Committee of the Whole Meeting — Agenda Packet
City of New Berlin · Waukesha County · Committee of the Whole · meeting of Jun 23, 2026 · Agenda packets
Open the original document More from City of New Berlin
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Committee of the Whole
Meeting Agenda
June 23, 2026 - 6:00 PM
Council Chambers
3805 S. Casper Drive
Published: 6/19/2026
AGENDA
1. CALL MEETING TO ORDER
2. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE
3. APPROVAL OF MINUTES
A. June 9, 2026, Committee of the Whole Meeting Minutes
4. UTILITY & FINANCE
A. Discussion and possible recommendation to the Common Council to approve the June
24, 2026, Water Utility claims in the amount of $13,075.07, Sewer Utility claims in the
amount of $21,044.62, and General City claims in the amount of $905,352.01, including
a General City Claims prepay batch of $80,632.12 dated for June 11, 2026.
5. LICENSES & PERMITS
A. Discussion and possible recommendation to the Common Council to approve the
renewal alcohol licenses, designated agents, and premise descriptions as outlined in
the list as presented, for the license year expiring June 30, 2027, contingent upon the
satisfaction of all City requirements
6. MISCELLANEOUS
A. Introduction of Steven Linn, City of New Berlin Communications Manager
B. New Berlin Public Library Update
C. Stormwater Management Presentation
D. Discussion and possible recommendation to the Common Council to approve a contract
with Fearing's Audio and Security in the amount of $46,550.92 for the Malone Park
audio project, subject to review and approval by the Mayor and City Attorney.
7. ADJOURN
Additional Information
• The agenda packet, including supplemental information related to agenda items, is available online at
www.NewBerlinWI.gov. Once finalized by the governing body, approved meeting minutes will also be posted online.
• Agenda items may be taken out of order at the governing body's discretion.
• Members, and possibly a quorum, of other municipal governmental bodies may attend this meeting to gather
information. However, no action will be taken by any governmental body other than the one referenced in this notice.
• Accommodations will be provided under the Americans with Disabilities Act (ADA) to meet the needs of individuals
with disabilities. If you require assistance or appropriate aids and services, please contact the Office of the City Clerk
at (262) 786-8610 with reasonable notice.
Page 1 of 48
Page 2 of 48
Committee of the Whole
MEETING MINUTES
June 9, 2026 - 6:00 PM
Council Chambers
3805 S. Casper Drive
MINUTES
1. CALL MEETING TO ORDER
Council President Ken Harenda called the meeting to order at 6:00 PM.
2. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE
City Clerk Rubina R. Medina took the roll call as follows:
Present: Alderperson Hopkins, Alderperson Maxey, Alderperson Harenda, Alderperson Stribl,
Alderperson Horbinski, Alderperson Kroupa, Commissioner Gardner
Excused: Mayor Dave Ament
Staff Present: City Attorney Mark Blum, City Clerk Rubina R. Medina
The City Clerk confirmed that a quorum was present and that the meeting was properly posted in
compliance with the open meetings law.
3. APPROVAL OF MINUTES
A. May 26, 2026, Committee of the Whole Meeting Minutes
MOTION: Motion to Approve
Motion by: Alderperson Kroupa
Second by: Alderperson Horbinski
VOTE:
Motion Passed 7-0
4. UTILITY & FINANCE
A. Discussion and possible recommendation to the Common Council to approve the June
10, 2026, Water Utility claims in the amount of $158,967.35, Sewer Utility claims in the
amount of $18,687.97, and General City claims in the amount of $1,078,208.61,
including a US Bank VISA EFT of $26,379.85.
MOTION: Motion to Approve
Motion by: Alderperson Stribl VOTE:
Second by: Alderperson Kroupa
Page 3 of 48
Motion Passed 7-0
5. LICENSES & PERMITS
A. Discussion and possible recommendation to the Common Council to approve the
renewal of alcohol licenses, designated agents, and premise descriptions as outlined in
the list as presented, for the license year expiring June 30, 2027, contingent upon the
satisfaction of all City requirements.
MOTION: Motion to Approve
Motion by: Alderperson Maxey
Second by: Alderperson Hopkins
VOTE:
Motion Passed 7-0
6. MISCELLANEOUS
A. Discussion and possible recommendation to the Common Council to approve
Resolution 26-09 amending the 2025 Capital Projects Budget by transferring
$139,762.00 from the 2024 Malone Park Capital Project Account to the 2025 Malone
Park Capital Project Account for the Malone Park audio system and beer garden
equipment, per the Requested Action Statement (RAS).
MOTION: Motion to Approve
Motion by: Alderperson Maxey
Second by: Alderperson Hopkins
VOTE:
Motion Passed 7-0
7. ADJOURN
MOTION: Motion to Adjourn at 6:03 PM
Motion by: Alderperson Stribl
Second by: Commissioner Gardner
VOTE:
Motion Passed 7-0
Respectfully Submitted,
Rubina R. Medina, City Clerk
Page 4 of 48
RENEWAL ALCOHOL LICENSE APPLICANTS
The establishments listed below hereby submit their application to the Common Council of the City of New Berlin for an alcohol
license, as described herein and in their accompanying application materials, pursuant to the applicable provisions of the
Wisconsin Statutes and the Ordinances of the City of New Berlin, for the licensing period ending June 30, 2027. Licenses shall
be issued by the City Clerk contingent upon the fulfillment of all statutory and municipal requirements, such as, but not limited to,
the successful completion of all required inspections and the payment of all applicable fees.
Trade Name Agent Name Applying for LicenseInvited
1Page:
1. Kathryn L. Buer "Class B" - ComboDrakes Watering Hole
Location: Premise Description: Main building within shopping plaza. Alcohol sold & consumed in dining space, stored in cooler,
back bar, & store room.
2. Dalip Singh "Class A" Retail - ComboNew Berlin Liquor
Location: PREMISE DESCRIPTION: SALE IN STORE ON SHELVES, IN COOLER, WALK-IN COOLER. STORE BASEMENT.
