Village of Jackson - Village Board — Minutes
Village of Jackson · Washington County · Village Board · meeting of Sep 9, 2025 · Minutes
Open the original document More from Village of Jackson
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
September 9, 2025 Village of Jackson - Village Board Meeting Minutes
Page 1 of 6
VILLAGE OF JACKSON
VILLAGE BOARD MEETING
Tuesday, September 9, 2025 at 7:30 PM
Minutes
1. Call to Order and Roll Call
The meeting was called to order at 7:30 PM by Pres. Heckendorf.
Members Present: Pres. Heckendorf, Tr. Emmrich, Tr. Engelhardt, Tr. Kruepke, Tr. Kurtz,
Tr. Olson, and Tr. Wells
Members Excused: None
Members Absent: None
Staff Present: Interim Administrator and Police Chief Ryan Vossekuil, Inspections and
Zoning Director Collin Johnson, Parks and Recreation Director Tyler Mentzel, Engineering
Technician Logan Myers, Treasurer Darlene Smith, Public Works Director Jack Straehler,
Fire Chief Aaron Swaney, and Clerk Jackie Schuh
2. Pledge of Allegiance
The Pledge of Allegiance was recited by those who were in attendance.
3. Public Hearings
a. Resolution #25-25 Final Resolution Authorizing the Levy of Special Assessments
Against Benefited Property Associated with the 2025 Ridgeway Drive and Chestnut
Court Reconstruction Project
b. Resolution #25-26 Final Resolution Authorizing the Levy of Special Assessments
Against Benefited Property Associated with the 2025 Hickory Lane Reconstruction
Project
c. Conditional Use and Site Plan Review - N168W19490 Main Street, Parcel:
V3_047700K - KARM Properties, LLC
d. Conditional Use and Site Plan Review - N168W20788 Main Street, Parcel:
V3_004000A - Center Main, LLC
Pres. Heckendorf opened the floor for the public hearings at 7:30 PM.
The following residents spoke regarding Public Hearing 3a::
• James Davis - W198N170114 Ridgeway Drive - Mr. Davis inquired whether the
installation of streetlights would also be assessed to residents next year.
• Chad Erdman - W198N16949 Ridgeway Drive - Mr. Erdman thought his assessment
should be for work done to the sidewalk and not to the curb, that a calculation error
should be the Village's responsibility and not the resident's, and indicated his property
had been hooked up to the sump pump lateral prior to this project.
• Jeff Peterson - W198N16994 Ridgeway Drive - Mr. Peterson stated he was thankful
for the incredible work the Village staff has done on these projects, and expressed
concern that a tree near the sidewalk may cause problems down the road.
• Nick Dentice - W198N19818 and W198N19820 Chestnut Court - Mr. Dentice stated
he owns two 16-family rental properties, and he only received one letter for each on
September 9, 2025 Village of Jackson - Village Board Meeting Minutes
Page 2 of 6
August 21st. He thinks $37,000.00 is an excessive amount of money for
approximately 80 feet of sidewalk and sump pump connections.
The following residents spoke regarding Public Hearing 3b:
• Timothy Pare - W196N16500 Hawthorn Drive - Mr. Pare requested a breakdown of
the cost per household and an explanation as to why it was broken down the way it
was.
• Mike and Maggie Burkwald of N164W19630 Hickory Lane - Mr. and Mrs. Burkwald
believe they should only be assessed for work completed from their sump pump to
within 5 feet of the sidewalk and the Village should be responsible for any work
beyond the easement. They inquired if the $1,772.00 of shared costs should also be
the responsibility of the Village, stated the restored ditches were too steep, and the
approach to neighboring properties were asphalt instead of concrete.
No residents spoke regarding Public Hearings 3c or 3d.
Pres. Heckendorf thanked the residents for their comments and closed the Public Hearings.
4. Village Citizen Comment on an Agenda Item (Please sign-in with the Clerk prior to
speaking. Please note this is the Village Board's monthly business meeting, not a public
hearing. People wishing to speak on an item on the agenda should present their comments
under this agenda item. Each commenter will be limited to a total of 2 minutes.)
None.
