Village of Jackson - Village Board — Agenda Packet
Village of Jackson · Washington County · Village Board · meeting of Jul 8, 2025 · Agenda packets
Open the original document More from Village of Jackson
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
July 8, 2025 Village of Jackson - Village Board Meeting Agenda
VILLAGE OF JACKSON
VILLAGE BOARD MEETING AGENDA
Tuesday, July 8, 2025 at 7:30 PM
Jackson Municipal Complex
Village Board Room
N168W19851 Main Street
Jackson, WI 53037
1. Call to Order and Roll Call
2. Pledge of Allegiance
3. Presentations
a. 2025 Water Rate Study Phase 2 - Presentation by Ehlers Financial Advisors, with
Possible Discussion and Action
4. Public Hearings
a. Ordinance #25-06 An Ordinance to Amend the Adopted 2050 Comprehensive Plan for
the Village of Jackson, Washington County, Wisconsin
5. Village Citizen Comment on an Agenda Item (Please sign-in with the Clerk prior to
speaking. Please note this is the Village Board's monthly business meeting, not a public
hearing. People wishing to speak on an item on the agenda should present their comments
under this agenda item. Each commenter will be limited to a total of 2 minutes.)
6. Consent Agenda
a. Approval of Minutes of the Village Board Meeting of June 10, 2025
b. Proposed Contract for Cleaning Services - N&J Professional Cleaners, LLC
7. Budget and Finance Committee
a. Change Order #1 - Ridgeway Drive and Chestnut Court Reconstruction Project -
Advanced Construction for an increase in the amount of $83,797.32
b. Pay Request #2 - Ridgeway Drive and Chestnut Court Reconstruction Project -
Advanced Construction in the amount of $219,429.58
c. Pay Request #16 - Wastewater Treatment Plant Tertiary Filters and UV Disinfection
Project - J.H. Hassinger in the amount of $99,540.52
d. Clean Water Fund Loan Request #13 - 2024 Wastewater Treatment Plant Project in the
amount of $125,364.57
e. Wastewater Treatment Plant Disk Filter Maintenance - Veolia Water Technologies in
the amount of $113,071.38
f. Review of Bids - Glen Brooke Drive and Jackson Drive Path Project
g. 2025-2026 Contract Amendment #2 - Gremmer & Associates in the amount of
$301,825.00
h. Pay Request #13 - Jackson Community Center Expansion Project - Moore Construction
in the amount of $108,416.85
Page 1 of 106
July 8, 2025 Village of Jackson - Village Board Meeting Agenda
8. Plan Commission
a. Ordinance #25-06 An Ordinance to Amend the Adopted 2050 Comprehensive Plan for
the Village of Jackson, Washington County, Wisconsin
9. West Bend School District
10. Washington County Board Report
11. Greater Jackson Business Alliance
12. Mid-Moraine Municipal Association Report
13. Closed Session Pursuant to Wis. Stats. §19.85(1)(c) "considering employment, promotion,
compensation, or performance evaluation data of any public employee over which the
Village has jurisdiction or exercises responsibility.", §19.85(1)(e) “deliberating or
negotiating the purchasing of public properties, the investing of public funds, or conducting
other specified public business, whenever competitive or bargaining reasons require a closed
session”, and §19.85(1)(g) "Conferring with legal counsel for the governmental body who is
rendering oral or written advice concerning strategy to be adopted by the body with respect
to litigation in which it is or is likely to become involved".
The closed session is for the following purposes:
1. To Receive Information Regarding Specific Employees
14. Reconvene in Open Session with Possible Action Related to the Subject of the Preceding
Closed Session
15. Adjourn
Persons with disabilities requiring special accommodations for attendance at the meeting should contact the
Administration Department at the Jackson Municipal Complex at least one (1) business day prior to the
meeting.
It is possible that members of the Village Board may attend the above meeting. No action will be taken by any
governmental body at this meeting other than the governmental body specifically referred to in this meeting
notice. This notice is given so that members of the Village Board may attend the meeting without violating the
open meeting law.
Page 2 of 106
Village of Jackson, WI
2025 Water Rate Study
Phase 2: PSC CRC Application
July 8, 2025 Village Board Meeting
Page 3 of 106
2
Phase 1 completed during 2024 FMP: Initial Long-Range Cash Flow Analysis
Last CRC: 2010. Last SRC: 1/1/2025 & 10/1/2023.
Phase 2: Ehlers completes Test Year 2025 PSC CRC Application
Ehlers presents initial results of application
Action: consensus to file application
Why are we here?
Page 4 of 106
3
PSC Math Review
Cash Basis
+ Op. and Maint. Expenses
+ Taxes/Transfer Payments
+ Debt Service (P&I)
+ Capital funded from rates
- Less Non -rate Revenue
= Total Revenue Requirements
Utility Basis - PSC
+ Op. and Maint. Expenses
+ Taxes/Transfer Payments
+ Depreciation
+ Rate of Return on Rate Base
- Less Non -Rate Revenue
= Total Revenue Requirements
How much revenue should we generate from user rates?
Page 5 of 106
4
Completing the Application
• Throughout the completion of the application, the 2024 PSC
Annual Report was published, and further analysis of 2025 Budget
was completed.
Anticipated additional customers increased projected revenues in 2025
application
Capital additions: asset projections updated with latest cost estimates,
adjusting PSC math and overall rate base
Booked CWIP from 2023 STH 60 and CTH P projects
PSC allows for normalizing one-time costs, averaging out year over year
expenses
Page 6 of 106
5
Water Rate Performance: Initial PSC Application
Est Application
Component Description 2020 2021 2022 2023 2024 2025
Ca sh Ba sis
1 O&M and PILOT $1,263,135 $1,048,620 $982,572 $1,060,535 $1,162,020 $1,129,610 Incl. Normalizations
2 Debt $0 $0 $0 $22,420 $200,951 $169,975
3 Cash Funded Capital1 $856,655 $449,956 $72,293 $942,631 $226,071 $631,985
Less:
Other Revenue $13,681 $44,760 $49,128 $25,083 $43,516 $68,000
Interest Income $733 $104 $2,831 $31,550 $17,335 $21,830
Revenue Requirement $2,105,376 $1,453,712 $1,002,906 $1,968,953 $1,528,192 $1,841,740
(Costs less Other Income)
User Rates Revenue $1,343,231 $1,351,629 $1,344,130 $1,413,393 $1,496,167 $1,599,622
Rate Adequacy ($762,145) ($102,083) $341,224 ($555,560) ($32,025) ($242,118)
Rate Adjustment Needed 56.74% 7.55% 0.00% 39.31% 2.14% 15.14%
Utility Basis (PSC)
1 O&M and PILOT $1,263,135 $1,048,620 $982,572 $1,060,535 $1,162,020 $1,129,610 Incl. Normalizations
2 Depreciation $212,919 $218,085 $227,420 $233,798 $254,056 $281,239 Added Capital
NIRB $5,627,291 $5,880,884 $6,084,596 $6,016,807 $5,604,806 $7,607,179 Added Capital
Benchmark ROI % 4.90% 4.90% 4.90% 6.50% 6.50% 6.70%
3 Calculated ROI $275,737 $288,163 $298,145 $391,092 $364,312 $509,681
Less:
Other Revenue $13,681 $44,760 $49,128 $25,083 $43,516 $68,000
Revenue Requirement $1,738,110 $1,510,108 $1,459,009 $1,660,343 $1,736,872 $1,852,530
(Costs less Other Income)
User Rates Revenue1 $1,343,231 $1,351,629 $1,344,130 $1,413,393 $1,496,167 $1,599,622
Rate Adequacy ($394,879) ($158,479) ($114,879) ($246,950) ($240,705) ($252,908)
Rate Adjustment Needed 29.40% 11.73% 8.55% 17.47% 16.09% 16.38%
Note s:
1) Includes recommended debt coverage at 1.6x annual debt payment.
2) Application User Rate Revenue does not include other revenue and private fire protection.
Revenue Requirement
Page 7 of 106
6
Future Projection: Initial PSC Application
Estimated
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Revenues
Total Revenues from User Rates1 $1,599,622 $1,861,583 $1,861,583 $1,917,430 $1,974,953 $1,974,953 $2,034,201 $2,034,201 $2,095,228 $2,095,228
Percent Increas e to Us er Rates 0.00% 16.38% 0.00% 3.00% 3.00% 0.00% 3.00% 0.00% 3.00% 0.00%
Cumulative Percent Rate Increas e 0.00% 16.38% 0.00% 3.00% 6.09% 6.09% 9.27% 9.27% 12.55% 12.55%
Dollar Amount Increase to Revenues $261,960 $0 $55,847 $57,523 $0 $59,249 $0 $61,026 $0
Total Other Revenues $89,830 $73,721 $75,719 $76,839 $73,984 $76,821 $81,066 $81,997 $96,989 $93,338
Total Revenues $1,689,452 $1,935,303 $1,937,301 $1,994,269 $2,048,937 $2,051,774 $2,115,267 $2,116,198 $2,192,216 $2,188,566
Les s : Expens es
Operating and Maintenance2 $980,011 $1,009,211 $1,039,283 $1,070,253 $1,102,148 $1,134,995 $1,168,824 $1,203,663 $1,239,542 $1,276,493
PILOT Payment $243,751 $248,626 $253,599 $258,671 $263,844 $269,121 $274,503 $279,993 $285,593 $291,305
Net Before Debt Service and Capital Expenditures $465,690 $677,466 $644,419 $665,345 $682,945 $647,658 $671,940 $632,542 $667,081 $620,767
Debt Service
Existing Debt P&I $169,975 $219,844 $226,138 $219,888 $213,638 $207,388 $201,138 $194,888 $193,963 $188,363
New (2025-2034) Debt Service P&I $0 $0 $0 $0 $0 $0 $84,150 $88,575 $157,238 $170,100
Total Debt Service $169,975 $219,844 $226,138 $219,888 $213,638 $207,388 $285,288 $283,463 $351,200 $358,463
Transfer In (Out) $47,300 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000
Less: Capital Improvements $1,409,950 $1,223,640 $353,000 $1,176,525 $63,400 $834,247 $364,811 $691,984 $774,527 $247,614
Debt Proceeds $815,000 $0 $0 $0 $0 $1,080,000 $0 $840,000 $0 $0
Net Annual Cash Flow ($251,935) ($746,018) $85,282 ($711,067) $425,908 $706,023 $41,842 $517,096 ($438,646) $34,691
Restricted and Unrestricted Cash Balance:
Balance at first of year $2,268,296 $2,016,361 $1,270,343 $1,355,625 $644,558 $1,070,465 $1,776,488 $1,818,331 $2,335,427 $1,896,781
Net Annual Cash Flow Addition/(subtraction) -$251,935 -$746,018 $85,282 -$711,067 $425,908 $706,023 $41,842 $517,096 -$438,646 $34,691
Balance at end of year $2,016,361 $1,270,343 $1,355,625 $644,558 $1,070,465 $1,776,488 $1,818,331 $2,335,427 $1,896,781 $1,931,472
"All-in" Debt Coverage 3.02 3.17 2.94 3.12 3.29 3.22 2.43 2.30 1.96 1.79
PSC Days Cash on Hand 503 237 262 32 160 332 308 440 293 300
Note s: Legend:
1) Assumes no changes in customer count or usage beyond Test Year. Simplified Rate Case (projected eligibility)
2) Assumes 3.00% annual inflation beyond budget year. Conventional (Full) Rate Case
Projected
Page 8 of 106
7
Rate Impact Analysis – Avg. Res. User
Page 9 of 106
• No PFP for some
(charged different
by utility)
• Sorted by 12 kgal
consumption
column
8
Rate Comparison – By County (2)
Utility Name County Utility Class
Min. Quart. Bill
(5/8 inch meter)
6,000
GAL
12,000
GAL
15,000
GAL
18,750
GAL
75,000
GAL Effective Date
Hustisford Utilities Dodge D 68.10 120.00 171.90 197.85 230.29 713.07 1/1/2013
L omira Municipal Water Utility Dodge D 36.00 87.78 139.56 165.45 197.81 659.60 3/24/2025
City of Horicon Water Utility Dodge C 33.00 80.40 127.80 151.50 181.13 547.50 2/1/2025
Waupun Public Utilities Dodge C 41.46 84.18 126.90 148.26 174.96 568.75 5/1/2012
Iron Ridge Municipal Water Utility Dodge D 49.98 88.38 126.78 145.98 169.98 529.98 1/1/2025
C olumbus Water And Light Department Dodge C 43.74 84.46 125.18 145.54 170.99 538.88 2/1/2024
