NOT HELD DUE TO LACK OF QUORUM - Plan Commission Meeting — Agenda Packet
City of New Berlin · Waukesha County · Plan Commission · meeting of Mar 2, 2026 · Agenda packets
Open the original document More from City of New Berlin
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Plan Commission
Meeting Agenda
March 2, 2026 - 6:00 PM
Council Chambers
3805 S. Casper Drive
Published: 2.20.2026
AGENDA
1. PRIVILEGE OF THE FLOOR
Each speaker will be limited to three (3) minutes. The Privilege of the Floor session shall not
exceed a total of thirty (30) minutes.
2. CALL TO ORDER, PLEDGE OF ALLEGIANCE
3. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE
4. APPROVAL OF MINUTES
A. February 2, 2026 Meeting Minutes
5. PLAN COMMISSION SECRETARY'S REPORT
6. NEW BUSINESS
A. (7) KH SP-2600056 John Jewell with JJED Holdings LLC - Five Fields at Historic Coffee
Road - 21-Lot Concept Subdivision Review.
7. PENDING
A. (3) KH CU-2502137 Welcome East Side LLC – 17200 W. Cleveland Avenue –
Conditional Use Permit to reoccupy the existing building for a gas station and
convenience store, and the construction of an 891 square foot addition. (Public Hearing
12/8/25)
8. COMMUNICATIONS
9. ADJOURN
Additional Information
• The agenda packet, including supplemental information related to agenda items, is available online at
www.NewBerlinWI.gov. Once finalized by the governing body, approved meeting minutes will also be posted online.
• Agenda items may be taken out of order at the governing body's discretion.
• Members, and possibly a quorum, of other municipal governmental bodies may attend this meeting to gather
information. However, no action will be taken by any governmental body other than the one referenced in this notice.
• Accommodations will be provided under the Americans with Disabilities Act (ADA) to meet the needs of individuals
with disabilities. If you require assistance or appropriate aids and services, please contact the Office of the City Clerk
at (262) 786-8610 with reasonable notice.
Page 1 of 20
Plan Commission
MEETING MINUTES
February 2, 2026 - 6:00 PM
Council Chambers
3805 S. Casper Drive
MINUTES
1. PRIVILEGE OF THE FLOOR
No one spoke at Privilege of the Floor
2. CALL TO ORDER, PLEDGE OF ALLEGIANCE
Mayor Ament called the meeting to order at 06:07 PM and led the Pledge of Allegiance.
3. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE
Deputy City Clerk Megan Godshall took the roll call as follows:
Present: Commissioner Schulpius, Commissioner Felda, Mayor Ament, Commissioner Gardner,
Mayor Dave Ament
Excused: Commissioner Theodore Anderson
Absent: Commissioner Rafel, Alderman Stribl
Staff Present: City Attorney Mark Blum, DCD Director Greg Kessler, DCD Deputy Director Nikki
Jones, Principal Planner Kelly Wall, Deputy City Clerk Megan Godshall
The Deputy City Clerk confirmed that a quorum was present and that the meeting was properly
posted in compliance with open meetings law.
4. APPROVAL OF MINUTES
A. January 7, 2026 Meeting Minutes
MOTION: Motion to approve
Motion by: Commissioner Schulpius
Second by: Commissioner Gardner
VOTE:
Motion Passed 4-0
5. NEW BUSINESS
A. Discussion and possible recommendation to the Common Council approval of (7) KW
RZ-2502434 Dianne Keller – 3820 S. Woelfel Road (Tax Key #: 1216.999.003) and
adoption of Ordinance 2716 that approves the rezoning from A-1 & C-1 to A-2, R-1/R-2
& C-1.
Page 2 of 20
MOTION: Motion to approve
Motion by: Commissioner Schulpius
Second by: Commissioner Felda
VOTE:
Motion Passed 4-0
B. Discussion and possible action to recommend to Common Council approval of (7) KW
LD-2502436 Dianne Keller - 3820. S. Woelfel Rd (Tax Key #: 1216.991.003) - 3-Lot
Certified Survey Map.
MOTION: Motion to approve
Motion by: Commissioner Schulpius
Second by: Commissioner Gardner
VOTE:
Motion Passed 4-0
C. Discussion and possible action to recommend to Common Council approval of (3) NJ
LD-2502502 John Spitz with Western Contractors Inc. - 2445 S. 179th Street (Tax Key
#: 1185.990) & 2345 S. 179thStreet (Tax Key #'s: 1185.994 & 1185.991) - 1-Lot Certified
Survey Map.
