Village Board — Agenda Packet
Village of Germantown · Washington County · Village Board · meeting of May 18, 2026 · Agenda packets
Open the original document More from Village of Germantown
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MEETING: REGULAR MEETING OF THE VILLAGE BOARD
DATE & TIME: Monday, May 18, 2026 at 7:00 PM
LOCATION: Germantown Village Hall Board Room
N112 W17001 Mequon Road
Any member of the body and/or citizen may attend the meeting virtually through the WebEx platform, Meeting #:2551 746 8900 Password:
RGfHMePh684 which can be accessed by phone at 408-418-9388 or by clicking the link
below: https://villageofgermantown.my.webex.com/villageofgermantown.my/j.php?MTID=mbac09c1bf
900c82b3d4fd86d044402dc
Citizens not wishing to attend the meeting personally or virtually may submit any public comments by sending an email to
comments@germantownwi.gov by 4 p.m. on the day of the meeting so that it can be provided to the members of the body for their
consideration. Previously recorded VillageBoard Meeting Videos can be viewed at:
https://www.youtube.com/channel/UCOYp0EgELzTCa9X_iCohyhQ
AGENDA
I. CALL TO ORDER: This meeting has been given public notice in accordance with
Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public
and news media of subject matter that is intended for consideration and action.
II. ROLL CALL:
III. PLEDGE OF ALLEGIANCE / MOMENT OF SILENCE:
IV. PRESIDENT’S REPORT:
V. ANNOUNCEMENTS OF FORTHCOMING EVENTS OF PUBLIC INTEREST /
COMMITTEE AND DEPARTMENT REPORTS:
VI. CITIZEN INPUT: (Please be advised per 19.84(2) that information and comment will
be received from the public. It is the policy of this municipality that public input be
limited to a four (4) minute period per person with a time extension granted at the
discretion of the Chairperson. Be advised that there may be limited discussion of the
information received but no action will be taken under public comments.) Comments
that may be injurious to village personnel or other individuals will not be allowed.
VII. CONSENT AGENDA:
A. Meeting Minutes: May 4, 2026 (ACTION)
B. One-Time/Special Event Outside Premise Extension Application for Metro
Cigars, N102W19455 Willow Creek Way - June 7, 2026 12pm-5pm (ACTION)
C. Temporary Class "B" Beer/"Class B" Wine Application for Post One Inc, 4th of
July Celebration - July 4, 2026 (ACTION)
D. Temporary Class "B" Beer/"Class B" Wine Application for Kiwanis of
Germantown, Taste of Germantown - July 23, 2026 (ACTION)
E. Application for Fireworks Permit for July 4, 2026, by Parks & Recreation
Director Guilford Standridge (ACTION)
F. Cardiac Monitor Repair Warranty / Service Contract (ACTION)
Page 1 of 167
VILLAGE BOARD AGENDA
May 18, 2026
Page 2
G. Award of Contract for Construction Manager At-Risk services for the Fire
Station Remodeling Project to CG Schmidt in an amount not to exceed
$817,037 plus a 10% contingency. (ACTION)
H. Well 7 Liner Installation and Contract Extension #1 with CTW in the amount of
$136,555.00. (ACTION)
I. Award of professional services agreement to Foth in the amount of $34,000.00
for Well 7 liner installation and pump replacement professional services.
(ACTION)
J. A Resolution Approving a Relocation Order – Division Road Reconstruction
Project (ACTION)
K. A Resolution Approving a Relocation Order — Pleasant View Drive
Reconstruction Project. (ACTION)
L. Award Contract to Stark Pavement Corp. in the amount not to exceed
$595,719.50 plus a 10% contingency for the 2026 Road Program - Heritage
Hills Reconstruction. (ACTION)
M. Award Contract to Payne & Dolan, Inc. in the amount not to exceed $1,105,237
plus a 10% contingency for the 2026 Road Program - Esquire Estates
Reconstruction (ACTION)
N. Award Contract to Harwood Engineering for Engineering Services - Site Plan
Reviews on a time and materials basis in an amount not to exceed $15,000
(ACTION)
O. Award Contract to Point Land Surveying for Pioneer Road Survey (ACTION)
P. Agreement with WisDOT for STH 145 Improvements (ACTION)
Q. Authorization to Purchase a 6” emergency bypass pump from Thompson Pump
for the amount not to exceed $53,300. (ACTION)
VIII. UNFINISHED BUSINESS:
IX. PUBLIC HEARINGS:
X. NEW BUSINESS:
A. Request to Amend Operating Budget to Fund Additional Turf Maintenance
Costs. (ACTION)
B. Request to Update the List of Authorized Signers for Bank Documentation
(ACTION)
C. Professional Services Agreement with Innovative Public Advisors LLC for the
provision of interim Finance Director staffing. (ACTION)
D. Request for Potential TID Incentive for a Prospective Tenant in the Gateway
Corporate Park (TID 8) and Establishing a Policy for Handling Future Requests.
The Village Board may convene into closed session pursuant to Wis. Stat. §
19.85(1)(e) for the purpose of deliberating or negotiating the purchasing of
public properties, the investing of public funds, or conducting other specified
public business, whenever competitive or bargaining reasons require a closed
session and then may reconvene in open session to take such action as it
deems appropriate. (ACTION)
Page 2 of 167
VILLAGE BOARD AGENDA
May 18, 2026
Page 3
E. Village Administrator Vacancy. The Village Board may convene into closed
session pursuant to Wis. Stat. § 19.85(1)(c) for the purpose of considering
employment, promotion, compensation or performance evaluation data of any
public employee over which the governmental body has jurisdiction or exercises
responsibility and then may reconvene in open session to take such action as it
deems appropriate. (ACTION)
F. Appointment of Travis Broughton for Wastewater Superintendent / Recycling
Coordinator for Department of Public Works
XI. ADJOURNMENT:
UPON REASONABLE NOTICE, efforts will be made to accommodate the needs of disabled individuals through
appropriate aids and services. For additional information or to request this service, please contact the Village
Clerk at (262)250-4745 at least 2 days prior to the meeting.
Notice is hereby given that a possible quorum of other boards, committees, and/or commissions may attend this
meeting to gather information about an item over which they have decision-making responsibility. This may
constitute a meeting of these bodies per State ex rel. Badke v Greendale Village Board, even though these
bodies will not take formal action at this meeting.
Page 3 of 167
MEETING: AMENDED REGULAR MEETING OF THE VILLAGE
BOARD
DATE AND TIME:
Monday, May 4, 2026
7:00 PM
LOCATION:
Germantown Vi
llage Hall Board Room
N112 W17001 Mequon Road
MINUTES
I. CALL TO ORDER: This meeting has been given public notice in accordance with
Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public
and news media of subject matter that is intended for consideration and action.
Village President Bob Soderberg called the Village Board meeting to order at 7:02 PM.
II. ROLL CALL:
Prese
nt: Trustee Robert Warren, Trustee Meg Cutts, Trustee Scott Hefle, Trustee Jan
Miller, Trustee Patrick Kaiser, Trustee Jim Stout, Trustee Terri Kaminski, Village
President Bob Soderberg
Absent: Trustee Pieper
Also Present: Village Clerk Donna Ott, Support Services Manager Gosia
Wormsbacher, Village Attorney Brian Sajdak, Interim Village Administrator Mitch
Reynolds, Finance Director Matthew Uselding, Water Superintendent Paul Haugen,
Community Development Director Jeff Retzlaff, Fire Chief John Delain
III. PLEDGE OF ALLEGIANCE / MOMENT OF SILENCE:
IV. PRESIDENT’S REPORT:
Village President Soderberg spoke regarding his attendance at the Chamber of
Commerce Community Awards Celebration, the ongoing recruitment for key Village
staff members, the recent heavy rainfall, upcoming Village events, new Village
trustees, and Village Board goals and governance.
V. APPOINTMENTS OF BOARD, COMMITTEE, AND COMMISSION MEMBERS:
A. Appointment Spreadsheet (ACTION)
Motion: Approve as presented
Motioned By: Terri Kaminski
Seconded By: Robert Warren
DRAFT
Page 4 of 167
Page 2
Yes: Robert Warren, Meg Cutts, Scott Hefle, Jan Miller, Patrick Kaiser, Jim Stout, Terri
Kaminski, Bob Soderberg
No: None
Abstain: None
Motion Carried by Voice Vote (Yes 8, No 0, Abstained 0)
VI. ANNOUNCEMENTS OF FORTHCOMING EVENTS OF PUBLIC INTEREST /
COMMITTEE AND DEPARTMENT REPORTS:
Trustee Kaminski announced the upcoming Public Works & Highways Committee
meeting on Wednesday, May 13, 2026, at 5:30 PM.
Trustee Cutts announced the upcoming Public Safety Committee meeting on
Wednesday, May 6, 2026, at 6:00 PM and the upcoming General Government &
Finance Committee meeting on Monday, May 18, 2026, at 5:30 PM.
Trustee Miller announced the upcoming Tourism Commission meeting on Monday,
May 11, 2026, at 5:00 PM and the upcoming Economic Development Commission
meeting on Tuesday, May 12, at 6:30 PM.
Village Clerk Ott announced the upcoming Open Book and Board of Review on May
7th, at 4:00 PM, and June 4th, at 10:00 AM, respectively.
VII. CITIZEN INPUT: (Please be advised per 19.84(2) that information and comment will
be received from the public. It is the policy of this municipality that public input be
limited to a four (4) minute period per person with a time extension granted at the
discretion of the Chairperson. Be advised that there may be limited discussion of the
information received but no action will be taken under public comments.) Comments
that may be injurious to village personnel or other individuals will not be allowed.
Lynne Schauer Bednarz (W156N10121 Pawnee Ct) spoke regarding the Village
budget.
Melanie Smythe (N140W17938 Cedar Ln) spoke regarding a forensic audit of the
Village budget and congratulated the newly elected trustees.
A representative of the Germantown Firefighters Local 4854 spoke regarding the
scope and budget of the Fire Station 2 project.
Charlie Hargan (W169N11504 Biscayne Dr) spoke regarding newly elected officials.
Written comments were not read aloud, but are included with these minutes.
VIII. CONSENT AGENDA:
Motion: Approve as presented
DRAFT
Page 5 of 167
Page 3
Motioned By: Robert Warren
Seconded By: Meg Cutts
Yes: Robert Warren, Meg Cutts, Scott Hefle, Jan Miller, Patrick Kaiser, Jim Stout, Terri
Kaminski, Bob Soderberg
No: None
Abstain: None
Motion Carried by Voice Vote (Yes 8, No 0, Abstained 0)
A. Meeting Minutes: April 20, 2026 (ACTION)
B. Equity Salary Adjustment for Fire Chief Delain (ACTION)
C. 2026 Budget Amendment to Carry Over 2025 Funds to FY2026 for Projects Not
Completed (ACTION)
D. An Ordinance Repealing and Recreating Section 1.50 of the Germantown
Municipal Code Relating to Municipal Court Assessments and Fees. (ACTION)
IX. UNFINISHED BUSINESS:
X. PUBLIC HEARINGS:
XI. NEW BUSINESS:
A. Temporary Class "B" Beer/"Class B" Wine Application for Deutschstadt
Heritage Foundation, Maifest - May 15-17, 2026 (ACTION)
Motion: Approve as presented
Motioned By: Terri Kaminski
Seconded By: Robert Warren
Yes: Robert Warren, Meg Cutts, Scott Hefle, Jan Miller, Patrick Kaiser, Jim Stout, Terri
Kaminski, Bob Soderberg
No: None
Abstain: None
Motion Carried by Voice Vote (Yes 8, No 0, Abstained 0)
B. Resolution Disallowing the Claim of Davine Black (ACTION)
Motion: Approve the Resolution disallowing the claim as presented
Motioned By: Terri Kaminski
Seconded By: Robert Warren
DRAFT
Page 6 of 167
Page 4
Yes: Robert Warren, Meg Cutts, Scott Hefle, Jan Miller, Patrick Kaiser, Jim Stout, Terri
Kaminski, Bob Soderberg
No: None
Abstain: None
Motion Carried by Voice Vote (Yes 8, No 0, Abstained 0)
C. Abacus Architects, Agent for DONTOF LLC, Property Owner, and Basic Metals,
Inc. W180 N11819 River Lane; Certified Survey Map (CSM) application to
combine two (2) existing parcels into one 7-ac parcel in the Germantown
Industrial Park. (ACTION)
Motion: Approve subject to the one condition noted
Motioned By: Robert Warren
Seconded By: Meg Cutts
Yes: Robert Warren, Meg Cutts, Scott Hefle, Jan Miller, Patrick Kaiser, Jim Stout, Terri
Kaminski, Bob Soderberg
No: None
Abstain: None
Motion Carried by Voice Vote (Yes 8, No 0, Abstained 0)
D. Resolution Adopting the Water Supply Service Area Plan of the Germantown
Water Utility (ACTION)
Motion: Approve the Resolution adopting the WSSAP as presented
Motioned By: Meg Cutts
Seconded By: Scott Hefle
Yes: Robert Warren, Meg Cutts, Scott Hefle, Jan Miller, Patrick Kaiser, Jim Stout, Terri
Kaminski, Bob Soderberg
No: None
Abstain: None
Motion Carried by Voice Vote (Yes 8, No 0, Abstained 0)
E. Proposal to adopt the 2026 pay rate chart, including recommended
classification modifications aligned with market analysis and organizational
needs (ACTION)
Motion: Approve as presented
Motioned By: Terri Kaminski
Seconded By: Robert Warren
Yes: Robert Warren, Meg Cutts, Scott Hefle, Jim Stout, Terri Kaminski, Bob Soderberg
DRAFT
Page 7 of 167
Page 5
No: Jan Miller, Patrick Kaiser
Abstain: None
Motion Carried by Roll Call Vote (Yes 6, No 2, Abstained 0)
F. Consideration to Increase the Pay Range for the Recruitment of Senior Center
Coordinator Position. (ACTION)
This item was superseded by the action taken to adopt the 2026 Pay Rate Chart in
New Business Item E and required no further consideration.
G. Discussion regarding the Police and Fire Departments Budgets and Procedures
as it relates to the Newly Proposed Police Department Building and Addition to
Fire Station (DISCUSSION)
Village President Soderberg, Interim Administrator Reynolds, and Fire Chief Delain led
discussion regarding the budgets and procedures for the newly proposed Police
Department building and the Fire Station.
H. Review of the Downgrade and Rating Report by Moody (DISCUSSION)
Finance Director Uselding and Interim Administrator Reynolds answered questions
from trustees regarding the Moody downgrade and rating report.
I. Village Administrator Vacancy. The Village Board may convene into closed
session pursuant to Wis. Stat. § 19.85(1)(c) for the purpose of considering
employment, promotion, compensation or performance evaluation data of any
public employee over which the governmental body has jurisdiction or exercises
responsibility and then may reconvene in open session to take such action as it
deems appropriate. (ACTION)
Motion: Enter into Closed Session at 8:53 PM with the Interim Administrator and
Innovative Public Advisors in attendance
Motioned By: Terri Kaminski
Seconded By: Patrick Kaiser
Yes: Robert Warren, Meg Cutts, Scott Hefle, Jan Miller, Patrick Kaiser, Jim Stout, Terri
Kaminski, Bob Soderberg
No: None
Abstain: None
Motion Carried by Roll Call Vote (Yes 8, No 0, Abstained 0)
XII. ADJOURNMENT:
Village President Soderberg adjourned the Village Board meeting directly from Closed
Session at 10:11 PM.
DRAFT
Page 8 of 167
From: crb crb
To: Comments
Subject: V.B. MEETING 5-4-26
Date: Friday, May 1, 2026 12:19:14 PM
CAUTION: This email originated from outside the organization.
Do not click links or open attachments unless you recognize the sender and know the content is
safe.
Hello,
We have some concern we would like to voice our opinions about.
New business items G &H on the VILLAGE BOARD AGENDA FOR 5-4-26 MEETING.
ITEM G: We have been saying why does the police and fire departments get to pick and
choose the firm that will do the projects for their department?
Yes, they can have all the input they want for the projects.
But like we have been saying who is paying for the projects?
The departments or the residents /taxpayers?
Where are the residents/taxpayer's input in the decisions?
After they have picked the firm already.
This is not the proper procedure at all!
Like we said, it needs to be done, but the proper way!
With in BUDGET THAT WE CAN AFFORD TO PAY FOR!
KEY WORD IS BUDGET!!! NOT HOW MUCH TO BORROW FOR MORE DEBT!!!!
Remember, it was said a home value at $450,000. Is $272. More in taxes. It seems like the
ones who voted for this are ok'd with this increase taxes. Don't forget we need to borrow $17
millions to cover for this year's budget! Which is another $172. Increase in taxes too!
Does this village have a list of procedures how a project should be handled by employees?
Do they follow it?
We know for sure, in these 2 projects, the procedures were not follow.
The former administer did not enforce it to be done by procedures either.
Don't think so! This is how it is coming across at the meetings.
Remember the 2050 meetings/ FLOWER SOURCE meetings-means resident's input.
Did all the 2050 meetings happen? NOPE!!!
Did the village center happen? NOPE!!!
But we the residents who live in the village, are now LANDLORDS NIT BY CHOICE EITHER!
By the way, what is going at the OLD FLOWER SOURCE?
Seems like nothing!
Please remember too: New DPW BUILDING started out at $10 millions and grew to almost $40
DRAFT
Page 9 of 167
millions by the time they were done.
Yes, was another project that should have been done long ago too!
This is how we got a new president and some new trustees to the board.
It was stated at the V.B. Meeting last month, the fire department is now over by $2.1 million
on the budget for their project!
Found this out by a trustee bring it up during the police dept building discussion.
Where will this money be found?
Seems like it will happen due to not have a construction manager and something else that was
not included in the budget.
Who should the residents point the finger at for forgetting these things to be included?
This is why we have been saying what we have been saying about paying for it!
Also, why the procedures are not being follow on a project to done in the village?
We believe both projects, before anything else happens, need to go to the CONSTRUCTION
OVERSITE COMMITTEE, then should have passed on unto the PUBLIC SAFETY COMMITTEE and
finally to the BOARD FOR THE DECISION TO BE DISCUSSED AND MADE AND VOTE ON!!
Needs to go over with a "fine tooth comb".
There is NO ONE PERSON ON THIS BOARD AND OR IN VILLAGE EMPLOYEES THAT KNOW
EVERYTHING THAT NEEDS TO BE DONE ON PROJECTS. Nor do we know.
MORE EYES ON IT,
THE BETTER IT WILL BE!
Remember it's a TEAM THING!
Not a department thing!
PLEASE REMEMBER WHO IS PAYING FOR THESE PROJECTS!!!
Don't forget, these project should have been done long ago!
Yes, some members of the old and this board have been on this board for a very long time.
NOW WE HAVE TO PAY!
OR
Maybe put the police dept. On hold for a bit longer.
Look again at the location too!
ITEM H: How is the MOODY RATING BE EFFECT BY THE BORROWING OF $17milions?
KEY WORD: IF this new board does give the approval on the police department building too,
how will this effect the rating with MOODY?
MOST IMPORTANT HOW WILL THIS EFFECT THE RESIDENTS/TAXPAYERS IN THE INCREASE OF
TAXES?
Believe the village debt as of now, is $95 millions and growing!
Please keep this in mind too: the prices of gas, groceries, and everything and anything a
person/family needs to live is up in price's and will continue to raise up.
Don't forget about the war, unknow how long that will be.
When the war ends, do you really believe the prices on everything will "FALL RIGHT AWAY"?
DRAFT
Page 10 of 167
We don't! It goes up real fast, may slowly fall and or not all.
HOW WILL ALL THE RESIDENTS BE ABLE AFFORD EVERYTHING THEY NEED TO LIVE ON ,PLUS
THE ALL THE INCREASES OF TAXES AND WATER AND SEWER BILL TOO!
Don't forget the "NEW PAY RATE CHART " too that they want to vote on!
In your discussions on these topics please explain to us, how we will be afford to do everything
in the village want.
Or
Please tell us where the money trees are planted in the village, they we can pick.
The Schneider's
DRAFT
Page 11 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: One-Time/Special Event Outside Premise Extension Application
for Metro Cigars, N102W19455 Willow Creek Way - June 7, 2026
12pm-5pm (ACTION)
SUBMITTED BY: Kasie Miller, Chief Deputy Clerk
SUMMARY EXPLANATION:
Jennifer Groh of Metro Cigars, N102W19455 Willow Creek Way, submitted an
application requesting to extend their Class "B" Beer, "Class B" Liquor License Outside
Premise to temporarily serve alcohol for a One-Time/Special Event on June 7, 2026,
from 12:00pm - 5:00pm for a customer event. The requested area would include the
adjacent sidewalk and grass/lawn area, which will have a 40’x20’ tent. Metro Cigars is
already approved to serve beer and/or alcohol on the concrete patio as noted on their
2025-2026 Annual License. Groh advised there would not be any music outside,
therefore, they did not apply for an Outdoor Entertainment permit.
On 04/14/2026, 300ft notices were mailed to adjacent property owners.
Police, Fire, and Community Development Departments have provided approval of this
application with recommended contingencies.
ATTACHMENT:
1. Metro Cigars One-Time Special Event Extension Application With Approvals
STAFF RECOMMENDATION:
Approval of the One-Time/Special Event Outside Premise Extension Application for the
Metro Cigars event on June 7, 2026, contingent upon obtaining the necessary tent
inspection with SAFEBuilt upon installation.
ACTION BY COMMITTEE:
Page 12 of 167
Page 13 of 167
Page 14 of 167
Page 15 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Temporary Class "B" Beer/"Class B" Wine Application for Post One
Inc, 4th of July Celebration - July 4, 2026 (ACTION)
SUBMITTED BY:
SUMMARY EXPLANATION:
ATTACHMENT:
1. 07.04.26 4th of July Beer and Wine_Redacted
STAFF RECOMMENDATION:
ACTION BY COMMITTEE:
Page 16 of 167
g-icense(s) Requested Fees
License Fees $
-€:ftr
Background Check $ O -pf, qJre^
Total Fees $ ,ruj-u
I Temporary "Class B" Wine @ Temporary Class "B" Beer
,art A: Organization lnformation
Organization Name
Post One Inc
[. Oroanization Permanent Address
; N120W15932 Freistadt Road
City
Germantown
4. State
WI
5. Zip Code
53022
Mailing Address (if different from permanent address)
P.O. Box 32I
FEIN
39-188s143
B. Date of Organization/lncorporation 9. State of Organization/lncorporation
0. Phone
262-25r-541 0
1'l . Email
legionpostoneGqmai l- . com
2. Organizationtype (check one)
I Bona Fide Club f] Church ! FairAssociation/Agriculturalsociety @ Veteran's Organization
I Lodge/Society I Chamber of Commerce or similar Civic or Trade Organization under ch. 181 , Wis. Stats.
3. ls this organization required to hold a Wisconsin Seller's permit? Z Yes I tlo
4. Wisconsin Seller's Permit Number (if applicable)
4s6-1020152431-03
B: lndividual lnformation
.ist the name, title, and phone number for all officers, directors, and agent of the organization. lnclude an lndividual Questionnaire
Form AB-100) for each person listed below Attach additional sheets if necessary.
)orporations must also include Alcohol Beverage Appointment of Agent (Form AB-101 ).
,ast Name First Name Tille Phone
onnell Kri sti Commander
atchak Christopher Executive Officer
oretta Ramona Financial- Officer
AB-220 Temporary Alcohol Beverage License
Municipality
Continued ---+
I
'llrrhn
-1-(R. 1-25) Wisconsin Department of Revenue
Page 17 of 167
1. Name of Event (if applicable)
Fourth of July
Part C: Event lnformation
2. Dates of Operation
01 / 04/2025 01 /04/2025
3. Hours of Operation
0700-2300
4. Premises Address
Firemants Park
5. City
Germantown
6. State
WT
7. Zip Code
53022
8. County
Washington
9. Governing Municipality n City ! Town p Village
of: Germant.own
I 0. Aldermanic District
'11. Organizer of Event (if noi the named applicani) 12. Email and/or Phone Number for Organizer of Event
legionpostoneG gmai I . com
$
ii
13. Organizer Website
www. legionpostone . org
14. Event Website
i
15. Premises Description - Describe the building or buildings and any outside areas where alcohol beverages und ,""ord- "[ "ffistored, or consumed, and related records are kept. Describe all rooms within the building, including living quarters. Authorized
alcohol beverage activities and storage of records may occur only on the premises describqd in this appiication. Attach a map{
or diagram and additional sheets if necessary. ,'b4r ".4w":\zrc.,^.\
Sold from the Fi-reman's Park Pavi1lon, stored in coolers for day of event. Recordskept at American Legion PosL.q/U
Part D: Attestation
READ CAREFULLY BEFORE SIGNING: Under penalty of law, I have answered each of the above questions completely andi
truthfully. I agree that I am acting solely on behalf of the applicant organization and not on behalf of any other individual or entity
seeking the license. Further, I agree that the rights and responsibilities conferred by the license(s), if granted, will not be assigned;
to another individual or entity. I agree to operate according to the law, including but not limited to, purchasing alcohol beverageq
from Wisconsin-permitted wholesalers. I understand that lack of access to any portion of a licensed premises during inspection wilE
be deemed a refusal to allow inspection. Such refusal is a misdemeanor and grounds for revocation of this license. I understandl
that any license issued contrary to Wis. Stat. Chapter 125 shall be void under penalty of state law. I further understand that I maf
be prosecuted for submitting false statements and affidavits in connection with this application, and that any person who knowingly'
provides materially false information on this application may be required to forfeit not more than $1,000 if convicted.
Who must sign this application?
. one officer or director of the nonprofit organization
Last Name
Bonnell
First Name
Kristi
M.t Iil
irB
Title
Commander
Email
Phone
Sig
04/23/26
Date
Part E: For Clerk Use Only ,tA
tr
I
'.i:fl[:$1T" il#:"'-l t L5 - 0+5 ]yp(il' I License Number
Date License Gran-ted Date License lssued
Signature of Clerk/Deputy Clerk
AB-220 (R. 1-25) -2-
i
Page 18 of 167
orm
AB-100
sole proprietor
all partners of a partnership
individuals involved in the alcohol beverage business must complete this form, including
Alcohol Beverage
lndividual Questionnaire
. all officers, directors, and agent of a corporation or nonprofit organization
. members and agent of a limited liability company
Date
04/23/2026
Continued ->
ur alcohol beverage application or renewal is not complete until all required lndividual Questionnaires are submitted
,art A: Business lnformation
Legal Business Name (individual name if sole proprietor)
Post One Inc
I partnership ! timiteO Liability Company I Corporation Z Nonprofit Organization
Business Trade Name or DBA
Post One Inc
EntityType (check one)
tr Sole Proprietor
t B: lndividual lnformation
3. M.t
B
2. First Name
Kristi
Last Name
Bonnell
I
6. Phone
(1 0 6) 91,0 - 4L 40
5. Email
krisLibonnellGqmail . com
+
i
Relationship to Business (Title)
Commander n Age,nt
v
I
Home Address
1'1 9. State 10. Zip Code). City
13. Drivers License/State lD State of lssuance112. Drivers License/State lD Number
i
Do you currently live in Wisconsin? . .
lf yes, provide the month and year when you permanently moved to Wisconsin
06 / 2020
art G: Address Hi
I ves I tto
Z. List in chronological order all of your addresses within the last 5 years. Attach additional sheets if necessary.
State Zip CodeCityPrevious Address 1
State Zip CodeCityPrevious
l
Address 2
State Zip CodeCityPrevious Address 3
:
i
State Zip CodeCity)revious Address 4
State Zip CodeCity)revious Address 5
]. List all states and counties you have lived in as an adult. Attach additional sheets if necessary.
State CountyState CountyState CountyItate County
County
County StateCounty StateItate County State
-1-100 (R. 1-25) Wisconsin Department of Revenue
Page 19 of 167
Part D: Criminal History
1' Have you ever been convicted of any offenses (excluding traffic offenses unless related to alcohol beverages)
for violation of any federal, Wisconsin, or another state's laws or of any county or municipal ordinances?. . . . ,
lf yes to question 1, please list details of each conviction below. Attach additional sheets as needed.
I ves Z r.ro
LawiOrdinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . I Ves f] ruo
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . ! ves f] No
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . f Ves f] frfo
2. Are charges for any offenses currently pending against you (excluding traffic offenses unless related to alcohol
beverages) for violation of any federal, Wisconsin, or another state's laws or any county or municipal
ordinances?.
lf yes to question 2, describe nature and status of pending charges using the space below. Attach additional
sheets as needed.
