Special Public Safety Committee — Agenda Packet
Village of Germantown · Washington County · Public Safety Committee · meeting of May 6, 2026 · Agenda packets
Open the original document More from Village of Germantown
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MEETING: SPECIAL MEETING OF THE PUBLIC SAFETY
COMMITTEE
DATE & TIME: Wednesday, May 6, 2026 at 6:00 PM
LOCATION: Germantown Village Hall Board Room
N112 W17001 Mequon Road
Any member of the body and/or citizen may attend the meeting virtually through the WebEx platform, Meeting #: 2555 630 3918 Password:
qdSbcjjG635 which can be accessed by phone at 408-418-9388 or by logging on
at https://villageofgermantown.my.webex.com/villageofgermantown.my/j.php?MTID=mf02f89ae06906588002f9d9c97908bad
Citizens not wishing to attend the meeting personally or virtually may submit any public comments by sending an email
to comments@germantownwi.gov by 4 p.m. on the day of the meeting so that it can be provided to the members of the body for their
consideration. Previously recorded Village Board Meeting Videos can be viewed at
https://www.youtube.com/channel/UCOYp0EgELzTCa9X_iCohyhQ.
AGENDA
I. CALL TO ORDER: This meeting has been given public notice in accordance with
Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public
and news media of subject matter that is intended for consideration and action.
II. ROLL CALL:
III. PRESENTATION OF LIFE-SAVING AWARDS:
IV. CITIZEN INPUT: (Please be advised per 19.84(2) that information and comment will
be received from the public. It is the policy of this municipality that public input be
limited to a four (4) minute period per person with a time extension granted at the
discretion of the Chairperson. Be advised that there may be limited discussion of the
information received but no action will be taken under public comments.) Comments
that may be injurious to village personnel or other individuals will not be allowed.
V. MEETING MINUTES:
A. April 9, 2026 (ACTION)
VI. REPORTS (DISCUSSION AND POSSIBLE ACTION UNLESS OTHERWISE
NOTED):
A. Police Monthly Report
B. Fire Department Monthly Report
C. Fire Department Building Project
D. Overtime Report
E. Policy Updates
VII. UNFINISHED BUSINESS:
VIII. NEW BUSINESS:
A. One-Time/Special Event Outside Premise Extension Application for Metro
Cigars, N102W19455 Willow Creek Way - June 7, 2026 12pm-5pm (ACTION)
Page 1 of 136
PUBLIC SAFETY COMMITTEE AGENDA
May 6, 2026
Page 2
B. Temporary Class "B" Beer/"Class B" Wine Application for Kiwanis of
Germantown, Taste of Germantown - July 23, 2026 (ACTION)
C. Temporary Class "B" Beer/"Class B" Wine Application for Post One Inc, 4th of
July Celebration - July 4, 2026 (ACTION)
D. Application for Fireworks Permit for July 4, 2026, by Parks & Recreation
Director Guilford Standridge (ACTION)
E. Cardiac Monitor Repair Warranty / Service Contract (ACTION)
F. Selection of CMAR for Station 2 Project (ACTION)
G. Construction Manager at Risk RFP for New Police Department (DISCUSSION)
IX. ADJOURNMENT:
UPON REASONABLE NOTICE, efforts will be made to accommodate the needs of disabled individuals through
appropriate aids and services. For additional information or to request this service, please contact the Village
Clerk at (262)250-4745 at least 2 days prior to the meeting.
Notice is hereby given that a possible quorum of other boards, committees, and/or commissions may attend this
meeting to gather information about an item over which they have decision-making responsibility. This may
constitute a meeting of these bodies per State ex rel. Badke v Greendale Village Board, even though these
bodies will not take formal action at this meeting.
Page 2 of 136
MEETING: SPECIAL MEETING OF THE PUBLIC SAFETY
COMMITTEE
DATE AND TIME: Thursday, April 9, 2026 6:00 PM
LOCATION: Germantown Village Hall Board Room
N112 W17001 Mequon Road
MINUTES
I. CALL TO ORDER: This meeting has been given public notice in accordance with
Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public
and news media of subject matter that is intended for consideration and action.
Chairperson Trustee Cutts called the meeting to order at 6:00pm.
II. ROLL CALL:
Present: Trustee Meg Cutts, Trustee David Baum, Trustee Jolene Pieper, Trustee
Kristen Borst
Also Present: Interim Village Administrator Mitch Reynolds, Police Chief Pat Merten,
Administrative Manager Amy Lerch
III. CITIZEN INPUT: (Please be advised per 19.84(2) that information and comment will
be received from the public. It is the policy of this municipality that public input be
limited to a four (4) minute period per person with a time extension granted at the
discretion of the Chairperson. Be advised that there may be limited discussion of the
information received but no action will be taken under public comments.) Comments
that may be injurious to village personnel or other individuals will not be allowed.
Melanie Smythe (Cedar Lane) commented on the proposed Germantown Police
Department building project.
IV. MEETING MINUTES:
A. March 2, 2026 (ACTION)
Motion: Approve as presented
Motioned By: Jolene Pieper
Seconded By: Kristen Borst
Yes: Meg Cutts, David Baum, Jolene Pieper, Kristen Borst
No: None
Abstain: None
Motion Carried by Voice Vote (Yes 4, No 0, Abstained 0)
V. UNFINISHED BUSINESS:
Page 3 of 136
Page 2
A. Award of Architectural Firm contract for Police Department Building
construction project - recommendation to Village Board on April 20, 2026
(ACTION)
Germantown Chief of Police Pat Merten gave a presentation of the GPD building
construction project. Information was also provided in the Agenda packet.
Chairperson Trustee Cutts entertained a motion.
Motion: Go forward with the Zimmerman design.
Motioned By: David Baum
Seconded By: Kristen Borst for discussion.
Lengthy discussion ensued. Brad Kropp of FGMA answered project cost questions
related to previous projects.
Yes: None
No: Meg Cutts, Kristen Borst
Abstain: David Baum, Jolene Pieper
Kristen Borst changed her vote to abstain
Motion Failed by Voice Vote (Yes 0, No 1, Abstained 3)
Chairperson Trustee Cutts entertained a second motion.
Second Motion: Move forward with a recommendation of FGMA.
Motioned By: Meg Cutts
Seconded By: Jolene Pieper for discussion.
Trustee Pieper asked Chief Merten his opinion as to which meeting he would want this
Agenda item: April 20th or May 4th? Chief Merten requested this be brought to the
existing Village Board on 4/20/26.
Discussion ensued.
Yes: Meg Cutts, Jolene Pieper
No: None
Abstain: David Baum, Kristen Borst
Motion Failed by Voice Vote (Yes 2, No 0, Abstained 2)
Chairperson Trustee Cutts entertained a third motion.
No motion made; this item moves forward to the Village Board 4/20/26 meeting
with no recommendation.
VI. ADJOURNMENT:
Chairperson Trustee Cutts adjourned the meeting at 7:00pm.
Page 4 of 136
Page 5 of 136
Page 6 of 136
Page 7 of 136
Page 8 of 136
Page 9 of 136
Page 10 of 136
Page 11 of 136
Page 12 of 136
Page 13 of 136
Page 14 of 136
Page 15 of 136
Page 16 of 136
Page 17 of 136
Page 18 of 136
Page 19 of 136
Page 20 of 136
Page 21 of 136
Page 22 of 136
Page 23 of 136
Page 24 of 136
Page 25 of 136
Page 26 of 136
Page 27 of 136
Page 28 of 136
Page 29 of 136
Page 30 of 136
Page 31 of 136
Page 32 of 136
Page 33 of 136
Page 34 of 136
Page 35 of 136
Page 36 of 136
Page 37 of 136
Page 38 of 136
Page 39 of 136
Page 40 of 136
Page 41 of 136
Page 42 of 136
Page 43 of 136
Page 44 of 136
Page 45 of 136
2026 POLICE UNION OT
OT HRS OT PAID COMP HRS OT COMP
JAN 65.25 4,583.90$ 53.00 $3,672.16
FEB 83.25 5,633.78$ 74.75 $5,024.03
MAR 283.00 19,196.83$ 83.50 $5,146.76
APR 171.75 11,813.50$ 66.25 $4,440.29
MAY - -$ - $0.00
JUN - -$ - $0.00
JUL - -$ - $0.00
AUG - -$ - $0.00
SEP - -$ - $0.00
OCT - -$ - $0.00
NOV - -$ - $0.00
DEC - -$ - $0.00
TOTAL 603.25 41,228.00$ 277.50 18,283.23$
Page 46 of 136
2026 POLICE SGT OT
OT HRS OT PAID COMP HRS OT COMP
JAN 27.50 2,209.76$ 8.25 $662.93
FEB 28.00 2,249.94 11.50 924.08
MAR 68.75 5,524.41 12.50 1,004.44
APR 45.50 3,656.15 8.50 683.02
MAY - - - -
JUN - - - -
JUL - - - -
AUG - - - -
SEP - - - -
OCT - - - -
NOV - - - -
DEC - - - -
TOTAL 169.75 13,640.26$ 40.75 $3,274.47
Page 47 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: One-Time/Special Event Outside Premise Extension Application
for Metro Cigars, N102W19455 Willow Creek Way - June 7, 2026
12pm-5pm (ACTION)
SUBMITTED BY: Kasie Miller, Chief Deputy Clerk
SUMMARY EXPLANATION:
Jennifer Groh of Metro Cigars, N102W19455 Willow Creek Way, submitted an
application requesting to extend their Class "B" Beer, "Class B" Liquor License Outside
Premise to temporarily serve alcohol for a One-Time/Special Event on June 7, 2026,
from 12:00pm - 5:00pm for a customer event. The requested area would include the
adjacent sidewalk and grass/lawn area, which will have a 40’x20’ tent. Metro Cigars is
already approved to serve beer and/or alcohol on the concrete patio as noted on their
2025-2026 Annual License. Groh advised there would not be any music outside,
therefore, they did not apply for an Outdoor Entertainment permit.
On 04/14/2026, 300ft notices were mailed to adjacent property owners.
Police, Fire, and Community Development Departments have provided approval of this
application with recommended contingencies.
ATTACHMENT:
1. Metro Cigars One-Time Special Event Extension Application With Approvals
STAFF RECOMMENDATION:
Approval of the One-Time/Special Event Outside Premise Extension Application for the
Metro Cigars event on June 7, 2026, contingent upon obtaining the necessary tent
inspection with SAFEBuilt upon installation.
ACTION BY COMMITTEE:
Page 48 of 136
Page 49 of 136
Page 50 of 136
Page 51 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Temporary Class "B" Beer/"Class B" Wine Application for Kiwanis
of Germantown, Taste of Germantown - July 23, 2026 (ACTION)
SUBMITTED BY: Kasie Miller, Chief Deputy Clerk
SUMMARY EXPLANATION:
ATTACHMENT:
1. 07.23.26 Taste of Germantown - Beer and Wine_Redacted
STAFF RECOMMENDATION:
ACTION BY COMMITTEE:
Page 52 of 136
Page 53 of 136
Page 54 of 136
Page 55 of 136
Page 56 of 136
Page 57 of 136
Page 58 of 136
Page 59 of 136
Page 60 of 136
Page 61 of 136
Page 62 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Temporary Class "B" Beer/"Class B" Wine Application for Post One
Inc, 4th of July Celebration - July 4, 2026 (ACTION)
SUBMITTED BY:
SUMMARY EXPLANATION:
ATTACHMENT:
1. 07.04.26 4th of July Beer and Wine_Redacted
STAFF RECOMMENDATION:
ACTION BY COMMITTEE:
Page 63 of 136
g-icense(s) Requested Fees
License Fees $
-€:ftr
Background Check $ O -pf, qJre^
Total Fees $ ,ruj-u
I Temporary "Class B" Wine @ Temporary Class "B" Beer
,art A: Organization lnformation
Organization Name
Post One Inc
[. Oroanization Permanent Address
; N120W15932 Freistadt Road
City
Germantown
4. State
WI
5. Zip Code
53022
Mailing Address (if different from permanent address)
P.O. Box 32I
FEIN
39-188s143
B. Date of Organization/lncorporation 9. State of Organization/lncorporation
0. Phone
262-25r-541 0
1'l . Email
legionpostoneGqmai l- . com
2. Organizationtype (check one)
I Bona Fide Club f] Church ! FairAssociation/Agriculturalsociety @ Veteran's Organization
I Lodge/Society I Chamber of Commerce or similar Civic or Trade Organization under ch. 181 , Wis. Stats.
3. ls this organization required to hold a Wisconsin Seller's permit? Z Yes I tlo
4. Wisconsin Seller's Permit Number (if applicable)
4s6-1020152431-03
B: lndividual lnformation
.ist the name, title, and phone number for all officers, directors, and agent of the organization. lnclude an lndividual Questionnaire
Form AB-100) for each person listed below Attach additional sheets if necessary.
)orporations must also include Alcohol Beverage Appointment of Agent (Form AB-101 ).
