibility of the property owner.
Recommendation: Staff recommends approval of the requested amendment extending the
completion deadline through September 30, 2027, subject to conditions that
preserve the approved site plan, require documented progress and staff
access for follow -up inspections, keep all building and trade- permit
compliance matters separate, and provide that failure to meet the amended
deadline may
result in further action under Section 94.16.06(11)(c) of the
Village of Weston Zoning Code.
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
Motion to approve an amendment to Conditional Use Permit No. 20230129 for BUG Properties
LLC, 6406 Schofield Avenue, extending the deadline for completion of the remaining site
improvements shown or required by the approved site plan to September 30, 2027, subject to the
seven conditions set forth below:
1. Scope of Amendment
This amendment applies only to the remaining concrete work, fencing and gates, and landscape
improvements, including landscape rock and curbing, required by the approved site plan. It does not
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
authorize any change to the approved use, site plan, building placement, access, outdoor storage
configuration, grading, drainage, landscaping, fencing, or other approved improvement.
2. Changes to Adjacent Property
Any proposed change associated with the acquisition or use of adjacent property, revised site
elevations, expanded operations, or a revised site layout shall be submitted separately and shall
receive all required Village approvals before related work begins.
3. Progress Updates and Inspections
The property owner shall maintain active communication with the Planning & Development
Department and shall provide a written progress update within 10 business days after receiving a
written request from staff. The property owner shall also permit reasona ble follow-up inspections by
Village staff to document progress and compliance.
4. Completion Deadline
All remaining improvements shall be completed no later than September 30, 2027. The property
owner shall request a final compliance inspection from the Planning & Development Department at
least 10 business days before that deadline. Staff shall determine compliance following the inspection
and receipt of any required documentation.
5. Separate Permit/Inspection Matters
This amendment does not extend, reinstate, or approve any expired building, electrical, HVAC,
plumbing, or other permit; does not resolve the items identified in the August 11, 2026 Commercial
Final Inspection Report; and does not authorize occupancy or us e contrary to applicable codes or
permit requirements. Those matters remain subject to separate administrative review and approval.
6. All Other Conditions Remain
All other terms and conditions of Conditional Use Permit No. 20230129, the Development Agreement,
and the approved site plan remain in full force and effect unless specifically modified by this action.
7. Enforcement
Failure to complete the required improvements by September 30, 2027, or failure to comply with
Conditional Use Permit No. 20230129, the Development Agreement, the approved site plan, or these
conditions may result in further proceedings under Section 94.16 .06(11)(c) of the Village of Weston
Zoning Code, including modification, revocation, or other appropriate enforcement action.
ADDITIONAL ACTION: Direct staff to issue written notice of the Plan Commission’s action, update
the CUP administrative record, monitor progress, and return the matter to
the Plan Commission if the conditions or amended deadline are not met.
PUBLIC HEARING NOTICE - CONDITIONAL USE PERMIT
Property Address: 6406 Schofield Avenue
Applicant/Property Owners: Bruce Guss, BUG Properties, LLC
Project Number: 20230129
The Village of Weston Plan Commission will hold a public hearing to consider a request from Bruce
Guss, on behalf of BUG Properties, LLC, to modify the completion deadline associated with
Conditional Use Permit No. 20230129 for the property located at 6406 Schofield Avenue.
The Conditional Use Permit was approved for the development and operation of a light industrial
contractor shop and associated outdoor storage area. The approved development is subject to an
approved site plan and Development Agreement, including requirements for completion of the
approved site improvements.
At its September 14, 2026, meeting, the Plan Commission determined that the property was not
currently in compliance with Conditional Use Permit No. 20230129 and the associated Development
Agreement and established September 23, 2026, as the deadline for completion of the remaining site
improvements.
Pursuant to Section 94.16.06(11)(c) of the Village of Weston Zoning Code, a Conditional Use Permit
may be modified by the Plan Commission when the Commission determines that the associated
improvements are not in compliance with the terms of the Zoning Code or the approved Conditional
Use Permit, including any associated plan or approval condition. The applicant has requested an
extension of the completion deadline through September 30, 2027. The requested extension applies
to the remaining concrete work, required fencing and gates, and landscape improvements, including
landscape rock and curbing. The applicant has identified budget considerations, potential acquisition
of the adjacent property, and weather conditions as factors contributing to the request for additional
time.
The property is approximately 1.01 acres in size, is zoned B-3 General Business and is identified as
PIN 192 2808 153 0946.
PUBLIC HEARING INFORMATION
Date: Monday, October 12, 2026
Time: 6:00 p.m.
Location: Weston Municipal Center Board Room
4747 Camp Phillips Road, Weston, WI
The purpose of the public hearing is to receive comments from interested residents and property
owners regarding the requested modification to Conditional Use Permit No. 20230129 before the Plan
Commission considers action on the request.
REVIEW PROJECT MATERIALS
Application materials, site plans, and supporting documents are available for review at the Planning &
Development Department during normal business hours (Monday through Friday, 8:00 a.m. to 4:30
p.m.) and online through the Village website at www.westonwi.gov.
SUBMIT COMMENTS
Residents who wish to provide comments may attend the public hearing or submit written comments
to the Planning & Development Department prior to the meeting. Written comments to be included in
the meeting packet should be submitted no later than noon on Wednesday, October 7, 2026.
Written comments received after the packet deadline and before the hearing will be provided to the
Plan Commission for consideration at the meeting
For additional information, please contact the Village of Weston Planning & Development Department
at (715) 241-2613 or plandev@westonwi.gov.
NOTICE TO ADJACENT PROPERTY OWNERS AND MUNICIPALITIES
In accordance with Wis. Stat. § 62.23(7)(d)2 and Weston Zoning Ordinance Chapter 94, notice of this
public hearing has been mailed to property owners within 300 feet of the affected parcel and to any
adjacent municipality within 1,000 feet.
PLAN COMMISSION STAFF REPORT
Conditional Use Permit Compliance Review
6406 Schofield Avenue – BUG Properties LLC
Property Information
Property Address: 6406 Schofield Avenue
Property Owner: BUG Properties LLC
Operator: Bruce Guss
CUP Number: 20230129
Original Approval Date: October 9, 2023
Background
On October 9, 2023, the Village of Weston Plan Commission approved Conditional Use
Permit No. 20230129 for operation of a Light Industrial Contractor Shop and Outdoor
Storage Area at 6406 Schofield Avenue. A Development Agreement was subsequently
executed requiring the property to be developed in accordance with the approved plans and
Village approvals. Building, plumbing, HVAC, and electrical permits were subsequently
issued for construction of the project.
Administrative Record and Exhibits
Exhibit A – Recorded Conditional Use Permit No. 20230129.
Exhibit B – Recorded Development Agreement for the property located at 6406 Schofield
Avenue.
Exhibit C – June 18, 2026 Final Inspection Site Photographs.
• Figure C-1: West Side Building Elevation and Sidewalk Improvements
• Figure C-2: Rear Yard and Storage Area Conditions
• Figure C-3: Building Exterior and Rear Yard Area
• Figure C-4: Front Building Elevation and Landscape Area
Exhibit D – Permit and Inspection Records.
• Building Permit No. 202400092 Inspection History
• Plumbing Permit No. 202400147 Inspection History
• HVAC Permit No. 202400860 Inspection History
• Electrical Permit No. 202401142 Inspection History
Exhibit E – August 11, 2026 Commercial Final Inspection Report.
Findings of Noncompliance
1. The Conditional Use Permit was approved based upon the submitted site plan and
supporting documents and requires development in accordance with the approved plans
and conditions.
2. The Development Agreement requires the property to be developed in accordance with
approved plans and Village approvals.
3. Project records indicate construction activity continued through 2024, 2025 and 2026.
4. The Conditional Use Permit established a project completion deadline of October 9, 2025.
5. On June 18, 2026, staff conducted a Final inspection with Village inspection staff and
DSPS. Mr. Guss was not present for the inspection but was contacted over the phone to
approve entry into the premises.
6. At the time of inspection, concrete work, fencing/gates, landscape improvements and
curbing remained incomplete.
7. The building permit had expired and the site remained incomplete beyond the
completion deadline.
8. Staff determined the site was not in compliance with the Conditional Use Permit,
Development Agreement, and approved site plan.
Staff Analysis
Staff recognizes that substantial progress has occurred on the site since approval of
Conditional Use Permit No. 20230129. The principal building has been constructed,
multiple permits were issued and inspected, and significant investment has been made
toward development of the property.
Staff also acknowledges that project-related activities, permit inspections, and site visits
occurred over an extended period of time. While staff recalls additional discussions and site
observations during construction, the recommendations contained within this report are
based upon the documented administrative record.
Exhibit C demonstrates that substantial investment has occurred on the property and that
significant portions of the development have been completed. However, the photographs
also document site conditions existing on June 18, 2026, which must be considered in
conjunction with the approved site plan, Development Agreement, permit records, and
inspection findings.
The issue presently before the Plan Commission is whether the development was
completed in accordance with the approved site plan and within the timeframe established
by the Conditional Use Permit and Development Agreement.
Based upon the documented permit history, inspection records, approved plans,
Conditional Use Permit, and Development Agreement, staff concludes that the approved
development was not completed by the applicable completion deadline and therefore
remains out of compliance with the terms and conditions of approval.
Staff Recommendation
Staff recommends that the Plan Commission find that the property located at 6406 Schofield
Avenue is not currently in compliance with Conditional Use Permit No. 20230129 and the
associated Development Agreement due to failure to complete the approved development
within the required timeframe and in accordance with the approved site plan.
Staff recommends that the Plan Commission establish a specific deadline for completion of
all remaining site improvements and direct staff to conduct a follow-up inspection after the
compliance deadline. Staff does not presently recommend revocation of the Conditional Use
Permit; however, continued failure to comply may result in future enforcement actions,
including modification, suspension, or revocation of the permit.
Proposed Motion
Motion to find that the property located at 6406 Schofield Avenue is not in compliance with
Conditional Use Permit No. 20230129 and the associated Development Agreement, and to
direct the property owner and operator to complete all remaining site improvements and
obtain compliance with the approved site plan by ________, with staff to report back to the
Plan Commission regarding compliance status.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 1
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
Village of Weston, Wisconsin
OFFICIAL PROCEEDINGS OF THE VILLAGE PLAN COMMISSION AND
JOINT TOWN & VILLAGE EXTRATERRITORIAL ZONING COMMITTEE MEETING
held on Monday, October 9, 2023, at 6:00 p.m., in the Board Room, at 4747 Camp Phillips Road
AGENDA ITEMS.
1. Meeting called to order by Plan Commission Chair and Village Trustee Steve Cronin at
approximately 6:00 p.m.
2. Roll Call of Village Plan Commission (PC) by Secretary Parker.
Roll call indicated 5 PC members present.
Member Present
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave YES
Guerndt, Gary YES
Hoffman, Travis EXCUSED
Jordan, Joe YES
Mumper, Roy EXCUSED
3. Roll Call of Joint Village & Town of Weston Extraterritorial Zoning Committee (ETZ) by
Secretary Parker.
Roll call indicated 5 ETZ members present.
Member Present
Olson, Milt {Chair} YES
Cronin, Steve {Vice Chair} YES
Christiansen, Randy YES
Guerndt, Gary YES
Hull, Mark YES
Mumper, Roy EXCUSED
Village Staff in attendance, in-person: Higgins, Wodalski, Anklam, Maguire, Meverden, and Parker.
SAFER Fire Marshal, Marty Christiansen, and Wausau P.D. Humane Officer, Ashlee Bishop, were
present.
Village Staff in attendance, via Zoom: None
Audience Members in attendance, in-person: There were 23 audience members present, in-person.
Audience Members in attendance, via Zoom: There were no audience members present, via Zoom.
PUBLIC COMMENT
No public comment.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 2
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
MINUTES FROM PREVIOUS MEETINGS [0:02:00 Zoom Meeting Recording]
4. Approve minutes from the July 10, 2023, Joint PC & ETZ Meeting. (ETZ)
(ETZ) Motion by Hull, second by Olson: To approve the July 10, 2023, Joint PC & ETZ meeting
minutes.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member (ETZ) Voting
Olson, Milt {Chair} YES
Cronin, Steve {Vice Chair} YES
Christiansen, Randy YES
Guerndt, Gary YES
Hull, Mark YES
Mumper, Roy ------
5. Approve minutes from the September 11, 2023, PC Meeting. (ETZ)
(PC) Motion by Guerndt, second by Diesen: To approve the September 11, 2023, PC meeting
minutes.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave YES
Guerndt, Gary YES
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
COMMUNICATIONS, DISCLOSURES, AND RECUSALS
6. Written Communications Received. [0:02:43 Zoom Meeting Recording]
Cronin read in for the record an e-mail (attached) Parker received on Oct. 7
th, from resident, Sam
Wessel, of 5810 Tricia Avenue, sharing his comments and support for the Chicken Ordinance
discussion tonight.
PUBLIC HEARINGS
Zoning Map & Text Amendments, Conditional Uses & Related Requests
7. Ordinance No. 23-016: An Ordinance Amending Provisions within Chapter 94, of the
Municipal Code, affecting the performance standards of the personal storage facility land use,
calculation of minimum required parking spaces, bicycle parking, and nonconforming sites in
the Village of Weston and the Extraterritorial Zoning Area of the Town of Weston. [0:04:26
Zoom Meeting Recording]
Valerie Parker updated @ 10/11/2023 1:59 PM Page 3
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
a. Open Public Hearing.
Cronin opened the public hearing at 6:04 pm
b. Presentation by Applicant and/or Staff.
Higgins explained these are four ordinance amendments that have been discussed over the last
several months. She went through the different proposed ordinance amendments from her report.
Pinsonneault commented on the second proposed amendment, how he feels it would be very difficult
for the average person to understand the language and asked to have the language in this simplified
and put more into layman’s terms, so that it is easier to understand.
Pinsonneault questioned, on the third proposed amendment, on the reference to the “inverted-U”
shaped bike rack and questioned why the preference of this style over other bike rack styles.
Maguire stated this is just standard language from other model ordinances. Hull commented these
are more easily available for purchase, and from a bike-owner’s perspective are better than having a
“rack” or designated bike parking area. Hull stated the inverted-U’s are bolted down to the ground
and are more secure for bike owners. He stated there is another kind known as the “W” (wave-style)
Bike Rack, which is the same as the ‘inverted-U” but holds more.
Hull questioned, in the Personal Storage Facility amendment, under Performance Standard #6, he
pointed out it states “All outdoor storage areas shall be completely enclosed…”, and how in all the
other sections it states outdoor areas to be fully screened.
He clarified that enclosed could be interpreted as four sides and a roof, where screened is closed in
with just the sides. Higgins stated she can change the language to reflect “screening” versus
“enclosed”.
c. Public Comment Period.
None.
d. Close Public Hearing.
Cronin closed at 6:12 p.m.
e. Recommendation from Staff.
Higgins recommends approval with the changes that were discussed.
f. Discussion & Recommendation to the Board of Trustees by the Plan Commission.
(PC) Motion by Jordan, second by Diesen: To recommend approval to the Board of Trustees
on the Ordinance Amendments as proposed, but with the changes as discussed.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave YES
Guerndt, Gary YES
Valerie Parker updated @ 10/11/2023 1:59 PM Page 4
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
g. Discussion & Recommendation to the Board of Trustees by the ETZ.
(PC) Motion by Hull, second by Christiansen: To recommend approval to the Board of
Trustees on the Ordinance Amendments as proposed, but with the changes as discussed.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member (ETZ) Voting
Olson, Milt {Chair} YES
Cronin, Steve {Vice Chair} YES
Christiansen, Randy YES
Guerndt, Gary YES
Hull, Mark YES
Mumper, Roy ------
8. Ordinance No. 23-0XX: An Ordinance Amending provisions within Chapter 94, Article 4,
Section 94.4.09(10), of the Municipal Code, affecting Keeping of Farm Animals on Residential
Lots, as an Accessory Land Use, in the Village of Weston and the Extraterritorial Zoning Area
of the Town of Weston. [0:13:23 Zoom Meeting Recording]
a. Open Public Hearing.
Cronin opened the public hearing at 6:14 p.m.
b. Presentation by Applicant and/or Staff.
Anklam explained, from his report, that resident, Ryan Cortright, now officially applied for the Zoning
Code Text Amendment. Anklam explained since our July PC meeting, staff opened up a public
survey and worked with Zoning Ordinance consultant, Mark Roffers, on the proposed zoning code
language to re-work the section of code to allow for backyard chickens. He explained the proposed
language is based off of the comments made at the July PC meeting along with responses to the
public survey and what other municipalities have in their codes.
Ryan Cortright, 6503 Alta Verde Street, was present. He confirmed his petition letter from June was
in the packet. Cortright gave an overview of his petition letter. He commented on how ordinances
are for people who follow ordinances. He commented that it appears the Board is aware of existing
chickens in the community but have taken a stance that as long as no complaints are received, they
would look the other way. He feels ordinances against chickens are 1990’s and wants to bring the
Village into 2000’s. He feels if this is approved, not everyone will start raising chickens.
Hull questioned if a building permit would be required for a chicken coop or chicken run. Anklam read
the proposed language, explaining an annual license would need to be applied for, and the required
site inspection, and fee. Higgins stated the 1
st permit would be more expensive, as it would include
the site inspection and license, then just annual renewals after that. Hull questioned if this is
regulated the same as an accessory structure, and how our current code has limitations on accessory
Valerie Parker updated @ 10/11/2023 1:59 PM Page 5
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
structures. Hull also brought up how our accessory structure ordinance requires the structure to be
on a hard surface, not on grass. Anklam commented the difference is a coop is not used for
residential use, he pointed out the section of the draft ordinance on maximum size and minimum
setbacks and stated it would be treated similarly as a doghouse.