Brownsville Water Utility Dodge D 46.39 84.19 121.99 140.89 164.52 513.49 1/20/2025
Lowell Municipal Water And Sewer Utility Dodge D 30.00 71.40 112.80 133.50 159.38 547.50 7/1/2020
Mayville Municipal Water Utility Dodge C 42.00 75.36 108.72 125.40 146.25 422.70 1/30/2025
Theresa Municipal Water And Sewer
Utility Dodge D 42.00 74.04 106.08 122.10 142.13 353.40 8/2/2024
City of Hartford Utilities Washington AB 40.50 70.20 99.90 114.75 133.31 411.45 1/8/2011
Beaver Dam Water Utility Dodge AB 21.15 57.95 94.75 113.15 136.15 467.95 1/31/2025
City of Fox Lake Water Utility Dodge D 33.72 62.52 91.32 105.72 123.72 393.72 12/27/2024
Town of Portland Sanitary District #1 Dodge D 30.00 58.02 86.04 100.05 117.56 380.25 11/1/2024
Watertown Water Department Dodge AB 25.20 55.60 86.00 101.20 120.20 397.40 4/15/2017
Randolph Municipal Water Utility Dodge D 30.90 58.38 85.86 99.60 116.78 328.32 1/2/2020
Leroy Sanitary District No 1 Dodge D 24.51 54.33 84.15 99.06 117.70 397.26 12/1/2024
Juneau Utility C ommission Dodge D 30.00 55.50 81.00 93.75 109.69 323.25 7/1/2020
S linger Utilities Washington C 26.10 52.20 78.30 91.35 107.66 332.91 11/1/2024
Village of Jackson Water Utility (16.38%
PSC Adjustment) Washington C 30.93 52.16 73.39 84.00 97.27 264.86 1/1/2025
Germantown Water Utility Washington AB 21.00 47.10 73.20 86.25 102.56 347.25 12/15/2024
Kewaskum Municipal Water Utility Washington C 33.36 52.74 72.12 81.81 93.92 266.11 12/1/2023
Reeseville Water Utility Dodge D 33.30 52.56 71.82 81.45 93.49 274.05 12/31/2018
City of West Bend Water Utility Washington AB 21.00 42.44 63.88 74.60 88.00 289.00 4/1/2025
Allenton Sanitary District No 1 Washington D 18.81 41.19 63.57 74.76 88.75 285.06 12/8/2022
Village of Menomonee Falls Water Utility Washington AB 11.52 37.38 63.24 76.17 92.33 309.97 1/1/2017
Village of Jackson Water Utility
(Current) Washington C 26.58 44.82 63.06 72.18 83.58 227.58 1/1/2025
C lyman Utility C ommission Dodge D 31.74 41.58 51.42 56.34 62.49 125.67 8/7/2024
Page 10 of 106
9
• File CRC Application for Test Year 2025 at benchmark Rate of Return (ROR)
• PSC CRC Rate Proceedings ESTIMATED Timeline:
o Audit: 2-3 months
o Public Hearing: 4-5 months
o Implementation: 6 months
o Subject to PSC timing
• Continue with Utility Cashflow Updates as a part of 2025 FMP and beyond
• Will continue discussions regarding future simplified rate increases
Recommendations
TONIGHT’s ACTION: Consensus on water rate application approach.
Page 11 of 106
10
A
Q
&
Page 12 of 106
Ordinance #25-06 Page 1 of 3
STATE OF WISCONSIN VILLAGE OF JACKSON WASHINGTON COUNTY
ORDINANCE #25-06
AN ORDINANCE TO AMEND THE ADOPTED 2050 COMPREHENSIVE PLAN
FOR THE VILLAGE OF JACKSON, WASHINGTON COUNTY, WISCONSIN
WHEREAS, the Village Board adopted a comprehensive plan on August 10, 2009, as
referenced in Chapter 38 of the Village Code of Ordinances; and Sections 66.1001(1)(a) and
66.1001(2), Wis. Stats.; and
WHEREAS, the Village Board has made a number of minor revisions to the adopted
plan since that time including a major plan update in 2019; and
WHEREAS, the Plan Commission desires to revise the definition of
“Multi-
Family/High-Density Urban Residential” outlined under the Land Use Categories on pages six
(6) through seven (7) in the adopted comprehensive plan; and
WHEREAS, the Plan Commission desires to Amend Map 1, titled “Land Use Plan for
the Village of Jackson: 2050” on page 5 of the Comprehensive Plan for The Village of
Jackson: 2050 by changing the projected land use for various Parcels; and
WHEREAS, the Plan Commission finds that the revision set forth herein is consistent
with the remainder of the adopted plan; and
WHEREAS, the Village published a Class 1 public notice and held a public hearing on
July 8, 2025, to obtain public comments regarding the comprehensive plan amendment, as
enumerated in Section 66.1001(4)(d), Wis. Stats., and the public participation procedures for
comprehensive plan amendments adopted by the Village Board through Resolution #19-24;
and
WHEREAS, by a majority vote of the entire Plan Commission recorded in its official
minutes on Thursday, May 15, 2025, the Plan Commission recommends to the Village Board
the revisions to the adopted comprehensive plan as included in adopted Resolution #25-17
and as set forth herein.
NOW, THEREFORE BE IT RESOLVED, the Village of Jackson Village Board,
Washington County Wisconsin ORDAINS AS FOLLOWS:
PART 1. Amend the Land Use definition of
Multi-Family/High-Density Urban Residential to
read as follows:
Multi-Family/High-Density Urban Residential
The Multi-Family/High-Density Urban Residential land use category consists primarily
of high density single-family, two-family, multi-family residential development, and
Page 13 of 106
Ordinance #25-06 Page 2 of 3
manufactured or modular homes. Multi-family residential development has a minimum
lot size of 16,000 square feet, a minimum lot area of 3,000 square feet for each one-
bedroom dwelling unit, or a minimum lot area of 3,500 square feet for each dwelling
unit with two or more bedrooms, whichever is larger. Manufactured home park
developments have a minimum park size of 20 acres while the minimum lot area for a
single manufactured home is 5,000 square feet and the minimum lot area for a
modular home is 7,200 square feet. Two-family residential development in this land
use category could occur on lots of at least 7,000 square feet at a density of up to 12
dwelling units per net acre. Single-family residential development in this land use
category could occur on lots of at least 4,500 square feet at a density of up to 7
dwelling units per net acre.
PART 2. Amend Map 1, titled “Land Use Plan for the Village of Jackson: 2050” on page 5 of
the Comprehensive Plan for The Village of Jackson: 2050 by changing the projected land use
for the Parcels listed below from Medium-Density Residential to Multi-Family/High-Density
Urban Residential.
Parcels: V3_0536001 thru V3_0536020 – Interior lots
Parcels: V3_0536021 thru V3_0536040 – Exterior lots
Parcels: V3_0536050 thru V3_0536062 – Rear loaded single-family lots
Parcels: V3_0536049 – Outlot 9 for townhomes
Parcels: V3_0536047 – Outlot 6 for townhomes
PART 3. Amend Map 1, titled “Land Use Plan for the Village of Jackson: 2050” on page 5 of
the Comprehensive Plan for The Village of Jackson: 2050 by changing the projected land use
for the Parcels listed below from Medium-Density Residential to Other Conservancy Lands to
be Preserved.
Parcel: V3_0536042 (Outlot 1) – Sidewalk Area (vegetated)
Parcel: V3_0536043 (Outlot 2) – Stormwater Pond (east)
Parcel: V3_0536044 (Outlot 3) – Sidewalk Area (east)
Parcel: V3_0536045 (Outlot 4) – Sidewalk Area (central)
Parcel: V3_0536046 (Outlot 5) – Sidewalk Area (west)
Parcel: V3_0536048 (Outlot 7) – Stormwater Pond (west)
PART 4. Amend Map 1, titled “Land Use Plan for the Village of Jackson: 2050” on page 5 of
the Comprehensive Plan for The Village of Jackson: 2050 by changing the projected land use
for the Parcels listed below from Medium-Density Residential to Park and Recreation.
Parcel: V3_008200E
PART 5. This ordinance shall become effective upon passage and posting, or publication as
provided by law.
PART 6. The Village Clerk is directed to send a copy of the amendments to each of the
following parties listed below pursuant to Section 66.1001(4)(b) of the Statutes:
a. the clerk for Washington County;
Page 14 of 106
Ordinance #25-06 Page 3 of 3
b. the clerk for the Town of Jackson;
c. the clerk for the Town of Polk;
d. State of Wisconsin Department of Administration;
e. Southeastern Wisconsin Regional Planning Commission (SEWRPC); and
f. Slinger Community Library.
PART 7. The several sections of this ordinance are declared to be severable. If any section
or portion thereof shall be declared by a court of competent jurisdiction to be invalid,
unlawful, or unenforceable, such decision shall apply only to the specific Section or portion
thereof directly specified in the decision and shall not affect the validity of any other
provisions, sections, or portions thereof of the ordinance. The remainder of the ordinance
shall remain in full force and effect. Any other ordinances whose terms are in conflict with
the provisions of this ordinance are hereby repealed as to those terms that conflict.
PART 8. The Village Clerk and Village Administrator are authorized and directed to make all
changes within the Village of Jackson Code of Ordinances necessary to reflect this ordinance.
Introduced by: Seconded by:
Vote: aye nay Passed and approved
VILLAGE OF JACKSON
By:
Brian J. Heckendorf, Village President
Attest:
Jacqueline Schuh, Village Clerk
Proof of Posting:
I, the undersigned, certify that I posted this Resolution on bulletin boards at the Jackson Municipal Complex, Post Office, and
the Village of Jackson Website.
Village Official Date
Page 15 of 106
Taking the lead in Washington County.
VILLAGE OF JACKSON
WASHINGTON COUNTY, WISCONSIN
Notice of Public Hearing
PLEASE TAKE NOTICE:
Notice is hereby given, pursuant to Wisconsin Statutes Section 19.84 and
66.1001(4)(d), and provisions of the Village of Jackson Code of Ordinances,
that the Village Board will conduct a public hearing at 7:30 p.m. on Tuesday,
July 8, 2025, at the Jackson Municipal Complex, located at N168W19851 Main
Street, Jackson, WI, 53037 on:
Resolution #25-17- A Resolution Recommending to the Village Board
Various Revisions to the Adopted 2050 Comprehensive Plan for the
Village of Jackson, Washington County, Wisconsin
The public hearing for public comment on Resolution #25-17 is to consider
various proposed amendments to the Land Use Plan Map and to the text of A
Comprehensive Plan for the Village of Jackson: 2050.
• Amend the definition of Multi-Family/High-Density Urban Residential.
o The Multi-Family/High-Density Urban Residential land use
category consists primarily of high density single-family, two-
family, multi-family residential development, and manufactured or
modular homes. Multi-family residential development has a
minimum lot size of 16,000 square feet, a minimum lot area of
3,000 square feet for each one-bedroom dwelling unit, or a
minimum lot area of 3,500 square feet for each dwelling unit with
two or more bedrooms, whichever is larger. Manufactured home
park developments have a minimum park size of 20 acres while
the minimum lot area for a single manufactured home is 5,000
square feet and the minimum lot area for a modular home is 7,200
square feet. Two-family residential development in this land use
category could occur on lots of at least 7,000 square feet at a
density of up to 12 dwelling units per net acre. Single-family
residential development in this land use category could occur on
lots of at least 4,500 square feet at a density of up to seven
dwelling units per net acre.
