Packet – TB 2026-10-20
Town of Brookfield · Waukesha County · meeting of Oct 20, 2026 · Agenda packets
Open the original document More from Town of Brookfield
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PLEASE NOTE: It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above meetings to gather
information. No action will be taken by any governmental body other than that specifically noticed. Also, upon reasonable notice, efforts will be made to accommodate the needs of individuals
with disabilities through appropriate aids and services. For additional information or to request such services contact the clerk’s office at the above.
Page 1 of 1
Office of the Town Clerk
Town of Brookfield | 645 N. Janacek Road, Brookfield, WI 53045
Office: 262-796-3788 | Clerk@TownofBrookfieldwi.gov
MEETING AGENDA
Tuesday, October 20, 2026
7 p.m.
Town Board
Utility District No. 1
Sanitary District No. 4
Erich Gnant Room
TOB Municipal Building
645 N. Janacek Rd., Brookfield, WI
1. Call to Order & Roll Call.
2. Meeting Notices.
3. Approval of Agenda.
4. Approval of Minutes:
a. October 6, 2026 meeting of the TB, UD1, SD4.
5. Citizen Comments: Three-minute limit.
6. Committee/Commission Reports/Recommendations: None.
7. Old Business: None.
8. New Business:
a. Discover Brookfield Quarterly Update
b. Discussion and possible action regarding the 2027 Budget.
c. Discussion and possible action regarding WE Energies Davidson Road Electric Relocation Plan.
9. Departments Reports/Recommendations: None.
10. Approval of Vouchers and Checks.
11. Communication and Announcements.
12. Adjourn.
Posted October 16, 2026
Emily Howells, Town Clerk
PLEASE NOTE: It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above meetings to gather
information. No action will be taken by any governmental body other than that specifically noticed. Also, upon reasonable notice, efforts will be made to accommodate the needs of individuals
with disabilities through appropriate aids and services. For additional information or to request such services contact the clerk’s office at the above.
Page 1 of 3
Office of the Town Clerk
Town of Brookfield | 645 N. Janacek Road, Brookfield, WI 53045
Office: 262-796-3788 | Clerk@TownofBrookfieldwi.gov
MEETING MINUTES
Tuesday, October 6, 2026
7 p.m.
Town Board
Utility District No. 1
Sanitary District No. 4
Erich Gnant Room
TOB Municipal Building
645 N. Janacek Rd., Brookfield, WI
1. Call to Order & Roll Call.
Chairman Henderson called the meeting to order at 7:00 p.m.
Present: Chairman Henderson, Supervisors Steve Kohlmann, John Charlier, Matthew Paris and Ryan Stanelle.
A quorum was met (5-0).
Staff Present: Administrator Tom Hagie, Fire Chief John Schilling, Sanitary District No. 4 Superintendent Tony Skof and
Clerk Emily Howells.
2. Meeting Notices.
Howells confirmed the meeting notices were posted as required by law.
3. Approval of Agenda.
Motion by Charlier to approve the agenda with the exception that item 9 immediately follows item 8c; seconded by
Kohlmann.
Motion prevailed by a voice vote (5-0).
4. Approval of Minutes:
a. September 15, 2026 meeting of the TB, UD1, SD4.
Motion by Stanelle to approve the TB, UD1, SD4 minutes of September 15, 2026; seconded by Kohlmann.
Motion prevailed by a voice vote (5-0).
5. Citizen Comments: Three-minute limit. None.
6. Committee/Commission Reports/Recommendations: None.
7. Old Business:
a. Discussion and possible action regarding text amendments to Chapter 17 regarding automobile uses.
Motion by Chairman Henderson to table the item; seconded by Kohlmann.
Motion prevailed by a voice vote (5-0).
8. New Business:
a. Discussion and possible action regarding a Temporary Alcohol Beverage License by the Elmbrook Education
Foundation for the 6th Annual Boos & Ghouls Night Out on Thursday, October 8, 2026, located at the Corners of
Brookfield from 5:30 – 8 p.m.
Motion by Charlier to approve the Temporary Alcohol Beverage License by the Elmbrook Education Foundation for the
6th Annual Boos & Ghouls Night Out on Thursday, October 8, 2026, located at the Corners of Brookfield from 5:30 – 8
p.m.; seconded by Kohlmann.
Motion prevailed by a voice vote (5-0).
Town of Brookfield Town Board Minutes, October 6, 2026 Page 2 of 3
PLEASE NOTE: It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above meetings to gather
information. No action will be taken by any governmental body other than that specifically noticed. Also, upon reasonable notice, efforts will be made to accommodate the needs of individuals
with disabilities through appropriate aids and services. For additional information or to request such services contact the clerk’s office at the above.
b. Discussion and possible action regarding the 2027 Professional Services Agreement for Planning Services.
Motion by Kohlmann to approve the 2027 Professional Services Agreement for Planning Services.; seconded by
Charlier.
Motion prevailed by a voice vote (5-0).
c. Discussion and possible action regarding the 2027 Draft Budget Review.
No action.
d. Convene into CLOSED SESSION pursuant to Wis. Stat. § 19.85(1)(c) to consider employment, promotion, compensation
or performance evaluation data of any public employee over which the government body has jurisdiction or exercises
responsibility: Town Administrator Annual Review
Motion by Kohlmann at 7:57 p.m. to convene into CLOSED SESSION pursuant to Wis. Stat. § 19.85(1)(c) to consider
employment, promotion, compensation or performance evaluation data of any public employee over which the
government body has jurisdiction or exercises responsibility: Town Administrator Annual Review.; seconded by Charlier.
Motion prevailed by a voice vote (5-0).
e. Reconvene into OPEN SESSION, according to Wis. Stat. § 19.85(1)(c), for any necessary action resulting from the Closed
Session.
Motion by Kohlmann at 8:32 p.m. to reconvene into OPEN SESSION, according to Wis. Stat. § 19.85(1)(c), for any necessary
action resulting from the Closed Session.; seconded by Charlier.
Motion prevailed by a voice vote (5-0).
No action.
9. Departments Reports/Recommendations:
a. Fire Department
1. Memo regarding Open Burning in December
No action.
b. Sanitary District No. 4
1. Discussion and possible action regarding Strand Task Order No. 26-03 Well No. 4 Rehabilitation.
Motion by Charlier to approve Strand Task Order No. 26-03 Well No. 4 Rehabilitation not to exceed $51,900;
seconded by Kohlmann.
Motion prevailed by a voice vote (5-0).
2. Discussion and possible action regarding Cherokee Lift Station Motor Control Panel Replacement Bids.
Motion by Charlier to approve the Cherokee Lift Station Motor Control Panel Replacement Bid by J. Miller Electric,
Inc. not to exceed $183,902; seconded by Kohlmann.
Motion prevailed by a voice vote (5-0).
10. Approval of Vouchers and Checks.
Motion by Kohlmann to approve vouchers and checks in the amount of $312,341.56; seconded by Charlier.
Motion prevailed by a voice vote (5-0).
11. Communication and Announcements.
a. Hagie communicated the Brewers spirit wear day at Town Hall.
b. Hagie announced the TIF request from IM properties has been received for review on October 5.
c. Howells announced In-Person Absentee Voting (IPAV) begins Tuesday, October 20 from 9-4 p.m.
d. Stanelle announced that the Wisconsin Towns Association (WTA) meeting is Thursday, October 28, 2026.
Town of Brookfield Town Board Minutes, October 6, 2026 Page 3 of 3
PLEASE NOTE: It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above meetings to gather
information. No action will be taken by any governmental body other than that specifically noticed. Also, upon reasonable notice, efforts will be made to accommodate the needs of individuals
with disabilities through appropriate aids and services. For additional information or to request such services contact the clerk’s office at the above.
12. Adjourn.
Motion by Kohlmann to adjourn at 8:36 p.m.; seconded by Charlier.
Motion prevailed by a voice vote (5-0).
Respectfully submitted by,
Emily Howells, Town Clerk
FY 2027 Capital Equipment and Improvement Summary
Capital Equipment by Department
Department Item Description Cost Funded?
General Fund
Allocation
Police New Squad (1) 56,000 $ y
Squad Equipment Replacement (1) 15,000$ y
Squad Modem Replacement 1,700$ y
Squad Camera - Panasonic Arbitrator 7,000$ y
Squad Ballistic Shields (4@$5,400) 21,600$ y
Squad Radio Replacement (8) 45,500$ y
Handheld Radio Replacement (14) 95,000$ y
Axon Tasers (Qnty 17, payment 4 of 5) 10,500$ y
Tactical Helmets (4@$1,000) 4,000$ y
Roof Replacement 60,000$ n
Weather Siren Replacement (4) 90,000$ n
Siren Controls (Upgrade to CompuLert NEXGen)25,000$ n
PD subtotal 431,300 $ 183,000 $
Fire PPV Fan 6,000$ y
Vent saws (2) 4,000$ y
Training Container 6,000$ y
Hall Lockers 19,000$ y
Mobile (Apparatus) Radios (8 units) 67,403$ y
FD subtotal 102,403 $ 69,000$
DPW UTV (Split with Parks) 17,000 $ n
Plow Truck Replacement 125,000$ n GO Debt
DPW subtotal 142,000 $ -$
Park & Rec Toro Wide Area Replacement 128,000 $ y GO Debt
Marx Park Playground Equip. Replacement 200,000$ y Park Fund
UTV (Split with DPW) 17,000$ n
P&R subtotal 345,000 $ -$
Administration Emergency Govmt 14,000 $ y
Building & Grounds 5,000$ y
Admin. subtotal 19,000 $ 19,000$
Building & GroundsCampus Signage 50,000$ n
Town Website Update 25,000$ n
B&G subtotal 75,000 $ 10,000$
Capital ImprovementDavidson Road 2,500,000$ y GO Debt. Funded in part by fund balance, grants, and TIF
CI subtotal 2,500,000 $ -$
Debt Service 2025 Ambulance Loan (closes 2030) 66,143$ y
Debt subtotal 66,143 $ 66,143 $
Total Capital Equipment & Capital Improvement 3,680,846$ 347,143$
Town of Brookfield
Comparison of Tax Levy & Mill Rate
Budget Year
2023 Tax Roll paid in 2024 2024 Tax Roll paid in 2025 2025 Tax Roll paid in 2026 2026 Tax Roll paid in 2027
Tax Levy Tax % Mill Rate Tax Levy Tax % Mill Rate Tax Levy Tax % Mill Rate Tax Levy Tax % Mill Rate
General 3,921,66587.86% 3.100703 3,982,80988.81% 3.188978 4,026,35286.94% 2.801122 4,378,36192.65% 3.075300
Police CE 97,000 2.17% 0.076694 138,000 3.08% 0.110495 132,000 2.85% 0.091832 183,000 3.87% 0.128537
Emg Govt CE 9,000 0.20% 0.007116 9,000 0.20% 0.007206 14,000 0.30% 0.009740 19,000 0.40% 0.013345
Fire CE 106,000 2.37% 0.083810 52,000 1.16% 0.041636 15,000 0.32% 0.010435 69,000 1.46% 0.048465
DPW CE 118,000 2.64% 0.093298 5,000 0.11% 0.004003 70,000 1.51% 0.048699 0 0.00% 0.000000
Park&RecCE 7,000 0.16% 0.005535 81,600 1.82% 0.065336 2,500 0.05% 0.001739 0 0.00% 0.000000
B&G CE 5,000 0.11% 0.003953 5,000 0.11% 0.004003 5,000 0.11% 0.003478 10,000 0.21% 0.007024
Rd Const CI 199,892 4.48% 0.158047 211,000 4.71% 0.168945 300,000 6.48% 0.208709 0 0.00% 0.000000
Debt 0 0.00% 0.000000 0 0.00% 0.000000 66,143 1.43% 0.046015 66,143 1.40% 0.046458
4,463,557 1 3.5291554 4,484,409 1 3.5906017 4,630,995 1 3.2217702 4,725,504.00 1 3.3191283
Levy Change ($) 10,135$ 20,852$ 146,586$ 94,509.00BALANCES
Levy Change (%) 0.23% 0.47% 3.27% 2.04%
4,725,504.00
Equalized Value
(w/ TID Value Increment)1,618,867,500 2.48% 1,650,058,900 1.93% 1,808,275,900 9.59% 1,950,402,400 7.86%
TID Value Increment 274,397,9007.67% 301,211,6009.77% 300,337,300-0.29% 373,512,60024.36%
Equalized Value
(less TID Value Increment)1,344,469,600 1,348,847,300 1,507,938,600 1,576,889,800
Interim Rate 0.003319939 0.003324623 0.003071077 0.002996724
Levy Amount (w/TID Value)5,374,541 5,485,824 5,553,355 5,844,818
Tax Increment 910,984 1,001,415 922,360 1,119,314
Assessed Value (Equated)1,522,897,217-0.42% 0.940717642 1,527,828,6000.32% 0.925923675 1,723,696,80012.82% 0.953226662 1,760,949,7002.16%
TOB Mill Rate 3.5291554 /$1,000 3.5906017 /$1,000 3.2217702 /$1,000 3.3191283 /$1,000
TOB Mill Rate (less TID) 3.319939 3.324623 3.071077 2.996724
% Mille Rate Change 1.64% 1.74% -10.27% 3.02%
TOB Mill Rate 3.529155% 3.590602% 3.221770% 3.319128%
2027202620252024
S:\Administration\Administrator\Budget\2027 Budget\2027 Estimated Tax Comparison.xlsx - Proposed Budget
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 1
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
GENERAL FUND 100
TAXES
100-411100 GENERAL PROPERTY TAXES 3,921,665 3,982,809 .00 4,026,352 4,378,361 8.7 %
100-413100 ROOM TAX 707,702 1,286,096 832,455 950,000 1,350,000 42.1 %
100-419999 Other Tax Revenue 2,237 .00 966 5,000 5,000 .00
Total TAXES: 4,631,604 5,268,905 833,421 4,981,352 5,733,361 15.1 %
INTERGOVERNMENTAL REVENUES
100-434100 STATE SHARED TAXES 254,219 260,060 40,335 260,060 275,000 5.7 %
100-434200 STATE FIRE DUES & CONTRAC 63,905 69,104 74,214 55,000 65,000 18.2 %
100-435200 STATE AID - POLICE TRAINING .00 .00 .00 2,000 .00 -100.0
100-435310 STATE AID - GENERAL HIGHWA 361,821 374,415 276,721 369,180 376,500 2.0 %
100-435400 STATE AID - RECYCLING GRAN 4,405 .00 .00 4,405 .00 -100.0
100-436100 STATE AID - MUNICIPAL SERVIC 4,600 4,728 5,598 4,500 4,500 .00
100-436600 STATE AID - EXEMPT COMPUTE 48,898 48,898 48,898 48,898 48,898 .00
100-436710 STATE AID - PERSONAL PROPE 46,004 301,744 301,744 301,744 301,744 .00
100-436800 OTHER AID / GRANTS 20,153 19,503 19,503 20,000 19,503 -2.5 %
Total INTERGOVERNMENTAL REVENUES: 804,005 1,078,453 767,014 1,065,787 1,091,145 2.4 %
LICENSES & PERMITS
100-441100 LIQUOR & MALT BEVERAGE LIC 13,720 30,710 18,425 25,000 18,000 -28.0 %
100-441110 OPERATOR'S/BARTENDER LIC 45,360 12,580 12,950 12,000 12,000 .00
100-441200 CIGARETTE LICENSE 400 650 450 450 450 .00
100-441240 AMUSEMENT DEVICES 4,480 4,080 5,080 4,280 4,500 5.1 %
100-441260 PAWN BROKER/SECOND HAND 1,500 2,000 2,000 2,000 2,000 .00
100-441290 OTHER BUSINESS LICENSE 1,600 2,550 1,800 500 1,500 200.0 %
100-442000 PICNIC LICENSE 40 .00 .00 250 250 .00
100-442100 DOG LICENSE 93- 3,370 937 1,500 1,500 .00
