RecordWell Data

2026 09 14 BOT packet website resize

Village of Maine · Marathon County · meeting of Sep 14, 2026 · Agenda packets

Open the original document More from Village of Maine

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Village of Maine 6111 N 44th Ave, Wausau WI 54401 https://villageofmaine.org Regular Board of Trustees Meeting Agenda Monday, September 14th, 2026 5:30 pm Maine Village Hall The Village of Maine respects the role of our elected officials, commission and committee members, past and present, and respects our village residents. We are committed to working in collaboration to provide the best decision-making for our village’s future. This meeting is a formal event, and courteous and respectful conduct is the expectation of all in attendance. Disparaging and divisive comments toward any person, falsely or otherwise, will not be tolerated. Sufficient warnings may be given by the Village President at any time during the remarks, and if any individual shall violate the rules of decorum, such person may then be cut off from comment. 1. 5:30pm – Trustees to view payment vouchers. General business will commence at 6:00pm. 2. Call the Board of Trustees Meeting to Order. Please Silence Cell Phones. Board members please turn off your cell phone. 3. Roll Call 4. Pledge of Allegiance to the Flag 5. Village President Report 6. Public Works & Utility Report 7. Finance Committee Report 8. Municipal Projects & Public Property Committee Report. 9. Treasurer Report 10. Clerk Report 11. Fire Department Report 12. County Supervisor Report 13. Public comment regarding other Business items, limited to three minutes Other Business: 14. Approve the minutes of the Regular Meeting on 08/03/2026. 15. Approve the minutes of the Special Meeting on 08/31/2026. 16. Discussion – Network and Phone Update. 17. Discussion and Possible Action – Projector Quote 18. Discussion and Possible Action – Sound System quotes. 19. Discussion and Possible Action – Website upgrade. 20. Discussion and Possible Action – Ordinance §8.15.040(a) Village Board Meetings and Rules of Procedure –Agenda. 21. Discussion and Possible Action – Office Hours. 22. Discussion and Possible Action – Ordinance §10.06(2) Recycling Regulations. 23. Discussion and Possible Action – Village Owned Property and Proprietary Information. 24. Discussion and Possible Action – Timesheets. 25. Discussion and Possible Action – Falcon Drive 4 – way stop and/or Reduced Speed Limit. 26. Discussion and Possible Action – Falcon Drive Development. 27. Discussion – DNR Reports Update 28. Approve Monthly Vouchers for Payment. 29. New Business 30. Next Board of Trustees’ meeting date, time, and place 31. Adjournment Judith Hase, Village President Please note, upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals through appropriate aids and services. For additional information or to request services, contact the Village Hall (715) 675-5607 September 14 2026 President’s Report – Judith Hase • There has been tremendous effort to complete past due and new DNR Reports. As soon as we are made aware of a delinquent report and new requirement, we have been quick to efficiently bring Maine into compliance. • Road Paving  N 20th Ave and Timber Dr is complete - Shout out to Nate for removing mailboxes as needed and then re-installing after paving ☐ N 20th Ave shouldering – Worden stated mid/late September for completion • Address Signs were ordered and received. Plates with addresses have been ordered. Public Works has installation planned for the next couple of weeks. • Board of Review was held August 20th o There was about a 5% gain in value = 74% value ($100,000 house will be assessed at $74,000) o $3,269,600 in new home, garage, and shed construction o 2029 need for re-evaluation in assessment • Shout out to Trustee Bruce Reynolds for all the time and effort he put into the network, phone, and media upgrades. His expertise and experience are incredibly valuable to ensure the village residents are best served by the right equipment, with the most qualified and responsive vendors, at the best price for long-term use. • Shout out to Clerk Jamie Heindl, Chief Inspector Colette Brill, and election workers John Babl, Cindy Brandenburg, Amanda Geurts, Duane Mueller, Jan Mueller, Judy Mueller, Tom Mueller, Ann Ovel, Barb Reynolds, and Debbie Zastrow for their commitment to serving the community and spending long hours at the village hall for the August 11 election. The dedication from these twelve residents is commendable. • The Marathon County Humane Society contract began September 1st. The Village’s contract with the Lincoln County Humane Society (charged $250 per cat + $1,000 annual fee) ended August 31 2026. Starting September 1st, the Village has signed a contract with the Marathon County Humane Society at a taxpayer cost savings (charges $185 per cat). • Dog complaints have been increasing – habitual barking (nuisance), and uncontrolled dogs running out at walkers (scary). There are ordinances in place, but not much ‘teeth’ to them: o Maine Ordinance 3:10 prohibits dogs ‘running at large’ stating dogs must stay ‘within the confines of the owner’s premises’ o Brokaw Ordinance Title 5.2.060 states ‘running at large’ means the presence of a dog at any place except on the premises of the owner. o Brokaw Ordinance Title 5.2.080 states it is unlawful for any person to keep any dog which habitually barks, yelps or howls. And 5.2.100 states upon the written or oral complaint of two adults, not from the same family, filed with the police department, that such dog shall be removed by the owner within 72 hours after service of a written notice by the police department. Failure to remove such dog(s) will result in penalties set by the Village Board. o Maine and Brokaw ordinances are in the process of being combined. Please watch for proposed updates to the dog ordinance. • High speed drivers on village roads - there has been an increase in calls, emails, and website contacts regarding concerns with vehicles hitting high speeds on Maine’s Falcon, Grove, Kellar, and Overlook roads. This is a serious safety concern. Some actions have been taken, and some will be addressed at subsequent meetings: o Falcon – a constant concern with documentation of speeds above 85MPH as well as video of vehicles passing stopped school buses o Grove – no speed limit sign; plans to install a speed limit sign o Kellar – there was no speed limit sign, and a 35MPH sign has been installed o Overlook – I am still researching why the road posts 30MPH and ATV 35 MPH o In addition – a thank you to PW for installing a new bright yellow ‘school’ sign across from the village hall that replaced the worn brown one hidden by trees Public Works Repot – August 2026 • started to mow the field that potentially could be rented out • cut brush and grass near bridges for bridge inspections • lots of maintenance on N 20th - brush - mailboxes - approaches - building up shoulders • fix signs • grade roads • sweep intersections Budget Comparison - Detail 2026 2026 Budget Status Budget % of September Fund: All Funds 1 ACCT 11:21 AM9/10/2026 Actual 2026 Account Number 09/14/2026 Budget Page: 1,605,940.00 1,839,122.39 -233,182.39 87.32100-00-41110-000-000 GENERAL PROPERTY TAX 0.00 311,017.05 0.00 311,017.05 0.00400-00-41120-000-000 PROPERTY TAX REV TID 0.00 0.00 77,834.66 -77,834.66 0.00100-00-41122-000-000 TAX INCREMENTS (TID) 0.00 16,989.93 500.00 16,489.93 3,397.99100-00-41150-000-000 FOREST CROP/MNG FOREST TAX 0.00 214.48 0.00 214.48 0.00100-00-41160-000-000 TIMBER SALES 0.00 ====================================================================================================================================================== TAXES 0.00 100.871,934,161.46 16,704.411,917,457.05 ====================================================================================================================================================== 0.00 1,600.00 -1,600.00 0.00100-00-42300-000-000 SPECIAL ASSESSMENTS 0.00 ====================================================================================================================================================== SPECIAL ASSESSMENTS 0.00 0.000.00 -1,600.001,600.00 ====================================================================================================================================================== 0.00 0.00 0.00 0.00100-00-43200-000-000 FEDERAL GRANTS 0.00 69,321.07 64,000.00 5,321.07 108.31100-00-43210-000-000 INTERGOVERNMENTAL FIRE 0.00 25,174.68 138,256.38 -113,081.70 18.21100-00-43410-000-000 SHARED REV CITY & MUNI 0.00 2,912.60 0.00 2,912.60 0.00400-00-43410-000-000 TID SHARED REV-MUNI 0.00 25,541.27 23,069.36 2,471.91 110.72100-00-43420-000-000 2% FIRE DUES 0.00 795.03 3,707.63 -2,912.60 21.44100-00-43430-000-000 EXEMPT COMPUTER 0.00 0.00 0.00 0.00 0.00100-00-43435-000-000 UTILITY AID 0.00 30,555.28 38,629.44 -8,074.16 79.10100-00-43440-000-000 PERSONAL PROPERTY AID 0.00 24,664.68 0.00 24,664.68 0.00400-00-43440-000-000 TID PERSONAL PROPERTY AID 0.00 2,047.50 0.00 2,047.50 0.00100-00-43500-000-000 STATE GRANTS 0.00 0.00 0.00 0.00 0.00100-00-43510-000-000 COUNTY & MUNI AIDS 0.00 171,426.96 228,569.30 -57,142.34 75.00100-00-43530-000-000 TRANSPORTATION AIDS 0.00 1,585.19 1,500.00 85.19 105.68100-00-43545-000-000 DNR RECYCLING GRANT 0.00 0.00 0.00 0.00 0.00100-00-43640-000-000 SEVERANCE/YIELD/WITHDRAW TAX 0.00 725.86 0.00 725.86 0.00100-00-43650-000-000 FOREST CROP/MFL FROM STATE 0.00 ====================================================================================================================================================== INTERGOVERNMENTAL REVENUES 0.00 71.27354,750.12 -142,981.99497,732.11 ====================================================================================================================================================== 3,238.00 2,200.00 1,038.00 147.18100-00-44102-000-000 DOG LICENSES 0.00 962.88 2,300.00 -1,337.12 41.86100-00-44110-000-000 LIQUOR, CIG, AMUS LICENSES 0.00 525.00 900.00 -375.00 58.33100-00-44115-000-000 OPERATORS LICENSES 0.00 0.00 0.00 0.00 0.00100-00-44200-000-000 NON BUSINESS LICENSE 0.00 6,000.00 2,000.00 4,000.00 300.00100-00-44300-000-000 OCCUPANCY PERMITS 1,000.00 13,050.00 12,000.00 1,050.00 108.75100-00-44310-000-000 BUILDING PERMITS 1,650.00 850.00 9,000.00 -8,150.00 9.44100-00-44400-000-000 ZONING PERMITS 0.00 150.00 0.00 150.00 0.00100-00-44410-000-000 CONDITIONAL USE PERMITS 0.00 400.00 0.00 400.00 0.00100-00-44415-000-000 LAND DIVISION APP FEES 0.00 200.00 200.00 0.00 100.00100-00-44420-000-000 WRECKING PERMITS 100.00 1,148.56 2,000.00 -851.44 57.43100-00-44425-000-000 CULVERT PERMITS/INSTALLATION 0.00 8,750.00 5,000.00 3,750.00 175.00100-00-44430-000-000 UTILITY PERMITS 0.00 30.00 20.00 10.00 150.00100-00-44900-000-000 FIREWORKS PERMITS 0.00 ====================================================================================================================================================== LICENSES AND PERMITS 2,750.00 99.1135,304.44 -315.5635,620.00 ====================================================================================================================================================== 0.00 0.00 0.00 0.00100-00-45100-000-000 LAW & ORDINANCE VIOLATIONS 0.00 ====================================================================================================================================================== FINES, FORFEITS AND PENALTIES 0.00 0.000.00 0.000.00 ====================================================================================================================================================== 1,360.00 0.00 1,360.00 0.00100-00-46100-000-000 CLERK'S FEES 35.00 1,200.00 500.00 700.00 240.00100-00-46210-000-000 ADDRESS MARKERS 150.00 0.00 64,371.00 -64,371.00 0.00100-00-46220-000-000 FIRE DEPARTMENT FEES 0.00 0.00 0.00 0.00 0.00100-00-46230-000-000 AMBULANCE FEES 0.00 0.00 0.00 0.00 0.00100-00-46325-000-000 ASPHALT / GRANITE / SALT FEES 0.00 Budget Comparison - Detail 2026 2026 Budget Status Budget % of September Fund: All Funds 2 ACCT 11:21 AM9/10/2026 Actual 2026 Account Number 09/14/2026 Budget Page: 480.00 1,300.00 -820.00 36.92100-00-46330-000-000 CULVERTS/CULVERT INSTALLATION 0.00 18,310.02 35,000.00 -16,689.98 52.31620-00-46410-000-622 MULTI FAMILY SEWER 0.00 16,806.58 40,000.00 -23,193.42 42.02620-00-46411-000-622 RESIDENTIAL SEWER 0.00 2,671.16 6,000.00 -3,328.84 44.52620-00-46412-000-622 COMMERCIAL SEWER 0.00 0.00 0.00 0.00 0.00620-00-46413-000-622 INDUSTRIAL SEWER 0.00 3,648.75 5,000.00 -1,351.25 72.98620-00-46414-000-622 PUBLIC AUTHORITY SEWER 0.00 0.00 0.00 0.00 0.00620-00-46416-000-635 OTHER REVENUE 0.00 134.02 0.00 134.02 0.00620-00-46417-000-470 FORFEITED DISCOUNTS 0.00 242,420.84 242,208.00 212.84 100.09100-00-46420-000-000 REFUSE & GARBAGE COLLECTION 0.00 0.00 0.00 0.00 0.00100-00-46430-000-000 SOLID WASTE DISPOSAL 0.00 15,299.23 40,000.00 -24,700.77 38.25610-00-46450-000-461 MULTI FAMILY WATER 0.00 23,023.30 40,000.00 -16,976.70 57.56610-00-46451-000-461 RESIDENTIAL WATER 0.00 5,219.82 7,000.00 -1,780.18 74.57610-00-46452-000-461 COMMERCIAL WATER 0.00 0.00 0.00 0.00 0.00610-00-46453-000-461 INDUSTRIAL WATER 0.00 0.00 0.00 0.00 0.00610-00-46454-000-462 PRIVATE FIRE WATER 0.00 7,089.82 0.00 7,089.82 0.00610-00-46455-000-463 PUBLIC FIRE WATER 0.00 4,384.92 5,000.00 -615.08 87.70610-00-46456-000-464 PUBLIC AUTHORITY 0.00 168.32 0.00 168.32 0.00610-00-46457-000-470 FORFEITED DISCOUNTS 0.00 1,600.00 2,400.00 -800.00 66.67610-00-46458-000-474 WATER TOWER RENTAL 0.00 0.00 0.00 0.00 0.00610-00-46459-000-474 OTHER WATER REVENUE 0.00 0.00 0.00 0.00 0.00100-00-46720-000-000 PARK FEES 0.00 0.00 0.00 0.00 0.00610-00-46900-000-474 UTILITY PERMITS & CHARGES 0.00 ====================================================================================================================================================== PUBLIC CHARGES FOR SERVICES 185.00 70.34343,816.78 -144,962.22488,779.00 ====================================================================================================================================================== 0.00 0.00 0.00 0.00610-00-47491-000-463 PUBLIC FIRE - VILLAGE 0.00 ====================================================================================================================================================== INTERGOV'T. CHARGES FOR SERV. 0.00 0.000.00 0.000.00 ====================================================================================================================================================== 15,058.02 19,000.00 -3,941.98 79.25100-00-48100-000-000 INTEREST REVENUE 0.00 0.00 0.00 0.00 0.00400-00-48100-000-000 INTEREST REVENUE 0.00 54.75 0.00 54.75 0.00610-00-48110-000-419 INTEREST ON INVESTMENTS 0.00 46.29 0.00 46.29 0.00620-00-48110-000-419 INTEREST ON INVESTMENTS 0.00 0.00 0.00 0.00 0.00100-00-48200-000-000 RENT REVENUE 0.00 344.90 200.00 144.90 172.45100-00-48310-000-000 SALE OF RECYCLABLE MATERIALS 0.00 0.00 0.00 0.00 0.00100-00-48500-000-000 VILLAGE DONATIONS 0.00 1,700.00 1,500.00 200.00 113.33100-00-48510-000-000 FIRE DEPARTMENT DONATIONS 0.00 3,500.00 0.00 3,500.00 0.00100-00-48515-000-000 FIRE DEPT SALE OF ASSET/SCRAP 0.00 0.00 0.00 0.00 0.00100-00-48520-000-000 FIRE DEPARTMENT FUNDRAISERS 0.00 24,045.00 0.00 24,045.00 0.00100-00-48900-000-000 MISC REVENUE 0.00 ====================================================================================================================================================== MISCELLANEOUS REVENUES 0.00 216.1844,748.96 24,048.9620,700.00 ====================================================================================================================================================== 0.00 830,000.00 -830,000.00 0.00100-00-49100-000-000 LONG-TERM DEBT PROCEEDS 0.00 0.00 0.00 0.00 0.00610-00-49300-000-423 CAPITAL CONTRIBUTIONS 0.00 0.00 0.00 0.00 0.00100-00-49900-000-000 APPLIED FUND BALANCE 0.00 ====================================================================================================================================================== OTHER FINANCING SOURCES 0.00 0.000.00 -830,000.00830,000.00 ====================================================================================================================================================== ====================================================================================================================================================== 2,712,781.76 3,791,888.16Total Revenues 2,935.00 71.54-1,079,106.40 ====================================================================================================================================================== Budget Comparison - Detail 2026 2026 Budget Status Budget % of September Fund: All Funds 3 ACCT 11:21 AM9/10/2026 Actual 2026 Account Number 09/14/2026 Budget Page: 32,372.50 55,000.00 22,627.50 58.86100-00-51100-110-000 BOARD SALARIES 30.00 2,476.67 4,207.50 1,730.83 58.86100-00-51100-130-000 BOARD SS/MEDICARE 2.30 0.00 0.00 0.00 0.00100-00-51100-131-000 BOARD RETIREMENT 0.00 1,187.64 2,000.00 812.36 59.38100-00-51100-224-000 BOARD CELL PHONE 0.00 146.97 0.00 -146.97 0.00100-00-51100-310-000 BOARD OFFICE SUPPLIES 0.00 2,379.00 500.00 -1,879.00 475.80100-00-51100-311-000 BOARD COMPUTER/SOFTWARE 0.00 0.00 0.00 0.00 0.00100-00-51100-312-000 BOARD ANTI-VIRUS 0.00 498.04 2,000.00 1,501.96 24.90100-00-51100-320-000 BOARD PUBLICATIONS 0.00 2,505.15 4,500.00 1,994.85 55.67100-00-51100-330-000 BOARD MILEAGE/SEMINAR 0.00 35,357.47 35,000.00 -357.47 101.02100-00-51300-000-000 LEGAL FEES 7,048.72 1,200.00 0.00 -1,200.00 0.00100-00-51300-000-001 UTILITY CLAIM FEES 0.00 0.00 0.00 0.00 0.00100-00-51400-110-000 ADMINISTRATIVE SALARIES 0.00 15,120.00 45,000.00 29,880.00 33.60100-00-51400-115-000 ADMINISTRATIVE WAGES 270.00 1,156.68 3,442.00 2,285.32 33.60100-00-51400-130-000 ADMINISTRATIVE SS/MEDICARE 20.66 0.00 0.00 0.00 0.00100-00-51400-131-000 ADMINISTRATIVE RETIREMENT 0.00 0.00 0.00 0.00 0.00100-00-51400-150-000 ADMINISTRATIVE HEALTH SUBSIDY 0.00 