• Amend the Future Land Use Map for parcels from Medium-Density
Residential to Multi-Family/High-Density Urban Residential
o V3_0536001 through V3_0536040, V3_0536047, V3_0536049,
V3_0536050 through V3_0536062
• Amend the Future Land Use Map for parcels from Medium-Density
Residential to Other Conservancy Lands to be Preserved
o V3_0536042, V3_0536043, V3_0536044, V3_0536045,
V3_0536046, V3_0536048
N168W19851
Main Street
Jackson, WI 53037
Phone: 262-677-9001
Fax: 262-677-1710
www.villageofjacksowi.gov
Page 16 of 106
Taking the lead in Washington County.
• Amend the Future Land Use Map for a parcel from Medium-Density
Residential to Park and Recreation
o V3_008200E
Copies of the proposed resolution are available for review at the Village
Administration Office located at N168W19851 Main Street, Jackson, WI 53037,
during regular business hours, 8:00 a.m. - 4:30 p.m., Monday through Friday.
Copies will also be distributed to Slinger Community Library and available
online. Interested parties may contact Collin Johnson via email at
collin.johnson@villageofjacksonwi.gov for additional information regarding the
proposed amendment.
The hearing is open to the public and all interested parties are encouraged to
attend the hearing and be heard. Written comments can be submitted to the Village
Clerk prior to the meeting and shall become part of the record. The Public Hearing
shall be closed when all interested parties in attendance have had a chance to
offer comment. Requests from persons with disabilities who need assistance to
participate in this meeting/hearing should be made to the Village Clerk’s Office with
as much advanced notice as possible.
You may also find a link of information on the Village Website
(www.villageofjacksonwi.gov under Agendas & Minutes)
Dated this 30th day of May 2025,
Jacqueline Schuh
Village Clerk - Village of Jackson
N168W19851 Main Street
Jackson, WI 53037
(262) 677-9001 Ext. 213
jackie.schuh@villageofjacksonwi.gov
Posted: Friday, May 30, 2025
Published: Wednesday, June 4, 2025
Page 17 of 106
FROM: Jackie Schuh – Village Clerk
TODAY’S DATE: May 30, 2025
SUBJECT: PHN – Village of Jackson - Village Board Meeting of 07/08/2025
Please publish the following Public Hearing Notice in the Wednesday, June 4, 2025, edition of
the Daily News in column format and Arial font.
VILLAGE OF JACKSON
NOTICE OF PUBLIC HEARINGS
PLEASE TAKE NOTICE: Notice is hereby given, pursuant to Wis. Stats. Section 19.84
& 66.1001(4)(d), & provisions of the Village of Jackson Code of Ordinances, that the
Village Board will conduct a public hearing at 7:30PM on Tues, 7/8/25, at the Jackson
Municipal Complex, N168 W19851 Main St, Jackson, WI, on: Resolution #25-17
Revisions to the Adopted 2050 Comprehensive Plan for the Village of Jackson. The
public hearing for public comment on Resolution #25-17 is to consider various proposed
amendments to the Land Use Plan Map & text of A Comprehensive Plan for the Village
of Jackson: 2050, amend the definition of Multi-Family/High-Density Urban Residential,
amend the Future Land Use Map for parcels from Medium-Density Residential to Multi-
Family/High-Density Urban Residential: V3_0536001 through V3_0536040,
V3_0536047, V3_0536049, V3_0536050 through V3_0536062, amend the Future Land
Use Map for parcels from Medium-Density Residential to Other Conservancy Lands to
be Preserved: V3_0536042, V3_0536043, V3_0536044, V3_0536045, V3_0536046,
V3_0536048, amend the Future Land Use Map for a parcel from Medium-Density
Residential to Park & Recreation: V3_008200E. The hearing is open to the public & all
interested parties are encouraged to attend the hearing & be heard. Copies of the
approved resolution are available for review at the Village Administration Office, N168
W19851 Main St, Jackson, WI, during regular business hours, 8AM-4:30PM, M-F.
Copies will be distributed to the Slinger Community Library & available online at:
www.villageofjacksonwi.gov. Interested parties may contact Collin Johnson via email at
collin.johnson@villageofjacksonwi.gov for additional information. The hearing is open to
the public & all interested parties are encouraged to attend the hearing & be heard.
Written comments can be submitted to the Clerk Schuh prior to the meeting & shall
become part of the record. The Public Hearing shall be closed when all interested
parties in attendance have had a chance to offer comment. Requests from persons with
disabilities who need assistance to participate in this meeting/hearing should be made
to the Village Clerk’s Office with as much advanced notice as possible.
Page 18 of 106
Page 19 of 106
Page 20 of 106
Page 21 of 106
Page 22 of 106
P
Rosewood
HawthornLinden Aspen
Ridgeway
Spruce
Jackson Oaks
Proposed Village of Jackson Comprehensive Plan Amendment
April 2025
Legend
Park and Recreation
Multifamily/High-Density
Urban Residential
Other Conservancy
Lands to be Preserved
Parcels
0 250 500125 Feet
µ
Prepared on 3/26/2025 by the Community Development Department of Washington
County.
This information is issued subject to errors and omissions and is not certified by
Washington County.
Orthophoto flight date: Spring, 2024
Page 23 of 106
DRAFT
Page 24 of 106
DRAFT
Page 25 of 106
DRAFT
Page 26 of 106
DRAFT
Page 27 of 106
DRAFT
Page 28 of 106
DRAFT
Page 29 of 106
DRAFT
Page 30 of 106
DRAFT
Page 31 of 106
Agreement for Cleaning Services at Jackson Municipal Complex
This Agreement for cleaning services at the Municipal Complex is made this _____ day of
_______, 20___ between the Village of Jackson, a municipal corporation, of Washington
County, Wisconsin (“Village”), and N&J Professional Cleaners, LLC (“Cleaning Service”)
Now therefore, it is agreed between the Village and the Cleaning Service as follows:
1) Scope of Services
a. Perform cleaning services per the manufacturers required maintenance for flooring
and tabletop surfaces. Specifications of cleaning frequency and responsibilities to
provide supplies or equipment as outlined in section 7.
2) Cleaning Services Qualifications
a. Must pass a background check of all employees accessing the premise.
b. All employees on premise must be fingerprinted by the Jackson Police Department
for security purposes.
3) Insurance Requirements
Chosen Cleaning Service must provide original certificates prior to commencing services.
Insurance: No contractor shall commence work under this contract until they have obtained all
insurance required under this paragraph:
Worker’s Compensation and Employer’s Liability
a. $100,000.00 each accident
b. $500,000.00 Disease-Policy Limit
c. $100,000.00 Disease-Employee
General Liability
a. $2,000,000.00 General Aggregate
b. $2,000,000.00 Products
c. $1,000,000.00 Personal and Advertising
d. $1,000,000.00 Each Occurrence
Automobile Liability
a. $1,000,000.00 Combined Single Limit
Excess Liability
a. $2,000,000.00 Umbrella Form
4) Term of Contract
Page 32 of 106
The contract period for the successful Cleaning Service is three (3) year and is set to begin on
November 1st. The contract may be terminated by either party with a minimum 60 days written
notice. The contract may be extended provided service rates for the following calendar year are
submitted to the Village Administrator by September 1st for the following year.
5) Cost for Services
a. Cleaning Service will agree to bill the Village at a total rate of $1400 on a monthly
basis, which will be itemized on a monthly bill to reflect the Jackson Police
Department charge of $945 a month, Jackson Fire Department charge of $50 a month,
and Administrative Offices charge of $405 a month with a 30-day period to remit
payment to Cleaning Service.
6) Cleaning Schedule
Cleaning Services will be required after business hours in the Village Hall Administrative
Offices. All other cleaning including meeting rooms, bathrooms, and Police Department office
spaces will be cleaned during business hours. See Exhibit A1 and Exhibit A2 for a first level
and second level floorplan and location of each listed area below.
a. Cleaning of rooms at a minimum of twice, weekly, will be as follows:
i. A06, A08, A09, A10, A11, A12, B03, B08, B09, B11, B17, B19, B20, B21,
B22, B23, B24, C01, C02, C03, D01, D02.
b. Cleaning of rooms at a minimum of once, weekly, will be as follows:
i. A04, C04, C05, C07, C08, C20, C09, C10, C11, C12, C13, C14, C16, C17,
C18, C19, C20, C21, 2D22, B01, B02, B04, B10, B12, B13, B14, B16 (Toilet,
sink, counter weekly, floors and shower cleaned monthly).
c. Vacuum/ wet mop floors and wiping counters/tables of rooms at a minimum of once,
monthly, will be as follows:
i. 1D26, 1D21, 1D25, 2D23, A03, A05, A13, B06, B18, B25, D23, D24.
d. Cleaning of rooms at a minimum of twice, monthly, will be as follows:
i. 2D23, 1D32/2D24.
7) Cleaning Duty
a. All trash receptacles are to be emptied and trash and recycling removed to their
collection point. This includes sanitary depositories. Container liners will be
furnished by Village.
b. Stock towels, tissue, hand soap and place at least one backup garbage liners in each
container. Paper products, soap replacements and liners to be furnished by Village,
the Cleaning Service shall email Administrator Heidtke when stock is below a two-
Page 33 of 106
week supply.
c. All bathroom surfaces to be cleaned to industry standards including but not limited to
dusting, sanitizing, and removal of any residue build up on floors or plumbing
fixtures.
d. Vacuum all carpeting and walk-off mats. Vacuum available for use by Contractor.
e. Thoroughly dust all horizontal surfaces, including desktops, windowsills, chairs,
tables, pictures and all manner of furnishings. Address insects and spider webs as
needed along floorboards, windowsills, and vents. Contractor to furnish cleaning
supplies.
f. Damp wipe all horizontal surfaces to remove stains. Contractor to furnish cleaning
supplies.
g. Dust and clean telephones. Contractor to furnish cleaning supplies.
h. Dust mop all hard surface flooring with a treated dust mop. Contractor to furnish
cleaning supplies.
i. Damp wipe all floors to remove stains and dirt. Contractor to furnish cleaning
supplies. All flooring finishes are standard grade and prefinished. Flooring types
include porcelain tile and vinyl tile. No waxing necessary. See Exhibit B for first
floor finish plans.
j. Damp wipe the interior and exterior of the main entrance metal/glass, and interior
glass windows to remove fingerprint, stains, and dirt. This includes interior vestibule
doors/ glass below 7’, and storefront windows of Police Department and
Administration Department.
k. Clean outside main entrance area for debris and litter.
l. Clean the water fountain in the main lobby, and in JPD clean the water fountain and
coffee bar (this was always part of the cleaning, just making it clear). located in the
Jackson Police Department.
In Witness whereof, the parties hereto have executed this Agreement on the day and year first above
written.
VILLAGE OF JACKSON N&J Professional Cleaners, LLC
By: __________________________ By: ________________________
Jen Heidtke, Village Administrator Jeff Wergin, Owner
Attest: ________________________
Jacqueline Schuh, Village Clerk
Page 34 of 106
V I LLAG E OF
T�� Lead,,i,n;W�C�y
JACKSON
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Change Order #1 - Ridgeway Drive and Chestnut Court Reconstruction Project
Meeting Date: June 24, 2025
Background and Analysis:
This memo is to inform you of Change Order #1 related to the Ridgeway Drive and Chestnut
Court Reconstruction project for Advanced Construction in the amount of $83,797.32.
This change order reflects necessary adjustments identified during construction. A breakdown
of the additional costs is as follows:
• Sanitary Sewer Amendments approximately $7,200.00 Includes pipe bursting and
related modifications to improve the sanitary sewer line.
• Storm Sewer Lateral Installation approximately $30,000.00 to include additional linear
footage and laterals due to incomplete records of existing infrastructure.
• Storm Sewer Catch Basin Reconstruction approximately $33,500.00 to include
reconstruction of existing catch basins not included in the original bid.
• Underground Utility Conflicts approximately $11,300.00 to include necessary field
changes due to unanticipated underground utility locations, requiring adjustments
primarily related to the water main.
• Miscellaneous Charges of approximately $2,000.00 Includes costs associated with
unanticipated tree removal necessary to complete portions of the work.
These changes were critical to maintaining and ensuring long-term functionality of the utility.
