Public Works & Highways Committee — Agenda Packet
Village of Germantown · Washington County · Public Works & Highways Committee · meeting of Apr 1, 2026 · Agenda packets
Open the original document More from Village of Germantown
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MEETING: REGULAR MEETING OF THE PUBLIC WORKS &
HIGHWAYS COMMITTEE
DATE & TIME: Wednesday, April 1, 2026 at 5:30 PM
LOCATION: Germantown Village Hall Board Room
N112 W17001 Mequon Road
Any member of the body and/or citizen may attend the meeting virtually through the WebEx platform, Meeting #: 2555 672 0428 Password:
ZNmFyjsD343 which can be accessed by phone at 408-418-9388 or by logging on
at: https://villageofgermantown.my.webex.com/villageofgermantown.my/j.php?MTID=mc28ed9f85300bb8f63267a15d2f40b55
Citizens not wishing to attend the meeting personally or virtually may submit any public comments by sending an email
to comments@germantownwi.gov by 4 p.m. on the day of the meeting so that it can be provided to the members of the body for their
consideration. Previously recorded Village Board Meeting Videos can be viewed at
https://www.youtube.com/channel/UCOYp0EgELzTCa9X_iCohyhQ.
AGENDA
I. CALL TO ORDER: This meeting has been given public notice in accordance with
Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public
and news media of subject matter that is intended for consideration and action.
II. ROLL CALL:
III. MEETING MINUTES:
A. March 4, 2026
IV. PUBLIC COMMENT: Please be advised per State Statute Section 19.84(2),
information will be received from the public. It is the policy of this municipality that there
be a four-minute time period, per person, with time extensions per the Chief Presiding
Officer’s discretion; be further advised that there may be limited discussion on the
information received, however, NO ACTION will be taken under public comments.
Comments that may be injurious to village personnel or other individuals will not be
allowed.
V. UNFINISHED BUSINESS:
VI. NEW BUSINESS:
A. Purchase of a Jacobsen turf mower from Horst Distributing with trade-in value
of $10,000.00 for an amount not to exceed $152,950.00. (ACTION)
B. Update on the removal of sprinkler heads at the Senior Center. (DISCUSSION)
C. Acceptance of Improvements constructed by Wolf Paving for the 2025 Road
Program to begin the one year warranty period. (ACTION)
D. Award of a contract to Visu Sewer to repair storm pipe with cured-in-place pipe
liner in Hickory Drive for an amount not to exceed $36,487.50. (ACTION)
E. Annual Separated Storm Sewer System (MS4) Report. (DISCUSSION)
F. Consideration of a change order with Great Lakes TV & Seal for additional
storm sewer cleaning not to exceed $23,686.00. (ACTION)
Page 1 of 52
PUBLIC WORKS & HIGHWAYS COMMITTEE AGENDA
April 1, 2026
Page 2
G. Authorization of a reduction to the Letter of Credit (LOC) for the Wrenwood
North subdivision in the amount of $215,500.00 for a proposed new LOC
amount of $181,000.00. (ACTION)
H. ARIP award to reconstruct Pioneer Rd from Division Rd / CTH G to Country
Aire Dr / CTH M. (DISCUSSION)
VII. DIRECTOR'S REPORT:
VIII. NEXT MEETING DATE:
IX. ANNOUNCEMENTS:
X. ADJOURNMENT:
UPON REASONABLE NOTICE, efforts will be made to accommodate the needs of disabled individuals through
appropriate aids and services. For additional information or to request this service, please contact the Village
Clerk at (262)250-4745 at least 2 days prior to the meeting.
Notice is hereby given that a possible quorum of other boards, committees, and/or commissions may attend this
meeting to gather information about an item over which they have decision-making responsibility. This may
constitute a meeting of these bodies per State ex rel. Badke v Greendale Village Board, even though these
bodies will not take formal action at this meeting.
Page 2 of 52
MEETING: REGULAR MEETING OF THE PUBLIC WORKS &
HIGHWAYS COMMITTEE
DATE AND TIME: Wednesday, March 4, 2026 5:30 PM
LOCATION: Germantown Village Hall Board Room
N112 W17001 Mequon Road
MINUTES
I. CALL TO ORDER:
Chairperson Kaminski called the Public Works and Highways Committee meeting to
order at 5:31PM.
II. ROLL CALL:
Present: Trustee Terri Kaminski, Trustee Rick Miller, Trustee Robert Warren, Trustee
Jan Miller
Absent: None
Excused: None
Also Present: None
III. MEETING MINUTES:
A. February 4, 2026 (ACTION)
Motion: Approve as presented
Motioned By: Rick Miller
Seconded By: Robert Warren
Yes: Terri Kaminski, Rick Miller, Robert Warren, Jan Miller
No: None
Abstain: None
Motion Passed (Yes 4, No 0, Abstained 0)
IV. PUBLIC COMMENT:
Three citizens spoke:
Norman Berger of W141N9978 Seven Pines Way spoke about garbage pick up and
fees.
Gary Konop of N117W17815 Augusta Ct spoke about the proposed sidewalk map.
Melanie Smythe of N140W17938 Cedar Lane spoke about the procedure for hiring
new Director of Public Works.
Unidentified person on Webex from Lake Park West spoke about the proposed
sidewalk map.
V. UNFINISHED BUSINESS:
None
VI. NEW BUSINESS:
A. A Resolution to adopt an Official Snow and Ice Removal Map as required by
the update to Municipal Code 8.02. (ACTION)
Page 3 of 52
Page 2
Village Administrator, Steven Kreklow, explained the history of the proposed Official
Snow and Ice Removal Map which was previously presented by the former Director of
Public Works, Matt Mortwedt. HPBG Superintendent, Scott Anderson, explained the
reasoning for the proposed map.
Motion: Approve as presented
Motioned By: Robert Warren
Seconded By: Rick Miller
Yes: Terri Kaminski, Rick Miller, Robert Warren
No: Jan Miller
Abstain: None
Motion Passed (Yes 3, No 1, Abstained 0)
B. Contract with Dan Larsen Landscaping for spring tree planting for an amount
not to exceed $27,866.00. (ACTION)
HPBG Superintendent, Scott Anderson, requested approval of a contract with Dan
Larsen Landscaping for spring tree planting not to exceed $27,866.00.
Motion: Approve as presented
Motioned By: Robert Warren
Seconded By: Rick Miller
Yes: Terri Kaminski, Rick Miller, Robert Warren, Jan Miller
No: None
Abstain: None
Motion Passed (Yes 4, No 0, Abstained 0)
C. Purchasing street lighting fixtures from Graybar for an amount not to exceed
$112,226.58. (ACTION)
HPBG Superintendent, Scott Anderson, explained the project will greatly reduce staff
time spent responding to outages due to recent lamp failures. Increased visibility
would also be a safety improvement, especially at major intersections in the project
areas. County Line Road, Appleton Avenue, Lannon Road, Pilgrim Road, River Lane
and the Maple Road Industrial Park are some of the areas where the project will have
the greatest impact.
Motion: Approve as presented
Motioned By: Jan Miller
Seconded By: Robert Warren
Yes: Terri Kaminski, Rick Miller, Robert Warren, Jan Miller
No: None
Abstain: None
Motion Passed (Yes 4, No 0, Abstained 0)
D. Development Handbook (DISCUSSION)
Page 4 of 52
Page 3
Village Engineer, Kevin Driscoll, discussed possible changes to language in the
Development Handbook. This was a discussion only item.
E. Telecom Consultant RFP Award. (ACTION)
1st Motion: Move order of Items: Item F before Item E
Motioned By: Rick Miller
Seconded By: Jan Miller
Yes: Terri Kaminski, Rick Miller, Robert Warren, Jan Miller
No: None
Abstain: None
1st Motion Passed (Yes 4, No 0, Abstained 0)
Village Engineer, Kevin Driscoll, discussed Consultant RFPs submitted to the Village
and the multiple options.
2nd Motion: Entry into Consultant Agreement with Clark Dietz to provide permit
reviews, site inspection, and costs to be reimbursed by fiberoptic companies.
Motioned By: Robert Warren
Seconded By: Jan Miller
Yes: Terri Kaminski, Rick Miller, Robert Warren, Jan Miller
No: None
Abstain: None
2nd Motion Passed (Yes 4, No 0, Abstained 0)
F. Consideration of approval to enter into agreements with respective utility
companies to allow the Village to pass through costs of Consultant Permit
Reviews and Inspection Services. (ACTION)
Village Engineer, Kevin Driscoll, explained in coordination with the Village Attorney,
Village staff are looking to establish agreements with the respective fiberoptic utility
applicants. These agreements are intended to recover 100% of the costs associated
with permit review and inspection of the fiberoptic work. The Village is looking to
contract consultant services for permit reviews and inspections. Village staff have
been in communication with the prospective applicants of the respective utility
companies regarding these agreements based on 8.065.
Motion: Recommend approval to the Village Board to enter into an agreement with
the respective Utility companies that allows the Village to pass through costs of
consultant permit reviews and inspection services contingent upon final review of the
Village Attorney.
Motioned By: Robert Warren
Seconded By: Rick Miller
Yes: Terri Kaminski, Rick Miller, Robert Warren, Jan Miller
No: None
Abstain: None
Page 5 of 52
Page 4
Motion Passed (Yes 4, No 0, Abstained 0)
G. Consideration of award of contract to Ruekert & Mielke for consultant services
to improve Main Street Lift Station and Old Farm Lift Station not to exceed
$532,659.00. (ACTION)
Wastewater Superintendent, Tim Zimmerman, requests the Public Works and
Highways Committee recommend to the Village Board the award of a contract for
Consultant Design Services to Improve Main Street Lift Station and Old Farm Lift
Station and Force Mains to Ruekert Mielke on a time and materials basis in an amount
not to exceed $532,659.00.
