October 14, 2025 Village of Jackson - Budget and Finance Committee Meeting Agenda
VILLAGE OF JACKSON
BUDGET AND FINANCE COMMITTEE MEETING AGENDA
Tuesday, October 14, 2025 at 7:00 PM
Jackson Municipal Complex
Village Board Room
N168W19851 Main Street
Jackson, WI 53037
1. Call to Order and Roll Call
2. Approval of Minutes of the Budget and Finance Committee Meeting of September 9, 2025
3. Approval of September 2025 Check Register and Treasurer's Report
4. Change Order #3 – 2025 Ridgeway Drive and Chestnut Court Reconstruction Project -
Advanced Construction for an increase in the amount of $22,047.75
5. Change Order #1 - 2025 Hickory Lane Reconstruction Project - Vinton Construction for an
Increase in the amount of $39,952.00
6. Change Order #2 - 2025 Hickory Lane Reconstruction Project - Vinton Construction for an
Increase in the amount of $5,950.00
7. Pay Request #5 – 2025 Ridgeway Drive and Chestnut Court Reconstruction Project -
Advanced Construction in the amount of $388,971.85
8. Pay Request #3 - 2025 Hickory Lane Reconstruction Project - Vinton Construction in the
amount of $479,393.34
9. Letter of Credit Reduction - Morning Meadows Subdivision Phase 3 – Home Path Financial
in the amount of $1,169,412.00
10. Letter of Credit Reduction - Morning Meadows Subdivision Phase 1 – Home Path Financial
in the amount of $30,912.00
11. Developer's Agreement Amendment and Letter of Credit Exchange - Laurel Springs
Addition #1 - Bielinski Homes
12. Citizens/Village Staff to Address the Budget and Finance Committee
13. Adjourn
Persons with disabilities requiring special accommodations for attendance at the meeting should contact the
Administration Department at the Jackson Municipal Complex at least one (1) business day prior to the
meeting.
It is possible that members of the Village Board may attend the above meeting. No action will be taken by any
governmental body at this meeting other than the governmental body specifically referred to in this meeting
notice. This notice is given so that members of the Village Board may attend the meeting without violating the
open meeting law.
Page 1 of 74
October 14, 2025 Village of Jackson - Budget and Finance Committee Meeting Agenda
Page 2 of 74
September 9, 2025 Village of Jackson - Budget and Finance Committee Meeting Minutes
Page 1 of 2
VILLAGE OF JACKSON
BUDGET AND FINANCE COMMITTEE MEETING
Tuesday, September 9, 2025 at 7:00 PM
Minutes
1. Call to Order and Roll Call
The meeting was called to order at 7:00 PM by Pres. Heckendorf.
Members Present: Pres. Heckendorf, Tr. Wells, and Tr. Olson
Members Excused: None
Members Absent: None
Staff Present: Interim Administrator and Police Chief Ryan Vossekuil, Parks and Recreation
Director Tyler Mentzel, Engineering Technician Logan Myers, Treasurer Darlene Smith,
Public Works Director Jack Straehler, Fire Chief Aaron Swaney, and Clerk Jackie Schuh
2. Approval of Minutes for the Budget and Finance Committee Meeting of August 12, 2025
The motion to approve Minutes of the August 12, 2025 Meeting of Budget and Finance
Committee was made by D. Olson and seconded by T. Wells.
Vote: 3 ayes, 0 nays. Motion carried.
3. Approval of August 2025 Check Register and Treasurer's Report
The motion to approve the August 2025 Check Register and Treasurer's Report was made by
T. Wells and seconded by D. Olson.
Vote: 3 ayes, 0 nays. Motion carried.
4. Pay Request #2 - 2025 Hickory Lane Reconstruction Project - Vinton Construction in the
amount of $353,033.25
The motion to recommend the Village Board approve Pay Request #2 for the Hickory Lane
Reconstruction Project to Vinton Construction in the amount of $353,033.25 was made by T.
Wells and seconded by D. Olson.
Vote: 3 ayes, 0 nays. Motion carried.
5. Pay Request #4 – 2025 Ridgeway Drive and Chestnut Court Reconstruction Project -
Advanced Construction in the amount of $374,957.76
The motion to recommend the Village Board approve Pay Request #4 for the Ridgeway
Drive and Chestnut Court Reconstruction Project to Advanced Construction in the amount of
$374,957.76 was made by D. Olson and seconded by T. Wells.
Vote: 3 ayes, 0 nays. Motion carried.
DRAFT
Page 3 of 74
September 9, 2025 Village of Jackson - Budget and Finance Committee Meeting Minutes
Page 2 of 2
6. Resolution #25-25 - Final Resolution Authorizing Levy of Special Assessments - 2025
Ridgeway Drive and Chestnut Court Reconstruction Project
The motion to recommend the Village Board approve Resolution #25-25 was made by D.
Olson and seconded by T. Wells.
Vote: 3 ayes, 0 nays. Motion carried.
7. Resolution #25-26 - Final Resolution Authorizing Levy of Special Assessments - 2025
Hickory Lane Reconstruction Project
The motion to recommend the Village Board approve Resolution #25-26 was made by T.
Wells and seconded by D. Olson.
Vote: 3 ayes, 0 nays. Motion carried.
8. Pay Request #15 - Jackson Community Center Expansion Project - Moore Construction in
the amount of $280,943.70
The motion to recommend the Village Board approve Pay Request #15 for the Jackson
Community Center Expansion Project to Moore Construction in the amount of $280,943.70
was made by D. Olson and seconded by T. Wells.
Vote: 3 ayes, 0 nays. Motion carried.
9. Citizens/Village Staff to Address the Budget and Finance Committee
None.
10. Adjourn
The motion to adjourn the meeting was made by D. Olson and seconded by T. Wells.
Vote: 3 ayes, 0 nays. Motion carried. The meeting adjourned at 7:04 PM.
Respectfully Submitted,
Jacqueline Schuh
Village Clerk
Village of Jackson
DRAFT
Page 4 of 74
Page 5 of 74
Page 6 of 74
Page 7 of 74
Page 8 of 74
Page 9 of 74
Page 10 of 74
Reprint Check Register - Quick Report - Regular 111:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________Check Nbr Check Date Payee Amount
From Account:9/01/2025
10/06/2025 Page:
6,496.6555712 ACUITY, A MUTUAL INSURANCE COMPANY
CLAIM TA0575
9/04/2025
160.2255713 AMAZON CAPITAL SERVICES
AMAZON BASICS SUPPLIES / REC
9/04/2025
2,400.0055714 ASCENT CONSULTING, LLC
WELLNESS SESSIONS & TRAVEL / JPD
9/04/2025
297.5155715 B&H PHOTO-VIDEO
CANON 16MM LENS / JPD
9/04/2025
125.0055716 BEER CAPITOL DISTRIBUTING, LLC
CONCESSIONS / REC
9/04/2025
27,928.9055717 CEDAR CORPORATION
RIDGEWAY/CHESTNUT CT RECON THRU 08-16-25
9/04/2025
343.0155718 CINTAS CORPORATION
MONTHLY FIRST AID SUPPLIES / STREETS
9/04/2025
1,561.1155719 CORE & MAIN LP
OMNI+ / WATER
9/04/2025
185.0055720 DEITSCH, JEFF L.
HEALTH & LIFE INS PREMIUMS / SEPT 2025
9/04/2025
374.9055721 DIGGERS HOTLINE, INC
FAX FEES / AUG 2025 / WATER
9/04/2025
95.1755722 ENDURACLEAN, INC.
CASCADES PRO 4-PLY WIPERS / STREETS
9/04/2025
1,040.8855723 FISHER, RENEE
HEALTH INSUR PREMIUM / SEPT 2025 / REC
9/04/2025
852.6255724 FRISTED, TODD A
HEALTH/MEDICAL REIMBURSEMENT / SEPT 2025
9/04/2025
40,808.1955725 GFL ENVIRONMENTAL
MONTHLY TRASH PICK-UP / AUG 2025
9/04/2025
128.1655726 GILLITZER ELECTRICAL CONTRACTORS, INC.
HICKORY PARK ELECT WORK / PARKS
9/04/2025
143.8955727 GREATAMERICA FINANCIAL SVCS
COPIER USAGE / JPD
9/04/2025
385.3355728 IMPACT ACQUISITIONS LLC
COPIER 08/24-09/23/25 / WATER
9/04/2025
75.0055729 JESSIFFANY CANINE SERVICES LLC
DELTA BOARDING 8/22-8/24/25 / JPD
9/04/2025
830.2855730 KOBER, BRIAN W.
HEALTH/MED/DENTAL/VISION - ENG
9/04/2025
Page 11 of 74
Reprint Check Register - Quick Report - Regular 211:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________Check Nbr Check Date Payee Amount
From Account:9/01/2025
10/06/2025 Page:
300.0055731 LEAGUE OF WISCONSIN MUNICIPALITIES
CONF REG 9/17-9/19/25 / D KURTZ
9/04/2025
90.0055732 LIESENER SOILS INC.
5 YDS LAWN & GARDEN / STREETS
9/04/2025
131,868.0055733 POBLOCKI PAVING CORPORATION
GLEN BROOKE PATH / CAP PRJT
9/04/2025
10,023.1055734 PROS 4 TECHNOLOGY, INC
NETWORK EQUIP FOR BLDG ADDTN / REC
9/04/2025
4,195.0055735 SALGADO, JORGE
MONTHLY CLEANING (84 HRS) / AUG / REC
9/04/2025
84.9855736 STAPLES
(2) CS COPY PAPER / JPD
9/04/2025
597.1955737 TENNIES ACE HARDWARE INC.
MONTHLY PURCHASES / JFD / JPD / PW
9/04/2025
60.0055738 TIP TOP TAP CLEANING
BEER LINE MAINT / REC
9/04/2025
21,540.4255739 TOWN & COUNTRY ENGINEERING, INC.