3. Renee M. Warzon "Class B" - ComboPrinceton Club
Location: Premise Description: Bar Area, Outdoor poll deck, Storage room
4. Rochelle D. Minley "Class A" Retail - ComboSpeedway #4230
Location: PREMISE DESCRIPTION: MAIN SALES FLOOR, COOLERS, UTILITY/STORAGE CLOSET.
5. Adam J. Novak "Class A" Retail - ComboSpeedway #4540
Location: PREMISE DESCRIPTION: MAIN SALES FLOOR, COOLERS, UTILITY/STORAGE CLOSET.
Page 5 of 48
Root River Watershed
Water Quality Problems and Solutions
Kristi Heuser
Program Manager- Root-Pike Watershed Initiative Network
Page 6 of 48
Page 7 of 48
Page 8 of 48
Page 9 of 48
Page 10 of 48
Page 11 of 48
Salt Display - NR 216.07(1)(a)1
Page 12 of 48
IMPAIRED!
Oak Creek Watershed
Root River Watershed
Wind Point Watershed
Pike River Watershed
Pike Creek Watershed
Page 13 of 48
Root River Watershed Impairments (Varies by location)
Phosphorus
Sediment
Page 14 of 48
Root River Watershed Impairments (Varies by location)
Chlorides
E.Coli Bacteria
Page 15 of 48
Root River Watershed Impairments (Varies by location)
Degraded Habitats and Low Dissolved Oxygen
Page 16 of 48
Native Landscaping- Municipal owned spaces & private residences
Page 17 of 48
Page 18 of 48
Updated Stormwater Pond Designs for
New Developments- Less Grass & Geese
Page 19 of 48
Native Landscaping Around Pond Buffers
Page 20 of 48
Pond Alternative:
Regenerative Stormwater
Conveyance System
Page 21 of 48
Page 22 of 48
Shoreland Lutheran HS RSC Flyover
Page 23 of 48
Page 24 of 48
Shoreland Lutheran HS- April 2026
Page 25 of 48
Before RSC-2023
After RSC-2026
Page 26 of 48
Pond Alternative: Constructed Wetland
Shoreland Lutheran HS- 2025 to 2026
Page 27 of 48
Attend SaltWise Training Workshops (DPW Staff & Elected Officials)
1 teaspoon of road salt permanently pollutes 5 gallons of fresh water
Page 28 of 48
Saltwise Training Workshop Topics
● Brine Systems
● Benefits of different
plow blades
● Importance of
Calibration
● Pavement Sensors
● Remote Weather
Stations/Cameras
● Snow & Ice Policy
“Salt brine achieved similar traction
and road conditions while using
between 40% and 72% less than dry
application.” - WisDOT 2026
Page 29 of 48
Projects in the Root River
Watershed Restoration Plan
Kristi Heuser
kristine@rootpikewin.org
Page 30 of 48
REQUESTED ACTION STATEMENT
TO: Common Council
Mayor Dave Ament
FROM: Dan Hogan, Municipal Project Coordinator
RE: Requested Action State ment for the Malone Park audio project
contract.
DATE: June 23, 2026
REQUESTED ACTION: Approval for the City to enter into a contract with Fearing’s Audio
and Security in the amount of $46,550.92 for the Malone Park
audio project subject to review and approval by the Mayor and
City Attorney
FISCAL IMAPCT: No new borrowing necessary, funds were transferred from a
previous project account within Malone Park that was completed
in 2024.
SOURCE OF FUNDS: Account: 04252900 61118 C2025
RATIONALE/BACKGROUND: The City solicited quotes for a sound system to be installed within
Malone Park that fits the needs of the various City users.
Fearing’s provided the most comprehensive and economical plan
that fulfilled the City’s requirements.
The City did not publicly bid due to a recent change in state law,
Act 188, that changed the public bidding law threshold for public
building projects from $25,000 to $50,000, except for roadway
projects.
The major annual event at Malone Park is the New Berlin 4
th of
July Festival. The Mayor and the 4th of July Commission have
expressed the need to have an adequate sound system that can
make various types of announcements, such as the daily fair
Page 31 of 48
events, severe weather and other emergency situations. The
festival sound system would be based in the smaller bathroom
pavilion located next to the playground and would broadcast on
all four sides of the structure. The “brains” of the sound system
would be housed within the concession pavilion near the baseball
quad. If budget allows, staff may investigate the feasibility of
installing audio at the concession pavilion that could be used for
the beer garden and games for field #3. The audio system could
be expanded to other fields within Malone Park in the future.
This equipment could also be utilized for other City events at
Malone Park, such as Winterfest, Boos and Brews, movie nights,
and the color run.
Page 32 of 48
Proposal To:
Proposal To:
City of New Berlin
For:
For:
Malone Park Audio System
June 16, 2026 P-203000 V1.3
Fearing's Milwaukee AV
1711 Paramount Ct, Suite 2, Waukesha, WI 53186
Project Site Address: 3805 South Casper Drive, New Berlin, WI, 53151
Page 33 of 48
RESTROOM PAVILION (PLAYGROUND BATHROOM)
SCOPE
Project Summary
The City of Berlin's Malone Park is undergoing facility expansions, as they are currently under construction adding a Restroom Pavilion
near the playground and a Concessions Building (Beer Garden Pavilion) near the main Baseball field. The Restroom Pavilion is nearby a
large field that hosts large gatherings such as the 4th of July festivities and requires speaker and wireless microphone coverage. The
Concessions Building near the main Baseball field will house the 'brain' of the system in an owner furnished equipment rack and feature
its own audio zones for music and wireless microphone playback in the surrounding area.
Restroom Pavilion (Playground Bathroom)
Functionality Description:
The Restroom Pavilion is located near the main parking lot for Malone Park, immediately near the large
Field that the City of New Berlin utilizes for large events.
