Capital Improvement Program
2027
Hartford Electric
REFERENCE NUMBER: 380-11-296
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE $0$0
DIVISION: Electric Utility
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
Enhance system reliability within the Abbott Avenue and West State Street area.
Replace aging underground conductors and transformers along the east side of Wacker Drive
between Abbott Avenue and West State Street. The project includes excavating and installing
underground cables and replacing exisiting equipment such as junction boxes, transfomers
and switchgears along the proposed route. Underground cables will be installed using a
directional boring method whenever possible to minimize disruption.
The existing underground cables are nearing the end of their useful service life, which could
lead to an increased risk of failures and power outages. Replacement of the underground
cables and equipment can mitigate these risks and ensure higher reliability.
$170,000
2031
$0$0
FUND: Electric Utility
$0
LESS DISPOSALS
NET COST $170,000
$0
$0
$0
$0
$0
$0
EXPENDITURES: REVENUES:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
2027 PROJECT YEAR
PROJECT SUMMARY
$0$0
PROJECT TITLE: Wacker Drive Rebuild - Abbott Avenue to West State Street
PROJECT YEAR:
$0$0
2030202920282027
CAPITAL COST
DEPARTMENT: Electric Utility
REFERENCE NUMBER: 380-11-296
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 3500 $165,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $170,000
RANK PRIOR YEARCURRENT YEAR
IMPORTANT
CRITICAL
X
SCHEDULED
PRIORITY
2027
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Wacker Drive Rebuild - Abbott Avenue to West State Street
X
DESIRABLE
MANDATORY
2027
REFERENCE NUMBER: 380-21-353
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: South Johnson Street Area Rebuild
$0 $0
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the South Johnson Street area.
Replace all aging overhead conductors, poles, and transformers along South Johnson Street
between West Sumner Street and West Lincoln Avenue. The Utility will notify and coordinate
this project with all communication utilities and utilize the most current construction
standards for this rebuild project.
The existing overhead conductors and poles are nearing the end of their useful service life,
which could lead to an increased risk of failures and power outages. Replacement of the
overhead conductors, poles, and transformers can mitigate these risks and ensure higher
reliability.
2031
CAPITAL COST $270,000 $0 $0 $0 $0
PROJECT YEAR: 2027
$0 $0
NET COST $270,000 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0
$0 $0
REFERENCE NUMBER: 380-21-353
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 3745 $265,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $270,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: South Johnson Street Area Rebuild
MANDATORY
CRITICAL
SCHEDULED 2027 2027
IMPORTANT X X
DESIRABLE
REFERENCE NUMBER: 380-22-366
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $160,000 $0 $0 $0
DIVISION: Electric Utility FUND: Electric Utility
Enhnace system reliability within the Sell Drive and Tamarack Avenue area.
Replace all aging overhead conductors, poles, and transformers along Sell Drive and
Tamarack Avenue. The Utility will notify and coordinate this project with all communication
utilities and utilize the most current construction standards for this rebuild project.
The existing overhead conductors and poles are nearing the end of their useful service life,
which could lead to an increased risk of failures and power outages. Replacement of the
overhead conductors, poles, and transformers can mitigate these risks and ensure higher
reliability.
2031
CAPITAL COST $160,000 $0 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Sell Drive and Tamarack Avenue Area Rebuild
REFERENCE NUMBER: 380-22-366
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 2750 $155,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $160,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2027 2027
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Sell Drive and Tamarack Avenue Area Rebuild
REFERENCE NUMBER: 380-23-369
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Electric Utility
2031
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Digger Derrick Truck Replacement - #207
$0
PROJECT YEAR: 2027
DIVISION: Electric Utility FUND: Electric Utility
Maintain a safe and reliable fleet of utility vehicles.
Purchase a new 2027 International 4x2 diesel flatbed chassis with a 47-foot center-mount
boom tip winch with a lifting capacity of 15,000 lbs. and remote hydraulic boom controls.
Utility staff use the Digger Derrick trucks to auger holes for utility poles, set anchors, lift
transformers and overhead line hardware, string conductors, and respond to storm-related
emergencies. The existing truck will be 25 years old in 2027 and is already showing extensive
wear. Replacing this vehicle is essential to maintain safe and reliable operations while
reducing the increasing maintenance costs associated with aging equipment. Due to industry-
wide delays in truck production, often exceeding two years, approval was obtained in May
2025 to purchase the replacement, keeping it on track for delivery in 2027.
CAPITAL COST $318,353 $0 $0 $0
$0$10,000 $0
$308,353 $0 $0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0
$0 $0
REFERENCE NUMBER:380-23-369
COST: PER UNIT TOTAL
PURCHASE PRICE $318,353 3 HOURS PER DAY
ANNUAL RENT 4 AVERAGE DAYS PER WEEK
INSTALLATION 45 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $318,353 $15,918 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 1
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEMS (2027) 10
TRUST/DONATIONS 1 week/year
GRANTS/AIDS **
FUND BALANCE $308,353
OTHER REVENUES $10,000
TOTAL SOURCES $318,353
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2027 2027
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Digger Derrick Truck Replacement - #207
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
** No down time if work can be rescheduled.
$1,500/week if rental unit is required
REFERENCE NUMBER: 380-27-385
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $80,000 $0 $0 $0
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability by ensuring the integrity and safe operation of all high-voltage
substation equipment.
Replace six oil‑filled high‑voltage insulators on both S&C 138 kV circuit switchers at the
Dodge Substation. The replacements will use matching S&C components to ensure proper
fit, compatibility, and long‑term reliability.
During a routine maintenance inspection, the oil‑filled high‑voltage insulators on the 138 kV
circuit switcher at the Dodge Substation were found to be leaking and in need of
replacement. While the current condition does not require immediate action, the oil leak
indicates aging seals and internal deterioration within the high‑voltage insulators. Replacing
the insulators proactively will prevent future equipment failures, reduce the risk of
unplanned outages, and maintain the reliability of the high‑voltage switching equipment that
protects and isolates the transformers. Approval for materials was obtained in May 2026 to
ensure the replacements can be completed during a planned outage in Q1 of 2027.
2031
CAPITAL COST $80,000 $0 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: 138kV Circuit Switcher Maintenance
REFERENCE NUMBER: 380-27-385
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) $80,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $80,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2027
IMPORTANT X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: 138kV Circuit Switcher Maintenance
REFERENCE NUMBER: 380-27-386
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Utility Operations Center HVAC Control System Replacement (50%)
2031
CAPITAL COST $22,000 $0 $0 $0 $0
PROJECT YEAR:
DIVISION: Electric Utility FUND: Electric Utility
Maintain a reliable, energy efficient heating and ventalation system at the Utility Operations
Center
Project includes removing the old control system and installing a new modern control system
platform with updated zone controllers, dampers, relays and communication wiring.
Programming, system start-up and staff training will also be included with the project.
The existing HVAC control system is original to the Utility Building and will be 26 years old at
the time of replacement. It has reached the end of its useful life, and many of the
components are obsolete and increasingly difficult to locate. Replacing the control system
will help avoid unexpected failures and ensure the heating and cooling equipment operates
efficiently. Service technicians have recommended replacement due to age, reliability
concerns, and limited availability of parts.
2027 2028 2029 2030
$0 $0$0 $0
$22,000 $0 $0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER:380-27-386
COST: PER UNIT TOTAL
PURCHASE PRICE $44,000 24 HOURS PER DAY
ANNUAL RENT 7 AVERAGE DAYS PER WEEK
INSTALLATION 52 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $44,000 $2,200 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 0
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEM
TRUST/DONATIONS
GRANTS/AIDS
FUND BALANCE $44,000
OTHER REVENUES
TOTAL SOURCES $44,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X
DESIRABLE
SCHEDULED 2027
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Utility Operations Center HVAC Control System Replacement (50%)
ESTIMATED EQUIPMENT USAGE:
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
Capital Improvement Program
2028
Hartford Electric
REFERENCE NUMBER: 380-21-356
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Prospect Street and Elm Street Area Rebuild
$0 $0
DIVISION: Electric Utility FUND: Electric Utility
Ensure system reliability within the Propect Street and Elm Street area.
Replace all aging overhead conductors, poles, and transformers along Elm Street between
Spruce Street and Prospect Street. This rebuild project will also include the pole line on
Prospect Street between Elm Street and Peace Lutheran Drive. The Utility will notify and
coordinate this project with all communication utilities and utilize the most current
construction standards for this rebuild project.
The existing overhead conductors and poles are nearing the end of their useful service life,
which could lead to an increased risk of failures and power outages. Replacement of the
overhead conductors, poles, and transformers can mitigate these risks and ensure higher
reliability.
2031
CAPITAL COST $0 $100,000 $0 $0 $0
PROJECT YEAR: 2027
$0 $0
NET COST $0 $100,000
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0
$0 $0
REFERENCE NUMBER: 380-21-356
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 1200 $95,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $100,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Prospect Street and Elm Street Area Rebuild
MANDATORY
CRITICAL
SCHEDULED 2028 2028
IMPORTANT X X
DESIRABLE
REFERENCE NUMBER: 380-21-357
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Grand Avenue Area Rebuild
$0 $0
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the Grand Avenue area.
Replace all aging overhead conductors, poles, and transformers along Grand Avenue
between East Sumner Street and East Lincoln Avenue. The Utility will notify and coordinate
this project with all communication utilities and utilize the most current construction
standards for this rebuild project.
The existing overhead conductors and poles are nearing the end of their useful service life,
which could lead to an increased risk of failures and power outages. Replacement of the
overhead conductors, poles, and transformers can mitigate these risks and ensure higher
reliability.
