Plan and Review Commission — Minutes
Town of Spider Lake · Sawyer County · Plan and Review Commission · meeting of Jan 2, 2025 · Minutes
Open the original document More from Town of Spider Lake
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Spider Lake
Plan and Review Commission Meeting MINUTES
January 2, 2025 at 6:00 pm and by Zoom
MINUTES
1. The meeting was called to order by Chair Delaney at 6:00pm.
PRESENT: Chair Delaney, Commissioners: Sheldon, Becker, Smith (Zoom), and
Haueter (Zoom). Zoning Administrator Mike Gardner was also in attendance.
2. Becker moved to approve the agenda; Smith seconded by. Motion carried.
3. Becker moved to approve the Minutes of the December 4, 2024 P&RC Meeting;
seconded by Haueter. Motion carried.
4. Zoning Administrator’s Report. The month has not been overly busy. Inquiries are
increasingly complex and require additional time. Regarding the North Star Camp
permit status, the State has reviewed and issued permits. The Town has requested that
these permits be included in the Town LUP application package.
a. 2024 Year-End Permit Summary – number and types of permits seem
consistent over the years. Highest total valuation in 2025. 2023 has highest
accessories buildings (24), largely due to snow load collapses. Chair Delaney
will verify the 2020 valuation numbers.
b. Permit applications
i. LUP 25-01 - T-Mobile Cell Tower Modifications – Requesting equipment
upgrades, with no change in height. Removing 5 pieces of equipment
Smith moved to approve permit Fullerton Engineering to
add/remove equipment on tower; seconded by Becker. Motion carried.
ii. LUP 25-02 – Nelson – Accessory structure -Becker moved to approve
LUP; seconded by Sheldon. Motion carried.
iii. DM 25-01 - Bay Ridge24 LLC - demolition of three structures. Sheldon
moved to approve the demolition permit; Smith seconds. Motion
carried.
c. Notices and anticipated activity – ZA Gardner attended a conference on
wetlands. Very informative; introductory but useful, and a great refresher. He will
attempt to compile and circulate a list of some of the resource materials
provided
5. Comprehensive Plan Update – Review of Plan Draft REV05
a. Text and Recommended Edits
b. Implementation Plan - Discussion
c. Timeline, Milestones and Next Steps – Information and Discussion
DISCUSSION ON COMPREHENSIVE PLAN
Differing views from the Commission on whether the document ‘flows’ well. It would
benefit from a single reader to remove some of the clauses that provide a lot of
detail. Majority felt it was useful to have extra detail if the Intro and Exec Summary
was all that was read. Smith: The Introduction and Executive Summary has the
task of summarizing the 85-page document in 8-10 pages.
Shifted to discuss the implementation plan specifically. Generally agreed to
segregate and highlight the action items to be considered in 2025-2026. All other
Town of Spider Lake
Plan and Review Commission Meeting MINUTES
January 2, 2025 at 6:00 pm and by Zoom
action items that are labeled as “ongoing” should remain and be considered in later
years to be focused on.
February 19, 2025 is the proposed public hearing date, and the draft document will
be available for public review for 30 days. Notice will appear in the Jan 15, 2025
Sawyer County Record.
6. Any other business that may come before the Commission for Discussion. No items
were raised.
7. Sheldon moved to adjourned; seconded by Smith. Motion carried.
Respectfully Submitted,
Tim Sheldon, Vice Chair, Plan & Review Commission
January 3, 2025
Source: Town of Spider Lake website. First collected Oct 18, 2026.