,ast Name First Name Tille Phone
onnell Kri sti Commander
atchak Christopher Executive Officer
oretta Ramona Financial- Officer
AB-220 Temporary Alcohol Beverage License
Municipality
Continued ---+
I
'llrrhn
-1-(R. 1-25) Wisconsin Department of Revenue
Page 64 of 136
1. Name of Event (if applicable)
Fourth of July
Part C: Event lnformation
2. Dates of Operation
01 / 04/2025 01 /04/2025
3. Hours of Operation
0700-2300
4. Premises Address
Firemants Park
5. City
Germantown
6. State
WT
7. Zip Code
53022
8. County
Washington
9. Governing Municipality n City ! Town p Village
of: Germant.own
I 0. Aldermanic District
'11. Organizer of Event (if noi the named applicani) 12. Email and/or Phone Number for Organizer of Event
legionpostoneG gmai I . com
$
ii
13. Organizer Website
www. legionpostone . org
14. Event Website
i
15. Premises Description - Describe the building or buildings and any outside areas where alcohol beverages und ,""ord- "[ "ffistored, or consumed, and related records are kept. Describe all rooms within the building, including living quarters. Authorized
alcohol beverage activities and storage of records may occur only on the premises describqd in this appiication. Attach a map{
or diagram and additional sheets if necessary. ,'b4r ".4w":\zrc.,^.\
Sold from the Fi-reman's Park Pavi1lon, stored in coolers for day of event. Recordskept at American Legion PosL.q/U
Part D: Attestation
READ CAREFULLY BEFORE SIGNING: Under penalty of law, I have answered each of the above questions completely andi
truthfully. I agree that I am acting solely on behalf of the applicant organization and not on behalf of any other individual or entity
seeking the license. Further, I agree that the rights and responsibilities conferred by the license(s), if granted, will not be assigned;
to another individual or entity. I agree to operate according to the law, including but not limited to, purchasing alcohol beverageq
from Wisconsin-permitted wholesalers. I understand that lack of access to any portion of a licensed premises during inspection wilE
be deemed a refusal to allow inspection. Such refusal is a misdemeanor and grounds for revocation of this license. I understandl
that any license issued contrary to Wis. Stat. Chapter 125 shall be void under penalty of state law. I further understand that I maf
be prosecuted for submitting false statements and affidavits in connection with this application, and that any person who knowingly'
provides materially false information on this application may be required to forfeit not more than $1,000 if convicted.
Who must sign this application?
. one officer or director of the nonprofit organization
Last Name
Bonnell
First Name
Kristi
M.t Iil
irB
Title
Commander
Email
Phone
Sig
04/23/26
Date
Part E: For Clerk Use Only ,tA
tr
I
'.i:fl[:$1T" il#:"'-l t L5 - 0+5 ]yp(il' I License Number
Date License Gran-ted Date License lssued
Signature of Clerk/Deputy Clerk
AB-220 (R. 1-25) -2-
i
Page 65 of 136
orm
AB-100
sole proprietor
all partners of a partnership
individuals involved in the alcohol beverage business must complete this form, including
Alcohol Beverage
lndividual Questionnaire
. all officers, directors, and agent of a corporation or nonprofit organization
. members and agent of a limited liability company
Date
04/23/2026
Continued ->
ur alcohol beverage application or renewal is not complete until all required lndividual Questionnaires are submitted
,art A: Business lnformation
Legal Business Name (individual name if sole proprietor)
Post One Inc
I partnership ! timiteO Liability Company I Corporation Z Nonprofit Organization
Business Trade Name or DBA
Post One Inc
EntityType (check one)
tr Sole Proprietor
t B: lndividual lnformation
3. M.t
B
2. First Name
Kristi
Last Name
Bonnell
I
6. Phone
(1 0 6) 91,0 - 4L 40
5. Email
krisLibonnellGqmail . com
+
i
Relationship to Business (Title)
Commander n Age,nt
v
I
Home Address
1'1 9. State 10. Zip Code). City
13. Drivers License/State lD State of lssuance112. Drivers License/State lD Number
i
Do you currently live in Wisconsin? . .
lf yes, provide the month and year when you permanently moved to Wisconsin
06 / 2020
art G: Address Hi
I ves I tto
Z. List in chronological order all of your addresses within the last 5 years. Attach additional sheets if necessary.
State Zip CodeCityPrevious Address 1
State Zip CodeCityPrevious
l
Address 2
State Zip CodeCityPrevious Address 3
:
i
State Zip CodeCity)revious Address 4
State Zip CodeCity)revious Address 5
]. List all states and counties you have lived in as an adult. Attach additional sheets if necessary.
State CountyState CountyState CountyItate County
County
County StateCounty StateItate County State
-1-100 (R. 1-25) Wisconsin Department of Revenue
Page 66 of 136
Part D: Criminal History
1' Have you ever been convicted of any offenses (excluding traffic offenses unless related to alcohol beverages)
for violation of any federal, Wisconsin, or another state's laws or of any county or municipal ordinances?. . . . ,
lf yes to question 1, please list details of each conviction below. Attach additional sheets as needed.
I ves Z r.ro
LawiOrdinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . I Ves f] ruo
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . ! ves f] No
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . f Ves f] frfo
2. Are charges for any offenses currently pending against you (excluding traffic offenses unless related to alcohol
beverages) for violation of any federal, Wisconsin, or another state's laws or any county or municipal
ordinances?.
lf yes to question 2, describe nature and status of pending charges using the space below. Attach additional
sheets as needed.
E r.loI ves
Part E: Attestation
READ CAREFULLY BEFORE SIGNING: Under penalty of law, I have answered each of the above questions completely andtruthfully. I certify that I am not prohibited from participating in this business due to any involvement in another tier of ihe aicoholbeverage industry as a restricted investor. I understand that any license issued contrary to wis. stat. chapter 125 shall be voidunder penalty of state law. I further understand that I may be prosecuted for submitting falie statements and affidavits in connectionwith this application, and that any person who knowingly provides materially false iniormation on this application may be required
to forfeit not more than $'1 ,000 if convicted.
Signature Date
04/23/2026
AB-100 (R. 1-25)
Page 67 of 136
individuals involved in the alcohol beverage business must complete this form, including
AB-100
sole proprietor
all partners of a partnership
Alcohol Beverage
lndividual Questionnaire
. all officers, directors, and agent of a corporation or nonprofit organization
. members and agent of a limited liability company
Date
04/23/2025
Continued ---+
ur alcohol beverage application or renewal is not complete until all required lndividual Questionnaires are submitted
A: Business lnformation
Legal Business Name (individual name if sole proprietor)
Post One Inc
Business Trade Name or DBA
Post One Inc
Entity Type (check one)
I Sole Proprietor f] Partnership I timiteO Liability Company ! Corporation @ Nonprofit Organization
art B: Individual lnformation
3. M.l
J
2. First Name
Ramona
Last Name
Moretta
6. Phone
(262) 25r-5410
5. Email
legionpostoneG gmai l- . com
Relationship to Business (Title)
Financial Officer
Home Address
11. Date of Birth10. Zip Code9. StateCity
13. Drivers License/State lD State of lssuance2. Drivers License/State lD Number
G: Address Histo
03 / 2023
Do you currently live in Wisconsin? .
lf yes, provide the month and year when you permanently moved to Wisconsin
[Yes nruo
List in chronological order all of your addresses within the last 5 years. Attach additional sheets if necessary.
AZ
Zip Code
85742
City
Queen Creek
Address 1
E. North Loop0834
State Zip CodeCityAddress 2
State Zip CodeCitys Address 3
Zip CodeStateCityAddress 4
Zip CodeStateCityAddress 5
List all states and counties you have lived in as an adult. Attach additional sheets if necessary
State CountyState CountyState CountyCounty
State CountySiate ntyCounty State
-1-100 (R. 1-25) Wisconsin Department of Revenue
Page 68 of 136
F
t:
Part D: Criminal
Have you ever been convicted of any offenses (excluding traffic oflenses unless related to alcohol beverages)
for violation of any federal, Wisconsin, or another state's laws or of any county or municipal ordinances?. . . . .
lf yes to question 1, please list details of each conviction below. Attach additional sheets as needed.
I ves Z r.ro'
LawiOrdinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed? ^ . . . . I Ves tr ne
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . I Ves n no
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . I Ves I no
2. Are charges for any offenses currently pending against you (excluding traffic offenses unless related to alcohol
beverages) for violation of any federal, Wisconsin, or another state's laws or any county or municipal
ordinances?.
lf yes to question 2, describe nature and status of pending charges using the space below. Attach additional
sheets as needed.
[ves Eruo
Part E: Attestation
READ CAREFULLY BEFORE SIGNING: Under penalty of law, I have answered each of the above questions completely andtruthfully. I certify that I am not prohibited from participating in this business due to any involvement in another tier of ihe alcoholbeverage industry as a restricted investor. I understand that any license issued contrary to Wis. Stat. Chapter j25 shall be voidunder penalty of state law. I further understand that I may be prosecuted for submitting false statements and affidavits in connectionwith this application, and that any person who knowingly provides materially false information on this application may be requiredto forfeit not more than $1,000 if convicted.
re
/'u
CLa-yt ta/-I
Signatu
04/23/2026
Date
AB-100 (R. 1-2s) - z-
Page 69 of 136
I individuals involved in the alcohol beverage business must complete this form, including
le proprietor . all officers, directors, and agent of a corporation or nonprofit organization
partners of a partnership . members and agent of a limited liability company
alcohol beverage application or renewal is not complete until all required lndividual Questionnaires are submitted
rm
AB-100
Alcohol Beverage
I ndividual Questionnaire
Date
04/23/2026
Continued ---+
tart A: Business lnformation
Legal Business Name (individual name if sole proprietor)
Post One Inc
f] Partnership n Limited Liability Company ! Corporation @ Nonprofit Organization
B: lndividual lnformation
Business Trade Name or DBA
Post One fnc
Entity Type (check one)
tr Sote Proprietor
3. M.t
J
Last Name
Yatchak
2. First Name
Christopher
6. Phone
(262) 25L-5410
5. Email
legionpostoneG gmai I . com
'. Relationship to Business (Title)
Executive Officer
'. Home Address
11 9. State
I
10. Zip Codei. City
13. Drivers License/Siate lD State of lssuance
C: Address Histo
2. Drivers License/State lD Number
Do you currently live in Wisconsin? .
lf yes, provide the month and year when you permanently moved to Wisconsin
fives nno
L List in chronological order all of your addresses within the last 5 years. Attach additional sheets if necessary.
State Zip CodeCitytrevious Address 1
State Zip CodeCity)revious Address 2
State Zip CodeCity)revious Address 3
Siate Zip CodeCity'revious Address 4
State Zip CodeCitytrevious Address 5
t. List all states and counties you have lived in as an adult. Attach additional sheets if necessary.
State CountyState Countyitate County State County
County State County;tate County State County State
100 (R. 1-25) Wisconsin Department of Revenue
Page 70 of 136
:i1
{i
Part D: Criminal History
Have you ever been convicted of any offenses (excluding traffic offenses unless related to alcohol beverages)
for violation of any federal, Wisconsin, or another state's laws or of any county or municipal ordinances?. . . . .
lf yes to question 1, please list details of each conviction below. Attach additional sheets as needed.
Nq
il
i
f, ves
1
V
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . f, ves I rrr
Law/Ordinance Violated Location Conviction Date
Penalty lmposed
Was sentence completed?. . . . . I Ves n f'1"
Law/Ordinance Violated Location Conviction Date
Penalty lrlposed
Was sentence completed?. . . . . I Ves E ruo
2. Are charges for any offenses currently pending against you (excluding traffic offenses unless related to alcohol
beverages) for violation of any federal, Wisconsin, or another state's laws or any county or municipal
ordinances?.
lf yes to question 2, describe nature and status of pending charges using the space below. Attach additional
sheets as needed.
f ves E ruo'
Part E: Attestation
READ CAREFULLY BEFORE SIGNING: Under penalty of law, I have answered each of the above
truthfully. I certify that I am not prohibited from participating in this business due to any involvement in
beverage industry as a restricted investor. I understand that any license issued
under penalty of state law. I further understand that I may be prosecuted for subm
gly provides materially false information on this application may be required
contrary
itting
questions completely and
another tier of the alcohol .,
to Wis. Stat. Chapter 125 shall be void
false statements and affidavits in connection
with this application, and that any person who knowin
to forfeit not than $1,000 if convicted.
Signature
04/23/2026
Date
AB-100 (R. 1-25) a
Page 71 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Application for Fireworks Permit for July 4, 2026, by Parks &
Recreation Director Guilford Standridge (ACTION)
SUBMITTED BY:
SUMMARY EXPLANATION:
ATTACHMENT:
1. July 4, 2025 Fireworks Application_Redacted
STAFF RECOMMENDATION:
ACTION BY COMMITTEE:
Page 72 of 136
Page 73 of 136
Page 74 of 136
Page 75 of 136
Page 76 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Cardiac Monitor Repair Warranty / Service Contract (ACTION)
SUBMITTED BY: John Delain, Fire Chief
SUMMARY EXPLANATION:
The Germantown Fire Department operates a Paramedic level EMS service. As part of
this service we are required to have cardiac monitors that our providers are trained to
utilize to detect potential problems with a persons heart, such as a heart attack.
Germantown owns/operates 4 Zoll X-Series Advanced cardiac monitors at a current
approximate cost of $60,000 each, or $240,000 total. Germantown last purchased
monitors in 2021 and purchased a 5-year no-risk warranty. The warranty has covered
thousands of dollars in repair costs, loaner equipment, and preventative maintenance
charges. The most common repair we have seen is replacement of the charging cable
and communication port, which is over $3,300.
The annual preventative maintenance and calibration is $650 per monitor ($2,600 total)
factoring the cost of a loaner monitor. We are respectfully requesting authorization to
purchase an additional 3-year warranty / service contract which will last until 5/1/2029.
The expected lifespan of the unit is 7-10 years however they only offered 3 additional
years of warranty.