Funding for this Change Order will come from Account Numbers:
600-00-56700-820-001 (Capital Project- Chestnut Court/Ridgeway Drive)
300-00-17600-000-380 (Sewer Construction Work)
200-00-18600-395-000 (Water Construction Work)
Please let me know if you have any questions.
JS
Recommendation:
I recommend the Board approve Change Order #1 in the amount of $83,797.32 to Advanced
Construction.
Page 35 of 106
SECTION 00 63 63
CHANGE ORDER NO.: 1
Owner:
Engineer: Engineer's Project No.:
Contractor: Contractor's Project No.:
Project:
Contract Name:
Date Issued:
Description:
1 =
2 =
3 =
4 =
5 =
6 =
7 =
8 =
9 =
10 =
11 =
12 =
13 =
14 =
15 =
16 =
17 =
18 =
19 =
20 =
21 =
22 =
23 =
24 =
TOTAL =
25 +/(-) 7 Day(s)
26 +/(-) 7 Day(s)
Reason for Change Order:
a)
b)
c)
ADD 88 LF 6" Dia PVC Storm Sewer Pipe @ 65.00/LF $5,720.00
ADD 1 EA 12"x 6" Reducer Fitting @ $275.00 EA $275.00
DELETE 25 Lineal Feet Remove & Replace Curb & Gutter (Bid Item #A2-6) @ $92.00/LF ($2,300.00)
DELETE Lump Sum Lawn Restoration (Bid Item #A2-9) @ $1,250.00 ($1,250.00)
ADD Lump Sum Lawn Restoration @ $2,000.00 $2,000.00
DELETE 515 Lineal Feet 6" PVC Sanitary Sewer Lateral (14 Units)(Bid Item #4) @
$165.50/LF ($85,232.50)
DELETE 761 Lineal Feet 6" PVC Sanitary Sewer Lateral (7 Units)(Bid Item #A1-3) @
$165.50/LF ($125,945.50)
ADD 1560 Lineal Feet 6" HDPE Pipe Bursted Sanitary Sewer Lateral @ $140.00/LF $218,400.00
Change Order Item No. 2: Owner preferred to have water service curb box material furnished by Owner resulting in a
curb box materials credit.
05789-0020
May 22, 2025
ADD 180 Lineal Feet of 4” Dia Storm Lateral (Bid Item #A1-12) @ $60.00/LF
ADD 1 EACH San. MH Barrel Joint Leak Repair – Chemical Grout @ $3,000.00 EA $3,000.00
$10,800.00
ADD 2 EACH Replace Catch Basin Castings w/ 3067 (2'x3') castings @ $838.00 EA $1,676.00
ADD 2 EACH Catch Basin Chimney Reconstruction using 2'x3' rings @ $2,000.00 EA $4,000.00
Change Order Item No. 1: Owner requested that the Contractor perform the connections from the proposed storm
sewer laterals to the existing sump pump discharges.
The Contract is modified as follows upon execution of this Change Order:
Extension of Contract Times - SUBSTANTIAL COMPLETION:
Extension of Contract Times - FINAL COMPLETION:
ADD Lump Sum Water Service Temporary Connections w/ Addtl WTM capping $8,000.00
ADD 15 EACH Storm Lateral/Sump Discharge Connections @ $500.00 EA $7,500.00
($1,168.00)
ADD 7 EACH Catch Basin Chimney Reconstruction using 2' round rings @ $2,000.00 EA
$83,797.32
$3,292.32ADD Lump Sum Investingation of Existing Water Main Location
ADD 2 EA 2'x 3' Catch Basins w/ 3067 Castings @ $3,800.00 EA $7,600.00
Change Order Item Nos. 3-6: Owner directed alterations to proposed storm sewer laterals on Chestnut Court resulting
in additional lateral pipe and cleanouts.
$14,000.00
ADD 2 EACH Remove Trees (Bid Item #A1-34) @ $1,000.00 EA $2,000.00
DELETE 88 LF 12" Dia PVC Storm Sewer Pipe (Bid Item #A2-2) @ $115.00/LF ($10,120.00)
ADD 1 EACH 4” Dia Storm Lateral Cleanout @ $450.00 EA $450.00
ADD 220 Lineal Feet of 6” Dia Storm Lateral @ $65.00/LF $14,300.00
ADD 1 EACH 6” Dia Storm Lateral Cleanout @ $500.00 EA $500.00
ADD 7 EACH Replace Catch Basin Castings w/ 3070 (2'x2') castings @ $900.00 EA $6,300.00
DELETE 16 EACH Water Service Curb Box Material @ $73.00 EA
Village of Jackson
Ridgeway Dr and Chestnut Ct
Reconstruction - REBID
Owner's Project No.
Effective Date of
Change Order:
Advance Construction
Cedar Corporation
Ridgeway Dr and Chestnut Ct
Reconstruction - REBID
May 22, 2025
Page 36 of 106
d)
e)
f)
g)
h)
i)
j)
k)
Attachments:
a)
b)
c)
d)
e)
f)
g)
Change Order Item Nos. 14-19: Revisions to proposed storm sewer/storm sewer inlet off of Willow Ridge Drive.
Revisions associated with Owner's negotiations with property owner to reduce the cost of the improvements.
Change Order Item Nos. 25 & 26: Contract time extension associated with all additional Work items within this contract
change order.
Change Order Item No. 24: Cost associated with the Contractor's additional efforts related to finding the actual
location of the existing water main on Ridgeway Drive by use of conventional and hydoexcavating. Water main location
as indicated on Drawing were based upon on site utility locations which were found to be in error during construction.
Change Order Item Nos. 25 & 26: Contractor's revised construction schedule dated 5/5/25.
Change Order Item No. 1: 1) Engineer's Sump Pump Connection Exhibit dated 3/28/25, 2) Email correspondence
between Engineer & Contractor dated 3/28/25 & 4/17/25 respectively.
Change Order Item No. 2: Email correspondence between Engineer & Contractor dated 3/28/25 & 4/17/25
respectively.
Change Order Item Nos. 20-22: Owner requested to have sanitary sewer lateral replacement extended beyond the
right-of-way to property owner's structures. Changes associated with revising the method of installation from open cut
pipe to pipe bursting.
Change Order Item Nos. 23 & 24: Contractor's Cost Quote dated 5/12/25.
Change Order Item Nos. 3-6: Email correspondence between Engineer & Contractor dated 4/2/25 & 4/17/25
respectively.
Change Order Item Nos. 7-11: Owner decided to have the existing curb catch basin castings replaced which
necessitated the reconstruction of structure chimneys. In addtion, the Owner added the replacement of 2 each catch
basin structures with new castings.
Change Order Item No. 23: Cost associated with the relocation of the proposed watermain and change in sequencing
resulting in additional efforts related to temporary water service connections and additional water main isolations and
capping.
Change Order Item No. 12: Existing sanitary manhole located at Sta. 20+05 was found to contain leaks and therefore,
the Contractor was directed by Owner to repair leaks by use of chemical grout.
Change Order Item No. 13: Additional tree removals found necessary for the purpose of the installation of storm sewer
laterals to adjacent properties.
Change Order Item No. 12: 1) Email correspondence between Owner & Engineer dated 4/2/25, 2) Email
correspondence between Engineer & Contractor dated 4/2/25 & 4/17/25 respectively.
Change Order Item Nos. 7-11, 14-19, 20-22: 1) Email correspondence between Owner & Contractor/Engineer dated
4/30/25 re approvals, 2) Contractor's Cost Quote 422251 dated 4/22/25 (Items 7-11, 3)Owner's Exhibit re revision to
Willow Ridge Dr. storm sewer (Items 14-19), 4) Contractor's Cost Quote 42225 dated 4/22/25 (Items 20-22),
Page 37 of 106
Page 38 of 106
Village of Jackson
Ridgeway Dr & Chestnut Ct
Reconstruction - REBID
PROJECT NO.
DRAWN BY:
SCALE:
DATE:
INSTALL SCH 40
TRANSITION
FITTING WITH
THREADED CAP
COUPLING TO
ACCOMODATE
NEW TO EXISTING
PIPE MATERIALS
05789-0020
DTK
3/28/25
NTS
CHANGE ORDER ITEM NO. 1
Page 39 of 106
1
Doug Kroes
From: Shane Kofler <skofler@advconst.net>
Sent: Thursday, April 17, 2025 9:10 AM
To: Doug Kroes
Cc: Joshua Molter; Logan Myers; jeff.kreutzinger@villageofjacksonwi.gov; Matt Stephan;
Jack Straehler
Subject: RE: Jackson Ridgeway/Chestnut Reconst: Request for Cost Proposals 3/28/25
Follow Up Flag: Follow up
Flag Status: Flagged
Doug,
Here is the pricing requested.
Shane Kofler
Advance Construction Inc
Phone: 920-434-3978 / Fax: 920-434-6228
Direct: 920-593-1016 / Cell: 920-606-5011
From: Doug Kroes <doug.kroes@cedarcorp.com>
Sent: Friday, March 28, 2025 4:25 PM
To: Shane Kofler <skofler@advconst.net>
Cc: Joshua Molter <joshua.molter@cedarcorp.com>; Logan Myers <Logan.Myers@villageofjacksonwi.gov>;
jeff.kreutzinger@villageofjacksonwi.gov; Brian Kober <brian.kober@villageofjacksonwi.gov>; Matt Stephan
<matt.stephan@cedarcorp.com>
Subject: Jackson Ridgeway/Chestnut Reconst: Request for Cost Proposals 3/28/25
Shane:
As discussed at the preconstruction conference, the Owner would like to add Work to the contract associated
with making the connections from the new storm lateral risers to the existing sump pump discharges. Attached
please find an exhibit detailing the ad
ded work item. Based on the same, please provide an EACH unit price for this
work:
ADD 15 EACH Connection to Exist. Sump Pump Discharge @ $______
500.00 __________EA
In addition, the Owner will be furnishing the water service curb box material and therefore, a credit form the same
is warranted. Please provide a credit amount as follows:
DELETE 16 EACH Water Service Curb Boxes @ $__________
73.00 ________EA
Please feel free to contact me should you have any questions.
Thank you,
CHANGE ORDER ITEM NOS. 1 & 2
Page 40 of 106
1
Doug Kroes
From: Shane Kofler <skofler@advconst.net>
Sent: Thursday, April 17, 2025 3:09 PM
To: Doug Kroes
Cc: Josh Martell; Bryan Greisch
Subject: RE: Jackson Ridgeway/Chestnut Reconst.: Revised Drawings/Added Work Items - 2nd
CLARIFICATION
Attachments: R-3070-0010.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Doug here is the spec sheet on the “other” castings.
Shane Kofler
Advance Construction Inc
Phone: 920-434-3978 / Fax: 920-434-6228
Direct: 920-593-1016 / Cell: 920-606-5011
From: Shane Kofler
Sent: Thursday, April 17, 2025 11:50 AM
To: 'Doug Kroes' <doug.kroes@cedarcorp.com>
Cc: Josh Martell <jmartell@advconst.net>; Bryan Greisch <bryan.greisch@cedarcorp.com>
Subject: RE: Jackson Ridgeway/Chestnut Reconst.: Revised Drawings/Added Work Items - 2nd CLARIFICATION
Doug,
Please find pricing below.
Shane Kofler
Advance Construction Inc
Phone: 920-434-3978 / Fax: 920-434-6228
Direct: 920-593-1016 / Cell: 920-606-5011
From: Doug Kroes <
doug.kroes@cedarcorp.com >
Sent: Wednesday, April 2, 2025 7:23 PM
To: Shane Kofler < skofler@advconst.net >
Cc: Josh Martell < jmartell@advconst.net >; Bryan Greisch < bryan.greisch@cedarcorp.com >
Subject: RE: Jackson Ridgeway/Chestnut Reconst.: Revised Drawings/Added Work Items - 2nd CLARIFICATION
EXTERNAL EMAIL - This email was sent by a person from outside your organization. Exercise caution when clicking links, opening
attachments or taking further action, before validating its authenticity.
