May 26, 2026 Public Works Committee Agenda 1
City of Lake Geneva, 626 Geneva St, Lake Geneva, WI 53147-262.248.3673-www.cityoflakgeneva.gov
Public Works Committee Agenda
Tuesday, May 26, 2026 - 4:00 PM
Lake Geneva City Hall, Council Chambers
Members:
Chair: Cathy Stoodley
JaNelle Powers, Linda Frame, Mary Jo Fesenmaier and Brian Smith
1. Call to Order
2. Roll Call
3. Comments from the public limited to 5 minutes, limited to items on this agenda
4. Approval of the minutes from April 27, 2026
5. Written Staff Reports
a. Director of Public Works Report
b. Street Superintendent Report
c. Parking Manager Report
d. Engineer Report
6. Highway 50 Update
7. Walworth County Highway Dept Update on CTH H construction
8. Discussion/Recommendation regarding draft policy for crosswalks, curb ramps, and sidewalks
9. Adjournment
A quorum of the Council may be present; however, no official Council action will be taken.
Requests from persons with disabilities who need assistance to participate in this meeting should be made to the City Clerk’s office in advance
so that the appropriate accommodations can be made.
Page 1 of 14
April 27, 2026 Public Works Committee Minutes 1
City Of Lake Geneva Public Works Committee Minutes
Monday, April 27, 2026 - 4:00 PM
Lake Geneva City Hall, Council Chambers
Call to Order
Meeting called to order by chairperson Stoodley.
Roll Call
Present:Cathy Stoodley, JaNelle Powers, Linda Frame, Mary Jo Fesenmaier, and Brian Smith
Others Present: City Administrator Dave De Angelis, Mayor Todd Krause, Public Works Director Tom Earle,
Public Works Superintendent Neil Waswo, Parking Manager Beth Gehris-Padro, and Noami Rauch.
Comments from the public limited to 5 minutes, limited to items on this agenda
Joel Hoiland, 390 Country Club Drive spoke regarding staff reports.
Peggy Schneider, 245 Lookout Drive, expressed concerns in regards to item 10.
Approval of the minutes from March 23, 2026.
Motion to approve by Powers, Second by Frame.
Voice vote, approved, motion carried.
Written Staff Reports
Director of Public Works Report
Public Works Director's report was included in the packet.
Committee members and Earle discussed multiple topics included in the report.
City Administrator Dave De Angelis explained pothole liability.
Street Superintendent Report
The Street Superintendent's report was included in the packet.
Committee members and Waswo discussed topics included in the report.
Parking Manager Report
The parking manager's report was included in the packet.
Discussion ensued regarding motorcycle and compact vehicle parking stalls.
Committee members and Gehris-Padro further discussed chalking data.
Engineer Report
The engineer's report was included in the packet.
Noami Rauch from Kapur briefly explained her report.
Highway 50 update
The Highway 50 update was included in the report.
De Angelis stated that a decision regarding the appearance of the traffic light pole should be made soon.
Discussion/Recommendation regarding declaring items from DPW for Wisconsin Surplus
Earle gave an overview of the auction list.
Fesennmaier requested pictures of auction items.
Motion to approve by Frame, second by Smith.
Voice vote, approved, motion carried.
Discussion regarding Sidewalk Evaluation Phase 2 results (Kapur)
Rauch explained the rating chart that was included in the packet.
Committee members and Rauch discussed evaluations of sidewalks.
Page 2 of 14
April 27, 2026 Public Works Committee Minutes 2
Discussion/Recommendation regarding Swan Creek Development Public Road Improvements (Kapur)
Rauch gave an overview of the Swan Creek Supper Club Public Road Improvements.
Neal Syka from Kapur explained the traffic configuration on Sage Street and Interchange North options that were
included in the packet.
Committee members and De Angelis discussed funding and projected costs for the traffic configuration.
Motion by Frame to approve Public Road Improvement for Sage Street as shown on the map, Second by Stoodley.
Discussion ensued regarding reconfiguration and restriping.
Voice vote, approved, motion carried.