2031
CAPITAL COST $0 $250,000 $0 $0 $0
PROJECT YEAR: 2027
$0 $0
NET COST $0 $250,000
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0
$0 $0
REFERENCE NUMBER: 380-21-357
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 2374 $245,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $250,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Grand Avenue Area Rebuild
MANDATORY
CRITICAL
SCHEDULED 2028 2028
IMPORTANT X X
DESIRABLE
REFERENCE NUMBER: 380-24-371
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $30,000
$0 $320,000 $0 $0
DIVISION: Electric Utility FUND: Electric Utility
Maintain a safe and reliable fleet of utility vehicles.
The Utility will purchase a new single-axle, diesel engine bucket truck with a maximum
working height of 55 feet and an insulated boom. The existing bucket truck will be traded-in
or sold through the Wisconsin Surplus auction site or a similar platform.
This truck will be 16 years old in 2028. Recent truck inspection reports have required
numerous repairs and adjustments to various components. The truck is showing visible signs
of extensive wear and tear. Replacing this bucket truck is essential to ensure reliable
performance, enhance operational safety, and reduce ongoing maintenance costs associated
with an aging vehicle.
2031
CAPITAL COST $0 $350,000 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Bucket Truck Replacement - #209
REFERENCE NUMBER:380-24-371
COST: PER UNIT TOTAL
PURCHASE PRICE $350,000 4 HOURS PER DAY
ANNUAL RENT 5 AVERAGE DAYS PER WEEK
INSTALLATION 45 WEEKS PER YEAR
OTHER COSTS 15 YEARS IN SERVICE
TOTAL COSTS $350,000 $23,333 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 3
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEMS (2028) 2, 2, 13
TRUST/DONATIONS 1 week/year
GRANTS/AIDS **
FUND BALANCE $320,000
OTHER REVENUES $30,000
TOTAL SOURCES $350,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2028 2028
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
** No down time if work can be rescheduled.
$1,500/week if rental unit is required
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Bucket Truck Replacement - #209
REFERENCE NUMBER: 380-24-372
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Replace Pickup Truck #206
2031
CAPITAL COST $0 $90,000 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DIVISION: Electric Utility FUND: Electric Utility
Maintain a safe and reliable fleet of utility vehicles.
Purchase a new, full size 1-ton pickup truck with a fiberglass utility body, extended cab and 4-
wheel drive. The existing 3/4-ton pickup truck will be traded-in or sold through the
Wisconsin Surplus auction site or a similar platform.
The existing pickup truck will be 21 years old in 2028. A larger truck provides an increase in
payload and towing capacity while the fiberglass utility body will allow for more tools and
equipment to be stored on the vehicle, which will improve efficiency.
$0$0 $1,000
$0 $89,000 $0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0
$0 $0
REFERENCE NUMBER:380-24-372
COST: PER UNIT TOTAL
PURCHASE PRICE $90,000 3 HOURS PER DAY
ANNUAL RENT 5 AVERAGE DAYS PER WEEK
INSTALLATION 50 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $90,000 $4,500 ANNUAL CAPITAL COST
SIMILAR ITEMS IN INVENTORY 3
ITEMS REPLACED 1
TAX LEVY AGE OF ITEM (2028) 2, 9, 21
LONG TERM DEBT DOWN TIME
SPL. ASSESSMENTS
TRUST/DONATIONS
GRANTS/AIDS
FUND BALANCE $89,000
OTHER REVENUES $1,000
TOTAL SOURCES $90,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2028 2028
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Replace Pickup Truck #206
ESTIMATED EQUIPMENT USAGE:
INVENTORY AND REPLACEMENT
REVENUE SOURCES
DOWN COST
REFERENCE NUMBER: 380-27-387
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
$0 $300,000 $0 $0
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the electric distribution network.
Replace aging underground conductors and equipment along Monroe Avenue between CTH
K and the east side of Independance Park. The project includes excavating and installing
underground cables and replacing exisiting equipment such as junction boxes and
switchgears along the proposed route. Underground cables will be installed using a
directional boring method whenever possible to minimize disruption.
The existing underground cables are nearing the end of their useful service life, which could
lead to an increased risk of failures and power outages. Replacement of the underground
cables and equipment can mitigate these risks and ensure higher reliability.
2031
CAPITAL COST $0 $300,000 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Reconductor 25kV Circuit on Monroe Ave
REFERENCE NUMBER: 380-27-387
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 1100 $295,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $300,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2028
IMPORTANT X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Reconductor 25kV Circuit on Monroe Ave
Capital Improvement Program
2029
Hartford Electric
REFERENCE NUMBER: 380-25-376
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Rebuild Circuit 15
2031
CAPITAL COST $0 $0 $362,000 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the electric distribution network.
Convert an existing section of an overhead electric circuit to underground construction along
the railroad tracks between Airport Drive and the Waste Water Treatment Plant. The project
includes excavating and installing underground cables adjacent to the existing overhead
powerline. Cables will be installed using a directionally boring method whenever possible to
minimize disruption. Upon completion of the project, the overhead line will be
decommissioned and removed.
Rebuilding this aging overhead electric circuit to underground construction will reduce tree
trimming expenses, minimize wildlife-related power interruptions, and reduce exposure to
weather-related damage. Replacing and converting this section of Cirucit 15 to underground
will increase the overall reliability of the entire distribution system.
$0 $0$0 $0
$0 $0 $362,000 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 380-25-376
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 4800 $352,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $10,000 Retained Earnings
TOTAL PROJECT $362,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Rebuild Circuit 15
MANDATORY
CRITICAL
SCHEDULED 2029 2029
IMPORTANT X X
DESIRABLE
REFERENCE NUMBER: 380-25-377
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
$0 $0 $410,000 $0
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the Bell Avenue area.
Replace aging underground conductors and transformers along Bell Avenue between South
Wilson Avenue and Plaza Drive, and install new underground conductors along Highway K
from East Sumner Street to Schauer Drive. The project includes excavating and installing
underground cables and replacing exisiting equipment such as junction boxes, transfomers
and switchgears along the proposed route. Underground cables will be installed using a
directional boring method whenever possible to minimize disruption.
The existing underground cables are nearing the end of their useful service life, which could
lead to an increased risk of failures and power outages. Replacement of the underground
cables and equipment can mitigate these risks and ensure higher reliability. A looped
configuration along Hwy K will enhance reliability during maintenance and outages.
2031
CAPITAL COST $0 $0 $410,000 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Rebuild Bell Avenue Area
REFERENCE NUMBER: 380-25-377
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 5100 $400,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $10,000 Retained Earnings
TOTAL PROJECT $410,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2029 2029
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Rebuild Bell Avenue Area
REFERENCE NUMBER: 380-26-382
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Purchase New Jetter Truck (50%)
DIVISION: Electric Utility FUND: Electric Utility
Maintain a safe and reliable fleet of excavation equipment for Hartford Electric and the
Water Utility.
The Utility’s current hydro excavator is 22 years old and was purchased from the Wastewater
Treatment Plant in 2018 following their equipment upgrade. Due to age and use, the unit
now requires frequent maintenance, resulting in increased downtime and escalating repair
costs. Initially designed for jetting and rodding sewer lines, the truck includes unnecessary
components for hydro excavation which cannot be removed or bypassed due to the internal
system design. These unused components are prone to failure and contribute significantly to
maintenance costs. Replacing the unit with a hydro excavator designed for hydrovac
operations will enhance reliability, reduce unplanned downtime, and lower long-term
operating costs.
PROJECT YEAR: 2027 2028 2029 2030
Purchase a new hydro excavator equipped with high-pressure water and vacuum technology
to safely and efficiently expose underground infrastructure, minimize the risk of utility
damage, and improve overall productivity in the field. The new unit will feature a 12–15 cubic
yard debris tank, a 1,200-gallon water tank, and a 27-foot boom. The existing hydro
excavator will be traded-in or sold through the Wisconsin Surplus auction site or a similar
platform.
$0
2031
CAPITAL COST $0 $0 $375,000 $0 $0
LESS DISPOSALS $0 $0 $30,000 $0
$0 $0 $345,000 $0 $0
$0 $0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
REFERENCE NUMBER:380-26-382
COST: PER UNIT TOTAL
PURCHASE PRICE $375,000 4 HOURS PER DAY
ANNUAL RENT 3 AVERAGE DAYS PER WEEK
INSTALLATION 45 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $375,000 $18,750 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 1
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEMS (2029) 22
TRUST/DONATIONS 4 week/year
GRANTS/AIDS **
FUND BALANCE $345,000
OTHER REVENUES $30,000
TOTAL SOURCES $375,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2029 2029
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Purchase New Jetter Truck (50%)
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
** No down time if work can be rescheduled.
$2,000/week if rental unit is required
REFERENCE NUMBER: 380-27-388
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0 $0
$0 $0 $45,000 $0 $0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
$0
PROJECT YEAR: 2027 2028 2029 2030
LESS DISPOSALS $0 $0
DEPARTMENT: Electric Utility
The existing generator is original to the building (installed in 2001) and is nearing the end of
its reliable service life. The existing generator doesn’t provide adequate capacity to support
the building’s electrical needs during an outage. Service calls are becoming more frequent
and increasingly costly. Replacing the generator with a properly sized standby unit will
ensure a dependable backup power supply during power interruptions and eliminate
ongoing maintenance issues.
DIVISION: Electric Utility FUND: Electric Utility
Maintain a safe and reliable back-up power supply at at the Utility Operations Center.
The project includes removing the existing exterior Generac natural gas generator and
replacing it with a new 40 kW natural gas standby unit on the existing concrete pad. The new
generator will be sized to support the building’s full electrical load during an outage. The
project also includes installing a new 600 amp, 120/208 volt, three phase automatic transfer
switch next to the main service disconnect, along with all required control wiring and
electrical connections between the transfer switch and generator.