Bishop spoke on her experiences with enforcing the Wausau chicken ordinance, which she helped
create. She pointed out Wausau’s ordinance was written so that she does all the inspections for
these, not their building inspectors. She pointed out with Wausau’s ordinance, the 25-foot minimum
setback refers to a distance from a neighbor’s residential housing unit, so a coop can be up against
that property owner’s dwelling, but it needs to be 10 feet from the property line. She stated the
biggest complaint she typically sees is from those who have roosters. She explained how most
people will go out and buy a pre-built coop from Menards or Fleet Farm, but a few families have built
their own. She explained Wausau’s ordinance requires the coop section must be off the ground (or
on a hard surface), and then the chickens have the attached run area that is on the ground. She
pointed out the “tractor” or movable coops are not allowed in Wausau, although she would like to see
those, as they are good for pest control and fertilizer.
Christiansen asked if Bishop has seen any issues with people’s chickens and neighbors with dogs.
Bishop stated only in the cases where the people with chickens who did not have licenses and did not
build their coop/run up to code. She said she has seen similar issues with a fox getting in by the
chickens.
Cronin asked about water and heat for the chickens during the winter. Bishop explained the owners
must provide non-frozen water and properly insulated coops. She stated some people will use
electric heated waterers and heat lamps. She explained that some people will put the coops up
against their house or garage, which helps to give some of that heat. She explained how during cold
months, though, chickens will huddle together to generate shared body heat, and how by having at
least 4 chickens will allow that to happen.
Diesen confirmed this ordinance covers up to 5 chickens. He questioned what will happen when
residents request to have ducks, geese, or guinea hens. Bishop stated these animals are more of a
“pet issue”, as people do not typically raise them for their eggs. She stated in Wausau, they are not
allowed.
Diesen questioned what size lots will allow for chickens. Anklam stated this is being written to allow
for chickens on any residentially-zoned property (SF-S, SF-L, 2-F, and M-F), but the principal use of
that lot has to be single-family detached residence, with a minimum lot size of 15,000 square feet.
Bishop explained in Wausau, the coop/run needs to be in the back or side-yard, not in the front.
People can request a waiver if they need to be closer than what is allowed, but only with a letter of
support from the affected neighbor.
Cronin asked what our enforcement currently is for backyard chickens. Bishop stated she is
contracted with the Village of Weston for dog complaints (not for non-dog strays). Bishop stated
when she is called in on a complaint, she will give a warning and a certain amount of time for the
resident to re-home the chickens, followed by a citation if not followed through. If we have the
ordinance in place, she would initially give the resident a warning and a certain amount of time to get
their license. If they don’t get the license then she would issue a citation.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 6
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
Maguire commented there is an issue with chickens over along the Mountain-Bay Trail.
Maguire confirmed with Bishop that she does all the inspections for the coops and runs in Wausau,
and asked if this ordinance passes, if she would do the inspections here. She stated yes, if in the
ordinance.
Pinsonneault asked Bishop’s cost is to do the inspections. She stated Wausau charges $35.00, and
there is no extra cost for her services, as it is built into what Weston pays for her contract.
Bishop stated there are about 18 – 20 total licensed coops in Wausau.
Diesen asked about if there have been issues with people keeping fighting cocks. Bishop stated back
in 2014, there was a resident in Weston, who was caught with fighting cocks.
Cortright commented he feels the draft ordinance takes care of a lot of brought up concerns.
c. Public Comment Period.
Oliver Cortright, 6503 Alta Verde Street, explained why he feels raising chickens is important, stating
that you get free colorful eggs, chickens are pretty quiet, raising chickens teaches kids responsibility,
they are inexpensive and easy to raise, and how most chickens are friendly and fun.
d. Close Public Hearing.
Cronin closed at 6:49 p.m.
e. Recommendation from Staff.
Higgins stated staff recommends approval as presented.
Anklam feels the draft is sufficient and allows staff the teeth to regulate and enforce. He stated this
would be a good starting point in adopting an ordinance to allow backyard chickens.
Hull feels the closer to Wausau’s that we make this ordinance will be a benefit to Bishop, who would
be enforcing this. Hull stated a lot of issues go away if we are not counting this as an accessory
structure, but instead more of a dog kennel. He pointed out some of the definitions may not be
consistent with our current definitions and will need to be looked at.
Higgins stated we can take a closer look at the definitions section of the code and make any changes
that need to be done. She stated if the PC is okay with this, we will count this as a start.
f. Discussion & Recommendation to the Board of Trustees by the Plan Commission. [0:53:10
Zoom Recording]
(PC) Motion by Guerndt, second by Jordan: To forward the proposed changes to the Board of
Trustees for approval, as proposed, and add the Humane Officer as the one to monitor and
inspect. Q: Higgins stated she will share this draft ordinance with Bishop for her feedback.
Pinsonneault commented on the number of survey responses received and how Anklam did a
good in incorporating those responses in this draft ordinance. Diesen voted nay. Motion
carried.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 7
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
Yes Vote: 4 No Votes: 1 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave NO
Guerndt, Gary YES
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
g. Discussion & Recommendation to the Board of Trustees by the ETZ. [0:55:50 Zoom
Recording]
(ETZ) Motion by Hull, second by Guerndt: To forward the proposed changes to the Board of
Trustees for approval, as proposed, and add the Humane Officer as the one to monitor and
inspect. Christiansen voted nay. Motion carried.
Yes Vote: 4 No Votes: 1 Abstain: 0 Not Voting: 1 Result: PASS
Member (ETZ) Voting
Olson, Milt {Chair} YES
Cronin, Steve {Vice Chair} YES
Christiansen, Randy NO
Guerndt, Gary YES
Hull, Mark YES
Mumper, Roy ------
9. ADJOURN ETZ COMMITTEE
Motion by Hull, second by Christiansen: to adjourn at 6:57 p.m.
10. Project #20230244 –Jeremy Zahn, 3020 Nick Ave, Mosinee, WI 54455, requesting a
Conditional Use Permit at 3020 Nick Ave, to exceed the allowed amount of Accessory
Structure Floor Area in the AR (Agriculture and Residential) Zoning district at 3020 Nick
Avenue. (PIN 192-2808-333-0985) (PC) [0:57:25 Zoom Recording]
a. Open Public Hearing.
Cronin opened the hearing at 6:58 p.m.
b. Presentation by Applicant and/or Staff.
Anklam stated this property is zoned AR, and consist of 20 acres, the zoning district allows for up to
2,500 square feet of an accessory structure. Zahn already has a garage that is 1,500 square feet, so
in order for Zahn to build the (48-foot x 60-foot) size structure he wants, he needs to obtain a
Conditional Use permit. Anklam stated the proposed structure meets the setback requirements.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 8
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
c. Public Comment Period.
Jeremy Zahn, 3020 Nick Avenue, was present and stated he has no further comments. He confirmed
to Cronin that this will be used for personal storage, not for business.
d. Close Public Hearing.
Cronin closed at 7:00 p.m.
e. Recommendation from Staff.
Higgins pointed out draft determination (attached).
f. Discussion & Action by the Plan Commission
Went through determination:
1 – yes
2 – yes
3 – yes
4 – yes
5 – yes
Motion by Guerndt, second by Diesen: To approve the Conditional Use Permit #20230244,
allowing Jeremy Zahn to exceed 2,500 square feet of accessory structure floor area for
residential use at 3020 Nick Avenue.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave YES
Guerndt, Gary YES
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
11. Project #20230129 – Bruce Guss, 7902 Alderson Street, Schofield, requesting a Conditional
Use Permit for the use of Outdoor Storage and Light Industrial, on a 1.01-acre property located
at 6406 Schofield Ave, Weston (PIN 192-2808-153-0946). (PC) [1:02:20 Zoom Recording]
a. Open Public Hearing.
Cronin opened the hearing at 7:03 p.m.
b. Presentation by Applicant and/or Staff.
Bruce Guss, 7902 Alderson Street was present in support.
Anklam explained the location and how last year, the structure that was there, was lost due to a fire.
He explained both land uses (outdoor storage and contractor shop) require a conditional use permit in
the B-3 zoning District. He stated the parcel itself is considered a non-conforming lot (due to its not
meeting landscaping, greenspace, and screening requirements). On a non-conforming lot, in the
case of a fire, a building can go back on the lot, provided it is the same size as the last one, and in
Valerie Parker updated @ 10/11/2023 1:59 PM Page 9
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
this case, Guss is proposing a larger building with a different footprint, which alters the non-
conforming status. Anklam stated that staff has addressed some of the non-conformance issues
(building footprint) with the ordinance amendment earlier tonight; however, because, as proposed,
with the non-conformance of landscaping, greenspace, screening, and missing plans, staff is unable
to approve the site plan. After discussions with Guss, it was determined best to bring this to Plan
Commission for their advice and recommendation, at which time Guss can bring back next month for
final approval.
Anklam stated that since Guss is not placing the building over the same footprint, the code then treats
this as a vacant lot, where Guss would have to meet the hard surface setback and green space
requirements. Anklam stated that Guss is in the process of getting cross access easements with the
neighbors recorded, which will take care of some of the hard surface setback issues.
Guerndt feels the proposed building will look better and will bring more tax base. Higgins stated we
are trying to help get this to fit into the code the best we can. Guerndt stated Guss’ materials for his
new building are sitting on the site currently, and he needs to get building, and how currently Guss is
working out of those seed containers until he new building can go up. Diesen and Guerndt feel we
should not be getting hung up on the landscaping.
Guss explained how he placed those seed containers to be respectable to what the neighborhood
would have to look at. He does not want to put up gates there, as it would create a blockage and
safety issue on Schofield Avenue, while his equipment tries to get into the site.
Guerndt stated he respects Guss’ issues, but pointed out staff is trying to help him find a way.
Higgins stated particular issue is now in the PC hands to help figure out a solution for Guss.
Pinsonneault stated the proposed building looks good. He suggested a shielded fence on east and
west both sides. There was discussion that it would be hard to put a fence along with west side, as
Auto Select needs that space to get to the back of theirs. Guss stated the same is with the nursery.
Cronin confirmed to approve this, staff needs the recorded cross access easements, which are at the
lawyer’s office waiting for recording.
Guerndt would rather there not be a fence obstructing their ability to get into the site. He brought up
the seed containers, and stated he does not think any of the Commissioners have an issue with those
there, as long as they are presentable. Guss stated he currently is keeping all of his inventory in
those containers right now.
Cronin confirmed that Guss can get a landscaping and lighting plan to staff, along with the cross
access easements. It was discussed that the area in front of the building that Guss can use
decorative rock, or turf to serve as greenspace there. Pinsonneault agrees the greenspace does not
have to be “alive” landscaping.
Higgins stated we need to see on the site plan labels of the proposed material and colors to use on
the building. Guss brought up they are planning to get the concrete in before the building.
Guss explained the materials and colors that that are proposed, he stated mechanicals could be on
the roof, behind the parapet.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 10
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
Wodalski commented on stormwater. He stated the drainage plan will show the impervious area on
the site, and the amount of impervious area will be the basis of the stormwater bill. He stated the
disturbed area is less than an acre, so he does not need a stormwater management plan.
Wodalski stated we will need a drainage plan on how the water will be moving off the site.
It was explained the dumpsters for this site will be in the rear yard. There are just a handful of
employees that park in the backyard.
Pinsonneault requests a waiver on bike rack requirements. Pinsonneault stated that Guss could add
some planters out front on the hard surface to dress it up.
Higgins stated a rock bed, boulders, etc. are allowed as landscaping.
Jordan stated it is important Guss puts together a landscaping plan, laying out what his proposal is.
The lighting plan and cross access easement need to get finished and submitted. He said #4 would
get a line drawn through it. Jordan stated the outdoor storage area is not fully enclosed and that Plan
Commission is okay with the use of the shipping containers as screening as long as they are
respectable looking. He stated that Guss will get specs on the colors and materials to be used on the
building, and include a notation on where the outside mechanicals will be located.
c. Public Comment Period.
None.
d. Close Public Hearing.
Cronin closed at 7:41 p.m.
e. Recommendation from Staff.
Cronin stated it was staff’s recommendation to defer to November meeting.
f. Discussion & Action by the Plan Commission [1:41:24 Zoom Meeting Recording]
Motion by Jordan, second by Guerndt, to approve the Conditional Use Permit #20230129,
based on performance guidelines as discussed, and allowing staff to make final determination
on Guss’ presentation on items needed.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave YES
Guerndt, Gary YES
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
At 7:43 p.m., Cronin moved the meeting to Agenda Item #14.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 11
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
NEW BUSINESS
12. Fee Schedule Recommendation – Backyard Chicken License & Renewal (PC) [1:51:25 Zoom
Meeting Recording]
Anklam stated this is on more for discussion on what they think is an appropriate fee, whether we
charge a higher fee initially (to cover inspection and license), or charge the same as Wausau.
Pinsonneault asked if we would be using the same company (PetData) for the licenses, as we do for
dogs and cats.
Higgins stated this would go through our Evolve licensing program. Higgins stated Wausau’s fee is
$35.00.
Diesen questioned if we need to make the cost for the first time more, to cover the inspection.
Higgins stated if Bishop is doing inspections, then it can be the same, and if our building inspectors
are doing the inspection, then she would want the cost to be more. She stated the license will go
through the Clerk’s office. Diesen feels $35 is not enough for our time.
Cronin pointed out that a fee needs to be justified. He feels if Wausau’s fee is only $35.00, then we
should go with that amount.
Higgins stated she was surprised that Wausau allows the coops to be up against the house. Maguire
stated these do not fall under the same structure separation standards, as residential structures.
Marty Christiansen commented that he would prefer they be 10 feet away from any residential
structure.
Motion by Guerndt, second by Cronin: To approve $35.00 permit fee for initial permit and
annual renewal. Diesen nay.
Yes Vote: 4 No Votes: 1 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave NO
Guerndt, Gary YES
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
13. Project #20230129 – Site Plan Approval for 6406 Schofield Avenue (192-2808-153-0946) (PC)
[1:56:30 Zoom Recording]
It was discussed that this was covered under the Conditional Use Permit discussion and action
(under Agenda Item #11)
Valerie Parker updated @ 10/11/2023 1:59 PM Page 12
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
14. Annexation Request – Recommendation to the Board on an annexation request from Green
Tree Companies, requesting a 33.459-acre vacant parcel in the Town of Weston located just
west of 161270 Ross Avenue be annexed to the Village to allow for construction of a single
family subdivision. (PIN 08228081040997). [1:42:49 Zoom Recording]
a. Discussion & Recommendation to the Board of Trustees by the Plan Commission on the
annexation request.
b. Discussion of Conceptual Plat for Green Tree Acres.
Higgins explained the Direct Annexation is the easiest way to annex in. She explained this is a 33.5-
acre parcel in the Town of Weston, along Ross Avenue, adjacent to the Sandy Meadow North First
Addition.
She explained this is just a concept plat, and we are still working out some details on road names
(approval from the County). She stated right now, this is sitting at the DOA, to make sure it is
continuous to the Village, and they will give an opinion by the Oct. 11
th. This will then go to the Board
of Trustees, who will have to adopt an annexation ordinance. Then it will come back to Plan
Commission for rezone (from AR to SF-S). She stated they are planning for a single-family small lot
subdivision, and Plan Commission will review the preliminary and final plat, when those are ready.
Higgins explained that this has always been looked at for future development, and how Muskie Drive
(which they need to correct the spelling on their concept plan) and Moose Drive are both dead-ended
to the property for future expansion into this site.
Higgins stated they still have to work out drainage, stormwater, etc., so some of the proposed lots
could be affected by that. Guerndt stated there may be some wetlands in this area. Maguire stated
this still needs to get re-delineated.
Higgins stated Wodalski gave some suggestions for future planning to the east and the west. She
stated the subdivision to the west (Power’s Subdivision) does not have sewer and water, and there
could be a need to add a road to that side (through proposed lot 42 or 43) to allow a potential utility
extension to the west in the future.
Cronin stated we need to make sure we have all our ducks in a row, on the easements to prevent
another Dominica Street issue.
Guerndt confirmed tonight we are just focusing on the annexation.
Higgins confirmed to Diesen that this is just a concept plan, and the lots sizes and subdivision layout
could potentially change.
[1:49:08 Zoom Meeting Recording]
Motion by Pinsonneault, Second by Guerndt: to approve mailing the letter. Q: Higgins
brought up that the motion should instead to be recommend approval to the Board of
Trustees, that there was a typo on the Request for Consideration document.
Pinsonneault motioned to withdraw his original motion, Guerndt seconded.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 13
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
Motion by Diesen, second by Guerndt: to accept the proposal to annex.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave YES
Guerndt, Gary YES
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
At 7:51 p.m. Cronin then moved back up to Agenda Item #12.
STAFF REPORTS [1:57:02 Zoom Recording]
15. Report re: September 2023 Staff-Approved Certified Survey Maps and Site Plans.
16. Report re: September 2023 Building Permits.
Motion by Pinsonneault, second by Diesen: To acknowledge Items #15 and #16.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave YES
Guerndt, Gary YES
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
17. Report re: Acknowledge Development Agreements Report.
Pinsonneault questioned if there is any protocol on the follow-up on these. Higgins stated that
currently there is not, but Meverden is working on the ones we know are done, primarily when they
ask for occupancy.
Guerndt asked the status on the Ryan Street development. Maguire stated the slabs and fence are
in. There was discussion on a neighbor who is unhappy with the fence, as that neighbor thought the
fence would go further along the property.
Motion by Pinsonneault, second by Jordan: to acknowledge Item #17.
Yes Vote: 5 No Votes: 0 Abstain: 0 Not Voting: 2 Result: PASS
Member (PC) Voting
Cronin, Steve {Chair} YES
Valerie Parker updated @ 10/11/2023 1:59 PM Page 14
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
Pinsonneault, Jim {Vice Chair-1} YES
Diesen, Dave YES
Guerndt, Gary YES
Hoffman, Travis ------
Jordan, Joe YES
Mumper, Roy ------
MISCELLANEOUS [2:00:36 Zoom Recording]
11. Project Updates
Higgins pointed out that Fuzzy’s Taco Shop officially opened today.