FILTER & UV CONST THRU 8-21-25 / WWTP
9/04/2025
275.0055740 TSR SOLUTIONS, INC.
DIAL TONE & DISASTER RECOV/ SEPT25/ADMIN
9/04/2025
1,207.6055741 VALENTINO, KELLY
HEALTH/DENTAL/VISION SEPT 2025
9/04/2025
370.0055742 WALTHER, JOHN M.
HEALTH INSURANCE / JOHN / SEPT 2025
9/04/2025
44,933.0055743 WE ENERGIES
ADMIN-ELECTRIC/GAS
9/04/2025
2,050.7055744 WILLIAM/REID
(4) GASKETS /WWTP
9/04/2025
285.0055745 WISCONSIN HYDRANT REPAIR LLC
INSTALL HYDRANT EXTENSION / 8-25-25
9/04/2025
374,957.7655746 ADVANCED CONSTRUCTION INC
PAY REQUEST #4 - APPROVED 09/09/2025
9/11/2025
744.6255747 AMAZON CAPITAL SERVICES
SUPPLIES / ADMIN / ENG / WATER / WWTP
9/11/2025
798.0055748 APGN INC
PRE-FILTERS (80) / WWTP
9/11/2025
104.8055749 AT&T MOBILITY
ACCT #287298726432 / AUG 2025 / JPD
9/11/2025
Page 12 of 74
Reprint Check Register - Quick Report - Regular 311:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________Check Nbr Check Date Payee Amount
From Account:9/01/2025
10/06/2025 Page:
28.0055750 AURORA MEDICAL GROUP
AUDIOMETRY TEST (1) 08/21/25 / JPD
9/11/2025
2,154.7855751 CENTRAL LAKE ARMOR EXPRESS, INC
BODY ARMOR (2) SETS / JPD
9/11/2025
15,555.5755752 CHARLES EQUIPMENT ENERGY SYSTEMS
EMERG SVCS & MAINT / WATER/WWTP/PW
9/11/2025
4,527.0055753 CIVI TEK CONSULTING LLC
ZONING CODE UPDATE THRU 08-31-25 / ADMIN
9/11/2025
503.6055754 COMPANION LIFE INSURANCE COMPANY
MONTHLY DENTAL INS PREMIUMS / SEPT 2025
9/11/2025
1,457.0055755 DEMPSEY LAW FIRM, LLP
AUGUST 2025 / (3) MATTERS
9/11/2025
5,046.5755756 EAST SIDE MART
MONTHLY FUEL / AUG 2025 / VOJ / PD
9/11/2025
350.0055757 GREAT LAKES TESTING INC.
LIFT TRUCK ANNUAL INSPECTION / STREETS
9/11/2025
660.5255758 GREATAMERICA FINANCIAL SVCS
MONTHLY SERVICES / ADMIN / REC
9/11/2025
686.1655759 HALLMAN LINDSAY QUALITY PAINTS
TRAFFIC MRK-WHITE / STREETS
9/11/2025
732.8255760 IDEXX DISTRIBUTION, INC
GAMMA IRRAD 20PK / WWTP
9/11/2025
645.7055761 JACKSON PROFESSIONAL POLICE ASSOCIATION
POLICE UNION DUES / 09-11-25
9/11/2025
140.0055762 JESSIFFANY CANINE SERVICES LLC
DOG FOOD (2) / JPD
9/11/2025
525.2355763 LAMM GARDENS
LANDSCAPE MAINT /SEPT 2025 ADMIN/JFD/JPD
9/11/2025
293.3055764 LENZ ELECTRIC MOTOR REPAIR LLC
3.4HP REPUBLIC BALL BRGS & MAINT / WWTP
9/11/2025
1,155.0055765 LUCIDA LLC
PROF SVCS / PSC/BOND CLOSE/PRESENT AUDIT
9/11/2025
35.0055766 MCCONNELL, EILEEN
REFUND KETTLEBELL / REC
9/11/2025
66.3355767 MCMASTER CARR SUPPLY CO
SS EXTENSION SPRING (3) / WWTP
9/11/2025
805.0055768 MIDWEST FIBER NETWORKS
MONTHLY INTERNT VARIOUS DEPT / SEPT 2025
9/11/2025
Page 13 of 74
Reprint Check Register - Quick Report - Regular 411:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________Check Nbr Check Date Payee Amount
From Account:9/01/2025
10/06/2025 Page:
280,943.7055769 MOORE CONSTRUCTION SERVICES, LLC
COMM CENTER / PAY REQ #15 / CAP PRJT
9/11/2025
6,771.4055770 MSA PROFESSIONAL SERVICES INC
DOG PARK DESIGN (2) STMTS / CAP PRJT
9/11/2025
299.1855771 O'REILLY AUTOMOTIVE, INC
FILTERS; CLEANERS; SUPPLIES / STREETS
9/11/2025
94.6055772 ODP BUSINESS SOLUTIONS, LLC
PAPER TOWELS / REC
9/11/2025
454.3855773 PITNEY BOWES GLOBAL FINANCIAL SRV LLC
LEASE 07/30 - 10/29/25 ADMIN
9/11/2025
346.5055774 SCHLOEMER LAW FIRM
AUGUST 2025 / JPD
9/11/2025
1,527.0055775 SECURIAN FINANCIAL GROUP, INC.
OCT 2025 Accident Insurance
9/11/2025
339.1655776 SUPPORT PAYMENT CLEARINGHOUSE
000431284201 / N WELCH / 09/08/25
9/11/2025
100.0055777 SZOLWINSKI, MARK & NORA
2024 HIGHWAY 60 - UTILITY EASEMENT
9/11/2025
865.1155778 U.S. CELLULAR
MONTHLY PHONE / SEPT 2025 / VARIOUS DEPT
9/11/2025
15,029.5155779 VEOLIA WATER TECHNOLOGIES, INC.
MAINTENANCE SUPPLIES / WWTP
9/11/2025
353,033.2555780 VINTON CONSTRUCTION COMPANY
2025 HICKORY LN RECON PRJT PYMT #2
9/11/2025
30.0055781 WASHINGTON COUNTY REGISTER OF DEEDS
DOC #1618903 08-28-2025/MAPLE FIELDS III
9/11/2025
49.0055782 WISCONSIN DEPT OF JUSTICE
BACKGROUND CKS / AUG 2025 / JFD/REC/GEN
9/11/2025
96.5055783 A/E GRAPHICS, INC.
BAG INSERT / JFD
9/18/2025
135.8755784 AIRGAS USA, LLC
OXYGEN RENTAL / AUG 2025 / JFD
9/18/2025
100.0055785 AURORA MEDICAL GROUP
OWI TESTS (4) 8/9,8/10 & 8/20/25 / JPD
9/18/2025
6,365.9655786 BMO HARRIS BANK N.A.
STATEMENT CHARGES AS OF 09/04/25
9/18/2025
2,193.8755787 BOUND TREE MEDICAL, LLC
MEDICAL & EMS SUPPLIES PER INVOICES/ JFD
9/18/2025
Page 14 of 74
Reprint Check Register - Quick Report - Regular 511:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________Check Nbr Check Date Payee Amount
From Account:9/01/2025
10/06/2025 Page:
1,633.5355788 EAST SIDE MART
MONTHLY FUEL / AUG 2025 / JFD & RESCUE
9/18/2025
2,080.0055789 FROEDTERT HEALTH/WORKFORCE HEALTH
(5) PHYSICALS PER INVOICE / JFD
9/18/2025
1,773.0055790 GREAT LAKES TESTING INC.
