June 15, 2026 Utility Commission Agenda 1
Lake Geneva Utility Commission
Municipal Water and Wastewater Services
361 W Main Street
PO Box 187
Lake Geneva, WI 53147
262-248-2311 - www.lgutilitycommission.com
Dennis Lyon-President
Josh Gajewski-Utility Director
Jeff Ecklund-Water Superintendent
Ken Bauman-Wastewater Superintendent
Utility Commission Agenda
Monday, June 15, 2026 - 4:00 PM
Lake Geneva City Hall; Council Chambers
Members:
President Dennis Lyon, Mayor Todd Krause, Alderperson Mary Jo Fesenmaier, Alderperson Brian Smith,
City Administrator Dave De Angelis, Bill Binn, James Marquardt
1. Call to Order
2. Roll Call
3. Comments from the public as allowed by Wis. Stats. §19.84(2), limited to items on this agenda,
except for public hearing items. Comments will be limited to 5 minutes
4. Approval of the minutes from May 18, 2026
5. Acknowledgement of Correspondence
6. Approval of May 2026 Financials
7. Approval of May 2026 Bills
8. Director's report
9. Discussion/Action on approval of Pay Application #2 for the Hwy H Utility Improvement Project
10. Discussion/Action on final scope of the 2026 Sanitary Sewer Lining Project and bidding
11. Discussion/Action on updated State Municipal Financial Agreement for WISDOT Hwy 50
Project
12. Discussion/Action on 2025 Compliance Maintenance Annual Report (CMAR) and Resolution
2026-02
13. Adjournment
A quorum of the Council may be present; however, no official Council action will be taken.
Requests from persons with disabilities who need assistance to participate in this meeting should be made to the City Clerk’s office in advance
so that the appropriate accommodations can be made.
Page 1 of 33
Page 2 of 33
Page 3 of 33
BUDGET COMPARISON THRU: 5 / 2026
YTD % Prior Prior
of Budget YTD YTD
REVENUES Current Period YTD 2026 Budget YTD vs Budget 42% 2025 5 Year Avg.
INTEREST EARNED 25,762 126,372 266,000 -139,628 47.5% 144,383 84,356
CUSTOMER SALES 21,172 537,942 2,184,637 -1,646,695 24.6% 574,974 525,382
OTHER REVENUE 1,055 6,194 581,695 -575,501 1.1% 8,731 6,124
CAPITAL CONTRIBUTIONS 7,833 48,527 48,117 410 100.9% 42,149 50,728
TOTAL REVENUES 55,823 719,036 3,080,449 -2,361,413 23.3% 770,237 666,590
EXPENSES
TOTAL OUTSIDE SERVICES 26,458 140,030 370,350 -230,320 37.8% 114,845 109,323
TOTAL OPERATING EXPENSES 2,264 12,138 51,100 -38,962 23.8% 13,885 13,638
TOTAL INSURANCE 0 0 35,500 -35,500 0.0% 0 6,197
TOTAL SALARY & BENEFITS 80,144 288,089 751,438 -463,349 38.3% 278,079 245,050
TOTAL LAB SUPPLIES 8,649 25,261 28,000 -2,739 90.2% 16,957 12,888
TOTAL MISCELLANEOUS EXPENSE 0 119 575 -456 20.7% 60 53
TOTAL MAINTENANCE 12,835 91,163 656,250 -565,087 13.9% 37,880 52,874
TOTAL OPERATION & MAINTENANCE EXPENSES 130,350 556,800 1,893,213 -1,336,413 29.4% 461,707 440,023
REVENUES OVER O&M EXPENSES -74,527 162,236 1,187,236 -1,025,000 308,530 226,567
TOTAL CAPITAL OUTLAY 27,580 137,759 992,119 -854,360 13.9% 72,620 126,403
REVENUES OVER TOTAL EXPENSES -102,107 24,477 195,118 -170,640 235,910 100,164
TOTAL CASH TRANSFERS 0 126,339 -117,117 243,456 -107.9% 190,859 801,626
NET CHANGE IN CASH BALANCE -102,107 -101,862 312,235 -414,097 45,051 -701,462
FUND CASH AND INVESTMENT SUMMARY Opening Balance Period Activity Ending Balance
Wastewater Utility Fund Cash 512,118 -192,210 319,908
LGIP #10 - Capital Project Fund 4,051,300 12,479 4,063,779
LGIP #11 - Debt Service Fund 0 0 0
LGIP #12 - Impact Fee Fund 2,251,275 6,934 2,258,209
LGIP #13 - Equipment Replacement Fund 1,880,235 5,791 1,886,027
LGIP #14 - Wastewater Operating Reserves Fund 168,993 521 169,513
TOTAL WASTEWATER CASH AND INVESTMENT 8,863,920 -166,485 8,697,435
LAKE GENEVA UTILITY COMMISSION
FUND 61 - WASTEWATER UTILITY
X0A0CX0A0C
X0A0CX0A0CX0A0CX0A0C
Page 4 of 33
BUDGET COMPARISON THRU: 5 / 2026
FUND 62 - WATER UTILITY
YTD % Prior Prior
of Budget YTD YTD
REVENUES Current Period YTD 2026 Budget YTD vs Budget 42% 2025 5 Year Avg.
INTEREST EARNED 16,188 79,282 167,000 -87,718 47.5% 90,953 51,068
CUSTOMER SALES 3,806 439,746 1,905,672 -1,465,926 23.1% 446,416 439,280
OTHER REVENUE 88,282 254,491 1,329,722 -1,075,231 19.1% 247,377 251,651
CAPITAL CONTRIBUTIONS 5,910 33,163 31,878 1,285 104.0% 28,690 44,541
TOTAL REVENUES 114,186 806,682 3,434,272 -2,627,590 23.5% 813,436 786,539
EXPENSES
TOTAL SOURCE OF SUPPLY - OPERATION 5,098 26,478 80,400 -53,922 32.9% 25,596 22,618
TOTAL SOURCE OF SUPPLY - MAINTENANCE 375 7,508 15,100 -7,592 49.7% 2,889 10,625
TOTAL PUMPING EXPENSE - OPERATION 6,600 34,696 84,700 -50,004 41.0% 26,668 25,448
TOTAL PUMPING EXPENSE - MAINTENANCE 1,851 4,729 112,600 -107,871 4.2% 4,710 16,540
TOTAL WATER TREATMENT - OPERATION 5,264 31,715 106,050 -74,335 29.9% 38,786 34,135
TOTAL WATER TREATMENT - MAINTENANCE 6,401 99,607 165,300 -65,693 60.3% 34,090 32,888
TOTAL TRANS. & DISTRIBUTION - OPERATION 10,711 35,260 108,200 -72,940 32.6% 29,555 22,937
TOTAL TRANS. & DISTRIBUTION - MAINTENANCE 16,086 59,741 321,450 -261,709 18.6% 66,069 86,200
TOTAL CUSTOMER ACCOUNTS 9,915 39,259 88,750 -49,491 44.2% 32,331 28,633
TOTAL ADMIN & GENERAL OPERATIONS 40,665 197,560 603,658 -406,098 32.7% 246,587 193,921
TOTAL OTHER EXPENSES 26,000 130,000 333,700 -203,700 39.0% 125,000 123,500
TOTAL OPERATION & MAINTENANCE EXPENSES 128,965 666,554 2,019,908 -1,353,354 33.0% 632,281 597,445
REVENUES OVER O&M EXPENSES -14,780 140,128 1,414,364 -1,274,236 181,155 189,094
TOTAL CAPITAL OUTLAY 137,070 139,242 1,311,485 -1,172,243 10.6% 138,520 128,957
REVENUES OVER TOTAL EXPENSES -151,849 886 102,879 -101,993 42,635 60,138
TOTAL CASH TRANSFERS 62,957 79,226 -102,878 182,104 -77.0% 124,114 491,972
NET CHANGE IN CASH BALANCE -214,807 -78,340 205,757 -284,097 -81,479 -431,835
FUND CASH AND INVESTMENT SUMMARY Opening Balance Period Activity Ending Balance
Water Utility Fund Cash 1,027,071 -133,876 893,195
LGIP #1 - Capital Project Fund 2,623,332 8,080 2,631,412
LGIP #2 - Impact Fee Fund 1,373,699 4,231 1,377,930
LGIP #3 - Equipment Replacement Fund 919,195 2,831 922,026
LGIP #4 - Water Operating Reserves Fund 321,286 989 322,274
TOTAL WATER FUND CASH AND INVESTMENT 6,264,582 -117,745 6,146,837
LAKE GENEVA UTILITY COMMISSION
X0A1CX0A1C
X0A1CX0A1CX0A1CX0A1C
Page 5 of 33
Page 6 of 33
Page 7 of 33
Page 8 of 33
Page 9 of 33
Page 10 of 33
Page 11 of 33
Page 12 of 33
Page 13 of 33
Page 14 of 33
Lake Geneva Utility Commission
MUNICIPAL WATER AND WASTEWATER SERVICES
361 W Main Street
P.O. Box 187
Lake Geneva, WI 53147
262-248-2311
www.lgutilitycommission.com
Dennis Lyon – President
Josh Gajewski – Utility Director
Jeff Ecklund – Water Superintendent
Ken Bauman – Wastewater Superintendent
TO: Lake Geneva Utility Commission
FROM: Josh Gajewski, Utility Director
SUBJECT: June 2026 Director’s Report
WATER OPERATIONS
Site work for the Center St. Tower Painting Project began June 2nd, and it is currently expected that the
interior work will be completed by June 19th. Pending weather for the exterior work, construction may
be completed near the end of June.