Shane, one more time… (gotta go home
) Corrections Below in RED font:
Shane:
CHANGE ORDER ITEM NOS. 3-6,12 & 13
Page 41 of 106
2
Attached please find revised Drawing 4/2/25. The revised Drawings include revisions as requested by the Owner.
These revisions will add some work items in which we are requesting unit prices. Items added that have
established bid unit prices will have the additional quantities recorded within their respective bid items.
Therefore, in addition to the items we have requested unit costs for previously (within attached email of 3/28/25),
please provide all-inclusive unit price costs for the following items:
New Items:
ADD 1 EACH 4” Dia Storm Lateral Cleanout @ $_______
450.00 _______EA
ADD 220 Lineal Feet of 6” Dia Storm Lateral @ $_______ 65.00 ________/LF
ADD 1 EACH 6” Dia Storm Lateral Cleanout @ $_______500.00 _______EA
ADD 1 EACH Replace Storm Catch Basin 2’x3’ w/ Casting & Chimney (Salvage Casting for Owner) @
$_______ 3800.00 _________EA This is for the stand alone inlets (not for structures built over the pipe)
ADD 8 EACH Replace Catch Basin Castings (Salvage Casting for Owner) @ $________ 838.00 ____________EA This is
for the 3067 2x3. Cost for the alternate casting more suited for round rings R – 3070 cost would be $900 Each
ADD 8 EACH Catch Basin Chimney Reconstruction @ $________ 4750.00 _______EA If rebuilding using R3070 with
round rings cost would be $4000.00
ADD 1 LUMP SUM San. MH Barrel Joint Leak Repair – Chemical Grout @ $__ 3000.00 ___________ LS (Photo
Attached – Intersection of Ridgeway & Willow Ridge – STA 20+00)
Established Bid Items :
ADD 180 Lineal Feet of 4” Dia Storm Lateral (Bid Item #17) @ $60.00/LF
ADD 27 Square Feet of Concrete Sidewalk Removal (Bid Item #20) @ $0.60/SF
ADD 27 Square Feet of 4” Concrete Sidewalk (Bid Item #21) @ $6.60/SF
ADD 2 EACH Remove Trees (Bid Item #39) @ $1,000.00 EA
ADD 27 Square Yard Remove Asphalt Driveway (Bid Item #29) @ $4.95/SY
ADD 27 Square Yard Asphalt Driveway (Bid Item #30) @ $33.00/SY
Please feel free to contact me if you have any questions.
Thank you,
Doug Kroes
Senior Construction Manager
W61 N497 Washington Avenue | Cedarburg | WI | 53012
Office: 262-204-2360 ext 1403 | TF: 800-472-7372
Cell: 920-246-6326
doug.kroes@cedarcorp.com
www.cedarcorp.com | LinkedIn | Facebook | Twitter
This e-mail and any attachments may contain proprie tary and confidential information from Cedar Corpor ation. Please visit our website at
http://www.cedarcorp.com/disclaimer for more details.
Page 42 of 106
1
Doug Kroes
From: Jack Straehler <jack.straehler@villageofjacksonwi.gov>
Sent: Wednesday, April 30, 2025 11:47 AM
To: Doug Kroes; Matt Stephan; skofler@advconst.net
Cc: Logan Myers
Subject: Ridgeway Drive & Chestnut Court
Follow Up Flag: Follow up
Flag Status: Completed
Team,
I have a few updates to share.
1. The alternative scope of work to include Pipe Bursting has been discussed with our Village Administrator
and Village President. We are in agreement with accepting this change. Doug can you please draft the
proper paperwork necessary to reflect this change?
2. The alternative scope of work to include using 2' x'2 castings and round rings where necessary when
reconstructing Storm Sewer catch basin has been discussed with our Village Administrator and Village
President. Again, we are all in agreement with accepting this change. Doug can you please draft the proper
paperwork necessary to reflect this change?
3. The alternative bid item for W198N17022 Ridgeway Drive has been discussed with our Village
Administrator and the property owner. The property owner has agreed to pay the second bid provided by
Advanced Construction as a special assessment. The property owner has also given the Village and its
contractor written permission to access the private property and perform the work without an easement.
Please let me know if you have any questions.
Thanks,
Jack B. Straehler II
Director of Public Works
Village of Jackson
W194 N16660 Eagle Drive
Jackson, WI 53037
Office: 262-677-0707
Cell: (262) 305-5012
CHANGE ORDER ITEM NOS. 7-11, 14-19, 20-22
Page 43 of 106
Advance Construction, Inc.
2141 Woodale Ave Quote # 422251
Green Bay, WI 54313 DATE: April 22 2025
Phone: (920) 434-3978
Fax: (920) 434-6228
Quote terms
Prices Good for
90 Days
Quantity Unit Unit Price Amount
2 EA 3,800.00 7,600.00$
-$
2 EA 838.00 1,676.00$
7 EA 900.00 6,300.00$
-$
2 EA 2,000.00 4,000.00$
7 EA 2,000.00 14,000.00$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
Subtotal 33,576.00$
Mark Up -$
Job
Storm Pricing
QUOTE
Bill To:
Village of Jackson
Replace Catch Basin Casting with 3070 (2x2)
Chimney Rebuild Catch Basin with round rings
Chimney Rebuild Catch Basin with 2x3 rings
Replace Catch Basin Casting with 3067 (2x3)
Description
Advance Construction Rep
Shane Kofler
Install new 2x3 inlet (takes 3067 casting)
CHANGE ORDER ITEM NOS. 7-11
Page 44 of 106
CHANGE ORDER ITEM NOS.14-19
Page 45 of 106
Advance Construction, Inc.
2141 Woodale Ave Quote # 42225
Green Bay, WI 54313 DATE: April 22, 2025
Phone: (920) 434-3978
Fax: (920) 434-6228
Quote terms
Prices Good for
90 Days
Quantity Unit Unit Price Amount
1560 LF 140.00 218,400.00$
-$
-$
1276 LF -165.50 (211,178.00)$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
Subtotal 7,222.00$
Mark Up -$
Description
Advance Construction Rep
Shane Kofler
Pipe Burst existing sanitary sewer laterals from property
to newly installed sewer main.
Open Trench new sewer laterals, new main to
right of way. (plan quantity footage)
Job
Ridgeway Dr - Pipe Bursting
QUOTE
Bill To:
Jack Straehler
Village of Jackson
CHANGE ORDER ITEM NOS. 20 - 22
Page 46 of 106
1
Doug Kroes
From: Doug Kroes
Sent: Wednesday, April 2, 2025 3:23 PM
To: Logan Myers; skofler@advconst.net; Joshua Molter; Matt Stephan
Cc: Jack Straehler; Jeff Kreutzinger
Subject: RE: Ridgeway/Chestnut Project - Additional work request
Logan:
Did you consider a chemical grout approach for addressing the leak in the joint? This has been proven as an
eective method of addressing leaks such as this.
Doug Kroes
Senior Construction Manager
W61 N497 Washington Avenue | Cedarburg | WI | 53012
Office: 262-204-2360 ext 1403 | TF: 800-472-7372
Cell: 920-246-6326
doug.kroes@cedarcorp.com
www.cedarcorp.com | LinkedIn | Facebook | Twitter
This e-mail and any attachments may contain proprie tary and confidential information from Cedar Corpor ation. Please visit our website at
http://www.cedarcorp.com/disclaimer for more details.
From: Logan Myers <Logan.Myers@villageofjacksonwi.gov>
Sent: Wednesday, April 2, 2025 2:08 PM
To: Doug Kroes <doug.kroes@cedarcorp.com>; skofler@advconst.net; Joshua Molter <joshua.molter@cedarcorp.com>;
Matt Stephan <matt.stephan@cedarcorp.com>
Cc: Jack Straehler <jack.straehler@villageofjacksonwi.gov>; Jeff Kreutzinger <jeff.kreutzinger@villageofjacksonwi.gov>
Subject: Ridgeway/Chestnut Project - Additional work request
All,
The Village has inspected the northernmost sanitary manhole at the intersection of Ridgeway and Willow Ridge
and noticed a large amount of infiltration and leaking from at least two joints. See attached photo. We would like
Advance Construction to disassemble, re-grout, and re-wrap this manhole to address this issue. Please account
for the additional time when scheduling work. Let me know if you have any questions or concerns.
Thank you,
Logan Myers
Engineering Technician
Village of Jackson
W194 N16660 Eagle Drive
Jackson, WI, 53037
Oice: (262) 677-0707 ext. 513
Mobile: (414) 573-9137
CHANGE ORDER ITEM NO. 12
Page 47 of 106
Advance Construction, Inc.
2141 Woodale Ave Quote #
Green Bay, WI 54313 DATE: May 12, 2025
Phone: (920) 434-3978
Fax: (920) 434-6228
Quote terms
Prices Good for
90 Days
Quantity Unit Unit Price Amount
6.5 HR 306.51 1,992.32$
-$
6.5 HR 200.00 1,300.00$
-$
1 LS 8,000.00 8,000.00$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
Subtotal 11,292.32$
Mark Up -$
Job
Ridgeway Dr
QUOTE
Bill To:
Village of Jackson
This includes 5 water service reconnects, and cutting
and capping the existing main 2 times.
$1000 per service & $1500 each for cut and cap.
Temporary reconnect of water services and cap existing
water main to allow for sewer install.
Hydro Vac Truck 4/9 & 4/10
Description
Advance Construction Rep
Shane Kofler
Crew Investigating and locating existing water 4/9 & 4/10
CHANGE ORDER ITEM NOS. 23 & 24
Page 48 of 106
Jackson - Ridgeway Dr 5-5-25
31-Mar 7-Apr 14-Apr 21-Apr 28-Apr 5-May 12-May 19-May 26-May 2-Jun 9-Jun 16-Jun 23-Jun 30-Jun 7-Jul 14-Jul 21-Jul 28-Jul 4-Aug 11-Aug 18-Aug 25-Aug 2-Sep
Traffic Control
Erosion Control
Tree Removal
Sanitary Mainline - Ridgeway Dr
Sanitary Mainline - Chestnut Ct
Water Main - Ridgeway Dr
Water Main - Chestnut Dr
Water Serices/Transfers
Sanitary Laterals Pipe Burst
Storm Sewer
Grading
Curb & Gutter
Sidewalks & Driveways
Restoration
Asphalt Pavement
Advance
Gordon Work Zones
Homer
Sommers
AllWays
Payne & Dolan
M&E
CHANGE ORDER ITEM NOS. 25 & 26
Page 49 of 106
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Pay Request #2 – Ridgeway Drive and Chestnut Court Reconstruction Project
Meeting Date: June 24, 2025
Background and Analysis:
This memo is to inform the Board of Pay Request #2 from Advance Construction in the amount
of $219,429.58 for work completed on the Ridgeway Drive and Chestnut Court Reconstruction
Project.
The work has been reviewed and verified for accuracy and completion in accordance with the
project contract documents and schedule.
Funding for this payment will come from Account Numbers:
600-00-56700-820-001 (Capital Project – Chestnut Court/Ridgeway Drive) $73,143.20
300-00-17600-000-380 (Sewer Construction Work) $73,143.19
200-00-18600-395-300 (Water Construction Work) $73,143.19
If you have any questions, please let me know.
JS
Recommendation:
I recommend the Board approve Pay Request #2 for Advanced Construction in the amount of
$219,429.58 as part of the ongoing financial management and progress of this capital
improvement project.
Page 50 of 106
Cedarburg • Green Bay • Madison • Menomonie
Community Infrastructure • Architecture • Environmental Services
W61N497 Washington Avenue
Cedarburg, WI 53013
262-204-2360
www.cedarcorp.com
May 30, 2025
Village of Jackson
N168 W20733 Main Street
PO Box 637
Jackson, WI 53037
Attn: Mr. Jack Straehler II, Director of Public Works
Subject: Contractor’s Application for Payment No. 2
Ridgeway Drive & Chestnut Court Reconstruction - REBID
Cedar Project No. 05789-0020
Dear Mr. Straehler:
Enclosed for your use in payment to Advance Construction in the amount of $219,429.58 is Contractor’s
Application for Payment No. 2.