Discussion regarding draft policy for crosswalks, curb ramps and sidewalks
Fesenmaier gave an overview of the purpose of the crosswalks, curb ramp and sidewalks policy that was included
in the packet.
Discussion ensued regarding revisions that should have been added to the policy and the reasons those revisions
are needed.
Rauch elaborated on the procedures, guidelines, and regulatory standards followed in the road project.
The draft policy was continued until changes are discussed with the assistant city administrator.
Adjournment
Motion by Powers to adjourn, second by Fesenmaier.
Voice vote, approved, motion carried.
Page 3 of 14
City of Lake Geneva
Department of Public Works
1065 Carey St.
Lake Geneva, WI 53147
262.248.6644
Streets l Parks l Forestry l Cemeteries l Buildings & Grounds
_____________________________________________________________________________
To: Public Works Committee
From: Tom Earle, Director of Public Works
RE: May. 2026 Director’s Report
PUBLIC WORKS OFFICE & ADMINISTRATION
DOT.
• Discuss Hwy 50 with LGUC and WisDOT several times, ongoing. Meet with Mayor/parking.
Trolley meetings.
• Discuss Real Estate acquisitions for STH 120 project with Admin and WisDOT Engineer. Ongoing,
meet with MaryKate.
• Meet with WisDOT regarding building projects on STH 50. Signage and traffic signage and
signals. Discuss ROW encroachments. Meet on site. The Manor Pillars.
DPW
• Meet regarding spillway lighting, ongoing, discuss with LGBC. Meet with BC regarding this and
other projects. Discuss with GLLC.
• Meet with Parks Director several times.
• Meet with Admin several times
• Meet with Comptroller several times.
• Currently working on CIP projects. Museum roof RFB opened 22 April. Museum furnace RFB due
20 May. Meet with Comptroller regarding funds
• Meet with designer/engineer on salt shed addition. Project projected start date 22 Sept. Project
moved back due to scheduling. Tentative date, April 2026. Started 1st week April, walls poured.
Floor in, demo work begun
• Discuss border roads winter maintenance with surrounding Muni’s.
• Review ROW permits, meet with B&Z. Attend DRT
• Daily activities, signage, roads, salt allocation, salt application seminars, etc. Signage issues
around town.
• Attend demo for asphalt
• Meet with WalCo, Engineers regarding Int. North project. Traffic issues for detour.
• Alleys are being listed based on PASER ratings. DPW aware of several issues in alleys. Baker St,
Crawford, Etc. Lists moving forward will include any known issues.
Cemeteries
• Survey complete, data compilation for design started. Borings performed. Project bids collected,
to be on Cemetery Board Agenda
• Attend Cemetery Board in May.. Updates on projects
• Several issues at Oak Hill are being resolved and ongoing. Many ownership issues lately, assisted
numerous families for ownership issues. This is ongoing and ramping up. LTE employment
looked at
• Address past errors in record keeping at Oak Hill, ongoing. Many new issues found.
Page 4 of 14
City of Lake Geneva
Department of Public Works
1065 Carey St.
Lake Geneva, WI 53147
262.248.6644
Streets l Parks l Forestry l Cemeteries l Buildings & Grounds
• DPW Admin Assistant is working on finding possible remedies for the Oak Hill Columbarium
issues. Intern fell through, looking for LTE, discussed at Cemetery Board
• Columbarium rebid opened 08 April, recommendation on Council agenda. Approved
• RFB for Sexton Shed came in at budget, hopefully work starts in next few months. Fence is
moved, trees removed. Waiting for project to begin
• Oak Hill running with one Staff member on leave.
• Meet with Comptroller, Admin and Asst. Admin regarding ERF and CIP
Page 5 of 14
City of Lake Geneva
Department of Public Works
1065 Carey St.
Lake Geneva, WI 53147
262.248.6644
DPW May 2026 Operational Report
Streets
I have been working with city Engineer on the 2026 Street program.
The 2026 street program construction has started.
Highway H construction has started.
Sweepers are out cleaning curb lines.
Staff have been repairing and straightening street signs and traffic signs.
Staff are working on streetlight repairs.
Staff have been out doing utility locates.