100-443000 BUILDING PERMITS 178,726 288,945 196,771 150,000 150,000 .00
100-443100 ELECTRICAL PERMITS 68,263 41,962 38,980 35,000 35,000 .00
100-443200 PLUMBING PERMITS 24,847 27,872 29,552 25,000 25,000 .00
100-443250 FIRE PROTECTION FEES 6,794 13,420 15,181 7,000 7,000 .00
100-449020 CABLE FRANCHISE FEES 35,580 34,788 24,676 40,000 40,000 .00
100-449990 OTHER PERMITS 625 570 750 150 150 .00
Total LICENSES & PERMITS: 381,842 463,497 347,552 303,130 297,350 -1.9 %
FINES, FORFEITURES, & PENALTIE
100-451100 COURT PENALTIES AND COST 135,451 173,406 116,390 150,000 150,000 .00
100-451150 POLICE REPORTS 2,304 1,358 1,687 1,500 1,500 .00
100-451300 PARKING VIOLATIONS .00 .00 .00 2,000 .00 -100.0
Total FINES, FORFEITURES, & PENALTIE: 137,755 174,763 118,078 153,500 151,500 -1.3 %
PUBLIC CHARGES FOR SERVICES
100-461180 LICENSE AND PUBLICATION FE 450 1,042 1,090 450 500 11.1 %
100-461220 ASSESSMENT LETTERS 6,100 5,650 5,100 4,500 4,500 .00
100-461300 APPEALS BOARD HEARING FE .00 450 .00 .00 .00 .00
100-462150 COPIES .00 .00 3 .00 .00 .00
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 2
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-462200 FD INSPECTION ASSESSMENT 44,699 44,154 30,952 45,000 45,000 .00
100-462250 FD CHARGE FOR CLEAN UP O 5,097 10,738 2,865 5,000 5,000 .00
100-462300 FD AMBULANCE RUN CHARGE 305,767 233,015 253,313 225,000 300,000 33.3 %
100-462340 FD AMBULANCE MILES & SUPP 73,554 100,482 68,987 70,000 80,000 14.3 %
100-467220 WPRA TICKET PROGRAM 2,310 2,399 1,933 1,200 1,200 .00
100-467240 RECREATION PROGRAM COST 6,944 6,329 5,424 6,000 6,000 .00
100-467260 RECREATION PROGRAM SPON 9,605 10,027 13,247 9,000 9,000 .00
100-467280 PARK USAGE FEES 4,970 5,343 3,835 4,000 4,000 .00
100-468500 PLANNING COMMISSION HEAR 4,900 8,300 10,350 4,000 4,000 .00
Total PUBLIC CHARGES FOR SERVICES: 464,396 427,928 397,099 374,150 459,200 22.7 %
MISCELLANEOUS REVENUE
100-481100 INTEREST ON INVESTMENTS 424,092 400,675 243,405 200,000 300,000 50.0 %
100-481150 NSF CHECK PENALTY 2,774 279 614 500 500 .00
100-482120 ENGINEERING & LEGAL BILLIN 32,756 34,086 40,106 60,000 60,000 .00
100-483100 SALE OF TOWN EQUIPMENT 33,567 18,860 9,878 20,000 20,000 .00
100-483150 SALES OF TOWN MATERIALS 561 644 779 250 250 .00
100-484000 INS RECOVERIES - W/C or Liab 55,170 7,740 15,555 10,000 10,000 .00
100-486000 PAYMENT IN LIEU OF TAXES 36,961 41,142 41,142 41,000 41,000 .00
100-489990 MISCELLANEOUS REVENUES 116,148- 151,852 49,804 25,000 25,000 .00
Total MISCELLANEOUS REVENUE: 469,733 655,277 401,283 356,750 456,750 28.0 %
OTHER FINANCING SOURCES
100-492230 Transfer from TIF 63,923 92,562 .00 66,388 66,388 .00
100-493300 UNRESERVED-UNDES TO GEN .00 .00 .00 412,228 15,661 -96.2 %
Total OTHER FINANCING SOURCES: 63,923 92,562 .00 478,616 82,049 -82.9 %
GENERAL GOVERNMENT
100-511000-110 TOWN BOARD-SALARY 27,196 38,106 30,854 38,200 38,200 .00
100-511000-130 TOWN BOARD-FICA 2,081 2,905 2,360 2,922 3,000 2.7 %
100-511000-320 TOWN BOARD-PUBLISH/SUBSC 1,485 3,899 3,238 4,000 4,000 .00
100-511000-330 TOWN BOARD-TRAIN/TRAVEL 3,020 1,890 475 .00 2,000 .00
100-511000-340 TOWN BOARD-OPERATING SU 35 .00 .00 .00 .00 .00
100-511000-341 TOWN BOARD-TOWN TIDINGS 15,142 12,177 5,790 10,000 14,000 40.0 %
TOWN BOARD Expenditure Total: 48,958 58,977 42,716 55,122 61,200 11.0 %
Total TOWN BOARD: 48,958 58,977 42,716 55,122 61,200 11.0 %
100-512000-110 MUNICIPAL COURT-JUDGE SAL 8,627 11,912 9,757 12,600 12,600 .00
100-512000-120 MUNICIPAL COURT-CLERK 50,144 50,872 45,527 48,755 61,800 26.8 %
100-512000-121 MUNICIPAL COURT-CASHIER 965 1,348 737 1,580 1,580 .00
100-512000-130 MUNICIPAL COURT- FICA 4,313 4,625 4,102 4,815 5,900 22.5 %
100-512000-131 MUNICIPAL COURT-RETIREME 3,448 3,551 3,319 4,531 5,600 23.6 %
100-512000-133 MUNICIPAL COURT-INSURANC 33,065 36,183 33,116 41,720 48,400 16.0 %
100-512000-212 MUNICIPAL COURT-PROFESSIO 400 800 200 800 800 .00
100-512000-214 MUNICIPAL COURT-DATA PROC 3,402 3,573 .00 3,000 3,000 .00
100-512000-310 MUNICIPAL COURT-OFFICE SU 374 500 853 1,000 1,000 .00
100-512000-311 MUNICIPAL COURT-POSTAGE .00 .00 .00 1,000 1,000 .00
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 3
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-512000-330 MUNICIPAL COURT-TRAIN/TRA 1,803 1,605 1,701 2,000 2,000 .00
100-512000-332 MUNICIPAL COURT-MILEAGE .00 .00 154 250 250 .00
100-512000-340 MUNICIPAL COURT-OPERATING .00 .00 .00 150 150 .00
MUNICIPAL COURT Expenditure Total: 106,542 114,968 99,465 122,201 144,080 17.9 %
Total MUNICIPAL COURT: 106,542 114,968 99,465 122,201 144,080 17.9 %
100-513400-200 LEGAL-MC ATTORNEY COUNSE 69,072 71,411 41,734 65,000 65,000 .00
100-513400-210 LEGAL-GENERAL ATTORNEY C 52,648 53,058 44,257 65,000 65,000 .00
100-513400-211 LEGAL-PD ATTORNEY COUNSE 1,171 1,140 1,777 10,000 10,000 .00
100-513400-212 LEGAL-FD ATTORNEY COUNSE 3,123 834 3,626 2,000 2,000 .00
100-513400-250 CODIFICATION OF ORDINANCE 1,195 3,117 1,914 1,500 1,500 .00
LEGAL Expenditure Total: 127,208 129,559 93,307 143,500 143,500 .00
Total LEGAL: 127,208 129,559 93,307 143,500 143,500 .00
100-514100-110 ADMINISTRATOR-*SALARY 83,949 103,551 64,099 78,132 94,200 20.6 %
100-514100-130 ADMINISTRATOR-FICA 6,220 7,117 4,696 5,977 7,300 22.1 %
100-514100-131 ADMINISTRATOR-RETIREMENT 5,795 7,195 4,615 5,626 6,900 22.6 %
100-514100-133 ADMINISTRATOR-INSURANCE 27,420 27,973 26,266 31,878 42,900 34.6 %
100-514100-330 ADMINISTRATOR-TRAIN/TRAVE .00 610 735 200 1,500 650.0 %
100-514100-332 ADMINISTRATOR-MILEAGE .00 521 .00 .00 .00 .00
ADMINISTRATOR Expenditure Total: 123,383 146,967 100,410 121,813 152,800 25.4 %
Total ADMINISTRATOR: 123,383 146,967 100,410 121,813 152,800 25.4 %
100-514200-111 CLERK-*SALARY 109,801 42,180 83,028 82,789 63,100 -23.8 %
100-514200-120 CLERK-ADMIN. ASSIST/DEPUTY 103,115 108,508 46,670 108,909 55,900 -48.7 %
100-514200-130 CLERK-FICA 13,219 11,190 9,808 14,665 9,200 -37.3 %
100-514200-131 CLERK-RETIREMENT 11,311 10,292 9,338 13,802 8,700 -37.0 %
100-514200-133 CLERK-INSURANCE 53,157 16,758 16,370 73,292 63,000 -14.0 %
100-514200-310 CLERK-OFFICE SUPPLIES 6,847 2,623 2,008 3,000 3,000 .00
100-514200-311 CLERK-POSTAGE 9,813 6,680 6,680 4,000 4,000 .00
100-514200-320 CLERK-PUBLISH/SUBSCRIPT/D 733 2,918 1,874 1,700 1,700 .00
100-514200-321 CLERK-LEGAL NOTICES 309 42 .00 1,000 1,000 .00
100-514200-330 CLERK-TRAIN/TRAVEL 499 2,200 534 2,500 2,500 .00
100-514200-332 CLERK-MILEAGE 1,151 .00 224 400 400 .00
100-514200-340 CLERK-OPERATING SUPPLIES 1,517 5,680 6,288 7,000 7,000 .00
100-514200-345 CLERK-BACKGROUND CHECK 2,471 2,261 2,604 2,500 2,500 .00
CLERK Expenditure Total: 313,943 211,332 185,426 315,557 222,000 -29.6 %
Total CLERK: 313,943 211,332 185,426 315,557 222,000 -29.6 %
100-514400-125 ELECTIONS-POLLWORKERS W 16,846 6,318 8,814 15,000 10,000 -33.3 %
100-514400-218 ELECTIONS-MACHINE MAINTE 765 723 745 1,500 1,500 .00
100-514400-310 ELECTIONS-OFFICE SUPPLIES 1,442 2,270 116 2,000 2,000 .00
100-514400-311 ELECTIONS-POSTAGE 38 6 .00 2,500 2,500 .00
100-514400-321 ELECTIONS-LEGAL NOTICES 84 41 .00 500 .00 -100.0
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 4
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-514400-330 ELECTIONS-TRAIN/TRAVEL 1,529 524 1,390 1,000 1,000 .00
100-514400-340 ELECTIONS-OPERATING SUPP 3,751 2,292 1,339 2,500 2,500 .00
ELECTIONS Expenditure Total: 24,454 12,174 12,405 25,000 19,500 -22.0 %
Total ELECTIONS: 24,454 12,174 12,405 25,000 19,500 -22.0 %
100-515100-111 TREASURER-*SALARY 23,835 29,401 18,199 22,183 31,400 41.5 %
100-515100-122 TREASURER-BOOKKEEPER 50,742 52,209 78,031 52,542 21,700 -58.7 %
100-515100-130 TREASURER-FICA 5,334 5,673 6,981 5,716 4,100 -28.3 %
100-515100-131 TREASURER-RETIREMENT 5,148 5,670 6,156 5,380 3,900 -27.5 %
100-515100-133 TREASURER-INSURANCE 56,476 49,391 48,462 58,341 14,700 -74.8 %
100-515100-210 TREASURER-VK AUDITING PR 46,375 43,604 34,950 40,000 40,000 .00
100-515100-214 TREASURER-DATA PROCESSIN 22,301 22,484 6,068 15,000 15,000 .00
100-515100-216 TREAS-COUNTY COLLECTION 10,024 11,798 9,993 12,500 12,500 .00
100-515100-330 TREASURER-TRAIN/TRAVEL 82 .00 1,711 1,000 1,500 50.0 %
100-515100-332 TREASURER-MILEAGE .00 .00 176 200 200 .00
100-515100-340 TREASURER-OPERATING SUP 471 979 122 500 500 .00
100-515100-342 TREASURER-BANK / CHECK M 2,827 10,034 10,802 8,000 8,000 .00
TREASURER Expenditure Total: 223,614 231,244 221,651 221,362 153,500 -30.7 %
Total TREASURER: 223,614 231,244 221,651 221,362 153,500 -30.7 %
100-515200-140 ASSESSOR-BOARD OF REVIE 1,300 350 .00 500 500 .00
100-515200-210 ASSESSOR-GROTA APPRAISAL 71,400 71,400 46,350 71,400 61,800 -13.4 %
100-515200-213 ASSESSOR-STATE MANUFACT 2,445 2,710 .00 4,400 4,400 .00
ASSESSOR Expenditure Total: 75,145 74,460 46,350 76,300 66,700 -12.6 %
Total ASSESSOR: 75,145 74,460 46,350 76,300 66,700 -12.6 %
100-516000-122 TOWN HALL-WAGE .00 .00 .00 .00 45,600 .00
100-516000-125 TOWN HALL-PT WAGE .00 .00 .00 10,000 10,000 .00
100-516000-130 TOWN HALL-FICA .00 .00 .00 765 4,300 462.1 %
100-516000-131 TOWN HALL-RETIREMENT .00 .00 .00 .00 4,100 .00
100-516000-133 TOWN HALL-INSURANCE 5,000 .00 .00 .00 43,700 .00
100-516000-210 TOWN HALL-PROFESSIONAL S .00 1,750 3,977 10,000 10,000 .00
100-516000-221 TOWN HALL-ELECTRIC 8,540 8,817 7,602 8,000 8,500 6.3 %
100-516000-222 TOWN HALL-WATER/SEWER/ST 2,182 2,190 1,723 2,000 2,000 .00
100-516000-224 TOWN HALL-NATURAL GAS/HE 1,616 2,095 1,791 2,000 2,500 25.0 %
100-516000-225 TOWN HALL-TELEPHONE 16,155 15,614 13,487 15,000 16,000 6.7 %
100-516000-240 TOWN HALL-MAINTENANCE CO 37 .00 .00 500 500 .00
100-516000-290 TOWN HALL-WASTE DISPOSAL 1,948 .00 493 .00 .00 .00
100-516000-340 TOWN HALL-OPERATING SUPP 11,038 13,330 11,616 8,000 12,000 50.0 %
100-516000-350 TOWN HALL-REPAIR & MAINTE 26,741 13,557 41,931 10,000 10,000 .00
TOWN HALL Expenditure Total: 73,257 57,353 82,621 66,265 169,200 155.3 %
Total TOWN HALL: 73,257 57,353 82,621 66,265 169,200 155.3 %
100-519300-511 POLICE PROF-GEN LIABILITY I 33,035 43,373 31,714 30,000 35,000 16.7 %
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 5
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-519300-513 BUSINESS AUTOMOBILE INSUR 31,257 48,528 30,007 30,000 35,000 16.7 %
100-519300-517 UNEMPLOYMENT INSURANCE 3,279 3,725 4,676 1,000 4,000 300.0 %
100-519300-518 WORKERS COMPENSATION - I 94,649 99,330 61,526 100,000 100,000 .00
100-519300-519 SECURITY BOND - INSURANCE 27,247 31,154 22,396 20,000 25,000 25.0 %
100-519300-740 ERRONEOUS TAXES, REFUND, .00 197,853 .00 .00 .00 .00
OTHER GENERAL Expenditure Total: 189,466 423,964 150,318 181,000 199,000 9.9 %
Total OTHER GENERAL: 189,466 423,964 150,318 181,000 199,000 9.9 %
GENERAL GOVERNMENT Revenue Total: .00 .00 .00 .00 .00 .00
GENERAL GOVERNMENT Expenditure Total: 1,305,970 1,460,999 1,034,669 1,328,120 1,331,480 0.3 %
Total GENERAL GOVERNMENT: 1,305,970 1,460,999 1,034,669 1,328,120 1,331,480 0.3 %
PUBLIC SAFETY
100-521000-115 PD ADMIN - SALARY 101,550 108,244 89,074 110,282 114,700 4.0 %
100-521000-120 PD ADMIN-CLERK/DISP WAGES 49,950 77,464 54,724 54,312 54,100 -0.4 %
100-521000-130 PD ADMIN-FICA 10,951 13,515 10,675 12,591 13,000 3.2 %
100-521000-131 PD ADMIN-RETIREMENT 17,990 23,655 18,228 20,122 20,600 2.4 %
100-521000-133 PD ADMIN- INSURANCE 79,951 83,475 35,420 100,000 25,500 -74.5 %
100-521000-212 PD ADMIN-PROFESSIONAL SER 3,083 1,646 4,493 1,552 5,000 222.2 %
100-521000-214 PD ADMIN-DATA PROCESSING 49,361 50,746 42,803 47,000 50,000 6.4 %
100-521000-240 PD ADMIN-REPAIR & MAINTENA 2,346 2,688 1,729 2,800 3,000 7.1 %
100-521000-241 PD ADMIN-TIME SYSTEM 1,577 1,672 1,177 2,000 2,000 .00
100-521000-242 PD ADMIN-TOWER EXPENSE 742 849 1,121 750 1,000 33.3 %
100-521000-243 PD ADMIN-PRISONER HOUSIN 185 657 283 500 500 .00
100-521000-310 PD ADMIN-OFFICE SUPPLIES 3,708 3,408 1,850 4,000 4,000 .00
100-521000-311 PD ADMIN-POSTAGE 168 32 .00 500 500 .00
100-521000-320 PD ADMIN-PUBLISH/SUBSCRIP 208 .00 2,970 250 400 60.0 %
100-521000-340 PD ADMIN-OPERATING SUPPLI 2,135 2,550 1,647 2,500 2,500 .00
POLICE ADMINISTRATION Expenditure Total: 323,905 370,602 266,193 359,159 296,800 -17.4 %
Total POLICE ADMINISTRATION: 323,905 370,602 266,193 359,159 296,800 -17.4 %
100-521200-119 PD PATROL-DETECTIVE/SGT W 254,370 264,795 222,517 387,574 304,500 -21.4 %
100-521200-120 PD PATROL-FULL TIME WAGES 795,692 844,515 722,313 928,232 930,000 0.2 %
100-521200-129 PD PATROL-O/T WAGES 205,851 153,490 85,344 72,420 80,000 10.5 %
100-521200-130 PD PATROL-FICA 91,938 93,356 74,974 106,199 100,600 -5.3 %
100-521200-131 PD PATROL-RETIREMENT 177,703 190,842 152,527 204,069 191,200 -6.3 %
100-521200-133 PD PATROL-INSURANCE 359,943 428,845 430,684 550,000 567,200 3.1 %
100-521200-139 PD PATROL-UNIFORM ALLOWA 28,103 26,677 23,267 22,900 30,000 31.0 %
100-521200-240 PD PATROL-REPAIR & MAINTEN 1,969 1,923 2,802 2,200 2,200 .00
100-521200-312 PD PATROL-EVIDENCE SUPPLI 6,397 6,460 2,610 5,800 5,800 .00
100-521200-340 PD PATROL-OPERATING SUPPL 2,475 4,387 10,343 6,500 7,500 15.4 %
100-521200-380 PD PATROL-VEHICLE MAINTEN 43,983 22,584 19,215 26,300 30,000 14.1 %
100-521200-385 PD PATROL-VEHICLE FUEL 29,291 29,942 29,264 30,000 30,000 .00
PD POLICE PATROL Expenditure Total: 1,997,714 2,067,814 1,775,859 2,342,194 2,279,000 -2.7 %
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 6
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
Total PD POLICE PATROL: 1,997,714 2,067,814 1,775,859 2,342,194 2,279,000 -2.7 %
100-521300-330 PD ED&TRAINING-TRAIN/TRAV 13,327 16,911 3,963 12,000 15,000 25.0 %
100-521300-332 PD ED&TRAINING-MILEAGE 315 .00 .00 50 .00 -100.0
100-521300-340 PD ED&TRAINING-OPERATING 6,552 4,368 7,922 8,100 8,000 -1.2 %
POLICE ED & TRAINING Expenditure Total: 20,194 21,278 11,885 20,150 23,000 14.1 %