2031
CAPITAL COST $0 $0 $45,000 $0 $0
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Purchase New Generator for Utility Operations Center (50%)
REFERENCE NUMBER: 380-27-388
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $45,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $45,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2029
IMPORTANT X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Purchase New Generator for Utility Operations Center (50%)
Capital Improvement Program
2030
Hartford Electric
REFERENCE NUMBER: 380-11-291
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: East Monroe Area Rebuild between South Main Street and Wilson Avenue
2031
CAPITAL COST $0 $0 $0 $415,000 $0
PROJECT YEAR:
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability on the south side of east Monroe Avenue.
Replace aging underground conductors and transformers on the south side of East Monroe
Avenue between South Main Street and Grand Avenue and along South Wilson Avenue. The
project includes excavating and installing underground cables and replacing exisiting
equipment such as junction boxes, transfomers and switchgears along the proposed route.
Underground cables will be installed using a directional boring method whenever possible to
minimize disruption.
The existing underground cables are nearing the end of their useful service life, which could
lead to an increased risk of failures and power outages. Replacement of the underground
cables and equipment can mitigate these risks and ensure higher reliability.
2027 2028 2029 2030
$0 $0$0 $0
$0 $0 $0 $415,000
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 380-11-291
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 5300 $410,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $415,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: East Monroe Area Rebuild between South Main Street and Wilson Avenue
MANDATORY
CRITICAL
SCHEDULED 2030 2030
IMPORTANT X X
DESIRABLE
REFERENCE NUMBER: 380-25-378
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
$0 $0 $0 $223,000
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the Timberline Trail and East Monroe Avenue area.
Replace aging underground conductors and transformers along Timberline Trail between East
Monroe Avenue and Ridge View Drive and also along East Monroe Avenue between
Timberline Trail and Ridge View Drive. The project includes excavating and installing
underground cables and replacing exisiting equipment such as junction boxes, transfomers
and switchgears along the proposed route. Underground cables will be installed using a
directionally boring method whenever possible to minimize disruption.
The existing underground cables are nearing the end of their useful service life, which could
lead to an increased risk of failures and power outages. Replacement of the underground
cables and equipment can mitigate these risks and ensure higher reliability.
2031
CAPITAL COST $0 $0 $0 $223,000 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Rebuild Timberline Trail Area
REFERENCE NUMBER: 380-25-378
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 3700 $213,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $10,000 Retained Earnings
TOTAL PROJECT $223,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2030 2030
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Rebuild Timberline Trail Area
REFERENCE NUMBER: 380-25-379
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Backhoe Replacement (50%)
$0 $55,000
DIVISION: Electric Utility FUND: Electric Utility
Maintain a safe and reliable fleet of excavation equipment for Hartford Electric and the
Water Utility.
Purchase a new backhoe tractor equipped with a front-end loader bucket with a one cubic
yard capacity and a backhoe that is capable of digging depths of up to 14 feet.
The existing Case backhoe will be 21 years old in 2030. This excavator shows signs of
extensive wear and tear and requires numerous repairs, which reduces reliability, delays
projects, and increases maintenance expenses. A new excavating machine will enhance
safety and productivity, reducing maintenance expenses and project delays. Hartford Electric
and the Water Utility will share the cost and use of the new excavation equipment equally.
2031
CAPITAL COST $0 $0 $0 $70,000 $0
PROJECT YEAR: 20274
$0 $0
NET COST $0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $15,000
$0 $0
REFERENCE NUMBER:380-25-379
COST: PER UNIT TOTAL
PURCHASE PRICE $70,000 3 HOURS PER DAY
ANNUAL RENT 2 AVERAGE DAYS PER WEEK
INSTALLATION 40 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $70,000 $3,500 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 2
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEMS: (2030) 5, 13
TRUST/DONATIONS
GRANTS/AIDS
FUND BALANCE $55,000
OTHER REVENUES $15,000
TOTAL SOURCES $70,000
RANK PRIOR YEAR CURRENT YEAR
MANDATORY
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2030 2030
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Backhoe Replacement (50%)
ESTIMATED EQUIPMENT USAGE:
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
REFERENCE NUMBER: 380-25-380
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Replace Pickup Truck #202
2031
CAPITAL COST $0 $0 $0 $90,000 $0
PROJECT YEAR: 2027 2028 2029 2030
DIVISION: Electric Utility FUND: Electric Utility
Maintain a safe and reliable fleet of utility vehicles.
Purchase a new, full size 1-ton pickup truck with a fiberglass utility body, extended cab and 4-
wheel drive. The existing 3/4-ton pickup truck will be traded-in or sold through the
Wisconsin Surplus auction site or a similar platform.
The existing pickup truck will be 23 years old in 2030. This truck is showing visible signs of
extensive wear and tear. Replacing this pickup truck is essential to ensure reliable
performance, enhance operational safety, and reduce ongoing maintenance costs associated
with an aging vehicle.
$1,000$0 $0
$0 $0 $0 $89,000
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0
$0 $0
REFERENCE NUMBER:380-25-380
COST: PER UNIT TOTAL
PURCHASE PRICE $90,000 3 HOURS PER DAY
ANNUAL RENT 5 AVERAGE DAYS PER WEEK
INSTALLATION 50 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $90,000 $4,500 ANNUAL CAPITAL COST
SIMILAR ITEMS IN INVENTORY 3
ITEMS REPLACED 1
TAX LEVY AGE OF ITEM (2029) 2, 4, 11
LONG TERM DEBT DOWN TIME
SPL. ASSESSMENTS
TRUST/DONATIONS
GRANTS/AIDS
FUND BALANCE $89,000
OTHER REVENUES $1,000
TOTAL SOURCES $90,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2030 2030
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Replace Pickup Truck #202
ESTIMATED EQUIPMENT USAGE:
INVENTORY AND REPLACEMENT
REVENUE SOURCES
DOWN COST
REFERENCE NUMBER: 380-26-383
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Honeysuckle and Briarwood Area Voltage Upgrade
2031
CAPITAL COST $0 $0 $0 $223,000 $0
PROJECT YEAR: 2027 2028 2029 2030
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the Honeysuckle Road and Briarwood Lane area.
Replace all existing transformers along Honeysuckle Road and Briarwood Lane between
Hilldale Road and Tamarack Ave as part of a voltage conversion project. This work will
upgrade the area from the 4kV to the 25kV distribution system. The project supports the
Utility’s long-range system improvement plan by reducing reliance on aging 4kV circuits and
expanding the reach of the more efficient and reliable 25kV system.
The project supports the Utility’s long-range system improvement plan by phasing out the
4kV infrastructure in this area and expanding the more efficient and reliable 25kV
distribution system.
$0 $0$0 $0
$0 $0 $0 $223,000
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 380-26-383
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $213,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $10,000 Retained Earnings
TOTAL PROJECT $223,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Honeysuckle and Briarwood Area Voltage Upgrade
MANDATORY
CRITICAL
SCHEDULED 2030 2030
IMPORTANT X X
DESIRABLE
Capital Improvement Program
2031
Hartford Electric
REFERENCE NUMBER: 380-11-295
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE $0$0
DIVISION: Electric Utility
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
Enhance system reliability within the Misty Meadows area.
Replace aging underground conductors and transformers along Misty Meadows Boulevard
and East Avenue betwee McKinely Avenue and Lincoln Avenue. The project includes
excavating and installing underground cables and replacing exisiting equipment such as
junction boxes, transfomers and switchgears along the proposed route. Underground cables
will be installed using a directional boring method whenever possible to minimize disruption.
The existing underground cables are nearing the end of their useful service life, which could
lead to an increased risk of failures and power outages. Replacement of the underground
cables and equipment can mitigate these risks and ensure higher reliability.
$0
2031
$205,000$0
FUND: Electric Utility
$0
LESS DISPOSALS
$0
$0
$205,000
$0
$0
$0
$0
EXPENDITURES: REVENUES:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
2031 PROJECT YEAR
PROJECT SUMMARY
$0$0
PROJECT TITLE: Misty Meadows Area Rebuild
PROJECT YEAR:
$0$0
2030202920282027
CAPITAL COST
DEPARTMENT: Electric Utility
REFERENCE NUMBER: 380-11-295
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 3300 $200,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $205,000
RANK PRIOR YEARCURRENT YEAR
IMPORTANT
CRITICAL
X
SCHEDULED
PRIORITY
2031
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Misty Meadows Area Rebuild
X
DESIRABLE
MANDATORY
2028
REFERENCE NUMBER: 380-19-335
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$115,000
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
$0 $0 $0 $0
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the Victor Drive area.
Replace aging underground conductors and transformers along Victor Drive and Elm Street
between Prospect Street and West Rossman Street. The project includes excavating and
installing underground cables and replacing exisiting equipment such as junction boxes,
transfomers and switchgears along the proposed route. Underground cables will be installed
using a directional boring method whenever possible to minimize disruption.
The existing underground cables are nearing the end of their useful service life, which could
lead to an increased risk of failures and power outages. Replacement of the underground
cables and equipment can mitigate these risks and ensure higher reliability.
2031
CAPITAL COST $0 $0 $0 $0 $115,000
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Rebuild Victor Drive Area
REFERENCE NUMBER: 380-19-335
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $110,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $115,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2031
IMPORTANT X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Rebuild Victor Drive Area
REFERENCE NUMBER: 380-22-365
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$125,000
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $0 $0 $0
DIVISION: Electric Utility FUND: Electric Utility
Improve system reliability in the East Sumner Street area.
Replace all aging overhead conductors, poles, and transformers along East Sumner Street
between Grand Avenue and Steel Craft Drive. The Utility will notify and coordinate this
project with all communication utilities and utilize the most current construction standards
for this rebuild project.
The existing overhead conductors and poles are nearing the end of their useful service life,
which could lead to an increased risk of failures and power outages. Replacement of the
overhead conductors, poles, and transformers can mitigate these risks and ensure higher
reliability.