1,972.90 5,000.00 3,027.10 39.46100-00-51400-310-000 ADMINISTRATIVE OFFICE SUPPLIES 210.00 1,833.00 2,000.00 167.00 91.65100-00-51400-311-000 ADMINISTRATIVE COMPUTER/SOFTWA 0.00 289.98 162.00 -127.98 179.00100-00-51400-312-000 ADMINISTRATIVE ANTI-VIRUS 0.00 200.00 2,000.00 1,800.00 10.00100-00-51400-315-000 ADMINISTRATIVE HOSPITATLITY 0.00 63,722.11 65,000.00 1,277.89 98.03100-00-51420-110-000 CLERK/TREAS SALARIES 3,289.02 4,261.30 4,972.00 710.70 85.71100-00-51420-130-000 CLERK/TREAS SS/MEDICARE 251.61 2,128.19 2,700.00 571.81 78.82100-00-51420-131-000 CLERK/TREAS RETIREMENT 131.56 0.00 6,348.00 6,348.00 0.00100-00-51420-150-000 CLERK/TREAS HEALTH SUBSIDY 0.00 198.67 400.00 201.33 49.67100-00-51420-224-000 CLERK/TREAS CELL PHONE 0.00 1,350.02 3,000.00 1,649.98 45.00100-00-51420-310-000 CLERK/TREAS OFFICE SUPPLIES 0.00 6,670.71 3,000.00 -3,670.71 222.36100-00-51420-311-000 CLERK/TREAS COMPUTER/SOFTWARE 0.00 190.86 81.00 -109.86 235.63100-00-51420-312-000 CLERK/TREAS ANTI-VIRUS 0.00 750.00 1,500.00 750.00 50.00100-00-51420-330-000 CLERK/TREAS MILEAGE/SEMINAR 0.00 23,726.52 52,000.00 28,273.48 45.63100-00-51425-110-000 DEPUTY CLERK SALARIES 0.00 1,627.94 3,978.00 2,350.06 40.92100-00-51425-130-000 DEPUTY CLERK SS/MEDICARE 0.00 756.50 2,080.00 1,323.50 36.37100-00-51425-131-000 DEPUTY CLERK RETIREMENT 0.00 0.00 12,800.00 12,800.00 0.00100-00-51425-150-000 DEPUTY CLERK HEALTH SUBSIDY 0.00 132.00 400.00 268.00 33.00100-00-51425-224-000 DEPUTY CLERK CELL PHONE 0.00 0.00 0.00 0.00 0.00100-00-51425-310-000 DEPUTY CLERK OFFICE SUPPLIES 0.00 0.00 500.00 500.00 0.00100-00-51425-311-000 DEPUTY CLERK COMPUTER/SOFTWARE 0.00 76.68 81.00 4.32 94.67100-00-51425-312-000 DEPUTY CLERK ANTI-VIRUS 0.00 332.00 1,000.00 668.00 33.20100-00-51425-330-000 DEPUTY CLERK MILEAGE/SEMINAR 0.00 333.95 100.00 -233.95 333.95100-00-51430-000-000 MISC BANK CHARGES 0.00 0.00 0.00 0.00 0.00100-00-51431-000-000 DESTROYED CHECKS/VOID CHECKS 0.00 2,921.50 2,500.00 -421.50 116.86100-00-51440-000-004 ELECTION PER DIEM 0.00 0.00 0.00 0.00 0.00100-00-51440-130-000 ELECTION SS/MEDICARE 0.00 715.73 1,500.00 784.27 47.72100-00-51440-315-001 ELECTION HOSPITATLITY 189.26 75.00 0.00 -75.00 0.00100-00-51440-320-002 ELECTION PUBLICATIONS 0.00 1,631.64 5,000.00 3,368.36 32.63100-00-51440-340-003 ELECTION OPER SUPPLIES 0.00 200.00 500.00 300.00 40.00100-00-51440-350-000 ELECTION EQUIPMENT MAINTENANCE 0.00 20,648.34 50,000.00 29,351.66 41.30100-00-51510-000-000 ACCOUNTING/AUDITING 0.00 0.00 0.00 0.00 0.00100-00-51520-110-000 TREASURER SALARIES 0.00 0.00 0.00 0.00 0.00100-00-51520-130-000 TREASURER SS/MEDICARE 0.00 0.00 0.00 0.00 0.00100-00-51520-131-000 TREASURER RETIREMENT 0.00 0.00 0.00 0.00 0.00100-00-51520-224-000 TREASURER CELL PHONE 0.00 0.00 3,000.00 3,000.00 0.00100-00-51520-310-000 TREASURER OFFICE SUPPLIES 0.00 Budget Comparison - Detail 2026 2026 Budget Status Budget % of September Fund: All Funds 4 ACCT 11:21 AM9/10/2026 Actual 2026 Account Number 09/14/2026 Budget Page: 1,126.00 1,250.00 124.00 90.08100-00-51520-311-000 TREASURER COMPUTER/SOFTWARE 1,126.00 13,125.00 17,500.00 4,375.00 75.00100-00-51530-290-000 ASSESSOR CONTRACTED SERVICES 0.00 0.00 100.00 100.00 0.00100-00-51530-320-000 ASSESSOR/BOR PUBLICATIONS 0.00 0.00 0.00 0.00 0.00100-00-51530-322-000 ASSESSOR FEES 0.00 55.00 50.00 -5.00 110.00100-00-51530-335-000 ASSESSOR/BOR TRAINING 0.00 395.90 5,000.00 4,604.10 7.92100-00-51600-000-822 MUNICIPAL BUILDINGS 0.00 6,037.90 9,000.00 2,962.10 67.09100-00-51600-220-000 MUNICIPAL BUILDINGS UTILITIES 607.05 700.08 4,750.00 4,049.92 14.74100-00-51600-350-000 MUNICIPAL BUILDINGS REPAIR/MAI 0.00 195.25 5,500.00 5,304.75 3.55100-00-51600-380-000 MUNICIPAL BUILDINGS EXPENSE 0.00 16,862.00 20,000.00 3,138.00 84.31100-00-51600-510-000 MUNICIPAL BUILDINGS INSURANCE 0.00 0.00 0.00 0.00 0.00100-00-51600-520-000 WORKERS COMP INS 0.00 3,361.75 5,000.00 1,638.25 67.24100-00-51610-110-000 CUSTODIAN SALARIES 154.00 180.66 382.00 201.34 47.29100-00-51610-130-000 CUSTODIAN SS/MEDICARE 11.78 0.00 0.00 0.00 0.00100-00-51610-131-000 CUSTODIAN RETIREMENT 0.00 43.84 500.00 456.16 8.77100-00-51610-350-000 CUSTODIAN SUPPLIES 0.00 0.00 0.00 0.00 0.00100-00-51700-000-220 UTILITIES-BROKAW MUNICIPAL BLD 0.00 4,201.24 6,500.00 2,298.76 64.63100-00-51910-321-000 GENERAL GOVERNMENT DUES 0.00 4,600.00 0.00 -4,600.00 0.00400-00-51910-321-000 GENERAL GOVERNMENT 0.00 ====================================================================================================================================================== GENERAL GOVERNMENT 13,341.96 61.47282,030.28 176,753.22458,783.50 ====================================================================================================================================================== 0.00 0.00 0.00 0.00100-00-52100-110-000 CONSTABLE SALARIES 0.00 0.00 0.00 0.00 0.00100-00-52100-130-000 CONSTABLE SS/MEDICARE 0.00 0.00 0.00 0.00 0.00100-00-52100-131-000 CONSTABLE RETIREMENT 0.00 0.00 0.00 0.00 0.00100-00-52100-224-000 CONSTABLE CELL PHONE 0.00 0.00 0.00 0.00 0.00100-00-52100-330-000 CONSTABLE MILEAGE/SEMINAR 0.00 0.00 0.00 0.00 0.00100-00-52100-380-000 CONSTABLE EXPENSE 0.00 8,693.64 17,000.00 8,306.36 51.14100-00-52110-000-000 PUBLIC SAFETY 0.00 14,955.50 50,000.00 35,044.50 29.91100-00-52200-110-000 FIRE DEPARTMENT SALARIES 1,340.00 1,108.78 3,825.00 2,716.22 28.99100-00-52200-130-000 FIRE DEPARTMENT SS/MEDICARE 102.51 1.60 0.00 -1.60 0.00100-00-52200-131-000 FIRE DEPARTMENT RETIREMENT 0.00 3,822.58 8,000.00 4,177.42 47.78100-00-52200-132-000 FIRE DEPARTMENT HERO PROGRAM 0.00 0.00 3,500.00 3,500.00 0.00100-00-52200-140-000 FIRE DEPARTMENT PER DIEM 0.00 3,728.50 1,000.00 -2,728.50 372.85100-00-52200-210-000 FIRE DEPARTMENT LEGAL 344.40 5,306.94 6,000.00 693.06 88.45100-00-52200-220-000 FIRE DEPARTMENT UTILITIES 262.92 7,255.95 26,000.00 18,744.05 27.91100-00-52200-225-000 FIRE DEPARTMENT TURNOUT GEAR 0.00 143.98 1,000.00 856.02 14.40100-00-52200-310-000 FIRE DEPARTMENT OFFICE SUPPLIE 0.00 1,330.04 4,650.00 3,319.96 28.60100-00-52200-311-000 FIRE DEPARTMENT COMPUTER/SOFTW 0.00 266.24 2,000.00 1,733.76 13.31100-00-52200-314-000 FIRE DEPARTMENT REFRESHMENTS 0.00 1,766.72 3,500.00 1,733.28 50.48100-00-52200-315-000 FIRE DEPART PROMOTIONAL 0.00 7.00 400.00 393.00 1.75100-00-52200-321-000 FIRE DEPARTMENT DUES 0.00 324.00 1,000.00 676.00 32.40100-00-52200-330-000 FIRE DEPARTMENT MILEAGE/SEMINA 0.00 1,594.00 2,000.00 406.00 79.70100-00-52200-335-000 FIRE DEPARTMENT TRAINING 0.00 1,088.59 2,000.00 911.41 54.43100-00-52200-340-000 FD FUEL/VEHICLE MISC 0.00 3,769.70 4,050.00 280.30 93.08100-00-52200-341-000 FIRE DEPARTMENT HOSE TESTING 0.00 0.00 1,500.00 1,500.00 0.00100-00-52200-342-000 FIRE DEPT BREATHING APPARATUS 0.00 4,237.54 2,000.00 -2,237.54 211.88100-00-52200-343-000 FIRE DEPT PAGERS AND RADIOS 0.00 0.00 3,500.00 3,500.00 0.00100-00-52200-344-000 FIRE DEPT CLOTHES 0.00 0.00 5,000.00 5,000.00 0.00100-00-52200-345-000 FIRE DEPARTMENT EQUIPMENT 0.00 3,629.68 5,000.00 1,370.32 72.59100-00-52200-350-000 FD BUILDING REPAIRS/MAINT. 938.65 145.00 500.00 355.00 29.00100-00-52200-351-000 FD FIRE EXTINGUISHER INSP 0.00 186.81 3,000.00 2,813.19 6.23100-00-52200-352-000 FD MISC EQUIPMENT MAINT. 0.00 1,317.98 5,400.00 4,082.02 24.41100-00-52200-380-000 FD SUPPLIES/ MISC FEES 0.00 Budget Comparison - Detail 2026 2026 Budget Status Budget % of September Fund: All Funds 5 ACCT 11:21 AM9/10/2026 Actual 2026 Account Number 09/14/2026 Budget Page: 8,713.00 13,000.00 4,287.00 67.02100-00-52200-510-000 FIRE DEPARTMENT INSURANCE 0.00 14,901.50 12,000.00 -2,901.50 124.18100-00-52200-520-000 FIRE DEPT WORKERS COMP 0.00 1,360.70 3,500.00 2,139.30 38.88100-00-52201-345-000 FIRE DEPT ENGINE 1 0.00 1,829.98 3,500.00 1,670.02 52.29100-00-52202-345-000 FIRE DEPT ENGINE 2 0.00 743.64 2,500.00 1,756.36 29.75100-00-52203-345-000 FIRE DEPT TENDER 1 0.00 487.50 1,000.00 512.50 48.75100-00-52204-345-000 FIRE DEPT TENDER 2 0.00 0.00 1,000.00 1,000.00 0.00100-00-52205-345-000 FIRE DEPT MINI PUMPER 0.00 637.98 400.00 -237.98 159.50100-00-52206-345-000 FIRE DEPT UTILITY TRUCK 0.00 0.00 400.00 400.00 0.00100-00-52207-345-000 FIRE DEPT TRAILER 0.00 0.00 700.00 700.00 0.00100-00-52208-345-000 FIRE DEPARTMENT POLARIS UTV 0.00 0.00 0.00 0.00 0.00100-00-52220-000-000 HYDRANT RENTAL (PUB FIRE PROT) 0.00 21,003.36 20,344.00 -659.36 103.24100-00-52300-000-000 AMBULANCE 0.00 1,403.31 2,500.00 1,096.69 56.13100-00-52310-000-000 FIRE DEPARTMENT EMS SUPPLIES 0.00 7,222.00 6,000.00 -1,222.00 120.37100-00-52400-110-000 FIRE INSPECTOR FEES 3,611.00 ====================================================================================================================================================== PUBLIC SAFETY 6,599.48 53.78122,983.74 105,685.26228,669.00 ====================================================================================================================================================== 131,172.81 195,000.00 63,827.19 67.27100-00-53310-110-000 PUBLIC WORKS SALARIES 6,306.44 9,931.82 15,000.00 5,068.18 66.21100-00-53310-130-000 PUBLIC WORKS SS/MEDICARE 482.44 5,031.80 8,000.00 2,968.20 62.90100-00-53310-131-000 PUBLIC WORKS RETIREMENT 227.24 0.00 25,600.00 25,600.00 0.00100-00-53310-150-000 PUBLIC WORKS HEALTH SUBSIDY 0.00 411.50 500.00 88.50 82.30100-00-53310-151-000 PUBLIC WORKS RANDOM DRUG 0.00 2,933.40 5,000.00 2,066.60 58.67100-00-53310-220-000 PUBLIC WORKS UTILITIES 262.92 400.00 1,500.00 1,100.00 26.67100-00-53310-224-000 PUBLIC WORKS CELL PHONE 0.00 3,197.56 3,000.00 -197.56 106.59100-00-53310-225-000 PUBLIC WORKS UNIFORMS 777.42 762.91 1,500.00 737.09 50.86100-00-53310-226-000 PUBLIC WORKS ROADMENS EXPENSE 0.00 0.00 200.00 200.00 0.00100-00-53310-320-000 PUBLIC WORKS PUBLICATIONS 0.00 0.00 500.00 500.00 0.00100-00-53310-330-000 PUBLIC WORKS MILEAGE/SEMINAR 0.00 2,451.12 8,000.00 5,548.88 30.64100-00-53310-340-000 PUBLIC WORKS SUPPLIES 101.77 0.00 1,500.00 1,500.00 0.00100-00-53310-341-000 PUBLIC WORKS DITCH CLEANUP 0.00 0.00 1,200.00 1,200.00 0.00100-00-53310-342-000 PUBLIC WORKS BRIDGE INSPECT. 0.00 5,563.17 21,000.00 15,436.83 26.49100-00-53310-345-000 PUBLIC WORKS EQUIPMENT 0.00 23,157.33 35,000.00 11,842.67 66.16100-00-53310-346-000 PUBLIC WORKS FUEL 0.00 3,811.06 3,000.00 -811.06 127.04100-00-53310-350-000 PUBLIC WORKS REPAIR/MAINT 941.36 2,540.25 50,000.00 47,459.75 5.08100-00-53310-368-000 PUBLIC WORKS ROAD BASE 382.20 0.00 16,150.00 16,150.00 0.00100-00-53310-369-000 PUBLIC WORKS DUST BUSTER 0.00 733.70 85,500.00 84,766.30 0.86100-00-53310-370-000 PW ASPHALT PATCH/CRACK FILLING 0.00 125,410.82 533,219.00 407,808.18 23.52100-00-53310-371-000 PUBLIC WORKS ASPHALT PAVING 125,410.82 8,181.99 20,000.00 11,818.01 40.91100-00-53310-372-000 PUBLIC WORKS GRANITE 3,283.46 6,121.25 7,500.00 1,378.75 81.62100-00-53310-373-000 PUBLIC WORKS SAND 0.00 0.00 100,000.00 100,000.00 0.00100-00-53310-374-000 PUBLIC WORKS SEAL/CHIP 0.00 8,926.25 16,000.00 7,073.75 55.79100-00-53310-375-000 PUBLIC WORKS SALT 0.00 0.00 15,000.00 15,000.00 0.00100-00-53310-376-000 PUBLIC WORKS SHOULDERING 0.00 14,868.73 29,630.00 14,761.27 50.18100-00-53310-377-000 PUBLIC WORKS EQUIP MAINT 2,015.10 5,950.00 12,000.00 6,050.00 49.58100-00-53310-378-000 PUBLIC WORKS STREET SWEEPING 0.00 5,565.00 12,000.00 6,435.00 46.38100-00-53310-380-000 PUBLIC WORKS BLDG EXPENSE 0.00 901.23 7,000.00 6,098.77 12.87100-00-53310-381-000 PUBLIC WORKS SIGNS 595.90 0.00 0.00 0.00 0.00100-00-53310-382-000 PUBLIC WORKS PULVERIZING 0.00 0.00 0.00 0.00 0.00100-00-53310-383-000 PUBLIC WORKS CENTERLINE STRIP 0.00 0.00 36,500.00 36,500.00 0.00100-00-53310-384-000 PW LANDSCAPING/DITCH SEEDING 0.00 4,610.42 5,000.00 389.58 92.21100-00-53310-385-000 PUBLIC WORKS CULVERTS 553.50 19,151.50 25,000.00 5,848.50 76.61100-00-53310-386-000 PW CUSTOM MACHINE HIRE 0.00 10,440.00 8,000.00 -2,440.00 130.50100-00-53310-510-000 PUBLIC WORKS INSURANCE 0.00 Budget Comparison - Detail 2026 2026 Budget Status Budget % of September Fund: All Funds 6 ACCT 11:21 AM9/10/2026 Actual 2026 Account Number 09/14/2026 Budget Page: 11,776.50 12,000.00 223.50 98.14100-00-53310-520-000 PUBLIC WORKS WORK COMP 0.00 14,737.11 22,000.00 7,262.89 66.99100-00-53420-000-000 STREET LIGHTING 1,799.77 0.00 0.00 0.00 0.00620-00-53610-000-403 SEWER GENERAL EXPENSES 0.00 1,376.40 0.00 -1,376.40 0.00620-00-53610-000-683 SEWER DUES & FEES 0.00 475.00 0.00 -475.00 0.00620-00-53610-000-684 SEWER TRAINING 25.00 7,808.33 0.00 -7,808.33 0.00620-00-53610-000-685 SEWER ACCOUNTING/AUDITING 0.00 45,045.56 45,000.00 -45.56 100.10620-00-53610-000-820 SEWER LABOR 2,149.84 364.01 0.00 -364.01 0.00620-00-53610-000-821 SEWER - UTILITIES 121.36 8,476.23 7,500.00 -976.23 113.02620-00-53610-000-822 SEWER WATER/SEWER USE 0.00 5,565.00 10,000.00 4,435.00 55.65620-00-53610-000-824 SEWER SLUDGE REMOVAL FEES 1,590.00 14,756.50 25,000.00 10,243.50 59.03620-00-53610-000-825 SEWER TESTING 3,643.00 667.75 8,000.00 7,332.25 8.35620-00-53610-000-826 SEWER CHEMICALS 0.00 0.00 10,000.00 10,000.00 0.00620-00-53610-000-828 SEWER TELEVISING 0.00 3,136.23 7,000.00 3,863.77 44.80620-00-53610-000-829 SEWER EQUIPMENT/MAINTENANCE 0.00 3,298.27 3,442.00 143.73 95.82620-00-53610-130-000 SEWER SS/MEDICARE 164.47 0.00 6,400.00 6,400.00 0.00620-00-53610-150-000 SEWER HEALTH SUBSIDY 0.00 2,260.00 5,000.00 2,740.00 45.20620-00-53610-510-827 SEWER INSURANCE 0.00 141,386.02 242,208.00 100,821.98 58.37100-00-53620-000-000 GARBAGE SERVICE 16,315.46 0.00 0.00 0.00 0.00100-00-53630-000-000 SOLID WASTE DITCH CLEANING 0.00 250.00 0.00 -250.00 0.00620-00-53631-000-840 SEWER CONSULTING FEES 0.00 53,267.22 0.00 -53,267.22 0.00100-00-53635-000-000 RECYCLING SERVICE 6,725.18 13,152.07 17,500.00 4,347.93 75.15620-00-53640-000-620 SEWER - UTILITIES 98.55 147.79 0.00 -147.79 0.00620-00-53640-000-660 SEWER FUEL PURCHASED 0.00 974.87 1,500.00 525.13 64.99620-00-53640-000-851 SEWER OFFICE EXPENSE 0.00 1,603.06 1,800.00 196.94 89.06620-00-53640-000-854 SEWER RETIREMENT 85.99 522.32 40,000.00 39,477.68 1.31620-00-53640-000-856 SEWER MISC EXPENSES 0.00 2,516.10 0.00 -2,516.10 0.00620-00-53690-000-850 SEWER LEGAL 2,100.74 0.00 0.00 0.00 0.00610-00-53700-000-403 DEPRECIATION EXP - FINANCED 0.00 0.00 0.00 0.00 0.00610-00-53700-000-426 DEPRECIATION EXP - CONTRIBUTED 0.00 578.53 600.00 21.47 96.42610-00-53710-000-340 WATER UTILITY LAND LEASE 0.00 30,432.67 30,000.00 -432.67 101.44610-00-53710-000-600 WATER SALARIES & WAGES 1,409.22 0.00 500.00 500.00 0.00610-00-53710-000-610 WATER CONT EDU & MILEAGE 0.00 6,314.80 13,200.00 6,885.20 47.84610-00-53710-000-620 WATER - UTILITIES 21.71 5,257.52 6,000.00 742.48 87.63610-00-53710-000-630 WATER CHEMICALS 561.85 640.31 500.00 -140.31 128.06610-00-53710-000-640 WATER OFFICE SUPPLIES 0.00 785.00 3,750.00 2,965.00 20.93610-00-53710-000-645 WATER TESTING 17.00 5,447.70 15,000.00 9,552.30 36.32610-00-53710-000-650 WATER REPAIRS 280.00 12,099.00 15,000.00 2,901.00 80.66610-00-53710-000-655 WATER EQUIPMENT 0.00 0.00 3,000.00 3,000.00 0.00610-00-53710-000-656 WATER METER EXPENSE 0.00 147.80 1,000.00 852.20 14.78610-00-53710-000-660 WATER UTILITY TRUCK MAIN 0.00 75.03 1,000.00 924.97 7.50610-00-53710-000-670 WATER MAINTENANCE 0.00 0.00 0.00 0.00 0.00610-00-53710-000-683 PSC EXPENSES 0.00 244.99 1,000.00 755.01 24.50610-00-53710-000-822 WATER UTILITY WATER/SEWER USE 0.00 0.00 0.00 0.00 0.00610-00-53710-000-825 PLANT WATER TESTING 0.00 2,180.41 2,500.00 319.59 87.22610-00-53710-130-000 WATER SS/MEDICARE 107.80 0.00 6,400.00 6,400.00 0.00610-00-53710-150-000 WATER HEALTH SUBSIDY 0.00 679.40 0.00 -679.40 0.00610-00-53710-210-000 WATER PLANT LEGAL 264.04 5,867.00 5,000.00 -867.00 117.34610-00-53710-510-682 WATER UTILITY INSURANCE 0.00 0.00 0.00 0.00 0.00610-00-53720-000-680 WATER SALARIES 0.00 0.00 0.00 0.00 0.00610-00-53720-000-681 WATER EXPENSES 0.00 3,028.05 1,300.00 -1,728.05 232.93610-00-53720-000-683 WATER DUES & FEES 93.10 30,548.33 40,000.00 9,451.67 76.37610-00-53720-000-685 WATER AUDITING/ACCOUNTING 0.00 Budget Comparison - Detail 2026 2026 Budget Status Budget % of September Fund: All Funds 7 ACCT 11:21 AM9/10/2026 Actual 2026 Account Number 09/14/2026 Budget Page: 1,003.78 800.00 -203.78 125.47610-00-53720-000-686 WATER RETIREMENT 56.37 0.00 0.00 0.00 0.00610-00-53720-000-689 WATER MISC EXPENSES 0.00 80.96 0.00 -80.96 0.00610-00-53720-000-822 WATER UTILITY WATER/SEWER USE 0.00 ====================================================================================================================================================== PUBLIC WORKS 178,971.02 43.93841,199.24 1,073,699.761,914,899.00 ====================================================================================================================================================== 2,750.00 5,000.00 2,250.00 55.00100-00-55120-000-000 ANIMAL SERVICES 0.00 0.00 0.00 0.00 0.00100-00-55300-000-000 RECREATION PROGRAM & EVENTS 0.00 ====================================================================================================================================================== CULTURE, RECREATION AND EDU. 0.00 55.002,750.00 2,250.005,000.00 ====================================================================================================================================================== 0.00 0.00 0.00 0.00100-00-56400-000-000 PLANNING LAND ACQUISITION 0.00 6,797.85 78,646.76 71,848.91 8.64100-00-56400-215-000 PLANNING CONSULTING 260.00 29,037.45 76,960.00 47,922.55 37.73100-00-56700-115-000 ZONING WAGES 0.00 1,992.81 11,774.88 9,782.07 16.92100-00-56700-130-000 ZONING SS/MEDICARE 0.00 971.63 3,080.00 2,108.37 31.55100-00-56700-131-000 ZONING RETIREMENT 0.00 0.00 12,800.00 12,800.00 0.00100-00-56700-150-000 ZONING HEALTH SUBSIDY 0.00 11,716.04 21,000.00 9,283.96 55.79100-00-56700-210-000 ZONING LEGAL 229.60 132.00 400.00 268.00 33.00100-00-56700-224-000 ZONING CELL PHONE 0.00 42,600.00 0.00 -42,600.00 0.00100-00-56700-290-000 ZONING CONTRACTED SERVICES 4,200.00 0.00 500.00 500.00 0.00100-00-56700-311-000 ZONING COMPUTER/SOFTWARE 0.00 76.68 81.00 4.32 94.67100-00-56700-312-000 ZONING ANTI-VIRUS 0.00 51.02 1,000.00 