Total POLICE ED & TRAINING: 20,194 21,278 11,885 20,150 23,000 14.1 %
100-521700-221 PD STATION-ELECTRIC 35,272 30,469 23,382 37,500 35,000 -6.7 %
100-521700-222 PD STATION-WATER/SEWER/ST 2,183 1,762 1,300 1,600 1,600 .00
100-521700-224 PD STATION-NATURAL GAS/HE 1,667 3,246 2,307 2,000 3,500 75.0 %
100-521700-225 PD STATION-CELL PHONES 8,870 8,355 7,222 8,600 9,500 10.5 %
100-521700-240 PD STATION-MAINTENANCE CO 5,418 6,170 2,367 2,500 3,000 20.0 %
100-521700-340 PD STATION-OPERATING SUPP 2,181 1,442 2,703 1,500 2,000 33.3 %
100-521700-350 PD STATION-REPAIR&MAINTEN 12,053 23,536 24,760 10,000 15,000 50.0 %
POLICE STATION Expenditure Total: 67,642 74,979 64,042 63,700 69,600 9.3 %
Total POLICE STATION: 67,642 74,979 64,042 63,700 69,600 9.3 %
100-522000-115 FD ADMIN-SALARY (CHIEF) 113,108 111,239 93,690 110,282 145,600 32.0 %
100-522000-116 FD ADMIN-SALARY (ASST CHIE 65,577 74,946 64,857 79,050 85,500 8.2 %
100-522000-130 FD ADMIN-FICA 13,530 14,242 11,728 14,484 17,700 22.2 %
100-522000-131 FD ADMIN-RETIREMENT 25,551 27,883 23,465 27,832 33,700 21.1 %
100-522000-133 FD ADMIN- INSURANCE 18,635 3,276 51,827 60,441 73,300 21.3 %
100-522000-139 FD ADMIN-UNIFORM ALLOW 1,852 784 958 750 750 .00
100-522000-212 FD ADMIN-CONSULTANTS PRO .00 4,052 7,089 .00 .00 .00
100-522000-214 FD ADMIN-DATA PROCESSI 20,089 23,968 25,123 21,420 22,000 2.7 %
100-522000-240 FD ADMIN-REPAIR & MAIN .00 .00 .00 750 750 .00
100-522000-242 FD ADMIN-RADIO EXPENSE 8,178 5,209 3,376 5,500 5,500 .00
100-522000-243 FD ADMIN-HAZARDOUS MAT 6,241 2,625 .00 3,000 3,000 .00
100-522000-310 FD ADMIN-OFFICE SUPPLI 3,628 1,027 445 2,000 2,000 .00
100-522000-311 FD ADMIN-POSTAGE 140 327 141 500 500 .00
100-522000-320 FD ADMIN-PUBLISH/SUBSC 2,376 2,162 388 2,200 2,200 .00
100-522000-330 FD ADMIN-TRAIN/TRAVEL 2,667 2,721 1,607 2,000 2,000 .00
100-522000-340 FD ADMIN-OPERATING SUP 4,367 2,058 566 1,600 1,600 .00
100-522000-342 FD ADMIN-PUBLIC RELATI 1,582 1,787 2,620 2,000 2,500 25.0 %
100-522000-343 FD ADMIN-FIRE PREVENTI 468 525 .00 750 750 .00
FIRE DEPT ADMINISTRATION Expenditure Total:
287,988 278,831 287,878 334,559 399,350 19.4 %
Total FIRE DEPT ADMINISTRATION: 287,988 278,831 287,878 334,559 399,350 19.4 %
100-522100-124 FD FIRE-FIGHTER WAGES 282,891 475,233 474,079 340,000 600,000 76.5 %
100-522100-125 FD FIRE-OFFICER WAGES 167,606 65,402 60,197 188,000 78,000 -58.5 %
100-522100-129 FD FIRE-O/T WAGES 98,467 30,080 41,654 65,000 65,000 .00
100-522100-130 FD FIRE-FICA 42,972 43,072 43,522 46,272 56,900 23.0 %
100-522100-131 FD FIRE-RETIREMENT 64,872 65,846 64,705 50,000 70,000 40.0 %
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 7
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-522100-139 FD FIRE-UNIFORM ALLOWANC 14,359 7,066 1,405 7,800 7,800 .00
100-522100-212 FIRE FIGHTERS- PREMIUM PAY 5,900 3,000 .00 4,000 4,000 .00
100-522100-340 FD FIRE-OPERATING SUPPLIES 12,450 23,626 10,778 13,800 13,800 .00
100-522100-341 FD FIRE-TURN OUT GEAR 17,491 19,924 21,621 22,000 38,500 75.0 %
100-522100-380 FD FIRE-VEHICLE MAINTENAN 143,687 86,413 59,421 25,000 25,000 .00
100-522100-385 FD FIRE-VEHICLE FUEL 5,786 5,873 6,612 8,000 8,000 .00
FD FIRE FIGHTERS SERVICE Expenditure Total:
856,481 825,535 783,995 769,872 967,000 25.6 %
Total FD FIRE FIGHTERS SERVICE: 856,481 825,535 783,995 769,872 967,000 25.6 %
100-522400-330 FD FIRE-ED&TRAIN-TRAIN/TRA 2,051 1,547 635 3,000 3,000 .00
100-522400-340 FD FIRE-ED&TRAIN-OPERATIN 49 69 .00 200 200 .00
FD FIRE-ED & TRAINING Expenditure Total: 2,100 1,615 635 3,200 3,200 .00
Total FD FIRE-ED & TRAINING: 2,100 1,615 635 3,200 3,200 .00
100-522700-221 FD STATION-ELECTRIC 8,540 8,817 7,602 7,500 8,000 6.7 %
100-522700-222 FD STATION-WATER/SEWER/ST 2,182 2,190 1,723 1,500 2,000 33.3 %
100-522700-224 FD STATION-NATURAL GAS/HE 1,616 2,158 1,791 2,000 2,500 25.0 %
100-522700-225 FD STATION-CELL PHONES 8,805 8,503 6,183 6,000 8,500 41.7 %
100-522700-240 FD STATION-MAINTENANCE CO 3,715 1,460 .00 2,200 2,200 .00
100-522700-340 FD STATION-OPERATING SUPP 4,692 4,291 3,477 3,100 4,300 38.7 %
100-522700-350 FD STATION-REPAIR & MAINTE 33,926 12,636 24,030 10,000 10,000 .00
FD FIRE STATION Expenditure Total: 63,476 40,054 44,807 32,300 37,500 16.1 %
Total FD FIRE STATION: 63,476 40,054 44,807 32,300 37,500 16.1 %
100-523100-124 FD EMS-PARAMEDIC WAGES 380,347 456,273 323,919 430,000 415,000 -3.5 %
100-523100-130 FD EMS-FICA 29,798 34,905 24,779 32,895 31,800 -3.3 %
100-523100-131 FD EMS-RETIREMENT 49,555 61,072 44,206 50,000 50,000 .00
100-523100-210 FD EMS-PROFESSIONAL SERVI .00 888 .00 .00 .00 .00
100-523100-240 FD EMS-REPAIR & MAINTENAN 9,221 3,631 475 7,000 7,000 .00
100-523100-340 FD EMS-OPERATING SUPPLIES .00 3,308 252 .00 .00 .00
100-523100-341 FD EMS-DISPOSABLE SUPPLIE 13,254 21,447 9,744 18,000 15,000 -16.7 %
100-523100-380 FD EMS-VEHICLE MAINTANCE 8,846 16,230 2,931 8,000 8,000 .00
100-523100-385 FD EMS-VEHICLE FUEL 5,786 6,153 6,222 6,000 8,000 33.3 %
FD EMS-AMBULANCE SERVICE Expenditure Total:
496,806 603,907 412,527 551,895 534,800 -3.1 %
Total FD EMS-AMBULANCE SERVICE: 496,806 603,907 412,527 551,895 534,800 -3.1 %
100-523400-330 FD EMS-ED&TRAIN EMT REFRE 1,091 2,263 3,727 20,000 10,000 -50.0 %
FD EMS-ED&TRAIN Expenditure Total: 1,091 2,263 3,727 20,000 10,000 -50.0 %
Total FD EMS-ED&TRAIN: 1,091 2,263 3,727 20,000 10,000 -50.0 %
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 8
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-524000-120 BUILDG INSPECT-ASSISTANT 19,987 20,083 15,968 25,500 24,000 -5.9 %
100-524000-130 BUILDG INSPECT-FICA 1,529 1,769 1,222 1,951 1,900 -2.6 %
100-524000-131 BUILDG INSPECT-RETIREMENT 5- 5 .00 .00 .00 .00
100-524000-211 BUILDG INSPECT-ENGINEERIN .00 15,048 .00 .00 .00 .00
100-524000-212 BUILDG INSPECT-INSPECT SER 197,724 208,675 131,319 112,500 112,500 .00
100-524000-310 BUILDG INSPECT-OFFICE SUP 308 .00 199 300 300 .00
100-524000-311 BUILDG INSPECT-POSTAGE .00 58 .00 300 300 .00
100-524000-340 BUILDG INSPECT-OPERATING 165- 105 8,398 500 500 .00
100-524000-385 BUILDG INSPECT-VEHICLE FUE 362 367 361 .00 .00 .00
BUILDING INSPECTION Expenditure Total: 219,740 246,111 157,466 141,051 139,500 -1.1 %
Total BUILDING INSPECTION: 219,740 246,111 157,466 141,051 139,500 -1.1 %
100-524010-212 ELECTRICAL INSPECTION-PRO 47,781 29,777 27,084 26,250 26,300 0.2 %
ELECTRICAL INSPECTION Expenditure Total: 47,781 29,777 27,084 26,250 26,300 0.2 %
Total ELECTRICAL INSPECTION: 47,781 29,777 27,084 26,250 26,300 0.2 %
100-524020-212 PLUMBING INSPECTION-PROF 17,305 18,904 20,194 18,750 18,800 0.3 %
PLUMBING INSPECTION Expenditure Total: 17,305 18,904 20,194 18,750 18,800 0.3 %
Total PLUMBING INSPECTION: 17,305 18,904 20,194 18,750 18,800 0.3 %
100-529000-140 OTHER-P&F COMM-REIMBURS 260 1,560 .00 500 500 .00
100-529000-200 OTHER-P&F COMM-OPERATIN .00 .00 .00 200 200 .00
100-529000-212 OTHER-Emerg Gov RADIO DISP 9,726 10,461 10,244 10,761 11,000 2.2 %
100-529000-221 OTHER-Emerg Gov ELECTRICIT 647 624 481 500 500 .00
100-529000-240 OTHER-Emerg Gov REPAIR & M .00 .00 .00 2,000 2,000 .00
100-529000-370 OTHER-FIRE HYDRANT RENTA 264,944 267,666 .00 264,944 265,000 .00
OTHER-PROTECTION Expenditure Total: 275,577 280,310 10,724 278,905 279,200 0.1 %
Total OTHER-PROTECTION: 275,577 280,310 10,724 278,905 279,200 0.1 %
PUBLIC SAFETY Revenue Total: .00 .00 .00 .00 .00 .00
PUBLIC SAFETY Expenditure Total: 4,677,800 4,861,981 3,867,016 4,961,985 5,084,050 2.5 %
Total PUBLIC SAFETY: 4,677,800 4,861,981 3,867,016 4,961,985 5,084,050 2.5 %
PUBLIC WORKS
100-531000-111 DPW ADMIN-*SALARY 55,164 38,242 31,475 38,979 40,600 4.2 %
100-531000-130 DPW ADMIN-FICA 3,989 2,713 2,207 2,982 3,200 7.3 %
100-531000-131 DPW ADMIN-RETIREMENT 3,808 2,657 2,266 2,806 3,000 6.9 %
100-531000-133 DPW ADMIN-INSURANCE 57,123 52,374 49,736 30,082 35,800 19.0 %
100-531000-139 DPW ADMIN-CLOTHING ALLOW 517 223 .00 300 300 .00
100-531000-241 DPW ADMIN-RADIO EXPENSE .00 .00 .00 100 100 .00
100-531000-310 DPW ADMIN-OFFICE SUPPLIES 80 45 93 400 400 .00
100-531000-311 DPW ADMIN-POSTAGE .00 21 .00 25 25 .00
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 9
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-531000-320 DPW ADMIN-PUBLISH/SUBSCRI .00 .00 .00 100 100 .00
100-531000-330 DPW ADMIN-TRAIN/TRAVEL 12,419 3,106 85 2,500 2,500 .00
100-531000-340 DPW ADMIN-OPERATING SUPP 801 1,351 456 1,000 1,000 .00
100-531000-342 DPW ADMIN-DRUG TESTS/INN 557 549 713 350 350 .00
DPW ADMINISTRATION Expenditure Total: 134,459 101,280 87,032 79,624 87,375 9.7 %
Total DPW ADMINISTRATION: 134,459 101,280 87,032 79,624 87,375 9.7 %
100-532400-122 DPW MACH&EQUIP-WAGES 12,149 18,440 15,652 22,592 23,500 4.0 %
100-532400-123 DPW TOWN/PD/FD VEHICLE-W 11,031 16,726 13,213 20,513 21,400 4.3 %
100-532400-130 DPW MACH&EQUIP-FICA 1,707 2,764 2,060 3,298 3,500 6.1 %
100-532400-131 DPW MACH&EQUIP-RETIREME 1,590 2,495 2,078 3,104 3,300 6.3 %
100-532400-133 DPW MACH&EQUIP-INSURANC 8,444 14,545 18,703 21,814 26,100 19.6 %
100-532400-139 DPW MACH&EQUIP-CLOTHING 1,903 754 1,372 800 1,000 25.0 %
100-532400-240 DPW MACH&EQUIP-MAINTENA 4,192 5,106 708 3,000 3,000 .00
100-532400-340 DPW MACH&EQUIP-OPERATIN 34,554 14,546 8,850 24,000 24,000 .00
100-532400-380 DPW MACH&EQUIP-VEHICLE M 8,423 2,109 3,806 7,000 7,000 .00
100-532400-385 DPW MACH&EQUIP-VEHICLEF 14,465 14,682 14,429 18,000 18,000 .00
MACHINERY & EQUIPMENT Expenditure Total: 98,459 92,167 80,872 124,121 130,800 5.4 %
Total MACHINERY & EQUIPMENT: 98,459 92,167 80,872 124,121 130,800 5.4 %
100-532700-133 DPW GARAGE-INSURANCE .00 .00 90 .00 .00 .00
100-532700-221 DPW GARAGE-ELECTRIC 4,547 4,164 3,418 5,000 5,000 .00
100-532700-222 DPW GARAGE-WATER/SEWER/ 1,002 1,372 784 750 750 .00
100-532700-224 DPW GARAGE-NATURAL GAS/H 2,713 3,794 3,162 4,000 4,000 .00
100-532700-225 DPW GARAGE-CELL PHONES 706 713 388 1,000 1,000 .00
100-532700-240 DPW GARAGE-MAINTENANCE 449 100 100 .00 .00 .00
100-532700-340 DPW GARAGE-OPERATING SU 688 940 1,426 1,000 1,000 .00
100-532700-350 DPW GARAGE-REPAIR AND MAI 1,154 3,018 1,187 3,000 3,000 .00
DPW GARAGE Expenditure Total: 11,258 14,101 10,555 14,750 14,750 .00
Total DPW GARAGE: 11,258 14,101 10,555 14,750 14,750 .00
100-533100-122 DPW RD&BRIDGE-WAGES 23,071 29,024 23,675 35,468 36,900 4.0 %
100-533100-130 DPW RD&BRIDGE-FICA 1,669 2,281 1,690 2,713 2,900 6.9 %
100-533100-131 DPW RD&BRIDGE-RETIREMEN 1,546 2,060 1,705 2,554 2,700 5.7 %
100-533100-133 DPW RD&BRIDGE-INSURANCE 6,937 11,968 16,381 17,949 21,500 19.8 %
100-533100-139 DPW RD&BRIDGE-CLOTHING A 928 922 .00 800 800 .00
100-533100-212 DPW RD&BRIDGE-PROF SERVI 24,648 165,576 134,479 60,000 60,000 .00
100-533100-340 DPW RD&BRIDGE-SUPPLIES 16,771 20,411 6,805 20,000 20,000 .00
100-533100-341 DPW RD&BRIDGE-SIGNS .00 985 1,415 3,000 3,000 .00
100-533100-342 DPW RD&BRIDGE-PAVEMENT P .00 1,689 .00 2,000 2,000 .00
100-533100-343 DPW RD&BRIDGE-PAVEMENT 6,219 .00 .00 6,400 6,400 .00
ROAD & BRIDGE MAINTENANCE Expenditure Total:
81,790 234,917 186,149 150,884 156,200 3.5 %
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 10
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
Total ROAD & BRIDGE MAINTENANCE: 81,790 234,917 186,149 150,884 156,200 3.5 %
100-533180-122 DPW SNOW/ICE-WAGES 25,846 45,982 37,007 56,380 58,600 3.9 %
100-533180-129 DPW SNOW/ICE-O/T WAGES 2,845 8,887 13,213 10,000 10,000 .00
100-533180-130 DPW SNOW/ICE-FICA 3,259 4,313 3,402 5,078 5,300 4.4 %
100-533180-131 DPW SNOW/ICE-RETIREMENT 2,040 3,310 3,431 4,779 5,000 4.6 %
100-533180-133 DPW SNOW/ICE-INSURANCE 11,604 19,024 31,880 28,532 34,100 19.5 %
100-533180-139 DPW SNOW/ICE-CLOTHING ALL .00 572 300 500 500 .00
100-533180-340 DPW SNOW/ICE-SALT & SAND 36,816 51,789 30,364 45,000 45,000 .00
SNOW/ICE CONTROL Expenditure Total: 82,409 133,877 119,597 150,269 158,500 5.5 %
Total SNOW/ICE CONTROL: 82,409 133,877 119,597 150,269 158,500 5.5 %
100-534200-221 STREET LIGHTING-ELECTRIC 14,031 13,997 9,712 14,000 14,000 .00
100-534200-340 STREET LIGHTING-OPERATING .00 3,557 2,250 5,000 5,000 .00
STREET LIGHTING Expenditure Total: 14,031 17,554 11,962 19,000 19,000 .00
Total STREET LIGHTING: 14,031 17,554 11,962 19,000 19,000 .00
100-535200-210 PUBLIC TRANS-MASS TRANSIT 2,000 2,000 2,000 2,000 2,000 .00
PUBLIC TRANSPORTATION Expenditure Total: 2,000 2,000 2,000 2,000 2,000 .00
Total PUBLIC TRANSPORTATION: 2,000 2,000 2,000 2,000 2,000 .00
100-536300-212 SANITATION-HAZARD WASTE D .00 702 626 500 500 .00
SANITATION Expenditure Total: .00 702 626 500 500 .00
Total SANITATION: .00 702 626 500 500 .00
PUBLIC WORKS Revenue Total: .00 .00 .00 .00 .00 .00
PUBLIC WORKS Expenditure Total: 424,405 596,599 498,792 541,148 569,125 5.2 %
Total PUBLIC WORKS: 424,405 596,599 498,792 541,148 569,125 5.2 %
HEALTH & HUMAN SERVICES
100-541100-129 ANIMAL/PEST CONTROL-O/T W .00 1,040 1,064 2,000 2,000 .00
100-541100-130 ANIMAL/PEST CONTROL-FICA .00 77 76 153 200 30.7 %
100-541100-131 ANIMAL/PEST CONTROL-RETIR .00 72 77 139 200 43.9 %
100-541100-133 ANIMAL/PEST CONTROL-INSUR .00 .00 2 1,000 1,000 .00
100-541100-139 ANIMAL/PEST CONTROL-CLOT .00 .00 .00 100 100 .00
100-541100-212 ANIMAL/PEST CONTROL-HUMA 5,250 4,750 1,750 3,500 3,500 .00
100-541100-340 ANIMAL/PEST CONTROL-MOSQ 2,436 2,574 3,037 3,000 3,000 .00
ANIMAL/PEST CONTROL Expenditure Total: 7,686 8,514 6,006 9,892 10,000 1.1 %
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 11
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
Total ANIMAL/PEST CONTROL: 7,686 8,514 6,006 9,892 10,000 1.1 %
HEALTH & HUMAN SERVICES Revenue Total: .00 .00 .00 .00 .00 .00
HEALTH & HUMAN SERVICES Expenditure Total:
7,686 8,514 6,006 9,892 10,000 1.1 %
Total HEALTH & HUMAN SERVICES: 7,686 8,514 6,006 9,892 10,000 1.1 %
CULTURE, RECREATION, & ED.
