Planning Department
W240 N3065 Pewaukee Road
Pewaukee WI 53072
Phone: 262-691-0770
PLAN COMMISSION
MEETING NOTICE AND AGENDA
Thursday, October 15, 2026
6:00 PM
Pewaukee City Hall Common Council Chambers
W240N3065 Pewaukee Road, Pewaukee, WI
1. Call to Order and Pledge of Allegiance
2. Discussion and Action Regarding Approval of Plan Commission Meeting Minutes
2.1 May 21, 2026
2.2 June 18, 2026
2.3 July 16, 2026
2.4 August 20, 2026
3. Items for Discussion and Action
3.1 Discussion and Action Regarding a Zoning Code Text Amendment to Amend Section 340-4.36C(5)
to Allow Swimming Pools Within the 75-Foot Ordinary High Water Mark and Floodplain Setback as
Requested by Timothy and Robin Andringa (Tabled at 9/17/26 Plan Commission Meeting)
3.2 Discussion and Action Regarding a Zoning Permit Application for a Proposed 35-Foot Tall Flagpole
on Property Located at N27 W24025 Paul Court as Requested by Neumann Development (PWC
0921984009)
3.3 Discussion and Action Regarding the Site and Building Plans for Matthew Steiner for the Purpose
of Constructing an Approximately 10,000 Square Foot Industrial Building Upon Property Located at
N15 W24887 Bluemound Road (PWC 0951993001)
3.4 Discussion and Action Regarding a Recommendation to the Common Council for a Conditional
Use Permit for The Florence Collective Located at the Northeast Corner of Redford Boulevard and
Nancy Court for the Purpose of Constructing a Two-Story Salon and Wellness Facility (PWC
0958986009)
3.5 Discussion and Action Regarding a Site and Building Plan Amendment Requested by Cedar
Gables for the Purpose of Requesting Approval of a Site Change to Eliminate the Through Street
and Serve Phase 1 and Phase 2 of the Development with Separate Cul-De-Sacs
4. Adjournment
Ami Hurd
Page 1 of 74
Deputy Clerk
Community Development Coordinator
October 8, 2026
NOTICE
It is possible that members of other governmental bodies of the municipality may be in attendance to gather information that may form a quorum at the above
stated meeting. No action will be taken by any governmental body other than the governmental body specifically referred to above in this notice.
Any person who has a qualifying disability under the Americans with Disabilities Act that requires the meeting or materials at the meeting to be in an accessible
format must contact the City Planner/Community Development Director Nick Fuchs, at (262) 691-6007 three business days prior to the meeting so that
arrangements may be made to accommodate your request.
Page 2 of 74
Plan Commission meeting minutes ~ May 21, 2026 Page 1
City of Pewaukee
W240 N3065 Pewaukee Road
Plan Commission Meeting Minutes
Thursday, May 21, 2026
In attendance:
Mayor S. Bierce, Alderwoman C. Brown, D. Linsmeier, A. Schoenemann, and S. Sullivan.
Also in attendance:
City Planner & Community Development Director N. Fuchs, Administrator S. Klein, and Department of Public Works
Director M. Wagner.
1. Call to Order and Pledge of Allegiance
Chairman Bierce called the meeting to order at 6:00pm and requested everyone stand for the Pledge
of Allegiance.
2. Discussion and Action Regarding Approval of Plan Commission Meeting Minutes
2.1 January 15, 2026
2.2 March 19, 2026
A motion was made and seconded (S. Sullivan, A. Schoenemann) to approve the January
15, 2026 and March 19, 2026 Plan Commission meeting minutes. Motion Passed: 3-For,
0-Against, 2-Abstain (C. Brown, D. Linsmeier).
3. Items for Discussion and Action
3.1 Discussion and Action Regarding a Recommendation to the Common Council for a
Conditional Use Permit for Solveig Spa Skola to Allow for a Spa Service Business to be
Located at N27 W23960 Paul Road (PWC 0918998024)
A motion was made and seconded (D. Linsmeier, S. Sullivan) to recommend approval of
the Conditional Use Permit for Solveig Spa Skola. Motion Passed: 5-For, 0-Against.
3.2 Discussion and Action Regarding the Site and Building Plans for TI Investors of
Pewaukee/Amazon for the Purpose of Constructing an 8-Foot Tall Chain-Link Fence on
Property Located at W232 N2950 Roundy Circle East (PWC 0917994030)
A motion was made and seconded (S. Bierce, S. Sullivan) to table the Site and Building
Plans for TI Investors of Pewaukee/Amazon. Motion Passed: 5-For, 0-Against.
3.3 Discussion and Action Regarding the Site and Building Plans for Cold Noses Sanctuary for
the Purpose of Constructing an Addition to an Accessory Structure on Property Located at
N47 W26699 Lynndale Road (PWC 0882999001)
A motion was made and seconded (A. Schoenemann, C. Brown) to approve the Site and
Building Plans for Cold Noses Sanctuary. Motion Passed: 5-For, 0-Against.
4. Adjournment
Page 3 of 74
Plan Commission meeting minutes ~ May 21, 2026 Page 2
A motion was made and seconded (J. Endl, D. Linsmeier) to adjourn the meeting at pm.
Motion Passed: 5-For, 0-Against.
Respectfully Submitted
Ami Hurd, WCMC
Deputy Clerk/
Community Development Coordinator
Page 4 of 74
Plan Commission meeting minutes ~ June 18, 2026 Page 1
City of Pewaukee
W240 N3065 Pewaukee Road
Plan Commission Meeting Minutes
Thursday, June 18, 2026
In attendance:
Mayor S. Bierce, Alderwoman C. Brown, D. Linsmeier, A. Schoenemann, and S. Sullivan.
Also in attendance:
City Planner & Community Development Director N. Fuchs, Administrator S. Klein, Department of Public
Works Director M. Wagner, and Deputy Clerk/Community Development Coordinator A. Hurd.
1. Call to Order and Pledge of Allegiance
Chairman Bierce called the meeting to order at 6:00pm and requested everyone stand for
the Pledge of Allegiance.
2. Discussion and Action Regarding Approval of Plan Commission Meeting Minutes
2.1 April 16, 2026
A motion was made and seconded (C. Brown, A. Schoenemann) to approve the
April 16, 2026 Plan Commission meeting minutes. Motion Passed: 4-For, 0-
Against, 1-Abstain (Linsmeier).
3. Mitigation Plans
3.1 Discussion and Action Regarding a Mitigation Plan for the Jon Williams Residence
Located at N27 W27136 Woodland Drive (PWC 0933127)
A motion was made and seconded (C. Brown, D. Linsmeier) to approve the
Mitigation Plan for the Jon Williams Residence. Motion Passed: 5-For, 0-Against.
3.2 Discussion and Action Regarding a Mitigation Plan for the Joseph Mesec Residence
Located at N29 W26700 Peterson Drive (PWC 0930049)
A motion was made and seconded (D. Linsmeier, S. Sullivan) to approve the
Mitigation Plan for the Joseph Mesec Residence. Motion Passed: 5-For, 0-Against.
4. Items for Discussion and Possible Action
4.1 Discussion and Action Regarding the Site and Building Plans for TI
Investors/Amazon for the Purpose of Constructing an Eight-Foot Tall Chain-Link
Fence on Property Located at W232 N2950 Roundy Circle East (PWC 0917994030)
A motion was made and seconded (A. Schoenemann, S. Sullivan) to approve the
Site and Building Plans for TI Investors/Amazon with the conditions noted in the
staff report. No action was taken.
Page 5 of 74
Plan Commission meeting minutes ~ June 18, 2026 Page 2
After further discussion, the original motion was amended and seconded (A.
Schoenemann, S. Sullivan) to approve the Site and Building Plans for TI
Investors/Amazon by adding two man gates on the north and southeast sides
with exit signage and City staff approval of the landscaping, Motion Passed: 5-
For, 0-Against.
4.2 Discussion and Action Regarding a Certified Survey Map for T&M Waukesha, LLC
to Combine Their Two Adjacent Properties Located at N4 W22610 Bluemound Road
(PWC 0963999016 & PWC 0963999037)
A motion was made and seconded (D. Linsmeier, C. Brown) to recommend
approval of the Certified Survey Map for T&M Waukesha, LLC. Motion Passed:
5-For, 0-Against.
4.3 Discussion and Action Regarding the Site and Building Plans for Cold Noses
Sanctuary for the Purpose of Constructing a New Gravel Driveway, Gravel Parking
Lot, Pasture Buildings, Fencing, and Designating Two Event Parking Areas on
Property Located at N47 W26699 Lynndale Road (PWC 0882999001)
A motion was made and seconded (A. Schoenemann, C. Brown) to approve the
Site and Building Plans for Cold Noses Sanctuary with the conditions listed in
the staff report. Motion Passed: 5-For, 0-Against.
4.4 Discussion Regarding a Conceptual Review Application for Matthew Steiner for the
Purpose of Constructing Two Buildings and Parking Areas for a Rain Gutter Business
on Property Located at N15 W24887 Bluemound Road (PWC 0951993001)
Discussion took place regarding the Conceptual Review. No action was taken.
4.5 Discussion and Possible Action Regarding Section 340-2.9C(2)(d) and Section 320-
4F(2)(C) of the City's Zoning Code Pertaining to Requirements for Recreational
Vehicle Parking
Discussion took place regarding the requirements for recreational vehicle parking. No
action was taken.
5. Adjournment
A motion was made and seconded (D. Linsmeier, A. Schoenemann) to adjourn the
meeting at 7:20pm. Motion Passed: 5-For, 0-Against.
Respectfully Submitted
Ami Hurd
Deputy Clerk
Community Development Coordinator
Page 6 of 74
Plan Commission meeting minutes ~ July 16, 2026 Page 1
City of Pewaukee
W240 N3065 Pewaukee Road
Plan Commission Meeting Minutes
Thursday, July 16, 2026
In attendance:
Mayor S. Bierce, Alderwoman C. Brown, J. Endl, D. Kiser, and D. Linsmeier.
Also in attendance:
City Planner & Community Development Director N. Fuchs, Administrator S. Klein, Department of Public Works
Director M. Wagner, and Deputy Clerk/Community Development Coordinator A. Hurd.
1. Call to Order and Pledge of Allegiance
Chairman Bierce called the meeting to order at 6:00pm and requested everyone stand for the Pledge
of Allegiance.
2. Items for Discussion and Action
2.1 Discussion and Action Regarding a Kennel License for Annmarie Gray for Property Located
at N7 W27811 Northview Road for the Purpose of Having Four Resident Dogs and
Temporarily Fostering Puppies in Need Through HAWS (PWC 0982997006)
A motion was made and seconded (D. Linsmeier, D. Kiser) to approve the Kennel
License for Annmarie Gray. Motion Passed: 5-For, 0-Against.
2.2 Discussion and Action Regarding the Site and Building Plans for Cold Noses Sanctuary for
the Purpose of Constructing an Approximately 3,700 Square Foot Dog Facility on Property
Located at N47 W26699 Lynndale Road (PWC 0882999001)
A motion was made and seconded (C. Brown, J. Endl) to approve the Site and Building
Plans for Cold Noses Sanctuary with the final Engineering conditions. Motion Passed: 5-
For, 0-Against.
2.3 Discussion and Action Regarding a Recommendation to the Common Council for a
Conditional Use Permit for Mental Health America of Wisconsin to Operate a Peer-Run
Respite Home for Veterans Located at N2 W27318 Lyles Drive (PWC 0984029)
A motion was made and seconded (S. Bierce, D. Kiser) to advance the Conditional Use
Permit to the Common Council to make a decision with no recommendation from the
Plan Commission. Motion Passed: 3-For, 1-Against (C. Brown), 1-Abstain (J. Endl).
2.4 Discussion and Action Regarding the Site and Building Plans for T&M Waukesha,
LLC/Terex for the Purpose of Adding Overhead Doors to the East and West Elevations and
Installing an Overhead Lift Within the Outdoor Gravel Storage Area on Property Located at
N4 W22610 Bluemound Road (PWC 0963999016)
A motion was made and seconded (C. Brown, D. Kiser) to approve the Site and Building
Plans for T&M Waukesha LLC/Terex with the condition to repair the broken slats in
the fencing. Motion Passed: 5-For, 0-Against.
Page 7 of 74
Plan Commission meeting minutes ~ July 16, 2026 Page 2
3. Adjournment
A motion was made and seconded (D. Kiser, D. Linsmeier) to adjourn the meeting at 7:16pm.
Motion Passed: 5-For, 0-Against.
Respectfully Submitted
Ami Hurd
Deputy Clerk
Community Development Coordinator
Page 8 of 74
Plan Commission meeting minutes ~ August 20, 2026 Page 1
City of Pewaukee
W240 N3065 Pewaukee Road
Plan Commission Meeting Minutes
Thursday, August 20, 2026
In attendance:
Mayor S. Bierce, Alderwoman C. Brown, J. Endl, D. Kiser, D. Linsmeier, and A. Schoenemann.