Substantial completion for the Hwy H Utility Improvements Project is expected to be reached by June
17th. Final restoration will continue for approximately a week afterward and will be coordinated with
the ongoing County paving work.
WASTEWATER OPERATIONS
Staff proceeded with several equipment maintenance services and replacements that were necessary
after the April weather events. As the last of the replacement equipment units arrive, staff will finalize
their replacement.
Annual maintenance work continues with structure inspections within the col lection system , and
seasonal surface maintenance work at the groundwater treatment system was recently completed.
As the Wastewater Treatment Plant Facilities Planning moves forwa rd, a working session for the
evaluation of treatment alternatives was held in early June. The current schedule anticipates that the
report will be in final draft format near the end of July, at which time an update will be provided to the
Commission before we pro ceed toward the require d public hearing that’s necessary to finalize the
work.
OFFICE & ADMINISTRATION
Second quarter utility billing is under way, and bills will be issued on July 1 st to start t he collections
process.
Utility staff continues to coordinate with BS&A for the transition of billing and fina ncial software.
Several recent and upcoming meetings will focus on data gathering and review for the conversion.
Several coordination meetings with WisDOT were attended for the STH 50/Main Street project, which
remains on schedule for release of bidding in November of 2026, followe d by Utility construction
beginning in approximately February of 2027.
Page 15 of 33
Page 16 of 33
From
1.
2.
3.
4.
5.
a. X
b. X
c.
6.
7.
8.
9.
PAYMENT OF:
Title:
226,993.25$ Amount eligible to date (Line 4 - Line 5.c)
Less previous payments (Line 6 from prior application)
Amount due this application
Contractor:
336,850.04$
11,947.01$
-$
145,621.00$
5%
81,372.25$
$ 238,940.26
$ -
(line 8 or other - attach explanation of the other amount)
4/9/2026
Contractor's Application for Payment
Application No.: 2
26012
Lake Geneva Utility Commission
Ultimate Backroads LLC
MSA Professional Services
Sheridan Springs/CTH H Utility Improvements
Owner's Project No.:
Engineer's Project No.:
Contractor's Project No.:
Application Period:
Contract:
Owner:
Contractor:
Engineer:
Project:
to
07815014
Utility Improvements
4/1/2026 5/15/2026
Application Date: 5/15/2026
Ultimate Backroads LLC
Contractor's Certification
Balance to finish, including retainage (Line 3 - Line 4, plus 5c)
Approved by Owner
The undersigned Contractor certifies, to the best of its knowledge, the following:
(1) All previous progress payments received from Owner on account of Work done under the Contract have been
applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered
by prior Applications for Payment;
(2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this
Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and
encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such
liens, security interest, or encumbrances); and
(3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not
defective.
Recommended by Engineer
Net change by Change Orders
Date:
Signature:
Title:
Date:
Approved by Funding Agency
By:
Title:
Date:
By:
Date:
145,621.00$
By:
Title:
Date:
By:
(Sum of Column G Lump Sum Total and Column J Unit Price Total)
Retainage
Work Completed
Stored Materials
Total Retainage (Line 5.a + Line 5.b)
Current Contract Price (Line 1 + Line 2)
11,947.01$
551,220.75$
12,622.54$
563,843.29$
238,940.26$
Original Contract Price
Total Work completed and materials stored to date
EJCDC C-620 Contractor's Application for Payment
(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.
Project Engineer, MSA
5/22/2026
Page 17 of 33
07815014
26012
2 From 04/01/26 to 05/15/26 05/15/26
A C D E F G H I J K L
Item Quantity Units
Unit Price
($)
Value of Bid Item
(C X E)
($)
Estimated
Quantity
Incorporated in
the Work
Value of Work
Completed to Date
(E X G)
($)
1 1.00 LS $ 30,000.00 $ 30,000.00 1.00 $ 30,000.00 $ 30,000.00 100% $ -
2 1.00 LS $ 55,655.00 $ 55,655.00 1.00 $ 55,655.00 $ 55,655.00 100% $ -
3 10.00 EA $ 464.00 $ 4,640.00 5.00 $ 2,320.00 $ 2,320.00 50% $ 2,320.00
4 3.00 EA $ 1.00 $ 3.00 $ - $ - 0% $ 3.00
5 2.00 EA $ 620.00 $ 1,240.00 1.00 $ 620.00 $ 620.00 50% $ 620.00
6 1.00 LS $ 2,066.00 $ 2,066.00 $ - $ - 0% $ 2,066.00
7 1.00 LS $ 300.00 $ 300.00 $ - $ - 0% $ 300.00
8 70.00 LF $ 33.00 $ 2,310.00 11.00 $ 363.00 $ 363.00 16% $ 1,947.00
9 288.00 SF $ 7.00 $ 2,016.00 $ - $ - 0% $ 2,016.00
10 7.00 EA $ 455.00 $ 3,185.00 1.00 $ 455.00 $ 455.00 14% $ 2,730.00
11 4.00 EA $ 200.00 $ 800.00 $ - $ - 0% $ 800.00
12 15.00 LF $ 177.00 $ 2,655.00 $ - $ - 0% $ 2,655.00
13 10.00 LF $ 260.25 $ 2,602.50 9.70 $ 2,524.43 $ 2,524.43 97% $ 78.07
14 410.00 LF $ 115.00 $ 47,150.00 55.50 $ 6,382.50 $ 6,382.50 14% $ 40,767.50
15 10.00 LF $ 165.00 $ 1,650.00 $ - $ - 0% $ 1,650.00
16 2.00 EA $ 3,852.00 $ 7,704.00 1.00 $ 3,852.00 $ 3,852.00 50% $ 3,852.00
17 1.00 EA $ 2,652.00 $ 2,652.00 $ - $ - 0% $ 2,652.00
18 1.00 EA $ 2,891.00 $ 2,891.00 $ - $ - 0% $ 2,891.00
19 1.00 EA $ 2,346.00 $ 2,346.00 1.00 $ 2,346.00 $ 2,346.00 100% $ -
20 1.00 EA $ 1,851.00 $ 1,851.00 $ - $ - 0% $ 1,851.00
21 9.00 EA $ 565.00 $ 5,085.00 $ - $ - 0% $ 5,085.00
22 320.00 LF $ 136.25 $ 43,600.00 369.00 $ 50,276.25 $ 50,276.25 115% $ (6,676.25)
23 6.00 EA $ 2,025.00 $ 12,150.00 8.00 $ 16,200.00 $ 16,200.00 133% $ (4,050.00)
24 1.00 EA $ 1,533.00 $ 1,533.00 $ - $ - 0% $ 1,533.00
25 1.00 EA $ 1,498.00 $ 1,498.00 1.00 $ 1,498.00 $ 1,498.00 100% $ -
26 13.00 EA $ 750.00 $ 9,750.00 $ - $ - 0% $ 9,750.00
27 7.00 EA $ 750.00 $ 5,250.00 3.00 $ 2,250.00 $ 2,250.00 43% $ 3,000.00
28 140.00 LF $ 210.00 $ 29,400.00 11.00 $ 2,310.00 $ 2,310.00 8% $ 27,090.00
29 3.00 EA $ 4,900.00 $ 14,700.00 1.00 $ 4,900.00 $ 4,900.00 33% $ 9,800.00
30 4.00 EA $ 740.00 $ 2,960.00 1.00 $ 740.00 $ 740.00 25% $ 2,220.00
31 122.00 LF $ 21.00 $ 2,562.00 $ - $ - 0% $ 2,562.00
32 4.00 EA $ 625.00 $ 2,500.00 1.00 $ 625.00 $ 625.00 25% $ 1,875.00
33 3.00 EA $ 315.25 $ 945.75 1.00 $ 315.25 $ 315.25 33% $ 630.50
34 6.00 EA $ 1,874.00 $ 11,244.00 1.00 $ 1,874.00 $ 1,874.00 17% $ 9,370.00
35 6.00 EA $ 1,274.00 $ 7,644.00 $ - $ - 0% $ 7,644.00
36 1.00 LS $ 4,500.00 $ 4,500.00 $ - $ - 0% $ 4,500.00
37 650.00 LF $ 78.00 $ 50,700.00 215.00 $ 16,770.00 $ 16,770.00 33% $ 33,930.00
38 450.00 LF $ 41.45 $ 18,652.50 96.00 $ 3,979.20 $ 3,979.20 21% $ 14,673.30
39 1.00 LS $ 310.00 $ 310.00 $ - $ - 0% $ 310.00
Temporary Water Services
Sanitary Sewer, PVC, 8-Inch
Sanitary Manhole, 48-Inch, Complete
Connect to Existing Sanitary Sewer
Bend, 8-inch
1-1/4 Inch SDR 9 Polyethylene Water Service
1-1/4 Inch Corporation, Curb Stop, Box & Reconnect.