Maguire stated ABC Rentals is still waiting for State approvals.
Maguire stated that the Gold Key property has had no new progress. He has been in contact with
Budleski and that Zillisch is supposed to be doing the paving and curbing there.
Meverden stated that, as of Friday, Stillwater is getting better; however, the new trailers coming in
has slowed down, and there has been no new update on their road plan. Wodalski stated once they
are ready for their road work, we will look at replacing the water main (from E. Jelinek St to Schofield
Ave)
Diesen brought up, with regard to the new Tidal Wave car wash, how the hill is being dug out quite a
bit, where it appears it may be more than the 7 feet. Guerndt stated you have to tear out more
material before you can build it properly.
Guerndt asked about how the TIF is going along Schofield Ave. Higgins stated there are some things
percolating.
12. Announcements & Committee/Commissioner Remarks/Staff Referrals
Pinsonneault questioned if there has been any progress on a meeting to discussion bonding and
financial responsibilities for developing a subdivision. Wodalski stated we need to decide who we
want in this meeting. He stated that Tappe does not seem very interested in participating.
Pinsonneault stated we should have someone from the banking industry and a developer – such as
Green Tree. Wodalski stated he can talk to Higgins tomorrow to see who we want to come to the
table on this. It was discussed that there is an issue with some developers (Tappe) on the cost of a
Letter of Credit. Guerndt stated that the Village needs to protect what they are about to take on, and
there is a reason for this. He agrees any developer is going to not want this requirement.
Cronin asked if we can clean up by the fence along Stillwater Landing, on E. Jelinek Avenue, when
we do that project next year. Wodalski stated we could probably mow it, to knock it down. Cronin
stated there are also some unsightly trees up the hill that should come down. Wodalski stated if it is
in the right-of-way, we can take them out.
There was some discussion about the lot at 4501 E. Jelinek Avenue, that is owned by WPS, that is
very unsightly.
Valerie Parker updated @ 10/11/2023 1:59 PM Page 15
Mtg_BOT_231016_Consent_Minutes_PC-ETZ 231009-
ETZ231009
a. Next Regular Meeting Date – Monday, August 14, 2023, at 6pm.
ADJOURNMENT
Diesen/Guerndt to adjourn at 8:13 p.m.
Steve Cronin, Village Trustee and Plan Commission Chair
Jennifer Higgins, Director of Planning & Development
Valerie Parker, Recording Secretary
EXHIBIT C
June 18, 2026 Site Inspection Photographs
6406 Schofield Avenue – BUG Properties LLC
Figure C-1. West Side Building Elevation and Sidewalk Improvements
June 18, 2026 inspection photograph showing exterior building finishes, utility installations,
and concrete sidewalk improvements along the west side of the principal structure.
Exhibit C | Property: 6406 Schofield Avenue | Inspection Date: June 18, 2026
Figure C-2. Rear Yard and Storage Area Conditions
June 18, 2026 inspection photograph showing rear yard gravel surfacing, storage
containers, and overall site conditions.
Exhibit C | Property: 6406 Schofield Avenue | Inspection Date: June 18, 2026
Figure C-3. Building Exterior and Rear Yard Area
June 18, 2026 inspection photograph documenting the west and north building elevations
and adjacent site improvements.
Exhibit C | Property: 6406 Schofield Avenue | Inspection Date: June 18, 2026
Figure C-4. Entrance Threshold Condition
June 18, 2026 inspection photograph documenting the entrance threshold and adjacent
surface conditions observed during inspection.
Exhibit C | Property: 6406 Schofield Avenue | Inspection Date: June 18, 2026
Figure C-5. Front Building Elevation and Landscape Area
June 18, 2026 inspection photograph documenting front façade improvements and
landscape area conditions present at the time of inspection.
Exhibit C | Property: 6406 Schofield Avenue | Inspection Date: June 18, 202
EXHIBIT D
Permit and Inspection Records
6406 Schofield Avenue – BUG Properties LLC
This exhibit contains permit and inspection records associated with construction and
development of the property located at 6406 Schofield Avenue. These records are provided
as part of the administrative record reviewed by staff in preparation of the Conditional Use
Permit compliance review. The records document permit issuance, inspection activity, and
project status throughout the development process.
These permit histories are included for informational and chronological purposes. The Plan
Commission review concerns compliance with Conditional Use Permit No. 20230129 and
the Development Agreement. Building, plumbing, HVAC, and electrical code compliance
matters are administered through separate permitting and inspection processes.
Section D-1
Commercial Building Permit No. 202400092 Inspection History
Building permit issued February 13, 2024 for construction of a new building for BUG
Properties.
See attached inspection history record for complete permit chronology and inspection
details.
Section D-2
Commercial Plumbing Permit No. 202400147 Inspection History
Plumbing permit issued February 26, 2024 for plumbing associated with the new shop
building.
See attached inspection history record for complete permit chronology and inspection
details.
Section D-3
Commercial HVAC Permit No. 202400860 Inspection History
HVAC permit issued June 4, 2024 for HVAC installation associated with the new office/shop
building.
See attached inspection history record for complete permit chronology and inspection
details.
Section D-4
Commercial Electrical Permit No. 202401142 Inspection History
Electrical permit issued July 12, 2024 for electrical work associated with the project.
See attached inspection history record for complete permit chronology and inspection
details.
8/11/2026 03:39 PM rmaguire
Email To: bugconcrete@gmail.com
Bcc: plandev@westonwi.gov
Subject: Village of Weston Inspection Notification for New Commercial Construction
Permit at 6406 SCHOFIELD AVE, WESTON
Bruce Guss,
This notice is to inform you that your inspection has been completed. All comments
regarding this inspection are below.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
INSPECTION REPORT
Date: 08/11/2026
Permit Type: Commercial Building
Permit Number: 202400092
Permit Location: 6406 SCHOFIELD AVE, WESTON
Inspection Completed: Commercial Final
Status: Not Approved
Inspection Comments:
Inspection conducted on 6/18/2026. The building owner was not present at the time of
inspection. Via phone call, the building owner approved entry into the building. The
inspection was conducted with Electrical Inspector Scott Tatro, VOW, and Jon Molledahl,
DSPS.
Issues found are grouped by code citation type as follows:
Building / IBC Violations
1. No building numbers are present on the structure. Code reference: 2021 IBC Section
501.2, Address Identification. The building numbers shall be installed so that they are
visible from each direction on the street and shall contrast with the material they are
installed upon.
2. The rear door landing has not been installed at the time of inspection. Code reference:
2021 IBC 1010.1.4, “There shall be a floor or landing on each side of a door. ”
3. The east and west doors do not have compliant exiting hardware. Doors shall be
provided with compliant egress hardware, or where allowed by the Authority Having
Jurisdiction, signage shall state that doors shall remain unlocked during business hours or
while the building is occupied. Code reference: 2021 IBC Section 1010, Doors, Gates and
Turnstiles; Section 1010.2, Door Operations; Section 1010.2.1, Unlatching; Section
1010.2.9, Panic and Fire Exit Hardware; and 2021 IBC Chapter 11.
4. The stair handrail does not meet code requirements. The handrail shall return to the
floor, return to itself, return to the wall, return to a guard, or be continuous to the handrail of
an adjacent stair flight or ramp run. Code reference: 2021 IBC Section 1014, Handrails; and
Section 1014.6, Handrail Extensions.
5. The stairs near the handrail and window require further review. The issue may involve
stair geometry, handrail placement, guard/open-side protection, and/or safety glazing
requirements. Code reference: 2021 IBC Section 1011, Stairways; Section 1014, Handrails;
Section 1015, Guards; and Section 2406, Safety Glazing, including hazardous locations
adjacent to doors, walking surfaces, stairways, ramps, and landings.
Accessibility / ICC A117.1 Violations
1. Unisex bathroom signage is required to be installed on the doors or on the adjacent wall
to the bathroom door. Code reference: 2021 IBC Chapter 11, Accessibility; 2021 IBC
Section 1102.1, Design; and ICC A117.1 Section 703, Signs, including tactile characters,
pictograms, visual characters, and mounting location.
2. The east and west doors are not ADA/accessibility compliant. Code reference: ICC
A117.1 technical requirements for accessible door hardware and operation.
3. Accessible parking signage is not installed for the accessible parking space. Code
reference: 2021 IBC Section 1106, Parking and Passenger Loading Facilities; 2021 IBC
Section 1101.2, Design and Administration for accessibility signage where applicable; ICC
A117.1 Section 502, Parking Spaces; and ICC A117.1 Section 703, Signs.
Electrical / NEC Violations
1. Multiple GFCI receptacles are not readily accessible. Code reference: 2017 NEC Section
210.8(B), Ground-Fault Circuit-Interrupter Protection for Personnel.
2. Electrical panels are not identified. Code reference: 2017 NEC Section 408.4(A), Circuit
Directory or Circuit Identification; Section 110.22, Identification of Disconnecting Means,
where applicable; and Section 110.26, Spaces About Electrical Equipment, where access
or working clearance is affected.
3. Electrical panels do not have complete directories. Code reference: 2017 NEC Section
408.4(A), Circuit Directory or Circuit Identification, requiring clear identification of every
circuit and circuit modification.
4. The intersystem bond block needs to be installed. Code reference: 2017 NEC Section
250.94, Bonding for Other Systems/Communications Systems, including intersystem
bonding termination requirements.
Site Plan / Permit / Conditional Use Violations
1. Building is not complete. The building permit was issued on February 13, 2024, and
expired on February 13, 2025. At the time of inspection, the permit was expired by more
than one year, placing the site in direct violation of the Conditional Use Permit,
Development Agreement and the approved Site Plan.
2. The Conditional Use Permit for this site was issued on October 9, 2023. That made the
project completion deadline October 9, 2025. At the time of the inspection on June 18,
2026, the project was not complete, as there was still concrete work to be done behind and
in front of the building. Fencing with the gate to be installed. Landscape rock and curbing to
be installed. This is a violation of the Conditional Use Permit which will be brought before
the Village of Weston Plan Commission at the September regularly scheduled meeting.
75.00 Fee Charged
View inspector photos online at https://evolvepublic.infovisionsoftware.com/weston/
Inspector: Roman Maguire
Phone: 715-359-6114
Email: plandev@westonwi.gov
To contact the above listed Inspector Office, please call the front desk at 715-241-2613.
Office hours are 8:00AM to 4:30PM, Monday thru Friday.
All requests for reinspections require a 24-hour notice. Please schedule an appointment if
you require an in-person meeting with a building inspector.
Walk-ins are not advised as Inspectors are typically out in the field on inspection and not in
the office. Your cooperation is appreciated.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Thank you,
Village of Weston
Planning and Development Department
September 15, 2026
Via Certified Mail and Email
BUG PROPERTIES LLC
ATTN BRUCE GUSS
165961 RIVER RD
RINGLE, WI 54471
RE: Conditional Use Permit No. 20230129
BUG Properties, 6406 Schofield Avenue – Plan Commission Review
Dear Bruce,
The Village of Weston Plan Commission met on September 14, 2026, and
reviewed the compliance status of Conditional Use Permit No. 20230129 for
the property located at 6406 Schofield Avenue. Village staff presented the
administrative record, including the Conditional Use Permit, Development
Agreement, approved site plan, permit and inspection records, site
photographs, and the August 11, 2026 Commercial Final Inspection Report.
Following review and discussion, the Plan Commission determined that the
property is not currently in compliance with Conditional Use Permit No.
20230129 and the associated Development Agreement. The Plan
Commission directed staff to notify you that the property must be brought into
compliance no later than September 23, 2026.
Based on the documented inspection and site-plan review, the remaining site
improvements necessary to bring the property into compliance include:
• Complete the remaining concrete work shown/required by the approved
site plan.
• Complete the required fencing and gate improvements.
• Complete the required landscape improvements, including landscape rock
and curbing, in accordance with the approved site plan
Please complete the remaining site improvements and obtain the necessary
approvals to demonstrate compliance by September 23, 2026. Please also
provide the Planning & Development Department with a written timeline of the
work, including the anticipated completion date for each remaining item. This
will allow staff to document progress and determine whether the property has
been brought into compliance.
If additional time is needed to complete the approved development, you
should submit a written request and proposed timeline to the Planning &
Development Department as soon as possible. Staff discussed with you today
the need to establish a timeline and, if necessary, bring a request to the Plan
Commission to modify Conditional Use Permit No. 20230129 to address the
construction completion deadline. Any modification of the Conditional Use
Permit would require Plan Commission action and is not granted by staff.
If the property is not brought into compliance, and no appropriate modification
has been approved, the matter may proceed to a public hearing before the
Plan Commission on October 12, 2026 for consideration of proceedings under
Section 94.16.06(11)(c) of the Village of Weston Zoning Code. At that
hearing, the Plan Commission may consider modification, suspension,
revocation, or other appropriate action regarding the Conditional Use Permit,
as authorized by the Zoning Code.
The August 11, 2026 Commercial Final Inspection Report is enclosed for your
reference. That report identifies additional building, accessibility, electrical,
and other inspection items that are administered through the applicable
building-permit and inspection process. This letter is specifically addressing
compliance with the Conditional Use Permit, Development Agreement, and
approved site plan. This does not address the trades work associated with the
expired Building, Electrical, HVAC and Plumbing permits that is a separate
compliance item that can be handled administratively with staff.
Sincerely,
Jennifer Higgins
Director of Planning & Development / Zoning Administrator
CC by email:
Plan Commission
Enclosure: August 11, 2026 Commercial Final Inspection Report
From: Jennifer Higgins
To: "bugconcrete@gmail.com"
Cc: Jami Gebert; PlanDev; Roman Maguire
Bcc: Plan Commission
Subject: BUG Properties – CUP No. 20230129 – Plan Commission Follow-Up
Date: Tuesday, September 15, 2026 4:11:14 PM
Attachments: 26915 Plan Commission Follow-Up.pdf
Enclosure_August_11_Inspection_Report.pdf
Importance: High
BCC: Plan Commission
Hi Bruce,
Following up on our conversation this morning, attached is the letter regarding the Village of
Weston Plan Commission’s September 14, 2026 review of Conditional Use Permit No.
20230129 for 6406 Schofield Avenue.
As discussed, the Plan Commission determined that the property is not currently in
compliance with the Conditional Use Permit and associated Development Agreement and
directed that the remaining site improvements be completed by September 23, 2026. The
attached letter outlines the remaining items and the steps needed to document compliance.
As we discussed this morning, please provide the Planning & Development Department with a
written timeline for completing the remaining work. If additional time is needed to
complete the work, please let us know by September 23, 2026, and provide your
proposed timeline so that staff can work with you on bringing a request to the Plan
Commission to modify the CUP completion deadline. Any information or proposed
modification request would need to be included in the October 12, 2026 Plan Commission
meeting packet. Therefore, the requested information for the meeting packet would
need to be received by the Planning & Development Department no later than
October 5, 2026.
I have also attached the August 11, 2026 Commercial Final Inspection Report for your
reference. As noted in the letter, the building, electrical, HVAC, and plumbing inspection
items are separate from the CUP compliance matter and can be addressed administratively
with staff.
Please let me know if you have any questions or would like to discuss the timeline or next
steps.
Thank you,
Jennifer Higgins
Planning & Development Director
Zoning Administrator
Village of Weston, Wisconsin
Direct: (715) 241-2638 Office: (715) 359-6114
Email: jhiggins@westonwi.gov | Web: www.westonwi.gov
4747 Camp Phillips Rd, Weston, WI 54476
How did I do for you today? Please take some time to fill out our online Customer Service Survey. Thank you!
Our mission is to support a high quality of life, balancing the needs and expectations of all those we serve. We do this through the delivery
of reliable, cost-effective services, leveraging collaborative partnerships, embracing continual improvement, and purposefully guiding
growth.
As a local governmental entity, the Village of Weston is subject to Wisconsin statutes relating to open records. Any e-mail received by
anyone at the Village of Weston, as well as, any e-mail sent by someone from the Village of Weston, are subject to these laws. Unless
otherwise exempted from the Open Records law, senders and receivers of Village e-mail should presume that any e-mail is subject to
release upon request.
8/11/2026 03:39 PM rmaguire
Email To: bugconcrete@gmail.com
Bcc: plandev@westonwi.gov
Subject: Village of Weston Inspection Notification for New Commercial Construction
Permit at 6406 SCHOFIELD AVE, WESTON
Bruce Guss,
This notice is to inform you that your inspection has been completed. All comments
regarding this inspection are below.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
INSPECTION REPORT
Date: 08/11/2026
Permit Type: Commercial Building
Permit Number: 202400092
Permit Location: 6406 SCHOFIELD AVE, WESTON
Inspection Completed: Commercial Final
Status: Not Approved
Inspection Comments:
Inspection conducted on 6/18/2026. The building owner was not present at the time of
inspection. Via phone call, the building owner approved entry into the building. The
inspection was conducted with Electrical Inspector Scott Tatro, VOW, and Jon Molledahl,
DSPS.
Issues found are grouped by code citation type as follows:
Building / IBC Violations
1. No building numbers are present on the structure. Code reference: 2021 IBC Section
501.2, Address Identification. The building numbers shall be installed so that they are
visible from each direction on the street and shall contrast with the material they are
installed upon.
2. The rear door landing has not been installed at the time of inspection. Code reference:
2021 IBC 1010.1.4, “There shall be a floor or landing on each side of a door. ”
3. The east and west doors do not have compliant exiting hardware. Doors shall be
provided with compliant egress hardware, or where allowed by the Authority Having
Jurisdiction, signage shall state that doors shall remain unlocked during business hours or
while the building is occupied. Code reference: 2021 IBC Section 1010, Doors, Gates and
Turnstiles; Section 1010.2, Door Operations; Section 1010.2.1, Unlatching; Section
1010.2.9, Panic and Fire Exit Hardware; and 2021 IBC Chapter 11.