Motion: Approve as presented
Motioned By: Jan Miller
Seconded By: Robert Warren
Yes: Terri Kaminski, Rick Miller, Robert Warren, Jan Miller
No: None
Abstain: None
Motion Passed (Yes 4, No 0, Abstained 0)
H. Stormwater Ordinance Updates resulting from DNR MS4 Audit. (ACTION)
Village Engineer, Kevin Driscoll, discussed Stormwater Ordinance updates regarding
pond maintenance amendment.
Motion: Postpone and come back with additional language for an amendment to the
ordinance following consultation with the Village Attorney regarding long-term
maintenance agreements retroactively.
Motioned By: Rick Miller
Seconded By: Robert Warren
Yes: Terri Kaminski, Rick Miller, Robert Warren, Jan Miller
No: None
Abstain: None
Motion Passed (Yes 4, No 0, Abstained 0)
VII. DIRECTOR'S REPORT:
There was no March Director's Report due to the vacancy of the position. Village
Administrator, Steven Kreklow, gave an update on the hiring process for the new
Director of Public Works. The Village Board decided to hire internally, and four
applications were received by the deadline. Interviews are to be scheduled for next
week.
VIII. NEXT MEETING DATE:
The next Public Works and Highways Committee Meeting will be held on April 1, 2026
at 5:30PM.
IX. ANNOUNCEMENTS:
None
Page 6 of 52
Page 5
X. ADJOURNMENT:
Chairperson Kaminski adjourned the meeting at 7:29PM.
Page 7 of 52
From: crb crb
To: Comments
Subject: PUBLIC WORKS & HIGHWAY MEETING 3-4-26
Date: Tuesday, March 3, 2026 4:45:46 PM
CAUTION: This email originated from outside the organization.
Do not click links or open attachments unless you recognize the sender and know the content is
safe.
Hello,
We highly disagree with the map of the snow removal drawings.
First, we don't know how many years the village has been doing the snow removal on certain
sidewalks in the village.
But do know, if been a very long time.
We believe you should continue what has been done up to now.
Going forward ANYTHING NEW, SHOULD NOT BE DONE AT ALL!
EXAMPLE: Holy Hill Rd and going south by Truck Country.
We know for sure these are newer area that are on the map for sure.
EXAMPLE: Pilgrim Rd. It shows the village does some but not all of it. Then take a look at
County line Rd by Tree Tops too!
So, will the person who is doing the clearing of the snow, lift the blade and drive over the
snow on the side walk they will not be moving? Really????
Plus the village agree with all developers when they put the sidewalks in.
EXAMPLES: LAKE PARK & BLACKSTONE CREEK PROPERTIES.
Did the village send out notices to every home on the map showing what will be effect as of
now if this pass?
How residents reply back to the village on this?
OR
SUPRISE??
Guess What!! This is how it will be!
Like we said going forward, NO MORE ADDING OF REMOVAL OF SNOW ON SIDEWALKS TO BE
REMOVE.
Make sure on any new development where they have to put a sidewalk in, it is "SPELLED OUT"
in the village agreement with the developer too.
Do you really want to have more residents upset with the village?
But it is ok'd to give out RETENTION BONUSES TO EMPLOYEES?
Guess again!
We still didn't forget about the $43,000.increases one employee has receive over a short
Page 8 of 52
period of time!
Do we need to list the rest of them?
Yes, we understand the cost of the machine to be replace,
But it is ok'd to give out money left and right to the village employees?
The village needs to make cuts, then cuts the bonuses and buying a truck or ?
Also, remember what is going on in this world right now too!
This will effect everyone !
We have no control over this.
But you as a committee have control over things and how it will effect the residents.
The Schneider's
Page 9 of 52
From: john yatso
To: Jan Miller; Comments
Subject: Public Works Committee Sidewalk plowing map March 4, 2026
Date: Sunday, March 1, 2026 8:27:24 PM
Some people who received this message don't often get email from johnyatso@gmail.com. Learn why this is
important
CAUTION: This email originated from outside the organization.
Do not click links or open attachments unless you recognize the sender and know the content is
safe.
Dear Village Trustees,
I am writing to express my significant concerns regarding the proposed
"winter sidewalk maintenance map" and the associated proposal to
transfer the responsibility of sidewalk plowing from the Village to
individual residents and property owners. I reside in the area of Lark
Park West, and this proposal has considerable negative implications for
our neighborhood and potentially many others throughout the Village.
My primary concerns stem from the financial and logistical burden this
transfer of responsibility would place on residents. As noted in recent
budget discussions, the Village currently lacks the $170,000 needed to
purchase a new snow blower to maintain these sidewalks. If the Village,
with its resources and equipment, cannot manage this cost, it is
unreasonable to expect residents at Lark Park West, to purchase the
necessary equipment (such as a snow blower) to effectively clear public
sidewalks. We lack the resources and capacity to maintain these public
right-of-ways safely and consistently.
We understand that budget considerations are difficult. However, we
urge the Board to explore alternative solutions. The suggestion of
reallocating existing resources, such as potentially selling surplus
snowplows to fund a dedicated sidewalk maintenance program, seems
like a viable option worth exploring before downloading the
responsibility onto residents. The current approach appears to prioritize
equipment inventory over resident safety and accessibility.
Sidewalk plowing is one of those services that directly affect daily life—
especially in winter communities like Germantown. When neighboring
Page 10 of 52
cities such as West Bend and Mequon take responsibility for clearing
sidewalks, it sets a visible standard. If Germantown doesn’t match that,
residents understandably feel the gap in service. I noticed both of these
communities clear their sidewalks.
The maintenance of public sidewalks is a matter of public safety,
accessibility for all residents (including those with mobility challenges),
and community well-being. A patchwork of maintenance efforts driven
by individual capacity is not an effective solution.
We ask that this committee consider a proposal to keep the current map
"as is" and future developments are tasked with plowing their sidewalks,
and work towards a solution that ensures the Village maintains its
responsibility for safe and accessible sidewalks for all residents.
Thank you for your time and attention to these critical concerns.
Sincerely,
John Yatso
Lark Park West Vice President
Page 11 of 52
BUSINESS OF THE PUBLIC WORKS COMMITTEE & VILLAGE BOARD
GERMANTOWN, WI
MEETING DATE: Wednesday, April 1 st, 2026
AGENDA ITEM: New Business
ITEM TITLE: 2026 Jacobsen Turf Mower Purchase
SUBMITTED BY: Scott Anderson: Highway, Parks, Building & Grounds Superintendent
SUMMARY EXPLANATION:
Funds were allocated as part of the 2026 Parks Department capital budget in the amount of
$150,000.00 for the purchase of a 16’ turf mower. This machine is a direct replacement for one of
the sidewalk tractors which was originally proposed in the budget. This machine will be utilized 3-
4 days per week during the mowing season, and will be responsible for mowing larger areas of
turf, not limited to, but primarily in our park system.
Staff solicited bids from two regional vendors, and the pricing is outlined below highlighted in
grey. The machine is currently priced at $162,950.00, which leaves a $12,950.00 budget shortfall.
The capital line item used to purchase this mower also has the funding for the previously approved
parks department pick-up truck. The pick-up truck pricing has come back favorably and there is
$4,000.00 remaining in the same capital account. This brings our shortfall down to $8,950.00.
There are two options that can be used to close the remaining shortfall. One would be to auction
the old sidewalk tractor and use the funding to close the gap. The average auction sales price for
the sidewalk tractor is $10,883.00 The other option is to trade-in our old sidewalk tractor. The
vendor has offered the village $10,000.00 in trade-in value. Please see the figures below for clarity.
Total purchase price: $162,950.00
Trade-in value: $10,000.00
Final sale price: $152,950.00
Original budget: $150,000.00
Shortfall covered in same capital account: $2,950.00
Horst Distributing: $162,950.00 Chilton, Wisconsin
TurfWerks: $179,245.00 Oakdale, Minnesota
ATTACHMENT: ORDINANCE_____ RESOLUTION_____ OTHER _____
RECOMMENDATION:
Staff recommends purchasing a Jacobsen HR800 16’ turf mower with the trade-in value of
$10,000.00, for an amount not to exceed $152,950.00 and to forward this request onto the Village
Board with a positive recommendation. If approved, funds shall be allocated from the Park
Department capital account: 40564000-592200.
COMMITTEE ACTION:
Proper parliamentary procedure to deny a request is to have a motion made in the affirmative and
by voting NAY would deny the request if a majority vote.
Page 12 of 52
Page 13 of 52
Oakdale, MN - Johnston, IA - Omaha, NE - St Louis, MO
Equipment QUOTE
Customer Name Village of Germantown Date 3/23/26
Account Number Ship Address
Contact Person MATT KOLBOW City GERMANTOWN
Phone Number State WI
Mobile Number Zip Code
Fax Number Email Address
PO Number: X Quote Expires:
Deliver Date: X Special Terms:
MODEL # QTY PRODUCT DESCRIPTION UNIT PRICE TOTAL
1 2026 JACOBSEN HR800 CAB UNIT 179,245.00$
WITH HEAT/LIGHTS/AMBER BEACON
Notes Subtotal 179,245.00$
Sales Tax -$
TOTAL 179,245.00$
Page 14 of 52
BUSINESS OF THE PUBLIC WORKS COMMITTEE & VILLAGE BOARD
GERMANTOWN, WI
MEETING DATE: Wednesday, April 1 st, 2026.