ATTACHMENT:
1. zoll warranty
STAFF RECOMMENDATION:
The department is requesting authorization to purchase a 3-year warranty for a total
cost of $25,456.80 that is broken up into 3 annual payments of $8,485.60. Funding for
2026 will be from the State of Wisconsin EMS Grant. Funding for 2027 and 2028 may
be allocated from the State grant, County grant, or traditional levy funding.
ACTION BY COMMITTEE:
Page 77 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Cardiac Monitor Repair Warranty / Service Contract
SUBMITTED BY: John Delain, Fire Chief
SUMMARY EXPLANATION:
The Germantown Fire Department operates a Paramedic level EMS service. As part
of this service we are required to have cardiac monitors that our providers are trained to
utilize to detect potential problems with a persons heart, such as a heart attack.
Germantown owns/operates 4 Zoll X-Series Advanced cardiac monitors at a current
approximate cost of $60,000 each, or $240,000 total. Germantown last purchased
monitors in 2021 and purchased a 5-year no-risk warranty. The warranty has covered
thousands of dollars in repair costs, loaner equipment, and preventative maintenance
charges. The most common repair we have seen is replacement of the charging cable
and communication port, which is over $3,300. The annual preventative maintenance
and calibration is $650 per monitor ($2,600 total) factoring the cost of a loaner monitor.
We are respectfully requesting authorization to purchase an additional 3-year
warranty / service contract which will last until 5/1/2029. The expected lifespan of the
unit is 7-10 years however they only offered 3 additional years of warranty.
Minimum Service Charge
Description Out of Warranty Under Warranty
X-Series Advanced $355 No Charges
Recertification $340 No Charges
Loaner $355 No Charges
Labor $230 per hour No Charges
Parts MSRP No Charges
RECOMMENDATION:
The department is requesting authorization to purchase a 3-year warranty for a total
cost of $25,456.80 that is broken up into 3 annual payments of $8,485.60. Funding for
2026 will be from the State of Wisconsin EMS Grant. Funding for 2027 and 2028 may
be allocated from the State grant, County grant, or traditional levy funding.
ACTION BY Committee:
Page 78 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Selection of CMAR for Station 2 Project (ACTION)
SUBMITTED BY: John Delain, Fire Chief
SUMMARY EXPLANATION:
An RFP was issued for Construction Manager at-risk services for the remodel and
expansion project at Fire Station 2. The RFP was developed with then DPW Director
Matt Mortwedt, SEH team, and other area RFP’s.
The RFP was published by sending email notifications to firms, posting it on the Village
website, posting on social media platforms, and to the League of Municipalities.
Documentation supporting the steps in the evaluation process is included in the
meeting agenda packet. CG Schmidt will be present at the May 6 Public Safety
Committee meeting. They will be prepared with a brief presentation and/or to answer
questions from the Committee.
ATTACHMENT:
1. Selection of CMAR for Station 2 Project
2. GFD Station 2 CMAR Scoring Results
3. CG Schmidt Germantown Fire Station 2 CMAR RFP_CGS Proposal
STAFF RECOMMENDATION:
Staff recommend the Village Board award the Construction Manager At-Risk services
contract to CG Schmidt for the Station 2 remodel and expansion project for the amounts
of:
• Preconstruction Fee: $0 (No cost, based on awarding CMAR contract)
• CM Fee as a Percentage of the Cost of Work: 1.95%
o At 6.5M Building Cost: $126,750
• CM Contingency as a Percentage of the Cost of Work: 3%
o At 6.5M Building Cost: $195,000
o Controlled by the CMAR.
o Excess is returned at conclusion of project.
• General Conditions: $495,287
At a $6,500,000 building project this total is $817,037 and authorize staff an additional
10% contingency of $81,703.
ACTION BY COMMITTEE:
Page 79 of 136
Page 80 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
MEETING DATE: May 6, 2026
PLACEMENT: Action Item
ITEM TITLE: Selection of Construction Manager at Risk for Station 2 Project
SUBMITTED BY: John Delain, Fire Chief
SUMMARY EXPLANATION:
An RFP was issued for Construction Manager at-risk services for the remodel and expansion project at
Fire Station 2. The RFP was developed with then DPW Director Matt Mortwedt, SEH team, and other
area RFP’s.
The RFP was published by sending email notifications to firms, posting it on the Village website, posting
on social media platforms, and to the League of Municipalities.
A summary of the evaluation process:
• Staff met with 7 construction management firms for a mandatory site visit to tour Station 2 and
discuss the project.
• 5 firms responded to the RFP. Each firm had varying levels of experience, costs, and in some
cases project scope.
• A staff committee of members from the Fire Department and DPW individually scored each
response.
• The committee met to discuss the responses and scores.
• The top 3 firms were CG Schmidt, Moore Construction, and Scherrer Construction. They were
brought in for interviews with Staff and SEH.
o SEH was present but a non-voting member.
• Following the interview scoring, CG Schmidt had the highest score (75).
• Staff communicated with CG Schmidt to negotiate fees and were able to negotiate the
construction manager fee from 2.34% to 1.95%, and preconstruction services from $21,500 to
$0.
• Staff are recommending that the Village Board awards the Construction Manager At -Risk
contract to CG Schmidt.
o Preconstruction Fee: $0 (No cost, based on awarding CMAR contract)
o CM Fee as a Percentage of the Cost of Work: 1.95%
At 6.5M Building Cost: $126,750
o CM Contingency as a Percentage of the Cost of Work: 3%
At 6.5M Building Cost: $195,000
Controlled by the CMAR.
Excess is returned at conclusion of project.
o General Conditions: $495,287
• Staff are recommending authorization of staff for an additional 10% contingency for construction
management services for $81,703.
Documentation supporting the steps in the evaluation process is included in the meeting agenda packet.
CG Schmidt will be present at the May 6 Public Safety Committee meeting. They will be prepared with a
brief presentation and/or to answer questions from the Committee.
Page 81 of 136
ATTACHMENT:
1. CMAR Scoring Spreadsheet
2. CG Schmidt Technical Proposal
RECOMMENDATION:
Staff recommend the Village Board award the Construction Manager At-Risk services contract to CG
Schmidt for the Station 2 remodel and expansion project for the amounts of:
• Preconstruction Fee: $0 (No cost, based on awarding CMAR contract)
• CM Fee as a Percentage of the Cost of Work: 1.95%
o At 6.5M Building Cost: $126,750
• CM Contingency as a Percentage of the Cost of Work: 3%
o At 6.5M Building Cost: $195,000
o Controlled by the CMAR.
o Excess is returned at conclusion of project.
• General Conditions: $495,287
At a $6,500,000 building project this total is $817,037 and authorize staff an additional 10% contingency
of $81,703.
ACTION BY Committee:
Page 82 of 136
Beeler
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance (10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 7 6 19 10 10 5 57
Evaluator 2 0
Evaluator 3 6 6 18 10 10 5 55
Evaluator 4 7 7 20 15 10 5 64
Evaluator 5 7 7 19 19 10 5 67
Beeler Score 48.6
Moore
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance (10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 14 14 21 16 10 5 9 89
Evaluator 2 9 9
Evaluator 3 14 15 22 17 10 5 9 92
Evaluator 4 12 13 19 18 10 5 8 85
Evaluator 5 12 13 19 16 10 5 8 83
Moore Score 71.6
CG
Schmidt
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance (10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 14 14 22 18 10 5 8 91
Evaluator 2 8 8
Evaluator 3 14 14 20 18 10 5 7 88
Evaluator 4 15 14 23 19 10 5 9 95
Evaluator 5 14 14 23 20 10 5 7 93
CG Schmidt Score 75
Scherrer
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance (10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 13 11 21 19 10 5 7 86
Evaluator 2 7 7
Evaluator 3 14 12 22 19 10 5 8 90
Evaluator 4 12 11 21 18 10 5 7 84
Evaluator 5 13 13 23 18 10 5 8 90
Scherrer Score 71.4
Page 83 of 136
Wellspring
Firm Experience & Qualifications (15)
Project Team & Key Personnel (15)
Project Approach & Understanding (25)
Pre-Construction, Cost Control, & GMP
Development (20)
Bidding & Procurement Compliance
(10)
Safety & Quality Management (5)
Interview (10)
Total Points (100)
Evaluator 1 11 13 21 16 10 5 76
Evaluator 2 0
Evaluator 3 13 13 22 17 10 5 80
Evaluator 4 11 12 21 17 10 5 76
Evaluator 5 12 13 21 16 10 5 77
Wellspring Score 61.8
Score Totals
Beeler Score 48.6
CG Schmidt Score 75
Moore Score 71.6
Scherrer Score 71.4
Wellspring Score 61.8
Average Score 65.68
Costs Figuring $6,500,000 Building Cost
CM Fee Pre-Construction
Fee Fee Total General Conditions
Estimate
CMAR
Contingency
Total W/
Contingency Budget Remaining
Beeler 3% $25,000 $220,000 Not Provided 3% Unable to Determine Unable to Determine
CG Schmidt 1.95% $0 $126,750 $494,327 3% $816,077 $5,683,923
Moore 3.5% $1,500 $229,000 $219,600 10% $1,098,600 $5,401,400
Scherrer 3.5% 0 $227,500 $250,810 10% $1,128,310 $5,371,690
Wellspring 3% $73,974 $268,794 $527,720 3% $991,514 $5,508,486
Page 84 of 136
GERMANTOWN FIRE DEPARTMENT
FIRE STATION NO. 2
EXPANSION & REMODEL
PROPOSAL FOR CONSTRUCTION MANAGER AT RISK (CMAR)
February 16, 2026
Page 85 of 136
February 16, 2026
Amy Lerch
Administrative Manager
Germantown Fire Department
Fire Station No. 2
N115 W18752 Edison Drive
Germantown, WI 53022
Dear Ms. Lerch,
Thank you for the opportunity to submit our proposal for Construction Manager at Risk services for Germantown Fire
Department Fire Station No. 2’s renovation and expansion project. Fire stations are mission-critical facilities where layout,
construction sequencing, and building systems directly affect emergency response, firefighter safety, and long-term
operational readiness. Our team understands the responsibility that comes with delivering this work while maintaining
uninterrupted operations.
Response Time & Uninterrupted Operations
Station layout must support direct, intuitive movement from alarm to apparatus, and construction activities cannot impede
response reliability. Our approach emphasizes thoughtful phasing, logistics planning, and daily coordination with station
leadership to maintain full operational continuity throughout construction. From temporary access routes to clearly defined
work zones, we prioritize solutions that protect response time and readiness at all stages of the project.
Firefighter Wellness & Safety
We recognize the growing importance of station design in supporting firefighter health. Our team understands the need for
dedicated personal locker space and the separation of personal items from apparatus, gear, and exhaust zones. We
support clear zoning between apparatus, gear, living, and work areas to improve air quality and reduce contaminant
exposure. Our experience includes addressing ventilation performance, CO₂ monitoring, humidity and temperature control,
and mold prevention as part of a comprehensive wellness strategy. We also recognize the importance of improved hygiene
facilities and properly sized sleeping accommodations that support recovery and long-term wellness.
Preconstruction & Cost Planning
Early and collaborative preconstruction engagement is essential to aligning scope, budget, and operational priorities. As
CMAR, we will provide detailed cost modeling, constructability input, and phasing strategies that allow informed decision-
making without compromising safety or durability. Given the anticipated 5–10 year service life of this phase, our
recommendations will balance immediate needs with flexibility to accommodate future staffing, equipment, and operational
changes.
We are committed to delivering a facility that strengthens response capabilities, prioritizes firefighter health, and
responsibly invests public resources. We look forward to partnering with your team to deliver this project with clarity,
accountability, and respect for the vital services your department provides to the community.
Sincerely,
Joe Hoffmeier
Managing Director
(414) 828-8162
joeh@cgschmidt.com
11777 West Lake Park Drive
Milwaukee, WI 53224
Page 86 of 136
TABLE OF CONTENTS
01 // Firm Experience & Qualifications
02 // Proposed Team
03 // Project Approach & Understanding
04 // Preconstruction Services Cost Proposal
05 // GMP Development Approach
06 // Bidding & Procurement Methodology
07 // Safety & Quality Management
08 // Project References
09 // Draft Contract
10 // Appendix
Addendum Fees
Addendum General Conditions
Site Logistics
Page 87 of 136
CREATING EXCEPTIONAL
FACILITIES THAT IMPROVE
THE LIVES OF OTHERS.
A STRONG TEAM FOR
Germantown Fire Department Fire Station No. 2
KNOWLEDGE.
COMMUNICATION.
REPUTATION.PROVEN
YOUR PROJECT
Reaching Expansion & Remodel Goals with Precision
YOUR PARTNERSHIP
Where Experience
Becomes Impact
We really enjoy working with CG
Schmidt. They act as an extension
of our business, and they
understand what we need. Hiring
CG Schmidt is like pushing the
‘easy button’. They are committed
to our goals, and they know how
to get stuff done!
— Isaac Larson
Executive Director of Facilities
Froedtert ThedaCare
Leverage
the project as a catalyst
for broader community
transformation.
To transform this building, the Germantown Fire Department Fire Station No. 2 must:
Align
the project
with budget
constraints.
Address
mold issues
with the existing
building.
Accommodate
active firestation with
effective occupied space
construction strategy.