E r.loI ves
Part E: Attestation
READ CAREFULLY BEFORE SIGNING: Under penalty of law, I have answered each of the above questions completely andtruthfully. I certify that I am not prohibited from participating in this business due to any involvement in another tier of ihe aicoholbeverage industry as a restricted investor. I understand that any license issued contrary to wis. stat. chapter 125 shall be voidunder penalty of state law. I further understand that I may be prosecuted for submitting falie statements and affidavits in connectionwith this application, and that any person who knowingly provides materially false iniormation on this application may be required
to forfeit not more than $'1 ,000 if convicted.
Signature Date
04/23/2026
AB-100 (R. 1-25)
Page 20 of 167
individuals involved in the alcohol beverage business must complete this form, including
AB-100
sole proprietor
all partners of a partnership
Alcohol Beverage
lndividual Questionnaire
. all officers, directors, and agent of a corporation or nonprofit organization
. members and agent of a limited liability company
Date
04/23/2025
Continued ---+
ur alcohol beverage application or renewal is not complete until all required lndividual Questionnaires are submitted
A: Business lnformation
Legal Business Name (individual name if sole proprietor)
Post One Inc
Business Trade Name or DBA
Post One Inc
Entity Type (check one)
I Sole Proprietor f] Partnership I timiteO Liability Company ! Corporation @ Nonprofit Organization
art B: Individual lnformation
3. M.l
J
2. First Name
Ramona
Last Name
Moretta
6. Phone
(262) 25r-5410
5. Email
legionpostoneG gmai l- . com
Relationship to Business (Title)
Financial Officer
Home Address
11. Date of Birth10. Zip Code9. StateCity
13. Drivers License/State lD State of lssuance2. Drivers License/State lD Number
G: Address Histo
03 / 2023
Do you currently live in Wisconsin? .
lf yes, provide the month and year when you permanently moved to Wisconsin
[Yes nruo
List in chronological order all of your addresses within the last 5 years. Attach additional sheets if necessary.
AZ
Zip Code
85742
City
Queen Creek
Address 1
E. North Loop0834
State Zip CodeCityAddress 2
State Zip CodeCitys Address 3
Zip CodeStateCityAddress 4
Zip CodeStateCityAddress 5
List all states and counties you have lived in as an adult. Attach additional sheets if necessary
State CountyState CountyState CountyCounty
State CountySiate ntyCounty State
-1-100 (R. 1-25) Wisconsin Department of Revenue
Page 21 of 167
F
t:
Part D: Criminal
Have you ever been convicted of any offenses (excluding traffic oflenses unless related to alcohol beverages)
for violation of any federal, Wisconsin, or another state's laws or of any county or municipal ordinances?. . . . .
lf yes to question 1, please list details of each conviction below. Attach additional sheets as needed.
I ves Z r.ro'
LawiOrdinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed? ^ . . . . I Ves tr ne
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . I Ves n no
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . I Ves I no
2. Are charges for any offenses currently pending against you (excluding traffic offenses unless related to alcohol
beverages) for violation of any federal, Wisconsin, or another state's laws or any county or municipal
ordinances?.
lf yes to question 2, describe nature and status of pending charges using the space below. Attach additional
sheets as needed.
[ves Eruo
Part E: Attestation
READ CAREFULLY BEFORE SIGNING: Under penalty of law, I have answered each of the above questions completely andtruthfully. I certify that I am not prohibited from participating in this business due to any involvement in another tier of ihe alcoholbeverage industry as a restricted investor. I understand that any license issued contrary to Wis. Stat. Chapter j25 shall be voidunder penalty of state law. I further understand that I may be prosecuted for submitting false statements and affidavits in connectionwith this application, and that any person who knowingly provides materially false information on this application may be requiredto forfeit not more than $1,000 if convicted.
re
/'u
CLa-yt ta/-I
Signatu
04/23/2026
Date
AB-100 (R. 1-2s) - z-
Page 22 of 167
I individuals involved in the alcohol beverage business must complete this form, including
le proprietor . all officers, directors, and agent of a corporation or nonprofit organization
partners of a partnership . members and agent of a limited liability company
alcohol beverage application or renewal is not complete until all required lndividual Questionnaires are submitted
rm
AB-100
Alcohol Beverage
I ndividual Questionnaire
Date
04/23/2026
Continued ---+
tart A: Business lnformation
Legal Business Name (individual name if sole proprietor)
Post One Inc
f] Partnership n Limited Liability Company ! Corporation @ Nonprofit Organization
B: lndividual lnformation
Business Trade Name or DBA
Post One fnc
Entity Type (check one)
tr Sote Proprietor
3. M.t
J
Last Name
Yatchak
2. First Name
Christopher
6. Phone
(262) 25L-5410
5. Email
legionpostoneG gmai I . com
'. Relationship to Business (Title)
Executive Officer
'. Home Address
11 9. State
I
10. Zip Codei. City
13. Drivers License/Siate lD State of lssuance
C: Address Histo
2. Drivers License/State lD Number
Do you currently live in Wisconsin? .
lf yes, provide the month and year when you permanently moved to Wisconsin
fives nno
L List in chronological order all of your addresses within the last 5 years. Attach additional sheets if necessary.
State Zip CodeCitytrevious Address 1
State Zip CodeCity)revious Address 2
State Zip CodeCity)revious Address 3
Siate Zip CodeCity'revious Address 4
State Zip CodeCitytrevious Address 5
t. List all states and counties you have lived in as an adult. Attach additional sheets if necessary.
State CountyState Countyitate County State County
County State County;tate County State County State
100 (R. 1-25) Wisconsin Department of Revenue
Page 23 of 167
:i1
{i
Part D: Criminal History
Have you ever been convicted of any offenses (excluding traffic offenses unless related to alcohol beverages)
for violation of any federal, Wisconsin, or another state's laws or of any county or municipal ordinances?. . . . .
lf yes to question 1, please list details of each conviction below. Attach additional sheets as needed.
Nq
il
i
f, ves
1
V
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . f, ves I rrr
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . I Ves n f'1"
Law/Ordinance Violated Location Conviction Date
Penalty lrlposed
Was sentence completed?. . . . . I Ves E ruo
2. Are charges for any offenses currently pending against you (excluding traffic offenses unless related to alcohol
beverages) for violation of any federal, Wisconsin, or another state's laws or any county or municipal
ordinances?.
lf yes to question 2, describe nature and status of pending charges using the space below. Attach additional
sheets as needed.
f ves E ruo'
Part E: Attestation
READ CAREFULLY BEFORE SIGNING: Under penalty of law, I have answered each of the above
truthfully. I certify that I am not prohibited from participating in this business due to any involvement in
beverage industry as a restricted investor. I understand that any license issued
under penalty of state law. I further understand that I may be prosecuted for subm
gly provides materially false information on this application may be required
contrary
itting
questions completely and
another tier of the alcohol .,
to Wis. Stat. Chapter 125 shall be void
false statements and affidavits in connection
with this application, and that any person who knowin
to forfeit not than $1,000 if convicted.
Signature
04/23/2026
Date
AB-100 (R. 1-25) a
Page 24 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Temporary Class "B" Beer/"Class B" Wine Application for Kiwanis
of Germantown, Taste of Germantown - July 23, 2026 (ACTION)
SUBMITTED BY: Kasie Miller, Chief Deputy Clerk
SUMMARY EXPLANATION:
ATTACHMENT:
1. 07.23.26 Taste of Germantown - Beer and Wine_Redacted
STAFF RECOMMENDATION:
ACTION BY COMMITTEE:
Page 25 of 167
Page 26 of 167
Page 27 of 167
Page 28 of 167
Page 29 of 167
Page 30 of 167
Page 31 of 167
Page 32 of 167
Page 33 of 167
Page 34 of 167
Page 35 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Application for Fireworks Permit for July 4, 2026, by Parks &
Recreation Director Guilford Standridge (ACTION)
SUBMITTED BY:
SUMMARY EXPLANATION:
ATTACHMENT:
1. July 4, 2025 Fireworks Application_Redacted
STAFF RECOMMENDATION:
ACTION BY COMMITTEE:
Page 36 of 167
Page 37 of 167
Page 38 of 167
Page 39 of 167
Page 40 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Cardiac Monitor Repair Warranty / Service Contract (ACTION)
SUBMITTED BY: John Delain, Fire Chief
SUMMARY EXPLANATION:
The Germantown Fire Department operates a Paramedic level EMS service. As part of
this service we are required to have cardiac monitors that our providers are trained to
utilize to detect potential problems with a persons heart, such as a heart attack.
Germantown owns/operates 4 Zoll X-Series Advanced cardiac monitors at a current
approximate cost of $60,000 each, or $240,000 total. Germantown last purchased
monitors in 2021 and purchased a 5-year no-risk warranty. The warranty has covered
thousands of dollars in repair costs, loaner equipment, and preventative maintenance
charges. The most common repair we have seen is replacement of the charging cable
and communication port, which is over $3,300.
The annual preventative maintenance and calibration is $650 per monitor ($2,600 total)
factoring the cost of a loaner monitor. We are respectfully requesting authorization to
purchase an additional 3-year warranty / service contract which will last until 5/1/2029.
The expected lifespan of the unit is 7-10 years however they only offered 3 additional
years of warranty.
ATTACHMENT:
1. zoll warranty
STAFF RECOMMENDATION:
The department is requesting authorization to purchase a 3-year warranty for a total
cost of $25,456.80 that is broken up into 3 annual payments of $8,485.60. Funding for
2026 will be from the State of Wisconsin EMS Grant. Funding for 2027 and 2028 may
be allocated from the State grant, County grant, or traditional levy funding.
ACTION BY COMMITTEE:
Page 41 of 167
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Cardiac Monitor Repair Warranty / Service Contract
SUBMITTED BY: John Delain, Fire Chief
SUMMARY EXPLANATION:
The Germantown Fire Department operates a Paramedic level EMS service. As part
of this service we are required to have cardiac monitors that our providers are trained to
utilize to detect potential problems with a persons heart, such as a heart attack.
Germantown owns/operates 4 Zoll X-Series Advanced cardiac monitors at a current
approximate cost of $60,000 each, or $240,000 total. Germantown last purchased
monitors in 2021 and purchased a 5-year no-risk warranty. The warranty has covered
thousands of dollars in repair costs, loaner equipment, and preventative maintenance
charges. The most common repair we have seen is replacement of the charging cable
and communication port, which is over $3,300. The annual preventative maintenance
and calibration is $650 per monitor ($2,600 total) factoring the cost of a loaner monitor.
We are respectfully requesting authorization to purchase an additional 3-year
warranty / service contract which will last until 5/1/2029. The expected lifespan of the
unit is 7-10 years however they only offered 3 additional years of warranty.
Minimum Service Charge
Description Out of Warranty Under Warranty
X-Series Advanced $355 No Charges
Recertification $340 No Charges
Loaner $355 No Charges
Labor $230 per hour No Charges
Parts MSRP No Charges
RECOMMENDATION:
The department is requesting authorization to purchase a 3-year warranty for a total
cost of $25,456.80 that is broken up into 3 annual payments of $8,485.60. Funding for
2026 will be from the State of Wisconsin EMS Grant. Funding for 2027 and 2028 may
be allocated from the State grant, County grant, or traditional levy funding.
ACTION BY Committee:
Page 42 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Award of Contract for Construction Manager At-Risk services for
the Fire Station Remodeling Project to CG Schmidt in an amount
not to exceed $817,037 plus a 10% contingency. (ACTION)
SUBMITTED BY: John Delain, Fire Chief
SUMMARY EXPLANATION:
An RFP was issued for Construction Manager at-risk services for the remodel and
expansion project at Fire Station 2. The RFP was developed with then DPW Director
Matt Mortwedt, SEH team, and other area RFP’s.
The RFP was published by sending email notifications to firms, posting it on the Village
website, posting on social media platforms, and to the League of Municipalities.
Documentation supporting the steps in the evaluation process is included in the
meeting agenda packet. CG Schmidt will be present at the May 6 Public Safety
Committee meeting. They will be prepared with a brief presentation and/or to answer
questions from the Committee.
ATTACHMENT:
1. Selection of CMAR for Station 2 Project
2. GFD Station 2 CMAR Scoring Results
3. CG Schmidt Germantown Fire Station 2 CMAR RFP_CGS Proposal
STAFF RECOMMENDATION:
Staff recommend the Village Board award the Construction Manager At-Risk services
contract to CG Schmidt for the Station 2 remodel and expansion project for the amounts
of:
• Preconstruction Fee: $0 (No cost, based on awarding CMAR contract)
• CM Fee as a Percentage of the Cost of Work: 1.95%
o At 6.5M Building Cost: $126,750
• CM Contingency as a Percentage of the Cost of Work: 3%
o At 6.5M Building Cost: $195,000
o Controlled by the CMAR.
o Excess is returned at conclusion of project.
• General Conditions: $495,287
At a $6,500,000 building project this total is $817,037 and authorize staff an additional
10% contingency of $81,703.
ACTION BY COMMITTEE:
Page 43 of 167
The Public Works and Highways Committee unanimously recommended approval.
Page 44 of 167
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Selection of Construction Manager at Risk for Station 2 Project
SUBMITTED BY: John Delain, Fire Chief
SUMMARY EXPLANATION:
An RFP was issued for Construction Manager at-risk services for the remodel and expansion project at
Fire Station 2. The RFP was developed with then DPW Director Matt Mortwedt, SEH team, and other
area RFP’s.
The RFP was published by sending email notifications to firms, posting it on the Village website, posting
on social media platforms, and to the League of Municipalities.
A summary of the evaluation process:
• Staff met with 7 construction management firms for a mandatory site visit to tour Station 2 and
discuss the project.
• 5 firms responded to the RFP. Each firm had varying levels of experience, costs, and in some
cases project scope.
• A staff committee of members from the Fire Department and DPW individually scored each
response.
• The committee met to discuss the responses and scores.
• The top 3 firms were CG Schmidt, Moore Construction, and Scherrer Construction. They were
brought in for interviews with Staff and SEH.
o SEH was present but a non-voting member.
• Following the interview scoring, CG Schmidt had the highest score (75).
• Staff communicated with CG Schmidt to negotiate fees and were able to negotiate the
construction manager fee from 2.34% to 1.95%, and preconstruction services from $21,500 to
$0.
• Staff are recommending that the Village Board awards the Construction Manager At -Risk
contract to CG Schmidt.
o Preconstruction Fee: $0 (No cost, based on awarding CMAR contract)
o CM Fee as a Percentage of the Cost of Work: 1.95%
At 6.5M Building Cost: $126,750
o CM Contingency as a Percentage of the Cost of Work: 3%
At 6.5M Building Cost: $195,000
Controlled by the CMAR.
Excess is returned at conclusion of project.
o General Conditions: $495,287
• Staff are recommending authorization of staff for an additional 10% contingency for construction
management services for $81,703.
Documentation supporting the steps in the evaluation process is included in the meeting agenda packet.
CG Schmidt will be present at the May 6 Public Safety Committee meeting. They will be prepared with a
brief presentation and/or to answer questions from the Committee.
Page 45 of 167
ATTACHMENT:
1. CMAR Scoring Spreadsheet
2. CG Schmidt Technical Proposal
RECOMMENDATION:
Staff recommend the Village Board award the Construction Manager At-Risk services contract to CG
Schmidt for the Station 2 remodel and expansion project for the amounts of:
• Preconstruction Fee: $0 (No cost, based on awarding CMAR contract)
• CM Fee as a Percentage of the Cost of Work: 1.95%
o At 6.5M Building Cost: $126,750
• CM Contingency as a Percentage of the Cost of Work: 3%
o At 6.5M Building Cost: $195,000
o Controlled by the CMAR.
o Excess is returned at conclusion of project.
• General Conditions: $495,287
At a $6,500,000 building project this total is $817,037 and authorize staff an additional 10% contingency
of $81,703.
ACTION BY Committee:
Page 46 of 167
Beeler
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance (10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 7 6 19 10 10 5 57
Evaluator 2 0
Evaluator 3 6 6 18 10 10 5 55
Evaluator 4 7 7 20 15 10 5 64
Evaluator 5 7 7 19 19 10 5 67
Beeler Score 48.6
Moore
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance (10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 14 14 21 16 10 5 9 89
Evaluator 2 9 9
Evaluator 3 14 15 22 17 10 5 9 92
Evaluator 4 12 13 19 18 10 5 8 85
Evaluator 5 12 13 19 16 10 5 8 83
Moore Score 71.6
CG
Schmidt
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance (10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 14 14 22 18 10 5 8 91
Evaluator 2 8 8
Evaluator 3 14 14 20 18 10 5 7 88
Evaluator 4 15 14 23 19 10 5 9 95
Evaluator 5 14 14 23 20 10 5 7 93
CG Schmidt Score 75
Scherrer
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance (10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 13 11 21 19 10 5 7 86
Evaluator 2 7 7
Evaluator 3 14 12 22 19 10 5 8 90
Evaluator 4 12 11 21 18 10 5 7 84
Evaluator 5 13 13 23 18 10 5 8 90
Scherrer Score 71.4
Page 47 of 167
Wellspring
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance
(10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 11 13 21 16 10 5 76
Evaluator 2 0
Evaluator 3 13 13 22 17 10 5 80
Evaluator 4 11 12 21 17 10 5 76
Evaluator 5 12 13 21 16 10 5 77
Wellspring Score 61.8
Score Totals
Beeler Score 48.6
CG Schmidt Score 75
Moore Score 71.6
Scherrer Score 71.4
Wellspring Score 61.8
Average Score 65.68
Costs Figuring $6,500,000 Building Cost
CM Fee Pre-Construction
Fee Fee Total General Conditions
Estimate
CMAR
Contingency
Total W/
Contingency Budget Remaining
Beeler 3% $25,000 $220,000 Not Provided 3% Unable to Determine Unable to Determine
CG Schmidt 1.95% $0 $126,750 $494,327 3% $816,077 $5,683,923
Moore 3.5% $1,500 $229,000 $219,600 10% $1,098,600 $5,401,400
Scherrer 3.5% 0 $227,500 $250,810 10% $1,128,310 $5,371,690
Wellspring 3% $73,974 $268,794 $527,720 3% $991,514 $5,508,486
Page 48 of 167
GERMANTOWN FIRE DEPARTMENT
FIRE STATION NO. 2
EXPANSION & REMODEL
PROPOSAL FOR CONSTRUCTION MANAGER AT RISK (CMAR)
February 16, 2026
Page 49 of 167
February 16, 2026
Amy Lerch
Administrative Manager
Germantown Fire Department
Fire Station No. 2
N115 W18752 Edison Drive
Germantown, WI 53022
Dear Ms. Lerch,
Thank you for the opportunity to submit our proposal for Construction Manager at Risk services for Germantown Fire
Department Fire Station No. 2’s renovation and expansion project. Fire stations are mission-critical facilities where layout,
construction sequencing, and building systems directly affect emergency response, firefighter safety, and long-term
operational readiness. Our team understands the responsibility that comes with delivering this work while maintaining
uninterrupted operations.
Response Time & Uninterrupted Operations
Station layout must support direct, intuitive movement from alarm to apparatus, and construction activities cannot impede
response reliability. Our approach emphasizes thoughtful phasing, logistics planning, and daily coordination with station
leadership to maintain full operational continuity throughout construction. From temporary access routes to clearly defined
work zones, we prioritize solutions that protect response time and readiness at all stages of the project.
Firefighter Wellness & Safety
We recognize the growing importance of station design in supporting firefighter health. Our team understands the need for
dedicated personal locker space and the separation of personal items from apparatus, gear, and exhaust zones. We
support clear zoning between apparatus, gear, living, and work areas to improve air quality and reduce contaminant
exposure. Our experience includes addressing ventilation performance, CO₂ monitoring, humidity and temperature control,
and mold prevention as part of a comprehensive wellness strategy. We also recognize the importance of improved hygiene
facilities and properly sized sleeping accommodations that support recovery and long-term wellness.
Preconstruction & Cost Planning
Early and collaborative preconstruction engagement is essential to aligning scope, budget, and operational priorities. As
CMAR, we will provide detailed cost modeling, constructability input, and phasing strategies that allow informed decision-
making without compromising safety or durability. Given the anticipated 5–10 year service life of this phase, our
recommendations will balance immediate needs with flexibility to accommodate future staffing, equipment, and operational
changes.
We are committed to delivering a facility that strengthens response capabilities, prioritizes firefighter health, and
responsibly invests public resources. We look forward to partnering with your team to deliver this project with clarity,
accountability, and respect for the vital services your department provides to the community.
Sincerely,
Joe Hoffmeier
Managing Director
(414) 828-8162
joeh@cgschmidt.com
11777 West Lake Park Drive
Milwaukee, WI 53224
Page 50 of 167
TABLE OF CONTENTS
01 // Firm Experience & Qualifications
02 // Proposed Team
03 // Project Approach & Understanding
04 // Preconstruction Services Cost Proposal
05 // GMP Development Approach
06 // Bidding & Procurement Methodology
07 // Safety & Quality Management
08 // Project References
09 // Draft Contract
10 // Appendix
Addendum Fees
Addendum General Conditions
Site Logistics
Page 51 of 167
CREATING EXCEPTIONAL
FACILITIES THAT IMPROVE
THE LIVES OF OTHERS.
A STRONG TEAM FOR
Germantown Fire Department Fire Station No. 2
KNOWLEDGE.
COMMUNICATION.
REPUTATION.PROVEN
YOUR PROJECT
Reaching Expansion & Remodel Goals with Precision
YOUR PARTNERSHIP
Where Experience
Becomes Impact
We really enjoy working with CG
Schmidt. They act as an extension
of our business, and they
understand what we need. Hiring
CG Schmidt is like pushing the
‘easy button’. They are committed
to our goals, and they know how
to get stuff done!
— Isaac Larson
Executive Director of Facilities
Froedtert ThedaCare
Leverage
the project as a catalyst
for broader community
transformation.
To transform this building, the Germantown Fire Department Fire Station No. 2 must:
Align
the project
with budget
constraints.
Address
mold issues
with the existing
building.
Accommodate
active firestation with
effective occupied space
construction strategy.
01 02 03 04
70%
CONSTRUCTION
WORK COMPLETED IN
OCCUPIED SPACE 15
PERSON IN-HOUSE
PRECONSTRUCTION
TEAM
Joe Hoffmeier
Managing Director
Steve Knetter
Superintendent
Zach Singer
Project Manager
Charlie Haas
Director of
Preconstruction
» 27 YEARS INDUSTRY
EXPERIENCE
» ACTIVE PARTNER ON CITY
OF MKE PUBLIC WORKS
BUILDING BUDGET
» EXTENSIVE OCCUPIED
SPACE EXPERIENCE
» 25 YEARS INDUSTRY
EXPERIENCE
» ACTIVE PARTNER ON
CITY OF MKE PUBLIC
WORKS BUILDING
BUDGET
» 12 YEARS INDUSTRY
EXPERIENCE
» PREVIOUS FIRE
STATION EXPERIENCE
» EXTENSIVE OCCUPIED
SPACE EXPERIENCE
» 24 YEARS INDUSTRY
EXPERIENCE
» EXTENSIVE OCCUPIED
SPACE EXPERIENCE
0.99
2025 OSHA
INCIDENT
RATING
1. Zero-Interruption Operations Planning.
We design our sequencing so firefighters can
maintain full emergency response capabilities at
all times with no interruptions.
2. Noise, Dust, and Environmental
Containment. Our environmental controls
maintain a healthy, quiet, and disruption-free
workspace for fire crews.
3. Communication and Daily Coordination.
We provide real-time communication that keeps
firefighters informed and involved
4. Pre-construction and Cost Planning.
Progressive preconstruction keeps the project
aligned with budget and schedule.
Mission-Ready Logistics
Maintaining uninterrupted emergency
response drives every logistics decision.
We have developed three fully evaluated
site logistics options that protect
apparatus access, crew circulation,
and construction safety.
>> See the Appendix for detailed plans.
Page 52 of 167
Firm Experience
& Qualifications
01
FIRESTATION NO. 2
Page 53 of 167
6
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // FIRM EXPERIENCE & QUALIFICATIONS
SECTION 01
FIRM QUALIFICATIONS
OUR MISSION
To create exceptional facilities that improve
the lives of others.
VALUE PROPOSITION
Delivering an exceptional client experience,
founded on trust, quality construction and
dedication to strengthening communities.
DATE FIRST ORGANIZED
Founded in 1920
TYPE OF FIRM
Privately Owned
RECENT RECOGNITIONS
Top Workplaces (2010-2025)
Milwaukee Journal Sentinel
Best Places to Work (15x winner)
Milwaukee Business Journal
Best Places to Work (5x winner)
Wisconsin State Journal
Best Places to Work (2x winner)
Madison Magazine
Top 100 Construction Managers in the
Country
Engineering News Record
2x WI Family Business of the Year
Skills / Integrity / Responsibility Award
Distinguished Performer in DEI
Deloitte 75
LOCATIONS
Milwaukee (HQ & Project Managing Office)
11777 West Lake Park Dr. | Milwaukee, WI 53224
Madison
433 West Washington Ave. | Madison, WI 53703
Arizona
999 E Playa Del Norte Dr. #110 | Tempe, AZ 85288
Schmidt: A family name. A 106-year promise.
Founded in 1920 by Dutch immigrant Charles Schmidt, CG Schmidt was built
on a simple yet powerful idea: a name is only as strong as the reputation
behind it. He believed that every project was a reflection of character, and
that belief still guides us today.
Now in our fifth generation of family leadership, CG Schmidt has grown into
one of Wisconsin’s leading commercial builders. We’ve stayed true to the
core values passed down over the past 106 years—integrity, caring, and a
passion for excellence.
We are proud to be the trusted partner on many of the state’s most
respected organizations in communities across the state and nation, and
look forward to the opportunity to serve The Village of Germantown and
Germantown Fire Department Fire Station No. 2.
Pictured above clockwise from lower right: President & CEO, Eric Schmidt; Chairman,
Rick Schmidt; Managing Director, Ryan Schmidt; Senior Project Manager, Brad Schmidt.
106
YEARS
EXPERIENCE
5
GENERATIONS
STRONG
373
OFFICE & FIELD
PROFESSIONALS
3
OFFICE
LOCATIONS
0
LAWSUITS
WITH ANY
CLIENTS
OR ARCHITECTS
Page 54 of 167
7
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // FIRM EXPERIENCE & QUALIFICATIONS
RESPONSE TIME &
UNINTERRUPTED
OPERATIONS
We plan, phase, and communicate
construction site logistics
to preserve direct, intuitive
movement while maintaining
uninterrupted emergency
response throughout all phases
of work.
FIREFIGHTER
WELLNESS
& SAFETY
Our approach prioritizes clear
separation of firefighter operations
and wellbeing from construction
operations. Noise, dust, and other
disturbances are isolated by
proper ventilation and air quality
control to protect firefighter health
and long-term readiness.
PRECONSTRUCTION
& COST PLANNING
CONSIDERATIONS
Through early preconstruction
engagement, we align scope,
budget, and operational needs
to deliver durable, cost-effective
solutions that support current
demands while remaining flexible
for future growth.
DEDICATED TO SERVING & DELIVERING
EXCEPTIONAL CUSTOMER SERVICE TO
GERMANTOWN FIRE DEPARTMENT
FIRE STATION NO. 2
CG Schmidt will navigate the preconstruction, bidding, and construction services for the expansion
and remodel of Germantown Fire Department Fire Station No. 2 with dedication and high attention to:
Page 55 of 167
PROJECT LOCATION:
345 N. 95th St.
Milwaukee, WI 53226
OWNER CONTACT:
Debbie Mather
Business Manager
Milwaukee Montessori School
(414) 259-0370
dmather
@milwaukee-montessori.org
PROJECT ARCHITECT:
Dan Beyer Architects, LLC
PROJECT COMPLETION:
May 2024
PROJECT SIZE:
13,059 SF
PROJECT COST:
$3.6 M
Located in the City of Milwaukee, the 13,059 SF Milwaukee Montessori Field House
project includes the construction of a brand-new activities facility which consists of
a gymnasium, locker rooms, concession stand and dance studio. With this new field
house, staff at Milwaukee Montessori can design a schedule that provides more
physical-conditioning and game-playing opportunities for their students. They can also
host athletic tournaments while enjoying the home court advantage.