948.98 5.10100-00-56700-320-000 ZONING PUBLICATIONS 0.00 500.00 1,500.00 1,000.00 33.33100-00-56700-330-000 ZONING MILEAGE/SEMINAR 0.00 1,160.59 3,000.00 1,839.41 38.69100-00-56700-380-000 ZONING EXPENSE 0.00 ====================================================================================================================================================== CONSERVATION AND DEVELOPMENT 4,689.60 45.1095,036.07 115,706.57210,742.64 ====================================================================================================================================================== 156,867.72 973,794.02 816,926.30 16.11100-00-58100-000-000 DEBT SERVICE PRINCIPAL 14,595.41 43,845.26 0.00 -43,845.26 0.00400-00-58100-000-000 DEBT SERVICE PRINCIPAL 0.00 9,812.76 0.00 -9,812.76 0.00100-00-58200-000-000 DEBT SERVICE INTEREST 555.07 154.33 0.00 -154.33 0.00400-00-58200-000-000 DEBT SERVICE INTEREST 0.00 ====================================================================================================================================================== DEBT SERVICE 15,150.48 21.63210,680.07 763,113.95973,794.02 ====================================================================================================================================================== 0.00 0.00 0.00 0.00100-00-59200-000-000 TRANSFER TO OTHER FUNDS 0.00 ====================================================================================================================================================== OTHER FINANCING USES 0.00 0.000.00 0.000.00 ====================================================================================================================================================== ====================================================================================================================================================== 1,554,679.40 3,791,888.16Total Expenses 218,752.54 41.002,237,208.76 ====================================================================================================================================================== -1,158,102.360.00-215,817.54 1,158,102.36Net Totals Clerk Report 09/14/2026 • Created some quick reference guides for odd things that could come up on election day as requested by the poll workers • Quite a few people in the office for early in person absentee voting • Conducted the public test of election equipment – no issues • Election set up & take down • Attend a TIF webinar hosted by The League & Ehlers • More work on account reconciliation • A lot of questions for the Nsight co-location request • Entered all of the election information into WisVote and reconciled o Turnout of 814 voters o Also was able to get a few more people willing to become election workers • A lot of time spent gathering documents and writing procedures for the 2025 audit o BakerTilly started going through everything 08/31 – a lot of follow up questions from them the week of 09/07. o More documentation to find after they began going through their first request. • 09/09/2026 – attended a webinar put on by the League of WI Municipalities regarding the Levy Limit Worksheet as we are now in budget season. Went through each line in depth and explained what was allowable to claim. • Created a mailer to go out with the next round of utility bills. Michael is having issues with the pumps at the Wastewater plant due to things being flushed that should be going in the trash. • More work on creating SOPs as time allows. • Prep work for the 11/3 election in WisVote • Already received quite a few absentee requests for the 11/3 election o Should receive ballots from the County this week Board Meeting Chief Report Chief Report: – (August 26 ) Personnel Report: o Wyatt Hase and Lana Borechardt have begun their career with the Village of Maine Fire Department. Their first night of drill was on the 19th. EMS Response: o Month (16) ▪ Berlin – 2 ▪ Village of Maine – 9 ▪ Stettin – 5 o Year To Date - (104) ▪ BERLIN – (11) ▪ VILLAGE OF MAINE – (66) ▪ STETTIN – (27) Fire Response: o Month (5) ▪ 8/3/26 (1843 hrs) 15380 Brandenburg Ave. Utility Fire Call (No CO Found) – VMAINE ▪ 8/15/26 (1512 hrs) 241579 US 51 Grass Fire (Cancelled) – VMAINE ▪ 8/16/26 (0114 hrs) 146110 Marmel Drive Structure Fire (Mattress on Fire) – STETTIN ▪ 8/17/26 (1444 hrs) 146885 Whippoorwill Rd. Structure Fire (Shed on Fire) – VILLAGE OF RIB MOUNTAIN ▪ 8/29/26 (1641 hrs) County Rd U/N.44th Ave. MVC (Head Injury) – VMAINE o Year To Date - (43) ▪ BERLIN – (0) ▪ VILLAGE OF MAINE – (28) ▪ STETTIN – (11) ▪ OTHER – (4) Board Meeting Chief Report Concurrent Call Data: o Nothing to report Training: o Lana has begun Fire Class at NTC on Tuesday and Thursday evenings. She should be done with fire class by the end of November. Apparatus: o Engine 1 was taken to Baer Repair for an estimate on repairs needed and DOT inspection. o All other apparatus will be taken to this shop for the same reason. It is much closer than the previous mechanic shop in Woodruff. The previous shop will still be used for pump related issues. Fire Prevention/Public Education/Events: o Chief Genrich, Deputy Chief Gau, and FF Channel were at the elementary school for orientation day and handed out things for the kids. Also handed out a couple applications for the Fire Department. Grants/Projects: o Nothing to Report Village of Maine Special Meeting of the Board of Trustees Monday, August 3, 2026 Village Hall President Hase called the meeting to order at 6:00 p.m. The Pledge of Allegiance was said. Interim Clerk Heindl verified that all open meeting requirements have been satisfied. **The closed session at 5:30pm was cancelled due to the applicant taking a different job** ROLL CALL: Trustees present: Dan Brandenburg, Judith Hase, Bruce Reynolds, Ben Seidler, and Wes Schoepke. Also Present: Attorney James Kurszewski and Interim Clerk Jamie Heindl. Pledge of Allegiance was said. Motion by Reynolds/Brandenburg to approve the minutes of the regular meeting on 07/13/2026. Carried. 5/0 **Request to have motions verbatim** Agenda item #17 – Discussion & Possible Action – Volunteer Firefighter Wyatt Hase Motion by Reynolds/Brandenburg that we approve him. Carried 5/0 Agenda item #18 Discussion & Possible Action – Conditional Use Permit – Nsighttel Wireless Motion by Brandenburg/Schoepke we deny it. Carried. 5/0 Agenda item #19 Discussion & Possible Action – Zoning Board of Appeals Motion by Schoepke/Brandenburg to approve Kelley Warren. Carried. 5/0 Motion by Schoepke/Seidler to approve Todd Zastrow. Carried. 5/0 Motion by Brandenburg/Hase to approve Steve Zahn for two years. Carried. 5/0 Motion by Hase/Reynolds to approve Jim Kraemer and Tom Marquardt for one year terms. Carried. 3/2 Agenda item #20 Discussion & Possible Action – NTC Agricultural Science renting village land for crops Motion by Schoepke/Brandenburg to table it until the special meeting so the board can review the agreement. Carried. 5/0 Agenda item #21 Discussion & Possible Action – Hiring of Jamie Heindl as full-time Clerk/Deputy Treasurer. Motion by Reynolds/Schoepke to that we approve her and then we will have closed session for salary. Carried. 4/1 Agenda item #22 Discussion & Possible Action – Sale of Broom Attachment Motion by Schoepke/Brandenburg that we take it to Swiderski. Carried. 5/0 Agenda item #23 Discussion & Possible Action – Network/Technology Upgrades Motion by Seidler/Brandenburg to table website upgrade to the next regularly scheduled meeting. 5/0 Motion by Brandenburg/Schoepke that we accept the network upgrade and phone system as stated. Carried. 4/1 Motion by Reynolds/Hase to table the last two for the next scheduled meeting. Carried. 5/0 Agenda item #24 Discussion & Possible Action – Village of Maine Newsletter Motion by Brandenburg/Reynolds that we go forward having you [village president] write the newsletter and then board approval of the newsletter - spring & fall. Carried. 5/0 Agenda item #25 Discussion & Possible Action – Brokaw Lots Motion by Brandenburg/Reynolds for everything except the Habitat Homes for now on the 2019 value. Carried. 3/2 Roll Call Vote: Brandenburg – yes, Hase – yes, Reynolds – yes, Seidler – nay, Schoepke – no Agenda item #26 Discussion & Possible Action – Maine Lion’s Club Village Park Upgrades Motion by Brandenburg/Seidler approve going forward with this as long as any tax payer money that is going to be spent comes in front of the board. Carried. 5/0 Agenda item #27 Approve monthly vouchers for payment Motion by Seidler/Brandenburg to accept the vouchers. Carried. 5/0 Roll Call Vote: Schoepke – yes, Seidler – yes, Reynolds – yes, Hase – yes, Brandenburg – yes. New Business: • Website upgrade to Sept meeting • Projector & Sound system to Sept meeting **start regular meetings at 5:30pm for trustees to go through vouchers before general business at 6pm Next Board meeting: Special meeting on August 31st, 2026 at 6pm; regular meeting is September 14th, 2026, at 6pm. Motion by Schoepke/Brandenburg to adjourn at 8:37 p.m. Carried. 5/0 Submitted by, Jamie Heindl, Interim Village Clerk Village of Maine Special Meeting of the Board of Trustees Monday, August 31, 2026 Village Hall President Hase called the meeting to order at 6:00 p.m. The Pledge of Allegiance was said. Clerk Heindl verified that all open meeting requirements have been satisfied. ROLL CALL: Trustees present: Dan Brandenburg, Judith Hase, Bruce Reynolds, Ben Seidler, and Wes Schoepke. Also Present: Attorney James Kurszewski, Jon Trautman (CLA), and Clerk Jamie Heindl. Update on 2026 Budget Status from Jon Trautman: Jon Trautman came in to discuss the 2024 audited financial statements and how the budget/levy limit works as far as what was approved in loans and claimed as debt service on the 2025 Levy Limit Worksheet submitted to the department of revenue. Motion by Hase to switch #5 and #6. Agenda item #6 Discussion & Possible Action – Disclose the Nsight towers and antenna memo to the public Motion by Hase/Seidler to disclose the Nsight towers and antenna memo from the attorney to the public. Carried. 5/0 Agenda item #5 Discussion & Possible Action – Reconsideration of Nsight co-location request 6333 Rainbow Drive Attorney Kurszewski did a lot of research into state statutes to find out exactly what the board can/cannot do. Nsight is requesting a Class 2 co-location, which is permitted by state statute. Nsight did not have to go through the Conditional Use Permit process. They applied for the permit back in January; the board had 45 days from then to decide if they wanted to approve or deny the request. By statute, after the 45 days were up with no response, Nsight could have moved forward with their request. Motion by Schoepke/Reynolds to approve it. Carried. 3/2 Roll Call Vote: Brandenburg – no, Hase – yes, Reynolds – yes, Schoepke – yes, Seidler – no. Agenda item #7 Public Hearing – Data Center Moratorium Hase called the public hearing to order on the Data Center Moratorium at 6:40 p.m. Our current zoning code doesn’t have information pertaining to data centers. We are looking to adopt a 12 month moratorium to disallow data centers to give the Village time to research and create a zoning ordinance for data centers. Resident expressed concern about the data centers taking water from the Village. Jonathan Fisher – agrees with the moratorium so we have time to protect ourselves. Joe Yelle – also agrees with the moratorium. Motion by Brandenburg/Reynolds to adjourn the public hearing (6:52p.m.). Carried 5/0 Agenda item #7a. Discussion & Possible Action – Resolution 2026-01 Data Center Moratorium Motion by Brandenburg/Seidler that we go forward with the moratorium, 1 year moratorium they are requesting. Carried. 5/0 Agenda item #8 Discussion of 2025 Audit Planning Letter from BakerTilly. No action needed; BakerTilly requested a letter be distributed to trustees regarding the 2025 Audit. Agenda item #9 Discussion & Possible Action – Agreement for NTC to rent Village Parcel ID 146-2907- 004-0954 Motion by Brandenburg/Hase to talk about #11 and then come back to this. Carried. 5/0 Agenda item #11 Discussion and Possible Action – REI Falcon Drive Development Overlay Cost Motion by Brandenburg/Reynolds that we approve $1,500 for REI overlay cost. Carried. 5/0 Back to agenda item #9. Motion by Reynolds/Seidler that we deny the lease agreement with NTC. Carried. 4/1 Agenda item #10 Discussion & Possible Action – Temporary Class “B” Beverage License request from Maine Lion’s Club for 09/07/2026 at 5405 Hillcrest Drive. Motion by Seidler/Brandenburg to approve. Carried. 5/0 Agenda item #12 Discussion & Possible Action – TerX Brokaw properties lease amendment Motion by Reynolds/Brandenburg that we accept the amended lease. Carried. 5/0 Agenda Item #13 Discussion & Possible Action – Municipal Projects & Public Property Citizen Appointments Motion by Reynolds/Seidler to nominate Randy Blaschka. Carried. 5/0 Motion by Brandenburg/Reynolds to nominate Tom Gatzke. Carried. 5/0 Motion by Reynolds/Hase to nominate Jim Kraemer. Carried. 3/2 Agenda Item # 14 New Business • Tabled items from 8/3 Next Board Meeting: September 14, 2026, at 5:30 p.m. **October meeting – 3 of the trustees will be unavailable 10/12. Moving to September 28th** Agenda Item # 16 Request motion to convene in Closed Session as per Wisconsin Statutes 19.85(1)(c) for the purpose of considering employment, promotion, compensation, or performance evaluation of any public employee over which the governmental body has jurisdiction or exercises responsibility, for the purpose of discussing Clerk/Deputy Treasurer wage. Motion by Brandenburg/Seidler that we convene in closed session. Carried. Roll Call Vote: Brandenburg – yes, Hase – yes, Reynolds – yes, Schoepke – yes, Seidler – yes. ======================== CLOSED SESSION ======================== Motion by Brandenburg/Seidler to adjourn closed session and reconvene in open session. Carried. 5/0 Motion by Brandenburg/Hase to compensate Jamie $75,000 retroactive to 08/03. Carried. 5/0 Motion by Schoepke/Brandenburg to adjourn at 8:02 p.m. Carried. 5/0 Submitted by, Jamie Heindl, Village Clerk Network Upgrade – We are happy to announce that we have begun an upgrade to our current Village Hall and Fire Department/Public Works building. It is providing improved speeds, better security and monitoring capabilities, along with private and public “guest” networks. Visitors to the Village Halll now have a wireless next work labeled “Village Guest” that they may connect to for Internet access. The password for the guest network is – LovelyVillage Phone System Changes – The network upgrade also provided us the capability to upgrade our phone system. Once fully operational, it will reduce our monthly phone system expenses while providing better functionality which will better serve both residents and village staff. Bruce New Projector Proposal Vendor – Sound World • Better User Experience: The current unit is quite dim and has very low resolution meaning it is unable to properly display computer images. It has been difficult to use during committee meetings due to resolution restrictions. Audience has complained it is hard to see. Online audience reports they are unable to read the display. • Community Engagement: This will improve relations with online residents and in- person audience as we are meeting their needs of transparency and better readability of agendas and the supporting documents. Dispels rumors that the board is trying to hide things. • Improved Productivity and Efficiency: Board and committee meetings can be more productive with improved visibility and higher resolution of documents, spreadsheets and images. • Connectivity with Sound System: During conference/Teams/Video calls, audio from the laptop & projector will be connected directly to the sound system providing in-person and online audience amplified and higher quality sound from the outside attendee. • Better Color, Brightness & Contrast: Fully visible in lighted room. No longer a need to turn off lights or closing blinds. Laser technology is commonplace today and delivers wider color gamuts, deeper black levels, and much higher visual contrast. Our existing projector is a traditional lamp which will dim significantly over the lifespan, while lasers maintain high brightness for years. • Eco-Friendly & Efficient: Unit consumes less electricity, runs cooler, and contain no mercury lamps that harm the environment. • Flexible Installation: Unit would be mounted from the ceiling. Connection can be wireless or using wired connection from newly installed receptacle in the back wall. Project Name Project Description Vendor Cost Notes, Comments Projector Replacement New projector mounted from ceiling. Bright enough to be seen in full light, better optics and improved resolution Sound World $ 2,190.96 Includes estimated 4 hour install Sound System Proposal Vendor – Sound World • Better User Experience: There have been many complaints that board members, attorney, president and clerk cannot be heard. Online audience has stated it is extremely difficult to hear. Questions of trust have been raised due to the inability to hear at meetings. This solution has been requested by and is for the betterment of the community. • Community Engagement: Will improve relationship with online residents and in-person audience as we are meeting their needs. The goal is to provide quality sound to encourage more resident involvement, reduce frustration, build confidence in the administration and improve transparency. • Consistent Sound: o 7 microphones – 1 per user provides the best configuration and can be equalized to eliminate hollow pockets. o Additional Speakers – provides reliable and balanced sound throughout the entire meeting room. o Larger Amplifier – provides the ability to drive higher quality sound to all speakers within the hall. Project Name Project Description Vendor Cost Notes, Comments Sound System Upgrade Investigation has shown that