AERIAL APPARATUS/GRND LADDER INSPECT/JFD
9/18/2025
23,968.5055791 GREMMER & ASSOCIATES, INC
HICKORY LANE PROF SVCS 231116 / AUG 2025
9/18/2025
74.4055792 HALSNE SERVICE
2023 FORD OIL CHANGE / 09-04-25 / JPD
9/18/2025
3,041.6155793 HAWKINS, INC
AQUA HAWK - AUGUST / WWTP
9/18/2025
458.3655794 HORIZON COMMERCIAL POOLS
MAINT & CHEM FOR SPLASHPAD / PARKS
9/18/2025
208.0055795 INTOXIMETERS, INC.
INTOXIMETER EQUIPMENT / JPD
9/18/2025
51.7055796 JACKSON AUTO SERVICE INC
2024 FORD EXP OIL CHANGE / JPD
9/18/2025
213.4955797 MCMASTER CARR SUPPLY CO
UL CLASS T FUSE (6) / WWTP
9/18/2025
99.0055798 MID-MORAINE MUNICIPAL ASSOCIATION
VB/MMMA DINNER MTG (3) / VILLAGE BOARD
9/18/2025
199.6055799 MILWAUKEE RUBBER PRODUCTS
DISCHARGE HOSES (8) / WWTP
9/18/2025
711.0055800 NEENAH FOUNDRY COMPANY MUNICIPAL
SOLID PLATEN (2) / WWTP
9/18/2025
6,400.7755801 NORTH STAR EMERGENCY VEHICLE SERVICE INC
CHASSIS & PUMP MAINT / JFD
9/18/2025
363.7555802 NORTHERN LAKE SERVICE, INC.
2025 WDNR DRINKING WATER REQ / WATER
9/18/2025
408.5055803 SHERWIN INDUSTRIES, INC.
REPAIR TRANSDUCER & LABOR / STREETS
9/18/2025
157.1555804 ST. LAWRENCE EQUIPMENT, INC.
PARTS FOR EXMARK MOWERS / PARKS
9/18/2025
39.9855805 SUPERIOR CHEMICAL LLC
CLR LNR 55-60GL / PARKS
9/18/2025
1,780.8755806 UTILITY SALES & SERVICE, INC
CRANE INSPECT, BEARING BOLT TORQUE/ WWTP
9/18/2025
Page 15 of 74
Reprint Check Register - Quick Report - Regular 611:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________Check Nbr Check Date Payee Amount
From Account:9/01/2025
10/06/2025 Page:
205.9255807 WAUKESHA COUNTY TECHNICAL COLLEGE
FIREFIGHTER I-BACH & LAURILA / JFD
9/18/2025
3,150.6255808 WEST BEND SCHOOL DISTRICT
AUG 2025 MOBILE HOME PARKING FEES
9/18/2025
2,030.0055809 WOLLNER PLUMBING & EXCAVATING, LLC
INSTALL STORM SEWER 8-26-25 / WWTP
9/18/2025
637.4555810 AIR ONE EQUIPMENT INC
COMBO GAS, HYDROGEN SULFIDE / JFD
9/29/2025
1,981.7755811 AMAZON CAPITAL SERVICES
MISC DEPARTMENT SUPPLIES
9/29/2025
404.9755812 AURORA MEDICAL CENTER GRAFTON LLC
MISC PHARMACY SUP / SEPT 2025 / JFD
9/29/2025
38,030.0055813 BADGER STATE WASTE LLC
BIOSOLIDS HAULNG 9-12,9-15,9-16 / WWTP
9/29/2025
68.0055814 BEER CAPITOL DISTRIBUTING, LLC
KEG FOR CONCESSIONS / REC
9/29/2025
1,425.0055815 BETTER VIEW WINDOW CLEANING, LLC
WINDOW CLEANING / MUNI COMPLEX / ADMIN
9/29/2025
3,050.0055816 CATALIS LLC
2025 ASSESSOR CNTRACT INSTALL #9/ ADMIN
9/29/2025
20.5755817 CAWLEY COMPANY, THE
ACCOUNTABILITY TAGS / JFD
9/29/2025
5,344.2755818 CHEMTRADE CHEMICALS US LLC
ALUM SULFATE LIQ STD BULK / WWTP
9/29/2025
236.6355819 CINTAS CORPORATION
MONTHLY FIRST AID SUPPLIES / DPW
9/29/2025
7,624.5855820 CIVICPLUS LLC
CIVICLCERK & WEB 2025 ANNUAL FEE / ADMIN
9/29/2025
5,296.3355821 CORE & MAIN LP
510M WIRED SP (27) / WATER
9/29/2025
1,361.6055822 DELTA DENTAL OF WISCONSIN
OCT 2025 VISION & DENTAL INSURANCE
9/29/2025
1,195.0055823 DME ELEVATORS & LIFTS
ELEVATOR REPAIR 9-18-25 / MUNI COMPLEX
9/29/2025
101.8255824 ENDURACLEAN, INC.
DISPOSABLE GLOVES / PARKS
9/29/2025
117.7055825 EQUIPMENT RENTALS
AIR COMPRESSOR RENTAL / SPLASH PAD
9/29/2025
Page 16 of 74
Reprint Check Register - Quick Report - Regular 711:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________Check Nbr Check Date Payee Amount
From Account:9/01/2025
10/06/2025 Page:
231.4855826 EUROFINS S-F ANALYTICAL LABS, INC
EFFLUENT-CHLORIDE / 08-26-25 / WWTP
9/29/2025
49.2555827 FIRST SUPPLY LLC
8 SPG PLUG PVC GSKT / WWTP
9/29/2025
156.0055828 GENERAL COMMUNICATIONS, INC.
MOTOROLA MINITOR VI CHARGER (3) / JFD
9/29/2025
40,994.5855829 GFL ENVIRONMENTAL
MONTHLY TRASH PICK-UP / SEPT 2025
9/29/2025
317.9455830 GLOBAL INDUSTRIAL
REPLCMNT WATERPROOF CHARGER / JPD
9/29/2025
70.0055831 HAWKINS, INC
CHLORINE CYLINDERS - AUG / WATER
9/29/2025
20.0055832 HENNING, KAREN
REFUND AARP SAFETY DRIVER/ REC
9/29/2025
117.7055833 IMPACT ACQUISITIONS LLC
COPIER 09/24-10/23/25 / WATER
9/29/2025
7,300.0055834 JOHNSON AND SONS PAVING
JACKSON DR PATH PROJECT / TACK, ASPHALT
9/29/2025
2,966.4855835 MARTELLE WATER TREATMENT, INC.
AQUA MAG BULK / WATER
9/29/2025
17.7555836 MCMASTER CARR SUPPLY CO
LIGHT BULBS / WWTP
9/29/2025
450.0055837 MEDICAL COLLEGE OF WISCONSIN
IMAGE REVIEW / JANNA HOPPE / JPD
9/29/2025
306.6455838 MENARDS - WEST BEND
25 LB BAG-OIL DRI (3) / JFD
9/29/2025
967.9255839 MIDWEST ALARM SERVICES
MUNI COMPLEX FIRE ALARM INSPTN & MONITOR
9/29/2025
934.5555840 MORAINE PARK TECHNICAL COLLEGE DISTRICT
TUITION CHARGE / J SCHEER / JFD
9/29/2025
867.5855841 NATIONAL FIRE PROTECTION ASSOC (NFPA)
FPW 2025 KIDS BOOKS, BAGS, TATTOOS / JFD
9/29/2025
459.0055842 NICKALLS, ANTHONY
YOGA INSTRCTR / 9/9-10/14/2025 / REC
9/29/2025
112.9255843 O'REILLY AUTOMOTIVE, INC
BOOTS/TERMNL / STREETS
9/29/2025
290.3455844 ODP BUSINESS SOLUTIONS, LLC
PRINTER TONER & PAPER / JFD
9/29/2025
Page 17 of 74
Reprint Check Register - Quick Report - Regular 811:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________Check Nbr Check Date Payee Amount
From Account:9/01/2025
10/06/2025 Page:
1,524.0055845 PARKSON CORPORATION
NEW 18" WHEEL / WWTP
9/29/2025
345.0055846 PIEPER ELECTRIC, INC
SCHREIBER UNIT SERVICE / WWTP
9/29/2025
32.0055847 REICH, GREGORY
REC CARTOON INSTRUCTION / SEPT 2025
9/29/2025
402.6655848 REINDERS, INC.
BLDG MORTON SOLAR SALT 40# (63) / JFD
9/29/2025
534.3455849 RELIANT FIRE APPARATUS, INC.
FIRE PUMP / PRIMER REPAIR / JFD
9/29/2025
2,481.1055850 SCHAEFER'S SERVICE CENTER, INC.
15 SILVERADO FLYWHEEL / 9-15-25 / JFD
9/29/2025
40.0055851 SUPERIOR CHEMICAL LLC
COPY PAPER / REC
9/29/2025
339.1655852 SUPPORT PAYMENT CLEARINGHOUSE
000431284201 / N WELCH / 09/22/25
9/29/2025
1,145.6355853 TERRAVENTURE ADVISORS, LLC
MAIN ST LIGHTING PROJECT 1ST INVOICE
9/29/2025
779.0955854 TOP PACK DEFENSE
UNIFORMS / D TUCEK / JPD
9/29/2025
20,847.4755855 TOWN & COUNTRY ENGINEERING, INC.
FILTER & UV CONST THRU 9-13-25 / WWTP
9/29/2025
306.1055856 U.S. CELLULAR
INTERNET FAILOVER / SEPT 25 / ADMIN
9/29/2025
585.8255857 VERONA SAFETY SUPPLY, INC
CHAIN SAW CHAPS (2) / STREETS
9/29/2025
1,277.5055858 VON BRIESEN & ROPER S.C
SVCS THRU 08-31-25 /MATTER 26359 /ADMIN
9/29/2025
2,753.2755859 ZORN COMPRESSOR & EQUIPMENT, INC.
REPAIR WORK 9-18-25 / SEWER
9/29/2025
1,588,828.27Grand Total
Page 18 of 74
Reprint Check Register - Quick Report - Regular 911:43 AM ACCT
GENERAL VILLAGE CHECKING Accounting Checks
Posted From:
Thru Account:Thru: 9/30/2025
______________________________________________________________________________________ Amount
From Account:9/01/2025
10/06/2025 Page:
158,775.80Total Expenditure from Fund # 100 - GENERAL FUND
177.91Total Expenditure from Fund # 150 - HOTEL / MOTEL
291,879.63Total Expenditure from Fund # 200 - WATER UTILITY
403,307.39Total Expenditure from Fund # 300 - SEWER UTILITY
4,527.00Total Expenditure from Fund # 450 - ARPA FUND
11,239.76Total Expenditure from Fund # 500 - RECREATION
689,732.53Total Expenditure from Fund # 600 - CAPITAL PROJECT FUND
93.00Total Expenditure from Fund # 670 - TID #7
29,095.25Total Expenditure from Fund # 900 - FIRE & RESCUE
1,588,828.27Total Expenditure from all Funds
Page 19 of 74
TREASURERS REPORT
(Depository Accounts)
September 30, 2025
BALANCE BALANCE
8/31/2025 9/30/2025
GENERAL:
GENERAL CHECKING $449,029.70 $349,008.24
CREDIT CARD ACCOUNT $169,895.83 $10,344.94
HIPPA ACCOUNT $97,338.63 $8,807.85
MONEY MARKET $11,569,047.27 $11,023,899.22
DONATION ACCOUNT $1,679.72 $1,649.73
PARK FEES $224,981.94 $230,790.90
FIRE/RESCUE RESERVE $14,345.91 $14,397.23
FIRE IMPACT FEE $215,491.76 $220,363.87
POLICE IMPACT FEE $143,825.51 $147,076.85
ANTIQUE FIRE TRUCK $3,395.44 $3,407.59
PERSHING ADVISOR SOLUTIONS LLC - ARPA $61,568.25 $61,747.78
PERSHING ADVISOR SOLUTIONS LLC - GENERAL FUNDS $1,599,122.88 $1,601,748.29
PERSHING ADVISOR SOLUTIONS LLC - MUNI BLDG RESERVE ACCT $286,173.05 $286,875.19
PERSHING ADVISOR SOLUTIONS LLC - 2025A GO PROM NOTES $3,087,847.60 $2,618,619.25
PERSHING ADVISOR SOLLUTIONS LLC - 2024A GO PROM NOTES $390,422.67 $110,120.95
PERSHING ADVISOR SOLUTIONS LLC - DSR REVENUE BOND $526,197.61 $530,561.97
PERSHING ADIVSOR SOLUTIONS LLC - 2023B $37,233.53 $37,342.11
---------------------- ----------------------
TOTAL GENERAL $18,877,597.30 $17,256,761.96
---------------------- ----------------------
WATER UTILITY:
WATER UTILITY DEPRECIATION FUND $26,523.56 $26,618.45
WATER UTILITY RESERVE $137,908.96 $138,402.35
WATER IMPACT FEES $94,129.69 $98,262.63
---------------------- ----------------------
TOTAL WATER UTILITY $258,562.21 $263,283.43
---------------------- ----------------------
SEWER UTILITY:
DNR REPLACEMENT FUND $1,192,260.04 $1,196,525.49
SEWER UTILITY RESERVE $86,128.66 $86,436.80
SEWER DEPRECIATION FUND $6,669.76 $6,693.62
SEWER SERVICE FEES $1,984,441.63 $2,007,957.89
SEWER SPECIAL REDEMPTION FUND $2,899.89 $2,910.26
---------------------- ----------------------
TOTAL SEWER UTILITY $3,272,399.98 $3,300,524.06
---------------------- ----------------------
---------------------- ----------------------
GRAND TOTAL: $22,408,559.49 $20,820,569.45
---------------------- ----------------------
Page 20 of 74
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Change Order #3 – 2025 Ridgeway Drive and Chestnut Court Reconstruction
Project – Advanced Construction for an increase in the amount of $22,047.75
Meeting Date: September 30, 2025 - Board of Public Works
Background and Analysis:
This memo is to inform the Board of Change Order #3 related to the Ridgeway Drive
and Chestnut Court Reconstruction Project.