AGENDA ITEM: New Business
ITEM TITLE: 2026 Senior Center Fire Suppression Report (No action necessary)
SUBMITTED BY: Scott Anderson: Highway, Parks, Building & Grounds Superintendent
SUMMARY EXPLANATION:
Members of the Public Works Committee may recall that in December of 2025, staff recommend
the decommissioning the existing fire suppression system at the Senior Center. As discussed in
December, having a fire suppression system in place at the facility was not a code requirement and
the system needed costly upgrades to perform as necessary in the event of being needed. The
system was drained in December and will generally be decommissioned in place. The draining of
the system and subsequent antifreeze disposal were contracted through US Fire Protection and paid
for out of the general fund Senior Center operating budget.
There is a code requirement that once decommissioned, any visible signs of the system must be
removed from view. Because the topic was identified and discussed after the 2026 budget was well
underway, no funding existed for the remaining work in 2026. Regardless of budget, staff obtained
pricing for the remaining work, which in the end, consists of removing the visible sprinkler heads
from the facility. The village received a proposal for $16,590.00 to complete the removal. As staff
considered the task, the possibility of completing the work in house was also a consideration. Staff
completed several “test” removals in order to identify an estimated amount of time needed to
complete the work. Our cost internal cost estimated compared to the proposed amount showed
significant savings to the village and our overall budget. DPW staff started the removal in late in
late February, completing it in early March. Our time and materials equated to $7,135.00 to
complete the work in house, which provided the village with a $9,455.00 overall savings for
something that was ultimately unbudgeted.
I am proud of our team and wanted to take the opportunity to highlight the project and overall
savings. Having staff who are willing to step into unfamiliar tasks and complete extra work when
necessary are a benefit to the village and certainly worth highlighting.
_________________________________________________________________________
ATTACHMENT: ORDINANCE_____ RESOLUTION_____ OTHER _____
RECOMMENDATION:
No action item.
COMMITTEE ACTION:
No action item.
Page 15 of 52
Senior Center Sprinkler Removal Project
Materials & Supplies
Date Items Qty. Cost per itemTotal Cost
18-Feb Menards $ 54.99
19-Feb Menards $ 6.45
25-Feb Menards $ 66.27
26-Feb 5" Ceiling Cover Plates 23 $ 11.99 $ 275.77
26-Feb 1" Square Pipe Plug 90 $ 1.41 $ 126.90
26-Feb Menards $ 13.24
6-Mar Menards $ 38.26
Total Cost of Supplies & Materials $ 581.88
Staff Hours & Cost
Position Hours Hourly Rate Total Income
Crew Leader 8 $ 34.38 $ 275.04
Heavy Equipment Operator 82 $ 33.35 $ 2,734.70
Operator 89 $ 33.96 $ 3,022.44
Total Staff Cost $ 6,032.18
Contracted Services
Contractor Qty. Cost per unitTotal Cost
Enviro-Safe
Propylene Glycol 1 $ 165.00 $ 165.00
Supplied Empty Container 1 $ 85.00 $ 85.00
Transporation 1 $ 155.00 $ 155.00
Fuel Surcharge 1 $ 60.00 $ 60.00
Environmental, Insurance & Security Fee 1 12% $ 55.80
Total Disposal Cost $ 520.80
Project Total Cost $7,134.86
Proposed Contractor Price* ###########
Money Saved $9,455.94
% Saved 57%
*contractor price + cost of disposal (not included in proposal)
Page 16 of 52
BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE
GERMANTOWN, WI
MEETING DATE: April 1, 2026
AGENDA ITEM: New Business
ITEM TITLE: Acceptance of Improvements – 2025 Road Program Pavement
Reconstruction Project #2502 by Wolf Paving Co., Inc.
SUBMITTED BY: Kevin Driscoll – Village Engineer
SUMMARY EXPLANATION:
The Public Works and Highway Committee and Village Board approved the 2025 Annual Road
Improvement Projects in March 2025, where notice of this work was transmitted to adjacent
property owners; a pre-construction meeting was held with Village staff and the Contractor ; the
work was inspected; work was substantially completed in September 2025, payment applications
were processed except for retainage ; and the punchlist is complete. The Engineering staff has
inspected this paving projects in Maple Road from Lannon Road to I-41 bridge, Wagon Trail from
Donges Bay Road to a point north of the Jefferson Creek, Main Street Sidewalk, Catie Vista
Subdivision including Montgomery Drive, Francese Drive and Sylvan Circle (#2502), and found
the improvements to be acceptably built per contract documents, plans and specifications.
ATTACHMENT: ORDINANCE RESOLUTION OTHER _____
Exhibit A - Notice of Acceptance to Wolf - EJCDC Form (C-626-2018)
RECOMMENDATION:
It is the Engineering Department recommendation to accept the improvements as constructed by
Wolf Paving for the 2026 Road Program projects (#2502), and begin the one year warranty period
effective today.
COMMITTEE ACTION:
A motion to support authorize staff and a vote “Aye” is in the affirmative to support the contract
award.
Page 17 of 52
EJCDC® C-626, Notice of Acceptability of Work.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 1
NOTICE OF ACCEPTABILITY OF WORK
Owner: Village of Germantown Owner’s Contract No: 253102
Engineer: Germantown Engineering Dept. Engineer’s Project No.: 2502
Contractor: Wolf Contractor’s Project No.:
Project: 2025 Road Improvement Projects
Contract Name: #2502 ARIP Road Improvements
(Maple Rd, Wagon Trl, Catie Vista, Main St.)
Notice Date: 4/2/2026
Effective Date of the
Construction Contract: 4/7/2025
The Engineer hereby gives notice to the Owner and Contractor that Engineer recommends final payment
to Contractor, and that the Work furnished and performed by Contractor under the Construction Contract
is acceptable, expressly subject to the provisions of the Construction Contract’s Contract Documents
(“Contract Documents”) and of the Agreement between Owner and Engineer for Professional Services
dated [date of professional services agreement] (“Owner-Engineer Agreement”) . This Notice of
Acceptability of Work (Notice) is made expressly subject to the following terms and conditions to which
all who receive and rely on said Notice agree:
1. This Notice has been prepared with the skill and care ordinarily used by members of the
engineering profession practicing under similar conditions at the same time and in the same
locality.
2. This Notice reflects and is an expression of the Engineer’s professional opinion.
3. This Notice has been prepared to the best of Engineer’s knowledge, information, and belief as of
the Notice Date.
4. This Notice is based entirely on and expressly limited by the scope of services Engineer has been
employed by Owner to perform or furnish during construction of the Project (including
observation of the Contractor’s Work) under the Owner-Engineer Agreement, and applies only to
facts that are within Engineer’s knowledge or could reasonably have been ascertained by Engineer
as a result of carrying out the responsibilities specifically assigned to Engineer under such
Owner-Engineer Agreement.
5. This Notice is not a guarantee or warranty of Contractor’s performance under the Construction
Contract, an acceptance of Work that is not in accordance with the Contract Documents, including
but not limited to defective Work discovered after final inspecti on, nor an assumption of
responsibility for any failure of Contractor to furnish and perform the Work thereunder in
accordance with the Contract Documents, or to otherwise comply with the Contract Documents
or the terms of any special guarantees specified therein.
6. This Notice does not relieve Contractor of any surviving obligations under the Construction
Contract, and is subject to Owner’s reservations of rights with respect to completion and final
payment.
Engineer
(signature):
Name (printed): Kevin Driscoll
Title: Village Engineer
Exhibit A
Page 18 of 52
BUSINESS OF THE PUBLIC WORKS COMMITTEE & VILLAGE BOARD
GERMANTOWN, WI
MEETING DATE: April 1, 2026
AGENDA ITEM: New Business
ITEM TITLE: Storm Sewer Repair with Cured-In-Place Lining in Hickory Drive
SUBMITTED BY: Kevin Driscoll, P.E.- Village Engineer
SUMMARY EXPLANATION: Hickory Drive was paved and new shoulder placed in
2024. Following the August 2025 storm event a hole appeared in the shoulder. Staff
cleaned the storm sewer pipe and requested pricing repair the storm sewer. Prices were
quoted from Visu Sewer and Michels Pipeline company. InSitu-Form did not respond.
ATTACHMENT: ORDINANCE RESOLUTION OTHER X
Exhibits of Location Map and Quotes
RECOMMENDATION: Staff requests the Public Works and Highway Committee
recommend that Visu -Sewer, Inc. install the 235-ft of cured-in-place-pipe liner to repair
the storm system repair to Visu Sewer in an amount of $36,487.50 to install to the Village
Board.
COMMITTEE ACTION:
Proper parliamentary procedure to deny a request is to have a motion made in the
affirmative and by voting NAY would deny the request if a majority vote.
Page 19 of 52
Print Date: 12/11/2025
Village of Germantown GIS
CIPP Lining 15-inch dia. Storm
1,200.00
Village Of Germantown
N112 W17001 Mequon Road
Germantown, WI 53022
262-250-4700
SCALE: 1 = 100'
DISCLAIMER:
This map is not a survey of the actual boundary of any property this map depicts.
The Village of Germantown Does not guarantee the accuracy of the material contained here in and
is not responsible for any misuse or misrepresentation of this information or its derivatives.
W215 N10072 HICKORY DR
GTNV_312039
W215N10095 HICKORY DR
GTNV_312062
W215N10075 HICKORY DR
GTNV_312067
W215N10083 HICKORY DR
GTNV_312068
312-023
312-024
312-021
312-022
Section 31, NW 1/4
W/S Pipe ID: 312-021 - 312-022
E/S Pipe ID: 312-023 - 312-024
Page 20 of 52
www.visu-sewer.com
WISCONSIN - ILLINOIS - MINNESOTA - IOWA - MISSOURI - VIRGINIA - OHIO
Proposal
To: Kevin Driscoll From: Mike Olsen
Village of Germantown Visu Sewer, LLC.