4. The stair handrail does not meet code requirements. The handrail shall return to the
floor, return to itself, return to the wall, return to a guard, or be continuous to the handrail of
an adjacent stair flight or ramp run. Code reference: 2021 IBC Section 1014, Handrails; and
Section 1014.6, Handrail Extensions.
5. The stairs near the handrail and window require further review. The issue may involve
stair geometry, handrail placement, guard/open-side protection, and/or safety glazing
requirements. Code reference: 2021 IBC Section 1011, Stairways; Section 1014, Handrails;
Section 1015, Guards; and Section 2406, Safety Glazing, including hazardous locations
adjacent to doors, walking surfaces, stairways, ramps, and landings.
Accessibility / ICC A117.1 Violations
1. Unisex bathroom signage is required to be installed on the doors or on the adjacent wall
to the bathroom door. Code reference: 2021 IBC Chapter 11, Accessibility; 2021 IBC
Section 1102.1, Design; and ICC A117.1 Section 703, Signs, including tactile characters,
pictograms, visual characters, and mounting location.
2. The east and west doors are not ADA/accessibility compliant. Code reference: ICC
A117.1 technical requirements for accessible door hardware and operation.
3. Accessible parking signage is not installed for the accessible parking space. Code
reference: 2021 IBC Section 1106, Parking and Passenger Loading Facilities; 2021 IBC
Section 1101.2, Design and Administration for accessibility signage where applicable; ICC
A117.1 Section 502, Parking Spaces; and ICC A117.1 Section 703, Signs.
Electrical / NEC Violations
1. Multiple GFCI receptacles are not readily accessible. Code reference: 2017 NEC Section
210.8(B), Ground-Fault Circuit-Interrupter Protection for Personnel.
2. Electrical panels are not identified. Code reference: 2017 NEC Section 408.4(A), Circuit
Directory or Circuit Identification; Section 110.22, Identification of Disconnecting Means,
where applicable; and Section 110.26, Spaces About Electrical Equipment, where access
or working clearance is affected.
3. Electrical panels do not have complete directories. Code reference: 2017 NEC Section
408.4(A), Circuit Directory or Circuit Identification, requiring clear identification of every
circuit and circuit modification.
4. The intersystem bond block needs to be installed. Code reference: 2017 NEC Section
250.94, Bonding for Other Systems/Communications Systems, including intersystem
bonding termination requirements.
Site Plan / Permit / Conditional Use Violations
1. Building is not complete. The building permit was issued on February 13, 2024, and
expired on February 13, 2025. At the time of inspection, the permit was expired by more
than one year, placing the site in direct violation of the Conditional Use Permit,
Development Agreement and the approved Site Plan.
2. The Conditional Use Permit for this site was issued on October 9, 2023. That made the
project completion deadline October 9, 2025. At the time of the inspection on June 18,
2026, the project was not complete, as there was still concrete work to be done behind and
in front of the building. Fencing with the gate to be installed. Landscape rock and curbing to
be installed. This is a violation of the Conditional Use Permit which will be brought before
the Village of Weston Plan Commission at the September regularly scheduled meeting.
75.00 Fee Charged
View inspector photos online at https://evolvepublic.infovisionsoftware.com/weston/
Inspector: Roman Maguire
Phone: 715-359-6114
Email: plandev@westonwi.gov
To contact the above listed Inspector Office, please call the front desk at 715-241-2613.
Office hours are 8:00AM to 4:30PM, Monday thru Friday.
All requests for reinspections require a 24-hour notice. Please schedule an appointment if
you require an in-person meeting with a building inspector.
Walk-ins are not advised as Inspectors are typically out in the field on inspection and not in
the office. Your cooperation is appreciated.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Thank you,
Village of Weston
Planning and Development Department
Dear Village of Weston Board Members,
Re: Conditional Use Permit No. 20230129 – 6406 Schofield Ave
Following our discussion on September 15, 2026, with Roman, Gary, and Jennifer, and after
reviewing the documentation provided to me as a follow-up to that discussion, I have
determined that completing the remaining requirements by September 23, 2026, is not feasible.
Accordingly, I am respectfully requesting an extension of time to complete the outstanding
work.
There are several circumstances contributing to the need for additional time:
1. Budget considerations: The project has exceeded its original budget, and sufficient
funds are not currently available to purchase all of the remaining materials, including
concrete and fencing materials.
2. Potential acquisition of the adjacent property: We are currently exploring the potential
acquisition of the adjacent property for future expansion. Should that acquisition occur,
certain aspects of the site plan, including concrete elevations and heights, may need to
be reconsidered to accommodate the expanded property.
3. Weather conditions: Weather conditions may also affect our ability to complete the
remaining exterior improvements within the current timeframe.
As requested, the following is our proposed timeline for completing the remaining
requirements:
• Concrete Work: Complete all remaining concrete work shown and/or required by the
approved site plan.
Estimated completion date: September 30, 2027.
• Fencing and Gates: Complete the required fencing and gate improvements.
Estimated completion date: September 30, 2027.
• Landscape Improvements: Complete the required landscape improvements, including
landscape rock and curbing, in accordance with the approved site plan.
Estimated completion date: September 30, 2027.
With regard to the Commercial Final Inspection Report dated August 11, 2026, the outstanding
items identified in that report are also anticipated to be completed by September 30, 2027.
We respectfully request that the Village of Weston consider the circumstances outlined above
and approve an extension through September 30, 2027, to allow sufficient time to complete the
remaining improvements in accordance with the approved site plan and applicable
requirements.
Thank you for your time and consideration. Please let me know if any additional information or
documentation is required to support this request.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 1
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
PHOTOGRAPHIC EXHIBIT PACKAGE
6406 Schofield Avenue (BUG Properties LLC)
CUP No. 20230129
EXHIBITS A-D
Exhibit A - Overall Site Appearance
Exhibit B - Site Plan / CUP Compliance
Exhibit C - Accessibility and Final Inspection Deficiencies for Site
Exhibit D - Utilization / Occupancy Context
October 2026 Site Inspection
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 2
EXHIBIT INDEX - PHOTOGRAPHIC EXHIBIT INDEX
Figure Photo Caption
A-1 IMG_3561.JPG Front building elevation viewed from Schofield Avenue looking northwest.
A-2 IMG_3569.JPG Front building elevation and parking area viewed from adjacent property.
B-1 IMG_3562.JPG Driveway approach and site-access area.
B-2 IMG_3568.JPG Front building facade and frontage area.
B-3 IMG_3570.JPG West building elevation and concrete-to-gravel transition.
B-4 IMG_3571.JPG West building elevation and north-yard transition area.
B-5 IMG_3575.JPG Rear storage yard facing north.
B-6 IMG_3576.JPG North property area and adjacent-property context.
B-7 IMG_3577.JPG Rear storage yard facing northeast.
B-8 IMG_3578.JPG North building elevation and vehicle-storage area.
B-9 IMG_3579.JPG Northwest building corner and concrete-to-gravel transition.
B-10 IMG_3580.JPG North building wall conditions.
B-11 IMG_3584.JPG East-side access corridor and rear-yard approach.
B-12 IMG_3585.JPG East building elevation and side-yard conditions.
B-13 IMG_3586.JPG East property-line conditions.
B-14 IMG_3587.JPG East office entrance and building facade.
B-15 IMG_3588.JPG Front parking area and office entrance.
B-16 IMG_3589.JPG Front gravel area separating east and west parking areas.
C-1 IMG_3566.JPG Accessible parking area condition.
C-2 IMG_3563.JPG Roof-edge and parapet detail.
C-3 IMG_3572.JPG West parapet-wall coping condition.
C-4 IMG_3581.JPG North passage door and landing condition.
D-1 IMG_3582.JPG View through north overhead door.
D-2 IMG_3583.JPG Interior workspace conditions.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 3
EXHIBIT A - OVERALL SITE APPEARANCE
Figure A-1. Front building elevation viewed from Schofield Avenue looking northwest.
Figure A-2. Front building elevation and parking area viewed from adjacent property.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 4
EXHIBIT B - SITE PLAN / CUP COMPLIANCE
Figure B-1. Driveway approach and site-access area.
Figure B-2. Front building facade and frontage area.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 5
EXHIBIT B - SITE PLAN / CUP COMPLIANCE
Figure B-3. West building elevation and concrete-to-gravel transition.
Figure B-4. West building elevation and north-yard transition area.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 6
EXHIBIT B - SITE PLAN / CUP COMPLIANCE
Figure B-5. Rear storage yard facing north.
Figure B-6. North property area and adjacent-property context.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 7
EXHIBIT B - SITE PLAN / CUP COMPLIANCE
Figure B-7. Rear storage yard facing northeast.
Figure B-8. North building elevation and vehicle-storage area.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 8
EXHIBIT B - SITE PLAN / CUP COMPLIANCE
Figure B-9. Northwest building corner and concrete-to-gravel transition.
Figure B-10. North building wall conditions.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 9
EXHIBIT B - SITE PLAN / CUP COMPLIANCE
Figure B-11. East-side access corridor and rear-yard approach.
Figure B-12. East building elevation and side-yard conditions.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 10
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 11
EXHIBIT B - SITE PLAN / CUP COMPLIANCE
Figure B-13. East property-line conditions.
Figure B-14. East office entrance and building facade.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 12
EXHIBIT B - SITE PLAN / CUP COMPLIANCE
Figure B-15. Front parking area and office entrance.
Figure B-16. Front gravel area separating east and west parking areas.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 13
EXHIBIT C - ACCESSIBILITY AND FINAL INSPECTION DEFICIENCIES
Figure C-1. Accessible parking area condition.
Figure C-2. Roof-edge and parapet detail.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 14
EXHIBIT C - ACCESSIBILITY AND FINAL INSPECTION DEFICIENCIES
Figure C-3. West parapet-wall coping condition.
Figure C-4. North passage door and landing condition.
6406 Schofield Avenue | Photographic Exhibits A-D | October 2026
Page 15
EXHIBIT D - UTILIZATION / OCCUPANCY CONTEXT
Figure D-1. View through north overhead door.
Figure D-2. Interior workspace conditions.
6406 Schofield Avenue | Current Conditions Compliance Matrix | Working Copy
Village of Weston | Planning & Development | Working document for field and file verification
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
6406 SCHOFIELD AVENUE - CURRENT CONDITIONS COMPLIANCE MATRIX
BUG Properties LLC | CUP No. 20230129 | Working Draft
Instructions: Review each row and edit the October observation, select or revise the working status, and add file/site-plan notes. Suggested status terms: Complete, Partially Complete,
Incomplete, Open, Verify, Unable to Verify, or Not Applicable.
Compliance Item June 18, 2026 Finding / Record October 2026 Observation Working Status Verification / Notes
Building construction / commercial
final
Commercial final was not approved;
multiple building, accessibility,
electrical, and site items were identified.
The exterior appears substantially
constructed. Current final-inspection
approval and correction status require
file verification.
OPEN ITEM/NON-COMPLIANT
Inspection report; permit file
Front concrete improvements Concrete work remained incomplete at
the June inspection.
Significant front parking and sidewalk
concrete is installed. A gravel area
remains between the east and west
parking areas.
PARTIALLY COMPLETE. East and west
approaches from Schofield Ave have
been installed in the proposed
concrete areas, except for the area
directly Infront of the southernmost
wall of the building sidewalks are
installed
Photos 3562, 3568, 3588, 3589
West-side concrete / driveway Remaining concrete work was identified
generally.
Completed concrete transitions to gravel
along the west side and north-west
corner.
INCOMPLETE. The installed concrete
stops at a point approximately even
with the front face of the building
sidewalk and the west wall. The wall is
60' long.
Photos 3570, 3571, 3579
North / rear surface improvements Project remained incomplete.
Gravel surfaces remain along the north
building wall and rear storage-yard
areas.
Incomplete. When compared to the
site plan there is 30' behind the
structure that is yet to be installed
Photos 3575, 3577, 3578, 3580
East-side surface improvements Project remained incomplete.
Sidewalk is installed along portions of
the east elevation; gravel surfaces
remain in the side-yard and rear-yard
approach.
INCOMPLETE. The installed concrete
stops at a point approximately even
with the front face of the building and
the east wall. The wall is 60'long.
Photos 3584, 3585
Landscape improvements Landscape improvements were
identified as incomplete.
Sparse or unfinished frontage and
property-line areas are visible. Rusted
concrete reinforcing mesh remains in
the front gravel area.
LANDSCAPE. Based on the approved
site plan, the Plan Commission waived
any requirement for landscaping
improvements adjacent to the
building. However, based on the cost it
might be less expensive for the owner
to install some minimal plantings and
rock or mulch vs the approved
concrete.
Photos 3568, 3586, 3589
Landscape rock Landscape rock was identified as
incomplete.
Photographs do not establish
completion throughout all required
landscape areas.
LANDSCAPE. Based on the approved
site plan, the Plan Commission waived
any requirement for landscaping
improvements adjacent to the
building. However, based on the cost it
might be less expensive for the owner
to install some minimal plantings and
rock or mulch vs the approved
concrete.
Approved site plan; current photos
Curbing Curbing was identified as incomplete. Current photographs do not conclusively
document all required curbing locations.
CURBING HAS BEEN INSTALLED PER
CIVIL PLAN DATED 10/13/2023 Approved site plan; field check
6406 Schofield Avenue | Current Conditions Compliance Matrix | Working Copy
Village of Weston | Planning & Development | Working document for field and file verification
Compliance Item June 18, 2026 Finding / Record October 2026 Observation Working Status Verification / Notes
Fencing/Screening Fencing was identified as incomplete.
Property-line fencing is visible in some
locations, but completion of required
subject-property fencing is not
established.
OPEN ITEM/NON-COMPLIANT NO
FENCING ASSOCIATED WITH THIS
PROJECT HAS BEEN INSTALLED ON
THE SITE.
Photos 3576, 3586; approved site plan
Gates Gate installation was identified as
incomplete.
Gate installation is not conclusively
documented in the selected
photographs.
OPEN ITEM/NON-COMPLIANT
NO GATE HAS BEEN INSTALLED ON
THE SITE.
Approved site plan; field check
Outdoor storage area
CUP approved a light industrial
contractor shop and outdoor storage
area.
Rear-yard outdoor storage, trucks,
equipment, dumpster, and shipping
containers are visible. Conformance
with approved storage limits/layout
requires site-plan comparison.
OPEN ITEM/NON-COMPLIANT
Photos 3575-3578, 3584, 3586
Adjacent-property use / bleed over Not identified in the June inspection
report.
Heavy equipment visible beyond the
northern subject-property foreground
appears to be on the neighboring
property. Ownership, zoning, and
approval status require separate
verification.
SEPARATE REVIEW Photo 3576; parcel/zoning records
Painted accessible parking stall /
additional parking facilities
No parking-lot pavement had been
applied.
No parking stalls have been installed
on the site.
OPEN ITEM/NON-COMPLIANT Field observation; site-plan
comparison
Accessible parking identification Accessible parking signage was not
installed.
No visible accessible parking sign or
pavement identification is apparent in
the photographed front parking area.
OPEN ITEM/NON-COMPLIANT NO
HANICAPPED SIGNAGE HAS BEEN
INSTALLED
Photo 3566
North passage-door landing / stoop Rear door landing had not been
installed.
North passage door remains adjacent to
gravel with no finished landing/stoop
visible.
OPEN ITEM/NON-COMPLIANT. NO
REQUIERD STOOP INSTALLED
Photo 3581
Parapet coping Not specifically identified in the June
report.
Possible missing coping component at
the west parapet requires confirmation. REQUIRES REVIEW Photos 3563, 3572
Exterior utility / communications
condition Not identified in the June report.
Communications cabling appears poorly
or loosely installed. This appears related
to the utility installation and is not
presently attributed to property-owner
site completion.
DOCUMENT ONLY Photo 3574 removed from primary
exhibit set; retain as backup
Interior utilization indicators Not addressed as a separate June
finding.
Equipment, tools, materials, furnishings,
energized lighting, and workspace use
were visible through open overhead
doors.
ACTIVE USE OBSERVED Photos 3582, 3583
Certificate of occupancy The Commercial final remained
unapproved.
Village records must confirm whether a
certificate of occupancy has been
issued. Photographs alone do not
establish legal occupancy.
NO OCCUPANCY CERTIFICATE HAS
BEEN ISSUED AS THERE ARE
OUTSTANDING BUILDING CODE
VIOLATIONS.
Permit/Evolve records
Electrical permit / final inspection Electrical deficiencies were identified;
trade-permit activity remained open.
Separate electrical final was scheduled
for October 6, 2026. Insert the
inspection result and remaining
correction status.
FINAL INSPECTION PASSED ON 10/6 Electrical Permit 202401142; Evolve
6406 Schofield Avenue | Current Conditions Compliance Matrix | Working Copy
Village of Weston | Planning & Development | Working document for field and file verification
Compliance Item June 18, 2026 Finding / Record October 2026 Observation Working Status Verification / Notes
Building-address identification No building numbers were present on
the structure.
Current photo set has not been
evaluated as conclusive evidence of
corrected street-number installation.
OPEN ITEM/NON-COMPLIANT
BUILDING NUMBERS NOT INSTALLED Current photos / site verification
Door hardware and accessibility East and west doors were not compliant
for egress/accessibility.
Current exterior photographs do not
establish hardware compliance.
OPEN ITEM/NON-COMPLIANT
Commercial final inspection record
Stair / handrail / glazing review Handrail and stair-area concerns
required further review.
Current photo set does not resolve the
interior stair, handrail, guard, or glazing
questions.
OPEN ITEM/NON-COMPLIANT
Commercial final inspection record
Restroom signage Required unisex restroom signage was
missing.
Not documented in the exterior photo
set.
OPEN ITEM/NON-COMPLIANT
Interior inspection
Electrical correction items
GFCI accessibility, panel
identification/directories, and
intersystem bond block were identified.
Not established by the exterior
photographic record; use October 6
electrical-final result.