2031
CAPITAL COST $0 $0 $0 $0 $125,000
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: East Sumner Street Area Rebuild
REFERENCE NUMBER: 380-22-365
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 1500 $120,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000 Retained Earnings
TOTAL PROJECT $125,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2031
IMPORTANT X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: East Sumner Street Area Rebuild
REFERENCE NUMBER: 380-27-389
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Reconductor Section of Circuit 21
2031
CAPITAL COST $0 $0 $0 $0 $200,000
PROJECT YEAR:
DIVISION: Electric Utility FUND: Electric Utility
Enhance system reliability within the electric distribution network.
Install new 25kV underground electric cables from Innovation Way to the customer-owned
switchgear at Signicast. Underground cables will be installed using a directional boring
method whenever possible to minimize disruption.
The existing underground cables are nearing the end of their useful service life, which could
lead to an increased risk of failures and power outages. Replacement of the underground
cables and equipment can mitigate these risks and ensure higher reliability.
2027 2028 2029 2030
$0 $0$0 $0
$0 $0 $0 $0
$0
$200,000
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 380-27-389
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC (Linear Feet) 350 $190,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $10,000 Retained Earnings
TOTAL PROJECT $200,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Reconductor Section of Circuit 21
MANDATORY
CRITICAL
SCHEDULED 2031
IMPORTANT X
DESIRABLE
REFERENCE NUMBER: 380-27-390
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Electric Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Bucket Truck Replacement - Truck 203
2031
CAPITAL COST $0 $0 $0 $0 $350,000
PROJECT YEAR:
DIVISION: Electric Utility FUND: Electric Utility
Maintain a safe and reliable fleet of utility vehicles.
The Utility will purchase a new single-axle, diesel engine bucket truck with a maximum
working height of 48 feet and an insulated boom. The existing bucket truck will be traded-in
or sold through the Wisconsin Surplus auction site or a similar platform.
This truck will be 16 years old in 2031. Recent truck inspection reports have required
numerous repairs and adjustments to various components. The truck is showing visible signs
of extensive wear and tear. Replacing this bucket truck is essential to ensure reliable
performance, enhance operational safety, and reduce ongoing maintenance costs associated
with an aging vehicle.
2027 2028 2029 2030
$0 $0$0 $0
$0 $0 $0 $0
$30,000
$320,000
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER:380-27-390
COST: PER UNIT TOTAL
PURCHASE PRICE $350,000 4 HOURS PER DAY
ANNUAL RENT 5 AVERAGE DAYS PER WEEK
INSTALLATION 45 WEEKS PER YEAR
OTHER COSTS 15 YEARS IN SERVICE
TOTAL COSTS $350,000 $23,333 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 3
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEMS (2028) 6, 6, & 4
TRUST/DONATIONS 1 week/year
GRANTS/AIDS **
FUND BALANCE $320,000
OTHER REVENUES $30,000
TOTAL SOURCES $350,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X
DESIRABLE
SCHEDULED 2031
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Bucket Truck Replacement - Truck 203
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
** No down time if work can be rescheduled.
$1,500/week if rental unit is required
Capital Improvement Program
2027
Water Utility
REFERENCE NUMBER: 360-01-206
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0
FUND: Water Utility
DEPARTMENT: Water Utility
DIVISION: Water Utility
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
Maintain a reliable municipal water supply system.
Wells require rehabilitation to extend the life of the well, ensure maximum production, and
the reduce need for future well construction.
$70,000 $70,000 $70,000
20312030
$0
$0$0$0$0
$70,000
REVENUES:EXPENDITURES:
$0
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
2027 - 2031 PROJECT YEAR
PROJECT SUMMARY
202920282027
Remove and inspect the motor, column pipe, shaft, pump and associated parts of the well.
Replace all parts as necessary in order to maintain good well production. Project includes
wire brushing and chemically cleaning the well and aquifer. Well rehabilitaitons are
determined by evaluating the performance and yield of each of our five groundwater wells
every year.
PROJECT TITLE: Well Rehabilitation
CAPITAL COST
PROJECT YEAR:
LESS DISPOSALS
NET COST $70,000$70,000$70,000$70,000
$70,000$70,000
REFERENCE NUMBER: 360-01-206
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $455,000 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $455,000
RANK PRIOR YEARCURRENT YEAR
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 - 2031 PROJECT YEAR
MANDATORY
PRIORITY
2027
PROJECT TITLE: Well Rehabilitation
X
SCHEDULED
DESIRABLE
2027
IMPORTANT
CRITICAL
X
REFERENCE NUMBER: 360-16-303
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
2027-2030 PROJECT YEAR
PROJECT SUMMARY
PROJECT YEAR:
PROJECT TITLE: Water Meter Replacement Program
DEPARTMENT: Water Utility
DIVISION: Water Utility
Replace all commercial, industrial and residential water meters.
FUND: Water Utility
2031203020292027 2028
The Public Service Commission requires all water meters to be replaced within 20 years of
the original installation date. The batteries in the water meter modules are near the end of
their expected life of 15-20 years. The EPA has reduced the amount of lead allowable in
brass fittings and meters. As a result, all brass meter chambers are required to be replaced.
This is a multi-year project which began in 2019.
There are two parts to a complete water meter - the water module, which has a battery to
electronically collect, store and send monthly usage, and the meter chamber which measures
the water used. The new modules will use the same advanced metering infrastructure (AMI)
system as Hartford Electric. All water meter chambers will be replaced with a new plastic or
low-lead brass housing.
NET COST $95,000
EXPENDITURES:
CAPITAL COST
REVENUES:
$0 $0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
$0
$95,000$95,000
LESS DISPOSALS
$0$95,000$95,000$95,000
$0$95,000
$0
$95,000
$0
$0 $0
REFERENCE NUMBER: 360-16-303
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER METERS(2026-2029) 2444 $380,000 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $380,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
X
IMPORTANT
CRITICAL X
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027-2030 PROJECT YEAR
MANDATORY
PROJECT TITLE: Water Meter Replacement Program
SCHEDULED
DESIRABLE
20272027
REFERENCE NUMBER: 360-19-313
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $358,800 $0 $0 $0
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
Pleasant Avenue.
Replace approximately 1,200 linear feet of 4" and 6" watermain with an 8" watermain on
Pleasant Avenue between Grand Avenue and East Avenue.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
street reconstruction project.
2031
CAPITAL COST $358,800 $0 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Pleasant Avenue Watermain Replacement
REFERENCE NUMBER: 360-19-313
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 1200 $260 $312,000 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 1200 $26 $31,200 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 1200 $13 $15,600 Retained Earnings
TOTAL PROJECT $358,800
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2027 2027
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Pleasant Avenue Watermain Replacement
REFERENCE NUMBER: 360-24-336
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $224,300 $0 $0 $0
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
North Johnson Street.
Replace approximately 750 linear feet of 4" watermain with an 8" watermain on North
Johnson Street between State Street and High Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
street reconstruction project.
2031
CAPITAL COST $224,300 $0 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: North Johnson Street Watermain Replacement
REFERENCE NUMBER: 360-24-336
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 750 $260 $195,000 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 750 $26 $19,500 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 750 $13 $9,800 Retained Earnings
TOTAL PROJECT $224,300
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2027 2027
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: North Johnson Street Watermain Replacement
REFERENCE NUMBER: 360-25-344
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $454,000 $0 $0 $0
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
McKinley Avenue.
Replace approximately 1,200 linear feet of 4" watermain with an 8" watermain on McKinley
Avenue between Grand Avenue and East Avenue.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
street reconstruction project.
2031
CAPITAL COST $454,000 $0 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: McKinely Avenue Watermain Replacement
REFERENCE NUMBER: 360-25-344
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 1200 $329 $394,800 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 1200 $33 $39,500 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 1200 $16 $19,700 Retained Earnings
TOTAL PROJECT $454,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2027 2027
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: McKinely Avenue Watermain Replacement
REFERENCE NUMBER: 360-26-351
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $1,800,000 $9,000,000 $9,000,000
DIVISION: Water Utility FUND: Water Utility
Ensure a safe and dependable supply of drinking water.
Following the completion of the PFAS pilot testing in 2025, the Utility will begin the design
phase for permanent PFAS treatment facilities at Well 15 and Well 16. Pilot test results will
be used to select the most effective treatment media for each site, targeting the specific PFAS
compounds detected. The design phase will include detailed engineering plans, equipment
specifications, infrastructure modifications, and integration with the existing water system to
ensure long-term regulatory compliance. Construction of the facilities will begin following
DNR approval and is scheduled to start in 2028.
In 2024, the Environmental Protection Agency (EPA) announced new enforceable standards
for PFAS chemicals, significantly reducing the Maximum Contaminant Level (MCL) for
perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS) from 70 parts per
trillion (ppt) to 4 ppt. Based on recent sample results, the Water Utility exceeds this new MCL
by 2 ppt. To comply with the regulation, the Utility must reduce PFAS levels in the water
supply to below the new standard. While the original compliance deadline was 2029, the EPA
announced in May 2025 that the timeline has been extended to 2031. Developing detailed
engineering plans and specifications is essential to ensure the Utility can implement an
effective treatment system, meet regulatory requirements and initiate construction in 2028
to remain on schedule for the 2031 compliance deadline.
2030
CAPITAL COST $0 $1,800,000 $9,000,000 $9,000,000 $0
PROJECT YEAR: 2026 2027 2028 2029
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 - 2029 PROJECT YEAR
PROJECT TITLE: PFAS Remediation Plant Design & Construction at Wells 15 & 16
REFERENCE NUMBER: 360-26-351
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $18,000,000 Revenue Bonds
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER LATERAL $0
EQUIPMENT $0
ENGINEERING/ARCH. $1,800,000 Retained Earnings
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $19,800,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2027 2027
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 - 2029 PROJECT YEAR
PROJECT TITLE: PFAS Remediation Plant Design & Construction at Wells 15 & 16
REFERENCE NUMBER: 360-27-358
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Utility Operations Center HVAC Control System Replacement (50%)
2031
CAPITAL COST $22,000 $0 $0 $0 $0
PROJECT YEAR:
DIVISION: Water Utility FUND: Water Utility
Maintain a reliable, energy efficient heating and ventalation system at the Utility Operations
Center
Project includes removing the old control system and installing a new modern control system
platform with updated zone controllers, dampers, relays and communication wiring.