01 02 03 04
70%
CONSTRUCTION
WORK COMPLETED IN
OCCUPIED SPACE 15
PERSON IN-HOUSE
PRECONSTRUCTION
TEAM
Joe Hoffmeier
Managing Director
Steve Knetter
Superintendent
Zach Singer
Project Manager
Charlie Haas
Director of
Preconstruction
» 27 YEARS INDUSTRY
EXPERIENCE
» ACTIVE PARTNER ON CITY
OF MKE PUBLIC WORKS
BUILDING BUDGET
» EXTENSIVE OCCUPIED
SPACE EXPERIENCE
» 25 YEARS INDUSTRY
EXPERIENCE
» ACTIVE PARTNER ON
CITY OF MKE PUBLIC
WORKS BUILDING
BUDGET
» 12 YEARS INDUSTRY
EXPERIENCE
» PREVIOUS FIRE
STATION EXPERIENCE
» EXTENSIVE OCCUPIED
SPACE EXPERIENCE
» 24 YEARS INDUSTRY
EXPERIENCE
» EXTENSIVE OCCUPIED
SPACE EXPERIENCE
0.99
2025 OSHA
INCIDENT
RATING
1. Zero-Interruption Operations Planning.
We design our sequencing so firefighters can
maintain full emergency response capabilities at
all times with no interruptions.
2. Noise, Dust, and Environmental
Containment. Our environmental controls
maintain a healthy, quiet, and disruption-free
workspace for fire crews.
3. Communication and Daily Coordination.
We provide real-time communication that keeps
firefighters informed and involved
4. Pre-construction and Cost Planning.
Progressive preconstruction keeps the project
aligned with budget and schedule.
Mission-Ready Logistics
Maintaining uninterrupted emergency
response drives every logistics decision.
We have developed three fully evaluated
site logistics options that protect
apparatus access, crew circulation,
and construction safety.
>> See the Appendix for detailed plans.
Page 88 of 136
Firm Experience
& Qualifications
01
FIRESTATION NO. 2
Page 89 of 136
6
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // FIRM EXPERIENCE & QUALIFICATIONS
SECTION 01
FIRM QUALIFICATIONS
OUR MISSION
To create exceptional facilities that improve
the lives of others.
VALUE PROPOSITION
Delivering an exceptional client experience,
founded on trust, quality construction and
dedication to strengthening communities.
DATE FIRST ORGANIZED
Founded in 1920
TYPE OF FIRM
Privately Owned
RECENT RECOGNITIONS
Top Workplaces (2010-2025)
Milwaukee Journal Sentinel
Best Places to Work (15x winner)
Milwaukee Business Journal
Best Places to Work (5x winner)
Wisconsin State Journal
Best Places to Work (2x winner)
Madison Magazine
Top 100 Construction Managers in the
Country
Engineering News Record
2x WI Family Business of the Year
Skills / Integrity / Responsibility Award
Distinguished Performer in DEI
Deloitte 75
LOCATIONS
Milwaukee (HQ & Project Managing Office)
11777 West Lake Park Dr. | Milwaukee, WI 53224
Madison
433 West Washington Ave. | Madison, WI 53703
Arizona
999 E Playa Del Norte Dr. #110 | Tempe, AZ 85288
Schmidt: A family name. A 106-year promise.
Founded in 1920 by Dutch immigrant Charles Schmidt, CG Schmidt was built
on a simple yet powerful idea: a name is only as strong as the reputation
behind it. He believed that every project was a reflection of character, and
that belief still guides us today.
Now in our fifth generation of family leadership, CG Schmidt has grown into
one of Wisconsin’s leading commercial builders. We’ve stayed true to the
core values passed down over the past 106 years—integrity, caring, and a
passion for excellence.
We are proud to be the trusted partner on many of the state’s most
respected organizations in communities across the state and nation, and
look forward to the opportunity to serve The Village of Germantown and
Germantown Fire Department Fire Station No. 2.
Pictured above clockwise from lower right: President & CEO, Eric Schmidt; Chairman,
Rick Schmidt; Managing Director, Ryan Schmidt; Senior Project Manager, Brad Schmidt.
106
YEARS
EXPERIENCE
5
GENERATIONS
STRONG
373
OFFICE & FIELD
PROFESSIONALS
3
OFFICE
LOCATIONS
0
LAWSUITS
WITH ANY
CLIENTS
OR ARCHITECTS
Page 90 of 136
7
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // FIRM EXPERIENCE & QUALIFICATIONS
RESPONSE TIME &
UNINTERRUPTED
OPERATIONS
We plan, phase, and communicate
construction site logistics
to preserve direct, intuitive
movement while maintaining
uninterrupted emergency
response throughout all phases
of work.
FIREFIGHTER
WELLNESS
& SAFETY
Our approach prioritizes clear
separation of firefighter operations
and wellbeing from construction
operations. Noise, dust, and other
disturbances are isolated by
proper ventilation and air quality
control to protect firefighter health
and long-term readiness.
PRECONSTRUCTION
& COST PLANNING
CONSIDERATIONS
Through early preconstruction
engagement, we align scope,
budget, and operational needs
to deliver durable, cost-effective
solutions that support current
demands while remaining flexible
for future growth.
DEDICATED TO SERVING & DELIVERING
EXCEPTIONAL CUSTOMER SERVICE TO
GERMANTOWN FIRE DEPARTMENT
FIRE STATION NO. 2
CG Schmidt will navigate the preconstruction, bidding, and construction services for the expansion
and remodel of Germantown Fire Department Fire Station No. 2 with dedication and high attention to:
Page 91 of 136
PROJECT LOCATION:
345 N. 95th St.
Milwaukee, WI 53226
OWNER CONTACT:
Debbie Mather
Business Manager
Milwaukee Montessori School
(414) 259-0370
dmather
@milwaukee-montessori.org
PROJECT ARCHITECT:
Dan Beyer Architects, LLC
PROJECT COMPLETION:
May 2024
PROJECT SIZE:
13,059 SF
PROJECT COST:
$3.6 M
Located in the City of Milwaukee, the 13,059 SF Milwaukee Montessori Field House
project includes the construction of a brand-new activities facility which consists of
a gymnasium, locker rooms, concession stand and dance studio. With this new field
house, staff at Milwaukee Montessori can design a schedule that provides more
physical-conditioning and game-playing opportunities for their students. They can also
host athletic tournaments while enjoying the home court advantage.
Milwaukee Montessori School —
Field House
PROJECT
RELEVANCE
>> Addition & Renovation, Site Logistics,
Active Transportation and Foot Traffic
Page 92 of 136
PROJECT LOCATION:
6425 West Mequon Road
Mequon, WI 53092
OWNER CONTACT:
Gary Kinzer
Construction Project Manager
Aurora Health Care
(414)299-1647
gary.kinzer@aah.org
PROJECT ARCHITECT:
Zimmerman Architectural
Studios Inc.
PROJECT COMPLETION:
May 2024
PROJECT SIZE:
11,645 SF
PROJECT COST:
$4 M
Completed a seamless building addition along with comprehensive infrastructure
upgrades to improve safety, efficiency and functionality. The new wood-framed addition
was constructed using prefabricated trusses and wall panels and finished with durable
fiber cement siding and a shingled roof that integrates cohesively with the existing
structure.
To ensure long-term performance, the facility received complete systems upgrades,
including new lighting and fixtures throughout; a state-of-the-art fire alarm and
sprinkler system; and enhanced technology features such as access control, paging,
sound masking and nurse call systems. Mechanical and plumbing improvements
included a new rooftop unit, connection to city water and upgraded fixtures—ensuring
modern comfort, code compliance and reliability.
Aurora Urgent Care — Mequon
PROJECT
RELEVANCE
>> 9 Phases, Occupied Facility, Addition & Renovation
Page 93 of 136
PROJECT LOCATION:
1145 West Wisconsin Avenue
Milwaukee, WI 53233
OWNER CONTACT:
Raymond Ellingen
Director of Operations &
Administration
(414) 288-7101
raymond.ellingen
@marquette.edu
PROJECT ARCHITECT:
GROTH Design Group
PROJECT COMPLETION:
November 2025
PROJECT SIZE:
28,000 SF
PROJECT COST:
$6.4 M
This historic worship and wedding venue on Marquette University’s campus, underwent
a 28,000 SF renovation to enhance safety, accessibility, and the overall experience while
preserving its architectural beauty. Updates included new solid oak seating, porcelain
tile flooring with an integrated hearing loop system, reconfigured entry and sanctuary
ramps, and restored decorative ceilings. Additional improvements modernized lighting,
sound, security, and fire detection systems while maintaining the church’s timeless
character.
Church of the Gesu
Interior Renovations
PROJECT
RELEVANCE
>> Heart of Campus, Church Open During
Renovations, Working Around Churchtimes
Page 94 of 136
PROJECT LOCATION:
South 68th St
West Allis, WI 53227
OWNER CONTACT:
Michele Strasser
Director of Rec and Community
Services
West Allis-West Milwaukee
School District
(414) 604-3005
stram@wawmsd.org
PROJECT ARCHITECT:
GROTH Design Group
PROJECT COMPLETION:
December 2025
PROJECT SIZE:
25,585 SF
PROJECT COST:
$13M
The West Allis-West Milwaukee Rec Center project includes the remodel of the current
building as well as an addition. Highlights of the project include an indoor walking track,
full size gym, dance and fitness studio, preschool learning center, large multipurpose/
meeting rooms with an attached kitchen, convenient parking, updated office operations,
a permanent home for the Recreation and Community Services Department, and a
beautiful park-like setting with upgraded access. Furthermore, the brick is being re-
purposed to build the retaining wall commemorating the Franklin D. Roosevelt Works
Project that build the wall during the Great Depression.
West Allis-West Milwaukee
Recreation Center
PROJECT
RELEVANCE
>> Occupied Spaces, Addition & Renovation
Page 95 of 136
Proposed
Team
02
FIRE STATION NO. 2
Page 96 of 136
13
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
SECTION 02
PROJECT TEAM
PRECONSTRUCTION CONSTRUCTION
Project Lead
Joe Hoffmeier
Managing Director
Steve Knetter
Superintendent
Josh Schmitz
Safety Director
Zach Singer
Project Manager
Aaron Smith
Quality Director
The proposed CG Schmidt team
was chosen for their technical
expertise and experience with
occupied space construction.
Joe Hoffmeier and Zach Singer will
oversee all phases of the project as
your designated points of contacts.
SAFETY & QUALITY
Charlie Haas
Director of Preconstruction
Page 97 of 136
14
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
JOE HOFFMEIER
Managing Director
Joe’s experience stands out through his experience in occupied facilities and busy
campus environments. His ability to manage complex logistics and maintain safety and
accessibility has proven essential in high-traffic, high-sensitivity settings. The following
projects reflect Joe’s strength in navigating operational challenges while ensuring minimal
disruption to daily activities—an asset that will be critical to the success of this project.
RELEVANT PROJECT EXPERIENCE
West Allis West Milwaukee School District Recreation Center Addition and
Renovation | West Allis, WI | $10M
The West Allis-West Milwaukee Rec Center project included demolition of outdated
facilities, remodel of the 2005 building, and site prep for future additions. Completed
in summer 2020, the upgraded center features a gym, walking track, fitness and dance
studios, preschool, multipurpose rooms, and modern offices. Reclaimed brick was
used to build a retaining wall honoring the original FDR-era Works Project.
Milwaukee Montessori School — Field House | Milwaukee, WI | $3.6M
Located in the City of Milwaukee, the 13,059 SF Milwaukee Montessori Field House
project includes the construction of a brand-new activities facility which consists
of a gymnasium, locker rooms, concession stand and dance studio. With this new
field house, staff at Milwaukee Montessori can design a schedule that provides more
physical-conditioning and game-playing opportunities for their students. They can also
host athletic tournaments while enjoying the home court advantage.
Church of the Gesu — Interior Renovations | Milwaukee, WI | $6.4M
This historic worship and wedding venue on Marquette University’s campus,
underwent a 28,000 sf renovation to enhance safety, accessibility, and the overall
experience while preserving its architectural beauty. Updates included new solid oak
seating, porcelain tile flooring with an integrated hearing loop system, reconfigured
entry and sanctuary ramps, and restored decorative ceilings. Additional improvements
modernized lighting, sound, security, and fire detection systems while maintaining the
church’s timeless character.
City of Milwaukee Department of Public Works - Building Precon Budget |
Milwaukee, WI | Confidential
CG Schmidt is working alongside Graef for a new Milwaukee Department of Public
Works service center by providing the cost estimate piece. This project is in
process and confidential.
Education &
Training
BS, Construction
Management
UW - Stout
AAS, Architectural Drafting/
Construction Technology
Waukesha County Technical
College
Healthcare Construction
Certificate (HCC)
Wisconsin Healthcare
Engineering
CPR, AED and First Aid
Certification
Medic First Aid
30-Hour Construction Safety
Course
OSHA
SafeStart® Training
CG Schmidt
Page 98 of 136
15
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
ZACH SINGER
Project Manager
Working in all phases of construction, Zach manages scheduling, bid review, estimating,
budgeting and value engineering in the preconstruction phase. He also manages the
master schedule, shop drawing review, submittal review, monthly progress reports, and
management of subcontractors in the construction phase. Zach will lead the punch list
review, close-out and warranty follow-up.
RELEVANT PROJECT EXPERIENCE
School District of Brown Deer — North Commons | Brown Deer, WI | $25.9M
The successful referendum project included the conversion of the former middle
school to the current Brown Deer Elementary School and the conversion of the
high school to accommodate 7-12 th grade including alterations to their food service
line.
Elmbrook School District — Fairview South School | Elm Grove, WI | $3.5 M
Fairview South School underwent a renovation featuring redesigned classrooms,
a sensory suite, life-skills apartment, gross motor room, and an innovative
hydroponic learning lab—creating inclusive, hands-on spaces that support every
student’s growth and development.