portability is not needed, so a more fixed solution is warranted. Install more speakers, stronger amplifier, 7 wireless and rechargeable mics,with stands, and recharge station. FCC reserved and approved frequencies(this is required of all wireless transmitting devices). Sound World $ 7,588.87 Includes estimated 6 hours of install New Web Site Proposal Vendor - Catalis • Flexible Design and Configuration with Easy Navigation: Home page and links can all be designed and modified by staff as needed. Flat fee pricing, so no additional charges by the vendor. • Centralized Public Records: Easy access to public events calendar, meeting minutes, annual budgets, agendas, and local regulations. • 24/7 Digital Notice Board & Mass Notification: Using a centralized notification solution, administrators can send and manage communications to residents via multiple media channels. Long term, notifications can be sent out for meeting and links to watch live or archived videos. • Urgent/Emergency Alerts: Weather alerts, road closures, etc can be displayed on the Home page and emails/texts will be sent out to notify village residents. • Two-Way Communication: Ability to create digital feedback forms, public opinion surveys, and direct staff directories to build trust and accountability. Smart Search Architecture: Uses search bars so users can easily find zoning laws,ordinances, meeting agendas and minutes. • Local Tourism & Business Promotion: Ability to highlight the village’s offerings, personality and local merchants to attract out-of-town visitors. A valuable tool to leverage when marketing property such as lots in Brokaw. Project Name Project Description Vendor Cost Notes, Comments Website Upgrade Upgrade with many new features and notification enchancements Catalis $ 4,300.00 Includes a 1 time $900 Set up charge Wes (2) No later that the Thursday preceding the next regularly scheduled village board meeting, approved meeting minutes of the village board as well as any approved committee and commissions minutes shall be posted to the village website. Sec. 8.15.040 - Agenda. A request in writing or by email to the village president by a trustee by 12:00 p.m. the Monday preceding a Monday regular village board meeting may be made to the village president to add an agenda item to the immediately upcoming Monday regular village board meeting. The village president shall coordinate the preparation of the agenda. Any item that is properly submitted shall be placed on the next regularly scheduled village board meeting agenda. No substantive revisions, additions, or deletions to an agenda may occur after 5:00 p.m. on the Wednesday preceding the Monday regular village board meeting for which the agenda applies. (a) All meeting material, including all supplemental documents pertaining to the agenda item to be considered by the village board at its regularly scheduled meeting shall be provided to each village trustee in electronic format as well as hand delivered to each village trustee's residence or delivered to each trustee's mailbox at the village hall no later than the Thursday prior to the Monday regular village board meeting for which the packet is intended. The meeting materials shall include the monthly check register long form in pdf as well as the budget to actual report. (b) Meeting material packets, except unapproved meeting minutes, but including written reports, shall be posted on the Village of Maine website on the Thursday prior to the Monday regular board meeting subsequent to the village board meeting applicable to said materials, subject to all statutes, rules, ordinances, or board action concerning the same. Sec. 8.15.050 - Order of business. (a) The business of the village board shall be conducted in the following order unless specifically requested otherwise in writing by the village president or a village trustee. (a) Silence cell phones. (b) Call meeting to order.. (c) Roll call. (d) Pledge of allegiance. (e) Village President report. (f) Finance and Personnel Committee report. (g) Treasurer report. (h) Fire Department report. (1) County supervisor report. G) Public comment regarding Other Business items, limited to three minutes.* (k) Other Business. (1) New business. (m) Next Board of Trustees' meeting date, time, and place. (n) Adjournment. 2 Current recycling ordinance Judith Section 10.06(2) Recycling Regulations 1 VILLAGE OF MAINE, MARATHON COUNTY, WISCONSIN AN ORDINANCE TO AMEND CHAPTER 10.06(2) OF THE GENERAL CODE OF ORDINANCES ENTITLED RECYCLING REGULATIONS The Village Board of the Village of Maine, Marathon County, Wisconsin do ordain as follows: SECTION 1: Section 10.06(2) of the General Code of Ordinances of the Village of Maine, Marathon County, Wisconsin entitled Recycling Regulations is hereby created as follows: (a) Title. Recycling Ordinance for the Village of Maine. (b) Purpose. The purpose of this ordinance is to regulate and require the separation, collection and processing of recyclable materials to the greatest extent feasible and to promote recycling, composting, and resource recovery through the administration of an effective recycling program, as provided in s. 287.11, Wis. Stats., and ch. NR 544, Wisconsin Administrative Code. (c) Statutory Authority. This ordinance is adopted as authorized under s. 287.09(3)(b), Wis. Stats. (d) Abrogation and Greater Restrictions. It is not intended by this ordinance to repeal, abrogate, annul, impair or interfere with any existing rules, regulations, ordinances or permits previously adopted or issued pursuant to law. However, whenever this ordinance imposes greater restrictions, the provisions of this ordinance shall apply. (e) Interpretation. In their interpretation and application, the provisions of this ordinance shall be held to be the minimum requirements and shall not be deemed a limitation or repeal of any other power granted by the Wisconsin Statutes. Where any terms or requirements of this ordinance may be inconsistent or conflicting, the more restrictive requirements or interpretation shall apply. Where a provision of this ordinance is required by Wisconsin Statutes, or by a standard in ch. NR 544, Wis. Adm. Code, and where the ordinance provision is unclear, the provision shall be interpreted in light of the Wisconsin Statutes and the ch. NR 544 standards in effect on the date of the adoption of this ordinance, or in effect on the date of the most recent text amendment to this ordinance. (f) Severability. Should any portion of this ordinance be declared unconstitutional or invalid by a court of competent jurisdiction, the remainder of this ordinance shall not be affected. (g) Applicability. The requirements of this ordinance apply to all people including businesses and solid waste haulers within the Village of Maine. Owners and/or occupants of single-family and multi-family residences and non-residential facilities located within or conducting business in the Village are required to separate and recycle, from their municipal solid waste, those items identified in Section (1.10) of this Ordinance. (h) Administration. The provisions of this ordinance shall be administered by the Village Board or their designee. (i) Definitions. For this ordinance: 1) “Aluminum container” means all aluminum food or beverage cans. 2) “Bi-metal container” means a container for carbonated or malt beverages that is made primarily of a combination of steel and aluminum. 3) “Container board” means corrugated paperboard used in the manufacture of shipping containers and related products. 4) “Foam polystyrene packaging” means packaging made primarily from foam polystyrene that satisfies one of the following criteria: Judith Section 10.06(2) Recycling Regulations 2 a) Is designed for serving food or beverages. b) Consists of loose particles intended to fill space and cushion the packaged article in a shipping container. c) Consists of rigid materials shaped to hold and cushion the packaged article in a shipping container. 5) “Glass Container” means a glass bottle, jar or other packaging container used to contain a product that is the subject of a retail sale and does not include ceramic cups, dishes, oven ware, plate glass, safety and window glass, heat-resistant glass such as Pyrex, lead based glass such as crystal, or TV tubes. 6) “HDPE” means high density polyethylene, labeled by the resin code # 2. 7) “LDPE” means low density polyethylene, labeled by the resin code # 4. 8) “Magazines” means magazines and other materials printed on similar paper. 9) “Major appliance” means a residential or commercial air conditioner, clothes dryer, clothes washer, dishwasher, freezer, microwave oven, oven, refrigerator, furnace, boiler, dehumidifier, water heater or stove. 10) “Multiple-family dwelling” means a structure containing 5 or more residential units, including units that are occupied seasonally. 11) “Newspaper” means a newspaper and other materials printed on newsprint. 12) “Non-residential facilities and properties” mean commercial, retail, industrial, institutional and government facilities and properties. Non-residential facilities and properties include any location at which goods or services are provided or manufactured, including locations under construction, demolition, or remodeling, or used for special events such as fairs, festivals, sport venues, conferences, and exhibits. This term does not include multiple family dwellings. 13) “Office paper” means a variety of high-grade printing and writing papers. This term does not include industrial waste, newspaper or packaging. 14) “Other resins or multiple resins” mean plastic resins labeled by the resin code # 7. 15) “Person” includes any individual, corporation, limited liability company, partnership, association, local government unit, as defined in s. 66.0131(1)(a), Wis. Stats., state agency or authority or federal agency. 16) “PETE” or “PET” means polyethylene terephthalate, labeled by the resin code # 1. 17) “Plastic container” means an individual, separate, rigid plastic bottle, can, jar or carton, except for a blister pack, that is originally used to contain a product that is the subject of a retail sale. 18) “Postconsumer waste” means solid waste other than solid waste generated in the production of goods, hazardous waste, as defined in s. 291.01(7) Wis. Stats., waste from construction and demolition of structures, scrap automobiles, or high-volume industrial waste, as defined in s. 289.01(17)., Wis. Stats. 19) “PP” means polypropylene, labeled by the resin code # 5. 20) “PS” means polystyrene, labeled by the resin code # 6. 21) “PVC” means polyvinyl chloride, labeled by the resin code # 3. 22) “Recyclable materials” includes lead acid batteries; major appliances; waste oil; yard waste; aluminum containers; corrugated paper or other container board; foam polystyrene packaging; glass containers; magazines; newspaper; office paper; rigid plastic containers, including those made of PETE, HDPE, PVC, LDPE, PP, PS and other resins or multiple resins; steel containers; waste tires; and bi-metal containers. 23) “Solid waste” has the meaning specified in s. 289.01(33), Wis. Stats. 24) “Solid waste facility” has the meaning specified in s. 289.01(35), Wis. Stats. 25) “Solid waste treatment” means any method, technique or process which is designed to change the physical, chemical or biological character or composition of solid waste. “Treatment” includes incineration. 26) “Waste tire” means a tire that is no longer suitable for its original purpose because of wear, damage or defect. Section 10.06(2) Recycling Regulations 3 27) “Yard waste” means leaves, grass clippings, yard and garden debris and brush, including clean woody vegetative material no greater than 6 inches in diameter. This term does not include stumps, roots or shrubs with intact root balls. (j) Separation of Recyclable Materials. Occupants of single family and 2-to-4-unit residences, multiple- family dwellings and non-residential facilities and properties shall separate the following materials from postconsumer waste: 1) Lead acid batteries 2) Major appliances 3) Waste oil 4) Yard waste 5) Aluminum containers 6) Bi-metal containers 7) Corrugated paper or other container board 8) Foam polystyrene packaging 9) Glass containers 10) Magazines 11) Newspaper 12) Office paper 13) Rigid plastic containers made of PETE, HDPE, PVC, LDPE, PP, PS, and other resins or multiple resins 14) Steel containers 15) Waste tires (k) Separation Requirements Exempted. The separation requirements of Section (j) do not apply to the following: 1) Occupants of single family and 2-to-4-unit residences, multiple-family dwellings and non-residential facilities and properties that send their postconsumer waste to a processing facility licensed by the Wisconsin Department of Natural Resources that recovers the materials specified in s. 1.11 from solid waste in as pure a form as is technically feasible. 2) Solid waste which is burned as a supplement fuel at a facility if less than 30 % of the heat input to the facility is derived from the solid waste burned as supplement fuel. 3) A recyclable material specified in s. 1.11(5) through (15) for which a variance has been granted by the Department of Natural Resources under s. 287.11(2m), Wis. Stats., or s. NR 544.14, Wis. Adm. Code. (l) Care for Separated Recyclable Materials. To the greatest extent practicable, the recyclable materials separated in accordance with s. 1.11 shall be clean and kept free of contaminants such as food or product residue, oil or grease, or other non-recyclable materials, including but not limited to household hazardous waste, medical waste, and agricultural chemical containers. Recyclable materials shall be stored in a manner which protects them from wind, rain, and other inclement weather conditions. (m) Management of Lead Acid Batteries, Major Appliances, Waste Oil and Yard Waste. Occupants of single family and 2-to-4-unit residences, multiple-family dwellings and non-residential facilities and properties shall manage lead acid batteries, major appliances, waste oil, and yard waste as follows: 1) Lead acid batteries shall be taken to a retail business which sells led acid batteries or contact the Village’s contracted solid waste collector. 2) Major appliances shall be picked up by the Village’s contracted solid waste collector for a fee or deposited by the owner with a scrap metal recycling vendor which is licensed by the State. 3) Waste oil shall be disposed of by contacting the Village’s contracted solid waste collector for a fee. 4) Yard waste shall be taken to the yard waste drop off center designated by the Village for recycling or composting provided the compost pile does not constitute a nuisance and provided not more than 50 cubic yards of material are composted in any given year on the owner’s property. Although burning is Section 10.06(2) Recycling Regulations 4 discouraged, yard waste may be burned provided such burning does not constitute a nuisance and provided that the burning does not violate Village Burning Ordinances and policies as set forth by the Village Fire Department. Yard waste shall not be bagged for disposal with other refuse. (n) Preparation and Collection of Recyclable Materials. All recyclables must be prepared for collection as noticed to residents in the garbage and recycling brochure distributed annually. (o) Responsibilities of Owners or Designated Agents of Multiple-Family Dwellings. 1) Owners or designated agents of multiple-family dwellings shall do all the following to recycle the materials specified in s. (j) 5) through 15): a) Provide adequate, separate containers for the recycling program established in compliance with the ordinance. The number of recycling containers shall equal or be greater than the number of trash containers and at least one of the following shall be met: i. The minimum total volume of recycling container space is equal to 20 gallons per week per dwelling unit. ii. The ratio of trash container volume to recycling container volume is at most 2:1. iii. An alternative method that does not result in the overflow of a recycling container during the time between collection of materials and delivery to a recycling facility. b) Notify tenants in writing at the time of renting or leasing the dwelling and at least semi -annually thereafter about the established recycling program. c) Provide for the collection of materials separated from the solid waste by the tenants and the delivery of the materials to a recycling facility. d) Notify tenants which materials are collected, how to prepare the materials to meet the processing requirements, collection methods or sites, and locations of drop-off collection sites to recycle materials not collected on-site. 2) The requirements specified in 1) do not apply to the owners or designated agents of multiple-family dwellings if the postconsumer waste generated within the dwelling is treated at a processing facility licensed by the Department of Natural Resources that recovers for recycling the materials specified in Section (j) (5) through (15) from solid waste in as pure a form as is technically feasible. (p) Responsibilities of Owners or Designated Agents of Non-Residential Facilities and Properties. 