FINAL INSPECTION PASSED ON 10/6
Electrical final result
CUP completion deadline The October 9, 2025 completion
deadline was not met.
Substantial progress is visible, but
unresolved site-plan and permit items
remain subject to final verification.
OPEN ITEM/NON-COMPLIANT
CUP, Development Agreement, staff
report
INSPECTOR MARKUP / DECISION NOTES
Items confirmed complete: ___________________________________________________________________________________________________________________
Items confirmed incomplete: ___________________________________________________________________________________________________________________
Items requiring site-plan comparison: ___________________________________________________________________________________________________________________
Items requiring permit/Evolve verification: ___________________________________________________________________________________________________________________
Recommended report emphasis: ___________________________________________________________________________________________________________________
DRAFT
FIRST AMENDMENT TO CONDITIONAL USE PERMIT NO. 20230129
BUG PROPERTIES LLC — 6406 SCHOFIELD A VENUE
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
THIS FIRST AMENDMENT TO CONDITIONAL USE PERMIT NO. 20230129 (the
“First Amendment”) is made and entered as of the ____ day of __________________, 2026, by
the Plan Commission of the Village of Weston, Marathon County, Wisconsin (the “Plan
Commission”), with respect to the conditional use permit granted to Bruce Guss concerning
property owned by BUG Properties LLC.
RECITALS
WHEREAS, the Plan Commission approved Conditional Use Permit No. 20230129 on
October 9, 2023, and the permit was recorded with the Marathon County Register of Deeds on
November 8, 2023, as Document No. 1890229 (the “Original CUP”); and
WHEREAS, the Original CUP applies to the property commonly known as 6406 Schofield
Avenue, Village of Weston, Marathon County, Wisconsin, identified as Parcel Identification
Number 192-2808-153-0946 and legally described as: Part of the Southeast ¼ of the Southwest ¼
of Section 15, Township 28 North, Range 8 East, being Lot 4 of Certified Survey Map V olume 44,
Page 171, Document No. 10729, Marathon County, Wisconsin. (the “Property”); and
WHEREAS, the Original CUP authorizes a light industrial contractor shop and outdoor
storage area on the Property; and
WHEREAS, Condition 3 of the Original CUP established a two -year completion period
for the approved site improvements but inadvertently referred to the approved development as a
“personal storage facility,” although the approved conditional use is a light industria l contractor
shop and outdoor storage area; and
WHEREAS, on September 14, 2026, the Plan Commission reviewed the administrative
record and determined that the Property remained incomplete under the Original CUP and related
approved plans, including remaining concrete and paved-surface improvements, fencing and gate
improvements, frontage landscaping, landscape rock, and curbing; and
WHEREAS, the owner subsequently submitted a written request to extend the deadline
for completion of the remaining approved site improvements through September 30, 2027; and
WHEREAS, the Plan Commission conducted a public hearing and considered the
requested amendment on October 12, 2026, and determined that a limited extension, subject to the
conditions stated below, is appropriate while preserving the approved use, approved site pla n,
separate permit requirements, and the Village’s enforcement authority.
NOW, THEREFORE, BE IT RESOLVED by the Plan Commission of the Village of
Weston, Marathon County, Wisconsin, that the Original CUP is amended as follows:
1. Amendment to Condition 3; Extension of Completion Deadline. Condition 3 of the Original
CUP is deleted in its entirety and replaced with the following:
“3. All remaining site improvements required by the approved site plan shall be
completed no later than September 30, 2027, subject to the conditions of this First
Amendment. The property owner shall request a final compliance inspection from
the Planning & De velopment Department at least 10 business days before
September 30, 2027. Staff shall determine compliance following the inspection and
receipt of any required documentation. Any future addition, modification, or
change to the approved site plan must recei ve all required Village approvals in
advance of any work.
2. Scope of Extension. The extension applies only to the remaining concrete work, fencing and
gates, and landscape improvements, including landscape rock and curbing, required by the
approved site plan. It does not authorize any change to the approved use, site plan, building
placement, access, outdoor storage configuration, grading, drainage, landscaping, fencing, or other
approved improvement.
3. Separate Approval Required for Changes. Any proposed change associated with acquisition
or use of adjacent property, revised elevations, expanded operations, or a revised site layout must
be submitted separately and receive all required Village approvals before work proceeds.
4. Communication, Progress Updates, and Inspections. The property owner shall maintain
active communication with the Planning & Development Department and shall provide a written
progress update within 10 business days after receiving a written request from staff. The property
owner shall also permit reasona ble follow-up inspections by Village staff to document progress
and compliance.
5. Separate Building and Trade -Permit Compliance. This First Amendment does not extend,
reinstate, or approve any expired building, electrical, HV AC, plumbing, or other permit; does not
resolve the items identified in the August 11, 2026 Commercial Final Inspection Report; and does
not authorize occupancy or use contrary to applicable codes or permit requirements. Those matters
remain subject to separate administrative review and approval.
6. Enforcement. Failure to satisfy the conditions of this First Amendment or to complete the
approved site improvements by September 30, 2027, may result in further proceedings under
Section 94.16.06(11)(c) of the Village of Weston Zoning Code, including modification, revocation,
or other appropriate enforcement action.
7. No Other Amendments. Except as expressly amended by this First Amendment, all terms,
provisions, conditions, and requirements of the Original CUP remain unchanged and in full force
and effect. Nothing in this First Amendment modifies the Development Agreement or the approved
site plan except as expressly stated herein.
8. Incorporation and Construction. This First Amendment shall be attached to, recorded with,
and construed as part of the Original CUP. If a conflict exists between this First Amendment and
the Original CUP, this First Amendment controls solely to the extent of the express amendments
stated herein.
9. Effective Date. This First Amendment shall take effect upon approval by the Plan Commission
and execution by the authorized Village officials.
Dated this ____ day of __________________, 2026.
WESTON PLAN COMMISSION
By: ____________________________________
Hooshang Zeghami, Vice Chair
ATTEST:
________________________________________
Jennifer L. Higgins, Zoning Administrator
STATE OF WISCONSIN )
) ss.
COUNTY OF MARATHON )
Personally came before me this ____ day of __________________, 2026, the above-named
Hooshang Zeghami, Vice Chair, and Jennifer L. Higgins, Zoning Administrator, to me known to
be the persons who executed the foregoing instrument and acknowledged the same.
________________________________________
Notary Public, State of Wisconsin
Print Name: _____________________________
My commission expires: _________________
THIS INSTRUMENT DRAFTED BY:
Jennifer L. Higgins, Zoning Administrator
Village of Weston
4747 Camp Phillips Road
Weston, WI 54476
CONDITIONAL USE PERMIT AMENDMENT DETERMINATION
BY THE VILLAGE OF WESTON PLAN COMMISSION
Application/Petition No.: 20230129 Hearing Date: October 12, 2026
Applicant: Bruce Guss, BUG Properties, LLC
Location: 6406 Schofield Avenue, Weston, WI
Current Zoning: B-3 General Business
Description: Amend Conditional Use Permit No. 20230129 to extend the deadline for completion of
the remaining approved site improvements for a Light Industrial Contractor Shop and
Outdoor Storage Area to September 30, 2027.
The Department of Planning and Development of the Village of Weston, pursuant to the Village of Weston Zoning Code,
Article 16 Processes, Section 94.16.06 Conditional Use Permits, hereby makes the following findings and evaluation to the
Village of Weston Plan Commission:
GENERAL INFORMATION:
Approved Use: Light Industrial Contractor Shop and Outdoor Storage Area
Original Approval: October 9, 2023
Original Completion
Deadline:
October 9, 2025
Requested
Amendment:
Extend the deadline for completing the remaining concrete work, fencing and gates, and
landscape improvements, including landscape rock and curbing improvements to September
30, 2027. No change to the approved use or site plan is requested.
BACKGROUND INFORMATION:
October 9, 2023: The Plan Commission approved Conditional Use Permit No. 20230129 for a Light Industrial Contractor
Shop and Outdoor Storage Area at 6406 Schofield Avenue. The CUP, Development Agreement, and approved site plan
required the property to be developed in accordance with Village approvals and established October 9, 2025 as the
project completion deadline.
September 14, 2026: The Plan Commission reviewed the administrative record and determined that the property was
not in compliance with the CUP and Development Agreement. Remaining work included concrete, fencing and gates,
and landscaping, landscape rock, and curbing. The Plan Commission directed completion by September 23, 2026.
September 15, 2026: Staff provided written notice of the Plan Commission’s determination, identified the remaining site
improvements, and advised the owner to submit a written timeline or request additional time if the work could not be
completed by the deadline.
Applicant Request: The owner requested an extension through September 30, 2027, citing project costs, limited funds for
remaining materials, the potential acquisition of adjacent property that could affect future site elevations and design, and
weather conditions.
CURRENT PROPERTY CONDITIONS:
The principal building and substantial portions of the approved development have been completed. An updated October
2026 inspection confirms that the site remains incomplete under the approved site plan, including incomplete concrete -
to-gravel transitions, gravel-surfaced portions of the rear storage yard and parking/access areas, incomplete fencing and
gate improvements, and incomplete frontage landscaping. Building, accessibility, electrical, HVAC, plumbing, and other
final-inspection items are administered separately through the applicable permit and inspection processes and are not
part of the requested CUP amendment.
PLAN COMMISSION ACTION OPTIONS:
Sec. 94.16.06(6) Review and Action by the Plan Commission or Extraterritorial Zoning Committee. Within 60 days after the
public hearing, or an extension of said period requested in writing or electronic format by the applicant and granted by the
Commission or Committee, the Plan Commission or Extraterritorial Zoning Committee shall take final action on the
conditional use permit request. Prior to acting on a conditional use permit application, the Plan Commission or the
Extraterritorial Zoning Committee may request further information and/or additional reports from the Zoning
Administrator, the applicant, outside experts and/or any other source. The Commission or Committee may approve the
conditional use as originally proposed, may approve the proposed conditional use with conditions or modifications, or
may deny approval of the proposed conditional use and include reasons for denial. Any action to approve or amend the
proposed conditional use permit requires a majority vote of Commission or Committee members in attendance. Nothing
in this Chapter requires town plan commission or town board action on proposed conditional use permits in the ETZ Area.
1) Approve the amendment to Conditional Use Permit No. 20230129, extending the completion deadline to
September 30, 2027, subject to the following conditions. The conditions below are staff recommendations and
may be revised by the Plan Commission based on the record and hearing testimony.
1. This amendment applies only to the remaining concrete work, fencing and gates, and landscape improvements,
including landscape rock and curbing, required by the approved site plan. It does not authorize any change to the
approved use, site plan, building p lacement, access, outdoor storage configuration, grading, drainage,
landscaping, fencing, or other approved improvement.
2. Any proposed change associated with the acquisition or use of adjacent property, revised site elevations,
expanded operations, or a revised site layout shall be submitted separately and shall receive all required Village
approvals before related work begins.
3. The property owner shall maintain active communication with the Planning & Development Department and shall
provide a written progress update within 10 business days after receiving a written request from staff. The
property owner shall also permit reasonable follow -up inspections by Village staff to document progress and
compliance.
4. All remaining improvements shall be completed no later than September 30, 2027. The property owner shall
request a final compliance inspection from the Planning & Development Department at least 10 business days
before that deadline. Staff shall determine compliance following the inspection and receipt of any required
documentation.
5. This amendment does not extend, reinstate, or approve any expired building, electrical, HVAC, plumbing, or other
permit; does not resolve the items identified in the August 11, 2026 Commercial Final Inspection Report; and does
not authorize occupancy or us e contrary to applicable codes or permit requirements. Those matters remain
subject to separate administrative review and approval.
6. All other terms and conditions of Conditional Use Permit No. 20230129, the Development Agreement, and the
approved site plan remain in full force and effect unless specifically modified by this action.
7. Failure to complete the required improvements by September 30, 2027, or failure to comply with Conditional Use
Permit No. 20230129, the Development Agreement, the approved site plan, or these conditions may result in
further action under Section 94.16.06(1 1)(c) of the Village of Weston Zoning Code, including modification,
revocation, or other enforcement action.
2) Defer Action. Defer final action to a date certain, not later than the applicable decision deadline, pending receipt
and review of additional information specifically identified by the Plan Commission. The motion should state the
information or documentation required, the party responsible for providing it, the submission deadline, and the
meeting date when the amendment will return for consideration. If additional time beyond the ordinance decision
period is necessary, the applicant shall submit a written request for an extension and the Plan Commission must
grant the extension.
3) Deny the amendment to Conditional Use Permit No. 20230129. State the specific findings and reasons supporting
denial of the requested amendment.
DETERMINATION (To be completed by the Plan Commission):
Any decision to grant or deny the conditional use permit amendment must be supported by substantial evidence. Any
condition or modification must be related to the purpose of Chapter 94, reasonable, measurable to the extent
practicable, and based on substantial evidence.
1. Is the amendment consistent with the Village’s Comprehensive Plan, applicable ordinances, the approved use,
and adopted plans?
Staff Analysis: YES. The requested amendment changes only the deadline for completing previously approved site
improvements. It does not change the approved Light Industrial Contractor Shop and Outdoor Storage Area use, the
approved site plan, or the property’s zoning. Subject to the recommended conditions, staff finds the amendment
consistent with the Village’s Comprehensive Plan, applicable ordinances, the original CUP approval, and adopted
plans.
Plan Commission Finding:
2. Will the amendment avoid significant negative impacts to nearby properties, the surrounding area, the
environment, traffic, parking, public facilities, public property, or public rights-of-way?
Staff Analysis: YES, subject to the recommended conditions. The amendment does not authorize a new use,
expanded operations, additional traffic, or changes to access, parking, grading, drainage, outdoor storage,
landscaping, or fencing. Requiring completion by a firm deadline, allowing follow -up inspections, and preserving
enforcement authority will limit potential impacts associated with the unfinished improvements.
Plan Commission Finding:
3. Will the approved use remain compatible with nearby land uses in terms of type, intensity, and overall impact?
Staff Analysis: YES. The approved use and its intensity remain unchanged. The amendment provides additional time
to complete the approved concrete, fencing and gate, landscaping, landscape rock, and curbing improvements; it does
not authorize an expansion or a revised operational layout. Completion of those improvements will further support
compatibility with nearby properties.
Plan Commission Finding:
4. Will the amendment avoid placing an unreasonable burden on public facilities, utilities, or services?
Staff Analysis: YES. Extending the deadline for existing site improvements does not create additional demand on
public facilities, utilities, or services. Any building, electrical, HVAC, plumbing, accessibility, occupancy, or other permit
and inspection requirements remain subject to separate administrative review and approval.
Plan Commission Finding:
5. Do the expected public benefits of allowing a defined completion period outweigh potential negative impacts?
Staff Analysis: YES. A defined extension provides a practical and measurable path to full site compliance while
preserving the Village’s ability to monitor progress and take enforcement action if the work is not completed. The
recommended September 30, 2027 deadline, progress updates, inspection requirements, and continued applicability
of all other CUP and Development Agreement conditions provide public benefit and reduce potential negative
impacts.
Plan Commission Finding:
FINAL PLAN COMMISSION DETERMINATION
The Plan Commission, having conducted the public hearing on October 12, 2026, reviewed the application, staff analysis,
administrative record, submitted materials, public testimony, and applicable provisions of the Village of Weston Zoning
Code, hereby:
☐ APPROVES the amendment to Conditional Use Permit No. 20230129, extending the deadline for completion of the
remaining approved site improvements to September 30, 2027, subject to the conditions and requirements identified
herein and all other continuing terms of the CUP, Development Agreement, and approved site plan.
☐ DEFERS action pending receipt or review of additional information specifically identified by the Plan Commission:
________________________________________________.
☐ DENIES the amendment to Conditional Use Permit No. 20230129 for the specific findings and reasons stated in the
motion and meeting record.
Staff-Recommended Motion: Motion to approve the amendment to Conditional Use Permit No. 20230129 for BUG
Properties, LLC, extending the deadline to complete the remaining approved site improvements at 6406 Schofield Avenue
to September 30, 2027, based on the findings contained in this determination and subject to the seven conditions listed
above, with all other terms and conditions of Conditional Use Permit No. 20230129, the Development Agreement, and
the approved site plan remaining in full force and effect.
Vote: ______ in favor ______ opposed ______ abstained
Additional Conditions/Amendments:
Plan Commission Chair: ______________________________________________ Date: ___________________
Commission Clerk: __________________________________________________ Date: ___________________
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD, WESTON, WI 54476
Public Mtg/Date: Plan Commission, October 12, 2026
Description: Project #20260308 – Request for a Sign Special Exception Sign Permit for
Turf MD’s, 5605 Mesker Street.
From: Audrey Webster, Assistant Planner
Jennifer Higgins, Planning & Development Director/Zoning Administrator
Question: Should the Plan Commission approve the Special Exception Sign Permit
request submitted by property owner, Travis Hoffman, for Turf MD’s, allowing
installation of a cabinet replacement on the freestanding, pylon sign that does
not meet the front yard setback?
Background
The applicant requests a Special Exception Sign Permit for the existing freestanding pylon sign.
The applicant is proposing to replace the cabinet on the existing pylon sign. The sign height is
proposed to remain 20 feet tall and the front yard setback is 5 feet.
The property is located in the B-3 (General Business) Zoning District, which allows:
• One (1) freestanding (monument or pylon sign) per public street frontage per lot
• Maximum sign area: 64 square feet
• Maximum sign height: 20 feet
• Minimum setback: Equal to the height of the sign
Existing Pylon Sign
• Height: 20 feet
• Area: 49 square feet
• Location: Existing location, setback 5 feet from property line
• Notes: The existing pylon sign was originally constructed in 1996 with an overall height of 20
feet. Because the required setback is equal to the overall height of the sign, the existing 5-
foot setback met the ordinance requirements in effect today. The proposed new cabinet does
not increase the overall height of the sign and it will remain in the same location. As a result
of the cabinet change, the existing 5-foot setback no longer meets the current minimum
setback requirement, necessitating a Special Exception.