Church of the Gesu - Interior Renovations | Milwaukee, WI | $6.4M
This historic worship and wedding venue on Marquette University’s campus,
underwent a 28,000 sf renovation to enhance safety, accessibility, and the overall
experience while preserving its architectural beauty. Updates included new
solid oak seating, porcelain tile flooring with an integrated hearing loop system,
reconfigured entry and sanctuary ramps, and restored decorative ceilings.
Additional improvements modernized lighting, sound, security, and fire detection
systems while maintaining the church’s timeless character.
Bridge Church — Additions & Remodel | Waukesha, WI | In Progress
With the expected continued upward trend in attendance, BC is planning for
additions and renovations. The targeted addition would include a 750 seat worship
space, large gathering area with a café and renovated spaces within the existing
building. The renovations would include updates to the children’s ministry area
and the existing worship space.
*Fire Station No.97 & Fire Station No.98 | Menomonee Falls, WI & Lannon, WI |
Confidential
A simultaneous ground-up construction of two fire stations including one for
Menomonee Falls (Station 87) and another that is shared between Menomonee
Falls and Lannon (Station 98).
Education &
Training
BS, Building Construction
Management
UW - Platteville
CPR, AED and First Aid
Certification
Medic First Aid
30-Hour Construction Safety
Course
OSHA
Procore Certified,
Superintendent
Procore Technologies
SafeStart® Training
CG Schmidt
*Indicates project completed through previous employer
Page 99 of 136
16
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
STEVE KNETTER
Superintendent
Steve will be responsible during onsite construction and for the supervision, quality,
safety and coordination with all agencies and inspection services. He orchestrates and
enforces CG Schmidt’s “Leave It Better Than You Found It” policy for jobsite cleanup.
RELEVANT PROJECT EXPERIENCE
Dr. Howard Fuller Collegiate Academy | Milwaukee, WI | $20.8 M
The new, state-of-the-art, four-story high school at approximately 85,000 SF
featured a full operating kitchen for student hot lunches, regulation gymnasium
and dedicated community programming space in addition to traditional classroom
and administrative space.
Grafton School District — John Long Middle School | Grafton, WI | $8.3 M
This project featured a new 5 th grade addition with eight state-of-the-art
classrooms, along with comprehensive renovations to the science labs, cafeteria,
restrooms, and special education spaces
Muskego-Norway School District | Muskego, WI | $43.2 M
The facilities improvement referendum created a project that includes the
construction of a new middle school and 3-2-1 school organization—three
elementary schools, two middle schools and one high school.
Hartford Union High School — 2024 Referendum | Hartford, WI | $25.8 M
This facilities referendum project addresses infrastructure, safety and security,
learning space for technical education and engineering, swimming pool remodel,
updates to outdoor facility update, tech ed spaces, MEP upgrades, and additional
site work.
Milwaukee Montessori School — Field House | Milwaukee, WI | $3.6M
Located in the City of Milwaukee, the 13,059 SF Milwaukee Montessori Field House
project includes the construction of a brand-new activities facility which consists
of a gymnasium, locker rooms, concession stand and dance studio. With this new
field house, staff at Milwaukee Montessori can design a schedule that provides more
physical-conditioning and game-playing opportunities for their students. They can also
host athletic tournaments while enjoying the home court advantage.
Education &
Training
Supervisory Training
Program
Associated General
Contractors of Wisconsin
(AGC)
30-Hour Construction Safety
Course
OSHA
10-Hour Construction Safety
Course
OSHA
CPR, AED and First Aid
Certification
Medic First Aid
SafeStart Training
CG Schmidt
Page 100 of 136
17
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROPOSED TEAM
CHARLIE HAAS
Director of Preconstruction
Charlie works closely with the project team to provide continuity between preconstruction
planning and project operations. He ensures the information captured is shared, everyone
understands the vision, and that the learnings and insights gained from other projects
are applied for your project’s benefit.
RELEVANT PROJECT EXPERIENCE
West Allis West Milwaukee School District Recreation Center Addition and
Renovation | West Allis, WI | $10M
The West Allis-West Milwaukee Rec Center project included demolition of outdated
facilities, remodel of the 2005 building, and site prep for future additions. Completed
in summer 2020, the upgraded center features a gym, walking track, fitness and dance
studios, preschool, multipurpose rooms, and modern offices. Reclaimed brick was
used to build a retaining wall honoring the original FDR-era Works Project.
Pewaukee School District | Pewaukee, WI | Various
As a result of the approved referendum for facility improvements, in-progress
construction include additions and renovations to all four schools, with a scope
including campus-wide infrastructure improvements, enhanced safety and
security, more academic and office space, and grade reconfigurations.
Oconomowoc Area School District | Oconomowoc, WI | $25.7 M
A dynamic addition that expands learning opportunities for students, with a
scope including six new classrooms, dedicated collaboration spaces, small-group
instructional areas, shared classroom library spaces, and specialized science and
STEM learning environments. Enhancements provide educators and students with
a flexible and engaging learning environment.
City of Milwaukee Department of Public Works - Building Precon Budget |
Milwaukee, WI | Confidential
CG Schmidt is working alongside Graef for a new Milwaukee Department of Public
Works service center by providing the cost estimate piece. This project is in
process and confidential.
Muskego-Norway School District | Muskego, WI | $43.2 M
The facilities improvement referendum created a project that includes the
construction of a new middle school and 3-2-1 school organization—three
elementary schools, two middle schools and one high school.
Bridge Church — Additions & Remodel | Waukesha, WI | In Progress
With the expected continued upward trend in attendance, BC is planning for
additions and renovations. The targeted addition would include a 750 seat
worship space, large gathering area with a café and renovated spaces within
the existing building. The renovations would include updates to the children’s
ministry area and the existing worship space.
Education &
Training
MS, Architecture
UW - Milwaukee
MBA
Marquette University
BS, Civil Engineering
Villanova University
Licensed Architect
State of WI
SafeStart® Training
CG Schmidt
Page 101 of 136
Project
Approach &
Understanding
03
FIRE STATION NO. 2
Page 102 of 136
19
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
Mission-Critical
Operations Cannot Stop
Maintaining operational
continuity during renovation
and mold remediation
is critical to response
reliability and community
safety.
Cost Certainty
through Progressive
Preconstruction
The Village has defined a
structured preconstruction
process. This signals a clear
expectation: cost control
must happen in real time—
not at bid time.
Mold Remediation as
an Integrated Scope
Mold remediation is not a
side scope—it is a sequencing
driver. This work will directly
impact schedule flow, crew
relocations, and access
sequencing.
Transparent Public
Procurement
The Village has various
requirements that need to
be adhered to in this project.
Clear documentation, public
accountability, and clean bid
packaging will be essential.
PROJECT UNDERSTANDING CG SCHMIDT’S APPROACH
Early Alignment & Risk Mapping
At project kickoff, risks will be identified early, assigned
ownership, pricing when appropriate, and tracked through
GMP development.
Progressive Cost Leadership
No Surprises. Not only is that one of our core values, but
the goal for this project at GMP. To achieve this, we’ll use
real-time cost tracing, side-by-side estimate reconciliation
with SEH, early scope gap identification, and value analysis
focused on durability, lifecycle cost, and response reliability
to provide fluid estimating.
Operationally Driven Phasing
Our phasing strategy prioritizes apparatus access at all
times, clear construction/operations separation, life-safety
barrier plans, and mitigation for noise, vibration and dust.
Temporary relocations would be mapped out only when
unavoidable and would be supported with clear map
circulation, emergency paths, and construction zones before
work begins.
Mold Remediation Integration
Remediation becomes part of the master schedule, not an
isolated event. CG Schmidt will coordinate directly with SEH
in this process. Please see the following page for our plan.
Transparent, Competitive Procurement
To protect taxpayer dollars and project integrity, our
approach will emphasize thoughtful bid packages to
maximize competition, clear scopes to reduce change orders,
public bid transparency and documentation, and structured
recommendation summaries for Owner and Board review.
Construction Phase Leadership
Fully operational. Fully commissioned. Fully supported. That
is how we will leave this project. During construction, our
focus will include active on-site supervision, strict safety and
containment enforcement, proactive communication with
station leadership and Village stakeholders, and structured
closeout and commissioning coordination.
SECTION 03
PROJECT APPROACH & UNDERSTANDING
Page 103 of 136
20
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
Mold Remediation
Coordination &
Implementation Plan
1. INVESTIGATION & DEFINITION
Lead: SEH
» Identify moisture sources and affected assemblies
» Define remediation protocol and extent
» Provide environmental specifications
CG Schmidt’s Role: Validate constructability, develop
preliminary cost and schedule scenarios.
2. CONTAINMENT & PROTECTION PLANNING
» Establish isolated work zones
» Install negative air machines with HEPA filtration
» Protect adjacent living quarters and apparatus bays
» Maintain emergency egress routes
Fire Station Priority: Zero disruption to response readiness.
3. CONTROLLED REMEDIATION
» Remove impacted materials
» Clean and treat remaining substrates
» Continuous air monitoring
» Daily coordination with station leadership
CG Schmidt’s Role: Overseeing safety, documentation, schedule
compression where feasible.
4. CLEARANCE TESTING & VERIFICATION
» Third-party air and surface sampling
» Independent clearance confirmation
» Formal documentation for record
No reconstruction begins until clearance is achieved.
5. RECONSTRUCTION & RESTORATION
» Rebuild assemblies to current code
» Improve moisture management detailing
» Integrate work into overall phasing plan
» Closeout documentation and warranty review
Because a fire station operates 24/7 in
support of emergency response, mold
remediation must be executed with precision,
transparency, and zero impact to readiness.
Our approach integrates environmental
investigation, containment planning,
remediation, and reconstruction into a single
coordinated process that protects occupant
health while maintaining uninterrupted
operations.
Working in collaboration with SEH, we will
translate identified conditions into clear cost,
schedule, and phasing strategies—ensuring
remediation is addressed safely, efficiently,
and fully aligned with GMP development and
station response reliability.
Page 104 of 136
21
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
VALUE ENGINEERING STUDY
Value engineering is a critical process for
CG Schmidt, enabling the firm to optimize
project outcomes by balancing cost, quality,
and functionality. By carefully analyzing
design and construction methods, we work
with clients and stakeholders to identify
opportunities for cost savings without
compromising on performance or safety.
This proactive approach involves a
collaborative, team-oriented effort to
assess alternative materials, systems, and
techniques that can reduce expenses and
improve efficiency, all while maintaining the
project’s overall vision and standards. With
a focus on innovation and practical problem-
solving, our value engineering practices help
deliver superior value, ensuring that each
project meets both budgetary goals and the
highest quality benchmarks.
DETAILED COST ESTIMATE
CG Schmidt provides a detailed cost
estimate by assessing the project’s scope,
size, and complexity. They evaluate costs
for materials, labor, equipment, permits,
and overhead, breaking them into line
items for clarity. We also considers site
conditions, timelines, and potential risks.
This thorough estimate helps clients
understand the full financial commitment
and supports informed decision-making
throughout the project.
Sample Value Engineering Study
& Cost Control Log
Sample Cost Estimate
SAMPLE
SAMPLE
Effective Budgeting Tools to Optimize Outcomes
Page 105 of 136
22
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
WEEKLY LOOK-AHEAD SCHEDULE
CG Schmidt schedules and conducts
weekly construction meetings to
discuss progress, procedures, budget
and scheduling issues. In addition, we
review work completed during the past
week and outline work that is to be
completed in the next month. Action
items and deadlines are assigned to
the appropriate parties, recorded in the
weekly meeting minutes and tracked by
your project manager.
WORK SCHEDULE
Adhering to the construction schedule
is a top priority. We carefully plan and
coordinate all phases of the project to
ensure timely completion, minimizing
delays and maintaining project
momentum. By closely monitoring
progress, managing resources
efficiently, and addressing potential
issues early, we deliver projects on
time, meeting client expectations and
avoiding costly setbacks.
Site SUBCONTRACTOR 3/11 3/19 3/20 3/21 3/22 3/23 3/24 3/11 3/19 3/20 3/21 3/22 3/23 3/24 3/11 3/19 3/20 3/21 3/22 3/23 3/24 3/11 3 /19 3/20 3/21 3/22 3/23 3/24 3/11 3/19 3/20 3/21 3/22 3/23 3/24
Site Work 4/22 4/23 4/24 4/25 4/26 4/27 4/28 4/29 4/30 5/1 5/2 5/3 5/4 5/5 5/6 5/7 5/8 5/9 5/10 5/11 5/12 5/13 5/14 5/15 5/16 5/17 5/18/ 5/ 19 5/20 5/21 5/22 5/23 5/24 5/25 5/26 5/27 5/28 5/29 5/30 5/31 6 /1 6/2 6/3 6/4 6/5 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 6/14
Sheathing on walls CGS x x x x x x x x x x
Pour connector CGS x
Roof blocking classroom ongoing CGS
Set frame classrooms CGS xxxx xxxxx xxxxx x
Pour stairs mezz x
Brick classroom Hein xx xxxxx xxxxx xxxxx
Block classroom interior Hein x x x x x x x x x x x x x x x x x x
Block walls locker room Hein
Electrical rough in Masonry Hubbartt x x x x x x x x x x xxxxx xx
Over head rogh ins classroom Hubbartt x x x x x x x x x x
Finishes Gym and locker room Hubbartt x x x x x x xxxxx xx
Prime and paint Gym Davis x x x x
Prime and paint locker room Davis x x x x x
Paint door frames xxxx
Stairs mezz SPE x x x
Bar joist in C SPE xxxx xx
Masonry wall rough ins Maritime x x x x x x x x x x xxxxx
Roof Drains classroom pipe Maritime x x x x x x x x
Interior studs C Common links xxx x x xxxxx xx
Dense glass Exterior D Common links x x x x x
Drywall and finish locker rooms Common links x x x x
Interior studs connector Common links x x x x x x x
Frame soffits classroom Common links xxxx xxxxx
New roof on C Craft ?