Also in attendance:
City Planner & Community Development Director N. Fuchs, Administrator S. Klein, Department of Public Works
Director M. Wagner, and Deputy Clerk/Community Development Coordinator A. Hurd.
1. Call to Order and Pledge of Allegiance
Chairman Bierce called the meeting to order at 6:00pm and requested everyone stand for the Pledge
of Allegiance.
2. Items for Discussion and Action
2.1 Discussion and Action Regarding a Certified Survey Map for Waukesha State Bank for the
Purpose of Combining Two Lots on the Former Ruekert Mielke Property Located at W233
N2080 Ridgeview Parkway (PWC 0953984007 & PWC 0953984008)
A motion was made and seconded (C. Brown, D. Kiser) to approve the Certified Survey
Map for Waukesha State Bank. Motion Passed: 5-For, 0-Against.
2.2 Discussion and Action Regarding the Architectural Changes to the Shorepoint Church Site
and Building Plan Approvals for Property Located on the Southwest Corner of Duplainville
Road and Capitol Drive Originally Approved on 11/21/2024 (PWC 0912983, PWC 0912984,
PWC 0912985)
A motion was made and seconded (D. Kiser, D. Linsmeier) to reapprove the Certified
Survey Map for Shorepoint Church and return to Plan Commission with final color and
pattern selections on the metal paneling. Motion Passed: 5-For, 0-Against.
2.3 Discussion and Action Regarding Re-Approval of the Shorepoint Church Certified Survey
Map for Property Located on the Southwest Corner of Duplainville Road and Capitol Drive
Originally Approved on 11/21/2024 (PWC 0912983, PWC 0912984, PWC 0912985)
Action taken in Item 2.2.
3. Adjournment
A motion was made and seconded (D. Kiser, C. Brown) to adjourn the meeting at 6:34pm.
Motion Passed: 5-For, 0-Against.
Respectfully Submitted
Ami Hurd
Deputy Clerk
Community Development Coordinator
Page 9 of 74
Office of the Planner & Community Development Director
W240N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
262.691.6007
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of September 17, 2026
Date: September 10, 2026
Project Name: Andringa Zoning Code Amendment
Project Address/Tax Key No.: City-wide
Introduction
The applicant filed a Zoning Code Amendment request to allow swimming pools within the
floodplain and ordinary high water mark setbacks within Section 340-4.36C.(5) of the Zoning
Code.
Section 340-4.36C(5) currently prohibits structures, with certain specified exceptions, within 75
feet of the designated 100-year floodplain of a lake or navigable stream or within 50 feet of an
OHWM or officially designated wetland. The applicant proposes to add “approved swimming
pools” to the list of structures exempt from these setback requirements.
The proposed amendment would allow swimming pools to be located no closer than 35 feet from
the OHWM and 100-year floodplain boundary, subject to applicable requirements of the Zoning
Code.
The applicant is proposing to add “approved swimming pools” as shown below (emphasis
added).
Structure setbacks. No structure except necessary streets or accessways, utilities,
navigational aids, piers and boat launch facilities, parking areas, approved boathouses,
approved swimming pools, and principal buildings shall be located within 75 feet of a
designated 100-year recurrence interval (base flood) floodplain of any lake or navigable
stream or within 50 feet of an OHWM or officially designated wetland, unless there are
existing principal use structures on adjoining parcels, in which case the setback from the
OHWM or base flood elevation may be an average of setbacks on the adjoining parcels
but no less than 35 feet. (See § 207-35 for definition of "base flood.") In this subsection,
Page 10 of 74
Office of the Planner & Community Development Director
W240N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
262.691.6007
fuchs@pewaukee.wi.us
"principal building" shall mean the main building or structure on a single lot or parcel of
land and includes any attached garage, approved swimming pools, or attached porch.
If the amendment is considered for approval, staff also recommends that Section 340-2.9B.(2)(a),
which specifically regulates swimming pools, be revised to add the language below.
All swimming pools abutting a designated 100-year recurrence interval (base flood)
floodplain of any lake or navigable stream, including any associated fencing, concrete
surround, decking, or other impervious surface, shall be setback a minimum of 35 feet
from the ordinary high water mark and 100-year floodplain boundary.
Project Description/Analysis
The existing ordinance provides exceptions from the shoreland setback requirements for certain
structures and improvements, including necessary streets and accessways, utilities, navigational
aids, piers, boat-launch facilities, parking areas, approved boathouses, and qualifying principal
buildings.
These exceptions generally recognize structures or improvements that are functionally related to
the use of lakefront property or circumstances involving an established development pattern. The
existing regulations attempt to balance private property use with protection of shoreland areas,
water quality, wildlife habitat, and scenic character.
Staff finds that swimming pools are not distinguishable from other accessory structures that
remain subject to the applicable shoreland setbacks. Allowing swimming pools within the
setback could also increase structural and impervious-surface development near the shoreline
and establish a precedent for additional accessory structures within areas currently intended to
remain relatively undeveloped.
Staff Recommendation
The existing setback requirements help protect water quality and wildlife habitat and help
maintain a more natural and scenic shoreline that is not dominated by buildings, accessory
structures, or impervious surfaces.
Page 11 of 74
Office of the Planner & Community Development Director
W240N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
262.691.6007
fuchs@pewaukee.wi.us
Accordingly, staff recommends denial of the proposed Zoning Code Amendment.
If recommended for approval, staff recommends that the proposed ordinance language be
reviewed by the City Attorney prior to final adoption and publication to confirm compliance with
applicable Wisconsin statutes and administrative regulations.
Page 12 of 74
Page 13 of 74
Page 14 of 74
Page 15 of 74
Page 16 of 74
Page 17 of 74
Page 18 of 74
Page 19 of 74
Office of the Planner & Community Development Director
W240N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
262.691.6007
fuchs@pewaukee.wi.us
Planner & Community Development Director Nick Fuchs
REPORT TO THE PLAN COMMISSION
Meeting of October 15, 2026
Date: October 6, 2026
Project Name: Neumann Zoning Permit – Flag Poles
Project Address/Tax Key No.: Paul Court Right-of-Way
Applicant: Neumann Development
Property Owner: City of Pewaukee
Current Zoning: B-6 Mixed-Use Business District
2050 Land Use Map Designation: Office Commercial and Governmental/Institutional
Use of Surrounding Properties: Church use to the north and west and office to the south, east and
west
Project Description/Analysis
The applicant submitted a Zoning Permit requesting to replace two flagpoles within Paul Court right-
of-way. The applicant is proposing to replace the existing flagpoles within the exact same location but
would like to increase their height. One flagpole will have a height of 30 feet and the other a height of
35 feet.
Section 340-11.1C. states that flagpoles shall not exceed a height of 30 feet or the distance of the base
of the structure from the nearest lot line, whichever is less, unless otherwise authorized by the Plan
Commission.
As such, the Zoning Permit Application is being forwarded to the Plan Commission for approval of
the height of the 35-foot flagpole.
Recommendation
Staff recommends approval of the Zoning Permit, subject to the applicant obtaining a right-of-way
permit and receiving Common Council approval of a maintenance agreement to allow the structures
within the City’s right-of-way.
Page 20 of 74
1 5 8 . 8 2 '
1 8 . 0 4 '
2
5
9
.
9
8
'
1
2
3
. 5
7
'
1 9 5 . 4 8 '
1
1
2
.
0
5
'
P
A
U
L
C
T
6
0
.
3
0
'
71.02'
P
E
W
A
U
K
E
E
R
D
P
E
W
A
U
K
E
E
R
D
The information and depictions herein are for informational purposes and Waukesha County specifically disclaims accuracy
in this reproduction and specifically admonishes and advises that if specific and precise accuracy is required, the same
should be determined by procurement of certified maps, surveys, plats, Flood Insurance Studies, or other official means.
Waukesha County will not be responsible for any damages which result from third party use of the information and
depictions herein, or for use which ignores this warning.
Map Title
WATERTOWNRD
Legend
Site Address
Site Address Units
Tax Parcels
Assessor Plat Assessor
CSM CSM
Condominium Condomin
Subdivision Subdivisio
Notes
9/28/2026 4:35 PMPrinted Date:
SEWRPC, Waukesha County Land Information Office, Waukesha County LIS, Waukesha County Land Information Office
±
0 25 50 75 100
1 inch equals 50 feet
Page 21 of 74
Page 22 of 74
Page 23 of 74
Page 24 of 74
Office of the Planner & Community Development Director
W240N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
262.691.6007
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of October 15, 2026
Date: October 6, 2026
Project Name: Steiner Site & Building Plan Review
Project Address/Tax Key No.: N15W24887 Bluemound Road / PWC 0951993001
Applicant: Matthew Steiner
Property Owner: River Saige, LLC
Current Zoning: M-2 Limited Industrial District
2050 Land Use Map Designation: Manufacturing/Fabrication/Warehousing
Use of Surrounding Properties: Single-family residential to the north and industrial zoned properties
to the south, east and west
Project Description/Analysis
The applicant filed a Site & Building Plan Review Application for a proposed commercial
development located at N15W24887 Bluemound Road. This property is zoned M-2 Limited Industrial
District, has an area of 2.244-acres, and contains an existing single-family home, two barns, a garage,
and silo.
The project consists of two phases. Phase 1 includes a new 9,856 square foot building and nine parking
spaces for the property owner’s business, Rivers Rain Gutters, which will be subject to staff review and
approval of a Business Plan of Operation Application.
For the duration of Phase 1, the applicant has indicated they would like to keep and maintain the
existing buildings onsite, including the single-family home, which is leased to a caretaker of the
property. The only allowance for a residential use in the M-2 District is "[r]esidential quarters for the
owner or hired caretaker provided that such quarters are in the principal building, not more than 750
square feet in area, no more than two bedrooms, and not for rent, lease or separate sale," which is
allowed as a permitted accessory use.
This is a detached two-story home, which is believed to be greater than 750 square feet in area. As
such, the existing residential use is nonconforming and subject to Article 10 of the Zoning Code.
Phase 2 is anticipated to raze these existing structures to allow for construction of a second commercial
building and parking area on the property. This building will likely be leased to other businesses for
storage purposes. Phase 2 will be subject to a separate Site & Building Plan Review Application.
Page 25 of 74
Planner & Community Development Director Nick Fuchs
Furthermore, future uses, or any other proposed use, will be required to apply for a Business Plan of
Operation Application or a Conditional Use Permit depending on the allowance within the M-2
District.
The M-2 District also allows M-1 District uses. This would potentially allow for outdoor storage
“within an open area attractively and effectively visually screened from passerby, public streets, roads,
or highways and adjacent uses and where the individual goods or materials are not reduced in size or
basically changed in character.”
Staff recommends that no outdoor storage shall be allowed without Plan Commission approval of a
screening and landscaping plan that demonstrates the storage area will not be visible from the public
right-of-way or adjacent properties.
Site Plan
Staff finds that the proposed site plan conforms to M-2 District development standards as well as the
City’s minimum 40% greenspace requirement at full buildout. It should be noted that the setbacks are
based on eliminating a potential public right-of-way. CSM No. 8352 shows a future road, which is
illustrated on the applicant's Plat of Survey. This was shown as a "FUTURE RD" only, and not
dedicated at the time of the CSM. Staff does not anticipated this road being needed or improved in the
future. As such, staff does not object to eliminating that designation on the applicant's Site Plan.
Parking onsite is minimal, however, the buildings are anticipated to be primarily used for storage and
contractor shops, which may not have a significant parking demand. The Zoning Code suggests a
minimum of one parking space for each two employees in 12-hour period for manufacturing and
processing plants (including meat and food processing plants, laboratories, and warehouses).
Staff reviewed other parking ratios for warehousing and contractor shops. These ratios range anywhere
from 1 to 4 parking spaces per 1,000 square feet of floor area. For a 9,856 square foot building, that
would require between 10 to 40 parking spaces.
Staff does not object to the proposed parking within Phase 1 considering this building is primarily for
the property owner's business and known parking needs. Parking should be re-examined with Phase 2
and as businesses locate within the buildings.
The Landscape Plan illustrates approximately 40 new trees while also maintaining the existing treed
area along Bluemound Road and on the east side of the parcel. Staff recommends that a revised
landscape plan be submitted, for City Planner review and approval, that includes foundation and
interior plantings and trash enclosure screening in addition to the 40 trees around the perimeter of the
site. Furthermore, the landscape plan shall identify each individual planting type and size.
The lighting plan consists of only building mounted light fixtures. These appear to be low level
lighting. Considering there are single family uses across the street, staff reommends that lighting be
shielded in a manner to prevent glare onto adjacent properties, including those on the opposite side of
Bluemound Road.
Page 26 of 74
Planner & Community Development Director Nick Fuchs
The primary building materials are LP Smart Siding and a metal roof. The building includes windows
along the top of the building along all elevations. The building contains four overhead doors per the
architectural elevation (six overhead doors are shown on the rendering).
Staff suggests the Plan Commission consider other potential accents and architectural features such as,
awnings, a masonry foundation material, or pilasters between the overhead doors.
Additionally, staff recommends:
Trash enclosure materials shall be consistent with that of the principal building. Details of the
enclosure shall be provided for City Planner review and approval prior to issuance of a Building
Permit.