Staff are doing downtown and park garbage pickup Monday, Wednesday, Friday, Saturday and
Sunday.
DPW office have been getting visitors regularly for the brush drop off.
Staff also have been completing needed repairs to equipment.
Crews are out when weather permits filling Potholes weekly.
Staff have been attending online training courses and getting additional certifications.
Crews are out doing storm drain repairs along with contractors.
Crews were out clearing storm drains and keeping culverts cleared.
New salt shed construction is under way.
Met with TDS contractors. They will be installing fiber optics in the city.
Parks
Staff have been working on some PMs to mowing equipment.
Contractor has edged and mulched city flower beds.
Composte site has been cleaned up for spring material.
All public restrooms are open. Two weeks earlier than usual.
Page 6 of 14
City of Lake Geneva
Department of Public Works
1065 Carey St.
Lake Geneva, WI 53147
262.248.6644
Have been working on minor repairs to some playground equipment.
Crews are still going out for Curbside pickup. Spring program will end May26th. Drop off site
will still be open.
New stop signs have been installed at Broad and Dodge st.
Crews are out mowing.
We have two seasonal people started for the mowing crew.
Lake front crew has started on the weekends.
Crews are out doing restorations from winter damage.
Vets Park has been busy with weekend tournaments.
Staff met with the YMCA and went over responsibilities at Vet’s park with new staff.
Installed a new bottle fill station in Seminary Park. Will be working on others.
Forestry
Staff have been attending online and in person training.
The crew is out trimming trees.
Crews have been working on tree removals.
Staff cleaned up storm damage from heavy winds.
Crews are out stump grinding and restoring each location.
Also working on specs for new bucket truck.
Riviera
Lower Riviera is open for the season.
Working on AC unit issues.
Fountain is running
Page 7 of 14
Parking Operations Report -May 2026
2026 Parking Permits:
• 4,866 (4472 Resident – 217 WalCo Resident - 177 Business)
• 31/40 Parking Lot Permits
Citation Report:
Total: 12,500
Issued:2035
Paid: 8195
Dismissed/Closed: 1980
Sent to Collection: 0
Warning: 237
In Dispute: 53
Information pulled 5/20/2026
Ongoing Plan for 2026:
• Kiosk Quarterly Maintenance complete in advance of Memorial Day weekend
• Beach Kiosks updated and ready for Season Open
• Review of new Parking Configuration at Boat Launch
o Loss of 4 parking spaces on Wrigley Drive
o Updated location of signs at kiosk and spaces
Month Parkmobile-App Flowbird-Kiosks Month Parkmobile-App Flowbird-Kiosks
2026-01 18,895.00$ 29,416.30$ 2025-01 -$ 1,016.72$
2026-02 68,987.00$ 101,207.89$ 2025-02 59,369.00$ 89,258.76$
2026-03 66,394.00$ 87,701.80$ 2025-03 69,120.00$ 105,650.17$
Total Q1 154,276.00$ 218,325.99$ Total Q1 128,489.00$ 195,925.65$
Q1 Grand Total 372,601.99$ Q1 Grand Total 324,414.65$
2026-04 71,183.00$ 92,495.25$ 2025-04 65,362.00$ 101,188.91$
2026-05 69,324.00$ 95,246.32$ 2025-05 122,054.00$ 187,317.80$
2026-06 -$ -$ 2025-06 156,953.00$ 270,242.27$
Total Q2 140,507.00$ 187,741.57$ Total Q2 344,369.00$ 558,748.98$
Page 8 of 14
• Uptick in paid parking in Zone 8016 Dodge Street & North Broad due to parking lot
closure at 500 Broad Street.
• Identification of areas requiring more paid parking signs or signposts
▪ Dodge Street (may use temporary PBox option)
▪ Lake Shore Drive, 100 block west side
▪ Broad Street, 400 block west side
▪ Cook St at Geneva St (may use temporary PBox option)
▪ Library Park, West (may use temporary PBox option)
o Removing Compact Sign at parallel space in front of Post Office
o Removing one Compact Space in 700 block of Geneva St
• Staff discussion of No Parking Zone on Broad Street at Geneva Theatre
o Possible use for Trolley Stop. Project discussion ongoing.