This change order addresses necessary field modifications and unforeseen conditions
encountered during construction. The breakdown of additional costs is as follows:
• Additional $6,327.75 for 143 linear feet of removal and replacement of concrete
curb and gutter/driveway corrections – a credit was given in the full amount on
the last professional engineering services invoice.
• Additional $1,062.00 for 24 linear feet of removal and replacement of concrete
curb and gutter/driveway corrections – owner changes.
• Additional $16,380.00 for 78 linear feet of 6” PVC water service and valve box
installation.
• Additional $13,447.00 for 119 linear feet of 2” water service and curb up boxes.
• Reduction of $15,169.00 for 197 feet of 1¼” water service and curb up box.
Funding for this Change Order will come from Account Numbers:
600-00-56700-400-000 (Capital Projects Repairs/Construction)
300-00-17600-000-380 (Sewer Construction Work)
200-00-18600-395-000 (Water Construction Work)
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village
Board approve Change Order #3 for an increase in the amount of $22,047.75 to
Advanced Construction.
Page 21 of 74
SECTION 00 63 63
CHANGE ORDER NO.: 3
Owner:
Engineer: Engineer's Project No.:
Contractor: Contractor's Project No.:
Project:
Contract Name:
Date Issued:
Description:
1 =
2
=
3 =
4 =
5 =
TOTAL =
Reason for Change Order:
a)
b)
c)
d)
Attachments:
a)
b)
Change Order Item No. 2: Changes to installed curb and gutter as directed / preferred by Owner.
Change Order Item Nos. 3&4: Change in water service sizes based upon existing service sizes discovered at time of
construction and as directed by Owner.
ADD 24 Lineal Feet of Remove/Replace Concrete Curb & Gutter (Owner Changes) @ $44.25/
LF
$1,062.00
Change Order Item No. 1: Address/correct driveway apron openings to conform with plan detail. Engineer to reimburse
Owner for related cost.
Change Order Item Nos. 1&2: Contract Work Change Directive No. 1.
Change Order Item Nos. 3-5: Email correspondence between Engineer & Contractor dated 8/7/25 & 8/18/25
respecitively.
ADD 78 Lineal Feet of 6" PVC Water Service & Valve & Box (1 Unit) @ $210.00/LF $16,380.00
ADD 119 Lineal Feet of 2" Water Service & Curb Stop & Box (3 Units) @ $113.00/LF $13,447.00
Village of Jackson
Ridgeway Dr and Chestnut Ct
Reconstruction - REBID
Owner's Project No.
ADD 143 Lineal Feet of Remove/Replace Concrete Curb & Gutter (Driveway Corrections) @
$44.25/ LF $6,327.75
$22,047.75
Effective Date of
Change Order:
Advance Construction
Cedar Corporation
Ridgeway Dr and Chestnut Ct
Reconstruction - REBID
August 26, 2025
Change Order Item No. 5: Deletion of equivalent quantity of 1 1/4" water services replaced by 2" and 6" water services.
DELETE 197 Lineal Feet of 1 1/4" Water Service & Curb Stop & Box (Bid Item No. 12) @
$77.00/ LF ($15,169.00)
05789-0020
August 5, 2025
The Contract is modified as follows upon execution of this Change Order:
Page 22 of 74
Original Contract Price Original Contract Times:
Substantial completion (date):
$ Ready for Final Payment (date):
[Increase] from previous approved [Increase] from previous approved
Change Orders No. 1 to No. : Change Orders No. 1 to No. 2
Substantial Completion (days):
$ Ready for Final Payment (days):
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion (date):
$ Ready for Final Payment (date):
[Increase] this Change Order: [Increase][Decrease] this Change Order:
Substantial Completion (days):
$ Ready for Final Payment (days):
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion (date):
$ Ready for Final Payment (date):
Recommended by Engineer (if required) Accepted by Contractor
By:
Title:
Date:
Authorized by Owner Approved by Funding Agency (if applicable)
By:
Title:
Date:
September 29, 2025
8/25/2025
2
97,247.32
22,047.75
1,733,690.37
14
September 15, 2025
September 12, 2025
CHANGE IN CONTRACT TIMES:CHANGE IN CONTRACT PRICE:
August 29, 2025
14
0
September 12, 2025
September 29, 2025
0
1,755,738.12
Senior Construction Manager
1,636,443.05
Project Manager
8/29/25
Page 23 of 74
Page 24 of 74
1
Doug Kroes
From: Shane Kofler <skofler@advconst.net>
Sent: Monday, August 4, 2025 4:17 PM
To: Doug Kroes
Cc: Matt Stephan; Jack Straehler; Logan Myers
Subject: RE: Ridgeway Drive and Chestnut Ct Reconst.: Curb Removal/Replacement - Request for
Unit Cost
Doug, cost for removal and replacement of 167’ of curb will be $44.25/lf.
If acceptable Sommers will start right away.
Please let me know.
Thanks
Shane Kofler
Advance Construction Inc
Phone: 920-434-3978 / Fax: 920-434-6228
Direct: 920-593-1016 / Cell: 920-606-5011
From: Doug Kroes <doug.kroes@cedarcorp.com>
Sent: Monday, August 4, 2025 9:58 AM
To: Shane Kofler <skofler@advconst.net>
Cc: Matt Stephan <matt.stephan@cedarcorp.com>; Jack Straehler <jack.straehler@villageofjacksonwi.gov>; Logan
Myers <logan.myers@villageofjacksonwi.gov>
Subject: RE: Ridgeway Drive and Chestnut Ct Reconst.: Curb Removal/Replacement - Request for Unit Cost
EXTERNAL EMAIL - This email was sent by a person from outside your organization. Exercise caution when clicking links, opening
attachments or taking further action, before validating its authenticity.
Shane:
Thank you for your email In regard to driveway opening corrections, driveways with required corrections have been
marked on site with lath indicating the Top of 1’ Taper locations. Associated required removal limits have also
been marked on site with paint on the curb pan. In regard to quantities related to all curb removal/replacement
areas, below please find total quantities per category (attached please find a plan markup indicating locations,
category of R/R (Highlights), and lineal footage):
• Driveway Corrections: 23 Areas, 143 Lineal Feet
• Owner Changes (Highlighted Orange): 2 Areas, 24 Lineal Feet
• Contractor Replacements (Highlighted Green): 2 Areas, 31.5 Lineal Feet
At your earliest convenience, please provide and all-inclusive Lineal Foot unit cost for:
• 167 Lineal Feet of Remove/Replace Concrete Curb & Gutter @ $_________________/LF.
Please feel free to contact me should you have any questions.
Page 25 of 74
2
Thank you,
Douglas Kroes
Senior Construction Manager/O:ice Manager | Cedar Corporation
doug.kroes@cedarcorp.com
W61N497 Washington Avenue
Cedarburg, WI 53012
Oice 262.204.2360 Direct 262.204.2343 Mobile 920.246.6326
www.cedarcorp.com | Facebook | LinkedIn | Instagram
This e-mail and any attachments may contain proprietary and conf idential inf ormation f rom Cedar Corporation. Please visit our website at
http://www.cedarcorp.com/disclaimer f or more details.
Page 26 of 74
CURB REMOVAL FIELD NOTES 7/31/25
Page 27 of 74
Driveway Corrections: 23 Areas, 143 Lineal Feet
Owner Changes (Highlighted Orange): 2 Areas, 24 Lineal Feet
Contractor Replacements (Highlighted Green): 2 Areas, 31.5 Lineal Feet
CURB REMOVAL FIELD NOTES 7/31/25
Page 28 of 74
1
Doug Kroes
From: Shane Kofler <skofler@advconst.net>
Sent: Monday, August 18, 2025 7:18 AM
To: Doug Kroes
Cc: Paul Kultgen; Jack Straehler; Logan Myers; Joshua Molter; Matt Stephan
Subject: RE: Ridgeway/Chestnut Reconst.: Change Order No. 3 Items - Request for Unit Prices
Doug, see below in red for pricing.
Thanks
Shane Kofler
Advance Construction Inc
Phone: 920-434-3978 / Fax: 920-434-6228
Direct: 920-593-1016 / Cell: 920-606-5011
F
rom: Doug Kroes <doug.kroes@cedarcorp.com>
Sent: Thursday, August 7, 2025 2:59 PM
To: Shane Kofler <skofler@advconst.net>
Cc: Paul Kultgen <pkultgen@advconst.net>; Jack Straehler <jack.straehler@villageofjacksonwi.gov>; Logan Myers
<Logan.Myers@villageofjacksonwi.gov>; Joshua Molter <Joshua.Molter@cedarcorp.com>; Matt Stephan
<matt.stephan@cedarcorp.com>
Subject: Ridgeway/Chestnut Reconst.: Change Order No. 3 Items - Request for Unit Prices
EXTERNAL EMAIL - This email was sent by a person from outside your organization. Exercise caution when clicking links, opening
attachments or taking further action, before validating its authenticity.