1) Owners or designated agents of non-residential facilities and properties shall do all the following to recycle the materials specified in Section (j) (5) through (15): a) Provide adequate, separate containers for the recycling program established under this section. The total volume of recycling containers shall be sufficient to avoid overflowing during the time between collection of materials and delivery to a recycling facility. b) Notify in writing, at least semi-annually, all users, tenants and occupants of the properties about the established recycling program. c) Provide for the collection of materials separated from the solid waste by the users, tenants and occupants and the delivery of the materials to a recycling facility. d) Notify users, tenants and occupants which materials are collected, how to prepare materials to meet the processing requirements, collection methods or sites, and locations of drop-off collection sites to recycle materials not collected on-site. 2) The requirements specified in 1) do not apply to the owners or designated agents of non-residential facilities and properties if the postconsumer waste generated within the facility or property is treated at a processing facility licensed by the Department of Natural Resources that recovers for recycling the materials specified in Section (j) (5) through (15) from solid waste in as pure a form as is technically feasible. (q) Prohibitions on Disposal of Recyclable Materials Separated for Recycling. No person may dispose of in a solid waste disposal facility or burn in a solid waste treatment facility any of the materials specified in Section 10.06(2) Recycling Regulations 5 s. (j) 5) through 15) that have been separated for recycling, except waste tires may be burned with energy recovery in a solid waste treatment facility. (r) Enforcement. 1) For the purpose of ascertaining compliance with the provisions of this ordinance, any authorized officer, employee or representative of the Village of Maine may inspect recyclable materials separated for recycling, postconsumer waste intended for disposal, recycling collection sites and facilities, collection vehicles, collection areas of multiple-family dwellings and non-residential facilities and properties, and any records relating to recycling activities, which shall be kept confidential when necessary to protect proprietary information. No person may refuse access to any authorized officer, employee or authorized representative of the Village of Maine who requests access for purposes of inspection, and who presents appropriate credentials. No person may obstruct, hamper, or interfere with such an inspection. 2) Any person who violates the provision of this ordinance may be issued a citation by the Village of Maine to collect forfeitures. The issuance of a citation shall not preclude proceeding under any other ordinance or law relating to the same or any other matter. Proceeding under any other ordinance or law relating to the same or any other matter shall not preclude the issuance of a citation under this paragraph. 3) Penalties for violating this ordinance may be assessed as follows: (a) Any person who violates Section (r)(1) may be required to forfeit $50 for a first violation, $200 for a second violation, and not more than $1,000 for a third or subsequent violation, plus costs of prosecution. (b) Any person who violates the provision of this ordinance, except Section (r)(1), may be required to forfeit $50 for a first violation, $200 for a second violation, and not more than $2,000 for a third or subsequent violation, plus costs of prosecution. SECTION 2: If any provision of this Ordinance is invalid or unconstitutional, or if the application of this Ordinance to any person or circumstance is found invalid or unconstitutional by a Court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the provisions of application. SECTION 3: All Ordinances and parts of ordinances in conflict herewith are hereby repealed. SECION 4: This ordinance shall take effect and be in full force and effect from and after its passage and publication or posting as required by law. Adopted this ______ day of ________________________, 2026. VILLAGE OF MAINE ______________________ Judith Hase, Village President ATTEST: ____________________________ Jamie Heindl, Village Clerk Adopted: Published: Falcon Drive Speed Limit Background August 15 2022 BOT Meeting Minutes C. Discussion and possible action on request to have a four-way stop sign at corner of N 60th Avenue and Falcon Drive. This item was tabled. November 14 2022 BOT Meeting Minutes A. Discussion and possible action on Falcon Drive speed limit. Matthew Koser stated that he feels that cars are speeding on Falcon Drive, and he would like the speed limit to be lowered to 30 mph. There was a lengthy discussion regarding this. Attorney Frokjer stated that the Department of Transportation has completed many studies on the lowering of the speed limits on certain roads and the DOT has found that cars just find another road to drive on and keep driving over the speed limit so, in essence it simply creates a problem on a neighboring road. The Board discussed that this is really an enforcement issue and urged Mr. Koser to set up a meeting with Marathon County Sherriff’s Department. The Board also stated that there are flashing speed monitoring signs in the 2023 budget to hopefully help alleviate the speeding issue. There was no action taken on this item. November 13 2023 BOT Meeting Minutes Discussion and possible action on request to reduce Falcon Drive speed limit. Several residents from Falcon Drive were in attendance at the meeting. The residents would like the Board to reduce the speed on Falcon Drive to 35 mph and also put stop signs at the intersection of North 60th Avenue and Falcon Drive. The Board discussed this item with the residents at length. • Trustee Marquardt stated that as he understands it, the real issue is enforcement of the existing speed limit (45 mph). Trustee Marquardt told the residents that he has contacts at both the Sheriff’s Department and State Patrol and he would make an effort to increase the enforcement of the speed limit on Falcon Drive. • President Hoenisch stated that she would contact the Department of Transportation to see if the Village would need to pay for a study in order to reduce the Falcon Drive speed limit. • Trustee Yelle outlined the above points and told the residents that the Board would have them come back to another meeting when they had more information to give. Discussion and possible action on request to control Falcon Drive and N. 60th Avenue intersection with four-way stop signs. No action taken on this item. January 8 2024 BOT Meeting Minutes A. Update on Falcon Drive Speed Limit matter. President Hoenisch asked Trustee Marquardt to update the Board, Attorney and audience on the calls he made to Marathon County Sheriff’s Department to request speed limit enforcement. Trustee Marquardt asked Ms. Jena Staffaroni if a Marathon County Deputy had paid her a visit regarding the Falcon Drive speed limit violators. Ms. Staffaroni stated that she met with the deputy, however they have not noticed any additional patrols. President Hoenisch explained that she called Ms. Staffaroni contact Al Smith from the DOT. Mr . Smith is signing and pavement marking supervisor. Mr. Smith sent the contact information and message to the DOT Highway Safety Director. Mr. Smith stated that residents of Falcon Drive have contacted him, and he explained to them that he works on state highways, not local roads. President Hoenisch stated that she had a lengthy call with the State Highway Safety Director. Judith The information he provided is listed below: • Wisconsin is a home rule state, so municipalities must follow state and federal transportation regulations. • All local road speed limits are 55 mph and DOT regulations allow a Town or Village Board to lower it to 45 mph. • The DOT's stance is that roads are for vehicular traffic and meant to move traffic from point A to point B. • The speed limit on local roads cannot be lowered below 45 mph without having an Engineering Study completed and submitted to the Department of Transportation for approval. • This is not a Village of Maine Board matter, but rather a state law that mandates that speed limits cannot be lowered without going through an engineering study. • The engineer must do a 100-vehicle study and the cost of the study is $5,000 to $10,000 depending on multiple factors. • The engineer would need to document that vehicles were traveling under 39 mph to justify approving a lower speed limit. • Review of the engineering study does not mean it will be approved. • The DOT wants roads to be signed for a reasonable and pertinent speed limit. President Hoenisch explained that the Safety Engineer viewed the maps while discussing the matter. He stated the density of homes is not high enough to justify lowering the speed limit. The DOT requires 5 homes every 1,000 feet to approve a lower speed limit. President Hoenisch asked the Safety Engineer about the Town of Maine speed limit review that had been completed in 2000. The Safety Engineer explained that until 2006 the DOT provided that service. The DOT has cut its staff from five engineers to one engineer, plus an assistant. This has resulted in the state not having the manpower to complete local road safety studies, so the burden to hire an engineer now falls on the local municipality. The Safety Engineer stated he and his assistant cover 18 counties in Wisconsin. President Hoenisch explained to the Safety Engineer that the speeding violations has been more of an issue COVID. Vehicles. The Safety Engineer commented that the State Patrol are pulling over vehicles that are traveling at over 90 mph. Speeding and not following rules in general is a societal issue since Covid, he stated. President Hoenisch stated that the Falcon Drive speed limit item was on tonight’s agenda for discussion only. She felt the Trustees needed time to process the information provided by the DOT Safety Director. She asked the Trustees to notify the Clerk or herself when they are ready to discuss whether Maine should spend tax dollars to hire an engineer. Mr. Feavel stated that Falcon Drive Road top is narrow, has bad pavement, no centerline stripping and narrow shoulders. There was discussion between the Board, Feveal, Staffaroni and Kosher on the flashing speed signs. Ms. Staffaroni requested that flags be placed on the Falcon Drive 45 mph speed limit signs to draw motorist attention and the Trustees said yes. Mr. Feveal asked if N. 60th Avenue could be signed as a four-way stop intersection. President Hoenisch explained that she discussed this with the DOT Safety Engineer. The criterion for that request is there needs to be five accidents at an intersection in a twelve month period. It also needs to be a specific type of accident. The Safety Engineer check the accident report during the call and there has been one accident since January of 2018. Trustee Yelle stated that with the information provided it appears that the DOT will not approve a lower speed limit on Falcon Drive even if Maine has a study done. Trustee Marquardt asked Ms. Staffaroni to continue to monitor Falcon Drive for habitual violators. He encouraged her to call Marathon County with license plate numbers and descriptions of vehicles. Trustee Marquardt stated that if Marathon County does not respond, then Ms. Staffaroni should call him, and he will reach out to the captain that he worked with. April 28 2025 BOT Meeting Minutes Discussion and possible action on speed limit signs. There was a lengthy discussion on this item. Trustee Marquardt made a motion to authorize Administrator Grefe to bring speed limit sign quotes to the May 12, 2025, Board Meeting. Trustee Channel seconded the motion. Motion carried. May 12 2025 BOT Meeting Minutes Discussion and possible action on speed limit signs and/or mobile speed limit cart Administrator Grefe presented the speed limit sign information he received from the Department of Transportation and sign vendors. Trustee Hase made a motion to approve a Kustom Signal twelve-inch solar sign for $3,535.00 plus a mounting bracket kit. Trustee Channel seconded the motion. Motion carried. July 14 2025 BOT Agenda (No Meeting Minutes Posted) C. Discussion and possible action on placement of solar speed limit sign Trustee Hase Notes: Motion to buy on May 12. June 14 received solar signs. 4 weeks later, nothing was done. Delay because PW guy was out. Start of Falcon Drive between Koser’s and Zahn’s, for eastbound traffic by 52nd, northbound. Attached to a speed limit sign. PW could relocate a speed limit sign to attach it or a current speed limit sign that is in a good location. Stays on Falcon, review on August 11th meeting. Trustee Marquardt – encourage residents to come to that meeting and see how successful it is. Ask Rich if the sign can record speed limits of vehicles. August 11 2025 Public Comment (No Meeting Minutes Posted) Trustee Hase Notes: Matt Koser – radar shows vehicles at 80-90 MPH. We have been trying to get a solution since 2021. J:\DRAFTING\1838Brokaw\1838BASE-AsBuild.dwg 1/10/2003 8:45:36 AM CST (PREY_DISPLAY) LAYOUT TAB LOT LAYOUT RIVER RIDGE SUBDIVISION VILLAGE OF BROKAW MARATHON CO., WISCONSIN M.P.B. K.R.F. D.D.D.06/10/02 L11838 REVISION DATECHK'DBY SHEET PROJECT No. DATE: APPROVED BY: CHECKED BY: DRAWN BY: SURVEYED BY: DESIGNED BY: PHONE: (715) 675-9784 FAX: (715) 675-4060WAUSAU, WISCONSIN 54401 4080 N. 20th AVENUE EMAIL: mail@REIengineering.comCIVIL & ENVIRONMENTALENGINEERING, SURVEYING c Copyright 2002 by REI RIVER RIDGE SUBDIVISION SCALE: 1" = 100' 100' 50' 0100'200' BEARINGS REFERENCED TO THE SOUTH LINE OF THE SOUTHEAST 1/4, SEC. 4-29-7 RECORDED AS: S 89°34'02" W OUT BUILDING OUT BUILDING DWELLINGFFE=1403.8 DWELLING FFE=1406.4 DWELLINGFFE=1408.9 DWELLINGFFE=1412.1 DWELLING FFE=1416.5 DWELLINGFFE=1417.7 DWELLING FFE=1416.3DWELLING FFE=1413.0 PARCEL 1 CSM 19-147 CSM 19-147 PARCEL 2 CSM 19-147 PARCEL 3 RESERVED FOR FUTURE STREET LOT 1 CSM 27-178 UNPLATTED LANDS LOT 2 CSM 44-173 UNPLATTED LANDS OWNED BY OTHERS UNPLATTED LANDS OWNED BY OTHERS UNPLATTED LANDS OWNED BY OTHERS LOT 1 CSM 46-114 UNPLATTED LANDS OWNED BY OTHERS UNPLATTED LANDS OWNED BY OTHERS OH OH OH OH OH OH OHOHOHOHOHOHOHOHOHOHOHOH OH OH OH OH OH OH OHOHOHOH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH EXISTING ARBOR VITAES 24" WEEPING WILLOW T C T T T T C SW1/4 3-29-7 SE1/4 4-29-7 FALCON DRIVE C.T.H. "WW" U.S. "51" N. 32ND DRIVE VICINITY MAP SCALE 1" = 1000' SOUTHEAST 1/4 SECTION 4, T29N, R7E and THE SOUTHWEST 1/4 SECTION 3, T29N, R7E SUBJECT PARCEL EDGE OF EXISTING PAVEMENT EDGE OF EXISTING PAVEMENT DOUG & DIXIE WEINKAUF DOUG & DIXIE WEINKAUF EXISTINGBUILDING FFE=1419.6 GARAGE GRAVEL PARKING AREA AREA PARKING GRAVEL GRAVEL OH OH OH DRAINAGE DITCH UT UTUT UT UT UT J:\DRAFTING\1838Brokaw\1838BASE-AsBuild.dwg 1/10/2003 8:45:36 AM CST T ELEVATIONS BASED ON MARATHON COUNTY VERTICAL DATUM 30th AVENUE NORTH 28th AVENUE DENOTES FUTURE WOODED AREA DENOTES FUTURE TREE LOT 15 LOT 16 LOT 17 LOT 18LOT 19LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 66 LOT 65 LOT 64 LOT 63 LOT 62 LOT 61 LOT 60 LOT 59 LOT 58 LOT 57 LOT 56 LOT 67 LOT 68 LOT 69 LOT 70 LOT 71 LOT 72LOT 73LOT 74LOT 75LOT 76LOT 77LOT 78 LOT 83 LOT 82 LOT 81 LOT 80 LOT 79 LOT 55 LOT 54 LOT 53 LOT 34 LOT 35 LOT 37 LOT 38 LOT 39LOT 40 LOT 12 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT 6 LOT 5 LOT 4 LOT 52 LOT 51 LOT 50 LOT 49 LOT 48 LOT 47 LOT 46 LOT 45 LOT 44 LOT 43 LOT 42 LOT 41 LOT 36 LOT 27 LOT 28LOT 29LOT 30LOT 31LOT 32LOT 33 LOT 13 LOT 1 LOT 2 LOT 3 UNPLATTED LANDS OWNED BY OTHERS PROPOSED UTILITY EASEMENT POND A POND B T I.E.=1408.1 12" C.M.P.I.E.=1409.5 12" C.M.P. OH OH OH OH OH OH OH EDGE OF EXISTING PAVEMENT EDGE OF EXISTING PAVEMENT IE=1390.64 1390 IE=1390.29 70 LF - 18" CMP @ 0.50% R27' R25' 24" WEEPING WILLOW EXISTING ARBOR VITAES AREA PARKING GRAVEL DWELLING FFE=1416.3 N 223580.8404 E 270363.3893 N 223525.9275 E 270460.8873 GRADE TO DRAIN FALCON DRIVE 1410 GRADE TO DRAIN W/CMP ENDWALLS GRADE TO DRAIN 1391 1392 1394 1396 1398 1394 1396 FLAGSTONE LANE N. 30th AVENUE FLAGSTONE LANE N. 28th AVENUE N. 28th AVENUE SPILLWAYELEV.