Reducer, 8-inch x 6-inch
Reducer, 8-inch x 4-inch
Slurry Fill, Cap & Abandon Existing Sanitary Sewer
Remove Existing Sanitary Manhole
Cap & Abandon Existing 4-inch Pipe Through San MHs
Manhole Casting, Adjustment and Chimney Seal
Sanitary Bypass Pumping
Utility Trench Slurry Backfill
Utility Trench Granular Backfill
Salvage, Reinstall and Regrade Gravel Driveway
Abandon Existing Water Valve
Water Main, C900, 14-inch
Water Main, C900, 12-inch
Application Period:Application No.:
B
Stone Tracking Pad (Undistributed)
Original Contract
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
Work Completed
and Materials
Stored to Date
(H + I)
($)
Contract Information
Bid Item
No.
Mobilization, Bonds & Insurance
Traffic Control
Utility Line Opening (ULO)
Valve and Box, 6-inch
Owner:
Contractor's Application for PaymentProgress Estimate - Unit Price Work
Owner's Project No.:Lake Geneva Utility Commission
MSA Professional Services
Ultimate Backroads LLC
Sheridan Springs/CTH H Utility Improvements
Utility Improvements
Engineer:
Contractor:
Project:
Contract:
Engineer's Project No.:
Contractor's Project No.:
Application Date:
Cap and Abandon Existing Watermain
Description
Work Completed
Materials
Currently Stored
(not in G)
($)
Tree Removal
Clearing & Grubbing
Salvage, Stockpile, Reinstall Mailboxes
Remove Existing Watermain
2-Inch Rigid Insulation
Tee, 12-inch x 8-inch
Tee, 8-inch x 6-inch
Water Main, C900, 8-inch
Water Main, C900, 6-inch
Valve and Box, 8-inch
Tee, 14-inch x 8-inch
Manhole Adjustment and Chimney Seal (Undistributed)
Connect to Existing Watermain
Unit Price
EJCDC C-620 Contractor's Application for Payment
(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 2 of 4
Page 18 of 33
07815014
26012
2 From 04/01/26 to 05/15/26 05/15/26
A C D E F G H I J K L
Item Quantity Units
Unit Price
($)
Value of Bid Item
(C X E)
($)
Estimated
Quantity
Incorporated in
the Work
Value of Work
Completed to Date
(E X G)
($)
Application Period:Application No.:
B
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
Work Completed
and Materials
Stored to Date
(H + I)
($)
Contract Information
Bid Item
No.
Owner:
Contractor's Application for PaymentProgress Estimate - Unit Price Work
Owner's Project No.:Lake Geneva Utility Commission
MSA Professional Services
Ultimate Backroads LLC
Sheridan Springs/CTH H Utility Improvements
Utility Improvements
Engineer:
Contractor:
Project:
Contract:
Engineer's Project No.:
Contractor's Project No.:
Application Date:
Description
Work Completed
Materials
Currently Stored
(not in G)
($)
40 1,470.00 SY $ 8.00 $ 11,760.00 1,470.00 $ 11,760.00 $ 11,760.00 100% $ -
41 80.00 CY $ 20.60 $ 1,648.00 $ - $ - 0% $ 1,648.00
42 160.00 TON $ 28.85 $ 4,616.00 $ - $ - 0% $ 4,616.00
43 1,515.00 TON $ 28.85 $ 43,707.75 39.53 $ 1,140.44 $ 1,140.44 3% $ 42,567.31
44 305.00 LF $ 11.00 $ 3,355.00 117.50 $ 1,292.50 $ 1,292.50 39% $ 2,062.50
45 940.00 SF $ 1.25 $ 1,175.00 $ - $ - 0% $ 1,175.00
46 105.00 LF $ 72.15 $ 7,575.75 49.00 $ 3,535.35 $ 3,535.35 47% $ 4,040.40
47 250.00 SF $ 14.45 $ 3,612.50 $ - $ - 0% $ 3,612.50
48 160.00 SF $ 16.00 $ 2,560.00 $ - $ - 0% $ 2,560.00
49 165.00 TON $ 144.00 $ 23,760.00 $ - $ - 0% $ 23,760.00
50 35.00 TON $ 144.00 $ 5,040.00 $ - $ - 0% $ 5,040.00
51 10.00 SF $ 62.00 $ 620.00 $ - $ - 0% $ 620.00
52 1,065.00 SY $ 12.30 $ 13,099.50 $ - $ - 0% $ 13,099.50
53 565.00 LF $ 2.30 $ 1,299.50 506.00 $ 1,163.80 $ 1,163.80 90% $ 135.70
54 19.00 EA $ 65.00 $ 1,235.00 18.00 $ 1,170.00 $ 1,170.00 95% $ 65.00
55 4.00 EA $ 20.00 $ 80.00 $ - $ - 0% $ 80.00
56 150.00 LF $ 6.00 $ 900.00 $ - $ - 0% $ 900.00
57 1.00 LS $ 5,000.00 $ 5,000.00 $ - $ - 0% $ 5,000.00
58 52.00 VF $ 413.00 $ 21,476.00 $ - $ - 0% $ 21,476.00
$ - $ - $ - $ -
$ - $ - $ - $ -
$ - $ - $ - $ -
$ - $ - $ - $ -
551,220.75$ 226,317.72$ -$ 226,317.72$ 41% 324,903.03$
Concrete Curb & Gutter Removal
Concrete Pavement Removal
Sediment Logs (Undistributed)
Mobilization, Bonds & Insurance (Bid Alternative A)
Detectable Warning Fields
Topsoil, Seed, Fertilize, Erosion Mat Class II Type B (Urban)
Silt Fence (Undistributed)
Inlet Protection
Culvert Ditch Checks
Concrete Curb and Gutter, 30-Inch
Concrete Sidewalk, 4-Inch Depth
Concrete Driveway & Sidewalk Apron, 6-Inch Depth
Hot Mix Asphaltic Pavement, Roadway, Type 4LT 58-28 S
Hot Mix Asphaltic Pavement, Driveways, 3-IN Depth, Type
4LT 58-28 S
Excavation Below Subgrade (EBS)
Breaker Run
Dense Graded Base
Asphalt Pavement Removal
Original Contract Totals
Polyurea Lining Systems for Underground Structures, 48-
Inch, Veritical Foot
Unit Price
EJCDC C-620 Contractor's Application for Payment
(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 3 of 4
Page 19 of 33
07815014
26012
2 From 04/01/26 to 05/15/26 05/15/26
A C D E F G H I J K L
Item Quantity Units
Unit Price
($)
Value of Bid Item
(C X E)
($)
Estimated
Quantity
Incorporated in
the Work
Value of Work
Completed to Date
(E X G)
($)
Application Period:Application No.:
B
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
Work Completed
and Materials
Stored to Date
(H + I)
($)
Contract Information
Bid Item
No.