MOTION: Motion to approve
Motion by: Commissioner Felda
Second by: Commissioner Schulpius
VOTE:
Motion Passed 4-0
6. PENDING
A. (3) KH CU-2502137 Welcome East Side LLC – 17200 W. Cleveland Avenue –
Conditional Use Permit to reoccupy the existing building for a gas station and
convenience store, and the construction of an 891 square foot addition. (Public Hearing
12/8/25)
Item not discussed
7. ADJOURN
MOTION: Motion to adjourn at 6:11 PM
Motion by: Commissioner Schulpius
Second by: Commissioner Gardner
VOTE:
Motion Passed 4-0
Respectfully Submitted,
Megan Godshall, Deputy City Clerk
Page 3 of 20
File #: SP-2600056
PC Date: 3/2/26
Site Visit Date: 2/18/26
KH
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
STAFF REPORT
EXECUTIVE SUMMARY
APPLICANT/PROJECT: John Jewell, JJED Holdings LLC / Five Fields at Historic Coffee Road
Concept Subdivision
LOCATION: 16605 W. Coffee Road (Tax Key #: 1211.999.001)
REQUEST: Concept Plan discussion and information from the February 18, 2026
site visit.
D.R.C. RECOMMENDATION: NO RECOMMENDATION, for discussion purposes only.
DETAILS IN ATTACHED STAFF REPORT:
1
Page 4 of 20
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
CITY OF NEW BERLIN
DEPARTMENT OF COMMUNITY DEVELOPMENT
PLAN COMMISSION STAFF REPORT
Meetings of March 2, 2026 & February 18, 2026 (site visit)
John Jewell, JJED Holdings LLC / Five Fields at Historic Coffee Road Concept Subdivision
16605 W. Coffee Road (Tax Key #: 1211.999.001)
DATE STAFF REPORT PREPARED: January 12, 2026
APPLICANT / OWNER(S): John Jewell, JJED Holdings LLC / GP LEGACY, LLC
REQUEST / DESCRIPTION OF PROJECT: The applicant is requesting a site visit and further discussion for a
conceptual subdivision on 72.57 acres located at approximately 16605 W. Coffee Road (Tax Key #:
1211.999.001).
DATE OF APPLICATION / DATE FILED WITH CITY CLERK: 1/5/2026
DATE OF COMPLETENESS DETERMINATION: 1/7/2026
PRE-APPLICATION CONFERENCE HELD: Yes
Date(s) of Meeting(s): 10/14/2025
Neighborhood Informational Meeting: 2/17/2026
Plan Commission Site Visit(s): 2/18/2026
CONCEPTUAL PLAN: Yes, two concept plans have been provided (Concept Plan #2 was submitted on
February 18, 2026 in response to the feedback received at the February 17, 2026 neighborhood informational
meeting).
SIZE OF DEVELOPMENT / PARCEL(S): 72.57 acres
CURRENT ZONING: R-3 (Suburban Single-Family Residential District), C-1 (Upland Resource Conservancy),
C-2 (Shoreland-Wetland Holding District)
CURRENT LAND USE: Farmland
PROPOSED ZONING: N/A
PROPOSED LAND USE: Single-family residential subdivision
PROPOSED LOT SIZES: 20,000 SF minimum lot area (lots ranging from 1.1 acres to 11.3 acres)
PROPOSED DENSITY:
Concept #1: 72.57 acres / 21 lots = 1 lot per 3.5 acres
Concept #2: 72.57 acres / 24 lots = 1 lot per 3 acres
ADJACENT ZONING AND LAND USE:
North: Zoning: R-1/R-2, R-3, M-1 SPO, C-2 Land Use: Residential, Industrial (Drexel)
South: Zoning: I-1, P-1, C-2 Land Use: Institutional (Recycling Center)
East: Zoning: R-5 Land Use: Residential
West: Zoning: A-1, R-1/R-2, C-1, C-2 Land Use: Agriculture, Residential
2
Page 5 of 20
Department of
Community Development
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
CONFORMANCE WITH COMPREHENSIVE PLAN AND MUNICIPAL CODE: Yes
Chapter 14: Neighborhood D: Urban Neighborhood North:
Planning Context / Vision / Development Policies:
Vision:
• The Urban Neighborhood North shall continue to be a series of well maintained, single-family
neighborhoods served by neighborhood amenities such as parks, pedestrian connections to
adjacent neighborhoods and nearby shopping areas. Both the public infrastructure and the
private housing stock should be maintained. New development and redevelopment should
complement the residential character of the area. In compliance with State Smart Growth
Legislation, the city should also encourage infill residential development of quarter acre lots or
larger to match the existing character of the neighborhood.