Milwaukee Montessori School —
Field House
PROJECT
RELEVANCE
>> Addition & Renovation, Site Logistics,
Active Transportation and Foot Traffic
Page 56 of 167
PROJECT LOCATION:
6425 West Mequon Road
Mequon, WI 53092
OWNER CONTACT:
Gary Kinzer
Construction Project Manager
Aurora Health Care
(414)299-1647
gary.kinzer@aah.org
PROJECT ARCHITECT:
Zimmerman Architectural
Studios Inc.
PROJECT COMPLETION:
May 2024
PROJECT SIZE:
11,645 SF
PROJECT COST:
$4 M
Completed a seamless building addition along with comprehensive infrastructure
upgrades to improve safety, efficiency and functionality. The new wood-framed addition
was constructed using prefabricated trusses and wall panels and finished with durable
fiber cement siding and a shingled roof that integrates cohesively with the existing
structure.
To ensure long-term performance, the facility received complete systems upgrades,
including new lighting and fixtures throughout; a state-of-the-art fire alarm and
sprinkler system; and enhanced technology features such as access control, paging,
sound masking and nurse call systems. Mechanical and plumbing improvements
included a new rooftop unit, connection to city water and upgraded fixtures—ensuring
modern comfort, code compliance and reliability.
Aurora Urgent Care — Mequon
PROJECT
RELEVANCE
>> 9 Phases, Occupied Facility, Addition & Renovation
Page 57 of 167
PROJECT LOCATION:
1145 West Wisconsin Avenue
Milwaukee, WI 53233
OWNER CONTACT:
Raymond Ellingen
Director of Operations &
Administration
(414) 288-7101
raymond.ellingen
@marquette.edu
PROJECT ARCHITECT:
GROTH Design Group
PROJECT COMPLETION:
November 2025
PROJECT SIZE:
28,000 SF
PROJECT COST:
$6.4 M
This historic worship and wedding venue on Marquette University’s campus, underwent
a 28,000 SF renovation to enhance safety, accessibility, and the overall experience while
preserving its architectural beauty. Updates included new solid oak seating, porcelain
tile flooring with an integrated hearing loop system, reconfigured entry and sanctuary
ramps, and restored decorative ceilings. Additional improvements modernized lighting,
sound, security, and fire detection systems while maintaining the church’s timeless
character.
Church of the Gesu
Interior Renovations
PROJECT
RELEVANCE
>> Heart of Campus, Church Open During
Renovations, Working Around Churchtimes
Page 58 of 167
PROJECT LOCATION:
South 68th St
West Allis, WI 53227
OWNER CONTACT:
Michele Strasser
Director of Rec and Community
Services
West Allis-West Milwaukee
School District
(414) 604-3005
stram@wawmsd.org
PROJECT ARCHITECT:
GROTH Design Group
PROJECT COMPLETION:
December 2025
PROJECT SIZE:
25,585 SF
PROJECT COST:
$13M
The West Allis-West Milwaukee Rec Center project includes the remodel of the current
building as well as an addition. Highlights of the project include an indoor walking track,
full size gym, dance and fitness studio, preschool learning center, large multipurpose/
meeting rooms with an attached kitchen, convenient parking, updated office operations,
a permanent home for the Recreation and Community Services Department, and a
beautiful park-like setting with upgraded access. Furthermore, the brick is being re-
purposed to build the retaining wall commemorating the Franklin D. Roosevelt Works
Project that build the wall during the Great Depression.
West Allis-West Milwaukee
Recreation Center
PROJECT
RELEVANCE
>> Occupied Spaces, Addition & Renovation
Page 59 of 167
Proposed
Team
02
FIRE STATION NO. 2
Page 60 of 167
13
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
SECTION 02
PROJECT TEAM
PRECONSTRUCTION CONSTRUCTION
Project Lead
Joe Hoffmeier
Managing Director
Steve Knetter
Superintendent
Josh Schmitz
Safety Director
Zach Singer
Project Manager
Aaron Smith
Quality Director
The proposed CG Schmidt team
was chosen for their technical
expertise and experience with
occupied space construction.
Joe Hoffmeier and Zach Singer will
oversee all phases of the project as
your designated points of contacts.
SAFETY & QUALITY
Charlie Haas
Director of Preconstruction
Page 61 of 167
14
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
JOE HOFFMEIER
Managing Director
Joe’s experience stands out through his experience in occupied facilities and busy
campus environments. His ability to manage complex logistics and maintain safety and
accessibility has proven essential in high-traffic, high-sensitivity settings. The following
projects reflect Joe’s strength in navigating operational challenges while ensuring minimal
disruption to daily activities—an asset that will be critical to the success of this project.
RELEVANT PROJECT EXPERIENCE
West Allis West Milwaukee School District Recreation Center Addition and
Renovation | West Allis, WI | $10M
The West Allis-West Milwaukee Rec Center project included demolition of outdated
facilities, remodel of the 2005 building, and site prep for future additions. Completed
in summer 2020, the upgraded center features a gym, walking track, fitness and dance
studios, preschool, multipurpose rooms, and modern offices. Reclaimed brick was
used to build a retaining wall honoring the original FDR-era Works Project.
Milwaukee Montessori School — Field House | Milwaukee, WI | $3.6M
Located in the City of Milwaukee, the 13,059 SF Milwaukee Montessori Field House
project includes the construction of a brand-new activities facility which consists
of a gymnasium, locker rooms, concession stand and dance studio. With this new
field house, staff at Milwaukee Montessori can design a schedule that provides more
physical-conditioning and game-playing opportunities for their students. They can also
host athletic tournaments while enjoying the home court advantage.
Church of the Gesu — Interior Renovations | Milwaukee, WI | $6.4M
This historic worship and wedding venue on Marquette University’s campus,
underwent a 28,000 sf renovation to enhance safety, accessibility, and the overall
experience while preserving its architectural beauty. Updates included new solid oak
seating, porcelain tile flooring with an integrated hearing loop system, reconfigured
entry and sanctuary ramps, and restored decorative ceilings. Additional improvements
modernized lighting, sound, security, and fire detection systems while maintaining the
church’s timeless character.
City of Milwaukee Department of Public Works - Building Precon Budget |
Milwaukee, WI | Confidential
CG Schmidt is working alongside Graef for a new Milwaukee Department of Public
Works service center by providing the cost estimate piece. This project is in
process and confidential.
Education &
Training
BS, Construction
Management
UW - Stout
AAS, Architectural Drafting/
Construction Technology
Waukesha County Technical
College
Healthcare Construction
Certificate (HCC)
Wisconsin Healthcare
Engineering
CPR, AED and First Aid
Certification
Medic First Aid
30-Hour Construction Safety
Course
OSHA
SafeStart® Training
CG Schmidt
Page 62 of 167
15
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
ZACH SINGER
Project Manager
Working in all phases of construction, Zach manages scheduling, bid review, estimating,
budgeting and value engineering in the preconstruction phase. He also manages the
master schedule, shop drawing review, submittal review, monthly progress reports, and
management of subcontractors in the construction phase. Zach will lead the punch list
review, close-out and warranty follow-up.
RELEVANT PROJECT EXPERIENCE
School District of Brown Deer — North Commons | Brown Deer, WI | $25.9M
The successful referendum project included the conversion of the former middle
school to the current Brown Deer Elementary School and the conversion of the
high school to accommodate 7-12 th grade including alterations to their food service
line.
Elmbrook School District — Fairview South School | Elm Grove, WI | $3.5 M
Fairview South School underwent a renovation featuring redesigned classrooms,
a sensory suite, life-skills apartment, gross motor room, and an innovative
hydroponic learning lab—creating inclusive, hands-on spaces that support every
student’s growth and development.
Church of the Gesu - Interior Renovations | Milwaukee, WI | $6.4M
This historic worship and wedding venue on Marquette University’s campus,
underwent a 28,000 sf renovation to enhance safety, accessibility, and the overall
experience while preserving its architectural beauty. Updates included new
solid oak seating, porcelain tile flooring with an integrated hearing loop system,
reconfigured entry and sanctuary ramps, and restored decorative ceilings.
Additional improvements modernized lighting, sound, security, and fire detection
systems while maintaining the church’s timeless character.
Bridge Church — Additions & Remodel | Waukesha, WI | In Progress
With the expected continued upward trend in attendance, BC is planning for
additions and renovations. The targeted addition would include a 750 seat worship
space, large gathering area with a café and renovated spaces within the existing
building. The renovations would include updates to the children’s ministry area
and the existing worship space.
*Fire Station No.97 & Fire Station No.98 | Menomonee Falls, WI & Lannon, WI |
Confidential
A simultaneous ground-up construction of two fire stations including one for
Menomonee Falls (Station 87) and another that is shared between Menomonee
Falls and Lannon (Station 98).
Education &
Training
BS, Building Construction
Management
UW - Platteville
CPR, AED and First Aid
Certification
Medic First Aid
30-Hour Construction Safety
Course
OSHA
Procore Certified,
Superintendent
Procore Technologies
SafeStart® Training
CG Schmidt
*Indicates project completed through previous employer
Page 63 of 167
16
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
STEVE KNETTER
Superintendent
Steve will be responsible during onsite construction and for the supervision, quality,
safety and coordination with all agencies and inspection services. He orchestrates and
enforces CG Schmidt’s “Leave It Better Than You Found It” policy for jobsite cleanup.
RELEVANT PROJECT EXPERIENCE
Dr. Howard Fuller Collegiate Academy | Milwaukee, WI | $20.8 M
The new, state-of-the-art, four-story high school at approximately 85,000 SF
featured a full operating kitchen for student hot lunches, regulation gymnasium
and dedicated community programming space in addition to traditional classroom
and administrative space.
Grafton School District — John Long Middle School | Grafton, WI | $8.3 M
This project featured a new 5 th grade addition with eight state-of-the-art
classrooms, along with comprehensive renovations to the science labs, cafeteria,
restrooms, and special education spaces
Muskego-Norway School District | Muskego, WI | $43.2 M
The facilities improvement referendum created a project that includes the
construction of a new middle school and 3-2-1 school organization—three
elementary schools, two middle schools and one high school.
Hartford Union High School — 2024 Referendum | Hartford, WI | $25.8 M
This facilities referendum project addresses infrastructure, safety and security,
learning space for technical education and engineering, swimming pool remodel,
updates to outdoor facility update, tech ed spaces, MEP upgrades, and additional
site work.
Milwaukee Montessori School — Field House | Milwaukee, WI | $3.6M
Located in the City of Milwaukee, the 13,059 SF Milwaukee Montessori Field House
project includes the construction of a brand-new activities facility which consists
of a gymnasium, locker rooms, concession stand and dance studio. With this new
field house, staff at Milwaukee Montessori can design a schedule that provides more
physical-conditioning and game-playing opportunities for their students. They can also
host athletic tournaments while enjoying the home court advantage.
Education &
Training
Supervisory Training
Program
Associated General
Contractors of Wisconsin
(AGC)
30-Hour Construction Safety
Course
OSHA
10-Hour Construction Safety
Course
OSHA
CPR, AED and First Aid
Certification
Medic First Aid
SafeStart Training
CG Schmidt
Page 64 of 167
17
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
CHARLIE HAAS
Director of Preconstruction
Charlie works closely with the project team to provide continuity between preconstruction
planning and project operations. He ensures the information captured is shared, everyone
understands the vision, and that the learnings and insights gained from other projects
are applied for your project’s benefit.
RELEVANT PROJECT EXPERIENCE
West Allis West Milwaukee School District Recreation Center Addition and
Renovation | West Allis, WI | $10M
The West Allis-West Milwaukee Rec Center project included demolition of outdated
facilities, remodel of the 2005 building, and site prep for future additions. Completed
in summer 2020, the upgraded center features a gym, walking track, fitness and dance
studios, preschool, multipurpose rooms, and modern offices. Reclaimed brick was
used to build a retaining wall honoring the original FDR-era Works Project.
Pewaukee School District | Pewaukee, WI | Various
As a result of the approved referendum for facility improvements, in-progress
construction include additions and renovations to all four schools, with a scope
including campus-wide infrastructure improvements, enhanced safety and
security, more academic and office space, and grade reconfigurations.
Oconomowoc Area School District | Oconomowoc, WI | $25.7 M
A dynamic addition that expands learning opportunities for students, with a
scope including six new classrooms, dedicated collaboration spaces, small-group
instructional areas, shared classroom library spaces, and specialized science and
STEM learning environments. Enhancements provide educators and students with
a flexible and engaging learning environment.
City of Milwaukee Department of Public Works - Building Precon Budget |
Milwaukee, WI | Confidential
CG Schmidt is working alongside Graef for a new Milwaukee Department of Public
Works service center by providing the cost estimate piece. This project is in
process and confidential.
Muskego-Norway School District | Muskego, WI | $43.2 M
The facilities improvement referendum created a project that includes the
construction of a new middle school and 3-2-1 school organization—three
elementary schools, two middle schools and one high school.
Bridge Church — Additions & Remodel | Waukesha, WI | In Progress
With the expected continued upward trend in attendance, BC is planning for
additions and renovations. The targeted addition would include a 750 seat
worship space, large gathering area with a café and renovated spaces within
the existing building. The renovations would include updates to the children’s
ministry area and the existing worship space.
Education &
Training
MS, Architecture
UW - Milwaukee
MBA
Marquette University
BS, Civil Engineering
Villanova University
Licensed Architect
State of WI
SafeStart® Training
CG Schmidt
Page 65 of 167
Project
Approach &
Understanding
03
FIRE STATION NO. 2
Page 66 of 167
19
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
Mission-Critical
Operations Cannot Stop
Maintaining operational
continuity during renovation
and mold remediation
is critical to response
reliability and community
safety.
Cost Certainty
through Progressive
Preconstruction
The Village has defined a
structured preconstruction
process. This signals a clear
expectation: cost control
must happen in real time—
not at bid time.
Mold Remediation as
an Integrated Scope
Mold remediation is not a
side scope—it is a sequencing
driver. This work will directly
impact schedule flow, crew
relocations, and access
sequencing.
Transparent Public
Procurement
The Village has various
requirements that need to
be adhered to in this project.
Clear documentation, public
accountability, and clean bid
packaging will be essential.
PROJECT UNDERSTANDING CG SCHMIDT’S APPROACH
Early Alignment & Risk Mapping
At project kickoff, risks will be identified early, assigned
ownership, pricing when appropriate, and tracked through
GMP development.
Progressive Cost Leadership
No Surprises. Not only is that one of our core values, but
the goal for this project at GMP. To achieve this, we’ll use
real-time cost tracing, side-by-side estimate reconciliation
with SEH, early scope gap identification, and value analysis
focused on durability, lifecycle cost, and response reliability
to provide fluid estimating.
Operationally Driven Phasing
Our phasing strategy prioritizes apparatus access at all
times, clear construction/operations separation, life-safety
barrier plans, and mitigation for noise, vibration and dust.
Temporary relocations would be mapped out only when
unavoidable and would be supported with clear map
circulation, emergency paths, and construction zones before
work begins.
Mold Remediation Integration
Remediation becomes part of the master schedule, not an
isolated event. CG Schmidt will coordinate directly with SEH
in this process. Please see the following page for our plan.
Transparent, Competitive Procurement
To protect taxpayer dollars and project integrity, our
approach will emphasize thoughtful bid packages to
maximize competition, clear scopes to reduce change orders,
public bid transparency and documentation, and structured
recommendation summaries for Owner and Board review.
Construction Phase Leadership
Fully operational. Fully commissioned. Fully supported. That
is how we will leave this project. During construction, our
focus will include active on-site supervision, strict safety and
containment enforcement, proactive communication with
station leadership and Village stakeholders, and structured
closeout and commissioning coordination.
SECTION 03
PROJECT APPROACH & UNDERSTANDING
Page 67 of 167
20
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
Mold Remediation
Coordination &
Implementation Plan
1. INVESTIGATION & DEFINITION
Lead: SEH
» Identify moisture sources and affected assemblies
» Define remediation protocol and extent
» Provide environmental specifications
CG Schmidt’s Role: Validate constructability, develop
preliminary cost and schedule scenarios.
2. CONTAINMENT & PROTECTION PLANNING
» Establish isolated work zones
» Install negative air machines with HEPA filtration
» Protect adjacent living quarters and apparatus bays
» Maintain emergency egress routes
Fire Station Priority: Zero disruption to response readiness.
3. CONTROLLED REMEDIATION
» Remove impacted materials
» Clean and treat remaining substrates
» Continuous air monitoring
» Daily coordination with station leadership
CG Schmidt’s Role: Overseeing safety, documentation, schedule
compression where feasible.
4. CLEARANCE TESTING & VERIFICATION
» Third-party air and surface sampling
» Independent clearance confirmation
» Formal documentation for record
No reconstruction begins until clearance is achieved.
5. RECONSTRUCTION & RESTORATION
» Rebuild assemblies to current code
» Improve moisture management detailing
» Integrate work into overall phasing plan
» Closeout documentation and warranty review
Because a fire station operates 24/7 in
support of emergency response, mold
remediation must be executed with precision,
transparency, and zero impact to readiness.
Our approach integrates environmental
investigation, containment planning,
remediation, and reconstruction into a single
coordinated process that protects occupant
health while maintaining uninterrupted
operations.
Working in collaboration with SEH, we will
translate identified conditions into clear cost,
schedule, and phasing strategies—ensuring
remediation is addressed safely, efficiently,
and fully aligned with GMP development and
station response reliability.
Page 68 of 167
21
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
VALUE ENGINEERING STUDY
Value engineering is a critical process for
CG Schmidt, enabling the firm to optimize
project outcomes by balancing cost, quality,
and functionality. By carefully analyzing
design and construction methods, we work
with clients and stakeholders to identify
opportunities for cost savings without
compromising on performance or safety.
This proactive approach involves a
collaborative, team-oriented effort to
assess alternative materials, systems, and
techniques that can reduce expenses and
improve efficiency, all while maintaining the
project’s overall vision and standards. With
a focus on innovation and practical problem-
solving, our value engineering practices help
deliver superior value, ensuring that each
project meets both budgetary goals and the
highest quality benchmarks.
DETAILED COST ESTIMATE
CG Schmidt provides a detailed cost
estimate by assessing the project’s scope,
size, and complexity. They evaluate costs
for materials, labor, equipment, permits,
and overhead, breaking them into line
items for clarity. We also considers site
conditions, timelines, and potential risks.
This thorough estimate helps clients
understand the full financial commitment
and supports informed decision-making
throughout the project.
Sample Value Engineering Study
& Cost Control Log
Sample Cost Estimate
SAMPLE
SAMPLE
Effective Budgeting Tools to Optimize Outcomes
Page 69 of 167
22
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
WEEKLY LOOK-AHEAD SCHEDULE
CG Schmidt schedules and conducts
weekly construction meetings to
discuss progress, procedures, budget
and scheduling issues. In addition, we
review work completed during the past
week and outline work that is to be
completed in the next month. Action
items and deadlines are assigned to
the appropriate parties, recorded in the
weekly meeting minutes and tracked by
your project manager.
WORK SCHEDULE
Adhering to the construction schedule
is a top priority. We carefully plan and
coordinate all phases of the project to
ensure timely completion, minimizing
delays and maintaining project
momentum. By closely monitoring
progress, managing resources
efficiently, and addressing potential
issues early, we deliver projects on
time, meeting client expectations and
avoiding costly setbacks.
Site SUBCONTRACTOR 3/11 3/19 3/20 3/21 3/22 3/23 3/24 3/11 3/19 3/20 3/21 3/22 3/23 3/24 3/11 3/19 3/20 3/21 3/22 3/23 3/24 3/11 3 /19 3/20 3/21 3/22 3/23 3/24 3/11 3/19 3/20 3/21 3/22 3/23 3/24
Site Work 4/22 4/23 4/24 4/25 4/26 4/27 4/28 4/29 4/30 5/1 5/2 5/3 5/4 5/5 5/6 5/7 5/8 5/9 5/10 5/11 5/12 5/13 5/14 5/15 5/16 5/17 5/18/ 5/ 19 5/20 5/21 5/22 5/23 5/24 5/25 5/26 5/27 5/28 5/29 5/30 5/31 6 /1 6/2 6/3 6/4 6/5 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 6/14
Sheathing on walls CGS x x x x x x x x x x
Pour connector CGS x
Roof blocking classroom ongoing CGS
Set frame classrooms CGS xxxx xxxxx xxxxx x
Pour stairs mezz x
Brick classroom Hein xx xxxxx xxxxx xxxxx
Block classroom interior Hein x x x x x x x x x x x x x x x x x x
Block walls locker room Hein
Electrical rough in Masonry Hubbartt x x x x x x x x x x xxxxx xx
Over head rogh ins classroom Hubbartt x x x x x x x x x x
Finishes Gym and locker room Hubbartt x x x x x x xxxxx xx
Prime and paint Gym Davis x x x x
Prime and paint locker room Davis x x x x x
Paint door frames xxxx
Stairs mezz SPE x x x
Bar joist in C SPE xxxx xx
Masonry wall rough ins Maritime x x x x x x x x x x xxxxx
Roof Drains classroom pipe Maritime x x x x x x x x
Interior studs C Common links xxx x x xxxxx xx
Dense glass Exterior D Common links x x x x x
Drywall and finish locker rooms Common links x x x x
Interior studs connector Common links x x x x x x x
Frame soffits classroom Common links xxxx xxxxx
New roof on C Craft ?
Roof classroom Craft x x x x x x x x x x
Classroom pipping and duct Ahern x x x x x x x x x x xxxxx
Fire protection classrooms Ahern xxxxx xxxxx xxxxx xxxx
Pipe insulating Ahern x x x x x x x
Remove lead bar joist bridging Robinson xxxxx
Grid locker room Verhalen xxx xx
panels gym walls Verhalen xxxxx xxxxx
Install Gym equipment Carroll xxxx xx
Air barrier and spray foam Appleton lathe xxx xxxxx xxxx
Gym floor Baseman xxxxx xxxxx xxxxx xxxxx
Window install Omni xxx xxxxx xx xx
Updated
4/22/2024
Project
227182
Project Name
L.B. Clarke
Sample Weekly Look-
Ahead Schedule
Diligent Schedule Management
ID
Task
Mode
Task Name Duration Start Finish
1
WƌĞŽŶWŚĂƐĞ ϵϮĚĂLJƐ DŽŶϵͬϮϱͬϮϯ DŽŶϮͬϭϮͬϮϰ
13
ŽŶƐƚƌƵĐƚŝŽŶWŚĂƐĞ ϮϮϭĚĂLJƐ dƵĞϮͬϭϯͬϮϰ dƵĞϭϮͬϮϰͬϮϰ
14
WƌŽĐƵƌĞŵĞŶƚ ϭϭϬĚĂLJƐ dƵĞϮͬϭϯͬϮϰ tĞĚϳͬϭϳͬϮϰ
15
^ƵďĐŽŶƚƌĂĐƚƐ ϭǁŬ dƵĞϮͬϭϯͬϮϰ DŽŶϮͬϭϵͬϮϰ
16
^ƵďŵŝƚƚĂůƐ ϯǁŬƐ dƵĞϮͬϮϬͬϮϰ DŽŶϯͬϭϭͬϮϰ
17
,D&ƌĂŵĞWƌŽĐƵƌĞŵĞŶƚ ϴǁŬƐ dƵĞϯͬϭϮͬϮϰ DŽŶϱͬϲͬϮϰ
18
ŽŽƌͬ,ĂƌĚǁĂƌĞWƌŽĐƵƌĞŵĞŶƚ ϭϰǁŬƐ dƵĞϯͬϭϮͬϮϰ dƵĞϲͬϭϴͬϮϰ
19
WƌĞ&ĂďtĂůůWĂŶĞůƐ ϲǁŬƐ dƵĞϯͬϭϮͬϮϰ DŽŶϰͬϮϮͬϮϰ
20
WƌĞĨĂďƌŝĐĂƚĞtŽŽĚdƌƵƐƐĞƐ ϭϮǁŬƐ dƵĞϯͬϭϮͬϮϰ dƵĞϲͬϰͬϮϰ
21
DWƋƵŝƉŵĞŶƚWƌŽĐƵƌĞŵĞŶƚ ϭϴǁŬƐ dƵĞϯͬϭϮͬϮϰ tĞĚϳͬϭϳͬϮϰ
22
ZĞďĂƌWƌŽĐƵƌĞŵĞŶƚ ϰǁŬƐ dƵĞϯͬϭϮͬϮϰ DŽŶϰͬϴͬϮϰ
23
ƵŝůĚŝŶŐŽŶƐƚƌƵĐƚŝŽŶ ϭϲϲĚĂLJƐ DŽŶϰͬϴͬϮϰ dƵĞϭϮͬϯͬϮϰ
24
^ŝƚĞDŽďŝůŝnjĂƚŝŽŶ ϬĚĂLJƐ DŽŶϰͬϴͬϮϰ DŽŶϰͬϴͬϮϰ
25
^ŝƚĞ&ĞŶĐŝŶŐ ϮĚĂLJƐ dƵĞϰͬϵͬϮϰ tĞĚϰͬϭϬͬϮϰ
26
DĂƐƐĂƌƚŚǁŽƌŬ ϯĚĂLJƐ dŚƵϰͬϭϭͬϮϰ DŽŶϰͬϭϱͬϮϰ
27
^ŝƚĞhƚŝůŝƚŝĞƐ ϭϱĚĂLJƐ dƵĞϰͬϭϲͬϮϰ DŽŶϱͬϲͬϮϰ
28
ƵŝůĚŝŶŐ&ŽƵŶĚĂƚŝŽŶdžĐĂǀĂƚŝŽŶƐ ϯĚĂLJƐ dƵĞϰͬϭϲͬϮϰ dŚƵϰͬϭϴͬϮϰ
29
ƵŝůĚŝŶŐ&ŽŽƚŝŶŐƐ ϱĚĂLJƐ &ƌŝϰͬϭϵͬϮϰ dŚƵϰͬϮϱͬϮϰ
30
ƵŝůĚŝŶŐ&ƌŽƐƚtĂůůƐ ϭϬĚĂLJƐ &ƌŝϰͬϮϲͬϮϰ dŚƵϱͬϵͬϮϰ
31
ƵŝůĚŝŶŐhŶĚĞƌŐƌŽƵŶĚDW ϭϬĚĂLJƐ &ƌŝϱͬϭϬͬϮϰ dŚƵϱͬϮϯͬϮϰ
32
'ƌĂĚĞ^ůĂďKŶ'ƌĂĚĞ ϱĚĂLJƐ &ƌŝϱͬϮϰͬϮϰ &ƌŝϱͬϯϭͬϮϰ
33
ƵŝůĚŝŶŐ^ůĂďŽŶ'ƌĂĚĞ ϱĚĂLJƐ DŽŶϲͬϯͬϮϰ &ƌŝϲͬϳͬϮϰ
34
džƚĞƌŝŽƌtĂůůŽŶƐƚƌƵĐƚŝŽŶ ϭϬĚĂLJƐ DŽŶϲͬϭϬͬϮϰ &ƌŝϲͬϮϭͬϮϰ
35
/ŶƚĞƌŝŽƌtĂůůŽŶƐƚƌƵĐƚŝŽŶ ϭϬĚĂLJƐ DŽŶϲͬϮϰͬϮϰ DŽŶϳͬϴͬϮϰ
36
/ŶƐƚĂůů&ůĂƚZŽŽĨdƌƵƐƐĞƐΘ^ŚĞĞƚŝŶŐ ϭϬĚĂLJƐ dƵĞϳͬϵͬϮϰ DŽŶϳͬϮϮͬϮϰ
37
/ŶƐƚĂůůůĞĂƌƐƚŽƌLJtĂůůƐĂŶĚdƌƵƐƐĞƐ ϱĚĂLJƐ dƵĞϳͬϮϯͬϮϰ DŽŶϳͬϮϵͬϮϰ
45
/ŶƐƚĂůůdžƚĞƌŝŽƌ'ůĂnjŝŶŐ^LJƐƚĞŵƐ ϭϱĚĂLJƐ dƵĞϳͬϮϯͬϮϰ DŽŶϴͬϭϮͬϮϰ
38
/ŶƐƚĂůůƌŽŽĨďůŽĐŬŝŶŐ ϱĚĂLJƐ dƵĞϳͬϯϬͬϮϰ DŽŶϴͬϱͬϮϰ
39
/ŶƐƚĂůůZŽŽĨŝŶŐ ϭϬĚĂLJƐ dƵĞϴͬϲͬϮϰ DŽŶϴͬϭϵͬϮϰ
40
ƵŝůĚŝŶŐ/ŶǁĂůůͬďŽǀĞĞŝůŝŶŐDWΖƐ ϭϱĚĂLJƐ dƵĞϴͬϭϯͬϮϰ dƵĞϵͬϯͬϮϰ
41
/ŶƐƚĂůůdžƚĞƌŝŽƌĞŵĞŶƚ^ŝĚŝŶŐ ϮϬĚĂLJƐ dƵĞϴͬϮϬͬϮϰ dƵĞϵͬϭϳͬϮϰ
43
/ŶƐƚĂůůdžƚĞƌŝŽƌDĂƐŽŶƌLJ ϭϱĚĂLJƐ dƵĞϴͬϮϬͬϮϰ dƵĞϵͬϭϬͬϮϰ
47
ƌLJǁĂůůͬ,ĂŶŐͬdĂƉĞͬ&ŝŶŝƐŚ ϭϱĚĂLJƐ tĞĚϵͬϰͬϮϰ dƵĞϵͬϮϰͬϮϰ
44
/ŶƐƚĂůůdžƚĞƌŝŽƌdƌŝŵƐͬ&ůĂƐŚŝŶŐͬŽƉŝŶŐƐ ϮϬĚĂLJƐ tĞĚϵͬϭϭͬϮϰ dƵĞϭϬͬϴͬϮϰ
42
/ŶƐƚĂůůŽĨDĞƚĂůWĂŶĞůƐ ϭϬĚĂLJƐ tĞĚϵͬϭϴͬϮϰ dƵĞϭϬͬϭͬϮϰ
48
WĂŝŶƚ/ŶƚĞƌŝŽƌ ϭϬĚĂLJƐ tĞĚϵͬϮϱͬϮϰ dƵĞϭϬͬϴͬϮϰ
49
d'ƌŝĚ ϱĚĂLJƐ tĞĚϭϬͬϮͬϮϰ dƵĞϭϬͬϴͬϮϰ
50
/ŶƐƚĂůůDWƐŝŶ'ƌŝĚ ϭϬĚĂLJƐ DŽŶϭϬͬϳͬϮϰ &ƌŝϭϬͬϭϴͬϮϰ
46
/ŶƐƚĂůů^ŝƚĞŽŶĐƌĞƚĞWĂǀŝŶŐΖƐͬZĂŝůŝŶŐƐ ϭϱĚĂLJƐ tĞĚϭϬͬϵͬϮϰ dƵĞϭϬͬϮϵͬϮϰ
Subcontracts
Submittals
HM Frame Procurement
Door/Hardware Procurement
PreFab Wall Panels
Prefabricate Wood Trusses
MEP Equipment Procurement
Rebar Procurement
4/8
Site Fencing
Mass Earthwork
Site Utilities
Building Foundation Excavations
Building Footings
Building Frost Walls
Building Underground MEP
Grade Slab On Grade
Building Slab on Grade
Exterior Wall Construction
Interior Wall Construction
Install Flat Roof Trusses & Sheeting
Install Clearstory Walls and Trusses
Install Exterior Glazing Systems
Install roof blocking
Install Roofing
Building Inwall/Above Ceiling MEP's
Install Exterior Cement Siding
Install Exterior Masonry
Drywall/Hang/Tape/Finish
Install Exterior Trims/Flashing/Copings
Install of Metal Panels
Paint Interior
ACT Grid
Install MEPs in Grid
Install Site Concrete Paving's/Railings
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Qtr 3, 2023 Qtr 4, 2023 Qtr 1, 2024 Qtr 2, 2024 Qtr 3, 2024 Qtr 4, 2024 Qtr 1, 2025 Qtr 2, 2025
SD WI Dells District Office
Project Contract Schedule
Mon 2/19/24
CGS Schmidt
BUILDING A BETTER TOMORROW, TODAY
1
Sample Work Schedule
SAMPLE
Page 70 of 167
23
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
Our goal is to complete jobs efficiently and precisely.