Owner:
Contractor's Application for PaymentProgress Estimate - Unit Price Work
Owner's Project No.:Lake Geneva Utility Commission
MSA Professional Services
Ultimate Backroads LLC
Sheridan Springs/CTH H Utility Improvements
Utility Improvements
Engineer:
Contractor:
Project:
Contract:
Engineer's Project No.:
Contractor's Project No.:
Application Date:
Description
Work Completed
Materials
Currently Stored
(not in G)
($)
CO01 1.00 LS 12,622.54 12,622.54 1.00 12,622.54 12,622.54 100% -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
12,622.54$ 12,622.54$ -$ 12,622.54$ 100% -$
563,843.29$ 238,940.26$ -$ 238,940.26$ 42% 324,903.03$
Change Orders
Project Totals
Change Order Totals
Original Contract and Change Orders
Unit Price
EJCDC C-620 Contractor's Application for Payment
(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 4 of 4
Page 20 of 33
Page 21 of 33
ITEM ITEM EST. UNIT TOTAL
NO. DESCRIPTION QTY UNITS PRICE PRICE
GENERAL
1 Mobilization, Bonds & Insurance 1 LS 10,000.00$ 10,000.00$
2 Traffic Control 1 LS 15,000.00$ 15,000.00$
3 Sanitary Sewer Cleaning, Televising & Investigation, Laterals 19 EA 700.00$ 13,300.00$
4 Cured-in-Place Liner, 8-Inch 1,642 LF 50.00$ 82,100.00$
5 Reinstate Lateral Connection 19 EA 100.00$ 1,900.00$
6 Grout Lateral Connection 9 EA 1,000.00$ 9,000.00$
SUB-TOTAL: Items #1-#6 131,300.00$
UNDISTRIBUTED ITEMS
7 Ream Protruding Tap (Undistributed) 2 EA 270.00$ 540.00$
8 Supplemental Grout (Undistributed) 30 GAL 12.00$ 360.00$
9 CIPP Lateral Work Mobilization - Main St Area (Undistributed) 1 LS 2,500.00$ 2,500.00$
10 CIPP Lateral Work Mobilization - Mariane Terrace & Pine Tree Ln Area (Undistributed) 1 LS 2,500.00$ 2,500.00$
11 CIPP Lateral Tee Liner for 8-Inch Main (Undistributed) 10 EA 5,000.00$ 50,000.00$
SUB-TOTAL: Items #7-#11 55,900.00$
TOTAL: Base Bid (Items #1-11) 187,200.00$
Contingency (10%) 18,800.00$
TOTAL + Contingency 206,000.00$
LAKE GENEVA UTILITY COMMISSION (LGU) SANITARY SEWER LINING - 2026
ENGINEER'S ESTIMATE OF PROBABLE COSTS
CITY OF LAKE GENEVA, WALWORTH COUNTY, WISCONSIN
DATE CREATED: 06/11/2026
07815017 Engineer Estimate, Bid Tab & Pay Application
Engineers Estimate
Page 22 of 33
© MSA Professional Services, Inc.www.msa-ps.comENGINEERING | ARCHITECTURE | SURVEYINGFUNDING | PLANNING | ENVIRONMENTALSANITARY SEWER LINING - 2026LAKE GENEVA UTILITY COMMISSION (LGU)CITY OF LAKE GENEVA, WALWORTH COUNTY, WISCONSINPROJECT NO.07815017SHEETG1 DRAWN BY: Init DESIGNED BY: Init CHECKED BY: InitTITLE SHEET PLOT DATE: 6/11/2026 12:59 PM, G:\07\07815\07815017\CADD\Construction Documents\07815017 TITLE SHEET.dwg PROJECT DATE: .NO.REVISIONBY .. .. DATE6/11/2026....
SANITARY SEWER LINING - 2026CITY OF LAKE GENEVAWALWORTH COUNTY,WISCONSINSHEET INDEXUTILITIES
NOT TO SCALELOCATION MAP
PROJECTLOCATION
NOTE:UTILITY LOCATIONS SHOWN ON PLANS ARE APPROXIMATE AND CONTRACTORSHALL HAVE APPROPRIATE UTILITY MARK EXACT LOCATIONS PRIOR TOCONSTRUCTION.(800) 242-8511Dialorwww.DiggersHotline.com
LEGEND
BURIED ELECTRIC
EXISTING WATER MAIN, VALVE & HYDRANTEXISTING WATER SERVICE & CURB STOPPROPOSED WATER MAIN, VALVE, & HYDRANTPROPOSED WATER SERVICE & CURB STOPEXISTING SANITARY SEWER & MANHOLEEXISTING STORM SEWER & INLETPROPOSED STORM SEWER & INLETPROPOSED SANITARY SEWER & MANHOLEBURIED CABLE TELEVISIONBURIED TELEPHONEBURIED FIBER OPTICSEXISTING CURB & GUTTERPROPOSED CURB & GUTTEREXISTING SIDEWALKPROPOSED SIDEWALKEXISTING CULVERT PIPEFENCE LINE
EXISTING FORCEMAINBURIED GAS & VALVE
EXISTING WATER MAIN
UTILITY POLE & GUYSOIL BORINGLIGHT POLEPEDESTALSTREET SIGNTREE - CONIFEROUS
SILT FENCEPROPERTY LINEIRON PIPE
MAILBOXTREE TO BE REMOVEDTREE - DECIDUOUS
CONTROL POINTTREE LINERIGHT-OF-WAYBASELINE
FLAGPOLE
DRAINAGE ARROW
RAILROAD TRACKSPROPOSED CULVERT PIPE
IRON ROD
OVERHEAD UTILITY
BENCHMARK1000.00
<PROPOSED STORM SEWER & MANHOLE
G - GENERAL SHEETSG1TITLE SHEETG2DETAILSG3SEWER LINING & TRAFFIC CONTROL PLAN - MAIN ST, COUNTRYCLUB DR & WEST STG4SEWER LINING & TRAFFIC CONTROL PLAN - MARIANE TERRACE& PINE TREE LANECITY OF LAKE GENEVA:LAKE GENEVA PUBLIC WORKS DEPARTMENTTOM EARLE, DIRECTOR OF PUBLIC WORKS1065 CAREY STREETLAKE GENEVA, WI 53147PHONE: (262) 248-6644EMAIL: TEARLE@CITYOFLAKEGENEVA.COMELECTRIC:ALLIANT ENERGIESAUSTIN KROHN1870 HAYNES DRIVESUN PRAIRIE WI 53590EMAIL: AUSTINKROHN@ALLIANTENERGY.COMPHONE: (262) 741- 0905
SEWER & WATER:LAKE GENEVA UTILITY COMMISSIONJOSH GAJEWSKI, UTILITY COMMISSION DIRECTORP.O. BOX 187361 MAIN STLAKE GENEVA, WI 53147PHONE: (262) 248 - 2311
GAS:WE ENERGIESNICK WAGNER, DESIGN SPECIALIST1870 HAYNES DRIVESUN PRAIRIE, WI 53590EMAIL: NICHOLAS.WAGNER@WE-ENERGIES.COM
(414) 296-4333247 W Freshwater Way, Milwaukee WI 53204
OWNER: LAKE GENEVA UTILITIES (LGU)
PROJECT AREA: MAIN ST, COUNTRYCLUB DR & WEST ST
PROJECT AREA: MARINE TERRACE& PINE TREE LN
190% PLAN SUBMITTAL TO LGUJW
Page 23 of 33
© MSA Professional Services, Inc.www.msa-ps.comENGINEERING | ARCHITECTURE | SURVEYINGFUNDING | PLANNING | ENVIRONMENTALSANITARY SEWER LINING - 2026LAKE GENEVA UTILITY COMMISSION (LGU)CITY OF LAKE GENEVA, WALWORTH COUNTY, WISCONSINPROJECT NO.07815017SHEETG2 DRAWN BY: Init DESIGNED BY: Init CHECKED BY: InitDETAILS PLOT DATE: 6/11/2026 12:59 PM, G:\07\07815\07815017\CADD\Construction Documents\07815017 Detail Sheets.dwg PROJECT DATE: .NO.REVISIONBY .. .. DATE6/11/2026....