• Ongoing participation in Hwy 50 Construction Discussion Group
• Parking Manager is attending the International Parking & Mobility Institute
Conference in Milwaukee WI, June 14-17
2026-Revenue Impact
• Winterfest -$15,940 +shuttle value
• Church Parking Weekly Retail Value -$44,280
• Food Pantry Weekly Retail Value -$4,320
• YMCA 5K -$640
• Farmer’s Market -$13,260
• Concerts in the Park -$700
• Liberty on the Lake -$800
• Pink the Lake -$120
• Art in the Park -$13,500 est +shuttle value
• Venetian Fest -$39,120 est +shuttle value
• Fat Tire Charity Ride -$1000
o Total Impact -$133, 680
2025-Revenue Impact (-$134,173.72 includes shuttle)
Page 9 of 14
kapurinc.com
1224 South Pine Street
Burlington, WI 53105
T: 262.767.2747 • F: 262.767.2750
D:\Walworth_Co\Lake Geneva_City\Gov\260261_2026_Lake_Geneva_General_Engineering_DPW\PHSE 01
Meetings\PWC\05 MAY\May 2026 PWC Kapur Update.docx
Memo to City of Lake Geneva
To: Tom Earle, Director of Public Works Date: May 20, 2026
From: Naomi Rauch, P.E.
262-758-6032
CC: Kassandra Vina, City of Lake Geneva
Subject: Kapur Updates – May 2026 PWC
Oak Hill Cemetery Roads – Phase 1
Three competitive bids were received for the Phase 1 road improvements at Oak Hill Cemetery.
Bids will be submitted to Council.
Center Street and Interchange North
CTH H roadway improvements are anticipated to start June 1st. The developer of the NE quadrant
has provided proposed public road improvements to enable their proposed ingress/egress on
Interchange North at Sage as discussed last month. At the time of this report, we are not aware of
any official “acceptance” from the County.
HWY 50
The project is set to be let in November of 2026 and construction through the 2027 and 2028
seasons. Work is projected to start at the west end (Snake Road). Notifications to property owners
with structure encroachments within the Right of Way will begin within the next few weeks. Draft
PS&E is under review.
2025 Street Program
Punchlist items remaining. Working with Wolf to complete.
HWY 120 / Townline SISP
Pedestrian accommodations have been reviewed and discussed with WisDOT. Kapur will present
justifications for “maximum extents feasible” design decisions at June PWC for discussion.
HWY 120 DOT Project
The plat and relocation order for real estate on STH 120 were approved at Council and filed with
the County. The real estate consultant can begin negotiations.
2026 Street Program
Paving on Wrigley is scheduled for Wednesday May 20th and striping to follow. The roadway
should be reopened on schedule by Memorial Day. Park Drive sidewalk and path will be next to be
completed. Start data to be determined.
Page 10 of 14
Highway 50 Update
The reconstruction of WIS 50 through the City of Lake Geneva is on schedule to take place in 2027 and
2028. Weather permitting, roadway construction is anticipated to start as early as possible in 2027
(February) and go through the end of calendar year 2028.
WisDOT project will also incorporate the City’s water and sanitary improvements into the final plan set
and Let with the WisDOT project.
Upcoming milestones/events:
• Real estate acquisition process has begun and is anticipated to go through end of summer 2026
• Utility (private) coordination has started and is anticipated to go through mid-summer 2026
o Note: private utility (AT&T, WE gas/electric, etc…) relocations/moves are anticipated to
start late summer/ early fall 2026. WisDOT is still working on getting anticipated dates
on when those relocates will start.
• Public information meeting #2 was held on March 19th, 2026 at same location as last time.
• Bloom submitted 90% draft plans for review, the 90% draft review meeting will be held on 6/2
(Virtually). The City was sent an invite and the opportunity to comment on plans and specials.
• On going coordination with the City regarding plan details and special provisions.
• WisDOT is finalizing the SMFA now and will send over to the City for review and approval in the
next couple of weeks.