Expediting project closeout and ensuring all open
issues are addressed are important components for
successful projects.
We track project closeout activities and milestone
dates within the project schedule. Starting the
closeout process early eliminates last-minute fixes
and inefficiency. For example, as subcontractors are
hired, we ask them to provide their Operations and
Maintenance (O&M) information along with shop
drawing and equipment submittals. This way, O&M
information is readily available throughout training an
onboarding of staff.
As part of our Quality Assurance program, we utilize
a project closeout checklist to keep track of project
closeout items.
The checklist tracks:
» Project closeout notifications (internal and external)
» Completion status of punch list work items
» Substantial completion inspections
» Required project completion certifications
» Systems commissioning
» Training of operations and maintenance staff
» Record-set (as-built) documentation
» Assembly of operation and maintenance
information
» Project financial closeout record
After you take possession of your facility, we provide:
» Two-year warranty for all new construction
» Walk-through and building performance
assessments at the end of the first and second
years
» Trouble-shooting and operational assistance on
functional building issues for the life of the building
» Periodic systems retraining, if required, during
seasonal changes and the warranty period
Sample Project Closeout Checklist
During our two-year warranty period, CG Schmidt schedules specific
dates to review the performance of your new building. Typically, this
occurs at the one-year and two-year anniversaries of the completion
date. It is our goal to be proactive about any potential warranty
issues — addressing problems before they become troublesome.
MOBILE PUNCHLIST
ProjectSight is used to track and resolve ongoing
issues throughout the duration of the project.
As a result, there are minimal issues to address
during the punchlist phase, and any items on the
list can be resolved quickly which accelerates
the closeout process. ProjectSight provides all
team members with project information at their
fingertips no matter where they are located and
increases field productivity, giving our team
the tools we need to execute your project at the
highest level of quality.
CG Schmidt provides a
standard two-year warranty
for all of our projects
effective from the date of
substantial completion.
Project Closeout Precision
SAMPLE
Page 71 of 167
Preconstruction
Services Cost
Proposal
04
FIRE STATION NO. 2
Page 72 of 167
25
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
CHARLIE HAAS
Director of Preconstruction
VDC ESTIMATING MEP
MARK STIGLER
VDC Manager
CIERRA GRIFFIN
VDC Engineer/Drone
Fleet Manager
SEAN MAAS
VDC Engineer
MIYA ELYHA
VDC Engineer
RICK MORT
Director of
Estimating
JOHN FIERTAG
Senior Estimator
MATT IWANSKI
Senior Estimator
ANGELA RESNICK
Senior Estimator
LISA JELEN
Senior Estimator
NOAH RICKE
Estimator
BRIAN MEDINA
MEP Manager
CHRIS WARD
MEP Estimator
JESSICA SKROBIS
MEP Engineer
BRITTANY
WENTWORTH
MEP Engineer
CG Schmidt provides a fully integrated, in-
house preconstruction team—eliminating
the need for additional consultants while
delivering deeper coordination and clearer
decision-making from day one.
OUR TEAM OF EXPERTS
LEVERAGING TECHNOLOGY
TO IMPROVE PROJECT OUTCOMES
15
IN-HOUSE EXPERTS
IN VDC, MEP, AND
ESTIMATING
10
DIFFERENT SOFTWARE TOOLS
TO AID IN BUILDING SYSTEM
INTEGRATION
SECTION 04
PRECONSTRUCTION SERVICES
COST PROPOSAL
Page 73 of 167
26
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
Our 5-Step Preconstruction Process
CG Schmidt’s successful project approach is based on early project involvement. Projects greatly benefit from having
builder input during the planning and concept design stages. Each building decision contains cost and construction
impact, and with early engagement, we provide the necessary context to make informed building choices, allowing us to
perform at our highest capacity. We outline our 5-Step Preconstruction Process below:
STEP 1: LISTEN
» Engage in partnering sessions with all project
stakeholders
» Understand project vision, goals and parameters of work
(timeline, sequencing issues, etc.)
» Understand cash flow and proforma
» Begin continuous estimating process
» Confirm the allowable budget
» Understand major program decisions (i.e. square-footage,
number of levels, etc.)
STEP 2: INFORM
» Develop options and define target budgets
» Comparative analysis
» Begin constructability review, procurement plan and
prefabrication plan
» Virtual Design and Construction (VDC)
» Site selection
» Benchmarking
» Comparison to recent projects
» Gather subcontractor information
» Gather historical cost information
» Involve MEP partners, as needed
» Utilize the designer’s building massing and site layout
options to refine the continuous estimate
STEP 3: ADVISE
» Life cycle cost analysis
» Prioritize the project scope to maximize value
» Further refine the continuous estimate
» Entitlement process
» Utilize the designer’s massing/site to provide multiple
system alternates
» Total project budget development
» Involve enclosure and steel partners, as needed
STEP 4: ALIGN
» Project scheduling
» Refine the constructability review, procurement plan and
prefabrication plan
» Finalize the project scope
» Involve site, core and shell partners, as needed
» Understand the designer’s definition to systems and
alternates
» Further refine the continuous estimate
STEP 5: EXECUTE
» Bid packages
» Phasing and site logistics plan
» Understand designer’s final Guaranteed Maximum Price
(GMP) drawings
» Finalize GMP and alternates
» Local participation/workforce development
OUR FOCUS DURING THE
PRECONSTRUCTION PROCESS:
» Partnering
» Collaborating
» Continuous Budgeting/Estimating
» Developing and Evaluating Options
Page 74 of 167
27
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
COMMITTED TO THE NUMBER
At CG Schmidt, we prioritize meticulous planning and proactive
collaboration to ensure every project’s success. From day one, we
work closely with Germantown Fire Department Fire Station No. 2,
providing expertise in constructability, pricing, market trends, and
systems engineering. This approach guarantees a smooth, predictable
process and a high-quality product. Trust is at the core of our work,
and we uphold a legacy of transparency and integrity by presenting
clear, comparable bids.
PROVEN ESTIMATING ACCURACY
CG Schmidt consistently delivers accurate preliminary estimates at the
Schematic Design, Design Development, and Construction Document
phases, with final costs aligning closely to early projections. Our teams
maintain detailed cost control logs and work tirelessly to keep the
projects on track, demonstrating our commitment to budget discipline
and transparency.
Our Building Catalyst software is a powerful estimating tool that
leverages historical data from similar projects across the country to
generate highly accurate and detailed cost projections. By referencing
a broad database of comparable builds, it sets clear expectations
from the start, helping to eliminate surprises and enable smarter,
data-driven planning. When budgets are tight, Building Catalyst also
identifies value engineering opportunities to reduce costs without
compromising quality, ensuring your project remains both on track and
within scope.
YOUR ACTIVE DESIGN
PARTNER
While most firms can build according
to plans, our clients hire us because
we ensure their projects are planned
perfectly from the start. We invest
more time, energy, and resources in
the planning phase than any other
firm.
From day one, we collaborate closely
with your design partner, offering
our expertise in constructibility,
pricing, market conditions, systems
engineering, and more.
OUR HONEST AND
TRANSPARENT PROCESSES
We understand the concerns clients
have about hidden costs and trust
in contractors. Our longstanding
reputation in the industry speaks
for itself—we’ve upheld a legacy of
transparency and integrity
for generations.
We believe in the principle of “Trust,
but verify.” To ensure your complete
confidence in our services, we present
each bid in a clear, easy-to-compare
format. Moreover, we go the extra
mile by providing our sealed bid 24
hours ahead of other bidders, giving
you time to review and consider our
proposal thoroughly.
Construction Budget Management
Building Catalyst software sample
Page 75 of 167
28
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
Our reputation is built on market insight, strong subcontractor
relationships, consistent bid coverage, and a proven track record. With
generations of experience throughout the Greater Milwaukee area, we
bring the knowledge, trust, and foresight to guide complex projects
from day one.
Preconstruction Capabilities
CLIENT-CENTERED COST CONTROL
Continuous estimating ensures that projects stay on track,
within budget, and aligned with client expectations from
concept to completion.
REAL-TIME COLLABORATION
This dynamic approach involves real-time cost assessment
and collaboration throughout the project lifecycle, allowing
for proactive adjustments as designs and conditions evolve.
DATA-DRIVEN INSIGHTS
By leveraging cutting-edge technology and industry
expertise, continuous estimating empowers clients with
accurate, transparent insights at every phase—driving
smarter decisions and reducing risk.
BUILDING TRUST THROUGH INNOVATION
At CG Schmidt, it’s not just about building structures.
It’s about building trust through precision, agility, and
innovation.
» Estimating
» Conceptual Estimating
» Model Based Estimating
» Continuous Estimating
» Target Value Budgeting
» Value Analysis
» Total Project Cost Management
» Cash Flow Projections
» Alternative Financing
Mechanisms
» Design Phase Management
» Constructability Reviews
» Preliminary Scheduling
» Subcontracting Scoping
» Bidding & Buyout Support
» Construction Bulletin Review
» Trade Management Partnering
» Virtual Design & BIM
» Existing Facility Documentation
» As-Built Documentation
» Photo Documentation
» Reality Capture with Drone
Flights & Laser Scanning
» Interactive Facility Tours/
Videos
» Building Visualization
» Virtual Mock-Ups
» BIM Coordination & System
Conflict Identification
» Site Utilization Studies
» Site Optimization
» Cut/Fill Analysis
» Schedule Analysis
» Virtual & Augmented Reality
» MEP Technical Services
» Facility Assessments
» MEP Systems Assessments
» Life Cycle Cost Analysis
» Energy Audits
» Capital Maintenance /
Improvement Planning
» Energy Optimization
» Energy Benchmarking
» Mechanical Systems Controls
Audit
» Commissioning
Preconstruction Services
Our integrated clash-detection models provide a digital 3D model that combines
architectural, structural, mechanical, electrical, and plumbing (MEP) systems
to identify conflicts (or “clashes”) between different elements of a construction
project before physical work begins.
REAL-TIME COLLABORATION.
TRANSPARENT COSTS.
TRUSTED RESULTS.
Page 76 of 167
29
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
Please see the Appendix fee section for the
preconstruction services cost proposal.
Preconstruction Services
Cost Proposal
Page 77 of 167
GMP
Development
Approach
05
FIRESTATION NO. 2
Page 78 of 167
31
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // GMP DEVELOPMENT APPROACH
SECTION 05
GMP DEVELOPMENT
APPROACH
TRANSPARENCY AND UNDERSTANDING
We invest in dedicated time to understand project
objectives and how they will meet your goals. An open,
transparent approach and deep understanding of key
aims delivers a successful project.
CG Schmidt works diligently with the design team
and client to limit the number of allowances and
contingencies in the GMP. We recommend carrying the
following contingencies as we work through the design
process.
The sample project dashboard monitors the progression of the total project budget throughout the entirety of the project.
$7.0M
$6.5M
$6M
$5.5M
$5M
$4.5M
7/10/2024 7/29/2024 10/15/2024 12/8/2024 6/22/2025 8/13/2025 9/7/2025 9/17/2025
Budget:
$5.0M
$6.55M
$5.14M $5.03M
$4.77M
$4.96M $4.96M
$5.08M
$4.92M
CONFIDENTIAL RENOVATION: OWNER’S BUDGET $5.0M
RECOMMENDATIONS FOR FIRE STATION NO. 2:
» Protect Operations
» Manage Differing & Unknown Conditions
» Maintain Public Transparency
Guaranteed Maximum Price Approach
A guaranteed maximum price (GMP) acts as an insurance policy for an owner, transferring risk from the owner to the
contractor. However, like an insurance policy, there must be a balance of risk. To meet this need, we focus our efforts
on establishing precise estimates to determine GMPs early while keeping contingencies at a minimum.
OUR RESPONSIBILITY
No matter when the GMP is determined, it is our
responsibility to capture all aspects of design intent
and identify all costs, not only the portion that CG
Schmidt is under contract for directly. Your proposed
team will work with you to identify all project costs and
include each in overall budget.
Continuous estimating keeps CG Schmidt ahead of every cost
driver to deliver accurate, data-driven budgets.
Page 79 of 167
Bidding &
Procurement
Methodology
06
FIRE STATION NO. 2
Page 80 of 167
33
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // BIDDING & PROCUREMENT METHODOLOGY
QUALIFY SUBCONTRACTORS
MAXIMIZE THE NUMBER OF BIDS
PROVIDE SIDE-BY-SIDE COMPARISON FOR ALL PROJECTS
GERMANTOWN FIRESTATION NO. 2 SELECTS THE BEST BIDDER
LEVERAGE RELATIONSHIPS
WITH SUBS
ADD CLIENT-
PREFERRED SUBS
OPEN AND
TRANSPARENT
BREAK INTO SMALLER
CATEGORIES
LOCAL
ADVERTISING
ASSIST WITH
QUALIFICATION PROCESS
BID EVERYTHING
OUT
MAXIMIZE LOCAL
BIDDERS
MORE COMPETITIVE BIDS
& CLIENT SAVINGS
CG Schmidt is firmly committed to a fair, transparent bidding process
while simultaneously remaining competitive with our own bids. As one of
the largest contractors in the area, CG Schmidt has the buying power to
provide the most competitive bidding for your project. Simultaneously, by
competitively bidding aspects of the project, we can divide it into smaller
work categories, allowing for greater participation by smaller local
subcontractors. We have outlined this process below in four simple steps
We will use our process to pre-qualify all subcontractors, including any of the Germantown Fire Department
Fire Station No. 2’s preferred subcontractors. We have a standard pre-qualification form that all subcontractors
complete prior to being considered.
We will carefully compare and scrutinize bids to:
» Prevent change orders
» Allow for local involvement and labor
» Maximize cost savings by obtaining the most ideas and lowest bids
» Thoroughly review scope
1
2
3
4
SELECTING SUBCONTRACTORS
SECTION 06
BIDDING &
PROCUREMENT
METHODOLOGY
Page 81 of 167
Safety & Quality
Management
Programs
07
FIRE STATION NO. 2
Page 82 of 167
35
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / SAFETY & QUALITY MANAGEMENT
Safety is a top priority, and we are committed to maintaining a safe and healthy environment for all workers on our projects. Our
safety record demonstrates this commitment, with a consistently low Experience Modification Rate (EMR) over the past four years.
In 2025, our team worked an impressive 778,074 hours, with 19 OSHA recordable incidents and only 2 recordable injuries or
illnesses resulting in days away from work. Additionally, our lost time accidents for the year totaled 2, showcasing our
proactive approach to minimizing workplace injuries.
CG Schmidt has no lawsuits or liens.
YEAR EMR OSHA Incident
Rate DART Rate
2025 0.85 0.99 0.00
2024 0.81 4.62 3.34
2023 0.68 3.22 2.58
2022 0.80 3.02 2.64
SAFETY IS OUR
#1 PRIORITY
ON THE JOBSITE
EMR & SAFETY METRICS
CG Schmidt’s Safety Manual is always available and
up-to-date on our website. View it here.
SAFETY FIRST
Click to View
INTERNAL SAFETY MANUAL
ZERO
LAWSUITS
WITH CLIENTS IN
106 YEARS
SECTION 07
SAFETY & QUALITY
MANAGEMENT PROGRAMS
Safety Management Program
A CG Schmidt Safety Stand-down meeting is
held before the day’s work begins.
Page 83 of 167
36
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / SAFETY & QUALITY MANAGEMENT
Safety in
Occupied Spaces
CG Schmidt’s experience delivering complex projects
of all sizes includes new construction, renovations,
relocations, and expansions within fully occupied,
mission-critical facilities.
We understand that fire stations must remain fully
operational at all times, and our approach prioritizes
uninterrupted response, clear circulation, and safe
separation between construction and daily operations.
Through disciplined phasing, secure fencing, clear
wayfinding and signage, and proactive communication,
we minimize disruption from noise, vibration, and
dust while maintaining readiness, safety, and staff
confidence throughout construction.
CG Schmidt Clean Room
To mitigate any risk of cross-contamination on active jobsites, we source
materials and tools dedicated for healthcare projects from a controlled
clean room at our construction yard.
The clean room contains:
» Inventory of high grade equipment
» Sanitation system to clean materials before storage
» HEPA filtration system and Edge Guard panels and doors create a
dust barrier system
» High-efficient LED lighting
» Commercial grade vinyl floor
Dedicated Clean Room
OF OUR PROJECTS
ARE COMPLETED IN
OCCUPIED SPACES.
Keeping staff and visitors
safe at all times is our top
priority during construction.
In tandem, we need to
ensure our activities do
not impact the day-to-
day operations of your
firestation.
We start by meeting with
the Germantown Firestation
teams to determine work
plans that address both
safety and disruption
concerns so our crews
can plan around them.
Regardless of the time
or activity, we guarantee
complete partitioning of
construction work with
ample fencing, safety
signage and other barriers.
OVER 70%
Page 84 of 167
37
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / SAFETY & QUALITY MANAGEMENT
SYSTEMS TO ENSURE QUALITY
Germantown Fire Department Fire Station No. 2 will benefit from:
» PRE-INSTALLATION MEETINGS // Prior to the implementation of any large work packages being put in place, our
team holds pre-installation meetings to review shop drawings and identify potentially problematic construction
details or schedule, weather or material concerns that could impact the quality of the work. This often involves
creating mock-ups for key items to verify the quality of the work and the material. By identifying these items before
the work is installed, we offer clarity and address potential issues before they become costly field conditions or
punch-list or warranty items.
» BENCHMARKING // The first step of every key installation is inspection to confirm it meets the requirements of
the documents and the expectations of stakeholders before it is replicated throughout the space.
» FIELD ENGINEERING AND TESTING PROGRAM // We work with the project team to develop a comprehensive
field engineering and testing program, making recommendations for appropriate levels of independent inspection
for systems and materials.
» QC CHECKLISTS AND AUDITS // Problem-free installation is greatly achieved by pre-planning installation and
reviewing requirements for correct installation with field teams who perform the work. However, we still utilize
quality control checklists and audits to confirm that installations are, in fact, properly completed before the work is
covered by the next sequential installation.
Instead of relying on post-installation inspections to find and fix quality
issues that add cost and waste time, CG Schmidt’s Quality Management
Program finds problems before they occur. Our Quality Management
Program increases value and cost accuracy while mandating overall
project quality by:
» Building quality directly into the plans and specifications by
collaborating with architects as they complete their drawings and
addressing difficult or unclear construction details before they
become part of the final construction documents.
» Highlighting work scope and building systems which may require
mitigation to avoid warranty call-backs and repairs.
ENSURING
PROACTIVE
QUALITY
ASSURANCE
& QUALITY
CONTROL
Quality Management Program
Page 85 of 167
Project
References
08
FIRE STATION NO. 2
Page 86 of 167
39
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / PROJECT REFERENCES
CLIENT CONTACT
West Allis West Milwaukee School
District
9333 West Lincoln Avenue
West Allis, WI 53227-2303
Michelle Strasser
Director of Rec and Community Services
(414) 604-3005
stram@wawmsd.org
Church of the Gesu
1210 West Michigan Street
Milwaukee, WI 53233
Raymond Ellingen
Director of Operations & Administration
(414) 288-7101
raymond.ellingen@marquette.edu
Grafton School District
1900 Washington Street
Grafton, WI 53024
Jeff Nelson
Superintendent
(262) 376-5414
jnelson@grafton.k12.wi.us
References
CG Schmidt has provided similar services as the scope of work for the
following clients.
EMPOWERING YOUR VISION,
FROM CONCEPT TO COMPLETION.
“It was our pleasure
to work with Joe
Hoffmeier. The project
had the potential to
very disruptive, given
the work that had to be
done on each floor. Your
team just did a great
job in being unobtrusive
and respectful of the
needs of our patients and
caregivers. We sincerely
appreciated it.”
Rick Kellar,
Aurora West Allis Medical Center
President
SECTION 08
PROJECT REFERENCES
From Left: Proposed team
members Steve Knetter,
Superintendent; Zach Singer,
Project Manager, and Joe
Hoffmeier, Managing Director
at The Germantwon Fire
Department Fire Station No. 2’s
jobsite walkthrough.
Page 87 of 167
Draft Contract
09
FIRE STATION NO. 2
Page 88 of 167
41
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // DRAFT CONTRACT
AIA - A133 & AIA - A201
Please see separate attachment in email for
CG Schmidt’s full AIA A133 & A201 Template.
Page 89 of 167
Appendix
10
Addendum Fees
Addendum General Conditions
Site Logistics
FIRE STATION NO. 2
Page 90 of 167
43
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / APPENDIX
SECTION 09
APPENDIX
PRECONSTRUCTION SERVICES (LUMP SUM)
$21,500
CM FEE AS A PERCENTAGE OF THE COST OF WORK
2.34%
CM CONTINGENCY AS A PERCENTAGE OF THE COST OF WORK
3.00%
GENERAL CONDITIONS WITH RATES
Please see the below chart.
GENERAL CONDITIONS
(Assumes 9.5 Month Duration with 2 phases)
ITEM QUANTITY UNIT UNIT COST TOTAL COST
MANAGEMENT & SUPERVISION - 2027 RATES
Project Director 60 HR $206.00 $12,360
Project Manager (50%) 1104 HR $153.00 $168,912
Project Engineer 0 HR $125.00 -
General Superintendent 40 HR $177.00 $7,080
Superintendent (Full Time On Site) 1780 HR $153.00 $272,340
Project Coordinator 245 HR $85.00 $20,825
Project Accountant 72 HR $85.00 $6,120
Safety Manager 50 HR $153.00 $7,650
TOTAL $495,287
Fees & General Conditions
Page 91 of 167
44
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / APPENDIX
Site Logistics - East Option (Our Recommendation)
Page 92 of 167
45
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / APPENDIX
Site Logistics - North Option No. 1
Page 93 of 167
46
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / APPENDIX
Site Logistics - North Option No. 2
Page 94 of 167
cgschmidt.com
11777 West Lake Park Drive.
Milwaukee, WI 53224
Page 95 of 167
BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE
GERMANTOWN, WI
MEETING DATE: May 13 th, 2026
AGENDA ITEM: New Business
ITEM TITLE: Well #7 Rehab-Liner Installation and Contract
Extension No.1
SUBMITTED BY: Paul Haugen, Water Utility Superintendent
SUMMARY EXPLANATION:
After Well #7 was fully rehabbed and televising was evaluated, it was determined
that due to significant corrosion in the cased region a stainless steel liner will be
needed to ensure corrosion of the existing casing does not allow infiltration and
protect the integrity of the well. CTW was the contractor awarded the Well #7
rehabilitation work and it is recommended that their contract be extended and
modified to include installation of the liner and additional work to install a pump
and other ancillary items to extend the life of the well.
We reached out with two other firms to price check the cost CTW provided, below
are the results:
• Municipal Well and Pump
1212 Storbeck Dr. Waupun, WI $202,814.40
• Mid-City Corporation
12930 W Custer Ave, Butler, WI Non-responsive.
• CTW
21500 Good Hope Rd, Lannon, WI $136,555.00
See attached for the price breakdown
____________________________________________________________________________
ATTACHMENT: ORDINANCE_____ RESOLUTION_____ OTHER _____
RECOMMENDATION:
With approval from the PWHC and full board, Staff recommends acceptance of
CTW’s contract change in the amount of $136,555.00A
Page 96 of 167
COMMITTEE ACTION:
Proper parliamentary procedure to deny a request is to have a motion made in the
affirmative and by voting NAY would deny the request if a majority vote.
Page 97 of 167
25G018.01 Well No. 7 Rehabilitation and Pump Repla cement
August 2025 Village of Germantown
CHANGE ORDER
00 63 62 - 1
SECTION 00 63 62
CHANGE ORDER
No. 1
Date of Issuance: March 25, 2026 Effective Date: March 25, 2026
Owner: Village of Germantown Owner's Contract No.: 253184
Contractor: CTW Corporation Contractor’s Project No.:
Engineer: Foth Infrastructure & Environment Enginee r's Project No.: 25G018.01
Project: Well No 7 Rehab and Pump Replacement Contr act Name: Well 7 Rehab
The Contract is modified as follows upon execution of this Change Order:
Description:
1. Modification of chemical and mechanical rehabilitation – limited chemical rehabilitation and additional
mechanical rehabilitation
2. Removal of original bid items for motor replacement and well pump option 1
3. Incorporation of alternate 1 from the original bid package which involved rehabilitation of existing motor
4. Addition of rebuilding and reinstalling existing pump, repurposing of epoxy lined column pipe, and all items
necessary to bring the well back online
5. Time extension to accommodate future liner installation and additional work in 2026 (modified rehabilitation
plan, additional mechanical treatment)
6. Costs associated with future liner installation including furnishing of new well pump (type to be determined
as liner details are finalized, column pipe assembly (certa-lok PVC or stainless steel to be selected), accessory
items, reinstallation of water level indicators, and all services necessary to install and test the pump, disinfect
and flush, complete safe samples and return the well to service.