Roof classroom Craft x x x x x x x x x x
Classroom pipping and duct Ahern x x x x x x x x x x xxxxx
Fire protection classrooms Ahern xxxxx xxxxx xxxxx xxxx
Pipe insulating Ahern x x x x x x x
Remove lead bar joist bridging Robinson xxxxx
Grid locker room Verhalen xxx xx
panels gym walls Verhalen xxxxx xxxxx
Install Gym equipment Carroll xxxx xx
Air barrier and spray foam Appleton lathe xxx xxxxx xxxx
Gym floor Baseman xxxxx xxxxx xxxxx xxxxx
Window install Omni xxx xxxxx xx xx
Updated
4/22/2024
Project
227182
Project Name
L.B. Clarke
Sample Weekly Look-
Ahead Schedule
Diligent Schedule Management
ID
Task
Mode
Task Name Duration Start Finish
1
WƌĞŽŶWŚĂƐĞ ϵϮĚĂLJƐ DŽŶϵͬϮϱͬϮϯ DŽŶϮͬϭϮͬϮϰ
13
ŽŶƐƚƌƵĐƚŝŽŶWŚĂƐĞ ϮϮϭĚĂLJƐ dƵĞϮͬϭϯͬϮϰ dƵĞϭϮͬϮϰͬϮϰ
14
WƌŽĐƵƌĞŵĞŶƚ ϭϭϬĚĂLJƐ dƵĞϮͬϭϯͬϮϰ tĞĚϳͬϭϳͬϮϰ
15
^ƵďĐŽŶƚƌĂĐƚƐ ϭǁŬ dƵĞϮͬϭϯͬϮϰ DŽŶϮͬϭϵͬϮϰ
16
^ƵďŵŝƚƚĂůƐ ϯǁŬƐ dƵĞϮͬϮϬͬϮϰ DŽŶϯͬϭϭͬϮϰ
17
,D&ƌĂŵĞWƌŽĐƵƌĞŵĞŶƚ ϴǁŬƐ dƵĞϯͬϭϮͬϮϰ DŽŶϱͬϲͬϮϰ
18
ŽŽƌͬ,ĂƌĚǁĂƌĞWƌŽĐƵƌĞŵĞŶƚ ϭϰǁŬƐ dƵĞϯͬϭϮͬϮϰ dƵĞϲͬϭϴͬϮϰ
19
WƌĞ&ĂďtĂůůWĂŶĞůƐ ϲǁŬƐ dƵĞϯͬϭϮͬϮϰ DŽŶϰͬϮϮͬϮϰ
20
WƌĞĨĂďƌŝĐĂƚĞtŽŽĚdƌƵƐƐĞƐ ϭϮǁŬƐ dƵĞϯͬϭϮͬϮϰ dƵĞϲͬϰͬϮϰ
21
DWƋƵŝƉŵĞŶƚWƌŽĐƵƌĞŵĞŶƚ ϭϴǁŬƐ dƵĞϯͬϭϮͬϮϰ tĞĚϳͬϭϳͬϮϰ
22
ZĞďĂƌWƌŽĐƵƌĞŵĞŶƚ ϰǁŬƐ dƵĞϯͬϭϮͬϮϰ DŽŶϰͬϴͬϮϰ
23
ƵŝůĚŝŶŐŽŶƐƚƌƵĐƚŝŽŶ ϭϲϲĚĂLJƐ DŽŶϰͬϴͬϮϰ dƵĞϭϮͬϯͬϮϰ
24
^ŝƚĞDŽďŝůŝnjĂƚŝŽŶ ϬĚĂLJƐ DŽŶϰͬϴͬϮϰ DŽŶϰͬϴͬϮϰ
25
^ŝƚĞ&ĞŶĐŝŶŐ ϮĚĂLJƐ dƵĞϰͬϵͬϮϰ tĞĚϰͬϭϬͬϮϰ
26
DĂƐƐĂƌƚŚǁŽƌŬ ϯĚĂLJƐ dŚƵϰͬϭϭͬϮϰ DŽŶϰͬϭϱͬϮϰ
27
^ŝƚĞhƚŝůŝƚŝĞƐ ϭϱĚĂLJƐ dƵĞϰͬϭϲͬϮϰ DŽŶϱͬϲͬϮϰ
28
ƵŝůĚŝŶŐ&ŽƵŶĚĂƚŝŽŶdžĐĂǀĂƚŝŽŶƐ ϯĚĂLJƐ dƵĞϰͬϭϲͬϮϰ dŚƵϰͬϭϴͬϮϰ
29
ƵŝůĚŝŶŐ&ŽŽƚŝŶŐƐ ϱĚĂLJƐ &ƌŝϰͬϭϵͬϮϰ dŚƵϰͬϮϱͬϮϰ
30
ƵŝůĚŝŶŐ&ƌŽƐƚtĂůůƐ ϭϬĚĂLJƐ &ƌŝϰͬϮϲͬϮϰ dŚƵϱͬϵͬϮϰ
31
ƵŝůĚŝŶŐhŶĚĞƌŐƌŽƵŶĚDW ϭϬĚĂLJƐ &ƌŝϱͬϭϬͬϮϰ dŚƵϱͬϮϯͬϮϰ
32
'ƌĂĚĞ^ůĂďKŶ'ƌĂĚĞ ϱĚĂLJƐ &ƌŝϱͬϮϰͬϮϰ &ƌŝϱͬϯϭͬϮϰ
33
ƵŝůĚŝŶŐ^ůĂďŽŶ'ƌĂĚĞ ϱĚĂLJƐ DŽŶϲͬϯͬϮϰ &ƌŝϲͬϳͬϮϰ
34
džƚĞƌŝŽƌtĂůůŽŶƐƚƌƵĐƚŝŽŶ ϭϬĚĂLJƐ DŽŶϲͬϭϬͬϮϰ &ƌŝϲͬϮϭͬϮϰ
35
/ŶƚĞƌŝŽƌtĂůůŽŶƐƚƌƵĐƚŝŽŶ ϭϬĚĂLJƐ DŽŶϲͬϮϰͬϮϰ DŽŶϳͬϴͬϮϰ
36
/ŶƐƚĂůů&ůĂƚZŽŽĨdƌƵƐƐĞƐΘ^ŚĞĞƚŝŶŐ ϭϬĚĂLJƐ dƵĞϳͬϵͬϮϰ DŽŶϳͬϮϮͬϮϰ
37
/ŶƐƚĂůůůĞĂƌƐƚŽƌLJtĂůůƐĂŶĚdƌƵƐƐĞƐ ϱĚĂLJƐ dƵĞϳͬϮϯͬϮϰ DŽŶϳͬϮϵͬϮϰ
45
/ŶƐƚĂůůdžƚĞƌŝŽƌ'ůĂnjŝŶŐ^LJƐƚĞŵƐ ϭϱĚĂLJƐ dƵĞϳͬϮϯͬϮϰ DŽŶϴͬϭϮͬϮϰ
38
/ŶƐƚĂůůƌŽŽĨďůŽĐŬŝŶŐ ϱĚĂLJƐ dƵĞϳͬϯϬͬϮϰ DŽŶϴͬϱͬϮϰ
39
/ŶƐƚĂůůZŽŽĨŝŶŐ ϭϬĚĂLJƐ dƵĞϴͬϲͬϮϰ DŽŶϴͬϭϵͬϮϰ
40
ƵŝůĚŝŶŐ/ŶǁĂůůͬďŽǀĞĞŝůŝŶŐDWΖƐ ϭϱĚĂLJƐ dƵĞϴͬϭϯͬϮϰ dƵĞϵͬϯͬϮϰ
41
/ŶƐƚĂůůdžƚĞƌŝŽƌĞŵĞŶƚ^ŝĚŝŶŐ ϮϬĚĂLJƐ dƵĞϴͬϮϬͬϮϰ dƵĞϵͬϭϳͬϮϰ
43
/ŶƐƚĂůůdžƚĞƌŝŽƌDĂƐŽŶƌLJ ϭϱĚĂLJƐ dƵĞϴͬϮϬͬϮϰ dƵĞϵͬϭϬͬϮϰ
47
ƌLJǁĂůůͬ,ĂŶŐͬdĂƉĞͬ&ŝŶŝƐŚ ϭϱĚĂLJƐ tĞĚϵͬϰͬϮϰ dƵĞϵͬϮϰͬϮϰ
44
/ŶƐƚĂůůdžƚĞƌŝŽƌdƌŝŵƐͬ&ůĂƐŚŝŶŐͬŽƉŝŶŐƐ ϮϬĚĂLJƐ tĞĚϵͬϭϭͬϮϰ dƵĞϭϬͬϴͬϮϰ
42
/ŶƐƚĂůůŽĨDĞƚĂůWĂŶĞůƐ ϭϬĚĂLJƐ tĞĚϵͬϭϴͬϮϰ dƵĞϭϬͬϭͬϮϰ
48
WĂŝŶƚ/ŶƚĞƌŝŽƌ ϭϬĚĂLJƐ tĞĚϵͬϮϱͬϮϰ dƵĞϭϬͬϴͬϮϰ
49
d'ƌŝĚ ϱĚĂLJƐ tĞĚϭϬͬϮͬϮϰ dƵĞϭϬͬϴͬϮϰ
50
/ŶƐƚĂůůDWƐŝŶ'ƌŝĚ ϭϬĚĂLJƐ DŽŶϭϬͬϳͬϮϰ &ƌŝϭϬͬϭϴͬϮϰ
46
/ŶƐƚĂůů^ŝƚĞŽŶĐƌĞƚĞWĂǀŝŶŐΖƐͬZĂŝůŝŶŐƐ ϭϱĚĂLJƐ tĞĚϭϬͬϵͬϮϰ dƵĞϭϬͬϮϵͬϮϰ
Subcontracts
Submittals
HM Frame Procurement
Door/Hardware Procurement
PreFab Wall Panels
Prefabricate Wood Trusses
MEP Equipment Procurement
Rebar Procurement
4/8
Site Fencing
Mass Earthwork
Site Utilities
Building Foundation Excavations
Building Footings
Building Frost Walls
Building Underground MEP
Grade Slab On Grade
Building Slab on Grade
Exterior Wall Construction
Interior Wall Construction
Install Flat Roof Trusses & Sheeting
Install Clearstory Walls and Trusses
Install Exterior Glazing Systems
Install roof blocking
Install Roofing
Building Inwall/Above Ceiling MEP's
Install Exterior Cement Siding
Install Exterior Masonry
Drywall/Hang/Tape/Finish
Install Exterior Trims/Flashing/Copings
Install of Metal Panels
Paint Interior
ACT Grid
Install MEPs in Grid
Install Site Concrete Paving's/Railings
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Qtr 3, 2023 Qtr 4, 2023 Qtr 1, 2024 Qtr 2, 2024 Qtr 3, 2024 Qtr 4, 2024 Qtr 1, 2025 Qtr 2, 2025
SD WI Dells District Office
Project Contract Schedule
Mon 2/19/24
CGS Schmidt
BUILDING A BETTER TOMORROW, TODAY
1
Sample Work Schedule
SAMPLE
Page 106 of 136
23
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PROJECT APPROACH & UNDERSTANDING
Our goal is to complete jobs efficiently and precisely.
Expediting project closeout and ensuring all open
issues are addressed are important components for
successful projects.
We track project closeout activities and milestone
dates within the project schedule. Starting the
closeout process early eliminates last-minute fixes
and inefficiency. For example, as subcontractors are
hired, we ask them to provide their Operations and
Maintenance (O&M) information along with shop
drawing and equipment submittals. This way, O&M
information is readily available throughout training an
onboarding of staff.
As part of our Quality Assurance program, we utilize
a project closeout checklist to keep track of project
closeout items.
The checklist tracks:
» Project closeout notifications (internal and external)
» Completion status of punch list work items
» Substantial completion inspections
» Required project completion certifications
» Systems commissioning
» Training of operations and maintenance staff
» Record-set (as-built) documentation
» Assembly of operation and maintenance
information
» Project financial closeout record
After you take possession of your facility, we provide:
» Two-year warranty for all new construction
» Walk-through and building performance
assessments at the end of the first and second
years
» Trouble-shooting and operational assistance on
functional building issues for the life of the building
» Periodic systems retraining, if required, during
seasonal changes and the warranty period
Sample Project Closeout Checklist
During our two-year warranty period, CG Schmidt schedules specific
dates to review the performance of your new building. Typically, this
occurs at the one-year and two-year anniversaries of the completion
date. It is our goal to be proactive about any potential warranty
issues — addressing problems before they become troublesome.
MOBILE PUNCHLIST
ProjectSight is used to track and resolve ongoing
issues throughout the duration of the project.
As a result, there are minimal issues to address
during the punchlist phase, and any items on the
list can be resolved quickly which accelerates
the closeout process. ProjectSight provides all
team members with project information at their
fingertips no matter where they are located and
increases field productivity, giving our team
the tools we need to execute your project at the
highest level of quality.