Page 11 of 14
NEWS RELEASE
FOR IMMEDIATE RELEASE
May 20, 2026
County Highway-H (Interchange North) Construction
-City of Lake Geneva-
Construction to continue along CTH-H (Interchange North) in the City of Lake Geneva through
the Summer.
(ELKHORN, WI): The City of Lake Geneva is nearing completion of their underground utility
work on CTH -H between George Street and E. Geneva Square . Walworth County will be
following up with a roadway repair and resurfacing project expected to last until late August.
What to Expect
Beginning in early June, the City’s utility contractor will demobilize, and the County’s pavement
contractor will resume construction activities. Traffic patterns will be shifting, and the road will
remain open with one lane in each direction until the end of June. After July 4, a signed detour
will be in place using local roads as the contractor completes work between George St. and Center
St.
Keep an eye out for message signboards for more specific information as it becomes available.
The work is anticipated to be completed by the end of August.
Who to Contact
During construction, questions or concerns can be directed to Joe Kroll, County Engineer at
(262) 741-3441 or via email at jkroll@co.walworth.wi.us
###
Page 12 of 14
4/24/26
City of Lake Geneva
Policy on Crosswalks, Curb Ramps, and Sidewalks
Purpose
The purpose of this policy is to establish a consistent framework for the design, construction,
maintenance, and placement of crosswalks, curb ramps, and sidewalks within the City of Lake
Geneva, ensuring compliance with all applicable federal and state standards while minimizing
legal risk.
Scope
This policy applies to all city-owned or city-managed public rights-of-way, including streets,
sidewalks, intersections, and pedestrian facilities.
Policy Statement
The City of Lake Geneva shall adhere to all applicable federal and state laws, regulations, and
guidelines governing crosswalks, curb ramps, and sidewalks. The City will not adopt design
standards that conflict with or deviate from these established requirements.
Governing Standards and Regulations
Federal Standards
The City shall comply with all applicable federal requirements, including:
• Manual on Uniform Traffic Control Devices (MUTCD)
• Americans with Disabilities Act (ADA)
• Public Right-of-Way Accessibility Guidelines (PROWAG)
• U.S. Access Board guidance
State Standards
The City shall comply with all applicable State of Wisconsin requirements, including:
• Wisconsin Department of Transportation (WisDOT) Standard Detail Drawings
• WisDOT Facilities Development Manual
• WisDOT Standard Specifications for Highway and Structure Construction
Local Ordinances
All work shall remain consistent with:
• City of Lake Geneva Municipal Code, Chapter 62 – Streets, Sidewalks, and Other Public
Places
Design and Implementation
Crosswalks
Crosswalk design, placement, and marking shall comply with federal and state standards.
• The City retains the ability to paint and maintain crosswalks in approved patterns
consistent with applicable guidelines.
Curb Ramps
• Curb ramps shall be designed and constructed in full compliance with ADA, PROWAG,
and applicable WisDOT standards.
• All curb ramp installations must meet required accessibility specifications.
Page 13 of 14
4/24/26
Sidewalks
• Sidewalk construction and reconstruction shall comply with ADA, PROWAG, and
WisDOT standards.
• Accessibility and safety shall be primary considerations in all sidewalk design and
maintenance activities.
Roles and Responsibilities
Public Works Department
• Responsible for implementation and maintenance.
Code Enforcement
• Responsible for enforcement of policy.
Engineering Consultants
• Responsible for design and technical recommendations in accordance with the most
stringent applicable standards.
Public Works Committee
• Provides oversight and policy direction.
City Administration and Legal Counsel
• Provide guidance to ensure compliance and minimize liability.
Risk Management and Compliance
The City shall not deviate from established federal and state standards when designing or
implementing crosswalks, curb ramps, or sidewalks. Deviation might increase risk of legal
liability and litigation.
Public Awareness
To enhance safety and accessibility, the City may implement:
• Increased or improved signage
• Public education or information campaigns
• Other awareness initiatives related to pedestrian safety
Policy Review
This policy shall be reviewed periodically by the Public Works Committee and City
Administration to ensure continued compliance with evolving federal and state regulations.
Effective Date
This policy shall take effect upon adoption by the Common Council.
Page 14 of 14