Attachments: Modified bid schedule reflecting modifications included in this change order, liner proposal and
applicable information compiled to date, and modified well rehab plan as prepared by Water Quality
Investigations (WQI) and replaces Appendix A of the original contract documents.
All increases to contract price shall include costs for bonding and insurance.
The costs represented in this change order reflect the highest anticipated costs for completing this work, both
the initial well rehabilitation and the future modifications and testing needed with the liner installation. Once
the final column pipe material and pump are selected, the cost may be adjusted but will be less than or equal
to the amounts represented in this change order.
No additional cost increases for the labor and materials outlined in this change order will be presented or
approved. The costs reflected in this change order reflect pricing that will be maintained through project
completion. If additional components, equipment, approvals, meetings, etc. are required to complete the work
that are not specified in this change order or the original contract, additional costs or time extensions may be
proposed and approved.
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES
[note changes in Milestones if applicable]
Original Contract Price: Original Contract Times:
Substantial Completion: February 27, 2026
$ 114,060.00 Ready for Final Payment: March 27, 2026
days or dates
[Increase] [Decrease] from previously approved
Change Orders No. 0 to No. 0 :
[Increase] [Decrease] from previously approved
Change Orders No. 0 to No. 0 :
Substantial Completion: NA
$ 0.00 Ready for Final Payment: NA
days
Page 98 of 167
25G018.01 Well No. 7 Rehabilitation and Pump Repla cement
August 2025 Village of Germantown
CHANGE ORDER
00 63 62 - 2
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial Completion: February 27, 2026
$ 114,060.00 Ready for Final Payment: March 27, 2026
days or dates
[Increase] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order:
Substantial Completion:
Rehabilitation Phase: April 17, 2026
Liner Phase: April 21, 2028
$ 136,555.00 Ready for Final Payment:
Rehabilitation Phase: May 15, 2026
Liner Phase: June 30, 2028
days or dates
Contract Price incorporating this Change Order: Con tract Times with all approved Change Orders:
Substantial Completion:
Rehabilitation Phase: April 17, 2026
Liner Phase: April 21, 2028
$ 250,615.00 Ready for Final Payment:
Rehabilitation Phase: May 15, 2026
Liner Phase: June 30, 2028
days or dates
RECOMMENDED: ACCEPTED: ACCEPTED:
By: By: By:
Engineer (if required)
Owner (Authorized
Signature)
Contractor (Authorized
Signature) Title: Project Manager Title
:
Title
:
Date: March 25, 2026 Dat
e:
Dat
e:
Approved by Funding Agency (if
applicable)
By: Date:
Title:
Page 99 of 167
25G018.01 Well No. 7 Rehabilitation and Pump Repla cement
August 2025 Village of Germantown
CHANGE ORDER
00 63 62 - 3
COST SUMMARY
CONSTRUCTION - 2026 WORK EXPENDITURES
Base Bid Part A – 1, 2, 3, 4, 5, 15, 16, 17, 18
Base Bid Part B – 1, 4
Change Order Items – 1, 2, 3BR
$65,732.00
CONSTRUCTION - 2028 ANTICIPATED COSTS
Future well pump including column pipe, accessory items, and all services and
materials necessary to install and test the pump and return the well to full function
Liner – 12”, including all labor and testing
Change Order Items – FP, FL (only one FP cost will apply – highest FP cost
incorporated)
$184,883.00
CONSTRUCTION COST BREAKDOWN
Original Base Bid Total
2026 Total Spend
2028 Anticipated Cost
Total Revised Construction Cost
Additional Construction Cost Request
$114,060.00
$65,732.00
$184,883.00
$250,615.00
$136,555.00
(250,615-114,060)
SUPPORTING
Foth Original Cost
Foth Addendum Cost
$4,000 in 2026 and $30,000 in 2028
Foth Total
Additional Supporting Costs
$37,200.00
$34,000.00
$71,200.00
$34,000.00
Page 100 of 167
Re:
Item # Item Description Quantity Units Unit Price Extended Price
1 Labor to Remove Exisiting Pump Set 1.00 LS 4,280.00$ 4,280.00$
2 Labor to Furnish and Install 120' of 12" SS Liner 1.00 LS 34,860.00 34,860.00
3 Labor to Televise Well Twice 2.00 EA 2,095.00 4,190.00
4 Labor to Install Test Pump, Run Pump Test, WQ Sampling 1.00 LS 38,720.00 38,720.00
5 Labor to Install all new sumbersible equipment and sample (2 1.00 LS 7,450.00 7,450.00
6 84' of 8" Stainless Steel Column pipe with SS CV 84.00 ft 495.10 41,588.40
7 PumpEnd Flowise 9WC 1200GPM @ 240TDH 1.00 EA 4,700.00 4,700.00
8 100Hp SME Submersible Motor 1.00 EA 13,170.00 13,170.00
9 1/0 Flat Jacketed Submersible Cable 110.00 ft 36.40 4,004.00
10 SS Well liner 12" x 120' .375 wall & needed materials 1.00 LS 46,370.00 46,370.00
11 Test Pumping Material Expenses 1.00 LS 290.00 290.00
12 Grout 80.00 Bag 39.90 3,192.00
13 - -
14 - -
15 - -
16 - -
17 - -
18 - -
19 - -
20 - -
21 - -
22 - -
23 - -
24 - -
25 - -
26 - -
27 - -
28 - -
29 - -
30 - -
31 - -
32 - -
33 - -
34 - -
35 - -
36 - -
37 - -
38 - -
39 - -
40 - -
41 - -
42 - -
43 - -
44 - -
45 - -
46 - -
47 - -
48 - -
Total Project Proposal 202,814.40$
Dated: April 26, 2026 By:
Chase Hoinacki
Project Manager
Municipal Well & Pump
www.municipalwellandpump.com
Project Proposal
Germantown Well 7 Liner
Chase Hoinacki
P.O. Box 311, Waupun, WI 53963 – Office: 920-324-3400 – Toll-Free: 800-383-7412 – Fax: 920-324-3431
4/26/2026 - 6:33 PM
https://municipalwellandpump.sharepoint.com/sites/Shared/Shared Documents/Proposals/Chase - Proposals/2026/Germantown Well 7 Liner with
Pump/Estimate/Germantown Well 7 Liner.xlsx
Page 101 of 167
BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE
GERMANTOWN, WI
MEETING DATE: May 13 th, 2026
AGENDA ITEM: New Business
ITEM TITLE: Award of professional services agreement, Foth
Infrastructure for Well 7 liner installation and
pump replacement
SUBMITTED BY: Paul Haugen, Water Utility Superintendent
SUMMARY EXPLANATION:
See Exhibit A in the Agreement for cost breakdown of services
____________________________________________________________________________
ATTACHMENT: ORDINANCE_____ RESOLUTION_____ OTHER: X
RECOMMENDATION:
With approval from the PWHC and full board, Staff recommends acceptance of the
Foth services agreement in the amount not to exceed $34,000.00
COMMITTEE ACTION:
Proper parliamentary procedure to deny a request is to have a motion made in the
affirmative and by voting NAY would deny the request if a majority vote.
Page 102 of 167
Page 1 of 2 Rev. 03/31/2021
AGREEMENT FOR SERVICES
ADDENDUM No. 1
Project Title: Well No. 7 Rehabilitation and Pump Replacement FOTH Project Number: 25G018.01
CLIENT Project Number:
(If applicable) 253104
This Addendum (in addition to and subject to the conditions contained in the Agreement for Services dated May 19, 2025),
(hereinafter "Addendum"), is made and entered into 25th day of March, 2026 by and between FOTH INFRASTRUCTURE &
ENVIRONMENT, LLC, (hereinafter “Consultant”) and VILLAGE OF GERMANTOWN , (hereinafter “Client”), for the services
described under the Scope of Services (the “Services”).
CLIENT: Village of Germantown
Address: N112W17001 Mequon Road, Germantown, WI 530 22
Phone No: 262-250-4700 Email Address: phaugen@germa ntownwi.gov
Scope of Services : Client hereby agrees to retain Consultant to perform the following Services:
Services beyond the original agreement are included in Exhibit A.
Schedule : Services shall be performed according to the following schedule:
Services will be completed no later than December 31, 2028.
Compensation : In consideration of these Services, the Client agrees to pay Consultant compensation as follows:
Lump-Sum in the amount of $ .00
Unit Cost/Time Charges (Standard Rates) with a total amount not-to-exceed $34,000.00
Unit Cost/Time Charges (Standard Rates) for an estimated cost of $ .00
Other as stated here:
Special Conditions (if any):
Entire Agreement: This Addendum, along with other approved Addendums, together with and subject to the Agreement for
Services referenced above, constitutes the entire understanding between the parties with respect to the subject matter
hereof. This Addendum may be modified by subsequent written addenda mutually agreeable by both parties.
IN WITNESS WHEREOF, this Agreement is accepted on the date last written below, subject to the terms and conditions
above stated and the provisions set forth herein.
CLIENT FOTH INFRASTRUCTURE & ENVIRONMENT, LLC
Signed:
Signed:
Name (printed): Name (printed): Thomas J. Lud wig
Title: Title: Client Director
Date: Date: 03/25/2026
Signed:
Name (printed): Andy Schultz
Title: Senior Project Manager
Date: 03/27/2026
Page 103 of 167
Page 2 of 2 Rev. 03/31/2021
Exhibit A
Additional Services:
1. Complete summary report of findings, recommendations, timeline
2. Rehabilitation modification meetings and coordination
3. Discussions on and coordination for liner installation, pump modifications, and future
coordination
4. Additional site inspections (4 visits, 8 hours each = 32 hours total)
o Mobilization, pulling pump
o Liner installation
o Televising
o Pump Testing
5. Pay Application
6. Project resume coordination meeting, kickoff meeting, post-pump pull/pre-installation
discussion, televising review discussion, and final project wrap-up
7. Coordination with contractor on project documentation and closeout
8. Submittals
o O&M Manuals – receive and review/approve
o Pump Product Data, warranty, training, startup/testing
9. Updates to project summary binder
10. Project Management
FEE INFORMATION
TASK DESCRIPTION HOURS COST
1 Summary report, recommendations, timing 20 $4,000
2, 3, 5, 6,
7, 8, 9, 10
Project Coordination, Check-in Meetings, Liner
Coordination, Pump Selection, Pay Applications
118 $23,600
4 Site Inspections 32 $6,400
SCHEDULE OUTLINE
DESCRIPTION SCHEDULE
Current Rehabilitation Closeout Mar-Jun 2026
Project Resuming Coordination Nov 2027
Well Offline Dec 2027-Apr 2028
Substantial Completion (Well Online) April 2028
Project Closeout/Punchlist Complete May 2028
Page 104 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Resolution
ITEM TITLE: A Resolution Approving a Relocation Order – Division Road
Reconstruction Project (ACTION)
SUBMITTED BY: Kevin Driscoll, Village Engineer
SUMMARY EXPLANATION:
Following the Division Road Public Information meetings in 2024, staff brought a
number of updates to the Public Works and Highways Committee in 2025 and 2026.
These included updates on plat work and appraisals to establish a more uniform right-
of-way corridor consistent with the statutory highway easements.
A resolution is required for the relocation order to update the plat. The resolution is
attached for the Division Road reconstruction from Mequon Road to County Line
Road. The exhibits include the Phase I project from Jefferson Creek to Mequon Road,
and the Phase 2 project from Jefferson Creek to County Line Road.
Phase 1 construction is scheduled for advertisement to bidders (5/13) and the contract
award is anticipated the following month (June). Work is anticipated to begin this
summer and be substantially completed in fall 2026.
ATTACHMENT:
1. 2- Staff Memo for Division Road Relocation Order Resolution_exhibits (Phase I)
2. 2- Staff Memo for Division Road Relocation Order Resolution_exhibits (Phase II)
3. Ex C - RESOLUTION NO. R-26-xx Division Road Relocation Resolution
STAFF RECOMMENDATION:
Staff recommends the Public Works and Highways Committee and Village Board
approve the Resolution for the Division Road project Relocation Order.
ACTION BY COMMITTEE:
The Public Works and Highways Committee unanimously recommended approval.
Page 105 of 167
REIGLE
TRUSE THOMPSON MARTIN
SE-NE NE-NE NE-SE
DOMBROCK
REIGLE
TRUSE DOMBROCK THOMPSON
SIGNATURE:
PRINT NAME: ROBERT C. BEILFUSS, P .L.S.
REGISTRATION NUMBER: S-2072
DATE:
SIGNATURE:
PRINT NAME:
DATE:
VILLAGE OF GERMANTOWN
X/XX/2020
X/XX/2020
TRANSPORTATION PROJECT PLAT NO: PROJECT 2501 THAT PART OF THE NORTHEAST 1 4 AND SOUTHEAST 1 4 OF SECTION 28, TOW
NSHIP 9 NORTH,
RANGE 20 EAST OF THE FOURTH PRINCIPLE M
ERIDIAN, LOCATED IN THE VILLAGE OF
GERM
ANTOW
N, W
ASHINGTON COUNTY, STATE OF W
ISCONSIN.
SCHEDULE OF LANDS & INTERESTS REQUIRED
OWNERS NAMES ARE SHOWN FOR REFERENCE PURPOSES
ONLY , AND ARE SUBJECT TO CHANGE PRIOR TO THE
TRANSFER OF LAND INTEREST TO THE VILLAGE.
Page 106 of 167
Page 107 of 167
Page 108 of 167
RESOLUTION NO. xxxx
APPROVING A RELOCATION ORDER – DIVISION ROAD
RECONSTRUCTION PROJECT
WHEREAS, it is the desire of the Village of Germantown to reconstruct Division Road; and
WHEREAS, the construction of this project will require the acquisition of additional right of
way, and
WHEREAS, a "Transportation Project Right of Way Plat " has been prepared by Point Land
Surveying and Mapping; and
WHEREAS, Section 32.05 of the Wisconsin State Statutes requires the adoption of a
Relocation Order by a municipality prior to the relocation of the right of way; and
NOW, THEREFORE, BE IT RESOLVED, that the Village Board of the Village of
Germantown hereby adopts the Relocation Order to allow the reconstruction of Division Road.
BE IT FURTHER RESOLVED that the Director of Public Works is hereby authorized to
sign any future real estate acquisition documents associated with this project.
Introduced by: Trustee _________
Adopted: month day, 2026
Vote: Ayes:
Nays:
Absent:
____________________________________
Robert Soderburg, Village President
ATTEST:
______________________________
Donna Ott, Village Clerk
Page 109 of 167
BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE
GERMANTOWN, WI
MEETING DATE: May 13, 2026
AGENDA ITEM: New Business
ITEM TITLE: Pleasant View Drive – Resolution for Relocation Order
SUBMITTED BY: Kevin Driscoll – Village Engineer
SUMMARY EXPLANATION:
Following the Rockfield Road and Pleasant View Drive reconstruction projects in 2025, the final
phase of this WisDOT ARIP grant funded project is scheduled to be gin in f all 2026 and be
completed in spring 2027. The WDNR general permit has been applied for, and the final plans
and specifications are anticipated for completion and advertis ement to bidders later in summer
2026. For construction purposes, an updated plat establishes an 80 -ft uniform right of way ,
consistent with the Ultimate Right of Way for this section of Pleasant View Drive.
A resolution is required for the plat work and relocation order. The resolution is attached for this
final phase of the Pleasant View Drive reconstruction project for Village Board review and
approval.
ATTACHMENT: ORDINANCE RESOLUTION X OTHER __X___
Project Exhibits
RECOMMENDATION:
It is the Engineering Department ’s recommendation to for the Public Works and Highways
Committee and Village to approve the resolution for a relocation order to establish a plat with right
of way consistent with the Ultimate Right of Way plan.
COMMITTEE ACTION:
A motion to support authorize staff and a vote “Aye” is in the affirmative to support the contract
award.
Page 110 of 167
RESOLUTION NO. ______
APPROVING A RELOCATION ORDER
PLEASANT VIEW DRIVE RECONSTRUCTION PROJECT
WHEREAS, it is the desire of the Village of Germantown to reconstruct Pleasant View Drive
from Freistadt Road to Lovers Lane and replace the stream crossing structure; and
WHEREAS, the construction of this project will require the acquisition of additional right of
way, and
WHEREAS, a "Plat of Right of Way Required for the Pleasant View Drive " has been
prepared by Point Land Surveying and Mapping; and
WHEREAS, Section 32.05 of the Wisconsin State Statutes requires the adoption of a
Relocation Order by a municipality prior to the relocation of the right of way; and
NOW, THEREFORE, BE IT RESOLVED, that the Village Board of the Village of
Germantown hereby adopts the Relocation Order to allow the reconstruction of the Pleasant View
Drive from Freistadt Road to Lovers Lane.
Introduced by:
Adopted:
Vote: Ayes:
Nays
Ayes: Nays:
____________________________________
Bob Soderberg, Village President
ATTEST:
______________________________
Donna Ott, Village Clerk
Page 111 of 167
MUELLER MMSD BLAU
SIGNATURE:
PRINT NAME: ROBERT C. BEILFUSS, P .L.S.
REGISTRATION NUMBER: S-2072
DATE:
SIGNATURE:
PRINT NAME:
DATE:
VILLAGE OF GERMANTOWN
X/XX/2026
X/XX/2026
TRANSPORTATION PROJECT PLAT NO: PROJECT 2501 THAT PART OF THE SOUTHEAST 1 4 OF THE SOUTHW
EST 1 4 OF SECTION 14, TOW
NSHIP 9 NORTH,
RANGE 20 EAST OF THE FOURTH PRINCIPLE M
ERIDIAN, LOCATED IN THE VILLAGE OF
GERM
ANTOW
N, W
ASHINGTON COUNTY, STATE OF W
ISCONSIN.
SCHEDULE OF LANDS & INTERESTS REQUIRED
OWNERS NAMES ARE SHOWN FOR REFERENCE PURPOSES
ONLY, AND ARE SUBJECT TO CHANGE PRIOR TO THE
TRANSFER OF LAND INTEREST TO THE VILLAGE.
Know what's below.
before you dig. Call
R
Page 112 of 167
GERMANTOWN, WISCONSINVILLAGE OF GERMANTOWNSTREET MAPVILLAGE OF GERMANTOWN ENGINEERING DEPARTMENT
2536263427283332312930192021222324131212345678910111415161718
35KNIGHT DR
Page 113 of 167
Page 114 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Award Contract to Stark Pavement Corp. in the amount not to
exceed $595,719.50 plus a 10% contingency for the 2026 Road
Program - Heritage Hills Reconstruction. (ACTION)
SUBMITTED BY: Kevin Driscoll, Village Engineer
SUMMARY EXPLANATION:
The annual road program was approved by the Village Board in December 2025. The
Village of Germantown staff completed survey, design, and preparation of specifications
to advertise in March and opened bids for the 2026 Annual Road Program, Heritage
Hills Project #2605A and the bids are summarized below and bid item details are
attached.
Contractor
(Plan Set Holder)
Amount
Stark $595,719.50
Payne and Dolan $605,988.00
Wolf $621,991.64
The 2026 Road Program budget is $1,622,400, and this roadwork in Heritage Hills is
within the approved budget. This project includes pavement removal with full depth
milling, catch basin replacement work and spot replacements of curb and gutter and
driveways incidental to the catch basin and curb work. The schedule is to begin work
later this spring, with project completion this fall. Staff will be sending notification letters
to adjacent property owners. The link to the project webpage will also be updated:
https://www.germantownwi.gov/176/Construction-Projects
ATTACHMENT:
1. 4 - 2026-04-02_Road Project 2605A Construction Award_exhibit
STAFF RECOMMENDATION:
Staff requests the Public Works and Highways Committee recommend to the Village
Board, approval of a contract for the 2026 Road Program, Heritage Hills Project #2605A
to the lowest qualified bidder, Stark, in the amount of $595,719.50), and allow a 10%
contingency ($59,572), for a total in the amount of $655,291 against account 40-
561000-5316400.
ACTION BY COMMITTEE:
The Public Works and Highways Committee unanimously recommended approval.
Page 115 of 167
2026 Road Improvement Project (#10038091)
Owner: Germantown, Village of
Solicitor: Germantown, Village of
04/01/2026 09:00 AM CDT
Stark Pavement Corp. Payne & Dolan, Inc. Wolf Paving
Section TitleLine ItemItem CodeItem Description UofM QuantityUnit Price Extension Unit Price Extension Unit Price Extension
HERITAGE HILLS SUBDIVISION $595,719.50 $605,988.00 $621,991.64
1 1 SAWCUT ASPHALT & CONCRETE PAVEMENT LF 275 $5.00 $1,375.00 $2.50 $687.50 $4.98 $1,369.50
2 2 ASPHALT MILLING - FULL PAVEMENT REMOVAL (5-8") SY 13250 $3.90 $51,675.00 $3.40 $45,050.00 $1.50 $19,875.00
3 3 BASE AGGREGATE 1-1/4" TON 2925 $16.50 $48,262.50 $19.70 $57,622.50 $18.25 $53,381.25
4 4 GEOGRID TYPE SR SY 3500 $2.80 $9,800.00 $2.05 $7,175.00 $1.75 $6,125.00
5 5 EXCAVATION BELOW SUBGRADE (EBS) CY 1170 $21.00 $24,570.00 $17.15 $20,065.50 $19.50 $22,815.00
6 6 HMA PAVEMENT - DRIVEWAYS, MATCH UP TO 5" HMA 4 LT 58-28S, 12 mmTON 2 $250.00 $500.00 $415.00 $830.00 $222.10 $444.20
7 7 3" BINDER COURSE - HMA 3 LT 58-28S, 19 mm TON 2290 $60.25$137,972.50 $72.65$166,368.50 $77.43$177,314.70
8 8 2" SURFACE COURSE - HMA 4 LT 58-28S, 12 mm TON 1490 $66.00 $98,340.00 $75.00$111,750.00 $87.43$130,270.70
9 9 ASPHALT TACK COAT GAL 675 $3.00 $2,025.00 $2.30 $1,552.50 $3.56 $2,403.00
1111 CONCRETE DRIVEWAY - 7" DEPTH SF 140 $51.90 $7,266.00 $15.15 $2,121.00 $15.00 $2,100.00
1212 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 820 $76.90 $63,058.00 $62.00 $50,840.00 $62.00 $50,840.00
1414 CATCH BASIN - REPLACE ADJUSTMENT RINGS VF 39.5 $1,250.00 $49,375.00 $925.00 $36,537.50 $1,250.00 $49,375.00
1515 CATCH BASIN - TUCKPOINT RINGS VF 20 $500.00 $10,000.00 $165.00 $3,300.00 $500.00 $10,000.00
1616 CATCH BASIN - REPLACEMENT EA 15 $3,200.00 $48,000.00 $3,830.00 $57,450.00 $3,200.00 $48,000.00
1717 STORMWATER MANHOLE - REPLACE ADJUSTMENT RINGS VF 8 $1,250.00 $10,000.00 $1,900.00 $15,200.00 $1,250.00 $10,000.00
1818 TRAFFIC CONTROL LS 1 $18,280.00$18,280.00 $13,888.00$13,888.00$14,950.00$14,950.00
1919 STRIPING - WHITE 6-inch, SOLID LF 54 $44.00 $2,376.00 $15.00 $810.00 $44.00 $2,376.00
2020 STRIPING - WHITE 8-inch, SOLID LF 28 $60.00 $1,680.00 $15.00 $420.00 $60.00 $1,680.00
2121 SURFACE RESTORATION, TOPSOIL, SEED, EROSION MAT, AND WATERINGSY 210 $7.45 $1,564.50 $10.00 $2,100.00 $20.20 $4,242.00
2222 EROSION CONTROL LS 1 $1,500.00 $1,500.00 $2,000.00 $2,000.00 $6,330.29 $6,330.29
2323 REMOVE AND REPLACE VALVE BOX EA 2 $1,550.00 $3,100.00 $2,610.00 $5,220.00 $1,550.00 $3,100.00
2424 MAILBOX ALLOWANCE LS 1 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
Base Bid Total: $595,719.50 $605,988.00 $621,991.64
Page 116 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Award Contract to Payne & Dolan, Inc. in the amount not to exceed
$1,105,237 plus a 10% contingency for the 2026 Road Program -
Esquire Estates Reconstruction (ACTION)
SUBMITTED BY: Kevin Driscoll, Village Engineer
SUMMARY EXPLANATION:
The annual road program was approved by the Village Board in December 2025. The
Village of Germantown staff completed survey, design, and preparation of plans and
specifications to advertise in March and opened bids for the 2026 Annual Road
Program, Esquire Estates Project #2605B and the bids are summarized below and bid
item details are attached.
Contractor Amount
Payne and Dolan $1,105,237
Stark $1,130,941
Wolf $1,157,616
The 2026 Road Program budget is $1,622,400, and this roadwork in Esquire Estates
subdivision is within the approved budget. This project includes pavement removal with
full depth milling, catch basin replacement work and spot replacements of curb and
gutter and driveways incidental to the catch basin and curb work. This project also
included Water Utility gate valve work and Parks reconstruction of an asphalt path.
Water Utility cost portions totals $47,668 and the Kinderburg Park path work totals
$43,652. The schedule is to begin work later this construction season, with project
completion this fall. Staff will be sending notification letters to adjacent property owners.
The link to the project webpage will also be updated:
https://www.germantownwi.gov/176/Construction-Projects
ATTACHMENT:
1. 5 - 2026-05-06_Road Project 2605B Construction Award_exhibit
2. 5 - 2026-05-06_Road Project 2605B Construction Award_exhibit2
STAFF RECOMMENDATION:
Staff requests the Public Works and Highways Committee recommend to the Village
Board, approval of a contract for the 2026 Road Program, Esquire Estates Project
#2605B to the lowest qualified bidder, Payne and Dolan and allow a 10% contingency
in the amount of $110,523, for a total of $1,215,761, respectively against accounts 40-
561000-5316400 (Roads); Water:50-642000-551673; Parks: 40-56400-592100.
ACTION BY COMMITTEE:
The Public Works and Highways Committee unanimously recommended approval.