Shane:
In preparing contract Change Order No. 3, we have the curb removal/replacement items and in addition, we have
recorded some changes to water services sizes. Below I have provided our daily quantities sheets for 2” and 6”
water services installed. These sizes of water services were not provided for as bid items. Therefore, please
provide all inclusive unit prices as follows:
• ADD 78 Lineal Feet of 6" PVC Water Service & Valve & Box (1 Unit) @ $_______210__________/LF
• A
DD 119 Lineal Feet of 2" Water Service & Curb Stop & Box (3 Units) @ $____113__________/LF
P
lease feel free to contact me if you have any questions.
Thanks,
Page 29 of 74
2
Douglas Kroes
Senior Construction Manager/O?ice Manager | Cedar Corporation
doug.kroes@cedarcorp.com
W61N497 Washington Avenue
Cedarburg, WI 53012
Oice 262.204.2360 Direct 262.204.2343 Mobile 920.246.6326
Page 30 of 74
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Change Order #1 – 2025 Hickory Lane Reconstruction Project – Vinton
Construction for an increase in the amount of $39,952.00
Meeting Date: September 30, 2025 - Board of Public Works
Background and Analysis:
This memo is to inform the Board of Change Order #1 related to the Hickory Lane
Reconstruction Project. This change order addresses the necessary field modification
needed to the existing water main at the intersection of Eagle Drive and Hickory Lane.
The breakdown of the additional cost is as follows:
The Additional cost of $39,952.00 is for the excavation and reconfiguration of the
existing water main at the intersection of Eagle Drive and Hickory Lane. This includes
the removal of three 12” valves, approximately 70 feet of 12” ductile iron water main,
one 6” gate valve with fire hydrant, and miscellaneous adjustments. It also includes the
installation of one new 12” valve, approximately 50 feet of new PVC water main, the
relocation of one new hydrant and gate valve, and additional miscellaneous parts. This
work also includes the abandonment of a dead-end section of 12” water main south of
the intersection.
Funding for this Change Order will come from Account Numbers:
600-00-56700-400-000 (Capital Projects Repairs/Construction)
300-00-17600-000-380 (Sewer Construction Work)
200-00-18600-395-000 (Water Construction Work)
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village
Board approve Change Order #1 for an increase in the amount of $39,952.00 to Vinton
Construction.
Page 31 of 74
Hickory Lane 00560-1 Contract Change Order
DOCUMENT 00560
CONTRAC
T CHANGE ORDER
Order No.:
Date:
Agreement Date:
NAME OF PROJECT:
OWNER: Village of Jackson
CONTRACTOR:
The following changes are hereby made to the CONTRACT DOCUMENTS:
Water main relocations at Eagle Drive and contract time extension.
Justification: Water main relocations added at Eagle Drive due to conflicts with storm sewer and non-functioning
valve. Increased contract time/completion date due to delays in schedule caused by utility conflicts.
Change to CONTRACT PRICE:
Original Contract Price: $
Current Contract Price adjusted by Previous Change Order: $
The Contract Price due to this Change Order will be increased by: $
The new Contract Price including this Change Order will be: $
Change to CONTRACT TIME:
The CONTRACT TIME will be increased by 36 calendar days.
The date for completion of all work will be 11/3/2025.
Page 32 of 74
Page 33 of 74
Page 34 of 74
Page 35 of 74
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Change Order #2 – 2025 Hickory Lane Reconstruction Project – Vinton
Construction for an increase in the amount of $5,950.00
Meeting Date: September 30, 2025 - Board of Public Works
Background and Analysis:
This memo is to inform the Board of Change Order #2 related to the Hickory Lane
Reconstruction Project. This change order addresses the necessary field modification
needed to the new 60” culvert installation.
The Additional cost of $5,950.00 is for the placement of native soils to create a stream
substrate at the base of the new 60” culvert, as required by the Department of Natural
Resources (DNR).
Funding for this Change Order will come from Account Numbers:
600-00-56700-400-000 (Capital Projects Repairs/Construction)
300-00-17600-000-380 (Sewer Construction Work)
200-00-18600-395-000 (Water Construction Work)
JS
Recommendation:
Board of Public Works recommends Budget and Finance Committee and Village Board
approve Change Order #2 for an increase in the amount of $5,950.00 to Vinton
Construction.
Page 36 of 74
Hickory Lane 00560-1 Contract Change Order
DOCUMENT 00560
CONTRACT CHANGE O
RDER
Order No.:
Date:
Agreement Date:
NAME OF PROJECT:
OWNER: Village of Jackson
CONTRACTOR:
The following changes are hereby made to the CONTRACT DOCUMENTS:
Added cost for stream substrate material in cross culvert pipe.
Justification: Per DNR requirements for the 60" cross culvert pipe, 6" of natural habitat stream
substrate is to be added inside the pipe.
$
$
$
$
Change to CONTRACT PRICE:
Original Contract Price:
Current Contract Price adjusted by Previous Change Order:
The Contract Price due to this Change Order will be increased by:
The new Contract Price including this Change Order will be:
Change to CONTRACT TIME: None
Page 37 of 74
Page 38 of 74
Outlook
Added stream substrate
FromScott Fletcher <sfletcher@vintonwis.com>
Date Fri 9/19/2025 1:44 PM
To Jeff Chvosta <J.Chvosta@gremmerassociates.com>
Cc Ethan Wedemayer <e.wedemayer@gremmerassociates.com>; Jeff Spaeth <J.Spaeth@gremmerassociates.com>; Grant Manion
<gmanion@vintonwis.com>; Jeff Maples <jmmaples@vintonwis.com>; Ron Raboine <rraboine@vintonwis.com>
Jeff,
We are going to be doing that 60” culvert on Hickory Rd. in Jackson next week. There was an email a while back that was
asking for a price to have native material placed in the new 60” culvert to create a stream substrate. The cost to place this
existing material will be a lump sum of $5,950.00, this is assuming that there is native material on site that will be acceptable for
the stream substrate. If no material is found on site, then there will need to be a new price for us to haul in acceptable material.
Please let me know if this price is accepted.
Thanks,
Scott Fletcher
Sewer Estimator/Superintendent
Sfletcher@vintonwis.com
Mobile-920-374-0824
Office-920-682-0375
Page 39 of 74
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Pay Request #5 – 2025 Ridgeway Drive and Chestnut Court Reconstruction
Project – Advanced Construction in the amount of $388,9 71.85
Meeting Date: September 30, 2025 – Board of Public Works
Background and Analysis:
This memo is to inform the Board of Pay Request #5 from Advanced Construction in
the amount of $388,971.85 for work completed on the Ridgeway Drive and Chestnut
Court Reconstruction Project.
The work has been reviewed and verified for accuracy and completion in accordance
with the project contract documents and schedule.
Funding for this payment will come from Account Numbers:
600-00-56700-400-000 (Capital Projects Repairs/Construction ) $129,657.28
300-00-17600-000-380 (Sewer Construction Work) $129,657.28
200-00-18600-395-000 (Water Construction Work) $129,657.29
If you have any questions, please let me know.
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village
Board approve Pay Request #5 for Advanced Construction in the amount of
$388,971.85.
Page 40 of 74
Cedarburg • Green Bay • Madison • Menomonie
Community Infrastructure • Architecture • Environmental Services
W61N497 Washington Avenue
Cedarburg, WI 53013
262-204-2360
www.cedarcorp.com
September 16, 2025
Village of Jackson
N168 W20733 Main Street
PO Box 637
Jackson, WI 53037
Attn: Mr. Jack Straehler II, Director of Public Works
Subject: Contractor’s Application for Payment No. 5
Ridgeway Drive & Chestnut Court Reconstruction - REBID
Cedar Project No. 05789-0020
Dear Mr. Straehler:
Enclosed for your use in payment to Advance Construction in the amount of $388,971.85 is Contractor’s
Application for Payment No. 5.
Please Note: As the Contractor has not yet received payment from the Village related to their Application for
Payment No. 4, this application does not include lien waivers from subcontractors and/or material suppliers
associated with Application No. 4. These lien waivers will be submitted upon the Contractor’s receipt of
payment for the same.
Following your review and approval, please complete the application for payment forms within the areas reserved
for the Owner. Thereafter, retain one copy for your records, provide the second copy to the Contractor with
payment and provide the third copy to our office.
Should you have any questions, please feel free to contact me at our Cedarburg office.
Sincerely,
CEDAR CORPORATION
Douglas T. Kroes
Senior Construction Manager
Enclosed: Contractor’s Application for Payment No. 5
Lien Waivers: Application for Payment No. 3
Cc: Shane Kofler, Advance Construction
Page 41 of 74
9/16/25
Page 42 of 74
Page 43 of 74
Page 44 of 74
Page 45 of 74
Page 46 of 74
UNCONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT
NOTICE TO CLAIMANT: THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT
NOTICE, AND PAYMENT BOND RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE
BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU
IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A
CONDITIONAL WAIVER AND RELEASE FORM.
Identifying Information
Name of Claimant:
Name of Customer:
Job Location:
Owner:
Through Date:
Unconditional Waiver and Release
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor
and service provided, and equipment and material delivered, to the customer on this job through the Through Date of
this document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written
change order that has been fully executed by the parties prior to the date that this document is signed by the
claimant, are waived and released by this document, unless listed as an Exception below. The claimant has received
the following progress payment:
$___________________________________
Exceptions
This document does not affect any of the following:
(1) Retentions.
(2) Extras for which the claimant has not received payment.
(3) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the
right to recover compensation for work not compensated by the payment.
Signature
Claimant's Signature:
Claimant's Title:
Date of Signature:
Additional Identifying Information (If Applicable):
Job No
Ferguson Enterprises, LLC dba Ferguson Waterworks
ADVANCE CONSTRUCTION INC
RIDGEWAY DRIVE JACKSON, WI 53037
VILLAGE OF JACKSON
2025-06-30
18,784.53
Tina Castillo, Credit Coordinator
2025-09-02
JACKSON RIDGEWAY DR & CHE
WISCWW*22843
Page 47 of 74
0446449-1 04JUN25 192.36
0448264 12JUN25 1185.10
0447440 13JUN25 8212.52
0449003 19JUN25 134.52
0449013 19JUN25 1162.00
0446010-1 20JUN25 698.88
0447440-1 20JUN25 5208.24
0449179 20JUN25 79.01
0449289 23JUN25 315.50
0449280 24JUN25 375.22
0449570 25JUN25 542.18
0447440-2 30JUN25 679.00
Page 48 of 74
Page 49 of 74
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Pay Request #3 – 2025 Hickory Lane Reconstruction Project - Vinton
Construction in the amount of $479,393.34
Meeting Date: September 30, 2025 – Board of Public Works
Background and Analysis:
This memo is to inform the Board of Pay Request #3 from Vinton Construction in the
amount of $479,393.34 for work completed on the Hickory Lane Reconstruction Project.
