Highway Committee Meeting — Minutes
Town of Linn · Walworth County · Highway Committee Meeting · meeting of Jul 7, 2026 · Minutes
Open the original document More from Town of Linn
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Meeting Minutes
HIGHWAY COMMITTEE
TUESDAY, July 7th, 2026, 6:00 PM
TOWN CONFERENCE ROOM
W3728 Franklin Walsh St. Zenda, WI. 53195
1) Call to Order: 6:00 pm
2) Roll Call: Palmer, Livingston, Handel, Polyock present. Hayden - excused.
3) Approval of meeting minutes:
- Motion by Livingston, second by Handel motioned to approve the minutes
from May 5, 2026, meeting. Motion Carried
4) Comments from the public:
- Matt and Steve Loudenbeck (Residents at Hillside Bridge Project): Addressed the
committee regarding significant ongoing issues with the bridge construction. He
reported a lack of communication, workers parking in his driveway, and a crew
member bringing a dog onto his property. He was also informed that during the
concrete pour, his driveway would be blocked for 5-7 hours, which he called
unacceptable for a working dairy farm with frequent deliveries and equipment
movements. He requested compensation for the disruption.
5) a. Highway Profit & Loss Statements - April 2026
- David Zimmerman presented the June 2026 Profit & Loss Statements. The committee
briefly discussed high costs related to equipment repairs, noting that modern
equipment seems to require frequent maintenance.
- Action: No formal motion. The report was accepted as presented.
b. Monthly Highway Report
- Superintendent Wittum presented the report. He noted ongoing challenges with
drainage from heavy rains and mentioned the department is back to dealing with tree-
related issues. He acknowledged the issues at the Hillside Bridge project, stating the
farm residents have been very patient, and a lack of initial planning contributed to the
problems.
c. Monthly Vehicle Maintenance Report – May & June 2026
- No formal motion, report accepted as presented.
d. W3805 Parker Drive Water Problem
- Ben Stewart, the property owner, presented his concern. He explained that water
accumulates in a town easement and pools, eventually flowing down his driveway. He
requested the town install a pipe under the top of his driveway, within the easement, to
route the water to a ravine on the north side of his property.
- Action: The committee directed Superintendent Wittum to survey the site, check
the elevations, and assess the feasibility of installing a pipe to meet the property
owner’s request. He will report back at the next meeting.
e. Basswood Drive Curb Replacement Bids
- A single bid from Upland Construction and Maintenance LLC for $8,600 was
reviewed. Superintendent Wittum noted this was cheaper than the last section replaced
and recommended using the "road bond" fund (damage by contractor fund) as the
damage was caused by construction vehicles.
- Motion by Livingston, second by Polyock to recommend to the Town Board to
recommend the award of the $8,600 bid to Upland Construction and
Maintenance LLC to the Town Board out of the road bond fund.
f. South Lakeshore Drive Drainage Bids
- Superintendent Wittum reported that no bids were received. He explained that one
contractor who pulled the bid packet stated the subcontractor costs for concrete work
were too uncertain, leading them not to bid. The Town Engineer will rework the
scope of work to address these concerns.
- Action: The committee directed staff to continue the bid process with a revised
scope of work. No formal motion was required as the project had already been
authorized to proceed.
g. W3858 Laurel Second Driveway Request
- The committee reviewed a request for a second driveway. Superintendent Wittum
confirmed the request presented no safety or water drainage issues, as the property is
on an easement and the new driveway would not worsen existing pooling.
- Motion by Palmer, second by Livingston to recommend to the Town Board to
approve the second driveway request for the Laurel property.
h. Town Ordinance Review, Chapter 3-9(E) – Culvert Maintenance
- Superintendent Wittum initiated a discussion on the town's culvert maintenance
ordinance, which currently makes property owners responsible. He noted many
culverts are failing and property owners are not maintaining them.
- Recommendation: The committee reached a consensus to change the policy. The
recommendation is for the Town to supply and install/replace the culvert pipe, with
the property owner being responsible for restoring the driveway surface (e.g., asphalt,
concrete, pavers). This is intended to be a more efficient and proactive solution.
- Action: Superintendent Wittum will draft an edited version of the ordinance for
review at the next meeting. Chair Alex Palmer will add the topic to the Town
Board agenda for a preliminary discussion.
i. Driveway Permit Process
- Administrator Zimmerman presented proposed administrative improvements to the
driveway permit process. This includes adding a check-box to the building inspector's
form to confirm applicants are informed about the highway driveway permit, and
making the online application more user-friendly (e.g., using a Microsoft Form).
- Action: The committee acknowledged and recommended the process improvements.
No formal motion was required.
j. Academy Road Traffic Study
- The committee reviewed a traffic study requested by a citizen who complained about
speeding. The study, conducted by the Police Department, showed an average speed
of 34 mph in a 35 mph zone. The Police Chief did not recommend a speed limit
reduction.
- Action: No action was taken. The committee accepted the findings and agreed no
change is warranted.
k. Linn Road Traffic Study
- Discussion: The committee reviewed a traffic study prompted by a resident's concern
about vehicle speeds. The study was discussed in the Protective Services Committee.
The data showed that while there were some outliers, the majority of vehicles were
operating at reasonable speeds.
- Action: No action was taken. The study was accepted for informational purposes.
l. Project Updates - June 2026
- Hillside Bridge Project: The committee is closely monitoring the driveway-blocking
concerns for the adjacent farm. Mr. Polyock suggested moving equipment to the west
side of the road to avoid blocking the driveway entirely.
- Lackey Lane: Superintendent Wittum reported the gas main relocation should be
completed this week. The project progress is dependent on the weather and
completion of that work.
- Date for next meeting: August 4th, 2026 at 6:00 p.m.
7) Adjournment: Motion by Livingston, second by Polyock to adjourn. Motion carried.
Meeting adjourned at 7:22 PM.
Minutes by Administrator/Treasurer - David Zimmerman
Source: Town of Linn website. First collected Oct 19, 2026.