Page 117 of 167
2026 Road Improvement Project 2605B (#10164206)
Owner: Germantown, Village of
Solicitor: Germantown, Village of
05/07/2026 09:00 AM CDT
Payne & Dolan, Inc. Stark Pavement Corp. Wolf Paving
Section Title Item CodeItem Description UofMQuantityUnit Price Extension Unit Price Extension Unit Price Extension
ESQUIRE ESTATES SUBDIVISION $1,105,237.00 $1,130,940.50 $1,157,615.50
1 SAWCUT ASPHALT & CONCRETE PAVEMENT LF 290 $2.50 $725.00 $5.00 $1,450.00 $4.84 $1,403.60
2 ASPHALT PAVEMENT REMOVAL SY 26170 $3.65 $95,520.50 $4.95 $129,541.50 $5.99 $156,758.30
3 BASE AGGREGATE 1-1/4" TON 5520 $20.60 $113,712.00 $22.65 $125,028.00 $21.00 $115,920.00
4 GEOGRID TYPE SR SY 5790 $2.10 $12,159.00 $3.20 $18,528.00 $1.26 $7,295.40
5 EXCAVATION BELOW SUBGRADE (EBS) CY 2080 $16.35 $34,008.00 $23.00 $47,840.00 $24.00 $49,920.00
6 ROADWAY HOT MIX ASPHALTIC PAVEMENT - 3-INCH BINDER COURSE (3 LT 58-28 S, 19 mm)TON 4375 $71.90 $314,562.50 $68.70 $300,562.50 $68.18 $298,287.50
7 ROADWAY HOT MIX ASPHALTIC PAVEMENT - 2-INCH SURFACE COURSE (4 LT 58-28 S, 12 mm)TON 2840 $78.00 $221,520.00 $71.15 $202,066.00 $77.81 $220,980.40
8 PARK PATHWAY HOT MIX ASPHALTIC PAVEMENT - 3-INCH SURFACE COURSE (4 LT 58-28 S, 12 mm)TON 145 $94.50 $13,702.50 $140.50 $20,372.50 $114.47 $16,598.15
9 ASPHALT TACK COAT GAL 1275 $2.35 $2,996.25 $3.00 $3,825.00 $3.50 $4,462.50
10 REMOVE AND REPLACE CONCRETE DRIVEWAY, 7-INCH DEPTH SF 445 $14.50 $6,452.50 $48.00 $21,360.00 $14.42 $6,416.90
11 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 1681 $76.50 $128,596.50 $72.00 $121,032.00 $73.50 $123,553.50
12 18" RCP STORM SEWER LF 76 $142.00 $10,792.00 $125.00 $9,500.00 $125.00 $9,500.00
12A 18" RCP STORM SEWER WITH CLASS A BEDDING LF 76 $180.50 $13,718.00 $145.00 $11,020.00 $145.00 $11,020.00
13 CATCH BASIN - REPLACE ADJUSTMENT RINGS VF 9 $1,100.00 $9,900.00 $2,250.00 $20,250.00 $2,250.00 $20,250.00
14 CATCH BASIN - TUCKPOINT EA 4 $700.00 $2,800.00 $550.00 $2,200.00 $550.00 $2,200.00
15 CATCH BASIN - REPLACEMENT EA 4 $3,840.00 $15,360.00 $3,350.00 $13,400.00 $3,350.00 $13,400.00
16 STORMWATER MANHOLE - REPLACE ADJUSTMENT RINGS VF 0 $2,700.00 $0.00 $1,500.00 $0.00 $1,800.00 $0.00
17 TRAFFIC CONTROL LS 1 $20,179.25 $20,179.25 $16,000.00 $16,000.00$34,800.00 $34,800.00
18 STRIPING - WHITE 6-INCH, SOLID LF 50 $13.00 $650.00 $13.00 $650.00 $13.00 $650.00
19 STRIPING - WHITE 8-INCH, SOLID LF 25 $7.00 $175.00 $7.00 $175.00 $7.00 $175.00
20 STRIPING - YELLOW 4-INCH, DOUBLE LF 200 $11.50 $2,300.00 $11.50 $2,300.00 $11.50 $2,300.00
21 STRIPING - SYMBOLS EA 3 $335.00 $1,005.00 $335.00 $1,005.00 $335.00 $1,005.00
22 SURFACE RESTORATION, TOPSOIL, SEED, EROSION MAT, AND WATERING SY 1015 $9.00 $9,135.00 $9.00 $9,135.00 $7.95 $8,069.25
23 EROSION CONTROL LS 1 $3,600.00 $3,600.00 $3,150.00 $3,150.00 $2,100.00 $2,100.00
24 REMOVE AND REPLACE VALVE BOX EA 10 $2,610.00 $26,100.00 $1,350.00 $13,500.00 $1,350.00 $13,500.00
25 REMOVE AND REPLACE VALVE AND VALVE BOX EA 2 $10,784.00 $21,568.00 $6,525.00 $13,050.00 $6,525.00 $13,050.00
26 ALLOWANCE, LOOP DETECTORS EA 2 $10,000.00 $20,000.00 $10,000.00 $20,000.00$10,000.00 $20,000.00
27 ALLOWANCE, MAILBOXES EA 16 $250.00 $4,000.00 $250.00 $4,000.00 $250.00 $4,000.00
Base Bid Total: $1,105,237.00 $1,130,940.50 $1,157,615.50
Page 118 of 167
Page 119 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Award Contract to Harwood Engineering for Engineering Services -
Site Plan Reviews on a time and materials basis in an amount not
to exceed $15,000 (ACTION)
SUBMITTED BY: Kevin Driscoll, Village Engineer
SUMMARY EXPLANATION:
Village staff requested Consultant Reviews of Site Plan Applications. Harwood
Engineering previously provided this full service to the Village of Germantown from
2019-2023. Upon Village Engineer position in October 2023 being filled, Harwood
continued at a limited capacity reviewing the lengthy Storm Water Management Plans
for the various site development project.
Year Hours Fees
2019 98 $10,417.50
2020 148 $16,600.00
2021 144 $15,900.00
2022 69 $8,280.00
2023 102 $12,585.00 $12,756.50 Average 2019-
2023
2024 38.5 $5,151.50
2025 34.5 $4,657.50
2026 7 $945.00
ATTACHMENT:
1. 6 - Harwood Site Plans Reviews_exhibit
STAFF RECOMMENDATION:
Staff requests the Public Works and Highways Committee recommend to the Village
Board, approval of a consultant contract to review Site Plans and provide comments to
Hardwood Engineer, on a time and materials basis not to exceed $15,000 without
authorization, against account 40-561000-541000.
ACTION BY COMMITTEE:
The Public Works and Highways Committee unanimously recommended approval.
Page 120 of 167
2
55 North 21
st
Street
Milwaukee, WI 53233
(414) 475
-
5554
hecl.com
civil
|
landscape architecture
|
structural
|
mechanical
|
electrical
|
plumbing/fire protection
|
lighting design
|
telecommunications
|
security
Page 121 of 167
City of Germantown WI
Page
2
of
5
Statement of Qualifications
April
20
, 2026
April
20
, 2026
Kevin Driscoll
, P.E.
Village Engineer
Village of Germantown
N112 W17001 Mequon Road
Germantown, WI
53022
-
0337
RE:
Statement of Qualifications
On
-
Call Engineering Services
Hello
Kevin:
Please consider the attached response an indication of Harwood Engineering’s interest in
continuing to
collaborat
e
with the Village of Germantown for the on
-
call design/review
services as
needed. We are providing our experience and background for your reference
and use.
Harwood Engineering Consultants has provided Municipal consulting engineering related
to specific projects for dozens of communities throughout Wisconsin over the years. In
addition to municipal consulting, Harwood has been the Engineer on
-
call for a numb
er
government agencies as well as private facilities
-
s
pecifically Milwaukee County, City of
Mequon,
City of Franklin,
Walworth County, GE Healthcare, Aurora Psychiatric Campus,
Nicolet College,
Waukesha County Technical College,
Lakeshore Technical Colle
ge, and
Southwest Technical College.
•
Harwood
will
complete
development reviews
for proposed developments
within the
Village to ensure the development will meet or exceed the Municipal standards set
forth in the Village of Germantown design standards as well as the Zoning Code.
•
We assume will be similar to the current process. Administrative coordinator for
Community Development will send out proposed projects via email.
Harwood will
review the civil / site plans and stormwater management plan and prepare a review
memo. The memo will be provided to the Community Development Department
•
We
compile comments from the
DPW Superintendents into the
review
m
emo under
categories including but not limited to: Sanitary/Water/Roads/Storm/Lighting
.
Page 122 of 167
City of Germantown WI
Page
3
of
5
Statement of Qualifications
April
20
, 2026
•
Harwood also has the ability to answer questions pertaining to Village requirements
for project applicants and attend pre
-
submittal meeting
s
if requested by the Village.
•
In addition to site development reviews.
Harwood has the full capability to assist with
all aspects
typically handled by the Village engineer
, including:
•
General code conformance
•
Design and plan compliance
•
Stormwater management review
•
MMSD submittals and coordination
•
Addressing resident concerns
•
Plan Commission meeting attendance
•
Utility design
and
review
•
WDNR permit coordination
Traditionally
,
the fees associated with the consulting services requested are contracted
on a
T&M
(
Time & Materials
)
basis , with a not
-
to
-
exceed limit established prior to
approval. We propose the following hourly rates for the individuals associated with the
reviews
.
We have established review contracts for municipalities and private clients in many
different formats; we will work with whatever format and method works best for you.
Most municipalities and government bodies bill these consulting services directly to the
applicant as part of the municipal review process.
Proposed
Hourly Rates
Principal
/ Vice President
................................
............
$1
95
Project Engineer
II
................................
.............................
$1
5
5
Project Engineer
I
................................
...............................
$
135
Administrative
................................
................................
....
$
105
Reimbursable Expenses
Reimbursable Expenses are in addition to Compensation for Basic and Additional
Services and include actual expenditures made by HECL, its employees, and / or
Professional Consultants in the interest of the Project and subject to prior written consent
of th
e
Client.
Reimbursable Expenses shall be paid by consultant who is to be reimbursed
by Client at cost x 1.0 and shall include the following:
a.
Travel expenses including mileage, etc.
Page 123 of 167
City of Germantown WI
Page
4
of
5
Statement of Qualifications
April
20
, 2026
Schedule
We would anticipate completing the required reviews in a timely cycle that allows the
municipality to review the comments in advance of the monthly reports getting issued to
the members. We can work with whatever review schedule the Village requires.
Terms and Conditions
This proposal is based on the terms and conditions of the Standard Form Statement
between Architect and Owner, C401 Latest Edition. If this proposal meets with your
approval, HECL requests a signed proposal and / or a contract to proceed on this
project.
Authorization to begin may be indicated by signing this proposal in the space
provided below or attach and reference this letter to the AIA Standard Form
Contract.
Unless a written confirmation is received, verbal authorization to proceed shall
be deemed
to be acceptance of this proposal.
This proposal remains in effect for a
period of not more than (6) six months from the date of this letter.
Invoices shall be sent monthly with payment due within (60) days of receipt.
Conclusion
Kevin
, we welcome the opportunity to
continue to
demonstrate our talent and
commitment to the Village of Germantown as well as those that you serve.
. We have the
ability to work with you and complete this task in a timely and efficient method in order to
meet the ultimate goal of getting projects reviewed and developed in the Village.
If you have questions or require additional information, please do not hesitate to give me
a call. Thank you for your time and consideration!
Sincerely,
Harwood Engineering Consultants, Ltd.
Brad M. Seubert, PE
Vice President | Director of Civil Engineering
For: Village of Germantown
Signature
Title
Date
Page 124 of 167
Experience
Years at Current Firm: 15.5
Years at Other Firms: 04
Professional Registrations
Registered Professional Engineer,
44238-6, Wisconsin, Granted 2015
Also registered in Arizona, Georgia,
Illinois, Indiana, Iowa, Ohio, and
Texas
Education
Bachelor of Science, Civil
Engineering Michigan State
Technological University, Houghton,
MI, 2006
Brad Seubert is a seasoned civil design engineer with experience
in residential, commercial, and municipal projects. As Civil
Director, he manages projects from inception to completion,
focusing on client relationships. He specializes in site design,
including road and parking layouts, grading plans, utility and
stormwater management, and eco-friendly Best Management
Practices (BMP).
City of Mequon Development Review
City of Franklin Development Review
City of Brookfield Development Review
Waupaca Department of Public Works Building – Waupaca, WI
Rotary Park - Mequon, WI
Town of Grand Chute New Highway Garage - Grand Chute, WI
Waupaca Watermain Extension - Waupaca, WI
Waukesha County, New Campus Grounds and Service Center -
Waukesha, WI
Woodman’s Sports & Convention Center – Janesville, WI
Tyler joined Harwood Engineering in 2022 as an intern and later
returned as a Project Engineer on the Civil team after earning
his Bachelor of Science in Civil Engineering from UW–Platteville.
He supports a variety of recreational, government, educational,
and industrial site development projects and brings valuable
field experience in construction inspection, surveying, and
construction staking.
Moraine Park Technical College – West Bend, WI
Woodman’s Sports & Convention Center – Janesville, WI
Catholic Memorial High School Sullivan Campus – Waukesha, WI
Northridge Way Water and Sewer Extension – Woodruff, WI
Green County Family YMCA Addition – Monroe, WI
Pritchard Park Mall – Racine, WI
Page County Law Enforcement Center – Clarinda, Iowa
Wacker Neuson – Menomonee Falls, WI
Waupaca Department of Public Works Building – Waupaca, WI
GEA – Janesville, WI
BRADLEY M. SEUBERT, PE
Vice President | Director of Civil Engineering
Civil Project Manager
TYLER RIEMENSCHNEIDER
Civil Engineer
Civil Engineer
Experience
Years at Current Firm: 3.5
Years at Other Firms: 1.0
Professional Registration
Engineering in Training, 2023
Working towards becoming a
professional engineer once eligible
in 2026
Education
Bachelor of Science, Civil
Engineering, University of Wisconsin-
Platteville, Platteville, WI, 2022
Page 125 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Award Contract to Point Land Surveying for Pioneer Road Survey
(ACTION)
SUBMITTED BY: Kevin Driscoll, Village Engineer
SUMMARY EXPLANATION:
The Village of Germantown in partnership with the Town of Jackson was selected for an
Agricultural Road Improvement (ARIP) grant by the Wisconsin Department of
Transportation (WisDOT) to reconstruct Pioneer Road from Division Road (CTH G) to
Country Aire Drive (CTH M). The project length is approximately 2 miles, and Jackson
has jurisdiction over one mile and the Village has jurisdiction over one mile. The state
municipal financial agreement (SFMA) is attached, where 90% of the costs are covered
by WisDOT and 10% of costs are the municipal obligation. Based on the Village of
Germantown and the Town of Jackson each having one mile of jurisdiction over the two
mile Pioneer Road segments, the costs will be distributed 50/50.
The Village requested services to survey the road and Point Land Surveying provided
pricing in the amount of $10,500. The municipal obligation is $1,050, where the Village
of Germantown responsibility is to $525. The link to the Village of Germantown projects
webpage and the Road Program website will also be updated:
https://www.germantownwi.gov/176/Construction-Projects
ATTACHMENT:
1. 9 - Award Contract to PLS for Pioneer Road Survey - exhibits
STAFF RECOMMENDATION:
Staff requests the Public Works and Highways Committee approve a contract for survey
services by PLS in the amount of $10,500, where the Village will receive reimbursement
from the Town of Jackson through the SMFA, with a total obligation from the Village in
the amount of $525 against account 40-561000-5316400.
ACTION BY COMMITTEE:
The Public Works and Highways Committee unanimously recommended approval.
Page 126 of 167
Point Land Surveying & Mapping
“State of the Art Technology, Old Fashioned Quality”
Professional Land Surveying and Mapping Services
W174 N9467 Joper Road, Menomonee Falls, Wisconsin, 53051
262-250-8003 office pointlandsurveying@gmail.com email
April 13, 2026
Village of Germantown Engineering
Kevin Driscoll, PE
Village Engineer
N112 W17001 Mequon Road
Germantown, Wisconsin 53022
RE: Pioneer Road Topographic Survey
Dear Mr. Driscoll,
Re: Proposal for Professional Surveying and Mapping Servi ces
Pioneer Road Topographic Survey
Point Land Surveying & Mapping is pleased to submit this proposal for the following
professional surveying and mapping services required for the above-referenced project:
SCOPE OF SERVICES
Project Description
The Pioneer Road construction project will require topo graphic mapping of the corridor
between Division Road and Country Aire Drive for design and bidding purposes. The
corridor is approximately 10,500 feet in length.
Most of the parcels on both sides of the road are farm land, small residential lots or
marshland.
The lands north of the Section and Quarter Section lin es are located in the Town of
Jackson and the lands to the south in the Village of Ger mantown and a small portion in
the Town of Germantown.
What Point Land Surveying & Mapping proposes is to prepa re a three-dimensional road
topographic map based on a field survey data collected in the corridor.
As no existing topographic mapping is currently available f or the project area, this
proposal will include performing a field survey, withi n the project area, to locate the
existing features such as pavements, driveways, culverts (inverts a nd sizes), shoulders,
ditch and slope lines.
Point Land Surveying and Mapping will call Diggers Hotl ine to have the underground
utilities marked within the existing right of way. The u tility locates will be incorporated
into the topographic base map. This includes any power po les, pedestals and ground
Page 127 of 167
Point Land Surveying & Mapping
“State of the Art Technology, Old Fashioned Quality”
Professional Land Surveying and Mapping Services
W174 N9467 Joper Road, Menomonee Falls, Wisconsin, 53051
262-250-8003 office pointlandsurveying@gmail.com email
marks/ flags of underground utilities.
These locates will be constrained to the existing road R/W and/or highway easement.
Point Land Surveying & Mapping cannot guarantee how com plete the Diggers utility
locates will be performed.
All field data will be collected in a 3D format using either a GPS/GNSS receiver or
robotic total station technology.
The road pavement will be located at approximately 50’ intervals depending on the
terrain.
Once the field data has been collected and processed, a b ase map of the area will be
compiled and a surface model of the area created with a 1’ foot 3D contour map.
Topographic Survey Map
The topographic survey map will contain the following elements:
1. Existing topographic features.
2. Legend for symbols and line types used on the survey
3. Dimensions of existing right of way and/or highway ease ment.
4. North arrow
5. Graphic scale
6. Bearing basis
7. Dimensional ties to monuments marking the corners of the Public Land Survey
System.
8. Establish a basis of C/L stationing along the north line of Sections 2 and 3 as
defined by the PLSS monument located every ½ mile
9. Prepare plan and profile sheets of the corridor wit h the existing road C/L profile
shown to an approved mapping scale.
10. Professional Land Surveyors certificate
11. Professional Land Surveyors seal and signature
I have researched the Wisconsin DNR Surface Water Data Vie wer online and it is
showing some mapped wetlands and wetland indicators and soils in the roadway and
these will need to be delineated and mapped for the wetland report and construction
purposes.
This work would be done by others under a separate contra ct with the Village. Point
Land Surveying & Mapping can provide the mapping services for this work.
Page 128 of 167
Point Land Surveying & Mapping
“State of the Art Technology, Old Fashioned Quality”
Professional Land Surveying and Mapping Services
W174 N9467 Joper Road, Menomonee Falls, Wisconsin, 53051
262-250-8003 office pointlandsurveying@gmail.com email
Optional-Construction plans
Working with Village staff input regarding pavement a nd shoulder width, C/L slope and
ditch regrading along with developing a standard road cross section/template and
extracting road quantities and alignments, Point Land Surveying & Mapping is prepared
to create this work to prepare plans for bidding purposes.
This optional work would be done on a time and materi als basis with a not to exceed
amount based on our 2026 fee schedule agreed to betwee n the Village and Point Land
Surveying & Mapping.
Survey Control
A survey control network will be created based on a calibr ation survey of seven (7)
PLSS section corner monuments. The coordinate values being used will be based on
the Wisconsin State Plane Coordinate System, South Zone Grid as established under
the NAD83 Datum, (2011 adjustment). Elevations will be based on the monument
elevations which have been derived on the NAVD 88 datum.
A series of intervisible survey control points will be set b etween Division Road and
Country Aire Drive to be used by either robotic total stations or a GPS/GNSS network
rover.
Deliverables
Point Land Surveying & Mapping will provide digital fi les containing the topographic
mapping in AutoCAD/Carlson Software .dwg format using the Village CADD/layer
specifications. Provide two (2) signed and sealed copies of the maps.
Project Schedule
It is our intent to perform all of the field work before the end of May.
Project Fees
The services to be performed upon acceptance of this prop osal have been described in
the above sections of this proposal and are based upon o ur understanding of the
project. Point Land Surveying & Mapping proposes to com plete these services for the
following lump sum fees:
Topographic Mapping…………………………………………… $ 10,500.00 .
This fee does not include the wetland delineation or associated mapping.
Page 129 of 167
Point Land Surveying & Mapping
“State of the Art Technology, Old Fashioned Quality”
Professional Land Surveying and Mapping Services
W174 N9467 Joper Road, Menomonee Falls, Wisconsin, 53051
262-250-8003 office pointlandsurveying@gmail.com email
The lump sum fee will be paid by the Client to Point Land Surveying & Mapping upon
completion of the tasks and services outlined above. Paymen t is not dependent upon
any third parties work, contract obligations or real estate closing.
Proposed changes, if any, to the scope of work following c ommencement of Point Land
Surveying & Mapping’ services will be discussed with you and a mendments made as
described in Section 1. of the attached General Conditions of Service.
For additional services rendered, if any, but not include d in the scope of work described
in the above section of this proposal, invoice amounts wil l be based on the actual units
used at the 2026 fee schedules established by Point Land S urveying & Mapping, and
will also include travel costs, and other expenses incurred b y Point Land Surveying &
Mapping in rendering the services of this proposal.
The included fee schedules will apply to Point Land Surve ying & Mapping additional
services if this proposal is accepted by the Village of Ger mantown within 60 days after
the date of the proposal. After acceptance of this pro posal, adjustments, if any, to the
fee schedules will be subject to Section 2.a. of the General Conditions of Service.
2026 FEE SCHEDULE
Professional Land Surveyor Per Ho ur 130.00$
Robotic or GPS Survey Crew P er Hour 150.00$
CADD Technician Pe r Hour 90.00$
Charges for technical personnel will be made for time s pent in the field, in consultation, in
collecting existing survey control data, research of reco rd documents, in preparation of reports
and invoices, in administrating contracts, in project coordination and scheduling and in traveling.
Overtime will be charged after 8.00 hours per day. Double-time will be charged on Holidays.
Expert Witness Testimony will be billed at the rates shown here x 1.5.
Standards and Requirements
All work will be performed in accordance with the minim um requirements for property
surveys as defined by AE-7 of the Wisconsin Administrative Code
The maps will be prepared in accordance with the drafti ng and design standards
established by Point Land Surveying & Mapping which refl ect common Wisconsin
professional land surveying practice. Point Land Surveying & Mapping will not complete
Owner checklists or comply with an Owner’s standard boiler plate plan or layering
standards unless approved in advance for additional compensation.
Page 130 of 167
Point Land Surveying & Mapping
“State of the Art Technology, Old Fashioned Quality”
Professional Land Surveying and Mapping Services
W174 N9467 Joper Road, Menomonee Falls, Wisconsin, 53051
262-250-8003 office pointlandsurveying@gmail.com email
To accept this proposal, please sign where indicated belo w and return a copy of this
document as your acceptance of this agreement and our authorization to proceed.
If you have any questions or comments, please do not hesitate to contact me at
262-250-8003. I look forward to working with you on this project.
Sincerely,
Point Land Surveying & Mapping
Bob Beilfuss, PLS
Principle
Accepted by:
Village of Germantown
Signature Date
Page 131 of 167
Date:
ARIP Project Number:
Primary Recipient
Secondary Recipient
April 22, 2026
A00095
Town of Jackson
Village of Germantown
Project ID:
Appropriation:
Account:
Primary County:
Secondary County:
39508802714
29800
8700140
Washington
Washington
The signatory city, village, town or county, hereinafter called the Municipality, through its duly authorized officers or officials via the signed ARIP
application form and terms and conditions, and the State of Wisconsin Department of Transportation, hereinafter called the State, enter into this
agreement, hereinafter referred to as the Agreement, to accomplish the described project, hereinafter referred to as the Project.
The authority for the Municipality and the State to enter into this agreement is provided by Wis. Stats. 86.31 and Wis. Admin. Code Tans. 206.03(12)
(a).
Improvement Type: Reconstruction
Surface Type: 70 - Hot Mix Asphalt Pavement (HMAC)
On Route 1:
At Route:
Toward Route:
Structure:
Section Length:
Pioneer Rd
CTH M (Termini)
CTH G (Break)
Culverts
5226 ft
Need for Improvement: Structurally Deficient
Other Work: Clearing and grubbing, Driveway joints, Geotextile grid fabric, Pavement marking, Re-establish crown, Re-grade
ditches, Widening roadway
Thickness
5.00 in
Travel Width (Per Lane)
12 ft 0 in
Left Shoulder
2 ft 0 in
Curb & Gutter
N
Right Shoulder
2 ft 0 in
Curb & Gutter
N
Additional Locations are displayed on Page 2
Project Cost Summary Estimated Costs ARIP/State Funds Municipal Funds
(includes ineligible costs)
Engineering: 15,000.00
Right-of-Way Acquisition: 0.00
Construction: 1,385,000.00
Total Eligible Costs: 1,400,000.00
Total Ineligible Costs 0.00
Total Improvement Costs: $1,400,000.00 $1,260,000.00 $140,000.00
This request is subject to the terms and conditions agreed to at the time of application for the designated MUNICIPALITY and upon acceptance by
the STATE, per signature below, shall constitute agreement between the MUNICIPALITY and the STATE.
Accepted for the State of Wisconsin, Department of Transportation:
By: Merrill Mechler-Hickson 4/22/2026
Local Transportation Programs and Finance Date
2026-2027
Agricultural Roads Improvement Program (ARIP)
State Municipal Project Agreement
Page 1 of 4
Page 132 of 167
Additional Locations:
On Route 2:
At Route:
Toward Route:
Structure:
Section Length:
Pioneer Rd
Pioneer Rd (Break)
CTH G (Termini)
Culverts
5439 ft
Need for Improvement: Structurally Deficient
Other Work: Clearing and grubbing, Driveway joints, Geotextile grid fabric, Pavement marking, Re-establish crown, Re-grade
ditches, Widening roadway
Thickness
5.25 in
Travel Width (Per Lane)
12 ft 0 in
Left Shoulder
2 ft 0 in
Curb & Gutter
N
Right Shoulder
2 ft 0 in
Curb & Gutter
N
Project Funding
Funding Type Biennium Sunset Date Approved Amount Date
New Biennium Project 2026-2027 7/3/2030 $1,260,000.00 4/22/2026
Total $1,260,000.00
2026-2027
Agricultural Roads Improvement Program (ARIP)
State Municipal Project Agreement
Page 2 of 4
Page 133 of 167
Terms and Conditions
1. The Municipalities agree that the State will not be liable in any disputes, issues, disagreements that arise out of the joint cooperation between
the Municipalities in administering and completing this Project. The Municipalities are expected to define their respective responsibilities in a
separate agreement that will include, but not be limited to, the amount funded by each Municipality for the Project, the anticipated Project cost per
Municipality, and what is to occur if a Municipality terminates this Agreement. Any separate agreement between the Municipalities shall require
compliance with the terms of this Agreement.
2. The State will not be liable to any third party for injuries or damages resulting from work under or for the Project. The Municipalities and the
Municipalities’ surety shall indemnify and save harmless the State, its officers and employees, from all suits, actions or claims of any character
brought because of any injuries or damages received or sustained by any person, persons or property on account of the operations of the
Municipalities and its sureties; or on account of or in consequence of any neglect in safeguarding the work; or because of any act or omission,
neglect or misconduct of the Municipalities or its sureties; or because of any claims or amounts recovered for any infringement by the Municipalities
and its sureties of patent, trademark or copyright; or from any claims or amounts arising or recovered under the Worker's Compensation Act,
relating to the employees of the Municipalities and its sureties; or any other law, ordinance, order or decree relating to the Municipalities’
operations.
3. Contract modification: This Agreement can only be modified by written instruments duly executed by all parties to this Agreement. No term or
provision of neither this Agreement nor any of its attachments may be changed, waived or terminated orally.
4. Binding effects: All terms of this Agreement shall be binding upon and inure to the benefits of the legal representatives, successors and
executors. No rights under this Agreement may be transferred to a third party. This Agreement creates no third-party enforcement rights.
5. Choice of law and forum: This Agreement shall be interpreted and enforced in accordance with the laws of the State of Wisconsin. The parties to
this Agreement hereby expressly agree that the terms contained herein are enforceable by an action in the Circuit Court of Dane County, Wisconsin.
6. Non-appropriation of funds: With respect to any payment required to be made by the State under this Agreement, the parties to this Agreement
acknowledge the State’s authority to make such payment is contingent upon appropriation of funds and required legislative approval sufficient for
such purpose by the Wisconsin Legislature. If such funds are not so appropriated, any party to this Agreement may terminate this Agreement after
providing written notice to all parties to this Agreement not less than thirty (30) days before the termination is to take effect. (Reference 66 OAG 408;
State ex rel. LaFollette v. Reuter, 36 Wis. 2d 96, 119 [1967]).
7. The initiation and accomplishment of the project will be subject to the applicable federal, state and local laws, administrative policy and program
rules, ordinances, standards, and contract bidding requirements. Please note that if any portion of the project are funded using federal funds, the
project will be subject to federal requirements. All components of the project must be defined. Any federally funded portion of the project is not
eligible for reimbursement under this Agreement.
8. The construction of the project will be in accordance with the appropriate standards unless an exception to standards is granted by the State
prior to construction. The entire cost of the project not constructed to standards will be the responsibility of the Primary Recipient unless such
exception is explicitly granted, in writing, by the State.
9. The Municipalities will assume all responsibility for complying with all applicable environmental requirements for the project.
10. The project, which is eligible for State participation, will be administered by the Primary Recipient.
11. The Municipalities agree to comply with the relevant applicable statutes governing advertisements for bids. The Primary Recipient is
encouraged to advertise for greater than the minimum requirements to provide the widest possible coverage. The Primary Recipient must keep
affidavits of publication in the project file. The Primary Recipient shall provide the State information regarding the source where the ARIP bid
advertisements can be located no less than seven (7) days prior to the first week of advertisement.
12. All Municipalities’ contracts for this project will be let by competitive bid and awarded to the lowest responsible bidder in accordance with the
provisions of Wis. Stat. § 86.31(2) and all other municipal bidding requirements.