5. Consent Agenda
a. Approval of Minutes for the Village Board Meeting of August 12, 2025
b. Resolution #25-27 - A Resolution Declaring a State of Emergency in Response to
Historic Rainfall and Flooding in August 2025
c. Resolution #25-28 - A Resolution Waiving Certain Permit Fees in Response to the State
of Emergency Declared After Historic Rainfall and Flooding in August 2025
The motion to approve items 5a through 5c on the consent agenda was made by Tr. Olson
and seconded by Tr. Emmrich.
Vote: 7 ayes, 0 nays. Motion carried.
6. Budget and Finance Committee
a. Pay Request #2 - 2025 Hickory Lane Reconstruction Project - Vinton Construction in
the amount of $353,033.25
The motion to approve Pay Request #2 for the 2025 Hickory Lane Reconstruction Project
payable to Vinton Construction in the amount of $353,033.25 was made by Tr. Wells and
seconded by Tr. Olson.
Vote: 7 ayes, 0 nays. Motion carried.
September 9, 2025 Village of Jackson - Village Board Meeting Minutes
Page 3 of 6
b. Pay Request #4 - 2025 Ridgeway Drive and Chestnut Court Reconstruction Project -
Advanced Construction in the amount of $374,957.76
The motion to approve Pay Request #4 for the 2025 Ridgeway Drive and Chestnut Court
Reconstruction Project payable to Advanced Construction in the amount of $374,957.76 was
made by Tr. Wells and seconded by Tr. Kruepke.
Vote: 7 ayes, 0 nays. Motion carried.
c. Resolution #25-25 - Final Resolution Authorizing Levy of Special Assessments - 2025
Ridgeway Drive and Chestnut Court Reconstruction Project
The motion to approve Resolution #25-25 was made by Tr. Engelhardt and seconded by Tr.
Kurtz.
Extensive discussion topics included special assessment calculation procedures and lawn
credits for watering not being offered to residents. Director Straehler indicated lawn repairs
are guaranteed by the contractor, and, if there is a problem, they will come back to re-seed
again.
Vote: 7 ayes, 0 nays. Motion carried.
d. Resolution #25-26 - Final Resolution Authorizing Levy of Special Assessments - 2025
Hickory Lane Reconstruction Project
The motion to approve Resolution #25-26 was made by Tr. Engelhardt and seconded by Tr.
Olson.
Extensive discussion topics included how the special assessments were calculated, the
resulting pitch of modified ditches, and when driveway approaches must be concrete as
compared to asphalt.
Vote: 5 ayes, 2 nays. Tr. Emmrich and Tr. Kurtz voted nay. Motion carried.
e. Pay Request #15 - Jackson Community Center Expansion Project - Moore Construction
in the amount of $280,943.70
The motion to approve Pay Request #15 for the Jackson Community Center Expansion
Project to Moore Construction in the amount of $280,943.70 was made by Tr. Wells and
seconded by Tr. Kruepke.
Vote: 7 ayes, 0 nays. Motion carried.
7. Plan Commission
a. Conditional Use and Site Plan Review - N168W19490 Main Street, Parcel:
V3_047700K - KARM Properties, LLC
The motion to approve the Conditional Use and Site Plan for N168W19490 Main Street for
KARM Properties, LLC, was made by Tr. Wells and seconded by Tr. Engelhardt.
Vote: 6 ayes, 0 nays. Tr. Kruepke abstained. Motion carried.
September 9, 2025 Village of Jackson - Village Board Meeting Minutes
Page 4 of 6
b. Conditional Use and Site Plan Review - N168W20788 Main Street, Parcel:
V3_004000A - Center Main, LLC
The motion to approve the Conditional Use and Site Plan for N168W20788 Main Street for
Center Main, LLC, subject to the past due water bill being paid, was made by Tr. Emmrich
and seconded by Tr. Kurtz.
Vote: 7 ayes, 0 nays. Motion carried.
8. Board of Public Works
a. Proposal to Implement Annual Fee for Brush and Yard Waste Site Access - 2026
The motion to suspend the rules and combine the discussion of agenda items 8a and 8b was
made by Pres. Heckendorf and seconded by Tr. Kruepke. A roll call vote was taken:
Tr. Emmrich: Aye
Tr. Engelhardt: Aye
Tr. Kurtz: Aye
Pres. Heckendorf: Aye
Tr. Kruepke: Aye
Tr. Wells: Aye
Tr. Olson: Aye
Vote: 7 ayes, 0 nays. Motion carried.