N112 W17001 Mequon Road W230 N4855 Betker Dr.
Germantown, WI 53022 Pewaukee, WI 53072
262-250-4724 262-695-2340
Date: 12/31/2025 Project: Hickory Road Storm Sewer CIPP Installation
_____________________________________________________________________________________________
Visu-Sewer is pleased to provide the following quotation for CIPP installation:
Item 1 – 312-023-312-024:
Install 145 linear feet of 15" National Liner @ $126.50 per linear foot $18,342.50
Item 2 – 312-21-312-22:
Install 190 linear feet of 15" National Liner @ $95.50 per linear foot $18,145.00
The above listed prices are based on a video inspection dated 11/6/2025 and above ground, visual inspection and
assume the current pipe condition is suitable for CIPP installation utilizing air pressure for the inversion and hot air/
steam for curing. Pricing includes:
- Labor, material, and equipment.
- Mobilization and Traffic Control
- Light cleaning (up to two (2) passes) and televising of sewers prior to installation.
- Installation of National Liner per manufacturer's instructions, ASTM 1216.
- Fully Structural CIPP – 6.0 mm finished thickness
- Televising sewers after installation.
NOTES: The above listed prices are based on the assumption that Item 2 will be completed in conjunction with Item 1 or
Item 1 will be completed on it’s own. Due to the host pipe’s condition and configuration, The final CIPP may have defects
(e.g., wrinkles, lumps, etc.) and will be accepted “AS IS”. Due to volatility in material pricing and availability this
proposal is valid for 30 days from the date of origination. If a signed proposal has not been received within 30 days
price(s) may be adjusted upon mutual agreement, or the proposal may be withdrawn by either party.
The Village of Germantown shall provide: drivable equipment access to all inlets/outlets, water from nearby
hydrants (without charge), a dump site for captured debris, and traffic control beyond cones and signs. If needed,
removal of obstructions (e.g., roots, deposits, and protruding taps), and heavy cleaning with vacuum extraction will
be completed at a T&M rate of $465.00 per hour. If needed, grouting of active leaks will be quoted separately. If it is
determined that current pipe conditions are not suitable for an air inversion and hot air/ steam cure, pricing may be
adjusted to reflect alternate installation methods. Mobilization and/ or time on site will be billed at a T&M rate of
$465.00 per hour for pipe sections not suitable for CIPP installation. Thank you for the opportunity to quote on this
project. Please do not hesitate to call if you have any questions.
Page 21 of 52
_____________________________________________________________________________________________
All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike manner according to standard practices or specific ations submitted. Any alteration or
deviation from the above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements
contingent upon strikes, accidents, or delays beyond our control. The owner to carry fire, tornado, and other necessary insurance. If a collapse of the original pipe results during the lining
process, Visu-Sewer, LLC. will not be held liable for costs associated with excavation, repairs, or restoration. Our workers are fully covered by Workmen's Compensation Insurance. Time and
material rates are charged "port to port". This proposal may be withdrawn if not accepted within 30 days of issue . Terms - Net 30 days.
Acceptance of Proposal
The above prices / conditions are satisfactory and are hereby accepted. Visu-Sewer, LLC. is authorized to do the
work as specified.
Date: _________________ Signature: ______________________________________
Page 22 of 52
Date: 12/19/2025
Attention: Kevin R. Driscoll – Village of Germantown, Village Engineer
Project: Hickory Drive Culvert Cleaning & Lining
Michels Trenchless Inc. (MTI), a MICON Group Company, is pleased to have the opportunity to provided budgetary
pricing to supply the labor, supervision, equipment, and materials necessary to complete the items of work as listed below.
Class III Budget Pricing: (-20%/+30%)
Item Description Quantity U/M Unit Extension
1 Michels Mobilization 1 LS $41,616.00 $41,616.00
2 East and West Pipe Cleaning 335 LF $30.00 $10,050.00
3 East Pipe CIPP 145 LF 330.00 $47,850.00
4 West Pipe CIPP 190 LF 330.00 $62,700.00
5
Total $162,216.00
Michels Budgetary Estimate is Based on the Following Assumptions:
1. Above estimate is for 2025 construction, escalations could take affect for future years’ construction. Michels has not
included winter construction costs.
2. Michels proposal is based on executing all work in one mobilization to and from project site.
3. Owner must provide legal right of way access and physical “drive to” access to both Upstream and Downstream
manholes for equipment and personnel to perform all aspects of Clean/CCTV/CIPP operations. This shall include
coordinating permission/access/notifications/special permits.
4. Includes televising of pipe prior to CIPP installation. No Sonar inspection included.
5. Includes post-CCTV inspection of pipe after CIPP installation.
6. Estimate is based on working 10-12 hours/day 5-days/week.
7. No bypass and temporary water diversion anticipated. Work to be done in dry weather.
8. Final restoration and erosion control to be provided by others.
9. Water supply to be provided by owner at no cost to MTI.
10. CIPP Samples and Stamped CIPP Designs included in above price.
11. Local traffic control (signs and cones only) included in above pricing.
12. Liner thickness based on assumed based on limited data. Pipe depth variation will increase liner thickness.
13. Cleaning based on light debris depths in pipe.
Thank You,
Vance Rath
Senior Estimator
Michels Trenchless
Page 23 of 52
BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE
GERMANTOWN, WI
MEETING DATE: April 1, 2026
AGENDA ITEM: New Business
ITEM TITLE: Municipal Separated Storm Sewer System (MS4) Annual Report to
the Wisconsin Department of Natural Resources (WDNR)
SUBMITTED BY: Kevin Driscoll – Village Engineer
SUMMARY EXPLANATION:
The Village of Germantown is required to submit an annual report to the Wisconsin Department
of Natural Resources for the Municipal Separated Storm Sewer System (MS4) to adhere with the
Wisconsin Pollutant Discharge Elimination System (WPDES) permit requirements. It is attached
for reference and will also be posted to the Village's website.
ATTACHMENT: ORDINANCE RESOLUTION OTHER __X___
Annual Report
RECOMMENDATION:
Informational Item only
COMMITTEE ACTION:
Informational Item only
Page 24 of 52
Submittal of Annual Reports and Other Compliance Documents for Municipal
Separate Storm Sewer System (MS4) Permits
NOTE: Missing or incomplete fields are highlighted at the bottom of each page. You may save, close an d return to your draft permit as often as necessary to complete
your application. After 120 days your draft is deleted.
Form 3400-224(R8/2021)
Reporting Information :
Will you be completing the Annual Report or other submittal type? Annual Report Other
Is this submittal also satisfying an Urban Nonpoint Source Grant funded deliverable? Yes No
Required Attachments and Supplemental Information
Please complete the contents of each tab to submit your MS4 permit compliance document. The information
included in this checklist is necessary for a complete submittal. A complete and detailed submittal will help us
review about your MS4 permit document. To help us make a decision in the shortest amount of time possible, the
following information must be submitted:
Review related web site and instructions for Municipal storm water permit eReporting [Exit Form]
Complete all required fields on the annual report form and upload required attachments
Attach the following other supporting documents as appropriate using the attachments tab above
Public Education and Outreach Annual Report Summary
Public Involvement and Participation Annual Report Summary
Illicit Discharge Detection and Elimination Annual Report Summary
Construction Site Pollution Control Annual Report Summary
Post-Construction Storm Water Management Annual Report Summary
Pollution Prevention Annual Report Summary
Leaf and Yard Waste Management
Municipal Facility (BMP) Inspection Report
Municipal Property SWPPP
Municipally Property Inspection Report
Winter Road Maintenance
Storm Sewer Map Annual Report Attachment
Storm Water Quality Management Annual Report Attachment
Project Name: 2025 Annual Report
County: Washington
Municipality: Germantown, Village
Permit Number: S065404
Facility Number: 31267
Reporting Year: 2025
Annual Report
Page 25 of 52
TMDL Attachment
Storm Water Consortium/Group Report
Municipal Cooperation Attachment
Other Annual Report Attachment
Attach the following permit compliance documents as appropriate using the attachments tab above
Storm Water Management Program
Public Education and Outreach Program
Public Involvement and Participation Program
Illicit Discharge Detection and Elimination Program
Construction Site Pollutant Control Program
Post-Construction Storm Water Management Program
Pollution Prevention Program
Municipal Storm Water Management Facility (BMP) Inventory
Municipal Storm Water Management Facility (BMP) Inspection and Maintenance Plan
Total Maximum Daily Load documents (*If applicable, see permit for due dates.)
TMDL Mapping*
TMDL Modeling*
TMDL Implementation Plan*
Fecal Coliform Screening Parameter *
Fecal Coliform Inventory and Map (S050075-03 general permittees Appendix B B.5.2 – document due to the
department by March 31, 2022)
Fecal Coliform Source Elimination Plan (S050075-03 general permittees Appendix B - document due to the
department by October 31,2023)
Sign and Submit form
Page 26 of 52
Form 3400-224 (R8/2021)
Note : Compliance items must be submitted using the Attachments tab.
Primary Municipal Contact Person (Authorized Representative for MS4 Permit)
The “Authorized Representative” or “Authorized Municipal Contact” includes the municipal official that was
charged with compliance and oversight of the permit conditions, and has signature authority for submitting
permit documents to the Department (i.e., Mayor, Municipal Administrator, Director of Public Works, City
Engineer).
Do not close your work until you SAVE.
Municipal Contact Information- Has Missing Items
Notice: Pursuant to s. NR 216.07(8), Wis. Adm. Code, an owner or operator of a Municipal Separate Storm Sewer System (MS4) is
required to submit an annual report to the Department of Natural Resources (Department) by March 31 of each year to report on
activities for the previous calendar year (“reporting year”). This form is being provided by the Department for the user’s convenience for
reporting on activities undertaken in each reporting year of the permit term. Personal information collected will be used for
administrative purposes and may be provided to the extent required by Wisconsin’s Open Records Law [ss. 19.31-19.39, Wis. Stats.].