Development Policies:
• Explore additional pedestrian and bicycle connections between subdivisions as a way to create
a sense of “neighborhood” beyond individual subdivisions. Also explore connections between
subdivisions and nearby commercial shopping and civic areas, such as parks, schools, and the
Civic Center.
Land Use:
• Future Land Use Map: Urban Residential
ZONING CODE (Chapter 275): The lots will need to meet the requirements in §275-33B(3). Since this
is a conceptual plan, a detailed review of all the lot standards has not been completed. This is done at
the time of preliminary plat when more detailed plans are required.
DEVELOPMENT CODE (CHAPTER 235): Yes, in compliance with §235-15, which recommends
submittal of an application for a Voluntary Sketch Plan.
REZONING REQUIRED: No
CONDITIONAL USE REQUIRED: No
PUBLIC HEARING REQUIRED: No
USE / SITE / ARCHITECTURAL REVIEW:
Use Approval Required: No
Site Plan Required: Yes, see concept subdivision plans
Architectural Review Required: No
PROPOSED ARCHITECTURE: N/A
UNIQUE SITE CHARACTERISTICS:
Environmental Corridor: Yes, Secondary Environmental Corridor.
Wetland On Property: Yes, wetlands will be registered on the City’s Zoning Map. Wetlands were field
delineated by Heartland Ecological Services in 2025.
Conservancy Districts (C-1, C-2): Yes, C-1 and C-2
NRCS Map Classification: Not Inventoried
Floodplain: No
Topography / Geologic: The site slopes down from the southeast corner of the site. The remainder of the site
is very flat.
3
Page 6 of 20
Department of
Community Development
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
BIKE & PEDESTRIAN FACILITIES PLAN: Figure 6.16 of the Comprehensive Plan identifies existing and
proposed “On Road” and “Off Road” Facilities. Provide a connection between the following existing and
proposed facilities within this subdivision:
• Coffee Road as an existing “On Road Facility” with bicycle lanes
• Al Stigler Parkway as an existing “Off Road Facility” with sidepaths
• Malone Park/Recycling Center as an existing and proposed “Off Road Facility” with trails
Needs Assessment for Bicycle and Pedestrian Routes
• Better bicycle and pedestrian trail linkages between residential subdivisions and other
subdivisions, parks, schools, libraries and commercial nodes.
Objective 2: Policies for Multi-Modal Transportation
• Construct bicycle and pedestrian facilities as recommended by the Comprehensive Plan.
• Design roadways for the safety of pedestrians and bicycles at all points of interaction with
motorized vehicles.
• Promote the use of the bicycle and pedestrian facilities. The Plan Commission will establish the
pedestrian and bicycle facility map (See Figure 6:16), while the Facilities and Grounds
Department will establish the Recreational Trail Plan and Map, along with the Safe Routes to
School.
• Evaluate the provision of bicycle and/or pedestrian facilities as integral components of new
development and redevelopment projects. Require connections with existing bicycle and
pedestrian facilities.
• Expand upon the system of bicycle and pedestrian facilities along arterial and Collector Street
and adjacent developments with new street construction or reconstruction projects. All other
roadways shall be evaluated based on the City’s existing and future planned segments (both
pedestrian/bicycle facilities and recreational trails).
• Interconnect adjacent developments and street reconstruction projects with bicycle and
pedestrian facilities.
Objective 5: Improve bicycle and pedestrian facilities
• Require developments to provide appropriate pedestrian and bicycle accommodations and
connections.
Objective 8: Minimize the Environmental Impact of Transportation Facilities
• Promote the use of multi-modal transportation to minimize average impacts upon the
environment.
PARK & OPEN SPACE PLAN: Chapter 7 of the City’s Park and Open Space Plan provides recommendations
to address the future needs of the community. As additional facilities are needed within the parks, consider
expansion of parkland. Focus on the development of parkland in the eastern sector of the City where
moderate-density residential uses are located. The long-term improvements in this area include:
• Explore the opportunity for possible expansion of Malone Park by purchasing the 71 acre
Posner Property (section 15), which is located northwest of Malone Park.
NATURAL RESOURCES PROTECTION:
Limits of Disturbance (LOD): Subdivision boundary is shown on the sketch plan.