All rooftop and ground mechanical equipment shall be screened from view from public
rights-of-way.
Final Engineering Department review and approval of grading, erosion control, utilities, and
storm water management plans shall be obtained prior to any land disturbing activities.
Recommendation
Staff recommends approval of the Site & Building Plan Review Application for development of Phase
1 for property located at N15W24887 Bluemound Road, subject to the conditions listed within this
report.
Page 27 of 74
Project Narrative
Applicant: Rivers Rain Gutters LLC
Project Location: N15W24887 Bluemound Rd, Pewaukee, WI 53072
Tax Parcel Number: PWC 0951993001
Current Zoning District: M-2 (Limited Industrial District)
Submitted To: City of Pewaukee Plan Commission
Executive Summary & Request
This application requests Site and Building Plan Approval for the construction of two light industrial/flex
buildings totaling 19,712 square feet (9,856 square feet per building) at N15W24887 Bluemound Rd. The
subject property is located within the M-2 (Limited Industrial) zoning district, which explicitly permits contractor
offices, shops, and storage yards.
The master plan will be executed in two distinct phases to manage site preparation and construction efficiently.
The primary facility will house the operations of Rivers Rain Gutters LLC, a local seamless rain gutter
installation and manufacturing business. To maximize space efficiency and satisfy a documented community
need, the second structure will be partitioned into high-quality indoor storage sections for local trade
contractors. This development represents a substantial estimated project value of $1,500,000 and will
significantly improve the site utility along the Bluemound Road corridor.
Phasing & Site Demolition Plan
To ensure an organized development rollout, the project will follow a strategic two-phase timeline:
Phase 1 (Primary Facility): Construction will begin on the first 9,856 sq. ft. building to establish operations
for Rivers Rain Gutters LLC. Existing site elements will be integrated or protected as needed during this
initial construction period.
Phase 2 (Flex Facility): Prior to breaking ground on the second 9,856 sq. ft. building, all existing structural
assets currently on the property will be professionally demolished and removed from the site. This
sequence allows the business to remain operational during transitions and ensures a clean, cohesive final
layout that adheres fully to modern city standards.
Business & Operational Information
The operations are designed around low-intensity industrial storage and assembly, matching the performance
standards of the M-2 district.
Rain Gutter Business Headquarters (Phase 1): Building 1 will serve as the central hub for Rivers Rain
Gutters LLC. Activities include the indoor staging of aluminum/copper coils, downspout inventory, and
transport vehicles. A small portion will feature specialized roll-forming machinery to pre-fabricate gutters
Page 28 of 74
before field deployment.
Contractor Storage Sections (Phase 2): Building 2 spaces will be divided into micro-bays ranging from
1,500 to 3,000 square feet. These units will be leased to licensed area tradesmen (e.g., electricians, HVAC
technicians, plumbers) strictly for the indoor storage of tools, equipment, materials, and work vans. No
retail operations, public storefronts, or manufacturing will occur within these tenant spaces.
Hours of Operation: Standard business hours will run Monday through Friday from 7:00 AM to 5:00 PM,
with limited Saturday morning activity (7:00 AM to 12:00 PM) for field crews loading vehicles.
Employee Count & Traffic: Rivers Rain Gutters LLC employs 1 on-site office staff member and 8 field
crew members. The crew members arrive briefly in the morning to load vehicles, exit the site early for field
installations, and return in the late afternoon. This operational model minimizes active on-site presence
during core business hours. Contractor tenant traffic will similarly be low-velocity and non-simultaneous,
ensuring negligible impact on Bluemound Road traffic.
Site & Building Improvements
The architecture and site layout have been systematically planned to meet Pewaukee's design guidelines while
emphasizing clean visual continuity next to neighboring industrial assets like Harken, Inc.
Building Design: Both 9,856 sq. ft. structures will meet high-quality commercial architectural standards.
The structures will feature durable wood frame construction wrapped in LP Smart Siding. This material
palette provides an attractive, professional finish that elevates the visual profile of the Bluemound Road
corridor.
Access, Parking, & Loading: All vehicle parking and loading zones are positioned safely off the
right-of-way. The design incorporates grade-level overhead doors for indoor loading, completely eliminating
outside storage. Spaces are allocated to comfortably accommodate utility vans and localized gutter trailers.
Utilities & Stormwater: The facility will tie into the City of Pewaukee's municipal utility extensions running
along Bluemound Road. A fully engineered stormwater management and retention system will be detailed
in the accompanying engineered site plans to ensure localized drainage matches post-development
standards.
Landscaping & Screening: A meticulous landscape buffer will be established to enhance the property's
aesthetics and respect the streetscape. Specifically, evergreen Arborvitae trees will be planted strategically
along Bluemound Road to break up the building massing, provide year-round green screening, and
maintain a highly professional appearance from the public right-of-way.
Tentative Development Schedule
Phase 1 Groundbreaking & Utility Tie-ins: March 2027
Phase 1 Building Completion & Occupancy: May 2027
Demolition of Existing Structures & Phase 2 Groundbreaking: October 2027 (or sooner)
Phase 2 Project Completion: March 2028
Page 29 of 74
883882881880880881882883884884883882881880880
881
881
880879878877876875874874875876877
875874873873874875876877878
875874873872871871872873874875876877878879880881882881880881882883884884883882881882
EMGM
EM
IP FND0.16' NW'LY0.14' NE'LY
IP FND0.08' SE'LY
IP FND0.08' W
IP FND0.04' WIP FND0.03' NE'LY0.03' NIP FND0.07' NE'LY0.07' NN89° 59' 49"W
N00° 00' 11"EA=144.68'
N41° 40' 04"E
S48° 19' 56"E
100.00'
515.66'
500.81'
132.49'
N20° 02' 05"W3.56' R=198.95'B=N20°50'08"ECHD=141.51'
45' BUILDING SETBACK
25' BUILDING SETBACK
100.00'
150.00'
N41° 40' 04"E 50.00'
25.53'31.75'
59.26'
74.01'
13.55'30.55'11.67'9.53'8.16'9.53'4.79'30.49'5.91'5.04'1.65'1 12 STORY STONE ANDFRAME RESIDENCE#N15W24887
SHEDBARN
BARN
46.33'24.33'40.37'26.28'20.09'19.88'
SILOEX ASPHALT DRIVEWAYCONCRETE PADEDGE OF PAVEMENTEDGE OF GRAVEL
EXISTING BUILDINGASPHALT DRIVEWAYASPHALT DRIVEWAY16.22'
15.16'
DECK
FUTURE ROAD(PER CSM 8352)33.00'33.00'
BLUEMOUND ROAD
(CTH "JJ")
(100' R.O.W.)
VISION TRIANGLE(PER CSM 8352)
LOT 1CSM 835297,729.20 SF2.244 AC
LOT 2CSM 8352
LOT 2CSM 8352
UNPLATTED LAND
50.00'
S48° 19' 56"E14.34'N41° 40' 04"E 129.70'
S41° 40' 04"W 50.00'
25' BUILDING SETBACK(PER CITY)
60.00'176.00'
176.00'
60.00'
155.95' E
169.67' E
185.42' SE3'x6'8" DOOR(TYP.)
8" SAN CLEANOUT
8" SAN CLEANOUT
6" SAN CLEANOUT
26.00'
50.97'
26.00'
85.50'122.07'
26.00'
26.00'71.34'
EXISTING RESIDENCE ANDASSOCIATED OUT BUILDINGS TO BEREMOVED AT THE START OF PHASE 2CONSTRUCTION.
FUTURE ROADTO BE REMOVED
39.92'
20.00'9.00'24.00'
20.00'9.00'24.00' PROPOSEDREFUSEAREA
PROPOSEDSTORMWATERDETENTIONEASEMENTS41° 40' 04"W 61.76'S48° 19' 56"E 39.56'S65° 36' 37"E 35.16'N89° 49' 59"E 23.03'N44° 41' 39"E 36.01'N48° 19' 56"W 92.19'
PROPOSED BUILDING(PHASE 1)
PROPOSED PARKING 9 SP(PHASE 1)
PROPOSED BUILDING(PHASE 2)
DETENTION BASIN AREA
PROPOSED PARKING 16 SP(PHASE 2)
DRAFT
FILE NAME: S:\projects\26-10186 Matt Steiner Bluemound\DWG\26-10186 R2.dwg
030'SCALE IN FEET LOT 1 OF CERTIFIED SURVEY MAP NO. 8352, RECORDED ON SEPTEMBER 8, 1997 IN VOLUME 73 OF CERTIFIED SURVEY MAPS ON PAGES 117 TO 120, AS DOCUMENT NO. 2243090, BEING A PART OF THE NORTHWEST ¼ AND THE SOUTHWEST ¼ OF SECTION 22,TOWNSHIP 7 NORTH, RANGE 19 EAST, CITY OF PEWAUKEE, WAUKESHA COUNTY, WISCONSIN.PROPOSED SITE PLAN
SHEET: 1 OF 1 JAHNKE & JAHNKEASSOCIATES, LLC.ENGINEERS● PLANNERS● SURVEYORSCONNECT► EMPOWER►DESIGNWWW.JAHNKEANDJAHNKE.COM524 BLUEMOUND ROAD, WAUKESHA, WI 53188PHONE: (262) 542-5797, EMAIL: SURVEY@JAHNKEANDJAHNKE.COMCHECKED BY: MRDRAWN BY: JBJOB NO.: 26-10186REVISIONSDATEDESCRIPTIONBYCLIENTPROJECTMATT STEINER301 SAND HILL LANE,DOUSMAN, WI 53118
CLO
CATCH BASIN SQUARE
CLEANOUTPOWER POLE
GUY WIREOVERHEAD WIRESOHOHBUREAU OF ELECTRICAL SERVICESBESFENCE LINEXXCOMMUNICATIONSCOMCOM
CHISELED CROSS FOUNDSTSTORM MANHOLECATCH BASIN ROUNDFIRE HYDRANTGAS VALVE
MAILBOXTELEPHONE MANHOLE
TELEPHONE LINETTGAS LINEGG
SANITARY MANHOLE
IRON ROD FOUND
UNKNOWN MANHOLECOMBINED SEWER MANHOLEELECTRIC MANHOLELIGHT POLESIGN
IRON PIPE SET
WATER VALVEFIBER OPTICSFIBFIBWATER MAINWW
AIRGMEM
SS
GAS METER
SANITARY SEWER (SAN)
AIR CONDITIONERELECTRIC METERELECTRIC PEDESTALTELEPHONE PEDESTAL
)))))))))))))TREE LINE
IRON PIPE FOUND
UNDERGROUNDCOMBUSTIBLE GASLINESTSTSTORM SEWER (STO)
SECTION CORNER MONUMENT
ELECTRIC TRANSFORMER
COPYRIGHT NOTICETHIS DRAWING IS THE PROPERTY OF JAHNKE ANDJAHNKE ASSOCIATES, LLC AND IS NOT TO BE USEDFOR ANY PURPOSE OTHER THAN THE SPECIFICPROJECT AND SITE NAMED HEREIN AND CANNOT BEREPRODUCED IN ANY MANNER WITHOUT THEEXPRESSED WRITTEN PERMISSION FROM JAHNKEAND JAHNKE ASSOCIATES, LLC.COPYRIGHT 2026 JAHNKE AND JAHNKEASSOCIATES, LLC - ALL RIGHTS RESERVED.
N15W24887 BLUEMOUND ROADWAUKESHA, WI 53188
ABBREVIATIONS:12.23'= MEASURED DISTANCE(12.23')= RECORD/DEED DISTANCEA= ARC OF CURVEAC.= ACRESASPH= ASPHALTB= BEARINGBM= BENCHMARKCALC.= CALCULATED DISTANCECONC.= CONCRETECH.= CHORD LENGTHCOR= CORNERCSM= CERTIFIED SURVEY MAPC.T.H.= COUNTY TRUNK HIGHWAYD= DELTADEG= DEGREE OF CURVEE= EASTE'LY= EASTERLYEL.= ELEVATIONEX.= EXISTINGEXC.= EXCEPTIONFFE= FINISH FLOOR ELEVATIONFNC= FENCEFND= FOUNDGFE= GARAGE FLOOR ELEVATIONGND= GROUNDINV. = INVERTIP= IRON PIPEIRD= IRON RODNAD= NORTH AMERICAN DATUMNAVD= NORTH AMERICAN VERTICAL DATUMN= NORTHN'LY= NORTHERLYNE= NORTHEASTNE'LY= NORTHEASTERLYNO. = NUMBERNW= NORTHWESTNW'LY= NORTHWESTERLYPG. = PAGEQTR= QUARTERR= RADIUSREC= RECORDEDRET= RETAINING WALLR.O.W.= RIGHT OF WAYS= SOUTHS'LY= SOUTHERLYSE= SOUTHEASTSE'LY= SOUTHEASTERLYS.T.H.= STATE TRUNK HIGHWAYSW= SOUTHWESTSW'LY= SOUTHWESTERLYSUR= SURVEYEDU.S.H.= UNITED STATES HIGHWAYVAR= VARIESW= WESTW'LY= WESTERLY
N00° 57' 17"W 936.88'
N89° 24' 43"E 868.86'
WEST LINE OF THE SW 1/4 OF SECTION 22-7-19(S01° 12' 19"W 2645.49' SEWRPC)N01° 12' 11"W 2645.51'1982.45'663.06'
SURVEY NOTES:1.Date of the Survey field work: 03/05/20262.Building lines, easements and other restrictions not shown herein,should refer to deed, title policy and local zoning ordinances.3.All dimensions shown are in decimal feet, US survey units.4.Legal description was obtained from the client which may not becurrent, accurate or complete. Review legal description and recordmeasurements on this plat and at once report any apparent differenceto the surveyor.5.Utilities have not been certified, therefore the location and size of theunderground structures and utilities shown hereon have been locatedto a reasonable degree of accuracy, but Jahnke & Jahnke AssociatesLLC does not guarantee their exact location or the location of othersnot shown. Contact Diggers Hotline, Inc., Etc.6.Reference bearing is assumed unless noted. Bearing shown here arebased on the North American Datum of 1983 (NAD 83)(2011),Wisconsin State Plane Coordinate System South Zone. Elevations (ifany) shown are in relation to the North American Vertical Datum of1988 (NAVD 88).7.No measurements are to be assumed by scaling.8.Any comments, modifications, alterations and revisions to this Surveymust be brought to our attention within 30 days from date ofcompletion on this sheet.9.To insure legitimacy of this Plat of Survey, it must carry the EmbossedCorporate Seal of Jahnke & Jahnke Associates LLC.10.Per scope of this survey, not all improvements are shown.