Proposed Pylon Sign
• Height: 20 feet (meets current maximum height)
• Area: 51 square feet (meets current maximum sign area)
• Location: Same as existing sign
• Setback: 5 feet from front property line
• Notes: Closer to property line than current setback requirement (20 feet). Requires Special
Exception for setback
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD, WESTON, WI 54476
The Sign Code provides the ability to grant Special Exceptions when the following criteria are met:
1. Consistent with the purpose and intent of this Chapter and this Section.
Nothing within the proposed request is inconsistent with the intent of the Sign Code.
2. Consistent with the Comprehensive Plan including any applicable aesthetic signage
guidelines therein.
The proposal is consistent with the Comprehensive Plan and applicable aesthetic signage
guidelines.
3. Not negatively affecting the reasonable use and development of nearby properties or
the community.
The proposed cabinet replacement of the pylon sign is consistent with the surrounding
properties and will not negatively impact them or any potential development of the
properties.
4. Compatible with existing signage on and visible from the subject site and not
significantly exceeding the height, area, or quantity of such existing signage.
The proposed pylon sign cabinet replacement height is remaining the same, but does not
exceed the maximum height permitted.
5. Proportional with the scale of the subject site and the building(s) and use(s) on the
subject site to which the sign relates or advertises.
The size of the proposed monument sign is consistent with the scale of the site and
buildings.
6. Not hazardous, harmful, or otherwise adverse to the natural environment and
aesthetic value of the site, nearby properties, and the community.
No adverse impacts are anticipated. The signage will help to notify the public of what is
offered within the building.
7. Not negatively affecting the safe and efficient installation, use, and maintenance of
public facilities serving the area, including but not limited to roadways, sidewalks and
paths, and utilities.
Clear directional signage will ensure that drivers are quickly and safely directed to their
destinations which will ensure that traffic flow remains stable for motorists and pedestrians.
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD, WESTON, WI 54476
8. Supported by evidence that normally applicable requirements do not provide for
sufficient visibility for the proposed signage or use(s) it advertises, such as a highway
visibility study for freestanding signage that exceeds normally applicable height area
requirements.
The request is not to increase the sign beyond the maximum permitted height or area, but to
allow the existing sign to remain in its current location. Relocating the sign would require
reconstruction of the existing monument base and result in unnecessary cost with little or no
corresponding public benefit. Granting the setback exception allows the existing sign location
to be retained while maintaining a sign that remains well within the maximum area and
height permitted in the B-3 District.
Staff believes the request represents a reasonable deviation from the setback requirement because
the proposal maintains the existing sign location, remains at the maximum permitted height and
below the maximum sign area, and is not anticipated to create adverse impacts on adjacent
properties or public safety.
Staff Recommendation:
Staff recommends approval of the requested Special Exception Sign Permit based on the findings above
and subject to the following condition:
1. A sign permit shall be issued prior to installation, and the sign shall be installed in substantial
conformance with the plans submitted with the Special Exception application.
Attached Docs: • Letter to adjacent landowners
• Current Sign Specs & Site Plan
Committee Action: N/A
FISCAL IMPACT: N/A
Recommendation: Staff recommends approval of the requested Special Exception Sign Permit
based on the findings above and subject to the following condition:
1. A sign permit shall be issued prior to installation, and the sign shall
be installed in substantial conformance with the plans submitted with
the Special Exception application.
Recommended Language for Official Action
I move to approve the Special Exception Sign Permit per staff recommendation
allowing Turf MD’s /Travis Hoffman to replace the cabinet on the existing
freestanding pylon sign, that does not meet the setback requirements.
Additional action: Issuance of Sign Permits (Staff)
October 2, 2026
Re: Turf MD’s - Special Exception for Signage
Dear Weston Property Owner,
NOTICE IS HEREBY GIVEN that the Village of Weston Plan Commission will hold a
meeting on Monday, October 12, 2026, at approximately 6:00 p.m., or shortly
thereafter, at the Weston Municipal Center, 4747 Camp Phillips Road, Weston, WI
54476, to discuss the following request:
Project #20260308 – A Special Exception Sign Permit request submitted by Turf
MD’s/Finishing Touch Signs, to allow the installation and replacement of a
freestanding, single business sign that does not meet the front yard setback, for the
property located at 5605 Mesker St, legally described as:
SEC 16-28-08 PT OF NE 1/4 SE 1/4 - CSM #5561 / VOL 20-154 / DOC #912150
Application materials are available for public inspection at the Village of Weston
Planning and Development Department during normal business hours.
Written comments may be submitted no later than noon on the date of the public
meeting to the Village of Weston Plan Commission, c/o Valerie Parker, Plan
Commission Secretary, 4747 Camp Phillips Road, Weston, WI 54476, or by email to
vparker@westonwi.gov. All written and oral comments received will be considered by
the Plan Commission at the meeting.
All interested persons wishing to provide oral or written comments during the
meeting will be given an opportunity to be heard.
Any person with questions, or who requires special accommodation in order to attend
or participate in the meeting, should contact Valerie Parker, Planning Technician,
Planning and Development Department, at 715-241-2607.
Sincerely,
Valerie Parker,
Planning Technician
THOMAS J BARTELME
5407 JEAN ELLEN ST
WESTON WI 54476
DAVID BURAZIN
JANICE M BURAZIN
5515 JEAN ELLEN ST
WESTON WI 54476
RONALD H BUTALLA
RUTHANN BUTALLA
223843 LAKESHORE DR
WAUSAU WI 54401
KURT J GERROW
KELLY L GERROW
5311 JEAN ELLEN ST
WESTON WI 54476
DANIEL P HUTH
KAYLA S HUTH
2439 SUNNY MEADOW DR
KRONENWETTER WI 54455
CLARANCE R KERSEMEIER JR
SUZANNE L KERSEMEIER
PO BOX 392
WESTON WI 54476
JOSHUA J KONKOL
163310 GUSMAN RD
WESTON WI 54476
JAKE T KRAIMER
389 N MILITARY RD
FOND DU LAC WI 54935
KREKLAU WESTON PROP LLC
174175 CHURCH ROAD
ANIWA WI 54408
JAMES LAMB
HANNAH LAMB
5511 JEAN ELLEN ST
WESTON WI 54476
M4 RENTALS LLC
1306 JEFFERSON ST
QUINCY IL 62301
DAVID A MCCARTHY
SUSAN L MCCARTHY
5202 LEE AVE
WESTON WI 54476
NINNEMANN DUPLEX #1 LLC
235451 FOREST LAWN RD
WAUSAU WI 54403
RUSSELL A OBERMEIER
TAMARA L OBERMEIER
5411 JEAN ELLEN ST
WESTON WI 54476
PENNY J RENTALS LLC
5205 STERNBERG AVE
WESTON WI 54476
PERRODIN INVESTMENTS-
STERNBERG LLC
W6947 LOOP RD
TOMAHAWK WI 54487
PRAECAVEO II LLC
PO BOX 1761
WAUSAU WI 54402
RICHARD BENDER RENTALS
PO BOX 136
WESTON WI 54476
JAMES C SCHROEDER
MARLA SCHROEDER
8605 WINDSOR DR
WESTON WI 54476
STATEWIDE DEVELOPMENT
W6483 DESIGN DR UNIT A
GREENVILLE WI 54942
MARK L STEINES
228239 FUST LN
WAUSAU WI 54403
DAWN M STOMMEL
5408 MESKER ST
WESTON WI 54476
T&A HOFFMANN LLC
RANDY KEUNTJES
6005 MESKER ST
WESTON WI 54476
MARY BECK
RANDY BECK
5503 JEAN ELLEN ST
WESTON WI 54476
LAURIE K ZELENKA
5507 JEAN ELLEN ST
WESTON WI 54476
TURF MD'S
NICK TECHEL
5605 MESKER ST
WESTON WI 54476
Sign Specifications:Sign Specifications:
- (2) New lexan panels with translucent vinyl
-
Customer: Turf MD
Job Location: Schofield
Job #: 20494
Proof Date: 9/4/26
Sales Rep: Tom Diedrick
Designer: Suzi
Client Approval:
TBD
Pantone 350
Black
White
TBD
Double Sided
Single Sided
Lit Sign
Non Lit
Opaque Vinyl
Translucent Vinyl
Frosted
Painted
Exterior
Interior
Substrate:
Colors:
TBD
FINAL DRAWING APPROVAL
These drawings will be released to manufacturing once signed and returned. Any detail or dimension
changes will delay fabrication and incur extra charges. Once the design is approved Finishing Touch will
not be responsible for errors. Colors shown for representation only. Actual paint or vinyl graphics may
not match ink colors on layout.
This artwork is copywrited and may not be reproduced or used without written permission.
Design fees will be charged without authorized use.
FINAL DRAWING APPROVAL
These drawings will be released to manufacturing once signed and returned. Any detail or dimension
changes will delay fabrication and incur extra charges. Once the design is approved Finishing Touch will
not be responsible for errors. Colors shown for representation only. Actual paint or vinyl graphics may
not match ink colors on layout.
This artwork is copywrited and may not be reproduced or used without written permission.This artwork is copywrited and may not be reproduced or used without written permission.
Design fees will be charged without authorized use.Design fees will be charged without authorized use.
5111 Sherman St.
Wausau, WI 54401
Office: 715-845-0500
-the doctor is in-
-the doctor is in-
119.5 in
62 in
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
Public Mtg/Date: Plan Commission, October 12, 2026
Description: Review proposed modifications to the approved site plan for the Mountain
Bay Metropolitan Police Department, Project No. 20260116, at 3600
Community Center Drive, and consider recommending conditional
authorization for staff to issue an early-start permit for footings and
foundation following verification of applicable building setbacks and
satisfaction of all other requirements.
From: Jennifer Higgins, Planning & Development Director/Zoning Administrator
Michael Wodalski, Director of Public Works
Roman Maguire, Building Inspector
Audrey Webster, Assistant Planner
Question: Should the Plan Commission acknowledge the potential site plan revisions
associated with the location of the existing TC Energy gas line and
recommend that, once staff verifies that the proposed building location meets
all applicable setback requirements and all other early-start requirements are
satisfied, staff be authorized to issue an early-start permit limited to footings
and foundation , with verification anticipated shortly after the Plan
Commission meeting and, if possible, before the Board of Trustees considers
the matter on October 19, 2026?
BACKGROUND
The Mountain Bay Metropolitan Police Department (MBMPD) is constructing a new regional police
department headquarters and municipal court facility at 3600 Community Center Drive in the Village
of Weston. The original Site Plan, architectural elevations, and exterior building design were reviewed
and approved by the Plan Commission and Board of Trustees in May 2026.
Village Planning & Development Staff recently received notice from Dustin Vreeland, project
engineer, that the project team encountered an issue with the approved site layout after determining
that the existing gas line is not located within the easement r
ecorded many years ago. This field
condition requires portions of the approved site plan to be revised.
The project team is working with TC Energy to identify and approve a revised layout that
accommodates the actual gas-line location and applicable easement requirements. According to the
updated project narrative, the building itself remains consistent with the previously approved project;
the anticipated changes are site-related modifications necessary to address the gas-line conflict.
Because of the timing and the need to keep the project moving, staff is presenting the matter to the
Plan Commission and Board of Trustees so both bodies, as the original approval authorities, are
aware of the potential changes before the revised plans are finalized.
Over the next month, staff will work with the project engineer, MBMPD, TC Energy, and other
applicable reviewers to complete the technical Site Plan review. Once the revisions are sufficiently
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
developed, the plans may be submitted to the State for required approvals so the project can continue
toward issuance of the building permit.
Staff will bring the final amended Site Plan package back to the Plan Commission and Board of
Trustees in November 2026 for formal approval. This subsequent action will provide a clear public
record of the approved revisions and the final scope of the project.
STAFF REVIEW SUMMARY:
The immediate purpose of this item is informational. Staff is not requesting final approval of the
amended Site Plan at this meeting because the revisions are still being coordinated with TC Energy
and remain subject to complete Village technical review.
To help avoid unnecessary construction delay, the Plan Commission is being asked to support
conditional authorization for an early -
start permit limited to footings and foundation. Staff may not
have completed setback verification by the Plan Commission meeting but expects to do so shortly
afterward and, if possible, before the Board of Tr ustees considers the matter on October 19, 2026.
The early-start permit would not be issued unless staff first verifies that the proposed building location
complies with all applicable setback requirements and confirms that all other applicable Code, plan,
submittal, and approval requirements have been satisfied. The applicant would proceed at its own
risk before final approval of the amended Site Plan.
Key review and documentation steps include:
• Staff verification, anticipated shortly after the Plan Commission meeting and, if possible, before the
October 19, 2026 Board meeting, that the proposed building location meets all applicable setback
requirements
• Confirmation of the actual gas-line location and applicable easement requirements
• TC Energy review and approval of the revised site layout
• Completion of Village planning, zoning, engineering, utility, stormwater, access, landscaping,
lighting, and code review
• Confirmation that all Code, plan, and submittal requirements for an early -start permit limited to
footings and foundation have been satisfied
• Coordination of the revised plans for required State approvals before building permit issuance
• Return of the final amended Site Plan package to the Plan Commission and Board of Trustees in
November 2026
Attached Docs: • Updated Project Narrative
• Updated Site Plan Set – Vreeland Associates (dated October 7, 2026)
• Original Site Plan Approved, May 2026
Committee Action: Informational review and recommendation to the Board of Trustees
regarding continued technical review and conditional authorization for staff
to issue an early-start permit limited to footings and foundation after
verifying applicable building setbacks and all other early-start requirements.
Setback verification is anticipated shortly after the Plan Commission
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
meeting and, if possible, before the October 19, 2026 Board meeting. No
final approval of the amended Site Plan is requested at this meeting.
Fiscal Impact: Fiscal impacts associated with construction, operations, and long-term
maintenance are being managed by MBMPD, the MBMPD Police
Commission, MBMPD Oversight Board, and participating municipalities.
Recommendation: Staff recommends that the Plan Commission acknowledge the potential site
plan revisions associated with the actual location of the TC Energy gas line,
direct staff to continue coordinating the technical review , and recommend
conditional early-start authorization to the Board of Trustees. Staff may not
have completed setback verification by the Plan Commission meeting but
expects to do so shortly afterward and, if possible, before the Board
considers the matter on October 19, 2026. An early -start permit limited to
footings and foundation would be issued only after staff verifies that the
proposed building location meets all applicable setback requirements and
determines that all other Code, plan, submittal , and approval requirements
have been satisfied. The final amended Site Plan package will return to the
Plan Commission and Board of Trustees in November 2026 for formal
approval and documentation of the approved changes and final project
scope.
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
Motion to acknowledge the potential amendments to the previously approved
Site Plan for the Mountain Bay Metropolitan Police Department and Municipal
Court facility at 3600 Community Center Drive ; direct Village Staff to continue
technical review and coordination; and recommend to the Board of Trustees that
staff be authorized to issue an early -start permit limited to footings and
foundation only after staff verifies that the proposed building location meets all
applicable setback requirements and confirms that all other applicable Code,
plan, submittal, and approval requirements have been satisfied, with setback
verification anticipated shortly after the Plan Commission meeting and, if
possible, before the October 19, 2026 Board meeting, and with the final amended
Site Plan package returning to the Plan Commission and Board of Trustees for
formal approval in November 2026.
ADDITIONAL ACTION: 1. Project engineer and MBMPD to continue coordinating the revised
site layout with TC Energy.
2. Staff to verify that the proposed building location meets all applicable
setback requirements shortly after the Plan Commission meeting
and, if possible, before the October 19, 2026 Board meeting.
3. Staff to complete planning, zoning, engineering, utility, stormwater,
access, landscaping, lighting, and code review of the revised plans.
4. Following Board authorization, staff may issue an early-start permit
limited to footings and foundation only after all applicable setback,
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
Code, plan, submittal, and approval requirements are satisfied, with
the applicant proceeding at its own risk pending final approval of the
amended Site Plan.
5. Revised plans to be submitted for required State approvals before
issuance of the full building permit.
6. Staff to place the final amended Site Plan package on the November
2026 Plan Commission and Board of Trustees agendas for formal
approval.
7. Staff to retain the final approved amended Site Plan package as the
official record of the approved changes and project scope.
Project Narrative:
The Mountain Bay Metropolitan Police Department is relocating and building a new
building with attached garage to house both the multi-jurisdictional police department
and municipal court. The police department serves the Village of Rothschild, Village of
Weston, City of Schofield and Town of Weston. The municipal court serves the Village
of Rothschild, Village of Weston, City of Schofield, Town of Weston, Village of Edgar
and City of Marathon.
This new building will have enough office space and room to house approximately 40
officers, 4 clerical staff and three staff from the municipal court, with room for growth
and the ability to accommodate current and future needs. The project is centralized for
quick access to all four municipalities. The building will provide adequate room for the
public to be served by both the police department and municipal court. An attached
garage will allow for indoor parking of police vehicles when not in use, which will
extend the life and investment of police equipment and electronics. A large evidence
storage area is included, which will accommodate past, current and future evidence,
with room for future decades of service.
The building was approved on the initial review site plan, however due to variations in
the easement for the gas line, the site plan had to be slightly modified to meet the
requirements of that easement.
This was an unforeseen change that occurred once the exact location of the gas line
was determined.
Please see the plans for the exact measurements, lot size, and square footage of each
space.
SS
SS
STST EB
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DUSTIN VREELANDDESIGNER: DUSTIN VREELANDFILE NO.: 25-0203 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:FIELD DATE: MAY 8TH, 2025
TITLE PAGE:
PREPARED FOR:CONSTRUCTION SET DATE:7/9/26DVADD NOTE 14 TO C39/20/26DVCOMPLETE SITE REDESIGNDUE TO TC ENERGY
C41" = 40'
SS
SS
STST EB
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DUSTIN VREELANDDESIGNER: DUSTIN VREELANDFILE NO.: 25-0203 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:DATE: MAY 8TH, 2025
TITLE PAGE:
PREPARED FOR:REVISED PLAN DATE:
C41" = 40'
VILLAGE OF WESTON, WISCONSIN
AGENDA ITEM COVER SHEET / REQUEST FOR CONSIDERATION
DESCRIPTION: September/October Staff-approved Certified Survey Maps and Site Plans.