Wildlife Habitat Protection: N/A
Wildlife Management Plan: An Endangered Resources review will be completed on the property prior to the
preliminary plat being submitted.
4
Page 7 of 20
Department of
Community Development
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
ENVIRONMENTAL IMPACT: Wetlands will be registered on the City’s Zoning Map. Wetlands were field
delineated by Heartland Ecological Services in 2025.
STORMWATER MANAGEMENT / DRAINAGE PLAN: Applicant is required to adhere to all City of New Berlin
Codes, Ordinances and Plans regarding storm water conveyance and maintenance as identified by the
Department of Community Development. A stormwater management plan will be required at the time of
submittal for the preliminary plat.
SANITARY SEWER PROVISION:
Within Current Sewer Service Area: No
Basin Capacity Available: N/A
Adequate Linkage: N/A
Onsite System Required: Yes, perc tests are on file with the City and will be required at the time of
preliminary plat.
WATER USAGE CALC.: Estimated 250 GPD per new single-family lot. Private wells will be required.
TRAFFIC IMPACT: TIA will not be required at the time of preliminary plat. See findings section for additional
information.
SCHOOL DISTRICT IMPACT:
Concept #1: Concept #2:
12 total estimated students 14 total estimated students
Elementary 0.31 students / lot 0.31 students / lot
Middle 0.14 students / lot 0.14 students / lot
High School 0.14 students / lot 0.14 students / lot
Notice Sent to Affected School District(s): Will be sent upon submittal of application for preliminary plat.
PREVIOUS ACTION: None
CONSISTENCY WITH PREVIOUS ACTION: N/A
FINDINGS:
1. The applicant has submitted plans for a conceptual subdivision on 72.57 acres. Concept #1 includes 21
lots and Concept #2 includes 24 lots. Concept Plan #2 was submitted on February 18, 2026 in
response to the feedback received at the February 17, 2026 neighborhood informational meeting.
2. A neighborhood informational meeting was held on February 17, 2026 by Alderwoman Kroupa and the
applicant. Neighbors were invited to asks questions of the applicant ahead of further discussion by the
Plan Commission at the March 2, 2026 meeting. Below is a summary of the items discussed:
a. A revision to the proposed subdivision layout was discussed to eliminate the road/cul-de-sac
extension of Hansen Drive. This would mean that all new lots in the proposed subdivision would
be access from either Coffee Road or Calhoun Road. The findings in this staff report reflect the
original concept plan that was submitted, not this proposed change. Concept Plan #2 was
submitted on February 18, 2026 in response to the feedback received at the February 17, 2026
neighborhood informational meeting.
b. There will be no extension of City sewer and water. Lots will be served by onsite septic and
wells.
c. The applicant intends to keep existing tree lines to the maximum extent possible to provide
vegetative buffers to/from surrounding properties.
5
Page 8 of 20
Department of
Community Development
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
d. Compliance during Construction will be enforced by the Development Agreement.
e. Stormwater will be handled on site and will be an improvement from existing conditions.
3. The site visit was held with the Plan Commission and general public on February 18, 2026. Section
§235-15 of the City of New Berlin Subdivision Code allows the owner to voluntarily invite the Plan
Commission, Department of Community Development staff, members of the Common Council and
abutting neighbors to visit the site prior to the filing of a preliminary plat. This allows attendees the
opportunity to see the area of the proposed subdivision in person, ask any questions they may have
and visualize the proposal first hand.
4. All comments are based on a preliminary review. Additional comments will be made after more
detailed plans have been submitted and reviewed.
5. The Preliminary Plat shall show the City’s Recycling Center property to the south for context.
6. The following notes shall be placed on the face of the subdivision plat regarding adjacent uses:
a. The City of New Berlin Recycling Center is an active municipal property throughout the weekdays
and weekends. The Recycling Center contains cold storage buildings for the City DPW and Utility
Departments, as well as outdoor storage. The area is used by employees working at the site as
well as residents dropping off yard waste. The compost at the site does emit odors typical to
recycling activities. Noise generated on this site may come from wood chipping equipment, the
audible reverse/backup warning signals from trucks, vehicles and equipment on site. Additional
dust, traffic, and lighting may occur due to the activities at this site.
b. Malone Park is a community park that is active year-round, including programming, events and
rentals, which includes festivals, tournaments and fireworks. Activities occur during weekdays
and weekends throughout the day and into the evening.