TO OBTAIN LOCATIONS OF PARTICIPANTSUNDERGROUND FACILITIES BEFORE YOUDIG IN WISCONSIN
CALL DIGGERS HOTLINE811 OR 1-800-242-8511 TOLL FREEWIS STATUTE 182.0175(1974) REQUIRES MIN. 3WORK DAYS NOTICE BEFORE YOU EXCAVATEMILW. AREA 1-414-259-1181NOTE: The location and size of theunderground structures and utilities shownhereon have been located to a reasonabledegree of accuracy, but the Engineerand/or Surveyor does not guarantee theirexact location or the location of others notshown. Contact Diggers Hotline, Inc., Etc.
LEGEND:
THIS PROPERTY IS ZONED M-2 PER CITY OF PEWAUKEE ZONING MAP:·THERE SHALL BE A MINIMUM BUILDING (OR STREET) SETBACK OF 45FEET FROM THE RIGHT-OF-WAY OF ALL STREETS·THERE SHALL BE A MINIMUM SIDE YARD EQUAL TO THE REQUIREDSIDE YARD IN THE ADJACENT DISTRICT, BUT NOT LESS THAN 25FEET, AND BUILDINGS SHALL BE NO CLOSER THAN 50 FEET TOANOTHER BUILDING·THERE SHALL BE A REAR YARD OF NOT LESS THAN 25 FEET.·THERE SHALL BE ADEQUATE PAVED OFF-STREET PARKING SPACEPROVIDED FOR INTENDED USE OF THE PROPERTY AND NOON-STREET PARKING OR ON-STREET VEHICLE MANEUVERING WILLBE ALLOWED IN THE VICINITY OF THE PROPERTY.·THERE SHALL BE ADEQUATE PAVED OFF-STREET LOADING AREASTO ACCOMMODATE ALL NECESSARY LOADING OR UNLOADINGACTIVITIES ON THE PREMISES, AND NO LOADING DOCK OR AREASHALL BE LOCATED CLOSER THAN 100 FEET TO THE RIGHT-OF-WAYOF A PUBLIC ACCESS STREET.·THERE SHALL BE NO DRIVEWAY, PARKING OR LOADING AREA WITHIN15 FEET OF AN ADJACENT PROPERTY OR WITHIN 25 FEET OF ASTREET RIGHT-OF-WAY.
DATE: 03/10/2026
PROPOSED SITE PLAN
M-2 ZONING CODE (CITY OF PEWAUKEE):1.Lots shall have a minimum area of two (2) acres. Current area is 2.244 acres.2.Parking and Loading Space2.1.There shall be adequate paved off-street parking space provided for intended use of the property and noon-street parking or on-street vehicle maneuvering will be allowed in the vicinity of the property. (seesubsection 17.0210 and section 17.0600). (9 Total proposed spaces for Phase 1 and 25 total proposedspaces for Phase 2)2.2.There shall be adequate paved off-street loading areas to accommodate all necessary loading orunloading activities on the premises, and no loading dock or area shall be located closer than 100 feetfrom the right-of-way of a public access street.2.3.All parking and loading areas shall be adequately screened as determined by the Plan Commission.2.4.There shall be no driveway, parking or loading area within 15 feet of an adjacent property or within 25 feetof a street right-of-way.3.Impervious Area3.1.The existing impervious area is 7,989.61 square feet (approximately 8.18% of the Lot area).3.2.The Phase 1 impervious area adds 19,910.51 square feet (approximately 20.37% of the Lot area) to theexisting impervious area. Total Phase 1 impervious area is 27,900.12 square feet (approximately 28.55%of the Lot area).3.3.The Phase 2 Impervious area is 38,213.09 square feet (approximately 39.10% of the Lot area).4.Building Height and Size4.1.No principal building or parts of a principal building shall exceed 35 feet in height.4.2.No accessory building shall exceed 18 feet in height.
1 1/2" BITUMINOUS SURFACE2 1/2" BINDER COURSE8" CRUSHED LIMESTONE BASEON COMPACTED BACKFILL.EXISTING BASE TO BE VERIFIEDPRIOR TO INSTALLATION OFASPHALT.STANDARD ASPHALT PAVING DETAIL(NOT TO SCALE)
Page 30 of 74
883882881880880881882883884884883882881880880
881
881
880879878877876875874874875876877
875874873873874875876877878
875874873872871871872873874875876877878879880881882881880881882883884884883882881882
EMGM
EM
IP FND0.16' NW'LY0.14' NE'LY
IP FND0.08' SE'LY
IP FND0.08' W
IP FND0.04' WIP FND0.03' NE'LY0.03' NIP FND0.07' NE'LY0.07' NN89° 59' 49"W
N00° 00' 11"EA=144.68'
N41° 40' 04"E
S48° 19' 56"E
100.00'
515.66'
500.81'
132.49'
N20° 02' 05"W3.56' R=198.95'B=N20°50'08"ECHD=141.51'
45' BUILDING SETBACK
25' BUILDING SETBACK
100.00'
150.00'
N41° 40' 04"E 50.00'
25.53'31.75'
59.26'
74.01'
13.55'30.55'11.67'9.53'8.16'9.53'4.79'30.49'5.91'5.04'1.65'1 12 STORY STONE ANDFRAME RESIDENCE#N15W24887
SHEDBARN
BARN
46.33'24.33'40.37'26.28'20.09'19.88'
SILOEX ASPHALT DRIVEWAYCONCRETE PADEDGE OF PAVEMENTEDGE OF GRAVEL
EXISTING BUILDINGASPHALT DRIVEWAYASPHALT DRIVEWAY16.22'
15.16'
DECK
FUTURE ROAD(PER CSM 8352)33.00'33.00'
BLUEMOUND ROAD
(CTH "JJ")
(100' R.O.W.)
VISION TRIANGLE(PER CSM 8352)
LOT 1CSM 835297,729.20 SF2.244 AC
LOT 2CSM 8352
LOT 2CSM 8352
UNPLATTED LAND
50.00'
S48° 19' 56"E14.34'N41° 40' 04"E 129.70'
S41° 40' 04"W 50.00'
25' BUILDING SETBACK(PER CITY)155.95' E
169.67' E
185.42' SE
8" SAN CLEANOUT
8" SAN CLEANOUT
6" SAN CLEANOUT
FUTURE ROADTO BE REMOVED
TO OBTAIN LOCATIONS OF PARTICIPANTSUNDERGROUND FACILITIES BEFORE YOUDIG IN WISCONSIN
CALL DIGGERS HOTLINE811 OR 1-800-242-8511 TOLL FREEWIS STATUTE 182.0175(1974) REQUIRES MIN. 3WORK DAYS NOTICE BEFORE YOU EXCAVATEMILW. AREA 1-414-259-1181NOTE: The location and size of theunderground structures and utilities shownhereon have been located to a reasonabledegree of accuracy, but the Engineerand/or Surveyor does not guarantee theirexact location or the location of others notshown. Contact Diggers Hotline, Inc., Etc.
LEGEND:
FILE NAME: S:\projects\26-10186 Matt Steiner Bluemound\DWG\26-10186 R2.dwg
030'SCALE IN FEET LOT 1 OF CERTIFIED SURVEY MAP NO. 8352, RECORDED ON SEPTEMBER 8, 1997 IN VOLUME 73 OF CERTIFIED SURVEY MAPS ON PAGES 117 TO 120, AS DOCUMENT NO. 2243090, BEING A PART OF THE NORTHWEST ¼ AND THE SOUTHWEST ¼ OF SECTION 22,TOWNSHIP 7 NORTH, RANGE 19 EAST, CITY OF PEWAUKEE, WAUKESHA COUNTY, WISCONSIN.PLAT OF SURVEY
SHEET: 1 OF 1 JAHNKE & JAHNKEASSOCIATES, LLC.ENGINEERS● PLANNERS● SURVEYORSCONNECT► EMPOWER►DESIGNWWW.JAHNKEANDJAHNKE.COM524 BLUEMOUND ROAD, WAUKESHA, WI 53188PHONE: (262) 542-5797, EMAIL: SURVEY@JAHNKEANDJAHNKE.COMCHECKED BY: MRDRAWN BY: JBJOB NO.: 26-10186REVISIONSDATEDESCRIPTIONBYCLIENTPROJECTMATT STEINER301 SAND HILL LANE,DOUSMAN, WI 53118
STATE OF WISCONSIN COUNTY OF WAUKESHAI CERTIFY, THAT THIS SURVEY WAS PREPARED UNDER MY SUPERVISION AND TO THEBEST OF MY PROFESSIONAL KNOWLEDGE AND BELIEF, PLAT HEREON DRAWN IS AREPRESENTATION OF SAME.DATED AT WAUKESHA, WISCONSIN THIS 6th DAY OF MARCH, 2026.BY:_________________________________________________________________________ MOHAMMAD I. RANJHA - WISCONSIN PROFESSIONAL LAND SURVEYOR NO. S-2126}SS.
CLO
CATCH BASIN SQUARE
CLEANOUTPOWER POLE
GUY WIREOVERHEAD WIRESOHOHBUREAU OF ELECTRICAL SERVICESBESFENCE LINEXXCOMMUNICATIONSCOMCOM
CHISELED CROSS FOUNDSTSTORM MANHOLECATCH BASIN ROUNDFIRE HYDRANTGAS VALVE
MAILBOXTELEPHONE MANHOLE
TELEPHONE LINETTGAS LINEGG
SANITARY MANHOLE
IRON ROD FOUND
UNKNOWN MANHOLECOMBINED SEWER MANHOLEELECTRIC MANHOLELIGHT POLESIGN
IRON PIPE SET
WATER VALVEFIBER OPTICSFIBFIBWATER MAINWW
AIRGMEM
SS
GAS METER
SANITARY SEWER (SAN)
AIR CONDITIONERELECTRIC METERELECTRIC PEDESTALTELEPHONE PEDESTAL
)))))))))))))TREE LINE
IRON PIPE FOUND
UNDERGROUNDCOMBUSTIBLE GASLINESTSTSTORM SEWER (STO)
SECTION CORNER MONUMENT
ELECTRIC TRANSFORMER
COPYRIGHT NOTICETHIS DRAWING IS THE PROPERTY OF JAHNKE ANDJAHNKE ASSOCIATES, LLC AND IS NOT TO BE USEDFOR ANY PURPOSE OTHER THAN THE SPECIFICPROJECT AND SITE NAMED HEREIN AND CANNOT BEREPRODUCED IN ANY MANNER WITHOUT THEEXPRESSED WRITTEN PERMISSION FROM JAHNKEAND JAHNKE ASSOCIATES, LLC.COPYRIGHT 2026 JAHNKE AND JAHNKEASSOCIATES, LLC - ALL RIGHTS RESERVED.