Programming, system start-up and staff training will also be included with the project.
The existing HVAC control system is original to the Utility Building and will be 26 years old at
the time of replacement. It has reached the end of its useful life, and many of the
components are obsolete and increasingly difficult to locate. Replacing the control system
will help avoid unexpected failures and ensure the heating and cooling equipment operates
efficiently. Service technicians have recommended replacement due to age, reliability
concerns, and limited availability of parts.
2027 2028 2029 2030
$0 $0$0 $0
$22,000 $0 $0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER:360-27-358
COST: PER UNIT TOTAL
PURCHASE PRICE $44,000 24 HOURS PER DAY
ANNUAL RENT 7 AVERAGE DAYS PER WEEK
INSTALLATION 52 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $44,000 $2,200 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 0
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEM
TRUST/DONATIONS
GRANTS/AIDS
FUND BALANCE $44,000
OTHER REVENUES
TOTAL SOURCES $44,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X
DESIRABLE
SCHEDULED 2027
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Utility Operations Center HVAC Control System Replacement (50%)
ESTIMATED EQUIPMENT USAGE:
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
Capital Improvement Program
2028
Water Utility
REFERENCE NUMBER: 360-16-306
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $448,500 $0 $0
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
West Loos Street.
Replace approximately 1,500 linear feet of 4" and 6" watermain with an 8" watermain on
West Loos Street between Summit Street and Rural Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
street reconstruction project.
2031
CAPITAL COST $0 $448,500 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: West Loos Street Watermain Replacement
REFERENCE NUMBER: 360-16-306
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 1500 $260 $390,000 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 1500 $26 $39,000 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 1500 $13 $19,500 Retained Earnings
TOTAL PROJECT $448,500
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2028 2028
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: West Loos Street Watermain Replacement
REFERENCE NUMBER: 360-25-345
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $441,100 $0 $0
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
West Rogers Street.
Replace approximately 1,300 linear feet of 4" watermain with an 8" watermain on West
Rogers Street between South Main Street and Cedar Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
street reconstruction project.
2031
CAPITAL COST $0 $441,100 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: West Rogers Street Watermain Replacement
REFERENCE NUMBER: 360-25-345
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 1300 $295 $383,500 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 1300 $30 $38,400 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 1300 $15 $19,200 Retained Earnings
TOTAL PROJECT $441,100
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2028 2028
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: West Rogers Street Watermain Replacement
REFERENCE NUMBER: 360-26-352
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $1,000
$0 $101,000 $0 $0
DIVISION: Water Utility FUND: Water Utility
Maintain a safe and reliable fleet of utility vehicles.
Purchase a new, full size 1-ton pickup truck with a utility body, extended cab and 4-wheel
drive and snow plow. The existing 3/4-ton pickup truck will be traded-in or sold through the
Wisconsin Surplus auction site or a similar platform.
The existing pickup truck will be 18 years old in 2028. A larger truck provides an increase in
payload and towing capacity while the fiberglass utility body will allow for more tools and
equipment to be stored on the vehicle, which will improve efficiency.
2031
CAPITAL COST $0 $102,000 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Pickup Truck Replacement - #402
REFERENCE NUMBER:360-26-352
COST: PER UNIT TOTAL
PURCHASE PRICE $102,000 5 HOURS PER DAY
ANNUAL RENT 5 AVERAGE DAYS PER WEEK
INSTALLATION 48 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $102,000 $5,100 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 4
LONG TERM DEBT 1
SPL. ASSESSMENTS 2, 3, 7, 19
TRUST/DONATIONS
GRANTS/AIDS
FUND BALANCE $101,000
OTHER REVENUES $1,000
TOTAL SOURCES $102,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2028 2028
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
AGE OF ITEMS in 2026
DOWN TIME
DOWN COST
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Pickup Truck Replacement - #402
.
Capital Improvement Program
2029
Water Utility
REFERENCE NUMBER: 360-24-334
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $0 $130,000 $0
DIVISION: Water Utility FUND: Water Utility
Extend the life of the elevated water storge tanks.
Visually inspect and pressure wash the exterior paint system to remove any delamination,
flaking and contaminants. Any coating failures will be spot cleaned, primed, and painted.
One coat of epoxy and two coats of urethane will be applied to protect the tank. The
urethane system provides abrasion resistance with a high gloss sheen retention.
The DNR requires each water storage tank to be inspected every five years by a qualified
engineer. This tower was inspected in 2020 and the engineer's report recommends a high
pressure wash and overcoat of the exterior with a urethane system between 2027 - 2030.
The expected life of the urethane system is approximately fifteen years. This tower was
constructed in 2010.
2031
CAPITAL COST $0 $0 $130,000 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029
PROJECT TITLE: Overcoat the 750K Water Tower
REFERENCE NUMBER: 360-24-334
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $125,000 Retained Earnings
WATER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $5,000
TOTAL PROJECT $130,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2029 2029
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029
PROJECT TITLE: Overcoat the 750K Water Tower
REFERENCE NUMBER: 360-25-347
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $0 $681,000 $0
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
Grand Avenue.
Replace approximately 1,800 linear feet of 4" watermain with an 8" watermain on Grand
Avenue between Church Street and Branch Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
upcoming street reconstruction project.
2031
CAPITAL COST $0 $0 $681,000 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Grand Avenue Watermain Replacement
REFERENCE NUMBER: 360-25-347
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 1800 $329 $592,200 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 1800 $33 $59,200 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 1800 $16 $29,600 Retained Earnings
TOTAL PROJECT $681,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2029 2029
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Grand Avenue Watermain Replacement
REFERENCE NUMBER: 360-26-353
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0 $0 $345,000 $0 $0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
$0
CAPITAL COST $0 $0 $375,000 $0 $0
LESS DISPOSALS $0 $0 $30,000 $0
2031
DIVISION: Water Utility FUND: Water Utility
Maintain a safe and reliable fleet of utility vehicles.
Purchase a new hydro excavator equipped with high-pressure water and vacuum technology
to safely and efficiently expose underground infrastructure, minimize the risk of utility
strikes, and enhance overall productivity in the field. The new unit will feature a 12–15 cubic
yard debris tank, a 1,200-gallon water tank, and a 27-foot boom, significantly improving the
Utility’s excavation capabilities. The existing hydro excavator will be traded in or sold through
the Wisconsin Surplus auction site or a similar platform.
PROJECT YEAR: 2027 2028 2029 2030
The Utility’s current hydro excavator is 22 years old and was purchased from the Wastewater
Treatment Plant in 2018 following their equipment upgrade. Due to age and use, the unit
now requires frequent maintenance, resulting in increased downtime and escalating repair
costs. Initially designed for jetting and rodding sewer lines, the truck includes unnecessary
components for hydro excavation which cannot be removed or bypassed due to the internal
system design. These unused components are prone to failure and contribute significantly to
maintenance costs. Replacing the unit with a hydro excavator designed for hydrovac
operations will enhance reliability, reduce unplanned downtime, and lower long-term
operating costs.
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Purchase New Jetter Truck (50%)
DEPARTMENT: Water Utility
REFERENCE NUMBER:360-26-353
COST: PER UNIT TOTAL
PURCHASE PRICE $375,000 4 HOURS PER DAY
ANNUAL RENT 3 AVERAGE DAYS PER WEEK
INSTALLATION 45 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $375,000 $18,750 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 1
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEMS (2029) 22
TRUST/DONATIONS 4 week/year
GRANTS/AIDS **
FUND BALANCE $345,000
OTHER REVENUES $30,000
TOTAL SOURCES $375,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2029 2029
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
** No down time if work can be rescheduled.
$2,000/week if rental unit is required
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Purchase New Jetter Truck (50%)
REFERENCE NUMBER: 360-27-359
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Purchase New Generator for Utility Operations Center (50%)
2031
CAPITAL COST $0 $0 $45,000 $0 $0
PROJECT YEAR:
DIVISION: Water Utility FUND: Water Utility
Maintain a safe and reliable back-up power supply at at the Utility Operations Center.
The project includes removing the existing exterior Generac natural gas generator and
replacing it with a new 40 kW natural gas standby unit on the existing concrete pad. The new
generator will be sized to support the building’s full electrical load during an outage. The
project also includes installing a new 600 amp, 120/208 volt, three phase automatic transfer
switch next to the main service disconnect, along with all required control wiring and
electrical connections between the transfer switch and generator.
The existing generator is original to the building (installed in 2001) and is nearing the end of
its reliable service life. The existing generator doesn’t provide adequate capacity to support
the building’s electrical needs during an outage. Service calls are becoming more frequent
and increasingly costly. Replacing the generator with a properly sized standby unit will
ensure a dependable backup power supply during power interruptions and eliminate
ongoing maintenance issues.
2027 2028 2029 2030
$0 $0$0 $0
$0 $0 $45,000 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 360-27-359
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $45,000 Retained Earnings
WATER $0
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $45,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Purchase New Generator for Utility Operations Center (50%)
MANDATORY
CRITICAL
SCHEDULED 2029
IMPORTANT X
DESIRABLE
Capital Improvement Program
2030
Water Utility
REFERENCE NUMBER: 360-25-349
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $15,000$0 $0
NET COST $0 $0 $0 $55,000
DIVISION: Water Utility FUND: Water Utility
Maintain a safe and reliable fleet of excavation equipment for Hartford Electric and the
Water Utility.