Please Note: As the Contractor has not yet received payment from the Village related to their Application for
Payment No. 1, this application does not include lien waivers from subcontractors and/or material suppliers
associated with Application No. 1. These lien waivers will be submitted upon the Contractor’s receipt of
payment for the same.
Following your review and approval, please complete the application for payment forms within the areas reserved
for the Owner. Thereafter, retain one copy for your records, provide the second copy to the Contractor with
payment and provide the third copy to our office.
Should you have any questions, please feel free to contact me at our Cedarburg office.
Sincerely,
CEDAR CORPORATION
Douglas T. Kroes
Senior Construction Manager
Enclosed: As Noted
Cc: Shane Kofler, Advance Construction
Page 51 of 106
5/30/25
Page 52 of 106
Page 53 of 106
Page 54 of 106
Page 55 of 106
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Pay Request #16 – Wastewater Treatment Plant Tertiary Filters and UV Disinfection
Project
Meeting Date: June 24, 2025
Background and Analysis:
This memo is to inform the Board of Pay Request #16 from J.H. Hassinger in the amount of
$99,540.52 for work completed on the Wastewater Treatment Plant Tertiary Filters and UV
Disinfection project.
The work has been reviewed and verified for accuracy and completion in accordance with the
project contract documents and schedule.
Funding for this payment will come from Account Number:
300-00-17600-000-380 (Sewer Construction Work)
If you have any questions, please let me know.
JS
Recommendation:
I recommend the Board approve Pay Request #16 for J.H. Hassinger in the amount of
$99,540.52 as part of the ongoing financial management and progress of this capital
improvement project.
Page 56 of 106
Page 57 of 106
Page 58 of 106
Page 59 of 106
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Clean Water Fund Loan Request Loan Request #13 – Wastewater Treatment Plant
Tertiary Filters and UV Disinfection Project
Meeting Date: June 24, 2025
Background and Analysis:
This memo is to inform the Board of the Clean Water Fund Loan Reimbursement Request #13
in the amount of $125,364.57 for work completed on the Wastewater Treatment Plant Tertiary
Filters and UV Disinfection Project.
The work has been reviewed and verified for accuracy and completion in accordance with the
project contract documents and schedule.
Funding from this payment will reimburse Account Number:
300-00-17600-000-380 (Sewer Construction Work)
If you have any questions, please let me know.
JS
Recommendation:
I recommend the Board approve the Clean Water Fund Loan Reimbursement Request #13 in
the amount of $125,364.57 as part of the ongoing financial management and progress of this
capital improvement project.
Page 60 of 106
Page 61 of 106
Page 62 of 106
Page 63 of 106
Page 64 of 106
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Wastewater Treatment Plant Disk Filter Maintenance
Meeting Date: June 24, 2025
Background and Analysis:
As Part of ongoing Wastewater Treatment Plant Maintenance this memo is to inform the Board
of the reasoning behind receiving a single-source proposal from Veolia Water Technologies.
Veolia Water Technologies is the original manufacturer of this equipment. As such, they are
uniquely trained and qualified to perform the required 5-year maintenance. This scheduled
maintenance program is a standard manufacturer recommended service that, to my
understanding, has not yet been completed since the system’s original installation. Completion
of this program is important to preserve the performance, safety, and longevity of the
equipment.
According to information provided by Veolia, the company will not honor warranty coverage if
parts are purchased or installed by a third party. Therefore, to ensure the integrity of the system
and to maintain warranty protections, it is necessary to have Veolia perform this work directly.
Additionally, the Village’s Purchasing and Authority Policy and Procedures allows for sole
source procurement under circumstances where only one vendor can provide the required
service or product due to proprietary or warranty-related reasons. For these reasons, I received
a single-source proposal from Veolia which was reviewed with staff and our consultant
Engineering firm Town and Country.
Funding for this project will come from Account Numbers:
300-00-57320-831-000 (Sewer Collection System Maintenance) $56,535.69
300-00-57320-833-000 (Sewer Equipment Maintenance) $56,535.69
Please let me know if you have any questions.
JS
Recommendation:
I recommend the Board approve this sole source purchase proposal from Veolia Water
Technologies in the amount of $113,071.38, to carry out the five-year maintenance program.
Page 65 of 106
KRUGER | 1500 Garner Rd. Raleigh NC 27610
Veolia Codes: PS
QUOTEFROM
QUOTE NO:
1500 Garner Road, Suite C QUOTE DATE:
Raleigh, North Carolina 27610 USA EXPIRATION DATE:7/1/2025
CLE Jackson WWTP, WI In Stock
2 PRIPHT374989SPACER WASHER D235/179X15 - AXIAL BEARING $214.18 $428.36
4 PRIPHT374976SLIDE BUSHING D178.4 $1,318.54 $5,274.16
2 PRIPHT375120RBR SEAL HSF22/26 REAR BRG $88.29 $176.58
2 PRIPHT361142RBR SEAL HSF22/26 FRONT BRG $126.10 $252.20
2 PRIPHT377653EFF CTR SHAFT 22/26 WELD $3,892.90 $7,785.80
2 PRIPHT375113BRG HOUSE HSF22/2600 316L REAR $4,711.02 $9,422.04
2 PRIPHT377652INF CTR SHAFT 22/26 ASSY S32205 W/O FC (or #PRIPHT365737) $6,036.50 $12,073.00
2 PRIPHT375114BRG HOUSE 2200-HN INL 316L WELD $5,146.98 $10,293.96
2 PRIPHT377077SPACER WASHER D177/166.9X10 - V-RING SLEEVE $118.00 $236.00
2 SEVRRU343948V-SEALING V-180A INF V-RING $55.91 $111.82
2 PRIPHT361469SWIV CONN 2 INCH D9-BALL ASSY S32205 W/ STOP SCREW STR NIP $1,295.82 $2,591.64
2 PRIPHT374961RBR LIP SEAL HSF17/21/2200 $394.05 $788.10
2 SEORRU343088O-SEALING 180X4 $17.63 $35.26
2 IMPSGG325347MANOMETER 0-16 BAR PSI KR ¼" $133.53 $267.06
2 CFCFGU201095SCREEN,WIRE,200 MICRON WEAVE $175.92 $351.84
2 PRIPHT370971HUB SPROCKET DO150 DI45 316L $1,417.29 $2,834.58
2 PRIPHT371733HUB FLG DO150 DI80 316L $313.56 $627.12
2 PRIPHT375296SPACER BW WHEEL HSF2200-N $451.06 $902.12
2 PRIPHT375295WHEEL BW HEADER HSF2200-N $410.06 $820.12
2 PRIPHT377786SPACER WASHER D340/231X16 PA6 $541.48 $1,082.96
2 FXSCYR337597SCREW MSK6SS M8X50 A4 DIN916 - SET SCREW FOR HUB $4.78 $9.56
2 FXSCYP337628SCREW M6S M6X55 A4 - SMALL SCREW ON BW WHEEL $0.78 $1.56
2 PRIPHT377783SPROCKET Z=12 HSF2200 $532.95 $1,065.90
2 PRIPHT377784SPROCKET Z=32 HSF2200 $1,811.75 $3,623.50
2 PRIPHT364472CHAIN HT78 47 LINKS 316L/PLASTIC $1,427.98 $2,855.96
2 FXWAYP337486WASHER RB 6.4X18X1.6 A4 - WASHER BW WHEEL $0.27 $0.54
10 FXSCYZ337620SCREW M6S M16X120 - SCREW BW WHEEL & REAR CENTER SHAFT PLATE $24.30 $243.00
34 FXWAYT337489WASHER RB 10.5X20X2 - HUB WASHER $0.49 $16.66
14 PRIPHT369554WASHER W/ LOCKING DEVICE SET 316L HSF2200/HSF2600 $175.81 $2,461.34
14 FXSCYZ337165SCREW M6S M16X90 - SPROCKET SCREWS $81.85 $1,145.90
2 SEVRRU343913V-SEALING NBR V-45A (SEAL ON SEW SHAFT) $10.84 $21.68
16 FXSCYT336408SCREW M6S M10X60H - HUB SCREWS $5.30 $84.80
16 FXNUYT336018NUT NYLOC M6NM M10 - HUB NUT $1.52 $24.32
24 FXWAZA337493WASHER RB 17X30X3 $1.52 $36.48
58 FXNUYZ336020NUT NYLOC M6NM M16 $4.84 $280.72
12 FXSCYP337502SCREW M6S M6X16H (REAR BRG SEAL) $0.55 $6.60
12 FXWAYP337485WASHER RB 6.4X12X1.6 - REAR HOUSING SEAL WASHER $0.27 $3.24
8 FXSCYZ337581SCREW M6S M16X60 - FRONT INF SHAFT $12.67 $101.36
16 FXSCYP337064SCREW MK6S M6X16 - REAR HOUSING SEAL SCREW $2.07 $33.12
42 FXSCYZ336887SCREW M6S M16X65 - SPOKE SCREWS $7.06 $296.52
84 FXWAZB336888WASHER 18X30X8.0 - SPOKE WASHERS $4.89 $410.76
4 FXSCYP337508SCREW M6S M6X50 $1.03 $4.12
4 FXSCYR337597SCREW MSK6SS M8X50 $5.09 $20.36
1 PRIPHT364205TEST TUBE ASSY CAPACITY CTRL OF FLTR PNL $229.91 $229.91
Veolia Water Technologies, Inc. Chris Evans
919.455.1522
PHONE 888-578-4378 FAX 919-661-4568 Chris.Evans@veolia.com
Contact Name:Chad Russ Company:Village of Jackson
Phone:262-893-0855 Address:W194 North 16658 Eagle Drive
Jackson, WI 53037Email:chad.russ@villageofjacksonwi.gov
Sales
Person Job EQUIPMENT SERIAL #. Payment Terms DELIVERY TERMS DELIVERY SCHEDULE
Net 30 Days DAP, Prepaid & Add
Destination*
QTY PART NUMBER DESCRIPTION UNIT PRICE LINE TOTAL
06062025
6/6/2025 Aftermarket Sales Manager - Hydrotech Filtration, Kruger
This quote is valid for 25 days
Page 66 of 106
KRUGER | 1500 Garner Rd. Raleigh NC 27610
2
VEOLIA HYDROTECH 2210 DISC FILTER (QTY 1) 2 VEOLIA TECHS ONSITE
FOR UP TO 2 DAYS TO COMPLETE A 5 YEAR KIT REBUILD
SCOPE
TRAVEL TO JACKSON, WI
SAFTEY MEETING
LOTO UNIT
REHAB DISC FILTER WITH 5 YEAR SERVICE KIT
REMOVE LOTO
TEST RUN UNIT
TURN UNIT BACK OVER TO PLANT OPERATORS
CLIENT RESPONSIBILITES
1. UNIT DRIANED AND WASHED OUT.
2. PROVIDE ACCESS TO WATER HOSE
$20,944.38 $41,888.75
[[Confidential, Do not share with third parties]]
$1,850.00
If Applicable
ALL PRICES SUBJECT TO COST AND AVAILABILITY AT TIME OF ORDER.
PRICES EXCLUDES PACKAGING, FREIGHT (INTERNATIONAL & DOMESTIC),CUSTOMS, DUTIES,
BROKERAGE, FEES AND APPLICABLE TAXES.
PRICES EXCLUDES INSTALLATION LABOR, STARTUP, & TRAINING
SHIPPING CHARGES ARE PREPAID AND ADDED TO THE INVOICE ORYOUR FREIGHT ACCOUNT.
MINIMUM ORDER $50.00.
^THESE ITEMS MAY BE AFFECTED BY INTERNATIONAL TARIFFS.
SUBTOTAL $111,221.38
ESTIMATED FREIGHT*
Sales Tax
Total USD $113,071.38
*If customer's shipping method is preferred (FOB), enter your freight carrier & account number:
A SIGNED QUOTATION IS REQUIRED TO PROCESS ORDER. PLEASE SIGN BELOW.