N15W24887 BLUEMOUND ROADWAUKESHA, WI 53188
DRAFTABBREVIATIONS:12.23'= MEASURED DISTANCE(12.23')= RECORD/DEED DISTANCEA= ARC OF CURVEAC.= ACRESASPH= ASPHALTB= BEARINGBM= BENCHMARKCALC.= CALCULATED DISTANCECONC.= CONCRETECH.= CHORD LENGTHCOR= CORNERCSM= CERTIFIED SURVEY MAPC.T.H.= COUNTY TRUNK HIGHWAYD= DELTADEG= DEGREE OF CURVEE= EASTE'LY= EASTERLYEL.= ELEVATIONEX.= EXISTINGEXC.= EXCEPTIONFFE= FINISH FLOOR ELEVATIONFNC= FENCEFND= FOUNDGFE= GARAGE FLOOR ELEVATIONGND= GROUNDINV. = INVERTIP= IRON PIPEIRD= IRON RODNAD= NORTH AMERICAN DATUMNAVD= NORTH AMERICAN VERTICAL DATUMN= NORTHN'LY= NORTHERLYNE= NORTHEASTNE'LY= NORTHEASTERLYNO. = NUMBERNW= NORTHWESTNW'LY= NORTHWESTERLYPG. = PAGEQTR= QUARTERR= RADIUSREC= RECORDEDRET= RETAINING WALLR.O.W.= RIGHT OF WAYS= SOUTHS'LY= SOUTHERLYSE= SOUTHEASTSE'LY= SOUTHEASTERLYS.T.H.= STATE TRUNK HIGHWAYSW= SOUTHWESTSW'LY= SOUTHWESTERLYSUR= SURVEYEDU.S.H.= UNITED STATES HIGHWAYVAR= VARIESW= WESTW'LY= WESTERLY
N00° 57' 17"W 936.88'
N89° 24' 43"E 868.86'
WEST LINE OF THE SW 1/4 OF SECTION 22-7-19(S01° 12' 19"W 2645.49' SEWRPC)N01° 12' 11"W 2645.51'1982.45'663.06'
SURVEY NOTES:1.Date of the Survey field work: 03/05/20262.Building lines, easements and other restrictions not shown herein,should refer to deed, title policy and local zoning ordinances.3.All dimensions shown are in decimal feet, US survey units.4.Legal description was obtained from the client which may not becurrent, accurate or complete. Review legal description and recordmeasurements on this plat and at once report any apparent differenceto the surveyor.5.Utilities have not been certified, therefore the location and size of theunderground structures and utilities shown hereon have been locatedto a reasonable degree of accuracy, but Jahnke & Jahnke AssociatesLLC does not guarantee their exact location or the location of othersnot shown. Contact Diggers Hotline, Inc., Etc.6.Reference bearing is assumed unless noted. Bearing shown here arebased on the North American Datum of 1983 (NAD 83)(2011),Wisconsin State Plane Coordinate System South Zone. Elevations (ifany) shown are in relation to the North American Vertical Datum of1988 (NAVD 88).7.No measurements are to be assumed by scaling.8.Any comments, modifications, alterations and revisions to this Surveymust be brought to our attention within 30 days from date ofcompletion on this sheet.9.To insure legitimacy of this Plat of Survey, it must carry the EmbossedCorporate Seal of Jahnke & Jahnke Associates LLC.10.Per scope of this survey, not all improvements are shown.
THIS PROPERTY IS ZONED M-2 PER CITY OF PEWAUKEE ZONING MAP:·THERE SHALL BE A MINIMUM BUILDING (OR STREET) SETBACK OF 45FEET FROM THE RIGHT-OF-WAY OF ALL STREETS·THERE SHALL BE A MINIMUM SIDE YARD EQUAL TO THE REQUIREDSIDE YARD IN THE ADJACENT DISTRICT, BUT NOT LESS THAN 25FEET, AND BUILDINGS SHALL BE NO CLOSER THAN 50 FEET TOANOTHER BUILDING·THERE SHALL BE A REAR YARD OF NOT LESS THAN 25 FEET.·THERE SHALL BE ADEQUATE PAVED OFF-STREET PARKING SPACEPROVIDED FOR INTENDED USE OF THE PROPERTY AND NOON-STREET PARKING OR ON-STREET VEHICLE MANEUVERING WILLBE ALLOWED IN THE VICINITY OF THE PROPERTY.·THERE SHALL BE ADEQUATE PAVED OFF-STREET LOADING AREASTO ACCOMMODATE ALL NECESSARY LOADING OR UNLOADINGACTIVITIES ON THE PREMISES, AND NO LOADING DOCK OR AREASHALL BE LOCATED CLOSER THAN 100 FEET TO THE RIGHT-OF-WAYOF A PUBLIC ACCESS STREET.·THERE SHALL BE NO DRIVEWAY, PARKING OR LOADING AREA WITHIN15 FEET OF AN ADJACENT PROPERTY OR WITHIN 25 FEET OF ASTREET RIGHT-OF-WAY.
DATE: 03/10/2026
Page 31 of 74
0 25 50 75 100 125 150 175
Length (Feet)
10
0
10
20
30
40
50
60
70
Width (Feet)
176' Total Length
56'
Width
Office
10'x12'
Bath
Bay 1
(Clear: 87.66')
Bay 2
(28.66')
Bay 3
(28.66')
Bay 4
(29.66')
88' 117' 146'
2D Floor Plan Blueprint (56' x 176')
Page 32 of 74
Page 33 of 74
Avery LED Outdoor Sconce
AVRW Series
Features
Modern design. Provides lighting in residential, commercial, and hospitality applications.
Fixture mounts to standard junction box (not included).
Construction
Aluminum housing. Standard mounting holes and
hardware are included. Power supply connections must be made
inside a junction box (not included).
Finish
Black powder coated finish.
Diffuser
White acrylic.
Electrical
Input 120-277 VAC 60 HZ.
0-10V dimming (120-277V), TRIAC (120V).
Minimum starting temp -4° F / -20°C
Lamping
Fixture includes a LED modules capable of producing:
20W = 1280 delivered lumens
25W = 1440 delivered lumens
Adjustable 2700K, 3000K, 3500K, 4000K, 5000K (CCT).
Rated for 50,000 Hrs. 90 CRI.
Certification
All fixtures are cETLus listed for wet locations.
Title 24/JA8 Compliant
Warranty
5 Year Limited Warranty:
Restrictions apply based on location.
Specifications and dimensions
subject to change without notice.
2345 N. Ernie Krueger Circle • Waukegan, IL. 60087 • P: 847.249.5970 • F: 847.249.2618 • AFXinc.com R0/25
DATE
LOCATION
PREPARED
BY
COMMENTS
CATALOG
NUMBER
QUANTITY
FIXTURE TYPE
Ordering Information:
Black LED Adjustable CCT H W D
AVRW0717LAJUDBK 20W 2700K/3000K/3500K/4000K/5000K 19" 7" 7"
AVRW0727LAJUDBK 25W
2700K/3000K/3500K/4000K/5000K 24" 7" 7"
Lumens
1280
1440
Delivered
ADLF
LENF
OTVF
ADLF
OTVF
L
L
ADLF
LENF
OTVF
ADLF
OTVF
L
L
ADLF
LENF
OTVF
ADLF
OTVF
L
L
ADLF
LENF
OTVF
RWNS
ADLF
LENF
OTVF
L
L
ADLF
LENF
OTVF
RWNS
ADLF
LENF
OTVF
L
L
ADLF
GYLS
LENF
OTVF
RWNS
RYDV
L
Emergency Back-Up (Optional ‘-BB’)
• 90 minute run-time
• 9.6VDC LiFePO4 battery
• 8 watts
AVRW0727LAJUDBK-BB 25W 2700K/3000K/3500K/4000K/5000K 24" 7" 7" 1440
AVRW0717LAJUDBK-BB 20W 2700K/3000K/3500K/4000K/5000K 19" 7" 7"1280
Page 34 of 74
Page 35 of 74
Page 36 of 74
Page 37 of 74
Page 38 of 74
Office of the Planner & Community Development Director
W240N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
262.691.6007
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of October 15, 2026
Date: October 5, 2026
Project Name: The Florence Collective Conditional Use Permit Application
Project Address/Tax Key No.: Not Assigned/PWC 0958986009
Applicant: Keith Barnes, KCB Architects
Property Owner: KW Office LLC
Current Zoning: B-6 Mixed-Use Business District
2050 Land Use Map Designation: Office Commercial
Use of Surrounding Properties: Industrial to the north and east, B-6 District zoned property to the
south, and HWY F and the Waukesha Gun Club to the west
Project Description/Analysis
The applicant filed a Conditional Use Permit Application for property located at the northeast corner of
Nancys Court and Redford Boulevard (HWY F). The property has an area of approximately 2.235 acres
and is currently vacant.
The applicant is proposing to construct a two-story salon and wellness facility. The building is
anticipated to include 46 suites for rent to individual businesses. Hours of operations are expected to be
between 8:00 a.m. to 8:00 p.m. for client/customer appointments. Business owners would have access
to the business at any time. The applicant has provided a project narrative that describes the proposal
and lists anticipated uses.
The property is zoned B-6 District, which generally allows B-4 and B-5 permitted and conditional uses.
Salon and wellness type uses are not specifically listed within any of these districts; however, Section
340-4.22C.(2) of the B-6 District allows, as a conditional use, any retail, service or office use that is
compatible with those uses listed within the district as determined by the Plan Commission. Attached
are the B-4, B-5 and B-6 districts for Plan Commission review of allowed uses.
The City's conditional use regulations allow for the approval of uses within the Conditional Use
Permit. Following conditional use approval, it is up to the discretion of the Zoning Administrator if
uses match, or are similar to, those listed on the conditional use permit. See below.
Section 340-7.1
The City Common Council may authorize the City Planner or Zoning Administrator to issue a
conditional use permit for conditional uses after review and a public hearing, provided that such
conditional uses and related structures are in accordance with the purpose and intent of this
Page 39 of 74
Planner & Community Development Director Nick Fuchs
chapter and are found to be not hazardous, harmful, offensive, or otherwise adverse to the
environment or the value of the neighborhood or the community. Conditional uses are listed in
the regulations of each zoning district as set forth in Article 4 of this chapter.
Section 340-7.4B.
Uses proposed to be located in a Plan Commission approved multi-tenant building that are
included on a list of uses for that building previously given "blanket" approval by the Common
Council following a conditional use hearing may not require individual conditional use permits
but only approval of a business plan of operation as set forth herein. Non-conditional use status
of such uses shall be determined by the City Planner or the Plan Commission.
Note that the applicant is requesting approval of the Conditional Use Permit first and then, if approved,
will submit a Site & Building Plan Review application for the development. Preliminary site and
building plans are attached.
Recommendation
Staff recommends approval of the Conditional Use Permit for the Florence Collective for property
bearing Tax Key No. 0958986009. subject to the following conditions:
1. The following uses shall be allowed with the approval of a Business Plan of Operation Application
by the Zoning Administrator. The Business Plan of Operation shall be obtained prior to the
commencement of use. Uses not substantially similar to these approved uses shall be subject to
review by the Zoning Administrator/City Planner and may require separate Plan Commission or
Conditional Use approval.
Cosmetologist s, hairstylists and barbers
Estheticians/advanced estheticians
Nail technicians
Lash and brow artists
Makeup artists
Massage therapists/ bodywork practitioners
Licensed medical aesthetic/ wellness providers and injectors
Permanent makeup/cosmetic tattoo/microblading artists
Tattoo/piercing professionals
Waxing/sugaring specialists
Spray/sunless tanning
Skincare/ facial specialists
Med-spa and non-invasive aesthetic services, including laser/light-based treatments and body
contouring
Nutritionists/dietitians and wellness consultants
Physical/occupational therapists, chiropractors and acupuncturists
Mental-health/counseling professionals
Health/lifestyle/wellness coaches
Bridal/beauty services
Studios for photography, painting, music, sculpture, dance, or other recognized fine art
Beauty/wellness education and small-group professional training
Page 40 of 74
Planner & Community Development Director Nick Fuchs
Boutique/incidental retail
Other substantially similar or compatible personal-care, beauty, health, aesthetic and
wellness uses as determined appropriate by the Zoning Administrator
2. The detached accessory structure shall be allowed for storage purposes only. No independent
business activity shall occur within this building.
3. No outdoor storage of equipment, materials, refuse or business-related items shall be allowed
onsite.
4. This Conditional Use approval shall be valid only if the conditional use is recorded by the County
Register of Deeds, a building permit is obtained within one year from the date of this approval. The
use or operation shall be commenced within six months following completion of the building.
Note the Plan Commission may consider restricting hours of operations if there are potential concerns.
For example, business operations could be limited between 7:00 a.m. and 9:00 p.m. with tenant access
only outside of these hours.
Page 41 of 74
Page 42 of 74
Page 43 of 74
KCB Architects
400 E. Wisconsin Ave, #205
Milwaukee, WI 53202
P: 414-261-8956
www.kcb-architects.com
Page 1 of 2
October 1, 2026
Petition for Conditional Use
New Florence Collective Salon Suites Building - Pewaukee
Tax Key #: PWC 0958986009
Project Narrative
The Florence Collective is a salon suite and professional wellness facility designed to provide
private, individual spaces for independent beauty, personal care, and wellness professionals.
Each suite is leased to an independent professional who operates their own business within the
building.