=1378.00 10'x48' RIPRAP FIREFLY DRIVE 54 LF - 6" HDPE @ 1.85% 40 LF - 12" HDPE @ 5.0% 40 LF - 12" HDPE @ 5.0% 40 LF - 12" HDPE @ 5.0% MATCH EXISTING DRIVEWAY OPENING DRIVEWAY OPENING UT DENOTES TRACK PAD STRUCTURE STRUCTURE SIZE CASTING STYLE RIM ELEV. INV. DIR. INV. ELEV. SIZE MATERIAL STM MH#1 48" DIA.R-1689 1407.16 N 1401.16 12" SDR 35 E 1402.86 12" SDR 35 W 1401.76 12" SDR 35 STM INLET #1 2' x 3'R-3067-L 1406.98 E 1401.81 12" SDR 35 STM INLET #2 2' x 3'R-3067-L 1406.98 W 1402.97 12" SDR 35 STM MH#2 48" DIA.R-1689 1397.54 S 1392.80 12" SDR 35 NW 1392.70 12" SDR 35 STM MH#3 60" DIA.R-1689 1392.78 SE 1384.96 12" SDR 35 W 1383.96 24" RCP CL III SW 1385.09 12" SDR 35 NE 1383.96 24" RCP CL III STM INLET #3 2' x 3'R-3067-L 1392.63 NE 1385.14 12" SDR 35 STM MH#4 48" DIA.R-3067-L 1392.63 SW 1383.75 24" RCP CL III N 1383.75 24" RCP CL III STM OUTFALL - S 1375.00 24" RCP CL III STM MH#5 48" DIA.R-1689 1391.37 E, W 1385.40 24" RCP CL III N 1386.15 12" SDR 35 S 1386.00 12" SDR 35 STM INLET #4 2' x 3'R-3067-L 1391.17 N, E 1386.20 12" SDR 35 STM INLET #4A 2' x 3'R-3067-L 1391.18 W 1386.23 12" SDR 35 STM INLET #5 2' x 3'R-3067-L 1391.17 S 1386.26 12" SDR 35 STM MH#6 60" DIA.R-1689 1392.00 E 1386.15 24" RCP CL III NW 1386.25 24" RCP CL III N 1387.00 12" SDR 35 S 1386.90 12" SDR 35 STM INLET #6 2' x 3'R-3067-L 1391.80 N, E, W 1387.05 12" SDR 35 STM INLET #23 2' x 3'R-3067-L 1391.83 E 1387.08 12" SDR 35 STM INLET #24 2' x 3'R-3067-L 1391.77 W 1387.08 12" SDR 35 STM INLET #7 2' x 3'R-3067-L 1391.80 S 1387.11 12" SDR 35 STM MH#7 72" DIA.R-1689 1392.95 SE 1387.20 24" RCP CL III NW, SW 1387.20 12" SDR 35 E 1388.20 12" SDR 35 W 1388.20 12" SDR 35 STM INLET #8 2' x 3'R-3067-L 1392.17 NE 1387.28 12" SDR 35 STM INLET #9 2' x 3'R-3067-L 1392.75 W 1388.31 12" SDR 35 STM INLET #10 2' x 3'R-3067-L 1392.19 SE, NE 1387.55 12" SDR 35 STM INLET #25 2' x 3'R-3067-L 1392.19 SW 1387.58 12" SDR 35 Note: Casting Styles are Neenah Foundry Company's Catalog Reference Numbers. STORM SEWER TABLE 1372 1374 1376 1378 1379 1379 1379 1379 1372 1372 EASEMENT EASEMENT EASEMENT EASEMENT Judith                                 1 2 3 4 5 6 7 8 9 10 11 12 13 14151617181920 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61   •  • • • • •   • • • •  • • • • • • •’ • • •        ••  • 675 • 9784          • 1. DNR Capacity, Management, Operations, Maintenance (CMOM) – Under Wisconsin Administrative Code NR 210.23, wastewater collection systems must implement a CMOM program. Its primary goal is to reduce or eliminate sanitary sewer overflows (SSOs) and basement backups by improving system performance and planning. Date 2026 Email (forwarded by DNR) & Status Jan 20 DNR - Wastewater Treatment Plant on-site compliance inspection Jan 30 DNR - NOTICE OF NONCOMPLIANCE - WI Pollution Discharge Elimination System (WPDES) Permit, and Biosolids underreporting 2024-2025 Referral to Dept of Justice with potential penalties pending Feb 3 DNR – provided Inspection Report outlining the specific deficiencies of the CMOM: many sections contain template language and not tailored to Maine; need to meet 5.3.2 of WPDES permit and NR 210.23 of WI Admin Code; re-write of sewer ordinance not required but accurately reference the existing sewer ordinance. Feb 19 Pres Hoenisch formal response to DNR Feb 20 DNR – When can I expect revisions to the CMOM? I cannot designate Maine in substantial compliance until the revisions have been made. When can I expect a response to the recommended actions? Feb 25 Pres Hoenisch – response stating Utility Ordinance re-write and references to CMOM pending; winter storms prevented discussing and working on action items, will in near future March 9 BOT Meeting President’s Report: The Utility Operator had his first DNR WWTP Inspection. An inspection is required prior to the DNR renewing the Village of Maine permit…Mr. Henaman, and I met and drafted a response to the DNR’s items. Mr. Henaman corrected all of the mechanical items. Mr. Grefe and I are working on the items the DNR needs updated in Brokaw’s utility ordinance. July 30 DNR – Where are the CMOM updates? If I do not get one within the month, I will need to issue a Notice of Non-Compliance. July 30 Pres Hase – acknowledged CMOM required revisions, confirmed August 30 due date Aug 8 Hase, Henaman, Clerk Heindl, DNR Lindstrom, meet to discuss next steps. Henaman spends over 8 hours and Hase spends over 20 hours re-writing CMOM. Aug 20 Hase and Henaman complete CMOM > sent to DNR Lindstrom for review  DNR Lindstrom approves Maine’s CMOM. Maine CMOM meets permit and code requirements. Aug 21  DNR Substantial Compliance Determination Letter: A compliance inspection letter was issued on Feb 3 2026 stating the DNR found the village to not be in substantial compliance with the conditions of their WPDES permit until the required actions were completed. The CMOM submitted and accepted on Aug 20 2026 completed all required actions necessary to get the village back into substantial compliance. Judith 2. DNR Wisconsin Pollutant Discharge Elimination System (WPDES) Municipal Water Systems General Permit – Electronic Discharge Monitoring Reports (eDMR) Date Email Status July 7 DNR – WPDES Permit requires submittals of electronic discharge monitoring reports (eDMRs) to collect discharge data. Need to submit past due hydrant flushing reports from 2021 to 2025 July 19 Pres Hase requested more information of Operator Henaman regarding the WPDES Permit and reporting Aug 3 DNR Lindstrom provides Maine’s past WPDES permit Aug 15 Hase asked DNR for additional information Aug 20 DNR - All municipalities have annual reports for discharges from hydrant flushing. Those reports are due no later than January 21 of the following year. *DNR is not pursuing non- compliance but is more interested in making sure Maine is caught up Aug 20 Henaman is working on locating and uploading past hydrant flushing annual eDMR reports. New to this reporting requirement. 2021 to 2025 reports pending upload Sept 1  Henaman completes all reports Pending DNR approval 3. DNR Recycling Ordinance from Responsible Unit Recycling Program – As of July 1 2025 administrative code that oversees Responsible Unit (RU) effective recycling programs and other aspects of WI’s recycling law have been revised. An RU is a municipality tasked with planning, operating, and funding a local recycling program. Changes include RU Education, Collection Requirements, Recycling Ordinance Modifications, Haulers, and Materials Recovery Facilities. Date Email Jun 2025 DNR – recycling rule revisions sent to all municipal clerks in June 2025 Aug 26 2026 DNR – Recycling Ordinance Update Reminder - the DNR has not yet received an updated copy of the recycling ordinance Aug 28 Clerk Jamie Heindl creates the compliant recycling ordinance Sep 2 Pres Hase edits and reformats > Heindl approves >  ready for board approval Judith From: Lindstrom, Nicholas E - DNR To: Michael Henaman Cc: Village of Maine Zoning Subject: *Forwarded from Zoning*FW: CMOM Document and Recommended Actions Date: Thursday, July 30, 2026 1:45:59 PM Michael, Where are we with the CMOM updates? If I do not get one within the month I will need to issue a Notice of Noncompliance. - Nicholas Lindstrom Cell Phone: (715) 492-1787 Email: Nicholas.Lindstrom@wisconsin.gov We are committed to service excellence. Visit our survey at http://dnr.wi.gov/customersurvey to evaluate how I did. From: Betty Hoenisch <bhoenisch@villageofmaine.org> Sent: Wednesday, February 25, 2026 8:16 AM To: Lindstrom, Nicholas E - DNR <Nicholas.Lindstrom@wisconsin.gov> Cc: Michael Henaman (mhenaman@villageofmaine.org) <maineutility@gmail.com>; Rich Grefe <zoning@villageofmaine.org> Subject: RE: CMOM Document and Recommended Actions CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning Mr. Lindstrom, CMOM INFO - Maine’s Zoning Administrator Rich Grefe is working with Cedar Corp and the plan is to have them start the ordinance re-write in May 2026. The ordinance re-write would include the Utility Ordinance and necessary references to the CMOM. If this timeline is not satisfactory, please let me know because I will need to obtain Board approval to have Cedar Corp update the Utility Ordinance prior to entering into a contract for Maine’s municipal code rewrite. RECOMMENDED ACTIONS – small municipality employees and officials wear a lot of hats and the winter storms have prevented Operator Henaman and I from meeting to discuss the “Recommended Actions.” Operator Henaman and I will schedule a time to work on the “Recommended Action” responses in the near future. Judith Thank you, Betty Hoenisch From: Lindstrom, Nicholas E - DNR <Nicholas.Lindstrom@wisconsin.gov> Sent: Friday, February 20, 2026 8:41 AM To: Betty Hoenisch <bhoenisch@villageofmaine.org> Cc: Michael Henaman (mhenaman@villageofmaine.org) <maineutility@gmail.com> Subject: RE: Please discard WORD version of Maine's formal response letter Good morning Betty, When can I expect the revisions to the CMOM document? I cannot designate Maine in substantial compliance until the revisions have been made. Also when can I expect a response to the recommended actions? - Nicholas Lindstrom Cell Phone: (715) 492-1787 Email: Nicholas.Lindstrom@wisconsin.gov We are committed to service excellence. Visit our survey at http://dnr.wi.gov/customersurvey to evaluate how I did. From: Betty Hoenisch <bhoenisch@villageofmaine.org> Sent: Thursday, February 19, 2026 4:52 PM To: Lindstrom, Nicholas E - DNR <Nicholas.Lindstrom@wisconsin.gov> Cc: Michael Henaman (mhenaman@villageofmaine.org) <maineutility@gmail.com> Subject: RE: Please discard WORD version of Maine's formal response letter CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Mr. Lindstrom, I reviewed all of the attachments that Michael Henaman sent to you via email today at 2:10 p.m. I originally sent the formal response letter to Michael in WORD so he and I could make revisions if needed. I would feel more comfortable is you would discard the WORD version in Michael’s email and incorporate the attached PDF version of the formal response letter into Maine’s substantial compliance folder. Thank you – have a great evening, Betty Hoenisch From: Lindstrom, Nicholas E - DNR <Nicholas.Lindstrom@wisconsin.gov> Sent: Thursday, February 19, 2026 3:42 PM To: Michael Henaman <mhenaman@villageofmaine.org> Cc: Betty Hoenisch <bhoenisch@villageofmaine.org> Subject: RE: Formal Response to January 20th Inspection Received. I will review and get back to you if I need anything else. If everything looks good I will shoot you an email stating Maine is in substantial compliance. Nicholas Lindstrom Cell Phone: (715) 492-1787 Email: Nicholas.Lindstrom@wisconsin.gov We are committed to service excellence. Visit our survey at http://dnr.wi.gov/customersurvey to evaluate how I did. From: Michael Henaman <mhenaman@villageofmaine.org> Sent: Thursday, February 19, 2026 2:10 PM To: Lindstrom, Nicholas E - DNR <Nicholas.Lindstrom@wisconsin.gov> Cc: Betty Hoenisch <bhoenisch@villageofmaine.org> Subject: Formal Response to January 20th Inspection CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good afternoon Nick, Attached is the formal response letter from President Hoenisch along with various attachments addressing the requested actions. Please let me know if you have any questions. Thank you, Michael Henaman Village of Maine Water & Waste Water Utility mhenaman@villageofmaine.org 715-573-5607 CAPACITY, MANAGEMENT, OPERATION, & MAINTENANCE (CMOM) PROGRAM AUGUST 2026 Judith Maine CMOM 2026 Page 2 of 19 TABLE OF CONTENTS 1.0 INTRODUCTION ....................................................................................................... 3 2.0 GOALS...................................................................................................................... 3 3.0 ORGANIZATION ....................................................................................................... 4 3.1 Organizational Structure ................................................................................ 4 3.2 Job Descriptions ............................................................................................. 5 3.3 Training ........................................................................................................... 5 3.4 Public Information and Education .................................................................. 6 4.0 LEGAL AUTHORITY .................................................................................................. 6 5.0 DESIGN AND PERFORMANCE STANDARDS ............................................................. 7 5.1 Wastewater Treatment Plant ........................................................................ 8 5.2 Collection System .......................................................................................... 8 5.3 Lift Station Capacity Determination .............................................................. 8 5.4 Sewage Collection System Map .................................................................... 9 5.5 Mapping ........................................................................................................ 9 5.6 Sewer System Inspection ............................................................................ 10 6.0 OPERATION AND MAINTENANCE .......................................................................... 11 6.1 Parts and Equipment Inventory .................................................................. 11 6.2 Asset Management ..................................................................................... 12 6.3 Routine Preventive Operation .................................................................... 13 6.4 Lift Station Maintenance ............................................................................. 14 6.5 Force Mains ................................................................................................. 15 6.6 Condition Assessment ................................................................................. 15 7.0 OVERFLOW EMERGENCY RESPONSE PLAN ........................................................... 16 7.1 Response Communication ........................................................................... 16 7.2 Lift Station .................................................................................................... 16 8.0 ANNUAL REVIEW ................................................................................................... 19 LIST OF TABLES Table 1: Village Staff .......................................................................................................... 4 Table 2: System Profile ...................................................................................................... 7 Table 3: Lift Station Capacity ............................................................................................. 8 Table 4: Collection System Routine Maintenance Schedule .......................................... 11 Table 5: Collection System Response and Repair Hierarchy........................................... 13 Table 6: Condition Assessment ....................................................................................... 15 Table 7: Life Station Information .................................................................................... 17 LIST OF FIGURES Figure 1: Organizational Structure .................................................................................... 3 Figure 2: Emergency Response Flow Chart ..................................................................... 18 LIST OF ATTACHMENTS Attachment 1: Sewer Ordinance Attachment 2: Annual Wastewater Treatment Plant Review Checklist Maine CMOM 2026 Page 3 of 19 1.0 INTRODUCTION The Village of Maine is in Marathon County and part of the Wausau Metropolitan Statistical Area. The population is approximately 2,600 people . Maine was organized as a town in 1866. In December 2015, Maine voted to become a village. The village has a total area of 42.4 square miles and 83 miles of roads. The Maine Wastewater Treatment Facility directly handles wastewater for the Brokaw area, serving approximately 80 customers. The Maine Sewer Utility currently operates and maintains a sewer collection system which consists of 22,000 linear fee t of sewer mains (approximately 4.17 miles) . A USDA Rural Development investment expanded the system by adding 2,375 linear fee t of gravity sewer alongside twelve new manholes. The wastewater network serves the local Brokaw district and was heavily altered when Maine absorbed the defunct Village of Brokaw Wastewater Utility Plant. The Village of Maine Wastewater Treatment Plant is located at 90 Everest Avenue in Brokaw WI. Management of the Wastewater Treatment Plant will be a proactive endeavor so that we are able to meet the goals of this plan as well as to provide our customers with fiscally, technically , and environmentally sound operations of the system. An overview of our system along with our management approach is contained in the following sections. 2.0 GOALS The Wisconsin Department of Natural Resources (DNR) defines a CMOM plan that ensures the following general standards are met: • The sewage collection system is properly managed, operated, and always maintained • The sewage collection system provides adequate capacity to convey all peak design flows • All feasible steps are taken to eliminate excessive infiltration and inflow, cease sanitary sewer overflows and sewage treatment facility overflows , and mitigate the impact of such overflows on waters of the state, the environment, and public health • A process is in place to notify the public and other directly affected parties of any incidents of overflows from the sewerage system • Annual reports are submitted The Village of Maine has developed this Capacity, Management, Operation and Maintenance Plan to put into place the ideas, concepts and procedures to be used to prevent sewer overflows to the extent possible and practicable. The goals of the plan are: • Prevent overflows from the sanitary sewer to the extent possible • Manage the assets of the Wastewater Utility inclusive of personnel and equipment to affect a regular maintenance program and to be able to respond to emergency overflows of the system • Promote safety by verifying all workers have the required equipment prior to any work performed and keep the Public Works crew up to date with all safety procedures through continuing education classes • Prioritize maintenance, rehabilitation and replacement activities for the portions of the collection system Maine CMOM 2026 Page 4 of 19 • Complete a percentage of preventative maintenance on the collection system including, but not limited to televising, cleaning, root removal and inspections • Enforce appropriate ordinances that will help to better manage the performance of the collection system, including inspections for private sump connections and Inflow/Infiltration (I/I) reduction. Review and update these ordinances as necessary. • Work together with the Village Board to ensure there are ample funds budgeted for any projected projects on the collection system • Educate the public on the importance of an efficient collection s ystem through mailings, newsletters, brochures, and information on the Village’s website • Review CMOM annually to ensure compliance with NR 210.23, especially as it relates to notification of the public and those directly affected by any overflows, and submit annual reports according to NR 208 3.0 ORGANIZATION Persons who are responsible for implementing the CMOM program shall be identified including administration, management, and maintenance personnel or positions, lines of authority of such personnel or positions, internal and external communication responsib ilities, and the person or persons who shall report all overflow events to the department and to the public. 