5 DRUMS SPACED AT10' INTERVALS AS NEEDEDIN FRONT OF ARROW BOARDTEMPORARY PAVEMENT MARKING LINE, 6 INCH,(WHITE ON RIGHT, YELLOW ON LEFT)AAL(TAPER LENGTH)BUFFER SPACE (B)A
GENERAL NOTES
100'TYP.
1
G20-2A
W20-1A
W20-5A
WO4-2R
A
SE
A
XXX
LEGENDSIGN ON PERMANENT SUPPORTTRAFFIC CONTROL DRUMTRAFFIC CONTROL DRUM WITH TYPE "C" STEADY BURN LIGHTTYPE III BARRICADE WITH ATTACHED SIGNTYPE "A" WARNING LIGHT (FLASHING)REMOVING PAVEMENT MARKINGSDIRECTION OF TRAFFICWORK AREACONNECTED ARROW BOARDWZ START LOCATION MARKEREWZ END LOCATION MARKERS
1
253035200'200'350'POSTED SPEED LIMITPRIOR TO WORKSTARTING (MPH)ADVANCEWARNING SIGNSPACING (A) FEETTAPER LENGTH(12 FT. LANE)(L) FEETBUFFERSPACE(B) FEET125'180'245'155'200'250'4045350'500'320'540'305'360'5055500'500'600'660'425'495' 48"X24"
X X X X X X X X XSPACING:25' @ 40 MPH OR LESS50' @ 45 MPH OR MORESPACING:50' MAX. @ 40 MPH OR LESS100' MAX @ 45 MPH OR MOREA
W20-1AG20-160"X24"G20-2A48"X24"
THIS DETAIL MAY BE USED FOR ROADWAYS WITH EITHER TWO OR THREE LANES IN EACH DIRECTION.ALL SIGNS ARE 48"X48" UNLESS OTHERWISE NOTED. IF NECESSARY DUE TO SPACE CONSTRAINTS INURBAN AREAS, 36"X 36" SIGNS MAY BE USED IF APPROVED BY REGIONAL TRAFFIC UNIT."WO" SIGN IS THE SAME AS "W" SIGN EXCEPT THE BACKGROUND IS ORANGE.ANY SIGNS TEMPORARY OR EXISTING, WHICH CONFLICT WITH THE TRAFFIC CONTROL "IN USE" SHALLBE REMOVED OR COVERED AS NEEDED AND AS APPROVED BY THE ENGINEER. NO WARNING LIGHTSSHALL BE WORKING ON COVERED OR "DOWNED" SIGNS.SIGNS THAT WILL BE IN PLACE LESS THAN 7 CONTINUOUS DAYS AND NIGHTS OR THAT WILL BE PLACEDIN A CLOSED LANE MAY BE MOUNTED ON TEMPORARY SUPPORTS.THE EXACT NUMBER, LOCATION, AND SPACING OF ALL SIGNS AND DEVICES SHALL BE ADJUSTED TO FITFIELD CONDITIONS AS APPROVED BY THE ENGINEER.THE SPACING BETWEEN TRAFFIC CONTROL SIGNS SHOULD BE ADJUSTED TO NOT CONFLICT WITH AND TOPROVIDE A MINIMUM OF 200 FEET (500' DESIRABLE) DISTANCE TO EXISTING SIGNS THAT WILL REMAIN IN PLACEW20-1A, G20-1 AND G20-2A SIGNS ARE NOT REQUIRED IF THE LANE CLOSURE IS WITHIN A LARGER WORK ZONEWHERE THESE SIGNS ARE ALREADY PRESENT.REMOVE PAVEMENT MARKINGS AND PLACE TEMPORARY PAVEMENT MARKING LINE IF LANE CLOSURE IS TO BE
IN PLACE FOR 4 OR MORE CONTINUOUS DAYS AND NIGHTS.CONSIDER GEOMETRICS WHEN LOCATING SIGNS AND ARROW BOARDS SO THE APPROACHING DRIVER HAS ACLEAR VIEW OF THE ARROW BOARDS AND LANE CLOSURE DRUMS FOR A MINIMUM 1500 FEET IN FRONT OF DRUMS.
DRUMS IN A CLOSED LANE THAT MUST BE MOVED FOR A WORK OPERATION SHALL BE IMMEDIATELYREESTABLISHED UPON COMPLETION OF THE OPERATION, OR FOR CONTINUING OPERATIONS, AT THE END OFEACH WORKING DAY.CHANNELIZING DEVICES PLACED ADJACENT TO WORK AREA SHALL BE PULLED BACK FROM THE TRAVEL LANEWHEN WORK IS NOT IN PROGRESS.WARNING LIGHTS ARE NOT REQUIRED IF THE LANE CLOSURE IS A DAYTIME ONLY OPERATION.OMIT G20-1 SIGNS IF LENGTH OF WORK AREA IS 2 MILES OR LESS.2
WORK AREA2 PLACE 3 DRUMS APPROXIMATELYEVERY 1000' ACROSS THECLOSED LANE.1000'
TYPE III BARRICADER11-2L48" X 30"CLOSEDLANE
STATE OF WISCONSINDEPARTMENT OF TRANSPORTATIONAPPROVEDDATEWORK ZONE ENGINEER/S/FHWA
NON-FREEWAY/EXPRESSWAYNovember 2025Andrew Heidtke
CLOSURE, UNDIVIDEDSINGLE RIGHT LANETRAFFIC CONTROL,
6SDD
SDD
6
15D20-11b
15D20-11b
AL(TAPER LENGTH)BUFFER SPACE (B)
GENERAL NOTES
100'TYP.
1
BUFFER SPACE (B)L(TAPER LENGTH)
TEMPORARY PAVEMENT MARKING LINE,6 INCH (WHITE ON RIGHT, YELLOW ON LEFT)
L / 322
AWO4-2L
AAA A100'TYP.
SE
ES
L / 3A SPACING:50' MAX. @ 35 MPH OR LESS100' MAX @ 40 MPH OR MORE
XXX
LEGENDSIGN ON PERMANENT SUPPORTTRAFFIC CONTROL DRUMTRAFFIC CONTROL DRUM WITH TYPE "C" STEADY BURN LIGHTTYPE III BARRICADE WITH ATTACHED SIGNTYPE "A" WARNING LIGHT (FLASHING)REMOVING PAVEMENT MARKINGSDIRECTION OF TRAFFICWORK AREACONNECTED ARROW BOARDWZ START LOCATION MARKEREWZ END LOCATION MARKERS
12
253035200'200'350'POSTED SPEED LIMITPRIOR TO WORKSTARTING (MPH)ADVANCEWARNING SIGNSPACING (A) FEETTAPER LENGTH(12 FT. LANE)(L) FEETBUFFERSPACE(B) FEET125'180'245'155'200'250'4045350'500'320'540'305'360'5055500'500'600'660'425'495'
1WO4-2L SPACING:50' MAX. @ 35 MPH OR LESS100' MAX @ 40 MPH OR MORE
A
W20-1AW20-55A
G20-2A48"X24"
G20-2A48"X24"
G20-160"X24"W20-55A
W20-1A
G20-160"X24"
THIS DETAIL MAY BE USED FOR ROADWAYS WITH EITHER TWO OR THREE LANES IN EACH DIRECTION.ALL SIGNS ARE 48"X48" UNLESS OTHERWISE NOTED. IF NECESSARY DUE TO SPACE CONSTRAINTS INURBAN AREAS, 36"X 36" SIGNS MAY BE USED IF APPROVED BY REGIONAL TRAFFIC UNIT."WO" SIGN IS THE SAME AS "W" SIGN EXCEPT THE BACKGROUND IS ORANGE.ANY SIGNS TEMPORARY OR EXISTING, WHICH CONFLICT WITH THE TRAFFIC CONTROL "IN USE" SHALLBE REMOVED OR COVERED AS NEEDED AND AS APPROVED BY THE ENGINEER. NO WARNING LIGHTSSHALL BE WORKING ON COVERED OR "DOWNED" SIGNS.SIGNS THAT WILL BE IN PLACE LESS THAN 7 CONTINUOUS DAYS AND NIGHTS OR THAT WILL BE PLACEDIN A CLOSED LANE MAY BE MOUNTED ON TEMPORARY SUPPORTS.THE EXACT NUMBER, LOCATION, AND SPACING OF ALL SIGNS AND DEVICES SHALL BE ADJUSTED TO FITFIELD CONDITIONS AS APPROVED BY THE ENGINEER.THE SPACING BETWEEN TRAFFIC CONTROL SIGNS SHOULD BE ADJUSTED TO NOT CONFLICT WITH ANDTO PROVIDE A MINIMUM OF 200 FEET (500' DESIRABLE) DISTANCE TO EXISTING SIGNS THAT WILL REMAININ PLACE.W20-1A, G20-1 AND G20-2A SIGNS ARE NOT REQUIRED IF THE LANE CLOSURE IS WITHIN A LARGER WORKZONE WHERE THESE SIGNS ARE ALREADY PRESENT.REMOVE PAVEMENT MARKINGS AND PLACE TEMPORARY PAVEMENT MARKING LINE IF LANE CLOSURE IS TOBE IN PLACE FOR 4 OR MORE CONTINUOUS DAYS AND NIGHTS.CONSIDER GEOMETRICS WHEN LOCATING SIGNS AND ARROW BOARDS SO THE APPROACHING DRIVER HAS ACLEAR VIEW OF THE ARROW BOARDS AND LANE CLOSURE DRUMS FOR A MINIMUM 1500 FEET IN FRONT OFDRUMS.DUE TO LACK OF SHOULDER/MEDIAN, ARROW BOARD IS PLACED AT THE THE END OF THE TAPER.