Tenants may include;
• Cosmetologists, hairstylists and barbers
• Estheticians/advanced estheticians
• Nail technicians
• Lash and brow artists
• Makeup artists
• Massage therapists/bodywork practitioners
• Licensed medical aesthetic/wellness providers and injectors
• Permanent makeup/cosmetic tattoo/microblading artists
• Tattoo/piercing professionals
• Waxing/sugaring specialists
• Spray/sunless tanning
• Skincare/facial specialists
• Med-spa and non-invasive aesthetic services, including laser/light-based treatments and
body contouring
• Nutritionists/dietitians and wellness consultants
• Physical/occupational therapists, chiropractors and acupuncturists
• Mental-health/counseling professionals
• Health/lifestyle/wellness coaches
• Bridal/beauty services
• Studios for photography, painting, music, sculpture, dance, or other recognized fine art
• Beauty/wellness education and small-group professional training
• Boutique/incidental retail
• Other substantially similar or compatible personal-care, beauty, health, aesthetic and
wellness uses as determined by the Zoning Administrator
Page 44 of 74
KCB Architects
400 E. Wisconsin Ave, #205
Milwaukee, WI 53202
P: 414-261-8956
www.kcb-architects.com
Page 2 of 2
*Services are primarily provided by appointment, with each professional maintaining their own
individual schedule. Because of this model, customer traffic is spread throughout the day rather
than concentrated around traditional opening, closing, or shift-change times.
Building Hours & Access:
The building's regular public hours will be 8:00 AM to 8:00 PM, seven days per week. During
these hours, the main entrances will be open for tenants and their scheduled clients. After 8:00
PM and before 8:00 AM, exterior doors will remain locked and the building will only be
accessible through secured access provided to authorized tenants. This allows tenants who
choose to work outside of regular building hours to have 24/7 access while keeping the building
secured to the general public.
Customer appointments are expected to occur primarily during normal daytime and evening
hours. Any appointments outside of regular building hours would be limited and would require
the tenant to provide their client access to the secured building.
The property will provide on-site parking for tenants and their customers. All business activities
will take place indoors. The use is not expected to generate significant noise, outdoor storage,
truck traffic, or other impacts associated with more intensive commercial uses. The Florence
Collective will maintain and manage the building and common areas to provide a clean,
professional, and well-maintained environment.
Page 45 of 74
Page 46 of 74
Page 47 of 74
Page 48 of 74
Page 49 of 74
Page 50 of 74
Page 51 of 74
Conditional Use Permit – The Florence Collective Page 1
A COVENANT
REGARDING THE ISSUANCE OF A
CONDITIONAL USE PERMIT
BY THE
CITY OF PEWAUKEE
TAX KEY NUMBER(S) CONDITIONAL USE
OR PARCEL(S) INVOLVED: PERMIT:
NO. CUP-26-10-1
__PWC 0958986009__
LEGAL DESCRIPTION:
LOT 2 CERT SURV 8665 VOL 76/277 2.235 AC PT NW1/4 SEC 24
T7N R19E DOC# 3131899
PERSON(S), AGENT(S) OR CORPORATION(S) PETITIONING
FOR PERMIT:
The Florence Collective
Recording area
________________________
Name & Return Address
City of Pewaukee
W240N3065 Pewaukee Rd
Pewaukee, WI 53072
WHEREAS, It is understood by all parties to this covenant that Section 62.23 of WIS. Statutes
prescribes the legal basis for the granting of a conditional use permit by a City and Chapter
17 of the City Codes and Ordinances provides for the issuance of such permits as well as
the standards by which all such uses will be measured; and,
WHEREAS, The City Plan Commission has held a meeting on October 15, 2026; has reviewed the
various elements of the petitioner’s proposal; and has recommended that a Conditional Use
Permit be granted to the above-named petitioner for the property/parcel identified above;
and,
WHEREAS, The City Common Council held a public hearing meeting on November 16, 2026.
NOW, THEREFORE, let it be known that the City Common Council by its action on November 16,
2026 has, hereby, granted a Conditional Use Permit for the following use(s):
Construct and operate a salon suite and professional wellness facility.
FURTHER, such approved use of the above designated parcel(s) are hereby allowed based on the
following conditions being continually met:
1. The following uses shall be allowed with the approval of a Business Plan of Operation Application
Page 52 of 74
Conditional Use Permit – The Florence Collective Page 2
by the Zoning Administrator. The Business Plan of Operation shall be obtained prior to the
commencement of use. Uses not substantially similar to these approved uses shall be subject to
review by the Zoning Administrator/City Planner and may require separate Plan Commission or
Conditional Use approval.
• Cosmetologists, hairstylists and barbers
• Estheticians/advanced estheticians
• Nail technicians
• Lash and brow artists
• Makeup artists
• Massage therapists/ bodywork practitioners
• Licensed medical aesthetic/ wellness providers and injectors
• Permanent makeup/cosmetic tattoo/microblading artists
• Tattoo/piercing professionals
• Waxing/sugaring specialists
• Spray/sunless tanning
• Skincare/ facial specialists
• Med-spa and non-invasive aesthetic services, including laser/light-based treatments and
body contouring
• Nutritionists/dietitians and wellness consultants
• Physical/occupational therapists, chiropractors and acupuncturists
• Mental health/counseling professionals
• Health/lifestyle/wellness coaches
• Bridal/beauty services
• Studios for photography, painting, music, sculpture, dance, or other recognized fine art
• Beauty/wellness education and small-group professional training
• Boutique/incidental retail
• Other substantially similar or compatible personal-care, beauty, health, aesthetic and
wellness uses as determined appropriate by the Zoning Administrator
2. The detached accessory structure shall be allowed for storage purposes only. No independent
business activity shall occur within this building.
3. No outdoor storage of equipment, materials, refuse or business-related items shall be allowed
onsite.
4. This Conditional Use approval shall be valid only if the conditional use is recorded by the County
Register of Deeds, a building permit is obtained within one year from the date of this approval. The
use or operation shall be commenced within six months following completion of the building.
The parties hereto, namely the City of Pewaukee and the Equitable Owner of the property for which this
conditional use has been sought, set their signatures or the signatures of their representatives below,
thereby agreeing to the provisions and conditions set forth in this covenant.
Attest: Signature of equitable owner
Page 53 of 74
Conditional Use Permit – The Florence Collective Page 3
Date
Kelly Tarczewski Steve Bierce
City Clerk Mayor, City of Pewaukee
Date
State of Wisconsin
County of Waukesha
Signed or attested before me on ______________________, 2026 by Steve Bierce, Mayor and Kelly
Tarczewski, Clerk.
(Seal) Ami Hurd
My Commission expires __________
This instrument was drafted by Ami Hurd, Deputy Clerk
Page 54 of 74
Scale
Date
PROJECT:
OWNER:
PROJECT ADDRESS:
Sheet No.
Sheet Title:
Drawing Issuance Schedule:
Stamp:
General Notes:
All work shall be done in compliance with local codes,
ordinances, rules and regulations.
No work shall be started until plans have been approved by
the building inspector and all other agencies having
jurisdiction.
KCB Architects
400 E. Wisconsin Ave. #205
Milwaukee, Wi 53202
(414) 261 -8956
admin@kcb -architects.com
NOT FOR
CONSTRUCTION
9/4/2026 6:23:36 PM
A-101
COVER SHEET
THE FLORENCE COLLECTIVE LLC
PEWAUKEE SALON SUITES
09/04/2026
Pewaukee, WI 53186
No. Description Date
1 Conditional Use 09/04/2026
THE FLORENCE COLLECTIVE - SALON SUITES
PEWAUKEE, WAUKESHA COUNTY, WISCONSIN
AERIAL IMAGE 3D SITE AXON
SHEET INDEX
Sheet
Number
Sheet
Name
Current
Revision
Current
Revision
Date
0 GENERAL
A-101 COVER
SHEET
1 09/04/20
26
1 CIVIL
C-102 SITE PLAN
2 ARCHITECTURAL
A-103 FLOOR
PLAN -
BASEMEN
T
1 09/04/20
26
A-104 FLOOR
PLAN -
1ST
FLOOR
1 09/04/20
26
A-105 FLOOR
PLAN -
2ND
FLOOR
1 09/04/20
26
A-106 BUILDING
ELEVATIO
NS
1 09/04/20
26
A-107 BUILDING
ELEVATIO
NS
1 09/04/20
26
A-108 ACCESSO
RY
BUILDING
- UTILITY
GARAGE
1 09/04/20
26
REDFORD BLVD
PARCEL
NANCY CT
N
09/ /20
26
30
2
Page 55 of 74
TREE LINE
TREE LINE
TREE LINE
WETLANDSDELINEATED BY KAPURON 8/07/2026
ASPHALTPARKING LOT
ASPHALTPARKING LOT
WETLANDSDELINEATED BY KAPURON 8/07/2026
PROPOSEDBUILDING
BIO-RETENTION BASIN
COUNTY HWY F
NANCY COURT
width varies
20' WEPCO EASEMENTDOC. 2536562
40' DRAINAGE EASEMENT CSM 8665
XXXX
SALON SUITES PEWAUKEE
PEWAUKEE,WI 53217
ScaleDate
PROJECT:
OWNER:
PROJECT ADDRESS:
Sheet No.
Sheet Title:
Drawing Issuance Schedule:
Stamp:
General Notes:All work shall be done in compliance with local codes,ordinances, rules and regulations.No work shall be started until plans have been approved bythe building inspector and all other agencies havingjurisdiction.
KCB Architects400 E. Wisconsin Ave. #205Milwaukee, Wi 53202(414) 261-8956admin@kcb-architects.com
NOT FORCONSTRUCTION
1" = 20'-0"
No.DescriptionDate
C102
SITE LAYOUT PLAN
DIGGERS HOTLINEDial or (800)242-8511www.DiggersHotline.com
09/ /2026
30
9/
No. Description Date
1 Conditional Use 09/04/2026
4/2026 6:23:36 PM
30
2
/30/2026
09
Conditional Use
Page 56 of 74
122 SF
MEP 73 SF
LAUNDRY
86 SF
STORAGE
261 SF
QUIET SUITE
177 SF
QUIET SUITE
177 SF
QUIET SUITE
70 SF
RECOVERY 167 SF
QUIET SUITE
158 SF
QUIET SUITE
205 SF
QUIET SUITE
148 SF
QUIET SUITE
146 SF
QUIET SUITE
139 SF
QUIET SUITE
70 SF
RECOVERY
51 SF
BATHROOM
OVERALL SUITE TOTALS:
12 SINGLE SUITES
18 DOUBLE SUITES
7 TRIPLE SUITES
9 QUIET SUITES
TOTAL: 46
SUITE TOTALS:
9 QUIET SUITES
2 RECOVERY ROOMS
BASEMENT FLOOR: 3061 SQFT
UP
108 SF
EXIT STAIR
41 SF
ELEV
50' - 9 3/8"
65' - 0"
1' - 4"
24' - 4" 25' - 1 3/8"
1' - 4" 21' - 0" 20' - 4" 21' - 0" 1' - 4"
5' - 0"
5' - 0"
5' - 0"
11' - 9"
1' - 3 1/4"
13' - 1 1/4" 4' - 0" 10' - 0"
6' - 6 1/2"
14' - 5" 5' - 0" 9' - 4 1/4" 11' - 8"
12' - 10" 11' - 2 1/2" 12' - 0" 11' - 2 1/4"
6' - 9" 10' - 3" 11' - 11 3/4"
8' - 5" 5' - 10 1/2" 5' - 10 1/2"
17' - 0 3/4" 5' - 0" 11' - 0" 14' - 2 1/2"
14' - 0"
6' - 10" 6' - 1 3/4" 2' - 4" 8" 8' - 0 1/4"
UNEXCAVATED
Scale
Date
PROJECT:
OWNER:
PROJECT ADDRESS:
Sheet No.
Sheet Title:
Drawing Issuance Schedule:
Stamp:
General Notes:
All work shall be done in compliance with local codes,
ordinances, rules and regulations.
No work shall be started until plans have been approved by
the building inspector and all other agencies having
jurisdiction.