100-551000-139 TOWN BEAUTIFICATION-CLOTH .00 89 .00 100 100 .00
100-551000-340 TOWN BEAUTIFICATION-OPER 823 283 217 400 400 .00
100-551000-341 TOWN BEAUTIFICATION-SIGNS 430 2,403 .00 1,400 1,400 .00
100-551000-342 TOWN BEAUTIFICATION-PLANT 1,168 1,246 793 1,200 1,200 .00
TOWN BEAUTIFICATION Expenditure Total: 2,421 4,021 1,010 3,100 3,100 .00
Total TOWN BEAUTIFICATION: 2,421 4,021 1,010 3,100 3,100 .00
100-551010-344 TOWN TREE COMM-URBAN FO 1,197 411 405 2,000 2,000 .00
TOWN TREE COMM Expenditure Total: 1,197 411 405 2,000 2,000 .00
Total TOWN TREE COMM: 1,197 411 405 2,000 2,000 .00
100-552000-111 PARKS/PLYGRUNDS-*SALARY 30,994 31,618 26,040 32,240 33,600 4.2 %
100-552000-125 PARKS/PLYGRDS-P/T WAGES 5,618 7,254 7,760 15,000 8,000 -46.7 %
100-552000-130 PARKS/PLYGRDS-FICA 2,605 2,761 2,385 3,614 3,200 -11.5 %
100-552000-131 PARKS/PLYGRDS-RETIREMENT 2,138 2,196 1,875 3,401 3,100 -8.9 %
100-552000-133 PARKS/PLYGRDS-INSURANCE 27,159 26,679 25,168 30,769 35,700 16.0 %
100-552000-139 PARKS/PLYGRDS-CLOTHING A 552 139 220 200 200 .00
100-552000-211 PARKS/PLYGRDS-PROFESSION .00 .00 1,787 .00 .00 .00
100-552000-221 PARKS/PLYGRDS-ELECTRIC 1,644 2,002 1,612 1,900 1,900 .00
100-552000-222 PARKS/PLYGRDS-WATER/SEW 3,198 3,318 2,562 3,100 3,100 .00
100-552000-310 PARKS/PLYGRDS-OFFICE SUP 57 39 2,085 100 100 .00
100-552000-332 PARKS/PLYGRDS-MILEAGE 384 986 603 900 900 .00
100-552000-340 PARKS/PLYGRDS-OPERATING 3,520 7,427 2,827 4,500 4,500 .00
100-552000-341 PARKS/PLYGRDS-REPAIR AND 1,839 3,293 2,710 6,000 6,000 .00
100-552000-380 PARKS/PLYGRDS-VEHICLE MAI 566 966 675 1,000 1,000 .00
100-552000-385 PARKS/PLYGRDS-VEHICLE FUE 1,446 1,468 1,443 1,500 1,500 .00
PARKS/PLAYGROUNDS Expenditure Total: 81,720 90,146 79,753 104,224 102,800 -1.4 %
Total PARKS/PLAYGROUNDS: 81,720 90,146 79,753 104,224 102,800 -1.4 %
100-552010-122 PARK&LAWN CUTTING-WAGES .00 4,593 4,094 .00 .00 .00
100-552010-129 PARK&LAWN CUTTING-O/T WA .00 .00 134 .00 .00 .00
100-552010-130 PARK&LAWN CUTTING-FICA .00 338 302 .00 .00 .00
100-552010-131 PARK&LAWN CUTTING-RETIRE .00 319 304 .00 .00 .00
100-552010-133 PARK&LAWN CUTTING-INSURA 13 851 2,274 .00 .00 .00
100-552010-139 PARK&LAWN CUTTING-CLOTHI .00 .00 .00 200 200 .00
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 12
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-552010-340 PARK&LAWN CUTTING-OPERAT 702 222 170 1,000 1,000 .00
PARK AND LAWN CUTTING Expenditure Total: 715 6,324 7,279 1,200 1,200 .00
Total PARK AND LAWN CUTTING: 715 6,324 7,279 1,200 1,200 .00
100-553000-340 CELEBRATIONS-OPERATING E 15,779 16,395 19,064 18,000 22,000 22.2 %
CELEBRATIONS Expenditure Total: 15,779 16,395 19,064 18,000 22,000 22.2 %
Total CELEBRATIONS: 15,779 16,395 19,064 18,000 22,000 22.2 %
100-553100-111 RECREATION PRG-*SALARY 30,994 31,618 26,040 32,240 33,600 4.2 %
100-553100-130 RECREATION PRG-FICA 2,222 2,206 1,792 2,466 2,600 5.4 %
100-553100-131 RECREATION PRG-RETIREMEN 2,140 2,197 1,875 2,321 2,500 7.7 %
100-553100-133 RECREATION PRG-INSURANCE 26,365 25,928 25,167 30,769 35,700 16.0 %
100-553100-310 RECREATION PRG-OFFICE SUP 80 .00 .00 .00 .00 .00
100-553100-311 RECREATION PRG-POSTAGE 2,295 1,364 1,444 1,500 1,500 .00
100-553100-320 RECREATION PRG-PUBLISH/SU 725 425 590 650 650 .00
100-553100-330 RECREATION PRG-TRAIN/TRAV 606 699 428 700 700 .00
100-553100-332 RECREATION PRG-MILEAGE 670 .00 294 900 900 .00
100-553100-340 RECREATION PRG-OPERATING 2,324 1,333 1,552 3,000 3,000 .00
100-553100-341 RECREATION PRG-TEAM SIGN 2,274 1,794 748 3,500 3,500 .00
100-553100-342 RECREATION PRG-WPRA TICK 2,245 2,305 2,132 1,700 1,700 .00
100-553100-343 RECREATION PRG-RECREATO 509 489 1,202 1,000 1,000 .00
100-553100-344 RECREATION PRG-PRINTING E 3,071 3,494 3,920 2,800 2,800 .00
RECREATION PROGRAM Expenditure Total: 76,520 73,851 67,184 83,546 90,150 7.9 %
Total RECREATION PROGRAM: 76,520 73,851 67,184 83,546 90,150 7.9 %
100-554000-210 ATHLETIC CTS&FI-PROFESSIO 1,176 612 17,392 1,000 1,000 .00
100-554000-230 ATHLETIC CTS&FIELDS-REPAIR 2,611 4,896 2,655 6,000 6,000 .00
100-554000-340 ATHLETIC CTS&FIELDS-OPERA 635 1,758 500 3,000 3,000 .00
ATHLETIC COURTS & FIELDS Expenditure Total:
4,423 7,266 20,547 10,000 10,000 .00
Total ATHLETIC COURTS & FIELDS: 4,423 7,266 20,547 10,000 10,000 .00
CULTURE, RECREATION, & ED. Revenue Total:
.00 .00 .00 .00 .00 .00
CULTURE, RECREATION, & ED. Expenditure Total:
182,775 198,412 195,242 222,070 231,250 4.1 %
Total CULTURE, RECREATION, & ED.: 182,775 198,412 195,242 222,070 231,250 4.1 %
CONSERVATION & DEVELOPMENT
100-563000-140 PLANNING-COMMISSION REIM 1,000 1,660 .00 2,520 2,500 -0.8 %
100-563000-210 PLANNING-LEGAL PROF SERV 15,896 1,820 .00 10,000 10,000 .00
100-563000-211 PLANNING-ENGINEERING/BILL 76,137 71,714 58,135 35,000 35,000 .00
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 13
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
100-563000-212 PLANNING-PROF SERVICES .00 24,393 43,193 64,600 60,000 -7.1 %
100-563000-213 PLANNING-TIFF PROJECT 6,300 5,650 800 .00 .00 .00
100-563000-340 PLANNING-OPERATING EXPEN .00 524 .00 .00 .00 .00
PLANNING Expenditure Total: 99,332 105,760 102,127 112,120 107,500 -4.1 %
Total PLANNING: 99,332 105,760 102,127 112,120 107,500 -4.1 %
100-563010-140 ARCHITECTUAL-COMMISSION 800 1,540 .00 800 800 .00
ARCHITECTUAL CONTROL Expenditure Total: 800 1,540 .00 800 800 .00
Total ARCHITECTUAL CONTROL: 800 1,540 .00 800 800 .00
100-564000-140 ZONING-BOARD REIMBURSEM 80 60 .00 150 150 .00
ZONING Expenditure Total: 80 60 .00 150 150 .00
Total ZONING: 80 60 .00 150 150 .00
100-567000-211 ECONOMIC DEVELOP-TOURIS 293,870 696,446 418,623 537,000 937,000 74.5 %
ECONOMIC DEVELOPMENT Expenditure Total:
293,870 696,446 418,623 537,000 937,000 74.5 %
Total ECONOMIC DEVELOPMENT: 293,870 696,446 418,623 537,000 937,000 74.5 %
CONSERVATION & DEVELOPMENT Revenue Total:
.00 .00 .00 .00 .00 .00
CONSERVATION & DEVELOPMENT Expenditure Total:
394,083 803,806 520,750 650,070 1,045,450 60.8 %
Total CONSERVATION & DEVELOPMENT: 394,083 803,806 520,750 650,070 1,045,450 60.8 %
OTHER FINANCING USES
100-592400-400 CAPITAL FUND TRANSFER .00 71 .00 .00 .00 .00
FUND TRANSFER Expenditure Total: .00 71 .00 .00 .00 .00
Total FUND TRANSFER: .00 71 .00 .00 .00 .00
OTHER FINANCING USES Revenue Total: .00 .00 .00 .00 .00 .00
OTHER FINANCING USES Expenditure Total: .00 71 .00 .00 .00 .00
Total OTHER FINANCING USES: .00 71 .00 .00 .00 .00
GENERAL FUND 100 Revenue Total: 6,953,257 8,161,386 2,864,446 7,713,285 8,271,355 7.2 %
GENERAL FUND 100 Expenditure Total: 6,992,718 7,930,382 6,122,476 7,713,285 8,271,355 7.2 %
TOWN OF BROOKFIELD Budget Worksheet - % 100 (2019) & Budgeted Funds w WS Page: 14
Periods: 00/27-12/27 Oct 16, 2026 08:58AM
2024-24 2025-25 2026-27 2026-26 2027-27 %
Prior year 2 Prior year Current year Current year Future year Inc/Dec
Account Number Account Title Actual Actual Actual Budget Budget in Bud
Net Total GENERAL FUND 100: 39,461- 231,004 3,258,030- .00 .00 .00
Memo
To: Tom Hagie, Brookfield Town Administrator
From: Harry Allen, Ehlers Senior Municipal Advisor
Greg Johnson, Ehlers Senior Municipal Advisor
Date: October 1, 2026
Subject: 2027 Debt Issuance
The Town has provided Ehlers with the below list of capital projects that will need to be funded in
2027:
1. Davidson Road: $4.30 million
2. Fire Engine: $1.00 million
3. Dump Truck: $250,000
4. Park Mower: $130,000
The funding for each project will be handled differently. Based on the anticipated timing and
available funding sources, Ehlers recommends the following financing approach.
Davidson Road
Davidson Road will be paid for throughout the year and has several funding sources that will
reduce the amount ultimately financed with long-term debt, including the following estimated cash
contributions from Town funds:
Utility District No. 1 - $304,488
Sanitary District No. 4 - $84,685
TID No. 1 - $1,554,340
Discover Brookfield - $170,000
In addition to the amounts above, the Town expects to receive reimbursements from a State grant,
estimated at $1.73 million, and the City of Brookfield (the “City”), estimated at $350,000. The
Town will front the total cost of the road project with reimbursements to be received after project
completion. The Town does not have sufficient cash to initially fund a project of this scale.
Accordingly, Ehlers recommends the issuance of a Note Anticipation Note (“NAN”) to provide
proceeds to cover the cost of the project.
A NAN is a short-term borrowing instrument authorized under Wisconsin law that allows a
municipality to finance project costs on an interim basis until a permanent financing source is
available. The NAN is typically structured with the expectation that it will be repaid from the
proceeds of a future debt issuance and/or project-related reimbursements.
We anticipate the NAN would most likely be privately placed with a local or regional financial
institution rather than sold through a public offering. This structure generally allows for greater
flexibility in designing repayment provisions and draw schedules tailored to the project's
construction timeline.
We recommend utilizing a draw-down structure whereby funds are borrowed only as project
expenditures are incurred. Under this approach, the Town would not receive the entire borrowing
amount at closing. Instead, proceeds would be drawn periodically throughout construction as
needed. Because interest accrues only on amounts actually drawn, this structure can significantly
reduce total interest costs compared to funding the full borrowing amount upfront. Ehlers also
recommends structuring the NAN with all interest payable at maturity, eliminating the need for
interim debt service payments during the construction period.
The anticipated permanent financing would occur in the fall of 2027 through the issuance of
General Obligation Promissory Notes (the "2027 Notes"). At that time, the Town would apply any
State and Town reimbursement proceeds received during the project period toward repayment of
the NAN. Proceeds of the 2027 Notes would be used to retire any remaining NAN principal
balance and permanently finance the Town’s remaining project costs not covered by
reimbursements or cash contributions. In addition, accrued interest on the NAN could be
incorporated into the permanent financing, allowing both the remaining principal and interest
obligations of the NAN to be paid from the proceeds of the 2027 Notes.
Fire Engine
The fire engine will be paid for in fall and is anticipated to be funded directly with the proceeds
from the 2027 Notes.
Dump Truck and Park Mower
The dump truck and park mower will be purchased prior to the issuance of the 2027 Notes. Given
the cost of these purchases, it is currently anticipated that the Town will pay for the projects with
cash on hand with the expectation that such costs will be recovered by proceeds of the 2027
Notes. To preserve the Town’s ability to reimburse these expenditures with tax-exempt debt
proceeds, the Town will need to adopt a reimbursement resolution before the costs are incurred.
A sample reimbursement resolution is included as Attachment A.
Attachments
A. Sample Reimbursement Resolution
RESOLUTION DECLARING INTENT
RESOLUTION NO. ____________
RESOLUTION DECLARING OFFICIAL INTENT
TO REIMBURSE EXPENDITURES
FROM PROCEEDS OF BORROWING
WHEREAS, the _________________, ____________ County, Wisconsin (the "Issuer")
plans to undertake
(the "Project");
WHEREAS, the Issuer expects to finance the Project on a long-term basis by issuing
tax-exempt bonds or other tax-exempt obligations (collectively, the "Bonds");
WHEREAS, because the Bonds will not be issued prior to commencement of the
Project, the Issuer must provide interim financing to cover costs of the Project incurred prior to
receipt of the proceeds of the Bonds; and
WHEREAS, the ________________ (the "Governing Body") of the Issuer deems it to
be necessary, desirable, and in the best interests of the Issuer to advance moneys from its funds
on hand on an interim basis to pay the costs of the Project until the Bonds are issued.
NOW, THEREFORE, BE IT RESOLVED by the Governing Body of the Issuer that:
Section 1. Expenditure of Funds. The Issuer shall make expenditures as needed from
its funds on hand to pay the cost of the Project until proceeds of the Bonds become available.
Section 2. Declaration of Official Intent. The Issuer hereby officially declares its
intent under Treas. Reg. Section 1.150-2 to reimburse said expenditures with proceeds of the
Bonds, the principal amount of which is not expected to exceed $____________.
Section 3. Unavailability of Long-Term Funds. No funds for payment of the Project
from sources other than the Bonds are, or are reasonably expected to be, reserved, allocated on a
long-term basis, or otherwise set aside by the Issuer pursuant to its budget or financial policies.
Section 4. Public Availability of Official Intent Resolution. The Resolution shall be
made available for public inspection at the office of the Issuer's Clerk within 30 days after its
approval in compliance with applicable State law governing the availability of records of official
acts including Subchapter II of Chapter 19, and shall remain available for public inspection until
the Bonds are issued.
APPENDIX A
Section 5. Effective Date. This Resolution shall be effective upon its adoption and
approval.
Adopted and recorded _____________________, 20___
Approved ____________________, 20___
______________________________
______________________________
Chief Executive Officer
(e.g. President, Mayor, City Manager)
ATTEST:
(SEAL)
___________________________________
___________________________________
Clerk/Secretary
APPENDIX A
Standard Lighting Record-WI
Billing Name
Billing Address Install Remove
C/T/V State WI Zip 53045 Open cIS CONTRACT# 0707132985-00024
Service Address, if different than Billing Address Open cIS Premise# 382182262
Name
Address
C/T/V State WI Zip 53186 5163154 Related Work Request #
Page #/ of # 1 OF 1
Ref # Pole # Rate Qty Source Style Color
Fixt
Class
Watts
/ fixture
LED
Fixture
Install Charge
Facilities/
LED fixture
per mo
Rate per/
HID fixture
per mo
Energy
Class
(kWh)
Energy /
fixture
per mo
Total / mo
w/ Source
Charge *
Install /
Remove
Date
185 68-5845 LE5 gov -1 LED_3K Oval-Low Gray D 70 ($175) $13.04 25-27 $2.73 ($16.77)
180 26- LE5 gov 1 LED_3K Oval-Low Gray D 70 $175 $13.04 25-27 $2.73 $16.77
295 61-4639 LE5 gov -1 LED_3K Oval-Low Gray C 55 ($150) $11.56 19-21 $2.11 ($14.67)
290 26- LE5 gov 1 LED_3K Oval-Low Gray C 55 $150 $11.56 19-21 $2.11 $14.67
815 92-03739 LE5 gov -1 LED_3K Oval-Low Gray C 40 ($150) $11.56 13-15 $1.52 ($14.08)
810 26- LE5 gov 1 LED_3K Oval-Low Gray C 40 $150 $11.56 13-15 $1.52 $14.08
Pole Charge, GL1
Span Charge, GL1
6,708.00
6,708.00$ Total Install Charges $0.00 Total monthly charges, or net change, before taxes
* Monthly total subject to surcharges and credits per Wisconsin Electric Service Rates and future rate changes approved by Public Service Commission
Comments:
Authorization:
Property Owner / Authorized Representative Signature Date
DAVIDSON RD
BROOKFIELD
NE CORNER SECTION OF DAVIDSON RD & W
HILLCREST DR
Fixture
Work Request #
Location Description
NE CORNER SECTION OF DAVIDSON RD & W
HILLCREST DR
Governmental (MS3/GL1/ LE5)
New Account?
Town of Brookfield
645 N Janacek Rd
Brookfield
Town of Brookfield
2 - 6' bracket transfers 1 - 8' bracket transfer 2 new overhead spans 2 street light pole relocations 3 conductor transfers -
W SIDE OF DAVIDSON RD - 200' SW OF W
RAVENSWOOD HILLS CIRCLE
Miscellaneous credits
Customer / Rate Options
W SIDE OF DAVIDSON RD - 200' SW OF W
RAVENSWOOD HILLS CIRCLE
Additional charges for service extension, permits, etc.