3.1 Organizational Structure The Village operates the wastewater collection system. The Main Utility staff includes one full - time employee who divides their time between operation and maintenance of the sewer collection system , the water works, and public works. The Village’s President and Trustees oversee the time and management of the Utilities. See Table 1 for Village Staff and Figure 1 for the Organizational Structure. Table 1 Village Staff Title Name Email Phone President Judith Hase jhase@villageofmaine.org (715) 675-5067 Trustee Dan Brandenburg dbrandenburg@villageofmaine.org Trustee Bruce Reynolds breynolds@villageofmaine.org Trustee Wayne Schoepke wschoepke@villageofmaine.org Trustee Ben Seidler bseidler@villageofmaine.org Utility Operator Michael Henaman mhenaman@villageofmaine.org (715) 573-5607 Clerk/Treasurer Jamie Heindl clerk@villageofmaine.org (715) 675-5607 Public Works Nathan Fitzke nfitzk81@yahoo.com Contractor Jesse Hass jhass@wrwa.org (920) 470-2963 Figure 1 Organizational Structure: Village President Board of Trustees Clerk/Treasurer Utility Operator Public Works Foreman Maine CMOM 2026 Page 5 of 19 3.2 Job Descriptions The Village President and Village Trustees form the governing Village Board. The President acts as the manager and meeting chair, while Trustees serve as members of the legislative body. Together, they pass local laws, approve budgets, and oversee municipal operations. The Utility Operator is the d esignated person responsible for officially notifying the Wisconsin DNR, Village leadership, and the public if a Sanitary Sewer Overflow (SSO) or emergency event occurs. The Utility Operator is responsible for the system maintenance and oversees the sewer cleaning, televising, and manhole inspections; completes regulatory reporting and documents system information for the annual DNR Compliance Annual Report (CMAR); implements the Overflow Emergency Response Plan (OERP) to prevent and manage SSOs; evaluates and manages peak flows, system bottlenecks, and groundwater infiltration; inputs field data into GIS software to track asset condition and maintenance histories; and coordinates lift station maintenance. The Village Clerk manages daily municipal operations and is a key local government official who manages municipal record-keeping, administrative tasks, and public finances. This combined role handles official board proceedings, local elections, license iss uances, budget preparation, tax collection, and fund accounting under state statutes and board policies. The Village Public Works Foreman is a first -level supervisory and working role that directs daily field operations, maintains local infrastructure like roads, parks, and utilities, operates heavy equipment, and manages public works crews to ensure community safety and service delivery. Contract support includes a wastewater technician/trainer that assists as needed. 3.3 Training The Village of Maine ensures municipal utility personnel have the knowledge and technical skills to manage wastewater collection systems efficiently, prevent sanitary SSOs, and comply with environmental standards . Each employee is required to periodically attend safety training courses. Training may be in the form of formal off -site or on -site training, on -the-job training, college/vocational course work or other appropriate venue. Certified Operators are required t o obtain continuing education units for his/her license. Required Training: • Technical training in sewer cleaning, closed-circuit television (CCTV) inspection, and lift station maintenance • Essential safety protocols including Confined Space Entry, Lockout/Tagout (LOTO), excavation safety, and traffic control • Emergency Overflow Response training on how to rapidly diagnose, mitigate, and report SSOs or basement backups • Fats, Oils, and Grease (FOG) inspections and public education strategies to minimize pipeline blockages • Data Management & Auditing training on tracking standard operating procedures (SOPs), recordkeeping, and completing the annual CMAR Maine CMOM 2026 Page 6 of 19 • Within the first three months of employment, utility personnel are required to attend a course in lock out/tag out and confined space entry • Routine line maintenance – jet cleaning • Environmental/safety regulations • Pump theory, operation including speed control, and maintenance • Laboratory procedures, equipment calibration, sample collection and handling • Electrical and instrumentation training • Sewer overflow response and reporting • Collection system evaluation including smoke testing and CCTV • Pipe repair • Collection system rehabilitation including pipe bursting, cured in place, slip lining, and trenching/shoring • Heavy equipment operation • Wastewater System Operations and Maintenance The operating budget shall contain a line item sufficient to provide a mix of on and off -site training such that each employee can obtain professional/trades development training annually inclusive of continuing education needed for license requirements. T he line -item funding will include course costs, travel, lodging and meals , and incidental expenses consistent with typical costs for the location. 3.4 Public Information and Education The public has a direct impact on the condition and maintenance of the collection system. The Village of Maine makes every effort to educate the public through postings on the website, spring and fall newsletters, and educational brochures inserted in thei r utility bills. The bi -annual newsletters will instruct residential and commercial kitchens never to pour grease down the drain, which solidifies and causes severe blockages; educate the public that items labeled as "flushable" wipes do not break down and must be thrown in the trash; educate the public to never flush sanitary napkins down the toilet and when flushed, they expand and cause severe sewer backups; and instruct homeowners against illegally connecting sump pumps, roof downspouts, or foundation d rains to the sanitary sewer system, which overloads wastewater plants during heavy rains. The village will notify affected customers prior to any scheduled maintenance work with the distribution of notices and/or on -site conversations. The Village offers information to help residents understand why basement backups happen, how they can be prevented and what steps citizens should take if a sewer backup affects their property. 4.0 LEGAL AUTHORITY Legal authority consists of the Village codes and ordinances and the enforcement of codes and ordinances. The Village of Maine has taken steps to enforce the legal authority necessary to regulate the flow entering the collection system from residential, commercial and industrial customers by passing Ordinance Chapter 10.2.020 Sanity Sewers in September 2015 that ensures oversight and control as necessary. See Attachment 1 for the Sewer Ordinance. A summary of steps follows: Maine CMOM 2026 Page 7 of 19 1) Inflow/Infiltration – No person shall discharge or cause to be discharged, any unpolluted waters, such as storm water, ground water, roof runoff, subsurface drainage or cooling water to any sewer. Chapter 10.2.020. 2) New Sewer Design, Installation – The property owner is responsible for all costs and expenses for the installation and connection of new sewer laterals where available. The size, slope, alignment and materials of construction of any new sewer lateral, along with the methods to be used i n excavating, placement of the pipe, jointing, testing and backfilling the trench shall all conform to the requirements of the building and plumbing code, or applicable rules and regulations of the Village of Maine. New connections to the system shall not be allowed unless all downstream components have a reserve capable of accepting them. Chapter 10.2.050 (E). 3) Inspection and Testing - The collection system operator, or other duly authorized employee of the village bearing proper credentials and identification, shall be permitted to enter all properties for the purpose of inspection, observation and testing, in accordance with the provisions of this chapter and state laws. Chapter 10.2.040. 4) Utility Access – The Village of Maine shall be permitted to have an authorized representative inspect any new or old installations for compliance. Chapter 10.1.200. 5) Pretreatment Program – Pretreatment is required to modify or eliminate wastes that are harmful to the structures, processes or operation of the wastewater treatment facility. This shall be done at his or her expense. Chapter 10.2.030 (H). 6) Grease Controls – Grease, oil and sand interceptors shall be provided when, in the opinion of the approving authority, they are necessary. All interceptors shall be of a type and capacity approved by state plumbing code and shall be located for easy access for cleaning and inspection. The owner is responsible for removal of the captured material and maintaining all cleaning records. Chapter 10.2.020 (5c). 7) Violations & Penalties – A Written Notice of Violation will be served to persons violating the ordinance, stating the nature of the violation and providing a reasonable time for the satisfactory correction thereof. Continuance of any violation will result in forfeiture of an amount according to a fee schedule adopted by the Village Board together with the costs of prosecution. Chapter 10.2.080 (c). 5.0 DESIGN AND PERFORMANCE STANDARDS The Village of Maine sanitary sewer system consists of gravity and forced main components. The system is not interconnected with other sanitary collection systems. Maps of the system are maintained by the utility at 90 Everest Ave. See Table 2 for the System Profile. Table 2 System Profile Office Address 6111 N 44th Avenue, Wausau WI 54401 Population 2636 in Maine, there are 81 utility customers Annual Precipitation Approximately 33 inches per year Utility Operator Michael Henaman mhenaman@villageofmaine.org (715) 573-5607 WWTP Permit WPDES Permit# WI-0022136-10-0 Upgrade Modifications None Maine CMOM 2026 Page 8 of 19 Plant Design Capacity 0.45 MGD Avg Daily Wastewater Volume 0.020 MGD Feet of Gravity Sewers 18,137.8 feet Feet of Force Mains 936.2 feet Number of Lift Stations 1 Number of Manholes 70 5.1 Wastewater Treatment Plant The Village of Maine Wastewater Treatment Plant is located at 90 Everest Ave, on approximately 2.27 acres. All wastewater from the Village enters the WWTF through an 8” main. 5.2 Collection System Capacities within the collection system vary by the size of the piping that makes up the system. It is important to determine capacities within the collection system to gauge whether portions are subject to surcharge and overflows and to develop a baseline from which planning decisions regarding new connections may be made. Even if the treatment plant flows within the design capacity, portions of the collection system could be receiving more flows than their design capacities. Some items that may affect sew er capacity are debris (solids, grease), root growth, I/I, new connections . The Lift Station Evaluation shows the collection system is in fairly good condition. 5.3 Lift Station Capacity Determination The concept of capacity for a wastewater system has two basic elements : the capacity of the wastewater plant and the capacity of the collection system. Inflow/infiltration and growth can result in wastewater flows exceeding the design capacity of either the plant or collection system or both. Existing flows were determined on a sewer district basis using the number of units within the sewer district and area wastewater flow rates for various types of land use. Land uses and population projections were used to determine future flows. Peak flows were used as a basis for evaluating the existing sewer system and lift stations. In developed areas, peak flows were compared with the system capacities to identify those facilities that might be undersized at ultimate development. Each service area was a nalyzed independently. Of the one existing lift station, all have adequate capacity today to handle ultimate flows. All design standards for the Village of Maine follow State of WI Plumbing Code, Municipal code, and DNR code for sewer design work, municipal sewer inspections or for construction design and inspections. See Table 3 for the Lift Station Capacity. Table 3 Lift Station Capacity Lift Station Peak Capacity Estimate Firm Capacity* 1 460 GPM 230 GPM *Firm Capacity assumes one pump running. Maine CMOM 2026 Page 9 of 19 5.4 Sewage Collection System Map . The map below shows the layout, force mains, manholes, lift station, and flow direction. 5.5 Mapping The importance of maintaining accurate, current maps of the collection system cannot be overstated. Efficient collection system maintenance repairs are unlikely if mapping is not adequate. Collection system maps should clearly indicate the information that personnel need to carry out their assignments. The collection system maps contain information on the following: • Sewer gravity mains • Building/house laterals (where available) • Manholes • Cleanouts • Force mains • Lift station • Service area boundaries • Other landmarks (roads, water bodies, etc.) • Aerial overlay The collection system maps have a permanently assigned numbering system which uniquely identifies all elements of the collection system. The maps are simple and easy to understand. Easements and property lines are also included on the maps. Other information included on the maps is a scale, north arrow, date the map was drafted and the date of the last revision. Maine CMOM 2026 Page 10 of 19 Geographic Information System (GIS) technology has made the mapping and map updating process considerably more efficient. Village office and field personnel can easily view all attributes of each component of the collection system. These include, but are not limited to: • Sewer Pipe Material and Diameter • Sewer Pipe Length, Slope and Direction of Flow • Sewer Pipe Televising Dates and Information • Manhole Rim and Invert Elevations • Construction History of Sewer Pipes, Manholes and Lift Stations • Maintenance History of Sewer Pipes, Manholes and Lift Stations • Note of any critical areas pertaining to Basement Backups or Inflow/Infiltration Specific procedures have been established for correction of errors and updating maps and drawings. Field personnel are trained to recognize discrepancies between field conditions and map data so that office personnel can make the changes necessary to corre ct the existing mapping system. As -built plans are also used to update the maps. These new components are also field verified with GPS equipment using the same County coordinates. The maps are available to both office and field personnel. 5.6 Sewer System Inspection Visual inspection of manholes and pipelines are the first line of defense in the identification of existing or potential problem areas. Visual inspections take place on both a scheduled basis and as part of any preventative or corrective maintenance activi ty. Visual inspections provide additional information concerning the accuracy of system mapping, the presence and degree of I/I problems and the physical state -of-repair of the system. By observing the manhole directly and the incoming and outgoing lines, it is possible to determine structural condition, the presence of roots, condition of joints, depth of debris in the line and depth of flow. An examination of the records of visual inspections ensures the following information is recorded: • Manhole identification number location • Cracks or breaks in the manhole or pipe • Accumulation of grease, debris or grit • Wastewater flow characteristics • Inflow or Infiltration • Condition of manhole cover • Presence of corrosion • Offsets or misalignments • Condition of the frame • Evidence of surcharge • Atmospheric hazard measurements (hydrogen sulfide) Close circuit television analysis of the interior of sewer lines is one of the most comprehensive evaluation methods available as it allows surveying the interior conditions of a pipe. Areas of the sewer system that are experiencing frequent blockages and/ or I/I should be analyzed by CCTV analysis to determine the cause of the problems. Tree roots, misaligned joints, saddles, and Maine CMOM 2026 Page 11 of 19 collapses are common reasons for blockages to occur as grease and other materials begin to accumulate in these areas. Likewise, cracks, joint problems and illegal connections can be identified with the aid of television inspection. CCTV inspection of the sewer system will be utilized in areas with know n and repeat problems to diagnose the cause(s) of the problems. All sewer mains are televised on a 3-year frequency. 