KCB Architects
400 E. Wisconsin Ave. #205
Milwaukee, Wi 53202
(414) 261 -8956
admin@kcb -architects.com
NOT FOR
CONSTRUCTION
3/16" = 1'-0"
9/4/2026 6:23:36 PM
A-103
FLOOR PLAN -
BASEMENT
THE FLORENCE COLLECTIVE LLC
PEWAUKEE SALON SUITES
09/04/2026
Pewaukee, WI 53186
1 BASEMENT
N
No. Description Date
1 Conditional Use 09/04/2026
Page 57 of 74
96 SF
SHAMPOO
BOWLS
68 SF
MEP
73 SF
LAUNDRY
51 SF
BATHROOM
51 SF
BATHROOM 86 SF
STORAGE 65 SF
PROCESSING
46 SF
MAIL ROOM
173 SF
BREAK
125 SF
SINGLE SUITE
133 SF
SINGLE SUITE
122 SF
SINGLE SUITE
146 SF
SINGLE SUITE
156 SF
SINGLE SUITE
181 SF
DOUBLE SUITE
190 SF
DOUBLE SUITE
158 SF
DOUBLE SUITE
170 SF
DOUBLE SUITE
211 SF
DOUBLE SUITE
188 SF
DOUBLE SUITE
156 SF
DOUBLE SUITE
307 SF
TRIPLE SUITE
265 SF
TRIPLE SUITE
261 SF
CONFERENCE
414 SF
OUTDOOR PATIO
159 SF
LOBBY
363 SF
EVENT
A-107 2
152 SF
SINGLE SUITE
177 SF
DOUBLE SUITE
OVERALL SUITE TOTALS:
12 SINGLE SUITES
18 DOUBLE SUITES
7 TRIPLE SUITES
9 QUIET SUITES
TOTAL: 46
SUITE TOTALS:
6 SINGLE SUITES
9 DOUBLE SUITES
2 TRIPLE SUITES
1ST FLOOR: 6160 SQFT
DN UP
UP
108 SF
EXIT STAIR
41 SF
ELEV
1' - 4" 1' - 4"
21' - 0" 20' - 4" 22' - 4"
1' - 4" 1' - 4"
1' - 4"
24' - 4" 40' - 4" 37' - 4"
103' - 4"
69' - 0"
5' - 0"
5' - 0"
1' - 4"
13' - 0" 4' - 0" 10' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 6"
12' - 2"
12' - 7 3/4" 14' - 11 3/4" 12' - 9"
13' - 0 1/2"
22' - 2 3/4" 12' - 9 1/2" 13' - 10 1/2" 12' - 7" 11' - 11 1/2" 12' - 1 1/2" 12' - 9 1/2"
12' - 9" 14' - 11 3/4" 20' - 0 1/4"
9 1/2"
5' - 5" 8' - 9"
12' - 10 1/4"
13' - 0"
14' - 4"
15' - 8"
14' - 4 1/2"
15' - 8 1/2"
14' - 4"
13' - 0"
14' - 2 1/4"
3' - 7 1/4"
2' - 6"
2' - 8"
4' - 6"
5' - 0"
5' - 9"
8' - 1" 15' - 11"
28' - 0"
6' - 6 1/2" 10' - 3 1/4" 10' - 4 3/4"
7' - 3 1/4"
9"
8"
5' - 3 3/4" 3' - 4 1/2" 6' - 7 3/4"
EQ EQ
24' - 0"
6' - 11 1/4" 10' - 3 1/4" 10' - 9 1/2"
15' - 0"
27' - 0"
Scale
Date
PROJECT:
OWNER:
PROJECT ADDRESS:
Sheet No.
Sheet Title:
Drawing Issuance Schedule:
Stamp:
General Notes:
All work shall be done in compliance with local codes,
ordinances, rules and regulations.
No work shall be started until plans have been approved by
the building inspector and all other agencies having
jurisdiction.
KCB Architects
400 E. Wisconsin Ave. #205
Milwaukee, Wi 53202
(414) 261 -8956
admin@kcb -architects.com
NOT FOR
CONSTRUCTION
3/16" = 1'-0"
9/4/2026 6:23:36 PM
A-104
FLOOR PLAN - 1ST
FLOOR
THE FLORENCE COLLECTIVE LLC
PEWAUKEE SALON SUITES
09/04/2026
Pewaukee, WI 53186
1 Level 1_NEW-WORK
N
No. Description Date
1 Conditional Use 09/04/2026
Page 58 of 74
156 SF
SINGLE SUITE
307 SF
TRIPLE SUITE
239 SF
TRIPLE SUITE
170 SF
SINGLE SUITE
201 SF
DOUBLE SUITE
235 SF
TRIPLE SUITE
212 SF
TRIPLE SUITE 281 SF
TRIPLE SUITE
172 SF
SINGLE SUITE
157 SF
DOUBLE SUITE
174 SF
DOUBLE SUITE
179 SF
DOUBLE SUITE
204 SF
DOUBLE SUITE
177 SF
DOUBLE SUITE
204 SF
DOUBLE SUITE
137 SF
SINGLE SUITE
177 SF
DOUBLE SUITE
83 SF
PROCESSING
75 SF
MEP
73 SF
LAUNDRY
86 SF
STORAGE
127 SF
SINGLE SUITE
127 SF
SINGLE SUITE
OPEN TO
BELOW
51 SF
BATHROOM
A-106
1
A-106 2
A-107
1
A-107 2
OVERALL SUITE TOTALS:
12 SINGLE SUITES
18 DOUBLE SUITES
7 TRIPLE SUITES
9 QUIET SUITES
TOTAL: 46
FLOOR SUITE TOTALS:
6 SINGLE SUITES
9 DOUBLE SUITES
4 TRIPLE SUITES
2ND FLOOR: 5893 SQFT
51 SF
BATHROOM
DN
DN
108 SF
EXIT STAIR
41 SF
ELEV
156 SF
SINGLE SUITE
1' - 4" 1' - 4" 21' - 0" 20' - 4" 21' - 0"
1' - 4"
1' - 4"
1' - 4"
1' - 4" 24' - 4" 23' - 8" 14' - 0" 2' - 8" 17' - 0" 6' - 0" 13' - 0" 1' - 4"
103' - 4"
69' - 0"
20' - 6"
11' - 6"
12' - 0"
5' - 6"
5' - 0"
1' - 4" 13' - 0" 4' - 0" 10' - 0"
28' - 0"
24' - 0"
12' - 0" 12' - 0"
6' - 11 1/4" 10' - 3 1/4" 10' - 9 1/2"
6' - 7 3/4" 8' - 8 1/4"
8"
8' - 0 1/4"
22' - 2 3/4" 12' - 9 1/2" 12' - 9 1/2" 14' - 9 1/4" 11' - 6" 11' - 7 3/4" 5' - 3 1/4" 7' - 4 3/4"
8' - 8 1/2"
5' - 5" 14' - 0 1/2" 15' - 1 1/2" 5' - 0" 14' - 4 3/4"
5' - 0" 13' - 5 1/2" 7' - 0" 12' - 0" 13' - 8 3/4" 16' - 1 1/4" 5' - 0" 13' - 0 1/2"
14' - 1 1/2" 14' - 0 1/2" 12' - 2 1/2"
14' - 4 1/2"
13' - 0 1/2"
17' - 0 1/2"
15' - 8 1/2"
12' - 10 1/4"
14' - 2 1/4"
15' - 8"
14' - 4"
13' - 0"
14' - 4"
5' - 0"
5' - 0"
5' - 0"
Scale
Date
PROJECT:
OWNER:
PROJECT ADDRESS:
Sheet No.
Sheet Title:
Drawing Issuance Schedule:
Stamp:
General Notes:
All work shall be done in compliance with local codes,
ordinances, rules and regulations.
No work shall be started until plans have been approved by
the building inspector and all other agencies having
jurisdiction.
KCB Architects
400 E. Wisconsin Ave. #205
Milwaukee, Wi 53202
(414) 261 -8956
admin@kcb -architects.com
NOT FOR
CONSTRUCTION
3/16" = 1'-0"
9/4/2026 6:23:37 PM
A-105
FLOOR PLAN - 2ND
FLOOR
THE FLORENCE COLLECTIVE LLC
PEWAUKEE SALON SUITES
09/04/2026
Pewaukee, WI 53186
1 SECOND FLOOR
N
No. Description Date
1 Conditional Use 09/04/2026
Page 59 of 74
LEVEL 1
843' - 0"
LEVEL 2
856' - 0"
ROOF
869' - 0"
5
5 1
6
2
4
3
4
5
51
6
2
4
3
4
5
5
5
5
5
5
5
5
5
5
4
4
4444
2
2
1 1
1
33 33
2' - 0" 9' - 0" 13' - 0" 2' - 0" 11' - 0"
37' - 0"
LEVEL 1
843' - 0"
LEVEL 2
856' - 0"
ROOF
869' - 0"
6
5 5 5 5 5
5 5 5 5 51
2
4
2
1
6 6
3
4
2
4
3
4
22
1
6
4 4 4 4
6" 2' - 9" 18' - 9" 4' - 0" 11' - 0"
37' - 0"
EXTERIOR KEYED NOTES
1
2
3
4
5
BLACK BRICK SIDING W/ DARK MORTAR
HARDIE STUCCO TEXTURE PANEL
HARDIE CORNER TRIM, COLOR TO MATCH
STUCCO PANEL
HARDIE TRIM, COLOR TO MATCH ALUMINUM
FRAMED WINDOW
BLACK ALUMINUM FRAMED WINDOWS
DIMENSIONAL ASPHALT SHINGLE ROOFING
WHITE VINYL LAP SIDING
WHITE VINYL FASCIA & TRIM
10' X 12' MANUAL GARAGE DOOR
PREFINISHED ALUMINUM K -STYLE GUTTER
6
7
8
9
10
Scale
Date
PROJECT:
OWNER:
PROJECT ADDRESS:
Sheet No.
Sheet Title:
Drawing Issuance Schedule:
Stamp:
General Notes:
All work shall be done in compliance with local codes,
ordinances, rules and regulations.
No work shall be started until plans have been approved by
the building inspector and all other agencies having
jurisdiction.
KCB Architects
400 E. Wisconsin Ave. #205
Milwaukee, Wi 53202
(414) 261 -8956
admin@kcb -architects.com
NOT FOR
CONSTRUCTION
As indicated
9/4/2026 6:23:47 PM
A-106
BUILDING
ELEVATIONS
THE FLORENCE COLLECTIVE LLC
PEWAUKEE SALON SUITES
09/04/2026
Pewaukee, WI 53186
3/16" = 1'-0" 1 East Elevation
3/16" = 1'-0" 2 North Elevation
No. Description Date
1 Conditional Use 09/04/2026
Page 60 of 74
LEVEL 1
843' - 0"
LEVEL 2
856' - 0"
ROOF
869' - 0"
5
51
6
2
4
3
4
5
5
1
6
2
4
3
4
5
5
3
4
4 4
2
2
1
1
2 22
4 4 4 4
5
5
5
5
5
5
5
5
1
13' - 0" 13' - 0" 9' - 0" 1' - 6" 6"
11' - 0"
3
3
37' - 0"
LEVEL 1
843' - 0"
LEVEL 2
856' - 0"
ROOF
869' - 0"
6
55555
55555 1
2
4
2
1
6
6
3
4
2
4
3
4
2 2
1
4 4444
6" 2' - 9" 18' - 9" 4' - 0" 11' - 0"
37' - 0"
EXTERIOR KEYED NOTES
1
2
3
4
5
BLACK BRICK SIDING W/ DARK MORTAR
HARDIE STUCCO TEXTURE PANEL
HARDIE CORNER TRIM, COLOR TO MATCH
STUCCO PANEL
HARDIE TRIM, COLOR TO MATCH ALUMINUM
FRAMED WINDOW
BLACK ALUMINUM FRAMED WINDOWS
DIMENSIONAL ASPHALT SHINGLE ROOFING
WHITE VINYL LAP SIDING
WHITE VINYL FASCIA & TRIM
10' X 12' MANUAL GARAGE DOOR
PREFINISHED ALUMINUM K -STYLE GUTTER
6
7
8
9
10
Scale
Date
PROJECT:
OWNER:
PROJECT ADDRESS:
Sheet No.
Sheet Title:
Drawing Issuance Schedule:
Stamp:
General Notes:
All work shall be done in compliance with local codes,
ordinances, rules and regulations.
No work shall be started until plans have been approved by
the building inspector and all other agencies having
jurisdiction.
KCB Architects
400 E. Wisconsin Ave. #205
Milwaukee, Wi 53202
(414) 261 -8956
admin@kcb -architects.com
NOT FOR
CONSTRUCTION
As indicated
9/4/2026 6:23:57 PM
A-107
BUILDING
ELEVATIONS
THE FLORENCE COLLECTIVE LLC
PEWAUKEE SALON SUITES
09/04/2026
Pewaukee, WI 53186
3/16" = 1'-0" 1 West Elevation
3/16" = 1'-0" 2 South Elevation
No. Description Date
1 Conditional Use 09/04/2026
ROOF
869' - 0"
6
55555
2
4
2
6
6
3
4
2
4
3
4
2 2
4 4444
6" 2' - 9" 18' - 9"
37' - 0"
LEVEL 1
843' - 0"
LEVEL 2
856' - 0"
1
4' - 0" 11' - 0"
Page 61 of 74
Office of the Planner & Community Development Director
W240N3065 Pewaukee Road
Pewaukee, Wisconsin 53072
262.691.6007
fuchs@pewaukee.wi.us
REPORT TO THE PLAN COMMISSION
Meeting of October 15, 20026
Date: October 6, 2026
Project Name: Cedar Gables Condominiums Site & Building Plan Review Amendment
Project Address/Tax Key No.: Approximately N18W22670 Watertown Road/PWC 0958990032,
0958990048, and 0958990049
Applicant: Cedar Gables LLC
Property Owner: Cedar Gables LLC
Current Zoning: Rm-1 Multiple-Family Residential District, UC Upland Conservancy District, LC
Lowland Conservancy District
2050 Land Use Map Designation: Medium Density Residential (6,500 Sq. Ft. - 1/2 Ac. / D.U.) and
Floodplains, Lowland, & Upland Conservancy and Other Natural Areas
Use of Surrounding Properties: Single-family residential to the north, south, east, and west
Project Description/Analysis
The applicant filed an amendment to the previously approved site plan for the Cedar Gables
condominium development located at the northwest corner of Watertown Road and North Avenue. The
site plan was originally approved with a through street connecting Phase 1 and Phase 2.