Source Devices:
• (1) Wireless Microphone Receiver will be installed in the owner-furnished (OFE) equipment rack in the utility closet of the Restroom
Pavilion. (2) Outdoor-rated RF Mic Antennas will be installed beneath the soffit (exact placement TBD and will be decided at the time of
installation based upon architectural considerations) on the North and South sides of the building, centered on the building. FAVS to
provide and install weather-rated antenna cabling, connecting the antennas to the Antenna combiner in the OFE rack. The antenna
cabling will be routed through the accessible attic. This will result in at least 50' of wireless microphone coverage on the North and
South side of the building. The current design intent for this microphone is for this mircophone to be utilized and played back at the
Restroom Pavilion only.
• The Bluesound Professional B100S Music player listed in the Concessions Building portion of this proposal will provide music audio to
the Restroom Pavilion. For more information regarding this device, please see
Concessions Building (Beer Garden Pavilion).
Audio:
• (4) Community R.25-94Z 8" weather-rated speakers will be provided and installed on the roof of the Restroom Pavilion, utilizing
Unistrut hardware between the metal roof's corrugations. The speakers will be installed in (2) audio zones, (2) speakers per zone, with
each pair facing North / South. The speakers are paintable- if the client would like to paint the speakers to match the roofing colors it is
the client's responsibility to do so. These speakers will provide intelligible paging and/or background music audio up to 100' away
from the Pavilion (under elevated background noise conditions- as background noise increases, intelligibility of audio will directly and
inversely decrease.
• (1) QSC CX-Q 2K4 amplifier will be provided and installed into the OFE rack in the utility closet. This amplifier will power all (4)
speakers via (2) amplifier channels. The client is required to provide a dedicated (shared with other audio system components) 20A
120V power outlet and 20A power strip at the equipment rack for the amplifier to receive power. The client is required to provide (1)
data drop at the amplifier to allow it to communicate over the client's network with the Audio processor to be installed in the
Concessions Building OFE rack. The client is responsible for configuring their network to support QLAN Audio - IGMP Snooping, QoS,
and PTPv2 must be enabled for QLAN audio to pass successfully. The client has stated that they plan to install a Cisco Catalyst 9200CX
network switch at the Restroom Pavilion and a Cisco Catalyst 9300 network switch at the Concession Building. Both Network switches
are able to pass QLAN audio when configured accordingly.
Control System(s):
• The 'Brain' of the audio system consists of (1) QSC Core 8 Flex, which will be installed in the Concessions Building OFE rack in
preparation for future system expansions. Please see
Concessions Building (Beer Garden Pavilion)
section of this proposal for more
information.
• (1) QSC C1 controller will be installed in the Utility closet in a 1G surface mount box, exact installation location TBD but should be
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
2
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 34 of 48
immediately near the OFE rack and audio components. This device will provide controls to adjust volume of either Restroom Pavilion
audio zones (North / South speaker pairs) as well as control the music player (player physically located in the Concessions Building
rack). Please note that changing the music player stations from the Restroom pavilion will also change the station at the Concessions
Building because there is only one music player to be shared between each building. The client is responsible for providing (1) PoE
data drop at the controller's location inside the utility closet and configuring their network to support the device.
• To ensure seamless system integration and reliable performance, the network environment must support mDNS and SSDP for device
discovery, and allow Q-LAN traffic via UDP Port 6502 and TCP Port 1702 for native Q-SYS peripheral communication. Integration with the
Bluesound B100S requires TCP Port 11000 for BluOS API control and UDP Port 11010 for status feedback. Additionally, the network
infrastructure must have IGMP Snooping and an IGMP Querier active to manage multicast traffic, with Energy Efficient Ethernet (EEE)
disabled on all AV-related ports to prevent synchronization dropouts. Static IP assignments for the Core 8 Flex, CX-Q 2K4 amplifier, and
B100S music player are required to maintain persistent driver communication and control stability.
Equipment Location:
• The Core 8 Flex and B100S will be installed in an OFE Rack in the Concessions Building.
• The (4) Community speakers will be installed on the roof of the Restroom Pavilion.
• The wireless microphone receiver, antenna combiner, and amplifier for the Restroom Pavilion speakers will be installed on the OFE
rack in the utility closet.
• The client is required to provide a dedicated (shared among audio system components) 20A 120V power outlet(s) and 20A power strip
at the equipment rack for the audio equipment to receive power. Audio equipment totals 4U of (OFE) rack space, but 6U should be
provided to keep equipment cool during high-use times. If the client is unable to provide the necessary rack space for the audio
equipment in the Restroom Pavilion's closet, FAVS may provide a wall mounted equipment rack at an additional cost.
• The wireless microphone antennas will be installed beneath the soffit on the North and South side of the Restroom Pavilion.
**** ALL ROUGH IN PATHWAYS, FLOOR BOXES, RISERS, CONDUIT BETWEEN RISERS, RACEWAYS, BOXES AND SLEEVES, WILL BE
FURNISHED, INSTALLED AND MADE AVAILABLE AT FEARINGʼS REQUIRED LOCATIONS BY OTHERS. IF PATHWAYS ARE NOT PROVIDED AND
FEARING'S HAS TO PROVIDE, IT WILL BE AN ADDITIONAL CHARGE. PLEASE NOTE THAT THIS MAY REQUIRE THE CUSTOMER TO GET AN
ADDITIONAL QUOTE OR MODIFY AN EXISTING QUOTE FROM THE CONTRACTOR OR ELECTRICAL CONTRACTOR SEPARATELY FROM THIS
QUOTE. FEARING'S CAN PROVIDE ROUGH IN REQUIREMENTS FOR THIS PROJECT, BUT PLEASE NOTE THAT DOCUMENTATION IS
CREATED AFTER PROJECT APPROVAL.
AUDIO
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
4
Biamp Systems
R.25-94Z
Full-Range 2-Way 8-Inch 90 X 40 Grey
$536.72
$2,146.88
1
Custom
Unistrut and Safety Mounting Hardware
Unistrut and Safety Mounting Hardware.
All hardware to be painted dark GREEN prior to installation on the roof.