CHANNELIZING DEVICES PLACED ADJACENT TO WORK AREA SHALL BE PULLED BACK FROM THE TRAVEL LANEWHEN WORK IS NOT IN PROGRESS.WARNING LIGHTS ARE NOT REQUIRED IF THE LANE CLOSURE IS A DAYTIME ONLY OPERATION.OMIT G20-1 SIGNS IF LENGTH OF WORK AREA IS 2 MILES OR LESS.LANE MAY BE OPENED WHEN WORKERS ARE NOT PRESENT IN THE WORK AREA.
TYPE III BARRICADER11-2L48" X 30"
DRUMS IN A CLOSED LANE THAT MUST BE MOVED FOR A WORK OPERATION SHALL BE IMMEDIATELYREESTABLISHED UPON COMPLETION OF THE OPERATION, OR FOR CONTINUING OPERATIONS, AT THE END OFEACH WORKING DAY.
WORK AREA3
PLACE 3 DRUMS APPROXIMATELYEVERY 1000' ACROSS THECLOSED LANE.
1000'
1000'3CLOSEDLANE
SPACING:25' MAX. @ 35 MPH OR LESS50' MAX @ 40 MPH OR MORE
STATE OF WISCONSINDEPARTMENT OF TRANSPORTATIONAPPROVEDDATEWORK ZONE ENGINEER/S/FHWA
NON-FREEWAY/EXPRESSWAYNovember 2025Andrew Heidtke
CLOSURE, UNDIVIDEDSINGLE LEFT LANETRAFFIC CONTROL,
6SDD
SDD
6
15D20-11c
15D20-11c (414) 296-4333247 W Freshwater Way, Milwaukee WI 53204
TOPSOILSUBSOILSTRAW MULCH OR EROSION CONTROL BLANKETAS SPECIFIED BY CITY PUBLIC WORKSSPECIFIED SEED MIX ANDFERTILIZER APPLIED ATSPECIFIED RATESCARIFY SUBSOIL TO PROMOTEROOT PENETRATION
4" MIN.TOPSOIL AND SEEDING DETAILNO SCALE
STATE OF WISCONSINDEPARTMENT OF TRANSPORTATIONAPPROVEDDATE/S/FHWANovember 2025ANDREW HEIDTKEUNDIVIDED ROADWAYSHOULDER OR PARKING LANE,TRAFFIC CONTROL, WORK ON
STATEWIDE WORK ZONE TRAFFICSAFETY ENGINEER
WORKROADAHEADW20-1A
LEGENDGENERAL NOTES
WORKROADAHEADW20-1A
WORKNARROWSROAD
A
A
W21-5WO5-1
ORIF TRAFFIC CONTROL DEVICESENCROACH ONTO TRAVELED WAY, USE
AL/3BUFFER SPACE (B)ENDROAD WORKG20-2A
50' MAX. AT 40 MPH OR LESS100' MAX. AT 45 MPH OR MORE
ENDROAD WORKG20-2A
5 DRUMSMINIMUMIN TAPERWORK AREA25' MAX AT 40 MPH OR LESS50' MAX. AT 45 MPH OR MORE
253035200'200'350'POSTED SPEED LIMITPRIOR TO WORKSTARTING (MPH)ADVANCEWARNING SIGNSPACING (A) FEETBUFFERSPACE(B) FEET155200250 4045350'500'305360 5055500'500'425495
W, LATERAL OFFSET (FT)82435476210411628405470119132457 10152026455014202735596617253444748332130405389996SHOULDER TAPER L / 3
547391109127145
ALL SIGNS ARE 48"X48" UNLESS OTHERWISE NOTED. IF NECESSARY DUE TO SPACE CONSTRAINTS INURBAN AREAS, 36" X 36" SIGNS MAY BE USED IF APPROVED BY THE REGIONAL TRAFFIC UNIT."WO" SIGN IS THE SAME AS "W" SIGN EXCEPT THE BACKGROUND IS ORANGE.ANY SIGNS TEMPORARY OR EXISTING, WHICH CONFLICT WITH THE TRAFFIC CONTROL "IN USE" SHALL BEREMOVED OR COVERED AS NEEDED AND AS APPROVED BY THE ENGINEER.THE EXACT NUMBER, LOCATION, AND SPACING OF ALL SIGNS AND DEVICES SHALL BE ADJUSTED TO FITFIELD CONDITIONS AS APPROVED BY THE ENGINEER.CHANNELIZING DEVICES PLACED ADJACENT TO WORK AREA SHALL BE PULLED BACK FROM THE TRAVELLANE WHEN WORK IS NOT IN PROGRESS.SIGNS THAT WILL BE IN PLACE LESS THAN 7 CONTINUOUS DAYS AND NIGHTS MAY BE MOUNTED ONPORTABLE SUPPORTS.W20-1A AND G20-2A SIGNS ARE NOT REQUIRED IF THE WORK AREA IS WITHIN A LARGER WORK ZONEWHERE THESE SIGNS ARE ALREADY PRESENT. G20-2A SIGNS MAY ALSO BE OMITTED IF DURATION OFWORK IS LESS THAN 7 CONTINUOUS DAYS AND NIGHTS.
SIGN ON PERMANENT SUPPORTTRAFFIC CONTROL DRUMDIRECTION OF TRAFFICWORK ZONE
48"X24" SHOULDER ORPARKING LANETAPER LENGTH
48"X24"
6SDD
SDD
6
15D28-05
15D28-05
GENERAL PROJECT NOTES:1.WORK INCLUDES CIPP LINNING OF SEWERS ATTWO MAIN PROJECT LOCATIONS IN THE CITY:A.W MAIN ST & COUNTRY CLUB DR/WEST ST.B.MARIANE TERRACE & PINE TREE LN.2.A SUMMARY OF WORK IS BELOW:A.MAINLINE WORK INCLUDES CIPP LINING OF THEMAINLINE SEWERS.B.LATERAL IMPROVEMENTS WILL BEDETERMINED AFTER SANITARY SEWERCLEANING & TELEVISING IS COMPLETED.LATERAL IMPROVEMENTS WILL CONSIST OFGROUTING THE LATERAL CONNECTION ORINSTALLATION OF CIPP LATERAL TEE LINER.3.PROJECT WAS NOT SURVEYED. SANITARY SEWERSYSTEM AND PARCEL LINEWORK IS FROM GIS.LATERAL LOCATIONS ARE FROM TV REPORTS.4.RESTORATION OF DISTURBED TURF AREAS SHALLBE CONSIDERED INCIDENTAL TO THE PROJECT.