The through street included a crossing of an intermittent stream. The applicant has provided a narrative
discussing the challenges in designing a structure for that crossing. As a result of engineering
difficulties and costs, the applicant is now requesting the through street be eliminated and each phase
of the development be served by its own cul-de-sac.
The applicant has included three options for consideration. None of the options significantly changes
the unit count. See below.
Site Plans Phase 1 (units) Phase 2 (units) Total (units)
Previously Approved 38 54 92
Option A 38 56 94
Option B 38 56 94
Option C 34 58 92
Page 62 of 74
Planner & Community Development Director Nick Fuchs
Options A and B both keep the clubhouse within Phase 2. Option C, however, relocates the clubhouse
to Phase 1, directly adjacent to the intersection of Watertown Road and North Avenue. This includes a
swimming pool and parking lot at this intersection.
As the applicant noted in their narrative, the cul-de-sacs are not longer than the required maximum
length of 900 feet. With that said, there are Fire Department concerns with the proposed cul-de-sacs
and eliminating the through street, particularly considering the density of the development and access
to multiple buildings that are located further back off of a private drive extending from the cul-de-sacs
in Phase 2. These buildings will be more difficult to access for emergency services.
Below are Engineering Department comments related to the information provided by the applicant and
the proposed request.
The development team has only evaluated culvert, box culvert, and concrete span type structures
for the waterway crossing between Phase 1 and 2 of the development. No traditional pre-cast
concrete slab or girder bridge options have been evaluated. Staff is confident that a structure could
be designed to cross between Phase 1 and 2 of the development but it would be significantly more
expensive than options which have been evaluated to date.
Existing right-of-way for Phase 1 of the development extends to the west property line to
accommodate connection to future development of the adjacent parcel. Engineering staff would not
support any layout (such as Options A, B, or C) which do not locate the proposed cul-de-sac near
the furthest extents of the right-of-way.
The Phase 2 intersection at Elmwood Drive is currently designed to prevent left-turns out of the
development. Engineering staff would not support any layout with no connection between Phase 1
and Phase 2 which doesn’t include a full, unrestricted intersection with Elmwood Drive.
Recommendation
Staff recommends this item be tabled to allow the applicant to address staff's site plan and cul-de-sac
design concerns. This would also allow for the Plan Commission to recommend a preferred option and
staff can review that in more detail. Moreover, it is suggested that the Plan Commission consider the
relocation of the clubhouse and amenities within Phase 1 of Option C.
Staff also recommends the Plan Commission request additional financial information for other
options/solutions that may allow for the crossing and through street. Staff recommends sufficient
information be provided for review of the engineering and improvement costs to determine if the
through street is cost prohibitive for the development. This may be the case; however, the narrative
does not provide details considering alternatives such as a girder bridge as mentioned by the
Engineering Department.
If approved, staff recommends:
1. Detailed plans for the clubhouse, parking lot and other amenities shall be submitted for Plan
Commission review and approval and to determine compliance with all applicable Zoning Code
regulations, such as setbacks.
2. The site plan shall be revised to show the location of the right-of-way connection to the property to
Page 63 of 74
Planner & Community Development Director Nick Fuchs
the west.
3. The applicant shall vacate the current right-of-way dedications and dedicate the new right-of-way
location via Certified Survey Map.
4. The cul-de-sacs and all turn around designs shall conform to the City of Pewaukee Municipal Code
and Technical Standards.
5. The proposed curbing at the intersection of the new public road and Elmwood Drive shall be
removed.
As a reminder, the curbing at the intersection of the new right-of-way within Phase 2 and Elmwood
Drive was designed to prevent traffic from turning left onto Elmwood Drive thus preventing traffic
from cutting through the existing Springdale Estates neighborhood. This was done to address traffic
concerns of those residents that attended the public hearing when this development was initially
proposed.
Page 64 of 74
Page 65 of 74
Page 66 of 74
10/02/2026
RE: October 15th, 2026, Plan Commission Submittal
Nick,
Enclosed please find 12 copies of the following.
Thanks,
Cedar bles LLC
Hand
Delivered
10/02/2026
obert A, Patch Sr.
Sole Member
1.) Narrative
2.) Engineering review times
3.) Amended site plans
4.) Clubhouse plans
Cedar Gables LLC
13965 W Burleigh Rd. Suite 101
Brookfield, WI 53005
Page 67 of 74
TO:
Cedar Gables Roadway ConfigurationSUBJECT:
October 2, 2026DATE:
INTRODUCTION
BACKGROUND/ENGINEERING CHALLENGES
-1-
The Honorable Steve Bierce, Chair, City of Pewaukee Plan Commission
City of Pewaukee Plan Commissioners
City of Pewaukee Staff
An intermittent stream is located between Phase 1 and Phase 2 of the Cedar Gables
development. This watercourse is intermittent in nature, meaning that it is generally not flowing
under normal dry-weather conditions and becomes active primarily following rainfall events. The
stream functions as a drainageway for an approximately 350-acre tributary area consisting of
properties located upstream and tributary to Cedar Gables. During rainfall events, runoff from this
contributing drainage area is conveyed through the intermittent stream toward the downstream
drainage system.
Cedar Gables will provide a much needed option for Pewaukee empty nesters to
stay in Pewaukee. Moreover, it has an estimated assessed fair market value of at least
$82.6 million, adding at least $325,000 to the City’s tax base and $450,000 to the school district’s
tax base. Considering that the residents will be almost entirely empty nesters, it will not provide
any appreciable impact on city services or road usage. And it is being developed without any City
contribution or incentives.
Cedar Gables is a luxury residential development located in the City of Pewaukee,
Wisconsin. As planned, the development will contain residential units constructed in two phases,
identified as Phase 1 and Phase 2. Each phase would contain a portion of the residential units.
CEDAR GABLES LLC
13965 West Burleigh Street, Suite 101
Brookfield, Wisconsin 53005
As part of the City's review and planning for the Cedar Gables development, the
City identified a desired roadway connection between Phase 1 and Phase 2. Providing this
connection would require the roadway to cross the intermittent stream and, consequently, would
require some form of hydraulic crossing, such as a bridge or culvert system.
A fundamental requirement of the proposed crossing is that it cannot cause any
increase, or "rise," in water elevations that would result in additional water backing up onto the
Page 68 of 74
EXHAUSTIVE EFFORT
NEEDED AMENDMENT
-2-
neighboring property to the west. Accordingly, the crossing must be designed to accommodate the
applicable stormwater flows while maintaining existing hydraulic conditions on the property to
the west.
Although a roadway connection between the two phases was evaluated through a
comprehensive range of bridge and culvert alternatives, the hydraulic analysis establishes that the
required zero-rise condition cannot be achieved through a crossing.
The results of the analysis demonstrated that none of the alternatives or
combinations evaluated could satisfy the requirement for zero rise in water backing up onto the
property to the west. In other words, regardless of the crossing configuration evaluated,
constructing a roadway connection between the two phases would result in some degree of
increased hydraulic head and associated water-surface elevation affecting the neighboring
property.
City staff, Cedar Gables and Cedar Gables’s engineers have exhausted every
feasible alternative for solving this issue. This group has worked on this issue for 1168 days, or
about 3.2 years.
Cedar Gables’s engineers started working on this issue on July 23, 2023 and made
their first formal submittal on January 10, 2024. Including that original submittal, there have been
a total of nine submittals. City staff has spent a considerable amount of time and effort on these
plans, averaging 58 days from submittal to response, with a response usually coming in about 25
days. Between each City response and the next submittal, there was investigation, testing and new
plans.
Cedar Gables originally wanted this crossing and has spent hundreds of thousands
of dollars trying to satisfy the City’s requirements. A project like this cannot afford more
engineering and more delays.
To evaluate whether this requirement could be achieved, an engineering hydrology
and hydraulics analysis was performed examining numerous alternative configurations for the
roadway crossing. The alternatives evaluated included, among others, a single-span bridge
crossing, a series of nine side-by-side circular culverts, and a series of six side-by-side box culverts.
Numerous combinations and configurations of these alternatives were analyzed to determine
whether a feasible crossing could be designed that would provide the desired roadway connection
while maintaining zero rise in water elevations on the neighboring property to the west.
Page 69 of 74
CONCLUSION
-3-
Based on the results of the engineering analysis, the only remaining solution that
satisfies the City's requirement of no rise in water backing up onto the property to the west is to
eliminate the roadway crossing between Phase 1 and Phase 2. Under this configuration, each phase
would retain its own roadway network terminating in cul-de-sacs, with no roadway connection
across the intermittent stream.
Fortunately, this will have little impact on neighbors. Cul-de-sacs effectively divide
the traffic entering and exiting the development, ensuring that neither road entrance creates
material amounts of traffic. Moreover, considering that all or almost all of these units will certainly
be purchased by empty nesters, the amount of traffic will be nominal.
The proposed cul-de-sacs are allowed under the City’s Ordinances. Pewaukee Ord.
239-8.A(4) provides:
This is not new ground and does not set some new precedent. The City has a
considerable number of these cul-de-sacs in residential developments.
The proposed cul-de-sacs meet all City design standards. They will be well-
designed fire, police, plowing and other services.
Proposed streets shall extend to the boundary lines of the property being
subdivided unless prevented by topography or other physical conditions
or unless, in the opinion of the Plan Commission, such extension is not
necessary or desirable for the coordination of the layout of the subdivision
or for the advantageous development of the adj acent lands, in which case a
permanent cul-de-sac shall be provided in accordance with City design
standards. Such permanent cul-de-sac streets shall be no longer than 900
feet measured from the center of the "sac" to the nearest intersection
of a street having access to an arterial or collector street.
The “physical conditions” of this property prevent a through street. Cedar Gables
has gone far beyond a good faith effort to provide a through street but cannot do so without
affecting water levels on the property to the west. It is not feasible to continue that effort.
The Cedar Gables development will make a substantial positive impact on the
Pewaukee tax base and will be a much needed luxury housing option for Pewaukee empty nesters.
Cedar Gables is proud of the homes that Cedar Gables is offering to Pewaukee residents. We would
gladly provide tours to any of you so you can see how Cedar Gables will be a credit to the
community. However, in order to bring the benefits of this new neighborhood to Pewaukee, Cedar
Gables needs your approval of this amendment.
Page 70 of 74
START DATE FINISH DATE DAYS
#1
#2
#3
#4
#5
#6
#7
#8
12/16/25#9
9/03/26 261 days
Current Date: 9/24/2026 1,159 DAYS
11/20/25
12/04/25
05/23/25
07/23/25
02/12/24
04/05/24
3/14/2025
4/10/2025
10/15/25
11/20/25
07/23/25
08/15/25
61 days
36 days
04/10/25
04/30/25
08/15/25
10/15/25
07/23/23
01/10/24
10/10/24
03/14/25
05/15/24
08/06/24
12/04/25
12/16/25
1/10/2024
2/12/2024
4/30/2025
5/23/2025
4/5/2024
5/15/2024
171 Days
33 Days
156 Days
28 Days
14 days
12 days
20 Days
23 days
84 Days
66 Days
JSD Original Submittal
Pewaukee review time
61 days
23 days
8/6/2024
10/10/2024
54 Days
41 Days
JSD Corrections (resubmit)
Pewaukee review time
Wetland Crossing continuance
Wetland Crossing Denial
JSD Corrections
Pewaukee Review Time
JSD Corrections
Pewaukee Review Time
JSD Corrections
Pewaukee Review Time
JSD Corrections
Pewaukee review time
JSD Corrections
Pewaukee review time
JSD Corrections (resubmit)
Pewaukee review time
Note: Utilities approved without crossing
CEDAR GABLES
ENGINEERING DESIGN AND REVIEW
TIMES
Time from City submittal #1
1/10/2024 thru 9/24/2026 :
988 Days of Continuous Reviews
REVIEW# Submittal time frames:
Page 71 of 74
Page 72 of 74
DIMENSIONALFIBERGLASS SHINGLES
CEDAR SHINGLE SIDING
HALQUIST STONEVENNER
6x6 TREATEDWOOD POSTS,WRAPPED
DIMENSIONALFIBERGLASS SHINGLES
CEDAR SHINGLE SIDINGHALQUIST STONEVENNER
6x6 TREATEDWOOD POSTS,WRAPPED
DIMENSIONALFIBERGLASS SHINGLES
CEDAR SHINGLE SIDING
HALQUIST STONEVENNER
6x6 TREATEDWOOD POSTS,WRAPPED
ARCHITECTURE * ENGINEERING * CONSTRUCTIONTGAR GROUP, Inc.DESIGN BUILDTGAR
A2.007/07/2026ELEVATIONS1/4"=1'-0"
CEDAR GABLESCLUBHOUSE
11/4" = 1'-0"SOUTH ELEVATION
21/4" = 1'-0"WEST ELEVATION
41/4" = 1'-0"NORTH ELEVATION
31/4" = 1'-0"EAST ELEVATION