$253.18
$253.18
1
RF Venue
DFIN-IPX
Diversity Fin® IPX Antenna
$758.24
$758.24
1
RF Venue
DFIN-IPX
Diversity Fin® IPX Antenna
$758.24
$758.24
6
Travel
Technician Travel
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
3
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 35 of 48
CONTROL
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
1
QSC
C1
Single gang US, IP Wall Controller, PoE (includes white and black faceplates)
$625.85
$625.85
1
Wiremold
NM2044
NM EXTRA DEEP DEVICE BOX
$11.85
$11.85
RACK
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
1
QSC
CX-Q 2K4
4-Channel 700W/CH Q-SYS Network Amplifier, Lo-Z, 70V, 100V direct drive,
FlexAmp™, Mic/line Inputs, 100-240V.
$2,456.99
$2,456.99
1
Shure
SLXD24+/58-G57
SLXD24+/58-G57
$749.40
$749.40
1
RF Venue
4ZONE
The 4 ZONE antenna combiner takes the complexity out of multi-zone
wireless microphone projects. 4 ZONE combines together up to four separate pairs of
diversity antenna connections for multi-purpose rooms, indoor-outdoor configurations, or
main stages with secondary breakout rooms. For fine tuning RF levels in each coverage
area, 4 ZONE provides individual channel RF signal attenuation control down to -31dB in 1
dB steps. And for active antennas or in-line amplifiers, it features selectable 12V DC power
to accommodate long cable runs. With selectable ON/OFF inputs, 4 ZONE also allows for
quick control of coverage zones for roaming microphone transmitters, so you can choose
which zones are active as a live event or location sound project progresses, saving setup
and breakdown time onsite. When used in conjunction with up to four Diversity Fin
Antennas and one or more DISTRO4 antenna distributors, 4 ZONE completes a turnkey
package for any multi-zone wireless microphone project.
$916.47
$916.47
CABLING
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
1
AV Cabling Bundle (NEW Standard)
Cabling/Fittings/Hooks/Beam Clamps
$260.14
$260.14
2
Wirepath
WP-PC-CAT6-10FT-BLK
Wirepath Cat6 10ft Ethernet Patch Cable (Black)
$4.73
$9.46
0.2
West Penn Wire
810BK0500
RG-213 12G STR FOIL/TC BRAID
$547.40
$109.48
0.2
West Penn Wire
810BK0500
RG-213 12G STR FOIL/TC BRAID
$547.40
$109.48
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
4
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 36 of 48
EQUIPMENT TOTAL
$9,226.56
LABOR TOTAL
$5,474.35
MISC. CABLES AND ACCESSORIES
$645.86
SHIPPING AND HANDLING
$369.06
RESTROOM PAVILION (PLAYGROUND BATHROOM) TOTAL
$15,715.83
5
West Penn Wire
CN-BM53-8
50 ohm 3pc. RG8
$6.09
$30.45
5
West Penn Wire
CN-BM53-8
50 ohm 3pc. RG8
$6.09
$30.45
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
5
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 37 of 48
CONCESSIONS BUILDING (BEER GARDEN PAVILION)
SCOPE
Project Summary
The City of Berlin's Malone Park is undergoing facility expansions, as they are currently under construction adding a Restroom Pavilion
near the playground and a Concessions Building (Beer Garden Pavilion) near the main Baseball field. The Restroom Pavilion is nearby a
large field that hosts large gatherings such as the 4th of July festivities and requires speaker and wireless microphone coverage. The
Concessions Building near the main Baseball field will house the 'brain' of the system in an owner furnished equipment rack and feature
its own audio zones for music and wireless microphone playback in the surrounding area.
Concessions Building (Beer Garden Pavilion)
Functionality Description:
The Concessions Building is located near the main Baseball field and will be utilized for concession sales
and other event gatherings. The Concession building will house the 'headend' of the park's new audio systems being provided and
described within this proposal.
Source Devices:
• (1) Bluesound Professional B100S Music player will be installed in the Concessions Building's OFE rack and will provide music audio to
the Restroom Pavilion and Concessions Building. The B100S is capable of supporting many online music subscription services,
including Spotify, SiriusXM for Business, Pandora, TuneIn, iHeart, and many more. For a full list of supported subscription services,
please view the B100S' product webpage:
https://bluesoundprofessional.com/product/b100s-network-music-player/
The client is
responsible for providing and maintain a music subscription from the list of available subscription services supported by the B100s.
• (2) New Wireless Microphone receivers will be installed in the OFE equipment rack near the QSC Core 8 Flex. New antenna cabling,
distribution headend, and (2) new antennas will be installed. The antennas will be installed under the soffit on the North and South
sides of the building to provide maximum coverage around the building. (2) Handheld wireless microphones are included. The
distribution headend includes (1) 1U antenna combiner to combine the (2) diversity antennas and (1) 1U antenna distributor to
combine the (2) wireless microphone receivers' A/B antenna connections.
Audio:
• (2) 6" BLACK surface mount speakers (tapped at 15W each) will be installed on a dedicated audio zone inside the Concessions
Building, utilizing preinstalled single-gang electrical box locations in the main room for cabling and speaker installation locations.
• (4) Community Speakers will be installed on the roof, zoned in pairs facing North and South. These speakers in conjunction with the
new amplifier will allow music and mic audio to be clearly heard up to 100' away from the building
• The 'Brain' of the audio system consists of (1) QSC Core 8 Flex, which will be installed in the Concessions Building OFE rack. The Core 8
Flex is an Audio digital signal processor (DSP) as well as control processor, which allows it to provide all audio processing, mixing, and
routing as needed, as well as control processing to control audio and video systems as needed (no video systems are included with this
current proposal).
• (1) New amplifier will be installed in the OFE equipment rack near the QSC Core 8 Flex. The new amplifier provides 4 channels, of
which (3) will be utilized- North pair of speakers (4ohm load), South pair of speakers (4ohm load), and inside pair of speakers (70V).