CG Schmidt provides a
standard two-year warranty
for all of our projects
effective from the date of
substantial completion.
Project Closeout Precision
SAMPLE
Page 107 of 136
Preconstruction
Services Cost
Proposal
04
FIRE STATION NO. 2
Page 108 of 136
25
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
CHARLIE HAAS
Director of Preconstruction
VDC ESTIMATING MEP
MARK STIGLER
VDC Manager
CIERRA GRIFFIN
VDC Engineer/Drone
Fleet Manager
SEAN MAAS
VDC Engineer
MIYA ELYHA
VDC Engineer
RICK MORT
Director of
Estimating
JOHN FIERTAG
Senior Estimator
MATT IWANSKI
Senior Estimator
ANGELA RESNICK
Senior Estimator
LISA JELEN
Senior Estimator
NOAH RICKE
Estimator
BRIAN MEDINA
MEP Manager
CHRIS WARD
MEP Estimator
JESSICA SKROBIS
MEP Engineer
BRITTANY
WENTWORTH
MEP Engineer
CG Schmidt provides a fully integrated, in-
house preconstruction team—eliminating
the need for additional consultants while
delivering deeper coordination and clearer
decision-making from day one.
OUR TEAM OF EXPERTS
LEVERAGING TECHNOLOGY
TO IMPROVE PROJECT OUTCOMES
15
IN-HOUSE EXPERTS
IN VDC, MEP, AND
ESTIMATING
10
DIFFERENT SOFTWARE TOOLS
TO AID IN BUILDING SYSTEM
INTEGRATION
SECTION 04
PRECONSTRUCTION SERVICES
COST PROPOSAL
Page 109 of 136
26
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
Our 5-Step Preconstruction Process
CG Schmidt’s successful project approach is based on early project involvement. Projects greatly benefit from having
builder input during the planning and concept design stages. Each building decision contains cost and construction
impact, and with early engagement, we provide the necessary context to make informed building choices, allowing us to
perform at our highest capacity. We outline our 5-Step Preconstruction Process below:
STEP 1: LISTEN
» Engage in partnering sessions with all project
stakeholders
» Understand project vision, goals and parameters of work
(timeline, sequencing issues, etc.)
» Understand cash flow and proforma
» Begin continuous estimating process
» Confirm the allowable budget
» Understand major program decisions (i.e. square-footage,
number of levels, etc.)
STEP 2: INFORM
» Develop options and define target budgets
» Comparative analysis
» Begin constructability review, procurement plan and
prefabrication plan
» Virtual Design and Construction (VDC)
» Site selection
» Benchmarking
» Comparison to recent projects
» Gather subcontractor information
» Gather historical cost information
» Involve MEP partners, as needed
» Utilize the designer’s building massing and site layout
options to refine the continuous estimate
STEP 3: ADVISE
» Life cycle cost analysis
» Prioritize the project scope to maximize value
» Further refine the continuous estimate
» Entitlement process
» Utilize the designer’s massing/site to provide multiple
system alternates
» Total project budget development
» Involve enclosure and steel partners, as needed
STEP 4: ALIGN
» Project scheduling
» Refine the constructability review, procurement plan and
prefabrication plan
» Finalize the project scope
» Involve site, core and shell partners, as needed
» Understand the designer’s definition to systems and
alternates
» Further refine the continuous estimate
STEP 5: EXECUTE
» Bid packages
» Phasing and site logistics plan
» Understand designer’s final Guaranteed Maximum Price
(GMP) drawings
» Finalize GMP and alternates
» Local participation/workforce development
OUR FOCUS DURING THE
PRECONSTRUCTION PROCESS:
» Partnering
» Collaborating
» Continuous Budgeting/Estimating
» Developing and Evaluating Options
Page 110 of 136
27
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
COMMITTED TO THE NUMBER
At CG Schmidt, we prioritize meticulous planning and proactive
collaboration to ensure every project’s success. From day one, we
work closely with Germantown Fire Department Fire Station No. 2,
providing expertise in constructability, pricing, market trends, and
systems engineering. This approach guarantees a smooth, predictable
process and a high-quality product. Trust is at the core of our work,
and we uphold a legacy of transparency and integrity by presenting
clear, comparable bids.
PROVEN ESTIMATING ACCURACY
CG Schmidt consistently delivers accurate preliminary estimates at the
Schematic Design, Design Development, and Construction Document
phases, with final costs aligning closely to early projections. Our teams
maintain detailed cost control logs and work tirelessly to keep the
projects on track, demonstrating our commitment to budget discipline
and transparency.
Our Building Catalyst software is a powerful estimating tool that
leverages historical data from similar projects across the country to
generate highly accurate and detailed cost projections. By referencing
a broad database of comparable builds, it sets clear expectations
from the start, helping to eliminate surprises and enable smarter,
data-driven planning. When budgets are tight, Building Catalyst also
identifies value engineering opportunities to reduce costs without
compromising quality, ensuring your project remains both on track and
within scope.
YOUR ACTIVE DESIGN
PARTNER
While most firms can build according
to plans, our clients hire us because
we ensure their projects are planned
perfectly from the start. We invest
more time, energy, and resources in
the planning phase than any other
firm.
From day one, we collaborate closely
with your design partner, offering
our expertise in constructibility,
pricing, market conditions, systems
engineering, and more.
OUR HONEST AND
TRANSPARENT PROCESSES
We understand the concerns clients
have about hidden costs and trust
in contractors. Our longstanding
reputation in the industry speaks
for itself—we’ve upheld a legacy of
transparency and integrity
for generations.
We believe in the principle of “Trust,
but verify.” To ensure your complete
confidence in our services, we present
each bid in a clear, easy-to-compare
format. Moreover, we go the extra
mile by providing our sealed bid 24
hours ahead of other bidders, giving
you time to review and consider our
proposal thoroughly.
Construction Budget Management
Building Catalyst software sample
Page 111 of 136
28
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
Our reputation is built on market insight, strong subcontractor
relationships, consistent bid coverage, and a proven track record. With
generations of experience throughout the Greater Milwaukee area, we
bring the knowledge, trust, and foresight to guide complex projects
from day one.
Preconstruction Capabilities
CLIENT-CENTERED COST CONTROL
Continuous estimating ensures that projects stay on track,
within budget, and aligned with client expectations from
concept to completion.
REAL-TIME COLLABORATION
This dynamic approach involves real-time cost assessment
and collaboration throughout the project lifecycle, allowing
for proactive adjustments as designs and conditions evolve.
DATA-DRIVEN INSIGHTS
By leveraging cutting-edge technology and industry
expertise, continuous estimating empowers clients with
accurate, transparent insights at every phase—driving
smarter decisions and reducing risk.
BUILDING TRUST THROUGH INNOVATION
At CG Schmidt, it’s not just about building structures.
It’s about building trust through precision, agility, and
innovation.
» Estimating
» Conceptual Estimating
» Model Based Estimating
» Continuous Estimating
» Target Value Budgeting
» Value Analysis
» Total Project Cost Management
» Cash Flow Projections
» Alternative Financing
Mechanisms
» Design Phase Management
» Constructability Reviews
» Preliminary Scheduling
» Subcontracting Scoping
» Bidding & Buyout Support
» Construction Bulletin Review
» Trade Management Partnering
» Virtual Design & BIM
» Existing Facility Documentation
» As-Built Documentation
» Photo Documentation
» Reality Capture with Drone
Flights & Laser Scanning
» Interactive Facility Tours/
Videos
» Building Visualization
» Virtual Mock-Ups
» BIM Coordination & System
Conflict Identification
» Site Utilization Studies
» Site Optimization
» Cut/Fill Analysis
» Schedule Analysis
» Virtual & Augmented Reality
» MEP Technical Services
» Facility Assessments
» MEP Systems Assessments
» Life Cycle Cost Analysis
» Energy Audits
» Capital Maintenance /
Improvement Planning
» Energy Optimization
» Energy Benchmarking
» Mechanical Systems Controls
Audit
» Commissioning
Preconstruction Services
Our integrated clash-detection models provide a digital 3D model that combines
architectural, structural, mechanical, electrical, and plumbing (MEP) systems
to identify conflicts (or “clashes”) between different elements of a construction
project before physical work begins.
REAL-TIME COLLABORATION.
TRANSPARENT COSTS.
TRUSTED RESULTS.
Page 112 of 136
29
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // PRECONSTRUCTION SERVICES COST PROPOSAL
Please see the Appendix fee section for the
preconstruction services cost proposal.
Preconstruction Services
Cost Proposal
Page 113 of 136
GMP
Development
Approach
05
FIRESTATION NO. 2
Page 114 of 136
31
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // GMP DEVELOPMENT APPROACH
SECTION 05
GMP DEVELOPMENT
APPROACH
TRANSPARENCY AND UNDERSTANDING
We invest in dedicated time to understand project
objectives and how they will meet your goals. An open,
transparent approach and deep understanding of key
aims delivers a successful project.
CG Schmidt works diligently with the design team
and client to limit the number of allowances and
contingencies in the GMP. We recommend carrying the
following contingencies as we work through the design
process.
The sample project dashboard monitors the progression of the total project budget throughout the entirety of the project.
$7.0M
$6.5M
$6M
$5.5M
$5M
$4.5M
7/10/2024 7/29/2024 10/15/2024 12/8/2024 6/22/2025 8/13/2025 9/7/2025 9/17/2025
Budget:
$5.0M
$6.55M
$5.14M $5.03M
$4.77M
$4.96M $4.96M
$5.08M
$4.92M
CONFIDENTIAL RENOVATION: OWNER’S BUDGET $5.0M
RECOMMENDATIONS FOR FIRE STATION NO. 2:
» Protect Operations
» Manage Differing & Unknown Conditions
» Maintain Public Transparency
Guaranteed Maximum Price Approach
A guaranteed maximum price (GMP) acts as an insurance policy for an owner, transferring risk from the owner to the
contractor. However, like an insurance policy, there must be a balance of risk. To meet this need, we focus our efforts
on establishing precise estimates to determine GMPs early while keeping contingencies at a minimum.
OUR RESPONSIBILITY
No matter when the GMP is determined, it is our
responsibility to capture all aspects of design intent
and identify all costs, not only the portion that CG
Schmidt is under contract for directly. Your proposed
team will work with you to identify all project costs and
include each in overall budget.
Continuous estimating keeps CG Schmidt ahead of every cost
driver to deliver accurate, data-driven budgets.
Page 115 of 136
Bidding &
Procurement
Methodology
06
FIRE STATION NO. 2
Page 116 of 136
33
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // BIDDING & PROCUREMENT METHODOLOGY
QUALIFY SUBCONTRACTORS
MAXIMIZE THE NUMBER OF BIDS
PROVIDE SIDE-BY-SIDE COMPARISON FOR ALL PROJECTS
GERMANTOWN FIRESTATION NO. 2 SELECTS THE BEST BIDDER
LEVERAGE RELATIONSHIPS
WITH SUBS
ADD CLIENT-
PREFERRED SUBS
OPEN AND
TRANSPARENT
BREAK INTO SMALLER
CATEGORIES
LOCAL
ADVERTISING
ASSIST WITH
QUALIFICATION PROCESS
BID EVERYTHING
OUT
MAXIMIZE LOCAL
BIDDERS
MORE COMPETITIVE BIDS
& CLIENT SAVINGS
CG Schmidt is firmly committed to a fair, transparent bidding process
while simultaneously remaining competitive with our own bids. As one of
the largest contractors in the area, CG Schmidt has the buying power to
provide the most competitive bidding for your project. Simultaneously, by
competitively bidding aspects of the project, we can divide it into smaller
work categories, allowing for greater participation by smaller local
subcontractors. We have outlined this process below in four simple steps
We will use our process to pre-qualify all subcontractors, including any of the Germantown Fire Department
Fire Station No. 2’s preferred subcontractors. We have a standard pre-qualification form that all subcontractors
complete prior to being considered.
We will carefully compare and scrutinize bids to:
» Prevent change orders
» Allow for local involvement and labor
» Maximize cost savings by obtaining the most ideas and lowest bids
» Thoroughly review scope
1
2
3
4
SELECTING SUBCONTRACTORS
SECTION 06
BIDDING &
PROCUREMENT
METHODOLOGY
Page 117 of 136
Safety & Quality
Management
Programs
07
FIRE STATION NO. 2
Page 118 of 136
35
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / SAFETY & QUALITY MANAGEMENT
Safety is a top priority, and we are committed to maintaining a safe and healthy environment for all workers on our projects. Our
safety record demonstrates this commitment, with a consistently low Experience Modification Rate (EMR) over the past four years.
In 2025, our team worked an impressive 778,074 hours, with 19 OSHA recordable incidents and only 2 recordable injuries or
illnesses resulting in days away from work. Additionally, our lost time accidents for the year totaled 2, showcasing our
proactive approach to minimizing workplace injuries.
CG Schmidt has no lawsuits or liens.
YEAR EMR OSHA Incident
Rate DART Rate
2025 0.85 0.99 0.00
2024 0.81 4.62 3.34
2023 0.68 3.22 2.58
2022 0.80 3.02 2.64
SAFETY IS OUR
#1 PRIORITY
ON THE JOBSITE
EMR & SAFETY METRICS
CG Schmidt’s Safety Manual is always available and
up-to-date on our website. View it here.
SAFETY FIRST
Click to View
INTERNAL SAFETY MANUAL
ZERO
LAWSUITS
WITH CLIENTS IN
106 YEARS
SECTION 07
SAFETY & QUALITY
MANAGEMENT PROGRAMS
Safety Management Program
A CG Schmidt Safety Stand-down meeting is
held before the day’s work begins.