FROM: Jennifer Higgins, Director of Planning & Development
Valerie Parker, Planning Technician
FOR REVIEW BY: Plan Commission, 10/12/2026
POLICY QUESTION: Should the PC acknowledge the staff approvals as submitted by the
Department?
ISSUE-IN-BRIEF: September/October Staff-approved Certified Survey Maps and Site Plans.
FISCAL IMPACT: TBD.
GUIDANCE: Director of Planning & Development recommends the PC acknowledge
the report and place on file.
PRIOR REVIEW: No previous public review.
REQUEST: Acknowledge and place on file.
☐ Is there an additional briefer with this agenda item?
☐ Are there additional documents which have been attached to this report?
List of CSM’s and Site Plans Approved by Staff Since the last PC Meeting:
Certified Survey Maps –
Project #20260359 – Gremmer/Dombeck, 220540 County Road J – Plat of Survey
Project #20260315 – Riverside Land Surveying/Lokre, 4605 – 4613 Camp Phillips Road – New Condo Plat
Site Plans –
None.
**To view any of the above-approved projects (CSM’s & Site Plans), visit:
https://evolvepublic.infovisionsoftware.com/weston/, under the PROJECT heading, select PROJECT
SEARCH. You can then search any of the above projects by name, address, or date range.**
VILLAGE OF WESTON, WISCONSIN
AGENDA ITEM COVER SHEET / REQUEST FOR CONSIDERATION
DE
SCRIPTION: Report re: September 2026 Building Permits
F
ROM: Roman Maguire, Building Inspector
Travis Meverden, Building Inspector
FO
R REVIEW BY: Plan Commission, 10/12/2026
Board of Trustees, 10/19/2026
P
OLICY QUESTION: Should the PC & BOT acknowledge the September 2026 building
permits issued as submitted by the Department?
I
SSUE-IN-BRIEF: Monthly report from the Planning & Development Department – Building
Inspections Division.
F
ISCAL IMPACT: $39,686,153 in permit valuation
$253,951 in permit fees
1,132 total permits issued (1,092 Village, 20 Town, 20 Rothschild)
(YTD as of 9/30/26)
Mo
nth of September 2026 Permits Issued.
Village of Weston - 162
Town of Weston - 2
Village of Rothschild - 4
$32,759 received in permit fees.
$3,092,824 in permit valuation
G
UIDANCE: Inspectors recommend the PC & BOT acknowledge the report and place
on file.
P
RIOR REVIEW: No previous public review.
R
EQUEST: Acknowledge and place on file.
☐ Is there an additional briefer with this agenda item?
☒ Are there additional documents which have been attached to this report?
September 2026 Building Permits
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
Town of Weston
202601432 226163 CLEARVIEW
DR, WESTON
09/02/2026082280812300
05
PHILLIP STURM $5,820 $50.00Driveway 0 111
202601449 163905 RIVER RD,
WESTON
09/05/2026082280813309
82
DOUGLAS BERG $12,000 $140.00Home
Improvemen
t
0 105
Town of Weston Permits Valuation
Town of Weston Permits Fees
Town of Weston Permits Issued 2
$190
$17,820
Town of Weston Permits Finished SqFt
0 Town of Weston Permits Project SqFt
Village of Rothschild
202601476 1807 CEDAR CREEK
DR, ROTHSCHILD
MARATHON
PLUMBING
SERVICE LLC
09/11/2026176280831110
03
PAUL HOFFMAN $60.00Meter 0 506
202601457 1204 LEMKE AVE,
ROTHSCHILD
RUNKEL
ABSTRACT
09/08/2026176280725111
56
KAREN TAUFERNER $15.00Special
Assessment
0 911
202601546 8811 BRIAN DR,
ROTHSCHILD
09/18/2026176280830310
61
KENNETH WOELLNER $60.00Well
Resinspecti
on
0 312
202601581 1106 HARLYN AVE,
ROTHSCHILD
09/28/2026176280725411
07
JAMES BEDWELL $60.00Well
Resinspecti
on
0 312
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
Village of Rothschild Permits Valuation
Village of Rothschild Permits Fees
Village of Rothschild Permits Issued 4
$195
Village of Rothschild Permits Finished SqFt
0 Village of Rothschild Permits Project SqFt
Village of Weston
202601541 5003 RIVER BEND RD,
WESTON
09/18/2026192280815109
80
PEDRO RAZO $1,500 $76.40Accessory 0 101
202601548 8402 CASTLEBERRY
CIR, WESTON
09/19/2026192280829300
68
RONALD FENHAUS $1,800 $40.00Accessory 0 101
202601480 4311 SCHOFIELD AVE,
WESTON
09/11/2026192280816309
43
ILLINOIS AVENUE
HOUSING LLC
$1,900 $40.00Accessory 0 101
202601426 3306 PORTAGE ST,
WESTON
09/01/2026192280810202
56
DONALD KUSS $2,200 $40.00Accessory 0 101
202601467 1625 EVEREST AVE,
WESTON
09/09/2026192280819200
12
JOSHUA GOOD $5,000 $40.00Accessory 0 101
202601568 6300 BIRCH ST,
WESTON
09/24/2026192280820109
96
MHWI COLONIAL
GARDENS OF WESTON
LLC
$5,200 $40.00Accessory 0 101
202601434 8905 HINNER
SPRINGS DR,
WESTON
09/02/2026192280829400
14
LUCAS WORZALLA $7,500 $68.80Accessory 0 101
202601520 3860 MUSKIE DR,
WESTON
09/14/2026192280810401
15
JOSHUA HOLBACH $10,000 $68.80Accessory 0 101
202601572 3400 MINISTRY PKWY,
WESTON
The Samuels
Group
09/25/2026192280820409
59
MCHS HOSPITALS INC $38,855 $200.00Commercial
Buildout
595 202
202601523 4002 SCHOFIELD AVE,
WESTON
Scherrer
Construction
Co, Inc
09/15/2026192280817408
70
3910 SCHOFIELD
AVENUE LLC
$473,015 $568.90Commercial
Buildout
5,689 202
202601595 5009 ARROW ST,
WESTON
09/30/2026192280816200
65
W MATTI OKKONEN $5,000 $100.00Deck 0 103
202601530 3840 MUSKIE DR,
WESTON
Double J
Construction
LLC
09/16/2026192280810401
20
KARIN PAVELKO $15,000 $100.00Deck 0 103
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601483 1907 SCHOFIELD AVE,
WESTON
THATCHER
CONST &
REMODELING
LL
09/14/2026192280818409
96
AR PROFESSIONAL
BUILDING LLC
$7,000 $100.00Deck 0 206
202601495 5006 VON KANEL ST,
WESTON
09/14/2026192280816209
78
JASON BEAL $0 $50.00Driveway 0 111
202601433 3606 SANDY LN,
WESTON
09/02/2026192280809109
96
ELEANOR VESPER $7,000 $50.00Driveway 0 111
202601603 No Address Ress Outdoor
Services
09/30/2026082280813309
72
$48,500 $75.00Driveway 0 111
202601591 5706 QUARTZ TRAIL
RD, WESTON
Timber Ridge
Builders LLC.
09/30/2026192280822201
60
TIMBER RIDGE BUILDERS
LLC
$100.00Early Start 0 115
202601592 5700 QUARTZ TRAIL
RD, WESTON
Timber Ridge
Builders LLC.
09/30/2026192280822201
59
TIMBER RIDGE BUILDERS
LLC
$100.00Early Start 0 115
202601593 5712 QUARTZ TRAIL
RD, WESTON
Timber Ridge
Builders LLC.
09/30/2026192280822201
61
TIMBER RIDGE BUILDERS
LLC
$100.00Early Start 0 115
202601594 5716 QUARTZ TRAIL
RD, WESTON
Timber Ridge
Builders LLC.
09/30/2026192280822201
62
TIMBER RIDGE BUILDERS
LLC
$100.00Early Start 0 115
202601454 7206 VON KANEL ST,
WESTON
09/08/2026192280821309
98
JEFFREY ROBL $2,000 $75.00Electrical 10 702
202601485 4303 DEER ST,
WESTON
FLOYD J
MOORE
09/14/2026192280808300
63
MICHAEL MILLER $2,000 $75.00Electrical 10 702
202601525 1711 ROSSENBACH
AVE, WESTON
09/15/2026192280818109
32
MARGARET GOYTOWSKI $2,200 $75.00Electrical 200 702
202601469 5515 GLAD ST,
WESTON
BoKar
Mechanical
09/09/2026192280817300
51
MPD PROPERTIES LLC $2,500 $95.00Electrical 900 702
202601440 4503 AUGUSTINE AVE,
WESTON
09/03/2026192280816300
57
GORDON MEYER $2,692 $75.00Electrical 20 702
202601562 6407 RED OAK CT,
WESTON
Elite Electrical
Contractors
LLC
09/24/2026192280810300
66
TODD HAGEDORN $16,500 $85.00Electrical 100 702
202601474 8211 SCHOFIELD AVE,
WESTON
Croker
Electric, LLC
09/11/2026192280823109
55
MC P1 STORAGE LLC $7,500 $200.00Electrical
Comm
7,500 700
202601558 1708 DALEY AVE,
WESTON
Wisconsin
Public Service
09/23/2026192280819100
19
ARNOLD BRUZEK $75.00Excavation 0 300
202601569 4408 AUGUSTINE AVE,
WESTON
WISCONSIN
PUBLIC
SERVICE
09/25/2026192280816300
27
KURT STOLZE $75.00Excavation 0 300
202601570 2702 PLEASANT VIEW
DR, WESTON
WISCONSIN
PUBLIC
SERVICE
09/25/2026192280808300
35
DANIEL GRABKO $75.00Excavation 0 300
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601443 6010 SAXON AVE,
WESTON
Wisconsin
Public Service
09/04/2026192280815309
85
NB LLC $75.00Excavation 0 300
202601446 4504 CEDAR AVE,
WESTON
WISCONSIN
PUBLIC
SERVICE
09/04/2026192280816309
42
SURVIVOR'S TRUST $75.00Excavation 0 300
202601447 7206 VON KANEL ST,
WESTON
WISCONSIN
PUBLIC
SERVICE
09/04/2026192280821309
98
JEFFREY ROBL $75.00Excavation 0 300
202601439 3600 COMMUNITY
CENTER DR,
WESTON
Worden
Enterprises
09/03/2026 $0.00Excavation 0 300
202601453 5611 S TIMBER ST,
WESTON
Freedom
Construction
09/08/2026192280816301
44
JAMES BECKER $375.00Excavation 0 300
202601448 5907 CANOE ST,
WESTON
TDS Telecom 09/04/2026192280810201
60
JENNIFER HELMINIAK $75.00Excavation 0 300
202601598 2906 EAU CLAIRE
AVE, WESTON
Wisconsin
Public Service
09/30/2026192280808300
40
RICHARD BOEHMER $75.00Excavation 0 300
202601425 1829 DALEY AVE,
WESTON
09/01/2026192280819101
11
JIMMY CHANG $6,438 $40.00Fence 0 108
202601430 6110 KAYAK DR,
WESTON
09/02/2026192280810202
73
GUNNAR YONKER $7,000 $40.00Fence 0 108
202601424 9305 CHRISTIE LN,
WESTON
Revamp
Fence & Deck
09/01/2026192280824300
49
ELIZABETH WYNNE $16,000 $40.00Fence 0 108
202601486 3507 MAKENZIE DR,
WESTON
09/14/2026192280810100
18
JAMIE REIMER $50.00Hardscape 0 117
202601521 3860 MUSKIE DR,
WESTON
09/14/2026192280810401
15
JOSHUA HOLBACH $50.00Hardscape 0 117
202601573 5302 GORDON ST,
WESTON
ProBuild
Construction
LLC
09/25/2026192280817409
63
NATHAN WILLIAMSON $8,500 $50.00Home
Improvemen
t
0 105
202601529 9615 SANDHILL DR,
WESTON
Mad City
Windows &
Baths
09/16/2026192280832200
66
YANG XIONG $10,000 $45.00Home
Improvemen
t
0 105
202601444 5912 PINE PARK ST,
WESTON
Mad City
Windows &
Baths
09/04/2026192280818400
20
BILLIE JO SULLIVAN $10,000 $45.00Home
Improvemen
t
0 105
202601482 4512 TWIN PINES LN,
WESTON
09/14/2026192280815201
13
JAYSON MAGUIRE $15,000 $185.00Home
Improvemen
t
0 105
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601428 7707 SCHOFIELD AVE,
WESTON
MALBRIT
MECHANICAL
INC.
09/02/2026192280823209
92
LONE OAK-SCHOFIELD
LLC
$27,380 $100.00HVAC 0 600
202601464 4302 ROSS AVE,
WESTON
Best HVAC 09/09/2026192280816209
64
ALLEN GILBERTSON $4,000 $50.00HVAC Res 0 604
202601565 5110 APACHE LN,
WESTON
Comfort
Gallery
09/24/2026192280815100
03
KIM THURS $4,780 $50.00HVAC Res 0 604
202601564 5904 QUENTIN ST,
WESTON
MALBRIT
MECHANICAL
INC.
09/24/2026192280810201
02
JACK SMITH $4,820 $50.00HVAC Res 0 604
202601550 2711 E NEUPERT AVE,
WESTON
WILL
HEATING &
COOLING INC
09/21/2026192280817301
14
SHARON RUHL $8,900 $50.00HVAC Res 0 604
202601468 6208 ISAIAH ST,
WESTON
MALBRIT
MECHANICAL
INC.
09/09/2026192280810201
33
MICHELLE HUFF $9,570 $50.00HVAC Res 0 604
202601466 6300 BIRCH ST,
WESTON
Merrill Sheet
Metal
09/09/2026192280820109
96
MHWI COLONIAL
GARDENS OF WESTON
LLC
$12,136 $50.00HVAC Res 0 604
202601484 6405 VON KANEL ST,
WESTON
WILL
HEATING &
COOLING INC
09/14/2026192280821109
90
DCC INCOME TRUST $12,150 $50.00HVAC Res 0 604
202601431 6314 ALTA VERDE ST,
WESTON
Frasiers
Plumbing &
Heating
09/02/2026192280819100
77
STEPHEN JASINSKI $13,800 $50.00HVAC Res 0 604
202601585 5810 WESTON AVE,
WESTON
France
Service, LLC,
DBA France
Sales &
Service, Inc
09/28/2026192280822309
81
ANDREW WALDVOGEL $50.00Lateral 0 503
202601586 5810 WESTON AVE,
WESTON
France
Service, LLC,
DBA France
Sales &
Service, Inc
09/28/2026192280822309
81
ANDREW WALDVOGEL $1,325.00Meter 0 506
202601487 3616 GREEN
PASTURES LN,
WESTON
Timber Ridge
Builders LLC.
09/14/2026192280829101
15
TIMBER RIDGE BUILDERS
LLC
$1,325.00Meter 0 506
202601488 3618 GREEN
PASTURES LN,
WESTON
Timber Ridge
Builders LLC.
09/14/2026192280829101
16
TIMBER RIDGE BUILDERS
LLC
$1,325.00Meter 0 506
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601489 3710 GREEN
PASTURES LN,
WESTON
Timber Ridge
Builders LLC.
09/14/2026192280829101
18
TIMBER RIDGE BUILDERS
LLC
$1,325.00Meter 0 506
202601490 3712 GREEN
PASTURES LN,
WESTON
Timber Ridge
Builders LLC.
09/14/2026192280829101
19
TIMBER RIDGE BUILDERS
LLC
$1,325.00Meter 0 506
202601491 3802 GREEN
PASTURES LN,
WESTON
Timber Ridge
Builders LLC.
09/14/2026192280829101
20
TIMBER RIDGE BUILDERS
LLC
$1,325.00Meter 0 506
202601492 3804 GREEN
PASTURES LN,
WESTON
Timber Ridge
Builders LLC.
09/14/2026192280829101
21
TIMBER RIDGE BUILDERS
LLC
$1,325.00Meter 0 506
202601493 3702 GREEN
PASTURES LN,
WESTON
Timber Ridge
Builders LLC.
09/14/2026192280829101
17
TIMBER RIDGE BUILDERS
LLC
$1,325.00Meter 0 506
202601494 3812 GREEN
PASTURES LN,
WESTON
Timber Ridge
Builders LLC.
09/14/2026192280829101
22
TIMBER RIDGE BUILDERS
LLC
$1,325.00Meter 0 506
202601456 8708 HINNER
SPRINGS DR,
WESTON
CHARLIES
HARDWARE
09/08/2026192280829400
38
KATHERINE DAHLIE $60.00Meter 0 506
202601465 3805 MUSKIE DR,
WESTON
TTP Plumbing
LLC
09/09/2026192280810401
76
EDWARD KORDUS $60.00Meter 0 506
202601437 6003 BUSINESS
HIGHWAY 51,
WESTON
Highpoint
Landworks,
Inc.