SE CORNER OF DAVIDSON RD & KOSSOW RD
SE CORNER OF DAVIDSON RD & KOSSOW RD
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
September 29, 2026
Town of Brookfield
645 Janacek Rd
Brookfield, WI 53045
Subject: Lighting at Davidson Rd - 3 Bracket & Conductor Transfers, 2 Pole Relocations, & 2 New
Overhead Spans
Dear Town of Brookfield:
This letter details work for We Energies Outdoor Lighting. The upfront charge for this work, which
expires 90 days from the date of this letter, is $6,708.00, and does not include site restoration. Net
monthly charges will initially decrease by $0.00, which is subject to future rate changes as approved
by the Public Service Commission of Wisconsin. Your next steps are:
1. Review the following prior to providing authorization and payment:
• Luminaires are controlled to provide dusk to dawn operation.
• Customer must contact us for lighting maintenance.
• Fixtures are warranted until removed.
• Non-standard poles and conductors are warranted for 15 years.
• Customer must locate private underground facilities and grant or obtain, without expense to
us, access to property, necessary permissions, easements, ordinance satisfaction and
permits for installation, removal and maintenance of lighting facilities.
• Termination or change requests after installation and prior to conclusion of the initial term
will result in customer charges. Monthly rates for fixtures on the LED rate are reduced after
the initial term.
• All applicable lighting tariff terms and conditions are available at www.we-energies.com.
• We do not guarantee this installation meets AASHTO or the Illuminating Engineering
Society’s minimum recommended standards for lighting.
2. Remit payment, if applicable, using one of the following options. Reference the work request
number shown below on your check or when paying via phone or online.
• Personal check.
• Online by visiting www.we-energies.com/payconstructionbill.
• By phone at 855-570-0998.
3. Sign and return the enclosed documents to:
We Energies
Essential Services A299
PO Box 2046
Milwaukee, WI 53201-9627
If returning via email send to Night-Aura-Outdoor-Ltg@wecenergygroup.com.
Material will be ordered upon receipt of required authorizations and payment. Work will be
scheduled when all contingencies are met. If you have any questions, please call me at
920.572.9572. We look forward to working with you on your lighting project.
Sincerely,
Laura Garcia
By signing this letter, you authorize us to do this work and acknowledge acceptance of the rates
and conditions of the specified tariffs as approved by the Public Service Commission of Wisconsin.
Signature: Date:
Print name: Title:
Work request #: 5163154
Enclosures
K
O
S
S
O
W
R
D
S
U
N
N
Y
S
ID
E
D
R
GREENDALE DR
C
ATSKILL R
D
SCARLET HAW
THO
RNE RDC
LA
R
E
M
O
N
T
C
T
CIR
LONG BEARD RD
RIP VAN WINKLE
RAMBLING ROSE RD
S
U
M
M
IT
D
R
S
A
LLE
N
R
D
BIRDSEYE LN
S
P
R
IN
G
D
A
LE
R
D
C
ATS
K
ILL R
D
K
O
S
S
O
W
R
D
C
O
P
E
N
H
ILL D
R
W HILLCREST DR
S
B
A
R
K
E
R
R
D
H
A
W
TH
O
R
N
E
C
T
S
C
A
R
LE
T
P
A
R
K
LA
W
N
D
R
CATSKILL RD
BELGREN RD
PAR
KLAW
N
D
R
CANDLEWOOD DR
V
IC
T
O
R
IA
LN
DAVIDSON RD
DONESWOOD DR
H
I-R
ID
G
E
AV
E
S
B
A
R
K
E
R
R
D
VILLA TER
C
LA
R
IO
N
LN
E MORELAND BLVD
R
IP
V
A
N
W
IN
K
LE
D
R
S
U
N
N
Y
C
R
E
S
T
D
R
CAPELLA CT
R
IP
VA
N
W
IN
K
LE
D
RLO
N
G
BEAR
D
R
D
ABBOTT DR
W
HILLCREST DR
DAVIDSON RD
DAVIDSON RD
DAVIDSON RD
CT
NAFTER PAVING CONSTRUCTION
IN POINT NOTES TO BE 8' ABOVE GROUND
POLE TAG ATTACHMENT HEIGHT NOTED
WHEN SETTING POLES AT NON-STANDARD DEPTH
SHEET 4 SHEET 5 SHEET 6 SHEET 7 SHEET 8 SHEET 9 SHEET 10SHEET 11SHEET 12 SHEET 13
SHEET 14
D
R
EL
A
D
G
NI
RPS S
S
U
N
N
Y
C
R
E
S
T
D
R
RD ELADNEERG
RIC SDAORSSOR
C
D
R
N
E
E
R
G GNILWOB
DR RELGEK
NL
N
E
D
NIL
R
D
K
E
E
R
C
RALPOP
SLLIH DOO
W
S
N
E
V
A
R
WNL NE
D
NIL
R
D
K
E
E
R
C
R
AL
P
O
P
Y
K
P
E
K
O
O
R
B
T
S
E
W
RD ATSIV A
N
O
D
T
C
NIELK
T
C
O
CIL
A
C
TC LLIHRETEP
D
R ELAD
G
NI
RPS S
L
R
T
R
E
E
N
OI
P
NL UAETAL
P
DVL
B
R
E
W
O
T
R
ETAW
RD NOSNEWS
RD TSERCLLIH
YKP EKOORBTSE
W
R
D
N
E
E
R
G
G
NILL
OR
MIDWEST FIBER NETWORKS
N/A
CSCHMUKI@MIDWESTFIBERNETWORKS.COM
CORY SCHMUKI
414-459-3561 N/A
EMAIL
, CELL # PHONE #
CONSTRUCTION CONTACT:
PROJECT #:
JU COMPANY
PROPERTY:
RESTORE PRIVATESTAKING REQUIREMENTS:
SURVEYOR
DESIGNER
STAKED
NOT NEEDED YES NO
ELECTRIC WORK REQUEST
TYPE OF WORK:
CGS#:
IO #:
CELL #:
Q:4
1T-R-S -
PROPOSED FEEDER:
EXISTING FEEDER:
OPERATING MAPS:
PROJECT ID:
OFFICE #:
E-MAIL:
PREPARED BY:
PROJECT LOCATION:
CUST/PROJ NAME:
C T V:
YES NO
5163154
WR 5163154X
X
DAVIDSON RD RECONSTRUCTION
262-758-6031
MUNI PROJ. ID: 1127.037
BRANDON.DEAN@WE-ENERGIES.COM
4032-7616-04
X
X
CABLE REPLACEMENT
CONVERSION kV to kV
FEEDER CUT
X PAVING RELOCATION
REBUILD
X
NO NEW EASEMENTS REQUIRED
755 S SPRINGDALE RD
BRANDON DEAN (K)
N/A
76855
OTHER
THIS IS A JUMPP PROJECT THIS IS NOT A JUMPP PROJECT
TO STAKE C/L AND MARK WIDTH OF EASEMENT ON STAKE.
ROW TO OBTAIN EASEMENT / ADD EASEMENT. SURVEYOR
ROW TO CONTACT CST/DESIGNER FOR EASEMENT REQ'S.
X X
Z82982 & Z28973 ARCADIAN SS
Z82982 & Z82973 ARCADIAN SS
C/ WAUKESHA, T/ BROOKFIELD
WSP0166
N/AT7N R20E SEC31SW
EROSION CONTROL NOTES
CHARTER COMMUNICATIONS
N/A
NICHOLAS.BOVIN@CHARTER.COM
NICK BOVIN
262-281-4273 N/A
EMAIL
, CELL # PHONE #
CONSTRUCTION CONTACT:
PROJECT #:
JU COMPANY
AT&T
A05GBDY
TF8394@ATT.COM
TYLER FLECK
414-248-6803 N/A
EMAIL
, CELL # PHONE #
CONSTRUCTION CONTACT:
PROJECT #:
JU COMPANY
RAILROAD PERMITTING/FLAGGING REQUIRED X
RR NAME
PROJECT SPECIFIC EROSION CONTROL NOTES:
EXCAVATION, PROTECT STOCKPILES WITH 12" WATTLES.
STOCKPILE MATERIALS SHALL BE PLACED UPSLOPE FROM EXCAVATION. IF STOCKPILE MATERIALS MUST BE PLACED DOWNSLOPE OF
DEPENDING ON THE TIME OF YEAR AND WEATHER CONDITIONS, CONSIDER USING PLATES/MATS IN WETLANDS OR CROSSING DITCHES.
CONSTRUCTION SOIL STRATIFICATION AND TO PRE-CONSTRUCTION ELEVATIONS.
IF DISTURBANCE OCCURS IN AGRICULTURAL FIELDS, SOIL SEGREGATION WILL NEED TO TAKE PLACE TO RETURN FIELDS TO PRE-
ANCHORED MULCH, UNLESS NOTED.
IF DISTURBANCE OCCURS OUTSIDE THE SLOPE INTERCEPT, FINAL STABILIZATION SHALL BE PERMANENT SEED AND PROPERLY
IF DISTURBANCE OCCURS WITHIN THE SLOPE INTERCEPT, FINAL STABILIZATION SHALL BE SOIL STABILIZER, UNLESS NOTED.
FINAL STABILIZATION IS REQUIRED IN SPRING.
NOTED. IF DISTURBANCE OCCURS IN WINTER, TEMPORARY STABILIZATION SHALL BE SOIL STABILIZER, UNLESS NOTED.
IF DISTURBANCE OCCURS IN SUMMER, FINAL STABILIZATION SHALL BE PERMANENT SEED AND PROPERLY ANCHORED MULCH, UNLESS
0
DESIGN APPROVED FOR CONSTRUCTION
BD
8/25/26
REV. DESCRIPTION BY DATE
8/26/202612:27:06 PM
\\corp.dirsrv.com\data\teams\Milwaukee\t34_DO_server\Data\@Work Management\SEW Major Projects\@SEW 5160000 - 5179999\5163154\5163154.dgn
SHEET 1 OF 16Printed
# OF URD EQUIPMENT INSTALLATIONS/REPLACEMENTS:
# OF POLE INSTALLATIONS/REPLACEMENTS:
MUG CABLE FOOTAGE:MUG CONDUIT FOOTAGE:
3PHASE DB FOOTAGE:1PHASE DB FOOTAGE:
3PHASE OH FOOTAGE:1PHASE OH FOOTAGE: 31 2
N/A
N/A
47
3021
114
N/A
N/A
K
O
S
S
O
W
R
D
S
U
M
M
IT
D
R
DAVIDSON RD
BELGREN RD
DAVIDSON RD
BELGREN RDC
A
LIC
O
C
T
(O
N
P
R
IV
A
T
E
P
R
O
P
E
R
T
Y
)
G
E
O
R
G
E
H
U
N
T
C
IR
K
O
S
S
O
W
R
D
S
U
M
M
IT
D
R
DAVIDSON RD
BELGREN RD
DAVIDSON RD
BELGREN RDC
A
LIC
O
C
T
(O
N
P
R
IV
A
T
E
P
R
O
P
E
R
T
Y
)
G
E
O
R
G
E
H
U
N
T
C
IR
A
B
C
1A
L
ABC
Z82982
Z
82973
Z
82973
2A
S
2A
S
Z82973
336AS
Z82973
336AS
2A
S
Z82973
336AS
2A
S
Z
82973
336A
S
Z82982
2A
S
2A
S
Z
82982
2A
S
336AS
2AS
2AS
2AS
2AS
336AS
2AS
Z82982
336AS
Z82982
336AS
2A
S
336A
S
2AS
Z
82973
Z82973
Z82973
Z
82982
Z
82982
Z
82973
Z82973
Z82973
ZX82982
Z
82973
Z82982
1AL
C
2AL
Z82982
Z
82982
1AL
Z
82973
ABC
Z82973
Z82973
A
B
C
1A
L
ABC
Z82982
Z
82973
Z
82973
2A
S 2A
S
Z82973
336AS
2A
S
Z82973
336AS
2A
S
Z
82973
2
A
S
Z82982
2A
S
Z
82982
2A
S
336AS
2AS
2AS
2AS
2AS
336AS
2AS
Z82982
336AS
2A
S
336A
S
Z
82973
Z82973
Z
82982
Z
82982
Z
82973
Z82973
Z82973
ZX82982 Z
82973
Z82982
1AL
C
2AL
Z
82982
1AL
1AL
A
B
C
Z82973
ABC
Z82973
Z82973
Z82982
2AS Z82973
Z
82973
2A
S
Z82973
2AS
1
/0
A
S
Z
8
2
9
7
3
1AL
A
B
C
Z82973
2AS
Z82973
336AS
Z82973
336AS
Z82973
Z82982
336AS
ABC
Z
82973
2A
L
2A
LABC
Z
82973
2A
L ABC
Z
82973
2A
L ABC
Z
82973
120/208
75-3
120/208
300-3
120/208
75-3
120/208
75-3
120/208
75-3
C
C
B
C
B
A
C
B
A
A
B
C
B
A
C
B
A
C
B
A
C
B
A
ABC
C
100K 100K
100K
100K
100K
100K
40K
40K
65K
65K
40K LB72596
25B
50A
50B
25C
50C
50A
25C
50C
25B
50B
50C
50A
50C
50B
50A
3B
25C
25C
50A25C
25C
ABC C
A
B
C
A
B
C
ABC
A
B
C
A
C ABC
C
B
A
SVR
120/208
300-3
120/208
75-3
120/208
75-3
C
B
C
B
A
C
B
A
B
C
B
A
C
B
A
C
B
A
ABC
100K
100K
40K
40K
65K
65K
40K LB72596
25B
50A
50B
25C
50C
50A
50C
50B
50A
50A
3B
25C
25C
50A25C
25C
ABC
C
C
B
A
ABC
C
B
A
A
C ABC
C
B
A
50C
C
A
25C
C 120/208
75-3 120/208
75-3
100K
100K
C
ABC
100K
A
C
B
A
100K
C
B
A
5
0
B
50B
5
0
C
5
0
C
WORK AREA
WORK AREA
C
B
A
SVR
N
SHEET 3
Y
K
P
E
K
O
O
R
B
T
S
E
W
E
V
A
E
G
DI
R-I
H
RD TSERCLLIH
RD ELADNEERG
R
D ATSIV A
N
O
D
SHEET 3
SOURCE
SVR# 9402
LOAD
Y
K
P
E
K
O
O
R
B
T
S
E
W
E
V
A
E
G
DI
R-I
H
RD TSERCLLIH
R
D ATSIV A
N
O
D
RD ELADNEERG
SOURCE
SVR# 9402
LOAD
ELECTRIC WORK REQUEST
SHEET 2 OF 16
EXISTING FEEDER Z82982, Z82973
PROPOSED FEEDER Z82982, Z82973
8/26/2026 12:27:07 PMPrinted
5163154
W
R
AV
E
N
S
W
O
O
D
H
ILLS
C
IR
DAVIDSON RD DAVIDSON RD
S
B
A
R
K
E
R
R
D
W
R
AV
E
N
S
W
O
O
D
H
ILLS
C
IR
DAVIDSON RD
DAVIDSON RD
S
B
A
R
K
E
R
R
D
1A
L
1AL
Z
22784
Z82973
Z82973
2AS
ZX
82973
2A
S
Z82973
336AS2A
S
2A
S
336A
S
Z
82973
2A
S
2AS
Z82973
2AS
2AS
336AS
2AS
Z
82973
ZX82973
Z82973
Z82973
Z
X
82973
Z
82973
336AS
Z82973
336AS
Z82973
336A
S
Z
82973
336A
S
Z
82973
ZX82973
Z82973
B
2AS
C2AS
ZX82973
ABC
2A
L
Z
82973
1A
L
1AL
Z
22784
Z82973
2AS
ZX
82973
Z82973
2A
S2A
S
336A
S
Z
82973
2A
S
2AS
Z82973
2AS
2AS
2AS
Z
82973
ZX82973
Z82973
Z82973
Z
X
82973
Z
82973
336AS
Z82973
336A
S
Z
82973
336A
S
Z
82973
ZX82973
Z82973
B
2AS
C2AS
ZX82973
ABC
2A
L
Z
82973
2A
S
2A
S
2CU
Z82973
336AS
A
B
C
Z82973
5
0
B
5
0
B
2AS
Z82973
2AS
Z82973
336AS
A
B
C
Z82973
336AS
A
B
C
Z82973
A
B
C
336AS
Z82973
3
B
1AL
Z82973
2AS
B
Z82973
5
0
B
SVR
SVR
120/20875-3
120/208
75-3
ABC
B
B
A
B
C
B
B
B
100K
40K
40K
100K
65K
50C 50A
25B
50B
25B
50B
3B
50B
100B
25B
50B
50B
25A
25A
50B
50B
100B
50C
167A
S
T
E
P
B
A
B
ABC
A
A
B
C
A
B
C
ABC
ABC
A
B
120/20875-3
120/208
75-3
ABC
B
B
B
B
40K
25B
25B
50B
100B
25B
50B
25A
25A
50B
50B
100B
50C
167A
S
T
E
P
B
A
A
A
C
B
A
ABC
ABC
A
B
B
50C
B
50A
ABC
140K
65K
B
B
WORK AREAS
WORK AREAS
40K
B
100K
65K
65K100K
100K
40K
N
SHEET 2
LOAD SOURCE
SVR# 9595
R
D
K
E
E
R
C
R
AL
P
O
P
NL NEDNIL
D
R
N
O
S
DIVAD
SCARLET H
AW
TH
O
R
N
DR LLIKSTAC
NL
N
E
D
NIL
SHEET 2
LOAD SOURCE
SVR# 9595
R
D
K
E
E
R
C
R
AL
P
O
P
NL NEDNIL
D
R
N
O
S
DIVAD
SCARLET
DR LLIKSTAC
NL
N
E
D
NIL
H
AW
N
HT
O
R
SOURCE LOAD
SOURCE LOAD
50B
ELECTRIC WORK REQUEST
SHEET 3 OF 16
EXISTING FEEDER Z82982, Z82973
PROPOSED FEEDER Z82982, Z82973
8/26/2026 12:27:08 PMPrinted
5163154
1001
947.152
WAT
1002
947.556
WAT
1003
947.616
WAT
1004
947.530
WATV
1005
947.536
HYD
118+00 119+00 120+00
121+00
122+00
PC: 120+50.00
P
T: 121
+50.01
+50 +50 +50
+50
401+00
EP: 401+48.92
+50
118+00
122+00
123+00
124+00
WSO
WSO
WM
S
DAVIDSON RD
S
S
P
R
IN
G
D
A
LE
R
D
FBR
OLD JU CUT
OFF POLE
DAVIDSON RD
121+00120+00119+00
P-STM
WTR
P-EOP
P-EOP
P-EOP
WTR
P-EOP
S
C
H
O
O
L D
R
IV
E
W
A
Y
&
P
A
R
K
IN
G
P-EOP
P-EOP
P-SIDEWALK
P
-S
T
M SAN
P-STM
WTR
P-EOP
E
O
P
E
O
P
S/I
S/I
S
/I
P-SIDEWALK FBR
FBR
FBR
FBR
FBR
FBR
FBR
VAULT
WEATHER
EMERGENCY
SIREN POLE
EOP
LP
LP
LP
LP
R/W
R/W
R/W
S
S
HP
S
4S
5
S5
S5
S4
S4
S1
GAS
GAS
12" HP GAS
GAS
12" HP GAS
Z
7S
8
139'
Z7N2S
143'
ZN
25'
Z7N2
188'
ZN
135'Z14
150'
Z7N2
133'
ZN
130'
POLE STA. 119+55, 25' RT POLE STA. 121+61.5, 20' RT
POLE STA. 122+35.5, 20' RT
ANC. STA, 122+35, 42' RT
POLE STA. 123+68.5, 20' RT
SVR
X16
623'
X
16
S
35'
Z
16
143'
Z7N2S
98'
95'
Z
7S
8
73'
7
7
'
100K
P-GAS
P-GAS
A
P
P
24-11243
50-2
3B
SVR# 9402
89U4840
25C
02U0371
300-3
120/208
94U8696
50B
91U7655
89U4841
89-06192
45-4
13-06071
45'
13-06247
50'
02-09772
40'
Z7N2S
208'
131'
Z7N2
74'
154'
105 115
125
135
SOURCE LOAD
SVR# 9402
N
SHEET 5
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES
100
110
120
13026-
45-3
POLE STA. 119+51.5, 27' RT
CUT 0.5'
STD 110-13.7
07-08520
45-5
82-08902
45-5
26-
45-3
TRANSFER EXISTING LED
POLE STA. 120+82, 27' RT
POLE TAG 16' FROM BUTT OF POLE
FILLING 1.5'
1-866-939-4267
PRIOR TO AMR TRANSFER
CONTACT LANDYS+GYR
AMR TO BE XFERD FROM PT. 115
ANC. STA. 120+82', 37.5' RT
10"SCR-10'L-3/8"PRI, 3/8"NEU
STD 104-40.1
STD 110-13.7
26-
50-1
POLE STA. 122+35.5, 24.5' RT
POLE TAG 18' FROM BUTT OF POLE
FILLING 3'
ANC. STA. 122+36, 39.5' RT
8"DSCR-15'L-3/8"PRI, 3/8"NEU
ANC. STA. 122+36, 44.5' RT
10"SCR-20'L-3/8"PRI
DO NOT FUSE TAP
STD 110-21.5
90-27164
45-4
13-06248
45-5
26-
45-3
POLE STA. 123+69, 25' RT
POLE TAG 18' FROM BUTT OF POLE
FILLING 3.5'
STD 124-11.9
STD 110-13.7
755
720
21810
715
750
21850
2200
ELECTRIC WORK REQUEST
SHEET 4 OF 16
8/26/2026 12:27:09 PMPrinted
SCALE
5163154
1" = 40'
125+00
126+00
127+00
128+00
129+00
130+00
131+00
S
T
ST
510+00
510+56
520+00
520+56
540+00
541+
00
541+
04
530+
00
531+00531+12
WSO
WSO
W
V
WV
WV
W
V
W
V
S
S
S
WV
CO
WV
S
WV
DO
NA VISTA DR
W
H
ILLC
R
E
S
T
D
R
DAVIDSON RD
DAVIDSON RD
P-SIDEWALK
P-SIDEWALK
P-SIDEWALKSAN
SAN
SAN
P-STM
P-STM
P-STM
WTR
W
TR
W
T
R
WTR
W
TR
SAN
P-EOP
P-EOP
P-EOP
EO
P
EO
P
P-EOP
S/I
S/I
S/I S/I
S
/I
S/I
S/I
S
T
M
S
T
M
FBR
FBR
FBR
FBR
FBR
FBR
FBRP-STM
WTR
STM
EOP
LP
LP
LP
LP
LP
LP
LP LP
R/W
R/W
R/W
R/W
R/W
R/W
S S
S
HP
S4
81'
S4
S
4
171'
S4
131'S3
S5
S
1
S1105'
S8
S1
74'
HP
GAS
GAS
G
A
S
12" HP GAS
12" HP GAS
Z7S8
175'Z7N2
142'
Z7S8
122'
Z7S8
139'
Z7N2
28' 32'
SLACKED
Z
7S
8
114'
1
0
8
'
134'
Z
N
POLE STA. 125+56, 23.5' RT
POLE STA. 126+98, 23' RT
POLE STA. 128+73.5, 30.5' LT
(16' BRACKET)
�MAXIMUM LOADED TENSION IS 150 LBS.