The work has been reviewed and verified for accuracy and completion in accordance
with the project contract documents and schedule.
Funding for this payment will come from Account Numbers:
600-00-56700-400-000 (Capital Projects Repairs/Construction) $159,797.78
300-00-17600-000-380 (Sewer Construction Work) $159,797.78
200-00-18600-395-000 (Water Construction Work) $159,797.78
If you have any questions, please let me know.
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village
Board approve Pay Request #3 for Vinton Construction in the amount of $479,393.34.
Page 50 of 74
September 19, 2025
Village of Jackson
W194 N16660 Eagle Drive
Jackson, WI 53037
Attention: Jack Straehler
Director of Public Works
Subject: Project: VOJ 25-01
Hickory Lane Reconstruction
Pay Request #3
Dear Mr. Straehler:
Enclosed you will find Pay Request #3 for the Hickory Lane Reconstruction project in the Village
of Jackson. The total amount, due to the contractor, has been reduced by five percent (5%) for
retainage but not to exceed maximum retainage. This is per Article 6.02.A.1 Progress Payments;
Retainage, of Contract Document 00500, Agreement:
Work completed, Pay Request #3 = $504,624.58
Retainage, Pay Request #3 (5%) = $25,231.22
Amount due to Contractor, Pay Request #3 = $479,393.34
If you have any questions or comments, please contact me at (262) 343-0351.
Sincerely,
Ethan Wedemayer
Project Inspector
Gremmer & Associates, Inc.
Page 51 of 74
9/19/2025
$479,393.34
Page 52 of 74
Page 1 of 4Unit Cost Breakdown Project: Jackson Hickory Lane VOJ-25-01
Contractor: Vinton Construction Company
Application Date: 09/17/25
VCC Job# 25057 Payment Application #: 3 REVISED2
ITEM DESCRIPTION OF WORK Scheduled Vs. Percent
NO. Actual Complete
Quantity UOM Unit Price Amount
Quantity Amount Quantity Amount Quantity Amount Add(Deduct)
Section 100 Roadway Items
1 100-01 Clearing & Grubbing 1 LS $ 10,000.00 $ 10,000.00 1.00 10,000.00$ - -$ 1.00 10,000.00$ -$ 100.0%
2 100-02 Removing Curb & Gutter 665 LF $ 5.00 $ 3,325.00 - -$ 538.00 2,690.00$ 538.00 2,690.00$ 635.00$ 80.9%
3 100-03 Removing Concrete Driveways and Sidewalk 740 SY $ 6.30 $ 4,662.00 - -$ 589.00 3,710.70$ 589.00 3,710.70$ 951.30$ 79.6%
4 100-04 Removing Guardrail 311 LF $ 2.00 $ 622.00 311.00 622.00$ - -$ 311.00 622.00$ -$ 100.0%
5 100-05 Excavation Common 7,315 CY $ 24.09 $ 176,218.35 - -$ 3,657.50 88,109.18$ 3,657.50 88,109.18$ 88,109.18$ 50.0%
6 100-06 Excavation Below Subgrade 1,508 CY $ 18.25 $ 27,521.00 - -$ - -$ - -$ 27,521.00$ 0.0%
7 100-07 Base Aggregate Dense 3/4-Inch 470 TON $ 34.20 $ 16,074.00 - -$ 198.00 6,771.60$ 198.00 6,771.60$ 9,302.40$ 42.1%
8 100-08 Base Aggregate Dense 1 1/4-Inch 8,475 TON $ 16.55 $ 140,261.25 - -$ 4,970.00 82,253.50$ 4,970.00 82,253.50$ 58,007.75$ 58.6%
9 100-09 Base Aggregate Dense 3-Inch 3,320 TON $ 19.47 $ 64,640.40 - -$ - -$ - -$ 64,640.40$ 0.0%
10 100-10 Concrete Driveway 7-Inch 115 SY $ 72.00 $ 8,280.00 - -$ 125.00 9,000.00$ 125.00 9,000.00$ (720.00)$ 108.7%
11 100-11 Drilled Tie Bars 52 EA $ 10.00 $ 520.00 - -$ 39.00 390.00$ 39.00 390.00$ 130.00$ 75.0%
12 100-12 HMA Pavement 3 LT 58-28 S 2,615 TON $ 65.80 $ 172,067.00 - -$ - -$ - -$ 172,067.00$ 0.0%
13 100-13 HMA Pavement 4 LT 58-28 S 1,745 TON $ 71.80 $ 125,291.00 - -$ - -$ - -$ 125,291.00$ 0.0%
14 100-14 Asphaltic Surface Driveways 9 TON $ 120.00 $ 1,080.00 - -$ - -$ - -$ 1,080.00$ 0.0%
15 100-15 Concrete Curb & Gutter 24-Inch 335 LF $ 33.75 $ 11,306.25 - -$ 157.00 5,298.75$ 157.00 5,298.75$ 6,007.50$ 46.9%
16 100-16 Concrete Curb & Gutter 30-Inch Type D 835 LF $ 33.75 $ 28,181.25 - -$ 498.00 16,807.50$ 498.00 16,807.50$ 11,373.75$ 59.6%
17 100-17 Concrete Sidewalk 4-Inch 9,580 SF $ 6.50 $ 62,270.00 - -$ 7,544.00 49,036.00$ 7,544.00 49,036.00$ 13,234.00$ 78.7%
18 100-18 Concrete Sidewalk 6-Inch 965 SF $ 7.50 $ 7,237.50 - -$ 1,048.00 7,860.00$ 1,048.00 7,860.00$ (622.50)$ 108.6%
19 100-19 Curb Ramp Detectable Warning Field Natural Patina 190 SF $ 28.00 $ 5,320.00 - -$ 150.00 4,200.00$ 150.00 4,200.00$ 1,120.00$ 78.9%
20 100-20 Mobilization 1 EA $ 95,500.00 $ 95,500.00 0.50 47,750.00$ 0.25 23,875.00$ 0.75 71,625.00$ 23,875.00$ 75.0%
21 100-21 Silt Fence 3,515 LF $ 2.05 $ 7,205.75 3,435.00 7,041.75$ - -$ 3,435.00 7,041.75$ 164.00$ 97.7%
22 100-22 Temporary Ditch Checks 72 LF $ 8.00 $ 576.00 20.00 160.00$ 52.00 416.00$ 72.00 576.00$ -$ 100.0%
23 100-23 Culvert Pipe Checks 42 EA $ 25.00 $ 1,050.00 - -$ 4.00 100.00$ 4.00 100.00$ 950.00$ 9.5%
24 100-24 Inlet Protection Type B 20 EA $ 70.00 $ 1,400.00 20.00 1,400.00$ - -$ 20.00 1,400.00$ -$ 100.0%
25 100-25 Inlet Protection Type C 25 EA $ 73.00 $ 1,825.00 25.00 1,825.00$ - -$ 25.00 1,825.00$ -$ 100.0%
26 100-26 Topsoil, Seed, Fertilizer, and Mulch 10,000 SY $ 6.59 $ 65,900.00 - -$ - -$ - -$ 65,900.00$ 0.0%
Previous Request This Request To Date
Scheduled- Work Completed Total Completed/Stored
Page 53 of 74
Page 2 of 4Unit Cost Breakdown Project: Jackson Hickory Lane VOJ-25-01
Contractor: Vinton Construction Company
Application Date: 09/17/25
VCC Job# 25057 Payment Application #: 3 REVISED2
ITEM DESCRIPTION OF WORK Scheduled Vs. Percent
NO. Actual Complete
Quantity UOM Unit Price Amount
Quantity Amount Quantity Amount Quantity Amount Add(Deduct)
Previous Request This Request To Date
Scheduled- Work Completed Total Completed/Stored
27 100-27 Topsoil, Seed, Fertilizer, and Erosion Mat 1,100 SY $ 9.99 $ 10,989.00 - -$ - -$ - -$ 10,989.00$ 0.0%
28 100-28 Riprap Medium w/ Geotextile Fabric Type HR 30 CY $ 120.00 $ 3,600.00 - -$ 30.00 3,600.00$ 30.00 3,600.00$ -$ 100.0%
29 100-29 Geotextile Fabric Type SAS 4,524 SY $ 1.75 $ 7,917.00 - -$ - -$ - -$ 7,917.00$ 0.0%
30 100-30 Traffic Control 1 LS $ 6,000.00 $ 6,000.00 0.50 3,000.00$ 0.25 1,500.00$ 0.75 4,500.00$ 1,500.00$ 75.0%
31 100-31 Permanent Signing 1 LS $ 2,300.00 $ 2,300.00 - -$ - -$ - -$ 2,300.00$ 0.0%
32 100-32 Marking Line Epoxy 4-Inch 13,795 LF $ 0.63 $ 8,690.85 - -$ - -$ - -$ 8,690.85$ 0.0%
33 100-33 Marking Stop Line Epoxy 18-Inch 150 LF $ 13.50 $ 2,025.00 - -$ - -$ - -$ 2,025.00$ 0.0%
34 100-34 Marking Crosswalk Epoxy Transverse Line 6-Inch 725 LF $ 10.50 $ 7,612.50 - -$ - -$ - -$ 7,612.50$ 0.0%
35 100-35 Sawing Asphalt 468 LF $ 4.00 $ 1,872.00 468.00 1,872.00$ 15.00 60.00$ 483.00 1,932.00$ (60.00)$ 103.2%
36 100-36 Sawing Concrete 124 LF $ 5.00 $ 620.00 70.00 350.00$ 4.00 20.00$ 74.00 370.00$ 250.00$ 59.7%
37 100-37 Remove Fallen Trees from Cedar Creek 1 LS $ 5,000.00 $ 5,000.00 1.00 5,000.00$ - -$ 1.00 5,000.00$ -$ 100.0%
Section 200 Storm Sewer Items
38 200-01 Removing Manholes 20 EA $ 515.00 $ 10,300.00 3.00 1,545.00$ 2.00 1,030.00$ 5.00 2,575.00$ 7,725.00$ 25.0%
39 200-02 Removing Inlets 13 EA $ 305.00 $ 3,965.00 5.00 1,525.00$ 18.00 5,490.00$ 23.00 7,015.00$ (3,050.00)$ 176.9%
40 200-03 Removing Storm Sewer 3,207 LF $ 29.00 $ 93,003.00 342.00 9,918.00$ 2,068.00 59,972.00$ 2,410.00 69,890.00$ 23,113.00$ 75.1%
41 200-04 Abandoning Storm Sewer 40 CY $ 255.00 $ 10,200.00 - -$ 40.00 10,200.00$ 40.00 10,200.00$ -$ 100.0%
42
200-05 Apron Endwalls for Culvert Pipe Reinforced Concrete
15-Inch 2 EA $ 1,225.00 $ 2,450.00 - -$ - -$ - -$ 2,450.00$ 0.0%
43
200-06 Apron Endwalls for Culvert Pipe Reinforced Concrete