Purchase a new backhoe tractor equipped with a front-end loader bucket with a one cubic
yard capacity and a backhoe that is capable of digging depths of up to 14 feet.
The existing Case backhoe will be 21 years old in 2030. This excavator shows signs of
extensive wear and tear and requires numerous repairs, which reduces reliability, delays
projects, and increases maintenance expenses. A new excavating machine will enhance
safety and productivity, reducing maintenance expenses and project delays. Hartford Electric
and the Water Utility will share the cost and use of the new excavation equipment equally.
2031
CAPITAL COST $0 $0 $0 $70,000 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Backhoe Replacement (50%)
REFERENCE NUMBER:360-25-349
COST: PER UNIT TOTAL
PURCHASE PRICE $70,000 3 HOURS PER DAY
ANNUAL RENT 2 AVERAGE DAYS PER WEEK
INSTALLATION 40 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $70,000 $3,500 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 3
LONG TERM DEBT 1
SPL. ASSESSMENTS AGE OF ITEMS: (2029) 5, 13
TRUST/DONATIONS
GRANTS/AIDS
FUND BALANCE $55,000
OTHER REVENUES $15,000
TOTAL SOURCES $70,000
RANK PRIOR YEAR CURRENT YEAR
MANDATORY
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2030 2030
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Backhoe Replacement (50%)
ESTIMATED EQUIPMENT USAGE:
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
DOWN TIME
DOWN COST
REFERENCE NUMBER: 360-25-350
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $1,000$0 $0
$0 $0 $0 $97,000
DIVISION: Water Utility FUND: Water Utility
Maintain a safe and reliable fleet of utility vehicles.
Purchase a new, full size 1-ton pickup truck with a utility body, bumper crane, extended cab
and 4-wheel drive. The existing 3/4-ton van will be traded-in or sold through the Wisconsin
Surplus auction site or a similar platform.
The existing pickup truck will be 21 years old in 2030. A larger truck provides an increase in
payload and towing capacity while the fiberglass utility body will allow for more tools and
equipment to be stored on the vehicle, which will improve efficiency.
2031
CAPITAL COST $0 $0 $0 $98,000 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Pickup Truck Replacement - #408
REFERENCE NUMBER:360-25-350
COST: PER UNIT TOTAL
PURCHASE PRICE $98,000 5 HOURS PER DAY
ANNUAL RENT 5 AVERAGE DAYS PER WEEK
INSTALLATION 48 WEEKS PER YEAR
OTHER COSTS 20 YEARS IN SERVICE
TOTAL COSTS $98,000 $4,900 ANNUAL CAPITAL COST
TAX LEVY SIMILAR ITEMS IN INVENTORY 4
LONG TERM DEBT 1
SPL. ASSESSMENTS 2, 4, 5, 9
TRUST/DONATIONS
GRANTS/AIDS
FUND BALANCE $97,000
OTHER REVENUES $1,000
TOTAL SOURCES $98,000
RANK PRIOR YEAR CURRENT YEAR
CRITICAL
IMPORTANT X X
DESIRABLE
SCHEDULED 2030 2030
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
AGE OF ITEMS (in 2030)
DOWN TIME
DOWN COST
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Pickup Truck Replacement - #408
REFERENCE NUMBER: 360-26-354
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $0 $0 $128,700
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
Church Street.
Replace approximately 340 linear feet of 4" watermain with an 8" watermain on Church
Street between Branch Street and South Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
upcoming street reconstruction project.
2031
CAPITAL COST $0 $0 $0 $128,700 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Church Street Watermain Replacement
REFERENCE NUMBER: 360-26-354
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 340 $329 $111,900 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 340 $33 $11,200 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 340 $16 $5,600 Retained Earnings
TOTAL PROJECT $128,700
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2030 2030
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Church Street Watermain Replacement
REFERENCE NUMBER: 360-26-355
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $0 $0 $321,700
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
Teddy Avenue.
Replace approximately 850 linear feet of 4" watermain with an 8" watermain on East Loos
Street between Branch Street and Teddy Avenue.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
upcoming street reconstruction project.
2031
CAPITAL COST $0 $0 $0 $321,700 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Teddy Avenue Watermain Replacement
REFERENCE NUMBER: 360-26-355
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 850 $329 $279,700 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 850 $33 $28,000 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 850 $16 $14,000 Retained Earnings
TOTAL PROJECT $321,700
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2030 2030
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Teddy Avenue Watermain Replacement
REFERENCE NUMBER: 360-26-356
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $0 $0 $373,800
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
East Loos Street.
Replace approximately 1,250 linear feet of 4" watermain with an 8" watermain on East Loos
Street between Branch Street and Teddy Avenue.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
upcoming street reconstruction project.
2031
CAPITAL COST $0 $0 $0 $373,800 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: East Loos Street Watermain Replacement
REFERENCE NUMBER: 360-26-356
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 1250 $260 $325,000 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 1250 $26 $32,500 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 1250 $13 $16,300 Retained Earnings
TOTAL PROJECT $373,800
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2030 2030
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: East Loos Street Watermain Replacement
REFERENCE NUMBER: 360-26-357
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $0 $0 $84,900
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
Kossuth Street.
Replace approximately 250 linear feet of 4" watermain with an 8" watermain on Kossuth
Street between South Rural Street and South Johnson Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
upcoming street reconstruction project.
2031
CAPITAL COST $0 $0 $0 $84,900 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Kossuth Street Watermain Replacement
REFERENCE NUMBER: 360-26-357
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 250 $295 $73,800 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 250 $30 $7,400 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 250 $15 $3,700 Retained Earnings
TOTAL PROJECT $84,900
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2030 2030
IMPORTANT X X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Kossuth Street Watermain Replacement
Capital Improvement Program
2031
Water Utility
REFERENCE NUMBER: 360-23-332
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Forest Street Watermain Replacement
2031
CAPITAL COST $0 $0 $0 $0 $288,400
PROJECT YEAR:
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
East Washington Street.
Replace approximately 850 linear feet of 4" and 6" watermain with an 8" watermain on
Forest Street between Prospect Street and Rossman Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
street reconstruction project.
2027 2028 2029 2030
$0 $0$0 $0
NET COST $0 $0 $0 $0
$0
$288,400
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 360-23-332
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 850 $295 $250,800 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 850 $30 $25,100 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 850 $15 $12,500 Retained Earnings
TOTAL PROJECT $288,400
RANK PRIOR YEARCURRENT YEAR
CRITICAL
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Forest Street Watermain Replacement
PRIORITY
MANDATORY
SCHEDULED 2031
IMPORTANT X
DESIRABLE
REFERENCE NUMBER: 360-25-346
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$356,300
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
NET COST $0 $0 $0 $0
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
East Washington Street.
Replace approximately 1,050 linear feet of 4" watermain with an 8" watermain on
Washington Street between Rural Street and the alley located 600 feet west of Branch Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
street reconstruction project.
2031
CAPITAL COST $0 $0 $0 $0 $356,300
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Washington Street Watermain Replacement
REFERENCE NUMBER: 360-25-346
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 1050 $295 $309,800 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 1050 $30 $31,000 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 1050 $15 $15,500 Retained Earnings
TOTAL PROJECT $356,300
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2031
IMPORTANT X
DESIRABLE
MANDATORY
CRITICAL
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Washington Street Watermain Replacement
REFERENCE NUMBER: 360-24-336
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Water Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: North Johnson Street Watermain Replacement
2031
CAPITAL COST $0 $0 $0 $0 $224,300
PROJECT YEAR:
DIVISION: Water Utility FUND: Water Utility
Ensure compliance with all State and Federal regulatory requirements while simultaneously
enhancing water pressure, fire protection, and the overall reliability of the water system on
North Johnson Street.
Replace approximately 750 linear feet of 4" watermain with an 8" watermain on North
Johnson Street between Jackson Street and West Sumner Street.
In 2025, the Environmental Protection Agency (EPA) approved the Lead and Copper Rule
Improvements (LCRI), requiring the removal of all lead service laterals by 2037. Nearly all
Utility-owned lead laterals are connected to 4" water mains. In addition to regulatory
compliance, the Department of Natural Resources (DNR) recommends replacing all 4" water
mains to improve system flow and pressure for fire protection. This project addresses an
aging segment of water main with a history of breaks and is being coordinated with the
street reconstruction project.
2027 2028 2029 2030
$0 $0$0 $0
NET COST $0 $0 $0 $0
$0
$224,300
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 360-24-336
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER (Linear Feet) 750 $260 $195,000 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. (+/-10%) 750 $26 $19,500 Retained Earnings
FORCE LABOR $0
CONTINGENCIES (+/-5%) 750 $13 $9,800 Retained Earnings
TOTAL PROJECT $224,300
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: North Johnson Street Watermain Replacement
MANDATORY
CRITICAL
SCHEDULED 2031
IMPORTANT X
DESIRABLE
Capital Improvement Program
2027
Sewer
REFERENCE NUMBER: 370-16-191
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027-2030 PROJECT YEAR
PROJECT TITLE: Water Meter Replacement Program
$95,000 $95,000
DIVISION: Sewer FUND: 595.370.536296.59501
Replace all commercial, industrial and residential water meters.
There are two parts to a complete water meter - the water module which has a battery and
electronically collects, stores and send monthly usage, and the meter chamber which
measures the water used. The new modules will use the same advanced metering
infrastructure (AMI) system as Hartford Electric. All water meter chambers will be replaced
with a new plastic or low-lead brass housing.
The Public Service Commission requires all water meters to be replaced within 20 years of
the original installation date. The EPA has reduced the amount allowable in brass fittings and
meters. As a result, all brass meter chambers are required to be replaced. This is a multi-year
projkect which began in 2019.