Municipality Information
Name of Municipality Germantown, Village
Facility ID # or (FIN): 31267
Updated Information: Check to update mailing address information
Mailing Address: N112 W17001 Mequon Rd
Mailing Address 2:
City: Germantown, Village
State: WI
Zip Code: xxxxx or xxxxx-xxxx 53022
Select to create new primary contact
First Name: Kevin
Last Name: Driscoll
Select to update current contact information
Title: Village Engineer
Mailing Address: N112 W17001 Mequon Rd
Mailing Address 2:
City: Germantown
State: WI
Zip Code: xxxxx or xxxxx-xxxx 53022
Phone Number: Ext: xxx-xxx-xxxx 262-250-4724
Email: kdriscoll@germantownwi.gov
Additional Contacts Information (Optional)
I&E Program
Page 27 of 52
Municipal Billing Contact Person (Authorized Representative for MS4 Permit)
1. Does the municipality rely on another entity to satisfy some of the permit requirements?
Yes No
Individual with responsibility for:
(Check all that apply)
IDDE Program
IDDE Response Procedure Manual
Municipal-wide Water Quality Plan
Ordinances
Pollution Prevention Program
Post-Construction Program
Winter roadway maintenance
First Name: Jake
Last Name: Sajdak
Title:
Mailing Address: N112 W17001 Mequon Road
Mailing Address 2:
City: Germantown WI 53022
State:
Zip Code: xxxxx or xxxxx-xxxx
Phone Number: Ext: xxx-xxx-xxxx
Email: jsajdak@germantownwi.gov
Select to create new Billing contact
First Name: Matthew
Last Name: Uselding
Select to update current contact information
Title: Finance Director
Mailing Address: N112 W17001 Mequon Rd
Mailing Address 2:
City: Germantown
State: WI
Zip Code: xxxxx or xxxxx-xxxx 53022
Phone Number: Ext: xxx-xxx-xxxx 262-250-4777
Email: muselding@germantownwi.gov
Public Education and Outreach
Public Involvement and Participation
Illicit Discharge Detection and Elimination
Southeastern Wisconsin Watersheds Trust
Southeastern Wisconsin Watersheds Trust
Page 28 of 52
2. Has there been any changes to the municipality’s participation in group efforts towards permit compliances (i.e.,
the municipality has added or dropped consortium membership)?
Yes No
Construction Site Pollutant Control
Post-Construction Storm Water Management
Pollution Prevention
Missing Information
Page 29 of 52
Minimum Control Measures- Section 1 :
a. Does MS4 conduct any educational efforts or events independently (not with a group) Yes
No
b. How many total educational events were held during the reporting year:
c. Were any of the public education and outreach deliv ery mechanisms conducted during the
reporting year active or interactive? Yes No
d. Please select all storm water topics, target audienc es, and delivery mechanisms used in the
reporting year
e. Will additional information/summary of these educa tion events be attached to the annual report?
Yes No
If no, please provide additional comment in the brie f explanation box below. Limit response to 250
characters and/or attach supplemental information o n the attachments page.
Note : For the minimum control measures, you must fill out all questions in sections 1 through 7.
Do not close your work until you SAVE.
Form 3400-224 (R8/2021)
Complete
1. Public Education and Outreach
1
Public Education and Outreach Delivery Mechanisms (Active and Passive)
Active/Interactive Mechanisms Passive Mechanisms
Education activities (school presentations, summer camps)
Information booth at event
Targeted group training (contractors, consultants, etc.)
Government event (public hearing, council meeting)
Workshops
Tours
Other:
Passive print media (brochures at front desk, posters, etc.)
Distribution of print media (mailings, newsletters, etc.) via
mail or email.
Media offerings (radio and TV ads, press release, etc.)
Social media posts
Signage
Website
Other:
Topics Covered Target Audience
Illicit discharge detection and elimination
Household hazardous waste disposal/pet waste management/vehicle
washing
Yard waste management/pesticide and fertilizer application
Stream and shoreline management
Residential infiltration
Construction sites and post-construction storm water management
Pollution prevention
Green infrastructure/low impact development
Other:
Public Works Project Summary for 2025
General Public
Public Employees
Residents
Businesses
Contractors
Developers
Industries
Public Officials
Other:
Page 30 of 52
Form 3400-224 (R8/2021)
Minimum Control Measures - Section 2 :
a. Permit Activities . Select all of the following topics the Permittee did to engage public participation
and involvement.
b. Volunteer Activities
. Select all of the following audiences targeted fo r volunteer involvement and
participation related to storm water.
c. Brief explanation on Public Involvement and Parti cipation reporting. Limit response
to 250 characters and/or attach supplemental inform ation on the attachments page.
Missing Information
Note : For the minimum control measures, you must fill out all questions in sections 1 through 7
Do not close your work until you SAVE.
Complete
2. Public Involvement and Participation
Topics Covered Target Audience Estimated People
Reached (Optional)
Regional Effort
(Optional)
MS4 Annual Report
Storm Water Management
Program
Storm Water related ordinance
Other:
General Public
Public Employees
Residents
Businesses
Contractors
Developers
Industries
Public Officials
Other
1 - 10 Yes No
NA (Individual Permittee)
Topics Covered Target Audience Estimated People
Reached (Optional)
Regional Effort
(Optional)
Volunteer Opportunity General Public
Public Employees
Residents
Businesses
Contractors
Developers
Industries
Public Officials
Other
101 + Yes No
Missing Information
Page 31 of 52
Form 3400-224 (R8/2021)
Minimum Control Measures - Section 3 :
Form 3400-224 (R8/2021)
Minimum Control Measures - Section 4 :
Note : For the minimum control measures, you must fill out all questions in sections 1 through 7
Do not close your work until you SAVE.
Complete
3. Illicit Discharge Detection and Elimination
a. How many total outfalls does the municipality have? 20
b. How many major outfalls does the municipality have? 5
c. How many outfalls did the municipality evaluate as part of their
routine ongoing field screening program?
0
d. From the municipality's routine screening, how many were
confirmed illicit discharges?
0
e. How many illicit discharge complaints did the munic ipality receive? 0
f. From the complaints received, how many were confirme d illicit
discharges?
0
g. How many of the identified illicit discharges did t he municipality
eliminate in the reporting year (from both routine screening and
complaints)?
(If the sum of 3.c. and 3.e. does not equal 3.f., p lease explain below.)
0
h. What types of regulatory mechanisms does the munici pality have available to compel
compliance with this program? Check all that are a vailable and how many times each
were used in the reporting year.
Verbal Warning 0
Written Warning (including email) 0
Notice of Violation
0
Civil Penalty/ Citation
0
Additional Information:
i. Brief explanation on Illicit Discharge Detection an d Elimination reporting. If you
marked Unsure for any questions above, justify the reasoning . Limit response to
250 characters and/or attach supplemental informati on on the attachments page.
Missing Information
Note : For the minimum control measures, you must fill out all questions in sections 1 through 7
Do not close your work until you SAVE.
Complete
Page 32 of 52
Form 3400-224 (R8/2021)
Minimum Control Measures - Section 5 :
4. Construction Site Pollutant Control
a. How many total construction sites with one acre or more of land
disturbing construction activity were active at any point in the
reporting year?
22
b. How many construction sites with one acre or more o f land
disturbing construction activity did the municipali ty issue permits for
in the reporting year?
17
c. How many erosion control inspections did the munici pality complete
in the reporting year (at sites with one acre or mo re of land
disturbing construction activity)?
152
d. What types of regulatory mechanisms does the munici pality have available to compel
compliance with this program? Check all that are a vailable and how many times each
were used in the reporting year.
Verbal Warning 6
Written Warning (including email) 4
Notice of Violation 2
Civil Penalty/ Citation 0
Stop Work Order 1
Forfeiture of Deposit
Other - Describe below
e. Brief explanation on Construction Site Pollutant Co ntrol reporting . If you marked
Unsure for any questions above, justify the reasoni ng. Limit response to 250 characters
and/or attach supplemental information on the attac hments page .
Missing Information
Note : For the minimum control measures, you must fill out all questions in sections 1 through 7
Do not close your work until you SAVE.
Complete
5. Post-Construction Storm Water Management
a. How many new structural storm water management Best Management
Practice (BMP) have received local approval ?
*Engineered and constructed systems that are designed to provide storm water quality control such as
wet detention ponds, constructed wetlands, infiltration basins, grassed swales, permeable pavement,
4
b. Does the MS4 have procedures for inspecting and mai ntaining private storm
water facilities?
Yes No
c. If Yes, how many privately owned storm water managem ent facilities were
Page 33 of 52
Form 3400-224 (R8/2021)
inspected in the reporting year ? Inspections completed by private landowners should be
included in the reported number.
4
d. Does the municipality utilize privately owned storm water management
BMP in its pollutant reduction analysis?
Yes No
e. Does MS4 have maintenance authority on these privat ely owned BMPs?
Yes No
f. What types of enforcement actions does the municipa lity have available to compel
compliance with the regulatory mechanism? Check al l that apply and enter the number of
each used in the reporting year.
Verbal Warning 0
Written Warning (including email) 0
Notice of Violation 0
Civil Penalty/ Citation 0
Forfeiture of Deposit
Complete Maintenance 0
Bill Responsible Party 0
Other - Describe below
g. Brief explanation on Post-Construction Storm Water Management reporting . If
marked 'Unsure' on any questions above, justify you r reasoning. Limit your response to
250 characters and/or attach supplemental informati on on the attachments page .