18-Inch 1 EA $ 1,515.00 $ 1,515.00 - -$ - -$ - -$ 1,515.00$ 0.0%
44
200-07 Apron Endwalls for Culvert Pipe Reinforced Concrete
24-Inch W/ Pipe Grate 1 EA $ 3,565.00 $ 3,565.00 - -$ 1.00 3,565.00$ 1.00 3,565.00$ -$ 100.0%
45
200-08 Apron Endwalls for Culvert Pipe Reinforced Concrete
60-Inch 1 EA $ 4,060.00 $ 4,060.00 - -$ - -$ - -$ 4,060.00$ 0.0%
46
200-09 Apron Endwalls for Culvert Pipe Reinforced Concrete
Horizontal Elliptical 38x60-Inch W/ Pipe Grate 1 EA $ 6,545.00 $ 6,545.00 1.00 6,545.00$ - -$ 1.00 6,545.00$ -$ 100.0%
47 200-10 Concrete Masonry Endwall 1 EA $ 17,678.00 $ 17,678.00 -$ - -$ -$ 17,678.00$ 0.0%
48
200-11 Storm Sewer Pipe Reinforced Concrete Class III 42-
Inch 310 LF $ 194.50 $ 60,295.00 310.00 60,295.00$ - -$ 310.00 60,295.00$ -$ 100.0%
49
200-12 Storm Sewer Pipe Reinforced Concrete Class III 48-
Inch 325 LF $ 240.00 $ 78,000.00 295.00 70,800.00$ - -$ 295.00 70,800.00$ 7,200.00$ 90.8%
50
200-13 Storm Sewer Pipe Reinforced Concrete Class III 60-
Inch 60 LF $ 356.95 $ 21,417.00 - -$ - -$ - -$ 21,417.00$ 0.0%
51
200-14 Storm Sewer Pipe Reinforced Concrete Class IV 12-
Inch 34 LF $ 84.00 $ 2,856.00 - -$ 33.00 2,772.00$ 33.00 2,772.00$ 84.00$ 97.1%
Page 54 of 74
Page 3 of 4Unit Cost Breakdown Project: Jackson Hickory Lane VOJ-25-01
Contractor: Vinton Construction Company
Application Date: 09/17/25
VCC Job# 25057 Payment Application #: 3 REVISED2
ITEM DESCRIPTION OF WORK Scheduled Vs. Percent
NO. Actual Complete
Quantity UOM Unit Price Amount
Quantity Amount Quantity Amount Quantity Amount Add(Deduct)
Previous Request This Request To Date
Scheduled- Work Completed Total Completed/Stored
52
200-15 Storm Sewer Pipe Reinforced Concrete Class IV 15-
Inch 61 LF $ 84.50 $ 5,154.50 33.00 2,788.50$ - -$ 33.00 2,788.50$ 2,366.00$ 54.1%
53
200-16 Storm Sewer Pipe Reinforced Concrete Class IV 18-
Inch 207 LF $ 89.60 $ 18,547.20 51.00 4,569.60$ 151.00 13,529.60$ 202.00 18,099.20$ 448.00$ 97.6%
54
200-17 Storm Sewer Pipe Reinforced Concrete Class IV 24-
Inch 43 LF $ 135.00 $ 5,805.00 - -$ 44.00 5,940.00$ 44.00 5,940.00$ (135.00)$ 102.3%
55
200-18 Storm Sewer Pipe Reinforced Concrete Class IV 48-
Inch 242 LF $ 278.00 $ 67,276.00 228.00 63,384.00$ - -$ 228.00 63,384.00$ 3,892.00$ 94.2%
56
200-19 Storm Sewer Pipe Reinforced Concrete Horizontal
Elliptical Class HE-IV 38x60-Inch 426 LF $ 357.00 $ 152,082.00 420.00 149,940.00$ - -$ 420.00 149,940.00$ 2,142.00$ 98.6%
57 200-20 Storm Sewer Pipe Class III-A 12-Inch 186 LF $ 87.35 $ 16,247.10 83.00 7,250.05$ 107.00 9,346.45$ 190.00 16,596.50$ (349.40)$ 102.2%
58 200-21 Storm Sewer Pipe Class III-A 15-Inch 188 LF $ 76.30 $ 14,344.40 64.00 4,883.20$ 101.00 7,706.30$ 165.00 12,589.50$ 1,754.90$ 87.8%
59 200-22 Storm Sewer Pipe Class III-A 18-Inch 152 LF $ 90.85 $ 13,809.20 28.00 2,543.80$ - -$ 28.00 2,543.80$ 11,265.40$ 18.4%
60 200-23 Storm Sewer Pipe Class III-A 24-Inch 506 LF $ 113.00 $ 57,178.00 - -$ - -$ - -$ 57,178.00$ 0.0%
61 200-24 Storm Sewer Pipe Class III-A 30-Inch 25 LF $ 109.20 $ 2,730.00 24.00 2,620.80$ - -$ 24.00 2,620.80$ 109.20$ 96.0%
62 200-25 Storm Sewer Pipe Class III-A 36-Inch 576 LF $ 130.00 $ 74,880.00 582.00 75,660.00$ - -$ 582.00 75,660.00$ (780.00)$ 101.0%
63 200-26 Storm Sewer Pipe PVC 4-Inch 49 LF $ 35.00 $ 1,715.00 -$ 691.00 24,185.00$ 691.00 24,185.00$ (22,470.00)$ 1410.2%
64 200-27 Storm Sewer Pipe PVC 6-Inch 12 LF $ 35.00 $ 420.00 - -$ 15.00 525.00$ 15.00 525.00$ (105.00)$ 125.0%
65 200-28 Storm Sewer Pipe PVC 15-Inch 7 LF $ 127.00 $ 889.00 - -$ - -$ - -$ 889.00$ 0.0%
66 200-29 Storm Sewer Pipe PVC 18-Inch 5 LF $ 155.00 $ 775.00 - -$ - -$ - -$ 775.00$ 0.0%
67 200-30 Catch Basins 4-FT Diameter w/ Casting 6 EA $ 3,820.00 $ 22,920.00 2.00 7,640.00$ 4.00 15,280.00$ 6.00 22,920.00$ -$ 100.0%
68 200-31 Catch Basins 5-FT Diameter w/ Casting 1 EA $ 5,870.00 $ 5,870.00 - -$ 1.00 5,870.00$ 1.00 5,870.00$ -$ 100.0%
69 200-32 Catch Basins 2.5x3-FT w/ Casting 13 EA $ 3,670.00 $ 47,710.00 5.00 18,350.00$ 5.00 18,350.00$ 10.00 36,700.00$ 11,010.00$ 76.9%
70 200-33 Manholes 4-FT Diameter w/ Casting 6 EA $ 3,995.00 $ 23,970.00 3.00 11,985.00$ 2.00 7,990.00$ 5.00 19,975.00$ 3,995.00$ 83.3%
71 200-34 Manholes 5-FT Diameter w/ Casting 1 EA $ 5,961.00 $ 5,961.00 - -$ - -$ - -$ 5,961.00$ 0.0%
72 200-35 Manholes 6-FT Diameter w/ Casting 3 EA $ 7,414.00 $ 22,242.00 3.00 22,242.00$ - -$ 3.00 22,242.00$ -$ 100.0%
73 200-36 Manholes 7-FT Diameter w/ Casting 3 EA $ 9,734.00 $ 29,202.00 3.00 29,202.00$ - -$ 3.00 29,202.00$ -$ 100.0%
74 200-37 Manholes 8-FT Diameter w/ Casting 3 EA $ 12,662.00 $ 37,986.00 3.00 37,986.00$ - -$ 3.00 37,986.00$ -$ 100.0%
75 200-38 Inlets Median 2 Grate w/ Casting 2 EA $ 4,172.00 $ 8,344.00 1.00 4,172.00$ - -$ 1.00 4,172.00$ 4,172.00$ 50.0%
76 200-39 Bulkhead Storm Sewer 15-Inch 4 EA $ 175.00 $ 700.00 - -$ 2.00 350.00$ 2.00 350.00$ 350.00$ 50.0%
77 200-40 Connect to Existing Storm Sewer Lateral 3 EA $ 195.00 $ 585.00 - -$ 23.00 4,485.00$ 23.00 4,485.00$ (3,900.00)$ 766.7%
Page 55 of 74
Page 4 of 4Unit Cost Breakdown Project: Jackson Hickory Lane VOJ-25-01
Contractor: Vinton Construction Company
Application Date: 09/17/25
VCC Job# 25057 Payment Application #: 3 REVISED2
ITEM DESCRIPTION OF WORK Scheduled Vs. Percent
NO. Actual Complete
Quantity UOM Unit Price Amount
Quantity Amount Quantity Amount Quantity Amount Add(Deduct)
Previous Request This Request To Date
Scheduled- Work Completed Total Completed/Stored
78 200-41 Connect to Existing Storm Sewer Structure 1 EA $ 325.00 $ 325.00 - -$ - -$ - -$ 325.00$ 0.0%
79 200-42 Connect to Existing Storm Sewer Pipe 2 EA $ 850.00 $ 1,700.00 - -$ - -$ - -$ 1,700.00$ 0.0%
Section 300 Water Main Items
80 300-01 Connect to Existing Water Main Pipe 2 EA $ 2,635.00 $ 5,270.00 3.00 7,905.00$ - -$ 3.00 7,905.00$ (2,635.00)$ 150.0%
81 300-02 Remove and Replace Water Service Curb Box 2 EA $ 1,170.00 $ 2,340.00 - -$ 2.00 2,340.00$ 2.00 2,340.00$ -$ 100.0%
82 300-03 Water Main PVC 8-Inch 16 LF $ 72.00 $ 1,152.00 52.50 3,780.00$ - -$ 52.50 3,780.00$ (2,628.00)$ 328.1%
83 300-04 Water Service Pipe 1-Inch 42 LF $ 95.00 $ 3,990.00 - -$ - -$ - -$ 3,990.00$ 0.0%
84 300-05 Water Gate Valve 8-Inch 2 EA $ 3,080.00 $ 6,160.00 2.00 6,160.00$ - -$ 2.00 6,160.00$ -$ 100.0%
85 300-06 Adjusting Water Valve 17 EA $ 300.00 $ 5,100.00 - -$ - -$ - -$ 5,100.00$ 0.0%
86 300-07 Offset Water Main 4 EA $ 7,950.00 $ 31,800.00 3.00 23,850.00$ - -$ 3.00 23,850.00$ 7,950.00$ 75.0%
Section 400 Sanitary Sewer Items
87 400-01 Sanitary Sewer Manhole Covers Type J-Special 13 EA $ 1,440.00 $ 18,720.00 10.00 14,400.00$ - -$ 10.00 14,400.00$ 4,320.00$ 76.9%
88
400-02 Sanitary Sewer Manhole Covers Type J-Special -
Anchored 1 EA $ 1,540.00 $ 1,540.00 - -$ - -$ - -$ 1,540.00$ 0.0%
89 400-03 Reconstructing Sanitary Sewer Manhole 63 VF $ 450.00 $ 28,350.00 34.80 15,660.00$ - -$ 34.80 15,660.00$ 12,690.00$ 55.2%
90 400-04 Connect to Existing Sanitary Sewer Pipe 1 EA $ 1,325.00 $ 1,325.00 - -$ - -$ - -$ 1,325.00$ 0.0%
91 400-05 Sanitary Sewer PVC 12-Inch 5 LF $ 88.00 $ 440.00 - -$ - -$ - -$ 440.00$ 0.0%
Total: 2,156,363.50$ 746,620.70$ 504,624.58$ 1,251,245.28$ 905,118.23$
Less: 5% Retainage 37,331.04$ 25,231.22$ 62,562.26$
Total: 709,289.66$ 479,393.34$ 1,188,683.00$
Amount Previously Requested 709,289.66$ -$ 709,289.66$