2031
CAPITAL COST $95,000 $95,000 $95,000 $95,000 $0
PROJECT YEAR: 2027
$0 $0
$95,000 $95,000
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0
$0 $0
REFERENCE NUMBER: 370-16-191
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER 2444 $380,000 Retained Earnings
SANITARY SEWER $0
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $380,000
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2027-2030
PROJECT TITLE: Water Meter Replacement Program
MANDATORY
CRITICAL X
SCHEDULED 2027-2030
IMPORTANT
DESIRABLE
REFERENCE NUMBER: 370-23-235
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
PROJECT TITLE: Aeration Basin Rehab
CAPITAL COST
PROJECT YEAR:
LESS DISPOSALS
NET COST -$ -$ -$ -$
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
2027 PROJECT YEAR
PROJECT SUMMARY
202920282027
Complete aeration basin rehab including new motors, gear boxes, shafts and discs.
3,000,000.00$
REVENUES:EXPENDITURES:
$0
FUND: Sewer
DEPARTMENT: Sewer Utility
DIVISION: Sewer
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
Replace 28 year old aeration equipment.
Components of the treatment process are at the end of their useful life. Rust and corrosion
have made these parts unserviceable.
$3,000,000
20312030
$0
REFERENCE NUMBER: 370-23-235
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 1 $3,000,000 $3,000,000 Retained earnings
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $3,000,000
RANK PRIOR YEARCURRENT YEAR
PROJECT TITLE: Aeration Basin Rehab
SCHEDULED
DESIRABLE
2027
IMPORTANT
CRITICAL X
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
MANDATORY
PRIORITY
REFERENCE NUMBER: 370-24-241
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: North Johnson St Sanitary Sewer Replacement
2031
CAPITAL COST $198,456 $0 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DIVISION: Sewer FUND: Sewer
Replace sanitary sewer on North Johnson Street.
Replace 724 linear feet of 8" sanitary sewer on North Johnson Street from West State St. to
High St.
Eight inch clay sanitary sewer needs to be replaced in conjunction with water main
replacement and street reconstruction.
$0 $0$0 $0
NET COST $198,456 $0 $0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 370-24-241
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 724 $238 $172,565 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 724 $24 $17,260 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 724 $12 $8,630 Retained Earnings
TOTAL PROJECT $198,456
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: North Johnson Street Sanitary Sewer Replacement
MANDATORY
CRITICAL X
SCHEDULED 2027
IMPORTANT
DESIRABLE
REFERENCE NUMBER: 370-25-251
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Pleasant Ave Sanitary Sewer Replacement
-$ -$
DIVISION: Sewer FUND: Sewer
Replace sanitary sewer on Pleasant Avenue.
Replace 867 linear feet of 8 inch sanitary sewer on Pleasant Ave from Grand Avenue to East
Avenue
Clay sanitary pipe is in poor condition and needs to be replaced in conjunction with street
reconstruction project.
2031
CAPITAL COST 237,653.00$
PROJECT YEAR: 2027
NET COST 237,653.00$ - $ - $
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 370-25-251
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 867 $238 $206,649 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 867 $24 $20,669 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 867 $12 $10,335 Retained Earnings
TOTAL PROJECT $237,653
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Pleasant Ave Sanitary Sewer Replacement
MANDATORY
CRITICAL X
SCHEDULED 2027
IMPORTANT
DESIRABLE
REFERENCE NUMBER: 370-25-252
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
-$
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
NET COST 347,730.00$ - $ -$ -$
DIVISION: Sewer FUND:
Replace sanitary sewer on McKinley Avenue.
Replace 987 linear feet of sanitary sewer between Grand Avenue and East Avenue.
Replace collapsed PVC pipe and clay pipe in conjunction with watermain replacement.
2031
CAPITAL COST 347,730.00$
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: McKinley Avenue Sanitary Sewer Replacement
REFERENCE NUMBER: 370-25-252
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 987 $306 $302,367 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 987 $31 $30,242 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 987 $15 $15,121 Retained Earnings
TOTAL PROJECT $347,730
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: McKinley Avenue Sanitary Sewer Replacement
MANDATORY
CRITICAL X
SCHEDULED 2027
IMPORTANT
DESIRABLE
REFERENCE NUMBER: 370-26-258
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Sewer Utility Rate Study & Reserve Capacity Assessment
$0 $0
DIVISION: Sewer FUND: Sewer
Analyze financial future of sewer utility.
Analyze sewer rates, treatment cost, possible Chloride and PFAS remediation costs and
reserve capacity assessment fees.
The current reserve capacity schedule ends in 2028, and the last rate study was in 2013.
2031
CAPITAL COST $18,000 $0 $0 $0 $0
PROJECT YEAR: 2027
$0 $0
$18,000 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0
$0 $0
REFERENCE NUMBER:370-26-258
COST: PER UNIT TOTAL
PURCHASE PRICE $18,000 24 HOURS PER DAY
ANNUAL RENT $0 7 AVERAGE DAYS PER WEEK
INSTALLATION $0 52 WEEKS PER YEAR
OTHER COSTS $0 14 YEARS IN SERVICE
TOTAL COSTS $18,000 $1,286 ANNUAL CAPITAL COST
TAX LEVY $0 SIMILAR ITEMS IN INVENTORY 0
LONG TERM DEBT $0 0
SPL. ASSESSMENTS $0 0
TRUST/DONATIONS $0 0
GRANTS/AIDS $0 0
FUND BALANCE $18,000
OTHER REVENUES $0
TOTAL SOURCES $18,000
RANK PRIOR YEAR CURRENT YEAR
MANDITORY
CRITICAL X
IMPORTANT
DESIRABLE
SCHEDULED 2027
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2027 PROJECT YEAR
PROJECT TITLE: Sewer Utility Rate Study & Reserve Capacity Assessment
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
AGE OF ITEMS in 2027
DOWN TIME
DOWN COST
Capital Improvement Program
2028
Sewer
REFERENCE NUMBER: 370-24-236
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
$0 $389,510 $0 $0
DIVISION: Sewer FUND:
Replace sanitary sewer on West Loos Street.
Replace 1,421 linear feet of 6" clay sanitary sewer with 8" PVC pipe on West Loos from
Summit Street to South Rural Street.
Clay sanitary sewer needs to be replaced in conjunction with watermain replacement.
2031
CAPITAL COST $0 $389,510 $0 $0 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: West Loos Street Sanitary Sewer Replacement
REFERENCE NUMBER: 370-24-236
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 1421 $238 $338,695 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 1421 $24 $33,877 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 1421 $12 $16,938 Retained Earnings
TOTAL PROJECT $389,510
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2028
IMPORTANT
DESIRABLE
MANDATORY
CRITICAL X
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: West Loos Street Sanitary Sewer Replacement
REFERENCE NUMBER: 370-24-237
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: Truck 503 replacement
-$ -$
DIVISION: Sewer FUND:
Replace truck 503.
Purchase a 2028 3/4 ton service truck to replace 2027 service truck.
2017 service truck is showing signs of wear, has high miles and is in need of replacement.
2031
CAPITAL COST 80,000.00$
PROJECT YEAR: 2027
NET COST -$ 80,000.00$ - $
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER:370-24-237
COST: PER UNIT TOTAL
PURCHASE PRICE $80,000 8 HOURS PER DAY
ANNUAL RENT $0 5 AVERAGE DAYS PER WEEK
INSTALLATION $0 52 WEEKS PER YEAR
OTHER COSTS $0 11 YEARS IN SERVICE
TOTAL COSTS $80,000 $7,273 ANNUAL CAPITAL COST
TAX LEVY $0 SIMILAR ITEMS IN INVENTORY 0
LONG TERM DEBT $0 2017 pickup
SPL. ASSESSMENTS $0 11 years
TRUST/DONATIONS $0 0
GRANTS/AIDS $0 0
FUND BALANCE $80,000
OTHER REVENUES $0
TOTAL SOURCES $80,000
RANK PRIOR YEAR CURRENT YEAR
MANDITORY
CRITICAL X
IMPORTANT
DESIRABLE
SCHEDULED 2028
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
AGE OF ITEMS in 2027
DOWN TIME
DOWN COST
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2028
PROJECT TITLE: Truck 503 Replacement
REFERENCE NUMBER: 370-25-253
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2028 PROJECT YEAR
PROJECT TITLE: West Rogers Street Sanitary Sewer Replacement
$0 $0
DIVISION: Sewer FUND: Sewer
Replace sanitary sewer on West Rogers Street.
Replace 1,200 linear feet of 6" clay sanitary sewer with 8" PVC pipe on West Rogers between
South Main Street and Cedar Street.
Clay sanitary sewer is in poor condition and needs to be replaced in conjunction with
watermain replacement.
2031
CAPITAL COST $0 $328,932 $0 $0 $0
PROJECT YEAR: 2027
$0 $0
$0 $328,932
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0
$0 $0
REFERENCE NUMBER: 370-25-253
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 1,200 $238 $286,020 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 1,200 $24 $28,608 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 1,200 $12 $14,304 Retained Earnings
TOTAL PROJECT $328,932
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2028
PROJECT TITLE: West Rogers Sanitary Sewer Replacement
MANDATORY
CRITICAL X
SCHEDULED 2028
IMPORTANT
DESIRABLE
Capital Improvement Program
2029
Sewer
REFERENCE NUMBER: 370-27-267
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Truck 501 Replacement
$65,000 $0
DIVISION: Sewer FUND:
Replace truck 501
Replace truck 501 with a 2029 3/4 ton with plow.