6.0 OPERATION AND MAINTENANCE Collection system operation and maintenance (O&M) consist of inspection, evaluation, preventative maintenance, and cleaning of sewer main and laterals, manholes and lift stations to maintain flow and mitigate inflow and infiltration. O&M varies by the equipment type, condition, age and operating history, with equipment identified as critical receiving maintenance at greater frequencies. Periodic factors may necessitate a more frequent O&M schedule for individual components. Appropriate corrective actions or temporary mitigation measures are initiated based upon the findings of the routine O&M activities. The Village of Maine cleans the sanitary sewer per the routine maintenance schedule using a contracted Vactor Truck and portable tanker trailer for flushing. All sewer cleaning records are kept on file at the WWTP Office and are also used for updating the Village’s GIS mapping system. The records include date, time, crew members, manhole or Lift Station ID#, type of work performed, cause and location of any stoppage, method of cleaning, length of sewer main cleaned, televised or repaired, or any further actions necessary. The Village of Maine increased sewer line cleaning to 33 percent/year to ensure the sewer-line is being properly maintained. See Table 4 for the Collection System Routine Maintenance Schedule. Table 4 Collection System Routine Maintenance Schedule Description Known Issues Weekly Annually Master Lift Station Grease build- up and rags Visual check for general condition, grease buildup, floats, transducers. Test pumps, alarm system, generator Remove pumps for inspection and clean master lift with Vactor Truck Remainder of collection system No known problems Visual check for general condition, grease buildup, floats, transducers. Test pumps, alarm system, generator Visual check for general condition and overflow evidence, clean 33% of the collection system and televise any areas with suspected problems 6.1 Parts and Equipment Inventory . To perform routine operations and maintenance, respond to emergencies and prevent sanitary sewer overflows, it is critical to have adequate equipment. The inventory is based on equipment manufacturer’s recommendations, supplemented by historical experience with maintenance and equipment problems. Files for the Village’s inventory of parts are maintained at the WWTP Office. Below is a current list of equipment located at the Village Public Works Garage: (1) Portable Trash Pump (1) Portable Centrifugal Pump Maine CMOM 2026 Page 12 of 19 (2) Portable Generators (1) Loader (3) Dump Trucks (1) Pick-up Truck w/Warning Lights & Hand Tools (1) 20’ Equipment Trailer (1) Hot Water Pressure Washer (1) Skid steer w/Snow Blower, Broom, and Bucket (1) Line Locators (1) Portable Spotlight (4) Extension Cords (1) First Aid Kits (4) Fire Extinguishers Personal Safety Equipment Barricades & Flashers Various sizes and lengths of Hoses for Pumps Various Fire Hoses with fittings and adapters 6.2 Asset Management The assets of the Village of Maine sanitary sewer system include the collection system, lift station, Wastewater Treatment Plant, generators, vehicles, office and laboratory facilities and all related appurtenances. Both paper and computer -based records fo r these assets are located at the WWTP office. The Village addresses asset management to maintain infrastructure, evaluate equipment condition, and budget for long -term repair or replacement by taking the following steps: • Create a complete list of all collection systems and treatment plant parts • Maintain preventive maintenance and inspection schedules • Track repair time and cost • Rank assets by age, condition, failure history, and replacement costs • Budget for a repair schedule and financial reserve plan • Review performance annually through CMAR financial and collection system sections The ability of the Village of Maine to effectively manage its collection system is directly related to its ability to maintain access to the most current information concerning the facilities. Maintenance of this current information is an effort involving all members of the collection system - from staff answering the telephone to workers in the street. Operational information informs and clarifies financial information. This will make the financial information more useful for the policy makers, leading to better decisions. The system should be kept current with accurate information. A satisfactory management information system will supply the Village with the following advantages: • Maintain preventive maintenance and inspection schedules • Offer budgetary justification • Track repairs • Organize capital replacement plans Maine CMOM 2026 Page 13 of 19 • Manage tool and equipment inventories • Record customer service inquiries, complaints or requests • Provide measurement of effectiveness of program and O&M activities 6.3 Routine Preventive Operation Critical components are parts of the collection system which if failure occurs will result in system failure and sewer overflow. Such items may include failure of a pump, failure of a backup generator to start, or obstruction in the sewer line. Other probl ems identified by maintenance activities will be less acute and can be repaired on a lower priority basis. This may include loose or missing manhole bricks, broken manhole covers, lift station lighting, etc. The response time is a requirement for the Village of Maine to complete. Not meeting the required response time will be considered a failure on the part of the system to meet the requirements of this plan. The repair time goal is a stated goal. Many factors, some out of control of the system, will impact the ability of the system to make the necessary repairs. Not meeting the repair goals will not be considered a plan failure but will be noted in self -audits from which plan and or operational changes may be fashioned. Routine maintenance will identify repair needs within system components. The appropriate repair for any given problem is dependent upon the nature of the problem and cannot be prescribed in this plan. However, a priority hierarchy has been established to structure what and when repairs are to be accomplished. The hierarchy is based upon identifying and repairing critical components first. When normal maintenance activities identify the need for component repairs or when problems are brought to the attention of the system by customers or others, the problem and corresponding repair will be assigned a priority ranking . See Table 5 for the Collection System Response and Repair Hierarchy. Table 5 Collection System Response and Repair Hierarchy: Problem Priority Response Time Action Repair Time Goal Active Sewer Overflow 1 Within 1 hour of receiving report Stop overflow, return system to normal operation Within 4 hours of arriving on site Failure of Critical Component, Overflow/Bypass Will Occur if Not Repaired 1 Within 1 hour of receiving report or discovering problem Repair or replace component, return system to normal operation Within 4 hours of arriving on site Unsafe Condition Poses Risk to public or Employees 1 Within 1 hour of receiving report or discovering problem Mitigate and repair to eliminate unsafe condition Mitigate risk within 2 hours of arriving on site, repair within 8 hours if public risk, 7 days if employee risk Evidence of System Surcharging and Intermittent Overflow 2 Within 1 day of receiving report of discovering problem Clean sewer line, check for proper lift station operation. Re-evaluate problem following cleaning/repair. Begin I&I Within 8 hours of arriving on site for cleaning and station repairs. Initiate I&I evaluation and Maine CMOM 2026 Page 14 of 19 evaluation and corrections if not corrected. corrective actions within 30 days Failure of Backup Power System 2 Within 3 days of receiving report or discovering problem Repair or replace equipment as needed. Within 10 days of response Evidence of Surcharging, No Overflow Evidence 3 Within 1 week of receiving report or discovering problem Clean sewer line, check for proper lift station operation. Re-evaluate problem following cleaning/repair. Begin I&I evaluation and corrections if not corrected. Within 8 hours of arriving on site for cleaning and station repairs. I&I evaluation and corrective actions within 180 days Failure of Monitoring or Measuring Equipment 3 Within 3 days of receiving report of discovering problem Make repairs or replace as needed Repairs within 7 days of response. Replacement within 30 days. Evidence of I&I Non- surcharging 4 Complete evaluation of cause within 90 days of problem Make corrective actions based on I&I evaluation findings Within 360 days Component failures non-critical maintenance 5 Evaluate repair need within 180 days of discovering problem Make repairs Within 360 days In general, the collection system meets the needs of the Village of Maine. Grease and grease-like products can be significant contributors of sewer overflows. The lift station within our system is closely monitored and cleaned annually to prevent the buildup of grease. All users are discouraged from discharging fats, oils, greases and all copper -based products. Educational material is available at the Village Hall. The discharge of fats, oils and grease (FOG) are regulated by Village Ordinance Chapter # 10.2.020-10.2.030. The system has one lift station to move sewage from low elevation areas to higher elevation areas. Periodic loss of power may occur due to storms and electrical grid equipment failures. The Village’s lift station and the Treatment Plant are monitored with either a SCADA Alarm System or an on-site light and alarm. The Lift Stations all have back-up power available. Therefore, none of the lift stations are considered critical components due to a lack of backup power. 6.4 Lift Station Maintenance All Lift Station equipment is to be maintained in accordance with the manufacturer’s specifications. A team from a licensed sewer cleaning service inspects and cleans the Lift Station on an annual basis to ensure it is in good working condition. The Villag e is provided a copy of their maintenance reports. Specification manuals for each of the Lift Station pumps are in the respective electrical panels. The following maintenance activities are conducted by utility personnel monthly: • Inspect the Level Sensing Floats • Inspect Transducer Maine CMOM 2026 Page 15 of 19 • Inspect for Grease Buildup • Test the Pumps • Test Alarm System • Hookup and run generator under load (annually) 6.5 Force Mains Utility personnel run both pumps simultaneously on a weekly basis at all Lift Stations to scour the sewer force mains. Procedures such as poly pigging, televising, etc. will be considered as needed. Reports will be submitted to the DNR for the sewage collection system that details the location of the lift station, force main, and its downstream discharge point as well as the capacity analysis showing that the downstream gravity sewer system can adequately handle the pressurized flow from the force main. 6.6 Condition Assessment The condition of an asset is dependent upon several factors including its overall condition, maintenance requirements, whether it is over or under capacity for its intended service, and how well the asset is performing the job it was designed to perform. All these factors are subjective in nature, so the condition assessment is meant to be an estimate and not an exact analysis. Following are the assessment criteria that the Village w ill use to assess the condition of the utility’s assets. See Table 6 for Condition Assessment. Table 6 Condition Assessment Performance Assessment 0 New 1 Excellent No failures, no I/I 2 Good Rare failure, minor infiltration, no inflow 3 Average Failures typical of equipment, infiltration exceeds design, minor inflow 4 Poor Frequent failures, substantial I/I but no overflows 5 Salvage Needs substantial maintenance to keep operational, overflows occur Capacity Assessment 0 Oversized +25 Meets current need plus more than 25% 1 Oversized <25% Meets current need plus up to 25% more 2 Full sized Meets current need 3 Undersized Current need exceeds capability but able to control through operational means 4 Undersized <25% Current need exceeds capability by up to 25%, can’t control 5 Undersized +25% Current need exceeds capability by more than 25%, can’t control Non-PM Maintenance Assessment 0 None No non-PM maintenance requirements 1 Normal Normal requirements 2 Minor More than normal but not significant 3 Significant Requires frequent maintenance Maine CMOM 2026 Page 16 of 19 4 Renew Substantial including frequent component 5 Replace Nearly unserviceable Non-PM excludes routine items such as greasing, cleaning, oil changes or other consumable part replacements at normal intervals Total Score 0 New or like new 1-3 Excellent 4-6 Good 7-9 Average 10-12 Poor Any Component score of 5 Replace 7.0 OVERFLOW EMERGENCY RESPONSE PLAN An Overflow Emergency Response Plan is required for dealing with both routine and catastrophic emergencies. Routine emergencies include situations such as overflowing manholes, sewer main breaks, localized electrical failure and power outages at Lift Stati ons. Catastrophic emergencies include floods, tornadoes, earthquakes, other natural events, serious chemical spills or widespread electrical failure. Procedures for the Emergency Response Plan should be understood and practiced by all personnel to ensure safety of the public and the collection system personnel responding. The Plan is in the Wastewater Utility Office at 90 Everest Ave, Brokaw WI and Village Hall at 6111 N. 44th Avenue, Wausau WI . The Village President and the Operator in Charge shall review and update this document annually. Detailed records of emergencies and responses are documented. 7.1 Response Communication The Village of Maine, per Wisconsin Administrative Code NR 210.23, will establish standards to safely manage, mitigate, and report Sanitary Sewer Overflows (SSOs) and basement backups. The Operator in Charge will verbally notify the WI DNR within 24 hours of discovering an SSO. Affected public areas will be closed off, warning signs will be posted, and an alert will be broadcast from the village website to affected residents if drinking water or recreational waters are impacted. A rapid containment measure to limit the volume of the discharge, stop the overflow, and prevent raw sewage from entering storm sewers or surface waters will be conducted by first locating the source of the SSO. The Operator in Charge will initiate c lean-up and disinfection procedures for removing debris, vacuuming spilled wastewater, and applying lime or other disinfectants to the affected soil or pavement . As soon as the SSO is contained, an all-clear announcement will be communicated to the affected residents via a website alert. Within five days, a written report will be submitted to the DNR Regulatory contact personnel. 7.2 Lift Station in Emergency The Lift Station is equipped with two submersible pumps. In the case of a complete Village-wide electrical outage, portable pumping by Village personnel and private waste haulers as well as Maine CMOM 2026 Page 17 of 19 non-use of the low flow Lift Stations would accommodate the system’s needs on a temporary basis. During an emergency, Lift Station #1 will be powered by a portable generator. In the event of two pump failures a local septic hauler will be contacted to shuttle wastewater to the treatment plant. The Village of Maine has taken steps towards the security of the collection system by installing a SCADA Alarm System. See Table 7 Lift Station Design Information. Table 7 Lift Station Design Information Lift Station Location Year Constructed Backup Power Alarm System 1 400 Everest Ave 2021 Portable Generator SCADA Onsite Alarm and Light The following flow chart describes the actions that will be taken in the event of an overflow of the collection system. See Figure 2 for the Emergency Response Flow Chart. Maine CMOM 2026 Page 18 of 19 Figu Annual Wastewater Treatment Plant Review Checklist Plant: ______________________________ Review Year: __________ Date Completed: _____________________ Completed By: _______________________ 1. Regulatory & Compliance • Review current Wisconsin DNR wastewater permit • Verify all permit limits and monitoring requirements • Review previous year's DMRs • Review any permit violations or exceedances • Review corrective actions from previous violations • Verify required sampling frequency is being met • Verify laboratory certifications and analytical methods • Review chain-of-custody records • Verify sampling locations are clearly identified • Review flow measurement records • Review influent and effluent monitoring data • Review biosolids/sludge reporting requirements • Verify required inspections and records are current • Review correspondence with regulatory agencies • Verify required annual reports have been submitted Notes: Annual Wastewater Treatment Plant Review Checklist Plant: ______________________________ Review Year: __________ Date Completed: _____________________ Completed By: _______________________ 1. Regulatory & Compliance OIC: Michael Henaman 715-573-5607 Village President: Judith Hase 715-393-9137 Village Hall: 715-675-5607 Local Emergency: 911 Figure 2: Emergency Response Flow Chart Maine CMOM 2026 Page 19 of 19 8.0 ANNUAL REVIEW The Village of Maine shall review this CMOM annually (prior to submittal of the CMAR) to ensure all the components are implemented, evaluated, and updated as needed. The Village of Maine will conduct an Annual Self-Audit based on the CMOM Program Self-Assessment Checklist to evaluate performance, track trends, and prevent SSOs. The Village will track these core requirements: • System Performance Metrics - Quantifying the total number of yearly SSOs • Maintenance Activity Tracking - Auditing sewer cleaning percentages, lift station checks, and manhole inspections • Infiltration and Inflow (I/I) - Reviewing flow monitoring data and analyzing wet-weather trends • Overflow Emergency Response - Verifying response logs, site-specific measures, and notification protocols are up to date • Financial and Budget Audits - Documenting capital improvement plans, resource allocations, and O&M cost centers • Legal Authority Controls - Ensuring local sewer use ordinances adequately enforced • Program Updates - Formally log changes to operational objectives or asset management strategies over the past 12 months The Annual Review Checklist shall be used for this process. See Attachment 2. Judith Hase, Village President Village of Maine 6111 N 44th ave Wausau, WI 54401 Subject: Substantial Compliance Determination WPDES Permit No: WI-0022136-10-0 Ms. Hase, A compliance inspection letter was issued on February 03, 2026 stating that the Wisconsin Department of Natural resources found the village to not be in substantial compliance with the conditions of their WPDES permit until the required actions were completed. The CMOM was submitted and accepted on August 20, 2026 which completed all the required actions necessary to get the village back into substantial compliance. Thank you for working with the department on completing all required actions. Sincerely, Nicholas Lindstrom, WIDNR-Wastewater Engineer State of Wisconsin DEPARTMENT OF NATURAL RESOURCES 101 S. Webster Street Box 7921 Madison WI 53707-7921 dnr.wi.gov wisconsin.gov Judith

Source: Village of Maine website. First collected Oct 17, 2026.