�POLES USED FOR SLACK SPANS SHOULD BE BURIED AN
ADDITIONAL 1’ AND RAKED APPROX. 12” IN THE DIRECTION
OPPOSITE OF THE WIRE TENSION.
oEX. 50’ SLACK SPAN SHOULD BE BURIED 8’ (10% + 2’ + 1’ = 8’)
�BACKFILL POLES WITH 1.5-2”CRUSHED STONE WITH FINES
OR 1-1.5” TRAFFIC BOND AND TAMP WELL.
SET WOOD BLOCK MN 105-3019 AGAISNT DIRECTION OF PULL
ZN
Z7N2
X16
76'
ZN109'
POLE STA. 125+53.5, 52' RT
Z7S8
151'
S
80'
A
P
13-06178
45-5
50B
91U13875
13-06238
45'
13-06069
45-5
POLE STA. 128+20, 24.5' RT
13-04333
45'
13-06061
45'
91-11460
40'
145
165
185
170
155
N
SHEET 4
SHEET 6
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES
140
160
180
150
26-
45-2
POLE STA. 125+56, 26' RT
POLE TAG 16' FROM BUTT OF POLE
FILLING 0.5'
SET POLE 7.5' DEEP FOR SLACK SPAN
BLOCK RAKE AND STONE FILL
DO NOT FUSE TAP
STD 110-21.5
13-06250
50-2
26-
45-3
POLE STA. 126+98, 25.5' RT
ANC. STA. 126+88, 25.5' RT
10"SCR-10'L-3/8"NEU
STD 110-13.7
13-06249
45-5
26-
40-5
6' BRACKET
TRANSFER EXISTING LED
POLE STA. 128+78.5, 30' LT
1-866-939-4267
PRIOR TO AMR TRANSFER
CONTACT LANDYS+GYR
AMR TO BE XFERD FROM PT. 185
STD 104-40.1
68-5845
40-5
16
Sag Table In Inches
17 17 17
13 14 15 15
90°60°30°0°Circuit Conductor and Tension
Primary
Neu/Sec
336 ACSR 18/1, Merlin @150lbs
3/0 ACSR 6/1, Pigeon @150lbs
32' SLACK SPAN BETWEEN POINTS 140 - 150
S
13-04337
45-2
26-
45-2
POLE STA. 125+55, 58' RT
ANC. STA. 125+56, 38' RT
8"DSCR-20'L-3/8"PRI, 3/8"NEU
ANC. STA. 125+56, 33' RT
10"SCR-25'L-3/8"PRI
STD 111-17.8
710
750
21620
725
21770
690
695
21810
720
ELECTRIC WORK REQUEST
SHEET 5 OF 16
8/26/2026 12:27:10 PMPrinted
SCALE
5163154
1" = 40'
131+00
132+00
133+00
134+00
135+00
136+00
137+00
WSO
WSO
WVWSO
WSO
WV
WSO
WSO
WM
S
S
DAVIDSON RD
C
O
M
M
S
P-SIDEWALK
SAN
SAN
SAN
P-STM P-STM P-STM
P-STM
P-STM
P-STM P-STM
WTR
WTR
WTR
P-EOP
P-EOP
P-EOP
P-EOP
S/I
S/I S/I
S/I
S/I
S/I
FBR
FBR
FBR
FBR
COMMS
COMMS
LP LP
LP
LP
LP
LP
LP
LP
LPR/W
R/W
R/W
R/W
S
S S
S
HP
S
280'
S
1
121'
102'
S
1
S2
47'
S284'
S
2
67' S
1
80'
S
3
75'
S1
30'
S
3
90'
S2
44'
GAS
S
8
35'
141'
S
8
S4
S3
12" HP GAS
12" HP GAS
Z7S8
102'
Z7S8
99'
Z7S8
116'
Z7S8
150'
146'
Z7S8
151'
ZN
SLACKED
68'
ZN
POLE STA. 134+48.5, 26' RT POLE STA. 135+99, 27.5' RT
Z7S8
40K 40K
Z176'
13-06063
45-5
50A
13-06189
45'
13-06062
45-4
CUST
0'
06T11672
35'
195 205
13-06055
45-5
40K FUSE
13-06067
45-5
25B
N
SHEET 5
SHEET 7
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES
190
200
13-06052
45-5
26-
45-3
POLE STA. 134+50.5, 25' RT
OF POLE
POLE TAG 14.5' FROM BUTT
CUTTING 2.5'
SET POLE 9' DEEP
HYDRO-VAC THIS POLE
STD 124-11.9
STD 110-13.9
26-
45-3
POLE STA. 135+97, 25.5' RT
OF POLE
POLE TAG 14.5' FROM BUTT
CUTTING 1.5'
SET POLE 8' DEEP
HYDRO-VAC THIS POLE
STD 110-30.6
STD 110-13.9
50C
13-06074
45-5
21580
21470
21510
21430
21590
21540
21500
21480
21450 21420
21550
ELECTRIC WORK REQUEST
SHEET 6 OF 16
8/26/2026 12:27:17 PMPrinted
SCALE
5163154
1" = 40'
138+00
139+00
140+00
141+00
142+00
143+00
550+
00
550+35
560+00
560+34
570+
00
570+55
580+00
580+
52
S
T
WSO
W
V
WV
S
S
W
V
S
S
WSO
WSO WV
DAVIDSON RD
B
E
LG
R
E
N
R
D
K
O
S
S
O
W
R
D
OLD JU CUT
OFF POLE
FBR
OLD JU CUT
OFF POLEP-SIDEWALK
P-SIDEWALK
P-SIDEWALK
SAN
SAN
SAN
P-SSR
P-STM P-STM
P-STM P-STM
P-STM
WTR
WTR
WTR
W
T
R
W
T
R
STM
P-EOP
P-EOP
E
O
P
E
O
P
P-EOP
P-EOP
P-EOP
S/I
S/I
S/I
S/I
S/I
FBR
FBR
F
B
R
FBR
FBR
VAULT
F
B
R
FBRP-STM P-STM
P-STM
P-EOP
E
O
P
E
O
P
LP
LP
LP
LP
LP
LP
LP
LP
BRBR
R
/W
R/W
R
/W
R
/W
R
/W
R/W
S
S
S
S
S S
S
S
8, 27
ENV
8, 27
ENV
HP
101'
S4
S325'
S3
43'
S
2
100'
61'
S234'
135'
S1
108'
G
A
S
GAS
99'
S
2
G
A
S
S2
48'
S
5
320'
2
1
4
'
G
A
S
12" HP GAS
12" HP GAS
S2
S
1
175'
165'
Z7S8
151'
201'
80'
Z
3S
8
Z
3S
8
137'
POLE STA. 137+50, 24' RT
ANC. STA. 137+50, 29' RT POLE STA. 140+64, 24.5' RT
ANC. STA. 140+90.5, 24' RT
POLE STA. 142+14.5, 19.5' RT
(16' BRACKET)
POLE STA. 139+15,
23.5' RT
POLE STA. 142+16, 33' LT
STA. 138+52, 39.5' RT
103'
197'
S3
56'Z3S8
145'
149'
Z7S8
76'
(100K)
57'
POLE STA. 137+64,
33.5' LT
ANC. STA. 137+52.5,
33.5' LT
POLE STA. 139+61.5,
29.5' LT
POLE STA. 139+65,
33' LT
POLE STA. 141+56,
20.5' LT
100K
214'
Z
7S
8
(MIDSPAN)
67'S
S3124'
A
99-06151
45-5
25C
10-04654
35'
95-08877
35'
215
S5
109'
BORE AT
EL. 925
4.5' FROM
EXISTING GRADE
275
295
255
325
245
265
280
Z7S8
138'
96'
Z7S8 Z7S8
116'
99-00548
45-4
STD 111-17.8
(100K FUSES)
300
350
235
S
8
1
3
5
'
2'
315
N
SHEET 6
SHEET 8
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES
220
270
290
250
320
210
310
230
26-
45-3
POLE STA. 137+44.5, 25' RT
BUTT OF POLE
POLE TAG 14.5' FROM
CUTTING 2'
SET POLE 8.5' DEEP
ANC. STA. 137+45, 35' RT
10"SCR-10'L-3/8"NEU
STD 110-42.4
STD 110-30.6
STD 110-13.9
50C
45-4
13-06051
50C
13-06054
45-2
26-
45-3
POLE STA. 140+66, 25.5' RT
BUTT OF POLE
POLE TAG 14.5' FROM
CUTTING 1'
SET POLE 7.5' DEEP
ANC. STA. 140+65.5, 40.5' RT
10"SCR-15L-3/8"PRI, 3/8"NEU
100K FUSESNORTH TAP
STD 110-21.7
26-
45-3
12' BRACKET
TRANSFER EXISTING LED
POLE STA. 142+3.5, 26' RT
BUTT OF POLE
POLE TAG 15.5' FROM
SET POLE 7' DEEP - MIN GRADE CHANGE
AMR TRANSFER 1-866-939-4267
CONTACT LANDYS+GYR PRIOR TO
AMR TO BE XFERD FROM PT. 295
STD 110-13.7
61-4639
40-5
26-
45-3
LB72596
25' RT
POLE STA. 139+20.5,
BUTT OF POLE
POLE TAG 14.5' FROM
CUTTING 1.5'
SET POLE 8' DEEP
STD 127-64.1
STD 111-17.8
45-4
99-00547
50B
26-
40-3
POLE STA. 143+9.5, 29' LT
STD 104-40.1
S5
G4G3
Z7S8
Z7S8 Z7S8
Z7
99-06427
30-5 99-00549
45-4
26-
45-3
POLE STA. 142+99, 25.5' RT
STD 110-30.6
STD 110-13.9
50B
S
S
45-4
13-06075
LB72596
S1
S
7
49-4553
35-5
26-
35-3
-3/8"SEC
10"SCR-10L'
DEUNITNOCSID
21290
21385
21300
21320
720
21220
21240
21360
760
OWNED BY
21385
ELECTRIC WORK REQUEST
SHEET 7 OF 16
8/26/2026 12:27:18 PMPrinted
SCALE
5163154
1" = 40'
144+00
145+00
146+00
147+00
148+00
149+00
150+00
ST
600+
00
600+33
590+00
590+
33
610+
00
610+60
620+00
620+
36
640+00
640+70
630+00
630+52
ST
ST
ST
ST
WSO
WV
WSO
WV
W
V
S
WV
S
S
S
WV
WV
WV
DAVIDSON RD
S
U
M
M
IT
D
R
W
E
S
T
B
R
O
O
K
E
P
K
Y
G
EO
R
G
E H
U
N
T
C
IR
.
FBR
OLD JU CUT
OFF POLE
OLD JU CUT
OFF POLE
OLD JU CUT
OFF POLE
OLD JU CUT
OFF POLE
P-SIDEWALK
P-SIDEWALK
SAN
S
A
N
SAN
S
A
N
SANP-STM
P-STM
P
-S
TM
P-STM
P-STM
WTR
W
T
R
WTR
WTR
W
T
R
P-EOP
P-EOP
P-EOP
S/I
S/I
S/I
S/IFBR
FBR
FBR
S
A
N
F
B
R
P-STM
STM
LP
LP
LP
LP
BR
R
/W
R/W
R
/W
R
/W
R/W
S
S
S
S
S
8, 27
ENV
8, 27
ENV
HP
S2
S2
S
2
S2
86'
S2
S2
105'
GAS
HP
GAS
GAS
S4
93'
8
4
'
S3
12" HP GAS
12" HP GAS
91'
SLAC
KED
125'
42'
82' 300'
291'
(100K FUSE)
POLE STA. 144+58.5, 25.5' LT
(100K FUSES)
POLE STA. 145+41, 26' LT
(100K FUSES)
POLE STA. 144+14.5, 31.5' RT
STA. 144+62.5, 33.5' LT
10'
266'
STA. 148+0.5, 37.5' LT
(100K)
(100K)
(100K)
(100K)
100K
POLE STA. 147+86.5, 50' RT
ZS8
158'
1
5
2
'
146'
Z
3S
8
Z3S8
56' 59'
100K
100K
100K
Z14
275'
265'
530'
796'
Z14
POLE STA. 144+16.5, 24.5' LT
POLE STA. 148
+41, 23.5' LT
POLE STA. 149+52.5,
37' LT
(COACH HPS 100W)
Z3S8
151'
92U7791
INSTALL ARRESTORS
AT OPEN POINT IN
DB LOOP
AREA APPROX. 1400' NE -
NORTH OF PROPERTY 20880
92U7791
INSTALL ARRESTORS
AT OPEN POINT IN
DB LOOP
AREA APPROX. 920' N
BETWEEN PROPERTY
20900 & 20950
44'
Z14
MCC
95U13742
75-3
120/208
RETAG
99-06604
35-5
99-00537
40-5
365
118'
Z7S8
82'
Z7S8 Z7N2
147'
Z7N2
143'
Z7N2S
153'
Z7N2
122'
475
375
385
465
335
TRENCH
Z14
17'
Z
S
8
1
5
0
'
415
Z
4
S
8
5
3
'
91U9241
75-3
120/208
RETAG
420
370
455
345
376
91-05535 45'
ANGLE
6°
378
442
444
N
SHEET 7
SHEET 9
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES BORE ALL CABLE UNLESS OTHERWISE NOTED
SHEET 7
360
330
380
440
390
400
410
450
340
430
26-
45-3
INSTALL ARRESTOR SIGN
POLE STA. 144+19, 34' LT
49' LT
ANC. STA. 144+20,
3/8"NEU
8"DSCR-15'L-3/8"PRI,
100K FUSES
STD 110-41.5
STD 110-14.7
99-00546
45-4
S
Z7N2G3 Z7N2 Z7N2
Z7N2
96-L-02604
12' DECOR
02-07146
45-5
99-00545
45-5
99-00544
50-4
99-00605
40-5
Z14
Z14
26-
45-3
POLE STA. 144+96.5, 25' RT
BUTT OF POLE
POLE TAG 14.5' FROM
FILL 0.5'
ANC. STA. 145+6.5', 25' RT
10"SCR-10'L-3/8"NEU
STD 124-11.9
STD 110-13.7
26-
45-3
POLE STA. 146+43, 26' RT
BUTT OF POLE
POLE TAG 15.5' FROM
FILL 1'
STD 110-13.7
26-
45-3
POLE STA. 147+86.5, 25' RT
BUTT OF POLE
POLE TAG 15.5' FROM
FILLING 1.5'
ANC. STA. 147+86.5, 40' RT
10"SCR-15'L-3/8"PRI, 3/8"NEU
100K FUSESOUTH TAP
DO NOT FUSE TAP TO NORTH
STD 110-21.5
ZS3
26-
45-3
1-866-939-4267
PRIOR TO AMR XFER
LANDYS+GYR
CONTACT
FROM PT. 445
AMR TO BE XFERD
25' RT
POLE STA. 149+39.5,
BUTT OF POLE
POLE TAG 15.5' FROM
FILL 1'
STD 110-13.7
S
G
3G
3
99-00535
45-5
Z
N
S
3
26-
45-3
INSTALL ARRESTER SIGN
POLE STA. 147+87, 28' LT
ANC. STA. 147+87.5, 53' LT
8"DSCR-15'L-3/8"PRI, 3/8"NEU
100K FUSES
STD 110-41.5
STD 110-14.5
Z7S8
S1
99-06443
40-5
POLE STA. 144+15, 25' RT
POLE TAG 14.5' FROM BUTT OF POLE
SET POLE 7' DEEP - CUTTING 0.5'
ANC. STA. 144+25, 25' RT
10"SCR-10'L-3/8"PRI, 3/8"NEU
100K FUSESSOUTH TAP
DO NOT FUSE TAP TO NORTH
SIMILAR TO 111-17.8
FRAME TAP XARM
45-3
STD 110-21.5
26-
STD 110-42.2
STD 110-30.6
STD 110-13.9
45-3
50B
26-
91-01665
40-5
DEUNITNOCSID
DEUNITNOCSID
DEUNITNOCSID
715
720
21075
21215
21075
720
21055
710
760
ELECTRIC WORK REQUEST
SHEET 8 OF 16
8/26/2026 12:27:19 PMPrinted
SCALE
5163154
1" = 40'
151+00
152+00
153+00
154+00
155+00
156+00
ST
ST
610+60
650+
00
650+47
660+00
660+
70
680+00
680+
53
670+
00
670+51
R
30.0'
WSO
WV
WSO
WSO
WSO
WV
S
W
V
WV
W
V
ST
DAVIDSON RD
G
E
O
R
G
E
H
U
N
T
C
IR
.