Amount DueThis Request -$ 479,393.34$ 479,393.34$
Page 56 of 74
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Letter of Credit Reduction - Morning Meadows Subdivision Phase 3 – Home
Path Financial in the amount of $1,169,412.00
Meeting Date: September 30, 2025 – Board of Public Works
Background and Analysis:
The Village of Jackson has received and reviewed the letter of credit reduction request
in the amount of $1,169,412.00, as submitted by Home Path Financial, dated August
26, 2025, for the Morning Meadows Phase 3 subdivision.
This reduction corresponds to the completion and installation of public improvements
within Phase 3.
Approval of this request will result in a $113,850.00 balance for the Phase 3 letter of
credit, for the final lift of asphalt and streetlights which will need to be completed and
verified.
JS
Recommendation:
Board of Public Works recommends Budget and Finance and Village Board approve the
letter of credit reduction for Morning Meadows Subdivision Phase 3 in the amount of
$1,169,412.00 to Home Path Financial.
Page 57 of 74
5116 N 126th St. Butler WI 53007 - www.myhomepath.com - Facebook.com/HomePathFinancial
“Home Path Financial ~ Opening a Path to Success”
08/26/25
Village of Jackson
Attn: Jack Straehler
N168W19851 Main St
Jackson, WI 53037
Re: Morning Meadows Phase 3
Mr. Straehler,
Please consider this letter our formal request for a bond reduction for the subdivision surety referenced
above. We are requesting a reduction in the amount of $1,169,412 for Phase 3, leaving a surety balance
of $113,850.
Please provide written approval at your earliestconvenience or contact me with questions or comments.
Sincerely,
William Gentil
Acquisitions and Development Group
Home Path Financial Limited Partnership
Page 58 of 74
Location: Village of Jackson
Date: 31-Jul-23
Item Number Description Unit Estimated
Quantity Extension
1 Connect to Phase 2 Sanitary EA 1
2 48" Precast Concrete Manhome with Frame EA 1
3 8" SDR-35 PVC Sanitary Sewer LF 1
4 6" PVC Sanitary Laterals EA 62
Subtotal Sanitary Sewer $396,685.00
5 Connect to Exisitng EA 1
6 Hydrant Assemblies W/6" Gate Valve & Box EA 6
7 8" C-900 PVC Water Main LF 1958
8 6" CL-52 Ductile Iron Hydrant Lead LF 171
9 8" gate Valve EA 5
10 1.25" Water Lateral EA 62
11 Tapping Saddle, 1.25" corp stop, curb stop, &box EA 62
Subtotal Water Main $419,145.00
13 18" RCP Storm Sewer LF 192
14 12" CMP Hydrant Driveway Culverts with Stone EA 6
15 18" RCP End Section W/Trash Guard EA 12
Subtotal Storm Sewer $52,050.00
17 9" Stone Base Course W/Shoulder SY 6050
18 30" Concrete Curb and Gutter LF 685
19 3" Asphalt Binder Course SY 6050
20 2' Aggregate Shoulder LF 3340
21 2" Ashpalt Surface Course SY 6050
22 2' Aggregate Shoulder LF 3340
Subtotal Roadwa
y $248,000.00
Improvement Totals $1,115,880.00
15% Contingency $167,382.00
SURETY TOTAL $1,283,262.00
Surety Calculations for Public Improvements
Home Path Financial.LP
Morning Meadows Phase III
Page 59 of 74
Page 60 of 74
Page 61 of 74
By Ken Frank at 9:49 am, Mar 12, 2025
Page 62 of 74
Page 63 of 74
..Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Letter of Credit Reduction - Morning Meadows Subdivision Phase 1 – Home
Path Financial in the amount of $30,912.00
Meeting Date: September 30, 2025 – Board of Public Works
Background and Analysis:
The Village of Jackson has received and reviewed the letter of credit reduction request
in the amount of $30,912.00, as submitted by Home Path Financial, dated August 26,
2025, for the Morning Meadows Phase 1 subdivision.
This reduction corresponds to the completion and installation of the remaining required
public improvements within Phase 1, including the installation of streetlights.
Approval of this request will result in a $0 balance for the Phase 1 letter of credit,
indicating that all necessary work has been satisfactorily completed and verified.
JS
Recommendation:
Board of Public Works recommends Budget and Finance and Village Board approve the
letter of credit reduction for Morning Meadows Subdivision Phase 1 in the amount of
$30,912.00 to Home Path Financial.
Page 64 of 74
5116 N 126th St. Butler WI 53007 - www.myhomepath.com - Facebook.com/HomePathFinancial
“Home Path Financial ~ Opening a Path to Success”
08/26/25
Village of Jackson
Attn: Jack Straehler
N168W19851 Main St
Jackson, WI 53037
Re: Morning Meadows Phase 1
Mr. Straehler,
Please consider this letter our formal request for a bond reduction for the subdivision surety referenced
above. We are requesting a reduction in the amount of $30,912 for Phase 1, leaving a surety balance of
$0.
Please provide written approval at your earliestconvenience or contact me with questions or comments.
Sincerely,
William Gentil
Acquisitions and Development Group
Home Path Financial Limited Partnership
Page 65 of 74
Page 66 of 74
Page 67 of 74
Page 68 of 74
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Darlene Smith, Village Treasurer
From: Jack Straehler, Director of Public Works
Jackie Schuh, Village Clerk
Subject: Developer’s Agreement Amendment and Letter of Credit Exchange – Laurel
Springs Addition #1 – Bielinski Homes
Meeting Date: October 14, 2025 – Budget and Finance Committee
Background and Analysis:
The Village of Jackson has reviewed and accepted a request from Bielinski Homes to
exchange their current Letter of Credit, valued at $34,500.00 and held at Old National
Bank, for a cash deposit of the same amount. This Letter of Credit was originally issued
for the installation of street trees in the Laurel Springs Addition #1 subdivision.
Attorney Matt Parmentier has prepared an amendment to the Developer’s Agreement to
formalize this change. Upon Village Board approval and the execution and recording of
the amendment, Bielinski Homes will provide a cashier’s check for $34,500.00, payable
to the Village of Jackson.
Once the payment is received, the Village will issue a release of the Letter of Credit to
Old National Bank. The funds deposited will be held in a depository account at
Westbury Bank in accordance with Village financial policies.
Recommendation:
Approval of the Developer’s Agreement Amendment for Laurel Springs Addition #1.
Furthermore, approval is granted for the release of the Letter of Credit in the amount of
$34,500.00, contingent upon Bielinski Homes submitting an equivalent amount
$34,500.00 to be held in a depository account. These funds shall remain in the account
until all outstanding work on the project has been satisfactorily completed and verified in
accordance with the terms of the agreement.
Page 69 of 74
Page 70 of 74
Page 71 of 74
Page 72 of 74
Page 73 of 74
October 10th, 2025
Dear Village of Jackson,
Bielinski Homes, Inc. has agreed to install street trees per plan dated 10/2/25
(attached above) on all finished homes, any common areas of Laurel Springs
Addition #2 Subdivision and (7) additional trees on Jackson Drive no later than
November 30th, 2025, which all trees will have a 1-year warranty from the date of
planting from Bielinski Homes.
Sincerely,
John Donovan
Acquisitions & Development Manager
Bielinski Homes
Office - 262.548.5570
Cell – 414-587-8081
bielinski.com
Office - 262.548.5570
Cell – 414-587-8081
Page 74 of 74