Control System(s):
• (1) QSC C1 Controller to be installed near the equipment rack on the wall. This controller will allow users to control volume levels of
each zone as well as select music. Note that changing the music station will result in the station changing for all audio zones at the
park. If the client would like to be able to play different Music in different areas, additional music players or the upgrade to the 4-Zone
player would be required, depending on how many dedicated music stations are desired to be utilized.
• To ensure seamless system integration and reliable performance, the network environment must support mDNS and SSDP for device
discovery, and allow Q-LAN traffic via UDP Port 6502 and TCP Port 1702 for native Q-SYS peripheral communication. Integration with the
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
6
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 38 of 48
Bluesound B100S requires TCP Port 11000 for BluOS API control and UDP Port 11010 for status feedback. Additionally, the network
infrastructure must have IGMP Snooping and an IGMP Querier active to manage multicast traffic, with Energy Efficient Ethernet (EEE)
disabled on all AV-related ports to prevent synchronization dropouts. Static IP assignments for the Core 8 Flex, CX-Q 2K4 amplifier, and
B100S music player are required to maintain persistent driver communication and control stability.
Equipment Location:
• The Core 8 Flex, Amplifier, Wireless Microphone receiver, and B100S music player will be installed in an OFE Rack in the Concessions
Building.
• The client is required to provide (1) dedicated (shared by the audio headend equipment) 20A 120V power outlet at the OFE equipment
rack as well as (1) power strip to power the Core 8 Flex, amplifier, wireless microphone receiver, wireless microphone antenna
distribution (the wireless mic receivers will receive power from the antenna distro unit), and B100S.
• The client is required to provide (4) data drops for the Concessions Building Audio equipment - (1) drop for the Core 8 Flex, (1) drop for
the amplifier, (1)
PoE
drop for the C1 Controller, and (1) drop for the B100S music player. The client is responsible for configuring their
network accordingly, as described above.
• The client is required to provide a minimum of (10) RU of rack space, but if able, (12) RU would be optimal to allow for greater airflow
around the devices to keep them cool and elongate device life. Device rack unit needs: Core 8 Flex - 1U, Amplifier - 2U, B100S - 1U, x2
Wireless mic receivers - 1U (installed side by side), and antenna distro - 2U (two devices, 1U each). If the client is unable to provide the
necessary rack space, Fearing's may provide and install a new wall-mounted equipment rack near the OFE rack (at an additional cost).
**** ALL ROUGH IN PATHWAYS, FLOOR BOXES, RISERS, CONDUIT BETWEEN RISERS, RACEWAYS, BOXES AND SLEEVES, WILL BE
FURNISHED, INSTALLED AND MADE AVAILABLE AT FEARINGʼS REQUIRED LOCATIONS BY OTHERS. IF PATHWAYS ARE NOT PROVIDED AND
FEARING'S HAS TO PROVIDE, IT WILL BE AN ADDITIONAL CHARGE. PLEASE NOTE THAT THIS MAY REQUIRE THE CUSTOMER TO GET AN
ADDITIONAL QUOTE OR MODIFY AN EXISTING QUOTE FROM THE CONTRACTOR OR ELECTRICAL CONTRACTOR SEPARATELY FROM THIS
QUOTE. FEARING'S CAN PROVIDE ROUGH IN REQUIREMENTS FOR THIS PROJECT, BUT PLEASE NOTE THAT DOCUMENTATION IS
CREATED AFTER PROJECT APPROVAL.
AUDIO
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
4
Biamp Systems
R.25-94Z
Full-Range 2-Way 8-Inch 90 X 40 Grey
$530.00
$2,120.00
1
Custom
Unistrut and Safety Mounting Hardware
Unistrut and Safety Mounting Hardware.
All hardware to be painted dark GREEN prior to installation on the roof.
$250.00
$250.00
2
RF Venue
DFIN-IPX
Diversity Fin® IPX Antenna
$748.75
$1,497.50
10
Travel
Technician Travel
CONTROL
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
7
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 39 of 48
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
1
QSC
C1
Single gang US, IP Wall Controller, PoE (includes white and black faceplates)
$618.00
$618.00
1
Wiremold
NM2044
NM EXTRA DEEP DEVICE BOX
$11.85
$11.85
RACK
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
1
Bluesound Professional
B100S
1 Zone Network Music Player - 1/3 1U
$645.59
$645.59
1
Bluesound Professional
RM100
Rack Mount Accessory for B100S
$128.91
$128.91
1
QSC
CORE 8 FLEX
Unified Core with 8 local audio I/O channels, 64x64 network I/O
channels with 8x8 Software-based Dante license included, USB AV bridging, dual LAN
ports, VoIP telephony, 8x8 GPIO, 8 AEC processors, Half-size 1RU.
$2,886.10
$2,886.10
1
QSC
CX-Q 2K4
4-Channel 700W/CH Q-SYS Network Amplifier, Lo-Z, 70V, 100V direct drive,
FlexAmp™, Mic/line Inputs, 100-240V.
$2,426.25
$2,426.25
1
RF Venue
4ZONE
The 4 ZONE antenna combiner takes the complexity out of multi-zone
wireless microphone projects. 4 ZONE combines together up to four separate pairs of
diversity antenna connections for multi-purpose rooms, indoor-outdoor configurations, or
main stages with secondary breakout rooms. For fine tuning RF levels in each coverage
area, 4 ZONE provides individual channel RF signal attenuation control down to -31dB in 1
dB steps. And for active antennas or in-line amplifiers, it features selectable 12V DC power
to accommodate long cable runs. With selectable ON/OFF inputs, 4 ZONE also allows for
quick control of coverage zones for roaming microphone transmitters, so you can choose
which zones are active as a live event or location sound project progresses, saving setup
and breakdown time onsite. When used in conjunction with up to four Diversity Fin
Antennas and one or more DISTRO4 antenna distributors, 4 ZONE completes a turnkey
package for any multi-zone wireless microphone project.