H
I-R
ID
G
E
A
V
E
OLD JU CUT
OFF POLE OLD JU CUT
OFF POLE
OLD JU CUT
OFF POLE
DAVIDSON RD
P-SIDEWALK
P-SIDEWALK
P-SIDEWALKSAN
SAN
S
A
N
SAN
P-STM
P
-S
TM
P-STM
WTR
WTR
WTR
P-EOP
P-EOP
P-EOP
P-EOP
P-EOP
S/I S/I
S/I
S/I
FBR
FBR
FBR FBR
FBR
P-STM
P-STM
COMMS
P-STM
S
T
M
P
-S
T
M
LP
LP
LP
R
/W
R/W
R/W
R/W
R/W
S
S
S
8, 27
ENV
HP
S4
S
3
63'
S2
GASGAS
GAS
130'
12" HP GAS
12" HP GAS
Z
S
8
138'
S
LA
C
K
E
D
76'
300'
247'
POLE STA. 153+12,
40.5' LT
(LED MED COACH)
(100K FUSE)
POLE STA. 151+32, 24' LT
POLE STA. 154+33, 25' LT
POLE STA. 155+51, 28.5' RT
(65K FUSES)
POLE STA. 156+80.5,
28.5' LT
33'
36'
(100K)
100K
(65K)
Z
N
178'
STA. 156+72.5,
63' LT
100K
�MAXIMUM LOADED TENSION IS 150 LBS.
�POLES USED FOR SLACK SPANS SHOULD BE BURIED AN
ADDITIONAL 1’ AND RAKED APPROX. 12” IN THE DIRECTION
OPPOSITE OF THE WIRE TENSION.
oEX. 50’ SLACK SPAN SHOULD BE BURIED 8’ (10% + 2’ + 1’ = 8’)
�BACKFILL POLES WITH 1.5-2”CRUSHED STONE WITH FINES
OR 1-1.5” TRAFFIC BOND AND TAMP WELL.
SET WOOD BLOCK MN 105-3019 AGAISNT DIRECTION OF PULL
ZS8
140'
99-00535
45-5
99-00534
40-5
99-00600
45-5
STD 110-07.4
(100K)
Z
29
197'
2
1
4
'
124'
Z7N2
149'
Z7N2
138'
Z7N2
143'
Z7N2
102'
515
505
525
535
Z7N2
104'
560
545
Z
N
6
1
'
Z7N2
33'
Z25
53'
ZN
20'
SLACKED
Z7N2
89U4319
75-3
120/208
RETAG
ANGLE
24°
ANGLE
24°
500
552
N
SHEET 8
SHEET 10
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES
UNLESS OTHERWISE NOTED
BORE ALL CABLE
Z29 = 3 #2AL 28kV
ADDITIONAL WIRE KEY
530
490
480
510
520
540
550
S
S2
Z7N2
Z7N2
Z7N2
96-L-02625
12' DECOR
99-00543
50-4
50-4
99-00551
25B
99-06428
35-5
26-
45-2
POLE STA. 155+46, 28.5' RT
BUTT OF POLE
POLE TAG 15' FROM
CUT 0.5'
SET POLE 7' DEEP
ANC. STA. 155+48, 38' RT
8"DSCR-10'L-7/16"PRI, 3/8"NEU
STD 110-30.6
STD 110-17.2
50B
ZN
26-
45-3
POLE STA. 151+64, 25.5' RT
POLE TAG 15.5' FROM BUTT OF POLE
CUT 0.5'
100K FUSE
SET POLE 8' DEEP FOR SLACK SPAN
BLOCK RAKE AND STONE FILL
STD 110-20.5
26-
45-3
POLE STA. 150+62, 25' RT
OF POLE
POLE TAG 15' FROM BUTT
CUT 0.5'
SET POLE 7' DEEP
STD 110-13.7
26-
45-3
27' RT
POLE STA. 153+13,
BUTT OF POLE
POLE TAG 14.5' FROM
CUT 0.5'
SET POLE 7' DEEP
STD 110-13.7
26-
45-3
28' RT
POLE STA. 154+16.5,
BUTT OF POLE
POLE TAG 14.5' FROM
CUT 0.5'
SET POLE 7' DEEP
STD 124-11.9
STD 110-13.7
89-05417
45-4
Z7N2
26-
45-2
POLE STA. 156+77.5, 28.5' LT
ANC. STA. 156+74.5, 48' LT
8"DSCR-20L-3/8"PRI, 3/8"NEU
100K FUSE
SIMILAR TO 110-17.1
FRAME TOP CROSSARM
STD 110-20.5
Z29
3
Sag Table In Inches
4 5 6
3 4 5 6
90°60°30°0°Circuit Conductor and Tension
Primary
Neu/Sec
#2 ACSR 6/1, Sparrow @150lbs
#2 ACSR 6/1, Sparrow @150lbs
20' SLACK SPAN BETWEEN POINTS 490 - 500
DEUNITNOCSID
DEUNITNOCSID
20865
715
710
20800
20825
21075
750
745
ELECTRIC WORK REQUEST
SHEET 9 OF 16
8/26/2026 12:27:20 PMPrinted
SCALE
5163154
1" = 40'
157+00
158+00
159+00
160+00
161+00
162+00
163+00
ST
ST
ST
0+00
0+
36
0+
00
0+36
WV
ST
S
ST
WV
S
WV
DAVIDSON RD
C
O
M
M
S
P-SIDEWALK
P-SIDEWALK
SAN
SAN
SAN
P-STM
P-STM
P-STM
WTR WTR
P-EOP
P-EOP
P-EOP
P-EOP
S/I
S/I
S/I
S/I
S/I
FBR
FBR
FBR
S/I
P-STM
P-STM
FBR
W
T
R
F
B
R
LP
LP
LP
R/W
R/W TS
S S
S
S
HP
H
P
HP
S
3
79'
61'
S
2
105'
103'
S3
65'
114'
S
1
S1111'
64'
GAS
GAS
GAS
50'
G
A
S
12" HP GAS
12" HP GAS
196'
65'
184'
POLE STA. 158+78.5, 33.5' RT POLE STA. 161+8, 34' RT
POLE STA. 162+91.5, 34.5' RT
229'
150'
POLE STA. 158+75, 27' LT
POLE STA. 161+3, 30' LT
POLE STA. 163+6, 28.5' LT
POLE STA. 157+13, 25' LT
Z
N
100K
595
625
645
Z7N2
164'
Z7S8
200'
146'
Z7N2
585
615
Z7S8
105'
Z7S8
126'
635
Z7N2
Z25
575
99-00513
40-?
655
S
7
5
4
'SERVICE
TENSION
N
SHEET 9
SHEET 11
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES
BORE ALL CABLE UNLESS OTHERWISE NOTED
580 610 630
570
650
600
45-5
99-00521
50B
99-00522
45-5
45-4
99-00523
50B
Z7S8
Z7S8
Z7S8
Z7S8
Z7N
2
56-6038
35-5
26-
45-3
POLE STA. 158+78, 24.5' LT
ANC. STA. 158+65, 25' LT
10"SCR-10L-3/8"NEU
STD 110-13.9
26-
45-3
POLE STA. 161+6.5, 22' LT
BUTT OF POLE
POLE TAG 16' FROM
FILL 1.5'
STD 110-13.9
89-06442
40-5
26-
45-3
POLE STA. 163+6.5, 22' LT
BUTT OF POLE
POLE TAG 16' FROM
FILL 1.5'
ANC. STA. 163+17, 22' LT
10"SCR-10L-3/8"NEU
STD 110-30.6
STD 110-13.7
50B
60-3996
35-5
Z7N2
S
2
S
2 S
3
26-
45-3
POLE STA. 157+11, 28' LT
100K FUSES
STD 110-41.5
STD 110-13.7
99-00575
45-4
S
12
53-13305
30-5
26-
35-5
26-
45-3
POLE STA. 159+80.5, 23.5' LT
STD 110-30.6
STD 110-13.7
50B
20655
20735
20695
20785
20615
ELECTRIC WORK REQUEST
SHEET 10 OF 16
8/26/2026 12:27:21 PMPrinted
SCALE
5163154
1" = 40'
164+00
165+00
166+00
167+00
168+00
169+00
ST
ST
WSO
WSO
WSO
WV
WV
WV
S
WV
WV
ST
S
DAVIDSON RD
P-SIDEWALK
P-SIDEWALKSAN
P-STM
P-STM
P-STM
P-STM
WTR
WTR
WTR
P-STM
P-EOP
P-EOP
P-EOP
P-EOP
S/I
S/I
S/I S/I
S/IS/I
S/I
S
/I
FBR
FBR
P-STM P-STM
SAN
SAN
P-STM
W
T
R
W
T
R
LP
LP
LP
LP
LP
R/W
R/W
R/W
T
T
S
S
HP
S4
S3
S4
117'
S8
148'
S2
76'
115'
S1
160'
S1
77'
S
1
S
1
86'
S
8
S
L
A
C
K
S
P
A
N
GAS
GAS GAS
12" HP GAS
12" HP GAS
E
E
LOOP
209'
(SVR# 9595)
POLE STA. 164+42, 35' RT
SEE SHEET 16 FOR
RECLOSER REMOVAL FORM
POLE STA. 165+92, 34.5' RT POLE STA. 167+97, 34' RT
SVR
150'
205'
UGE
100K
�MAXIMUM LOADED TENSION IS 450 LBS.
�POLES USED FOR SLACK SPANS SHOULD BE BURIED AN
ADDITIONAL 1’ AND RAKED APPROX. 12” IN THE DIRECTION
OPPOSITE OF THE WIRE TENSION.
oEX. 50’ SLACK SPAN SHOULD BE BURIED 8’ (10% + 2’ + 1’ = 8’)
�BACKFILL POLES WITH 1.5-2”CRUSHED STONE WITH FINES
OR 1-1.5” TRAFFIC BOND AND TAMP WELL.
SET WOOD BLOCK MN 105-3019 AGAISNT DIRECTION OF PULL
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLESERO NOTE:
SVR
65-4345
35'
665
675
725
Z7N2
126'
Z7N2
177'Z7N2
120'
Z7N2
1
0
1
'
Z
N
ANGLE
20°
ANGLE
19°
SVR# 9595
LOAD SOURCE
695
Z7N2
139'
705
S
3
1
1
5
'
710
N
SHEET 10
SHEET 12
660
680
730
720
690
700
45-2
99-00524
3B 45-4
99-00514
50B
99-00526
40-5
Z7S8 Z7S8
Z7N2G3
Z7N2
26-
45-3
POLE STA. 164+52.5, 22.5' LT
STD 124-11.9
STD 110-13.7
S
8
26-
50-2
POLE STA. 168+66, 32' RT
CUT 1'
SET POLE 7.5' DEEP
FOR RECLOSER FORMSHEET 16SEE
ON EAST SIDE OF POLE
INSTALL RECLOSER CABINET
COMMS900L
SVR# 9595
STD 128-70.4
3B
26-
45-3
POLE STA. 167+46.5, 32' RT
BUTT OF POLE
POLE TAG 14.5' FROM
CUT 1'
SET POLE 7.5' DEEP
ANC. STA. 167+44, 47' RT
10"SCR-15L-3/8"PRI, 3/8"NEU
STD 110-17.1
90-06760
35-5
62-6426
35-5
26-
45-5
3/8"NEU
10"SCR-10'L-3/8"PRI,
STD 110-07.6
STD 110-30.6
50B
S
1
26-
45-3
STD 110-20.5
POLE STA. 165+78.5, 25' LT
BUTT OF POLE
POLE TAG 14.5' FROM
CUT 1'
SET POLE 7.5' DEEP
ANC. STA. 165+80.5, 35' LT
10"SCR-10L-3/8"PRI, 3/8"NEU
100K FUSE
SIMILAR TO 110-17.1
FRAME TOP CROSSARM
26-
35-5
10"SCR-5'-3/8"NEU
STD 110-42.2
STD 109-89.3 N/A
Sag Table In Inches
N/A N/A N/A
61 62 63 65
90°60°30°0°Circuit Conductor and Tension
Primary
Neu/Sec
N/A
4/0 Al, 246.9 Al @450lbs
86' SLACK SPAN BETWEEN POINTS 690 - 700
OF RADIO SURVEY/INSTALL/ANTENNA DIRECTION
ETHAN.KRYGIER@WECENERGYGROUP.COM, FOR COORDINATION
CONTACT ETHAN KRYGIER OF TELECOM GROUP 414-221-2729,
CONSTRUCTION REMARKS FOR CREW LEAD:
PEDC-NLOS-92 - PEWAUKEE DATA CENTER
SHOULD BE AIMED 308° NW TOWARD
- ANTENNA MOUNTING: SVR# 9595 WR 5163154
COMMS900L- INSTALL ANTENNA
ANTENNA NOTES:
20615
20470
20550
20510
20420
20575
20525
20475
20425
ELECTRIC WORK REQUEST
SHEET 11 OF 16
8/26/2026 12:27:22 PMPrinted
SCALE
5163154
1" = 40'
170+00 171+00 172+00 173+00 174+00 175+00 176+00171+00 172+00 173+00 174+00 175+00
ST
218+00
218+
30
219+
00
219+32
220+00
220+
31
220+
98
221+
00
221+27
ST
ST
S
W
V
ST
WSO
WV
WV
W
V
S
WSO
WSO
WV
S
WV
DAVIDSON RD DAVIDSON RD
S
B
A
R
K
E
R
R
D
S
B
A
R
K
E
R
R
D
LINDEN LN
LIN
D
E
N
LN
SAN SAN
P-STM P-STM
WTR
WTR WTR
P-EOP
P-EOP
P-EOP
S/I
S/I
S/I
S/I
F
B
R
COMMS COMMS
STM
SAN
S/I
LP LP
R
/W
R
/W
R
/W
R
/W
R/W
R/W
R
/W
8, 27
ENV
HP HP
S
6
17'
S
1
83'
S187'
S1115'
GAS GAS
S4
12" HP GAS 12" HP GAS
E
E
E
E
E
E
E
E
E
LOOP
LO
O
P
LO
O
P
E
LOOP
LOOP
Z
7S
8
177'
273'
Z13
182'
ZN ZN
236'
102'
(40K)
164'
ZNG4G4G4 (65K)
140K
UGE
UGE
UGE
178'
170'
65K
11'
82-01934
40-5
100B
COMMS ATTACHMENTS
99U4181
100B
RETAG
97-03321
45'
97-11719
45-4
ATTACH PRI POLE GUYS
0.5' BELOW E TAP
ATTACH NEU POLE GUY
0.5' ABOVE E NEU FOR
ADDITIONAL CLEARANCE
OVER TRAFFIC LIGHT POLE
ON BARKER RD
65'
Z
7N
2
Z
7N
2
308'
(40K FUSE)
POLE STA. 173+55, 22' RT
765
740
Z7N2
(65K FUSE)
POLE STA. 171+84.5, 22.5' RT
POLE REMOVED BY AT&T
755
184'
ZN
TRENCH
Z13
7'
772
N
SHEET 11
SHEET 13
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES BORE ALL CABLE UNLESS OTHERWISE NOTED
760
750
770
26-
40-5
INSTALL ARRESTER SIGN
POLE STA. 173+55, 27' RT
POLE TAG 14.5' FROM BUTT OF POLE
CUT 1'
SET POLE 6.5' DEEP
65K FUSE
STD 110-40.4
STD 110-06.5
89-12981
40-4
Z7N2
26T
40-2
POLE SET BY WE
POLE STA. 171+71, 29.5' RT
NO GRADE CHANGE
FUSE 140K
11' FROM POLE TOP
ATTACH PRI,NEU POLE GUY
FROM POLE TOP
ATTACH PRI POLE GUY 6.5'
ANC. STA. 171+96, 29.5' RT
10"SCR-25'L-3/8"PRI
ANC. STA. 171+91, 29.5' RT
10"SCR-20'L-3/8"PRI,3/8"NEU
STD 127-21.3
89T64089
40-4
G3G3
G3G3
Z13
DEUNITNOCSID
20360 20330
20290
ELECTRIC WORK REQUEST
SHEET 12 OF 16
8/26/2026 12:27:22 PMPrinted
SCALE
5163154
1" = 40'
177+00 178+00 179+00 180+00 181+00
215+
00
215+32
216+00
216+
36
217+
00
217+36
214+00
214+
27
182+00
WSO
WSO
WSO
WSO
WV
WV
WSO
S
WV
WV
WV
S
S
W
V
DAVIDSON RD
P
O
P
LA
R
C
R
E
E
K
D
R
P
O
P
LA
R
C
R
E
E
K
D
R
SAN SAN
SAN
P-STM P-STM
P-STM
P-STM
WTR
WTR
WTR
P-EOP
P-EOP
P-EOP
S/I
S/I
S/I
S/I
S/I
S/I
LP
LP
LP
LP
R
/W
R
/W
R/W
R/W
R/W
R/W
R/W
R/W
HP
S4
165'
S366'
S4
72'
S377'
S2
69'S2
81'
S
2107'
S
2
111'
GAS
12" HP GAS 12" HP GAS
ZN
142'
ZN
52'
SLACKED
Z138'
149'
Z
S
7
ZS7
120'
152'
ZS7
Z
S
7
111'
ZN
134'
(40K)
65K
65K
(40K)
99-00585
40-5
50B
99-00584
40-5
25B
99-00599
40'
99-00589
40'
790
805
N
SHEET 14
SHEET 12
SEED AND EROSION MAT CLASS 1, TYPE B.