7. Groundwater:
a. Wisconsin DNR well construction reports for two nearby properties within the same hydrologic
area (one directly across the street and one immediately adjacent to the subject parcel) indicate
static groundwater levels ranging from approximately 1’ to 5’ below ground surface at the time of
their drilling. These records suggest shallow groundwater conditions are present within the
immediate vicinity of the proposed development site.
b. The following notes shall be placed on the face of the plat regarding the groundwater levels in
this area and any possible basement restrictions , based upon seasonable high ground water
levels:
i. Portions of this subdivision are in an area where shallow groundwater conditions have
been documented in nearby well construction reports. Seasonal high groundwater
elevations may impact basement construction and lot drainage.
ii. The City of New Berlin makes no representation regarding surface conditions. Foundation
& basement design, groundwater control, and lot drainage shall be the responsibility of
the property owner. It is recommended that either a licensed professional engineer or
other soils expert design a basement and foundation which will be suitable to withstand
the various problems associated with saturated soil conditions on basements walls or
floors or that special measures be taken.
iii. Lot grading, drainage, and stormwater management plans shall follow all approved plans
and shall be maintained by the property owners in accordance with all approved
plans. Berms, landscaping, walls, patios, fences and/or any other physical alterations that
modifies or obstructs drainage patterns shall be the responsibility of the property owner.
Post-construction drainage issues related to private lot improvements or deviations from
6
Page 9 of 20
Department of
Community Development
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
the approved grading plan(s) shall be the responsibility of the property owner. No owner
shall alter or impede established drainage swales, overland flow paths or stormwater
conveyance areas without prior written approval by the City.
8. Utilities:
a. The property, which is located outside of the current MMSD Sewer Service Area, will require
private on-site waste treatments sites (POWTS) for each lot that is created that will meet
Waukesha County requirements. Soil testing for individual site designed septic systems is
required. A letter from Waukesha County approving the sites is required at the time of the
Preliminary Plat.
b. Private water supply wells meeting the requirements of the Wisconsin Department of Natural
Resources (WDNR) will also be required. If any additional requirements will be placed on the
wells due to the proximity to the Recycle Center, please add those notes to the Preliminary Plat.
9. Fire:
a. Per §235-32, the installation of one 10,000-gallon cistern for fire protection shall be required.
The cistern shall be assessable from the new roadway off Coffee Road and shall be located
within an outlot, at a location to be coordinated with the New Berlin Fire Department. The cistern
shall be accessible from a paved shoulder with bollards around the cistern for protection.
10. Trails:
a. Consider incorporating a trail within the subdivision that would connect the trail system within
Malone Park to the bicycle lanes on Coffee Road, aligning with Chapter 6 of the Comprehensive
Plan. This will require further discussion by the Plan Commission as this project moves forward.
§235-34 of the Subdivision Code addresses dedication and land reservations for public sites,
open spaces and trails.
11. Park and Open Space:
a. Consider expanding outlot area to create shared open space for residents of the subdivision to
use to align with the long-term improvements as identified in the City’s Park and Open Space
Plan. This will require further discussion by the Plan Commission as this project moves forward.
§235-34 of the Subdivision Code addresses dedication and land reservations for public sites,
open spaces and trails.
12. Wetlands:
a. Wetlands will be registered on the City’s Zoning Map. Wetlands were field delineated by
Heartland Ecological Services in 2025. A wetland registration application shall be submitted to
the City.
13. Environmental:
a. The applicant may be required to coordinate with staff to prepare and record a Conservation
Easement document at the time of Final Plat to protect environmentally sensitive areas.
b. The limits of any Tree Preservation Easements shall be shown on the Preliminary Plat. A tree
inventory is required to better understand the type and quality of trees to determine if tree
preservation easements are needed. Consider placing tree preservation easements on the south
edge of this subdivision to provide a buffer from the City’s Recycling Center.
14. Infrastructure Standards:
a. A Development Agreement will be required.
b. Full infrastructure plans (cross-sections and plan & profile sheets) are required for the proposed
7
Page 10 of 20
Department of
Community Development
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
roadways at the time of preliminary plat.
c. Right-of-Way widths shall be a minimum of 66 feet for public streets.
15. Provide a grading plan that will demonstrate how the proposed lots will meet the grading requirements
of §275-55.
16. Vision Triangle Easements will be required per §275-46. Coffee Road is classified as a Standard
Arterial; 60-foot vision triangles are required at proposed intersections.
17. Per §275-57, Driveways on arterials and collectors shall be located a minimum of 300 feet from a street
intersection.
a. Access restriction for Lot 20 to Calhoun Rd/Coffee Rd should be established on plat to restrict
driveway to preferred roadway and distance from intersection.