$905.00
$905.00
2
Shure
SLXD24+/58-G57
SLXD24+/58-G57
$740.00
$1,480.00
1
Shure
UA844+SWB
"Five-way active antenna splitter and power distribution system for
QLX-D®, ULX®, ULX-D®, SLX®, and BLX® (BLX4R only) receivers. (470-952 MHz)"
$591.25
$591.25
CABLING
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
1
AV Cabling Bundle (NEW Standard)
Cabling/Fittings/Hooks/Beam Clamps
$458.25
$458.25
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
8
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 40 of 48
EQUIPMENT TOTAL
$14,313.78
LABOR TOTAL
$13,328.81
MISC. CABLES AND ACCESSORIES
$1,001.96
SHIPPING AND HANDLING
$572.55
CONCESSIONS BUILDING (BEER GARDEN PAVILION) TOTAL
$29,217.10
0.4
West Penn Wire
810BK0500
RG-213 12G STR FOIL/TC BRAID
$540.54
$216.22
10
West Penn Wire
CN-BM53-8
50 ohm 3pc. RG8
$6.01
$60.10
2
Wirepath
WP-PC-CAT6-10FT-BLK
Wirepath Cat6 10ft Ethernet Patch Cable (Black)
$4.65
$9.30
2
Wirepath
WP-PC-CAT6-10FT-BLK
Wirepath Cat6 10ft Ethernet Patch Cable (Black)
$4.73
$9.46
IMAGE
QTY
DESCRIPTION
PRICE
PRICE EXT
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
9
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 41 of 48
STANDARD PERFORMANCE PLAN - ANNUAL
$1,618.00
TAX
$0.00
TOTAL
+$1,618.00
STANDARD PERFORMANCE PLAN - ANNUAL
This Annual Plan Includes:
-Same day phone response time. *1
-Priority service scheduling. *2
-10% discount on service labor based on current rates at time of service. *3
-10% discount on service-related equipment replacement. *4
-Unlimited remote, phone and email support included.
-Annual on-site checkup and system cleaning. *5
-Remote access. *6
-20% discount on loaner equipment. *7
-Manufacturer's Cloud Management is included. *8
1. Phone support regarding questions on how to use or potentially fix a hardware, software, or connection problem yourself. Nights
and weekends will vary.
2. Contact hours are Monday through Friday, 8 am through 4:30 pm. Calls received after 3 pm may not be returned or service performed
until the next business day, or emergency rates will apply for after-hours service.
3. Standard service labor at time of sale is $159/hr during business hours and $229/hr for emergency after hours service.*
4. Equipment replacement does not include licenses and/or subscriptions.
5. Inspections will be scheduled ahead of time and must include availability for all spaces. Inspections include firmware updates that
can be completed within a single trip. Additional trips required to complete firmware updates or resolve issues related to firmware
updates are not included and will be billed at reduced plan rates. Lifts will be billed at an additional cost if required.
6. Remote Access requires the installation of a customer provided on-site appliance (PC) with the necessary permissions and access
through the customerʼs network to communicate with the appliance or client provided VPN access.
7. Based on availability.
8. Does not include hardware or paid software/services that may be required to connect to the cloud. Requires internet connection.
* During normal business hours, Monday through Friday, 8 am through 4:30 pm.
Major holidays (and days they are observed) are excluded from response time guarantees for performance plans. This does not cover
labor to repair owner furnished equipment or cabling. We reserve the right to adjust cost annually due to inflation up to 5% with a 30
day notice. Performance plans are perpetual and require a 30 day notice of termination.
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
10
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 42 of 48
Installation Exclusions – The following work is not included in our Scope of Work
• Any necessary ceiling modifications for the projector and screen including T-Bar refinishing.
• Ceiling tile replacement and or repair.
• All conduits, high voltage wiring panels, breakers, relays, boxes, receptacles, etc.
• Concrete saw cutting and/or core drilling.
• Fire wall, ceiling, roof and floor penetration.
• All millwork (moldings, trim, cut outs, etc.).
• Furniture modifications (table cuts, credenza cuts, etc.).
• Painting and patching.
• Permits (unless specifically provided for and identified within the contract).
Client Responsibilities
• Providing all required permits and passes for Fearingʼs personnel.
• All AC power, including power cabling, equipment, receptacles, floor boxes, risers, conduit between risers, raceways, etc., will be
furnished, installed and made available at Fearingʼs required locations by others.
• All Network configurations including IP addresses are to be provided, operational and functional before integration begins. Fearingʼs
will not be responsible for testing the LAN connections.
• Cable or Satellite drops must be in place with converter boxes operational before the completion of integration.
• There is a temporary secure storage area for equipment during a multiple-day integration.
• Meeting all milestone dates agreed upon in the initial Client Coordination meeting (below)
• Scheduling all necessary employees for system training.
• For VOIP projects, customer to fill out VOIP worksheets prior to installation or additional labor, trips or other costs may be billable to
customer due to delays and additional time needed to implement.
• Motorized 2 man lifts capable of safely reaching install area to be provided by customer if needed for installation for Fearing's sole use
during installation and testing. If customer cannot provide lifts, Fearing's can provide them for an additional cost.
• For any customer-provided or on-site existing network infrastructure—including switches, related hardware, software licenses, and
supporting components—such equipment must be available and fully configured to our integration specifications before rack
installation or system implementation begins. If the provided or existing network hardware, licensing, or infrastructure proves
inadequate or inaccessible, or if qualified customer personnel are not able to assist with configuration and testing, any resulting delays,
additional labor, or extra site visits will be billed to the customer.
• If required or recommended, customer to provide blocking or backing for displays or other heavier wall or ceiling mounted devices. If
required or recommended, customer to provide blocking or backing for displays or other heavier wall or ceiling mounted devices.
• Customer is responsible for all copyright authorizations on any content provided to Fearing's for the purpose of Fearing's creating
customer content.
• Lighting, including ambient lighting, can greatly effect both projection systems and camera systems and their perceived quality.