OF DISTURBANCE, FINAL STABILIZATION SHALL BE PERMANENT
INSTALL 12" WATTLE DITCH CHECK/CURVED WATTLE DOWNSLOPE
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES
780
80026-
40-5
POLE STA. 176+39, 22.5' RT
FILLING 0.5'
STD 110-06.5
99-00582
(40K FUSE)
65K FUSE
40-5
26-
40-3
POLE STA. 179+18, 36.5' RT
ANCHOR STA. 179+29.5, 37.5' RT
10"SCR-12'-3/8"PRI, 3/8"NEU
SIDEWALK GUY - 7' STRUT
ANC. STA. 179+18, 29.5' RT
10"SCR-7'L-3/8"PRI, 3/8"NEU
CUTTING 1' AT GUY POSITION
SET SIDEWALK ANCHOR 1' DEEPER
65K FUSE
FUSE TAP TO SOUTH
STD 110-12.1
99-00583
40-5
POLE STA. 179+14.5, 35.5' RT
ANCHOR STA. 179+15, 29' RT
2016520225
20190
20195
20150
20095
20275
ELECTRIC WORK REQUEST
SHEET 13 OF 16
8/26/2026 12:27:23 PMPrinted
SCALE
5163154
1" = 40'
190+00
194+00
S
T
188+00
189+00
191+00
192+00
193+00
ST
212+00
212+50
213+00
213+46
WSO
WSO
WSO
S
S
S
S
W
V
WV
W
V
DAVIDSON RD
W
R
AV
E
N
S
W
O
O
D
H
ILLS
C
IR
S
A
N
SAN
SAN
P-STM
P-STM
P-STM
P-STM
W
TR
WTR
WTR
D
AV
ID
S
O
N
R
D
P
-E
O
P
P
-E
O
P
P-EOP
P-EOP
P-EOP
P-EOP
S
/I
S
/I
S/I
S/I
S/I
S/I
S
A
N
EOP
LP
LP
R
/W
R/W
R/W
S
S
S
HP
H
P
218'
S
16
S4
146'
S
4
S
351'
G
A
S
GAS
GAS
S
199'
196'
12" H
P G
A
S
12" HP GAS
25-11144
35-5
56-40010 35'
9109 75'
POLE STA. 189+14, 18' LT
815
N
SHEET 13
MAT CLASS 1, TYPE B.
FINAL STABILIZATION SHALL BE PERMANENTSEED AND EROSION
INSTALL 12" CURVED WATTLE DOWNSLOPE OF DISTURBANCE,
IF UNANTICIPATED RUTTING/DISTURBANCE OCCURS AT POLES
810
26-
40-5
TRANSFER EXISTING LED
POLE STA. 189+20.5, 22.5' LT
POLE TAG 17' FROM BUTT OF POLE
FILLING 1.5'
PROPOSED SLOPE 2.5:1'
EXISTING SLOPE 2.2:1'
SET POLE 7' DEEP FOR SLOPED INSTALLATION
STD 104-40.1
92-03739
35-5
19825
19750
19725
615
610
ELECTRIC WORK REQUEST
SHEET 14 OF 16
8/26/2026 12:27:24 PMPrinted
SCALE
5163154
1" = 40'
200
210
310
600
530
340 630
690
730
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
50
120/240
26-
C
205-7022
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
3B
120/240
26-
B
205-0009
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
50
120/240
26-
C
205-7022
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
50
120/240
26-
B
205-7022
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
50
120/240
26-
B
205-7022
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
50
120/240
26-
B
205-7022
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
50
120/240
26-
B
205-7022
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
50
120/240
26-
B
205-7022
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
USE ONLY
FOR SOC
WE ENERGIES EQUIPMENT ENERGIZED _ Y _ N
Customer EQUIPMENT ENERGIZED _ Y _ N EDC: _____
SWITCHED BY: _________________ DATE/TIME: ______
50
120/240
26-
B
205-7022
MANUFACTURER: ___________________________
KVA: ______________________________________
VOLTAGE: _________________________________
LOCATION ID: ______________________________
PHASE: ____________________________________
FLUID TYPE: _______________ DESIGN IZ: _____
SERIAL: ___________________________________
MATERIAL #: _______________________________
ASSET ID #: ________________________________
3 PHASE TRANSFORMER LOAD BREAK SWITCHES? _ Y _ N
SHEET 15 OF 16
8/26/2026 12:27:24 PMPrinted
5163154
5163154 5163154
9595 9595
3 3
Z82973 Z82973
99-0052426-
T/ BROOKFIELD T/ BROOKFIELD
777 S BARKER ROAD777 S BARKER ROAD
x x
x x
730 665
Recloser Installation Procedure
Please provide the Work Request number, pole number, and SVR/SVS number.
5. Construction, please email WesternProjects@wecenergygroup.com when reclosers will be installed.
ETHAN KRYGIER, 414-221-2729.
4. On all units that are being removed please Check for radio and contact
3. Contact ETHAN KRYGIER, 414-221-2729, for verification of radio/antenna Direction.
the relay Technician to install.
2. JOE CHIESA, 414-540-5817, Protection Technician, has entered settings in the Aspen Data base for
can coordinate setting, calibration and testing of the electronic controls with the relay testing group.
of recloser. You must contact the Applications Engineer one week in advance of installation so they
1. Application Engineer, MARTY KOUTNIK, 262-574-3154 will supervise installation of control and energizing
LOCATION:
CITY / TOWN / VILLAGE:
ROUTE COMPLETED FORM WITH CREW COPY OF ORDER TO: Distribution Protection A289
A289 with copy of order.
forms shall be sent to the Distribution Protection Group -
recloser installed, removed or transferred. The form or
A. This form shall be completed by the crew leader for each
installed, removed, or transferred
703-6493), with crew copy of the order for each recloser
obtain and provide this form, Form 2554 (Material Item
B. It will be the responsibility of each construction office to
removed
tag, Form 766 (Material Item 701-7883), to each recloser
C. Complete and attach a separate equipment removal record
POLE NUMBER:
FEEDER NUMBER:
PHASE(A, B, C, or 3):
SERIAL NUMBER:
MANUFACTURER:
SERIAL NUMBER:
TRANSCEIVER ID:
0019C900.00020000:
COUNTER READING:
HYDRAULIC RECLOSER (removal only)
S&C TRIPSAVER II RECLOSER
VACUUM RECLOSER
SERIAL NUMBER:
MANUFACTURER:
INTERRUPTER TYPE:
SVR/SVS NUMBER:
ELECTRONIC CONTROL
MANUFACTURER:
SERIAL NUMBER:
SVR/SVS NUMBER:
COUNTER READING:
CONTROL TYPE:
DATE:
COMMENTS:
WORK REQUEST NUMBER: WORK DONE BY:
INSTALL RECLOSER REMOVE RECLOSER TRANSFERRED RECLOSER
NOTES:
FORM FOR RECLOSURE INSTALLATION OR REMOVAL
RECLOSER CONTROL FORM
LOCATION:
CITY / TOWN / VILLAGE:
ROUTE COMPLETED FORM WITH CREW COPY OF ORDER TO: Distribution Protection A289
A289 with copy of order.
forms shall be sent to the Distribution Protection Group -
recloser installed, removed or transferred. The form or
A. This form shall be completed by the crew leader for each
installed, removed, or transferred
703-6493), with crew copy of the order for each recloser
obtain and provide this form, Form 2554 (Material Item
B. It will be the responsibility of each construction office to
removed
tag, Form 766 (Material Item 701-7883), to each recloser
C. Complete and attach a separate equipment removal record
POLE NUMBER:
FEEDER NUMBER:
PHASE(A, B, C, or 3):
SERIAL NUMBER:
MANUFACTURER:
SERIAL NUMBER:
TRANSCEIVER ID:
0019C900.00020000:
COUNTER READING:
HYDRAULIC RECLOSER (removal only)
S&C TRIPSAVER II RECLOSER
VACUUM RECLOSER
SERIAL NUMBER:
MANUFACTURER:
INTERRUPTER TYPE:
SVR/SVS NUMBER:
ELECTRONIC CONTROL
MANUFACTURER:
SERIAL NUMBER:
SVR/SVS NUMBER:
COUNTER READING:
CONTROL TYPE:
DATE:
COMMENTS:
WORK REQUEST NUMBER: WORK DONE BY:
INSTALL RECLOSER REMOVE RECLOSER TRANSFERRED RECLOSER
NOTES:
FORM FOR RECLOSURE INSTALLATION OR REMOVAL
RECLOSER CONTROL FORM
SHEET 16 OF 16
8/26/2026 12:27:25 PMPrinted
5163154
12" WATTLE or 12"/20" SEDIMENT LOG
or 9.5"/20" EROSION EEL
SILT FENCE
VEGETATIVE BUFFER
ENV
8, 27
A/B/C/D
restoration of pre-construction soil stratification, and restoration to pre-construction
elevations.
surface.
navigable waterways/streams.
harass, harm, or kill a protected species under state and federal regulations. Proper
precautions shall be taken to ensure harm to individuals is avoided.
between November 5 and March 15.
Council on Forestry Transportation and Utility Rights-of Way Best Management Practices
potentially having Native American artifacts, burial mounds or burial sites, which could be
encountered during construction.
immediately. Contact the Environmental Department who will contact the State Burial
Sites Preservation Office and determine the next steps that must be taken in order to
comply with state law. Work at that site MAY NOT PROCEED until the Environmental
Department authorizes it.
Code HS 2.04 (6), must be present to monitor all ground disturbing activities.
contingency plan shall incorporate the following components.
and appropriately.
27. A frac-out contingency plan shall be on-site and implemented accordingly. The
25. If human bone or any artifacts are discovered during construction, work must cease
24. The project is within or adjacent to an area that is identified by the State of Wisconsin as
22. A qualified biologist must be present when conducting work at this location.
21. Exclusion fencing must be installed at the work area prior to March 15.
20. In order to protect the threatened or endangered species, work must be conducted
19. Threatened or endangered species are known to occur in the work area. It is illegal to
18. Any disturbed soil within 75-feet of the ordinary high water mark of any navigable
waterways/streams shall be stabilized within 24 hours of construction completion.
15. Poles scheduled to be removed, and that occur within wetland, shall be cut at the ground
a. Continuously inspect the bore paths for frac-outs in order to respond quickly
26. A "qualified archaeologist," as specified under Wis. Stats 157.70 (1) (i) and Wis. Admin.
23. State regulated invasive species are known to occur in the work area. Reasonable
14. Trenching and pit excavations within wetlands shall include soil segregation to facilitate
should be followed: (http://council.wisconsinforestry.org/invasives/transportation/).
17. No crossing of navigable waterways with equipment can occur. Foot traffic is allowed.
16. No work can be performed within the banks or below the ordinary high watermark of any
NEUTRAL
GUYING
STANDARD WIRE KEY N 1-#2 ACSR
N1 1-#1/0 ACSR
N2 1-#3/0 ACSR
N3 1-#4/0 AL
N4 1-#336 ACSR
N5 REMOVAL
G 1/4" ARM GUY
G1 5/16" ARM GUY
G2 3/8" ARM GUY
G3 5/16" POLE GUY
G4 3/8" POLE GUY
G5 7/16" POLE GUY
OVERHEAD PRIMARY
Z 1 #2 ACSR
Z1 1 #1/0 ACSR
Z2 1 #3/0 ACSR
Z3 3 #2 ACSR
Z4 3 #1/0 ACSR
Z5 3 #3/0 ACSR
Z7 3 #336 ACSR
Z9 SPECIAL LIST ON SKETCH
Z10 1 WIRE REMOVAL
Z11 2 WIRE REMOVAL
Z12 3WIRE REMOVAL
E, F, H, Q, R, W, X or Z
Z13 1 #1 AL 25KV
Z14 3 #1 AL 25KV
Z15 3 #500 AL 28KV
X16 1 #2 AL 15KV
X17 3 #2 AL 15KV
X18 3 #500 AL 15KV
R19 3 #1/0 AL 35KV
R20 3 #750 AL 35KV
Z21 3 #750 AL 28KV
X22 1 #2 Cu 15kV
X23 3 #2 Cu 15kV
Z24 1 #2 Cu 25kV
Z25 3 #2 Cu 25kV
X26 3 #500 Cu 15kV
Z27 3 #500 Cu 28kV
Z28 3 #750 Cu 28kV
Z29 SPECIAL - LIST
ON SKETCH
b. Containment materials (e.g. silt fence, straw bales, sand bags, etc.) shall be on site
precautions are legally required to prevent the spread of these species. The Wisconsin
and available should a frac-out occur.
c. A vac truck shall be accessible on short notice in order to respond quickly to a frac-out.
CLEARANCE NOTES:
-LOCATION OF OBSTRUCTIONS ARE FROM RECORDS AND MUST BE VERIFIED IN THE FIELD.
-MAINTAIN 2' MIN. CLEARANCE BETWEEN OUTSIDE FACE OF MANHOLE & BELL OF PIPE.
-THIS APPLIES TO GAS AND WATER MAINS.
-MAINTAIN 2' MIN. VERTICAL CLEARANCE AT CROSSINGS OF SEWER OR WATER MAINS.
-MAINTAIN 5' MIN. HORIZONTAL DIST. BETWEEN CONDUIT AND SEWER.
-MAINTAIN 3' MIN. HORIZONTAL DIST. BETWEEN CONDUIT AND WATER MAINS.
NOTE - CLEARANCES SHOWN ARE MINIMUM DISTANCES - REFERENCE PERMITS FOR
SPECIFIC CLEARANCE REQUIREMENTS. ADDITIONAL UNDERGROUND INFORMATION ON
EXCAVATION, BACKFILLING AND CLEARANCES CAN BE FOUND IN STD. 281-02.
General
Erosion Control
Contaminated Soils
Waterways
13. All excess spoils shall be removed from wetlands and placed in a suitable upland location.
Threatened and Endangered Species
Invasive Species
Cultural and Historical Resources, cont.
Spills
Notes 8 through 27 apply as noted at specific points within each work request:
Dewatering
Wetlands
Frac-out Contingency Plan
WE ENERGIES WORK REQUEST ENVIRONMENTAL NOTES (Notes 1 through 7 apply to ALL work requests)
Appendix A
1. If WDNR and/or USACE permits were obtained for the project, all permit conditions shall
be met during construction of the project.
2. If soil disturbance occurs on slopes or channels/ditches leading to wetlands or waterways,
or within wetlands, the disturbed areas shall be stabilized and appropriate erosion control
Best Management Practices (BMP's) shall be implemented.
3. Erosion Control BMR's shall meet or exceed the approved WDNR Storm Watter Management
Technical Standards (http://dnr.wi.gov/topic/stormwater/standards/const_standards.html).
Refer to We Energies Construction Site Sediment and Erosion Control Standards.
4. Inspect installed erosion control BMP's at least one time per week and after 1
2" rain events:
repair as necessary.
5. When temporary stabilization is required (e.g. for winter or short-term construction) prior to final
restoration, soil stabilizer shall be installed wherever possible. Erosion mat shall be used temporarily
only where appropriate, in accordance with state standards, and when approved by the
Operations Supervisor.
6. Whenever soil exhibiting obvious signs of contamination (e.g., discoloration, petroleum or solvent
odor, free liquids other than water, buried containers or tanks, or other obvious signs of environmental
impacts) is encountered during excavation or installation, cease work immediately, take appropriate
immediate precautions to ensure worker health and safety, and contact the Operations Supervisor
or Inspector.
7. If an oil spill occurs during construction, call the Environmental Incident Response Team
(EIRT) at 414-430-3478:
a. Any quantity of oil is spilled into surface water;
b. Any oil spill greater than 50 ppm PCB into a sewer, vegetable garden, or grazing land;
c. Any oil spill containing greater than 500 ppm PCB;
d. Five gallons or more of oil spilled to the ground;
e. Any oil spill involving a police department, fire department, DNR, or concerned property owner.
8. Dewatering of pits or trenches shall be done in accordance with state standards. Use an
approved sediment bag, a straw bale dewatering basin, a combination of both, or equivalent.
9. As much as practicable, the majorityof the work shall be staged from the public roadways
and road shoulders, keeping equipment out of adjacent wetlands.
10. All work shall be conducted to minimize soil disturance. No rutting will be allowed within
the wetlands.
11. If soils are not frozen or stable to a point that avoids rutting, timber mats, mud tracks, or
equivalent shall be utilized to access pole locations.
12. Excavated soils cannot be stockpiled in wetlands.
EROSION CONTROL LEGEND
INLET PROTECTION, TYPE
STONE DITCH CHECK
SOIL STABILIZER, TYPE B
TIMBER MAT
ROCK BAG
SURFACE WATER FLOW
TRACKING PAD
EROSION MAT CLASS I, TYPE A
EROSION MAT CLASS I, TYPE B
EROSION MAT CLASS I, TYPE B URBAN
EROSION MAT CLASS II
MULCH
EROSION MAT CLASS III
EROSION MAT CLASS I, TYPE A URBAN
DIRECT BURY PRIMARY - E, F, H, Q, R, W, X or Z
SECONDARY - 3PHASE
$12 4 WIRE REMOVAL
$11 3/0 QXR
$10 3 WIRE REMOVAL
$9 750 QXR
$8 350 QXR
$7 3/0 QXF
$6 1/0 QXF
$5 750 TX
$4 350 TX
$3 3/0 TX
$2 336 TXF
$1 4/0 TXF
$ 1/0 TXF
SECONDARY - 1PHASE
WE ENERGIES - ELECTRIC OPERATIONS
S15 1/0TX CIC
S14 6DX CIC
S12 3 WIRE MAIN
S11 3 WIRE REMOVAL
S10 750 TXF
S9 336 TXR
S8 4/0 TXF
S7 1/0 TXF
S6 750 TXR
S5 350 TXR
S4 3/0 TXR
S3 1/0 TXR
S2 2 TX
S1 4 TX
S 6DX
APPROXIMATE LOCATION FOR
UNDERGROUND FACILITY EXCAVATION
DW BASIN LOCATION
APPROXIMATE DEWATERING
Source: Town of Brookfield website. First collected Oct 19, 2026.