13. The parties agree that as a result of the Municipalities joint cooperation in administering and completing this project, Primary Recipient shall be
responsible for letting and awarding bids to complete this project on behalf of the Municipalities.
14. State financing will be limited to up to 90 percent (90%) participation in eligible items or to the project award amount – whichever is less. project
costs not eligible for State participation (i.e. at minimum, 10% of project cost) shall be the responsibility of the Municipalities. If the final cost
estimate at final reimbursement is lower than the estimate provided in the approved project application, the award amount shall be reduced to 90%
of reimbursable costs of the revised/final estimate. Award amounts will not be increased above the approved limit even if project cost estimates
increase after the project letting is complete.
15. Upon request by Primary Recipient, the State shall provide payment of any reimbursable costs incurred by the municipalities for eligible
Agricultural Roads Improvement Program (ARIP) projects not more frequently than quarterly subject to the terms detailed in item 13. All
reimbursement requests must be accompanied with an attestation by a professional certified engineer.
16. In order to guarantee the Municipalities’ foregoing agreements to pay the State, the Municipalities, through their above duly authorized officers or
officials, agrees and authorizes the State to set off and withhold the required reimbursement amount as determined by the State from any moneys
otherwise due and payable by the State to the Primary Recipient.
2026-2027
Agricultural Roads Improvement Program (ARIP)
State Municipal Project Agreement
Page 3 of 4
Page 134 of 167
17. The Municipalities will keep records of the cost of the project together with letting documents, advertising information, itemized invoices and
contractor payment documentation and will have them available for inspection by representatives of the State and will furnish copies when
requested.
18. By signing this agreement, the municipality certifies that the estimate provided to the State was in good faith based on information known at the
time estimate creation and reflects the best estimate of anticipated costs.
19. The design and construction of the project must be certified by a registered professional engineer, if the cost of the project exceeds $65,000 per
Wis. Stat. § 86.31(2)(e). Primary Recipient shall provide to the State one engineer’s certificate upon completion of the project, regardless of
whether the project completion occurs after all awarded funding has been received by the Primary Recipient.
20. Federal Single Audits of Local Government Units:
a. The Municipalities shall have a single organization audit performed by a qualified independent auditor if required to do so under federal law
and regulations. (See Federal Circular No. A-133).
b. This audit shall be performed in accordance with Federal Circular A-133 issued by the Federal Office of Management and Budget (OMB) and
state single audit guidelines issued by the Wisconsin Department of Administration (DOA).
c. The Municipalities will keep records of costs of construction, inspection tests and maintenance done by it to enable the State to review the
amount and nature of the expenditure for those purposes. Such accounting records and any other related records shall be subject to a
project review or audit as directed by the State within ten (10) years of project closing.
21. The Municipalities will maintain, at their own cost and expense, all portions of the Project that lie within its jurisdiction and will make provisions
of such maintenance as long as the road remains open to traffic.
22. In accordance with the State's sunset policy for ARIP funding, all requests for reimbursement of awarded ARIP funding must be received by the
State no later than June 1, 2030. In instances where final project reimbursements are submitted prior to project completion, the Primary Recipient
agrees and will ensure completion of any project funded in part with ARIP funding by June 30, 2031.
23. If any part of this Agreement is determined to be invalid, illegal, or unenforceable, such determination shall not affect the validity, legality, or
enforceability of any other part of this Agreement and the remaining parts shall be enforced as if such invalid, illegal, or unenforceable part was not
contained herein.
24. Nothing in this Agreement shall be deemed a waiver of the State’s Sovereign Immunity.
25. Remediation event: if a remediation event occurs, the Primary Recipient shall take into account its safety remediation plan for the project and
applicable site area.
26. In connection with the performance of work under this Agreement, the Municipalities agree not to discriminate against any employee or
applicant for employment because of age, race, religion, color, handicap, sex, physical condition, developmental disability as defined in s. 51.01
(5), sexual orientation or national origin. This provision shall include, but not be limited to, the following: employment, upgrading, demotion or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeship. Except with respect to sexual orientation, the Municipalities further agrees to take affirmative action to ensure equal
employment opportunities. The Municipalities agrees to post in conspicuous places, available for employees and applicants for employment,
notices to be provided by the contracting officer setting forth the provisions of the nondiscrimination clause.
X Checking this box indicates that the Preparer is authorized to conduct official business for the Municipality identified below and upon
acceptance by the State shall constitute agreement between the Municipality and the State, subject to the terms and conditions above.
Primary Sponsor: Town of Jackson County: Washington
Head of Government: ROBERT H HARTWIG Title: Head of Government
Preparer: Robert Eichner Title: Robert Eichner Date: 1/9/2026
Reviewer: Hillary Pelton Title: County Highway Commissioner Date: 1/9/2026
2026-2027
Agricultural Roads Improvement Program (ARIP)
State Municipal Project Agreement
Page 4 of 4
Page 135 of 167
https://germantownwi.sharepoint.com/sites/Engineering/Shared Documents/Engineering/CADD Projects/2702 - Pioneer (ARIP)/MOU/2026-04-09_MOU (Draft).doc
Engineering Section
Memorandum
To: Robert Eichner, Clerk for the Town of Jackson
From: Kevin Driscoll, Village Engineer
Date: 4 /10/2026
Re: Pioneer Road – WisDOT Agricultural Road Improvement Project
Memorandum of Understanding
Following a series of meetings w ith the Town of Jackson Clerk and Germantown Village Engineer have
discussed reconstructing Pioneer Road, a join t application was transmitted to WisDOT in concert with
respective municipal support. The Town of Jackson was notified by WisDOT on 3/24/2026 of the subject
ARIP project selection and that letter is attached. This project is along the south border of the Town of
Jackson and the north boarder Village of Germantown, and a project location map is attached. The
estimate of work is in the amount of $1,400,000 and that itemized estimate is attached.
Upon the Town of Jackson’s receipt of the subject State Municipal Financial Agreement (SMFA) from
WisDOT for the Pioneer Road project , please email a copy to engineering@germantownwi.gov and
transmit a hard copy to the Germantown Village Hall at N112 W17001 Mequon Road , PO BOX 0337,
Germantown, Wisconsin 53022-0337.
Overall, the project intent is outlined below the Pioneer Road reconstruction project (ARIP) from
Division Road to CTH M / Country Aire Drive that includes:
• The intent is for design to be completed by the Village of Germantown.
• The intent is for the contract to be advertised and awarded by the Village of Germantown.
• The intent is for the administration of the construction contract to be run the Village of
Germantown.
• The intent is for the payment to the contractor to be completed by the Village of Germantown.
• The intent is for the Village of Germantown to forward the paid invoices to the Town of Jackson,
where the Town of Jackson will obtain reimbursement from WisDOT, as outlined in the SMFA.
• The intent is for the Town of Jackson to reimburse the Village of Germantown for payments to
the contractor, as outlined in the SMFA and attached exhibit generally describing a (90/10) cost
share.
Page 136 of 167
Marc
h 24, 2026
Robert M Eichner
Town of Jackson
Jackson, WI 53037
Dear Robert M Eichner,
Congratulations! This letter confirms funding for your local project on Pioneer Rd from the 2026-27
Agricultural Roads Improvement Program (ARIP) Round 1 project solicitation. ARIP is a
reimbursement program administered by the Wisconsin Department of Transportation (WisDOT)
which improves highways functionally classified as local roads or minor collectors providing access
to agricultural lands or facilities used to produce agricultural or forestry products. The ARIP
program covers up to 90% of the total eligible project costs, with the balance of costs funded by the
political subdivision where the work is performed.
Your project was one of 29 selected for funding. The total eligible cost of the project is currently
estimated to be $1,400,000.00 based on the application materials submitted. WisDOT
reimbursement to the Town of Jackson will be limited to a maximum of ninety percent (90%)
participation in eligible items or to the $1,260,000.00 limit approved for the improvement –
whichever is less.
It is important that you not incur any project costs until receipt of your signed State Municipal
Project Agreement (SMA) from WisDOT.
In the absence of written notification to WisDOT indicating that the project award is being declined,
this award will be considered accepted. In the event that your municipality or county chooses to
decline this project award, please complete the form on the following page and email it to the ARIP
Program Manager, Hillary Pelton, at hillary.pelton@dot.wi.gov.
I greatly a
ppreciate your commitment to providing a quality transportation system that promotes
public safety and economic development. Our state and local partnership is imperative to the future
of Wisconsin’s transportation infrastructure. Congratulations on your project award, which is a key
piece of this effort.
Sincerely,
Kristina Boa
rdman, Secretary
Wisconsin Department of Transportation
W
isconsin Department of Transportation
Office of the Secretary
4822 Madison Yards Way, S903
Madison, WI 53705
Governor Tony Evers
Secretary Kristina Boardman
wisconsindot.gov
Telephone: (608) 266-1114
Email: sec.exec@dot.wi.gov
Page 137 of 167
Print Date: 10/14/2025
Village of Germantown GIS
Pioneer Road from Division Road (CTH G) to Country Aire Drive (CTH M)
12,000.00
Village Of Germantown
N112 W17001 Mequon Road
Germantown, WI 53022
262-250-4700
SCALE: 1 = 1000'
DISCLAIMER:
This map is not a survey of the actual boundary of any property this map depicts.
The Village of Germantown Does not guarantee the accuracy of the material contained here in and
is not responsible for any misuse or misrepresentation of this information or its derivatives.
PIONEER RD
Division Road
Town of Jackson
Town of Germantown
Page 138 of 167
12/9/2025 WisDOT ARIP
Pioneer Road (Project #2609)
Estimate for Application
Category
Circle one
ITEM NO.PROJECT ITEM DESCRIPTION Quantity UNITS UNIT COST TOTAL EST
MUNI EST
(10%)
1 Planning 1 LS $1,000 $1,000 $100
2 Survey - Engineering 1 LS $5,000 $5,000 $500
3 Design / Drafting Plans and Specifications - Roadway 1 LS $4,000 $4,000 $400
4 Design / Drafting Plans and Specifications - Culverts 1 EA $4,000 $4,000 $400
5 Outreach - Draft Letters and Postage - Engr. Admin 1 LS $1,000 $1,000 $100
$15,000 $1,500
6 Mobilization 1 LS $5,000 $5,000 $500
7 Re-Ditching and Temporary Easement (for 2 Rods, 24.75) 1 LS $15,000 $15,000 $1,500
8 Trucking/Hauling 1 LS $5,000 $5,000 $500
9 Erosion Control 1 LS $5,000 $5,000 $500
10 Traffic Control & Paint 1 LS $20,000 $20,000 $2,000
11 EBS 1 LS $50,000 $50,000 $5,000
$100,000 $10,000
12 Pioneer Road - CTH G to Church St (TOWN OF JACKSON) 5,280 LF $100 $528,000 $52,800
13 Pioneer Road - CTH G to Church St (TOWN OF GERMANTOWN) 100 LF $100 $10,000 $1,000
14 Pioneer Road - Church St. to CTH M (VILLAGE OF GERMANTOWN) 5,280 LF $100 $528,000 $52,800
10,660 LF $1,066,000 $106,600
2 @ 12-ft lanes with 2-ft shoulder 2.02Miles
10,660 14560
Category 004 - Drainage (Culvert Replacements)
16 Replace Arch CMP 72-Inch Division Road with New Concrete H.E. (ST032-005_ST032-004)60 LF $1,000 $60,000 $6,000
17
Replace Culvert Pipe CMP 18-Inch (Pioneer Rd - 1829' W of Church Rd) with Concrete Culvert
(ST031-001_ST031-002) 50 LF $200 $10,000 $1,000
18
Replace Culvert Pipe CMP 18-Inch (Pioneer Rd - 44' W of Church Rd) with Concrete Culvert (ST031-
003_ST022-001) 65 LF $200 $13,000 $1,300
19
Replace Culvert Pipe CMP 18-Inch (Pioneer Rd - 24' E of Church Rd) with Concrete Culvert (ST022-
002_ST022-003) 50 LF $200 $10,000 $1,000
$93,000 $9,300
$1,259,000 $125,900
$126,000
$1,385,000
$15,000 1%
$1,400,000
Roadway Segment
Village or Town
Jurisdiction
Distance
(ft.) Percent Mileage Cost
Pioneer Road - CTH G to Church St (TOWN OF JACKSON) TOWN 5280 49.5% 1.00 $62,359.47
Pioneer Road - CTH G to Church St (TOWN OF GERMANTOWN) TOWN 100 0.9% 0.02 $1,181.05
Pioneer Road - Church St. to CTH M (VILLAGE O GERMANTOWN) Village 5280 49.5% 1.00 $62,359.47
10660 100.0% 2.02 $125,900.00
Category 002 - General Construction
TOWN OF JACKSON / VILLAGE OF GERMANTOWN / TOWN OF GERMANTOWN
PIONEER ROAD -ARIP - COST ESTIMATE
Site Development, Water Utility, Sanitary Utility, ROAD PROGRAM, Parks, Municipal Buildings and Grounds
Date: 11/17/2025
Category 001 - Planning and Design
Category 003 - Pavement (Pulverize and Reconstruct, with select EBS 20%, Typ. Sec 12ft lanes, 2ft shoulder)
CONSTRUCTION COST SUBTOTAL
CONTINGENCIES (+/- 10%)
ESTIMATED Construction COST
ESTIMATED PROJECT COST
ESTIMATED Design
https://germantownwi.sharepoint.com/sites/Engineering/Shared Documents/Engineering/CADD Projects/2702 - Pioneer (ARIP - Cedar Lane)/2024-12-09_ARIP_Estimate (Rev)
Page 139 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Agreement with WisDOT for STH 145 Improvements (ACTION)
SUBMITTED BY: Kevin Driscoll, Village Engineer
SUMMARY EXPLANATION:
WisDOT is designing plans to reconstruct STH 145 / Fond du Lac Ave from Pilgrim
Road to a point north of Freistadt Road, near the new roundabout at Division Road.
WisDOT held a public meeting at the Library this winter about this project (2475-13-00).
Two design components have been discussed in previous PWHC meetings, and
include the Main Street reconfiguration and sidewalk connectivity work.
The estimate and plans for that respective work is attached. It includes new sidewalk
alignment along main street with a perpendicular intersection for safety improvements
and turning movement design improvements. The WisDOT Consultant Design will
continue during the Village Center District Planning efforts, and aspects can be
incorporated into the design. The sidewalk work includes approximately 1,500 LF
extension to connect the existing cross walk near Firemen’s Park to the existing
sidewalk near Pilgrim Road.
The STH 145 work is scheduled for construction in 2028. The sidewalk work is
estimated at approximately $92,000, with 50% obligation from Germantown equaling a
contribution in the amount of approximately $46,000. Items also included in the SMFA:
a rapid flashing beacon at the crosswalk to Firemen’s Park and an extension of
approximately 300 LF of sidewalk south to the dead end section of sidewalk along
Church Street. This work is estimated at $41,900 and is 100% Village obligation,
however would be constructed as part of the WisDOT project (D 2475-13-70).
Additional work items that would be Village obligations may include replacement of
cracked concrete light poles and potentially some storm sewer work adjacent to the
right of way.
ATTACHMENT:
1. 10 - SMFA with WisDOT for STH 145 - exhibits
STAFF RECOMMENDATION:
Staff requests the Public Works and Highways Committee recommend to the Village
Board, to enter into agreement with WisDOT for STH 145 / Fond du Lac Avenue road
reconstruction work at Main Street and Sidewalk connectivity in the amount of
$132,000, against account 40-561000-5316400 for work anticipated in 2028.
ACTION BY COMMITTEE:
A motion to support authorize staff and a vote “Aye” is in the affirmative to support
entering into a "state-municipal-financial-agreement" with WisDOT.
Page 140 of 167
50% Village of Germantown Participation (Filling in of Existing Sidewalk Gaps)
Item # Item Quantity Unit Price Amount Notes
305.0120 Base Aggregate Dense 1 1/4-Inch 1134 Ton $13.00 $14,736.66
601.0600 Concrete Curb Pedestrian 94 LF $52.00 $4,908.80 Ped curb added to reduce grading - minor landscape wall may be needed.
602.0410 Concrete Sidewalk 5-Inch 8289 SF $8.00 $66,308.00
602.0505 Curb Ramp Detectable Warning Field Yellow 70 SF $47.00 $3,290.00
602.0605 Curb Ramp Detectable Warning Field Radial Yellow 39 SF $69.00 $2,656.50
Category Total: $91,899.96
50% Village of Germantown Participation: $45,949.98
100% Village of Germantown Participation (New RRFB)
Item # Item Quantity Unit Price Amount Notes
SPV.0060 Rectangular Rapid Flashing Beacon (RRFB) System 1 Each $10,000.00 $10,000.00
Category Total: $10,000.00
100% Village of Germantown Participation: $10,000.00
100% Village of Germantown Participation (New Sidewalk Along Church Street)
Item # Item Quantity Unit Price Amount Notes
305.0120 Base Aggregate Dense 1 1/4-Inch 371 Ton $13.00 $4,821.99
601.0600 Concrete Curb Pedestrian 83 LF $52.00 $4,331.60 Ped curb addded at some locations to reduce grading.
602.0815 Concrete Driveway 7-Inch 40 SY $76.50 $3,049.80
602.0410 Concrete Sidewalk 5-Inch 2453 SF $8.00 $19,625.60
602.0505 Curb Ramp Detectable Warning Field Yellow 28 SF $47.00 $1,316.00
Category Total: $31,828.99
50% Village of Germantown Participation: $31,828.99
Total Estimated Village of Germantown Funding Participation: $87,778.97
SMFA ESTIMATE - VILLAGE OF GERMANTOWN
ID 2475-13-70
PILGRIM ROAD TO 0.2 MILE SOUTH OF DIVISION ROAD
STH 145, WASHINGTON COUNTY
Page 141 of 167
CANOPYWSIGNPOSTPOSTPOSTA/CMHINLINLSIGNPOSTINLINLMHMHSIGNMHMH WINLWA/CWPOSTINLWWWSIGNWWWSIGNSIGNSIGNSIGNSIGNSIGNA/CWWALLSMHSIGNMHSIGNA/CSIGNSIGNINLSTH 145STH 145PILGRIM RD
MAIN STSANSANELSSSANSSWVWVWVWVSANWVWVSSSAN SANSANSANSAN SANSANSANSAN
SANSANWVWVGUYGVWVWVELGUYGUYGUYGUYGUYGVWVWVWVWVWVWVGUYGUYGUYGUYWVWVFOFO
WWWWWWOHFOFO FOFOOHOH OHOHGG FOOHOH FOFOFOGGGGGGGGGGOHOHOHFOGEE
GGG
FO
OHOHWWWWWWWWWSANFOFOFOFOFOFOFOFOFOFOFOFOFOOHOHOHOHOHOHOHOHOHOHOHOHOH
SANSANSANSANSANFO FO
E500501502503504505506507STA 502+07.64-32.47' LTSTA 502+35.23-32.70' LTSTA 503+05.62-33.50' LTSTA 503+16.62-33.50' LTSTA 503+25.40-33.50' LTSTA 503+36.88-33.50' LTSTA 504+31.71-28.50' LTSTA 504+43.62-28.50' LTSTA 504+61.84-28.50' LTSTA 504+87.49-28.50' LTSTA 506+10.62-34.36' LTSTA 506+20.30-40.96' LTSTA 506+57.85-59.17' LTSTA 506+68.40-67.45' LT
STA 506+78.0752.34' RTSTA 505+37.8331.43' RTSTA 505+20.8131.24' RTSTA 504+80.8529.96' RTSTA 504+67.5829.77' RTSTA 504+18.3031.49' RTSTA 504+08.8731.49' RTSTA 503+15.2933.51' RTSTA 502+97.7733.50' RTSTA 502+62.6832.48' RTSTA 502+42.3432.50' RT STA 506+41.8020.50' RTSTA 506+07.8025.50' RTSTA 506+48.0752.34' RT
STA 507+55.79-72.00' LTSTA 507+56.79-62.00' LT
STA 500+67.2722.05' RTSTA 500+72.9132.74' RT STA 506+41.1812.00' RTSTA 506+07.1817.00' RTSTA 507+11.79-17.00' LT
Y
XXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXYYYYYYXXX
XXXXX
XXXXXXXX
YY
XXX XXXX
XXXXX
LEGENDHMA1SW5CPCCG18CSDCG30
3 1/2" HMA PAVEMENT 3LT 58-28 S (LOWER)1 3/4" HMA PAVEMENT 4LT 58-28 S (UPPER)CONCRETE SIDEWALK 5-INCHCONCRETE PEDESTRIAN CURBCONCRETE CURB & GUTTER18-INCH TYPE DCONCRETE CURB & GUTTER 4-INCHSLOPED 36-INCH TYPE DCONCRETE SURFACE DRAINSCONCRETE CURB & GUTTER30-INCH TYPE D
YYYYYYYYYYXXXXXXXXXXCG36
ASPHALT SURFACE DRIVEWAY 4-INCHCONCRETE DRIVEWAY 7-INCHSAWING ASPHALTSAWING CONCRETESLOPE INTERCEPT (SI)EXISTING RIGHT OF WAY (R/W)
CSNCONCRETE MEDIAN SLOPEDNOSE TYPE 1
BADBASE AGGREGATE DENSE 3/4-INCH
50% VILLAGE COST SHARE100% VILLAGE COSTWISDOT/CADDS SHEET 42EHWY:COUNTY:C:\USERS\EMMAVINDEDAHL\ONEDRIVE - DAAR CORPORATION\DOCUMENTS-SE-DESIGN\2475-13-00 STH 145\C3D\24751300\SHEETSOTHER\SMFA SIDEWALK FUNDING.DWGFILE NAME : 4/24/2026 6:37 AMPLOT DATE :PLOT BY :EMMA VINDEDAHL
2
PROJECT NO:PLOT NAME :
2
SHEET PLOT SCALE :1 IN:50 FT2475-13-70STH 145WASHINGTONPLAN DETAILSLAYOUT NAME - 021201
BEGIN PROJECTSTA 500+86MATCH EXISTINGSAW CUT REQUIREDSTH 145 SB
EXISTING R/W
EXISTING R/W
PILGRIM RD6'6'CG30CG30 STH 145 NBHMA1HMA1SISW5 SW5SW5 SW5HMA1HMA1SI CG30SW512'17'
AT&T WISCONSIN-COMMUNICATION LINE
AT&T WISCONSIN-COMMUNICATION LINEVILLAGE OF GERMANTOWN - LIGHTING
VILLAGE OF GERMANTOWN - SEWERVILLAGE OF GERMANTOWN - WATERVILLAGE OF GERMANTOWN - WATER
WE ENERGIES - ELECTRICWE ENERGIES - GASWE ENERGIES - GAS
SW5CPCSW5SW5SW5CPCCPC
SEE CURB RAMP DETAILS
17'17'
ANY SIDEWALK SHOWN WITHOUT COLOR WILL BE FUNDED 100% BY WISDOT
Page 142 of 167
SIGNWWALLSPOSTAGTANKSTPOSTPOSTINLINLPOSTPOSTSIGNSIGNSIGNSIGNW
CANOPYWWWA/CWWSIGNPOSTPOSTPOSTPOSTWALLSSIGNPOSTINLINLMHSIGNW
SIGNSTH 145STH 145MAIN STWWVWVWVWVSAN
SANSANSANSAN
GUYGUYWVGUYGV GUYGUYGOHOHOH
OH
FOGE
GGG FOFOFOFO
OHWWW
FOFOFOFOFOFOFOFOFOFOFOFOFOOHOHOHOHOHOHOHOHOHOHOHOHOHFOFOFOE
(?)E(?)E(?)E
(?)E(?)E(?)E
507508509510511512513514
17"MN"
18"MN"19"MN"
20"MN"
STA 506+57.85-59.17' LTSTA 506+68.40-67.45' LT
STA 506+78.0752.34' RT
STA 508+40.51-24.50' LTSTA 508+64.96-24.50' LT
STA 508+39.5133.05' RT
STA 507+70.87-152.64' LTSTA 507+88.75-167.11' LT
STA 509+35.06-20.50' LTSTA 509+80.81-20.50' LT
STA 508+74.5133.05' RTSTA 506+48.0752.34' RT
STA 513+65.4015.50' RTSTA 513+90.4224.00' RT
STA 507+85.79-72.00' LTSTA 507+55.79-72.00' LTSTA 507+56.79-62.00' LT
STA 513+65.0520.50' RT
STA 508+36.12-167.23' LTSTA 508+24.66-181.39' LT
STA 506+07.18STA 508+34.79-12.00' LTSTA 507+11.79-17.00' LT
STA 507+84.79-62.00' LT
YYYYYYYYYYYYYYXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXX
XXXX
XXXXXXX YYXXXXXYYYYYYY
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
WISDOT/CADDS SHEET 42EHWY:COUNTY:C:\USERS\EMMAVINDEDAHL\ONEDRIVE - DAAR CORPORATION\DOCUMENTS-SE-DESIGN\2475-13-00 STH 145\C3D\24751300\SHEETSOTHER\SMFA SIDEWALK FUNDING.DWGFILE NAME : 4/24/2026 6:37 AMPLOT DATE :PLOT BY :EMMA VINDEDAHL
2
PROJECT NO:PLOT NAME :
2
SHEET PLOT SCALE :1 IN:50 FT2475-13-70STH 145WASHINGTONPLAN DETAILSLAYOUT NAME - 021202
MAIN ST
EXISTING R/W
EXISTING R/W
6' STH 145 SBSTH 145 NBSI
SI
CG18
HMA1HMA1 HMA1HMA1HMA1CG30 CG30
LEGENDHMA1SW5CPCCG18CSDCG30
3 1/2" HMA PAVEMENT 3LT 58-28 S (LOWER)1 3/4" HMA PAVEMENT 4LT 58-28 S (UPPER)CONCRETE SIDEWALK 5-INCHCONCRETE PEDESTRIAN CURBCONCRETE CURB & GUTTER18-INCH TYPE DCONCRETE CURB & GUTTER 4-INCHSLOPED 36-INCH TYPE DCONCRETE SURFACE DRAINSCONCRETE CURB & GUTTER30-INCH TYPE D
YYYYYYYYYYXXXXXXXXXXCG36
ASPHALT SURFACE DRIVEWAY 4-INCHCONCRETE DRIVEWAY 7-INCHSAWING ASPHALTSAWING CONCRETESLOPE INTERCEPT (SI)EXISTING RIGHT OF WAY (R/W)
CSNCONCRETE MEDIAN SLOPEDNOSE TYPE 1
BADBASE AGGREGATE DENSE 3/4-INCH
50% VILLAGE COST SHARE100% VILLAGE COST
SW5
SW5SW5
12'12'5'5'6' 5'
EXISTING R/W
5'
AT&T WISCONSIN-COMMUNICATION LINESPECTRUM-COMMUNICATION LINE
SPECTRUM-COMMUNICATION LINEVILLAGE OF GERMANTOWN - SEWERVILLAGE OF GERMANTOWN - WATERWE ENERGIES - ELECTRICWE ENERGIES - ELECTRIC
WE ENERGIES - GAS
WE ENERGIES - GAS
VILLAGE OF GERMANTOWN - LIGHTING
AT&T WISCONSIN-COMMUNICATION LINE
R105'SI
SEE CURB RAMP DETAILSSEE CURB RAMP DETAILS
10'
15'
10'
15'20"MN"12' R43'R48'17'
ANY SIDEWALK SHOWN WITHOUT COLOR WILL BE FUNDED 100% BY WISDOT
Page 143 of 167
WMHMHSIGNSIGNSIGN
WSIGNA/CSIGNSIGNSIGNINLWWW
SIGN
SIGNSIGNT TPOSTPOSTPOSTINLINLINLAGPOSTPOSTINLSIGNINLTANKSAGSIGN
INLPOST
INL A/CSIGN
INL
SIGNSIGNSTH 145STH 145STH 145CRUSADER CT
CHURCH ST
SS SSSSSANSS
SAN
GUYGUYGVGUYGUY
OHOHOHOHG EE E
FOFOFOFO GGGGGGGFOFOFOFOFOFOFOFOFOFOFOFOOHOHOHOHOHOHOHOHOHOHOHOHOHSSFOFOFO FOFOFOFO514515516517518519520521
40"CH"
41"CH"
41"CH"
30"CR"
31"CR"
32"CR"
32"CR"
STA 513+65.4015.50' RTSTA 513+90.4224.00' RT STA 517+17.7951.40' RT STA 517+96.4170.60' RTSTA 517+95.7460.90' RTSTA 518+03.5995.04' RT
STA 519+12.5112.00' RT
STA 520+60.12-58.06' LTSTA 520+30.15-51.61' LTSTA 518+08.92-31.64' LTSTA 517+73.92-31.43' LTSTA 517+18.21-32.29' LTSTA 516+83.21-32.32' LT
STA 519+08.7628.00' RTSTA 519+19.2128.00' RTSTA 520+02.6326.00' RTSTA 520+12.7526.00' RT
STA 517+63.83128.45' RT
STA 516+80.8519.04' RT STA 521+54.86
STA 513+65.0520.50' RT STA 518+41.5718.01' RTSTA 518+32.0519.09' RT
STA 515+60.8512.15' RT
XXX
XXXXXXXXXXXXXXXX
XXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XXXXXX
XXXXXX
WISDOT/CADDS SHEET 42EHWY:COUNTY:C:\USERS\EMMAVINDEDAHL\ONEDRIVE - DAAR CORPORATION\DOCUMENTS-SE-DESIGN\2475-13-00 STH 145\C3D\24751300\SHEETSOTHER\SMFA SIDEWALK FUNDING.DWGFILE NAME : 4/24/2026 6:37 AMPLOT DATE :PLOT BY :EMMA VINDEDAHL
2
PROJECT NO:PLOT NAME :
2
SHEET PLOT SCALE :1 IN:50 FT2475-13-70STH 145WASHINGTONPLAN DETAILSLAYOUT NAME - 021203
CHURCH ST
CRUSADER CTEXISTING R/W
EXISTING R/W
EXISTING R/W
12'12'
5'6' 5'STH 145 SBSTH 145 NBSI HMA1HMA1SW5SI
HMA1
HMA1
CG30 CG18 SIBADLEGENDHMA1SW5CPCCG18CSDCG30
3 1/2" HMA PAVEMENT 3LT 58-28 S (LOWER)1 3/4" HMA PAVEMENT 4LT 58-28 S (UPPER)CONCRETE SIDEWALK 5-INCHCONCRETE PEDESTRIAN CURBCONCRETE CURB & GUTTER18-INCH TYPE DCONCRETE CURB & GUTTER 4-INCHSLOPED 36-INCH TYPE DCONCRETE SURFACE DRAINSCONCRETE CURB & GUTTER30-INCH TYPE D
YYYYYYYYYYXXXXXXXXXXCG36
ASPHALT SURFACE DRIVEWAY 4-INCHCONCRETE DRIVEWAY 7-INCHSAWING ASPHALTSAWING CONCRETESLOPE INTERCEPT (SI)EXISTING RIGHT OF WAY (R/W)
CSNCONCRETE MEDIAN SLOPEDNOSE TYPE 1
BADBASE AGGREGATE DENSE 3/4-INCH
50% VILLAGE COST SHARE100% VILLAGE COST
SIEXISTING R/W
SW5
EXISTING R/W
CG30
AT&T WISCONSIN-COMMUNICATION LINESPECTRUM-COMMUNICATION LINEWE ENERGIES - ELECTRIC
WE ENERGIES - ELECTRIC
WE ENERGIES - GAS
NOTE TO REVIEWERS: SIDEWALK SHOWN ON THE WESTSIDE OF CHURCH STREET AND THE SOUTH/WEST SIDE OFSTH145 BETWEEN CHURCH STREET AND PARK AVENUEIS CONCEPTUAL AT THIS TIME AND ONLY DISPLAYED INTHE PLAN DETAILS AND NOT THE CROSS SECTIONS.DURING THE PUBLIC OUTREACH COMPLETED THISWINTER THE VILLAGE OF GERMANTOWN REQUESTEDTHAT THIS SIDEWALK BE INCLUDED AS PART OF THEPROJECT. IT'S BEING SHOWN TO SOLICIT FEEDBACKFROM THE DEPARTMENT.