Lighting directly and indirectly shining on a projection screen can wash out the image. Fearing's recommends zoning the lights in the
room if needed, so that lighting hitting the screen is reduced to greatly increase picture quality. Also, for cameras, good lighting is
critical for a high quality picture. Portable or specialized directional lighting is highly recommended, especially when dealing with
cameras and projection screens in the same space. Lighting modifications to accommodate are the customerʼs responsibility unless
otherwise noted. Please speak with your Fearing's account manager or engineer for further information.
Assumptions – if these prove false a Change Order will be required
• There is sufficient accessibility and space in ceiling area for infrastructure support hardware.
• Any owner furnished equipment shall be available to display and test system audio/video connections and will integrate with the
purchased equipment and system(s).
• Any owner-furnished equipment shall be in good working order. Cost to repair or replace defective equipment shall be in addition to
the proposed cost herein.
• This proposal, if applicable, is based upon the re-utilization of existing cabling and/or equipment, which is assumed to be in proper
operating condition. In the event that it is determined that the existing cabling and/or equipment is not in proper operating condition,
Fearingʼs will submit a proposal for the additional costs to furnish and install new cabling and/or equipment where required.
• All above ceiling cable runs are assumed to have an unobstructed path from end to end unless otherwise noted. Any walls, beams, etc.
Page 43 of 48
discovered during the installation process necessitating additional unplanned labor and time will result in a change order with
additional costs.
• If consumer grade flat panel displays (TVs) are specified by the end user as part of the integration project and they prove to be
defective or incompatible with the proposed system, a return charge of $ 350.00 per TV will be assessed to correct the problem.
• There is ready access to the building / facility and the room(s) for equipment and materials.
• This proposal is based on a continuous work cycle, with no delays, performed during normal working hours. Monday through Friday,
excluding company holidays.
• Work is to be performed at Client name/location
• Document review / feedback on drawings / correspondence will be completed by the Customer within two business days {unless
otherwise noted}
• In developing a comprehensive proposal for equipment and integration services Fearingʼs Sales Representatives and Engineering
teams must make some assumptions regarding the physical construction of your facility, the availability of technical infrastructure and
site conditions for installation. If any of the conditions we have indicated in the Site Survey form are incorrect or have changed for your
particular project or project site, please let your Sales Representative know as soon as possible. Conditions of the site found during
integration effort which are different from those documented may have an effect on the price of the system solution, integration or
services. To ensure that you have an accurate proposal based on your facility and specific to the conditions of your project, please
review all project documentation carefully.
• The documented Change Control process will be used to the maximum extent possible – the Client will have an assigned person with
the authority to communicate/approve project Field Directed Change Orders and Contract Change Orders.
• Manufacturer equipment latest firmware updates will be performed during the course of the installation. No Manufacturer firmware
will be incorporated after Substantial Completion (equipment/room available for Clientʼs functional use) has been achieved. Further
firmware updates are the Clientʼs responsibility or Fearingʼs can be contracted on a time and materials basis to perform further updates.
It should be noted that a firmware update on one piece of equipment may require other items to be updated as well in order to
maintain system integrity and optimum functionality.
• Customer to provide a location for disposal of component packaging as well as misc. job waste/scraps.
• The projector and or camera mount is a standard mount. In rare occasions buildings and/or ceilings may vibrate causing the projector
or camera to vibrate, causing the image on the screen to move. This is a rare occurrence, but in the event it would occur on this project
additional expense could be incurred to resolve the issue. The proposal is based on the assumption that there is no building or
structure vibration that would affect the installed solutions.
• This proposal is based on Fearing's standard wage rates and is assumed to NOT be a Prevailing Wage project. If applicable it is the
customers responsibility to obtain a prevailing wage rate determination prior to creation of a Bid or RFP and notify Fearing's of such
determination so it is accounted for in proposing the project. In the event it is determined that prevailing wage applies after the
proposal is approved and work begins the customer will be responsible for any additional expenses associated with the difference in
wage cost. Fearing's will create a change order and with the additional charges and submit to the customer for payment. The customer
will be liable for the additional expenses for up to seven (7) years if a government audit determines Prevailing Wage was applicable
after the project is complete.
Construction Considerations {Delete these considerations if not applicable}
In order to accomplish the outlined goals of this project, the Client will be responsible for contracting with an outside entity to make the
necessary modifications to the space as directed by Fearingʼs according to the agreed upon schedule. The costs associated with these
modifications are not included in this proposal. The Client is responsible for informing Fearingʼs of any delays / changes which may
impact the assumptions outlined above.
Implementation Standards
Fearingʼs will follow a foundational project management process which may include the following actions/deliverables (based on the
size/complexity/duration of the integration project):
Project Management: Fearingʼs shall coordinate:
• Developing a project schedule (with Client* and Fearingʼs milestones).
o Client Purchase order receipt
o Client Coordination meeting*
o Design Validation*
o Equipment Order
o Equipment Receipt / on site
Page 44 of 48
o IT connectivity (IP addresses, WAP, etc.)*
o Room/Raceways Ready*
o Implementation and Integration complete
o Commissioning
o Substantial Completion*
o Client Training*
o Transition to Service / Support
• Staging equipment and materials at shop and installation site.
• Submittals of operator manuals of all equipment documentation.
• Installation supervision.
• Change Order Management (External and Field-Directed)
• Substantial Completion (room available for use)
• Completion of final punch list items.
On-Site Installation shall include:
• Pulling, bundling and terminating audio and control cables.
• Installing structural systems for audiovisual equipment.
• Software/hardware testing.
• Adjusting and balancing audio gain as required.
• Assuring the finished system meets the design criteria and functions per the design concept.
• Site cleanup and disposal, etc.
• Completion of final punch list items.
Amendments of Design or Contract:
• Any changes made to the design of the system or the contractual agreements in implementation or functionality will require a
“Contract Change Order” form signed by an authorized decision maker for the Client.
• Any price changes that should follow an amendment will be reflected on the final bill unless otherwise stated or agreed upon by
Fearingʼs and the client.
• It is understood by the Client that any changes made may affect delivery time tables and work schedules.