Missing Information
Note : For the minimum control measures, you must fill out all questions in sections 1 through 7
Do not close your work until you SAVE.
Minimum Control Measures - Section 6 : Has Missing Items
6. Pollution Prevention
Storm Water Management Best Management Practice Ins pections Not Applicable
a. Enter the total number of "municipally owned" (i.e. , publicly owned BMPs)
or operated (i. e., privately o wned BMPs) structural storm water
management best management practices.
26
b. How many new municipally owned storm water manageme nt best
management practices were installed in the reportin g year ?
1
Page 34 of 52
* Any municipally owned property that has the potential to generate stormwater pollution should have a SWPPP. For example, if a
municipal property stores compost piles, material storage, yard wastes, etc., outside and can contaminate stormwater runoff—a SWPPP
is required.
c. How many municipally owned (public) storm water man agement best
management practices were inspected in the reportin g year?
4
d. What elements are looked at during inspections (25 0 character limit)?
Vegetative overgrowth and inlet/outfall structural conditions
e. How many of these facilities required maintenance? 4
f. Brief explanation on Storm Water Management Best Ma nagement Practice inspection
reporting. If you marked Unsure for any questions above, justi fy the reasoning. Limit
response to 250 characters and/or attach supplement al information on the
attachments page .
Routine maintenance includes mowing and vegetative care
Public Works Yards & Other Municipally Owned Proper ties that require a stormwater pollution
prevention plan (SWPPP)* Not Applicable
g. How many municipal properties require a SWPPP? 3
h. How many inspections of municipal properties have b een conducted in the
reporting year?
12
i. Have amendments to the SWPPPs been made?
Yes No
j. If yes, describe what changes have been made. Limit response to 250 characters
and/or attach supplemental information on the attac hment page:
New SWPPP for New Town 9 Pkwy DPW Facility, and revi sed SWPPPs for Division
Road Salt Dome and Main Street Yard Waste Facility.
k. Brief explanation on Storm Water Pollution Preventi on Plan reporting. If you marked
Unsure for any questions above, justify the reasoni ng. Limit response to 250
characters and/or attach supplemental information o n the attachments page.
Collection Services - Street Sweeping Program Not Applicable
l. Did the municipality conduct street sweeping during the reporting year?
Yes No
m. If known, how many tons of material was removed? 298.9
n. Does the municipality have a low hazard exemption for this
material?
Yes No
o. If street sweeping is identified as a storm water b est management practice in the
pollutant loading analysis, was street cleaning comp leted at the assumed frequency?
Yes - Explain frequency
No - Explain
Not Applicable
Page 35 of 52
Collection Services - Catch Basin Sump Cleaning Program Not Applicable
p. Did the municipality conduct catch basin sump clean ing during the reporting
year? Yes No
q. How many catch basin sumps were cleaned in the repo rting year? 98
r. If known, how many tons of material was collected? 30.1
s. Does the municipality have a low hazard exemption f or this
material?
Yes No
t. If catch basin sump cleaning is identified as a sto rm water best management practice
in the pollutant loading analysis, was cleaning comp leted at the assumed frequency?
Yes- Explain frequency
No - Explain
Not Applicable
Collection Services - Leaf Collection Program Not Applicable
*Note: We are requesting information that goes beyond the reporting year, answer the best you can.
Liquids (gallons) (ex. brine)
Winter Road Management Not Applicable
aa. How many lane-miles of roadway is the municipality responsible for
doing snow and ice control? ( One mile of a two-way road equals two
lane miles .)
145
ab. Provide amount of de-icing products used by month l ast winter season?
Solids (tons) (ex. sand, or salt-sand)
Product Oct Nov Dec Jan Feb Mar
Salt 0 300 570 620 247 212
Oct Nov Dec Jan Feb Mar
Brine 0 1706 15814 14034 15743 0
ac. Was salt applying machinery calibrated in the repor ting year? Yes No
ad. Have municipal personnel attended salt reduction st rategy training in
the reporting year?
Yes No
Training Date Training Name # Attendance
3/31/2022 Salt Wise 20
ae. Brief explanation on Winter Road Management reporting. If you marked Unsure for any
questions above, justify the reasoning. Limit response to 250 characters and/or attach
supplemental information on the attachments page
Internal (Staff) Education & Communication
af. Has the municipality provided an opportunity for in ternal training
or education to staff implementing the municipality 's procedures
for each of the pollution prevention program elemen t ?
Yes No
Page 36 of 52
Form 3400-224 (R8/2021)
Minimum Control Measures - Section 7 :
If yes, describe what training was provided (250 ch aracter limit):
SWWT Conference & UW/UWM online professional development courses
ag. Describe how the municipality has kept the followin g local officials and municipal
staff aware of the municipal storm water discharge permit programs, procedures
and pollution prevention program requirements.
Elected Officials
Municipal Officials
Appropriate Staff ( such as operators, Department he ads, and those that interact
with public)
Post copies of the MS4 online in the Public Works a nd Highways Committee
Meeting packet, Village Board Meetings, on the Websit e, and at the Annual Public
Works Public Information Meeting
Public Works and Highways Committee Meetings, Villag e Board Meetings, and
Annual Public Works Public Information Meeting
Director of Public Works and Village Engineer have been points of contact at Public
Meetings, along with Engineering Technicians at the Village Hall Engineering Office
ah. Brief explanation on Internal Education reporting. If you marked Unsure for any
questions above, justify the reasoning. Limit respo nse to 250 characters and/or
attach supplemental information on the attachments page.
Missing Information
Note : For the minimum control measures, you must fill out all questions in sections 1 through 7
Do not close your work until you SAVE.
Complete
7. Storm Sewer System Map
a. Did the municipality update their storm sewer map t his year?
Yes No
If yes, check the areas the map items that got updated or changed:
Storm water treatment facilities
Storm pipes
Vegetated swales
Outfalls
Other - Describe below
b. Brief explanation on Storm Sewer System Map reporti ng. If you marked Unsure for an
question for any questions above, justify the reaso ning. Limit response to
250 characters and/or attach supplemental information on the attachments page .
Page 37 of 52
Page 38 of 52
Form 3400-224 (R8/2021)
Final Evaluation -
Fiscal Analysis
Complete the fiscal analysis table provided below. For municipalities that do not break out funding
into permit program elements, please enter the monet ary amount to your best estimate of what
funding may be going towards these programs.
Element: Public Education and Outreach
Element: Public Involvement and Participation
Element: Illicit Discharge Detection and Elimination
Element: Construction Site Pollutant Control
Element: Post-Construction Storm Water Management
Element: Pollution Prevention
Please provide a justification for a "0" entered in the Fiscal Analysis. Limit response to 250 characters .
Missing Information
Do not close your work until you SAVE.
Has Missing Items
Annual
Expenditure
Reporting Year
Budget
Reporting Year
Budget
Upcoming
Year
Source of Funds
10250 12000 13000 General revenue fund
10000 10000 10000 General revenue fund
360 500 500 General revenue fund
Select...
20323 25000 25000 Permit fee and/or deposit/escrow
8050 8100 8500 Permit fee and/or deposit/escrow
23500 0 0 Permit fee and/or deposit/escrow
2025 3000 3000 Permit fee and/or deposit/escrow
Other (describe)
Select...
Page 39 of 52
Water Quality
a: Were there any known water quality improvements i n the receiving waters to which the
municipality’s storm sewer system directly discharg es to?
Yes No Unsure If Yes, explain below:
b : Were there any known water quality degradation in t he receiving waters to which the
municipality’s storm sewer system directly discharg es to?
Yes No Unsure If Yes, explain below:
c: Have any of the receiving waters that the municip ality discharges to been added to the impaired
waters list during the reporting year?
Yes No Unsure
d: Has the municipality evaluated their storm water practices to reduce the pollutants of concern?
Yes No Unsure
Storm Water Quality Management
a. Has the municipality completed or updated modelin g in the reporting year (relating to developed
urban area performance standards of s. NR 151.13(2) (b)1., Wis. Adm. Code)? Yes No
b. If yes, enter percent reduction in the annual aver age mass discharging from the entire MS4 to
surface waters of the state as compared to implemen ting no storm water management controls:
Total suspended solids (TSS)
Total phosphorus (TP)
Additional Information
Based on the municipality’s storm water program eva luation, describe any proposed changes to the
municipality’s storm water program. If your response exceeds the 250 character limit, a ttach
supplemental information on the attachments page.
44
44
No changes to 2025 Germantown Storm Water Program
Page 40 of 52
Form 3400-224 (R8/2021)
Requests for Assistance on Understanding Permit Pro grams
Would the municipality like the Department to conta ct them about providing more information on
understanding any of the Municipal Separate Storm S ewer Permit programs?
Please select all that apply:
Public Education and Outreach
Public Involvement and Participation
Illicit Discharge Detection and Elimination
Construction Site Pollutant Control
Post-Construction Storm Water Management
Pollution Prevention
Storm Water Quality Management
Storm Sewer System Map
Water Quality Concerns
Compliance Schedule Items Due
MS4 Program Evaluation
Missing Information
Do not close your work until you SAVE.
Page 41 of 52
Form 3400-224(R8/2021)
Required Attachments and Supplemental Information
Upload Required Attachments (15 MB per file limit) - Help reduce file size and trouble shoot file uploads
*Required Item
Note: To replace an existing file, use the 'Click here to attach file ' link or press the to delete an item.
Municipal Facility SWPPP
Storm Sewer System Map
Attach - Other Supporting Documents
(To remove items, use your cursor to hover over the attachment section. When the drop down arrow appears, select remove item)
Attach - Permit Compliance Documents
Do not close your work until you SAVE.