CG30SEE CURB RAMP DETAILSSEE CURB RAMP DETAILSCPC
16'15'12'12'
30"CR"R36'R37.5'
R15'
R31.5'R22.5'
CSN
ANY SIDEWALK SHOWN WITHOUT COLOR WILL BE FUNDED 100% BY WISDOT
Page 144 of 167
FLAGWSIGNSIGNSIGN
W
MH
MH
SIGNSIGNINLINLMHSIGNSIGNW
SIGNSIGNSIGNSIGN
WWW WA/CA/CWINLINLMHMHMHMHMHINLWWINLPOOLWWA/C SIGNSIGNSIGNSIGNMHSIGNSIGNSIGNINLPOSTPOSTMHWWWSIGN
SIGN
SIGNSTH 145STH 145PARK AVE
SSWVGVSSGVSSSSSANSANGVSSSS SANWVCWV
SS
SANSANSANSANGUY GVSANWVWV
GUYGUYGUY
WVGVWVWVWVWVGUYGUYGUYOH
OH
OHGG
OHOHOHOHOH
GG
FOFO
OHOHOHOHOHGGGGGGGGGGGGGGGFOFOFOFOFOFOFOFOFOFOFOFOFOOHOHOHOHOHOHOHOHOHOHOHOHOH
WWWW
FOFO
OHOHOHWWV
SS
FOFOFOFOFO52152252352452552652752841"CH"
41"CH"
50"PK"
51"PK"
52"PK"
53"PK"
STA 520+60.12-58.06' LT
STA 520+02.6326.00' RTSTA 520+12.7526.00' RT STA 521+90.1826.00' RTSTA 521+71.3826.00' RTSTA 521+57.3226.00' RT STA 525+35.5831.64' RT
STA 521+54.86-24.74' LTSTA 521+76.39-24.74' LT STA 522+90.36-19.77' LTSTA 523+14.36-19.40' LT
STA 522+26.2526.00' RT
STA 526+76.99-42.91' LTSTA 526+93.01-30.69' LT
STA 526+39.13-15.00' LTSTA 525+82.58-26.11' LTSTA 525+95.82-22.01' LT STA 527+00.1415.00' RT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXX
XXXXXXXXXXXXXXXXXX
YY Y
Y
X
XXXXXXXXXXXXX
XXXXXX
13'
WISDOT/CADDS SHEET 42EHWY:COUNTY:C:\USERS\EMMAVINDEDAHL\ONEDRIVE - DAAR CORPORATION\DOCUMENTS-SE-DESIGN\2475-13-00 STH 145\C3D\24751300\SHEETSOTHER\SMFA SIDEWALK FUNDING.DWGFILE NAME : 4/24/2026 6:37 AMPLOT DATE :PLOT BY :EMMA VINDEDAHL
2
PROJECT NO:PLOT NAME :
2
SHEET PLOT SCALE :1 IN:50 FT2475-13-70STH 145WASHINGTONPLAN DETAILSLAYOUT NAME - 021204
PARK AVE
PARK AVE
EXISTING R/W
12'12'EXISTING R/WEXISTING R/W
EXISTING R/W
CHURCH ST
5' 5'
LEGENDHMA1SW5CPCCG18CSDCG30
3 1/2" HMA PAVEMENT 3LT 58-28 S (LOWER)1 3/4" HMA PAVEMENT 4LT 58-28 S (UPPER)CONCRETE SIDEWALK 5-INCHCONCRETE PEDESTRIAN CURBCONCRETE CURB & GUTTER18-INCH TYPE DCONCRETE CURB & GUTTER 4-INCHSLOPED 36-INCH TYPE DCONCRETE SURFACE DRAINSCONCRETE CURB & GUTTER30-INCH TYPE D
YYYYYYYYYYXXXXXXXXXXCG36
ASPHALT SURFACE DRIVEWAY 4-INCHCONCRETE DRIVEWAY 7-INCHSAWING ASPHALTSAWING CONCRETESLOPE INTERCEPT (SI)EXISTING RIGHT OF WAY (R/W)
CSNCONCRETE MEDIAN SLOPEDNOSE TYPE 1
BADBASE AGGREGATE DENSE 3/4-INCH
50% VILLAGE COST SHARE100% VILLAGE COST
SI
SI
REMOVE DRIVEWAYSTH 145 SBSTH 145 NBHMA1HMA1CG3012'12'SW5
SW5
SW5
SW5CG30CG36HMA1 HMA1
HMA1
SI
SICG30CG30 AT&T WISCONSIN-COMMUNICATION LINE
AT&T WISCONSIN-COMMUNICATION LINE
SPECTRUM-COMMUNICATION LINE
SPECTRUM-COMMUNICATION LINE
VILLAGE OF GERMANTOWN - SEWER
VILLAGE OF GERMANTOWN - WATER
WE ENERGIES - ELECTRIC
WE ENERGIES - ELECTRICWE ENERGIES - GAS
WE ENERGIES - GAS
NOTE TO REVIEWERS: SIDEWALK SHOWN ON THE WESTSIDE OF CHURCH STREET AND THE SOUTH/WEST SIDE OFSTH145 BETWEEN CHURCH STREET AND PARK AVENUEIS CONCEPTUAL AT THIS TIME AND ONLY DISPLAYED INTHE PLAN DETAILS AND NOT THE CROSS SECTIONS.DURING THE PUBLIC OUTREACH COMPLETED THISWINTER THE VILLAGE OF GERMANTOWN REQUESTEDTHAT THIS SIDEWALK BE INCLUDED AS PART OF THEPROJECT. IT'S BEING SHOWN TO SOLICIT FEEDBACKFROM THE DEPARTMENT.
SEE CURB RAMP DETAILSSEE CURB RAMP DETAILS
SEE CURB RAMP DETAILSSEE CURB RAMP DETAILS16'
20'20'SEE CURB RAMP DETAILS
R21'R77'
R59'R21.5'CG30CG363'3'
ANY SIDEWALK SHOWN WITHOUT COLOR WILL BE FUNDED 100% BY WISDOT
Page 145 of 167
BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE
GERMANTOWN, WI
MEETING DATE: May 13, 2026
AGENDA ITEM: New Business (ACTION)
ITEM TITLE: Authorization to Purchase - Emergency By- Pass Pump
SUBMITTED BY: Timothy K. Zimmerman – Director of Public Works
SUMMARY EXPLANATION:
After the historic flooding event of August 2025, money was included in the 2026 Wastewater
Utility Budget to purchase an additional 6” critically silenced trash pump for emergency
operations. This pump will give the Utility an additional 2,200 g.p.m. of by-pass pumping
capacity. Prices solicited are shown below:
Atlas/Capco Lincoln Contractors Supply – Milwaukee $68,118.50
Godwin/ Flygt Xylem Water – Bridgeport, NJ $65,175.76
Thompson Thompson Pump – Port Orange, FL $58,300.00
ATTACHMENT: ORDINANCE RESOLUTION OTHER___X____
RECOMMENDATION:
It is staff’s recommendation to purchase 1 6JSCEE-DIST-4LE2T-MC 6” critically silenced trash
pump from Thompson Pump for the amount not to exceed $53,300 including freight and forward
this recommendation on to the Village Board with a positive recommendation. Money budgeted
in account number 60000000-182460 Other Pumping Equipment.
COMMITTEE ACTION:
Proper parliamentary procedure to deny a request is to have a motion made in the affirmative and
by voting NAY would deny the request if a majority vote.
Page 146 of 167
4620 City Center Dr
Port Orange, FL 32129
Phone: (386) 767-7310
Website: www.thompsonpump.com
Date: 2/24/2026
Quote #: Q-27293
Timothy Zimmerman
Village of Germantown
W130N10200 Town 9 Parkway
Germantown, Wi. 53022
(262) 253-7765
tzimmerman@germantownwi.gov
Re: 6JSCEE-DIST-Germantown Wi.
Timothy,
We are Pleased to Quote you a 6" Dry Prime Trash Pump
1-6JSCEE-DIST-4LE2T-MC
Pump on Trailer with Lights & Brakes
Auto Controls On/Off Floats
Painted TPM Blue with Q D Fittings
Long Running Fuel Tank 70-80 Hours
Sound Attenuated Lockable Canopy
Call me if you have any Questions
Regards,
Mark Singleton
Region Manager
Thompson Pump & Manufacturing
(386) 767-7310
msingleton@thompsonpump.com
Page 147 of 167
4620 City Center Dr
Port Orange, FL 32129
Phone: (386) 767-7310
www.thompsonpump.com
Sale Quotation
Quote #: Q-27293-2
Date: 2/24/2026
Expires On: 3/26/2026
Lead Time: 8-12 Weeks (pending
receipt of PO)
Bill To
Village of Germantown
W130N10200 Town 9 Parkway
Germantown, Wi. 53022
US
Ship To
Village of Germantown
W130N10200 Town 9 Parkway
Germantown Wi. 53022
Contact: Timothy Zimmerman
Phone: (262) 253-7765
QTY PART # DESCRIPTION NET PRICE EXTENDED
1 6JSCEE-DIST-4LE2T-MC 6" ENVIROPRIME HIGH HEAD PUMP $56,500.00 $56,500.00
TOTAL: $56,500.00
Job Requirements: No specific duty point requested
Notes / Specification Variances: Shipping Not Included
FREIGHT:
Signature: ________________________________
Date: _____/_____/_____
Name (Print): ________________________________ Title: _____________________________
• All pumps are tested utilizing Hydraulic Institute standards. Thompson Pump is a member in good standing with the Contractor's Pump
Bureau, the governing association of U.S. pump manufacturer standards. ISO 9001:2015 certified.
• FOB: Freight - FOB Port Orange, FL; freight rates quoted are subject to change based on current market conditions.
• TERMS: DUE IN ADVANCE/SUBJECT TO CREDIT APPROVAL - Subject to credit approval. - A convenience fee of 2% will be added
when payment is made by credit or debit card.
• WARRANTY: One (1) year limited on new equipment. 30 day limited on used equipment.
• DELIVERY: The customer is responsible for any and all taxes, tariffs or associate fees in the sale and transport of equipment
purchased or rented. Thompson Pump to arrange freight.
• FREIGHT RATES: Any & all freight rates that may be quoted are for budgetary purposes only. All freight rates are an estimate only and
are not binding to Thompson Pump. Please provide a tax exemption certificate at time of order if applicable. No penalties or liquidated
damage are acceptable. Cancellation of the order or return of any equipment purchased may result in re-stocking fees.
• Quote validity: 30 days unless otherwise noted.
• All prices shown in Net US Dollars. Prices quoted do not include any applicable sales tax or fees.
Page 148 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Request to Amend Operating Budget to Fund Additional Turf
Maintenance Costs. (ACTION)
SUBMITTED BY:
SUMMARY EXPLANATION:
The Village's turf management plan for ten athletic fields and parks for 2025-2026 has
higher than expected contract costs and will require additional allocated funds. $19,385
is requested for 1659000-532000 to cover contract costs for Total Lawn Care
ATTACHMENT:
STAFF RECOMMENDATION:
Staff recommends approval
ACTION BY COMMITTEE:
Page 149 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Request to Update the List of Authorized Signers for Bank
Documentation (ACTION)
SUBMITTED BY:
SUMMARY EXPLANATION:
With the departure of Administrator Kreklow and Finance Director Uselding, the
Village's authorized signers for checks needs to be updated.
ATTACHMENT:
STAFF RECOMMENDATION:
The Board should approve President Soderberg, Clerk Ott, and interim Administrator
Reynolds as approved signers.
ACTION BY COMMITTEE:
Page 150 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Professional Services Agreement with Innovative Public Advisors
LLC for the provision of interim Finance Director staffing. (ACTION)
SUBMITTED BY: Brian Sajdak, Attorney
SUMMARY EXPLANATION:
With the departure of the Village's Finance Director, staff have identified a need to have
experienced professional finance department support while the recruitment for a
replacement is on-going. This support will be critical both to assist in day-to-day
operations and also as the Village moves into the beginning of the 2027 budget
planning.
Alternatives were explored, including the use of Baird or other staffing companies. IPA
was identified as one of the few options available that included someone experienced in
municipal finance. Ms. Robertson has significant experience in municipal government,
having spent over 28 years as the administrator in the Village of Thiensville where she
was involved in all facets of the village given Thiensville's small staff size. Ms.
Robertson was also able to spend a little amount of time with Mr. Uselding prior to his
departure which gave her a little bit of transition.
Note that given timing and the critical need, this item will also be on the Village Board
agenda on the same night.
ATTACHMENT:
1. Professional Services Agreement - IPA-V-Germantown-Interim-FD
STAFF RECOMMENDATION:
A motion to approve the professional services agreement with Innovative Public
Advisors for finance director services.
ACTION BY COMMITTEE:
Given timing and the critical need, this item has moved directly from GGF earlier in the
evening and no recommendation is known at the time of publishing this agenda.
Page 151 of 167
Page 152 of 167
Page 153 of 167
Page 154 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Request for Potential TID Incentive for a Prospective Tenant in the
Gateway Corporate Park (TID 8) and Establishing a Policy for
Handling Future Requests. The Village Board may convene into
closed session pursuant to Wis. Stat. § 19.85(1)(e) for the purpose
of deliberating or negotiating the purchasing of public properties,
the investing of public funds, or conducting other specified public
business, whenever competitive or bargaining reasons require a
closed session and then may reconvene in open session to take
such action as it deems appropriate. (ACTION)
SUBMITTED BY: Brian Sajdak, Attorney
SUMMARY EXPLANATION:
Introduction
Economic Development Washington County (EDWC) has been approached about a
possible incentive for a manufacturing company that is looking to relocate its current
facilities. EDWC has proposed an incentive structure similar to the incentive recently
approved for Flamingo Marine. However, as the Committee will recall, there was
significant criticism of that process. Given that criticism and the fact that the Village is
operating with an interim administrator, this request is being brought before the
Committee largely to seek guidance as to how the Committee (and ultimately the
Board) wishes to address the pending request. It is anticipated that this discussion will
form the basis of a future policy that can be utilized for future requests, even if the
decision as to how to treat this current request is different than what policy direction is
provided.
Discussion - Process Generally
Based on the discussions related to Flamingo Marine, there are multiple options as to
how to address these types of requests. They include:
1. The traditional approach. Historically, these types of requests were brought directly to
the Village Board for policy guidance as to whether the Board desired to consider
possible negotiations with the requestor. If the Board was interested, staff would
negotiate terms consistent with the directive of the Board and a final agreement would
be brought before the Board for approval.
2. A modified traditional approach. The traditional approach did not seek committee
recommendation. Under the Municipal Code, all actions should come with a committee
recommendation, although this can be waived by the Board. The process used could
involve having a standing committee weigh in on incentive requests.
3. Utilize the Plan Commission. The Plan Commission has a broad grant of authority by
Page 155 of 167
statute that includes many facets of planning and development, including having a role
in formulating the Village's master plan and comprehensive plan. While I am unaware of
any other community that utilizes the Plan Commission to weigh in on specific incentive
requests, there could be an argument that it is development related.
4. Utilize the Economic Development Commission. A frequent suggestion has been to
utilize the EDC. The Municipal Code defines the powers of the EDC to be:
(a) Formulate, manage and administer the Village's economic development program,
carrying out short-range and long-range elements of the program.
(b) Recommend an annual budget for its activities and programs.
(c) As called upon, serve in an advisory role to the Plan Commission and Village Board
on matters relevant to economic development in the Village.
(d) Engage in policy deliberations relative to economic development activities, such as
business park development and marketing, and make policy recommendations to the
Village Board and also to the Plan Commission when requested or where appropriate.
(e) Such other duties as may be assigned elsewhere in this Code, or by the Plan
Commission and Village Board.
As such, it is clear that the EDC is primarily a policy-focused body under the Code. In
that role, the EDC could clearly help the Board establish a TID policy that could include
guidelines both for when TIDs would be considered in the Village and also for when
incentives could be offered or utilized. Staff has, and continues to recommend, that the
EDC undertake this endeavor.
However, it is not clear whether the EDC has a role in reviewing specific development
proposals or incentive requests. Arguably under (c) the Board could ask the EDC to
advise on a request, but in light of the rest of the powers, that advice may be limited to
policy considerations and not the specifics of any particular request. If the Board wished
to include the EDC in this manner, a code change would be recommended to better
define this authority.
Discussion -- The Current Request
Notwithstanding any guidance on future policies and procedures, there is nonetheless a
current incentive to be addressed. The Committee should recommend some course of
action to the Board with respect to the handling of this request. As noted in the
introduction, this could be different than future requests. For example, the Board may
ultimately direct that the EDC establish a TID incentive policy that would dictate whether
the Board would even consider a specific type of incentive request. However, the Board
could nonetheless act on the pending request without that policy.
A high-level overview of the request is attached for informational purposes. However,
Page 156 of 167
given that the company is still in the exploration phase, they have requested
confidentiality as they have not chosen a location or even announced to their
employees that a move is being considered.
Closed Session Appropriateness
Under Wis. Stat. § 19.85(1)(e), the Village Board may enter into a closed session for
the purpose of deliberating or negotiating the purchasing of public properties, the
investing of public funds, or conducting other specified public business, whenever
competitive or bargaining reasons require a closed session. In this case, if the Board
desires to consider a potential incentive request, the Board may utilize a closed session
for the purposes of establishing its negotiating or bargaining position with respect to
such incentive.
ATTACHMENT:
1. EDWC_DecisionMemo_To-GtownVB_RE-ProjectIncentiveProposal_2026--05-13
2. Zilber Letter-Gateway Corp Park-5-5-26
3. Germantown TIF 8 Draft Proforma 051826
STAFF RECOMMENDATION:
Staff recommends that the Committee make a recommendation to the Board both with
respect to the future process to be utilized for incentive requests and also on the
pending request in TID 8.
ACTION BY COMMITTEE:
Given timing and the critical need, this item has moved directly from GGF earlier in the
evening and no recommendation is known at the time of publishing this agenda.
Page 157 of 167
Page 158 of 167
Page 159 of 167
Page 160 of 167
Page 161 of 167
Page 162 of 167
Page 163 of 167
Page 164 of 167
Current Status TID 8
Village of Germantown
TIF #8
Cash Flow Proforma Analysis
Assumptions
Annual Inflation During Life of TID…………………………………………………… 2.00%
2025 Gross Tax Rate (per $1000 Equalized Value)…………………………… $14.78
Annual Adjustment to tax rate…………………………………………………………… 0.00%
Investment rate…………………………………………………………………………………… 1.00%
Background Data Revenues TID Status
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Existing 11/1/2018 Year End
TIF District Inflation Construction TIF Increment Tax Tax Investment Total Debt Professional Admin Developer Flamingo Proposed Combined Annual Cumulative
Year Valuation Increment Increment Over Base Rate Revenue Income Revenues Service Services Expenditures Grant Marine #1 Up-Front Expenditures Balance Balance Cost Recovery Year
(January 1) (1) (1) Totals Totals Totals (December 31)
Base Value
$640,700
2024 $201,199,700 $39,134,600 $239,693,600 $15.07 $2,698,684 $6,135 $5,316,627 $981,788 $0 $119,478 $46 $1,837,208 $3,479,419 $172,453 Per 2024 Audit 2024
2025 $240,334,300 $4,806,686 $244,500,286 $14.78 $3,022,424 $1,725 $3,024,149 $1,179,533 $25,000 $84,872 $79,546 $1,368,951 $1,655,198 $1,827,651 2025
2026 $245,140,986 $4,902,820 $249,403,106 $14.78 $3,542,671 $18,277 $3,560,948 $1,345,894 $25,000 $87,418 $79,545 $750,000 $750,000 $3,037,857 $523,091 $2,350,741 2026
2027 $250,043,806 $5,000,876 $254,403,982 $14.78 $3,613,714 $23,507 $3,637,222 $1,389,075 $25,000 $90,041 $79,546 $1,583,662 $2,053,560 $4,404,301 2027
2028 $255,044,682 $5,100,894 $259,504,875 $14.78 $3,686,178 $44,043 $3,730,221 $1,450,503 $25,000 $92,742 $79,545 $1,647,790 $2,082,431 $6,486,732 2028
2029 $260,145,575 $5,202,912 $264,707,787 $14.78 $3,760,091 $64,867 $3,824,958 $1,559,965 $25,000 $95,524 $79,546 $1,760,035 $2,064,923 $8,551,655 2029
2030 $265,348,487 $5,306,970 $270,014,757 $14.78 $3,835,482 $85,517 $3,920,999 $1,562,581 $25,000 $98,390 $79,545 $1,765,516 $2,155,483 $10,707,138 2030
2031 $270,655,457 $5,413,109 $275,427,866 $14.78 $3,912,381 $107,071 $4,019,452 $1,572,244 $25,000 $101,342 $79,546 $1,778,132 $2,241,321 $12,948,459 Expenditures Recovered 2031
2032 $276,068,566 $5,521,371 $280,949,237 $14.78 $3,990,818 $129,485 $4,120,303 $1,533,584 $25,000 $104,382 $79,546 $1,742,512 $2,377,791 $15,326,250 Expenditures Recovered 2032
2033 $281,589,937 $5,631,799 $286,581,036 $14.78 $4,070,824 $153,262 $4,224,086 $1,501,278 $25,000 $107,513 $79,546 $1,713,337 $2,510,749 $17,836,999 Expenditures Recovered 2033
2034 $287,221,736 $5,744,435 $292,325,471 $14.78 $4,152,430 $178,370 $4,330,800 $1,464,838 $25,000 $110,739 $79,545 $1,680,122 $2,650,678 $20,487,677 Expenditures Recovered 2034
2035 $292,966,171 $5,859,323 $298,184,794 $14.78 $4,235,668 $204,877 $4,440,544 $1,269,681 $25,000 $114,061 $79,546 $1,488,288 $2,952,257 $23,439,933 Expenditures Recovered 2035
2036 $298,825,494 $5,976,510 $304,161,304 $14.78 $4,320,570 $234,399 $4,554,970 $1,236,619 $25,000 $117,483 $79,546 $1,458,648 $3,096,322 $26,536,255 Expenditures Recovered 2036
2037 $304,802,004 $6,096,040 $310,257,344 $14.78 $4,407,171 $265,363 $4,672,534 $1,227,425 $25,000 $121,007 $79,545 $1,452,977 $3,219,557 $29,755,812 Expenditures Recovered 2037
2038 $310,898,044 $6,217,961 $316,475,305 $14.78 $4,495,504 $297,558 $4,793,062 $1,192,100 $25,000 $124,637 $79,546 $1,421,283 $3,371,779 $33,127,591 Expenditures Recovered 2038
2039 $4,585,604 $331,276 $4,916,879 $532,219 $532,219 $4,384,660 $37,512,251 Expenditures Recovered 2039
$76,781,705 $0 $59,631,530 $2,139,596 $61,771,127 $20,017,539 $350,000 $1,450,151 $1,113,639 $750,000 $750,000 $24,431,329
Type of TID: Industrial
2018 TID Inception (7/02/2018) (1) Per Village
2033 Final Year to Incur TIF Related Costs
2038 Maximum Legal Life of TID (20 Years)
2039 Final Tax Collection Year
Expenditures
Page 165 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Village Administrator Vacancy. The Village Board may convene
into closed session pursuant to Wis. Stat. § 19.85(1)(c) for the
purpose of considering employment, promotion, compensation or
performance evaluation data of any public employee over which
the governmental body has jurisdiction or exercises responsibility
and then may reconvene in open session to take such action as it
deems appropriate. (ACTION)
SUBMITTED BY: Brian Sajdak, Attorney
SUMMARY EXPLANATION:
Under Wis. Stat. § 19.85(1)(c), the Village Board is authorized to go into closed session
for the purpose of considering employment, promotion, compensation or performance
evaluation data of any public employee over which the governmental body has
jurisdiction or exercises responsibility. This provision provides the Board with the ability
to go into closed session for the purposes of reviewing applications of potential
candidates, discuss possible terms of employment, and to otherwise decide on next
steps in the process of filling the existing vacancy.
ATTACHMENT:
1. Form Employment Agreement - Village Administrator
2. Application
STAFF RECOMMENDATION:
A motion to convene into closed session pursuant to Wis. Stat. § 19.85(1)(c) for the
purpose of considering employment, promotion, compensation or performance
evaluation data of any public employee over which the governmental body has
jurisdiction or exercises responsibility.
ACTION BY COMMITTEE:
Page 166 of 167
BUSINESS OF THE VILLAGE BOARD
MEETING DATE: May 18, 2026
PLACEMENT: Action Item
ITEM TITLE: Appointment of Travis Broughton for Wastewater Superintendent /
Recycling Coordinator for Department of Public Works
SUBMITTED BY:
SUMMARY EXPLANATION:
ATTACHMENT:
STAFF RECOMMENDATION:
ACTION BY COMMITTEE:
Page 167 of 167
Source: Village of Germantown website. First collected Oct 18, 2026.