The motion to not implement the fee for use of the Yard Waste Site so it remains free, and to
approve the proposed operational changes to the brush and bag collection was made by Pres.
Heckendorf and seconded by Tr. Kurtz.
Discussion topics for items 8a and 8b included reasons for operational changes in the past,
the need for more or fewer curbside collections, providing collection services after major
storms, code compliance to address brush left at the curb outside of collection times, and cost
offsets when residents utilize the Yard Waste Site compared to curbside pick-up.
Pres. Heckendorf amended his motion to include the following:
1. No fee for Yard Waste Site Access
2. Brush collection in Spring and Fall
3. Bag collection bi-weekly from May through November, following the same schedule
as recycling.
Tr. Kurtz agreed to the amendment.
Vote: 7 ayes, 0 nays. Motion carried.
b. Proposed Operational Changes to Brush and Bag Collection – 2026
Items 8a and 8b were discussed in tandem. See motions under item 8a.
c. Review - 2025 Draft Stormwater Pond Compliance Report and Recommendations
September 9, 2025 Village of Jackson - Village Board Meeting Minutes
Page 5 of 6
The motion to approve the 2025 Draft Stormwater Pond Compliance Report and
Recommendations and to file with the Wisconsin Department of Natural Resources was
made by Tr. Olson and seconded by Tr. Wells.
Vote: 7 ayes, 0 nays. Motion carried.
9. West Bend School District
Tr. Wells stated school is back in session and there is a new drop-off procedure.
10. Washington County Board Report
Pres. Heckendorf read a report from Washington County Executive Mike Schwab.
11. Greater Jackson Business Alliance
Nothing to report.
12. Mid-Moraine Municipal Association Report
Tr. Olson stated there is a Legislative meeting September 10th and a Dinner Meeting on
September 24th.
13. Closed Session Pursuant to Wis. Stats. §19.85(1)(e) “deliberating or negotiating the
purchasing of public properties, the investing of public funds, or conducting other specified
public business, whenever competitive or bargaining reasons require a closed session”, and
§19.85(1)(g) "Conferring with legal counsel for the governmental body who is rendering oral
or written advice concerning strategy to be adopted by the body with respect to litigation in
which it is or is likely to become involved".
The closed session is for the following purposes:
1. To Discuss Development of Publicly Owned Property
The motion to proceed into closed session pursuant to Wis. Stats. §19.85(1)(e) and
§19.85(1)(g) was made by Pres. Heckendorf and seconded by Tr. Emmrich. A roll call vote
was taken:
Pres. Heckendorf: Aye
Tr. Emmrich: Aye
Tr. Engelhardt: Aye
Tr. Kurtz: Aye
Tr. Kruepke: Aye
Tr. Wells: Aye
Tr. Olson: Aye
Vote: 7 ayes, 0 nays. Motion carried. The meeting proceeded into closed session at 8:34 PM.
Those present in closed session were Board members, Interim Administrator and Police
Chief Ryan Vossekuil, Fire Chief Aaron Swaney, Public Works Director Jack Straehler.
September 9, 2025 Village of Jackson - Village Board Meeting Minutes
Page 6 of 6
Attorney Matt Parmentier and Cedar Corp Representative Matt Stephan joined the closed
session virtually.
14. Reconvene in Open Session with Possible Action Related to the Subject of the Preceding
Closed Session
The motion to reconvene in open session was made by Pres. Heckendorf and seconded by Tr.
Emmrich.
Vote: 7 ayes, 0 nays. Motion carried. The meeting proceeded into open session at 10:02 PM.
No action was taken on the closed session items.
15. Adjourn
The motion to adjourn the meeting was made by Tr. Emmrich and seconded by Tr.
Engelhardt.
Vote: 7 ayes, 0 nays. Motion carried. The meeting adjourned at 10:03 PM.
Respectfully Submitted,
Jacqueline Schuh
Village Clerk
Village of Jackson
Source: Village of Jackson website. First collected Oct 18, 2026.