Any other MS4 program information for inclusion in the Annual Report may be attached on here. Use
the Add Additional Attachments to add multiple documents.
File Attachment
2026 -03 -23 SWPPP - Town 9 Pkwy (DPW Site).pdf
File Attachment
AR_Other
File Attachment
2025 DPW Spring Informational Meeting.pdf
AR_Other
File Attachment
2026 -03 -23 SWPPP - Division Road (DPW Salt Dome).pdf
AR_Other
File Attachment
2026 -03 -23 SWPPP - Main Street (DPW Site).pdf
SWQM_TMDLModel
File Attachment
Exhibit M - Existing BMPs WInSLAMM result summary (revised).xlsx
Page 42 of 52
(To remove items, use your cursor to hover over the attachment section. When the drop down arrow appears, select remove item)
Draft and Share PDF Report with the permittee's governing body or delegated representatives.
Press the button below to create a PDF. The PDF will be sent to the email address associated with the WAMS ID that is signed in. After
the annual report has been reviewed by the governing body or delegated representative, return to the MS4 eReporting System to
submit the final report to the DNR.
Storm Water Management Program (S050075-03 General Permit and S058416-04 Madison Area Group Permit shall
have a written storm water management program that describes in detail how the permittee intends to comply
with the permit requirements for each minimum control measure. Updated programs are due to the department by
March 31, 2021.)
Public Education and Outreach Program
Public Involvement and Participation Program
Illicit Discharge Detection and Elimination Program
Construction Site Pollutant Control Program
Post-Construction Storm Water Management Program
Pollution Prevention Program
Municipal Storm Water Management Facility (BMP) Inventory (S050075-03 03 General Permit and
S058416-04 Madison Area Group Permit 2.6.1 - inventory due to the department by March 31,
2021.)
Municipal Storm Water Management Facility (BMP) Inspection and Maintenance Plan (S050075-
03 03 General Permit and S058416-04 Madison Area Group Permit 2.6.2 – document due to the
department by March 31, 2021.)
Total Maximum Daily Load documents (*If applicable, see permit for due dates.)
TMDL Mapping *
TMDL Modeling *
TMDL Implementation Plan *
Fecal Coliform Screening Parameter *
Fecal Coliform Inventory and Map (S050075-03 general permittees Appendix B B.5.2 – document due to the
department by March 31, 2022)
Fecal Coliform Source Elimination Plan (S050075-03 general permittees Appendix B - document due to the
department by October 31,2023)
Missing Information
Draft and Share PDF Report
Page 43 of 52
Form 3400-224(R8/2021)
You have not completed all areas of the application . Please return to the application and complete
all missing items.
Do not close your work until you SAVE.
Complete and Submit Your Application
Contact Information: Has Missing Items
Minimum Control Measures Section 1: Complete
Minimum Control Measures Section 2: Complete
Minimum Control Measures Section 3: Complete
Minimum Control Measures Section 4: Complete
Minimum Control Measures Section 5: Complete
Minimum Control Measures Section 6: Has Missing Items
Minimum Control Measures Section 7: Complete
Attachments: Has Missing Items
Final Evaluation: Has Missing Items
Page 44 of 52
BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE
GERMANTOWN, WI
MEETING DATE: April 1, 2026
AGENDA ITEM: New Business
ITEM TITLE: Change Order with Great Lakes TV & Seal for Additional Storm
Sewer Cleaning and Televising Work
SUBMITTED BY: Kevin Driscoll – Village Engineer
SUMMARY EXPLANATION:
In September 2025, the PWHC and VB approved a Contract in amount of $29,975 with Great
Lakes TV & Seal to examine storm sewers for the 2026 road program and for a section of large
diameter storm sewers following the August 2025 flood event. Great Lakes TV & Seal is a pleasure
completed the scope was under budget, as the cleaning items were less than expected . Note that
based on the closed-circuit tel evising (CCTV) of the storm sewer pipes, required repairs were
identified and these repairs are included in the 2026 road program to avoid paving over storm
sewer that needs repair work.
In fall 2025, the PWHC and VB approved the 5 -year CIP for 202 6-2031 and that included
additional CCTV to inventory existing storm sewer as part of the Village’s asset management
strategy, ahead of paving. Village staff asked the company if they can continue to examine storm
sewers within the 2027 & 2028 Road Program areas at the same rates they previously provided,
and they agreed . At the time of this item, the cost of the work completed by Great Lakes was
approximately $29,500.
An additional CCTV length of 16,918 feet is estimated at $1.40/LF for a change order increase in
the amount of $ 23,686, where this revised scope will include CCTV for the storm sewers in t he
2027 and 2028 road program. A map of the additional storm sewers is attached, along with a link
to the annual road program webpage: https://www.germantownwi.gov/176/Construction-Projects
ATTACHMENT: ORDINANCE RESOLUTION OTHER __X___
Summary Work Map of Change Order
RECOMMENDATION:
Staff requests the Public Works and Highways Committee approve the change order in the amount
of $23,686 for Great Lakes TV & Seal (Project #2507) to go against account 40-561000-593100.
COMMITTEE ACTION:
A motion to support authorize staff and a vote “Aye” is in the affirmative to support the contract
Page 45 of 52
Page 46 of 52
BUSINESS OF THE PUBLIC WORKS COMMITTEE & VILLAGE BOARD
GERMANTOWN, WI
MEETING DATE: April 1, 2026
AGENDA ITEM: New Business
ITEM TITLE: Letter of Credit Reduction – Wrenwood North Subdivision
SUBMITTED BY: Kevin Driscoll, P.E.- Village Engineer
SUMMARY EXPLANATION: The Neumann Builders d eveloper of Wrenwood
Subdivision has requested a reduction to the Letter of Credit (LOC). The current value of
the LOC is $ 396,500.00. T he developer is requesting a reduction in the amount of
$215,500.00. The remaining amount is $181,000.00.
The majority of public improvements have been completed and accepted. Asphalt surface
pavement, minor curb & gutter replacement and minor punch list items are remaining.
ATTACHMENT: ORDINANCE RESOLUTION OTHER X
Letter dated 3/26/2026 from Neumann Development, Inc.
RECOMMENDATION: Staff requests the Public Works and Highway Committee
recommend a reduction to the Letter of Credit for the Wrenwood North subdivision to a
remaining amount of $181,000.00, for approval by the Village Board.
COMMITTEE ACTION:
Proper parliamentary procedure to approve a request is to have a motion made in the
affirmative and by voting NAY would deny the request if a majority vote.
Page 47 of 52
NEUMANN DEVELOPMENTS, INC. * N27 W24025 PAUL CT. SUITE 100 * PEWAUKEE, WI 53072
262-542-9200 * FAX: 262-349-9324 * NEUMANNDEVELOPMENTSINC.COM
March 26, 2026
Kevin Driscoll, Village Engineer
Village of Germantown
N112W17001 Mequon Road
Germantown, WI 53022
RE: Letter of Credit Reduction Request - Revised
Wrenwood North Subdivision
Dear Kevin,
Neumann Developments is submitting this request, on behalf of Wrenwood, LLC, for a re duction to the
Letter of Credit for the Wrenwood North subdivision. The current LOC as issued by Midland States Bank
included funds for the utility and paving for Phase 3 of the project. As Phase 3 is now substantially
complete, with the exception of surface paving, street signs and other ancillary items, we are requesting a
reduction to the LOC amount to account for un-completed work as outlined in the Development Agreement.
Current LOC Amount $396,500.00
Current Reduction Request ($215,500.00)
Proposed New LOC Amount $181,000.00
This reduction is being requested in accordance with the work as completed on the project. Specifically,
completion of the Phase 3 roadways and storm water utilities, as highlighted on the attached recap sheet.
Note the recap outlines that funds remain in the LOC to cover surface paving, adjustments prior to surface
paving, street lighting, street trees, street signs and finishing the interim storm water inlets prior to paving.
Additionally, we have retained some funds for Street Trees in Phase 1 of the project.
If any additional information is required, please feel free to contact me. Please forward a written
authorization for the amount of the Replacement Letter of Credit and I will coordinate with the lender as
appropriate.
Sincerely,
Neumann Developments
Kevin Anderson
Project Manager
Page 48 of 52
EXHIBIT "C" Revised 03/26/26
ITEM DESCRIPTION BASIS ESTIMATED AMOUNT COMPLETED AMOUNT REMAINING AMOUNT COMMENTS
Survey Monuments 1.02 $500.00 $0.00 $500.00
Site & Pond Grading 1.03 & 1.11 $273,170.00 $273,170.00 $0.00
Site & Pond Grading_Phase #2 1.03 & 1.11 $65,000.00 $65,000.00 $0.00
Site & Pond Grading_Phase #3 1.03 & 1.11 $35,000.00 $35,000.00 $0.00
Gravel Base and Asphalt Binder Coarse__Phase #1 1.05 $299,540.00 $299,540.00 $0.00
Gravel Base and Asphalt Binder Coarse__Phase #2 1.05 $140,000.00 $140,000.00 $0.00
Gravel Base and Asphalt Binder Coarse__Phase #3 1.05 $110,000.00 $110,000.00 $0.00
Curb & Gutter__Phase #1 1.05 $86,660.00 $86,660.00 $0.00
Curb & Gutter__Phase #2 1.05 $35,000.00 $35,000.00 $0.00
Curb & Gutter__Phase #3 1.05 $30,000.00 $30,000.00 $0.00
Asphalt Surface Coarse__Phase #1 1.05 $89,100.00 $89,100.00 $0.00
Asphalt Surface Coarse__Phase #2 1.05 $45,000.00 $0.00 $45,000.00
Asphalt Surface Coarse__Phase #3 1.05 $35,000.00 $0.00 $35,000.00
Freistadt Intersection at East Entrance(Ph2) 1.05 $35,000.00 $35,000.00 $0.00
Storm Water System & Ponds_ Phase # 1 1.12 $229,319.00 $229,319.00 $0.00
Storm Water System & Ponds_ Phase # 2 & #3 1.12 $0.00 $0.00 $0.00 (included in grading)
Walk Path ( granular base course & Asphalt pave) 1.05 $50,000.00 $50,000.00 $0.00 Paid to Village on Freistadt Rd.