2031
CAPITAL COST $0 $0 $65,000 $0 $0
PROJECT YEAR: 2027
$0 $0
$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0
$0 $0
REFERENCE NUMBER: 370-27-267
COST: PER UNIT TOTAL
PURCHASE PRICE $65,000 8 HOURS PER DAY
ANNUAL RENT $0 5 AVERAGE DAYS PER WEEK
INSTALLATION $0 52 WEEKS PER YEAR
OTHER COSTS $0 11 YEARS IN SERVICE
TOTAL COSTS $65,000 $5,909 ANNUAL CAPITAL COST
TAX LEVY $0 SIMILAR ITEMS IN INVENTORY 0
LONG TERM DEBT $0 2019 pickup
SPL. ASSESSMENTS $0 10 years
TRUST/DONATIONS $0 0
GRANTS/AIDS $0 0
FUND BALANCE $65,000
OTHER REVENUES $0
TOTAL SOURCES $65,000
RANK PRIOR YEAR CURRENT YEAR
MANDITORY
CRITICAL X
IMPORTANT
DESIRABLE
SCHEDULED 2029
ESTIMATED EQUIPMENT USAGE:
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2029
PROJECT TITLE: Truck 501 Replacement
PRIORITY
REVENUE SOURCES INVENTORY AND REPLACEMENT
ITEMS REPLACED
AGE OF ITEMS in 2027
DOWN TIME
DOWN COST
REFERENCE NUMBER: 370-26-259
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
-$
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
NET COST -$ -$ 43,858.00$ - $
DIVISION: Sewer FUND:
Replace sanitary sewer on a portion of Grand Avenue.
Replace 160 linear feet of 6" clay sanitary sewer on Grand Avenue with 8" PVC pipe between
Linden Avenue and manhole#03-1318.
Replace sanitary sewer in conjunction with watermain replacement.
2031
CAPITAL COST 43,858.00$
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Grand Avenue Sanitary Sewer Replacement
REFERENCE NUMBER: 370-26-259
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0 Retained Earnings
ELECTRIC $0
WATER $0
SANITARY SEWER 160 $238 $38,136
EQUIPMENT $0
ENGINEERING/ARCH. 160 $24 $3,814
FORCE LABOR $0
CONTINGENCIES 160 $12 $1,907
TOTAL PROJECT $43,858
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2029
IMPORTANT
DESIRABLE
MANDATORY
CRITICAL X
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR: 2029
PROJECT TITLE: Grand Avenue Sanitary Sewer Replacement
REFERENCE NUMBER: 370-26-256
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
NET COST -$ -$ 225,000.00$ - $ -$
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
2031
CAPITAL COST 225,000.00$
PROJECT YEAR: 2027 2028 2029 2030
LESS DISPOSALS
DIVISION: Sewer FUND:
Replace filter building roof.
Replace roof membrane, damaged insulation, ballast and flashing.
Roof is 30 years old and starting to leak.
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2029 PROJECT YEAR
PROJECT TITLE: Filter Building Roof Replacement
REFERENCE NUMBER: 370-26-256
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER $225,000 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. $0
FORCE LABOR $0
CONTINGENCIES $0
TOTAL PROJECT $225,000
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2029
IMPORTANT
DESIRABLE
MANDATORY
CRITICAL X
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR: 2029
PROJECT TITLE: Filter Building Roof Replacement
Capital Improvement Program
2030
Sewer
REFERENCE NUMBER: 370-26-260
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
-$
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
NET COST -$ -$ -$ 55,096.00$
DIVISION: Sewer FUND:
Replace sanitary sewer on Kossuth Street.
Replace 201 linear feet of 6" clay sanitary sewer with 8" PVC pipe between Rural Street and
South Johnson Street.
Replace sanitary sewer in conjunction with watermain replacement.
2031
CAPITAL COST 55,096.00$
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Kossuth Street Sanitary Sewer Replacement
REFERENCE NUMBER: 370-26-260
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 201 $238 $47,908 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 201 $24 $4,792 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 201 $12 $2,396 Retained Earnings
TOTAL PROJECT $55,096
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2030
IMPORTANT
DESIRABLE
MANDATORY
CRITICAL X
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2030
PROJECT TITLE: Kossuth Street Sanitary Sewer Replacement
REFERENCE NUMBER: 370-26-261
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
$0 $0 $0 $92,923
DIVISION: Sewer FUND:
Replace sanitary sewer on Church Street between Branch Street and South Street.
Replace 339 linear feet of 6" clay pipe with 8" PVC.
Replace sanitary sewer in conjunction with watermain replacement.
2031
CAPITAL COST $0 $0 $0 $92,923 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Church Street Sanitary Sewer Replacement
REFERENCE NUMBER: 370-26-261
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 339 $238 $80,801 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 339 $24 $8,082 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 339 $12 $4,041 Retained Earnings
TOTAL PROJECT $92,923
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2030
PROJECT TITLE: Church Street Sanitary Sewer Replacement
MANDATORY
CRITICAL X
SCHEDULED 2030
IMPORTANT
DESIRABLE
REFERENCE NUMBER: 370-26-262
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: East Loos Street Sanitary Sewer Replacement
$0 $348,120
DIVISION: Sewer FUND:
Replace sanitary sewer on East Loos Street.
Replace 1,270 linear feet of sanitary sewer between Branch Street and Wheelock Avenue.
Replace clay sanitary sewer with PVC pipe.
2031
CAPITAL COST $0 $0 $0 $348,120 $0
PROJECT YEAR: 2027
$0 $0
$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0
$0 $0
REFERENCE NUMBER: 370-26-262
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 1270 $238 $302,705
EQUIPMENT $0
ENGINEERING/ARCH. 1270 $24 $30,277
FORCE LABOR $0
CONTINGENCIES 1270 $12 $15,138
TOTAL PROJECT $348,120
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2030
PROJECT TITLE: East Loos Street Sanitary Sewer Replacement
MANDATORY
CRITICAL X
SCHEDULED 2030
IMPORTANT
DESIRABLE
REFERENCE NUMBER: 370-26-263
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$0
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
$0 $0 $0 $226,415
DIVISION: Sewer FUND:
Replace sanitary sewer on Teddy Avenue.
Replace 826 linear feet of sanitary sewer between Church Street and East Loos Street.
Sanitary sewer needs to be replaced in conjunction with watermain replacement.
2031
CAPITAL COST $0 $0 $0 $226,415 $0
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2030 PROJECT YEAR
PROJECT TITLE: Teddy Avenue Sanitary Sewer Replacement
REFERENCE NUMBER: 370-26-263
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 826 $238 $196,877 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 826 $24 $19,692 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 826 $12 $9,846 Retained Earnings
TOTAL PROJECT $226,415
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2030
IMPORTANT
DESIRABLE
MANDATORY
CRITICAL X
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2030
PROJECT TITLE: Teddy Avenue Sanitary Sewer Replacement
Capital Improvement Program
2031
Sewer
REFERENCE NUMBER: 370-27-268
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE
2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: West Washington Avenue Sanitary Sewer Replacement
-$ -$
DIVISION: Sewer FUND: Sewer
Replace sanitary sewer on West Washington Avenue.
Replace 500 linear feet of sanitary sewer on West Washington with 8" PVC between Rural
Street and Main Street.
Replace clay sanitary pipe with PVC in conjunction with watermain replacement.
2031
CAPITAL COST 137,055.00$
PROJECT YEAR: 2027
NET COST -$ -$ 137,055.00 $
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS
$0 $0
REFERENCE NUMBER: 370-27-268
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 500 $238 $119,175 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 500 $24 $11,920 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 500 $12 $5,960 Retained Earnings
TOTAL PROJECT $137,055
RANK PRIOR YEARCURRENT YEAR
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2031
PROJECT TITLE: West Washington Avenue Sanitary Sewer Replacement
MANDATORY
CRITICAL X
SCHEDULED 2031
IMPORTANT
DESIRABLE
REFERENCE NUMBER: 370-27-269
Sewer
PROJECT OBJECTIVE:
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
LABOR COST TAXES
CONTRACT SERVICES INCREMENTS
MATERIALS/SUPPLIES FINES/FEES/COST
DEPRECIATION USER CHARGES
UTILITIES RECURRING AIDS
DEBT SERVICE PMTS. IN LIEU
OTHER COSTS OTHER REVENUE
TOTAL EXPENSES TOTAL REVENUE$0 $0
$0
$235,914
ANNUAL OPERATING EXPENDITURES AND REVENUES REQUIRED
EXPENDITURES: REVENUES:
LESS DISPOSALS $0 $0$0 $0
$0 $0 $0 $0
DIVISION: Sewer FUND:
Repalce sanitary sewer on Forest St.
Replace 861 linear feet of sanitary sewer on Forest Street between Prospect Avenue and
Rossman Street.
Replace clay pipe with 8" PVC pipe in conjunction with water main replacement.
2031
CAPITAL COST $0 $0 $0 $0 $235,914
PROJECT YEAR: 2027 2028 2029 2030
DEPARTMENT: Sewer Utility
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
2031 PROJECT YEAR
PROJECT TITLE: Forest Street Sanitary Sewer Replacement
REFERENCE NUMBER: 370-27-269
PROJECT UNIT TOTAL PROJECT
DIMENSIONS COST COST SOURCES
LAND $0
SITE IMPROVEMENT $0
BUILDINGS $0
ROADWAY $0
SIDEWALK $0
CURB/GUTTER $0
STORM SEWER $0
LIGHTING $0
ELECTRIC $0
WATER $0
SANITARY SEWER 861 $238 $204,918 Retained Earnings
EQUIPMENT $0
ENGINEERING/ARCH. 861 $24 $20,664 Retained Earnings
FORCE LABOR $0
CONTINGENCIES 861 $12 $10,332 Retained Earnings
TOTAL PROJECT $235,914
RANK PRIOR YEARCURRENT YEAR
SCHEDULED 2031
IMPORTANT
DESIRABLE
MANDATORY
CRITICAL X
PRIORITY
CITY OF HARTFORD
CAPITAL IMPROVEMENT PROGRAM
PROJECT SUMMARY
PROJECT YEAR 2031
PROJECT TITLE: Forest Street Sanitary Sewer Replacement