Knowledge Transfer (Training)
This is geared specifically towards the end-user / operator. The purpose of this knowledge transfer is to provide operators with the
necessary knowledge to confidently and comfortably operate all aspects of the integrated system. Areas covered include the following
if applicable:
• Equipment and system overview
• Equipment operation and function
• Equipment start up, stop, and shut Down
• Equipment automatic and manual operation
• Discussion and documentation relating to control system operation
• Discussion and documentation relating to system processor and its control applications
• Powering up, powering down AV system via control system
• Manual operation of display systems, audio system and all other related components
• Use/operation of patch panels, when and where to be used
• Who to call when help is required
Important Notes Due to Current Events and Market
• A credit card processing fee of 3% of the payment will be assessed when a credit card is used to make payments of over $5,000.
• Quotes over 7 days - or - projects sold within the 7 days but have a delayed start date may be subject to price increases based on the
cost of materials and/or labor rising.
• Due to market fluctuations and issues with supply chain, raw material shortages, manufacturer delays and price increases, Fearing's
Audio Video & Security must share the mitigation of unexpected price increases and product availability with its clients if any
equipment, parts, or materials has a price increase or availability issue between proposal signing and receipt of equipment. We
appreciate your understanding in these unprecedented times.
Page 45 of 48
• Minimizing price potential increases: The customer may, at the time of proposal signing, provide the down payment and authorize the
immediate purchase of the equipment included in the proposal. Fearingʼs will order the equipment upon receipt of the down payment
which will lock in the pricing. NOTE: For some manufacturers, the equipment warranty begins at the time that Fearingʼs receives the
product from its supplier. In such cases when a customer has an equipment failure where the warranty period has expired based on the
equipment delivery to Fearingʼs but has not expired based on the project completion date, Fearingʼs will do everything in its power to
negotiate an extension to the warranty period but cannot guarantee it will be successful. In such cases where Fearingʼs is not successful
in obtaining a warranty extension, the customer would be responsible for all costs associated with the repair.
Page 46 of 48
PAYMENT SCHEDULE
Deposit will be based on total equipment price plus shipping,
with monthly progress billing through project completion.
EQUIPMENT TOTAL
$23,540.33
LABOR TOTAL
$18,803.16
MISC. CABLES AND ACCESSORIES
$1,647.82
SHIPPING AND HANDLING
$941.61
STANDARD PERFORMANCE PLAN - ANNUAL
(ANNUALLY)
$1,618.00
SUBTOTAL
$46,550.92
TOTAL TAX
$0.00
PROJECT TOTAL
$46,550.92
SIGNED
DATE
PRINT NAME
TITLE
SIGNED
DATE
PRINT NAME
TITLE
ACCEPTANCE
FINANCIAL
TERMS
City of New Berlin accepts this proposal and hereby authorize Fearing's Audio Video Security to proceed with the installation of the included systems at the
facilities of City of New Berlin constructing at 3805 South Casper Drive New Berlin, WI 53151 as described in the totality of this document. City of New Berlin
further authorize Fearing's Audio Video Security to be granted the facility access that will be required to complete this project in a workmanlike and timely
manner and for payment to be made to Fearing's Audio Video Security. In keeping with the Terms of Payment listed above: It has been made clear to City of New
Berlin that there exist no understandings regarding this project with any relevant party unless and until City of New Berlin and Fearing's Audio Video Security
agree to such additional or alternate understandings in writing. Project cost and pricing are dependent upon a continual flow of work without interruption or
delays imposed by City of New Berlin or their staff, construction, other building trades or any other party, and additional costs may be incurred by City of New
Berlin from Fearing's Audio Video Security. This includes timelines that require delays in ordering greater than 60 days from proposal acceptance. If price
increases of product or labor are incurred due to such delays, or result in additional costs to that are not covered by the pricing in this proposal: City of New
Berlin agrees that any additions to and/or deletions from the materials and labor to be provided by City of New Berlin acceptance of this proposal and any
resulting change(s) in cost of this project shall only be by way of written change order(s) and shall be valid only after being signed by City of New Berlin and
Fearing's Audio Video Security. By signing this acceptance, City of New Berlin is agreeing to the terms set forth in the attached sections labeled Installation
Exclusions, Client Responsibilities, Assumptions, Construction Considerations, Implementation Standards and Important Notes. This proposal is valid only if
accepted in writing by City of New Berlin within 7 days and deposit payment received no later than 30 days from June 16, 2026.
ACCEPTANCE
CITY OF NEW BERLIN
FEARING'S MILWAUKEE AV
City of New Berlin
Confidential Proposal
P-203000
Version 1.3 June 16, 2026
15
of 16
Equipment prices include any required accessories. Labor
prices include design, engineering, installation and
programming.
Page 47 of 48
Our Mission:
“To deliver a
great customer experience
and a superior outcome every
time.”
Standard Warranty Statement
Standard Warranty Statement
Warranty Coverage:
Warranty Coverage:
Fearing’s provides 90 Days of free service, whether onsite or remote, to make
repairs due to manufacturer’s equipment defects. Fearing’s will provide the
necessary support on manufacturer’s equipment failure at our standard service
rates when the equipment failure is past the 90 Days Fearing’s warranty.
Fearing's provides 90 Days of free service, whether onsite or remote, to make
repairs due to workmanship faults.
Warranty Coverage Exclusions:
Warranty Coverage Exclusions:
Damaged equipment due to Acts of God or Nature.
Equipment abuses or misuse as deemed by the manufacturer authorized repair
technician.
Equipment that has been attempted to be repaired by unauthorized personnel or
those other than Fearing’s or authorized manufacturer repair technicians.
Manufacturer’s
shipping costs incurred under warranty. These will be the
responsibility of equipment owner.
Madison Local Phone: 608-443-2595, Toll Free: 800.252.2253 | email: info@fearings.com
Corporate Office:
722 Walsh Road, Madison, WI 53714
|
Milwaukee Office:
1711 Paramount Ct #2, Waukesha, WI 53186
Serving Wisconsin with Audio, Video, Security, and Automation solutions for over 23 years!
Page 48 of 48