Page 119 of 136
36
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / SAFETY & QUALITY MANAGEMENT
Safety in
Occupied Spaces
CG Schmidt’s experience delivering complex projects
of all sizes includes new construction, renovations,
relocations, and expansions within fully occupied,
mission-critical facilities.
We understand that fire stations must remain fully
operational at all times, and our approach prioritizes
uninterrupted response, clear circulation, and safe
separation between construction and daily operations.
Through disciplined phasing, secure fencing, clear
wayfinding and signage, and proactive communication,
we minimize disruption from noise, vibration, and
dust while maintaining readiness, safety, and staff
confidence throughout construction.
CG Schmidt Clean Room
To mitigate any risk of cross-contamination on active jobsites, we source
materials and tools dedicated for healthcare projects from a controlled
clean room at our construction yard.
The clean room contains:
» Inventory of high grade equipment
» Sanitation system to clean materials before storage
» HEPA filtration system and Edge Guard panels and doors create a
dust barrier system
» High-efficient LED lighting
» Commercial grade vinyl floor
Dedicated Clean Room
OF OUR PROJECTS
ARE COMPLETED IN
OCCUPIED SPACES.
Keeping staff and visitors
safe at all times is our top
priority during construction.
In tandem, we need to
ensure our activities do
not impact the day-to-
day operations of your
firestation.
We start by meeting with
the Germantown Firestation
teams to determine work
plans that address both
safety and disruption
concerns so our crews
can plan around them.
Regardless of the time
or activity, we guarantee
complete partitioning of
construction work with
ample fencing, safety
signage and other barriers.
OVER 70%
Page 120 of 136
37
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / SAFETY & QUALITY MANAGEMENT
SYSTEMS TO ENSURE QUALITY
Germantown Fire Department Fire Station No. 2 will benefit from:
» PRE-INSTALLATION MEETINGS // Prior to the implementation of any large work packages being put in place, our
team holds pre-installation meetings to review shop drawings and identify potentially problematic construction
details or schedule, weather or material concerns that could impact the quality of the work. This often involves
creating mock-ups for key items to verify the quality of the work and the material. By identifying these items before
the work is installed, we offer clarity and address potential issues before they become costly field conditions or
punch-list or warranty items.
» BENCHMARKING // The first step of every key installation is inspection to confirm it meets the requirements of
the documents and the expectations of stakeholders before it is replicated throughout the space.
» FIELD ENGINEERING AND TESTING PROGRAM // We work with the project team to develop a comprehensive
field engineering and testing program, making recommendations for appropriate levels of independent inspection
for systems and materials.
» QC CHECKLISTS AND AUDITS // Problem-free installation is greatly achieved by pre-planning installation and
reviewing requirements for correct installation with field teams who perform the work. However, we still utilize
quality control checklists and audits to confirm that installations are, in fact, properly completed before the work is
covered by the next sequential installation.
Instead of relying on post-installation inspections to find and fix quality
issues that add cost and waste time, CG Schmidt’s Quality Management
Program finds problems before they occur. Our Quality Management
Program increases value and cost accuracy while mandating overall
project quality by:
» Building quality directly into the plans and specifications by
collaborating with architects as they complete their drawings and
addressing difficult or unclear construction details before they
become part of the final construction documents.
» Highlighting work scope and building systems which may require
mitigation to avoid warranty call-backs and repairs.
ENSURING
PROACTIVE
QUALITY
ASSURANCE
& QUALITY
CONTROL
Quality Management Program
Page 121 of 136
Project
References
08
FIRE STATION NO. 2
Page 122 of 136
39
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / PROJECT REFERENCES
CLIENT CONTACT
West Allis West Milwaukee School
District
9333 West Lincoln Avenue
West Allis, WI 53227-2303
Michelle Strasser
Director of Rec and Community Services
(414) 604-3005
stram@wawmsd.org
Church of the Gesu
1210 West Michigan Street
Milwaukee, WI 53233
Raymond Ellingen
Director of Operations & Administration
(414) 288-7101
raymond.ellingen@marquette.edu
Grafton School District
1900 Washington Street
Grafton, WI 53024
Jeff Nelson
Superintendent
(262) 376-5414
jnelson@grafton.k12.wi.us
References
CG Schmidt has provided similar services as the scope of work for the
following clients.
EMPOWERING YOUR VISION,
FROM CONCEPT TO COMPLETION.
“It was our pleasure
to work with Joe
Hoffmeier. The project
had the potential to
very disruptive, given
the work that had to be
done on each floor. Your
team just did a great
job in being unobtrusive
and respectful of the
needs of our patients and
caregivers. We sincerely
appreciated it.”
Rick Kellar,
Aurora West Allis Medical Center
President
SECTION 08
PROJECT REFERENCES
From Left: Proposed team
members Steve Knetter,
Superintendent; Zach Singer,
Project Manager, and Joe
Hoffmeier, Managing Director
at The Germantwon Fire
Department Fire Station No. 2’s
jobsite walkthrough.
Page 123 of 136
Draft Contract
09
FIRE STATION NO. 2
Page 124 of 136
41
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 // DRAFT CONTRACT
AIA - A133 & AIA - A201
Please see separate attachment in email for
CG Schmidt’s full AIA A133 & A201 Template.
Page 125 of 136
Appendix
10
Addendum Fees
Addendum General Conditions
Site Logistics
FIRE STATION NO. 2
Page 126 of 136
43
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / APPENDIX
SECTION 09
APPENDIX
PRECONSTRUCTION SERVICES (LUMP SUM)
$21,500
CM FEE AS A PERCENTAGE OF THE COST OF WORK
2.34%
CM CONTINGENCY AS A PERCENTAGE OF THE COST OF WORK
3.00%
GENERAL CONDITIONS WITH RATES
Please see the below chart.
GENERAL CONDITIONS
(Assumes 9.5 Month Duration with 2 phases)
ITEM QUANTITY UNIT UNIT COST TOTAL COST
MANAGEMENT & SUPERVISION - 2027 RATES
Project Director 60 HR $206.00 $12,360
Project Manager (50%) 1104 HR $153.00 $168,912
Project Engineer 0 HR $125.00 -
General Superintendent 40 HR $177.00 $7,080
Superintendent (Full Time On Site) 1780 HR $153.00 $272,340
Project Coordinator 245 HR $85.00 $20,825
Project Accountant 72 HR $85.00 $6,120
Safety Manager 50 HR $153.00 $7,650
TOTAL $495,287
Fees & General Conditions
Page 127 of 136
44
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / APPENDIX
Site Logistics - East Option (Our Recommendation)
Page 128 of 136
45
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / APPENDIX
Site Logistics - North Option No. 1
Page 129 of 136
46
GERMANTOWN FIRE DEPARTMENT - FIRE STATION NO. 2 / / APPENDIX
Site Logistics - North Option No. 2
Page 130 of 136
cgschmidt.com
11777 West Lake Park Drive.
Milwaukee, WI 53224
Page 131 of 136
BUSINESS OF THE PUBLIC SAFETY COMMITTEE
GERMANTOWN, WI
MEETING DATE: May 6, 2026
AGENDA ITEM: Discussion
ITEM TITLE: Construction Manager at Risk, Request for Proposal
SUBMITTED BY: Chief Patrick Merten
SUMMARY EXPLANATION:
The Village Board approved the hiring of FGM Architects on April 20, 2026, to design the new
police department. The next step in the process is to select a Construction Manager at Risk
(CMAR) through a Request for Proposal (RFP) process.
The RFP will be published on Thursday, May 7, 2026. Interested firms may submit proposals
until 3:00 p.m. on May 18, 2026.
The Police Department Building Committee will evaluate all submitted proposals using a 100-
point scoring. The top two or three firms will be invited to participate in interviews during the
week of May 18, 2026.
Following the interviews, the committee will present its CMAR recommendation to the Public
Safety Committee on June 1, 2026.
ATTACHMENT: ORDINANCE___ RESOLUTION_____ OTHER__X__
RECOMMENDATION:
Page 132 of 136
REQUEST FOR PROPOSALS (RFP)
Construction Management at Risk (CMAR) Services
New Village of Germantown Police Department Facility
N122W17177 Fond du Lac Avenue, Germantown, WI
RFP No.: GPD 26 - 2
Issue Date: May 7, 2026
Proposals Due: May 18, 2026
Owner: Village of Germantown, Wisconsin
Architect of Record: FGM Architects
Estimated Construction Cost: Approximately $27 - $30 million
Page 133 of 136
SECTION 1: PROJECT OVERVIEW AND BACKGROUND
1.1 Project Overview
The Village of Germantown (the “Village”) is soliciting proposals from qualified firms to
provide Construction Management at Risk (CMAR) services for the construction of a new,
approximately 64,500 to 66,500 square foot Police Department facility. The project
includes the complete replacement of existing facilities and a substantial 2,500-foot
sanitary sewer and water main extension.
The project will be located at the site of the former DPW building, N122 W17177 Fond du
Lac Ave, Germantown, Wisconsin. The Village has concurrently retained FGM Architects as
the Architect/Engineering (A/E) team to lead the design. The CMAR will be integrated into
the project team at the 30% Design Milestone to provide pre-construction services, cost
estimating, and construction phase management.
1.2 Project Scope and Budget
• Total Construction Budget: Approximately $27 - $30 Million, inclusive of utility
extensions.
• Key Features: Modern police administration, investigation spaces, evidence
storage, indoor secure parking/sallyport, and live fire range.
• Site Challenges: Bedrock considerations, stormwater management (BMP), and
significant utility extensions.
SECTION 2: SCOPE OF CMAR SERVICES
The CMAR will work collaboratively with the Village and the A/E firm under a guaranteed
maximum price (GMP) contract.
2.1 Pre-Construction Phase
The CMAR shall provide comprehensive pre-construction services in coordination with the
Owner and FGMA, including:
• Cost Estimating: Provide detailed estimates at 30%, 60%, 90%, and 100% design
milestones. Reconcile estimates with the A/E team.
• Constructability Reviews: Evaluate design documents for clarity, trade
coordination, and "buildability," specifically regarding the live-fire range and
bedrock excavation.
• Value Engineering (VE): Propose cost-saving alternatives that do not compromise
the 30-year operational lifecycle of the facility.
• Scheduling: Develop a detailed baseline construction schedule including long-lead
equipment procurement (e.g., specialized HVAC for the range, electrical gear).
Page 134 of 136
2.2 Bidding and Procurement
The CMAR shall be solely responsible for all bidding and procurement services for
construction trade contracts, including bid packaging, advertisement, receipt, public
opening, evaluation, and recommendation of awards.
• Subcontractor Interest: Conduct outreach to ensure competitive bidding.
• Bid Packages: Develop and manage all bid packages in accordance with Wisconsin
municipal bidding requirements.
• GMP Proposal: Deliver a Guaranteed Maximum Price (GMP) at a point determined
by the Village (typically 60% or 90% CD).
2.3 Construction Phase
During construction, the CMAR shall serve as the constructor of record and shall be
responsible for:
• On-Site Management: Full-time supervision and project management.
• Safety & Quality Control: Implement a rigorous safety program and quality
inspections, particularly for specialized ballistics and ventilation systems.
• Reporting: Monthly progress reports, budget tracking, and schedule updates.
SECTION 3: SUBMISSION REQUIREMENTS
Proposals must include:
• Technical Proposal: Firm profile, relevant police project experience, proposed site-
specific staffing plan, proposed project team and resume, and project lead and
resume.
• Project Approach: Specific strategy for the utility extension, live-fire range
integration, project approach and understanding.
• Cost Proposal:
▪ Lump sum fee for Pre-Construction Services.
▪ CM Fee percentage for the Construction Phase.
▪ General Conditions estimate
▪ Bidding and procurement methodology
▪ GMP development approach
• Proof of Insurance and Bond ability: Ability to provide 100% Performance and
Payment Bonds for a $35M total project cost.
• A Draft Contract: AIA A133–2019
Page 135 of 136
SECTION 4: CONTRACT TERMS
The Village anticipates using the AIA A133–2019 (Standard Form of Agreement Between
Owner and Construction Manager as Constructor where the basis of payment is the Cost
of the Work Plus a Fee with a Guaranteed Maximum Price), modified for Wisconsin
municipal requirements.
SECTION 5: EVALUATION CRITERIA
Proposals will be scored based on a 100-point scale:
Criteria Points
Relevant Experience: Success with law enforcement facilities and live-fire
ranges. 5
Project Team: Qualifications of the specific Project Manager and Team. 30
Pre-Construction Approach: Methodology for estimating and GMP development
in the current market. 20
Schedule/Logistics: Plan for managing the Fond du Lac Ave site and utility
extensions 25
Fee Proposal: Pre-construction fee and CM fee percentage. 10
Safety and Quality Management: Successful project outcomes. 10
SECTION 6: RFP SCHEDULE
To align with the A/E selection and the 30% design milestone, the following schedule is
established:
Milestone Date
RFP Issued May 7, 2026
Proposals Due May 18, 2026 at 3 PM
Interviews (Top Firms) Week of May 18, 2026
CMAR Selection/Award June 1, 2026
Submit To: Heidi VanBeek, Administrative Assistant
hvanbeek@germantownwi.gov
Hard copies to be delivered to Germantown Village Hall, Department of Public Works.
Page 136 of 136
Source: Village of Germantown website. First collected Oct 18, 2026.