18. The City of Waukesha Water Utility Pipeline is located parallel to the north side of Coffee Road. Any
work over this pipeline will require written permission from the Waukesha Water Utility.
19. Stormwater:
a. WDNR NOI is required.
b. MMSD Chapter 13 approval is required.
c. SWMP Maintenance Agreement is required; City of New Berlin boilerplate agreement is
available online.
20. A lot line plan without the aerial photo as the background.
21. A CAD File of the lot lines in NAD 83 2011 state plane WI south projection.
22. Concept #1:
a. For the proposed 12 homes accessing off a new roadway off Coffee Road with an average of
9.57 Trips/day = 115 ADT. See Figure 4 of the Development Handbook for Acceleration,
Deceleration, and bypass lane requirements.
b. Additional details will be needed to show how the jog will be resolved at the end of Hansen Dr.
c. Per the Development Handbook Section 5.1.4: Cul-de-Sacs:
i. All attempts shall be made to provide for continuity of existing roadways rather than
dead ends streets, per §235-23.
ii. Local dead end streets shall end with a cul-de-sac.
iii. No less than 3 parcels and no more than 15 parcels may be served by a cul-de-sac.
Applicant is proposing 16 lots to be accessible from Hansen Drive. See finding (v.) for
rationale for a waiver from this requirement.
iv. Block length between intersections shall not exceed 1,500 feet nor be less than 500 feet.
Block length is measured from the center line of the right-of-way to the center line of the
right-of-way of the two cross streets.
v. The requirements of parcels and block lengths above may be waived if all of the
following conditions are met:
1. Emergency Access – The Fire Department provides an email stating that they
are satisfied with the single point access, with the number of lots, and will not be
requiring a secondary access. Regarding the provision for emergency access,
the Fire Department has formally reviewed the proposed site plan and confirmed
approval via this email. A single point of access is sufficient for the current
8
Page 11 of 20
Department of
Community Development
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
number of lots and the requirement for a secondary access point is not required.
This confirmation ensures that the development meets all necessary safety and
accessibility standards for emergency response vehicles, including required
width and bulb radius minimums set forth in the municipal code.
2. Water main Length – The Utility Manager and City Engineer confirm that any
dead end water main lengths will meet City standards. Does not apply, Hansen
Drive is not serviced by municipal water.
3. Snowplowing - The Streets Manager and City Engineer confirm that there will not
be an issue with plow maneuverability. Hansen Drive currently has a temporary
bulb at the west end. Extending the road and constructing a full cul-de-sac bulb
will improve snow plowing operations.
4. Environmental constraints – DCD Staff confirms that the presence of wetlands,
floodplains, and other environmental constraints make connecting roads to
adjacent development difficult. There are no environmental constraints that would
limit this road extension.
vi. Residential:
1. All pavement widths for a standard residential cul-de-sac shall have a minimum
bulb radius of 42 feet as measured from the center of the cul-de-sac to the edge
of pavement.
2. The minimum bulb radius for the Right-of-Way shall be 66 feet as measured from
the center of the cul-de-sac.
23. Concept #2 (submitted 2/18/26):
a. A complete review has not been done for concept #2 yet.
b. The applicant has provided justification for not extending Hansen Drive. Subdivision Code
Sections 235-23K and 235-23L discuss dead-end streets and stub streets.
c. Per the Development Handbook Section 5.1.4: Cul-de-Sacs:
i. All attempts shall be made to provide for continuity of existing roadways rather than
dead ends streets, per §235-23.
ii. Local dead end streets shall end with a cul-de-sac.
iii. No less than 3 parcels and no more than 15 parcels may be served by a cul-de-sac.
iv. Block length between intersections shall not exceed 1,500 feet nor be less than 500 feet.
Block length is measured from the center line of the right-of-way to the center line of the
right-of-way of the two cross streets.
v. The requirements of parcels and block lengths above may be waived if all of the
following conditions are met:
1. Emergency Access – The Fire Department provides an email stating that they
are satisfied with the single point access, with the number of lots, and will not be
requiring a secondary access.
2. Water main Length – The Utility Manager and City Engineer confirm that any
dead end water main lengths will meet City standards.
3. Snowplowing - The Streets Manager and City Engineer confirm that there will not
be an issue with plow maneuverability.