Signed By:______________________________________________________________________________ Date:_______________________
Click or browse to URL(s) below for applicable Terms and Conditions
https://www.veoliawatertech.com/sites/g/files/dvc3601/files/document/2025/03/Parts%20and%20Service%20Terms%20%281%29.pdf
Page 67 of 106
KRUGER | 1500 Garner Rd. Raleigh NC 27610
QUOTE NO:06062025 QUOTE
Company information -
(OPTIONAL) Credit Card Section -
Signed by: Date:
Printed Name: Title:
Please complete this section if you have not previously provided this information.
Company Name:
Shipping Address:
City/State/Zip:
Telephone number:
Fax number:
Please complete this section if you prefer to pay by credit card.
Card Number:
Expiration Date:
Authorization (CID) #:
Card Holder Name:
Card Holder Phone #:
Company Name:
Billing Address:
City/State/Zip:
Visa MasterCard AMEX
I/We understand that the part(s), invoice(s) or sales orders(s) ordered / listed above will be charged to the credit card noted upon order acknowledgement.
Additionally, items ordered will not be processed until confirmation/authorization of charge is made. If the charge is for labor, a charge
confirmation/authorization will be performed prior to labor commencement. If the credit card is denied, Veolia will notify the cardholder to obtain an
alternative form of payment prior to processing the order
3 digit # located on back of card
My signature below is my company’s acknowledgement and acceptance of this order including all stated terms and conditions, is an acknowledgement
that I am authorized to sign this document on behalf of my company, and further authorizes Veolia to use the information entered in this section (if any)
to process credit card payment for this order.
•IF YOU SUBMIT A PO, PLEASE REFERENCE VEOLIA WATER TECHNOLOGIES, INC. QUOTATION NUMBER TO PROCESS ORDER.
•The Buyer is responsible for inspecting the equipment upon delivery and documenting any damage in writing on the delivery tickets. Signing
delivery tickets without the notation of damage or missing items deems the equipment acceptable.
•The pricing is expressly contingent upon the items in this quotation & is subject all terms stated herein, including all attached Veolia Water
Technologies, Inc. Standard Terms of Sale. No additional terms contained within Owner's and/or Engineer's Plans, Specifications & Purchase Orders
shall apply to nor become a part of this Quote.
•Except in the case where there are active, applicable, and mutually executed terms and conditions in place between Veolia and Purchaser prior to
issuance of this Quotation, the Parts and/or Services provided are subject to the terms and conditions linked above. These terms and conditions will
not change, but please print and include with your records if necessary.
Page 68 of 106
Page 69 of 106
Taking the lead in Washington County
Bid Tabulation Address / Location Work Type Contractor Price Glen Brooke Drive Path Complete Reconstruction Poblocki Paving $88,505.00 $48/Ton UndercuttingGlen Brooke Drive Path Complete Reconstruction Johnson & Sons $89,229.00 $55/Ton UndercuttingGlen Brooke Drive Path Complete Reconstruction PLM Paving $109,340.00 $72/Ton UndercuttingGlen Brooke Drive Path Complete Reconstruction Pro2Pave $117,044.00 $45/Ton Undercutting Glen Brooke Drive Path Profile Mill / Pave PLM Paving $77,756.00Address / Location Work Type Contractor Price Jackson Drive Path Maintenance Johnson & Sons $7,300.00Jackson Drive Path Maintenance PoblockI Paving $9,803.00Jackson Drive Path Maintenance PLM Paving $9,300.00 or $9,900.00(Depending on scope of work) Jackson Drive Path Maintenance Pro2Pave $13,500.00Address / LocationWork TypeContractor PriceJackson Drive Path Complete ReconstructionPoblocki Paving $63,174.00 $48/Ton UndercuttingJackson Drive Path Complete ReconstructionJohnson & Sons$66,251.00 $55/Ton UndercuttingJackson Drive Path Complete ReconstructionPLM Paving$78,685.00 $72/Ton UndercuttingJackson Drive Path Complete ReconstructionPro2Pave $88,744.00 $45/Ton UndercuttingJackson Drive Path PLM Paving$58,525.00
Page 70 of 106
Page 71 of 106
Page 72 of 106
Page 73 of 106
Page 74 of 106
Page 75 of 106
Page 76 of 106
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: 2025-2026 Contract Amendment #2 – Gremmer and Associates
Meeting Date: June 24, 2025
Background and Analysis:
This memo is to inform the Board of the estimated engineering and design cost associated with
the proposed 2026 Eagle Drive reconstruction project.
The Village currently holds a professional services agreement with Gremmer and Associates in
the amount of $193,450 for engineering and design services related to the 2026 street
reconstruction of Hawthorn, Aspen, and Linden.
This Contract Amendment #2 proposes to expand the scope of services to include design and
construction engineering for the proposed 2026 Eagle Drive reconstruction project. Gremmer
and Associates has provided the following options and associated fees for this additional work
scope:
• Rural reconstruction: $78,175.00
• Rural reconstruction with sidewalk: $93,990.00
• Urban reconstruction with sidewalk and storm sewer: $108,375.00
Funding for this contract will come from Account Numbers:
600-00-56700-000-000 (Miscellaneous Capital Projects)
300-00-17600-000-380 (Sewer Construction Work)
200-00-18600-395-000 (Water Construction Work)
After reviewing the proposed alternatives, urban reconstruction with sidewalk and storm sewer
will provide the most comprehensive long-term benefit and align with the Village’s infrastructure
standards and goals.
If you have any questions, please let me know.
JS
Recommendation:
I recommend the Board approve the 2025-2026 contract amendment #2 with Gremmer &
Associates for engineering services for a total amount of $301,825.00.
Page 77 of 106
June 18, 2025
Village of Jackson
W194 N16660 Eagle Drive
Jackson, WI 53037
Attention: Mr. Jack Straehler
Director of Public Works
Subject: Hickory Lane
Contract Amendment No. 2
Dear Mr. Straehler:
The following is Contract Amendment No. 2 for the subject project. The original contract dated October
26, 2023, and Amendment No. 1 dated 12/11/2024 is amended as follows:
SCOPE OF SERVICES – ALT. 1 (RURAL RECONSTRUCT – NO SIDEWALK)
1. Survey.
a. Topographic/utility/right-of-way survey and corresponding base map for Eagle Drive from
Hickory Lane to STH 60.
2. Preliminary and final roadway and drainage design/plans for the reconstruction of Eagle Drive
from approximately 350’ north of Hickory Lane to the southern roundabout limits at STH 60.
a. Scope assumes a rural roadway section with 5’ paved shoulders.
b. Scope assumes the roadway will continue to be drained via roadside ditches (no storm
sewer).
c. Scope assumes the existing culverts under Eagle Drive just north of Spruce Street will
not be replaced or extended.
3. Preliminary and final sanitary sewer and water main design
a. Sanitary sewer design/plans scope is limited to removal and replacement of the existing
sanitary sewer manhole cone including castings (no improvements to the mainline pipe
or laterals).
b. Water main design/plans scope is limited to removal and replacement of existing curb
stop boxes, and adjustment of water valve boxes.
7. WDNR/USACE coordination.
a. Add the additional Eagle Drive reconstruction project to the WDNR Notice of Intent for
Stormwater Discharges (NOI) for the 2026 let project.
b. Prepare and submit WDNR/USACE General Permit for the let 2026 project. Scope
assumes any wetland impacts will be able to be permitted via the General Permit; and
that wetland determination, mitigation, jurisdictional determination and/or artificial
wetland exemption/classification will not be required. Individual permits will be
considered additional services.
Page 78 of 106
-2-
6. Street Lighting design (sublet to KL Engineering).
a. Preliminary and final design for continuous street lighting along one side of Eagle Drive
from Hickory Lane to STH 60.
b. Street lighting poles and fixtures will match the recent Village of Jackson poles/fixtures
installed along Spruce Street.
7. Bid documents and bidding
a. Scope assumes the Eagle Drive reconstruction will be added to the project specific
specifications and bid related documents for the 2026 construction project along Linden
Drive, Aspen Drive and Hawthorn Drive.
SCOPE OF SERVICES – ALT. 2 (RURAL RECONSTRUCT – WITH SIDEWALK ALONG EAST SIDE)
1. Same scope of services as Alt. 1, except for the following modifications:
a. Add sidewalk along the east side of Eagle Drive.
b. Add a two-parcel r/w plat for any required land acquisition (permanent r/w or
easements) from the Piggly Wiggly and Ace Hardware properties.
SCOPE OF SERVICES – ALT. 3 (URBAN RECONSTRUCT)
1. Same scope of services as Alt. 1, except for the following modifications:
a. Scope is based on an urban section with curb and gutter, storm sewer, and sidewalk
along the east side of the road.
b. Stormwater management planning/design for the Eagle Drive corridor, in order to
comply with any applicable post-construction performance standards (either WDNR or
Village of Jackson standards). The scope of the project assumes the post-construction
performance standards will be accomplished through catch basins, grass swales, or
biofilters within the limits of the project corridor. Design of an offsite detention pond is
not included in the scope.
c. Prepare a two-parcel r/w plat for any required land acquisition (permanent r/w or
easements) from the Piggly Wiggly and Ace Hardware properties.
d. Water main design/plans scope is limited to offsets required for storm sewer conflicts,
removal and replacement of existing curb stop boxes, and adjustment of water valve
boxes.
Page 79 of 106
-3-
COMPENSATION
ENGINEER will be compensated by the OWNER for work outlined in the Scope of Services a lump sum
amount for the selected alternative as follows:
Alt. 1: Rural reconstruct – no sidewalk = $78,175 (includes $17,871 sublet to KL Engineering)
Alt. 2: Rural reconstruct – with sidewalk = $93,990 (includes $17,871 sublet to KL Engineering)
Alt. 3: Urban reconstruct = $108,375 (include $17,871 sublet to KL Engineering)
Contract Amendment No. 2 increases the lump sum fee for the project from $193,450 (Original w/
Amendment No. 1) to the following (based on the selected alternative):
Alt. 1: Rural reconstruct – no sidewalk = $271,625
Alt. 2: Rural reconstruct – with sidewalk = $287,440
Alt. 3: Urban reconstruct = $301,825
AUTHORIZATION AND TIMING
A receipt of a signed copy of the CONTRACT AMENDMENT shall be considered as authorization to proceed
with the services described.
For the ENGINEER Accepted by the OWNER
__________________________________ ___________________________________
Jeff Chvosta, Vice President Jack Straehler
Gremmer & Associates, Inc. Director of Public Works
___6/18/25_____________________ ___________________________________
Date Date
Page 80 of 106
Village of Jackson Community Center Addition
Application and Certification for Payment
June 2025 Summary
W146 N5650 Enterprise Avenue | Menomonee Falls, WI 53051 | P: 262-345-1280 | F: 262-345-1281
www.moore-cs.com
Village of Jackson
Parks and Recreation Department
N165W20330 Hickory Lane
Jackson, Wisconsin 53037
Attn: Tyler Mentzel, Parks and Recreation Director
RE: Jackson Community Center Addition
Project Pay Application #13
MCS Project # 23033
Enclosed for your use in payment to Moore Construction Services is Pay Application #13 for
$108,416.85.
Moore Construction Services has verified the work completed by project contractors and
approved the amounts included in column G of the AIA G702 and G703 Application and
Certification for Payment.
Following your review and approval, please complete the application for payment forms within
the areas reserved for the OWNER. Thereafter, retain one copy for your records, provide the
second copy to Moore Construction Services.
Please feel free to contact me with any questions or concerns.