09/03/2026192280818309
48
JHGV LLC $60.00Meter 0 507
202601587 5305 FULLER ST,
WESTON
A RITE
CONSTRUCTI
ON AND
ROOFIN
09/28/2026192280815309
41
BRIAN PENDELTON $4,349 $60.00Minor Home
Improvemen
t
0 901
202601577 5805 PINE PARK ST,
WESTON
Lauren
Exteriors
09/25/2026192280818409
85
NICHOLAS
LATENDRESSE
$5,950 $60.00Minor Home
Improvemen
t
0 901
202601527 5813 PINE PARK ST,
WESTON
Lauren
Exteriors
09/15/2026192280818400
16
JEREMIAH LARSON $6,100 $60.00Minor Home
Improvemen
t
0 901
202601537 1418 DALEY AVE,
WESTON
Lauren
Exteriors
09/17/2026192280819200
07
TNB INCOME TRUST $6,900 $60.00Minor Home
Improvemen
t
0 901
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601576 5507 FERGE ST,
WESTON
Lauren
Exteriors
09/25/2026192280818300
13
ALLAN GABOR $7,000 $60.00Minor Home
Improvemen
t
0 901
202601539 5913 CORONADO DR,
WESTON
Lauren
Exteriors
09/17/2026192280818401
99
JENNIFER HESCH $7,800 $60.00Minor Home
Improvemen
t
0 901
202601545 1802 HIGHLAND AVE,
WESTON
Big Dawg
Roofing and
Construction
09/18/2026192280819101
33
ERIC SCHNEIDER $8,000 $60.00Minor Home
Improvemen
t
0 901
202601589 5917 LAWNDALE ST,
WESTON
Lauren
Exteriors
09/30/2026192280818401
78
WALTER DAVIDSON $8,100 $60.00Minor Home
Improvemen
t
0 901
202601526 6702 ALTA VERDE ST,
WESTON
Lauren
Exteriors
09/15/2026192280819101
19
STEVEN AND KATHLEEN
JOHNSON REVOCABLE
LIVING TRUST
$8,900 $60.00Minor Home
Improvemen
t
0 901
202601579 5702 PINE PARK ST,
WESTON
Lauren
Exteriors
09/25/2026192280818400
28
WILLIAM AMSRUD $8,918 $60.00Minor Home
Improvemen
t
0 901
202601540 6106 ROGAN LN,
WESTON
Lauren
Exteriors
09/17/2026192280815200
45
JOHN STIEBER $9,100 $60.00Minor Home
Improvemen
t
0 901
202601590 3109 SANDGATE CT,
WESTON
Lauren
Exteriors
09/30/2026192280829300
50
MARC LEVY $9,350 $60.00Minor Home
Improvemen
t
0 901
202601470 5110 LINDA ST,
WESTON
09/10/2026192280816100
99
MATTHEW VAN DEN
HEUVEL
$9,858 $60.00Minor Home
Improvemen
t
0 901
202601578 1810 EL SEGUNDO
AVE, WESTON
Lauren
Exteriors
09/25/2026192280819100
58
ROSS HOWLAND $10,250 $60.00Minor Home
Improvemen
t
0 901
202601538 6111 LAWNDALE ST,
WESTON
Lauren
Exteriors
09/17/2026192280819100
59
JOHN SJOBERG $11,000 $60.00Minor Home
Improvemen
t
0 901
202601552 5307 VON KANEL ST,
WESTON
Alliance Home 09/21/2026192280816400
02
MANAT VANG $12,000 $60.00Minor Home
Improvemen
t
0 901
202601559 4515 STERNBERG
AVE, WESTON
CWI
CONSTRUCTI
ON LLC
09/23/2026192280816300
31
THOMAS RASMUSSEN $12,600 $60.00Minor Home
Improvemen
t
0 901
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601542 7604 FEITH AVE,
WESTON
Prestige
Roofing LLC
09/18/2026192280823209
65
LEE XIONG $13,500 $60.00Minor Home
Improvemen
t
0 901
202601544 1802 HIGHLAND AVE,
WESTON
Big Dawg
Roofing and
Construction
09/18/2026192280819101
33
ERIC SCHNEIDER $15,000 $60.00Minor Home
Improvemen
t
0 901
202601543 5908 ISAIAH ST,
WESTON
Big Dawg
Roofing and
Construction
09/18/2026192280810200
92
TANOR ALLEN $15,000 $60.00Minor Home
Improvemen
t
0 901
202601463 5405 ROCK RAPIDS
DR, WESTON
Mark Kern 09/09/2026192280809402
59
MARK KERN $16,000 $60.00Minor Home
Improvemen
t
0 901
202601571 5911 CORONADO DR,
WESTON
09/25/2026192280818401
98
CAITLIN ENGEL $18,000 $60.00Minor Home
Improvemen
t
0 901
202601567 6510 RANDYLYN ST,
WESTON
09/24/2026192280822100
83
KREKLAU PROPERTIES
LLC
$20,000 $60.00Minor Home
Improvemen
t
0 901
202601429 6300 BIRCH ST,
WESTON
FEEL GOOD
CARPENTRY
& DESIGN
09/02/2026192280820109
96
MHWI COLONIAL
GARDENS OF WESTON
LLC
$30,000 $60.00Minor Home
Improvemen
t
0 901
202601462 4608 RIVER BEND RD,
WESTON
Wausau
Roofing,
Siding &
Windows Co.
09/09/2026192280815100
37
TIMOTHY MARKSTRUM $30,588 $60.00Minor Home
Improvemen
t
0 901
202601427 6104 CONNIE LN,
WESTON
09/01/2026192280822200
20
DONALD BEILKE $31,850 $60.00Minor Home
Improvemen
t
0 901
202601423 9404 ANASTASIA DR,
WESTON
09/01/2026192280834209
80
MIRANDA LEZCANO $32,500 $60.00Minor Home
Improvemen
t
0 901
202601549 2204 CUTOFF RD,
WESTON
EEB Custom
Carperty
09/21/2026192280818100
41
BRIAN MAREK $39,550 $60.00Minor Home
Improvemen
t
0 901
202601441 6201 SCHOFIELD AVE,
WESTON
AutoSelect 09/03/2026192280815309
22
STEVEN NELSEN $150.00Occupancy 0 750
202601479 6606 MACHMUELLER
ST, WESTON
Milis Flatwork 09/11/2026192280819209
75
6606 MACHMUELLER
STREET LLC
$0 $0.00Parking Lot 0 211
202601477 6606 MACHMUELLER
ST, WESTON
Milis Flatwork 09/11/2026192280819209
75
6606 MACHMUELLER
STREET LLC
$72,000 $0.00Parking Lot 0 211
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601478 6606 MACHMUELLER
ST, WESTON
Milis Flatwork 09/11/2026192280819209
75
6606 MACHMUELLER
STREET LLC
$74,000 $0.00Parking Lot 0 211
202601475 5707 SCHOFIELD AVE,
WESTON
Milis Flatwork 09/11/2026192280815309
23
NORTHERN LIMITED
LIABILITY COMPANY
$84,000 $0.00Parking Lot 0 211
202601532 5707 SCHOFIELD AVE,
WESTON
Valentine
Plumbing &
Heating
09/17/2026192280815309
23
NORTHERN LIMITED
LIABILITY COMPANY
$86,000 $200.00Plumbing
Com
0 500
202601563 5105 QUIRT SANN DR,
WESTON
POOL
WORKS INC
09/24/2026192280817200
91
RAYMOND DEARING $110,359 $100.00Pool
Residential
0 113
202601528 2211 RADTKE AVE,
WESTON
Compass
Roofing &
Renovation
LLC
09/16/2026192280818100
69
ARJ REAL ESTATE LLC $30,000 $100.00Roof
Commercial
5,000 205
202601575 No Address Jeremy Voigt
Construction
09/25/2026 $100.00Shoreland 0 755
202601547 1401 KECK AVE,
WESTON
Super
Lettering &
Signs Inc
09/18/2026192280818309
65
CARLYJEAN
PROPERTIESLLC
$2,400 $30.00Sign 0 400
202601531 5707 SCHOFIELD AVE,
WESTON
Wausau
Signs, Inc.
09/17/2026192280815309
23
NORTHERN LIMITED
LIABILITY COMPANY
$3,800 $125.00Sign 0 400
202601524 4002 SCHOFIELD AVE,
WESTON
Signart
Company Inc
09/15/2026192280817408
70
3910 SCHOFIELD
AVENUE LLC
$5,416 $163.00Sign 0 400
202601566 6201 SCHOFIELD AVE,
WESTON
AutoSelect 09/24/2026192280815309
22
KJR HOLDING LLC $7,800 $250.00Sign 0 400
202601583 2900 SCHOFIELD AVE,
WESTON
D and L Signs 09/28/2026192280817301
80
INTERCITY STATE BANK $20,000 $230.00Sign 0 400
202601588 7205 STONE RIDGE
DR, WESTON
Creative Sign
Company
09/29/2026192280820409
61
PEOPLES STATE BANK $31,730 $230.00Sign 0 400
202601582 3844 MUSKIE DR,
WESTON
Portage
County Title
09/28/2026192280810401
19
GREEN TREE
CONSTRUCTION INC
$40.00Special
Assessment
0 910
202601536 3211 MOUNT VIEW
AVE, WESTON
Knight Barry
Title - QTax
09/17/2026192280817300
55
BRENDA BAUMANN $40.00Special
Assessment
0 910
202601533 6106 TOWER RIDGE
PL, WESTON
CuVanta Title
Services
09/17/2026192280821201
72
SCHRANK PROPERTIES
LLC
$40.00Special
Assessment
0 910
202601461 7607 RYAN AMY DR,
WESTON
RUNKEL
ABSTRACT
09/08/2026192280823200
68
ROGER BRODJIESKI $40.00Special
Assessment
0 910
202601450 5705 GORDON ST,
WESTON
Knight Barry
Title - QTax
09/08/2026192280817409
55
JEFFREY ROSENOW $40.00Special
Assessment
0 910
202601519 6002 ERIC ST,
WESTON
County Land
and Title Co.
09/14/2026192280817301
37
PAULA REED $40.00Special
Assessment
0 910
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601518 No Address County Land
and Title Co.
09/14/2026192280820100
30
SANDRA & RICHARD
AUSTIN
$40.00Special
Assessment
0 910
202601503 4201 OAK TER,
WESTON
County Land
and Title Co.
09/14/2026192280810301
12
JOHN SPERL $40.00Special
Assessment
0 910
202601504 5707 CONNIE LN,
WESTON
County Land
and Title Co.
09/14/2026192280822200
98
JAMES PLUNKETT $40.00Special
Assessment
0 910
202601556 1915 BLOEDEL AVE,
WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
09/21/2026192280818400
84
KEITH SYRING $40.00Special
Assessment
0 910
202601505 2002 BLOEDEL AVE,
WESTON
County Land
and Title Co.
09/14/2026192280818400
72
LINDSEY SCHWALBACH $40.00Special
Assessment
0 910
202601506 3618 GREEN
PASTURES LN,
WESTON
County Land
and Title Co.
09/14/2026192280829101
16
TIMBER RIDGE BUILDERS
LLC
$40.00Special
Assessment
0 910
202601459 5212 VON KANEL ST,
WESTON
RUNKEL
ABSTRACT
09/08/2026192280816200
40
KEVIN HAHN $40.00Special
Assessment
0 910
202601451 3606 SANDY LN,
WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
09/08/2026192280809109
96
ELEANOR VESPER $40.00Special
Assessment
0 910
202601458 4203 STERNBERG
AVE, WESTON
RUNKEL
ABSTRACT
09/08/2026192280816300
18
ALICIA REEDY $40.00Special
Assessment
0 910
202601507 No Address County Land
and Title Co.
09/14/2026 $40.00Special
Assessment
0 910
202601553 8707 HINNER
SPRINGS DR,
WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
09/21/2026192280829400
26
JARED SCHERR $40.00Special
Assessment
0 910
202601497 8301 HINNER
SPRINGS DR,
WESTON
County Land
and Title Co.
09/14/2026192280829100
60
JONATHAN CARROLL $40.00Special
Assessment
0 910
202601498 3004 BARCLAY WAY,
WESTON
County Land
and Title Co.
09/14/2026192280817200
53
GERALD WORDEN $40.00Special
Assessment
0 910
202601499 9603 ANASTASIA DR,
WESTON
County Land
and Title Co.
09/14/2026192280834209
70
REEDY BUILDERS LLC $40.00Special
Assessment
0 910
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601554 3702 JAMES LEE ST,
WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
09/21/2026192280810301
38
GERALD GEHRMANN $40.00Special
Assessment
0 910
202601555 6005 MORNING VIEW
LN, WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
09/21/2026192280815201
33
ZACKERY ALFORD $40.00Special
Assessment
0 910
202601500 3302 KAZIAK CT,
WESTON
County Land
and Title Co.
09/14/2026192280829400
08
BRUCE AND JUDY
SCHADE REVOCABLE
TRUST
$40.00Special
Assessment
0 910
202601501 6402 SCHOFIELD AVE,
WESTON
County Land
and Title Co.
09/14/2026192280815309
47
KJR HOLDING LLC $40.00Special
Assessment
0 910
202601502 6110 QUENTIN ST,
WESTON
County Land
and Title Co.
09/14/2026192280810201
13
MARKQUI WHITE $40.00Special
Assessment
0 910
202601514 5502 ISAIAH ST,
WESTON
County Land
and Title Co.
09/14/2026192280809101
29
DOUGLAS KELM $40.00Special
Assessment
0 910
202601515 9311 WOODLAND DR,
WESTON
County Land
and Title Co.
09/14/2026192280833209
95
KEITH AND SUSAN IMM
TRUST
$40.00Special
Assessment
0 910
202601516 3505 MAKENZIE DR,
WESTON
County Land
and Title Co.
09/14/2026192280810100
17
JASON CARLSON $40.00Special
Assessment
0 910
202601517 5707 PINE PARK ST,
WESTON
County Land
and Title Co.
09/14/2026192280818409
69
CORALEE FOSTER $40.00Special
Assessment
0 910
202601557 6606 PENINSULA LN,
WESTON
The Closing
Company,
LLC
09/21/2026192280824200
15
DENNIS JOHNSON $40.00Special
Assessment
0 910
202601508 3004 MANDALAY BAY
DR, WESTON
County Land
and Title Co.
09/14/2026192280832202
34
DAVID BALTES $40.00Special
Assessment
0 910
202601509 3206 CECIL ST,
WESTON
County Land
and Title Co.
09/14/2026192280808200
60
SCOTT LERCH $40.00Special
Assessment
0 910
202601510 5408 CAMP PHILLIPS
RD, WESTON
County Land
and Title Co.
09/14/2026192280817400
34
BRADLEY RYBARCZYK $40.00Special
Assessment
0 910
202601511 2808 BARCLAY WAY,
WESTON
County Land
and Title Co.
09/14/2026192280817209
09
RBW PROPERTIES LLC $40.00Special
Assessment
0 910
202601512 5409 ALEX ST,
WESTON
County Land
and Title Co.
09/14/2026192280809100
39
JOHN ROMANOWSKI $40.00Special
Assessment
0 910
202601513 6211 VOLKMAN ST,
WESTON
County Land
and Title Co.
09/14/2026192280819209
88
JANDT PROPERTIES LLC $40.00Special
Assessment
0 910
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601551 4306 RIVER BEND RD,
WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
09/21/2026192280810300
76
JOSHUA SPIEGL $40.00Special
Assessment
0 910
202601460 3303 MALLARD CT,
WESTON
RUNKEL
ABSTRACT
09/08/2026192280808409
72
SETH MITTLESTEADT $40.00Special
Assessment
0 910
202601473 No Address Knight Barry
Title - QTax
09/10/2026 $15.00Special
Assessment
0 911
202601442 6003 BUSINESS
HIGHWAY 51,
WESTON
Highpoint
Landworks,
Inc.
09/03/2026192280818309
48
JHGV LLC $16,000 $100.00Sprinkler 0 210
202601561 1803 SCHOFIELD AVE,
WESTON
Super
Lettering &
Signs Inc
09/23/2026192280818400
58
TROY CHAMPAN $50.00Temp Sign 0 401
202601522 6206 JACQUELYN RD,
WESTON
6206 09/14/2026192280822100
15
JAMES OTTO $60.00Well
Resinspecti
on
0 312
202601481 3803 MICHAEL DR,
WESTON
09/11/2026192280809401
63
RANDY WESTBERG $60.00Well
Resinspecti
on
0 312
202601496 4911 CHADWICK ST,
WESTON
09/14/2026192280816100
63
MATTHEW MERCE $60.00Well
Resinspecti
on
0 312
202601535 6109 RYAN ST,
WESTON
09/17/2026192280822109
96
JOSEPH TRYBA $60.00Well
Resinspecti
on
0 312
202601436 3806 SANDY LN,
WESTON
09/03/2026192280809401
73
SCOTT GEBERT $60.00Well
Resinspecti
on
0 312
202601580 6707 VON KANEL ST,
WESTON
09/28/2026192280821109
62
ANTHONY TAPIA $60.00Well
Resinspecti
on
0 312
202601584 6306 JACQUELYN RD,
WESTON
09/28/2026192280822100
13
JASEN BUCKMASTER $60.00Well
Resinspecti
on
0 312
202601471 3844 MUSKIE DR,
WESTON
Green Tree
Construction
Inc.
09/10/2026192280810401
19
GREEN TREE
CONSTRUCTION INC
$350,000 $3,131.00WUBPA 1,400 0 100
Date From 09/01/2026 and Date To 09/30/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601472 3848 MUSKIE DR,
WESTON
Green Tree
Construction
Inc.
09/10/2026192280810401
18
GREEN TREE
CONSTRUCTION INC
$395,000 $3,116.00WUBPA 1,624 0 100
202601597 4904 SHIRLEY AVE,
WESTON
Carlson
Construction
09/30/2026192280828100
19
DUSTIN WITTER $543,000 $3,751.00WUBPA 2,519 0 100
Village of Weston Permits Valuation
Village of Weston Permits Fees
Village of Weston Permits Issued 162
$32,374
$3,075,004
$5,543 Village of Weston Permits Finished SqFt
20,024 Village of Weston Permits Project SqFt
168Total Permits Issued
Total Permits Fees
Total Permits Valuation
$32,759
$3,092,824
Total Finished Sq Ft 5,543
Total Project Sq Ft 20,024
To: Plan Commission
From: Jennifer Higgins, Director of Planning & Development/Zoning Administrator
Date: October 7, 2026
Re: Planning & Development Project Updates
COMMUNITY & LONG RANGE PLANNING
Machmueller Park Master Plan
The Village contin
Text truncated. Open the original for the full document.