9
Page 12 of 20
Department of
Community Development
P:\DCD\Projects\SP\SP-2600056 Five Fields Concept Subdivision\SRP SP-2600056 2026_03_02.docx
4. Environmental constraints – DCD Staff confirms that the presence of wetlands,
floodplains, and other environmental constraints make connecting roads to
adjacent development difficult.
vi. Residential:
1. All pavement widths for a standard residential cul-de-sac shall have a minimum
bulb radius of 42 feet as measured from the center of the cul-de-sac to the edge
of pavement.
2. The minimum bulb radius for the Right-of-Way shall be 66 feet as measured from
the center of the cul-de-sac.
STAFF RECOMMENDATION: NO RECOMMENDATION, for discussion purposes only.
ATTACHMENTS:
Location Map
Applicant Letter
Concept Plan #1
Concept Plan #2
Concept Plan #2 – Request for permanent dead-end on Hansen Drive
10
Page 13 of 20
SP-2600056
Scale is estimate - not survey
0 650325
ft
Five Fields at Historic Coffee Road Concept
Map Printed: 2/20/2026 12:11 PM
´
The information and depictions herein have been produced using data available through photogrametric means by the City of New Berlin. The informations and depictions herein
are for informational purposes and the City of New Berlin specifically disclaims accuracy in this reproduction and specifically admonishes and advises that any and all depiction,
measurements, distances depicted herein and as to which specific or precise accuracy is required should be determined by procurement of certified maps, surveys, plats, Flood
Insurance Studies, or other official means.
City of New Berlin
Department of Community Development
3805 S Casper Dr.
New Berlin WI 53151
(262) 797-2445
www.newberlin.org
16605 W. Coffee Road (Tax Key #: 1211.999.001)
Zoning Boundaries
SPO
Special Conditions Apply
PUD
Zoning Overlay
Outside Wetland( (
Registered Wetland
E E
E E
Zoning Wetland Registration
Wetland
FEMA DFIRM - 0.2% Chance
FEMA DFIRM - Zone AE
FEMA DFIRM - Zone A
Floodplain FEMA DFIRM
Environmental Corridor
Conservation Easement
Road Right-of-Way
Parcels
11
Page 14 of 20
We are presenting Five Fields at Historic Coffee Road for Planning Commission review and
consideration. We respectfully request approval of a 21-lot modern rural residential subdivision.
The subject property is located at the southeast corner of Calhoun Road and Coffee Road (tax
key NBC1211999001 ). The site is predominantly zoned R-3, with a portion of the western area
zoned C-1. The proposed density is consistent with the R-3 zoning standard, which allows for
one-acre residential lots.
ln developing the conceptual plan, careful consideration was given to the surrounding land use
pattem and the City of New Berlin's established development transitions. This area functions as
a natural boundary where residential densities shift from smaller subdivision lots to larger, more
rural parcels. The proposed lot sizes reflect this transition by providing lower density
development, larger building envelopes, and increased open space, which is compatible with
the surrounding area.
The design also prioritizes the preservation of existing natural features, including wetlands and
mature trees. The reduced density supports longterm environmental protection while
maintaining the rural character of the site.
Additionally, the subdivision layout was designed to ensure that W. Hansen Drive does not
function as a through street. This limits cut-through traffic, enhances neighborhood safety, and
maintains the residential character and property values of adjacent properties.