190% PLAN SUBMITTAL TO LGUJW
Page 24 of 33
SANSANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSANSANSANSANSANSANSANSANSAN
SANSANSANSANSANSAN
SAN
SANSANSANSANSANSANSANSANSANSAN SANSANSANSANSSSS
S
S
S
S
S
© MSA Professional Services, Inc.www.msa-ps.comENGINEERING | ARCHITECTURE | SURVEYINGFUNDING | PLANNING | ENVIRONMENTALSANITARY SEWER LINING - 2026LAKE GENEVA UTILITY COMMISSION (LGU)CITY OF LAKE GENEVA, WALWORTH COUNTY, WISCONSINPROJECT NO.07815017SHEETG3 DRAWN BY: Init DESIGNED BY: Init CHECKED BY: InitSEWER LINING & TRAFFIC CONTROL PLAN - MAIN ST,COUNTRY CLUB DR & WEST ST PLOT DATE: 6/11/2026 12:59 PM, G:\07\07815\07815017\CADD\Construction Documents\0781507 Sewer Lining Plans.dwg PROJECT DATE: .NO.REVISIONBY .. .. DATE6/11/2026....(414) 296-4333247 W Freshwater Way, Milwaukee WI 53204
MH J7051MH J7050
MH J7052
MH J7049MH J7047MH J7043MH J7048W MAIN ST
WEST ST
COUNTRY CLUB DR
245 COUNTRY CLUB DR270 COUNTRY CLUB DR626 GENEVAST
342 W MAINST334 W MAIN ST326 W MAIN ST320 W MAIN ST110-1 WESTST234 W MAINST226 W MAINST
EXISTING SANITARYSEWER FROM GIS (TYP.)
03060
R3-224"X24"
R3-224"X24"
MAINTAINBIDIRECTIONALACCESS TODRIVEWAYFOR WORK INVOLVING MH J7048 & J7049:REFERENCE SDD 15D20-11B. EB & WB LEFTTURN LANES TO BE CLOSED AS PART OFWORK INVOLVING MH J7048 & J7049
REFERENCE SDD 15D20-11C; ADVANCEDSIGNAGE AND TRAFFIC CONTROL DEVICESWITHIN THE CLOSURE TAPERS ARE NOTNEEDED DUE TO UPSTEAM TURN LANESTYPE III BARRICADETYPE III BARRICADE WTH ATTACHED SIGNTRAFFIC CONTROL DRUMSIGN ON TEMPORARY SUPPORT
GENERAL NOTES FOR TRAFFIC CONTROL1.TRAFFIC CONTROL PLANS ARE NOT TO SCALE.2.COVER, REMOVE, OR ALTER ANY EXISTING OR PROPOSED SIGNS THAT DISPLAY A CONFLICTING MESSAGE.3.BARRICADES THAT MUST BE MOVED FOR A WORK OPERATION SHALLBE IMMEDIATELY RE-ESTABLISHED UPON COMPLETION OF THE OPERATION, OR FOR CONTINUING OPERATIONS, AT THE END OF EACHWORKING DAY.4.MAINTAIN ACCESS TO DRIVEWAYS AT ALL TIMES.LEGEND - SANITARY SEWER:CURED-IN-PLACE LINER, 8-INSSWR TV REPORT NOTES LATERAL IS CAPPEDLATERAL IMPROVEMENTS; SEE GENERAL PROJECT NOTES ON SHEET G2
TYPE III BARRICADECLOSEDLANER11-2L48" X 30"
TYPE III BARRICADECLOSEDLANER11-2L48" X 30"
TRAFFIC CONTROL LEGEND
190% PLAN SUBMITTAL TO LGUJW
Page 25 of 33
<><><><><>
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSANSANSANSANSANSAN
SANSANSANSANSANSANSAN
SAN
SANSANSSS
S
S
SSS
S
SSS
S
S
S
S S
S
S
S
S
© MSA Professional Services, Inc.www.msa-ps.comENGINEERING | ARCHITECTURE | SURVEYINGFUNDING | PLANNING | ENVIRONMENTALSANITARY SEWER LINING - 2026LAKE GENEVA UTILITY COMMISSION (LGU)CITY OF LAKE GENEVA, WALWORTH COUNTY, WISCONSINPROJECT NO.07815017SHEETG4 DRAWN BY: Init DESIGNED BY: Init CHECKED BY: InitSEWER LINING & TRAFFIC CONTROL PLAN - MARIANETERRACE & PINE TREE LANE PLOT DATE: 6/11/2026 12:59 PM, G:\07\07815\07815017\CADD\Construction Documents\0781507 Sewer Lining Plans.dwg PROJECT DATE: .NO.REVISIONBY 190% PLAN SUBMITTAL TO LGU.. .. DATE6/11/2026..JW..(414) 296-4333247 W Freshwater Way, Milwaukee WI 53204
LAKE GENEVA
MH L6031
PINE TREE LA
MARIANNE TERRACE
N KNOLL LA
S LAKE SHORE DR
MH L6030MH L6028MH L6027MH L6026
MH L6034MH L6022MH L6035
MH L6041MH L6040
MH L6038
MH L6032LIFT STATION WETWELL / MH L6043MH L6042
MH L6029MH L6046
MH L6039MH L6037MH L6036MH L6023
815 PINE TREE LA739 PINE TREE LA731 PINE TREE LA725 PINE TREE LA721 PINE TREE LA713 PINE TREE LA709 PINE TREE LA705 PINE TREE LA
830 PINE TREE LA
824 PINE TREE LA818 PINE TREE LA
816 PINE TREE LA806 PINE TREE LA742 PINE TREE LA736 PINE TREE LA739 KNOLL LA724 PINE TREE LA960 S LAKE SHORE DR960 S LAKE SHORE DR
915 MARIANE TERRACE914 MARIANE TERRACE924 MARIANE TERRACE932 MARIANE TERRACE938 MARIANE TERRACE946 MARIANE TERRACE950 MARIANE TERRACE962 MARIANE TERRACE739 KNOLL LA
910 MARIANE TERRACE
MH L6033
EXISTING SANITARYSEWER FROM GIS (TYP.)
REFERENCE SSD 15D28-05 FORAPPROPRIATE SIGNAGE &TRAFFIC CONTROL DEVICES
03060
TYPE III BARRICADETYPE III BARRICADE WTH ATTACHED SIGNTRAFFIC CONTROL DRUMSIGN ON TEMPORARY SUPPORT
GENERAL NOTES FOR TRAFFIC CONTROL1.TRAFFIC CONTROL PLANS ARE NOT TO SCALE.2.COVER, REMOVE, OR ALTER ANY EXISTING OR PROPOSED SIGNS THAT DISPLAY A CONFLICTING MESSAGE.3.BARRICADES THAT MUST BE MOVED FOR A WORK OPERATION SHALLBE IMMEDIATELY RE-ESTABLISHED UPON COMPLETION OF THE OPERATION, OR FOR CONTINUING OPERATIONS, AT THE END OF EACHWORKING DAY.4.MAINTAIN ACCESS TO DRIVEWAYS AT ALL TIMES.LEGEND - SANITARY SEWER:CURED-IN-PLACE LINER, 8-INSSWR TV REPORT NOTES LATERAL IS CAPPEDLATERAL IMPROVEMENTS; SEE GENERAL PROJECT NOTES ON SHEET G2TRAFFIC CONTROL LEGEND
Page 26 of 33
Page 27 of 33
\Agreements\Draft Agreements\Walworth ID 3170-09-01/71/81 – SE Region
Page 1 of 3
STATE/MUNICIPAL AGREEMENT
FOR A STATE- LET HIGHWAY
PROJECT
Date: June 9, 2026
I.D.: 3170-09-01/71/81
Road Name: STH 50
Limits: FOREST ST TO WELLS ST
County: Walworth
Roadway Length: 1.16 Miles
The signatory Lake Geneva Utility Commission, hereinafter called the Municipality, through its undersigned duly
authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter
called the State, to initiate and effect the highway or street improvement hereinafter described.
The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2),
and (3) of the Statutes.
NEEDS AND ESTIMATE SUMMARY:
Existing Facility - Describe and give reason for request: Improvement of Connecting Highway
Proposed Improvement - Nature of work: As determined by project scoping.
Describe non-participating work included in the project and other work necessary to finish the project
completely which will be undertaken independently by the municipality: A nominal amount is included to cover
items in paragraph 4 (to be adjusted in the final plan). Items to be 100% locally funded could include, but may not
be limited to, adjustment of water service boxes, gate valves, and manholes; adjustment of sanitary sewer manholes,
placing of new sanitary manhole seals and covers, stone wall reinstall, surface replacement for utility install.