Regards,
Jason M. Kruchko
Moore Construction Services
Project Manager
Enclosed: AIA G702-1992 Application and Certificate for Payment #13 dated June 23, 2025
Page 81 of 106
Page 82 of 106
Page 83 of 106
Page 84 of 106
Page 85 of 106
Page 86 of 106
Page 87 of 106
Page 88 of 106
Page 89 of 106
Page 90 of 106
W146 N5650 Enterprise Avenue | Menomonee Falls, WI 53051 | P: 262-345-1280
PARTIAL LIEN WAIVER AND RELEASE Check Date: 6-18-2025 This Partial Lien Waiver and Release is submitted pursuant to the Subcontractor Agreement between Moore nefit of Village of Jackson and Circle Electric, Inc. as Jackson Community Center (the located at N168W20330 Hickory Lane, Jackson, Wisconsin work to be performed by Subcontractor . This Partial Lien Waiver and Release is also submitted pursuant to Subc Payment for low voltage labor, materials and equipment installed in or furnished for the Project TO DATE and Subcontractor hereby waives the y or through the Application Date, on the Project, except as set forth below. (1) The Subcontractor has performed all Work through the date of the Application for Payment, pursuant to the terms and conditions of the Subcontract Documents. (2) Any and all subcontractors, laborers, suppliers and materialmen that have provided labor, material or services to the Subcontractor for use or incorporation into the construction of the improvements to the Property are listed in Subc for Payment. (3) All sums due by Subcontractor to subcontractors or any other party for labor, materials or services used or incorporated into the improvements to the Property, and for which Subcontractor has previously received payment, have been paid and satisfied in full, and there are no outstanding claims of any character arising out of, or related to, Subc activities on, or improvements to, the Property, except as set forth below. (4) Subcontractor is not aware of any claims which may arise against Contractor and/or Owner for damages resulting from injury or death to any employees, subcontractors, or the public at large arising out of any of Subcor construction work on the Property. (5) There are no known Claims of Lien, Preliminary Notices of Lien, or any suits or claims for payment, loss or damage of any kind, nature or description which might constitute a lien upon the Property as of the date of this Partial Lien Waiver and Release Upon Payment, except as set forth below. (6) This Partial Lien Waiver and Release constitutes a representation by the undersigned, for and on behalf of the Subcontractor, that the payment referenced above constitutes full and complete payment for all work performed through the date of the Application for Payment, except as set forth below. (7) Subcontractor will indemnify and save harmless Contractor and Owner from any claim, demand, lien or right to lien, and to defend all actions arising out of the same, and to pay any costs, expenses and attorneysContractor and/or Owner in connection therewith. (8) The Subcontractor certifies and represents that there are sufficient funds remaining in the Subcontract Sum to complete the Project in accordance with the Subcontract Documents. (9) Below is a list of items which serve as an exception to the representations set forth herein (items not listed are waived irrevocably): The undersigned warrants and represents that he or she has full authority to execute this Partial Lien Waiver and Release. SUBCONTRACTOR: Please sign and return this form via: E-Mail: rachael@moore-cs.com Signature: Name & Title: Ryan Kastanek, President Date: 6.19.2025
Page 91 of 106
Page 92 of 106
Page 93 of 106
Page 94 of 106
Page 95 of 106
Page 96 of 106
Page 97 of 106
Ordinance #25-06 Page 1 of 3
STATE OF WISCONSIN VILLAGE OF JACKSON WASHINGTON COUNTY
ORDINANCE #25-06
AN ORDINANCE TO AMEND THE ADOPTED 2050 COMPREHENSIVE PLAN
FOR THE VILLAGE OF JACKSON, WASHINGTON COUNTY, WISCONSIN
WHEREAS, the Village Board adopted a comprehensive plan on August 10, 2009, as
referenced in Chapter 38 of the Village Code of Ordinances; and Sections 66.1001(1)(a) and
66.1001(2), Wis. Stats.; and
WHEREAS, the Village Board has made a number of minor revisions to the adopted
plan since that time including a major plan update in 2019; and
WHEREAS, the Plan Commission desires to revise the definition of
“Multi-
Family/High-Density Urban Residential” outlined under the Land Use Categories on pages six
(6) through seven (7) in the adopted comprehensive plan; and
WHEREAS, the Plan Commission desires to Amend Map 1, titled “Land Use Plan for
the Village of Jackson: 2050” on page 5 of the Comprehensive Plan for The Village of
Jackson: 2050 by changing the projected land use for various Parcels; and
WHEREAS, the Plan Commission finds that the revision set forth herein is consistent
with the remainder of the adopted plan; and
WHEREAS, the Village published a Class 1 public notice and held a public hearing on
July 8, 2025, to obtain public comments regarding the comprehensive plan amendment, as
enumerated in Section 66.1001(4)(d), Wis. Stats., and the public participation procedures for
comprehensive plan amendments adopted by the Village Board through Resolution #19-24;
and
WHEREAS, by a majority vote of the entire Plan Commission recorded in its official
minutes on Thursday, May 15, 2025, the Plan Commission recommends to the Village Board
the revisions to the adopted comprehensive plan as included in adopted Resolution #25-17
and as set forth herein.
NOW, THEREFORE BE IT RESOLVED, the Village of Jackson Village Board,
Washington County Wisconsin ORDAINS AS FOLLOWS:
PART 1. Amend the Land Use definition of
Multi-Family/High-Density Urban Residential to
read as follows:
Multi-Family/High-Density Urban Residential
The Multi-Family/High-Density Urban Residential land use category consists primarily
of high density single-family, two-family, multi-family residential development, and
Page 98 of 106
Ordinance #25-06 Page 2 of 3
manufactured or modular homes. Multi-family residential development has a minimum
lot size of 16,000 square feet, a minimum lot area of 3,000 square feet for each one-
bedroom dwelling unit, or a minimum lot area of 3,500 square feet for each dwelling
unit with two or more bedrooms, whichever is larger. Manufactured home park
developments have a minimum park size of 20 acres while the minimum lot area for a
single manufactured home is 5,000 square feet and the minimum lot area for a
modular home is 7,200 square feet. Two-family residential development in this land
use category could occur on lots of at least 7,000 square feet at a density of up to 12
dwelling units per net acre. Single-family residential development in this land use
category could occur on lots of at least 4,500 square feet at a density of up to 7
dwelling units per net acre.
PART 2. Amend Map 1, titled “Land Use Plan for the Village of Jackson: 2050” on page 5 of
the Comprehensive Plan for The Village of Jackson: 2050 by changing the projected land use
for the Parcels listed below from Medium-Density Residential to Multi-Family/High-Density
Urban Residential.
Parcels: V3_0536001 thru V3_0536020 – Interior lots
Parcels: V3_0536021 thru V3_0536040 – Exterior lots
Parcels: V3_0536050 thru V3_0536062 – Rear loaded single-family lots
Parcels: V3_0536049 – Outlot 9 for townhomes
Parcels: V3_0536047 – Outlot 6 for townhomes
PART 3. Amend Map 1, titled “Land Use Plan for the Village of Jackson: 2050” on page 5 of
the Comprehensive Plan for The Village of Jackson: 2050 by changing the projected land use
for the Parcels listed below from Medium-Density Residential to Other Conservancy Lands to
be Preserved.
Parcel: V3_0536042 (Outlot 1) – Sidewalk Area (vegetated)
Parcel: V3_0536043 (Outlot 2) – Stormwater Pond (east)
Parcel: V3_0536044 (Outlot 3) – Sidewalk Area (east)
Parcel: V3_0536045 (Outlot 4) – Sidewalk Area (central)
Parcel: V3_0536046 (Outlot 5) – Sidewalk Area (west)
Parcel: V3_0536048 (Outlot 7) – Stormwater Pond (west)
PART 4. Amend Map 1, titled “Land Use Plan for the Village of Jackson: 2050” on page 5 of
the Comprehensive Plan for The Village of Jackson: 2050 by changing the projected land use
for the Parcels listed below from Medium-Density Residential to Park and Recreation.
Parcel: V3_008200E
PART 5. This ordinance shall become effective upon passage and posting, or publication as
provided by law.
PART 6. The Village Clerk is directed to send a copy of the amendments to each of the
following parties listed below pursuant to Section 66.1001(4)(b) of the Statutes:
a. the clerk for Washington County;
Page 99 of 106
Ordinance #25-06 Page 3 of 3
b. the clerk for the Town of Jackson;
c. the clerk for the Town of Polk;
d. State of Wisconsin Department of Administration;
e. Southeastern Wisconsin Regional Planning Commission (SEWRPC); and
f. Slinger Community Library.
PART 7. The several sections of this ordinance are declared to be severable. If any section
or portion thereof shall be declared by a court of competent jurisdiction to be invalid,
unlawful, or unenforceable, such decision shall apply only to the specific Section or portion
thereof directly specified in the decision and shall not affect the validity of any other
provisions, sections, or portions thereof of the ordinance. The remainder of the ordinance
shall remain in full force and effect. Any other ordinances whose terms are in conflict with
the provisions of this ordinance are hereby repealed as to those terms that conflict.
PART 8. The Village Clerk and Village Administrator are authorized and directed to make all
changes within the Village of Jackson Code of Ordinances necessary to reflect this ordinance.
Introduced by: Seconded by:
Vote: aye nay Passed and approved
VILLAGE OF JACKSON
By:
Brian J. Heckendorf, Village President
Attest:
Jacqueline Schuh, Village Clerk
Proof of Posting:
I, the undersigned, certify that I posted this Resolution on bulletin boards at the Jackson Municipal Complex, Post Office, and
the Village of Jackson Website.
Village Official Date
Page 100 of 106
Taking the lead in Washington County.
STAFF MEMO Village of Jackson
Plan Commission
Meeting Date: July 8, 2025
Agenda Item: # 6.d
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
Village Board
From: Collin Johnson, Director of Inspections/Zoning
Subject: Resolution #25-17 - Proposed Amendments to the Village of Jackson Comprehensive Plan
Description / Background and Analysis:
Staff is recommending several amendments to the Village’s adopted Comprehensive Plan to correct various
inconsistencies with both current and proposed land uses.
Part 1 of the Resolution provides an update to the Multi-Family/Urban-Density Residential use definition: The
proposed amendments include the addition of single-family and two-family dwellings. changes references to “mobile
homes” by referencing “manufactured” and “modular” homes. An adjustment to the minimum lot area for two-
family residential development decreases from 8,000 square feet to 7,000 and increases the density from 7.2 to 12
dwelling units per net acre. Additionally, it incorporates single-family residential development as a land use category
and establishes minimum single-family lot sizes of 4,500 square feet with a density of up to 7 dwelling units per net
acre.
Part 2 of the Resolution changes the current land use designations for certain residential lots from Medium-Density
Residential to Multi-Family/High-Density Urban Residential.
Part 3 of the Resolution simply changes the land use category for various non-developable lands within the Oaks of
Jackson subdivision from their current Medium-Density Residential land use category to the more appropriate Other
Conservancy Lands to be Preserved category.
Lastly, Part 4 of the resolution updates the land use category for the recently acquired parcel of land located on
Hasmer Lake intended for future park land from Medium-Density Residential use to Parks and Recreation use.
Comprehensive Plan and Zoning Impacts:
The proposed changes bring the Comprehensive Plan in line with the current or anticipated future zoning and/or land
uses.
Site Plan:
N/A
Review Procedures:
The Plan Commission is advisory, and the Village Board makes the final decision following a public hearing.
Signage:
N/A
Page 101 of 106
Taking the lead in Washington County.
Additional Staff Comments:
None.
Notice Requirements:
• Posting on the agenda
• Publishing a Class I Notice is required at least 30-days prior to the Village Board Public Hearing
Potential Action:
Motion to adopt Resolution #25-17 amending the definition of “Multi-Family/Urban-Density Residential”, updating
the Land Use categories for certain parcels referenced within the Resolution and amending Map 1 titled “Land Use
Plan for the Village of Jackson: 2050” contained within the Village of Jackson Comprehensive Plan.
Attachments:
1. Resolution #25-17 - Resolution to Amend the Village Comprehensive Plan - DRAFT
2. Land Use Amendment Map
Page 102 of 106
Page 103 of 106
Page 104 of 106
Page 105 of 106
P
Rosewood
HawthornLinden Aspen
Ridgeway
Spruce
Jackson Oaks
Proposed Village of Jackson Comprehensive Plan Amendment
April 2025
Legend
Park and Recreation
Multifamily/High-Density
Urban Residential
Other Conservancy
Lands to be Preserved
Parcels
0 250 500125 Feet
µ
Prepared on 3/26/2025 by the Community Development Department of Washington
County.
This information is issued subject to errors and omissions and is not certified by
Washington County.
Orthophoto flight date: Spring, 2024
Page 106 of 106
Source: Village of Jackson website. First collected Oct 18, 2026.