12
Page 15 of 20
ELLENA ENGINEERING CONSULTANTS, LLC
SHEET NUMBER
PROPERTY AREA (LESS ROW DEDICATION):
PROPOSED
PROPOSED LOTS:
NET AREA FOR R-3 DENSITY CALCULATION:
71.0 Acres
TOTAL WETLAND AREA:13.2 Acres
21 LOTS
71.0 - 13.2(.75) = 61.1 Acres
2025 WETLAND LINE
(BY HEARTLAND)
ALLOWABLE DENSITY FOR R- 3 @ 2DU/net area: 61.1 * 2 DU = 122 LOTS
PROPOSED TOTAL LENGTH OF ROADWAYS:1560 LF
MIN LOT SIZE:20,000 SF
MIN LOT WIDTH:110' (130' CORNERS)
MIN LOT DEPTH:155'
MIN FRONT:50'
MIN SIDE:15'
MIN REAR:50'
MIN WETLAND SETBACK:30'
R-3 ZONING:
PROPOSED 66' WIDE
PUBLIC ROW
13
Page 16 of 20
ELLENA ENGINEERING CONSULTANTS, LLC
SHEET NUMBER
PROPERTY AREA (LESS ROW DEDICATION):
PROPOSED
PROPOSED LOTS:
NET AREA FOR R-3 DENSITY CALCULATION:
71.0 Acres
TOTAL WETLAND AREA:13.2 Acres
24 LOTS
71.0 - 13.2(.75) = 61.1 Acres
ALLOWABLE DENSITY FOR R- 3 @ 2DU/net area: 61.1 * 2 DU = 122 LOTS
PROPOSED TOTAL LENGTH OF ROADWAYS:1730 LF
MIN LOT SIZE:20,000 SF
MIN LOT WIDTH:110' (130' CORNERS)
MIN LOT DEPTH:155'
MIN FRONT:50'
MIN SIDE:15'
MIN REAR:50'
MIN WETLAND SETBACK:30'
R-3 ZONING:
PROPOSED 66' WIDE
PUBLIC ROW
EXISTING WETLAND
PROPOSED 100' WIDE
PUBLIC BLVD ROW
CALHOUN ROAD
W COFFEE ROAD
14
Page 17 of 20
CITY OF NEW BERLIN
COMMON COUNCIL AGENDA REPORT
Agenda Item: Variance Request – Roadway Continuation Requirement
Applicant: JJED Holdings LLC
Location: West Terminus of W. Hansen Drive
Zoning: R-3 Suburban Single-Family Residential
Action Requested: Approval of a variance to allow W. Hansen Drive to remain a permanent dead-end.
REQUEST
The applicant is requesting approval of a variance from the subdivision roadway continuation requirement to allow W.
Hansen Drive to remain a permanent dead-end rather than extending the public right-of-way and roadway west
through the subject parcel.
BACKGROUND
The subject property is proposed to be developed as a single-family residential subdivision consistent with R-3 zoning
standards.
The request pertains solely to roadway continuation.
A Concept Plan prepared by Pinnacle Engineering Group dated January 6, 2025 is included as supporting
documentation.
ANALYSIS
1. Right-of-Way Limitation
The subject parcel does not contain sufficient land area to accommodate the required 60- or 66-foot public
right-of-way width for roadway continuation.
As shown on the Conceptual Plan (Sheet 1, dated 1/6/2025), the existing right-of-way alignment does not line up with
the parcel boundary to the west. The plan notes (PDF Attached):
“ROW does not line up. Parcel on west is 450' south of section line, east plat is 441.42' south of
section line so only 51.42' of 60' ROW in plat available to connect to.”
This condition prevents full right-of-way width from being established without shifting the roadway alignment beyond
property controlled by the applicant.
Supporting Exhibit:
Conceptual Plan – GP Legacy, LLC Property (Pinnacle Engineering Group, 1/6/2025
15
Page 18 of 20
2. Significant Grade Differential
There is an approximate 10-foot grade drop from the existing terminus of W. Hansen Drive to the subject property.
Extension of the roadway would require:
● Construction of a substantial retaining/landscape wall along the north right-of-way.
● Significant grading to achieve acceptable roadway slopes.
● Increased disturbance and structural intervention.
This topographic condition is a natural feature of the site.
3. Tributary Drainage Area
Approximately 6–8 acres of drainage area currently flows toward the terminus of W. Hansen Drive.
Roadway extension would redirect peak stormwater flows into the subdivision, requiring additional stormwater
infrastructure and potentially impacting overall site drainage performance.
Maintaining the dead-end preserves existing drainage patterns toward the northwest.
4. Pedestrian Connectivity
At the request of the Mayor, the development includes a pedestrian access easement allowing foot traffic connection
from W. Hansen Drive through the subject property.
This provides neighborhood connectivity without requiring full vehicular roadway extension.
PUBLIC HEALTH, SAFETY, AND WELFARE
The requested variance:
● Does not increase density.
● Does not reduce required lot dimensions or setbacks.
● Does not increase traffic beyond residential levels.
● Will maintain emergency access consistent with City engineering standards.
16
Page 19 of 20
VARIANCE CRITERIA CONSIDERATION
The practical difficulty arises from:
● Fixed parcel boundary constraints limiting right-of-way width.
● Significant natural grade drop.
● Existing tributary drainage patterns.
These conditions are unique to the property and not self-created.
Strict enforcement would require substantial grading, structural walls, and stormwater redirection without clear public
benefit.
RECOMMENDA
TION
The applicant respectfully requests approval of the variance to allow W. Hansen Drive to remain a permanent
dead-end, with pedestrian connectivity provided via easement.
17
Page 20 of 20
Source: City of New Berlin website. First collected Oct 18, 2026.