TABLE 1: SUMMARY OF COSTS
Total F ederal/State Municipal
Phase Est. Cost Funds % Funds %*
Preliminary Engineering:
Plan Development
Real Estate Acquisition:
Acquisition 100% -$ 0%
Compensable Utilities -$ -$ 0% -$ 100%
Construction: 1
Participating 7,126,200$ 7, 126,200$ 100% -$ 0%
Non-Participating (71) 100,000$ -$ 0% 100,000$ 100%
Non-Participating (81) 3,150,000$ -$ 0% 3,150,000$ 100%
Total Cost Distribution 10,376,200$ 7,126,200$ 3,250,000$
* See Item 8 Basis for local participation in Terms and Conditionsplans are complete.
This request is subject to the terms and conditions that follow (pages 2 – 3) and is made by the undersigned under
proper authority to make such request for the designated Municipality and upon signature by the State and delivery
to the Municipality shall constitute agreement between the Municipality and the State. No term or provision of
neither the State/Municipal Agreement nor any of its attachments may be changed, waived or terminated orally
but only by an instrument in writing executed by both parties to the State/Municipal Agreement.
Page 28 of 33
\Agreements\Draft Agreements\Walworth ID 3170-09-01/71/81 – SE Region
Page 2 of 3
Signed for and in behalf of the Lake Geneva Utility Commission (please sign in blue ink)
Name Title Date
Signed for and in behalf of the State (please sign in blue ink)
Name Title SE Region Planning Chief Date
TERMS AND CONDITIONS:
1. The Municipality shall pay to the State all costs incurred by the State in connection with the improvement which
exceeds federal/state financing commitments or are ineligible for federal/state financing. Local participation
shall be limited to the items and percentages set forth in the Summary of Costs table, which shows Municipal
funding participation. In order to guarantee the Municipality’s foregoing agreements to pay the State, the
Municipality, through its above duly authorized officers or officials, agrees and authorizes the State to set off
and withhold the required reimbursement amount as determined by the State from General Transportation
Aids or any moneys otherwise due and payable by the State to the Municipality.
2. Funding of each project phase is subject to inclusion in an approved program and per the State’s Facility
Development Manual (FDM) standards. Federal aid and/or state transportation fund financing will be limited
to participation in the costs of the following items as specified in the Summary of Costs:
(a) Design engineering and state review services.
(b) Real Estate necessitated for the improvement.
(c) Compensable utility adjustment and railroad force work necessitated for the project.
(d) The grading, base, pavement, curb and gutter, and structure costs to State standards, excluding the cost of
parking areas.
(e) Storm sewer mains, culverts, laterals, manholes, inlets, catch basins , and connections for surface water
drainage of the improvement; including replacement and/or adjustments of existing storm sewer manhole
covers and inlet grates as needed.
(f) Construction engineering incidental to inspection and supervision of actual construction work, except for
inspection, staking, and testing of sanitary sewer and water main.
(g) Signing and pavement marking necessitated for the safe and efficient flow of traffic, including detour routes.
(h) Replacement of existing sidewalks necessitated by construction and construction of new sidewalk at the
time of construction. Sidewalk is considered to be new if it’s constructed in a location where it has not
existed before.
(i) Replacement of existing driveways, in kind, necessitated by the project.
(j) New installations or alteration resulting from roadway construction of standard State street lighting and
traffic signals or devices. Alteration may include salvaging and replacement of existing components.
4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or
facility owner includes the following items:
(a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone,
telegraph, fire or police alarm facilities, parking meters, and similar utilities.
(b) New installation or alteration of signs not necessary for the safe and efficient flow of traffic.
(c) Roadway and bridge width in excess of standards.
Page 29 of 33
\Agreements\Draft Agreements\Walworth ID 3170-09-01/71/81 – SE Region
Page 3 of 3
(d) Construction inspection, staking, and material testing and acceptance for construction of sanitary
sewer and water main.
(e) Provide complete plans, specifications, and estimates for sanitary sewer and water main work. The
Municipality assumes full responsibility for the design, installation, inspection, testing, and operation of
the sanitary sewer and water system. This relieves the State and all of its employees from the liability for
all suits, actions, or claims resulting from the sanitary sewer and water system construction.
(f) Parking lane costs.
(g) Coordinate, clean up, and fund any hazardous materials encountered during construction. All
hazardous material cleanup work shall be performed in accordance to state and federal regulations.
(h) Damages to abutting property due to change in street or sidewalk widths, grades, or drainage.
(i) Conditioning, if required, and maintenance of detour routes.
(j) Repair of damages to roads or streets caused by reason of their use in hauling materials incidental to
the improvement.
5. As the work progresses, the Municipality will be billed for work comple ted which is not chargeable to
federal/state funds. Upon completion of the project, a final audit will be made to determine the final division of
costs.
6. If the Municipality should withdraw the project, it shall reimburse the State for any costs incurred by the State
in behalf of the project.
7. The work will be administered by the State and may include items not eligible for federal/state participation.
(a) The Municipality shall assume general responsibility for all public information and public relations for
the project and to make a fitting announcement to the press and such outlets as would generally alert the
affected property owners and the community of the nature, extent, and timing of the project and
arrangements for handling traffic within and around the projects.
8. Basis for local participation: Participation is based on actual costs incurred, all costs listed in Table1: Summary
of Costs are approximate costs unless otherwise noted
(a) Funding for preliminary engineering for a connecting highway 75% State 25% Municipal based on the
Department’s policy for connecting highways. City of Lake Geneva is funding the Municipal share of
design for this project
(b) Funding for compensable utilities required for standard roadway construction, 100% Municipal.
(c) Funding for construction of standard roadway items – 100% State.
(d) Funding for non-participating items 100% Municipal.
Comments and Clarification: This agreement is an active agreement that may need to be amended as the project
is designed. It is understood that these amendments may be needed as some issues have not been fully evaluated
or resolved. The purpose of this agreement is to specify the local and state involvement in funding the project.
A signed agreement is required before the State will prepare or participate in the preparation of detailed designs,
acquire right-of-way, or participate in construction of a project that merits local involvement.
[END]
Page 30 of 33
Page 31 of 33
Page 32 of 33
STATE OF WISCONSIN
WALWORTH COUNTY
CITY OF LAKE GENEVA
UTILITY COMMISSION
RESOLUTION NO. 2026 - 02
WHEREAS, the Wisconsin Department of Natural Resources has issued a permit to the
Lake Geneva Wastewater Treatment Plant to discharge under the Wisconsin Pollutant
Discharge Elimination System; and
WHEREAS, Chapter NR 208, Wis. Admin. Code, requires that WPDES permittees
complete and submit a Compliance Maintenance Annual Report (CMAR) to the Wisconsin
Department of Natural Resources each year; and
WHEREAS, the City of Lake Geneva Board of Utility Commissioners has completed a
review of the 2025 Compliance Maintenance Annual Report ; and
WHEREAS, the WDNR has been provided with interim goals for chloride concentrations
and mass loadings to groundwater that are based on operational variations in plant flows,
and
WHEREAS, based on the review of the Groundwater Quality section of the CMAR,
continued efforts to reduce chlorides in the wastewater collection and treatment system did
not result in compliance with Groundwater Enforcement Standards for chloride, as outlined
in Chapter NR 140, Wis. Admin. Code , and the effluent quality standards in the WWTP’s
WPDES Permit; and
WHEREAS, Staff has been directed to accelerate activities outlined in th e Chloride Source
Reduction Measures Plan, specifically including the development of a customer incentive
program to reduce chloride loadings contributed from water conditioning equipment.
NOW, THEREFORE, BE IT HEREBY RESOLVED that the City of Lake Geneva Board of
Utility Commissioners does hereby approve the 2025 Compliance Maintenance Annual
Report for the Lake Geneva Wastewater Treatment Plant.
BE IT FURTHER RESOLVED that Utility Staff have been directed to electronically submit
the report to the Wisconsin Department of Natural Resources, as required under Chapter
NR 208, Wis. Admin. Code .
Adopted this 15th day of June 2026, on a ____ - ____ vote.
CITY OF LAKE GENEVA
UTILITY COMMISSION
By: _________________________
Dennis Lyon, President
Attest: _________________________
Jo Busch, Utilities Coordinator