Sanitary Sewer System__Phase #1 1.02 $1,184,581.00 $1,184,581.00 $0.00
Sanitary Sewer System__Phase #2 1.02 $174,419.00 $144,419.00 $30,000.00 PHASE #2 / finish manholes
Sanitary Sewer System__Phase #3 1.02 $141,000.00 $121,000.00 $20,000.00 PHASE #3 / finish manholes
Water System__Phase #1 1.03 $728,332.00 $728,332.00 $0.00
Water System__Phase #2 1.03 $166,000.00 $166,000.00 $0.00
Water System__Phase #3 1.03 $134,000.00 $134,000.00 $0.00
Off-Site Water System__WaterMain Loop 1.03 $308,000.00 $308,000.00 $0.00 COMPLETED IN 2023
Street Lights__ Phase #1 1.11 $30,000.00 $30,000.00 $0.00
Street Lights__ Phase #2 1.11 $10,000.00 $10,000.00 $0.00
Street Lights__ Phase #3 1.11 $5,000.00 $5,000.00
Street Signs__Phase #1 1.05 $2,000.00 $2,000.00 $0.00
Street Signs__Phase #2 1.05 $1,500.00 $1,500.00
Street Signs__Phase #3 1.05 $0.00 $0.00 not in original budget (keep Ph. 2)
Street Trees__ Phase #1 ---Ph 1-117 trees-$40,950 1.1 $68,950.00 $65,450.00 $3,500.00
Street Trees__Phase #2-55---$19,000 1.1 $19,000.00 $19,000.00
Street Trees__Phase #3-25--$9,000 1.1 $9,000.00 $9,000.00
Interim Storm Inlets__Phase #1 1.12 $12,500.00 $12,500.00 $0.00
Interim Storm Inlets__Phase #2 1.12 $7,500.00 $7,500.00
Interim Storm Inlets__Phase #3 1.12 $5,000.00 $5,000.00
SUB-TOTAL___PHASE #1 $3,397,652.00 $4,384,071.00 $4,000.00
SUB-TOTAL___PHASE #2 $663,419.00 $560,419.00 $103,000.00
SUB-TOTAL___PHASE #3 $504,000.00 $430,000.00 $74,000.00
TOTAL PH #1 & PH #2 $4,565,071.00 $5,374,490.00 $181,000.00
DATA Conversion Fee (record drawings) 4.03 $1,000.00 *
Improvement Review Fee: 4.03 $50,264.88 *
Professional Fee (Attorney) 4.05 $500.00 *
4.05 $150,000.00 *
SUB-TOTAL $201,764.88
PHASE #1
Sanitary Sewer (46 REC @ $4,469.00 / REC) 4.02 $205,574.00 **
Water (46 REC @ $832 / REC) 4.02 $38,272.00 **
Fire (46 REC @ $171.00 / REC) 4.02 $7,866.00 **
Police (46 REC @ $148.00 / REC) 4.02 $6,808.00 **
Park & Recreation (46 REC @ $736.00 / REC) 4.02 $33,856.00 **
Library (46 REC @ $281.00 / REC) 4.02 $12,926.00 **
SUB-TOTAL $305,302.00
$201,764.88
$305,302.00
PHASE #2
Sanitary Sewer (26 REC @ $4,469.00 / REC) 4.02 $116,194.00 **
Water (26 REC @ $832 / REC) 4.02 $21,632.00 **
Fire (26 REC @ $171.00 / REC) 4.02 $4,446.00 **
Police (26 REC @ $148.00 / REC) 4.02 $3,848.00 **
Park & Recreation (26 REC @ $736.00 / REC) 4.02 $19,136.00 **
Library (26 REC @ $281.00 / REC) 4.02 $7,306.00 **
SUB-TOTAL $172,562.00
** Amount to be Paid at Time of Building Permit Issuance $172,562.00
PHASE #3
Sanitary Sewer (23 REC @ $4,469.00 / REC) 4.02 $102,787.00 **
Water (23 REC @ $832 / REC) 4.02 $19,136.00 **
Fire (23 REC @ $171.00 / REC) 4.02 $3,933.00 **
Police (23 REC @ $148.00 / REC) 4.02 $3,404.00 **
Park & Recreation (23 REC @ $736.00 / REC) 4.02 $16,928.00 **
Library (23 REC @ $281.00 / REC) 4.02 $6,463.00 **
SUB-TOTAL $152,651.00
** Amount to be Paid at Time of Building Permit Issuance $152,651.00
IMPACT & CONNECTION FEE'S TO BE PAID AT THE TIME OF BUILDING PERMIT ISSUANCE
* Amount to be Paid at Time of Signing of Development Agreement
** Amount to be Paid at Time of Building Permit Issuance
IMPACT & CONNECTION FEE'S TO BE PAID AT THE TIME OF BUILDING PERMIT ISSUANCE
IMPACT & CONNECTION FEE'S TO BE PAID AT THE TIME OF BUILDING PERMIT ISSUANCE
WRENWOOD-north SUBDIVISION
Residential Single Family Subdivision
Phase # 1 (46 Lots)-- Sanitary, Water, Storm & Roads (include off-site water main)
Phase # 2 (26 Lots)-- Sewer & Water Laterals, Storm Sewer & Roadways
Phase # 3 (23 Lots)-- Sewer & Water Laterals, Storm Sewer & Roadways
Inspection Fee Estimate (Actual based on construction time
Page 49 of 52
BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE
GERMANTOWN, WI
MEETING DATE: April 1, 2026
AGENDA ITEM: New Business
ITEM TITLE: ARIP/LRIP/MSIS Grant Funding Update
SUBMITTED BY: Kevin Driscoll – Village Engineer
Tim Zimmerman – Director of Public Works
SUMMARY EXPLANATION:
The Village of Germantown in partnership with the Town of Jackson has been selected for the
ARIP project to reconstruct Pioneer Road from Division Road / CTH G to Country Aire
Drive/CTH M. Design is planned for 2026 with 2 miles of road reconstruction in 2027.
This $1.4m for Pioneer Road is in addition to the $2.5m for Rockfield/Pleasant View (5.5 miles),
plus the pending LRIP/MSIS for Division (2+ miles; potentially 50% of $1.7m.
Where over the last two years the WisDOT grants total up to $4.5m ($3.75m ARIP), and may
triple the annual road program allocation of approximately $1.5m for the Village.
ATTACHMENT: ORDINANCE RESOLUTION OTHER___X_____
RECOMMENDATION:
Non-action item. Information only
COMMITTEE ACTION:
Information Only
Proper parliamentary procedure to deny a request is to have a motion made in the affirmative and
by voting NAY would deny the request if a majority vote.
Page 50 of 52
March 24, 2026
Robert M Eichner
Town of Jackson
Jackson, WI 53037
Dear Robert M Eichner,
Congratulations! This letter confirms funding for your local project on Pioneer Rd from the 2026-27
Agricultural Roads Improvement Program (ARIP) Round 1 project solicitation. ARIP is a
reimbursement program administered by the Wisconsin Department of Transportation (WisDOT)
which improves highways functionally classified as local roads or minor collectors providing access
to agricultural lands or facilities used to produce agricultural or forestry products. The ARIP
program covers up to 90% of the total eligible project costs, with the balance of costs funded by the
political subdivision where the work is performed.
Your project was one of 29 selected for funding. The total eligible cost of the project is currently
estimated to be $1,400,000.00 based on the application materials submitted. WisDOT
reimbursement to the Town of Jackson will be limited to a maximum of ninety percent (90%)
participation in eligible items or to the $1,260,000.00 limit approved for the improvement –
whichever is less.
It is important that you not incur any project costs until receipt of your signed State Municipal
Project Agreement (SMA) from WisDOT.
In the absence of written notification to WisDOT indicating that the project award is being declined,
this award will be considered accepted. In the event that your municipality or county chooses to
decline this project award, please complete the form on the following page and email it to the ARIP
Program Manager, Hillary Pelton, at hillary.pelton@dot.wi.gov.
I greatly appreciate your commitment to providing a quality transportation system that promotes
public safety and economic development. Our state and local partnership is imperative to the future
of Wisconsin’s transportation infrastructure. Congratulations on your project award, which is a key
piece of this effort.
Sincerely,
Kristina Boardman, Secretary
Wisconsin Department of Transportation
Wisconsin Department of Transportation
Office of the Secretary
4822 Madison Yards Way, S903
Madison, WI 53705
Governor Tony Evers
Secretary Kristina Boardman
wisconsindot.gov
Telephone: (608) 266-1114
Email: sec.exec@dot.wi.gov
Page 51 of 52
ARIP Project Award Declination Form
After review of the ARIP project award letter, the undersigned political subdivision hereby declines
the ARIP project award for the following project:
On Route: ________________________________________
Political Subdivision (Municipality or County): ________________________________________
Reason for declination: __________________________________________________________
The political subdivision understands that by declining this project award, the ARIP funds previously
awarded will be returned to the State of Wisconsin for reallocation in accordance with program
requirements. This action cannot be undone.
Authorized Signature: ________________________________________
Printed Name & Title: ________________________________________
Date: ________________________________________
Page 52 of 52
Source: Village of Germantown website. First collected Oct 18, 2026.